Water Services Industry (Planning, Design and Construction of Sewerage System and Septic Tank) Rules 2013
颁布于 2013 · 文本截至 2026-10-01
以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。
研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。
关于这部法律
- 语言
- English
- 类型
- 条例
- 国家
- 马来西亚
- 主题
- Water
- 关键词
- water supply, policy/planning, authorization/permit, offences/penalties, inspection
在哪里阅读
该法律没有记录来源链接。
文本
所收录的法律原文,按条款排列。每个条款都有自己的链接。
1753 P.U. (A) 214. WATER SERVICES INDUSTRY ACT 2006 Rule WATER SERVICES INDUSTRY (PLANNING, DESIGN AND C oNSTRucrroN OF SEWERAGE SYSTEM AND SEPTIC TANK) RULES 2013 ARRANGEMENT OF RULES PART I PRELIMINARY 1. Citation and commencement 2. Interpretation PAI{] II GENERAL 3. Application of Rules 4. Responsibility of developer 5. Planning procedures for development PART III SEWERAGE PLANNING 6. Conditions for preparation of sewerage planning 7. Application for approval of sewerage planning 8. Amendment to sewerage planning 9. Approval of sewerage planning 10. Validity period for approval of sewerage planning PART IV DESIGN I 1. Conditions for preparation of design 12. Application for approval of design P.U. (A) 214. 1754 Rule 13. Competent person to amend design 14. Approval of design 15. Validity period for approval of design PART V CONSTRUCTION Chapter I General requirement.< 16. Commencement of construction 17. Compliance during construction 18. Inspection by the Commission 19. Samples for testing Chapter 2 Constril(·tion o f ,e.,.·erage works 20. Notice for commencement of construction of sewerage works 21. Notice to lay open works Chapter 3 Constmction of srptic tank work; 22. Notice for commencement of construction of septic tank works 23. Notice of completion of septic tank works PART VI INSPECTION AND LETTER OF CONFIRt.lATION Chapter l Inspcclio11 of se,;·crage works 24. Intermediate inspection 25. Notice of final inspection 26. Surrender of land and way leaye 1755 P.U. (A) 214. Chapter 2 Letter of Confirmafioll Rule 27. Letter of confirmation for sewerage works and septic tank works PART VII HANDrNG OVER OF SEWERAGE SYSTEM 28. Handing over of sewerage system 29. Operations and maintenance of sewerage system before handing over 30. Defects liability period PART VIII COMPETBNT PER'-iON 31. Responsibility of competer,t pen,on 32. Obligation of competent pe1son 33. Change of competent per,;on 34. Liability of competf.nt person PART IX FEES 35. Payment of fees for sewerage planning approval 36. Payment of fees for design approval 37. Payment of fees for commencement of sewerage works 38. Payment of fees for intermediate inspection 39. Payment of fees for final inspection SCHEDULE I SCHEDULE 2 P.U. (A) 214. 1756 WATER SERVICES INDUSTRY ACT 2006 WATER SERVICES INDUSTRY (PLANNING, DESIGN AND CONSTRUCTION OF SEWERAGE SYSTEM AND SEPTIC TANK) RULES 2013 IN exercise of the powers conferred by paragraphs 180(n) and (p) of the Water Services Industry Act 2006 [Act 655], the Commission makes the following rules: Citation and commencement PART I PRELIMINARY 1. (1) These rules may be cited as the Water Services Industry (Planning, Design and Construction of Sewerage System and Septic Tank) Rules 2013. (2) These Rules come into operation on 1 July 2013. Interpretation 2. In these Rules unless the context otherwise requires "architect" means any penon who h registered as an architect under any law relating to the registration of architects in Malaysia and who under that law is allowed to practice 01 cai-ry on business as an architect; "Form" means the relevant forms set out in the Guidelines; "Guidelines" means the Malaysian Sewerage Industry Guidelines issued by the Commission including any amendments thereto from time to time; "engineer" means a person who is registered as a professional engineer under any law relating to the registration of engineers in Malaysia and who under the law is allowed to practice or carry on the business of a professional engineer; "sewerage works" means (a) any construction, installation, upgrading, refurbishment, alteration, modification, disconnection, relocation or closing up of a· sewerage system, individual internal sewerage piping, common internal sewerage piping or any part thereof; or (b) construction of a connection to a sewer; "septic tank works" means any construction, installation, refurbishment, alteration, modification, decommissioning or relocation of a septic tank or any part thereof; 1757 P.U. (A} 214. "competent person" means a person who is qualified to submit sewerage planning and design, supervise the construction, installation, testing and inspection of the sewerage works or septic tank works as particularly set out in the Schedule 1; "sewerage development plan" means detailed plans incorporating the needs in respect of the development and improvement of a sewerage system and measures for any existing sewerage system prepared by a licensee and approved by the Commission; "sewerage catchment plan" means plans formulating the policy, strategy and general proposals prepared by the Commission to address the sewerage needs for an area; "registered building draughtsman" for the purpose of these Rules means any building draughtsman who is registered under the relevant laws of Malaysia; "developer" means any person or government agency that engages in or carries out or undertakes or proYide\ monies for developing sewerage works or septic tank works; "permit holder" meam any pe1 son issued with permit IPA Type B or Type C under the Wate1 Services Industry (Permit) Rules 2007 [P.U. (A) 438/2007]; "town planner" me-ans any person who is registered as a town planner under any law relating to the 1egistration of town planner in Malaysia and who under that law is allowed to practice or carry on business as a town planner; "sewerage planning" means the reports together with plans detailing the location, layout and arrangement of sewerage works or septic tank works; "PE" means the population equivalent in terms of fixed population of a varying or transient population for domestic wastes from sectors which include residential, commercial and industrial that contribute flow to the sewerage system; "planning procedures" means procedures, policies and guidelines issued by the Commission from time to time pertaining to the planning of sewerage system or septic tank in any area; "design" means the detailed design, plan, calculation, drawing and specification; "Standards" means any Malaysian standards, international standards, specification and codes of practice recognized by the Commission. P.O. (A) 214. 1758 PART II GENERAL Application of Rules 3. These Rules shall also be applicable to any submission made for sewerage works or septic tank works that has commenced before the coming into force of these Rules. Responsibility of developer 4. (1) The developer shall ensure that the (a) sewerage planning and design of sewerage works and septic tank works are prepared in accordance with these Rules; (b) sewerage planning and design of se\•e1age works and septic tank works are submitted by a competent penon to the Commission for approval; (c) construction of the sewerage Vlotks are carried out by permit holders; (d) supervision of the sewerage work1. and septic tank works are carried out by competent person; and ( e) development is in accordance with seV1-erage development plan if there is a sewerage deYelopment plan for the developer' s development area. (2) A developer who fails to comply with paragraph (l)(a), (b), (c), (d) or (e) commits an offence and shall,-on conviction, be liable to a fine not exceeding three hundred thousand ringgit or to an imprisonment for a term of not exceeding one year or to both. (3) The deYeloper shall be responsible for the payment of the fees stipulated under Part IX. Planning procedure for development 5. The Commission may issue planning procedures for any development as follows: (a) general requirement for planning of sewerage system and septic tank; (b) requirement and criteria for the design of sewerage works or septic tank works to comply with (i) environmental discharge standards; and (ii) requirements of the sewerage catchment area; 1759 P.U. (A) 214. ( c) integration of sewerage planning with the sewerage systems in existence. planned or under construction in the area where the development is situated. P.:.RT III SEWERAGE PLANNING Conditions for preparation of sewerage planning 6. (I) The sewerage planning for sewerage works or septic tank works shall be prepared in compliance with (a) planning procedure; (h) Guidelines; and (c) sewerage catchment plan. (2) Where there is a sewerage devdopment plan for the development area, the sewerage planning for sewerage w01ks or septic tank works shall be prepared further to comply with the said sewerage development plan. (3) The sewerage planning for ,e-we1age works or septic tank works shall be prepared taking into consideration the following: (a) the layout and locat1011 of the sewerage system or septic tank; (b) the overall project development layout; (c) the type of \ev;-age treatment process; (d) the connection point to the existing sewerage system; ( e) the position of and access to sewerage ancillaries; (f) the integration of the proposed sewerage works or septic tank works with existing or future sewerage system in the vicinity of the proposed sewerage works or septic tank works; (g) the discharge point for treated effluent; (h) Standards; and (i) any information or documents as the Commission may require. Application for approval of sewerage planning 7. The competent person shall apply to the Commission for the approval of sewerage planning for sewerage works or septic tank works by submitting (a) a duly completed Form for the application for sewerage planning approval; (b) a written consent from the owner of the land where the sewerage system or the septic tank will be constructed; and P.U. (A) 214. 1760 (c) any document, report, plan, calculation or other relevant particulars or information endorsed by the competent person and required by the Commission. Amendment to sewerage planning 8. (l) The Commission may issue written notice to the competent person to amend the sewerage planning and resubmit the amended sewerage planning to the Commission for approval. (2) The competent person shall resubmit the amended sewerage planning to the Commission for approval within six months from the issuance of the written notice .under subrule (1). (3) Any sewerage planning resubmitted later than six months from the issuance of the written notice under subrule (I) shall be deemed as a fresh submission of sewerage planning for approval. Approval of sewerage planning 9. The Commission may approve. the sewerage planning or the amended sewerage planning and may impose ,11ch terms and conditions as it deems fit. Validity period for approval of sewerage planning 10. (1) The approval for the sewerage planning is valid for a term of t,10 years from the date the approval is issued by the Commission. (2) Any application to extend the validity period of the approval for sewerage planning shall be submitted to the Commission three months before the expiry of such validity period. (3) The Commission may extend the validity period of the sewerage planning approval for a duration deemed necessary by the Commission and may impose further conditions. (4) Any submission to extend the validity period of the approved sewerage planning shall be deemed as fresh submission when the submission is made (a) after the validity period for the approval has expired; or (b) less than three months before the expiry of the validity period. 1761 P.U. (A) 214. PART IV DESIGN Conditions for preparation of design 11. The design for sewerage works and septic tank works shall be prepared in compliance with the ( a) Standards; (b) Guidelines; (c) sewerage planning approved by the Commission; and (d) such other conditions as the Commission may from time to time deem necessary. Application for approval of design 12. (1) The design for sewerage wo1ks or septic tank works shall be submitted and approved by the Commission dunng the validity period of the approved sewerage planning. (2) The competent person 8hall apply to the Commission for the approval of design for sewerage works o.• septic tank works by submitting (a) a duly completed Fo1m for application for design approval; (h) a copy of the project or development planning approval from the relevant local planning authorities; (c) plans endorsed by the competent person and the developer; ( d) design calculations endorsed by the competent person; and (e) such other information or documents as the Commission may require. Competent person to amend design 13. (I) The Commission may issue a written notice to the competent person to amend the design and resubmit the amended design to the Commission for approval. (2) The competent person shall resubmit the amended design to the Commission for approval within six months from the issuance of the written notice under subrule (I). (3) Any design resubmitted later than six months from the issuance of the written notice under subrule (I) shall be deemed as a fresh submission of design for approval. P.U. (A) 214. 1762 Approval of design 14. The Commission may approve the design or the amended design and impose such terms and conditions as it deems fit. Validity period for approval of design 15. (1) The approval for design is valid for a duration of two years from the date of issuance of the approval by the Commission. (2) Any application to extend the validity period of the approval for design shall be submitted to the Commission, three months before the expiry of such validity period. (3) The Commission may extend the validity period of the design approval and may impose further conditions. (4) Any submission to extend the validity period of the approved design shall be deemed as fresh submission when the ~ubmi~sion is made (a) after the validity period for the dpproval has expired; or (b) anytime less than three month8 befo1e the expiry of the validity period. P•Rl V CONSTRUCTION Chapter I General requirements Commencement of construction 16. (1) The construction of the sewerage works or septic tank works shall commence during the validity period of the approved design. (2) If the sewerage works or the septic tank works do not commence within the validity period of the approved design for such works, the competent person shall submit fresh application for apprornl of sewerage planning and design in accordance v.ith these Rules before commencing such works. Compliance during construction 17. (1) A person who undertakes the construction of the sewerage works and septic tank works shall comply with (a) the approved sewerage planning and design; (b) Guidelines; 1763 P.U. (A) 214. (c) Standards; and (d) any other conditions stipulated by the Commission and other relevant authorities. (2) Any developer, competent person or contractor who fails to comply with the Standards in the construction of the sewerage works or septic tank works commits an offence and shall, on conviction, be liable to a fine not exceeding one hundred thousand ringgit or to imprisonment for a term not exceeding one year or to both. Inspection by the Commission 18. (1) The Commission or any person authorised by the Commission may inspect the sewerage works or septic tank works at any time deemed necessary by the Commission. (2) The competent person shall carry out ,my rectification notified by the Commission. (3) The competent person shall notify the Commission in writing upon completion of the rectification. Samples for testing 19. (1) The Commission or an} person authorised by the Commission shall be permitted to take- ~uch samples of the materials used in the construction of sewerage works as may be deemed necessary by the Commission for testing. (2) Any cost incurred by the Commission for testing of the materials shall be borne by the developer. (3) The Commission or any person authorised by the Commission shall not be liable for any loss, damage or cost due to taking such samples pursuant to subrule (1). Chapter 2 Consm1crion of sewerage works Notice for commencement of construction of sewerage works 20. (1) The competent person shall notify the Commission of (a) the commencement of the construction of sewerage works; and ( b) the date of any connection to a public sewer or public sewage treatment works if the construction works include any connection to a public sewer or public sewage treatment works, P.U. (A) 214. 1764 in the Form for notice of commencement of works that shall be submitted to the Commission at least fourteen days prior to the proposed commencement date of the construction. (2) The following documents shall be submitted to the Commission together with the Form for notice of commencement of works for all sewerage works except for sewerage works involving only construction of connection to existing public sewer or for sewer network construction: (a) one copy of the detailed structural plans of the sewerage works including the requirements for the foundation and stability together with a legible copy of the design calculation in the Form for details for structural plans and design calculation; and (b) one copy of the detailed electrical design, mechanical design and drawings of the sewerage works installation in the Form for details for electrical design, mechanical design and drawings. (3) The competent person or any person who commences the construction sewerage works before notifying the Commission of ,,uch construction under subrule (I), commits an offence and shall. on conviction, be liable to a fine not exceeding one hundred thousand ringg1t Notice to lay open works 21. The Commission may issue a notice in the Form to lay open works, to any person who fails to nottf) the Commission under sub1-ule 20(1) before commencing the construction of sewerage works to dig, cut into, Jay open, carry out any necessary works, or to tear down the works as may be deemed necessary by the Commission at the person's own cost and within a duration specified by the Commission to enable the Commission or any person authorised by the Commission to inspect such sewerage works. Chapter 3 Construction of septic tank works Notice for commencement of construction of septic tank works 22. ( 1) The competent person shall notify the Commission of the commencement of the construction of septic tank works in Form for notice of commencement of works, at least fourteen days prior to the proposed commencement date of construction. (2) The competent person or any person who commences the construction septic tank works before notifying the Commission of such construction under subrule (1) commits an offence and shall, on conviction, be liable to a fine not exceeding fifty thousand ringgit. 1765 P.U. (A) 214. Notice of completion of septic tank works 23. The competent person shall declare in the Form for declaration of supervision of septic tank works, that he has supervised the septic tank works and lodge the said Form with the Commission upon the completion of the septic tank works. PART VI INSPECTION AND LETTER OF CONFIRMATION Chapter I Inspection of sewerage works Interme~iate inspection 24. (l) The competent person shall notit} the Commission \.\hen the sewerage works will be ready for· intermediate inspection in the Form for intermediate inspection. (2) The competent person shall supervise the intermediate inspection of the sewerage works and ensu1e that the sewerage works complies with (a) the approved se\\-e1age planning and design; (b) Guidelines: (c) Standards; and (d) any conditions stipulated by the Commission. (3) The Commission or any person authorised by the Commission may witness the intermediate inspection of the sewerage works and may issue written notice to the competent person within fourteen days from the date of receipt of the Form for intermediate inspection notifying the competent person to rectify any non-compliance of the approved sewerage planning and design or any provision of these Rules within a duration stipulated by the Commission. (4) The competent person shall upon the rectification of such non-compliance notify the Commission in writing of such rectification. (5) A record of the intermediate inspection and any other testing required for the sewerage works shall be prepared and signed by the competent person and such record shall be submitted to the Commission upon the completion of the intermediate inspection. P.U. (A) 214. 1766 Notice of final inspection 25. (I) Upon the completion of the sewerage works, the competent person shall notify the Commission of the date for final inspection of the sewerage works by submitting to the Commission the following documents: (a) the Form for final inspection; (b) documents specified in the Guidelines; and (L) any information or documents required by the Commission. (2) · The Commission or any person authorised by the Commission shall witness the final inspection and may when it deems necessary, issue written notice to the competent person to rectify any non-compliance of the approved sewerage planning and design or any provisions of these Rules within fourteen days from the date of receipt of the Form for final inspection. (3) The competent person shall upon the rectificatmn of such non-compliance, notify the Commission in writing of such recdf1cat1on by resubmitting the Form for final inspection to the Commission to (a) certify that the defects notified by the Commission has been rectified; and (b) notify the date that the sewerage works will be ready for final inspection. (4) A record of the final inspection shall be prepared and signed by the competent person and such recotd shall be submitted to the Commission upon the completion of the final m,;pection. Surrender of land and way leave 26. (1) The developer of a new development who has constructed a sewerage system or part of the system that is to be handed over to a service licensee under section 47 of the Act shall together with the Form for the approval of design of the sewerage works submitted by the competent person, submit documentary proofs as an evidence that all the necessary steps or actions required under the National Land Code [Act 5611965] or any other written laws have been taken or complied with by the developer including for any approval to be obtained and fees or duties payable under such laws, for the surrender of the land where the sewerage system or part of the system are located to the State Authority. (2) Upon the sewerage system or part of the system being handed over under section 47 of the Act and prior to the completion of surrender of the land where the sewerage system or part of the system is located to the State Authority, the developer shall permit or cause the owner to permit the licensee to enter the land and carry out any repairs. upgrading or refurbishment of such system. 1767 P.U. (A) 214. (3) Where any part of the sewerage system is constructed by the developer on private land, any way leave secured by the developer in relation to such land shall be assigned in perpetuity to the service licensee. Chapter 2 Letter of Confirmation Letter of confirmation for sewerage works and septic tank works 27. ( 1) Subject to subrule (2), the Commission may issue a letter of confirmation, to confirm that the certificate of compliance may be issued for the sewerage works or the septic tank works after ( a) receipt of the Form of declaration of supervision of septic tank works by the competent person for septic tank works; or (b) final inspection of sewerage wo1ks i~ witnessed by the Commission. (2) The Commission may issue a letter of confirmation if the Commission is satisfied that ( a) the sewerage works or thr. !>eptic tank works has been constructed in accordance with these Rule~; and (b) the developer and the competent person have complied with the conditions imposed by the Commission. PART VII HANDING OVER OF SEWERAGE SYSTEM Handing over of sewerage system 28. (1) Upon the issuance of the certificate of compliance of a the sewerage system or part of the system by a qualified person under section 47 of the Act, the developer of a new development shall apply to the Commission in the Form for hand over the sewerage system to hand over the sewerage system or part of the system to the service licensee. (2) The service licensee shall accept the handing over of the sewerage system or part thereof at no cost for use as public sewerage system when the service licensee is satisfied that (a) the sewerage system or part thereof has been completed and every part thereto is in proper working order; and (b) the approved sewerage planning and approved design, all conditions imposed by the Commission, Guidelines and Standards are complied with. P.U. (A) 214. 1768 Operation and maintenance of sewerage system before handing over 29. Until the sewerage system is handed over to a service licensee under section 47 of the Act, the developer of a new development shall (a) be responsible to cause the sewerage system and all parts thereof to be operated and maintained; (b) make good any damage or defect to the sewerage system and all parts thereof; and (c) take all safety and security measures for the sewerage system and all parts thereof. Defects liability period 30. (1) Upon handing over of the sewerage system or part of the system under section 47 of the Act, a defects liability period for the sewerage system shall be imposed on the developer for a duration of twdve months from the date of handing over to the service licensee. (2) The developer shall provide a guarantee during the defects liability period of the sewerage system and the guarantee 1,hall be lodged with the service licensee when the competent person subrn,t~ the Form for final inspection to the Commission. (3) The amount of the guarantee !-;hall be five percent of the cost of the sewerage system to be handed over by the developer under section 47 of the Act. (4) The guarantee shall be gnen in the form of bank guarantee which shall be valid for a period of fifteen months from the date of handing over of the sewerage system to the service licensee. (5) The guarantee shall be a security and not a payment in advance and shall not relieve the developer from any liability under subrule (6). (6) If repairs are required within the defects liability period for any defects, imperfections or any other faults whatsoever which may appear or which are due to materials or goods or workmanship not in accordance with the approved sewerage planning and design, Guidelines and Standards, the sen-ice licensee shall immediately notify the developer and the developer shall carry out the repairs. (7) Throughout the defects liability period if the developer fails to undertake the repairs required within twenty one days from the notice by the service licensee, the service licensee may undertake such repairs. (8) Any cost of repairs resulting from any defects, imperfections or any other faults under subrule (6) shall be recoverable by the service licensee by utilizing the bank guarantee lodged with the service licensee under subrule (2). 1769 P.U. (A) 214. (9) If such repair cost exceeds the amount of bank guarantee provided, the excess shall be recoverable by the service licensee from the developer within thirty days from such utilization of the guarantee. (10) Where a bank guarantee has been utilised by the service licensee under subrule (8), the developer shall, within thirty days from the date of such utilisation reimburse the amount of the bank guarantee to ensure that the amount of the bank guarantee shall be as specified under subrule (3). (11) Upon expiry of the bank guarantee referred to in subrule (4), the bank guarantee shall be cancelled after deducting any amount which may be due to the service licensee as a result of any defect in the sewerage system. PART VIII COl\tPETENT PFRSON Responsibility of competent person 31. The competent person submitting the design for approval from the Commission shall supervise and undertake full responsibility of the ( a) construction, installation and mspection of the sewerage works or the septic tank works until the completion of such works; and (b) performance of &e~erage works or the septic tank works. Obligation of competent person 32. (1) A competent person preparing the sewerage planning or design for sewerage works or septic tank works shall ensure (a) that the sewerage planning and the design are in compliance with the provisions of the Act and these Rules; (b) that the plans, calculations, report, data, records or other relevant documents used for purposes of obtaining approval for the sewerage planning or design from the Commission are not false in a material particular; and (c) any certification in the Form by the competent person is true and accurate. (2) Any competent person undertaking the supervision of construction and installation of the sewerage works or septic tank works shall ensure that the works are in compliance with ( a) the provisions of the Act and these Rules; (b) the sewerage planning and design approved by the Commission including any conditions imposed by the Commission; and (c) Guidelines and Standards. P.U. (A) 214. 1770 (3) Any person who fails to comply with subrule (l) or (2) commits an offence and shall, on conviction, be liable to a fine not exceeding two hundred thousand ringgit or to imprisonment for a term not exceeding two years or to both. (4) No competent person upon conv1ct1on of any offence under these Rules shall prepare, submit any sewerage planning, design or supervise any construction of sewerage works or septic tank works. (5) A person who contravenes subrule (4) commits and offence and shall. on conviction. be liable to a fine not exceeding t\\·o hundred thousand ringgit or to imprisonment for a term not exceeding two years or to both. Change of competent person 33. (I) If a competent person ceases to carry out hi~ duties in regards to the sewerage works or the septic tank works in a de've!opment, the developer shall notify the Commission within fourteen day5 from the date of such cessation of duties. (2) The developer shall as soon as p1aL-llcal,le appoint another competent person and notify the Commission m writing of such appointment. (3) The sewerage works or the ~ept1c tank works shall not continue until the new competent person is appomted by the developer and until such appointment, the develope1 8hall be responsible to take all safety measures for such works. (4) The new competent person appointed pursuant to subrule (2) shall undertake full responsibility for the design, supervision of the construction, installation, inspection and performance of the sewerage works or the septic tank works and shall be fully liable for the acts or omission of all competent person who had been responsible for design. supervision of the construction, installation, inspection and performance of the works prior to his appointment. Liability of competent person 34. Notwithstanding any approval, inspection or certification by the Commission pursuant to these Rules, the competent person shall be wholly responsible for the design, quality of construction and installation of the sewerage works and the septic tank works and shall remain liable for any defects or failure in the design, construction and installation of the sewerage works and septic tank works including defects or failure in treatment process and structural stability. 1771 P.U. (A) 214. PART IX FEES Payment of fees for sewerage planning approval 35. (1) Any person when submitting the Form for application for sewerage planning approval for sewerage works or septic tank works shall pay the following fee: (a) the fee for septic tank as specified in column (2) of Part I of Schedule 2 in accordance to the size of development specified in column (I) of Part I of Schedule 2; ( b) the fee for single connection as specified in column (2) of Part II of Schedule 2 in accordance to the size of development specified in column (I) of Part II of Schedule 2; (c) the fee for sewer network as spec,fied in column (2) of Part III of Schedule 2 in accordance to the ~1ze of development specified in column (1) of Part III of Schedule 2, (d) the fee for pumping station Ji, 5pecified in column (2) of Part IV of Schedule 2 in accordance to ~he size of development specified in column (I) of Part IV ot Schedule 2; and (e) the fee for sewage tteatment plant as specified in column (2) of Part V of Schedule 2 m accordance to the size of development specified in column (1) of Part V of Schedule 2. (2) The fee paid for the submission of sewerage planning for the approval of the Commission includes initial submission and first resubmission of the sewerage planning for sewerage works and septic tank works. (3) The same amount of fee as the fee for initial submission will be imposed for every second resubmission of the sewerage planning to the Commission for the approval of the Commission. (4) Any submission to the Commission for approval of amendments to sewerage planning after such sewerage planning has been approved by the Commission shall be deemed as a fresh submission and the same amount of fee as the fee for initial submission shall be imposed. Payment of fees for design approval 36. (1) Any person when submitting the Form for application for design approval for sewerage works or septic tank works shall pay the following fee: (a) the fee for septic tank as specified in column (3) of Part I of Schedule 2 in accordance to the size of development specified in column (I) of Part 1 of Schedule 2; P.U. (A) 214. 1772 (b) the fee for single connection as specified in column (3) of Part II of Schedule 2 in accordance to the size of development specified in column (1) of Part II of Schedule 2; (c) the fee for sewer network as specified in column (3) of Part III of Schedule 2 in accordance to the size of development specified in column (1) of Part III of Schedule 2; (d) the fee for pumping station as specified in column (3) of Part IV of Schedule 2 in accordance to the size of development specified in column (1) of Part IV of Schedule 2; and (e) the fee for sewage treatment plant as specified in column (3) of Part V of Schedule 2 in accordance to the size of development specified in column (1) of Part V of Schedule 2. (2) The fee paid for the submission of design for the approval of the Commission includes initial submission and fir5t resubmission of the design for sewerage works or septic tank works. (3) The same amount of fee as the fee for m1tial submission will be imposed for every second resubmission of the design to the Commission for the approval of the Commission. (4) Any submission to the Comm1s$1on for approval of amendments to design after such design has been approved by the Commission shall be deemed as a fresh submission and the same fee a, the fee for the initial submission shall be imposed. Payment of fees for commencement of sewerage works 37. Any person when submitting every Form for notification of commencement of sewerage works shall pay the following fee: (a) the fee for single connection as specified in column (4) of Part II of Schedule 2 in accordance to the size of development specified in column (1) of Part II of Schedule 2; (b) the fee for sewer network as specified in column (4) of Part III of Schedule 2 in accordance to the size of development specified in column (1) of Part III of Schedule 2; (c) the fee for pumping station as specified in column (4) of Part IV of Schedule 2 in accordance to the size of development specified in column (1) of Part IV of Schedule 2; and (d) the fee for sewage treatment plant as specified in column (4) of Part V of Schedule 2 in accordance to the size of development specified in column (1) of Pait V of Schedule 2. 1773 P.U. (A) 214. Payment of fees for intermediate inspection 38. Any person when submitting every Form for notification of intermediate inspection of sewerage works shall pay the following fee: (a) the fee for single connection as specified in column (5) of Part II of Schedule 2 in accordance to the size of development specified in column (1) of Part II of Schedule 2; (b) the fee for sewer network as specified in column (5) of Part III of Schedule 2 in accordance to the size of development specified in column (1) of Part III of Schedule 2; (c) the fee for pumping station as specified in column (5) of Part IV of Schedule 2 in accordance to the size of development specified in column (1) of Part IV of Schedule 2; and (d) the fee for sewage treatment plant as specified in column (5) of Part V of Schedule 2 in accotdance to the size of development specified in column (1) of Patt V of ~chedule 2. Payment of fees for final inspection 39. (1) Any person when submitting the Form for notification of final inspection of sewerage works shall pay the following fee: (a) the fee for single connection as specified in column (6) of Part II of Schedule 2 m accordance to the size of development specified in column (1) of Part II of Schedule 2; (b) the fee for sewer network as specified in column (6) of Part III of Schedule 2 in accordance to the size of development specified in column (1) of Part III of Schedule 2; (c) the fee for pumping station as specified in column (6) of Part IV of Schedule 2 in accordance to the size of development specified in column (1) of Part IV of Schedule 2; and (d) the fee for sewage treatment plant as specified in column (6) of Part V of Schedule 2 in accordance to the size of development specified in column (1) of Part V of Schedule 2. (2) The fees paid for final inspection of the sewerage works are inclusive of initial final inspection and one follow up inspection carried out within three months from the initial final inspection. (3) Any follow up final inspection carried out later than three months from the initial final inspection shall be deemed as a fresh initial final inspection and the same amount of fee as the initial final inspection shall be imposed. P.U. (A) 214. 1°Jpe of Application Sewerage planning for sewerage v:orks Sewerage planning for septic tank works Design for septic tank works Design for sewer nel\--ork Design for pumping station Design for se11:age treatment plant Structural design Design for electrical installation Design for mechanical installation (I) Size of Development 1774 SCHEDULE 1 COMPETENT PERSONS (Rule 2) Competent Person Architect. town planner or engineer a. Architect or engineer b. Registered building draughtsman (for single dwelling house only) a. Architect or engineer b. Registered building draughtsman (for single d,;.'elling house only) Engineer (civil, enviror,me,ntal, chemical or mechanical discipline) Engineer (ci••;J e,,,·uonmental, chemical or mechanical discipline) Enginee, (civil, em ironmental, chemical or mechanical discipline) Engine.,, ( ci vii or structural discipline) I,.n~meer (electrical discipline) BI11imeer (mechanical discipline) SCHEDULE 2 PART I FEES FOR SEPTIC TANK (Rules 35 and 36) (2) Sewerage Pla11ni11g Approval (RM) (3) Design Approval (RM) Single dwelling house up to 5 PE 150.00 Development from 6 PE to 150 PE 200.00 150.00 Development exceeding J 50 PE 400.00 200.00 I (I) Size of Development Single dwelling house up to 10 PE Development from 11 PE to 150 PE Development from 151 PE to 500 PE De\·elopment from 50 I PE to 2,000 PE Development exceeding 2,000 PE (l) Size ~f Development DeYelopment up to 150 PE De,·elopment from 15 l to 1.000 PE Development from 1,001 to 5,000 PE Development from 5,001 to 10,000 PE Development from 10,001 to 20,000 PE Development exceeding 20,000 PE 1775 PART II FEES FOR SINGLE CONNECTION (Rules 35, 36, 37, 38 and 39) (2) (3) (4) Sewerage Design Commence Planning Approval Works Approval (Rl\l) (RM) (RM) 200.00 - 150.00 150.00 120.00 400.00 250.00 120.00 550.00 400.00 120.00 550.00 500 00 120.00 PART III FEES FOR SEWER NETWORK (Rules 35, 36, 37, 38 and 39) (2) (3) (4) (5) Intermediate /11spection (RM) 300.00 300.00 600.00 700.00 (5) Sel!'erage Design Commence Intermediate Planning Approval Works Inspection Approval (RM) (RM) (RM) (RM) 350.00 200.00 120.00 300.00 450.00 300.00 120.00 700.00 500.00 450.00 120.00 700,00 550.00 500.00 120.00 750.00 700.00 550.00 120.00 800.00 750.00 650.00 120.00 850.00 P.U. (A) 214. (6) Final lrrspection (RM) 300.00 300.00 600.00 700.00 (6) Final Inspection (RM) 300.00 700.00 700.00 750.00 800.00 850.00 P.U. (A) 214. (I) S.'ie of Develupment Development up to 150PE Development from 151 to 1,000 PE Development from 1,001 to 5,000 PE • Development from 5,001 to 10,000 PE Development from 10,001 to 20,000 PE Development exceeding 20,000 PE ( I) Size of Development De velopment up to 150 PE Development from 151 to 1,000 PE Development from 1,001 to 5,000 PE Development from 5 ,001 to 10,000 PE 1776 PART IV FEES FOR PUMPING ST A TION (Rules 35, 36, 37, 38 and 39) (2) (3) (4) ! (5) Sewerage Design Commence lmermediate Planning Approval Works l11spection Appm.-al (RM) (RMJ (RM) (RM) 350.00 200.00 • 120.00 300.00 500.00 250.00 120.00 500.00 550.00 300.00 120.0C 600.00 650.00 350.00 120.00 700.00 700.00 450.00 120.00 700.00 700.00 500.00 120.00 700.00 PART V FEES FOR SEWERAGE TREATMENT PLANT (Rules 35, 36, 37, 38 and 39) (2) (3) (4) (5) Sewerage Design Commence l11termediate Planning Approval W,,rk.i Inspection Approl'(1/ (RM) (RM) (RM) (RM) 350.00 200.00 120.00 300.00 550.00 450.00 120.00 700.00 650.00 550.00 120.00 700.00 700.00 600.00 120.00 700.00 (6) Final Inspection (RM) 300.00 500.00 600.00 700.00 700.00 700.00 (6) Final Inspection (RM) 300.00 700.00 700.00 700.00 1777 P.U. (A) 214. (I) (2) (3) (4) (5) (6) Size of Sewerage Design Commence Intermediate Final De,•elopmenf Planning Appro,·al Works hrspecrion Inspection Approrn/ (RM) (RM) (RM) (RM) (RM) Development from 750.00 850.00 120.00 1,600.00 1.600.00 I0.001 to 20,000 PE Development 750.00 850.00 120.00 1,600.00 1,600.00 exceeding 20,000 PE Made 21 June 2013 [KeTTHA:BP(S) 9/9 Klt. 23; PN(PU2)660/VIIIJ DATO' ISMAIL BIN KASIM Chairman of SuruhanJa)'a Perkhidmatan Air Negara Hakcipta Pencctak @ PERCETAKAN NASIONAL MALAYSIA BERHAD Scrnua Hak TCl]Llihara. Tiada mana-mana. bahagian ju.a. daripMa pcncrbitJ.n int bi1kb ditt:rbJtkim scmula arau di$impan di dalam bcnmt yan:g boleh dipcrolc.hi s..:muJa lllau disiarkao di.lam scb~r;ini bcutuk dong..m apa jua cars c:lcktrnnik, nu:·kanikal, folokupL takanum dan.' atau stl. ·.likny,1. 1anpa meodupar izin daripada rerrel•ka.Q Nasional Malaysia Be-rhad {Pencetak krpada Kerajaao Malaysia yani dilantik). DICETAK OLEH PERCETAKAN NASIONAL. MALAYSIABERHAD, KUALA LUMPUR PNMB BAGI PIHAK DAN DENGAN PER!NTAH KERAJA.\N MALAYSIA