关于这部法律

语言
English
类型
policy
组织
European Union
国家
约旦
主题
Energy, Water
关键词
renewable energy, biofuel, hydropower generation, waterworks, energy conservation/energy production

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. 1. Rehabilitation of Civil work,

  2. 2. Rehabilitation and/or install the following: A. Raiser pipes, B. Suction and discharge pipes, C. Pumps, Transformers, D. Earthing system, E. Panels, F. Cables, G. PLC's, H. Local SCADA Systems Project Responsible Sub-Projects KPls Project Base Line Project party Target

  3. 1. Rehabilitation of water 1. Miyahona/ CorridorWF 1. Annual Water Pumped fields in Zarqa & Al balqa Zarqa, 2. WAJ/ Al (m 3/year) Balqa 2. Annual Electrical Power consumption (kWh/year)

  4. 3. Annual Electrical 1,326,320 Power Saving (kWh/year) Merhib WF 1. Annual Water Pumped 1,086,078 1,086,078 (m 3/year)

  5. 2. Annual Electrical 3,589,044 699,325 Power consumption (kWh/year)

  6. 3. Annual Electrical 2,889,720 Power Saving (kWh/year) Rajib WF 1. Annual Water Pumped (m 3/year) 2 2. Annual Electrical Power consumption (kWh/year)

  7. 3. Annual Electrical 957,054 Power Saving (kWh/year) South Shouneh 1. Annual Water Pumped WF (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  8. 3. Annual Electrical 518,505 Power Saving (kWh/year) Al baqa'a WF 1. Annual Water Pumped 1,354,030 1,354,030 (m 3/year)

  9. 2. Annual Electrical 2,029,166 1,338,135 Power consumption (kWh/year)

  10. 3. Annual Electrical 691,031 Power Saving (kWh/year) Project Energy 6,382,630 Saving (kWh/ Year)

  11. 2. Rehabilitation of Well 1. WAJ /Karak, 2. Lajoun WF 1. Annual Water Pumped fields in Karak & Aqaba Aqaba company (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  12. 3. Annual Electrical 1,322,420 Power Saving (kWh/year) Mneisheer WF 1. Annual Water Pumped (m 3/year) 3 2. Annual Electrical Power consumption (kWh/year)

  13. 3. Annual Electrical 1,430,197 Power Saving (kWh/year) Project Energy 2,752,617 Saving (kWh/ Year)

  14. 3. Rehabilitation of Well Miyahuna Abu Zeeghan WF 1. Annual Water Pumped fields operated by (m 3/year) MiyahunaWC 2. Annual Electrical Power consumption (kWh/year)

  15. 3. Annual Electrical 1,794,579 Power Saving (kWh/year) Project Energy 1,794,579 Saving (kWh/ Year)

  16. 4. Rehabilitation of Well Yarmook A. Wadi Al Arab 1. Annual Water Pumped fields operated by Company WF (m 3/year) YarmookWC 2. Annual Electrical Power consumption (kWh/year)

  17. 3. Annual Electrical 1,069,419 Power Saving (kWh/year) B. Azraq WF 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  18. 3. Annual Electrical 2,903,783 Power Saving (kWh/year) 4 C. Al Aqeb WF 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  19. 3. Annual Electrical 3,359,203 Power Saving (kWh/year) D. Zniaeh WF 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  20. 3. Annual Electrical 637,795 Power Saving (kWh/year) E. Oyoon WF 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  21. 3. Annual Electrical 2,342,793 Power Saving (kWh/year) F. Mndah WF 1. Annual Water Pumped 838,843 838,843 (m 3/year)

  22. 2. Annual Electrical 1,008,217 891,585 Power consumption (kWh/year)

  23. 3. Annual Electrical 116,632 Power Saving (kWh/year) G. KiloWF 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption 5 (kWh/year)

  24. 3. Annual Electrical 181,342 Power Saving (kWh/year) H. Noaymeh WF 1. Annual Water Pumped 273,268 273,268 (m 3/year)

  25. 2. Annual Electrical 521,298 232,468 Power consumption (kWh/year)

  26. 3. Annual Electrical 288,830 Power Saving (kWh/year) Project Energy 10,899,797 Saving (kWh/ Year)

  27. 5. Rehabilitation of Pump Miyahuna A. Zay PS 1. Annual Water Pumped Stations operated by Company (m 3/year) MiyahunaWC 2. Annual Electrical Power consumption (kWh/year)

  28. 3. Annual Electrical 17,661.962 Power Saving (kWh/year) B. Damishkhi PS 1. Annual Water Pumped (m3/year) 2. Annual Electrical Power consumption (kWh/year)

  29. 3. Annual Electrical 875,179 Power Saving (kWh/year) C. Al Muntaza 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year) 6

  30. 3. Annual Electrical 9,380,147 Power Saving (kWh/year) D. Wadi Eseer PS 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  31. 3. Annual Electrical 390,338 Power Saving (kWh/year) E. Ain Gazal PS 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  32. 3. Annual Electrical 1,522,700 Power Saving (kWh/year) Project Energy 29,830,326 Saving (kWh/ Year)

  33. 6. Rehabilitation of Pump Yarmook A. Wadi Alarab 1. Annual Water Pumped Stations operated by Company PS0 (m 3/year) YarmookWC 2. Annual Electrical Power consumption (kWh/year)

  34. 3. Annual Electrical 5,858,009 Power Saving (kWh/year) B. Wadi Alarab 1. Annual Water Pumped PSl (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  35. 3. Annual Electrical 7,706,800 Power Saving (kWh/year) 7 C. Juhifiya PS 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  36. 3. Annual Electrical 420,000 Power Saving (kWh/year) Project Energy 13,984,809 Saving (kWh/ Year)

  37. 7. Rehabilitation of Pump 1. WAJ Karak A. At Tween PS 1. Annual Water Pumped Stations in Karak, Tafileh 2. WAJ Zarqa (m 3/year) and Zarqa 3. WAJ Tafileh 2. Annual Electrical Power consumption (kWh/year)

  38. 3. Annual Electrical 621,676 Power Saving (kWh/year) B. Hashemiyyeh 1. Annual Water Pumped PS (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  39. 3. Annual Electrical 151,020 Power Saving (kWh/year) C. Al Gwair PS 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  40. 3. Annual Electrical 626,940 Power Saving (kWh/year) 8 D. Qatraneh PS 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  41. 3. Annual Electrical 840,764 Power Saving (kWh/year) E. As Safi PS 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  42. 3. Annual Electrical 288,206 Power Saving (kWh/year) F. Al Qaser PS 1. Annual Water Pumped (m 3/year) 2. Annual Electrical Power consumption (kWh/year)

  43. 3. Annual Electrical 236,614 Power Saving (kWh/year) H. Zibdeh PS 1. Annual Water Pumped (m 3/year)

  44. 2. Annual Electrical Power consumption (kWh/year)

  45. 3. Annual Electrical 794,615 Power Saving (kWh/year) Project Energy Saving (kWh/ 3,559,835 Year) Total Projects Energy Saving (kWh/ Year) I 69,204,593 9 Ton CO2 50,381 Reduction/ Year I

  46. 8. Al Bqourieh 1. Annual Water Pumped - - (m 3/year)

  47. 2. Annual Electrical 4,688,000 3,176,372 Power consumption (kWh/year)

  48. 3. Annual Electrical 1,500,000 Power Saving (kWh/year)

  49. 9. Rehabilitation of Al Zarqa Pump Station. JICA

  50. 10. Rehabilitation of trunk line connecting AZRAQ pump station to KHAW tank. JICA

  51. 11. Rehabilitation of trunk line connecting ALHALABAT pump station to KHAW tank. JICA

  52. 12. Installation 600mm Pipe from AZRAQ pump station to ALBATRAWY tank. JICA

  53. 13. Rehabilitation 600mm, 4.1 km long Pipe from AZRAQ to KHAW tank. JICA

  54. 14. Install water meters and valves in pump station several locations in Al Zarqa governorate. JICA

  55. 15. Build new pump station building at Al zarqa Aljadeedah and transfer pumps from old Finished building to new one. After that, improve electrical power consumption in this pump station. JICA

  56. 16. Improve efficiency in pump station located in Al Zarqa governorate. JICA Finished

  57. 17. Rehabilitation Lib and Miyahuna Stage 1: 1. Annual Water Pumped 13,140,000 13,140,000 Wala Pump Stations in Company Replacing8 (m 3/year) 1,500 (m 3/ Hr) 1,500 (m 3/ MADABA governorates Surface Pumps Hr)

  58. 2. Electrical Power Wala 5,533,976 4,882,944 consumption (kWH/year) Lib 5,913,656 4,408,368 10 Sum 111,447,632 9,291,312

  59. 3. Annual Electrical 2,156,320 Power Saving (kWH/ Year) Program 2: Rehabilitation of water distribution networks Measures/Actions: Simulate existing network, compare demand and supply, find high pressure points, Pinpoint valves fitting and pipe needed to be replaced Replace direct pumping by Increased reliance on natural flow in the water supply networks. Project Responsible Sub-Projects KPls Project Base Line Project Target party 1. a water Miyahuna create a master savings in electrical 19807895 improvement project reservoir to energy consumption kWh= about of the capital Amman/ receive 1.7 million JD first stage water in Abu at 0.087 Alanda JD/kwh (2014 tariff)

  60. 2. Rehabilitation of Al Zarqa water Distribution network PS

  61. 3. Rehabilitation Zay Pump Stations

  62. 4. Amman water network Rehabilitation Project

  63. 5.Ein Albasha and Safoot water network Rehabilitation Project

  64. 6. Mahes water network Rehabilitation Project

  65. 7. Al salt water network Rehabilitation Project

  66. 8. Ja rash Swoof water network Rehabilitation Project

  67. 9. Altaybeh water network Rehabilitation Project

  68. 10. Karak Al-Mazar water network Rehabilitation Project

  69. 11. Ajloon water network Rehabilitation Project 11

  70. 12. Build a new water Supply network in AL Zarqa Aljadeedeh Area. JICA

  71. 13. Install Valves and Air release valve in water distribution Network at AL Zarqa governorate. JICA 14 Replace two pumps and one more at Zay Pump station in addition to valve and non-return 4,953,788 valves to supply and discharge lines. kWh/year 435,000 JOO/ year Program 3: Optimization of the water facilities Operation and Maintenance Measures/Actions: Project Responsible Sub-Projects KPls Project Base Line Project Target party

  72. 1. Wastewater trunk line Conveyed water (Million 0 40 from West AL Zarqa to m 3/ Year) Alkherbeh Alsamrah Energy Saving 0 7 (GWH/Year)

  73. 2. Operation of Lib and Miyahuna Stage 2: 1. Annual Water Pumped 13,140,000 13,140,000 Wala Pump Stations in Company Wala and Lib (m 3/year) MADABA governorates pump station Operation for 4 years Energy Saving 0 6.3 (GWH/Year) Program 4: Administrative Expenses Measures/Actions: Project Responsible Sub-Projects KPls Project Base Line Project party Target 12 Mid-Term Actions Program 1: Rehabilitation of Water Fields and Pumping stations Measures/Actions: Project Responsible Sub-Projects KPls Project Base Line Project party Target Program 2: Rehabilitation of water distribution networks Measures/Actions: Supply and installation of pumps, electrical motor and new pipes. Also installation of the following: A. Raiser pipes. B. Suction and discharge pipes, C. Valves, D. Pumps, Transformers., E. Earthing system, F. Panels, G. Cables. Project Responsible Sub-Projects KPls Project Base Line Project party Target Program 3: Optimization of the water facilities Operation and Maintenance Measures/Actions: Project Responsible Sub-Projects KPls Project Base Line Project party Target Program 4: Administrative Expenses Measures/Actions: Project Responsible Sub-Projects KPls Project Base Line Project party Target 13 Long Term Actions Program 1: Rehabilitation of Water Fields and Pumping stations Measures/Actions: Project Responsible Sub-Projects KPls Project Base Line Project party Target Program 2: Rehabilitation of water distribution networks Measures/Actions: Supply and installation of pumps, electrical motor and new pipes. Also installation of the following: A. Raiser pipes. B. Suction and discharge pipes, C. Valves, D. Pumps, Transformers., E. Earthing system, F. Panels, G. Cables. Project Responsible Sub-Projects KPls Project Base Line Project party Target Program 3: Optimization of the water facilities Operation and Maintenance Measures/Actions: Project Responsible Sub-Projects KPls Project Base Line Project party Target Program 4: Administrative Expenses Measures/Actions: Project Responsible Sub-Projects KPls Project Base Line Project party Target 14 B) Renewable Energy Action Plan Short Term Actions Program 1: Solar Energy Systems for Administrative Buildings of Water Sector Measures/Actions: Installation of Photovoltaic systems on the rooftop or near the administrative buildings ofthe water sector, e.g. ministry, water companies and water facilities buildings Project Location Size (kWp} Responsible KPls Project Base Project Target party Line

  74. 1. WAJ Roof-top PV system Amman 240 Power Generation 0 400 (MW/year) Monetary Saving (JOD/ year) 0 100,000 Program 2: Utilization of Hydro Power Potential to power the Water Sector Measures/Actions: construction of hydropower stations in water facilities, e.g. dams, to generate power for the water sector Project Location Size Responsible KPls Project Base Project saving party Line Target

  75. 1. Alkherbeh Alsamrah Project Al Zarqa 53 Sepco Total plant Power 63,510 -19,345 Phase I (2014) MWh/day Consumption (MWh/ Year) Power Saving (%) 0 30% Monetary Saving (JOD/Year) 0 3,842,355

  76. 2. Alkherbeh Alsamrah Project Al Zarqa 65 Sepco Total plant Power 98,915 -23,725 Phase II (2015) MWh/day Consumption (MWh/ Year) Power Saving(%) 0 24% Monetary Saving (JOD/Year) 0 2,064,000 15

  77. 3. Abu Alanda Reservoir to 30 Million Conveyed water (Million m3/ 0 30 Khaw Reservoir Water m3/ Year Year) Transmission Pipeline 16 Power Generation {GWH/ 0 16 GWH/Year Year)

  78. 4. King TalaL Dam 6MW Power Generation (KWh/ 15,000,000 Year) Program 3: Utilization of biofuel potential in wastewater facilities Measures/Actions: Utilization of wastewater treatment plants sludge to produce Bio-gas for facility power generation Project Location Size Responsible KPls Project Base Project saving party Line Target

  79. 1. Alkherbeh Alsamrah bio-gas AL Zarqa 101 Total plant Power 63,510 -36,865 project Phase I (2014) MWh/day Consumption (MWh/ Year) Power Saving{%) 0 58% Monetary Saving (JOD/year) 3,207,255

  80. 2. Alkherbeh Alsamrah bio-gas AL Zarqa 154 Total plant Power 98,915 -56,210 project Phase II (2015) MWh/day Consumption (MWh/ Year) Power Saving(%) 0 57% Monetary Saving (JOD/Year) 0 4,890,270

  81. 3. Construction at a mono Land AL Zarqa 4 GWH/Year 0 4 fill at Asamra Wastewater Power Generation Treatment Plant (2015-2016) (GWH/Year

  82. 4. Climate Change in the 7GWH/Year Power Generation 0 7 Wastewater Sector (Add Dates ) (GWH/Year) Mid-Term Actions Program 1: Solar Energy Systems for Administrative Buildings of Water Sector Measures/Actions: Installation of Photovoltaic systems on the roof top or near the administrative buildings ofthe water sector, e.g. ministry, water companies and water facilities buildings Project Location Size (kWp) Responsible KPls Project Base Project Target party Line

  83. 1. The water testing and Quality Amman 350 Power Generation 0 580 Building PV system (MWh/year) 16 Power Saving(%) 0 100 Monetary Saving (JOD) 0 140,000

  84. 2. The Storage and workshop Amman Power Saving(%) 0 Building PV System Monetary Saving (JOD) 0 Program 2: Utilization of Hydro Power Potential to power the Water Sector Measures/Actions: construction of hydropower stations in water facilities, e.g. dams, to generate power for the water sector Project Location Size (kWh) Responsible KPls Project Base Project Target party Line Program 3: Utilaization of biofuel potential in wastewater facilities Measures/Actions: Utilization of wastewater treatment plants sludge to produce Bio-gas for facility power generation Project Location Size (kWp) Responsible KPls Project Base Project Target party Line Program 4: large scale Renewable Energy Based Power Generation For Water Sector (on Available Lands) Measures/Actions: Construction of On-site Renewable Energy Systems for large water pumping stations (Net-metering) on lands adjusted to the water facility Project Location Size (MWp) Responsible KPls Project Base Project Target party Line

  85. 1. Wadi Al Arab Station (on 5 Power Saving(%) 0 available lands) Monetary Saving (JOD 0

  86. 2. Al Zaatari Station (on Al Zaatari 5 Power Saving(%) 0 available lands) Station Monetary Saving (JOD 0

  87. 3. Zara Ma'in Station (on WTP and 7 Power Generation (GWh) 0 13.86 17 available lands) I surroundi I Monetary Saving (JOD) 0 1,400,000 ng area I Program 5 large scale Renewable Energy Based Power Generation For Water Sector (Wheeling) Measures/Actions: Construction of Renewable Energy Systems for large water pumping stations on lands adjusted to the water facility (Net- metering) and in remote areas according to wheeling scheme Project Location Size (MWp} Responsible KPls Project Base Project Target party Line Wheeling PV Project so BOO Power Saving(%) Monetary Saving (JOD) Long Term Actions Program 1: Solar Energy Systems for Administrative Buildings of Water Sector Measures/Actions: Installation of Photovoltaic systems on the roof top or near the administrative buildings of the water sector, e.g. ministry, water companies and water facilities buildings Project Location Size (kWp} Responsible KPls Project Base Project Target party Line Program 2: Utilization of Hydro Power Potential to power the Water Sector Measures/Actions: construction of of hydropower stations in water facilities, e.g. dams, to generate power for the water sector Project Location Size (kWp) Responsible KPls Project Base Project Target party Line

  88. 1. Implement water turbine on Aldisi trunk line.

  89. 2. Implement water turbine on Ras AI-Ain trunk line. Program 3: Utilization of biofuel potential in wastewater facilities Measures/Actions: Utilization of wastewater treatment plants sludge to produce Bio-gas for facility power generation 18 Project Location Size (kWp} Responsible KPls Project Base Project Target party Line Program 4: large scale Renewable Energy Based Power Generation For Water Sector (Wheeling} Measures/Actions: Construction of Renewable Energy Systems for large water pumping stations on lands adjusted to the water facility (Net- metering) and in remote areas according to wheeling scheme Project Location Size (MWp} Responsible KPls Project Base Project Target party Line Wheeling PV Project to supply not 100 Power Saving(%) 0 various water PS defined Monetary Saving (JOD) 0 19