Regulation of the Minister of Public Works of RI. No. 01/PRT/M/2014 on Minimum Standard for Service and Space on Public Works (SPM)
颁布于 2014-02-24 · 文本截至 2026-10-01
以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。
研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。
关于这部法律
- 语言
- English
- 类型
- 条例
- 国家
- 印度尼西亚
- 主题
- Environment, Water
- 关键词
- freshwater pollution, waterworks, land-use planning, environmental planning, environmental standards, monitoring, policy/planning, standards, protection of environment, water supply, pollution control
在哪里阅读
该法律没有记录来源链接。
文本
所收录的法律原文,按条款排列。每个条款都有自己的链接。
EIVIESTMETIVNIN STANDARD MINIMUM SERVICE ON PUBLIC WORKS ' AND SPACE LAYOUT (Regulation of the Minister of Public Works of R.I Number 01/PRT/M/2014, dated February 24, 2014) WITH THE BLESSING OF THE ONE AND ONLY GOD ber: 14/PRT/M/2010 are difficult to implement MINISTER OF PUBLIC WORKS and realize so that they need to be adjusted; OF THE REPUBLIC OF INDONESIA, d. the Meeting of the Board of Regional Autonomy Considering: Consideration dated October 1, 2013 approved ' a. based on Government Regulation Number 65 the adjustment made to the Standard Minimum Year 2005, concerning Guideline for Compiling Service on Public Works and Space Layout; and Application of Standard Minimum Service, e. based on the consideration referred to in letter Regulation of the Minister of Public Works Nunn- a, letter b, letter c and letter d it is necessary ber 14/PRT/M/2010, concerning Standard Mini- to stipulate Regulation of the Minister of Public mum Service on Public Works and Space Layout has been stipulated, covering Regency/Municipal ity regions; Works on Standard Minimum Service on Public Works and Space Layout; In view of: b. the Regulation of the Minister referred to in letter , 1. Government Regulation Number 65 Year 2005, , a is not yet covering Standard Minimum Service , concerning Guideline for Compiling and Applying , on Public Works and Space Layout which imple mentation thereof is responsibility of Provincial re gion, which needs additional guideline on finance calculation in order to accomplish Standard Mini mum Service on Public Service and Space Layout; 2 c. some SPM indicators on Public Works and Space Layout of Regency/Municipality regions based ib Standard Minimum Service (Statute Book of the Republic of Indonesia Year 2005 Number 150, Supplement to Statute Book of the Republic of Indonesia Number 4585); Government Regulation Number 38 Year 2007, concerning Distribution of Governmental Affairs , among the Central Government, Regional Adnnin Regulation of the Minister of Public Works Num- istration of Province, Regional Administration of Business News 8616110-17-2014 19 Regency/Municipality (Statute Book of the Repub lic of Indonesia Year 2007 Number 82, Supple ment to Statute Book of the Republic of Indonesia Number 4737); 3. Presidential Regulation Number 47 Year 2009, concerning Establishment and Organization of the State Ministry as lately amended by Presidential Regulation Number 91 Year 2011; 4. Presidential Regulation Number 24 Year 2010, concerning Capacity, Duty, and Function of State 1 Ministry and Organizational Structure, Duty and Function of Echelon I of State Ministry as lately amended by Presidential Regulation Number 92 Year 2011; 5. Presidential Decree Number 84/P Year 2009; 6. Regulation of the Minister of Home Affairs Num ber 6 Year 2007, concerning Technical Guideline for Compiling and Applying Standard Minimum Service; 7. Regulation of the Minister Public Works Number 08/PRT/M/2010, concerning Organization and Work Procedure of the Ministry of Public Works; ON STANDARD MINIMUM SERVICE ON PUBLIC WORKS AND SPACE LAYOUT. CHAPTER I GENERAL PROVISION Article 1 What is meant in this Regulation of the Minis ter by: 1. Standard Minimum Service on Public Works and Space Layout hereinafter referred to as SPM on Public Works and Space Layout shall be terms on the type and quality of basic services on Public Works and Space Layout constituting obligatory affairs of the region that every individual has the right to obtain it at the least. 2. Basic Service on Public Works and Space Layout shall be the type of public service on Public Works and Space Layout constituting the mandatory ba sis for filfillment of the society's need for living in social and economic life. 3. SPM Indicator shall be benchmark of both quan tity and quality used to indicate the target vol ume to be fulfilled in accomplishing SPM in input, output process, result and/or benefit of the basic service. DECIDED: 4. Deadline for Accomplishment shall be deadline for To stipulate: accomplishing the target of basic service on Pub ' REGULATION OF THE MINISTER OF PUBLIC WORKS lic Works and Space Layout in phases based on 20 Business News 8616/10-17 2014 GOVERNMENT REGULATIONS the stipulated indicator and the value therof. c. Operator of SPM on Public Works and Space Lay out; 5. Provincial Government shall be the Governor and d. management and supervision; regional instrument constituting elements exercis- e. reporting; ing regional administration. f. Monitoring dan Evaluation; and . Financement. 6. Regency/Municipality government shall be the Re gent/Mayor and regional instrument constituting CHAPTER II element exercising regional administration. SPM ON BIDANG PUBLIC WORKS AND SPACE LAYOUT 7. Minister shall be minister exercising governmental Part Two affairs on Public Works and Space Layout. SPM on Public Works and Space Layout In Provincial Region Article 2 Article 4 (1) This Regulation of the Minister is meant as ref- (1) The Government of Province shall provide basic erence for Provincial Government and Regency/ 1 service on Public Works and Space Layout ac Municipality government for exercising SPM on cording to the provisions of SPM on Public Works ' Public Works and Space Layout. and Space Layout. (2) This Regulation of the Minister intends to support (2) The SPM on Public Works and Space Layout re Provincial Government and Regency/Municipality ferred to in point (1) consists of the basic service, government in applying the SPM on Public Works target, indicator, and deadline of accomplish and Space Layout so as to provide basic service ment. to the community. Article 5 Article 3 (1) The SPM on Public Works and Space Layout re , The scope of this Regulation of the Minister ferred to in Article 4 consists of types of basic covers: service, namely: a. SPM on Public Works and Space Layout; a. Water Resources b. Decision and Target of accomplishing SPM on Supply of standard water for the people's Public Works and Space Layout; need using indicator of percentage of the Business News 8616/ 10-17-2014 21 available water for irrigation of the people's es with deadline of accomplishment up to Year farms supplied by existing irrigation system 2019. based on its authority; Part Two b. Roads Provision of roads to serve the need of the people using indicator that shows: 1. percentage of the roads level of condition of provincial roads whether they are in good and in fair condition; 2. percentage of the links / connection there of to the center of activities and center of production in provincial region; c. Construction Service Development of information system on Con struction Service with percentage of three (3) types of available information on Construc tion Service of Provincial level on the Infor mation System on Management of Construc tion Service (SIPJAKI). d. Space Layout Information on Space Layout using indica tor of percentage of available information on Space Layout (RTR) in Provincial region and plan of details using analogue and digital map. SPM on Public Works and Space Layout In Regency/Municipality Region Article 6 (1) The Government of Regency/Municipality shall provide Basic Service on Public Service and Space Layout according to the SPM on Public Works and Space Layout. (2) The SPM on Public Works and Space Layout re ferred to in point (1) consists of services of basic type, target, indicator, and deadline for accom plishment. Article7 (1) The SPM on Public Works and Space Layout re ferred to in Article 6 covers basic service on: a. Water Resources. Standard water supply for the people's need is as shown in the indicator namely: 1. Percentage of available standard water to fulfill at least the principal daily need; and 2. Percentage of available standard water (2) The SPM on Public Works and Space Layout re- for irrigation for the existing people's I ferred to in point (1) will be implemented in phas- farms based on its authority. Business News 8616/10-17-2014 22 b. Roads Provision of roads to serve the people's using indicator that shows: 1. percentage of the condition of the roads level of condition of Regency/Municipality roads whether they are in good and in fair condition; and 2. percentage of the links / connection thereof to the center of activities and center of production in Regency/Munici pality region. c. Cipta Karya 1. Supply of potable water with indicator showing the percentage of population that obtained access to potable water safely. 2. Supply of sanitation with indicator, such as: al percentage of population supplied with adequate water waste system; with drainage network system of ur ban scale so as to prevent formation of water pool (of exceeding 30 cm, for 6 hours) more than twice a year. 3. Building Layout and Environment with indicator showing the percentage of the total number of issued Permits to Build Construction (IMB); 4. Handling dirty urban residential area with ; 1 indicator showing the percentage of mini mized area of dirty residential area in ur ban area. d. Construction Service 1. Development of Construction Service In formation System with indicator showing percentage of the seven (7) types of infor mation available in Regency/Municipality area at the Construction Service Informa tion Management System (SIPJAKI);dan bl percentage of waste minimization ac- 2. Permits for Construction Service with in tivity in urban areas; dicator showing the percentage of avail c) percentage of water transportation; able service on Construction Service dl percentage of Final Waste Discharge Business Permit (IUJK) with the deadline or (TPA) operation;and for issue within ten (10) working days as el perecentage of population supplied soon as the requirements are complied with. Business News 8616/10-17-2014 23 e. Space Layout 1. Information on Space Layout with indica tor showing the percentage of available information on space layout (RIR) Re gency/Municipality area and details of the plan thereof on the analogue and digital maps; and 2. Provision of Public Green Open Space (RTH) with indicator showing 20% per centage available area of public RTH of the total area extent of the urban area/ Article 7is as specified in Attachment II consti tuting inseparable part of this Regulation of the Minister. CHAPTER III STIPULATION AND TARGET FOR ACCOMPLISH MENT OF SPM ON PUBLIC WORKS AND SPACE LAYOUT Article 9 (1) Stipulation of SPM on Public Works and Space Layout may be improve3d and upgraded in phas es according to the progress of capability and the zone. need of the region. (2) The SPM on Public Works and Space Layout re ferred to in point (1)will be conducted in phas es with deadline for accomplishment until Year 2019. Article 8 (1) Types of basic service, target, performance in dicator, deadline for accomplishment of SPM on Public Works and Space Layout in Provincial re gion and Regency/Municipality region as referred to in Article 5 and Article 7 as specified in At tachment I constituting inseparable part of this Regulation of the Minister. (2) The target for accomplishment of SPM on Public Works and Space Layout referred to in Article 5 and Article 7 may be adjusted based on the result of evaluation of SPM accomplishment by the end of the deadline for accomplishment. CHAPTER IV OPERATOR OF SPM ON PUBLIC PUBLIC WORKS AND SPACE LAYOUT Article 10 (1) The Governor is responsible for implementing SPM on Public Works and Space Layout in Pro vincial region as referred to in Article 5. (2) Technical guideline for SPM on Public Works and (2) Teh Regent/Mayor is responsible for implementing Space Layout of Provincial region and Regency/ SPM on Public Works and Space Layout in Regen Municipality region as referred to in Article 5 and 1 cy/Municipality area as referred to in Article 7. Business News 8616/10-17-2014 24 (3) The SPM on Public Works and Space Layout as referred to in point (1) and point (2) will be im plemented by the work unit in charge of Public Works and Space Layout in Provincial region and Regency/Municipality region. (4) If the Government of Regency/Municipality has no work unti yet to handle the duty and function for managing construction service, such Govern ment may appoint or assign work unit that is in charge of Public Works. will be implemented using facilities for capacity development in the form of general orientation, technical management, education and training, and/or other assistances based on the provisions in the statutory regulation. (4) Facilties for capacity development referred to in point (3) will be provided with due consideration of the capability of institution, personnel, and State finance as well as regional finance. Article 13 CHAPTER V MANAGEMENT AND SUPERVISION Article11 The Minister shall manage and supervise im plementation of technical matter of SPM on Public Works and Space Layout. Article 12 (1) The Minister shall manage the implementation of the technical matter of SPM on Public Works and Space Layout exercised by Provincial Govern (1) The Minister is responsible for technical supervi sion on the application of SPM on Public Works and Space Layout implemented by Provincial gov ernment. (2) The Governor as Government's representative in the region will supervise the technical application of SPM implemented by the Regency/Municipality government. CHAPTER VI ment MONITORING AND EVALUATION Article 14 (2) The Governor as Government's representative in the region shall manage the technical matter of the SPM on Public Works and Space Layout car ried out by the Regency/Municipality government (1) The Minister shall monitor and evaluate the appli cation and accomplishment of SPM performance on Public Works and Space Layout exercised by the Provincial Government and Regency/Munici pality government. (3) The technical management referred to in point (1) Business News 8616/10-17-2014 25 (2) The monitoring and evaluation referred to in point (1) will be exercised by: a. the Minister for Provincial government; and b. the Governor as Government's representative for Regency/Municipality government. (3) The monitoring and evaluation referred to in point (2) shall be exercised in accordance with the pro visions in the statutory regulation. CHAPTER VII REPORTING Article 15 (1) The Work Unit responsible for Public Works and Space Layout of Provincial Region will submit an nual technical report on the result of application and accomplishment of SPM performance on Pub lic Works and Space Layout to the Governor. (2) Based on the report referred to in point (1) the Governor shall submit annual technical report on the result of application and achievement of SPM performance on Public Works and Space Layout of Provincial Region to the Minister (?) and Minis ter of Home Affairs. on Public Works and Space Layout to the Regent/ Mayor. (2) Based on the report referred to in point (1) the Re gent/Mayor shall submit annual technical report on the result of application and accomplishment of SPM performance on Public Works and Space Layout to the Governor. (3) The Governor shall submit summary of annual technical report on the result of application and accomplishment of SPM performance on Public Works and Space Layout in Regency/Municipality areas within its region to the Minister of Home Affairs. Article 17 Format of annual technical report on the re sult of application and accomplishment of SPM per formance on Public Works and Space Layout as re ferred to in Article15 and Article16 shall be based on the provisions in the statutory regulation. Article 18 The technical report of result of monitoring and evaluation of accomplishment of SPM perfor Article 16 mance on Public Works and Space Layout as referred (1) The work Unit responsible for Public Works and to in Article14 up to Article16 will be used for: Space Layout of Regency/Municipality shall sub- a. Input for upgrading the capacity fo Provincial mit annual technical report on the result of appli- Government and Regency/Municipality Govern cation and accomplishment of SPM performance ment for accomplishing SPM on Public Works and 26 Business News 8616/10-17-2014 Space Layout; and b. Material of consideration on management and supervision of SPM on Public Works and Space Layout, in cluding award of appreciation to the Government of Province and Government of Regency/Municipality that have accomplished excellent performace shall be based on the provisions in the statutory regulation. CHAPTER VIII FINANCEMENT Article 19 (1) Payment for implementing SPM on Public Works and Space Layout in Provincial area and Regency/Munici pality areas will be charged to the respective Regional Revenue and Expenditure Budget. (2) Financement for accomplishment of SPM on Public Works and Space Layout as referred to in number (1) will be calculated based on the provisions as specified in Attachment III constituting inseparable part of this Regulation of the Minister. CHAPTER IX TRANSITIONAL PROVISION Article 20 Government Regency/Municipality that has programmed SPM on Public Works and Space Layout in the planning document based on Regulation of the Minister Public Works Number 14/PRT/M/2010, concerning Standard Minimum Service on Public Works and Space Layout survives in running the program according to the plan that has been decided up to Year 2014. CHAPTER X OTHER PROVISIONS Article 21 Provision on SPM on Public Works and Space Layout of Regency/Municipality regions as referred to in Article 6 up to Article 8 prevails mutatis mutandis for Jakarta Capital City of Special Province. Business News 8616/10-17-2014 27 CHAPTER XI CLOSING PROVISION Article 22 With the enforcement of this Regulation of the Minister ini, Regulation of the Minister Public Works Number 14/PRT/M/2010, concerning Standard Mini mum Service on Public Works and Space Layout is revoked and hereby declared null and void. Article 23 This Regulation of the Minister takes effect on the date it is enacted. For public cognizance, this Regulation of the Minister shall be announced by placing it in the State Gazette of the Republic of Indonesia. Stipulated in Jakarta Dated February 24, 2014 MINISTER OF PUBLIC WORKS OF THE REPUBLIC OF INDONESIA, sgd. DJOKO KIRMANTO Enacted in Jakarta Dated February 27, 2014 MINISTER OF LAW AND HUMAN RIGHTS OF THE REPUBLIC OF INDONESIA, sgd. AMIR SYAMSUDIN I STATE GAZETTE OF THE REPUBLIC OF INDONESIA YEAR 2014 NUMBER 267 Note from Editor: Due to technical reason, no Attachment is provided herein. ( MA ) 28 Business News 8616/10-17-2014