跳到主要内容
Nelum
美国的法律

Resource Extraction Reclamation (Florida Statutes: Title XXVIII Natural Resources; Conservation, Reclamation, and Use; Chapter 378 Land Reclamation; Part III; ss. 378.401-378.901)

颁布于 1941 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

关于这部法律

语言
English
类型
法令
组织
European Union
国家
美国 · Florida
主题
Mineral resources
关键词
protection of environment, public health, soil conservation/soil improvement, soil pollution/quality, mining, inspection, enforcement/compliance, minerals, authorization/permit, pollution control
类别
metals-base, metals-precious, minerals-critical

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. (a) The petitioning local government has adopted and effectively implemented a local government comprehensive plan.

  2. (b) The local government has adequate review procedures and the financial and staffing resources necessary to assume responsibility for adequate review and inspection.

  3. (c) The local government has a record of effectively reviewing, inspecting, and enforcing compliance with local ordinances and state laws. (3) In making his or her determination, the secretary shall consult with the Department of Economic Opportunity, the appropriate regional planning council, and the appropriate water management district. (4) The secretary shall evaluate the performance of a local government on a regular basis to ensure compliance with this section. All or part of the certification may be rescinded if the secretary determines that the certification is not being carried out pursuant to the requirements of this part. (5) The department shall establish the certification procedure by rule. History.—s. 1, ch. 86-294; s. 331, ch. 94-356; s. 1026, ch. 95-148; s. 117, ch. 99-385; s. 255, ch. 2011-142. 378.4115 County certification for limerock mining in the Miami-Dade County Lake Belt.—The department and Miami-Dade County shall cooperate to establish and fulfill reasonable requirements for the departmental certification of the Miami-Dade County Department of Environmental Resource Management to implement the reclamation program under ss. 378.401-378.503 for limerock mining activities within the geographic area of the Miami-Dade County Lake Belt which was recommended for mining in the report submi ed to the Legislature in February 1997 under s. 373.4149. The delegation of implementing authority must be consistent with s. 378.411 and chapter 62C-36, Florida Administrative Code. Further, the reclamation program shall maximize the efficient mining of limestone, and the li oral area surrounding the lake excavations shall not be required to be greater than 100 feet average in width. History.—s. 4, ch. 97-222; s. 4, ch. 99-298; s. 5, ch. 2001-172. 378.412 Relationship with other laws.—It is the intent of the Legislature that ss. 378.202-378.804 supplement other laws regarding resource extraction. Nothing contained in such sections shall be construed to limit, abridge, or alter any agency’s duties, authority, and responsibilities granted pursuant to another statute. Nothing in ss. 378.202-378.804 shall be deemed to preempt local ordinances that impose stricter reclamation standards. History.—s. 1, ch. 86-294. 378.501 Limestone; notice of intent to mine required.— (1) No operator may begin the process of limestone resource extraction at a new mine without notifying the secretary of the intention to mine. (2) The operator’s notice of intent to mine shall include, but not be limited to: (a) The operator’s conceptual mining plan which is comprised of such maps and other supporting documents as may be reasonably required by the department, the operator’s time schedule that assures that the reclamation process is achieved in a timely manner, and the operator’s estimated life of the mine. (b) The operator’s signed acknowledgment of the limestone reclamation performance standards provided by s. 378.503. (3) The department shall develop by rule the required data, forms, and other information for the notice of intent to mine. The rule shall clearly state what data, forms, and other information are required and the reasons why such data, forms, and other information are required. (4) The secretary shall notify the operator as to the sufficiency of the notice of intent to mine. The review of such notice shall be accomplished in accordance with the provisions of s. 378.405. History.—s. 1, ch. 86-294; s. 332, ch. 94-356. 378.502 Existing mines.—After January 1, 1989, all operators of existing mines for limestone resource extraction shall meet the reclamation performance standards provided by s. 378.503 for any new surface area disturbed at such mines. The operator shall provide the department with a documented list of all existing mines subject to the provisions of this section. History.—s. 1, ch. 86-294; s. 333, ch. 94-356. 378.503 Limestone reclamation performance standards.— (1) All reclamation activities shall be initiated at the earliest practicable time. (2) Reclamation activities shall be consistent with all applicable local government ordinances at least as stringent as the criteria and standards contained in this section. (3) Reclamation shall achieve the stormwater, drainage, wetlands, and other surface and ground water management requirements of the Department of Environmental Protection and the appropriate water management district. (4) Provisions for safety to persons, wildlife, and adjoining property must be provided. (5) The operator shall use best management practices to minimize erosion. (6) Reclamation shall include revegetation, with species native to the area, of li oral zones and upland areas, except that revegetation shall not be required in those areas where revegetation is impractical or not in accordance with good land management practices. (7) Resource extraction which results in a water body shall provide one of the following shoreline treatments: (a) A li oral shelf not less than 18 feet in width with a berm on the waterward side. (b) A straight slope not steeper than 1 vertical to 3 horizontal, and extending downward from average water level to 6 feet below the average water level. (c) Where a sheer wall results, then in lieu of a shoreline treatment, access shall be controlled by the use of berms, fences, or other restrictive methods, all of which shall be used in conjunction with a transition shelf of at least 10 feet in width.

  4. (d) Slope requirements of the United States Army Corps of Engineers or the department under part IV of chapter 373.

  5. (e) The secretary may allow other shoreline treatments to achieve appropriate safety and environmental considerations. (8) Where a dry sheer wall results, access shall be controlled by the use of berms, fences, or other restrictive methods, all of which shall be used in conjunction with a transition shelf of at least 10 feet in width. History.—s. 1, ch. 86-294; s. 334, ch. 94-356; s. 6, ch. 2007-191. 378.601 Heavy minerals.— (1)(a) Each operator who intends to mine or extract heavy minerals at a new mine shall receive approval of the department of a conceptual reclamation plan prior to undertaking mining or extraction. (b) New mine, for the purposes of this section, shall mean a mine where the operator begins the clearing of land for mining after July 1, 1987. (c) The term “conceptual reclamation,” for the purposes of this section, means a graphic and wri en description of general activities to be undertaken across the whole mine to comply with the reclamation standards applicable to this part. (2) Each operator of an existing mine, which has not submi ed a conceptual reclamation plan pursuant to the requirements of s. 211.32, shall submit to the department for approval a conceptual reclamation plan no later than July 1, 1987. (3) The department may also require that each operator submit an annual report. (4) Reclamation standards applicable to this section shall be adopted by rule by the department. The intent shall be that these regulations shall be no more stringent than those standards currently in place for the heavy mineral mining. The department shall consider the following criteria in its regulations: (a) The reclamation standards shall reflect the circumstances unique to each mineral commodity and must reasonably address the practicality for reclamation for each commodity and the future use of the land. All reclamation activities shall, to the extent feasible, be coordinated with resource extraction and shall be initiated at the earliest practicable time. (b) Reclamation activities shall be conducted in a manner which has minimal long-term adverse impacts on surface and groundwater resources, wildlife, and adjacent lands. (c) The department shall by rule adopt adequate reclamation sloping requirements. (d) The operator shall use best management practices to minimize erosion. (e) Drainage systems, wetlands, and other surface waters shall function in manners which are not significantly different from those which existed prior to resource extraction.

  6. (f) Reclamation shall provide for revegetation. Plans for revegetation shall incorporate measures to minimize wildlife habitat lost as a result of resource extraction.

  7. (g) Reclamation shall result in landforms which are capable of supporting diverse and beneficial land uses.

  8. (h) Exceptions to the criteria contained in this section may be granted by the secretary for experimental or innovative techniques.

  9. (i) Reclamation of the land, including a complete growing season for revegetation, shall be completed within 3 years of the completion of the mining operation associated with the resource extraction. (5) Any heavy mineral mining operation which annually mines less than 500 acres and whose proposed consumption of water is 3 million gallons per day or less may not be subject to s. 380.06, provided permits and plan approvals pursuant to either this section and part IV of chapter 373, or s. 378.901, are issued. History.—s. 1, ch. 86-294; s. 335, ch. 94-356; s. 5, ch. 95-215; s. 1, ch. 97-222; s. 99, ch. 99-251; s. 2, ch. 2001-134; s. 17, ch. 2018-158. 378.701 Fuller’s earth clay; notice of intent to mine required.— (1) No fuller’s earth clay operator may begin the process of resource extraction at a new mine without notifying the secretary of the intention to mine. (2) The operator’s notice of intent to mine shall include, but not be limited to: (a) Such maps and other supporting documents as may be reasonably required by the department. (b) The operator’s time schedule that assures that the reclamation process is achieved in a timely manner. (c) The operator’s estimated life of the mine. (d) The operator’s conceptual reclamation plan. (3) The department shall develop by rule the required data, forms, and other information for the notice of intent to mine. The rule shall clearly state what data, forms, and other information are required and the reasons why such data, forms, and other information are required. (4) The secretary shall notify the operator as to the sufficiency of the notice of intent to mine. The review of such notice shall be accomplished in accordance with the provisions of s. 378.405. (5) The secretary shall approve, modify, or reject the operator’s conceptual reclamation plan. History.—s. 1, ch. 86-294; s. 336, ch. 94-356. 378.702 Existing mines.—On October 1, 1986, all operators of existing mines for fuller’s earth clay resource extraction shall meet the performance standards provided by s. 378.703 on all mines that increase the diameter of an existing mine. History.—s. 1, ch. 86-294. 378.703 Fuller’s earth clay reclamation performance standards.— (1) All reclamation activities shall, to the extent feasible, be coordinated with resource extraction and in any event shall be initiated at the earliest practicable time. (2) Reclamation activities shall be consistent with all applicable local government ordinances at least as stringent as the criteria and standards contained in this section. (3) Reclamation activities shall be conducted in a manner which has no long-term adverse impact on surface and groundwater resources, wildlife, and adjacent lands. (4) Drainage systems, wetlands, and other surface waters shall function in manners which are not significantly different from those which existed prior to resource extraction. (5) Reclamation shall achieve the stormwater requirements of the appropriate water management district. (6) The department shall establish by rule the reclamation sloping requirements. (7) The operator shall use best management practices to minimize erosion, including revegetation. (8) The plans for revegetation shall incorporate measures to offset wildlife habitat lost as a result of resource extraction. (9) Reclamation shall provide for the establishment of flora and fauna which are consistent with intended land use. (10) Reclamation and restoration shall result in landforms which are capable of supporting diverse and beneficial land uses. (11) Exceptions to the criteria and standards contained in this section may be granted by the secretary for experimental or innovative techniques. (12) Reclamation of the land, including a complete growing season for revegetation, shall be completed within 3 years of the completion of the mining operations associated with the resource extraction. History.—s. 1, ch. 86-294; s. 337, ch. 94-356. 378.801 Other resources; notice of intent to mine required.— (1) No operator may begin the process of extracting clay, peat, gravel, sand, or any other solid substance of commercial value found in natural deposits or in the earth, except fuller’s earth clay, heavy minerals, limestone, or phosphate, which are regulated elsewhere in this chapter, at a new mine without notifying the secretary of the intention to mine. (2) The operator’s notice of intent to mine shall consist of the operator’s estimated life of the mine and the operator’s signed acknowledgment of the performance standards provided by s. 378.803. History.—s. 1, ch. 86-294; s. 338, ch. 94-356. 378.802 Existing mines.—After January 1, 1989, all operators of existing mines for the extraction of resources as described in s. 378.801 shall meet the performance standards provided by s. 378.803 for any new surface area disturbed at such mines. History.—s. 1, ch. 86-294; s. 1, ch. 89-88. 378.803 Other resources reclamation performance standards.— (1) Reclamation shall achieve the stormwater, drainage, wetlands, and other surface and groundwater requirements of the Department of Environmental Protection and the appropriate water management district. (2) The final slopes shall be at such an angle as to minimize the possibility of slides and shall not exceed the natural angle of repose of the material being mined. (3) Provisions for safety to persons, wildlife, and adjoining property must be provided. (4) Any overburden and spoil shall be left in a configuration which is in accordance with accepted soil conservation practices and which is suitable for the proposed future use of the land. (5) Reclamation shall be designed to avoid the collection of water in pools which are, or are likely to become, noxious, odious, or foul. (6) All reclamation activities shall, to the extent possible, be coordinated with resource extraction and in any event shall be initiated at the earliest practicable time. (7) Reclamation activities shall be consistent with all applicable local government ordinances at least as stringent as the criteria and standards contained in this section. History.—s. 1, ch. 86-294; s. 339, ch. 94-356. 378.804 Exemption.—Any operator who extracts resources from any one site, not to exceed 20 acres over the life of the mine, or who extracts peat for agricultural purposes is exempt from the provisions of s. 378.801. History.—s. 1, ch. 86-294; s. 7, ch. 2007-191. 378.901 Life-of-the-mine permit.— (1) As used in this section, the term: (a) “Bureau” means the Bureau of Mine Reclamation of the Division of Water Resource Management of the Department of Environmental Protection. (b) “Life-of-the-mine permit” means a permit authorizing activities regulated under part IV of chapter 373 and part IV of this chapter. (2) As an alternative to, and in lieu of, separate applications for permits required under part IV of chapter 373 and part IV of this chapter, any operator who mines or extracts or proposes to mine or extract heavy minerals, limestone, or fuller’s earth clay may apply to the bureau for a life-of-the-mine permit. This subsection does not limit the authority of a local government to approve, approve with conditions, deny, or impose a permit duration that is different from the duration issued pursuant to this section. (3) The bureau may also issue life-of-the-mine permits to operators of sand mines as part of the consideration for conveyance to the Board of Trustees of the Internal Improvement Trust Fund of environmentally sensitive lands in an amount equal to or greater than the acreage included in the life-of-the-mine permit and provided such environmentally sensitive lands are contiguous to or within reasonable proximity to the lands included in the life-of- the-mine permit. (4) Notwithstanding the provisions of s. 378.405, an application for a life-of-the-mine permit must be reviewed as follows: (a) Within 30 days after receipt of an application for a permit under this section, the bureau shall review the application and shall request submi al of any additional information that the bureau requires. If the operator believes that the bureau is not authorized by law or rule to require any of the requested additional information, the operator may request a hearing pursuant to ss. 120.569 and 120.57. Within 30 days after receipt of the additional information, the bureau shall review it and may further request only that information needed to clarify the additional information or to answer new questions raised by or directly related to the additional information. (b) If the operator believes that any further request of the bureau for information is not authorized by law or agency rule, the bureau, at the operator’s request, shall proceed to process the permit application. (c) A life-of-the-mine permit must be approved or denied by the bureau within 135 days after receipt of the original completed application, receipt of the timely requested additional information, or correction of errors or omissions. The 135-day period must be tolled in accordance with s. 120.60. (5)(a) In determining whether to issue a life-of-the-mine permit or to approve an application for a modification to an existing life-of-the-mine permit, the bureau shall apply, and its authority shall be limited by, the relevant criteria in, and rules adopted under, part IV of chapter 373 and part IV of this chapter. The issuance of a life-of-the-mine permit relieves the operator from the requirement to obtain separate construction and operation permits. To the extent that a life-of-the-mine permit authorizes discharges regulated pursuant to s. 1 of Pub. L. No. 92-500, the permit may constitute State of Florida certification thereunder. (b) Wetlands reclamation activities under this part shall mitigate impacts to wetlands so long as the activities comply with s. 373.414(6). (6) The department may adopt only those rules that are necessary to describe the procedural requirements for the submi al and review of an application for a life-of-the-mine permit. The department may not adopt rules that separately set forth new substantive criteria for a life-of-the-mine permit except rules necessary to eliminate conflicting or duplicative provisions. (7) A life-of-the-mine permit is valid for the period designated in the application as the estimated life-of-the-mine. Notwithstanding the issuance of a life-of-the-mine permit, the department may release lands pursuant to s. 378.407 prior to the expiration of the life-of-the-mine permit. (8) The fee for a life-of-the-mine permit application shall equal the aggregate of the application fees for separate permits that authorize the activities covered by the life-of-the-mine permit, except that the application fee for a life-of- the-mine permit which exceeds 25 years shall be the fee for a permit which equals 25 years plus an additional amount for each year over 25 years equal to the pro rata share of a 25-year permit fee. (9) Each operator of a mine that has received construction approval in accordance with s. 403.087, s. 403.088, former part VIII of chapter 403, or part IV of chapter 373 in response to an application which was submi ed prior to July 1, 1995, may elect either to seek renewal of that permit or to seek a life-of-the-mine permit for all new or existing activities that require a permit. Life-of-the-mine permit applications for existing fuller’s earth mining activities must be reviewed as set forth in s. 373.414(15). (10) At the election and request of the applicant, the department shall coordinate and integrate the processing of industrial wastewater discharge permit applications and federally delegated National Pollutant Discharge and Elimination System permit applications with the life-of-the-mine permit application. The bureau shall initiate and oversee coordination of such applications with the goal of conducting a comprehensive and concurrent evaluation of the mine. History.—s. 1, ch. 95-215; s. 112, ch. 96-410; s. 7, ch. 97-222; s. 184, ch. 99-13; s. 3, ch. 99-353; s. 31, ch. 2010-205. Disclaimer: The information on this system is unverified. The journals or printed bills of the respective chambers should be consulted for official purposes. Copyright © 2000- 2018 State of Florida.

Resource Extraction Reclamation (Florida Statutes: Title XXVIII Natural Resources; Conservation, Reclamation, and Use; Chapter 378 Land Reclamation; Part III; ss. 378.401-378.901) · Nelum