跳到主要内容
Nelum
泰国的法律

Ministerial Regulation B.E. 2539 (1996) issued under the Energy Development and Promotion Act, B.E. 2535 (1992)

颁布于 1996 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

关于这部法律

语言
English
类型
条例
组织
Mekong River Commission (MRC)
国家
泰国
主题
Energy
关键词
energy conservation/energy production, renewable energy, authorization/permit, enforcement/compliance

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. 1.1 Being Ordinary Person, Age …....…Yrs. Nationality ……………………. I.D. Card / Alien Certificate No…………………………………………………………………..... Issued at Amphur / District……………………………..Province…………………………………. Living at House No. ……. Lane/Soi ……………………. Road ……………………..Moo ……… Tambol/Sub-District ……………….. Amphur/District …………………..Province……………… Postal Code ………………. Tel. ……………………………… Fax ……………………………...

  2. 1.2 Being Juristic Person, ……………………………………………………... Registered on ………….…………… Registration No. …………………………. Office located at No. …………. Lane/Soi …………………..……. Road …………………..………..Moo …..…… Tambol/Sub-District ……………….. Amphur/District …………………..Province……………… Postal Code ………………. Tel. ……………………………… Fax ……………………………... By ………………..Authorized Signature for Juristic Person of Applicant, Age …………… Yrs. Nationality ………………… I.D. Card/Alien Certificate No. …………………………………….. Issued at Amphur / District……………………………..Province…………………………………. Living at House No. ……. Lane/Soi ……………………. Road ……………………..Moo ……… Tambol/Sub-District ……………….. Amphur/District …………………..Province……………… Postal Code ………………. Tel. ……………………………… Fax ……………………………... Operated by …………………………….., Age ……….. Yrs. Nationality …………………. I.D. Card/Alien Certificate No. …………………………………….. Issued at Amphur / District……………………………..Province…………………………………. Living at House No. ……. Lane/Soi ……………………. Road ……………………..Moo ……… Tambol/Sub-District ……………….. Amphur/District …………………..Province……………… Postal Code ………………. Tel. ……………………………… Fax ……………………………... 2. I wish to apply for a permit of ' production ' expansion of production of Regulated Energy to operate …………………… at (name of place) …………………... Located at …………….. Lane/Soi …………………. Road ……………………..Moo …...…… Tambol/Sub-District ……………….. Amphur/District Province……………… Postal Code ………………. Tel. ……………………………… Fax …………………... With following details :-

  3. 2.1 Generators used for Regulated Energy Production are www.ThaiLaws.com 2 [ ] Diesel Engine [ ] Steam Engine [ ] Others (Specify) …….... as depicted in a list of engines used for Regulated Energy Production, and data on fuel consumption and environment annexed to this application.

  4. 2.2 Method of Regulated Energy Production is [ ] Direct Connection [ ] Combined Energy Production [ ] Others (Specify) ……......

  5. 2.3 Raw or Natural Materials used for fuel are (1) …………………………….. (2) …………………………….. (3) ……………………………..

  6. 2.4 Total investment in Regulated Energy Production is ………………………... Baht and operating cost of production (e.g. fuel, yearly maintenance, personnel, insurance fee, etc.), averages ………………….. Baht per kWh.

  7. 2.5 Production of Regulated Energy is for [ ] Own use [ ] Contingency Reserve [ ] Sale

  8. 2.6 In case of Production for sale (Details attached as necessary) Sold to ……………………..……. At a rate of ……………………………………. Baht per kWh.

  9. 2.7 Controller of Regulated Energy Production is ……………………………………. Qualification ………………………………………………………………………………………... Holder of License of Control Engineer, in category of (if any) ……………………………………. Registration No. ……………………………………………………………………………………. 3. With this application, I have enclosed the following documents: (1) A copy or Photostat copy of a registration certificate, objectives, and authorized signatures for juristic person of an applicant, made for no longer than six months, in case the applicant is a juristic person. (2) A letter of authorization in an official form, in case an applicant is authorized to submit an application. (3) A copy or Photostat copy of a house registration, I.D. Card or Alien Certificate of the authorized and the authorizer. (4) A location map of a place of Regulated Energy Production in 2 copies. (5) Diagrams of wiring and Regulated Energy Distribution in 2 copies. (6) Capacities of installed energy consumption of engines used that consumed Regulated Energy at each source of Regulated Energy Production in 2 copies. (7) A copy or Photostat copy of a license of control engineer for the controlling engineer (if any). (Signature) ……………………… (Applicant) (…………………………………..) Remark:- Mark / in blocks [ ] in front of required text. www.ThaiLaws.com 3 1. Particulars of machines and equipments for measurement and prevention, used in production of Regulated Energy.

  10. 1.1 Generators Particulars Machine No.1 Machine No.2 Machine No.3 Type (Diesel, Steam, Gas Trbine, Steam Turbine, etc.) H.P. Speed of engine (RPM) Type of fuel used (Diesel, Firewood, etc.) Number of cylinders or stages Year of Installation (B.E.) Engine condition when installed (%) Name of manufacturer Engine No. Present engine condition (%) Country of manufacturer Remark

  11. 1.2 Electricity Generator Particulars Generator No.1 Generator No.2 Generator No.3 Specification KW Capacity KWA Voltage (Volt) Current (Ampere) Speed of engine (RPM) System (Phase) Frequency (RPS) Power Factor (%) Year of Installation (B.E.) Engine condition when installed (%) Name of manufacturer Engine No. Present engine condition (%) Country of manufacturer Remark www.ThaiLaws.com 4

  12. 1.3 Specifications and capacities of measuring and preventing equipment attached to generator. Particulars Generator No.1 Generator No.2 Generator No.3 Current Meter (Ampere) Voltage Meter (Volt) Power Meter (kW) Frequency Meter (RPS) Output Meter(kWh) Fuse (Ampere) (Ampere) Cut out Switch Automatic (Volt) Relay to prevent over current (Ampere) Relay for over voltage (Volt) Relay for over low voltage (Volt) Relay for reverse current (Watt) Relay for speed (RPS) Other (Specify)

  13. 1.4 Particulars of expenditure and utilization of Regulated Energy Production Particulars Generator No.1 Generator No.2 Generator No.3 Cost (Baht) Production Cost (Baht per kWh) Power Meter (kW) Own Production Nature of Utilization For Reserve For Distribution Period of Use (Clock) www.ThaiLaws.com 5 2. Data on Fuel Consumption and Environment of Regulated Energy Production

  14. 2.1 Data on Fuel Consumption

  15. 2.1.1 Types and Volume of Fuel Consumption Volume per Year Type of Fuel Machine No. 1 Machine No. 2 Machine No. 3 Natural Gas (thousand cu.ft.) High Speed Diesel (thousand litres) Low Speed Diesel(thousand litres) Fuel Oil lst Type(thousand litres) Fuel Oil 2nd Type (thousand litres) Fuel Oil 3rd Type (thousand litres) Fuel Oil 4th Type (thousand litres) Local Coal (thousand MT) Imported Coal (thousand MT) Others (specify)

  16. 2.1.2 In case of usage of local or imported coal and other types of fuel besides oil and natural gas, please specify heat factor, sulfur content and ash content (if no usage of mentioned fuels, skip to 2.2) Heat Factor Sulfur Content Ash Content Type of Fuel (Kcal/Kg) (%) (%) Local Coal Imported Coal Others (specify)

  17. 2.2 Environmental Data on Regulated Energy Production (except for manufacturers mentioned in ending Remark)

  18. 2.2.1 Data on Exhaust Air Funnel Particulars Generator No. 1 Generator No. 2 Generator No. 3 Height of funnel above ground meter) Inside diameter of funnel (meter) Outside diameter of funnel (meter) Exhaust air velocity within funnel (meter per second) Exhaust air volume (cu.m. per second) Exhaust air (Degree Celsius) www.ThaiLaws.com 6

  19. 2.2.2 Data on control and prevention of air pollution

  20. 2.2.2.1 Control and prevention of air pollution [ ] Not applicable [ ] Applicable, i.e. [ ] Choose to use clean fuel [ ] Increase funnel height [ ] Install polluted air control system [ ] Other (specify)

  21. 2.2.2.2 Data on control and prevention of air pollution Generator No. 1 Generator No. 2 Generator No. 3 Type of Control Controlled Controlled Controlled System Efficiency Efficiency Efficiency Polluted Polluted Polluted (%) (%) (%) substances substances substances Electrostatic Precipitator Cyclone Bag House Filter Flue Gas Desulfurization (FGD) Low NoX Burner Two Stage Burner Other (specify)

  22. 2.2.3 Data on release of polluted substances through exhaust air funnel. Quantity of Polluted Substances (Mg Per Cu.M.) Compared at 25๐c pressure at 1 atmosphere Types of Polluted Generating Capacity of Regulated Energy Substances Below 10 MW Over 10 MW Generator Generator No. 2 Generator No. 3 Generator Generator No. Generator No. 3 No. 1 Excess Excess air Excess air No. 1 Excess 2 Excess air Excess air air _____(%) _____(%) _____(%) air _____(%) _____(%) _____(%) Sulfur Dioxide (SO2) Oxide of Nitrogen ((NO+NO2) Particulate Carbon monoxide(CO) Sulfur trioxide(SO3) Data Not Reqired Carbon Dioxide (CO2) Data Not Reqired Remark :- Following applicants for designated energy production are not required to fill in item 2.2 :

  23. 1.1 One who use only diesel engine, with a total generating capacity of less than 4 MW.

  24. 1.2 One who use fuel from agricultural surplus, with a total capacity of less than 2.4 MW. www.ThaiLaws.com 7 Form Phor Khor 2 Department of Energy Development and Promotion Regulated Energy Production Permit _______________________ No.……………/…….……….. This permit is given to _______________________ To prove a permission to [ ] produce [ ] expand prduction of regulated enegy in accordance with Section 25 of the Energy Development and Promotion Act B.E. 2535 at a location of regulated energy production. Name…………………………………………………………………………………….....………… Located at ……….Lane/Soi…………………Road…...………………..Moo…………… Sub-district/Kwaeng………………………………Distric/Khet ………………………… Province………………………………………………...Postal Code………...………………… Tel………………………………………………Fax…………………...……………… To operate…………………………………………………………………..…………… With following details………………………………………………………………..…………. ………………………………………………………………………………………………..……… ………………………………………………………………………………………………..……… ………………………………………………………………………………………………..……… ………………………………………………………………………………………………..……… ………………………………………………………………………………………………..……… This permit is valid on the date of issue until Date …… Month ……… B.E. ……... Given on the date of …… Month ……… B.E. ……… (Signature)…………………………………… Position……………………………………... Authorized Person www.ThaiLaws.com 8 (Reverse Side) Next Permission of Regulated Energy Production 1st Permission 1st Permission This Permit is valid until This Permit is valid until Date……..Month………..B.E…… Date……..Month………..B.E…… (Signature)………………………..…….. (Signature)………………………..…….. Position…………………………………. Position…………………………………. Authorized Person Authorized Person ………./……….…../……… ………./……….…../……… Conditions 1 This Permit will be displayed openly at a location of regulated energy production. 2 This permit is usable only at a location of regulated energy production as described herein. 3 A permitted person must obtain an approval by the Department of Energy Development and Promotion prior to removal, change or modification of equipment, being used in regulated energy production, from that appeared in an appendix to its application form. 4 A permitted person shall maintain equipment used in regulated energy production as well as their measuring devices in functional condition at all times. 5 Upon receipt of a form of annual report from the Department of Energy Development and Promotion, a permitted person shall fill in and send it, with relevant documents as described therein, to the Department of Energy Development and Promotion within the month of January of the following year. 6 In case of violation or no compliance with above conditions of Clause 1 to Clause 4, the Department of Energy Development and Promotion may give a warning, suspend or revoke a permit when considered suitable. Warning The permitted person shall submit an application for renewal of a permit of regulated energy production, not less than 120 days prior to its expiry date. Disclaimer This translation is intended to help Thais or foreigners to understand Thailand laws and regulations only, not to use as references, because it is only the original Thai version of legislation that carries legal effect. www.ThaiLaws.com, therefore, shall not be held responsible in any way for any damage or otherwise the user may incur as a result of or in connection with any use of this publication for any purposes. It’s the responsibility of the user to obtain the correct meaning or interpretation of this publication or any part thereof from Thai version or by making a formal request to the appropriate or related authorities. www.ThaiLaws.com 9

Ministerial Regulation B.E. 2539 (1996) issued under the Energy Development and Promotion Act, B.E. 2535 (1992) · Nelum