Building (Dam Safety) Regulations 2022 (SL 2022/133)

颁布于 2022 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

关于这部法律

语言
English
类型
条例
国家
新西兰
主题
Water
关键词
education, flood, hazards, labour, risk assessment/management, waterworks, classification/declassification, inland waters, inspection, monitoring, early warning system

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. Building (Dam Safety) Regulations 2022 (SL 2022/133) Cindy Kiro, Governor-General Order in Council At Wellington this 9th day of May 2022 Present: The Right Hon Jacinda Ardern presiding in Council These regulations are made under section 402 of the Building Act 2004— (a) on the advice and with the consent of the Executive Council; and (b) on the recommendation of the Minister for Building and Construction. Contents Page 1 Title 3 2 Commencement 3 3 Interpretation 3 4 Transitional, savings, and related provisions 5 Meaning of classifiable dam 5 Meaning of classifiable dam 5 6 Height of dam 5 Note The Parliamentary Counsel Office has made editorial and format changes to this version using the powers under subpart 2 of Part 3 of the Legislation Act 2019. Note 4 at the end of this version provides a list of the amendments included in it. These regulations are administered by the Ministry of Business, Innovation, and Employment. Version as at 13 May 2024 1 https://www.legislation.govt.nz/pdflink.aspx?id=DLM309069 https://www.legislation.govt.nz/pdflink.aspx?id=DLM306035 https://www.legislation.govt.nz/pdflink.aspx?id=DLM7298371 7 Stored volume of dam 5 Method of classification according to potential impact of dam failure 8 Regulation 9 applies for purpose of classifying dam 6 9 Method of classification 6 Dam safety assurance programme 10 Criteria and standards for dam safety 7 11 General requirements for dam safety assurance programme 7 12 Dam and reservoir operation and maintenance 8 13 Surveillance procedures 8 14 Inspection and maintenance of appurtenant structures and inspection, maintenance, and testing of gate and valve systems with dam safety functions 8 15 Intermediate dam safety reviews 9 16 Comprehensive dam safety reviews 10 17 Emergency planning and response 11 18 Identifying and managing dam safety issues 12 Dangerous dams, earthquake-prone dams, and flood-prone dams 19 Certain terms defined in relation to dangerous dams, earthquake prone dams, and flood-prone dams 12 20 Seismic hazard factor (Z factor) 13 Qualification and competency requirements for recognised engineers 21 Prescribed qualifications and competencies for recognised engineers 13 22 Qualification and competency for certifying and auditing potential impact classifications 13 23 Qualification and competency for certifying and auditing dam safety assurance programmes 14 Forms 24 Dam classification certificate 16 25 Dam safety assurance programme 16 26 Annual dam compliance certificate 16 Schedule 1 Transitional, savings, and related provisions 17 Schedule 2 Dam classification 18 Schedule 3 Forms 22 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 2 Regulations 1 Title These regulations are the Building (Dam Safety) Regulations 2022. 2 Commencement These regulations come into force on 13 May 2024. 3 Interpretation (1) In these regulations, unless the context otherwise requires,— Act means the Building Act 2004 commercial or industrial facility— (a) means a building, other than a farm building, that is used for commer‐ cial, business, industrial, or professional purposes; but (b) does not include any critical or major infrastructure community facility means any of the following: (a) an early childhood education and care centre or registered school within the meaning of section 10 of the Education and Training Act 2020: (b) the premises of an institution within the meaning of section 10 of the Education and Training Act 2020: (c) a rest home or a residential disability care institution (within the mean‐ ing of section 58(4) of the Health and Disability Services (Safety) Act 2001): (d) a building that is used to provide health or disability services as defined in section 5 of the Health and Disability Services (Safety) Act 2001 (other than a hospital building referred to in paragraph (b) of the defin‐ ition of critical or major infrastructure): (e) a marae, a community hall, or an event centre confirmed dam safety deficiency has the meaning set out in subclause (2)(c) critical or major infrastructure means any of the following: (a) a building or other infrastructure operated or used by a lifeline utility within the meaning of section 4 of the Civil Defence Emergency Man‐ agement Act 2002: Examples Electricity, water, sewage, gas, telecommunications, and rail infrastructure. (b) a hospital building that is likely to be needed in an emergency (within the meaning of section 4 of the Civil Defence Emergency Management Act 2002) to provide— (i) emergency medical services; or Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 r 3 3 https://www.legislation.govt.nz/pdflink.aspx?id=DLM306035 https://www.legislation.govt.nz/pdflink.aspx?id=LMS171311 https://www.legislation.govt.nz/pdflink.aspx?id=LMS171311 https://www.legislation.govt.nz/pdflink.aspx?id=DLM120905 https://www.legislation.govt.nz/pdflink.aspx?id=DLM120529 https://www.legislation.govt.nz/pdflink.aspx?id=DLM149796 https://www.legislation.govt.nz/pdflink.aspx?id=DLM149796 (ii) ancillary services that are essential for the provision of emergency medical services: (c) a building that is used to provide emergency response services (for example, policing, fire, ambulance, or rescue services): (d) buildings or infrastructure that are essential to the containment of a haz‐ ardous substance (as defined by section 2 of the Hazardous Substances and New Organisms Act 1996): (e) the dam, another dam, or flood protection works if the service that the dam, other dam, or flood protection works provide is critical to the com‐ munity and that service cannot be reasonably provided by alternative means dam safety issue has the meaning set out in subclause (2) historical or cultural site— (a) means any of the following that forms a part of the historical and cul‐ tural heritage of New Zealand: (i) land, including an archaeological site, a cemetery, or urupā (or part of an archaeological site, cemetery, or urupā): (ii) a building or structure (or part of a building or structure): (iii) any combination of land, buildings, structures, or associated buildings or structures (or parts of buildings, structures, or associ‐ ated buildings or structures); and (b) includes any thing that is in or fixed to land described in paragraph (a) IPENZ means the Institution of Professional Engineers New Zealand Incorpor‐ ated population at risk means the number of people likely to be affected by an uncontrolled release of all or part of the stored water or other fluid due to a failure of the dam (assuming that no person takes any action to evacuate) potential dam safety deficiency has the meaning set out in subclause (2)(b) potential failure mode means a mechanism or set of circumstances that could result in the uncontrolled release of all or part of the stored water or other fluid potential loss of life means the number of people expected to lose their life as a result of an uncontrolled release of all or part of the stored water or other fluid due to a failure of the dam specified categories are community, cultural, critical or major infrastructure, and natural environment (see table 1 of Schedule 2). (2) In these regulations, a dam safety issue means any of the following: (a) a physical infrastructure issue where dam performance cannot be adequately verified because of any problems with any of the following: (i) any equipment used to verify dam performance: r 3 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 4 https://www.legislation.govt.nz/pdflink.aspx?id=DLM381228 (ii) obtaining access to or around the dam for visual inspection and instrument reading: (iii) any instruments for measuring dam performance and reservoir water or fluid level: (iv) any communications systems for instrument readings: (v) how the dam has been, or is being, maintained: (b) an issue where the owner or a person acting on their behalf knows, or ought reasonably to know, that the performance requirements of the dam under design loading conditions may not be met (a potential dam safety deficiency): (c) an issue where the owner or a person acting on their behalf has already observed adverse performance of the dam or where the owner or that person knows, or ought reasonably to know, that adverse performance of the dam is reasonably likely to occur under design loading conditions (a confirmed dam safety deficiency): (d) a procedure or requirement of the dam safety assurance programme has not been complied with. 4 Transitional, savings, and related provisions The transitional, savings, and related provisions (if any) set out in Schedule 1 have effect according to their terms. Meaning of classifiable dam 5 Meaning of classifiable dam (1) For the purposes of the Act, classifiable dam means a dam that has a height of 4 or more metres and stores 20,000 or more cubic metres volume of water or other fluid. (2) Regulations 6 and 7 apply for the purposes of assessing whether a dam is a classifiable dam. Regulation 5(1): replaced, on 13 May 2024, by regulation 4 of the Building (Dam Safety) Amend‐ ment Regulations 2024 (SL 2024/58). 6 Height of dam A dam’s height must be measured for the purposes of regulation 5 in accord‐ ance with section 133B of the Act. 7 Stored volume of dam (1) In measuring a dam’s stored volume for the purposes of regulation 5, the stored volume of water or other fluid does not include,— (a) in the case of a dam across a stream, water or fluid that is lower than the natural ground level at the lowest downstream outside limit of the dam: Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 r 7 5 https://www.legislation.govt.nz/pdflink.aspx?id=LMS955369 https://www.legislation.govt.nz/pdflink.aspx?id=DLM5769542 (b) in the case of a dam not across a stream, water or fluid that is lower than the natural ground level at the lowest elevation at the outside limit of the dam: (c) in the case of a canal where the canal invert is below the natural ground level, water or fluid that is lower than the natural ground level at the lowest elevation at the outside limit of the canal structure. (2) In this regulation, canal invert means the lowest point of the inside of the canal structure that stores water or fluid. Method of classification according to potential impact of dam failure 8 Regulation 9 applies for purpose of classifying dam Regulation 9 applies for the purposes of section 134B of the Act, which requires a dam owner to give the dam one of the following classifications: (a) low potential impact: (b) medium potential impact: (c) high potential impact. 9 Method of classification (1) The owner of a dam must, in classifying the dam,— (a) identify the likely effect that an uncontrolled release of all of the con‐ tents of the reservoir due to a failure of the dam when full would have on each of the specified categories; and (b) use table 1 of Schedule 2 to determine the assessed damage level by assessing whether the damage level in each of the specified categories is likely to be catastrophic, major, moderate, or minimal, then selecting the highest damage level; and (c) select the highest damage level of the damage levels for the specified categories; and (d) estimate the population at risk and the potential loss of life; and (e) use table 2 of Schedule 2 to determine the dam’s potential impact clas‐ sification by correlating the damage level selected under paragraph (c) with the estimated population at risk and the estimated potential loss of life. Example An owner of a dam assesses the likely effect of an uncontrolled release of all of the contents of the reservoir due to a failure of the dam. The community and cultural specified categories are assessed as being at the moderate level of damage. No critical or major infrastructure facilities are likely to be damaged. The natural environment category is assessed as being at the major level of damage. r 8 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 6 https://www.legislation.govt.nz/pdflink.aspx?id=DLM5769558 Under subclause (1)(c), the selected damage level is major because of the assessed damage to the natural environment. This applies despite the moderate level of the other damage. The estimate of the population at risk is 10 with no potential loss of life. Correlating the population at risk and potential loss of life with the major damage level results in a dam classification of medium potential impact. (2) If the damage level in a specified category (or a column referred to in sub‐ clause (3)(a) or (b)) is assessed as meeting more than 1 level, the owner must select the highest damage level. (3) The owner of a dam must, in assessing the damage level in the critical or major infrastructure specified category,— (a) assess the damage level for the column headed “Damage”; and (b) assess the damage level for the column headed “Time to restore critical or major infrastructure to normal pre-dam failure operation”; and (c) select for that specified category the highest damage level that is assessed under paragraph (a) or (b). Example An owner of a dam assesses that an uncontrolled release of the reservoir due to a failure of the dam is likely to render a hospital inoperable. There is only minor damage to other critical or major infrastructure. The highest damage level in that column is therefore major. The time to restore the hospital to normal pre-dam failure operation is less than 3 months. The damage level is moderate. The highest damage level for the critical or major infrastructure specified category is therefore major. Dam safety assurance programme 10 Criteria and standards for dam safety Regulations 11 to 18 set out the criteria and standards for dam safety that a dam safety assurance programme must meet for the purposes of section 141 of the Act. 11 General requirements for dam safety assurance programme (1) A dam safety assurance programme must be appropriate to— (a) the nature of the dam, including— (i) the design and construction type of the dam; and (ii) potential failure modes of the dam; and (iii) potential dam safety deficiencies; and (iv) confirmed dam safety deficiencies; and (b) the dam’s classification under regulation 9. Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 r 11 7 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307322 (2) A dam safety assurance programme must, when setting out effective proced‐ ures for activities specified in regulations 12 to 18, provide for— (a) who may or must carry out the activity; and (b) when, where, and how the activity must or may be done. 12 Dam and reservoir operation and maintenance A dam safety assurance programme must contain effective procedures for— (a) operating the dam and reservoir; and (b) ensuring that persons who will operate the dam and reservoir have adequate experience and training; and (c) maintaining accurate records of reservoir water or other fluid levels under all loading conditions; and (d) maintaining the functionality of the dam and reservoir. 13 Surveillance procedures A dam safety assurance programme must contain effective procedures for surveillance of the dam, including procedures for— (a) collecting dam surveillance data, evaluating dam performance, and carrying out associated quality assurance processess; and (b) carrying out visual inspections of the dam (including specifying the required frequency of the inspections); and (c) reading dam performance monitoring instruments (including specifying the required frequency of the readings); and (d) monitoring dam surveillance data management systems; and (e) reporting surveillance and dam performance issues to the dam owner. 14 Inspection and maintenance of appurtenant structures and inspection, maintenance, and testing of gate and valve systems with dam safety functions A dam safety assurance programme must contain effective procedures for— (a) identifying and documenting appurtenant structures; and (b) identifying and documenting the gate and valve systems that have dam or reservoir safety functions; and (c) inspecting and maintaining appurtenant structures; and (d) inspecting, maintaining, and testing— (i) the gate and valve systems referred to in paragraph (b); and (ii) other equipment or systems that have dam or reservoir safety functions. r 12 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 8 15 Intermediate dam safety reviews (1) A dam safety assurance programme must provide— (a) for an intermediate dam safety review to be carried out as soon as practicable after the expiry of each 12-month period since the last inter‐ mediate dam safety review was completed; and (b) that the interval between the dates of the reports under subclause (3) for the intermediate dam safety reviews does not exceed 15 months. (2) For the purpose of intermediate dam safety reviews, a dam safety assurance programme must contain effective procedures for— (a) carrying out on-site inspections of the dam and appurtenant structures; and (b) reviewing dam and reservoir operation records, surveillance records, and maintenance records; and (c) reviewing records of planned and actual maintenance and testing of the gate and valve systems that have dam or reservoir safety functions; and (d) evaluating the performance of the dam during the relevant period based on the on-site inspections and reviews referred to in paragraphs (a) to (c). (3) In addition, a dam safety assurance programme must require the person who carries out the intermediate dam safety review to prepare a report on the review, which includes information on— (a) the activities carried out under subclause (2)(a) to (d); and (b) the dam safety issues (if any) that have been identified when carrying out those activities; and (c) the performance of the dam in the loading conditions experienced during the relevant period. (4) In this regulation,— (a) an intermediate dam safety review is completed on the date of the report under subclause (3): (b) relevant period means,— (i) in relation to the first intermediate dam safety review of a dam as referred to in subclause (5), the period starting when this regu‐ lation first applies to the dam and ending on the date of the report under subclause (3); and (ii) in any other case, the period since the date of the previous report under subclause (3). (5) A dam safety assurance programme must provide for the first intermediate dam safety review to be completed under this regulation within 15 months Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 r 15 9 after the programme is first approved under section 143 of the Act after the commencement of this regulation. 16 Comprehensive dam safety reviews (1) A dam safety assurance programme must provide— (a) for a comprehensive dam safety review to be carried out as soon as practicable after the expiry of each 5-year period since the last compre‐ hensive dam safety review was completed; and (b) that the interval between the dates of the reports under subclause (3) for the completed comprehensive dam safety reviews does not exceed 66 months. (2) For the purpose of comprehensive dam safety reviews, a dam safety assurance programme must contain effective procedures for— (a) reviewing known and potential hazards and threats to dam performance; and (b) considering and commenting on the appropriateness of— (i) the dam’s potential failure modes; and (ii) the description of the corresponding loading conditions that have been identified for those potential failure modes; and (iii) any visual and instrument performance indicators that have been identified for those potential failure modes; and (c) carrying out an on-site inspection of the dam and appurtenant structures; and (d) carrying out an on-site inspection and testing of gates, valves, and other equipment or systems that perform dam or reservoir safety functions; and (e) assessing the performance of the dam and its appurtenant structures in all design loading conditions; and (f) reviewing the dam owner’s safety management resources, systems, and procedures (including the contents of the dam safety assurance pro‐ gramme). (3) In addition, a dam safety assurance programme must require the person who carries out the comprehensive dam safety review to prepare a report on the review, which includes information on— (a) the activities carried out under subclause (2)(a) to (f); and (b) the dam safety issues (if any) that have been identified when carrying out those activities; and (c) the dam safety issues (if any) that have been previously identified in reviews under regulation 15 or this regulation (including information r 16 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 10 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307324 on the adequacy of the resolution of those issues or whether there are impediments that prevent their resolution). (4) A dam safety assurance programme must provide for the first comprehensive dam safety review to be completed under this regulation within 66 months after the programme is first approved under section 143 of the Act after the commencement of this regulation. (5) In this regulation, a comprehensive dam safety review is completed on the date of the report under subclause (3). 17 Emergency planning and response (1) A dam safety assurance programme must contain effective procedures for— (a) maintaining and reviewing an emergency action plan; and (b) consulting the following persons or bodies on the content of the plan (to the extent that those persons or bodies may be affected by a failure of the dam): (i) local authorities (within the meaning of section 5 of the Local Government Act 2002): (ii) a Civil Defence Emergency Management Group (within the meaning of section 4 of the Civil Defence Emergency Manage‐ ment Act 2002): (iii) emergency services (within the meaning of section 4 of the Civil Defence Emergency Management Act 2002); and (c) providing the persons or bodies referred to in paragraph (b) with a copy of the plan. (2) The emergency action plan must contain the following: (a) the purpose of the plan: (b) the roles and responsibilities for implementing the plan: (c) an emergency contact list: (d) procedures for identifying, assessing, and responding to a potential or imminent dam failure: (e) procedures for notifying those with roles and responsibilities under the plan of an actual or potential emergency involving the dam: (f) information about preventive and emergency actions that must or may be taken, and resources, equipment, and materials that may be used, to avoid a failure of the dam or to mitigate the consequences of a failure: (g) information about access to the site of the dam, including site location maps and main and alternative access routes: (h) procedures for maintaining the plan: Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 r 17 11 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307324 https://www.legislation.govt.nz/pdflink.aspx?id=DLM170881 https://www.legislation.govt.nz/pdflink.aspx?id=DLM149796 https://www.legislation.govt.nz/pdflink.aspx?id=DLM149796 (i) procedures for training and exercises for those with roles and responsi‐ bilities under the plan: (j) dam break inundation maps and tables. 18 Identifying and managing dam safety issues A dam safety assurance programme must contain effective procedures for— (a) recording, prioritising, and tracking dam safety issues; and (b) investigating, assessing, and resolving dam safety issues. Dangerous dams, earthquake-prone dams, and flood-prone dams 19 Certain terms defined in relation to dangerous dams, earthquake-prone dams, and flood-prone dams (1) For the purpose of section 153 of the Act (meaning of dangerous dam),— moderate earthquake,— (a) in relation to a high potential impact dam, means an earthquake that would result in ground shaking, at the site of the dam, at an intensity with an AEP of 1 in 100 (determined by normal measures of acceler‐ ation, velocity, and displacement) but not less than the 1 in 100 AEP shaking determined using a seismic hazard factor (Z factor) of 0.10; and (b) in relation to a medium potential impact dam, means an earthquake that would result in ground shaking, at the site of the dam, at an intensity with an AEP of 1 in 50 (determined by normal measures of acceleration, velocity, and displacement) but not less than the 1 in 50 AEP shaking determined using a seismic hazard factor (Z factor) of 0.10 moderate flood,— (a) in relation to a high potential impact dam, means a flood that would result in water or other fluid flowing into the reservoir formed by the dam at a flow rate with an AEP of 1 in 100; and (b) in relation to a medium potential impact dam, means a flood that would result in water or other fluid flowing into the reservoir formed by the dam at a flow rate with an AEP of 1 in 50. (2) For the purpose of section 153A of the Act (meaning of earthquake-prone dam and flood-prone dam),— earthquake threshold event means,— (a) in relation to a high potential impact dam, an earthquake that would result in ground shaking, at the site of the dam, at an intensity with an AEP of 1 in 500 (determined by normal measures of acceleration, velocity, and displacement) but not less than the 1 in 500 AEP shaking determined using a seismic hazard factor (Z factor) of 0.10; and r 18 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 12 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307337 https://www.legislation.govt.nz/pdflink.aspx?id=DLM1220589 (b) in relation to a medium potential impact dam, an earthquake that would result in ground shaking, at the site of the dam, at an intensity with an AEP of 1 in 250 (determined by normal measures of acceleration, velocity, and displacement) but not less than the 1 in 250 AEP shaking determined using a seismic hazard factor (Z factor) of 0.10 flood threshold event means,— (a) in relation to a high potential impact dam, a flood that would result in water or other fluid flowing, into the reservoir formed by the dam, at a flow rate with an AEP of 1 in 500; and (b) in relation to a medium potential impact dam, a flood that would result in water or other fluid flowing, into the reservoir formed by the dam, at a flow rate with an AEP of 1 in 250. (3) In this regulation, AEP (which stands for annual exceedance probability), in relation to an earthquake or a flood of a particular intensity or flow rate, means the probability that an earthquake or a flood of that intensity or flow rate or a greater intensity or flow rate will occur in any year. Example If a flood with a particular flow rate has an AEP of 1 in 50, the probability of a flood of at least that intensity occurring in any year is calculated as follows: 1 ÷ 50 = 2%. 20 Seismic hazard factor (Z factor) In these regulations, the seismic hazard factor (Z factor) must be calculated in accordance with New Zealand Standard NZS 1170.5:2004 (Structural design actions—Part 5: Earthquake actions—New Zealand), whether or not that stand‐ ard would otherwise apply. Qualification and competency requirements for recognised engineers 21 Prescribed qualifications and competencies for recognised engineers Regulations 22 and 23 prescribe qualifications and competencies for the pur‐ poses of section 149(1)(c) of the Act (which relates to prescribed qualifications and competencies of recognised engineers). 22 Qualification and competency for certifying and auditing potential impact classifications (1) This regulation applies in relation to sections 134B, 135, 136, 138, and 139 of the Act (which provide for a recognised engineer to audit and certify the classification of a dam). (2) The prescribed qualification is a qualification given by IPENZ that meets the following requirements: (a) IPENZ must have given the qualification only if it is satisfied that the engineer— Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 r 22 13 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307331 https://www.legislation.govt.nz/pdflink.aspx?id=DLM5769558 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307315 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307316 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307318 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307319 (i) is able to practise competently in the area of practice referred to in sections 134B, 135, 136, 138, and 139 of the Act (the area) to the reasonable standard of a professional engineer practising in the area; and (ii) has at least 4 years’ experience in the field of dam safety engin‐ eering within the previous 10 years; and (iii) has relevant experience in and knowledge of dam safety engineer‐ ing, including relevant experience in and knowledge of 1 or more of the fields referred to in subclause (3); and (b) IPENZ must have given the qualification to the engineer within the 6 year period before the engineer acts in the area. (3) For the purposes of subclause (2)(a)(iii), the fields are as follows: (a) water and natural resources engineering: (b) civil engineering: (c) hydrological and hydraulic engineering: (d) any other field of engineering that IPENZ considers is relevant to 1 or more of the following: (i) identifying dam potential failure modes: (ii) analysing dam breaks: (iii) assessing dam hazards: (iv) applying other principles of dam safety engineering. (4) The prescribed competency is that the engineer has demonstrated to IPENZ that the engineer has the experience in and knowledge of the following things that would be reasonably expected of a professional engineer practising in the area: (a) the classification of dams under section 134B of the Act (including regulation 9): (b) the identification of appurtenant structures: (c) the assessment of the hazard of potential dam-break floods to down‐ stream people and property and the environment (for example, assessing the extent of inundation, depth of inundation, velocity, flow, time to peak flow, and duration of inundation). 23 Qualification and competency for certifying and auditing dam safety assurance programmes (1) This regulation applies in relation to sections 140 to 148B and 150 of the Act (which provide for a recognised engineer to audit, certify, and review dam safety assurance programmes). (2) The prescribed qualification is a qualification given by IPENZ that meets the following requirements: r 23 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 14 https://www.legislation.govt.nz/pdflink.aspx?id=DLM5769558 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307315 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307316 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307318 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307319 https://www.legislation.govt.nz/pdflink.aspx?id=DLM5769558 https://www.legislation.govt.nz/pdflink.aspx?id=DLM306321 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307321 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307333 (a) IPENZ must have given the qualification only if it is satisfied that the engineer— (i) is able to practise competently in the area of practice referred to in sections 140 to 148B and 150 of the Act (the area) to the reasonable standard of a professional engineer practising in the area; and (ii) has at least 4 years’ experience in the field of dam safety engin‐ eering within the previous 10 years; and (iii) has relevant experience in and knowledge of 1 or more of the fields referred to in subclause (3); and (b) IPENZ must have given the qualification to the engineer within the 6 year period before the engineer acts in the area. (3) For the purposes of subclause (2)(a)(iii), the fields are as follows: (a) dam safety assurance programmes and management systems engineer‐ ing: (b) water and natural resources engineering: (c) civil engineering: (d) gate and valve systems and other dam and reservoir safety systems engineering: (e) any other field of engineering that IPENZ considers is relevant to 1 or more of the following: (i) designing and operating dam systems: (ii) managing dam safety risk: (iii) applying other principles of dam safety engineering. (4) The prescribed competency is that the engineer has demonstrated to IPENZ that the engineer has the experience in and knowledge of the following things that would be reasonably expected of a professional engineer practising in those areas: (a) the general requirements for dam safety assurance programmes (see regulation 11): (b) procedures for the operation and maintenance of dams and reservoirs (see regulation 12): (c) surveillance procedures (see regulation 13): (d) procedures for the identification, inspection, and maintenance of appur‐ tenant structures (see regulation 14): (e) procedures for the inspection, maintenance, and testing of gate and valve systems with dam or reservoir safety functions (see regulation 14): (f) procedures for intermediate dam safety reviews (see regulation 15): Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 r 23 15 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307321 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307333 (g) procedures for comprehensive dam safety reviews (see regulation 16): (h) procedures for emergency planning and response (see regulation 17): (i) procedures for identifying and managing dam safety issues (see regula‐ tion 18). Forms 24 Dam classification certificate A dam classification certificate must— (a) be in form 1 of Schedule 3; and (b) contain the information requested in the form. 25 Dam safety assurance programme A dam safety assurance programme must— (a) be in form 2 of Schedule 3; and (b) contain the information requested in the form and include any documen‐ tation required to be attached. 26 Annual dam compliance certificate An annual dam compliance certificate must— (a) be in form 3 of Schedule 3; and (b) contain the information requested in the form. r 24 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 16 Schedule 1 Transitional, savings, and related provisions r 4 Part 1 Provisions relating to these regulations as made There are no transitional, savings, or related provisions in these regulations as made. Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 Schedule 1 17 Sc he du le 2 D am c la ss ifi ca tio n r 9 Ta bl e 1— D et er m in at io n of a ss es se d da m ag e le ve l D am ag e le ve l Sp ec ifi ed c at eg or ie s C om m un ity C ul tu ra l N at ur al en vi ro nm en t C ri tic al o r m aj or in fr as tr uc tu re D am ag e Ti m e to re st or e cr iti ca l or m aj or in fr as tr uc tu re to n or m al p re d am fa ilu re o pe ra tio n1 Ca ta str op hi c O ne o r m or e of th e fo llo w in g ap pl y: • 50 o r m or e ho us eh ol d un its re nd er ed un in ha bi ta bl e: • 20 o r m or e co m m er ci al o r in du str ia l f ac ili tie s re nd er ed in op er ab le : • 2 or m or e co m m un ity fa ci lit ie s r en de re d in op er ab le o r un in ha bi ta bl e Irr ep ar ab le lo ss to 2 or m or e hi sto ric al o r cu ltu ra l s ite s Tw o or m or e cr iti ca l or m aj or in fra str uc tu re fa ci lit ie s r en de re d in op er ab le O ne y ea r o r m or e Ex te ns iv e an d w id es pr ea d da m ag e, w ith p er m an en t, irr ep ar ab le e ffe ct s on th e na tu ra l en vi ro nm en t M aj or O ne o r m or e of th e fo llo w in g ap pl y: O ne o r b ot h of th e fo llo w in g ap pl y: O ne c rit ic al o r m aj or in fra str uc tu re fa ci lit y is re nd er ed in op er ab le Th re e m on th s o r m or e bu t l es s t ha n 1 ye ar Ex te ns iv e an d w id es pr ea d da m ag e w he re it is p os sib le , Schedule 2 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 18 D am ag e le ve l Sp ec ifi ed c at eg or ie s C om m un ity C ul tu ra l N at ur al en vi ro nm en t C ri tic al o r m aj or in fr as tr uc tu re D am ag e Ti m e to re st or e cr iti ca l or m aj or in fr as tr uc tu re to n or m al p re d am fa ilu re o pe ra tio n1 • 4 or m or e bu t l es s th an 5 0 ho us eh ol d un its re nd er ed un in ha bi ta bl e: • 5 or m or e bu t l es s th an 2 0 co m m er ci al o r in du str ia l f ac ili tie s re nd er ed in op er ab le : • 1 co m m un ity fa ci lit y re nd er ed in op er ab le o r un in ha bi ta bl e • irr ep ar ab le lo ss to 1 hi sto ric al o r cu ltu ra l s ite : • lo ss to 1 o r m or e hi sto ric al o r cu ltu ra l s ite s w he re it is po ss ib le , b ut im pr ac tic ab le , to fu lly re sto re th e sit e bu t i m pr ac tic ab le , t o fu lly re sto re o r r ep ai r th e da m ag e M od er at e O ne o r m or e of th e fo llo w in g ap pl y: • 1 or m or e bu t l es s th an 4 h ou se ho ld un its re nd er ed un in ha bi ta bl e: • 1 or m or e bu t l es s th an 5 c om m er ci al or in du str ia l fa ci lit ie s r en de re d in op er ab le : • lo ss o f s om e fu nc tio na lit y of 1 Si gn ifi ca nt lo ss to 1 or m or e hi sto ric al o r cu ltu ra l s ite s w he re it is pr ac tic ab le to re sto re th e sit e O ne o r m or e cr iti ca l or m aj or in fra str uc tu re fa ci lit ie s a re a ffe ct ed by th e lo ss o f s om e fu nc tio na lit y Le ss th an 3 m on th s Si gn ifi ca nt d am ag e th at is p ra ct ic ab le to re sto re o r r ep ai r Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 Schedule 2 19 D am ag e le ve l Sp ec ifi ed c at eg or ie s C om m un ity C ul tu ra l N at ur al en vi ro nm en t C ri tic al o r m aj or in fr as tr uc tu re D am ag e Ti m e to re st or e cr iti ca l or m aj or in fr as tr uc tu re to n or m al p re d am fa ilu re o pe ra tio n1 or m or e co m m un ity fa ci lit ie s M in im al M in or d am ag e th at d oe s no t m at er ia lly a ffe ct th e fu nc tio na lit y of an y ho us eh ol d un it, co m m er ci al o r i nd us tri al fa ci lit y, o r c om m un ity fa ci lit y (o r n o da m ag e) Lo ss to 1 o r m or e hi sto ric al o r c ul tu ra l sit es th at w ill re qu ire m in or re sto ra tio n on ly (o r n o lo ss to a ny hi sto ric al o r c ul tu ra l sit e) M in or d am ag e to 1 o r m or e cr iti ca l o r m aj or in fra str uc tu re fa ci lit ie s (o r n o da m ag e) O ne w ee k or le ss O nl y m in or re ha bi lit at io n or re sto ra tio n m ay b e re qu ire d or re co ve ry is po ss ib le w ith ou t in te rv en tio n (o r n o da m ag e) N ot e 1 Th e es tim at ed ti m e re qu ire d to re pa ir th e da m ag e su ffi ci en tly to re tu rn th e cr iti ca l o r m aj or in fra str uc tu re to th e no rm al o pe ra tio n th at th e in fra str uc tu re h ad im m ed ia te ly b ef or e th e fa ilu re o f t he d am . Schedule 2 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 20 Ta bl e 2— D et er m in at io n of d am ’s po te nt ia l i m pa ct c la ss ifi ca tio n A ss es se d da m ag e le ve l ( fr om ta bl e 1) Po pu la tio n at r isk Po te nt ia l l os s o f l ife 0 1– 10 11 –1 00 m or e th an 1 00 Ca ta str op hi c H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct N o pe rs on s N /A (s ee n ot e 1) H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct O ne p er so n N /A (s ee n ot e 1) H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct Tw o or m or e pe rs on s M aj or M ed iu m p ot en tia l im pa ct M ed iu m p ot en tia l im pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct N o pe rs on s N /A (s ee n ot e 1) M ed iu m p ot en tia l im pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct O ne p er so n N /A (s ee n ot e 1) H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct Tw o or m or e pe rs on s M od er at e Lo w p ot en tia l i m pa ct Lo w p ot en tia l i m pa ct M ed iu m p ot en tia l im pa ct M ed iu m p ot en tia l im pa ct N o pe rs on s N /A (s ee n ot e 1) M ed iu m p ot en tia l im pa ct M ed iu m p ot en tia l im pa ct M ed iu m p ot en tia l im pa ct O ne p er so n N /A (s ee n ot e 1) H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct Tw o or m or e pe rs on s M in im al Lo w p ot en tia l i m pa ct Lo w p ot en tia l i m pa ct Lo w p ot en tia l i m pa ct Lo w p ot en tia l i m pa ct N o pe rs on s N /A (s ee n ot e 1) M ed iu m p ot en tia l im pa ct M ed iu m p ot en tia l im pa ct M ed iu m p ot en tia l im pa ct O ne p er so n N /A (s ee n ot e 1) H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct H ig h po te nt ia l i m pa ct Tw o or m or e pe rs on s N ot e 1 N ot a pp lic ab le . T he p op ul at io n at ri sk is z er o, th er ef or e th er e is no p ot en tia l l os s o f l ife . Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 Schedule 2 21 Schedule 3 Forms rr 24–26 Form 1 Dam classification certificate Sections 135, 138, and 139, Building Act 2004 Dam Dam name: Location of dam: Date of construction: Building consent number or identification (if applicable): Purpose of dam: Type of dam: Height of dam* (in metres): *Regulation 6 applies for the purpose of measuring a dam’s height. Dam’s stored volume* (in cubic metres): *Regulation 7 applies for the purpose of measuring a dam’s stored volume. Relevant regional authority: Potential impact classification Potential impact classification (determined under section 134B of the Building Act 2004 and regulation 9 of the Building (Dam Safety) Regulations 2022): Owner Name of owner: Chief executive of owner or equivalent (if owner is a body corporate)*: *If there is no chief executive, specify a person with an equivalent position in the body corporate. Contact details (phone number, business address, and postal address (if different from business address)): Certificate of recognised engineer I certify that the classification of the above dam as a [specify low, medium, or high] potential impact dam accords with the criteria and standards for dam safety prescribed under regulation 9 of the Building (Dam Safety) Regulations 2022. I am a recognised engineer in accordance with section 149 of the Building Act 2004 because I— • meet the requirements of section 149(1)(a) and (b) of that Act; and Schedule 3 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 22 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307315 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307318 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307319 https://www.legislation.govt.nz/pdflink.aspx?id=DLM5769558 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307331 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307331 • have the qualification and competency prescribed under regulation 22 of the Building (Dam Safety) Regulations 2022. I have attached evidence that I am a recognised engineer. Date: Signature of recognised engineer: Full name of recognised engineer: Chartered professional engineer registration number: Schedule 3 form 1: amended, on 21 September 2023, by regulation 4(a) of the Building (Dam Safety) Amendment Regulations 2023 (SL 2023/198). Schedule 3 form 1: amended, on 21 September 2023, by regulation 4(b) of the Building (Dam Safety) Amendment Regulations 2023 (SL 2023/198). Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 Schedule 3 23 https://www.legislation.govt.nz/pdflink.aspx?id=LMS878740 https://www.legislation.govt.nz/pdflink.aspx?id=LMS878740 Form 2 Dam safety assurance programme Sections 141 and 142, Building Act 2004 Dam safety assurance programme The dam safety assurance programme consists of this form, the attached documents, and any other referenced documents. Dam Dam name*: *If 2 or more dams are owned by the same owner and form a single reservoir, state the names of all of those dams to which the dam safety assurance programme applies and add a statement to the effect that those dams are owned by the same owner and form a single reservoir. In the case of a canal, if the whole canal is not owned by a single owner, specify the dams to which the dam safety assurance programme applies. See sections 148A and 148B of the Act. Relevant regional authority: Potential impact classification Potential impact classification(s): Dam classification certificate(s): [date and regional authority number (if any)] Owner Name of owner: Chief executive of owner or equivalent (if owner is a body corporate)*: *If there is no chief executive, specify a person with an equivalent position in the body corporate. Contact details (phone number, business address, and postal address (if different from business address)): Summary of compliance with criteria and standards Attach a brief summary of how each of the criteria and standards set out in regula‐ tions 10 to 18 of the Building (Dam Safety) Regulations 2022 have been addressed and indicate where these are addressed in the dam safety assurance programme. This should include brief descriptions of the following: • how the general requirements for dam safety assurance programmes have been met (see regulation 11): • the procedures for the operation and maintenance of dams and reservoirs (see regulation 12): • the surveillance procedures (see regulation 13): • the procedures for the inspection and maintenance of appurtenant structures (see regulation 14): • the procedures for the inspection, maintenance, and testing of gate and valve systems with dam or reservoir safety functions (see regulation 14): Schedule 3 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 24 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307322 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307323 https://www.legislation.govt.nz/pdflink.aspx?id=DLM5770113 https://www.legislation.govt.nz/pdflink.aspx?id=DLM5770114 • the procedures for intermediate dam safety reviews (see regulation 15): • the procedures for comprehensive dam safety reviews (see regulation 16): • the procedures for emergency planning and response (see regulation 17): • the procedures for identifying and managing dam safety issues (see regulation 18). Documentation of dam safety assurance programme 1 List the location of all documentation, manuals, and publications referred to in the dam safety assurance programme if applicable: [list] 2 State the location(s) of the dam safety assurance programme: [Specify loca‐ tion(s). See section 148(a) of the Act for where the programme must be kept.] The documents (other than those listed in item 1 above) that form the dam safety assurance programme are attached as follows: [List documents.] Appurtenant structures Full list of the dam’s appurtenant structures as determined by the recognised engineer: Certificate of recognised engineer I certify that the dam safety assurance programme prepared for the above dam— • meets the criteria and standards for dam safety prescribed by regulations 10 to 18 of the Building (Dam Safety) Regulations 2022; and • contains a full list of the dam’s appurtenant structures that I have determined. I am a recognised engineer in accordance with section 149 of the Building Act 2004 because I— • meet the requirements of section 149(1)(a) and (b) of that Act; and • have the qualification and competency prescribed under regulation 23 of the Building (Dam Safety) Regulations 2022. I have attached evidence that I am a recognised engineer. Date: Signature of recognised engineer: Full name of recognised engineer: Chartered professional engineer registration number: Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 Schedule 3 25 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307329 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307331 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307331 Form 3 Annual dam compliance certificate Section 150, Building Act 2004 Dam Dam name: Relevant regional authority: Potential impact classification Potential impact classification: Dam classification certificate [date and regional authority number (if any)]: Approval of dam safety assurance programme Date of approval of the dam safety assurance programme: Date by which the dam safety assurance programme must next be reviewed under section 146 of the Act: Owner Name of owner: Chief executive of owner or equivalent (if owner is a body corporate)*: *If there is no chief executive, specify a person with an equivalent position in the body corporate. Contact details (phone number, business address, and postal address (if different from business address)): Compliance All the procedures in the dam safety assurance programme have been fully complied with during the previous 12 months (except for the minor items of non-compliance identified below)*. *Omit “(except for the minor items of non-compliance identified below)” if inapplicable. Date: Signature of, or on behalf of, dam owner*: *The certificate must be signed by,— • if the owner is an individual, that individual; or • if the owner is a body corporate, the chief executive of that body corporate or, if there is no chief executive, a person with an equivalent position in the body corporate. Full name of dam owner: Schedule 3 Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 26 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307327 Certificate of recognised engineer I have reviewed the owner’s reports and other documents relating to the procedures in the dam safety assurance programme that the owner has followed in the previous 12 months. *The following is a summary of the minor items of non-compliance with the proced‐ ures of the dam safety assurance programme in the previous 12 months: *Omit if inapplicable. All procedures in the dam safety assurance programme have been complied with dur‐ ing the previous 12 months (except for the minor items of non-compliance identified above)*. *Omit “(except for the minor items of non-compliance identified above)” if inapplicable. I am a recognised engineer in accordance with section 149 of the Building Act 2004 because I— • meet the requirements of section 149(1)(a) and (b) of that Act; and • have the qualification and competency prescribed under regulation 23 of the Building (Dam Safety) Regulations 2022. I have attached evidence that I am a recognised engineer. Date: Signature of recognised engineer: Full name of recognised engineer: Chartered professional engineer registration number: Michael Webster, Clerk of the Executive Council. Issued under the authority of the Legislation Act 2019. Date of notification in Gazette: 12 May 2022. Version as at 13 May 2024 Building (Dam Safety) Regulations 2022 Schedule 3 27 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307331 https://www.legislation.govt.nz/pdflink.aspx?id=DLM307331 https://www.legislation.govt.nz/pdflink.aspx?id=DLM7298104 Notes 1 General This is a consolidation of the Building (Dam Safety) Regulations 2022 that incorporates the amendments made to the legislation so that it shows the law as at its stated date. 2 Legal status A consolidation is taken to correctly state, as at its stated date, the law enacted or made by the legislation consolidated and by the amendments. This presump‐ tion applies unless the contrary is shown. Section 78 of the Legislation Act 2019 provides that this consolidation, pub‐ lished as an electronic version, is an official version. A printed version of legislation that is produced directly from this official electronic version is also an official version. 3 Editorial and format changes The Parliamentary Counsel Office makes editorial and format changes to con‐ solidations using the powers under subpart 2 of Part 3 of the Legislation Act 2019. See also PCO editorial conventions for consolidations. 4 Amendments incorporated in this consolidation Building (Dam Safety) Amendment Regulations 2024 (SL 2024/58) Building (Dam Safety) Amendment Regulations 2023 (SL 2023/198) Wellington, New Zealand: Published under the authority of the New Zealand Government—2024 Notes Building (Dam Safety) Regulations 2022 Version as at 13 May 2024 28 https://www.legislation.govt.nz/pdflink.aspx?id=DLM7298365 https://www.legislation.govt.nz/pdflink.aspx?id=DLM7298371 http://www.pco.govt.nz/editorial-conventions/ https://www.legislation.govt.nz/pdflink.aspx?id=LMS955362 https://www.legislation.govt.nz/pdflink.aspx?id=LMS878734