Plan on Allocation of Greenhouse Gas Emission Quotas in the Republic of Croatia (National Allocation Plan)
颁布于 2009-06-26 · 文本截至 2026-10-01
以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。
研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。
关于这部法律
- 语言
- English
- 类型
- 条例
- 国家
- 克罗地亚
- 主题
- Air and atmosphere
- 关键词
- data collection/reporting, monitoring, clean development mechanism, environmental standards, emissions, standards, protection of environment
在哪里阅读
该法律没有记录来源链接。
文本
所收录的法律原文,按条款排列。每个条款都有自己的链接。
THE GOVERNMENT OF THE REPUBLIC OF CROATIA 1847 Pursuant to Article 47, paragraph 1 of the Air Protection Act (Official Gazette 178/2004 and 60/2008), the Government of the Republic of Croatia, at its session on 26 June 2009, adopted the following NATIONAL ALLOCATION PLAN FOR GREENHOUSE GAS EMISSION ALLOWANCES IN THE REPUBLIC OF CROATIA 1. PURPOSE AND OBJECTIVES Article 47, paragraph 1 of the Air Protection Act (Official Gazette 178/2004, 60/2008) establishes the legal framework for the adoption of the National Allocation Plan for Greenhouse Gas Emission Allowances in the Republic of Croatia. The Act lays down the basic elements of the National Allocation Plan for Greenhouse Gas Emission Allowances (hereinafter: National Allocation Plan). The National Allocation Plan is based on the Air Quality Protection and Improvement Plan in the Republic of Croatia for the period 2008 – 2011 (Official Gazette 61/2008) and Energy Development Strategy (Official Gazette 38/2002), and use of best available techniques. The Allocation Plan contains: total quantity of allowances allocated to the country within a certain period (national emission ceiling), data on present greenhouse gas emissions, list of activities generating greenhouse gas emissions, annual emission allowances allocated to installations, manner of allocating greenhouse gas emission allowances, assessment of future greenhouse gas emissions, establishment of the new entrants reserve, manner of using the Kyoto Protocol’s mechanisms and deadline for the allocation of emission allowances to installations. The transposition of the following acquis communautaire governing climate change into the Croatian legislation is an obligation of the Republic of Croatia, which it has assumed under the Kyoto Protocol and as the result of the process of accession of the Republic of Croatia to the European Union (EU): – Directive 2003/87/EC establishing a scheme for greenhouse gas emission allowance trading within the Community; – Directive 2004/101/EC amending Directive 2003/87/EC establishing a scheme for greenhouse gas emission allowance trading within the Community, in respect of the Kyoto Protocol’s project mechanisms; – Decision 2006/780/EC on avoiding double counting of greenhouse gas emission reductions under the Community emissions trading scheme for project activities under the Kyoto Protocol; – Decision 2007/589/EC establishing guidelines for the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC; – Decision 2005/381/EC establishing a questionnaire for reporting on the application of Directive 2003/87/EC; – Commission Regulation 2216/2004 for a standardised and secured system of registries pursuant to Directive 2003/87/EC and Decision No 280/2004/EC; – Commission Regulation 916/2007 amending Commission Regulation 2216/2004 on standardised and secured system of registries pursuant to Directive 2003/87/EC and Decision No 280/2004/EC; – Commission Regulation 994/2008 on standardised and secured system of registries pursuant to Directive 2003/87/EC and Decision No 280/2004/EC. The above mentioned acquis communautaire has been transposed into the Croatian legal system by the following regulations: – Regulation on the monitoring of greenhouse gas emissions in the Republic of Croatia (Official Gazette 1/2007), – Regulation on greenhouse gas emission allowances and emission allowance trading (Official Gazette 142/2008), – Regulation on the implementation of the flexible mechanisms of the Kyoto Protocol (Official Gazette 142/2008). The adoption of this National Allocation Plan has completed the transposition of the acquis communautaire into Croatian legislation. The purpose of the National Allocation Plan is to establish the mechanism for monitoring greenhouse gas emissions generated by entities included in the National Allocation Plan, verification of emission data, annual reports on emissions from installations and establishment of the emissions trading scheme, the implementation of which shall begin on the day of accession of the Republic of Croatia to the European Union. Operators shall organise monitoring of greenhouse gas emissions from installations and report thereon annually, in the prescribed manner. They shall also organise report verification. If they fail to fulfil these obligations in the prescribed period their right to trade shall be suspended until they remove the established deficiencies. The scheme for trading with allowances shall enable economic entities to reduce greenhouse gas emissions by implementing cost-efficient measures. This shall be achieved by issuing greenhouse gas emission permits for installations. The National Allocation Plan determines the total amount of allowances which are allocated to a specific installation and the precise amount of emissions in the form of allocated greenhouse gas emission allowances. In this respect one emission allowance represents the allowance to emit 1 tonne of CO2 equivalent. Installations which reduce their emissions bellow the permitted allowance by implementing low-cost measures shall be allowed, upon entry into the EU greenhouse gas emission allowance trading scheme, to sell the excess allowances to installations whose emissions exceed the permitted levels, where the implementation costs of mentioned measures is higher than the expense of purchasing emission allowances. Annual emission allowance of CO2 established by this National Allocation Plan is based on the principles of Directive 2003/87/EC and is completely harmonised with the requirements of Annex III of this Directive. Guidelines of the European Commission for the preparation of national plans for the period 2005 to 2007 (COM (2003/830) have also been taken into consideration as well as amended Guidelines of the European Commission for the preparation of national plans for the period 2008 to 2012 (COM (2005/703)). The European Commission (EC) shall evaluate the National Allocation Plan and, if necessary, request from the Republic of Croatia to deliver additional information or to modify certain parts of the National Allocation Plan, if it establishes that those parts are not in compliance with the Directive. In that case, the EC shall specify the reasons for demanding amendments and propose changes, and the thus modified National Allocation Plan shall be subject to further review. 2. BASIS AND PRINCIPLES FOR THE ALLOCATION OF GREENHOUSE GAS EMISSION ALLOWANCES Summary of principles for the allocation of greenhouse gas emission allowances to installations is presented in the following table: Basis Principle Reference Obligations of the Republic of Croatia arising from the Kyoto Protocol The amount of greenhouse gas emissions for the Republic of Croatia in the base year amounts to 34,845 Mt CO2eq. The Republic of Croatia has made commitments to reduce emissions by 5% in relation to the base year, thus achieving the Kyoto target of 33,102 Mt CO2 eq. Decision 7/CP.12 of the Conference of the Parties to the UN Framework Convention on Climate Change (UNFCCC) and Draft Report of the Convention Audit Team UNFCCC – IAR (May 2009) National emission ceiling Annual emission allowance for allocation amounts to a total of 13,310 Mt CO2 eq, including reserves for new entrants Projections of emission allowance trading scheme prepared on the basis of data from questionnaires, macroeconomic projections from 2003 (National Report) »Top-down« approach Total quantity of emission allowances for allocation is determined by top down projections Data from previous periods and projections Allocation method is based on the combination of approaches following data from previous periods and planning approach. The period from 2004 to 2007 is the base period for CO2 emission. Reference period and relevant emissions The preceding reference period is the period from 2004 to 2007. Relevant installation emissions are average emissions of two years with highest emissions during the reference period. Projections of emission allowance trading scheme on the basis of data from the questionnaire Two-stage approach The allocation of emission allowances is conducted in two stages. First, emission allowances are allocated to four sectors and then to installations within those sectors. Sector approach All installations are included in line with the definitions from Directive 2003/87/EC establishing a scheme for greenhouse gas emissions allowance trading. National Allocation Plan of emission allowances recognises 4 installation groups: power generation installations (thermal power > 20 MW), installations for cement and lime production, petrochemical installations and other installations. Allocation to installations is conducted in two stages. First emission allowances are allocated to four sectors and then to installations within those sectors. Allocation according to sectors Allocation according to sectors is performed by top-down approach projections made for emissions, which are based on data on emissions from preceding periods, projected production growth and projected reduction of carbon dioxide emissions. Allocation according to installations Allocation of allowances at installation level is conducted on the basis of an emission share of a particular installation in the total relevant emissions of that sector. Installations with incomplete data from the previous periods Individual cases are assessed for the purpose of determining emission allowances for installations whose data from preceding periods are incomplete. Emission allowances will be allocated on the basis of referential values. Previous activities and clean technology Previous activities and clean technology are not taken into account due to data insufficiency. New entrants New entrant reserve amounts to 0.858 Mt CO2eq per year. The reserve is based on known plans and projections. An installation which has obtained its use permit after the adoption of the National Allocation Plan for Greenhouse Gas Allowances shall be considered a new entrant. Installation shutdown Installation operators shall report on the shutdown of an installation. Unused emission allowances shall be transferred to the new entrant reserve. Reserve for joint implementation projects No reserve for joint implementation projects has been established. Emission units derived from the implementation of the Kyoto Protocol’s project mechanisms Installations are permitted to use emission reduction units (ERU) and certified emission reduction units (CER) up to 15% of their emission allowances. Allocation The allocation of emission allowances for the calendar year is completed by 28 February. Transfer of emission allowances to future period »Banking« Allows for transfer of emission allowances to future period which starts from 2013. Public auctioning Pursuant to this National Allocation Plan, allowances are allocated free of charge. Emission of other greenhouse gases (besides CO2) Besides CO2, other greenhouse gases have not been included in the National Allocation Plan. 3. CLIMATE CHANGE POLICY OF THE REPUBLIC OF CROATIA 3.1. Status overview Climate change is considered a dominant environmental issue in the 21st century. Climate change and its impacts are becoming more and more obvious, and scientists predict that those changes will become even more intensive. Climate change and its impacts are reflected in various phenomena: temperature change, quantity and distribution of precipitation, sea-level rise, frequency of extreme meteorological conditions, changes related to water resources, ecosystems, agriculture, forestry, health, and significant economic damages. Croatia has been a party to the United Nations Framework Convention on Climate Change since 1996 (Official Gazette – International Treaties 2/1996). The Republic of Croatia, as a country undergoing the process of transition to a market economy, has undertaken its scope of responsibility assumed under Annex I to the Convention. The Republic of Croatia has been a party to the Kyoto Protocol to the United Nations Framework Convention on Climate Change since 28 August 2007 (Official Gazette – International Treaties 5/2007). Annex B of the Kyoto Protocol lays down quantified emission limitation and reduction commitments for developed countries and countries undergoing the process of transition to a market economy that have to be achieved in the period from 2008 to 2012. The established emission reduction for the Republic of Croatia is 5% compared to the level in the base year, 1990. The European Union leads in global efforts for the prevention of climate change and intends to keep that position in the future. It has recognised that benefits from early actions are multiple in relation to damages that might appear in the future and risks they might pose for the competitiveness of the European economy. The first Climate Change Programme (2000 2004) and second Programme (2005) lay down the long-term path to low-carbon economy, with major changes in production and energy consumption as well as transport. In 2003, the EU emission share in total global greenhouse gas emissions amounted to 14%. Under the Kyoto Protocol, the EU has assumed the objective to reduce emissions by 8% (EU 15), using an internal scheme to define the various commitment arrangements for each country. The EU Environment Council supports the objective to limit global temperature rise to a maximum of 2º C in comparison to the pre-industrial age. In accordance with the above, the EU has recently set the objective to reduce emissions by 20% in 2020, in comparison to 1990, and is ready to reduce emissions even by 30% if other industrial countries undertake to do the same. After the initial emission decrease, due to renewal of economy, emissions started to grow in the period from 1995 to 1999 at an annual rate of 3.6%, while the average annual increase in the period from 2001 to 2005 was 2.6%. The greatest emission growth is recorded in the energy sector, related to energy production, and in transport. Pursuant to the Act on the Environmental Protection and Energy Efficiency Fund (Official Gazette 107/2003), the Environmental Protection and Energy Efficiency Fund was established in 2003 for the purpose of securing financial resources required for projects and programmes in the area of environmental protection, energy efficiency and use of renewable energy sources. In 2007, the Government of the Republic of Croatia has adopted the Regulation on unit charges, corrective coefficients and detailed criteria and benchmarks for establishing the charge for carbon dioxide emissions into the environment, (Official Gazette 73/2007). According to that measure, entities subject to payment of the charge are identified on the basis of their CO2 emissions. This includes all emission sources, that is, installations with thermal power exceeding 100 kW. In 2006, the Government of the Republic of Croatia adopted the Strategic Development Framework 2006 – 2013 and the National Programme for the Accession of the Republic of Croatia to the European Union which set the mid-term and long-term priorities and strategic objectives of the Republic of Croatia. The basic objectives in relation to economic development are the following: • increase of the average real growth rate of the GDP to 6.0% per year (5.1% from 2006 to 2009 and 7% from 2010 to 2013)[1] • inflation rate lower than 2.5% per year • unemployment rate below 9% (after accession to the EU) • increase of foreign investments. From 2000, economic growth has been especially accelerated (see figure 3.1.). In the energy sector, the Croatian economic growth has the following features: • low level of energy consumption (electric power consumption of 2 776 kWh/per capita) • low share of carbon in total consumption (8.3%) and production of electrical energy (6.3%) • high share of renewable energy sources in the production of electrical energy (43% of Croatia’s own electrical energy production in 1990) • large import of electrical energy (45%) • significant share of cogeneration in electrical energy production (13.6%) • significant share of biomass in satisfying heating consumption (17.4% general consumption) Figure 3.1 GDP and carbon dioxide movement trend in the Republic of Croatia. GDP data are expressed in chain-linked scope, the reference year is 2000 (according to foreign exchange http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-1 rates from 2000), source Eurostat[2]; GDP values and greenhouse gas emissions for the period from 2010 to 2012 have been projected from previous years. The economic situation was significantly different at the time when the National Allocation Plan was being prepared in the 1st quarter of 2009. So far, the global financial crisis has had a limited impact on the Croatian economy, slowing down its growth. Data from economic projections of key data for Croatia for the period 2005-2010, which were published on the Ecfina web site (table 3.1).were used for the preparation of the National Allocation Plan. Table 3.1 Economic projection of key data for Croatia (2005-2010) for 2008 – PREDICTING EFFECTS OF MAJOR MEASURES – CROATIA 2007 Change on annual level % In billion HRK Current price %GDP 1992 – 2004 2005 2006 2007 2008 2009 2010 GDP at permanent price 275.1 100.0 - 4.3 4.8 5.6 3.5 3.0 4.0 Private consumption 15.4 55.8 - 3.4 3.5 6.2 3.1 2.5 3.0 Public consumption 55.3 20.1 - 0.8 2.2 3.4 3.0 2.5 2.0 Permanent gross capital investments 82.4 30.0 - 4.9 10.9 6.5 6.0 5.0 7.5 Export (goods and services) 131.2 47.7 - 4.6 6.9 5.7 3.7 3.5 5.0 Import (goods and services) 154.2 56.1 - 3.5 7.3 5.8 4.3 3.9 4.8 Gross national income at permanent prices (GDP deflator) 266.6 96.9 - 3.5 4.4 6.0 3.2 3.6 4.5 Contributions to GDP growth Domestic demands - 3.7 5.7 6.4 4.3 3.6 4.6 Built reserve - 0.6 0.2 0.0 0.0 0.2 -0.1 Foreign balance - 0.1 -1.1 -0.8 -0.9 -0.7 -0.6 The Action Plan for Climate Change Mitigation in the Republic of Croatia, which was adopted within the framework of the Air Quality Protection and Improvement Plan for the Period from 2008 to 2011 (Official Gazette 61/2008) was also used for the preparation of the National Allocation Plan. 3.2. Greenhouse gas emissions in the Republic of Croatia In May 2008, the annual National Greenhouse Gas Emission Inventory Report of the Republic of Croatia was prepared, encompassing the period from 1990 to 2006. In accordance with reporting requirements pursuant to the UNFCCC, and as a party to the UNFCCC and to the Kyoto Protocol, as of 2001 the Republic of Croatia is under the obligation to submit the national greenhouse gas inventory report once a year to the Secretariat of the UNFCCC. http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-2 The 2008 National Greenhouse Gas Emission Inventory Report reflects general economic trends in the Republic of Croatia. Summarised data are presented in tables 3.2 and 3.3, and graphically in figures 3.2 and 3.3. Greenhouse gas emissions from the energy sector and transport make up approximately 76% of total greenhouse gas emissions in 2006. Main emission sources in industrial processes sectors are: – cement production – lime production – ammonia production – nitric acid production – consumption of synthetic gases in refrigerators and cooling devices. All together they make up 98.8% of total sector emissions in 2006. Iron production in blast furnaces and aluminium production were terminated in 1992, and ferroalloys production in 2002. Cement production grew in the period from 1997 to 2005. Manufacturers’ goal is maximum use of capacities which amounts to a total of approximately 3.2 million tonnes of clinker a year, while 3.1 million tonnes of clinker were produced in 2006. Ammonia production in 2006 was 1.8% lower in comparison to the previous year. Nitric acid production in 2006 was also lower by 1.1% in comparison to 2005. The emission level of these sub sectors is strictly related to market demand for a specific mineral fertiliser. Therefore the main policy and strategy measures are aimed at energy efficiency, energy security, use of renewable energy sources and expansion of the free energy market. For that purpose, the Republic of Croatia has adopted the following regulations for their implementation: – Energy Act (Official Gazette 68/2001, 177/2004 and 76/2007); – Act on the Regulation of Energy Activities (Official Gazette 177/2004); – Act on the Electricity Market (Official Gazette 177/2004 and 76/2007); – Act on Oil and Petroleum Products Market (Official Gazette 68/2001 and 87/2005); – Act on the Production, Distribution and Supply of Thermal Energy (Official Gazette 42/2005); – Regulation on the minimum share of electricity produced from renewable energy sources and cogeneration whose production is incentivised (Official Gazette 33/2007); – Regulation on incentive fees for promoting electricity production from renewable energy sources and cogeneration (Official Gazette 33/2007); – Tariff system for the production of electricity from renewable energy sources and cogeneration (Official Gazette 33/2007); – Ordinance on use of renewable energy sources and cogeneration (Official Gazette 67/2007); – Ordinance on acquiring the status of eligible electricity producer (Official Gazette 67/2007); – General conditions for electricity supply (Official Gazette 14/2006); – Electrical Energy System Network Rules (Official Gazette 36/2006); – Ordinance on the fee for connection to the energy network and increase in connected power (Official Gazette 28/2006); – Ordinance on the requirements for performing energy activities (Official Gazette 6/2003 and 94/2005); – Ordinance on energy balance (Official Gazette 67/2007). 3.3. European Union policy and Directive on greenhouse gas emission allowance trading EU’s proposed objectives by 2020 On 23 January 2008, the European Commission announced a proposal package for achieving objectives which are legally binding for the Union, for reducing greenhouse gas emissions by at least 20 % compared to 1990 levels. The emission reduction shall be increased to 30% by 2020 if developing and developed countries which are currently not parties to the Kyoto Protocol undertake appropriate commitments to reduce greenhouse gas emissions in that period. The fundamental starting point is general reduction of greenhouse gas emissions by 20% compared to 1990, which is equivalent to a 14% reduction compared to 2005. However, greater reduction is expected to happen in sectors included in the European scheme for greenhouse gas emission allowance trading (EU ETS), as emission reduction is cheaper in that area. The distribution of reductions is the following: • 21% emission reduction in sectors included in EU ETS by 2020 compared to 2005; • average reduction of approximately 10% compared to 2005 in sectors not covered by EU ETS; Changes in the greenhouse gas emission allowance trading system after 2012 Major changes are as follows: – instead of 27 national emission ceilings, there shall be just one for the whole EU area; the annual emission ceiling shall decrease in a linear manner which will continue even after the third trading period (from 2013 to 2020) from 1974 to 1720 Mt/annually by 2020; – emission allowances for the energy sector shall be allocated by public auctioning, and for the industry partially by public auctioning and partially free of charge; – harmonised rules shall be introduced for free allocation and public auctioning; – several new activities (e.g., aluminium and ammonia production) shall be introduced to the ETS, as well as gases: nitrous oxide and perfluorocarbon; – Member Sates shall be allowed to exclude smaller installations included in the system, under the condition that they are subjected to appropriate emission reduction measures; The EC proposes the introduction of a unique emission ceiling for the whole territory of the EU, as well as allocation of emission allowances on the basis of completely harmonised rules. Consequently, national emission allowance allocation plans shall no longer be necessary. As of 2013, the total quantity of emission allowances shall be reduced in a linear manner by 1.74% per year. Proposals for sectors not included in the emission allowance trading scheme In sectors which are not included in the emission allowance trading scheme, such as building, transport, agriculture and waste management, the EU shall reduce greenhouse gas emissions by an average of 10% below 2005 levels by 2020. The linear trend shall apply for the achievement of national targets by 2020, with the starting point in 2013 which presents an emission average for sectors not included in the emission allowance trading scheme in the period from 2008 to 2010. For each Member State, the EC proposes a separate target according to which it must reduce, or in the case of a new Member State, it may increase emissions by 2020. These changes range between -20% and +20%, which ultimately leads to the total average reduction of 10%. The EC proposes use of GDP per capita data as the main criterion for establishing targets for Member States. Table 3.2 Emissions/removal of greenhouse gases, according to gases, for the period from 1990 to 2006 (Gg CO2 eq) Greenhouse gas 1990 1995 2000 2001 2002 2003 2004 2005 2006 Carbon dioxide (CO2) 24 069 17 007 20 102 21 018 21 994 23 577 23 180 23 595 23 699 Methane (CH4) 3 390 2 684 2 638 2 785 2 847 2 953 3 070 2 962 3 110 Nitrous oxide (N2O) 4 079 3 197 3 465 3 531 3 463 3 352 3 649 3 654 3 594 Hydrofluorocarbons, perfluorocarbons (HFCs, PFCs) and sulphur hexafluoride SF6 980 43 23 49 49 164 189 349 431 Total emission (excluding CO2 from LULUCF) 32 527 22 930 26 228 27 383 28 353 30 045 30 08 30 561 30 834 Removal (LULUCF) -4 185 9 154 5 281 8 214 8 206 6 278 7 900 7 726 7 490 Total emission (including LULUCF) 25 13 20 19 20 23 22 22 23 342 776 947 169 148 768 189 835 344 Table 3.3 Emissions/removal of greenhouse gas, according to sectors, for the period from 1990 to 2006 (Gg CO2 eq) Source 1990 1995 2000 2001 2002 2003 2004 2005 2006 Energy 22 882 16 400 18 907 19 953 21 074 22 580 2 048 22 411 22 548 Industrial processes 4 609 2 785 3 400 3 271 3 148 3 348 3 659 3 833 4 004 Use of solvents and other products 80 80 69 75 99 108 135 155 182 Agriculture 4 558 3 191 3 285 3 485 3 400 3 348 3 549 3 560 3 507 Waste 399 475 567 599 633 663 697 601 591 Total emission (excluding CO2 from LULUCF) 32 527 22 930 26 228 27 383 28 353 30 045 30 088 30 561 30 834 Removal (LULUCF) -4 185 9 154 5 281 8 214 8 206 6 278 7 900 7 726 7 490 Total emission (including LULUCF) 25 342 13 776 20 947 19 169 20 148 23 768 22 189 22 835 23 344 Figure 3.2 Emissions/removal of greenhouse gas, according to gases, for the period from 1990 to 2006 (Gg CO2 eq) Figure 3.3 Emissions/removal of greenhouse gas, presented according to sectors, for the period from 1990 to 2006 (Gg CO2 eq) Table 3.4 Emission shares of CO2, according to activities, for the period from 1990 to 2006 (Gg CO2 eq) Resources 1990 1995 2000 2001 2002 2003 2004 2005 2006 Total share of emissions (%) Energy 7286 5198 5907 6327 7228 7895 6853 6884 6657 28 Industry and construction 5833 2943 3091 3231 3023 3184 3573 3671 3768 16 Transport (road and other) 4266 3469 4644 4752 5062 5453 5612 5839 6226 26 Services and households 3832 2922 3521 3713 3802 4061 3968 3997 3763 16 Purification of natural gas 416 697 633 688 665 684 710 691 663 3 Cement production 1069 622 1232 1393 1360 1369 1456 1487 1572 7 Lime production 160 83 138 163 181 178 186 198 244 1 Limestone and dolomite production 43 11 8 9 10 11 12 12 11 approximately 0 Production and use of Na2CO3 25 14 11 12 12 14 17 17 15 approximately 0 Use of ammonia 861 1051 1038 848 769 877 920 907 879 4 Ferroalloys production 194 33.9 20.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 Aluminium production 111 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total CO2 emissions (Gg) 24099 17045 20243 21137 22111 23726 23306 23704 23797 100 3.4. Greenhouse gas projections Projections of greenhouse gas emissions in the Republic of Croatia were published in 2003 [3], and updated in 2008. The report covers the period from 1990 to 2020. The greenhouse gas projections encompass the following three scenarios: 1. scenario »without measures«: special emission reduction measures have not been defined or implemented; 2. scenario »with measures«: including implementation of the most feasible scenario from the Energy Development Strategy which is basically restricted to measures in the energy sector; http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-3 3. scenario »with additional measures«: according to which, energy efficiency, renewable energy and emission reduction are effectively implemented in the Republic of Croatia, and significant effects are expected to take place in the period after 2010; priority sectors are: waste disposal, agriculture, industrial processes and renewable energy. An overview of the scenarios is presented on the basis of data from 2004, updated in 2008. Note: total projections of greenhouse gas emissions are presented with the scenario »with measures« and »without measures«. Figure 3.4 presents the Kyoto Protocol target. Figure 3.4 Projections of greenhouse gas emissions in the Republic of Croatia for the period from 1990 to 2020 (Gg CO2eq). Figure 3.5 Projections of greenhouse gas emissions in the Republic of Croatia; greenhouse gases according to sectors for the period from 1990 to 2020 (Gg CO2eq) for the scenario »without measures« Figure 3.6 Potentials for greenhouse gas emission reduction in the Republic of Croatia; greenhouse gases according to sectors for the period from 1990 to 2020 (Gg CO2eq) for the scenario »with measures«. Emission restriction has a major impact on the Croatian economy which marks a high level of electrical energy import. Furthermore, commitments to reduce emissions affect competitiveness of installations and release of carbon dioxide: (1) The Republic of Croatia is located between an economically highly developed area where industrial emissions are restricted i.e. the European Union and a region where the economy and industry are still recovering i.e. other countries of South Eastern Europe. Consequently, the Republic of Croatia faces two types of competition: one coming from more efficient and developed industry, and the other coming from undeveloped industry without restrictions; (2) the Croatian cement production sector is undergoing strong development due to great momentum in the construction sector; operators of cement or lime production installations wish to extend their capacities outside the Republic of Croatia, particularly to countries outside the EU; (3) in relation to the accession of the Republic of Croatia to the EU, the Croatian transport fuel productions (refineries) are facing harmonisation with the European fuel standards, such as low sulphur content; this shall require adjustment of refinery installations and result in greater energy consumption per tonne of product; (4) The Republic of Croatia is rapidly developing as a tourist destination; the relatively long Croatian coast attracts many tourists, and this will result in continuous increase of transport emissions. 4. QUANTITY OF EMISSION ALLOWANCES 4.1. National target according to the Kyoto Protocol The base year emission of the Republic of Croatia amounts to 34.845 million tonnes CO2 eq. The commitment of Republic of Croatia under the Kyoto Protocol is to reduce greenhouse gas emissions by 5% in comparison to the base year, which amounts to 33.102 million tonnes CO2 eq in the base year. According to land use, land-use change and forestry categories (LULUCF), in compliance with Article 3, paragraph 4 of the Kyoto Protocol, Croatia has 0.972 million tonnes emissions of CO2 eq in sinks. 4.2. Total quantity of emission allowances Methodology This section describes the methods and presumptions used to predict the total quantity of emission allowances, or a particular share of an installation, from sectors covered by the emission trading scheme, in the total national emissions, or in emission reduction commitments. Brief description of the methodology used for determining the total amount of emission allowances: • Stage 1: determining national projections of greenhouse gas emissions for sectors covered by the emission trading scheme and sectors not covered by the emission trading scheme, with measures laid down for all sectors not covered by the emission trading scheme, taking into account EU mid-term objectives, that is the objective of – 20% emission reduction by 2020; • Stage 2: determining expected emissions for sectors covered by the emission trading scheme following »without measures« scenario; • Stage 3: determining planned measures for emission reduction in sectors covered by the emission trading scheme and »benchmarking« with the European sectors covered by the emission trading scheme; • Stage 4: determining the total quantity of emission allowances for sectors covered by the emission trading scheme. Annual sequence of greenhouse gas emissions The last National Greenhouse Gas Emission Inventory of the Republic of Croatia for the period from 1990 to 2006 was published in May 2008.[4]. The details on emissions and emission projections for 2010, 2015 and 2020 are presented in section 3.4. Table 4.1 presents annual trend and projected quantities of greenhouse gas emissions in the Republic of Croatia by 2020. Table 4.1 Annual sequences of greenhouse gas emissions from 1990 to 2020. (Mt CO2 eq) [5] 1990 1995 2000 2005 2010 2020 Greenhouse gas emissions (total)(*) 32.527 22.930 26.228 30.561 35.219 41.867 Greenhouse gas emissions (energy sector and industry) (**) 10.775 7.213 6.741 10.340 12.238 14.373 (*) Total emissions in Croatia; data for 1990, 1995, 2000 and 2005; projections for 2010 and 2020 (**) Total greenhouse gas emissions generated by energy activities and industry defined in compliance with the National Inventory Report (»top-down« calculation); these data do not correspond to emissions of installations covered by the emission trading scheme according to the National Allocation Plan for which data have been collected using the »bottom-up« approach, even though they present emission trends in these two sectors. Greenhouse gas emissions (all gases), data for 1990, 1995, 2000 and 2005; projections for 2010 and 2020 Projection of greenhouse gas emissions in 2010 and in 2020 have the following features:[6]: (1) increase of CO2 emissions generated by domestic and international transport; (2) increase of CO2 emissions generated by increased industrial production capacities; (3) increase of CO2 emissions generated by increased energy production capacities; (4) decrease of energy consumption and related greenhouse gas emissions in the building sector, as a result of the thermal insulation improvement programme and increased use of renewable energy sources in this sector; (5) decrease of N2O emissions generated by artificial fertiliser industry; http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-4 http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-5 http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-6 (6) decrease of CO2 emissions generated by the gas sector caused by reduction measures applied during gas research; (7) decrease of CO2 emissions generated by electricity production caused by increased use of natural gas in the building and small enterprise sector; (8) decrease of CH4 and N2O emissions generated by the agricultural sector caused by implementation of measures for collecting biogas and improved fertiliser use; (9) increase of renewable energy sources in the overall domestic energy production, in particular due to increased capacities for using wind to generate energy, major increase of solar energy use and increased biomass based energy generation (in agriculture, heat supply sector and cement industry). Projections for the period from 2010 to 2020 show that according to the »without measures« scenario a major emission increase will take place (table 4.2). Table 4.2 Total increase, average annual increase of greenhouse gas emissions in total and for energy production sector in percents by 2020 Increase 2010 – 2020 Average annual increase Greenhouse gas emissions (without measures, total) 18.8% 1.7% Greenhouse gas emissions (without measures, energy production sector) 17.5% 1.6% Determining the total emission allowance which represents the ceiling for the greenhouse gas emission allowance trading scheme On the basis of the above described methodology, projections of the ceiling for the emission allowances trading scheme and its share in the total greenhouse gas emissions have been prepared, as shown in table 4.3. Table 4.3 Ceiling for the emission allowances trading scheme compared to national greenhouse gas emissions in the period from 2010 to 2012 (Mt CO2 eq) Annual average % of total emissions % +/- to Kyoto target Greenhouse gas emission according to »without measures« scenario 36.676 - +10.8 Greenhouse gas emission »with measures« (excluding forest management) 33.990 - +2.7 Emission with included allowance for forest 33.018 - -0.25 management (sink) -0.972 Mt CO2 eq The ETS ceiling, current level (base year 2007) 12.996 -- The ETS ceiling, »without measures« scenario 14.319 39.0 The ETS ceiling, with measures (-/- 7.5% emission reduction measures) 13.310 39.2 The total emission allowance which is at the same time the ceiling for the emission allowances trading scheme (ETS ceiling) has been established at 13,310 Mt CO2 eq per year, including the new entrant reserve of 0,858 Mt CO2 eq annually. Application of measures determined in Annex III of the Emission Trading Directive The Croatian Greenhouse Gas Allowance Allocation Plan has been prepared in compliance with the EU criteria for the preparation of National Allocation Plans. Table 4.4 Sectors outside the scheme (non-ETS) and within the emissions trading scheme (Mt CO2-eq.) Sector CO2 emissions Sectors included in the trading scheme (ceiling) ETS 13.310 Sectors outside the trading scheme (non-ETS) 20.680 Croatia – total 33.990 Base year 34.845 Kyoto target 33.102 Forest management allowance LULUCF 0.972 Kyoto target with forest management allowance LULUCF 34.074 4.3. New entrant reserve The new entrant reserve (NER) has been determined in compliance with the principles presented in section 5. The amount of the new entrant reserve and its share in the total quantity of emission allowances is presented in table 4.5. Table 4.5 New entrant reserve within the greenhouse gas emission trading scheme New entrant reserve 0.858 Mt CO2 eq. Share in total emission allowance quantity 6.4% 4.4. Possibility of inclusion and exclusion for trading in other greenhouse gases emissions There is no possibility for including other greenhouse gases e.g. N2O (nitrous oxide) in the period covered by the National Allocation Plan. 5. EMISSION ALLOWANCE ALLOCATION METHODOLOGY 5.1. General The total amount of emission allowances, 100%, is allocated to installations free of charge. The majority part, that is, 93.6% of emission allowances is allocated to installations, while the rest (6.4%) is intended for the new entrant reserve. Procedure description After compiling the list of installations which may be potential participants in the trading scheme pursuant to Annex I of Directive 2003/87/EC, questionnaires were delivered to installations, and thus entered data were examined by Croatian and international experts involved in the implementation of CARDS project. The examination was carried out in line with the provisions of Decision 2007/589/EC establishing guidelines for the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC. For the purpose of identifying all potential participants in the emission allowance trading scheme, installation operators have been invited to respond via the web site of the Ministry. Installations delivered data on their emissions for the period from 2004 to 2007, partially for 1990, 1995 and 2000, as well as plans for the period from 2008 to 2012 and 2015. Data for previous and future required periods are not equally reliable and complete. From the process of data examination and on-site assessments it may be concluded that data from 2004 to 2007 which make up the base can be considered as reliable. Data kept by the Environmental Protection and Energy Efficiency Fund were also used as a data source related to fees for emissions of CO2 into the environment, in the part which refers to collecting data on CO2 emissions generated by entities subject to payment of the fee. 5.2. Sector approach The allocation of emission allowances is conducted in two stages – emission allowances are allocated to four sectors and then to installations within those sectors. The selection of the four sectors is based on circumstances which are relevant for Croatia. During the preparation of the National Allocation Plan for Greenhouse Gas Allowances, installations have been distributed into four sectors: 1. energy sector; this sector includes installations for the generation of energy mainly for general consumption, that is, installations generating electrical energy and thermal installations; 2. mineral oil refineries; 3. cement and lime production installations; 4. other installations; this group includes the majority of smaller installations and mainly encompasses food production, brick production and manufacture of ceramic products; note: it also includes fuel oil furnaces which use installations included in the greenhouse gas emission allowances trading scheme. Sectors encompassed by the emission allowance, that is, in the greenhouse gas emission allowances trading scheme in the Republic of Croatia have the following characteristics: – the energy sector is very important and encompasses around 49% of emissions from installations included in the greenhouse gas emission allowances trading scheme; sector emissions are basically conditioned by domestic energy consumption and export; – mineral oil refineries, despite the restricted number, make up around 22% of emissions from installations included in the greenhouse gas emission allowances trading scheme, and their emissions are influenced by modifications in the field of fuel standards for motor vehicles in the Republic of Croatia and in Europe; – cement and lime production installations, which encompass 28% emissions from installations included in the greenhouse gas emission allowances trading scheme, and their emissions are effected by the increase in activity in the domestic construction sector; – other: encompasses a great number of small installations in the production sector, mostly related to brick and food production, and also includes a smaller number of local installations for heat production; these installations make up approximately 3% of emissions from installations included in the emission allowances trading scheme. Sector 1: Generation of electrical and thermal energy for general consumption (EN) Capacities for the generation of electrical energy in the Republic of Croatia include electrical power plants owned by the HEP group (Croatian Electric Power Company), a certain number of industrial power plants and several privately owned wind power plants and small hydro power plants. Total capacity which provides for the needs of the Croatian electricity system amounts to 4 049 MW (with 50% capacity of Krško nuclear power plant in Slovenia). Out of that quantity, 1 632 MW is generated by thermal power plants, 2 079 MW by hydro power plants and 338 MW by Krško nuclear power plant (which is 50% of its total capacity). Over the period of several years up to 2007, HEP d.d electrical power plants in Sisak and Rijeka were not operating in full capacity. In relation to the above, and with reference to domestic and international measures, this circumstance was taken into account when calculating the base emission year for these installations. Sector 2: Petrochemical industry (PC) Croatia has two oil refineries, in Sisak and Rijeka. Lubricants are produced by plants in Rijeka and Zagreb. Processing capacities of the Croatian refineries are owned by INA. Two types of fuel combustion are present in the refineries – for heating and/or cogeneration and for proper energy consumption in the production process. Furthermore, there is consumption of refinery gas for energy generation. Refineries are at present undergoing restructuring for the purpose of expanding their capacities. Growing fuel consumption in the transport sector and adoption of new standards in compliance with EU standards present the main reasons for expansion. Sector 3: Lime and cement production (CV) In the Republic of Croatia there are four major cement producers, which produce Portland cement. CO2 emissions which are generated during the cement production process present the most important source of total CO2 emissions outside the energy sector. This sector has a great growth perspective, as a direct consequence of growing building activities in Croatia and neighbouring countries, and in particular in Bosnia and Herzegovina. For calculating the base year for carbon dioxide emissions from sugar plants, characteristics are lime production (as a part of sugar production) and CO2 absorption during production Sector 4: Other production and installations (OP) Other production mainly includes installations in the following sectors: – brick and tile production, – nitric acid production – food production – other types of production. In Croatia, there is one nitric acid producer using the production procedure of applying double pressure, according to the pressure used during the oxidation and absorption stages. Ammonia which is used as raw material, evaporates, and when mixed with air burns in the catalyst made of platinum-rhodium alloy. Nitrous oxide, which is also a greenhouse gas, is thus generated. Approach to emission allowance allocation at the sector level Emission allowances according to the group source were allocated on the basis of individual negotiations, in which emission trends after 2004 were predicted and the method of calculation was defined. Plans submitted in relation to future emissions and related additional data, as well as expected justified CO2 emissions for the period from 2010 to 2012 have also been considered. Emission allowances according to source were allocated after reviewing additional information and other details. In general, data on CO2 emission quantities for an activity or product unit were used as reference criteria to the greatest possible extent. Sector allocation Allocation to four sectors was determined in accordance with the following methodology: Stage 1: determining the two years during which all sector installations jointly produced the highest emission, including the last four years, or 2004, 2005, 2006 and 2007. Stage 2: determining the average emission of an installation within the sector for two selected years; this figure presents the base year emission (EMbase). Stage 3: determining the base year emission for 2007 (EMbase (2007)). Stage 4: calculating total emissions from an installation for all four sectors in the base year (TotalSector EMbase (2007)). Stage 5: determining emission growth factors according to sectors, for the period from 2008 to 2012 (FRSector). Stage 6: calculating total emissions from an installation for all four sectors during the allocation period from 2010 to 2012, in line with the »without measures« scenario (TotalSector EMbase (2010- 2012)). Stage 7: establishing the commitment to reduce emission, which has to be fulfilled by each sector during the allocation period from 2010 to 2012 compared to the base year (SESector (2010- 2012)). Stage 8: subtraction of the commitment to reduce emission which has to be fulfilled by the sector during the allocation period from 2010 to 2012 (SESector (2010-2012)), from the installations’ total emissions for all four sectors during the allocation period from 2010 to 2012 (TotalSector EMbase (2010- 2012)). The obtained figure represents the total allocation of emission allowances per sector for the period from 2010 to 2012 (Total RSector (2010- 2012)). Brief overview of the calculation method: Total RSector (2010- 2012) = TotalSector EMbase (2007) x FRSector x SESector (2010-2012) Table 5.1 Allocation per sectors for the greenhouse gas emission trading scheme in the Republic of Croatia for the period from 2010 to 2012 (Mt CO2 eq) Sector Basis for the allocation TotalSector EMbase (2007) Emission growth factor (1) FRSector (per year) BAU emissions(2) TotalSector EMbase (2010 – 2012) (per year) Emission reduction commitment (3) SESector (2010- 2012) Allocation 2010 – 2012 Total RSector (2010 – 2012) Energy 6.623 0.0% 6.623 0.497 6.126 Petrochemical 2.440 1.6% 2.596 0.195 2.401 Cement and lime 3.021 1.9% 3.254 0.243 3.010 Other 0.917 1.9% 0.988 0.074 0.914 Total 13.001 Mt --- 13.461 1.009 12.451 (1) Emission growth factor determined as 60% of the economic growth factor of a certain sector. (2) BAU – without emission reduction measures (3) Commitment to reduce emissions = 7.5% 5.3. Calculation of emission allowance allocation at the installation level The allocation method is based on a combination of approaches taking into consideration the previous period and the prediction approach. The general principle for the calculation of emission allowance allocation at the installation level is, as follows: Total RInstallation = EMbase (2007) x Total RSector (2010 – 2012) / TotalSector EMbase (2007) where Total RInstallation = allocation to an installation for the period from 2010 to 2012. EMbase (2007) = base year emission of an installation for 2007. Total RSector (2010- 2012) = total allocation at sector level for the period from 2010 to 2012. TotalSector EMbase (2007) = calculated total emission of an installation for all four sectors in the base year, 2007. Note: the base year for individual installations consists of the average of the two years with the highest emissions in the relevant sector. Individual allocation of emission allowances Individual allocation of emission allowances to installations included in the greenhouse gas emission trading scheme is shown in table 1 section 1 List of installations 6. NEW ENTRANT RESERVE AND SHUTDOWN OF INSTALLATIONS 6.1. New entrant reserve General Emission allowances to new entrants shall be allocated free of charge, from the new entrant reserve. The new entrant reserve shall be managed at the national level and shall be available to new entrants from all sectors at the beginning of the first trading period. The reserve shall be subtracted from the total emission ceiling before the allocation of emission allowances to sectors. Emission allowances from the reserve shall be allocated free of charge, upon putting the installation into operation. If new entrants’ requirement for emission allowances exceeds the reserve, operators have to buy emission allowances on the market. Extent of new entrant reserve The reserve is established at the annual level of 0.858 Mt CO2 eq and makes up 6.4% of the total quantity of emission allowances. The new entrant reserve has been determined using data submitted by operators through questionnaires, plans for reducing emissions presented by installations and existing national strategies and programmes. The new entrant reserve includes entrants which have been established as new, as well as an additional quantity intended for non-established, new entrants. Accessibility and application submission New entrant is every new installation or existing installation which obtains a greenhouse gas emissions permit or renews it after the adoption of the National Allocation Plan. Installations recognised after the adoption of the National Allocation Plan are considered new entrants. If an existing installation undergoes capacity expansion, then the rights from the new entrant reserve are allocated only for that expansion. Access to the reserve is also permitted to installations which undergo modification in their operation or capacities, that is, in their technology which increases the nominal capacity of permitted emissions. All those changes must be reflected in their permits. The calculation of an emission allowance for a new participant shall be based on general principles applied to the relevant sector, technological characteristics, expected number of operating hours and other important assumptions. Permits for new entrants shall be based on the same principles in Croatia’s legislative practice which is applied for the purpose of issuing use permits. 6.2. Installation shutdown General An installation shall be considered as permanently shut down if the following conditions exist for at least one year: a) production is equal to zero, b) CO2 emissions are equal to zero, c) the installation is not re-opened in the future period, that is, in the present or following trading period. In case of demonstrated or reported shutdown, emission allowances will remain valid during the whole calendar year. For the following calendar year, emission allowances are transferred to the new entrant reserve. Temporary installation shutdown The installation shall be considered as temporarily shut down if the shutdown is stated in its business plan or is necessary due to unexpected circumstances, and the following conditions are simultaneously present during at least one year: a) production is equal to zero, b) CO2 emissions are equal to zero, c) the installation re-starts operation after shutdown. In case of temporary shutdown, the emission allowance for the period in which the installation is out of operation is transferred to the new entrant reserve. Partial shutdown The installation shall be considered as partially shut down when the operator has the intention to permanently reduce installation capacity which leads to reducing the nominal capacity of permitted emissions. The emission allowance related to reduction is transferred to the new entrant reserve. 7. USING EMISSION UNITS DERIVED FROM PROJECT MECHANISMS Criteria for participating in the greenhouse gas emission allowance trading scheme are conditioned by restrictions related to the use of reduction units obtained on the basis of the Clean Development Mechanism (CDM) and Joint Implementation (JI). This is in compliance with the provisions of the Kyoto Protocol which consider the use of emission units obtained through the implementation of the Kyoto Protocol mechanisms as an addition to domestic measures for countries committed to reduction under the Protocol. Criterion 12 of Annex III of the Directive on greenhouse gas emission allowance trading instructs that the NAP must establish the maximum number of certified emission reduction units (CER) and emission reduction unit (ERU) which the installation operator may use as a percent of the quantity allocated to each individual installation. The NAP establishes that installations may use emission units from JI and CDM projects at 15% of the quantity allocated to each installation. Installation operators included in the emission trading scheme in the Republic of Croatia shall therefore be offered the possibility to achieve the emission reduction target as established by the National Allocation Plan through an appropriate policy. The percentage is to a certain extent compliant with the measures the installations will undertake. Undertaken measures are calculated as the difference between projected emissions without measures and total allocated emission rights. Furthermore, the ceiling of 15% emission units from project mechanisms covered by the emission allowance trading scheme is also defined by the fact that the National Allocation Plan includes the possibility of applying cost efficient measures for installations which will have to be able to sustain compensation in case of unpredicted economic growth. Restrictions in relation to use of emission reduction units shall apply for the whole allocation period, at the installation level. The transfer of emission units from one period to the next shall be permitted between years, so that installations which have not used the allocated quantity during one trading year may transfer those emission reduction units to the following year for future use. As the Republic of Croatia is not a host country to joint implementation projects, the reserve for double calculation of emission units from JI projects has not been planned. 8. PUBLIC DISCUSSION Access to information and public participation has been realised in accordance with a special regulation governing access to information and public participation. Cooperation with participants has been realised by means of completing questionnaires and visiting installations. A Proposal of the NAP was published on the web site of the Ministry in September 2008, and was further presented to economic entities in November 2008. Economic entities delivered their objections, proposals and comments in writing. A series of meetings was held with specific installation operators, as well as with representatives of specific sector associations. In February 2009, a meeting was held on which the Proposal of the NAP was reviewed together with the European Commission representative. The NAP was amended in line with comments made by economic entities and suggestions from EU experts and was published for public inspection on the web site of the Ministry at the beginning of June. 9. OTHER CHARACTERISTICS 9.1. Transfer of emission allowances to another period Unused emission allowances from this period which remain on operators’ accounts in the registry may be, upon the settlement of accounts and not later than 30 April 2013, transferred to the following trading period. 9.2. Pooling of installations No application by an operator or group of operators wishing to pool has been received and therefore reserves for pools have not been established during this period. 9.3. Public auction Emission allowances are allocated to installations free of charge in the whole amount. The Ministry of Environmental Protection, Physical Planning and Construction has decided that there will be no sale or public auctioning of emission allowances. 9.4. Later entrants Later entrants are covered by the formulation which is contained in the section on the new entrant reserve stating that any installation which receives an operating permit after the adoption of the NAP, shall be considered as a new entrant. Therefore there is no room for the new category »later entrants«. 10. LIST OF INSTALLATIONS Table 1 List of installations obliged to obtain greenhouse gas emission permits with allocated annual greenhouse gas allowances Ordinal number Installation name Operator’s name Basic activity Annual emission allowance CO2 tonnes 1 Lička Tvornica Vapna Kamen Sirač d.d. lime 38,278 2 Kamen Sirač – PEC 1-2 Kamen Sirač d.d. lime 93,995 3 Kamen Sirač – PEC 3 Kamen Sirač d.d. lime 72,880 4 KRAŠ Food industry Kraš d.d. food industry 8,564 5 HEP – 1 ELTO HEP group energy 381,225 6 HEP – 2 KTE Jertovec HEP group energy 46,407 7 HEP – 3 Plomin-1 HEP group energy 668,507 8 HEP – 4 Plomin-2 HEP group energy 1,301,637 9 HEP – 5 Rijeka HEP group energy 1,058,567 10 HEP – 6 Sisak HEP group energy 1,696,777 11 HEP – 7 TE-TO Osijek HEP group energy 145,627 12 HEP – 8 TE-TO Zagreb HEP group energy 792,762 13 HEP – 9 Toplinarstvo Osijek HEP group energy 3,543 14 Rockwool Rockwool Adriatic construction materials 0 15 Vetropack Vetropack Straža d.d. (Vetropack AG) glass 105,112 16 CMC Sisak CMC Sisak d.o.o. metal industry 10,115 17 Dunapack Valoviti papir paper industry 1,841 Dunapack d.o.o. 18 TZV Gredelj – Vukomerec TZV Gredelj d.o.o. metal industry 1,150 19 Dalmacijacement 1 – 10 August CEMEX cement industry 350,275 20 Dalmacijacement 2 – Sveti Juraj CEMEX cement industry 754,918 21 Dalmacijacement 3 – Sveti Kajo CEMEX cement industry 408,945 22 Knauf Insulation Knauf Insulation d.o.o. (Knauf group) construction materials 30,993 23 Girk Kalun – Drniš Girk Kalun d.d. lime 85,130 24 DIOKI DIOKI d.d. chemical industry 157,117 25 Petrokemija Kutina Petrokemija d.d. artificial fertiliser 309,848 26 Holcim Holcim Hrvatska (Holcim group) cement industry 427,961 27 ITV Istarska tvornica vapna d.o.o. (Murexin group) lime 45,588 28 INA – Molve INA d.d. refinery 84,831 29 INA – Rijeka INA d.d. refinery 980,489 30 INA – Etan INA d.d. refinery 32,104 31 INA – Sisak INA d.d. refinery 743,144 32 Našicecement NEXE group cement industry 620,121 33 Podravka – Energy supply Podravka d.d. food industry 7,232 34 Energoremont – Thermal plant Energoremont d.d. energy 2,872 35 Ciglana Sladojevci Ciglana IGM d.o.o. Sladojevci brick plant 4,250 36 Istra Cement CALUCEM group cement industry 112,256 37 Keramika Vojnić Keramika Modus d.o.o. ceramic industry 6,318 38 KIO – Orahovica KIO keramika d.o.o. ceramic industry 20,530 39 Lipik Glas Lipik Glas d.o.o. glass 15,841 40 Opeco Opeco d.o.o. ceramic industry 6,554 41 Tondach Bedekovčina Tondach Hrvatska d.d. construction material 10,444 42 Viro Viro tvornica šećera d.d. sugar plant 69,989 43 Varteks Varteks d.d. textile industry 6,357 44 Željezara Split Željezara Split d.d. metal industry 14,028 45 Opeka – Osijek Opeka d.o.o. ceramic industry 5,053 46 Wienerberger Wienerberger ceramic industry 23,362 47 EKO Međimurje Eko Međimurje d.d. ceramic industry 8,174 48 Gradip Gradip d.d. brick plant 5,523 49 Tehnostan Tehnostan d.o.o. energy 3,429 50 Toplana – Karlovac Toplana d.o.o. energy 26,278 51 Sojara Agrokor food industry 15,985 52 Dina Petrokemija DINA Petrokemija d.d. chemical industry 15,296 53 IGM Brick plant Cerje Tužno IGM d.d. Lepoglava brick plant 14,160 54 Knauf – Knin Knauf d.o.o. (Knauf group) construction materials 31,859 55 Sladorana Sladorana d.d. food industry 74,515 56 Dilj NEXE group brick plant 26,774 57 Ciglana Blatuša Saša promet ciglana Blatuša d.o.o. brick plant 4,421 58 IGM Ciglana Cerovlje IGM d.d. Lepoglava brick plant 7,205 59 Đuro Đaković – energy supply Đuro Đaković Holding d.d. energy 1,457 60 Šećerana Osijek Kandit Premijer d.o.o. food industry 94,028 61 Belišće – Energy supply Belišće d.d. paper industry 114,517 62 Karlovačka pivovara Karlovačka pivovara d.o.o. (Heineken) food industry 8,664 63 PAN PAN – Papirna industrija d.o.o. paper industry 24,684 64 KIO – Rujevac KIO keramika d.o.o. ceramic industry 10,458 65 IGM Ciglana – Petrinja IGM Ciglana Petrinja d.o.o. brick plant 11,739 66 Ciglana Finag Finag d.d. brick plant 8,942 67 PLIVA Pliva Hrvatska d.o.o. pharmaceutical industry 21,513 68 Podravka – Danica Podravka d.d. food industry 8,397 69 Slavonija IGM Našice NEXE group brick plant 11,915 70 Ciglane Zagreb Ciglane Zagreb d.d. brick plant 4,572 71 PIK Vrbovec PIK Vrbovec – mesna industrija d.d. food industry 8,264 72 Česma – Energana Spačva d.d. energy supply 769 73 Ciglana Mraclin Ciglana Mraclin d.o.o. ceramic industry 2,419 74 Tondach Đakovo Tondach Hrvatska d.d. ceramic industry 10,569 75 Opeka – Sarvaš Opeka d.o.o. ceramic industry 8,292 76 Opeka – Ilok Opeka d.o.o. ceramic industry 5,316 77 Opeka – Vladislavci Opeka d.o.o. ceramic industry 4,494 78 Badel Badel d.o.o food industry 3,983 79 Ferro Preis Ferro-Preis d.o.o. metal 5,904 80 Petrokemija – proizvodnja čađe Petrokemija d.d. artificial fertilisers 78,253 81 Maziva Zagreb Maziva Zagreb d.o.o. lubricants 5,150 Total 12,451,456 Total including reserve Total annual CO2 emission allowance Energy 6,126,218 Cement and lime 3,010.347 Petrochemical industry 2,401,081 Other 913,810 Reserve 858,310 Total 13,309,766 11. ALLOCATION OF EMISSION ALLOWANCES TO INSTALLATIONS PURSUANT TO THE NATIONAL ALLOCATION PLAN OF THE REPUBLIC OF CROATIA The allocation of emission allowances to installations pursuant to the National Allocation Plan and the emission allowance trading procedure shall apply as of the day of accession of the Republic of Croatia to the European Union. 12. PUBLICATION OF THE NATIONAL ALLOCATION PLAN IN THE REPUBLIC OF CROATIA This Plan shall be published in the Official Gazette. Class: 351-02/09-02/03 Reg. No: 5030114-09-1 Zagreb, 26 June 2009. Prime Minister Ivo Sanader, m.p LIST OF ABBREVIATIONS AAU Assigned Amount Unit) BAT Best Available Techniques CEA Croatian Environment Agency CER Certified Emission Reduction CDM Clean Development Mechanism CH4 Methane CITL Community Independent Transaction Log COP Conference of Parties CO2 Carbon dioxide EIA Environmental Impact Assessment EC European Commission EKONERG Energy and Environmental Protection Institute FZOEU Environmental Protection and Energy Efficiency Fund ERU Emission Reduction Unit ETR Emissions Trading Registry ETS Emissions Trading Scheme EU European Union EUA EU Allowance – allowance to emit 1 tonne of CO2 equivalent EU ETS European Union Emissions Trading Scheme EUROSTAT European Statistical Office GDP Gross Domestic Product Gg Gigagram = 1 000 t GHG Greenhouse Gas GWP Global Warming Potential IPCC Intergovernmental Panel on Climate Change ITL International Transaction Log JI Joint Implementation LULUCF Land Use, Land Use Change and Forestry MRDFWM Ministry of Regional Development, Forestry and Water Management MEPPPC Ministry of Environmental Protection, Physical Planning and Construction MELE Ministry of the Economy, Labour and Entrepreneurship MFIN Ministry of Finance MHSW Ministry of Health and Social Welfare Mt Megatonne = 1 000 000 t NAP National Allocation Plan NER New Entrant Reserve NGO Non-Governmental Organisation NIR National Inventory Report N2O Nitrous Oxide RMU Removal Unit SME Small or Medium Sized Enterprise UNFCCC United Nations Framework Convention on Climate Change ECFIN Directorate General for Economic and Financial Affairs [1]Reference: State Office for the Economy [2] Eurostat: http://epp.eurostat.ec.europa.eu/portal [3]Greenhouse gas emission projections – Ministry of Environmental Protection, Physical Planning and Construction, September 2003 [4] 2008 National Greenhouse Gas Emission Inventory Report– Ministry of Environmental Protection, Physical Planning and Construction, submitted to UNFCCC in May 2008 [5]5 Study »Greenhouse Gas Emission Reduction Scenarios in the Republic of Croatia for the »Post-Kyoto« period until 2020, with prospects for 2030 and 2050«, Zagreb, June 2008, based on projections made in the 2008 National Greenhouse Gas Emission Inventory Report [6]Data from the trend analysis prepared by Ekonerg –Energy and Environmental Protection Institute (various documents) and Industrial research conducted as part of the CARDS 2004 project. http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-1-backlink http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-2-backlink http://epp.eurostat.ec.europa.eu/portal http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-3-backlink http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-4-backlink http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-5-backlink http://narodne-novine.nn.hr/clanci/sluzbeni/2009 07 76 1847.html#footnote-29081-6-backlink