Surveyors (Registration and Administration) (Amendment) Regulations 1996
颁布于 1996-12-31 · 文本截至 2026-10-01
以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。
研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。
关于这部法律
- 语言
- English
- 类型
- 条例
- 国家
- 马来西亚 · Sabah
- 主题
- Land and soil, Wild species and ecosystems
- 关键词
- survey/mapping, land valuation, wetlands
在哪里阅读
该法律没有记录来源链接。
文本
所收录的法律原文,按条款排列。每个条款都有自己的链接。
62 Ordinance No.22of 1960. Citation and commence ment. G.N. NoS9 of 1989. Amendment of Regulation 7. Amendment of Second Schedule. THE SURVEYORS ORDINANCE 1960 (Ordinance No.22 of 1960) SURVEYORS (REGISTRATION AND ADMINISTRATION) (AMENDMENT) REGULATIONS ·1996 In exercise of the powers conferred by section 19 of the Surveyors Ordinance 1960, the Surveyors Board, with the approval of the State Secretary, hereby makes the following regulations: I. These Regulations may be cited as the Surveyors (Registration and Administration) (Amendment) Regulations 1996, shall be read as one with the Surveyors (Registration and Administration) Regulations 1989 (hereinafter referred to as the "principal Regulations") and shall be deemed to have come into operation on the first day of January, 1996. 2. Regulation 7 of the grincipal Regulations is amended by inserting, iminediately after sub-regulation (2), a new sub-regulation (3) as follows: "(3) In any survey where land for different purposes is surveyed together, the fee shall be charged in accordance with the Table appropriate for each purpose.". 3. ''1be Second Schedule to the principa] Regulations is amended (a) in the "CONTENTS" (i) by substituting for the words appearing against "Table 2" thereof the following: "FOR SURVEY OF LAND HELD UNDER PART II, PART III AND PART IV OF THE LAND ORDINANCE CAP. 68 FOR OTHER THAN AGRICULTURAL PURPOSES." and (ii) by inserting, immediately after the words "Table 11 - DIS BURSEMENTS", the following: "TABLE 12 TABLE 13 TABLEl4 ADDITIONAL FEE FOR SURVEY OF LAND FOR MINING FOR SURVEY OF LAND FOR TEMPORARY OCCUPATION LICENCE"; (b) in Table I, by substituting for the words "Charge for lines for Azimuth, connections and controls" appearing in item 3 thereof the words "Charge for lines for azimuth, connections, controls and sections of boundary lines"; (c) in Table 2 (i) by substituting for the heading thereof the following: 63 "FOR SURVEY OF LAND HELD UNDER PART II, PART Ill AND PART IV OF THE LAND ORDINANCE (CAP.68) FOR OTHER THAN AGRICULTURAL PURPOSES".; (ii) by substituting for the words "The Survey fees for land held under Part II for other than agricultural purposes and land held under Part Ill of the Land Ordinance, Cap.68 namely:-" appear ing immediately below the heading the following: ''1he survey fees for land held under Part II, Part ill and Part IV of the Land Ordinance (Cap.68) for other than agricultural purposes, namely:-"; (iii) by substituting for the figures "300.00 400.00 500.00" appearing in item (n) the figures "100.00 I 10.00 120.00" respectively in the appropriate columns; (iv) by substituting for the words "Lines for azimuth, connections and controls" appearing in item "(o) the words "Lines for azimuth, connections, controls and sections of boundary lines"; and (v) by inserting immediately after item (o) a new item (p) as follows: "(p) Charge for the (a) (b) (c) re-establishment of old boundary marks found missing or out of position for each mark refixed or replaced ................ 150.00 per 150.00per 150.00per "; and mark mark mark ( d) by inserting, immediately after Table 11, the following new Tables 12, 13 and 14: TABLEl2 ADDITIONAL FEE Additional fee for survey of boundary or traverse lines in hilly areas, fresh water swamp and tidal swamp shall be charged as follows: (a) Hilly above IS-degree slope (b) Fresh water swamp (c) Tidal swamp RM 0.50 per metre 2.00 per metre 3.00 per metre 64 TABLE13 SURVEY OF LAND FOR MINING The survey fees for the survey ofland forthe purpose of mining lease shall be as follows: (a) I. Basic charge .................................. . (b) (c) RM 950.00 2. Charge for each lot as per rates shown below: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) ([) SlZEOFWT For l hectare or part thereof .......... . For each additional hectare of a lot up to 5 hectares ....................... . For 5 hectares ................................. . For each additional hectare of a lot above 5 hectares upto JO hectares .... . For lO hectares ............................... . For each additional hectare of a lot above lO hectares upto 25 hectares .. For 25 hectares ............................... . For each additional hectare of a lot above 25 hectares upto 50 hectares .. For 50 hectares ............................... . For each additional hectare of a lot above 50 hectares upto I 00 hectares ......................................... . For l 00 hectares ............................ . For each additional hectare of a lot above l 00 hectares upto 500 hectares ......................................... . (m) For 500 hectares ............................ . ( n) For each additional hectare of a lot above 500 hectares upto l 000 hectares .......................................... . ( o) For l000 hectares .......................... . (p) For each additional hectare of a lot above l 000 hectares ...................... . CHARGEPFR LOT RM 3,000.00 750.00 6,000.00 600.00 9,000.00 195.00 11,925.00 165.00 16,060.00 100.00 21,050.00 50.00 41,050.00 35.00 58,550.00 25.00 In calculating the above charges any additional part of an hectare will be reckoned as one hectare. 3.(a) Charge for lines for azimuth, connections and controls and also for surveyed boundary lines ..... ..... ..... . .... RM 2.00 per metre I. 2. 3. 4. (b) Charge for developed land where buildings, walls, fences, hedges, etc have been put along any of the boundaries Charge for the reestablishment of old boundary marks found missing or out of position for each mark refixed or replaced 5. Disbursements where applicable, are as provided in Table 11. TABLEl4 65 RM 2.50 per metre 150.00 per mark FOR SURVEY OF LAND FOR TEMPORARY OCCUPATION LICENCE (T.O.L.) The fees for the survey of land for different purposes under T.O.L. shall be as follows: Basic charge For logging, logpond & extraction of sea sands For residential, commercial and industrial purposes RM 950.00 as per rates prescribed under Table I as per rates prescribed under Table 2 4. For logging road and extraction of river sand/ stones as per rates prescribed under Table 6.". Made this 18th day of October, 1996. I have approved the foregoing Regulations. Dated this 31st day of December, 1996. MOHAMAD BIN JAFRY, Chairman, Surveyors Board, Sabah. DA1UK SERI PANGLIMA KHAULBINDA1UHI.JAMALUL, State Secretary.