跳到主要内容
Nelum
捷克的法律

Ministerial Decree No. 13/1994 specifying some details of agricultural land resources protection

颁布于 1993-12-29 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

research.laws.repealedOn

关于这部法律

语言
English
类型
条例
组织
European Union
国家
捷克
主题
Agricultural and rural development
关键词
agricultural land, erosion, soil conservation/soil improvement

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. DECREE of the Ministry of the Environment of the Czech Republic specifying some details of agricultural land resources protection Dated December 29, 1993 Decree 13/1994 Pursuant to § 22 of Czech National Council Act No. 334/1992 S.B. on protection of agricultural land resources, in the wording of Czech National Council Act No. 10/1991 S.B. (hereinafter the "Act"), the Ministry of the Environment of the Czech Republic issues the following decree: § 1 Decision criteria for the imposition of changes in plant species on agricultural land (ad § 2 par. 2 of the Act) The agricultural land resources protection authorities may impose a change in the cultivation of agricultural lands in cases where the land management with the present plant species leads to a) the danger of erosion of the land on the property in question and on surrounding properties, b) a detriment to the purity and quality of water in water courses and water reservoirs, c) a danger to surface or underground sources of drinking water, natural medicinal waters and sources of natural mineral tabie waters,' d) failure to comply with rights and obligations with regard to the protection of nature and the landscape, 2 e) damage to surrounding properties or to the favourable physical, biological and chemical properties of the soil, f) danger to the food chain. 1 § 30 of Decree No. 26/1976 S.B. on I.he protection and development of natural therapcutical spas and 1arural medicinal waters. 2 Czech National Council Act No. 114/1992 S.B. on the protection of nature and the landscape. in the vording of later regulations. )ccree No. 395/1992 S.B. for the implementation of some of the provisions of Czech National Council kt No. 114/!992 S.B. on the pro1cc1ion of nature and the lan<l.«:apc. Delimitation or the highest permi~ible soil pollutant levels (ad § 3 par. 1 and 3 or the Act) (I) The maximum pennissible values of 1he levels of hazardous elements in soils on the basis of the analytically determined contents are given in Annex No. I whid1 is an integral part of this Decree. (2) The levels of permissible soil comantination by some pollutants erulangering the existence of living organisms are given in Annex No. 2, which is an integral part of this Decree. Procedures for ensuring the protection of the agricultural land resources in the preparation and discussion of land use planning documentation and basic land use planning documents (ad § 5 of the Act) §3 (1) To ensure the protection of agricultural land resources. the preparation of land use planning documentation and basic land use planning documents should be based on a) the organization of the agricultural land resources in the territory, the hydrological and run-off conditions and the network of special-purpose agricultural roads, b) a plan for terrain modifications and delimitation of the currently buih-up areas in the given municipality, c) the plant cuhure (type of property) of the agricultural land on tJ'le basis of the cadas.ttal real estate records3 and the\r quality on the basis of assignment to evaluated ecological land units, d) the existence of non-agricultural land required to suppon agricultural production and fish ponds for breeding fish or water foul, e) the exis1ence of agricuhural land on which investments have been made into the soil for the purpose of increasing fenility, e.g. amelioration and irrigation facilities. (2) Basic documents pursuant to par. I are the data in the iabular and graphical pans of 1he basic technical land use documents for 1he protection of the agricultural land resources, data on the propcni.es on the basis of the cadastra\ real esme records.1 depiction of the soil value in ecological units to which the agricultural propeny is assigned, and its special-purpose l Czech National Council Ac1 No. 344/1992 S.B. on lhe real cs1ate cad3stc:r or lhe Czech Republic (The Cada.~tcr Acl}. evaluation into degrees of priority in protection and protection classes. approved proposals for tcnain m:idifications: data on investments already made in the soil for the pmpose of increasing its fertility and graphical depiction and infonnation on hydrogeological regions. (3) Data from the basic documents pun1uant to par. 2 arc to be evaluated by those preparing land use planning docu~ntation in the stage: of surveying and a11alysis and an:: to be depicted in a separate supplementary diagram or in the overall summary diagram.' The basic graphical documents of the supplementary diagram consist of maps on the scale used for the principal diagrams, which permit the depiclion of the evaluated data. The range and precision of this evaluation and its depiction are based on the stage and category of the land use planning documentation being prepared. The evaluation and depiction of this data forms a basis for the preparation of proposals Cot prediction work. land W1C and management principles and consttuction programs. ( 4) Those preparing or ordering predictiorl work, land use and management principles and construction programs are to discuss6 these proposals with the agricultural land resources protection authorities with jurisdiction to issoe approval for the prepared land .use planning documentation1 on the basis of the text, tabular and graphical parts of the: evaluation of the data in the basic documents pursuant to par. 3. In its report, the agricultural land resources protection authority is to designate that pan of the territory (properties) that may come into consideration for funher urban development from the standpoint of the smallest possible impact on the agricultural land resources. Simultaneollsly, it is tO delimit the way in which future plans of appropriate land use planning: documentation should be directed, to have the smallest possible impact on the agricultural IMd involved with the most favourable physical, biological and chemical properties of the soil, hydrological conditions, network of agricultural special•purpose roads, measures proposed ill propcny modifications, significant landscape elements, regional systems of ccologicaJ stability, the organization of the agricultural land resources in the territory and the nonproductive function of agricullural land as a component of the environrnenL (5) If the work involves the preparation of an urban development study or general land use plan, the party preparing the work is 10 carry out the evaluation and depiction of data from the basic documents as stated in par. 3. 1 §4 • § 8 and 9 of Czech National Council Acl No. 284/1991 S.B. on terrain modifications and property olfices in lhe wording of later regulations. ' § 19 of Decree No. &4/1976 S.B. on basic lerritoriaJ planning documents and territorial planning documentation, in the wording of later regulations. 6 § 126 o( Act No. 50/1976 S.B. on territorial plaming and lhc Consuuction Code (The Construction Act) in the wording or later regulations. 7 § 13 par. 2. § 14 letter d), § 15 leller d), § 16. § 17 lcuer a) or the AcL • § S par. I of lhe AcL (I) Those preparing land use planning documentation are to proceed in the preparation of basic concepts for the land use plan' in accordance with the requirements imposed by the appropriate agricultural land rerources protection authorities in discussing proposals for prediction work. land use and management principles and construction programs(§ 3 par, 4). Simultaneously, they are ro evaluate the expected impact of the proposed land use plan for the development of settlements and the region on the agricultural land resources considering the individual alternatives. For this purpose, they are to utilize the results of data evaluation from the basic documents llrld the depiction thereof(§ 3 par. 3). (2) Details of the contents of the evaluation pursuant to par. I are given in Annex No. · 3, which is an integral pan of this Decree. (3) If the work involves the preparation of an urban development study or general land use plan, then the impact of the proposed plan for the agricultural land resources and the evaluation of these land use planning documents are to be evaluated pursuant 10 the provisions of the preceding paragraphs similarly ta.king into consideration the special regulations.io § 5 Procedure for ensuring the protection of the agricultural land resources in the preparation and discussion of pt'oposals for lhe establishment of mining areas (ad § 6 of the Act) (1) In the preparation of a proposal for the establishment of a mining area that is to affect agricultural land resources, a legal or natural person authorized 10 carry out mining of minerals (hereinafter "person authorized 10 mine minerals"), in whose interests preliminary approval has been issued for the establishment of a mining area pursuant to the special regulations, 11 is to assess12 the expected impact of the proposed plan on the agricultural land resources. For this purpose, the basic documents for ensuring the protection of the agricultural land resources pursuant to § 3 par. I and 2 must be used and the nature of the mineral deposit and the means of its mining in the future must also be taken into account. (2) Details of I.he contents of the assessment pursuant to par. l arc given in Annex No. 4, which is an integral part of this Decree. (3) The assessment pursuant to par. I, the preliminary approval for 1he es1ablishme111 of ' § 5 par. 2 or lhc Ac1. 10 Act No. 50/1976 S.B. in the wording of later regulations. Decree No. 84/1976 S.B. in !he wording of la.lee rcgutatious. 11 § 24 par. 2 10 4 of Act No. 44/1988 S.B. on the protection and uliliz:uion of mineral resources (The Mining Act) in the wording of la1cr regulations. 12 § 6 par I of the ACL a mining area pursuant to the special rcgulations11 and the graphical depic1ion of the boundaries of the block of mineral stocks based on lhc ll:Sults of geological swveys constitute 1he basic documents for the submission of an application for the approval of the establishment of the mining area. 11 § 6 Procedures for ensuring protection of the agricultural land resources in the preparation of documentation for construction work requiring the issuance of a land use decision (l) ln the preparation of documentation for constrUction work requiring the issuance of land use decisions." lfutt arc to affect the agricultuml land resources, the investor is to assess fhe impact on these rcsources of the proposed location of the planned building. This assessment shall be an Annex to the application for the approval of the withdrawal of agricultural land resources pursuant to § 9 of the Act (2) Details on the contents of the assessment pursuant to par. 1 arc given in Annex No. 5 which is an integral part of this Decree. (3) If the prepared construction work is to be carried out outside of the currently built•up area of a community, the investor is to suggest technically feasible alternatives for the location in order to find a solution that will be most advantageous from the standpoint of the protection of the agricultural land resources and other legally protec1ed general interests; in doing this, the investor is to assess the impact of the individual alternatives on the agricultural land resources. (4) The alternatives of location pursuant to par. 3 are not to be suggested if the location of the construction work is in accordance with a) a plan approved in land use planning documentation or approved in basic land use planning documents, or b) a proposal for the route of surface and underground mains, roadways, national railways and water routes and pans thereof, for which the agricultural land resources protection authorities have issued approval, or c) conditions that have been defined by the appropriate agricultural land resources protection authorities in an approval of an application for the establishment of a mining space. (5) Terri1orial alternatives are not proposed if the work involves primary agricultural u § 6par. 2oflhe Act \4 I 32 leller a). I 39 of Act No. 50/1976 S.B. in lhe wording of later regulations. § 7 par. 4 or Decree No. 85/1976 S.B. on details or territorial processes and lhe Consuuclion Code in lhe wording of la1er rcgula1ions. production construetion work, the location of whi.ch is dclimi.ted by propeny ownership relations, the consU"Uction of agricultural special~purposc roadways, or investment in the soil to improve its fertility," where the location is unambiguously determined by the technical character and purpose of the wotk. § 7 Procedure for ensuring the protection of the agricultural land resources in the preparation or proposals for the routes of surface and underground mains, surface roadways, national railways and water routes and parts thereor (ad § 7 of the Act) (1) An investor concerned with the constrt1ction of surface and underground mains, surface roadways, national railways and water routes is to assess the expected impact of the proposed solution on the agricultural land resources 'tn preparing proposa\s for the routes of this work. 16 (2) If the construction work pursuant to par, l is to affect the agricultural land resources outside of the area of the currently built•up pans of communities, proposals are to be prepared for the routes of this work in technically feasible alternatives in order to find a solution that will be most suitable from the stand point of the protection of the agricultural land resources and other legally protected common interests. (3) The procedure under par. 1 and 2 is not to be followed in cases where constrUction work is being prepared a) for surface and underground mains, surface roadways, national railways and water routes and parts thereof that is to be canied out along routes approved in the land use planning documentation or approved in the basic land use planning documents or if the proposal for their implementation is contained in the documents for other consttuction work. required for the issuance of a land use decision. or b) that includes the modification of profile grades, and the widths and parameters of curves iA already constnieted surface roadways and national railways. u § 11 par. 3 letter a) of the Ac:L 1 • I 7 par. 3 of the ACL Procedures ror ensuring the protection or the agricultural land resources in construction, mining and industrial operations and in geological and hydrogeological surveys (ad § 8 or the Act) §8 Procedures for ensuring the protection or the agricultural land resources in geological and hydrogeological surveys If preparations are to be made for work to be carried out in connection with geological or hydrogeological surveys (hereinafter "geological work") that will affect agricultural land resources for a period longer than one year, the legal or natural person authorized to carry out this wOl'k pursuant to the special rcgulations11 is to as~ss, in preparing this work, the impact of such work on agricultural land resources!• This assessment shall be an Annex to the application for approval of the withdrawal of land from the agricultural land resources pursuant to § 9 of the Act. §9 Procedures for ensuring the protection of agricultural land resources in preparing a plan for construction of new mines, preparations and mining (1) In the preparation of a plan for construction of new mines, preparation and mining that is to affect the agricultural land resources, the person authorized to mine the minerals is to assess the impact of the proposed mining of minerals19 on the agricultural land resources?' This assessment shall be an Annex. to the application for the withdrawal of land from the agricultural land resources pursuant to § 9 of the Act. (2) Details of the content of the assessment pursuant to par. 1 are given in Annex No. 6, which constitutes an integral pan of this Decree. (3) The procedure pursuant to par. I and 2 is also to be followed by legal and natural persons that have been issued by the local Mines Office with a permit to mine minerals, if the mining of the minerals is to occur in areas (localities) for which a proposal for the establishment of a mining area need not be prepared and the mining is canied out on the basis of a decision issued under the special regulations.21 11 Czech National Council Act No. 62/1988 S.B. on geological work and the Czech Geological Office in tl1e wording of la1cr regulations. 11 § 18 of lhe Acl. 1 ' § 9 or the Act. xi § 6 par. I of lhc Acl. l\ Decree No/ 175/1992 S.B. on conditions for the u1iliza1ioo of deposits of nonrcscrve minerals. I 10 Procedure ror ensuring the protection of the agricultural land resources in safeguarding the top soil Jaye~ its implementation and the use of top soil ·1ayers (1) A person in whose interest approval is sought for the withdrawal of land from the agricuhural land resources, pursuam to § 9 par. 5 letter f) of the Act for nonagricultural use, is to prepare a preliminary calculation of the amount of the top-soil layers11 on the properties in question and a proposal for the means of utilization of thi~ soil. The prepared documents are to be submitted together with the application for the approval of the agricultural land resources protection authorities, for examination, and for further utilization in establishing the essential conditions to ensure the protection of the agricultura.l land resources. (2) Prior to the implelTlentation of nonagricultural operations that have been pcnnitted in a decision issued pursuant to the special regulations,22 1he person in whose interests the approval for the withdrawal of 1he land from the agricultural land resources Was issued is to provide for the safeguarding of the top 4 soil layersn, thell° relocation, and spreading or deposition, in accordance with the conditions established by the agricultural land resources protection authority in the approval issued. If the top-soil layers are deposited in a deposit area until they can be used for the purpose of land reclamaiion or preparation of areas for planting, this person is also to provide for their safeguarding against detriment and losses, and for proper care thereof and, where necessary. is to provide for useful utilization of the surface of this deposit area for agricultural production. This person ;s to keep a protocol (daybook) on work connected with this top 4 soil layer, the relocation, spreading or other use, deposition, protecfion and care of the top 4 soil layers; this daybook is to contain all the facts that arc necessary for assessing the correctness, completeness and use:fulness of the utilization of this soil. (3) If land is to be withdrawn from the agricultural land resources under conditions for which approval is not required from the agricultural land resources protection authoritics:z., then stripping of the top 4 soil layers on these properties and their relocation11 are to be established by territorial and construc,ion proceedings." (4) The procedure in par. I to 3 is nm 10 be followed if the agricuhura.1 land resources protection aulhorities grant an exception pursuant to § 8 par. 1 lener a) of the Act, for land in the agricultural land resources which has been withdrawn a) for the purpose of reforestation, u E.g.§ 66 and 71 of Act No.50/1976 S.B. in lhe wording of laicr regula1ions. D§SofthcAct. 24 § 9 par. 2 of lhe AcL :is ~ 4 par. 5 o{ Occ.ree No. 83/\916 S.B. on general technical requirements on consuuction work, in the wording of la1cr regulations. b) ror reasons or inclusion among other areas, provided 1ha1 the propenies constituting this land cannoc be cultivated, c) for the protection or archeological finds, e) in the establishment or zones to provide hygienic protection of sources of drinking water in Class I and narrower protective zones for natural medicinal sources and sources of natural mineral table waters, () in the establishment or territorial systems of ecological stability. § II Procedure for ensuring the protection of agricultural land resources in providing for land reclamation (1) Details on the contents of the reclama1ion plan and the means of its preparation are given in Annex No. 7, which is an integral part of this Decree. (2) A person who is obliged to CIIIT)' out reclamation work pursuant to an approved plan on the basis of conditions established in the appro~al of the agricultural land :resources protection authorities for the withdrawal of land from the agri~ultural land resources issued pursuant to § 9 of the Act is to ensure immediately after termination of the purpose for nonagricultural utilization of the withdrawn land26 that a) all temporary structures, equipment and other materials left from the completed nonagricultural operations that would prevent reclamation work will be removed from the properties in question, b) on propenies to which letter a) applies, the individual operations and measures of the technical and biological pans of the reclamation work wi\1 be commenced and implemented in the order and to the extent established in the approved reclamation plan, c) over the entire reclamation period under letter b), a protocol (working daybook) will be kept with records of the progress of the reclamation work, the procedures used in this work, the adherence to the conditions established in the reclamation plan and other details decisive for assessment of the quality, ex.tent and completeness of the reclamation work carried out, d) after completion of 1he last stage of biological reclamation work, a report is to be made 10 the agricultural land resources protection authorities who issued 1he decision on the withdrawal of the land from the agricultural land resources pursoant to § 12 par. 2 of the Act, that reclamation work has been completed, so that the reclaimed land can be transferred 10 the owner or leaseholder and so that the obligation to pay fees for the withdrawal of this land may be terminated. • § 8 par. I letter c) and d) of the Act. (3) In the interests of the usefulness of 1he reclama1ion work and the future use of the reclaimed properties, the reclamation plan will be ex1ended in justified cases IO include neighbouring properties 1hal are pan of the agricultural land resources that are not affected by 1he planned nonagricultural activities. Procedure to be followed in withdrawal of land from the agricultural land resources (ad § 9 and 10 or the Act) § 12 (1) Currently built-up community areas(§ 4, § 9 par. 2 leuer a, poini 4 of 1he Act) are understood to be the cadastral territory of communities that, on the date of detennination, are permanently built up or, on the basis of a construction permit or other decisions and measures with equal weight, are designated for permanent buildings. In addition, this includes areas that are unambiguously connected with the built-up areas or areas designated for building and that are utilized as residences, or for production, seivices, recreation, transportation and other nonagricultural purposes. Properties lying within the boundaries of the built-up territory of the community on September 1, 1966 according to the diagrams in the real e state records, are considered to be the built-up areas of communities in all cases, even if all thi:: above cri1eria are not fulfilled, except for properties of agricultural land designated for ensuring special agricultural production (garden centres, vegetable production). (2) Properties of agricultural land that, because of their large size or suitable shape were not included in the built-up areas of communities on September I, 1966 are not considered a part of the current built-up areas of communities, even if they do not form a continuous unit with the surrounding agricultural land, except for those properties that are, on the day of determination pennanently built-up or, on the basis of a construction permit or other decisions and measures with equal weight, are designated for permanent buildings. The boundaries of the currently built-up areas of communities on the date of determination are not entered into cadastral maps. § 13 In the determination of the authority of the agricuhural land resources protection authority, the !Ota! area of the land for which approval for withdrawal pursuant to § 9 par. 1 of the Act is requested, is decisive. § 14 (l) A person in whose imerest approval has been issued for withdrawal of land from the agricultural land resources for purposes the realization of which does not require the issuance of a decision pursuant to the speciaJ regulations (e.g. for the purpose of transfer of the propcny into other categories, provided that it cannot be cultivated agriculturally), is to employ this approva] 10 declare a change in the kind of property (plant species) and means of utilization pursuant t0 the special rcgulationr7 to the locally appropriate cadastral office. (2) If approval pursuant to § 9 par. 1 of the Act is issued by some other agricultural land resources protection authority than the aulhorizcd municipal office, this authoricy is to send a copy of the issued approval to the authorized municipal office on whose territory the land affected by this approval is located., or where the greatest pan 1hercof is located. Simultaneously it is also co send all the documentation that was attached to the application for the issuance of this approval. § 15 (1) In the withdrawal of land from the agricultural land resources for mining purposes on properties in approved mining areas or in protected deposit areas, the calculation of the fCC!: does not include the ecologkal weighl of the effect on the pmtecced deposit area. 21 (2) In an approval pursuant to § 9 par. 1 of the Act, the agricultural land resources protection authority is to delimit criteria only for the de1ennination of this fee. (3) The basic ra1e for fees for the withdrawal of land from the agricultural land resources may be decreased pursuant to Pan C of the fee rates in cases in which a) it is demonstrated by determination or special-purpose measurements carried out by an authorized professional organization of the Ministry of the Environment or Ministry of Agriculture or the rcpons of the Hygiene Service, thal the degree of damage to the soil caused by fall-out from industrial emissions or by the escape of solid or liquid toxic substances or oil substances prevents its use for the production of agricultural products entering the food chain for a period of at least ten years from the date of determination of this unfavourable state of affairs, b) it is detennined by a professional organization of the Ministry of the Environment or Ministry of Agriculture that this land cannot be rationally utilized for agricultural production or expected to fulfill its function as a component of the environment as a consequence of irreversible damage caused by wind or water erosion. ( 4) If it is not possible to determine the principal land unit in land that is to be withdrawn from the agricultural land resources because the land has not been assigned to evaluated land in ecological units (e.g. in the currently built-up &Jeas of communities), the calculation of the fee for withdrawal of this land is based on the principal land unit that is delimited on some other agricultural land property located at the shones1 distance from the land that is to be affected by the proposed withdrawal from the agricultural land resources. (5) If doubts arise as to the usefulness of the method for determining the principal land unit pursuant to par. 3 {e.g. in extensive residential areas or approved mining areas). the 11 § 10 par. I letters d) and e) of Czech National Council Act No. 344/1992 S.8. 11 Annex to lhe Act, Pan 8, factor group D. agriculturaJ land resources protection authority may require that the principal land uni.ton the propeny affected by the proposed withdrawal ancVor the given climaric region be detennined at a later date by an authoriz.ed professional organization of the Ministry of Agriculture.:,, Common and concluding provisions § 16 Decree 36/1987 S.B .• specifying some details of the protection of the agricultural land resources, in the wording of Decree No. 528/1991 S.B., is annulled. § 17 This Decree comes into legal force on the date of its promulgation. Signed by the Minister: Franti§ek Benda M. Eng. Ph.D. 8 lbe Research Institute for Land Amelioration and ProlCClion. Annex No. 1 to Decree 13/1994 S.8. RISK FACTORS in lands that are part of the agricultural land resources Table No. 1 Contents of hazardous elements in soils (mgicg-1) 2 M HNO1 extract (extraction with a solution of HNO1 at a ratio of soil to extractanl of 1:10) Element Maximum pcnnissible concentrations Light soils Other soils As Be Cd Co Cr Cu Hg Mo Ni Pb V Zn Element 4.S 2.0 0.4 10.0 40.0 30.0 5.0 15.0 50.0 20.0 50.0 Table No. 2 Contents of hazardous elements in soils (mgicg-1) Total content (decomposition by aqua rcgia) Maximum pcnnissible concenttations 4.S 2.0 1.0 25.0 40.0 50.0 5.0 25.0 70.0 50.0 100.0 Light soils Other soils As Be Cd Co Cr Cu Hg Mo Ni Pb V Zn Explanations lo Tables 1 and l 30.0 7.0 0.4 25.0 100.0 60.0 0.6 5.0 60.0 100.0 150.0 130.0 I. The values for the contents of hazardous clemems are not valid for organic soils. 30.0 7.0 1.0 50.0 200.0 100.0 0.8 5.0 80.0 140.0 220.0 200.0 2. Light soils are understood to be sandy and loamy-sandy soils based on lbe melhod of Pro£. Novak (Complex Melhods of Plant Nutrition No. 1/1990, published by the lnstitulC of Scientific and Technical Infonnatioo in Agricullure, Prague (in Czech)). 3. On lhe contents or hazardous elements in soils {mg¼.g·1): The data given arc valid ror mixed samples obtained from lhe upper layer of tesled mineral soils with a thickness or 0.25 m, dried in the air to constant wcighL Annex No. 2 lo Decree No. 13/1994 S.B. Pollution indices for land of the agricultural 1and resou,ces Soil ~rmh,sib\e Soil Permissible pollution pollution pollution pollution index. value index value I. Inorganic mg/\<g of dry c) Chlorinated hydrocarbons subs1ances material aliphatic (ind.) 0.1 B 40 aliphatic (total) 0.1 Br 20 chlorobenzenes (ind.) 0.01 F 500 chlorophenols (ind.) O.Dl CN , 5 PCB 0.01 CNwii:: I EOC\ {extractable S (sulfatic) 2 organically bonded chlorine) 0.1 JI. Organic substances d) Pesticides a) Aromatic hydrocarbons and dicir deri'Yatives organic chlorinated (indiv.) O.OI benzene 0.05 organic chlorinated ethyl benzene 0.05 (total) 0.1 phenol 0.05 other (iridiv.) 0.01 xylcf\CS 0.05 other {total) 0.1 total aromatics 0.3 e) Other b) Polycyclic aromatic hydrocarbons cyclohe,:.anol 0.1 pyridine 0.1 anthcacene 0.01 styf"Cne 0.1 benzo(a)anthracene 1.0 nonpolar hydrocarbons benz.o{a)pyrene 0.1 {total) so phenanthrene 0.1 fluoroamhene 0.1 chrysene 0.01 naphthalene 0.1 to1aJ polycyclic aromatic hydrocarbofls 1.0 Annex No. J to Decree No. 13/1994 S.B. Contents or the impact assessment or the proposed land use planning documentation on the agricultural land resources I. The assessment of the expected itnpact of the proposed land use planning documentation on the agricultural land resources is to consist of textual, tabular and graphical parts. The graphical part is to be prepared in a separate supplementary diagram based on the maps on a scale identical to ttlat employed for the principal diagrams. The extent and precision of this assessment and depiction are detennincd according to the degree and category of the prepared land use planning documentation. 2. The assessment pursuant to point t. is to be further divided according to the proposed functional utilization . of the land into individual areas {loca\ities) in which consideration is being given to the location of further development plans, and it is to contain 2.1. data on the total extent of the areas required and the portion of the land that is part of the agricultural land resources, data on the kind of property (plant species) of the land involved. data on the assignment of the agricultural land to evaluated ecological land units and to degrees of priority protection, 2.2 data on investments already made in the land for the pmpose of improving its fertility (amelioration and irrigation facilities, etc.) and on expected disturbance thereof, 2.3. data on lhe premises and buildings of primary agricultural production and agricultural settlements and the expected disturbance thereof, 2.4. data on the organization of the agricultural land resources in the region obtained to detennine the ecological stability of the landscape and imponant facts following from the approved proposals for land modifications and on the expected disrurbance thereof, 2.5 depiction of the boundaries of the territorial districts of communities and the boundaries of cadastral territories, 2.6. reasons why the proposed plan is preferable compared to other possible courses of aciion from the point of view of the protection of the agricultural land resources and other legally protected common interests, 2.7. for settlements and zones corresponding to the boundaries of currently built-up communities on the dale of preparation of the concept for the land use planning documentation, the boundaries of propenies held by individual legal and natw·al persons, the routes of basic agricultural special-purpose roads and land use and ecological plans following from the approved proposals for property modifications, and designation of any expected disturbance thereof. 3. If the land use planning documemation includes territories on which are located previously established mining areas or a protected deposit area'° where a mining atea has oot yet been established, then, in assessing thC impact or the planned course of action on the agricultural land resources, the person preparing this documentation need only 3. l. designate its boundaries in the graphical part of this assessment, 3.2. include in the tabular part of this assessment, the summary area of the land that is pan of the agricultural land resources that is located on this land, 3.3. inchide in the textual pan of this assessment the necessary details and data abm..tt such parts. 4. The procedute pursuant to point 3 is not to be followed if an area (locality) for the minlng of minerals, for which a mining space is not established,'0 is involved. :,o Act No. 4-J/1988 S.B. in lhe wording oC later regub.\kms. Annex No. 4 to Decree No. 13/1993 S.B. The content or tfle impact assessment ror a proposal for the establishment or a mining area within the agricultural land re5'M.lrces 1. The assessment of the expected impllCt of a proposal for lhe establishment of a mining space within the agricultural land resources is to consist of textual, tabular and graphical parts. Its extent and precision arc determined by fhe means of mining the minerals (surface, open• pit, deep mining, etc.) and the size of the mining area, which is to be established on the basis of geological surveys. 2. The assessment pursuant to point 1 is to be prepared for the entire area of land that is part of to the agricultural land resources, on which the mining area or its individual pans are to be established, as well as for the areas (properties) of this land that would be affected by the impact of mining the minerals (e.g. location of spoils, tips, dumps. construction and transportation plans). This assessment is to contain the details listed in Annex No. 3 point 2 taking into consideration any differences following from the course of action of the proposal for the establishment of the mining area and also the study of expected means, goals and procedures for carrying out reclamation of the properties affected by the mining and, where applicable, a preliminary proposal for the actual procedure for carrying out this reclamation work. Annex No. 5 to Decree No. 13/1994 S.B. Contents or the impact assessment of Che proposed location of construction work on the agricultural land resources 1. The assessment of the impact of the proposed location of construction work on the agricultural land resources is to be prepared for che whole ma of land that is part of to the agricultural land resources that is to be affected by the proposed construction work and any work connected with this work pursuant to the course of action con1aincd in the appropriate construction documentation required for the issuance of a land use decision, and is to consist of 1extual, tabular and graphical parts. The graphical pan of this assessment is tO be based on copies of cadastral maps on a scale corresponding to the areal extent of the construction work, at the largest on a scale of 1 :5000. 2. The assessment pursuant to poim I is to contain 2.1. in the text part 2.1.1. basic information on the planned construction work, reasoning behind the requirement, function and imponance thereof, 2.1.2. information on whether the proposed courses of action are based on approved land use planning documentation or approved land use planning documents, the proptfiCd routes of surface and underground mains. surface roads, national railways and water routes and parts thereof, which shall be affixed with the approval of the appropriate agricultural land resources protection authority or the approved proposal for the establishment of mining areas affixed with the approval of the appropriate agricultural land resources protection authoriiy, 2.1.3. overall assessment of the impact of the proposed construction work on the agricultural land resources, 2.2. in 1he tabular part, a lis1 of the properties that arc part of the agricultural land resources or the pans 1hereof classified according to whe1her these prope11ies are localed in the currently built-up 1erri1ory of communities or outside of this territory and as 10 whether the land is to be permanently or temporarily withdrawn, which is also 10 contain 2.2.1. infonnation on the properties pursuant to 1hc real es1atc cadaster (community, cadastral 1enitory, lot number, kind of property, and ownership or leasehold relations), 2.2.2. the areas of the propc.nies or pans: thereof, 2.2.3. information on the classification of lhe agricultural land propetty into evaluated ecological land units and, whe~ applicable, to degrees of priority in protection, 2.2.4. infonnalion on whether invcsuncnts have been made in the agricultural land property involved for the purpose of improving the soil fenility (amelioration facilitiC!!II. etc.), 2.3. in the graphical pan diagrams 2.3.1. of the positions of the boundaries of the ~ soil withdrawal from the agricultural land resources classified according &o whether the land is &o be withdrawn temporarily or pcnnanently. 2.3.2. of areas on which investments have been made in the land for the puq,ose of improving the soil fertility (ameliomtion facilities, etc.}, 2.3.3. of the boundary positions of the currently built-up territories of communities, where this is indicated by the nature of the matter, 2.3.4. of the positions of the boundaries of evaluated ecological land units and, where the nature of the matter so requiteS, the degrees of priority fo( protection, 2.3.5. depicling the individual kinds of properties (plant species) of land that is part of the agricultural land resources according to the real estate cadaster, where the nature of the matter so requires, 2.4. and. as a separate, independent pan, also 2.4.1. a calculation of the total amount of top-soil layers (e.g. top soil, grass layers) and more deeply deposited soil layers that could be rendered fertile and a plan for their relocation and economic utilization by spreading over other concretely delimited propenies or deposition for other concretely delimited purposes including reclamation measures, 2.4.2. a reclamation plan if the land is to be reclaimed after tennination of the purpose of withdrawal of the land from the agricultural land resourcc:s. where both of these parts are to be prepared with both a textual and tabular part and a graphical part depicting facts that are necessary to the assessment, approval and future implementation thereof. Annex No. 6 to Decree 13/199~ S.B. The content of the impact assessment for propused mining of minerals on lhe agricuUural land resources 1. The assessment of the impact of proposed mining of minerals is to be prepared for the whole area of the land in the agricultural land resources that is to be affected I.I. by the surface {quarry, open·pit) method of mining coal and lignite in regions of concentrated mining in the framework of an established mining area over a period of five y~ars. 1.2. by the surface method of mining minerals for the construction or industrial purposes over a period of ten years; here it is not decisive: whether the mining is to be carried out in the framework of an established mining area or in deposits for which a mining area is not established, 1.3. by the deep•mining method of mining minerals through the construction of mine buildings and operational facilities and also for the area of such land on properties that can be expected to be devastated in the framework of the established mining area as a result of slumping or collapse of the land as a consequence of mining•out of the deposit, or for other reasons, 2. The assessment pursuant to point J is to consist of textual, tabular and graphical parts. The graphical part of this assessmem is to consist of a copy of the cadastral map on a scale corresponding to the areal extent of the proposed mining and connected work, at the greatest on a scale of 1 :5000. The contents of the individual parts should be prepared analogously to Annex No. 5 with the following differences: 2.1. the content of the textual part pursuant to point 2.l. of Annex No. S win be related to the proposed mineral mining, 2.2. information is to be given in the textual p8!t according 10 point 2.1.2. of Annex No. 5 on whether the proposed solutions arc based on established mining areas that have received the approval of the agricultural land resources protection authorities or are based on approved land use planning documentation or approved. basic land use planning documents, if the plans concern the location of work connected with the planned mining operations, 2.3. the textual part pursuant to point 2.1.3. of Annex No. 5 is to contain an overall assessment of the impact of the planned mining and connected work on the agricultural land -resources and. if the mining is to be carried out by deep mining methods, orientationa1 infonnation on the lime period and extent of the probable incurring of dcvas1ating consequences of the mining 10 1he landscape, the character that such devastation is expected to exhibil and the measures that could be used to remediate such devastation, 2.4. in addition to the infomtation pursuant 10 points 2.3. 1. to 2.3.5. of Annex. No. S, the graphical pan is also \O tkpict 2.4.1. for the surface (quarry, open-pit) method of mining coal and lignite and swface method of mining other minerals, a diagram of the bouodaries of the individual stages of progress of the mining over the proposed period with designation of the time order and, where applicable, of the individual stages of implementation of work connected with the ac1ual mining work, 2.4.2. for the deep-mining method of mining minerals, a diagram of the boundaries of lhe areas (localities) of expected devastation of the terrain as a result of the consequences of mining with an indication of the probable time of iheir occurrence, 2.5. the reclamation plan pursuant 10 point 2.4.2 of Annex. No. S is also to include a proposal for the actual schedule of its implementation including the times of completion and termination of the work, whether there are special reasons for this timing in the surface (quarry, open-pit) method of mining coal and lignite and, exceptionally, in the surface method of mining ceramic clays and kaolin, if the implementation thereof will have similar character to the surface (quarry, open-pit) method of mining coal and lignite. 1. a technical part in which it is necessary to give the amount of top-soil layers and the mean$ for their utilization, the goal and means of terrain modification for the properties, tips and dump piles. including the preparation of the properties for biological reclamation, adjustment of water conditions, amelioration measures and means of constructing approach and working roads, 2. a biological pan which must include the amelioration seeding procedure, intensity of fertilization and the goal of the reclamation work, 3. the timetable for the technical 11nd biological reclamation work. 4. a budget of costs for carrying out the reclaiming work, 5 map documents indicating the information given in points l, 2 and 3, and land profiles prior to and after the reclamation work. including connection of the: reclaimed land to the surrounding land.

Ministerial Decree No. 13/1994 specifying some details of agricultural land resources protection · Nelum