跳到主要内容
Nelum
美国的法律

Wells, Borings, and Underground Uses (Minnesota Statutes: Chapter 103I)

颁布于 1851 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

关于这部法律

语言
English
类型
法令
组织
European Union
国家
美国 · Minnesota
主题
Energy, Water
关键词
well sinking/boreholes, groundwater, freshwater pollution, pollution control, authorization/permit, property rights, thermal and medicinal waters, natural gas
类别
energy

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. 1​ MINNESOTA STATUTES 2018​ 103I.005​ CHAPTER 103I​ WELLS, BORINGS, AND UNDERGROUND USES​ 103I.001​ LEGISLATIVE INTENT.​ 103I.505​ RECIPROCITY OF LICENSES AND​ 103I.005​ DEFINITIONS.​ REGISTRATIONS.​ JURISDICTION OVER WELLS AND BORINGS​ 103I.515​ LICENSES NOT TRANSFERABLE.​ 103I.101​ POWERS AND DUTIES OF COMMISSIONER OF​ 103I.521​ FEES.​ HEALTH.​ 103I.525​ WELL CONTRACTOR'S LICENSE;​ REPRESENTATIVE'S CERTIFICATION.​ 103I.103​ WASTE PREVENTION MAY BE REQUIRED.​ 103I.531​ LIMITED WELL/BORING CONTRACTOR'S​ 103I.105​ ADVISORY COUNCIL ON WELLS AND BORINGS.​ LICENSE; REPRESENTATIVE'S CERTIFICATION.​ 103I.111​ LOCAL AUTHORITY OVER WELLS AND BORINGS.​ 103I.535​ ELEVATOR BORING CONTRACTOR'S LICENSE;​ 103I.113​ APPLICABILITY TO MINING ACTIVITIES.​ REPRESENTATIVE'S CERTIFICATION.​ WELL CONSTRUCTION AND OWNERSHIP​ 103I.541​ ENVIRONMENTAL WELL CONTRACTOR'S​ 103I.115​ COMPLIANCE WITH THIS CHAPTER REQUIRED.​ REGISTRATION; REPRESENTATIVE'S​ CERTIFICATION.​ 103I.205​ WELL CONSTRUCTION.​ 103I.545​ REGISTRATION OF DRILLING MACHINES AND​ 103I.208​ NOTIFICATION FILING FEES AND PERMIT FEES.​ HOISTS REQUIRED.​ 103I.221​ PLASTIC CASINGS.​ 103I.550​ LIMITED PUMP, PITLESS, OR DUG WELL/DRIVE​ 103I.231​ COMMISSIONER MAY ORDER REPAIRS.​ POINT CONTRACTOR.​ 103I.235​ REAL PROPERTY SALE; DISCLOSURE OF​ EXPLORATORY BORINGS​ LOCATION OF WELLS.​ 103I.601​ EXPLORATORY BORING PROCEDURES.​ 103I.236​ WELL DISCLOSURE IN WASHINGTON COUNTY.​ 103I.605​ SUBMISSION OF DATA FROM EXPLORATORY​ 103I.241​ ACTION FOR WELL CONTAMINATION.​ BORINGS.​ WELL SEALING​ GROUNDWATER THERMAL EXCHANGE DEVICES​ 103I.301​ WELL SEALING REQUIREMENTS.​ 103I.621​ PERMITS FOR GROUNDWATER THERMAL​ EXCHANGE DEVICES.​ 103I.311​ IDENTIFICATION AND SEALING OF WELLS ON​ STATE PROPERTY.​ BORED GEOTHERMAL HEAT EXCHANGERS​ 103I.315​ ORDERS TO SEAL WELLS AND BORINGS.​ 103I.641​ BORED GEOTHERMAL HEAT EXCHANGERS.​ 103I.325​ LANDOWNER SEALED WELL AND BORING​ UNDERGROUND SPACE DEVELOPMENT​ LIABILITY.​ 103I.661​ MINED UNDERGROUND SPACE DEVELOPMENT.​ 103I.335​ FUNDING FOR PERSONS TO SEAL WELLS.​ UNDERGROUND STORAGE OF GAS OR LIQUID​ 103I.341​ COLLECTION AND ENFORCEMENT OF WELL​ 103I.681​ PERMIT FOR UNDERGROUND STORAGE OF GAS​ SEALING COSTS.​ OR LIQUID.​ 103I.345​ WELL AND BORING SEALING ACCOUNT.​ 103I.685​ ABANDONMENT OF UNDERGROUND STORAGE​ ELEVATOR BORINGS​ PROJECT.​ 103I.401​ ELEVATOR BORINGS.​ 103I.691​ CERTIFICATE OF USE.​ LICENSING AND REGISTRATION​ ENFORCEMENT​ 103I.501​ LICENSING AND REGULATION OF WELLS AND​ 103I.711​ IMPOUNDING OF EQUIPMENT.​ BORINGS.​ 103I.715​ CRIMINAL PENALTIES.​ 103I.001 LEGISLATIVE INTENT.​ This chapter is intended to protect the health and general welfare by providing a means for the​ development and protection of the natural resource of groundwater in an orderly, healthful, and reasonable​ manner.​ History: 1989 c 326 art 3 s 1​ 103I.005 DEFINITIONS.​ Subdivision 1. Applicability. The definitions in this chapter apply to this chapter.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.005​ MINNESOTA STATUTES 2018​ 2​ Subd. 1a. Bored geothermal heat exchanger. "Bored geothermal heat exchanger" means an earth-coupled​ heating or cooling device consisting of a sealed closed-loop piping system installed in a boring in the ground​ to transfer heat to or from the surrounding earth with no discharge.​ Subd. 2. Boring. "Boring" means a hole or excavation that is not used to extract water and includes​ exploratory borings, bored geothermal heat exchangers, and elevator borings.​ Subd. 2a. Certified representative. "Certified representative" means a person certified by the​ commissioner to represent a well contractor, limited well/boring contractor, environmental well contractor,​ or elevator boring contractor.​ Subd. 3. Commissioner. "Commissioner" means the commissioner of health.​ Subd. 4. Department. "Department" means the Department of Health.​ Subd. 4a. Dewatering well. "Dewatering well" means a nonpotable well used to lower groundwater​ levels to allow for construction or use of underground space. A dewatering well does not include:​ (1) an excavation 25 feet or less in depth for temporary dewatering during construction; or​ (2) a well used to lower groundwater levels for control or removal of groundwater contamination.​ Subd. 5. Drive point well. "Drive point well" means a well constructed by forcing a pointed well screen,​ attached to sections of pipe, into the ground with the screen and casing forced or driven into the ground with​ a hammer, maul, or weight.​ Subd. 6. Elevator boring. "Elevator boring" means a bore hole, jack hole, drilled hole, or excavation​ constructed to install an elevator hydraulic cylinder.​ Subd. 7. Elevator boring contractor. "Elevator boring contractor" means a person with an elevator​ boring contractor's license issued by the commissioner.​ Subd. 8. [Repealed, 1Sp2017 c 6 art 10 s 148]​ Subd. 8a. Environmental well. "Environmental well" means an excavation 15 or more feet in depth​ that is drilled, cored, bored, washed, driven, dug, jetted, or otherwise constructed to:​ (1) conduct physical, chemical, or biological testing of groundwater, and includes a groundwater quality​ monitoring or sampling well;​ (2) lower a groundwater level to control or remove contamination in groundwater, and includes a remedial​ well and excludes horizontal trenches; or​ (3) monitor or measure physical, chemical, radiological, or biological parameters of the earth and earth​ fluids, or for vapor recovery or venting systems. An environmental well includes an excavation used to:​ (i) measure groundwater levels, including a piezometer;​ (ii) determine groundwater flow direction or velocity;​ (iii) measure earth properties such as hydraulic conductivity, bearing capacity, or resistance;​ (iv) obtain samples of geologic materials for testing or classification; or​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  2. 3​ MINNESOTA STATUTES 2018​ 103I.005​ (v) remove or remediate pollution or contamination from groundwater or soil through the use of a vent,​ vapor recovery system, or sparge point.​ Subd. 8b. Environmental well contractor. "Environmental well contractor" means a person with an​ environmental well contractor's license issued by the commissioner.​ Subd. 9. Exploratory boring. "Exploratory boring" means a surface drilling done to explore or prospect​ for oil, natural gas, apatite, diamonds, graphite, gemstones, kaolin clay, and metallic minerals, including​ iron, copper, zinc, lead, gold, silver, titanium, vanadium, nickel, cadmium, molybdenum, chromium,​ manganese, cobalt, zirconium, beryllium, thorium, uranium, aluminum, platinum, palladium, radium,​ tantalum, tin, and niobium, and a drilling or boring for petroleum.​ Subd. 10. Explorer. "Explorer" means a person with an explorer's license issued by the commissioner.​ Subd. 11. Groundwater thermal exchange device. "Groundwater thermal exchange device" means a​ heating or cooling device that depends on extraction and reinjection of groundwater from an independent​ aquifer to operate.​ Subd. 12. Limited well/boring contractor. "Limited well/boring contractor" means a person with a​ limited well/boring contractor's license issued by the commissioner. Limited well/boring contractor's licenses​ are issued for:​ (1) constructing, repairing, and sealing bored geothermal heat exchangers;​ (2) installing, repairing, and modifying pitless units and pitless adaptors, well casings above the pitless​ unit or pitless adaptor, well screens, well diameters, and well pumps and pumping equipment;​ (3) constructing, repairing, and sealing dewatering wells; and​ (4) sealing wells and borings.​ Subd. 13. [Repealed, 2005 c 106 s 68]​ Subd. 14. [Repealed, 1Sp2017 c 6 art 10 s 148]​ Subd. 15. [Repealed, 1Sp2017 c 6 art 10 s 148]​ Subd. 16. Person. "Person" means an individual, firm, partnership, association, or corporation or other​ entity including the United States government, any interstate body, the state, and any agency, department,​ or political subdivision of the state.​ Subd. 17. Provisions of this chapter. "Provisions of this chapter" means the sections in this chapter​ and rules adopted by the commissioner under this chapter.​ Subd. 17a. Temporary environmental well. "Temporary environmental well" means an environmental​ well as defined in section 103I.005, subdivision 8a, that is sealed within 72 hours of the time construction​ on the well begins.​ Subd. 18. [Repealed, 1991 c 199 art 2 s 29; 1991 c 355 s 54]​ Subd. 19. [Repealed, 1990 c 597 s 73]​ Subd. 20. [Repealed, 2013 c 108 art 12 s 109]​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.005​ MINNESOTA STATUTES 2018​ 4​ Subd. 20a. Water supply well. "Water supply well" means a well that is not a dewatering well or​ environmental well and includes wells used:​ (1) for potable water supply;​ (2) for irrigation;​ (3) for agricultural, commercial, or industrial water supply;​ (4) for heating or cooling; and​ (5) for testing water yield for irrigation, commercial or industrial uses, residential supply, or public water​ supply.​ Subd. 21. Well. "Well" means an excavation that is drilled, cored, bored, washed, driven, dug, jetted,​ or otherwise constructed if the excavation is intended for the location, diversion, artificial recharge, monitoring,​ testing, remediation, or acquisition of groundwater. Well includes environmental wells, drive point wells,​ and dewatering wells. "Well" does not include:​ (1) an excavation by backhoe, or otherwise for temporary dewatering of groundwater for nonpotable​ use during construction, if the depth of the excavation is 25 feet or less;​ (2) an excavation made to obtain or prospect for oil, natural gas, minerals, or products of mining or​ quarrying;​ (3) an excavation to insert media to repressure oil or natural gas bearing formations or to store petroleum,​ natural gas, or other products;​ (4) an excavation for nonpotable use for wildfire suppression activities; or​ (5) borings.​ Subd. 22. Well disclosure certificate. "Well disclosure certificate" means a certificate containing the​ requirements of section 103I.235, subdivision 1, paragraph (j).​ Subd. 23. Well contractor. "Well contractor" means a person with a well contractor's license.​ Subd. 23a. Well that is in use. A "well that is in use" means a well that operates on a daily, regular, or​ seasonal basis. A well in use includes a well that operates for the purpose of irrigation, fire protection, or​ emergency pumping.​ Subd. 24. Wellhead protection area. "Wellhead protection area" means the surface and subsurface​ area surrounding a well or well field that supplies a public water system, through which contaminants are​ likely to move toward and reach the well or well field.​ History: 1989 c 326 art 3 s 2; 1990 c 597 s 16-20; 1991 c 355 s 6-8; 1999 c 153 s 1-3; 2000 c 260 s​ 15; 2005 c 106 s 9-15; 2006 c 281 art 3 s 16; 2008 c 277 art 1 s 5; 2013 c 108 art 12 s 11,108; 1Sp2017 c​ 6 art 10 s 1-8​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  3. 5​ MINNESOTA STATUTES 2018​ 103I.101​ JURISDICTION OVER WELLS AND BORINGS​ 103I.101 POWERS AND DUTIES OF COMMISSIONER OF HEALTH.​ Subdivision 1. Powers of commissioner. The commissioner has the powers reasonable and necessary​ to effectively exercise the authority granted by this chapter.​ Subd. 2. Duties. The commissioner shall:​ (1) regulate the drilling, construction, modification, repair, and sealing of wells and borings;​ (2) examine and license:​ (i) well contractors;​ (ii) persons constructing, repairing, and sealing bored geothermal heat exchangers;​ (iii) persons modifying or repairing well casings above the pitless unit or adaptor, well screens, well​ diameters, and installing well pumps or pumping equipment;​ (iv) persons constructing, repairing, and sealing dewatering wells;​ (v) persons sealing wells or borings; and​ (vi) persons excavating or drilling holes for the installation of elevator borings;​ (3) examine and license environmental well contractors;​ (4) license explorers engaged in exploratory boring and examine individuals who supervise or oversee​ exploratory boring;​ (5) after consultation with the commissioner of natural resources and the Pollution Control Agency,​ establish standards for the design, location, construction, repair, and sealing of wells and borings within the​ state; and​ (6) issue permits for wells, groundwater thermal devices, bored geothermal heat exchangers, and elevator​ borings.​ Subd. 3. Procedures for permits. The commissioner shall establish procedures for application, approval,​ and issuance of permits by rule.​ Subd. 4. Inspections by commissioner. The commissioner may inspect, collect water samples, and​ have access, at all reasonable times, to a well or boring site, including wells or borings drilled, sealed, or​ repaired.​ Subd. 5. Commissioner to adopt rules. The commissioner shall adopt rules including:​ (1) issuance of licenses for:​ (i) qualified well contractors;​ (ii) persons constructing, repairing, and sealing dewatering wells;​ (iii) persons sealing wells or borings;​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.101​ MINNESOTA STATUTES 2018​ 6​ (iv) persons installing, modifying, or repairing well casings, well screens, well diameters, and well​ pumps or pumping equipment;​ (v) persons constructing, repairing, and sealing bored geothermal heat exchangers;​ (vi) persons constructing, repairing, and sealing elevator borings; and​ (vii) persons constructing, repairing, and sealing environmental wells;​ (2) establishment of conditions for examination and review of applications for license and certification;​ (3) establishment of conditions for revocation and suspension of license and certification;​ (4) establishment of minimum standards for design, location, construction, repair, and sealing of wells​ and borings to implement the purpose and intent of this chapter;​ (5) establishment of a system for reporting on wells and borings drilled and sealed;​ (6) establishment of standards for the construction, maintenance, sealing, and water quality monitoring​ of wells in areas of known or suspected contamination;​ (7) establishment of wellhead protection measures for wells serving public water supplies;​ (8) establishment of procedures to coordinate collection of well and boring data with other state and​ local governmental agencies;​ (9) establishment of criteria and procedures for submission of well and boring logs, formation samples​ or well or boring cuttings, water samples, or other special information required for and water resource​ mapping; and​ (10) establishment of minimum standards for design, location, construction, maintenance, repair, sealing,​ safety, and resource conservation related to borings, including exploratory borings as defined in section​ 103I.005, subdivision 9.​ Subd. 6. Fees for variances. The commissioner shall charge a nonrefundable application fee of $275​ to cover the administrative cost of processing a request for a variance or modification of rules adopted by​ the commissioner under this chapter.​ History: 1989 c 326 art 3 s 3; 1990 c 597 s 21-23; 1991 c 355 s 9-12; 1994 c 557 s 19; 1996 c 305 art​ 2 s 21; 1997 c 203 art 2 s 4; 1999 c 153 s 4,5; 1Sp2001 c 9 art 1 s 3; 2002 c 379 art 1 s 113; 2005 c 106 s​ 16,17; 1Sp2005 c 4 art 6 s 2; 2007 c 147 art 16 s 2; 1Sp2011 c 9 art 2 s 5; 2013 c 108 art 12 s 108; 1Sp2017​ c 6 art 10 s 9-11​ 103I.103 WASTE PREVENTION MAY BE REQUIRED.​ The commissioner of natural resources may require the owners of wells, especially flowing artesian​ wells, to prevent waste to conserve the groundwater water supply of the state.​ History: 1989 c 326 art 3 s 4​ 103I.105 ADVISORY COUNCIL ON WELLS AND BORINGS.​ (a) The Advisory Council on Wells and Borings is established as an advisory council to the commissioner.​ The advisory council shall consist of 18 voting members. Of the 18 voting members:​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  4. 7​ MINNESOTA STATUTES 2018​ 103I.111​ (1) one member must be from the Department of Health, appointed by the commissioner of health;​ (2) one member must be from the Department of Natural Resources, appointed by the commissioner of​ natural resources;​ (3) one member must be a member of the Minnesota Geological Survey of the University of Minnesota,​ appointed by the director;​ (4) one member must be a responsible individual for a licensed explorer;​ (5) one member must be a certified representative of a licensed elevator boring contractor;​ (6) two members must be members of the public who are not connected with the boring or well drilling​ industry;​ (7) one member must be from the Pollution Control Agency, appointed by the commissioner of the​ Pollution Control Agency;​ (8) one member must be from the Department of Transportation, appointed by the commissioner of​ transportation;​ (9) one member must be from the Board of Water and Soil Resources appointed by its chair;​ (10) one member must be a certified representative of an environmental well contractor;​ (11) six members must be residents of this state appointed by the commissioner, who are certified​ representatives of licensed well contractors, with not more than two from the seven-county metropolitan​ area and at least four from other areas of the state who represent different geographical regions; and​ (12) one member must be a certified representative of a licensed bored geothermal heat exchanger​ contractor.​ (b) An appointee of the well drilling industry may not serve more than two consecutive terms.​ (c) The appointees to the advisory council from the well drilling industry must:​ (1) have been residents of this state for at least three years before appointment; and​ (2) have at least five years' experience in the well drilling business.​ (d) The terms of the appointed members and the compensation and removal of all members are governed​ by section 15.059.​ History: 1989 c 326 art 3 s 5; 1991 c 355 s 13; 1999 c 153 s 6; 2005 c 106 s 18; 2013 c 108 art 12 s​ 108; 2014 c 286 art 8 s 12; 1Sp2017 c 6 art 10 s 12​ 103I.111 LOCAL AUTHORITY OVER WELLS AND BORINGS.​ Subdivision 1. Delegation of duties of commissioner. (a) The commissioner of health may enter into​ an agreement with a community health board to delegate all or part of the inspection, reporting, and​ enforcement duties authorized under provisions of this chapter pertaining to permitting, construction, repair,​ and sealing of wells and elevator borings.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.111​ MINNESOTA STATUTES 2018​ 8​ (b) A community health board may delegate its powers and duties to other community health boards​ within its jurisdiction. An agreement to delegate powers and duties of a community health board must be​ approved by the commissioner and is subject to subdivision 3.​ Subd. 2. Delegation agreements. (a) Agreements authorized under this section must be in writing and​ signed by the delegating authority and the designated agent.​ (b) The agreement must list criteria the delegating authority will use to determine if the designated​ agent's performance meets appropriate standards and is sufficient to replace performance by the delegating​ authority.​ (c) The agreement may specify minimum staff requirements and qualifications, set procedures for the​ assessment of costs, and provide for termination procedures if the delegating authority finds that the designated​ agent fails to comply with the agreement.​ (d) A designated agent must not perform licensing, inspection, or enforcement duties under the agreement​ in territory outside its jurisdiction unless approved by the governing body for that territory through a separate​ agreement.​ (e) The scope of agreements established under this section is limited to duties and responsibilities agreed​ upon by the parties. The agreement may provide for automatic renewal and for notice of intent to terminate​ by either party.​ (f) During the life of the agreement, the delegating authority shall not perform duties that the designated​ agent is required to perform under the agreement, except inspections necessary to determine compliance​ with the agreement and this section or as agreed to by the parties.​ (g) The delegating authority shall consult with, advise, and assist a designated agent in the performance​ of its duties under the agreement.​ (h) This section does not alter the responsibility of the delegating authority for the performance of duties​ specified in law.​ Subd. 2a. Fees. A community health board under a delegation agreement with the commissioner may​ charge permit and notification fees, including a fee for well sealing, in excess of the fees specified in section​ 103I.208 if the fees do not exceed the total direct and indirect costs to administer the delegated duties.​ Subd. 2b. Ordinance authority. A political subdivision may adopt ordinances to enforce and administer​ powers and duties delegated under this section. The ordinances may not be inconsistent with or be less​ restrictive than standards in state law or rule. Ordinances adopted by the governing body of a statutory or​ home rule charter city or town may not be inconsistent with or be less restrictive than ordinances adopted​ by the county board. The commissioner shall review ordinances proposed under a delegation agreement.​ The commissioner shall approve ordinances if the commissioner determines the ordinances are not inconsistent​ with and not less restrictive than the provisions of this chapter.​ Subd. 2c. Permits. A community health board under a delegation agreement with the commissioner​ may require permits in lieu of the notifications required under sections 103I.205 and 103I.301.​ Subd. 3. Preemption unless delegation. Notwithstanding any other law, a political subdivision may​ not regulate the construction, repair, or sealing of wells or borings unless the commissioner delegates authority​ under subdivisions 1 and 2.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  5. 9​ MINNESOTA STATUTES 2018​ 103I.115​ Subd. 4. Local authority over exploratory boring. This chapter does not limit the authority of a local​ unit of government to prohibit mineral exploration within its boundaries, require permits from explorers, or​ impose reasonable requirements and fees upon explorers, that are consistent with other law.​ Subd. 5. Local government regulation of open wells and recharging basins. (a) The governing body​ of a county, municipality, statutory or home rule charter city, or town may regulate open wells and recharging​ basins in a manner not inconsistent with this chapter and rules and may provide penalties for the violations.​ The use or maintenance of an open well or recharging basin that endangers the safety of a considerable​ number of persons may be defined as a public nuisance and abated as a public nuisance.​ (b) The abatement of the public nuisance may include covering the open well or recharging basin or​ surrounding the open well or recharging basin with a protective fence.​ Subd. 6. Unsealed wells and borings are public health nuisances. A well or boring that is required​ to be sealed under section 103I.301 but is not sealed is a public health nuisance. A county may abate the​ unsealed well or boring with the same authority of a community health board to abate a public health nuisance​ under section 145A.04, subdivision 8.​ Subd. 7. Local license or registration fees prohibited. (a) A political subdivision may not require a​ licensed well contractor to pay a license or registration fee.​ (b) The commissioner of health must provide a political subdivision with a list of licensed well contractors​ upon request.​ Subd. 8. Municipal regulation of drilling. A municipality may regulate all drilling, except well, elevator​ boring, and exploratory drilling that is subject to the provisions of this chapter, above, in, through, and​ adjacent to subsurface areas designated for mined underground space development and existing mined​ underground space. The regulations may prohibit, restrict, control, and require permits for the drilling.​ History: 1989 c 326 art 3 s 6; 1990 c 597 s 24-26; 1991 c 355 s 14-17; 2005 c 106 s 19,20; 2015 c 21​ art 1 s 109; 1Sp2017 c 6 art 10 s 13,14​ 103I.112 [Repealed, 2009 c 79 art 10 s 51]​ 103I.113 APPLICABILITY TO MINING ACTIVITIES.​ The provisions of this chapter do not apply to mining activities within a mining area described in a​ permit to mine issued under section 93.481 except a well or boring from which water is withdrawn. The​ provisions of this chapter do not apply to borings made within an area for which a conditional use permit​ for kaolin clay extraction has been obtained from the appropriate permitting authority when the kaolin clay​ extraction activity will remove all of the materials in which the borings occurred except a well or boring​ from which water is withdrawn.​ History: 1989 c 326 art 3 s 7; 1993 c 113 art 3 s 1​ WELL CONSTRUCTION AND OWNERSHIP​ 103I.115 COMPLIANCE WITH THIS CHAPTER REQUIRED.​ A person may not construct, repair, or seal a well or boring, except as provided under the provisions of​ this chapter.​ History: 1989 c 326 art 3 s 8; 1992 c 544 s 5; 2005 c 106 s 21​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.205​ MINNESOTA STATUTES 2018​ 10​ 103I.205 WELL CONSTRUCTION.​ Subdivision 1. Notification required. (a) Except as provided in paragraph (d), a person may not construct​ a water-supply, dewatering, or environmental well until a notification of the proposed well on a form​ prescribed by the commissioner is filed with the commissioner with the filing fee in section 103I.208, and,​ when applicable, the person has met the requirements of paragraph (e). If after filing the well notification​ an attempt to construct a well is unsuccessful, a new notification is not required unless the information​ relating to the successful well has substantially changed. A notification is not required prior to construction​ of a temporary environmental well.​ (b) The property owner, the property owner's agent, or the licensed contractor where a well is to be​ located must file the well notification with the commissioner.​ (c) The well notification under this subdivision preempts local permits and notifications, and counties​ or home rule charter or statutory cities may not require a permit or notification for wells unless the​ commissioner has delegated the permitting or notification authority under section 103I.111.​ (d) A person who is an individual that constructs a drive point water-supply well on property owned or​ leased by the individual for farming or agricultural purposes or as the individual's place of abode must notify​ the commissioner of the installation and location of the well. The person must complete the notification​ form prescribed by the commissioner and mail it to the commissioner by ten days after the well is completed.​ A fee may not be charged for the notification. A person who sells drive point wells at retail must provide​ buyers with notification forms and informational materials including requirements regarding wells, their​ location, construction, and disclosure. The commissioner must provide the notification forms and informational​ materials to the sellers.​ (e) When the operation of a well will require an appropriation permit from the commissioner of natural​ resources, a person may not begin construction of the well until the person submits the following information​ to the commissioner of natural resources:​ (1) the location of the well;​ (2) the formation or aquifer that will serve as the water source;​ (3) the maximum daily, seasonal, and annual pumpage rates and volumes that will be requested in the​ appropriation permit; and​ (4) other information requested by the commissioner of natural resources that is necessary to conduct​ the preliminary assessment required under section 103G.287, subdivision 1, paragraph (c).​ The person may begin construction after receiving preliminary approval from the commissioner of natural​ resources.​ Subd. 2. Emergency permit and notification exemptions. The commissioner may adopt rules that​ modify the procedures for filing a well notification or well or boring permit if conditions occur that:​ (1) endanger the public health and welfare or cause a need to protect the groundwater; or​ (2) require the environmental well contractor, limited well/boring contractor, or well contractor to begin​ constructing a well or boring before obtaining a permit or notification.​ Subd. 3. Maintenance permit. (a) Except as provided under paragraph (b), a well that is not in use must​ be sealed or have a maintenance permit.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  6. 11​ MINNESOTA STATUTES 2018​ 103I.205​ (b) If an environmental well or a dewatering well is not sealed by 14 months after completion of​ construction, the owner of the property on which the well is located must obtain and annually renew a​ maintenance permit from the commissioner.​ Subd. 4. License required. (a) Except as provided in paragraph (b), (c), (d), or (e), section 103I.401,​ subdivision 2, or 103I.601, subdivision 2, a person may not drill, construct, repair, or seal a well or boring​ unless the person has a well contractor's license in possession.​ (b) A person may construct, repair, and seal an environmental well if the person:​ (1) is a professional engineer licensed under sections 326.02 to 326.15 in the branches of civil or​ geological engineering;​ (2) is a hydrologist or hydrogeologist certified by the American Institute of Hydrology;​ (3) is a professional geoscientist licensed under sections 326.02 to 326.15;​ (4) is a geologist certified by the American Institute of Professional Geologists; or​ (5) meets the qualifications established by the commissioner in rule.​ A person must be licensed by the commissioner as an environmental well contractor on forms provided​ by the commissioner.​ (c) A person may do the following work with a limited well/boring contractor's license in possession.​ A separate license is required for each of the four activities:​ (1) installing, repairing, and modifying well screens, pitless units and pitless adaptors, well pumps and​ pumping equipment, and well casings from the pitless adaptor or pitless unit to the upper termination of the​ well casing;​ (2) sealing wells and borings;​ (3) constructing, repairing, and sealing dewatering wells; or​ (4) constructing, repairing, and sealing bored geothermal heat exchangers.​ (d) A person may construct, repair, and seal an elevator boring with an elevator boring contractor's​ license.​ (e) Notwithstanding other provisions of this chapter requiring a license, a license is not required for a​ person who complies with the other provisions of this chapter if the person is:​ (1) an individual who constructs a water-supply well on land that is owned or leased by the individual​ and is used by the individual for farming or agricultural purposes or as the individual's place of abode;​ (2) an individual who performs labor or services for a contractor licensed under the provisions of this​ chapter in connection with the construction, sealing, or repair of a well or boring at the direction and under​ the personal supervision of a contractor licensed under the provisions of this chapter; or​ (3) a licensed plumber who is repairing submersible pumps or water pipes associated with well water​ systems if: (i) the repair location is within an area where there is no licensed well contractor within 50 miles,​ and (ii) the licensed plumber complies with all relevant sections of the plumbing code.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.205​ MINNESOTA STATUTES 2018​ 12​ Subd. 5. At-grade environmental wells. At-grade environmental wells are authorized without variance​ and may be installed for the purpose of evaluating groundwater conditions or for use as a leak detection​ device. An at-grade environmental well must be installed in accordance with the rules of the commissioner.​ The at-grade environmental wells must be installed with an impermeable double locking cap approved by​ the commissioner and must be labeled environmental or monitoring wells.​ Subd. 6. Distance requirements for sources of contamination, buildings, gas pipes, liquid propane​ tanks, and electric lines. (a) A person may not place, construct, or install an actual or potential source of​ contamination, building, gas pipe, liquid propane tank, or electric line any closer to a well or boring than​ the isolation distances prescribed by the commissioner by rule unless a variance has been prescribed by rule.​ (b) The commissioner shall establish by rule reduced isolation distances for facilities which have​ safeguards in accordance with sections 18B.01, subdivision 26, and 18C.005, subdivision 29.​ Subd. 7. Well identification label required. After a well has been constructed, the person constructing​ the well must attach a label to the well showing the unique well number.​ Subd. 8. Wells on property of another. A person may not construct or have constructed a well for the​ person's own use on the property of another until the owner of the property on which the well is to be located​ and the intended well user sign a written agreement that identifies which party will be responsible for​ obtaining all permits or filing notification, paying applicable fees and for sealing the well. If the property​ owner refuses to sign the agreement, the intended well user may, in lieu of a written agreement, state in​ writing to the commissioner that the well user will be responsible for obtaining permits, filing notification,​ paying applicable fees, and sealing the well. Nothing in this subdivision eliminates the responsibilities of​ the property owner under this chapter, or allows a person to construct a well on the property of another​ without consent or other legal authority.​ Subd. 9. Report of work. Within 30 days after completion or sealing of a well or boring, the person​ doing the work must submit a verified report to the commissioner containing the information specified by​ rules adopted under this chapter.​ Within 30 days after receiving the report, the commissioner shall send or otherwise provide access to a​ copy of the report to the commissioner of natural resources, to the local soil and water conservation district​ where the well is located, and to the director of the Minnesota Geological Survey.​ History: 1989 c 326 art 3 s 9; 1990 c 597 s 28-33; 1991 c 355 s 18-23; 1992 c 507 s 22; 1994 c 557 s​ 20; 1999 c 153 s 7,8; 2005 c 106 s 22,23; 2013 c 108 art 12 s 108; 2013 c 114 art 4 s 74; 2014 c 312 art​ 23 s 1; 2015 c 54 art 1 s 1; 1Sp2017 c 6 art 10 s 15-20​ 103I.208 NOTIFICATION FILING FEES AND PERMIT FEES.​ Subdivision 1. Well notification fee. The well notification fee to be paid by a property owner is:​ (1) for construction of a water supply well, $275, which includes the state core function fee;​ (2) for a well sealing, $75 for each well, which includes the state core function fee, except that a single​ fee of $75 is required for all temporary environmental wells recorded on the sealing notification for a single​ property, having depths within a 25 foot range, and sealed within 72 hours of start of construction;​ (3) for construction of a dewatering well, $275, which includes the state core function fee, for each​ dewatering well except a dewatering project comprising five or more dewatering wells shall be assessed a​ single fee of $1,375 for the dewatering wells recorded on the notification; and​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  7. 13​ MINNESOTA STATUTES 2018​ 103I.221​ (4) for construction of an environmental well, $275, which includes the state core function fee, except​ that a single fee of $275 is required for all environmental wells recorded on the notification that are located​ on a single property, and except that no fee is required for construction of a temporary environmental well.​ Subd. 1a. State core function fee. The state core function fee to be collected by the state and delegated​ community health boards and used to support state core functions is:​ (1) for a new well, $20; and​ (2) for a well sealing, $5.​ Subd. 2. Permit fee. The permit fee to be paid by a property owner is:​ (1) for a water supply well that is not in use under a maintenance permit, $175 annually;​ (2) for an environmental well that is unsealed under a maintenance permit, $175 annually except no fee​ is required for an environmental well owned by a federal agency, state agency, or local unit of government​ that is unsealed under a maintenance permit. "Local unit of government" means a statutory or home rule​ charter city, town, county, or soil and water conservation district, watershed district, an organization formed​ for the joint exercise of powers under section 471.59, a community health board, or other special purpose​ district or authority with local jurisdiction in water and related land resources management;​ (3) for environmental wells that are unsealed under a maintenance permit, $175 annually per site​ regardless of the number of environmental wells located on site;​ (4) for a groundwater thermal exchange device, in addition to the notification fee for water supply wells,​ $275, which includes the state core function fee;​ (5) for a bored geothermal heat exchanger with less than ten tons of heating/cooling capacity, $275;​ (6) for a bored geothermal heat exchanger with ten to 50 tons of heating/cooling capacity, $515;​ (7) for a bored geothermal heat exchanger with greater than 50 tons of heating/cooling capacity, $740;​ (8) for a dewatering well that is unsealed under a maintenance permit, $175 annually for each dewatering​ well, except a dewatering project comprising more than five dewatering wells shall be issued a single permit​ for $875 annually for dewatering wells recorded on the permit; and​ (9) for an elevator boring, $275 for each boring.​ History: 1989 c 326 art 3 s 10; 1990 c 597 s 34; 1991 c 355 s 24; 1994 c 557 s 21; 1997 c 203 art 2 s​ 5; 1998 c 407 art 2 s 23; 1999 c 247 s 1; 1Sp2001 c 9 art 1 s 5,6; 2002 c 379 art 1 s 113; 2005 c 106 s​ 24,25; 1Sp2005 c 4 art 6 s 3,4; 2007 c 147 art 16 s 3,4; 2009 c 79 art 10 s 1; 1Sp2011 c 9 art 2 s 6,7; 2013​ c 108 art 12 s 108; 2015 c 21 art 1 s 109; 1Sp2017 c 6 art 10 s 21,22​ 103I.211 [Repealed, 1990 c 597 s 73]​ 103I.221 PLASTIC CASINGS.​ Subdivision 1. Plastic casings allowed. The use of plastic casings in wells is expressly authorized.​ Subd. 2. Rules. The commissioner may adopt rules relating to the installation of plastic well casing.​ History: 1989 c 326 art 3 s 12​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.222​ MINNESOTA STATUTES 2018​ 14​ 103I.222 [Repealed, 2005 c 106 s 68]​ 103I.231 COMMISSIONER MAY ORDER REPAIRS.​ (a) The commissioner may order a property owner to take remedial measures, including making repairs,​ reconstructing, or sealing a well or boring according to provisions of this chapter. The order may be issued​ if the commissioner determines, based on inspection of the water or the well or boring site or an analysis of​ water from the well or boring, that the well or boring:​ (1) is contaminated or may contribute to the spread of contamination;​ (2) is required to be sealed under this chapter and has not been sealed according to provisions of this​ chapter;​ (3) is in a state of disrepair so that its continued existence endangers the quality of the groundwater;​ (4) is a health or safety hazard; or​ (5) is located in a place or constructed in a manner that its continued use or existence endangers the​ quality of the groundwater.​ (b) The order of the commissioner may be enforced in an action to seek compliance brought by the​ commissioner in the district court of the county where the well or boring is located.​ History: 1989 c 326 art 3 s 13; 1991 c 355 s 25; 2005 c 106 s 26​ 103I.235 REAL PROPERTY SALE; DISCLOSURE OF LOCATION OF WELLS.​ Subdivision 1. Disclosure of wells to buyer. (a) Before signing an agreement to sell or transfer real​ property, the seller must disclose in writing to the buyer information about the status and location of all​ known wells on the property, by delivering to the buyer either a statement by the seller that the seller does​ not know of any wells on the property, or a disclosure statement indicating the legal description and county,​ and a map drawn from available information showing the location of each well to the extent practicable. In​ the disclosure statement, the seller must indicate, for each well, whether the well is in use, not in use, or​ sealed.​ (b) At the time of closing of the sale, the disclosure statement information, name and mailing address​ of the buyer, and the quartile, section, township, and range in which each well is located must be provided​ on a well disclosure certificate signed by the seller or a person authorized to act on behalf of the seller.​ (c) A well disclosure certificate need not be provided if the seller does not know of any wells on the​ property and the deed or other instrument of conveyance contains the statement: "The Seller certifies that​ the Seller does not know of any wells on the described real property."​ (d) If a deed is given pursuant to a contract for deed, the well disclosure certificate required by this​ subdivision shall be signed by the buyer or a person authorized to act on behalf of the buyer. If the buyer​ knows of no wells on the property, a well disclosure certificate is not required if the following statement​ appears on the deed followed by the signature of the grantee or, if there is more than one grantee, the signature​ of at least one of the grantees: "The Grantee certifies that the Grantee does not know of any wells on the​ described real property." The statement and signature of the grantee may be on the front or back of the deed​ or on an attached sheet and an acknowledgment of the statement by the grantee is not required for the deed​ to be recordable.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  8. 15​ MINNESOTA STATUTES 2018​ 103I.235​ (e) This subdivision does not apply to the sale, exchange, or transfer of real property:​ (1) that consists solely of a sale or transfer of severed mineral interests; or​ (2) that consists of an individual condominium unit as described in chapters 515 and 515B.​ (f) For an area owned in common under chapter 515 or 515B the association or other responsible person​ must report to the commissioner by July 1, 1992, the location and status of all wells in the common area.​ The association or other responsible person must notify the commissioner within 30 days of any change in​ the reported status of wells.​ (g) If the seller fails to provide a required well disclosure certificate, the buyer, or a person authorized​ to act on behalf of the buyer, may sign a well disclosure certificate based on the information provided on​ the disclosure statement required by this section or based on other available information.​ (h) A county recorder or registrar of titles may not record a deed or other instrument of conveyance​ dated after October 31, 1990, for which a certificate of value is required under section 272.115, or any deed​ or other instrument of conveyance dated after October 31, 1990, from a governmental body exempt from​ the payment of state deed tax, unless the deed or other instrument of conveyance contains the statement​ made in accordance with paragraph (c) or (d) or is accompanied by the well disclosure certificate containing​ all the information required by paragraph (b) or (d). The county recorder or registrar of titles must not accept​ a certificate unless it contains all the required information. The county recorder or registrar of titles shall​ note on each deed or other instrument of conveyance accompanied by a well disclosure certificate that the​ well disclosure certificate was received. The notation must include the statement "No wells on property" if​ the disclosure certificate states there are no wells on the property. The well disclosure certificate shall not​ be filed or recorded in the records maintained by the county recorder or registrar of titles. After noting "No​ wells on property" on the deed or other instrument of conveyance, the county recorder or registrar of titles​ shall destroy or return to the buyer the well disclosure certificate. The county recorder or registrar of titles​ shall collect from the buyer or the person seeking to record a deed or other instrument of conveyance, a fee​ of $50 for receipt of a completed well disclosure certificate. By the tenth day of each month, the county​ recorder or registrar of titles shall transmit the well disclosure certificates to the commissioner of health. By​ the tenth day after the end of each calendar quarter, the county recorder or registrar of titles shall transmit​ to the commissioner of health $42.50 of the fee for each well disclosure certificate received during the​ quarter. The commissioner shall maintain the well disclosure certificate for at least six years. The​ commissioner may store the certificate as an electronic image. A copy of that image shall be as valid as the​ original.​ (i) No new well disclosure certificate is required under this subdivision if the buyer or seller, or a person​ authorized to act on behalf of the buyer or seller, certifies on the deed or other instrument of conveyance​ that the status and number of wells on the property have not changed since the last previously filed well​ disclosure certificate. The following statement, if followed by the signature of the person making the​ statement, is sufficient to comply with the certification requirement of this paragraph: "I am familiar with​ the property described in this instrument and I certify that the status and number of wells on the described​ real property have not changed since the last previously filed well disclosure certificate." The certification​ and signature may be on the front or back of the deed or on an attached sheet and an acknowledgment of​ the statement is not required for the deed or other instrument of conveyance to be recordable.​ (j) The commissioner in consultation with county recorders shall prescribe the form for a well disclosure​ certificate and provide well disclosure certificate forms to county recorders and registrars of titles and other​ interested persons.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.235​ MINNESOTA STATUTES 2018​ 16​ (k) Failure to comply with a requirement of this subdivision does not impair:​ (1) the validity of a deed or other instrument of conveyance as between the parties to the deed or​ instrument or as to any other person who otherwise would be bound by the deed or instrument; or​ (2) the record, as notice, of any deed or other instrument of conveyance accepted for filing or recording​ contrary to the provisions of this subdivision.​ Subd. 2. Liability for failure to disclose. Unless the buyer and seller agree to the contrary, in writing,​ before the closing of the sale, a seller who fails to disclose the existence or known status of a well at the​ time of sale and knew or had reason to know of the existence or known status of the well, is liable to the​ buyer for costs relating to sealing of the well and reasonable attorney fees for collection of costs from the​ seller, if the action is commenced within six years after the date the buyer closed the purchase of the real​ property where the well is located.​ Subd. 3. Temporary environmental well and unsuccessful well exemption. This section does not​ apply to temporary environmental wells or unsuccessful wells that have been sealed by a licensed contractor​ in compliance with this chapter.​ History: 1989 c 326 art 3 s 14; 1990 c 597 s 35; 1991 c 292 art 2 s 2; 1991 c 355 s 26; 1992 c 544 s​ 6; 1994 c 557 s 22; 1997 c 7 art 1 s 23; 1999 c 11 art 3 s 6; 1Sp2001 c 9 art 1 s 7; 2002 c 379 art 1 s 113;​ 1Sp2005 c 4 art 6 s 5; 2007 c 147 art 16 s 5; 2008 c 277 art 1 s 6; 1Sp2011 c 9 art 2 s 8; 1Sp2017 c 6 art​ 10 s 23​ 103I.236 WELL DISCLOSURE IN WASHINGTON COUNTY.​ Before signing an agreement to sell or transfer real property in Washington County that is not served​ by a municipal water system, the seller must state in writing to the buyer whether, to the seller's knowledge,​ the property is located within a special well construction area designated by the commissioner of health​ under Minnesota Rules, part 4725.3650. If the disclosure under section 103I.235, subdivision 1, paragraph​ (a), states that there is an unsealed well on the property, the disclosure required under this clause must be​ made regardless of whether the property is served by a municipal water system.​ History: 2003 c 128 art 1 s 170​ 103I.241 ACTION FOR WELL CONTAMINATION.​ Subdivision 1. Owner's cause of action for well contamination. The owner of real property where a​ well is located has a cause of action for civil damages against a person whose action or inaction caused​ contamination of a well. The property owner may commence an action for a period of six years after the​ owner knows or becomes aware of the contamination of the well.​ Subd. 2. Court awards. The court may award damages, reasonable attorney fees, and costs and​ disbursements.​ History: 1989 c 326 art 3 s 15​ WELL SEALING​ 103I.301 WELL SEALING REQUIREMENTS.​ Subdivision 1. Wells and borings. (a) A property owner must have a well or boring sealed if:​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  9. 17​ MINNESOTA STATUTES 2018​ 103I.311​ (1) the well or boring is contaminated or may contribute to the spread of contamination;​ (2) the well or boring was attempted to be sealed but was not sealed according to the provisions of this​ chapter; or​ (3) the well or boring is located, constructed, or maintained in a manner that its continued use or existence​ endangers groundwater quality or is a safety or health hazard.​ (b) A well or boring that is not in use must be sealed unless the property owner has a maintenance permit​ for the well.​ (c) The property owner must have a well or boring sealed by a licensed person authorized to seal the​ well or boring, consistent with provisions of this chapter.​ Subd. 2. Environmental wells. The owner of the property where an environmental well is located must​ have the environmental well sealed when the well is no longer in use. The owner must have a well contractor,​ limited well/boring sealing contractor, or an environmental well contractor seal the environmental well.​ Subd. 3. Dewatering wells. (a) The owner of the property where a dewatering well is located must have​ the dewatering well sealed when the dewatering well is no longer in use.​ (b) A well contractor, limited well/boring sealing contractor, or limited dewatering well contractor shall​ seal the dewatering well.​ Subd. 4. Sealing procedures. Wells and borings must be sealed according to rules adopted by the​ commissioner.​ Subd. 5. [Repealed, 1990 c 597 s 73]​ Subd. 6. Notification required. A person may not seal a well until a notification of the proposed sealing​ is filed as prescribed by the commissioner.​ History: 1989 c 326 art 3 s 16; 1990 c 597 s 36; 1991 c 355 s 27,28; 1992 c 544 s 7,8; 1999 c 153 s​ 9,10; 1Sp2017 c 6 art 10 s 24,25​ 103I.311 IDENTIFICATION AND SEALING OF WELLS ON STATE PROPERTY.​ Subdivision 1. Identification of wells. The commissioner of natural resources in cooperation with other​ state agencies must identify the location and status of wells and abandoned wells located on state property.​ Subd. 2. Plan and appropriation request for well sealing. In each budget year of a biennium, the​ commissioner must present a plan and an appropriation request to properly seal wells on state property.​ Subd. 3. Prohibition on state land purchased without well identification. The state may not purchase​ or sell a fee interest in real property without identifying the location of all wells on the property, whether in​ use, not in use, or sealed, and making provisions to have the wells not in use properly sealed at the cost of​ the seller as part of the contract. The deed or other instrument of conveyance evidencing the sale may not​ be recorded with the county recorder or registrar of titles unless this subdivision is complied with. Failure​ to comply with a requirement of this subdivision does not impair:​ (1) the validity of a deed or other instrument of conveyance as between the parties to the deed or​ instrument or as to any other person who otherwise would be bound by the deed or instrument; or​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.311​ MINNESOTA STATUTES 2018​ 18​ (2) the record, as notice, of any deed or other instrument of conveyance accepted for filing or recording​ contrary to the provisions of this subdivision.​ History: 1989 c 326 art 3 s 17; 1990 c 597 s 37; 1991 c 355 s 29; 2008 c 277 art 1 s 7​ 103I.315 ORDERS TO SEAL WELLS AND BORINGS.​ Subdivision 1. Order to seal well or boring. The commissioner may order a property owner to seal a​ well or boring if:​ (1) the commissioner determines that without being sealed the well or boring is an imminent threat to​ public health or public safety;​ (2) the well or boring is required to be sealed under section 103I.301; or​ (3) a well is an environmental well or dewatering well and by 14 months after construction of the well,​ the owner has not obtained a maintenance permit, or after a maintenance permit has been issued the owner​ has not renewed a maintenance permit.​ Subd. 2. Failure of owner to seal well or boring. If the property owner fails to seal a well or boring in​ the time provided in the commissioner's order, or if the commissioner is unable to identify or locate the​ property owner, the commissioner may enter the property and have the well or boring sealed. The property​ owner is liable for and must pay the costs of sealing the well or boring.​ History: 1989 c 326 art 3 s 18; 1992 c 544 s 9; 1Sp2017 c 6 art 10 s 26​ 103I.321 [Repealed, 1990 c 597 s 73]​ 103I.325 LANDOWNER SEALED WELL AND BORING LIABILITY.​ Subdivision 1. [Repealed, 1990 c 597 s 73]​ Subd. 2. Liability after sealing. The owner of a well or boring is not liable for contamination of​ groundwater from the well or boring that occurs after the well or boring has been sealed by a licensed​ contractor in compliance with this chapter if a report of sealing has been filed with the commissioner of​ health by the contractor who performed the work, and if the owner has not disturbed or disrupted the sealed​ well or boring.​ History: 1989 c 326 art 3 s 20; 1990 c 597 s 38; 2005 c 106 s 27​ 103I.331 [Repealed, 1989 c 326 art 3 s 21, subd 6; 1994 c 557 s 23]​ 103I.335 FUNDING FOR PERSONS TO SEAL WELLS.​ Subdivision 1. Application. A property owner who desires to seal a well may apply to the Board of​ Water and Soil Resources for the board to provide funds and seal the well.​ Subd. 2. Criteria for sealing. The Board of Water and Soil Resources shall adopt criteria for accepting​ applications to seal wells for property owners applying under subdivision 1.​ Subd. 3. Collection and enforcement of costs. If the applications are accepted, the costs of sealing​ become a governmental services lien as provided in section 103I.341. The Board of Water and Soil Resources​ must enter a written agreement to collect the costs of sealing the well in a manner provided under section​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  10. 19​ MINNESOTA STATUTES 2018​ 103I.345​ 103I.341, subdivision 3. If the costs are not paid according to the agreement, the Board of Water and Soil​ Resources may enforce the lien in any manner provided under section 103I.341, subdivisions 2 and 3.​ History: 1989 c 326 art 3 s 22​ 103I.341 COLLECTION AND ENFORCEMENT OF WELL SEALING COSTS.​ Subdivision 1. Lien for sealing costs. The commissioner and the Board of Water and Soil Resources​ have a governmental services lien under section 514.67 for the costs of sealing a well or boring that the​ commissioner or board has contracted to be sealed under section 103I.315, subdivision 2; or 103I.335. The​ lien attaches to the real property where the well or boring is located. The lien is perfected by recording the​ lien with the county recorder or registrar of titles where the well or boring and the property are located and​ serving or mailing by return receipt a copy of the lien to the property owner.​ Subd. 2. Enforcement of lien. The commissioner or the Board of Water and Soil Resources may enforce​ the lien in the manner provided for a judgment lien under chapter 550 or certify the amount to the county​ auditor, which must be assessed against the property and collected in the same manner as real estate taxes.​ Subd. 3. Assessment of installments. (a) In lieu of certifying the entire amount to be collected, the​ commissioner or the Board of Water and Soil Resources may have the amount due assessed in seven or less​ equal annual installments plus interest due at the rate determined by the state court administrator for judgments​ under section 549.09.​ (b) The interest due is an additional perfected lien on the property without further action by the​ commissioner or the Board of Water and Soil Resources.​ (c) The interest and the installment due must be entered on the tax lists for the year and collected in the​ same manner as real estate taxes for that year by collecting one-half of the total of the installment and interest​ with and as part of the real estate taxes.​ Subd. 4. Satisfaction of lien. The amount due and interest of a lien under this section may be paid at​ any time. When the amount of the lien including accrued interest is paid, the commissioner or board must​ execute a satisfaction of the lien and record the satisfaction with the county recorder or registrar of titles​ where the lien was recorded.​ Subd. 5. Appropriation of recovered costs. Costs of sealing wells recovered from property owners by​ the Board of Water and Soil Resources must be deposited in the state treasury and credited to the account​ from which the amounts were originally appropriated. The amounts are continuously appropriated to the​ board for sealing wells.​ History: 1989 c 326 art 3 s 23; 1992 c 544 s 10,11; 1997 c 7 art 1 s 24; 2005 c 4 s 27,28​ 103I.345 WELL AND BORING SEALING ACCOUNT.​ Subdivision 1. Revenue sources. Revenue from the following sources must be deposited in the state​ treasury and credited to a special account:​ (1) all money recovered by the commissioner under section 103I.341;​ (2) all money paid under section 144.99 or under any agreement, stipulation, or settlement resolving an​ enforcement action brought by the commissioner;​ (3) all interest attributable to investment of money credited to the account; and​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.345​ MINNESOTA STATUTES 2018​ 20​ (4) all money received in the form of gifts, grants, reimbursements, or appropriations from any source​ intended to be used for the purposes of the account.​ Subd. 2. Expenditures. Subject to appropriation by law, money in the account established under​ subdivision 1 may be used by the commissioner for sealing wells and borings.​ History: 1992 c 544 s 12; 1993 c 206 s 1; 2005 c 106 s 28​ ELEVATOR BORINGS​ 103I.401 ELEVATOR BORINGS.​ Subdivision 1. Permit required. (a) A person may not construct an elevator boring until a permit for​ the hole or excavation is issued by the commissioner.​ (b) The elevator boring permit preempts local permits except local building permits, and counties and​ home rule charter or statutory cities may not require a permit for elevator borings.​ Subd. 2. License required. A person may not construct an elevator boring unless the person possesses​ a well contractor's license or an elevator boring contractor's license issued by the commissioner.​ Subd. 3. Sealing. A well contractor or elevator boring contractor must seal a hole or excavation that is​ no longer used for an elevator boring. The sealing must be done according to rules adopted by the​ commissioner.​ Subd. 4. Report. Within 30 days after completion or sealing of an elevator boring, the person doing the​ work must submit a report to the commissioner on forms provided by the commissioner.​ History: 1989 c 326 art 3 s 24; 1994 c 557 s 24; 1997 c 203 art 2 s 6; 2005 c 106 s 29​ 103I.451 [Repealed, 1Sp2017 c 6 art 10 s 148]​ LICENSING AND REGISTRATION​ 103I.501 LICENSING AND REGULATION OF WELLS AND BORINGS.​ (a) The commissioner shall regulate and license:​ (1) drilling, constructing, and repair of wells;​ (2) sealing of wells;​ (3) installing of well pumps and pumping equipment;​ (4) excavating, drilling, repairing, and sealing of elevator borings;​ (5) construction, repair, and sealing of environmental wells; and​ (6) construction, repair, and sealing of bored geothermal heat exchangers.​ (b) The commissioner shall examine and license well contractors, limited well/boring contractors,​ elevator boring contractors, and environmental well contractors.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  11. 21​ MINNESOTA STATUTES 2018​ 103I.525​ (c) The commissioner shall license explorers engaged in exploratory boring and shall examine persons​ who supervise or oversee exploratory boring.​ History: 1989 c 326 art 3 s 26; 1999 c 153 s 11; 2005 c 106 s 30; 2013 c 108 art 12 s 108; 1Sp2017 c​ 6 art 10 s 27​ 103I.505 RECIPROCITY OF LICENSES AND REGISTRATIONS.​ Subdivision 1. Reciprocity authorized. The commissioner may issue a license or certify a person under​ this chapter, without giving an examination, if the person is licensed or certified in another state and:​ (1) the requirements for licensing or certification under which the well or boring contractor was licensed​ or person was certified do not conflict with this chapter;​ (2) the requirements are of a standard not lower than that specified by the rules adopted under this​ chapter; and​ (3) equal reciprocal privileges are granted to licensees or certified persons of this state.​ Subd. 2. Fees required. A well or boring contractor or certified person must apply for the license or​ certification and pay the fees under the provisions of this chapter to receive a license or certification under​ this section.​ History: 1989 c 326 art 3 s 27; 2005 c 106 s 31; 1Sp2017 c 6 art 10 s 28,29​ 103I.515 LICENSES NOT TRANSFERABLE.​ A license or certification issued under this chapter is not transferable.​ History: 1989 c 326 art 3 s 28; 1Sp2017 c 6 art 10 s 30​ 103I.521 FEES.​ Unless otherwise specified, fees collected by the commissioner under this chapter shall be deposited in​ the state treasury and credited to the state government special revenue fund.​ History: 1989 c 326 art 3 s 29; 2003 c 112 art 2 s 50; 2009 c 101 art 2 s 109; 2013 c 108 art 12 s 12​ 103I.525 WELL CONTRACTOR'S LICENSE; REPRESENTATIVE'S CERTIFICATION.​ Subdivision 1. Certification application. (a) A person must file an application and application fee with​ the commissioner to represent a well contractor.​ (b) The application must state the applicant's qualifications for certification as a representative, and other​ information required by the commissioner. The application must be on forms prescribed by the commissioner.​ Subd. 2. Certification fee. (a) The application fee for certification as a representative of a well contractor​ is $75. The commissioner may not act on an application until the application fee is paid.​ (b) The renewal fee for certification as a representative of a well contractor is $75. The commissioner​ may not renew a certification until the renewal fee is paid.​ (c) A certified representative must file an application and a renewal application fee to renew the​ certification by the date stated in the certification. The renewal application must include information that​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.525​ MINNESOTA STATUTES 2018​ 22​ the certified representative has met continuing education requirements established by the commissioner by​ rule.​ Subd. 3. Examination. After the commissioner has approved the application, the applicant must take​ an examination given by the commissioner.​ Subd. 3a. Issuance of certification. If an applicant meets the experience requirements established by​ rule and passes the examination as determined by the commissioner, the commissioner shall issue the​ applicant a certification to represent a well contractor.​ Subd. 4. Issuance of license. If a person employs a certified representative, submits the bond under​ subdivision 5, and pays the license fee under subdivision 6, the commissioner shall issue a well contractor's​ license.​ Subd. 5. Bond. (a) As a condition of being issued a well contractor's license, the applicant must submit​ a corporate surety bond for $25,000 approved by the commissioner. The bond must be conditioned to pay​ the state on performance of work in this state that is not in compliance with this chapter or rules adopted​ under this chapter. The bond is in lieu of other license bonds required by a political subdivision of the state.​ (b) From proceeds of the bond, the commissioner may compensate persons injured or suffering financial​ loss because of a failure of the applicant to perform work or duties in compliance with this chapter or rules​ adopted under this chapter.​ Subd. 6. License fee. The fee for a well contractor's license is $250.​ Subd. 7. Validity. A well contractor's license is valid until the date prescribed in the license by the​ commissioner.​ Subd. 8. Renewal. (a) A licensee must file an application and a renewal application fee to renew the​ license by the date stated in the license.​ (b) The renewal application fee for a well contractor's license is $250.​ (c) The renewal application must include information that the certified representative of the applicant​ has met continuing education requirements established by the commissioner by rule.​ (d) At the time of the renewal, the commissioner must have on file all properly completed well and​ boring construction reports, well and boring sealing reports, reports of elevator borings, water sample analysis​ reports, well and boring permits, and well notifications for work conducted by the licensee since the last​ license renewal.​ Subd. 9. Incomplete or late renewal. If a licensee fails to submit all information required for renewal​ in subdivision 8 or submits the application and information after the required renewal date:​ (1) the licensee must include a late fee of $75; and​ (2) the licensee may not conduct activities authorized by the well contractor's license until the renewal​ application, renewal application fee, late fee, and all other information required in subdivision 8 are submitted.​ History: 1989 c 326 art 3 s 30; 1990 c 597 s 40-42; 1991 c 355 s 31-34; 1996 c 305 art 3 s 12,13; 1999​ c 250 art 3 s 10; 1Sp2001 c 9 art 1 s 8-11; 2002 c 379 art 1 s 113; 2005 c 106 s 32-37; 2007 c 124 s 1;​ 1Sp2011 c 9 art 2 s 9; 1Sp2017 c 6 art 10 s 31-35​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  12. 23​ MINNESOTA STATUTES 2018​ 103I.531​ 103I.531 LIMITED WELL/BORING CONTRACTOR'S LICENSE; REPRESENTATIVE'S​ CERTIFICATION.​ Subdivision 1. Certification application. (a) A person must file an application and an application fee​ with the commissioner to represent a limited well/boring contractor.​ (b) The application must state the applicant's qualifications for the certification, and other information​ required by the commissioner. The application must be on forms prescribed by the commissioner.​ Subd. 2. Certification fee. (a) The application fee for certification as a representative of a limited​ well/boring contractor is $75. The commissioner may not act on an application until the application fee is​ paid.​ (b) The renewal fee for certification as a representative of a limited well/boring contractor is $75. The​ commissioner may not renew a certification until the renewal fee is paid.​ (c) The fee for three or more limited well/boring contractor certifications is $225.​ (d) A certified representative must file an application and a renewal application fee to renew the​ certification by the date stated in the certification. The renewal application must include information that​ the certified representative has met continuing education requirements established by the commissioner by​ rule.​ Subd. 3. Examination. After the commissioner has approved the application, the applicant must take​ an examination given by the commissioner.​ Subd. 3a. Issuance of certification. If an applicant meets the experience requirements established by​ rule and passes the examination as determined by the commissioner, the commissioner shall issue the​ applicant a certification to represent a limited well/boring contractor.​ Subd. 4. Issuance of license. If a person employs a certified representative, submits the bond under​ subdivision 5, and pays the license fee under subdivision 6, the commissioner shall issue a limited well/boring​ contractor's license. If the other conditions of this section are satisfied, the commissioner may not withhold​ issuance of a dewatering limited license based on the applicant's lack of prior experience under a licensed​ well contractor.​ Subd. 5. Bond. (a) As a condition of being issued a limited well/boring contractor's license for sealing​ wells and borings, constructing, repairing, and sealing dewatering wells, or constructing, repairing, and​ sealing bored geothermal heat exchangers, the applicant must submit a corporate surety bond for $10,000​ approved by the commissioner. As a condition of being issued a limited well/boring contractor's license for​ installing, repairing, and modifying well pumps and pumping equipment, well screens, pitless units and​ pitless adaptors, and well casings from the pitless adaptor or pitless unit to the upper termination of the well​ casing, the applicant must submit a corporate surety bond for $2,000 approved by the commissioner. The​ bonds required in this paragraph must be conditioned to pay the state on performance of work in this state​ that is not in compliance with this chapter or rules adopted under this chapter. The bonds are in lieu of other​ license bonds required by a political subdivision of the state.​ (b) From proceeds of a bond required in paragraph (a), the commissioner may compensate persons​ injured or suffering financial loss because of a failure of the applicant to perform work or duties in compliance​ with this chapter or rules adopted under this chapter.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.531​ MINNESOTA STATUTES 2018​ 24​ Subd. 6. License fee. The fee for a limited well/boring contractor's license is $75. The fee for three or​ more limited well/boring contractor licenses is $225.​ Subd. 7. Validity. A limited well/boring contractor's license is valid until the date prescribed in the​ license by the commissioner.​ Subd. 8. Renewal. (a) A person must file an application and a renewal application fee to renew the​ limited well/boring contractor's license by the date stated in the license.​ (b) The renewal application fee for a limited well/boring contractor's license is $75.​ (c) The renewal application must include information that the certified representative of the applicant​ has met continuing education requirements established by the commissioner by rule.​ (d) At the time of the renewal, the commissioner must have on file all properly completed well and​ boring construction reports, well and boring sealing reports, well and boring permits, water quality sample​ reports, and well notifications for work conducted by the licensee since the last license renewal.​ Subd. 9. Incomplete or late renewal. If a licensee fails to submit all information required for renewal​ in subdivision 8 or submits the application and information after the required renewal date:​ (1) the licensee must include a late fee of $75; and​ (2) the licensee may not conduct activities authorized by the limited well/boring contractor's license​ until the renewal application, renewal application fee, and late fee, and all other information required in​ subdivision 8 are submitted.​ History: 1989 c 326 art 3 s 31; 1990 c 597 s 43; 1991 c 355 s 35-37; 1996 c 305 art 3 s 14,15; 1999 c​ 153 s 12; 1999 c 250 art 3 s 11; 1Sp2001 c 9 art 1 s 12-15; 2002 c 379 art 1 s 113; 2005 c 106 s 38-43;​ 2007 c 124 s 2; 1Sp2011 c 9 art 2 s 10; 2013 c 108 art 12 s 108; 1Sp2017 c 6 art 10 s 36,37​ 103I.533 [Repealed, 1990 c 597 s 73]​ 103I.535 ELEVATOR BORING CONTRACTOR'S LICENSE; REPRESENTATIVE'S​ CERTIFICATION.​ Subdivision 1. Certification application. (a) An individual must file an application and application fee​ with the commissioner to represent an elevator boring contractor.​ (b) The application must state the applicant's qualifications for the certification, and other information​ required by the commissioner. The application must be on forms prescribed by the commissioner.​ Subd. 2. Certification fee. (a) The application fee for certification as a representative of an elevator​ boring contractor is $75. The commissioner may not act on an application until the application fee is paid.​ (b) The renewal fee for certification as a representative of an elevator boring contractor is $75. The​ commissioner may not renew a certification until the renewal fee is paid.​ (c) A certified representative must file an application and a renewal application fee to renew the​ certification by the date stated in the certification. The renewal application must include information that​ the certified representative has met continuing education requirements established by the commissioner by​ rule.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  13. 25​ MINNESOTA STATUTES 2018​ 103I.541​ Subd. 3. Examination. After the commissioner has approved the application, the applicant must take​ an examination given by the commissioner.​ Subd. 3a. Issuance of certification. If the applicant meets the experience requirements established by​ rule and passes the examination as determined by the commissioner, the commissioner shall issue the​ applicant a certification to represent an elevator boring contractor.​ Subd. 4. Issuance of license. If a person employs a certified representative, submits the bond under​ subdivision 5, and pays the license fee under subdivision 6, the commissioner shall issue an elevator boring​ contractor's license to the applicant.​ Subd. 5. Bond. (a) As a condition of being issued an elevator boring contractor's license, the applicant​ must submit a corporate surety bond for $10,000 approved by the commissioner. The bond must be​ conditioned to pay the state on performance of work in this state that is not in compliance with this chapter​ or rules adopted under this chapter.​ (b) From proceeds of the bond, the commissioner may compensate persons injured or suffering financial​ loss because of a failure of the applicant to perform work or duties in compliance with this chapter or rules​ adopted under this chapter.​ Subd. 6. License fee. The fee for an elevator boring contractor's license is $75.​ Subd. 7. Validity. An elevator boring contractor's license is valid until the date prescribed in the license​ by the commissioner.​ Subd. 8. Renewal. (a) A person must file an application and a renewal application fee to renew the​ license by the date stated in the license.​ (b) The renewal application fee for an elevator boring contractor's license is $75.​ (c) The renewal application must include information that the certified representative of the applicant​ has met continuing education requirements established by the commissioner by rule.​ (d) At the time of renewal, the commissioner must have on file all reports and permits for elevator boring​ work conducted by the licensee since the last license renewal.​ Subd. 9. Incomplete or late renewal. If a licensee fails to submit all information required for renewal​ in subdivision 8 or submits the application and information after the required renewal date:​ (1) the licensee must include a late fee of $75; and​ (2) the licensee may not conduct activities authorized by the elevator boring contractor's license until​ the renewal application, renewal application fee, and late fee, and all other information required in subdivision​ 8 are submitted.​ History: 1989 c 326 art 3 s 33; 1991 c 355 s 38,39; 1996 c 305 art 3 s 16; 1997 c 7 art 1 s 25; 1999 c​ 250 art 3 s 12; 1Sp2001 c 9 art 1 s 16-19; 2002 c 379 art 1 s 113; 2005 c 106 s 44-51; 1Sp2011 c 9 art 2 s​ 11; 1Sp2017 c 6 art 10 s 38,39​ 103I.541 ENVIRONMENTAL WELL CONTRACTOR'S REGISTRATION; REPRESENTATIVE'S​ CERTIFICATION.​ Subdivision 1. Certification. A person seeking certification to represent an environmental well contractor​ must meet examination and experience requirements adopted by the commissioner by rule.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.541​ MINNESOTA STATUTES 2018​ 26​ Subd. 2. Validity. An environmental well contractor's certification is valid until the date prescribed in​ the certification by the commissioner.​ Subd. 2a. Certification application. (a) An individual must submit an application and application fee​ to the commissioner to apply for certification as a representative of an environmental well contractor.​ (b) The application must be on forms prescribed by the commissioner. The application must state the​ applicant's qualifications for the certification, and other information required by the commissioner.​ Subd. 2b. Issuance of license. If a person employs a certified representative, submits the bond under​ subdivision 3, and pays the license fee of $75 for an environmental well contractor license, the commissioner​ shall issue an environmental well contractor license to the applicant. The fee for an individual registration​ is $75. The commissioner may not act on an application until the application fee is paid.​ Subd. 2c. Certification fee. (a) The application fee for certification as a representative of an environmental​ well contractor is $75. The commissioner may not act on an application until the application fee is paid.​ (b) The renewal fee for certification as a representative of an environmental well contractor is $75. The​ commissioner may not renew a certification until the renewal fee is paid.​ (c) A certified representative must file an application and a renewal application fee to renew the​ certification by the date stated in the certification. The renewal application must include information that​ the certified representative has met continuing education requirements established by the commissioner by​ rule.​ Subd. 2d. Examination. After the commissioner has approved an application, the applicant must take​ an examination given by the commissioner.​ Subd. 2e. Issuance of certification. If the applicant meets the experience requirements established by​ rule and passes the examination as determined by the commissioner, the commissioner shall issue the​ applicant a certification to represent an environmental well contractor.​ Subd. 3. Bond. (a) As a condition of being issued an environmental well contractor's license, the applicant​ must submit a corporate surety bond for $10,000 approved by the commissioner. The bond must be​ conditioned to pay the state on performance of work in this state that is not in compliance with this chapter​ or rules adopted under this chapter. The bond is in lieu of other license bonds required by a political​ subdivision of the state.​ (b) From proceeds of the bond, the commissioner may compensate persons injured or suffering financial​ loss because of a failure of the applicant to perform work or duties in compliance with this chapter or rules​ adopted under this chapter.​ Subd. 4. License renewal. (a) A person must file an application and a renewal application fee to renew​ the license by the date stated in the license.​ (b) The renewal application fee for an environmental well contractor's license is $75.​ (c) The renewal application must include information that the certified representative of the applicant​ has met continuing education requirements established by the commissioner by rule.​ (d) At the time of the renewal, the commissioner must have on file all well and boring construction​ reports, well and boring sealing reports, well permits, and notifications for work conducted by the licensed​ person since the last license renewal.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  14. 27​ MINNESOTA STATUTES 2018​ 103I.550​ Subd. 5. Incomplete or late renewal. If a licensed person submits a renewal application after the required​ renewal date:​ (1) the licensed person must include a late fee of $75; and​ (2) the licensed person may not conduct activities authorized by the environmental well contractor's​ license until the renewal application, renewal application fee, late fee, and all other information required in​ subdivision 4 are submitted.​ History: 1989 c 326 art 3 s 34; 1990 c 597 s 44-46; 1991 c 355 s 40,41; 1996 c 305 art 3 s 17,18; 1999​ c 250 art 3 s 13; 1Sp2001 c 9 art 1 s 20-22; 2002 c 379 art 1 s 113; 2005 c 106 s 52; 1Sp2011 c 9 art 2 s​ 12; 1Sp2017 c 6 art 10 s 40-48​ 103I.545 REGISTRATION OF DRILLING MACHINES AND HOISTS REQUIRED.​ Subdivision 1. Drilling machine. (a) A person may not use a drilling machine such as a cable tool,​ rotary tool, hollow rod tool, or auger for a drilling activity requiring a license under this chapter unless the​ drilling machine is registered with the commissioner.​ (b) A person must apply for the registration on forms prescribed by the commissioner and submit a $75​ registration fee.​ (c) A registration is valid for one year.​ Subd. 2. Hoist. (a) A person may not use a machine such as a hoist for an activity requiring a license​ under this chapter to repair wells or borings, seal wells or borings, or install pumps unless the machine is​ registered with the commissioner.​ (b) A person must apply for the registration on forms prescribed by the commissioner and submit a $75​ registration fee.​ (c) A registration is valid for one year.​ History: 1989 c 326 art 3 s 35; 1991 c 355 s 42; 1Sp2001 c 9 art 1 s 23; 2002 c 379 art 1 s 113; 2005​ c 106 s 53; 1Sp2017 c 6 art 10 s 49​ 103I.550 LIMITED PUMP, PITLESS, OR DUG WELL/DRIVE POINT CONTRACTOR.​ Subdivision 1. Limited pump or pitless license or certification. A person with a limited well/boring​ contractor's license or certification to install well pumps and pumping equipment; or a person with a limited​ well/boring contractor's license or certification to install, repair, and modify pitless units and pitless adapters,​ well casings above the pitless unit or pitless adapter, and well screens and well diameters, will be issued a​ combined license or certification to: (1) install well pumps and pumping equipment; and (2) install, repair,​ and modify pitless units and pitless adapters, well casings above the pitless unit or pitless adapter, well​ screens, and well diameters.​ Subd. 2. Limited dug well/drive point license or certification. A person with a limited well/boring​ contractor's license or certification to construct, repair, and seal drive point wells and dug wells will be​ issued a well contractor's license or certification.​ History: 1Sp2017 c 6 art 10 s 50​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.601​ MINNESOTA STATUTES 2018​ 28​ EXPLORATORY BORINGS​ 103I.601 EXPLORATORY BORING PROCEDURES.​ Subdivision 1. Definitions. (a) For the purposes of this section, the following words have the meanings​ given them.​ (b) "Data" includes samples and factual noninterpreted data obtained from exploratory borings and​ samples including analytical results.​ (c) "Parcel" means a government section, fractional section, or government lot.​ (d) "Samples" means at least a one-quarter portion of all samples from exploratory borings that are​ customarily collected by the explorer. When the exploratory borings are being done to explore or prospect​ for kaolin clay, "samples" means a representative sample of at least two cubic inches of material per foot​ from exploratory borings of the material that is customarily collected by the explorer.​ Subd. 2. License required to make borings. (a) Except as provided in paragraph (d), a person must​ not make an exploratory boring without an explorer's license. The fee for an explorer's license is $75. The​ explorer's license is valid until the date prescribed in the license by the commissioner.​ (b) A person must file an application and renewal application fee to renew the explorer's license by the​ date stated in the license. The renewal application fee is $75.​ (c) If the licensee submits an application fee after the required renewal date, the licensee:​ (1) must include a late fee of $75; and​ (2) may not conduct activities authorized by an explorer's license until the renewal application, renewal​ application fee, late fee, and sealing reports required in subdivision 9 are submitted.​ (d) An explorer must designate a responsible individual to supervise and oversee the making of exploratory​ borings.​ (1) Before an individual supervises or oversees an exploratory boring, the individual must file an​ application and application fee of $75 to qualify as a certified responsible individual.​ (2) The individual must take and pass an examination relating to construction, location, and sealing of​ exploratory borings. A professional engineer or geoscientist licensed under sections 326.02 to 326.15 or a​ professional geologist certified by the American Institute of Professional Geologists is not required to take​ the examination required in this subdivision, but must be certified as a responsible individual to supervise​ an exploratory boring.​ (3) The individual must file an application and a renewal fee of $75 to renew the responsible individual's​ certification by the date stated in the certification. If the certified responsible individual submits an application​ fee after the renewal date, the certified responsible individual must include a late fee of $75 and may not​ supervise or oversee exploratory borings until the renewal application, application fee, and late fee are​ submitted.​ Subd. 3. Notification of project construction. (a) By 30 days before making an exploratory boring, an​ explorer must register with the commissioner of natural resources and provide a copy of the registration to​ the commissioner of health. The registration must include:​ (1) the identity of the firm, association, or company engaged in exploratory boring; and​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  15. 29​ MINNESOTA STATUTES 2018​ 103I.601​ (2) the identification of an agent, including the agent's business address.​ (b) The commissioner of natural resources may require a bond, security, or other assurance from an​ explorer if the commissioner of natural resources has reasonable doubts about the explorer's financial ability​ to comply with requirements of law relating to exploratory boring. The commissioner's determination to​ require assurance is exempt from the rulemaking provisions of chapter 14 and section 14.386 does not apply.​ (c) An explorer shall annually register with the commissioner of natural resources while conducting​ exploratory boring.​ Subd. 4. Notification and map of borings. (a) By ten days before beginning exploratory boring, an​ explorer must submit to the commissioner of health a notification of the proposed boring on a form prescribed​ by the commissioner, and a fee of $275 for each exploratory boring.​ (b) By ten days before beginning exploratory boring, an explorer must submit to the commissioners of​ health and natural resources a county road map having a scale of one-half inch equal to one mile, as prepared​ by the Department of Transportation, or a 7.5 minute series topographic map (1:24,000 scale), as prepared​ by the United States Geological Survey, showing the location of each proposed exploratory boring to the​ nearest estimated 40 acre parcel. Exploratory boring that is proposed on the map may not be commenced​ later than 180 days after submission of the map, unless a new map is submitted.​ Subd. 5. Access to drill sites. The commissioners of health, natural resources, and the Pollution Control​ Agency, the community health board as authorized under section 145A.04, and their officers and employees​ shall have access to exploratory boring sites to inspect the drill holes, drilling, and sealing of the borings,​ and to sample ambient air and drilling waters, and to measure the radioactivity of the waste drill cuttings at​ the drilling site at the time of observation.​ Subd. 6. Emergency notification. The explorer must promptly notify the commissioners of health,​ natural resources, and the Pollution Control Agency, and the authorized agent of the commissioner of health​ of an occurrence during exploratory boring that has a potential for significant adverse health or environmental​ effects. The explorer must take reasonable action to minimize the adverse effects.​ Subd. 7. Inspection of data before submission. The commissioner of health may, if necessary, inspect​ data before its submission under section 103I.605. The data examined by the commissioner is not public​ data before it is submitted under section 103I.605.​ Subd. 8. Permanent and temporary sealing procedures. Exploratory borings must be temporarily or​ permanently sealed according to rules adopted by the commissioner.​ Subd. 9. Sealing report. (a) By 30 days after permanent or temporary sealing of an exploratory boring,​ the explorer must submit a report to the commissioners of health and natural resources.​ (b) The report must be on forms provided by the commissioner of health and include:​ (1) the location of each drill hole in as large a scale as possible, which is normally prepared as part of​ the explorer's record;​ (2) the type and thickness of overburden and rock encountered;​ (3) identification of water bearing formations encountered;​ (4) identification of hydrologic conditions encountered;​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.601​ MINNESOTA STATUTES 2018​ 30​ (5) method of sealing used;​ (6) methods of construction and drilling used; and​ (7) average scintillometer reading of waste drill cuttings from uranium or other radioactive mineral​ exploratory borings before backfilling of the recirculation pits.​ History: 1989 c 326 art 3 s 36; 1991 c 228 s 2; 1993 c 113 art 3 s 2; 2004 c 221 s 44; 2005 c 106 s​ 54,55; 1Sp2005 c 4 art 6 s 6; 1Sp2017 c 6 art 10 s 51,52​ 103I.605 SUBMISSION OF DATA FROM EXPLORATORY BORINGS.​ Subdivision 1. Requirement. Data obtained from exploratory borings must be submitted by the explorer​ to the commissioner of natural resources as provided in this section.​ Subd. 2. Mineral deposit evaluation data. (a) In applying for a permit required for activities relating​ to mineral deposit evaluation, which means examining an area to determine the quality and quantity of​ minerals, excluding exploratory boring but including obtaining a bulk sample, by excavating, trenching,​ constructing shafts, ramps, tunnels, pits, and producing refuse and other associated activities, but does not​ include activities intended, by themselves, for commercial exploitation of the ore body, the explorer must​ submit to the commissioner of natural resources data relevant to the proposal under consideration. The​ explorer may identify portions of the data that, if released, would impair the competitive position of the​ explorer submitting the data. Data identified must be considered to be not public data.​ (b) If requested to disclose the data, the commissioner shall mail notice of the request to the explorer​ and determine whether release of the data would impair the competitive position of the explorer submitting​ the data. If the commissioner determines that release of the data would impair the competitive position of​ the explorer submitting the data, the commissioner may not release the data to a person other than parties​ to the proceedings relating to the permit under consideration. Parties to the proceedings shall maintain the​ confidentiality of data.​ (c) Data that are classified as not public may not be released by the commissioner until 30 days after​ mailed notice to the explorer of the commissioner's intention to release the data. The commissioner may not​ release data to a person engaged in exploration, mining, milling, or related industry pertaining to minerals.​ If the commissioner determines to release data, the explorer may demand a contested case hearing on the​ commissioner's determination or may withdraw the permit application and the data may not be released.​ (d) Any person aggrieved by the decision of the commissioner may appeal the decision according to​ chapter 14.​ Subd. 3. Mine development data. In applying for a permit required for mine development, which means​ activities undertaken after mineral deposit evaluation for commercial exploitation of the ore body, the​ explorer must submit to the commissioner of natural resources data relevant to the proposal under​ consideration. The data is public data and persons submitting or releasing the data are not subject to civil​ or criminal liability for its use by others.​ Subd. 4. Exploration data. (a) By 180 days after termination by the explorer of a lease or other type​ of exploration agreement on a property the data from the exploration must be submitted to the commissioner​ of natural resources. The data are public data and persons submitting or releasing the data are not subject to​ civil or criminal liability for its use by others.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  16. 31​ MINNESOTA STATUTES 2018​ 103I.621​ (b) Data that will become public under paragraph (a) may be submitted, with the prior written permission​ of the commissioner of natural resources, before the termination. If the data are submitted earlier than the​ required time, the data do not become public data until 180 days after termination by the explorer of the​ lease or other type of exploration agreement on the property from which the data are obtained. An explorer​ submitting data before the time required by paragraph (a) shall provide to the commissioner of natural​ resources at the time the data are submitted and every 180 days after that time, in a format designated by​ the commissioner of natural resources, satisfactory evidence that the lease or other type of exploration​ agreement is in effect. If satisfactory evidence that the mineral lease or other exploration agreement is still​ in effect is not provided to the commissioner of natural resources for a given 180-day period by the required​ date, the data immediately become public data. The explorer may waive, in writing, the data privacy​ requirements and agree that data submitted before the time required by paragraph (a) are public data.​ (c) Upon the written request of the explorer, data submitted under paragraph (a) are nonpublic data until​ 180 days after termination by the explorer of: (1) all other leases or other types of exploration agreements​ on property located within the same government section as the property on which the exploratory boring​ was done, and (2) all other leases or other types of exploration agreements on property located within a​ government section having at least one point in common along its boundary line with the government section​ in which the exploratory boring was done; provided that the owner of the property on which the exploration​ occurred consents to the data not becoming public data.​ An explorer requesting that the exploration data not become public data shall provide to the commissioner​ of natural resources at the time the data are submitted and every 180 days after that time, in a format designated​ by the commissioner of natural resources: (1) satisfactory evidence that the lease or exploration agreement​ that provides the basis for requesting that the data remain as not public data remains in effect, and (2)​ satisfactory evidence that the owner of the property upon which the exploration occurred consents to the​ data not becoming public data.​ If either of the pieces of satisfactory evidence is not provided to the commissioner of natural resources​ for a given 180-day period by the required date, the data immediately become public data. The explorer may​ waive, in writing, the data privacy requirements and agree that the submitted data are public data.​ (d) Exploration data and samples submitted under paragraphs (b) and (c) become public data no later​ than five years after receipt of the exploration data and samples by the commissioner of natural resources​ even if the lease or other type of exploration agreement described in paragraphs (b) and (c) has not terminated.​ Subd. 5. Designation of samples to be submitted. The commissioner of natural resources shall designate​ the samples to be submitted, and specify where the sample is to be delivered. If an explorer requires certain​ samples in their entirety, the commissioner of natural resources may waive the requirement for a one-fourth​ portion of the samples. Samples submitted are property of the state.​ History: 1989 c 326 art 3 s 37; 1991 c 228 s 3; 1993 c 113 art 3 s 3​ GROUNDWATER THERMAL EXCHANGE DEVICES​ 103I.621 PERMITS FOR GROUNDWATER THERMAL EXCHANGE DEVICES.​ Subdivision 1. Permit. (a) Notwithstanding any department or agency rule to the contrary, the​ commissioner shall issue, on request by the owner of the property and payment of the permit fee, permits​ for the reinjection of water by a properly constructed well into the same aquifer from which the water was​ drawn for the operation of a groundwater thermal exchange device.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.621​ MINNESOTA STATUTES 2018​ 32​ (b) As a condition of the permit, an applicant must agree to allow inspection by the commissioner during​ regular working hours for department inspectors.​ (c) Not more than 200 permits may be issued for small systems having maximum capacities of 20 gallons​ per minute or less. The small systems are subject to inspection twice a year.​ (d) Not more than ten permits may be issued for larger systems having maximum capacities from 20 to​ 50 gallons per minute. The larger systems are subject to inspection four times a year.​ (e) A person issued a permit must comply with this section for the permit to be valid.​ Subd. 2. Water-use requirements apply. Water-use permit requirements and penalties under chapter​ 103F and related rules adopted and enforced by the commissioner of natural resources apply to groundwater​ thermal exchange permit recipients. A person who violates a provision of this section is subject to enforcement​ or penalties for the noncomplying activity that are available to the commissioner and the Pollution Control​ Agency.​ Subd. 3. Construction requirements. (a) Withdrawal and reinjection for the groundwater thermal​ exchange device must be accomplished by a closed system in which the waters drawn for thermal exchange​ do not have contact or commingle with water from other sources or with polluting material or substances.​ The closed system must be constructed to allow an opening for inspection by the commissioner.​ (b) Wells that are part of a groundwater thermal exchange system may not serve another function, except​ water may be supplied to the domestic water system if:​ (1) the supply is taken from the thermal exchange system ahead of the heat exchange unit; and​ (2) the domestic water system is protected by an airgap or backflow prevention device as described in​ rules relating to plumbing enforced by the commissioner of labor and industry.​ (c) A groundwater thermal exchange system may be used for domestic water heating only if the water​ heating device is an integral part of the heat exchange unit that is used for space heating and cooling.​ Subd. 4. Rules. The commissioner may adopt rules to administer this section.​ History: 1989 c 326 art 3 s 38; 1991 c 355 s 43; 2007 c 140 art 12 s 2​ BORED GEOTHERMAL HEAT EXCHANGERS​ 103I.641 BORED GEOTHERMAL HEAT EXCHANGERS.​ Subdivision 1. Requirements. A person may not drill or construct an excavation used to install a bored​ geothermal heat exchanger unless the person is a limited well/boring contractor licensed for constructing,​ repairing, and sealing bored geothermal heat exchangers or a well contractor.​ Subd. 2. Regulations for bored geothermal heat exchangers. Bored geothermal heat exchangers must​ be constructed, maintained, and sealed under the provisions of this chapter.​ Subd. 3. Permit required. (a) A bored geothermal heat exchanger may not be installed without first​ obtaining a permit for the bored geothermal heat exchanger from the commissioner. A limited well/boring​ contractor licensed for constructing, repairing, and sealing bored geothermal heat exchangers or a well​ contractor must apply for the permit on forms provided by the commissioner and must pay the permit fee.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  17. 33​ MINNESOTA STATUTES 2018​ 103I.681​ (b) As a condition of the permit, the owner of the property where the bored geothermal heat exchanger​ is to be installed must agree to allow inspection by the commissioner during regular working hours of​ Department of Health inspectors.​ History: 1989 c 326 art 3 s 39; 1999 c 153 s 13,14; 2013 c 108 art 12 s 108​ UNDERGROUND SPACE DEVELOPMENT​ 103I.661 MINED UNDERGROUND SPACE DEVELOPMENT.​ Subdivision 1. Commissioner of natural resources review. The commissioners of natural resources​ and health shall review all project plans that involve dewatering of underground formations for construction​ and operation of mined underground space to determine the effects of the proposal on the quality and quantity​ of underground waters in and adjacent to the areas where the mined underground space is to be developed.​ Subd. 2. Permit for water removal. A mined underground space project involving or affecting the​ quality and quantity of groundwater may not be developed until a water-use permit for the appropriation of​ waters under chapter 103G has been issued by the commissioner of natural resources.​ History: 1989 c 326 art 3 s 40​ UNDERGROUND STORAGE OF GAS OR LIQUID​ 103I.681 PERMIT FOR UNDERGROUND STORAGE OF GAS OR LIQUID.​ Subdivision 1. Permit required. (a) The state, a person, partnership, association, private or public​ corporation, county, municipality, or other political subdivision of the state may not displace groundwater​ in consolidated or unconsolidated formations by the underground storage of a gas or liquid under pressure​ without an underground storage permit from the commissioner of natural resources.​ (b) The state, a person, a public corporation, county, municipality, or other political subdivision of the​ state may not store a gas or liquid, except water, below the natural surface of the ground by using naturally​ occurring rock materials as a storage reservoir without an underground storage permit from the commissioner​ of natural resources.​ Subd. 2. Application. (a) A person may apply for an underground storage permit by filing an application​ form with the commissioner of natural resources accompanied by the application fee and maps, plans, and​ specifications describing the proposed displacement of groundwater and the underground storage of gases​ or liquids and other data required by the commissioner.​ (b) The commissioner of natural resources shall prescribe the application form to apply for an underground​ storage permit.​ (c) The commissioner of natural resources may require an applicant to demonstrate to the commissioner​ that the applicant has adequately provided a method to ensure payment of any damages resulting from the​ operation of a gas or liquid storage reservoir.​ Subd. 3. Hearing required. (a) An underground storage permit allowing displacement of groundwater​ may not be issued by the commissioner of natural resources without holding a public hearing on the issuance​ of the permit.​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.681​ MINNESOTA STATUTES 2018​ 34​ (b) By 20 days after receiving a complete application, the commissioner of natural resources shall set​ a time and location for the hearing.​ Subd. 4. Notice of hearing. The hearing notice must:​ (1) state the date, place, and time of the hearing;​ (2) show the location of groundwater and surface water and property affected by the proposed underground​ storage;​ (3) be published by the applicant, or by the commissioner of natural resources if the proceeding is​ initiated by the commissioner of natural resources, once each week for two successive weeks in a legal​ newspaper that is published in the county where a part or all of the affected groundwater or surface waters​ are located; and​ (4) be mailed by the commissioner of natural resources to the county auditor and the chief executive​ official of an affected municipality.​ Subd. 5. Procedure at hearing. (a) The hearing must be public and conducted by the commissioner of​ natural resources or a referee appointed by the commissioner.​ (b) Affected persons must have an opportunity to be heard. Testimony must be taken under oath and​ the parties must have the right of cross-examination. The commissioner of natural resources shall provide​ a stenographer, at the expense of the applicant, to take testimony and a record of the testimony, and all​ proceedings at the hearing shall be taken and preserved.​ (c) The commissioner of natural resources is not bound by judicial rules of evidence or of pleading and​ procedure.​ Subd. 6. Subpoenas. The commissioner of natural resources may subpoena and compel the attendance​ of witnesses and the production of books and documents material to the purposes of the hearing. Disobedience​ of a subpoena, or refusal to be sworn, or refusal to answer as a witness, is punishable as contempt in the​ same manner as a contempt of the district court. The commissioner of natural resources must file a complaint​ of the disobedience with the district court of the county where the disobedience or refusal occurred.​ Subd. 7. Required findings. An order granting a permit for the proposed storage may not be issued​ unless it contains and is based on a finding stating:​ (1) the proposed storage will be confined to geological stratum or strata lying more than 500 feet below​ the surface of the soil;​ (2) the proposed storage will not substantially impair or pollute groundwater or surface water; and​ (3) the public convenience and necessity of a substantial portion of the gas-consuming public in the​ state will be served by the proposed project.​ Subd. 8. Order conditions. The order granting the permit must contain conditions and restrictions that​ will reasonably protect:​ (1) private property or an interest not appropriated;​ (2) the rights of the property owners and owners of an interest in property located within the boundaries​ of the proposed storage area, or persons claiming under the owners, to explore for, drill for, produce or​ develop for the recovery of oil or gas or minerals under the property, and to drill wells on the property to​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

  18. 35​ MINNESOTA STATUTES 2018​ 103I.691​ develop and produce water; provided that the exploration, drilling, producing, or developing complies with​ orders and rules of the commissioner of natural resources that protect underground storage strata or formations​ against pollution and against the escape of gas; and​ (3) public resources of the state that may be adversely affected by the proposed project.​ Subd. 9. Publication of findings, conclusions, orders. (a) The commissioner of natural resources shall​ mail notice of any findings, conclusions, and orders made after the hearing to:​ (1) the applicant;​ (2) parties who entered an appearance at the hearing;​ (3) the county auditor; and​ (4) the chief executive officer of an affected municipality.​ (b) The commissioner of natural resources must publish notice of findings, conclusions, and orders made​ after the hearing at least once each week for two successive weeks in a legal newspaper in the county where​ a part or all of the proposed project is located. The costs of the publication must be paid by the applicant.​ Subd. 10. Appeal of commissioner's determination. An interested party may appeal the determination​ of the commissioner of natural resources to the court of appeals in accordance with the provisions of chapter​ 14.​ Subd. 11. Permit fee schedule. (a) The commissioner of natural resources shall adopt a permit fee​ schedule under chapter 14. The schedule may provide minimum fees for various classes of permits, and​ additional fees, which may be imposed subsequent to the application, based on the cost of receiving,​ processing, analyzing, and issuing the permit, and the actual inspecting and monitoring of the activities​ authorized by the permit, including costs of consulting services.​ (b) A fee may not be imposed on a state or federal governmental agency applying for a permit.​ (c) The fee schedule may provide for the refund of a fee, in whole or in part, under circumstances​ prescribed by the commissioner of natural resources. Fees received must be deposited in the state treasury​ and credited to an account in the natural resources fund. Permit fees received are appropriated annually from​ the natural resources fund to the commissioner of natural resources for the costs of inspecting and monitoring​ the activities authorized by the permit, including costs of consulting services.​ History: 1989 c 326 art 3 s 41; 1990 c 597 s 47; 1Sp2005 c 1 art 2 s 124; 1Sp2010 c 1 art 14 s 6​ 103I.685 ABANDONMENT OF UNDERGROUND STORAGE PROJECT.​ An underground storage project for which an underground storage permit is granted may not be​ abandoned, or a natural or artificial opening extending from the underground storage area to the ground​ surface be filled, sealed, or otherwise closed to inspection, except after written approval by the commissioner​ of natural resources and in compliance with conditions that the commissioner may impose.​ History: 1989 c 326 art 3 s 42; 1990 c 597 s 48​ 103I.691 CERTIFICATE OF USE.​ A person may not use a gas or liquid storage reservoir under an underground storage permit unless the​ right to use the property affected by the project has been acquired and a notice of the acquisition filed with​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​ 103I.691​ MINNESOTA STATUTES 2018​ 36​ the commissioner of natural resources. The commissioner of natural resources must issue a certificate​ approving use of the gas or liquid storage reservoir.​ History: 1989 c 326 art 3 s 43; 1990 c 597 s 49​ 103I.701 [Repealed, 1993 c 206 s 25]​ 103I.705 [Repealed, 1993 c 206 s 25]​ ENFORCEMENT​ 103I.711 IMPOUNDING OF EQUIPMENT.​ Subdivision 1. Impoundment. The commissioner may apply to district court for a warrant authorizing​ seizure and impoundment of all drilling machines or hoists owned or used by a person. The court shall issue​ an impoundment order upon the commissioner's showing that a person is constructing, repairing, or sealing​ wells or borings or installing pumps or pumping equipment or excavating holes for installing elevator borings​ without a license as required under this chapter. A sheriff on receipt of the warrant must seize and impound​ all drilling machines and hoists owned or used by the person. A person from whom equipment is seized​ under this subdivision may file an action in district court for the purpose of establishing that the equipment​ was wrongfully seized.​ Subd. 2. Release. The equipment must remain in the custody of the sheriff until the equipment is released​ under the order of a court or until the commissioner orders the sheriff to release the equipment.​ History: 1989 c 326 art 3 s 46; 1991 c 355 s 50; 1Sp2017 c 6 art 10 s 53​ 103I.715 CRIMINAL PENALTIES.​ Subdivision 1. Misdemeanors. A person who violates a provision of this chapter is guilty of a​ misdemeanor.​ Subd. 2. Gross misdemeanors. A person is guilty of a gross misdemeanor who:​ (1) willfully violates a provision of this chapter or order of the commissioner;​ (2) engages in the business of drilling or making wells, sealing wells, installing pumps or pumping​ equipment, or constructing elevator borings without a license required by this chapter; or​ (3) engages in the business of exploratory boring without an exploratory borer's license under this​ chapter.​ Subd. 3. Prosecution and venue. A violation of this chapter shall be prosecuted by the county attorney​ in the county where the violation occurred or is occurring. The trial shall be held in that county.​ History: 1989 c 326 art 3 s 47; 1Sp2017 c 6 art 10 s 54​ Copyright © 2018 by the Revisor of Statutes, State of Minnesota. All Rights Reserved.​

Wells, Borings, and Underground Uses (Minnesota Statutes: Chapter 103I) · Nelum