跳到主要内容
Nelum
赞比亚的法律

Order on Prescribed Form for purposes of the Water Act (Chapter 198)

颁布于 1953 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

关于这部法律

语言
English
类型
条例
组织
Zambezi Watercourse Commission (ZAMCOM)
国家
赞比亚
主题
Water
关键词
freshwater pollution, enforcement/compliance, pollution control

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. (a) up to 500m3/day, 100 fee units; and (b) 2 fee units per every excess cubic metre per day. (As amended by Act No. 13 of 1994) water right 8. The following charges shall be paid in respect of an application for the temporary use of water: (a) up to 500m3/day, 40 fee units; and (b) 1 fee unit per every excess cubic metre per day. (As amended by Act No. 13 of 1994) Charges on application for temporary water right SECTION 46-THE WATER RIGHTS (REGISTRATION) REGULATIONS Government Notice 279 of 1950 Regulations by the Minister 1. These Regulations may be cited as the Water Rights (Registration) Regulations. Title 2. The original and one copy of all orders required to be registered with the Water Registrar shall be forwarded, together with the prescribed fee, to the secretary of the Water Board. Documents to be forwarded to secretary 3. The secretary shall compare the copy with the original and, if he is satisfied that it is a true copy, he shall stamp it with the stamp of the Water Board. Duties of secretary 4. The secretary shall forward the stamped copy to the Water Registrar, who shall register such copy in a register to be known as the Water Rights Register. Registrar to register copy SECTION 46-PRESCRIBED FORM Order by the Minister Government Notice 18 of 1953 The form set out in the Schedule is hereby prescribed for the purposes of subsection (1) of section fifty-six of the Act. SCHEDULE PRESCRIBED FORM THE WATER ACT (Section 56 (1)) To ................................................................. of Whereas I, ..................................................................................... Water Officer for the prescribed purposes of the Water Act, am satisfied that public water is being fouled and/or polluted* by you at ....... I hereby call upon you as the person responsible therefor to take adequate measures to prevent such fouling and/or pollution within..... (specified period). Date........................................................................ Water Officer *Strike out whichever may be inapplicable. SECTION 46-THE WATER BOARD (WORKS) REGULATIONS Regulations by the Minister Statutory Instrument 119 of 1993 1. These Regulations may be cited as the Water Board (Works) Regulations. Title 2. The design of any works shall be made by a qualified and competent engineer and shall include a detailed report with all the necessary drawings. Design of works 3. The design of any works shall be approved by the Provincial Water Engineer or Senior Water Engineer in the locality or the Water Officer appointed by the Water Board. Approval of design 4. Any construction of the approved works shall be supervised by a qualified and competent engineer. Supervision of works 5. Any deviation during construction from the approved plan and any Design

Order on Prescribed Form for purposes of the Water Act (Chapter 198) · Nelum