跳到主要内容
Nelum
加拿大的法律

Yukon Environmental and Socio-Economic Assessment Act (S.C. 2003, c. 7)

颁布于 2003-05-13 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

关于这部法律

语言
English; French
类型
法令
组织
European Union
国家
加拿大 · Yukon
主题
Environment, Water
关键词
pollution control, environmental impact assessment (EIA), environmental security, Indigenous Peoples, institution, traditional knowledge/indigenous knowledge, monitoring, environmental audit, ecofriendly products/ecofriendly processes, access-to-justice, basic legislation, social impact assessment, governance, water abstraction

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. Current to November 9, 2016 Last amended on June 18, 2015 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Published by the Minister of Justice at the following address: http://laws-lois.justice.gc.ca Publié par le ministre de la Justice à l’adresse suivante : http://lois-laws.justice.gc.ca CANADA CONSOLIDATION Yukon Environmental and Socio-economic Assessment Act CODIFICATION Loi sur l’évaluation environnementale et socioéconomique au Yukon S.C. 2003, c. 7 L.C. 2003, ch. 7 Current to November 9, 2016 Last amended on June 18, 2015 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 OFFICIAL STATUS OF CONSOLIDATIONS CARACTÈRE OFFICIEL DES CODIFICATIONS Subsections 31(1) and (2) of the Legislation Revision and Consolidation Act, in force on June 1, 2009, provide as follows: Les paragraphes 31(1) et (2) de la Loi sur la révision et la codification des textes législatifs, en vigueur le 1er juin 2009, prévoient ce qui suit : Published consolidation is evidence Codifications comme élément de preuve 31 (1) Every copy of a consolidated statute or consolidated regulation published by the Minister under this Act in either print or electronic form is evidence of that statute or regula tion and of its contents and every copy purporting to be pub lished by the Minister is deemed to be so published, unless the contrary is shown. 31 (1) Tout exemplaire d'une loi codifiée ou d'un règlement codifié, publié par le ministre en vertu de la présente loi sur support papier ou sur support électronique, fait foi de cette loi ou de ce règlement et de son contenu. Tout exemplaire donné comme publié par le ministre est réputé avoir été ainsi publié, sauf preuve contraire. Inconsistencies in Acts Incompatibilité — lois (2) In the event of an inconsistency between a consolidated statute published by the Minister under this Act and the origi nal statute or a subsequent amendment as certified by the Clerk of the Parliaments under the Publication of Statutes Act, the original statute or amendment prevails to the extent of the inconsistency. (2) Les dispositions de la loi d'origine avec ses modifications subséquentes par le greffier des Parlements en vertu de la Loi sur la publication des lois l'emportent sur les dispositions in compatibles de la loi codifiée publiée par le ministre en vertu de la présente loi. NOTE NOTE This consolidation is current to November 9, 2016. The last amendments came into force on June 18, 2015. Any amendments that were not in force as of November 9, 2016 are set out at the end of this document under the heading “Amendments Not in Force”. Cette codification est à jour au 9 novembre 2016. Les dernières modifications sont entrées en vigueur le 18 juin 2015. Toutes modifications qui n'étaient pas en vigueur au 9 novembre 2016 sont énoncées à la fin de ce document sous le titre « Modifications non en vigueur ». Current to November 9, 2016 Last amended on June 18, 2015 iii À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 TABLE OF PROVISIONS TABLE ANALYTIQUE An Act to establish a process for assessing the environmental and socio-economic effects of certain activities in Yukon Loi instaurant un processus d’évaluation des effets de certaines activités sur l’environnement et la vie socioéconomique au Yukon Short Title Titre abrégé 1 Short title 1 Titre abrégé Interpretation Définitions et dispositions d’interprétation 2 Definitions 2 Définitions 3 Consultation 3 Consultation 4 Final agreement prevails 4 Préséance des accords définitifs General Dispositions générales 5 Effect of Act 5 Mise en oeuvre de l’accord-cadre 6 Non-application 6 Non-application 6.1 Delegation to territorial Minister 6.1 Délégation au ministre territorial 7 Delegation by territorial minister 7 Délégation PART 1 Yukon Environmental and Socio economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Yukon Environmental and Socio-economic Assessment Board Office d’évaluation environnementale et socioéconomique du Yukon 8 Board established 8 Constitution 9 Residence of Chairperson 9 Résidence du président 10 Term of office 10 Mandat 11 Tenure 11 Occupation du poste 12 Reappointment 12 Renouvellement 13 Conflict of interest 13 Conflit d’intérêts 14 Remuneration 14 Rémunération 15 Quorum 15 Quorum 16 Property and contracts 16 Biens et contrats 17 Staff and advisers 17 Personnel, mandataires, etc. 18 Indemnification 18 Indemnisation 19 Main office 19 Siège Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon TABLE OF PROVISIONS TABLE ANALYTIQUE Current to November 9, 2016 Last amended on June 18, 2015 iv À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Assessment Districts and Designated Offices Circonscriptions et bureaux désignés 20 Assessment districts 20 Mise en place 21 Alteration of boundaries 21 Modification des limites 22 Designated offices in named communities 22 Bureaux désignés : localité 23 Staff 23 Personnel 24 Conflict of interest 24 Conflit d’intérêts 25 Contracts and facilities 25 Obligations de l’Office Budgets and Reporting Budgets et rapports 26 Budgets of designated offices 26 Bureaux désignés 27 Budget of Board 27 Office 28 Accounts 28 Comptabilité 29 Annual report 29 Rapport annuel Rules and By-Laws Règles et règlements administratifs 30 Rules for executive committee and panels 30 Règles : comité de direction et comités restreints 31 Rules for designated offices 31 Règles : bureaux désignés 32 Standard mitigative measures 32 Règles particulières 33 General rules re information 33 Règles : informations et connaissances traditionnelles 34 Publication of proposed rules 34 Publication des projets de règles 35 By-laws of Board 35 Règlements administratifs : Office 36 By-laws for designated offices 36 Règlements administratifs : bureaux désignés 37 Standard mitigation measures 37 Mesures d’atténuation types 38 Statutory Instruments Act 38 Loi sur les textes réglementaires General Requirement Obligation générale 39 Scientific and traditional knowledge 39 Connaissances traditionnelles et autres PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Assessments — General Dispositions générales sur le processus 40 Non-duplication and certainty 40 Fiabilité 41 Timeliness of assessments 41 Célérité 42 Matters to be considered 42 Prise en compte de certains points 43 Requiring additional information 43 Renseignements supplémentaires 44 Regional land use plans 44 Plan d’aménagement régional 45 Pending land use plan 45 Plan d’aménagement en cours d’établissement 46 Participation by interested persons 46 Participation des intéressés Time Limits Délais 46.1 Authority and validity 46.1 Mandat et validité des actes Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon TABLE OF PROVISIONS TABLE ANALYTIQUE Current to November 9, 2016 Last amended on June 18, 2015 v À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Proposed Activities Subject to Assessment Activités visées 47 Regulations identifying activities 47 Pouvoir réglementaire 48 Declarations 48 Déclaration 49 Emergencies exempted 49 Activités soustraites à l’évaluation 49.1 No significant change 49.1 Absence de changements importants Proposals for Projects Saisine 50 Submission of proposals 50 Propositions 51 Determination of scope 51 Portée de l’évaluation 52 Grouping of related projects 52 Projets de développement liés 53 Evaluations by multiple designated offices 53 Pluralité de bureaux désignés 54 Withdrawal of project 54 Projet de développement abandonné Evaluation of Projects by Designated Offices Examen par le bureau désigné 55 Preliminary determinations 55 Détermination par le bureau désigné 56 Conclusion of evaluation 56 Décision Screening of Projects by Executive Committee Avis et préétude par le comité de direction 57 Preliminary determination 57 Détermination par le comité de direction 58 Conclusion of screening 58 Décision 59 Recommendation for non-referral rejected 59 Cas particulier : rejet d’une recommandation Request for Review Demande d’étude 60 Review of project 60 Demandeurs Powers of Minister of Environment Pouvoirs du ministre de l’Environnement 61 Requirement or request for review 61 Projets relevant d’un décisionnaire fédéral 62 Response to request 62 Acquiescement à la demande Panels of the Board Comité restreint 65 Establishment of panel 65 Établissement 66 Terms of reference 66 Mandat 66.1 Time limit 66.1 Délai 66.2 Agreement — coordination 66.2 Accord : coordination Agreements for Joint Panels Comité mixte 67 Conclusion of agreement with Minister of Environment 67 Conclusion d’un accord : ministre de l’Environnement 68 Preliminary determination 68 Vérification par le comité de direction 69 Equivalence of joint panel review 69 Évaluation par le comité mixte Reviews of Projects by Panels Étude du projet de développement 70 Conduct of panel review 70 Pouvoirs du comité restreint ou mixte 71 Judicial powers of panels 71 Attributions d’une cour supérieure 72 Commencement of panel review 72 Étude par le comité restreint ou mixte Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon TABLE OF PROVISIONS TABLE ANALYTIQUE Current to November 9, 2016 Last amended on June 18, 2015 vi À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Consideration of Recommendations and Issuance of Decision Documents Examen des recommandations et prise des décisions écrites 74 Consideration of accompanying information 74 Connaissances traditionnelles et autres 75 Decision on recommendation from designated office or joint panel 75 Recommandation du bureau désigné ou du comité mixte 76 Decision on recommendation from executive committee or panel of Board 76 Recommandation du comité de direction ou du comité restreint 77 Reconsideration on referral back 77 Réexamen 78 Consultation between decision bodies 78 Consultations entre décisionnaires 79 Mining interest on settlement lands 79 Droit d’exploitation de minéraux 80 Decision body’s reasons 80 Motifs 81 Distribution of decision documents 81 Copie des décisions écrites Implementation of Decision Documents Mise en oeuvre des décisions écrites 82 Federal agencies 82 Autorité fédérale 83 Territorial agencies and municipal governments 83 Autorité territoriale et municipalité 84 First nations 84 Première nation 85 Interpretation 85 Exception 86 Water licences 86 Droits relatifs aux eaux 87 Federal independent regulatory agencies 87 Organismes administratifs autonomes fédéraux 88 Territorial independent regulatory agencies 88 Organismes administratifs autonomes territoriaux 88.1 For greater certainty 88.1 Précision 89 Notice of actions taken following decision 89 Notification Projects on Yukon North Slope Versant nord du Yukon 90 Definitions 90 Définitions 91 Examination by Screening Committee or Review Board 91 Communication d’information à l’Office et au bureau désigné Collaboration and External Activities Coopération 92 Collaboration on projects 92 Collaboration avec d’autres autorités 93 External activities affecting Yukon 93 Activités à l’extérieur du Yukon Cost Recovery Recouvrement des coûts 93.1 Proponent’s obligation to pay costs 93.1 Obligation du promoteur Existing Projects Ouvrages 94 Definition of administrative authority 94 Définition de entité administrative 95 Request for panel review 95 Demande d’étude 96 Designation of members 96 Membres de l’Office 97 Terms of reference 97 Mandat 98 Commencement of review 98 Étude 99 Judicial powers of panels 99 Attributions d’une cour supérieure 100 Preliminary determination 100 Vérification de l’emplacement 101 Recommendations of panel 101 Rapport du comité restreint Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon TABLE OF PROVISIONS TABLE ANALYTIQUE Current to November 9, 2016 Last amended on June 18, 2015 vii À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Plans Plans 102 Definition of originator 102 Définition de concepteur 103 Request for panel review 103 Demande d’étude 104 Criteria for review 104 Facteurs à prendre en compte 105 Review of plans specified in regulations 105 Plan de catégorie réglementaire 106 Publication of notice 106 Publication 107 Designation of members 107 Membres de l’Office 108 Commencement of review 108 Commencement de l’étude 109 Recommendations of panel 109 Recommandations Audits and Effects Monitoring Mesures de contrôle et de vérification 110 Recommendation for audit or monitoring of project 110 Recommandations : projet de développement 111 Request for audit or monitoring of existing project 111 Demande Studies and Research Études et recherches 112 Request for studies or research 112 Demande d’études ou de recherches 113 Report of executive committee 113 Rapport du comité de direction Violation of Decision Document Violation des prescriptions des décisions écrites 114 Recommendation by Board to decision body 114 Recommandation en cas de violation Court Jurisdiction Compétence judiciaire 115 Court reference by Board 115 Renvoi de questions par l’Office 116 Application for judicial review 116 Demande de contrôle judiciaire Maintenance of Records and Public Access Dossiers et accès à l’information 117 Records of Board and designated offices 117 Documents conservés par l’Office et les bureaux désignés 118 Records of Board 118 Documents conservés par l’Office 119 Records of designated office 119 Documents conservés par les bureaux désignés 120 Public access 120 Consultation 121 Information held in confidence 121 Refus de communication Policy Directions Instructions générales 121.1 Minister’s policy directions 121.1 Instructions ministérielles Regulations and Orders Règlements et décrets 122 Regulations of Governor in Council 122 Pouvoir du gouverneur en conseil 122.1 Power of Governor in Council 122.1 Pouvoir du gouverneur en conseil 123 Amendment of schedule 123 Modification de l’annexe Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon TABLE OF PROVISIONS TABLE ANALYTIQUE Current to November 9, 2016 Last amended on June 18, 2015 viii À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 PART 3 Transitional Provisions, Consequential and Coordinating Amendments and Commencement PARTIE 3 Dispositions transitoires, modifications connexes, dispositions de coordination et entrée en vigueur Transitional Provisions Dispositions transitoires 124 Application of EARP Guidelines Order 124 Maintien de l’application du décret 125 Application of Canadian Environmental Assessment Act 125 Loi canadienne sur l’évaluation environnementale 126 Pending applications to territorial agencies and first nations 126 Demandes adressées aux autorités territoriales ou aux premières nations Consequential Amendments Modifications connexes Access to Information Act Loi sur l’accès à l’information Privacy Act Loi sur la protection des renseignements personnels Yukon First Nations Self-Government Act Loi sur l’autonomie gouvernementale des premières nations du Yukon Yukon Surface Rights Board Act Loi sur l’Office des droits de surface du Yukon Coordinating Amendments Dispositions de coordination Coming Into Force Entrée en vigueur *134 Order of Governor in Council *134 Décret SCHEDULE ANNEXE Current to November 9, 2016 Last amended on June 18, 2015 1 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 S.C. 2003, c. 7 L.C. 2003, ch. 7 An Act to establish a process for assessing the environmental and socio-economic effects of certain activities in Yukon Loi instaurant un processus d’évaluation des effets de certaines activités sur l’environnement et la vie socioéconomique au Yukon [Assented to 13th May 2003] [Sanctionnée le 13 mai 2003] Her Majesty, by and with the advice and consent of the Senate and House of Commons of Canada, en acts as follows: Sa Majesté, sur l’avis et avec le consentement du Sé nat et de la Chambre des communes du Canada, édicte : Short Title Titre abrégé Short title Titre abrégé 1 This Act may be cited as the Yukon Environmental and Socio-economic Assessment Act. 1 Loi sur l’évaluation environnementale et socioécono mique au Yukon. Interpretation Définitions et dispositions d’interprétation Definitions Définitions 2 (1) The following definitions apply in this Act. assessment means an evaluation by a designated office, a screening by the executive committee or a review by a panel of the Board. (évaluation) authorization means a licence, permit or other form of approval that is issued or given by (a) the Governor in Council, a government agency, an independent regulatory agency or a municipal govern ment, or (b) a first nation under its final agreement or a first nation law, but does not include an access order issued under the Yukon Surface Rights Board Act or a consent given by a 2 (1) Les définitions qui suivent s’appliquent à la pré sente loi. accord-cadre S’entend au sens de la Loi sur le règle ment des revendications territoriales des premières na tions du Yukon. (Umbrella Final Agreement) accord définitif S’entend au sens de la Loi sur le règle ment des revendications territoriales des premières na tions du Yukon. Est aussi visé l’accord figurant à l’an nexe C de l’accord gwich’in. (final agreement) accord gwich’in L’Entente sur la revendication territo riale globale des Gwich’in, conclue entre Sa Majesté la Reine du chef du Canada et ces derniers — représentés par le Conseil tribal des Gwich’in — , signée le 22 avril 1992 et approuvée, mise en vigueur et déclarée valide par la Loi sur le règlement de la revendication territoriale Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon Interpretation Définitions et dispositions d’interprétation Section 2 Article 2 Current to November 9, 2016 Last amended on June 18, 2015 2 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 first nation for access to settlement land in circumstances where an access order could be issued under that Act. (autorisation) Board means the Yukon Environmental and Socio-eco nomic Assessment Board established by section 8. (Of fice) category B settlement land means land that is, or is to be treated as, category B settlement land, as referred to in the definition settlement land. (terres désignées de catégorie B) Council means the Council for Yukon Indians or any successor to it or, in the absence of a successor, the first nations named in the schedule to the Yukon First Na tions Land Claims Settlement Act. (Conseil) decision body, in relation to a project, means (a) a first nation, if the project is to be located wholly or partly on its settlement land and (i) the first nation has the power under the Yukon First Nations Self-Government Act or under its fi nal agreement to issue an authorization that is re quired for the project to be undertaken, (ii) the first nation is a proponent of the project, has the power to grant an interest in land that is re quired for the project to be undertaken or has re ceived an application for financial assistance for the project, or (iii) no decision document is required for the project from any federal agency or the territorial minister; (b) the territorial minister, if any territorial agency, municipal government or territorial independent reg ulatory agency (i) has the power to issue an authorization that is required for the project to be undertaken, (ii) in the case of a project to be located wholly or partly on non-settlement land, is a proponent of the project, has the power to grant an interest in land that is required for the project to be undertaken or has received an application for financial assistance for the project, or (iii) is responsible for the administration of mines and minerals in category B or fee simple settlement land or Tetlit Gwich’in Yukon land, where the project involves a right to work those mines and minerals; des Gwich’in, ainsi que les modifications qui peuvent lui être apportées conformément à ses dispositions. (Gwich’in Agreement) accord sur l’autonomie gouvernementale Accord au sens de la Loi sur l’autonomie gouvernementale des pre mières nations du Yukon. (self-government agree ment) aide financière Versement, prêt ou garantie d’emprunt. Sont cependant exclus : a) tout allégement — notamment la réduction, le re port, le remboursement ou la remise — d’une taxe, d’un impôt ou de droits, à moins qu’il ne soit accordé par un texte législatif en vue de permettre l’exercice d’activités qui y sont nommément spécifiées; b) l’aide financière accordée pour des études de faisa bilité ou autres activités de nature préliminaire n’ayant aucun effet sur l’environnement; c) l’aide financière accordée pour des études environ nementales ou socioéconomiques qui portent sur l’é valuation d’un projet, mais qui ne constituent pas en soi un projet. (financial assistance) autorisation Toute forme d’autorisation — notamment un permis — délivrée ou accordée soit par le gouverneur en conseil, une autorité publique, un organisme adminis tratif autonome ou une municipalité, soit par une pre mière nation en vertu d’un accord définitif ou de ses textes législatifs. Sont exclues les ordonnances d’accès rendues sous le régime de la Loi sur l’Office des droits de surface du Yukon ainsi que l’autorisation accordée, en ce qui touche l’accès à des terres désignées, par une pre mière nation dans les circonstances où une telle ordon nance pourrait être rendue. (authorization) autorité fédérale Ministre du gouvernement fédéral ainsi que toute personne ou tout organisme remplissant des fonctions administratives sous le régime d’une loi fé dérale, exception faite de la Loi sur le Yukon, de la Loi sur le règlement des revendications territoriales des premières nations du Yukon et de la Loi sur l’autonomie gouvernementale des premières nations du Yukon. Sont exclus le gouverneur en conseil, les organismes adminis tratifs autonomes et l’Office des droits de surface du Yu kon. (federal agency) autorité publique Autorité fédérale ou territoriale. (government agency) autorité territoriale Membre du Conseil exécutif du Yu kon, ainsi que toute personne ou tout organisme remplis sant des fonctions administratives sous le régime de la Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon Interpretation Définitions et dispositions d’interprétation Section 2 Article 2 Current to November 9, 2016 Last amended on June 18, 2015 3 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (c) any federal agency that (i) has the power to issue an authorization that is required for the project to be undertaken, (ii) in the case of a project to be located wholly or partly on non-settlement land, is a proponent of the project, has the power to grant an interest in land that is required for the project to be undertaken or has received an application for financial assistance for the project, or (iii) is responsible for the administration of mines and minerals in category B or fee simple settlement land or Tetlit Gwich’in Yukon land, where the project involves a right to work those mines and minerals; (d) the federal minister, if the project is to be located wholly or partly on non-settlement land, no other fed eral agency is a decision body under paragraph (c) and (i) the territorial minister is not a decision body, or (ii) the territorial minister is a decision body and (A) the Governor in Council has the power to is sue an authorization that is required for the project to be undertaken, or (B) a federal independent regulatory agency is a proponent of the project, has the power to issue such an authorization or has received an applica tion for financial assistance for the project; or (e) the federal minister, if the project is to be located wholly on settlement land and (i) the Governor in Council or a federal indepen dent regulatory agency has the power to issue an authorization that is required for the project to be undertaken, or (ii) a federal independent regulatory agency has re ceived an application for financial assistance for the project. (décisionnaire) decision document means a decision document issued by a decision body under section 75, 76 or 77. (décision écrite) designated office means an office maintained under subsection 22(1). (bureau désigné) effects monitoring means the monitoring of environ mental and socio-economic effects, or of the effectiveness of mitigative measures. (mesures de contrôle) Loi sur le Yukon. Sont exclus les organismes administra tifs autonomes et les municipalités. (territorial agency) bureau désigné Bureau visé au paragraphe 22(1). (des ignated office) comité de direction L’organe dirigeant de l’Office, dont la composition est prévue à l’article 8. (executive com mittee) comité mixte Comité établi par un accord conclu au titre de l’article 67. (joint panel) comité restreint Comité établi en application du para graphe 65(1), de l’alinéa 93(1)a) ou des para graphes 95(1), 103(1) ou 105(1). (panel of the Board) connaissances traditionnelles L’ensemble des connais sances — qu’elles résultent d’observations ou d’une sensi bilité particulière, entre autres — faisant partie inté grante du mode de vie traditionnel des premières nations et portant soit sur l’environnement, soit sur les relations des êtres vivants entre eux, soit encore sur les relations entre ces derniers et l’environnement. (traditional knowledge) Conseil Le Conseil des Indiens du Yukon. Y est assimilé tout organisme lui succédant ou, à défaut, l’ensemble des premières nations dont le nom figure à l’annexe de la Loi sur le règlement des revendications territoriales des premières nations du Yukon. (Council) décision écrite Décision prise par un décisionnaire aux termes des articles 75, 76 ou 77. (decision document) décisionnaire S’entend, relativement à un projet de dé veloppement : a) de toute première nation, dans le cas où il est pro posé de réaliser tout ou partie du projet sur ses terres désignées et où : (i) soit elle peut délivrer, en vertu de la Loi sur l’au tonomie gouvernementale des premières nations du Yukon ou de son accord définitif, une autorisa tion nécessaire à la réalisation du projet, (ii) soit elle est promoteur du projet, elle peut ac corder des droits fonciers nécessaires à sa réalisa tion ou elle a reçu une demande d’aide financière à cette fin, (iii) soit aucune décision écrite n’est requise de la part d’une autorité fédérale ou du ministre territo rial; Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon Interpretation Définitions et dispositions d’interprétation Section 2 Article 2 Current to November 9, 2016 Last amended on June 18, 2015 4 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 environment means the components of the Earth and includes (a) air, land and water; (b) all layers of the atmosphere; (c) all organic and inorganic matter and living organ isms; and (d) the interacting natural systems that include the components referred to in paragraphs (a) to (c). (en vironnement) executive committee means the executive committee of the Board established by section 8. (comité de direc tion) existing project means an activity that has been under taken or completed and that, if proposed to be undertak en, would be subject to assessment under section 47. (ouvrage) federal agency means a minister of the federal govern ment or a person or body carrying out a function of gov ernment under a federal law other than the Yukon Act, the Yukon First Nations Self-Government Act or the Yukon First Nations Land Claims Settlement Act, but does not include the Governor in Council, an indepen dent regulatory agency or the Yukon Surface Rights Board. (autorité fédérale) federal decision body, in relation to a project, means a decision body referred to in any of paragraphs (c) to (e) of the definition decision body. (décisionnaire fédéral) federal independent regulatory agency means any body named in Part 1 of the schedule. (organisme ad ministratif autonome fédéral) federal minister means the Minister of Indian Affairs and Northern Development, unless another member of the Queen’s Privy Council for Canada is designated by the Governor in Council as the federal minister for the purposes of this Act. (ministre fédéral) fee simple settlement land means land that is, or is to be treated as, fee simple settlement land, as referred to in the definition settlement land. (terres désignées en fief simple) final agreement means a final agreement within the meaning of the Yukon First Nations Land Claims Settle ment Act or the agreement contained in Appendix C to the Gwich’in Agreement. (accord définitif) b) du ministre territorial, dans le cas où une autorité territoriale, un organisme administratif autonome ter ritorial ou une municipalité : (i) soit peut délivrer une autorisation nécessaire à la réalisation du projet, (ii) soit, dans le cas où il est proposé de réaliser tout ou partie du projet sur des terres non dési gnées, en est le promoteur, peut accorder des droits fonciers nécessaires à sa réalisation ou a reçu une demande d’aide financière à cette fin, (iii) soit, dans le cas d’un projet qui entraîne l’exer cice d’un droit d’exploitation de mines et minéraux sur des terres désignées de catégorie B ou en fief simple ou sur des terres gwich’in tetlit, est chargé de la gestion de ces mines et minéraux; c) de l’autorité fédérale qui : (i) soit peut délivrer une autorisation nécessaire à la réalisation du projet, (ii) soit, dans le cas où il est proposé de réaliser tout ou partie du projet sur des terres non dési gnées, en est le promoteur, peut accorder des droits fonciers nécessaires à sa réalisation ou a reçu une demande d’aide financière à cette fin, (iii) soit, dans le cas d’un projet qui entraîne l’exer cice d’un droit d’exploitation de mines et minéraux sur des terres désignées de catégorie B ou en fief simple ou sur des terres gwich’in tetlit, est chargée de la gestion de ces mines et minéraux; d) du ministre fédéral, dans le cas où, d’une part, il est proposé de réaliser tout ou partie du projet sur des terres non désignées sans qu’une autre autorité fédé rale soit décisionnaire et, d’autre part, l’une des condi tions suivantes est remplie : (i) le ministre territorial n’est pas décisionnaire, (ii) le ministre territorial est décisionnaire et soit l’autorisation du gouverneur en conseil ou d’un or ganisme administratif autonome fédéral est néces saire à la réalisation du projet, soit un tel organisme en est le promoteur ou a reçu une demande d’aide financière à cette fin; e) du ministre fédéral, dans le cas où le projet doit être réalisé en totalité sur des terres désignées et soit l’autorisation du gouverneur en conseil ou d’un orga nisme administratif autonome fédéral est nécessaire à sa réalisation, soit un tel organisme a reçu une de mande d’aide financière à cette fin. (decision body) Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon Interpretation Définitions et dispositions d’interprétation Section 2 Article 2 Current to November 9, 2016 Last amended on June 18, 2015 5 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 financial assistance means a payment, loan or loan guarantee, but does not include (a) a refund, remission, reduction or deferral, or any other form of relief from the payment, of a tax, duty or fee, other than relief provided by law to permit the un dertaking of an activity specifically named in the law; (b) assistance for anything done preliminary to a project, such as a feasibility study, that does not have effects on the environment; or (c) assistance for an environmental or socio-economic study undertaken in relation to the assessment of a project, except a study that itself comprises a project. (aide financière) first nation means a Yukon First Nation, within the meaning of the Umbrella Final Agreement, and includes the Gwich’in Tribal Council, in relation to consultation, or the Tetlit Gwich’in, in relation to any other matter. (première nation) first nation law means a law enacted by a first nation in accordance with the Yukon First Nations Self-Govern ment Act or the first nation’s final agreement. (texte lé gislatif d’une première nation) government agency means a federal agency or a terri torial agency. (autorité publique) Gwich’in Agreement means the Comprehensive Land Claim Agreement between Her Majesty the Queen in right of Canada and the Gwich’in as represented by the Gwich’in Tribal Council, signed on April 22, 1992 and ap proved, given effect and declared valid by the Gwich’in Land Claim Settlement Act, as that Agreement is amend ed from time to time in accordance with its provisions. (accord gwich’in) heritage resource means (a) a moveable work or assembly of works of people or of nature, other than a record only, that is of scientific or cultural value for its archaeological, palaeontologi cal, ethnological, prehistoric, historic or aesthetic fea tures; (b) a record, regardless of its physical form or charac teristics, that is of scientific or cultural value for its ar chaeological, palaeontological, ethnological, prehis toric, historic or aesthetic features; or (c) an area of land that contains a work or assembly of works referred to in paragraph (a) or an area that is of aesthetic or cultural value, including a human burial décisionnaire fédéral Décisionnaire visé à l’un ou l’autre des alinéas c) à e) de la définition de ce terme. (federal decision body) effets sur la vie socioéconomiqueeffets sur la vie so cioéconomique Sont notamment visés les effets sur l’é conomie, la santé, la culture, les traditions, le mode de vie et les ressources patrimoniales. (socio-economic ef fects) environnement Ensemble des conditions et des élé ments naturels de la Terre, notamment : a) le sol, l’eau et l’air; b) toutes les couches de l’atmosphère; c) toutes les matières organiques et inorganiques ain si que les êtres vivants; d) les systèmes naturels en interaction qui com prennent les éléments visés aux alinéas a) à c). (envi ronment) évaluation Examen effectué par un bureau désigné, pré étude effectuée par le comité de direction et étude effec tuée par un comité restreint. (assessment) Gwich’in Tetlit S’entend au sens de l’annexe C de l’ac cord gwich’in. (Tetlit Gwich’in) Indien du Yukon Outre les Gwich’in Tetlit, toute per sonne inscrite comme telle en application d’un accord dé finitif autre que l’accord gwich’in. (Yukon Indian per son) intéressé Toute personne ou tout organisme qui, à l’é gard du résultat de l’évaluation, a un intérêt qui ne soit ni futile ni vexatoire, en particulier : a) en ce qui touche les projets de développement sus ceptibles d’avoir des répercussions sur la gestion et la conservation des ressources halieutiques ou fauniques ou de leur habitat, la Commission de gestion des res sources halieutiques et fauniques constituée par l’ac cord-cadre; b) en ce qui touche les projets de développement sus ceptibles d’avoir des répercussions sur la gestion et la conservation des ressources en saumon ou de leur ha bitat, le Sous-comité du saumon de cette commission; c) en ce qui touche les projets de développement sus ceptibles d’avoir des répercussions sur la gestion et la Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon Interpretation Définitions et dispositions d’interprétation Section 2 Article 2 Current to November 9, 2016 Last amended on June 18, 2015 6 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 site outside a recognized cemetery. (ressources patrimoniales) independent regulatory agency means any body named in the schedule. (organisme administratif auto nome) interested person means any person or body having an interest in the outcome of an assessment, for a purpose that is not frivolous or vexatious, and includes (a) the Fish and Wildlife Management Board estab lished under the Umbrella Final Agreement, in rela tion to a project that is likely to affect the management and conservation of fish or wildlife or their habitat; (b) the salmon subcommittee of the Fish and Wildlife Management Board, in relation to a project that is likely to affect the management and conservation of salmon or their habitat; and (c) a renewable resource council established under a first nation’s final agreement, in relation to a project that is likely to affect the management and conserva tion of fish or wildlife or their habitat within the tradi tional territory of that first nation. (intéressé) joint panel means a joint panel established by an agree ment under section 67. (comité mixte) mitigative measures means measures for the elimina tion, reduction or control of adverse environmental or socio-economic effects. (mesures d’atténuation) non-settlement land means (a) land other than settlement land; (b) water lying on or flowing through land, including settlement land; or (c) mines and minerals, other than specified sub stances, in category B or fee simple settlement land or Tetlit Gwich’in Yukon land. (terres non désignées) panel of the Board means a panel established under subsection 65(1), paragraph 93(1)(a) or subsection 95(1), 103(1) or 105(1). (comité restreint) plan means any plan, program, policy or proposal that is not a project or existing project. (plan) project means an activity that is subject to assessment under section 47 or 48 and is not exempt from assess ment under section 49. (projet de développement) conservation, dans le territoire traditionnel d’une pre mière nation, des ressources halieutiques ou fau niques ou de leur habitat, le conseil des ressources re nouvelables constitué par l’accord définitif applicable. (interested person) mesures d’atténuation Mesures visant la limitation, la réduction ou l’élimination des effets négatifs sur l’envi ronnement ou la vie socioéconomique. (mitigative mea sures) mesures de contrôle Mesures prises en vue d’effectuer un contrôle soit des effets sur l’environnement ou la vie socioéconomique, soit de l’efficacité des mesures d’atté nuation. (effects monitoring) ministre fédéral Soit le ministre des Affaires indiennes et du Nord canadien, soit tout autre membre du Conseil privé de la Reine pour le Canada chargé par le gouver neur en conseil de l’application de la présente loi. (feder al minister) ministre territorial Le membre du Conseil exécutif du Yukon que désigne le commissaire du Yukon — avec l’a grément de ce conseil — pour l’application de la présente loi. (territorial minister) Office L’Office d’évaluation environnementale et socioé conomique du Yukon constitué par l’article 8. (Board) organisme administratif autonome Organisme men tionné à l’annexe. (independent regulatory agency) organisme administratif autonome fédéral Orga nisme mentionné à la partie 1 de l’annexe. (federal in dependent regulatory agency) organisme administratif autonome territorial Orga nisme mentionné à la partie 2 de l’annexe. (territorial in dependent regulatory agency) ouvrage Activité en cours ou dont l’exercice est terminé et qui, si elle était à l’étape de projet, serait assujettie à l’évaluation aux termes de l’article 47. (existing project) plan Plan, programme, orientation ou proposition, qui ne constitue pas un projet de développement ou un ou vrage. (plan) première nation Première nation du Yukon au sens de l’accord-cadre. Sont aussi visés le Conseil tribal des Gwi ch’in, dans le cas des consultations à effectuer au titre de la présente loi, ou les Gwich’in Tetlit, dans les autres cas. (first nation) Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon Interpretation Définitions et dispositions d’interprétation Section 2 Article 2 Current to November 9, 2016 Last amended on June 18, 2015 7 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 proponent, in relation to a project or other activity, means a person or body that proposes to undertake it, or a government agency, independent regulatory agency, municipal government or first nation that proposes to re quire — under a federal or territorial law, a municipal by law or a first nation law — that it be undertaken. (pro moteur) self-government agreement has the same meaning as in the Yukon First Nations Self-Government Act. (ac cord sur l’autonomie gouvernementale) settlement land means land that is category A settle ment land, category B settlement land or fee simple set tlement land under a final agreement or under section 63 of the Yukon Surface Rights Board Act, or land that is to be treated as such by virtue of a self-government agree ment, and includes Tetlit Gwich’in Yukon land, but does not include water or mines and minerals defined to be non-settlement land. (terres désignées) socio-economic effects includes effects on economies, health, culture, traditions, lifestyles and heritage re sources. (effets sur la vie socioéconomique) territorial agency means a member of the Executive Council of Yukon or a person or body carrying out a func tion of government under the Yukon Act, but does not in clude an independent regulatory agency or a municipal government. (autorité territoriale) territorial independent regulatory agency means any body named in Part 2 of the schedule. (organisme ad ministratif autonome territorial) territorial minister means the member of the Executive Council of Yukon designated as the territorial minister for the purposes of this Act by the Commissioner of Yukon acting with the consent of the Executive Council of Yukon. (ministre territorial) territory means (a) in relation to a first nation for which a final agree ment is in effect, that first nation’s traditional territory and any of its settlement lands within Yukon that are not part of that traditional territory; (b) in relation to the first nation known as the Tetlit Gwich’in, the areas described in Annex A of Ap pendix C to the Gwich’in Agreement; and (c) in relation to any other first nation, the geographic area within Yukon identified on the map provided by that first nation under the Umbrella Final Agreement projet de développement Activité qui est assujettie à l’évaluation aux termes des articles 47 et 48 et qui n’y est pas soustraite aux termes de l’article 49. (project) promoteur Quiconque — particulier ou organisme — propose la réalisation d’un projet de développement ou l’exercice de toute autre activité. Y sont assimilés l’autori té publique, l’organisme administratif autonome ou la municipalité qui se propose, en vertu d’un texte législatif fédéral ou territorial ou d’un règlement municipal, d’or donner la réalisation d’un projet de développement ou l’exercice d’une activité ainsi que la première nation qui se propose de le faire en vertu de ses textes législatifs. (proponent) ressources patrimoniales a) Les objets d’origine humaine ou naturelle — autres que les documents — ayant une valeur scientifique ou culturelle du fait de leurs caractéristiques archéolo giques, paléontologiques, ethnologiques, préhisto riques, historiques ou esthétiques, ainsi que les assem blages de tels objets; b) les documents, quels qu’en soient la forme et le support, ayant une telle valeur; c) les lieux où se trouvent les objets ou assemblages mentionnés à l’alinéa a) et ceux — notamment les lieux de sépulture situés à l’extérieur des cimetières reconnus — ayant une valeur particulière sur le plan esthétique ou culturel. (heritage resource) terres désignées Les terres gwich’in tetlit ainsi que les terres qui, aux termes d’un accord définitif ou de l’ar ticle 63 de la Loi sur l’Office des droits de surface du Yu kon, sont soit affectées aux catégories A ou B, soit déte nues en fief simple, ou qui sont tenues pour telles aux termes d’un accord sur l’autonomie gouvernementale. Sont exclus les étendues d’eau ainsi que les mines et les minéraux visés par la définition de terres non dési gnées. (settlement land) terres désignées de catégorie B Terres affectées à cette catégorie ou tenues pour telles de la façon mention née à la définition de terres désignées. (category B settlement land) terres désignées en fief simple Terres ainsi détenues ou tenues pour telles de la façon mentionnée à la défini tion de terres désignées. (fee simple settlement land) terres gwich’in tetlit Terres décrites à la sous-annexe B de l’annexe C de l’accord gwich’in. (Tetlit Gwich’in Yukon land) Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon Interpretation Définitions et dispositions d’interprétation Sections 2-3 Articles 2-3 Current to November 9, 2016 Last amended on June 18, 2015 8 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 for the purpose of delineating the first nation’s traditional territory. (territoire) Tetlit Gwich’in means the Tetlit Gwich’in as defined in Appendix C to the Gwich’in Agreement. (Gwich’in Tet lit) Tetlit Gwich’in Yukon land means land described in Annex B of Appendix C to the Gwich’in Agreement. (terres gwich’in tetlit) traditional knowledge means the accumulated body of knowledge, observations and understandings about the environment, and about the relationship of living beings with one another and the environment, that is rooted in the traditional way of life of first nations. (connais sances traditionnelles) Umbrella Final Agreement has the same meaning as in the Yukon First Nations Land Claims Settlement Act. (accord-cadre) Yukon [Repealed, 2003, c. 7, s. 133] Yukon Indian person means a person enrolled under a final agreement — other than the Gwich’in Agreement — or a person who is a Tetlit Gwich’in. (Indien du Yukon) terres non désignées Outre les terres qui ne sont pas visées par la définition de terres désignées, les étendues d’eau qui se trouvent soit sur celles-ci, soit sur des terres désignées, ou qui les traversent, de même que les mines et les minéraux — à l’exclusion des matières spécifiées — des terres désignées de catégorie B ou en fief simple ou des terres gwich’in tetlit. (non-settlement land) territoire a) En ce qui touche les premières nations qui sont parties à un accord définitif en vigueur, leur territoire traditionnel ainsi que leurs terres désignées situées à l’extérieur de celui-ci mais au Yukon; b) en ce qui touche les Gwich’in Tetlit, les zones d’ex ploitation délimitées à la sous-annexe A de l’annexe C de l’accord gwich’in; c) en ce qui touche toute autre première nation, le ter ritoire situé au Yukon et délimité par la carte fournie par elle sous le régime de l’accord-cadre dans le but de définir son territoire traditionnel. (territory) texte législatif d’une première nation Texte législatif édicté par la première nation en conformité avec la Loi sur l’autonomie gouvernementale des premières nations du Yukon ou un accord définitif. (first nation law) Definitions from Umbrella Final Agreement Définitions de l’accord-cadre (2) In this Act, the expressions mines, minerals, right to work, specified substances and traditional territo ry have the same meanings as in the Umbrella Final Agreement. (2) Dans la présente loi, droit d’exploitation, matières spécifiées, minéraux, mines et territoire traditionnel s’entendent au sens de l’accord-cadre. Grant of interest in land Sens particulier de attribution (3) In this Act, a reference to the granting of an interest in land includes only the granting of such an interest in circumstances where there is a discretion whether to grant it or not. 2003, c. 7, ss. 2, 133(E). (3) Dans la présente loi, la mention de l’attribution de droits fonciers ne vaut mention que de celle effectuée en vertu d’un pouvoir discrétionnaire. 2003, ch. 7, art. 2 et 133(A). Consultation Consultation 3 Where, in relation to any matter, a reference is made in this Act to consultation, the duty to consult shall be ex ercised (a) by providing, to the party to be consulted, (i) notice of the matter in sufficient form and detail to allow the party to prepare its views on the mat ter, (ii) a reasonable period for the party to prepare its views, and 3 Toute consultation rendue obligatoire par la présente loi comporte l’envoi à la partie à consulter d’un avis suffi samment détaillé, l’octroi d’un délai suffisant pour lui permettre de préparer ses arguments, l’occasion de pré senter ceux-ci à qui de droit ainsi que leur examen appro fondi et équitable. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon Interpretation Définitions et dispositions d’interprétation Sections 3-5 Articles 3-5 Current to November 9, 2016 Last amended on June 18, 2015 9 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (iii) an opportunity to present its views to the party having the duty to consult; and (b) by considering, fully and fairly, any views so pre sented. Final agreement prevails Préséance des accords définitifs 4 In the event of an inconsistency or conflict between a final agreement and this Act, the agreement prevails to the extent of the inconsistency or conflict. 4 Les dispositions de tout accord définitif l’emportent sur les dispositions incompatibles de la présente loi. General Dispositions générales Effect of Act Mise en œuvre de l’accord-cadre 5 (1) This Act gives effect to provisions of the Umbrella Final Agreement respecting assessment of environmental and socio-economic effects. 5 (1) La présente loi met en œuvre diverses dispositions de l’accord-cadre relatives à l’évaluation des effets sur l’environnement ou la vie socioéconomique. Purposes of Act Objectifs (2) The purposes of this Act are (a) to provide a comprehensive, neutrally conducted assessment process applicable in Yukon; (b) to require that, before projects are undertaken, their environmental and socio-economic effects be considered; (c) to protect and maintain environmental quality and heritage resources; (d) to protect and promote the well-being of Yukon Indian persons and their societies and Yukon resi dents generally, as well as the interests of other Cana dians; (e) to ensure that projects are undertaken in accor dance with principles that foster beneficial socio-eco nomic change without undermining the ecological and social systems on which communities and their resi dents, and societies in general, depend; (f) to recognize and, to the extent practicable, enhance the traditional economy of Yukon Indian persons and their special relationship with the wilderness environ ment; (g) to guarantee opportunities for the participation of Yukon Indian persons — and to make use of their knowledge and experience — in the assessment pro cess; (h) to provide opportunities for public participation in the assessment process; (2) Elle vise les objectifs suivants : a) instaurer un processus complet et impartial d’éva luation applicable au Yukon; b) subordonner la réalisation des projets de dévelop pement à la prise en compte des effets éventuels sur l’environnement ou la vie socioéconomique; c) protéger la qualité de l’environnement et les res sources patrimoniales; d) protéger et favoriser tant le bien-être des Indiens du Yukon, de leurs collectivités et des autres résidents du Yukon que les intérêts des autres Canadiens; e) faire en sorte que les projets de développement soient réalisés de façon à favoriser l’avancement dans le domaine socioéconomique sans mettre en péril les systèmes sociaux et écologiques dont dépendent, d’une part, les localités et leurs résidents et, d’autre part, les collectivités de façon générale; f) reconnaître l’existence de l’économie traditionnelle des Indiens du Yukon et d’une relation particulière entre eux et l’environnement dans son état sauvage, et valoriser l’une et l’autre dans la mesure du possible; g) assurer aux Indiens du Yukon la possibilité de par ticiper au processus d’évaluation et, dans le cadre de celui-ci, faire appel à leurs connaissances et à leur ex périence; h) offrir au public la possibilité de participer au pro cessus d’évaluation; Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon General Dispositions générales Sections 5-8 Articles 5-8 Current to November 9, 2016 Last amended on June 18, 2015 10 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (i) to ensure that the assessment process is conducted in a timely, efficient and effective manner that avoids duplication; and (j) to provide certainty to the extent practicable with respect to assessment procedures, including informa tion requirements, time limits and costs to partici pants. i) faire en sorte que le processus d’évaluation se dé roule avec célérité et efficacité, et de manière à éviter le double emploi; j) préciser, dans la mesure du possible, les divers as pects de la procédure à suivre, notamment les obliga tions en matière d’information, les délais et les coûts. Non-application Non-application 6 The Canadian Environmental Assessment Act, 2012 does not apply in Yukon. 2003, c. 7, s. 6; 2015, c. 19, s. 2. 6 La Loi canadienne sur l’évaluation environnementale (2012) ne s’applique pas au Yukon. 2003, ch. 7, art. 6; 2015, ch. 19, art. 2. Delegation to territorial Minister Délégation au ministre territorial 6.1 (1) The federal minister may delegate, in writing, to the territorial minister all or any of the federal minister’s powers, duties or functions under this Act, either gener ally or as otherwise provided in the instrument of delega tion. 6.1 (1) Le ministre fédéral peut, par écrit, déléguer au ministre territorial tout ou partie des attributions que lui confère la présente loi. La délégation peut être générale ou spécifique; dans ce dernier cas, sa portée est précisée dans l’acte de délégation. Notice Avis (2) The federal minister must notify the first nations in writing of any such delegation. 2015, c. 19, s. 2. (2) Le ministre fédéral avise, par écrit, les premières na tions de la délégation. 2015, ch. 19, art. 2. Delegation by territorial minister Délégation 7 The territorial minister may authorize a territorial agency or an employee of a territorial agency to carry out any of that minister’s functions under this Act. 7 Le ministre territorial peut déléguer les fonctions qui lui sont conférées par toute disposition de la présente loi à toute autorité territoriale ou à tout fonctionnaire de celle-ci. PART 1 PARTIE 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Yukon Environmental and Socio economic Assessment Board Office d’évaluation environnementale et socioéconomique du Yukon Board established Constitution 8 (1) The Yukon Environmental and Socio-economic Assessment Board is hereby established, consisting of (a) an executive committee of three persons; (b) four other members; and 8 (1) Est constitué l’Office d’évaluation environnemen tale et socioéconomique du Yukon. Outre les trois membres qui en forment le comité de direction et quatre autres membres qui en complètent la formation mini male, l’Office peut compter un nombre pair de membres supplémentaires fixé par le ministre fédéral après consul tation du ministre territorial et des premières nations. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Yukon Environmental and Socio-economic Assessment Board Office d’évaluation environnementale et socioéconomique du Yukon Sections 8-10 Articles 8-10 Current to November 9, 2016 Last amended on June 18, 2015 11 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (c) an even number of additional members that may be fixed from time to time by the federal minister fol lowing consultation with the territorial minister and the first nations. Appointment by federal minister Nomination des membres (2) The federal minister shall appoint the members of the Board after seeking the views of the Minister of the Environment. (2) Le ministre fédéral nomme les membres de l’Office après avoir demandé l’avis du ministre de l’Environne ment. Executive committee Comité de direction (3) One member of the executive committee referred to in paragraph (1)(a) shall be appointed on the nomination of the Council, another on the nomination of the territo rial minister and the third, being the Chairperson of the Board, following consultation by the federal minister with the other two members. (3) Le comité de direction est formé d’un membre nom mé sur proposition du Conseil, d’un autre nommé sur proposition du ministre territorial, et d’un troisième — le président de l’Office — nommé après consultation des deux autres membres. Other members Autres membres de la formation minimale (4) Of the four members of the Board referred to in para graph (1)(b), two shall be appointed on the nomination of the Council and one on the nomination of the territori al minister. (4) Des quatre membres de la formation minimale qui ne font pas partie du comité de direction, deux sont nom més sur proposition du Conseil et un sur celle du mi nistre territorial. Additional members Membres supplémentaires (5) If additional members of the Board are to be appoint ed pursuant to paragraph (1)(c), one-half shall be ap pointed on the nomination of the Council and one-half following consultation by the federal minister with the territorial minister. (5) La moitié des membres supplémentaires sont nom més sur proposition du Conseil et l’autre moitié après consultation du ministre territorial. Consultation of first nations Consultation des premières nations (6) The Council shall consult the first nations before nominating a person to the Board. 2003, c. 7, s. 8; 2015, c. 19, s. 3. (6) Le Conseil consulte les premières nations avant de faire une proposition. 2003, ch. 7, art. 8; 2015, ch. 19, art. 3. Residence of Chairperson Résidence du président 9 (1) The Chairperson of the Board must be a resident of Yukon. 9 (1) Le président de l’Office doit avoir sa résidence au Yukon. Residency of majorities Résidence des autres membres (2) A majority of the members appointed on the nomina tion of the Council, as well as a majority of the other members excluding the Chairperson, must be residents of Yukon. (2) La majorité des membres nommés sur proposition du Conseil ainsi que la majorité des autres membres — sans compter le président — doivent avoir leur résidence au Yukon. Term of office Mandat 10 (1) Subject to subsections (2) and (3), a member of the Board shall be appointed to hold office for a term of three years. 10 (1) Sous réserve des paragraphes (2) et (3), le man dat des membres de l’Office est de trois ans. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Yukon Environmental and Socio-economic Assessment Board Office d’évaluation environnementale et socioéconomique du Yukon Sections 10-11 Articles 10-11 Current to November 9, 2016 Last amended on June 18, 2015 12 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Term of first members Premiers membres (2) The first members appointed under subsections 8(3) and (4) on the nomination of the Council or the territori al minister shall be appointed for the term, not exceeding three years, specified by the Council or territorial minis ter when making the nomination, and the other first members shall be appointed for the term, not exceeding three years, specified by the federal minister. (2) La durée du mandat des premiers membres qui sont nommés par le ministre fédéral et qui sont visés aux pa ragraphes 8(3) et (4) est fixée par le Conseil ou le mi nistre territorial, dans le cas où leur nomination a été proposée par ceux-ci, ou par le ministre fédéral, dans les autres cas. Elle ne peut cependant excéder trois ans. Vacancy Vacance (3) In the event of a vacancy occurring during a mem ber’s term of office, the federal minister may, subject to the requirements of sections 8 and 9 applicable to the ap pointment of that member, appoint another person to fill the vacancy for the remainder of the term. (3) Le ministre fédéral peut, sous réserve des conditions de nomination fixées par les articles 8 et 9, combler toute vacance en cours de mandat d’un poste de membre; le remplaçant exerce ses fonctions pendant le reste du man dat. Acting after expiry of term Fonctions postérieures au mandat (4) If a member is a member of the executive committee or of a panel of the Board and, while that committee or panel is conducting a screening or review of a project, their term expires before a decision document is issued by each decision body to whom the committee or panel has made a recommendation in respect of that project, they may — in accordance with the by-laws of the Board or, in the absence of an applicable by-law, the direction of the Chairperson — continue to perform their functions in relation to that screening or review until those deci sion documents are issued. For the purpose of the ap pointment of a replacement, the member’s office is con sidered to be vacant as soon as their term expires. 2003, c. 7, s. 10; 2015, c. 19, s. 4. (4) S’il est aussi membre du comité de direction qui ef fectue la préétude d’un projet de développement ou d’un comité restreint qui en étudie un, le membre dont le mandat expire avant qu’une décision écrite ne soit ren due par chacun des décisionnaires auxquels le comité en question a communiqué des recommandations à l’égard de ce projet peut, en conformité avec les règlements ad ministratifs de l’Office — ou, en l’absence de règlements administratifs applicables, avec les instructions du pré sident —, continuer à exercer ses fonctions relativement à cette préétude ou étude jusqu’à ce que ces décisions écrites soient rendues. En ce qui concerne la nomination de son remplaçant, la vacance du poste est réputée surve nir dès l’expiration du mandat. 2003, ch. 7, art. 10; 2015, ch. 19, art. 4. Tenure Occupation du poste 11 (1) A member of the Board holds office during good behaviour but may be removed by the federal minister for cause or on any other ground set out in the by-laws of the Board. 11 (1) Sauf révocation motivée de la part du ministre fé déral — notamment pour un motif prévu par règlement administratif de l’Office — , les membres exercent leurs fonctions à titre inamovible. Loss of resident status Changement de résidence (2) The federal minister shall remove a member from of fice, in conformity with the regulations, if the federal minister determines that, because of a change in that member’s place of residence, the requirements of sec tion 9 are no longer met. (2) Le ministre fédéral est tenu de révoquer, en confor mité avec les règlements, le membre qui cesse de résider au Yukon s’il conclut, de ce fait, au non-respect des conditions fixées par l’article 9. Consultation by federal minister Consultation préalable (3) Before a member nominated by the Council or the territorial minister is removed from office, the federal minister shall consult the Council or the territorial minis ter, as the case may be. (3) La révocation d’un membre nommé sur proposition du Conseil ou du ministre territorial est subordonnée à la consultation, par le ministre fédéral, de l’un ou de l’autre, selon le cas. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Yukon Environmental and Socio-economic Assessment Board Office d’évaluation environnementale et socioéconomique du Yukon Sections 11-14 Articles 11-14 Current to November 9, 2016 Last amended on June 18, 2015 13 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Acting after removal of member Fonctions postérieures à la révocation (4) If a member is a member of the executive committee or of a panel of the Board and, while that committee or panel is conducting a screening or review of a project, they are removed from office under subsection (2) before a decision document is issued by each decision body to whom the committee or panel has made a recommenda tion in respect of that project, they may — in accordance with the by-laws of the Board or, in the absence of an ap plicable by-law, the direction of the Chairperson — con tinue to perform their functions in relation to that screening or review until those decision documents are issued. For the purpose of the appointment of a replace ment, the member’s office is considered to be vacant as soon as they are removed from office. 2003, c. 7, s. 11; 2015, c. 19, s. 5. (4) S’il est aussi membre du comité de direction qui ef fectue la préétude d’un projet de développement ou d’un comité restreint qui en étudie un, le membre qui est révo qué en application du paragraphe (2) avant qu’une déci sion écrite ne soit rendue par chacun des décisionnaires auxquels le comité en question a communiqué des re commandations à l’égard de ce projet peut, en conformi té avec les règlements administratifs de l’Office — ou, en l’absence de règlements administratifs applicables, avec les instructions du président —, continuer à exercer ses fonctions relativement à cette préétude ou étude jusqu’à ce que ces décisions écrites soient rendues. En ce qui concerne la nomination de son remplaçant, la vacance du poste est réputée survenir dès la révocation. 2003, ch. 7, art. 11; 2015, ch. 19, art. 5. Reappointment Renouvellement 12 The Chairperson, a member of the executive commit tee or any other member of the Board is eligible to be reappointed to the Board in the same or a different ca pacity. 12 Tout membre peut recevoir un nouveau mandat, à des fonctions identiques ou non. Conflict of interest Conflit d’intérêts 13 (1) A member of the Board may not participate in any business of the Board, the executive committee or a panel of the Board, if doing so would place the member in a material conflict of interest. 13 (1) Est incompétent pour prendre part à une affaire devant l’Office, le comité de direction ou un comité res treint le membre qui se trouverait de ce fait en situation de conflit d’intérêts important. Yukon Indian persons Indien du Yukon (2) A member is not in a material conflict of interest solely by virtue of being a Yukon Indian person. (2) N’a cependant pas pour effet de créer une telle situa tion le seul fait d’être un Indien du Yukon. Remuneration Rémunération 14 (1) Each member of the Board shall be paid the fees or other remuneration that is fixed by the federal minis ter. 14 (1) Les membres de l’Office reçoivent la rémunéra tion fixée par le ministre fédéral. Expenses Frais (2) Each member is entitled to be reimbursed for any travel and living expenses incurred by the member in the course of performing duties under this Act, while absent from the member’s ordinary place of residence, that are consistent with directives of the Treasury Board. (2) Ils sont indemnisés, selon des règles compatibles avec les directives du Conseil du Trésor, des frais de dé placement et de séjour faits dans l’exercice de leurs fonc tions hors du lieu de leur résidence habituelle. Benefits Indemnisation (3) The members of the Board and its employees are deemed to be employees for the purposes of the Govern ment Employees Compensation Act and to be employed in the federal public administration for the purposes of any regulations made under section 9 of the Aeronautics Act. 2003, c. 7, s. 14, c. 22, s. 277(E). (3) Les membres de l’Office et son personnel sont répu tés être des agents de l’État pour l’application de la Loi sur l’indemnisation des agents de l’État et occuper un emploi au sein de l’administration publique fédérale pour l’application des règlements pris en vertu de l’article 9 de la Loi sur l’aéronautique. 2003, ch. 7, art. 14, ch. 22, art. 277(A). Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Yukon Environmental and Socio-economic Assessment Board Office d’évaluation environnementale et socioéconomique du Yukon Sections 15-19 Articles 15-19 Current to November 9, 2016 Last amended on June 18, 2015 14 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Quorum Quorum 15 (1) A quorum of the Board consists of a majority of the members holding office or three members, whichever is greater. 15 (1) Le quorum de l’Office est constitué par la majori té des membres en fonction; il ne peut toutefois être infé rieur à trois. Telephone or other communications Participation à distance (2) Subject to the rules and by-laws, participation in a meeting of the Board, the executive committee or a panel of the Board may be by means of telephone or other com munications facilities that are likely to enable all persons participating in the meeting to hear each other, and a person so participating is deemed to be present at the meeting. (2) Sous réserve des règles applicables ou des règlements administratifs, le membre peut, pour participer à une réunion de l’Office, du comité de direction ou d’un comi té restreint, utiliser tout moyen technique — notamment le téléphone — de nature à permettre à tous les partici pants de communiquer oralement entre eux; il est alors réputé avoir assisté à la réunion. Property and contracts Biens et contrats 16 (1) The Board may, for the purposes of conducting the business of the Board and of designated offices in ac cordance with the approved budget of the Board, acquire property in its own name, dispose of such property and enter into contracts in the name of the Board. 16 (1) L’Office peut, en son propre nom et compte tenu du budget approuvé à son égard, acquérir et aliéner des biens et conclure des contrats pour l’exercice de ses tra vaux ou de ceux des bureaux désignés. Legal proceedings Action en justice (2) Actions, suits or other legal proceedings in respect of any right or obligation acquired or incurred by the Board may be brought or taken by or against the Board in its own name in any court that would have jurisdiction if the Board were a corporation. (2) Il peut, à l’égard de ses droits et obligations, ester en justice sous son propre nom devant toute juridiction qui serait compétente s’il était une personne morale. Staff and advisers Personnel, mandataires, etc. 17 The Board may, in accordance with the approved budget of the Board, employ any officers and employees and engage the services of any agents, advisers and con sultants that are necessary for the proper conduct of the business of the Board and of designated offices, fix the terms and conditions of their employment or engage ment and pay their remuneration. 17 L’Office peut, compte tenu du budget approuvé à son égard, s’assurer les services du personnel, des manda taires, des conseillers et des experts nécessaires à l’exer cice de ses travaux et de ceux des bureaux désignés, en fixer les conditions d’emploi ou d’engagement et payer leur rémunération. Indemnification Indemnisation 18 The members and employees of the Board shall be indemnified by the Board against all damages awarded against them, any settlement paid by them with the ap proval of the federal minister and all expenses reasonably incurred by them, in respect of any claim arising out of their functions as members or employees, if those func tions were performed honestly and in good faith with a view to the best interests of the Board. 18 Les membres et le personnel de l’Office sont indem nisés par ce dernier de tous les dommages-intérêts aux quels ils sont condamnés en cette qualité, des frais en traînés par toute réclamation qui leur est adressée en ce sens et des sommes versées avec l’agrément du ministre fédéral à la suite d’un règlement à l’amiable, s’ils ont agi en leur qualité avec intégrité et bonne foi. Main office Siège 19 The main office of the Board shall be at Whitehorse or at any other place in Yukon that may be designated by the Governor in Council. 19 Le siège de l’Office est fixé à Whitehorse ou en tout autre lieu du Yukon que désigne le gouverneur en conseil. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Assessment Districts and Designated Offices Circonscriptions et bureaux désignés Sections 20-22 Articles 20-22 Current to November 9, 2016 Last amended on June 18, 2015 15 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Assessment Districts and Designated Offices Circonscriptions et bureaux désignés Assessment districts Mise en place 20 (1) Following consultation by the federal minister with the territorial minister and the first nations, and in accordance with any agreement that may be concluded by those ministers with the first nations, the federal min ister shall, by order, establish six contiguous assessment districts that together constitute the whole of Yukon. 20 (1) Le ministre fédéral divise, par arrêté pris après consultation du ministre territorial et des premières na tions, le Yukon en six circonscriptions, conformément à toute entente conclue entre ces ministres et les premières nations. Change in number of districts Modification du nombre (2) Where the Board recommends, on the basis of opera tional requirements, a change in the number of contigu ous assessment districts that constitute Yukon, the feder al minister shall, by order, change the number of assessment districts in accordance with the Board’s rec ommendation, following consultation with the territorial minister and the first nations, or else provide written rea sons to the Board for rejecting the recommendation. (2) En conformité avec la recommandation de l’Office fondée sur les besoins fonctionnels, le ministre fédéral peut modifier le nombre de circonscriptions constituant le Yukon par arrêté pris après consultation du ministre territorial et des premières nations. S’il refuse la recom mandation, il communique par écrit ses motifs à l’Office. Alteration of boundaries Modification des limites 21 (1) The Board may, by order, alter the boundary be tween adjacent assessment districts, and shall do so where the federal minister changes the number of assess ment districts. 21 (1) L’Office peut, par ordonnance, modifier les li mites des circonscriptions; il est tenu de le faire en cas de modification du nombre de circonscriptions. Consultation Consultation (2) Before altering the boundaries of assessment dis tricts, the Board shall consult the designated offices for those assessment districts as well as the federal minister, the territorial minister, the Council and any first nation whose territory falls wholly or partly within those dis tricts, and shall seek the views of residents and municipal governments of the communities located in those dis tricts. (2) Toute modification des limites est cependant subor donnée à la consultation des bureaux désignés concernés, du ministre fédéral, du ministre territorial, du Conseil, ainsi que des premières nations dont le territoire est si tué, en tout ou en partie, dans l’une des circonscriptions touchées. L’Office est en outre tenu de demander l’avis des municipalités de la circonscription et de leurs rési dents. Statutory Instruments Act Loi sur les textes réglementaires (3) Sections 3, 5 and 11 of the Statutory Instruments Act do not apply in respect of an order altering boundaries, but the Board shall publish a notice of the order in the Canada Gazette, in a periodical that, in the Board’s opin ion, has a large circulation in Yukon and, if any part of the affected assessment districts falls within the territory of the Tetlit Gwich’in, in a periodical distributed in the Gwich’in Settlement Area referred to in the Gwich’in Agreement. (3) L’ordonnance est soustraite à l’application des ar ticles 3, 5 et 11 de la Loi sur les textes réglementaires. L’Office fait toutefois publier un avis de sa prise dans la Gazette du Canada, dans un périodique qui, à son avis, est largement diffusé au Yukon et, si les circonscriptions touchées recouvrent toute partie du territoire des Gwi ch’in Tetlit, dans un périodique distribué dans la région désignée des Gwich’in visée dans l’accord gwich’in. Designated offices in named communities Bureaux désignés : localité 22 (1) The federal minister shall name a community in each assessment district as the site of an office to be maintained by the Board and known as the designated office for that assessment district. 22 (1) Le ministre fédéral désigne, pour chaque circons cription, la localité dans laquelle l’Office tient un bureau — le bureau désigné. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Assessment Districts and Designated Offices Circonscriptions et bureaux désignés Sections 22-26 Articles 22-26 Current to November 9, 2016 Last amended on June 18, 2015 16 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Change of designated community Modification (2) Before any change is made in the community named as the site of a designated office for an assessment dis trict, the federal minister shall consult the territorial minister, the Council and any first nation whose territory falls wholly or partly within that district, and shall seek the views of residents and municipal governments of the communities located in that district. (2) Toute modification relative à cette désignation est su bordonnée à la consultation du ministre territorial, du Conseil et des premières nations dont le territoire est si tué, en tout ou en partie, dans la circonscription en ques tion. Le ministre est de plus tenu de demander l’avis des municipalités de la circonscription et de leurs résidents. Notice Publication (3) The federal minister shall publish a notice of the se lection of a community, or of any change in the selection, in the Canada Gazette, in a periodical that, in the federal minister’s opinion, has a large circulation in Yukon and, if any part of the affected assessment district falls within the territory of the Tetlit Gwich’in, in a periodical dis tributed in the Gwich’in Settlement Area referred to in the Gwich’in Agreement. (3) Le ministre fédéral donne avis de la désignation et de toute modification de celle-ci dans la Gazette du Canada, dans un périodique qui, à son avis, est largement diffusé au Yukon et, si la circonscription touchée recouvre toute partie du territoire des Gwich’in Tetlit, dans un pério dique distribué dans la région désignée des Gwich’in vi sée dans l’accord gwich’in. Staff Personnel 23 (1) The staff of each designated office shall be com posed of employees of the Board assigned to that office by the Board. 23 (1) Le personnel du bureau désigné est formé des personnes que l’Office y affecte parmi son propre person nel. Powers in relation to evaluations Pouvoirs en matière d’évaluation (2) The Board shall authorize one or more members of the staff to exercise the powers of the designated office relating to evaluations, and those persons may delegate any of those powers to another member of the staff. (2) L’Office désigne, parmi ce personnel, les personnes chargées d’exercer les pouvoirs — qu’elles peuvent délé guer à d’autres membres du personnel — conférés au bu reau désigné en matière d’évaluation. Conflict of interest Conflit d’intérêts 24 (1) A member of the staff of a designated office may not participate in any business of that office if doing so would place the member in a material conflict of interest. 24 (1) Est incompétent pour prendre part à une affaire devant le bureau désigné le membre du personnel qui se trouverait de ce fait en situation de conflit d’intérêts im portant. Yukon Indian persons Indien du Yukon (2) A member of the staff is not in a material conflict of interest solely by virtue of being a Yukon Indian person. (2) N’a cependant pas pour effet de créer une telle situa tion le seul fait d’être un Indien du Yukon. Contracts and facilities Obligations de l’Office 25 The Board shall, at the request of a designated office but in accordance with the approved budget of the Board, procure services required by that office and make proper ty and facilities available to it. 25 Sur demande du bureau désigné mais compte tenu du budget approuvé à l’égard de celui-ci, l’Office lui four nit les services nécessaires ou met à sa disposition des biens ou des locaux. Budgets and Reporting Budgets et rapports Budgets of designated offices Bureaux désignés 26 Each designated office shall annually, after consulta tion with any first nation whose territory falls wholly or 26 Chaque bureau désigné établit annuellement pour l’exercice suivant, après consultation des premières na tions dont le territoire est situé — en tout ou en partie — Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Budgets and Reporting Budgets et rapports Sections 26-29 Articles 26-29 Current to November 9, 2016 Last amended on June 18, 2015 17 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 partly within its assessment district, prepare and submit a budget for the ensuing fiscal year to the Board. dans sa circonscription, un budget qu’il soumet à l’agré ment de l’Office. Budget of Board Office 27 (1) The Board shall submit annually to the federal minister its budget for the ensuing fiscal year, which shall incorporate the budgets of the designated offices as submitted by them or as varied by the Board. 27 (1) L’Office établit annuellement pour l’exercice sui vant un budget qu’il soumet à l’agrément du ministre fé déral. Il y incorpore les budgets des bureaux désignés tels quels ou avec les modifications qu’il peut y apporter. Approval of budget Ministre fédéral (2) The federal minister may approve the budget as sub mitted by the Board, or with any variations that the fed eral minister may make after seeking the views of the Board, the territorial minister and the Council. (2) Le ministre fédéral peut agréer le budget tel quel, ou avec les modifications qu’il peut y apporter après avoir demandé l’avis de l’Office, du ministre territorial et du Conseil. Funding for languages and training Formation des membres (3) The Board shall consider including in its annual bud get funding in order to enable its members and employ ees to carry out their functions in their traditional lan guages and in order to provide its members and employees with training, including cross-cultural orien tation and education, for the purpose of improving their ability to carry out their duties. (3) Dans l’établissement de son budget, l’Office doit en visager la possibilité d’allouer des fonds, d’une part, à la prise de mesures pour permettre à ses membres et à ses employés d’exercer leurs fonctions dans leur langue tra ditionnelle et, d’autre part, à la formation de ceux-ci — notamment en matière de sensibilisation et d’éducation interculturelles — en vue de les aider à mieux s’acquitter de leurs fonctions. Accounts Comptabilité 28 (1) The Board shall maintain books of account and related records in accordance with accounting principles recommended by the Canadian Institute of Chartered Ac countants or its successor. 28 (1) L’Office tient les documents comptables en conformité avec les principes comptables recommandés par l’Institut canadien des comptables agréés ou tout or ganisme lui succédant. Consolidated financial statements États financiers consolidés (2) The Board shall, within the time after the end of each fiscal year that the federal minister specifies, prepare consolidated financial statements in respect of that fiscal year in accordance with the accounting principles re ferred to in subsection (1) and shall include in them any information or statements that are required in their sup port. (2) Dans le délai fixé par le ministre fédéral suivant la fin de chaque exercice, l’Office établit annuellement, en conformité avec les mêmes principes comptables, les états financiers consolidés de l’exercice, auxquels il joint les renseignements ou documents nécessaires à l’appui. Audit Vérification (3) The accounts, financial statements and financial transactions of the Board shall be audited annually by the auditor of the Board and, where the federal minister re quests, by the Auditor General of Canada. The auditor and, where applicable, the Auditor General of Canada shall, as soon as practicable, make a report of the audit to the Board and the federal minister. (3) Les comptes, états financiers et opérations finan cières de l’Office sont vérifiés chaque année par le vérifi cateur de l’Office et, sur demande du ministre fédéral, par le vérificateur général du Canada. Les rapports de vé rification sont présentés à l’Office et au ministre fédéral dans les meilleurs délais. Annual report Rapport annuel 29 The executive committee shall, within three months after the end of each fiscal year, prepare for the approval of the Board an annual report of the activities of the 29 Dans les trois mois qui suivent la fin de chaque exer cice, le comité de direction établit le rapport d’activité de l’Office pour cet exercice. Il en communique la version Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Budgets and Reporting Budgets et rapports Sections 29-30 Articles 29-30 Current to November 9, 2016 Last amended on June 18, 2015 18 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Board for that fiscal year, and the executive committee shall submit the approved report to the federal minister and make it available to the public. approuvée par ce dernier au ministre fédéral et le met à la disposition du public. Rules and By-Laws Règles et règlements administratifs Rules for executive committee and panels Règles : comité de direction et comités restreints 30 (1) The Board shall make rules, applicable to screen ings by the executive committee and reviews by panels of the Board, with respect to (a) the form and content of proposals submitted un der paragraph 50(1)(a) or of requests made under sec tion 60; (b) the determination of the scope of a project; (c) for the purposes of section 46, the participation of interested persons and the public; and (d) the periods, for each step from the submission or referral of a proposal to the conclusion of the screen ing or review of the project or existing project, within which the executive committee and panels of the Board must perform their functions. 30 (1) L’Office établit des règles régissant, en matière de préétude par le comité de direction et d’étude par les co mités restreints : a) la forme et la teneur des propositions soumises en application du paragraphe 50(1) et des demandes pré vues à l’article 60; b) la détermination de l’envergure des projets de dé veloppement; c) la participation des intéressés et du public, pour l’application de l’article 46; d) les délais dont disposent le comité de direction et les comités restreints pour effectuer leurs travaux rela tivement à chacune des étapes, depuis la soumission de la proposition ou son renvoi jusqu’à la conclusion de la préétude ou de l’étude du projet de développe ment ou de l’ouvrage. Rules for executive committee and panels Idem (2) The Board may make rules with respect to (a) the manner in which proponents of projects must consult with first nations and residents of communi ties for the purposes of subsection 50(3); (b) the conduct of screenings of projects by the execu tive committee and reviews of projects by panels of the Board; (c) the reconsideration of recommendations referred back to the executive committee or a panel of the Board by a decision body; (d) the membership of panels of the Board and the es tablishment of their terms of reference; and (e) cooperation by the executive committee and pan els of the Board with other bodies, including the coor dination of functions. (2) L’Office peut établir d’autres règles régissant : a) le mode de la consultation prévue au para graphe 50(3); b) les préétudes et les études des projets de dévelop pement par le comité de direction et les comités res treints, respectivement; c) le réexamen des recommandations que renvoie au comité de direction ou aux comités restreints un déci sionnaire; d) la composition des comités restreints et l’établisse ment de leur mandat; e) la coopération du comité de direction et des comi tés restreints avec d’autres organismes, notamment en ce qui a trait à la coordination des travaux. Other rules Autres règles (3) The Board may make rules with respect to (a) reviews of existing projects, reviews of plans and reviews of activities outside Yukon; (3) L’Office peut aussi établir des règles régissant : a) l’étude d’ouvrages et de plans, ainsi que l’étude d’activités à l’extérieur du Yukon; Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Rules and By-Laws Règles et règlements administratifs Sections 30-31 Articles 30-31 Current to November 9, 2016 Last amended on June 18, 2015 19 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (b) the conduct of audits, and effects monitoring, of projects and existing projects under sections 110 and 111; and (c) the conduct of studies and research under sec tion 112. b) les mesures de contrôle ou de vérification visées aux articles 110 et 111; c) les études et les recherches visées à l’article 112. Categories of projects, etc. Catégories particulières (4) Rules made under this section may provide for differ ent types of screenings or reviews for different categories of projects, existing projects or plans, or activities outside Yukon, as the case may be. 2003, c. 7, s. 30; 2015, c. 19, s. 6. (4) Les règles établies en vertu du présent article peuvent prévoir différents types de préétudes et d’études pour di verses catégories soit de projets de développement, d’ou vrages ou de plans, soit d’activités à l’extérieur du Yukon. 2003, ch. 7, art. 30; 2015, ch. 19, art. 6. Rules for designated offices Règles : bureaux désignés 31 (1) The Board shall make rules with respect to the conduct of evaluations of projects by designated offices, which may include rules providing for (a) different phases of the evaluation of projects; and (b) different types of evaluations for different cate gories of projects. 31 (1) L’Office établit des règles régissant le déroule ment de l’examen effectué par les bureaux désignés. Il peut notamment à ce titre : a) déterminer les étapes de l’examen d’un projet de développement; b) prévoir différents types d’examen pour les diverses catégories de projets de développement. Rules for designated offices Règles régissant l’examen (2) The Board shall make rules, applicable to evaluations of projects by designated offices, with respect to (a) the form and content of proposals submitted un der paragraph 50(1)(b); (b) the determination of the scope of a project; (c) for the purposes of section 46, participation in evaluations by interested persons and the public; (d) the submission of proposals for projects located in two or more assessment districts; (e) the conduct of evaluations by two or more desig nated offices, jointly or by one of them on behalf of the other or others, under section 53; and (f) the periods, for each step from the submission of a proposal to the conclusion of the evaluation of the project or existing project, within which designated of fices must perform their functions. (2) Il établit aussi des règles régissant, en matière d’exa men par les bureaux désignés : a) la forme et la teneur des propositions qui leur sont soumises en application du paragraphe 50(1); b) la détermination de l’envergure des projets de dé veloppement; c) la participation des intéressés et du public, pour l’application de l’article 46; d) la présentation de propositions relatives à un pro jet de développement devant être réalisé dans plus d’une circonscription; e) les modalités permettant soit à différents bureaux désignés d’effectuer l’examen conjointement, soit à un seul de le faire pour le compte de tous, dans les cas vi sés à l’article 53; f) les délais dont disposent les bureaux désignés pour effectuer leurs travaux relativement à chacune des étapes, depuis la soumission de la proposition jusqu’à la conclusion de l’examen du projet de développement ou de l’ouvrage. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Rules and By-Laws Règles et règlements administratifs Sections 31-34 Articles 31-34 Current to November 9, 2016 Last amended on June 18, 2015 20 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Rules for cooperation Autres règles (3) The Board may make rules with respect to coopera tion by designated offices with other bodies, including the coordination of functions. (3) L’Office peut établir d’autres règles régissant la co opération des bureaux désignés avec d’autres orga nismes, notamment en ce qui concerne la coordination des travaux. Collaboration with designated offices Collaboration (4) The Board shall seek the collaboration of the desig nated offices in making rules under subsections (1) to (3). (4) L’Office prend les mesures voulues pour s’assurer la collaboration des bureaux désignés dans l’élaboration des règles qu’il établit au titre des paragraphes (1) à (3). Rules made by designated office Règles particulières (5) A designated office may make rules with respect to the conduct of its evaluations, including rules respecting any of the matters specified in subsections (1) to (3), but rules made by the Board prevail over rules made by a designated office to the extent of any inconsistency. 2003, c. 7, s. 31; 2015, c. 19, s. 7. (5) Tout bureau désigné peut établir ses propres règles d’examen, mais les dispositions des règles établies en vertu des paragraphes (1) à (3) l’emportent en cas d’in compatibilité. 2003, ch. 7, art. 31; 2015, ch. 19, art. 7. Standard mitigative measures Règles particulières 32 (1) The Board may make rules with respect to the de velopment, by a designated office or the executive com mittee, of standard mitigative measures referred to in section 37. 32 (1) L’Office peut établir des règles spécifiques pour l’élaboration des mesures d’atténuation types visées à l’article 37. Collaboration Collaboration (2) The Board shall seek the collaboration of the desig nated offices in making rules under subsection (1). (2) L’Office prend les mesures voulues pour s’assurer la collaboration des bureaux désignés dans l’élaboration de ces règles. General rules re information Règles : informations et connaissances traditionnelles 33 The Board shall make rules with respect to (a) the integration of scientific information, tradition al knowledge and other information by designated of fices, the executive committee and panels of the Board; (b) the determination of whether traditional knowl edge is confidential for the purposes of para graph 121(a); and (c) the handling of information to prevent its disclo sure contrary to section 121, including the conduct of private hearings and the restriction of access to infor mation at public hearings. 33 L’Office établit des règles régissant : a) l’intégration, par les bureaux désignés, le comité de direction et les comités restreints, de l’information scientifique, des connaissances traditionnelles et de toute autre information; b) la détermination de la nature confidentielle des connaissances traditionnelles pour l’application de l’a linéa 121a); c) la façon de traiter l’information pour prévenir sa communication en contravention de l’article 121, no tamment la tenue d’audiences à huis clos et les restric tions applicables à l’accès à l’information dans le cadre des audiences publiques. Publication of proposed rules Publication des projets de règles 34 (1) At least 60 days before making rules, the Board or a designated office shall publish a notice of any proposed rules in the Canada Gazette, in a periodical that, in its opinion, has a large circulation in Yukon and in a period ical distributed in the Gwich’in Settlement Area referred 34 (1) Au moins soixante jours avant l’établissement de règles, l’Office ou le bureau désigné, selon le cas, en donne avis dans la Gazette du Canada, dans un pério dique qui, à son avis, est largement diffusé au Yukon et dans un périodique distribué dans la région désignée des Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Rules and By-Laws Règles et règlements administratifs Sections 34-37 Articles 34-37 Current to November 9, 2016 Last amended on June 18, 2015 21 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 to in the Gwich’in Agreement and shall, in the notice, in vite written representations to be made to it with respect to the proposed rules within 60 days after publication. Gwich’in visée dans l’accord gwich’in. L’avis invite toute personne à présenter par écrit, dans les soixante jours suivant la publication, ses observations à cet égard. Exception Dispense (2) No further notice need be published if the proposed rules are amended solely in response to representations made to the Board or the designated office. (2) Il n’est pas nécessaire de publier de nouvel avis dans le cas des projets de règles modifiés uniquement par suite d’observations présentées à l’Office ou au bureau désigné. Publication of rules Publication des règles (3) Rules made by the Board or a designated office shall be published in the Canada Gazette immediately after they are made. (3) Le texte définitif des règles est publié dans la Gazette du Canada dès leur établissement. By-laws of Board Règlements administratifs : Office 35 The Board may make by-laws (a) for the conduct and management of its internal administrative affairs; (b) specifying grounds for the removal of members from office other than for cause, for the purposes of subsection 11(1); and (c) respecting the performance of a member’s func tions for the purposes of subsections 10(4) and 11(4). 2003, c. 7, s. 35; 2015, c. 19, s. 8. 35 L’Office peut, par règlement administratif : a) régir la conduite et la gestion de ses affaires in ternes; b) établir, pour la révocation des membres visée au paragraphe 11(1), des motifs autres que ceux du droit commun; c) régir l’exercice des fonctions d’un membre pour l’application des paragraphes 10(4) et 11(4). 2003, ch. 7, art. 35; 2015, ch. 19, art. 8. By-laws for designated offices Règlements administratifs : bureaux désignés 36 (1) The Board may make by-laws for the conduct and management of the internal administrative affairs of all designated offices. 36 (1) L’Office peut prendre des règlements administra tifs en matière de conduite et de gestion des affaires in ternes des bureaux désignés. Collaboration Collaboration (2) The Board shall seek the collaboration of the desig nated offices in making by-laws applicable to them. (2) L’Office prend les mesures voulues pour s’assurer la collaboration des bureaux désignés dans l’élaboration de ces règlements administratifs. By-laws made by designated office Règlements administratifs : bureaux désignés (3) A designated office may make by-laws for the con duct and management of its internal administrative af fairs, but by-laws made by the Board under subsec tion (1) prevail over by-laws made by a designated office to the extent of any inconsistency. (3) Tout bureau désigné peut se doter de ses propres rè glements administratifs en la matière, mais les disposi tions des règlements administratifs pris en vertu du para graphe (1) l’emportent en cas d’incompatibilité. Standard mitigation measures Mesures d’atténuation types 37 (1) A designated office may develop standard mitiga tive measures that can be applied to a class of projects, or to projects located within a geographic area. 37 (1) Le bureau désigné peut élaborer des mesures d’atténuation types applicables à des catégories de pro jets de développement ou aux projets d’une région don née. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 1 Yukon Environmental and Socio-economic Assessment Board and Designated Offices PARTIE 1 Office d’évaluation environnementale et socioéconomique du Yukon et bureaux désignés Rules and By-Laws Règles et règlements administratifs Sections 37-40 Articles 37-40 Current to November 9, 2016 Last amended on June 18, 2015 22 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Standard mitigation measures Mesures types : comité de direction (2) The executive committee may develop standard mit igative measures that can be applied to a class of projects or existing projects, or to projects or existing projects lo cated within a geographic area. (2) Le comité de direction peut élaborer des mesures d’atténuation types applicables soit à des catégories de projets de développement ou d’ouvrages, soit aux projets ou aux ouvrages d’une région donnée. Public participation Participation du public (3) The designated office and the executive committee shall provide opportunities for public participation in the development of standard mitigative measures. (3) Le bureau désigné et le comité de direction sont te nus de favoriser la participation du public à l’élaboration de ces mesures d’atténuation types. Conflict Conflit (4) Unless otherwise provided by the rules, standard mitigative measures developed by the executive commit tee prevail over those developed by a designated office to the extent of any inconsistency. (4) Sauf disposition contraire des règles, les mesures d’atténuation types élaborées par le comité de direction l’emportent sur les mesures d’atténuation types incom patibles élaborées par le bureau désigné. Statutory Instruments Act Loi sur les textes réglementaires 38 Sections 3, 5 and 11 of the Statutory Instruments Act do not apply in respect of the rules or by-laws of the Board or a designated office. 38 Les articles 3, 5 et 11 de la Loi sur les textes régle mentaires ne s’appliquent pas aux règles et aux règle ments administratifs de l’Office ou des bureaux désignés. General Requirement Obligation générale Scientific and traditional knowledge Connaissances traditionnelles et autres 39 A designated office, the executive committee or a panel of the Board shall give full and fair consideration to scientific information, traditional knowledge and other information provided to it or obtained by it under this Act. 39 Le bureau désigné, le comité de direction et le comité restreint tiennent compte pleinement et équitablement des connaissances traditionnelles et de l’information scientifique ou autre qui leur sont communiquées ou qu’ils obtiennent conformément à la présente loi. PART 2 PARTIE 2 Assessment Process and Decision Documents Processus d’évaluation et décisions écrites Assessments — General Dispositions générales sur le processus Non-duplication and certainty Fiabilité 40 The Board, the designated offices, the executive com mittee and panels of the Board shall avoid duplication in the assessment process and shall provide certainty, to the extent practicable, to persons participating in the assess ment process with respect to assessment procedures, in cluding information requirements, time limits and costs. 40 L’Office, les bureaux désignés, le comité de direction et les comités restreints veillent à éviter le double emploi dans le cadre du processus d’évaluation et donnent aux participants des assurances, autant que faire se peut, en ce qui touche la procédure, notamment l’information à fournir, les délais et les frais. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Assessments — General Dispositions générales sur le processus Sections 41-42 Articles 41-42 Current to November 9, 2016 Last amended on June 18, 2015 23 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Timeliness of assessments Célérité 41 The designated offices, the executive committee and panels of the Board shall conduct assessments of projects, existing projects and plans in a timely and expe ditious manner. 41 Les bureaux désignés, le comité de direction et les co mités restreints effectuent l’évaluation d’un projet, d’un ouvrage ou d’un plan avec célérité. Matters to be considered Prise en compte de certains points 42 (1) In conducting an assessment of a project or exist ing project, a designated office, the executive committee or a panel of the Board shall take the following matters into consideration: (a) the purpose of the project or existing project; (b) all stages of the project or existing project; (c) the significance of any environmental or socio economic effects of the project or existing project that have occurred or might occur in or outside Yukon, in cluding the effects of malfunctions or accidents; (d) the significance of any adverse cumulative envi ronmental or socio-economic effects that have oc curred or might occur in connection with the project or existing project in combination with the effects of other projects for which proposals have been submit ted under subsection 50(1) or any activities that have been carried out, are being carried out or are likely to be carried out in or outside Yukon; (d.1) any studies or research undertaken under sub section 112(1) that are relevant to the project or exist ing project; (d.2) the need for effects monitoring; (e) alternatives to the project or existing project, or al ternative ways of undertaking or operating it, that would avoid or minimize any significant adverse envi ronmental or socio-economic effects; (f) mitigative measures and measures to compensate for any significant adverse environmental or socio economic effects; (g) the need to protect the rights of Yukon Indian per sons under final agreements, the special relationship between Yukon Indian persons and the wilderness en vironment of Yukon, and the cultures, traditions, health and lifestyles of Yukon Indian persons and oth er residents of Yukon; (g.1) the interests of first nations; (h) the interests of residents of Yukon and of Canadi an residents outside Yukon; 42 (1) Les bureaux désignés, le comité de direction et les comités restreints tiennent compte des points ci-après dans l’évaluation d’un projet de développement ou d’un ouvrage : a) les raisons d’être du projet ou de l’ouvrage; b) toutes les étapes du projet ou de l’ouvrage; c) l’importance des effets — actuels ou éventuels — du projet ou de l’ouvrage sur l’environnement ou la vie socioéconomique au Yukon ou à l’extérieur de ses li mites, notamment ceux découlant d’accidents ou de défaillances; d) l’importance des effets cumulatifs négatifs — ac tuels ou éventuels — du projet ou de l’ouvrage sur l’en vironnement ou la vie socioéconomique lorsqu’il est combiné soit à d’autres projets ayant fait l’objet d’une proposition en conformité avec le paragraphe 50(1), soit à des activités — dont la réalisation est terminée, en cours ou probable — au Yukon ou à l’extérieur de ses limites; d.1) les études ou les recherches entreprises en vertu du paragraphe 112(1) qui se rapportent au projet ou à l’ouvrage; d.2) la nécessité de prendre des mesures de contrôle; e) les solutions de rechange soit au projet ou à l’ou vrage lui-même, soit à ses modalités de réalisation ou d’exploitation, susceptibles d’éviter ou de réduire les effets négatifs importants sur l’environnement ou la vie socioéconomique; f) les mesures d’atténuation et d’indemnisation indi quées dans les circonstances; g) la nécessité de protéger les droits conférés aux In diens du Yukon sous le régime des accords définitifs, la relation particulière entre ces derniers et l’environ nement du Yukon dans son état sauvage ainsi que les cultures, les traditions, la santé et le mode de vie tant des Indiens du Yukon que des autres résidents du Yu kon; g.1) les intérêts des premières nations; Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Assessments — General Dispositions générales sur le processus Sections 42-43 Articles 42-43 Current to November 9, 2016 Last amended on June 18, 2015 24 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (i) any matter that a decision body has asked it to take into consideration; and (j) any matter specified by the regulations. h) les intérêts des résidents du Yukon et des autres ré sidents du Canada; i) les éléments indiqués par le décisionnaire compé tent; j) les éléments précisés par règlement. Additional matters to be considered Autres activités à prendre en compte (2) In addition to the matters referred to in subsection (1), the executive committee or a panel of the Board shall take into consideration the capacity of any renewable re sources that are likely to be significantly affected by the project or existing project to meet present and future needs. (2) Le comité de direction et le comité restreint tiennent en outre compte de la capacité des ressources renouve lables qui risquent le plus de subir le contrecoup du pro jet de développement ou de l’ouvrage de répondre aux besoins actuels et à ceux des générations futures. Potential activities of third parties Activité potentielle d’un tiers (2.1) If the proponent is a government agency or first nation and the project or existing project concerns plan ning activities related to timber harvesting, the designat ed office, executive committee or panel of the Board shall take into consideration any potential activities of third parties that, if proposed to be undertaken, would be sub ject to an assessment under section 47 or 48. (2.1) Si le promoteur d’un projet de développement ou d’un ouvrage portant sur la planification d’activités rela tives à la récolte de bois est une autorité publique ou une première nation, le bureau désigné, le comité de direc tion ou le comité restreint tiennent également compte de toute activité potentielle d’un tiers qui, si elle était à l’é tape de projet, serait assujettie à l’évaluation aux termes des articles 47 ou 48. Consideration of standards Prise en compte (3) Where a project or existing project to be assessed be longs to a class, or is to be located in a geographic area, for which standard mitigative measures have been devel oped, whether developed by the designated office or the executive committee, those measures shall be taken into consideration by the designated office, the executive committee or a panel of the Board when assessing the project or existing project. (3) Le bureau désigné, le comité de direction et le comité restreint tiennent compte, dans leurs évaluations, des mesures d’atténuation types applicables soit à la catégo rie dont fait partie le projet de développement ou l’ou vrage, soit à la région de réalisation ou d’exploitation, que ces mesures soient conçues par le bureau désigné ou par le comité de direction. Optional matters Autres points pertinents (4) A designated office, the executive committee or a panel of the Board may also take into consideration any matter that it considers relevant in the assessment of a project or existing project. 2003, c. 7, s. 42; 2015, c. 19, s. 9. (4) Le bureau désigné, le comité de direction et le comité restreint peuvent en outre tenir compte de tout point qu’ils jugent pertinent. 2003, ch. 7, art. 42; 2015, ch. 19, art. 9. Requiring additional information Renseignements supplémentaires 43 (1) A designated office, the executive committee or a panel of the Board may require the proponent to provide any supplementary information that it considers neces sary for its assessment, whether or not it has commenced the assessment. 43 (1) Le bureau désigné, le comité de direction et le co mité restreint saisis d’un projet de développement peuvent, avant la fin de l’évaluation, exiger de son pro moteur la communication des renseignements supplé mentaires qu’ils estiment nécessaires. Suspension Suspension (2) If the proponent fails to provide the required supple mentary information within the period prescribed by the rules, the designated office, executive committee or panel (2) Si le promoteur omet de fournir les renseignements supplémentaires ainsi exigés dans les délais précisés par les règles, le bureau désigné, le comité de direction et le Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Assessments — General Dispositions générales sur le processus Sections 43-44 Articles 43-44 Current to November 9, 2016 Last amended on June 18, 2015 25 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 of the Board may suspend its assessment activities until the proponent provides that information and it must make the reasons for the suspension public if it does so. comité restreint peuvent suspendre leurs travaux d’éva luation respectifs jusqu’à ce qu’il les leur fournisse. En cas de suspension, ceux-ci rendent les motifs de leur dé cision publics. Termination of assessment Fin de l’évaluation (3) If a proponent does not provide the required supple mentary information within two years after the day on which the request is made, the assessment of the project is discontinued, unless the Board grants an extension of that period. (3) L’évaluation prend fin dans le cas où le promoteur ne fournit pas les renseignements supplémentaires dans les deux ans suivant la date où ils ont été exigés, sauf si l’Of fice a prolongé ce délai. Extension of time limit Prolongation du délai (4) The Board may extend the period referred to in sub section (3) by a maximum of one year. (4) L’Office peut prolonger le délai prévu au paragraphe (3) pour une période d’au plus un an. Interpretation Précision (5) For greater certainty, the proponent may submit a new proposal in relation to the project in accordance with section 50. (5) Il est entendu que le promoteur peut soumettre une nouvelle proposition relativement au projet de dévelop pement conformément à l’article 50. Consideration of previous assessments Prise en compte des travaux antérieurs (6) In conducting an assessment of the project to which the new proposal relates, a designated office, the execu tive committee or a panel of the Board must consider, and may rely on, any assessment activities previously carried out under this Act in respect of the project. 2003, c. 7, s. 43; 2015, c. 19, s. 10. (6) Le bureau désigné, le comité de direction ou le comi té restreint chargé de l’évaluation du projet de dévelop pement visé par la nouvelle proposition tiennent compte des travaux d’évaluation antérieurs effectués au titre de la présente loi à l’égard du projet et peuvent s’appuyer sur ceux-ci. 2003, ch. 7, art. 43; 2015, ch. 19, art. 10. Regional land use plans Plan d’aménagement régional 44 (1) If a regional land use plan is in effect in a plan ning region established under a final agreement, a desig nated office, the executive committee or a panel of the Board shall, when conducting an assessment of a project proposed in the planning region, request the planning commission established under the final agreement to ad vise it as to whether the project is in conformity with the regional land use plan, unless such a request has already been made in relation to the project. 44 (1) Le bureau désigné, le comité de direction et le co mité restreint sont tenus, durant l’évaluation d’un projet de développement devant être réalisé dans une région as sujettie, en vertu d’un accord définitif, à un plan d’amé nagement régional, de demander à l’office d’aménage ment mis sur pied en conformité avec cet accord de les conseiller quant à la conformité du projet avec ce plan. Ils sont soustraits à cette obligation si une telle demande a déjà été présentée à l’égard du projet. Non-conformity with plan Non-conformité (2) A designated office, the executive committee or a panel of the Board shall, if advised by the planning com mission for a planning region, before or during its assess ment of a project, that the project is not in conformity with the regional land use plan, consider the regional land use plan and invite the planning commission to make representations to it with respect to the project. (2) Si l’office d’aménagement les avise, avant la fin de l’é valuation, que le projet n’est pas conforme au plan d’a ménagement régional, le bureau désigné, le comité de di rection et le comité restreint doivent tenir compte du plan et inviter l’office à leur présenter des observations sur le sujet. Recommendation for project Conditions recommandées (3) Where a designated office, the executive committee or a panel of the Board recommends that a project re ferred to in subsection (2) be allowed to proceed, it shall, (3) Le bureau désigné, le comité de direction et le comité restreint sont tenus, dans la mesure du possible, d’assor tir toute recommandation visant à permettre la Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Assessments — General Dispositions générales sur le processus Sections 44-47 Articles 44-47 Current to November 9, 2016 Last amended on June 18, 2015 26 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 to the extent possible, recommend terms and conditions that will bring the project into conformity with the re gional land use plan. réalisation du projet de conditions assurant sa conformi té avec le plan d’aménagement. Pending land use plan Plan d’aménagement en cours d’établissement 45 (1) When a planning commission established for a planning region under a final agreement notifies the ex ecutive committee and designated offices that it is preparing a regional land use plan pursuant to the final agreement, the executive committee and each designated office whose assessment district includes any part of the planning region shall provide the planning commission with the information in its possession about every project in the planning region for which an assessment is pend ing. 45 (1) Une fois informés par l’office d’aménagement mis sur pied en conformité avec un accord définitif qu’un plan d’aménagement régional visant — même en partie — une circonscription est en cours d’établissement confor mément à cet accord, le bureau désigné compétent et le comité de direction sont tenus de communiquer à l’office d’aménagement tous les renseignements dont ils dis posent relativement aux projets de développement de vant être réalisés dans la région en question et faisant l’objet d’une évaluation. Representations Invitation (2) The executive committee shall invite a planning com mission that is preparing a land use plan to make repre sentations to it and to each panel of the Board that is conducting a review of a project, and each designated of fice that is conducting an evaluation of a project shall in vite the planning commission to make representations to it. (2) Ils sont aussi tenus d’inviter l’office d’aménagement à leur présenter, avant la fin de l’examen ou de la préétude, selon le cas, ses observations au sujet du plan. Le comité de direction peut aussi inviter l’office à faire cette présen tation devant le comité restreint qui procède à l’étude du projet de développement. Participation by interested persons Participation des intéressés 46 Subject to subsections 60(4), 95(4) and 103(4), a des ignated office, the executive committee or a panel of the Board shall provide and publicize opportunities for inter ested persons and the public to participate in any assess ment conducted by it. 46 Sous réserve des paragraphes 60(4), 95(4) et 103(4), le bureau désigné, le comité de direction et le comité res treint sont tenus de permettre la participation des inté ressés et du public aux évaluations et de donner avis pu blic des occasions offertes à cette fin. Time Limits Délais Authority and validity Mandat et validité des actes 46.1 The failure of the federal minister, the Minister of the Environment, the territorial minister, the Board, a decision body, a designated office, the executive commit tee, a panel of the Board or a joint panel to exercise a power or perform a duty or function within a period pro vided for under this Act does not terminate their authori ty to do so nor does it invalidate any document prepared or submitted or any decision or action taken in the exer cise or performance of their powers, duties or functions. 2015, c. 19, s. 11. 46.1 Le défaut du ministre fédéral, du ministre de l’En vironnement, du ministre territorial, de l’Office, d’un dé cisionnaire, d’un bureau désigné, d’un comité de direc tion, d’un comité restreint ou d’un comité mixte d’exercer ses attributions dans le délai prévu sous le régime de la présente loi n’a pas pour effet de mettre fin à son mandat ni d’invalider les documents préparés ou présentés dans l’exercice de ses attributions ou les décisions et mesures prises dans le cadre de celles-ci. 2015, ch. 19, art. 11. Proposed Activities Subject to Assessment Activités visées Regulations identifying activities Pouvoir réglementaire 47 (1) The Governor in Council may make regulations 47 (1) Le gouverneur en conseil peut, par règlement, établir la liste des activités qui pourraient être assujetties Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Proposed Activities Subject to Assessment Activités visées Sections 47-48 Articles 47-48 Current to November 9, 2016 Last amended on June 18, 2015 27 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (a) listing activities that may be made subject to as sessment; and (b) making exceptions from activities so listed. à l’évaluation; il peut aussi prévoir des exceptions à celles-ci. Circumstances Assujettissement (2) An activity listed under paragraph (1)(a) — and not excepted under paragraph (1)(b) — is subject to assess ment if proposed to be undertaken in Yukon and if (a) a federal agency or federal independent regulatory agency is the proponent; (b) a territorial agency, municipal government, terri torial independent regulatory agency or first nation is the proponent and an authorization or the grant of an interest in land would be required for the activity to be undertaken by a private individual; (c) an authorization or the grant of an interest in land by a government agency, independent regulatory agency, municipal government or first nation is re quired for the activity to be undertaken; or (d) an authorization by the Governor in Council is re quired for the activity to be undertaken. 2003, c. 7, s. 47; 2015, c. 19, s. 12. (2) Est assujettie à l’évaluation toute activité qui pourrait l’être aux termes des règlements, qui ne fait pas l’objet d’une exception réglementaire, qui doit être exercée au Yukon et qui remplit l’une ou l’autre des conditions sui vantes : a) une autorité fédérale ou un organisme administra tif autonome fédéral en est le promoteur; b) une autorité territoriale, une municipalité, un orga nisme administratif autonome territorial ou une pre mière nation en est le promoteur, dans les cas où la délivrance d’une autorisation ou l’attribution de droits fonciers serait nécessaire à son exercice si le promo teur était un particulier; c) l’autorisation d’une autorité publique, d’un orga nisme administratif autonome, d’une municipalité ou d’une première nation, ou l’attribution, par ceux-ci, de droits fonciers est nécessaire à son exercice; d) l’autorisation du gouverneur en conseil est néces saire à son exercice. 2003, ch. 7, art. 47; 2015, ch. 19, art. 12. Declarations Déclaration 48 (1) Where an activity is listed under para graph 47(1)(a) but is excepted under paragraph 47(1)(b), a declaration that the activity is subject to assessment may nevertheless be made, in circumstances referred to in subsection (3) or (4), by (a) a federal agency that is the proponent of the activi ty or that has the power to issue an authorization or to grant an interest in land required for the activity to be undertaken; (b) the federal minister, if the Governor in Council has the power to issue an authorization required for the activity to be undertaken or if a federal indepen dent regulatory agency is the proponent of the activity or has the power to issue an authorization or to grant an interest in land required for the activity to be un dertaken; (c) the territorial minister, if a territorial agency, a municipal government or a territorial independent regulatory agency is the proponent of the activity or has the power to issue an authorization or to grant an 48 (1) Est assujettie à l’évaluation l’activité exceptée en vertu du paragraphe 47(1) qui fait l’objet d’une déclara tion à cet effet — dans les cas visés aux paragraphes (3) ou (4) — de la part : a) d’une autorité fédérale, dans le cas où celle-ci en est le promoteur ou peut accorder une autorisation ou des droits fonciers nécessaires à son exercice; b) du ministre fédéral, dans le cas où soit l’autorisa tion du gouverneur en conseil est nécessaire à son exercice, soit un organisme administratif autonome fédéral en est le promoteur ou peut accorder une telle autorisation ou de tels droits; c) du ministre territorial, dans le cas où une autorité territoriale, un organisme administratif autonome ter ritorial ou une municipalité en est le promoteur ou peut accorder une telle autorisation ou de tels droits; d) d’une première nation, dans le cas où celle-ci en est le promoteur ou peut accorder une telle autorisation ou de tels droits. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Proposed Activities Subject to Assessment Activités visées Section 48 Article 48 Current to November 9, 2016 Last amended on June 18, 2015 28 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 interest in land required for the activity to be undertaken; or (d) a first nation that is the proponent of the activity or that has the power to issue an authorization or to grant an interest in land required for the activity to be undertaken. Consent to declaration Agrément (2) A declaration that a particular activity is subject to assessment must be consented to by every person or body referred to in subsection (1) that has the power to make that declaration. (2) Toute déclaration doit recevoir l’agrément de qui conque est autorisé à la faire relativement à l’activité en cause. Significant adverse effects Effets négatifs (3) A declaration that an activity is subject to assessment may be made by the federal agency, federal minister, ter ritorial minister or first nation if they are of the opinion that the activity might (a) have significant adverse environmental or socio economic effects in or outside Yukon; or (b) contribute significantly to cumulative adverse en vironmental or socio-economic effects in combination with projects for which proposals have been submitted under subsection 50(1) or with other activities known to them that are proposed, undertaken or completed in or outside Yukon. (3) La déclaration peut être faite dans les cas où, de l’avis du déclarant, l’activité visée : a) soit est susceptible d’avoir des effets négatifs im portants sur l’environnement ou la vie socioécono mique au Yukon ou à l’extérieur de ses limites; b) soit, lorsqu’elle est combinée à des projets de déve loppement ayant fait l’objet d’une proposition en vertu du paragraphe 50(1) ou à d’autres activités — même projetées ou complétées — , au Yukon ou à l’extérieur de ses limites, qui ont été portées à sa connaissance, risque de contribuer de façon importante aux effets cumulatifs négatifs sur l’environnement ou la vie so cioéconomique. Activity in protected area Lieu de réalisation (4) A declaration that an activity is subject to assessment may also be made in respect of an activity if the activity is to be undertaken (a) in an area that contains a heritage resource, other than a record only, or that is a heritage resource, and that is for that reason protected by federal, territorial or first nation law or that is identified, in a land use plan in effect under a final agreement, as an area that should be so protected; (b) in a special management area that is identified as such in a final agreement or that is established in ac cordance with a final agreement; or (c) in an area that forms the habitat for any species of plant or wildlife that is determined to be rare, threat ened, endangered or at risk by or under federal, terri torial or first nation law. 2003, c. 7, s. 48; 2015, c. 19, s. 13. (4) La déclaration peut en outre être faite dans les cas où l’activité visée doit être exercée dans l’un ou l’autre des lieux suivants : a) une région qui contient une ressource patrimoniale — autre qu’un document — ou en constitue une et qui, de ce fait, fait l’objet soit d’un régime de protection en vertu d’un texte législatif fédéral ou territorial ou d’un texte législatif d’une première nation, soit d’une re commandation en ce sens dans un plan d’aménage ment régional applicable en vertu d’un accord défini tif; b) une zone spéciale de gestion dont fait mention un accord définitif ou dont l’établissement est prévu par celui-ci; c) une région où des espèces animales ou végétales rares, menacées, en voie de disparition ou en péril — aux termes d’un texte législatif fédéral ou territorial ou d’un texte législatif d’une première nation — ont leur habitat. 2003, ch. 7, art. 48; 2015, ch. 19, art. 13. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Proposed Activities Subject to Assessment Activités visées Sections 49-50 Articles 49-50 Current to November 9, 2016 Last amended on June 18, 2015 29 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Emergencies exempted Activités soustraites à l’évaluation 49 (1) Notwithstanding sections 47 and 48, no assess ment is required of an activity that is undertaken in re sponse to a national emergency for which special tempo rary measures are being taken under the Emergencies Act, or in response to an emergency when it is in the in terest of public welfare, health or safety or of protecting property or the environment that the activity be under taken immediately. 49 (1) Est soustraite à l’évaluation, par dérogation aux articles 47 et 48, l’activité qui est exercée soit en réaction à une situation de crise nationale pour laquelle des me sures d’intervention sont prises aux termes de la Loi sur les mesures d’urgence, soit en réaction à une situation d’urgence nécessitant qu’elle soit exercée sans délai pour la protection des biens ou de l’environnement ou pour le bien-être, la santé ou la sécurité publics. Reporting after emergencies Rapport (2) As soon as practicable after any such activity is com pleted, the person who undertook it shall send a written report to the designated office for each assessment dis trict in which it was undertaken describing the nature, extent and duration of the activity and any work required in order to restore or rehabilitate the area affected by it. (2) Quiconque exerce cette activité fait parvenir au bu reau désigné de toute circonscription où a eu lieu l’exer cice, dans les meilleurs délais suivant la fin de l’activité, un rapport indiquant sa nature, son envergure et sa du rée et décrivant les travaux de remise en état effectués dans les régions touchées. No significant change Absence de changements importants 49.1 (1) A new assessment of a project or existing project is not required when an authorization is renewed or amended unless, in the opinion of a decision body for the project, there is a significant change to the original project that would otherwise be subject to an assessment. 49.1 (1) Ne doit pas faire l’objet d’une nouvelle évalua tion le projet de développement ou l’ouvrage pour lequel une autorisation est renouvelée ou modifiée, à moins que, de l’avis du décisionnaire compétent, il n’ait fait l’objet de changements importants qui seraient par ailleurs assujettis à une évaluation. Consultation between decision bodies Consultation entre décisionnaires (2) If there is more than one decision body for the project, they shall consult one another in determining whether a new assessment is required. 2015, c. 19, s. 14. (2) Si le projet de développement relève de plus d’un dé cisionnaire, ils se consultent pour décider si une nouvelle évaluation est requise. 2015, ch. 19, art. 14. Proposals for Projects Saisine Submission of proposals Propositions 50 (1) A proponent shall submit a proposal for a project (a) to the executive committee, in the case of a project specified in regulations made under paragraph 122(c); or (b) in any other case, to the designated office for the assessment district in which the project is to be under taken, subject to the rules made under para graph 31(2)(d). 50 (1) Le promoteur d’un projet de développement sou met une proposition, s’il s’agit d’un projet visé par un rè glement pris en vertu de l’alinéa 122c), au comité de di rection ou, dans les autres cas, au bureau désigné de toute circonscription où le projet doit être réalisé, sous réserve des règles établies en vertu de l’alinéa 31(2)d). Considerations by proponent Points importants (2) The proponent of a project shall, in preparing a pro posal, incorporate any appropriate mitigative measures and take into consideration the matters referred to in paragraphs 42(1)(b), (c), (e) and (f) and, if applicable, subsection 42(2.1), in the case of a proposal submitted to a designated office, or the matters referred to in those (2) Le promoteur fait état, dans sa proposition, des me sures d’atténuation appropriées et tient compte des points énumérés aux alinéas 42(1)b), c), e) et f) et, le cas échéant, au paragraphe 42(2.1), lorsqu’il soumet sa pro position au bureau désigné, et de ceux énumérés à ces alinéas et aux alinéas 42(1)g) à h) et, le cas échéant, au Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Proposals for Projects Saisine Sections 50-53 Articles 50-53 Current to November 9, 2016 Last amended on June 18, 2015 30 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 paragraphs, paragraphs 42(1)(g) to (h) and, if applicable, subsection 42(2.1), in the case of a proposal submitted to the executive committee. paragraphe 42(2.1), lorsqu’il la soumet au comité de di rection. Consultation Consultation (3) Before submitting a proposal to the executive com mittee, the proponent of a project shall consult any first nation in whose territory, or the residents of any commu nity in which, the project will be located or might have significant environmental or socio-economic effects. (3) La proposition ne peut être soumise au comité de di rection qu’après consultation, par le promoteur, des pre mières nations sur le territoire desquelles le projet doit être réalisé ou est susceptible d’avoir des effets impor tants sur l’environnement ou sur la vie socioéconomique, ainsi que des résidents des localités où le projet doit être réalisé ou est susceptible d’avoir de tels effets. Notification of Environment Minister Notification (4) The executive committee shall notify the Minister of the Environment of any proposal submitted to it under paragraph (1)(a) for a project for which there is a federal decision body. 2003, c. 7, s. 50; 2015, c. 19, s. 15. (4) Le comité de direction notifie au ministre de l’Envi ronnement toute proposition qui lui est soumise visant un projet de développement relevant d’un décisionnaire fédéral. 2003, ch. 7, art. 50; 2015, ch. 19, art. 15. Determination of scope Portée de l’évaluation 51 A designated office or the executive committee shall determine the scope of a project to be assessed by it, and shall include within the scope of the project, in addition to any activity identified in the proposal, any other activi ty that it considers likely to be undertaken in relation to an activity so identified and sufficiently related to it to be included in the project. 51 Le bureau désigné ou le comité de direction déter mine l’envergure du projet de développement qui fait l’objet de l’évaluation. Ce faisant, il étend la portée de l’é valuation à toute activité, outre les activités mentionnées dans la proposition, qui sera vraisemblablement exercée en rapport avec celles-ci et leur est suffisamment liée pour faire partie du projet. Grouping of related projects Projets de développement liés 52 A designated office or the executive committee shall assess as a single project two or more projects for which it has received proposals where it considers that the projects are so closely related as to be part of the same activity or where all the decision bodies for each of the projects have advised it that they consider the projects to be so related. 52 Le bureau désigné ou le comité de direction, s’il es time que plusieurs projets de développement à l’égard desquels il reçoit des propositions sont suffisamment liés pour faire partie d’une même activité ou si tous les déci sionnaires compétents l’ont avisé qu’ils les estiment ainsi liés, les évalue comme s’ils ne formaient qu’un seul pro jet. Evaluations by multiple designated offices Pluralité de bureaux désignés 53 An evaluation may be conducted, in the manner pro vided by the rules made under paragraph 31(2)(e), by two or more designated offices jointly or by one of them on behalf of the other or others, where (a) a single project is located in two or more assess ment districts; or (b) a designated office considers projects located in two or more assessment districts to be closely related. 53 Différents bureaux désignés peuvent effectuer conjointement l’examen d’un projet de développement et un seul peut le faire pour le compte de tous, en conformi té avec les règles établies en vertu de l’alinéa 31(2)e), dans les cas suivants : a) le projet doit être réalisé dans plus d’une circons cription; b) l’un des bureaux désignés estime étroitement liés des projets devant être réalisés dans des circonscrip tions différentes. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Proposals for Projects Saisine Sections 54-55 Articles 54-55 Current to November 9, 2016 Last amended on June 18, 2015 31 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Withdrawal of project Projet de développement abandonné 54 (1) A proponent that intends not to proceed with a project shall give notice to that effect to any body that has conducted or is conducting an assessment of the project and to any decision body that is considering recommen dations relating to the project. 54 (1) Le promoteur est tenu de notifier l’abandon d’un projet de développement à quiconque est chargé de son évaluation, ou y a procédé, et au décisionnaire saisi des recommandations qui en découlent. Discontinuance Effet (2) Any assessment of a project conducted by a body that is notified under subsection (1), and any consideration of a recommendation made in respect of the project by a de cision body notified under that subsection, shall be dis continued. (2) La notification met fin à toute forme d’évaluation en cours sous le régime de la présente partie et à l’examen des recommandations qui en découlent. Evaluation of Projects by Designated Offices Examen par le bureau désigné Preliminary determinations Détermination par le bureau désigné 55 (1) Where a proposal for a project is submitted to a designated office under paragraph 50(1)(b), the designat ed office shall (a) consider whether the applicable rules have, in its opinion, been complied with and notify the proponent accordingly; and (b) determine whether the project will be located, or might have significant environmental or socio-eco nomic effects, in the territory of a first nation. 55 (1) Saisi d’une proposition relative à un projet de dé veloppement en application du paragraphe 50(1), le bu reau désigné : a) adresse au promoteur un avis indiquant si, à son avis, les obligations prévues par les règles ont été rem plies; b) établit si le lieu de réalisation se trouve dans le ter ritoire d’une première nation ou si le projet est suscep tible d’avoir, dans un tel territoire, des effets impor tants sur l’environnement ou la vie socioéconomique. Evaluation by designated office Examen (2) A designated office shall commence the evaluation of a project as soon as possible after it notifies the propo nent affirmatively under paragraph (1)(a). (2) Le bureau désigné procède à l’examen du projet de développement dans les meilleurs délais suivant l’envoi d’un avis positif en vertu de l’alinéa (1)a). Information and views Demande d’avis et de renseignements (3) A designated office may seek any information or views that it believes relevant to its evaluation. (3) Le bureau désigné peut demander les avis et l’infor mation qu’il estime nécessaires à l’examen. Information and views Demande obligatoire (4) Before making a recommendation under any of para graphs 56(1)(a) to (c), a designated office shall seek views about the project, and information that it believes rele vant to the evaluation, from any first nation identified under paragraph (1)(b) and from any government agen cy, independent regulatory agency or first nation that has notified the designated office of its interest in the project or in projects of that kind. (4) Le bureau désigné ne formule ses recommandations au titre des alinéas 56(1)a) à c) qu’après avoir, d’une part, demandé l’avis de la première nation dont le territoire est touché aux termes de l’alinéa (1)b) et des autorités pu bliques, organismes administratifs autonomes et pre mières nations l’ayant avisé de leur intérêt dans le projet de développement ou dans les projets de même catégorie et, d’autre part, cherché à obtenir d’eux l’information qu’il estime nécessaire à l’examen. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Evaluation of Projects by Designated Offices Examen par le bureau désigné Section 56 Article 56 Current to November 9, 2016 Last amended on June 18, 2015 32 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Conclusion of evaluation Décision 56 (1) A designated office shall, within nine months af ter the day on which a proposal is submitted to it under paragraph 50(1)(b), conclude its evaluation of the project by (a) recommending to the decision bodies for the project that the project be allowed to proceed, if it de termines that the project will not have significant ad verse environmental or socio-economic effects in or outside Yukon; (b) recommending to those decision bodies that the project be allowed to proceed, subject to specified terms and conditions, if it determines that the project will have, or is likely to have, significant adverse envi ronmental or socio-economic effects in or outside Yukon that can be mitigated by those terms and condi tions; (c) recommending to those decision bodies that the project not be allowed to proceed, if it determines that the project will have, or is likely to have, significant adverse environmental or socio-economic effects in or outside Yukon that cannot be mitigated; or (d) referring the project to the executive committee for a screening, if, after taking into account any mit igative measures included in the project proposal, it cannot determine whether the project will have, or is likely to have, significant adverse environmental or so cio-economic effects. 56 (1) Dans les neuf mois suivant la date où une propo sition lui est soumise aux termes du paragraphe 50(1), le bureau désigné termine l’examen du projet de développe ment en prenant l’une ou l’autre des décisions suivantes : a) il recommande aux décisionnaires compétents de permettre la réalisation du projet de développement dans le cas où il conclut que celui-ci n’aura pas d’effets négatifs importants sur l’environnement ou la vie so cioéconomique au Yukon ou à l’extérieur de ses li mites; b) il leur recommande de permettre la réalisation du projet sous réserve de certaines conditions dans le cas où il conclut que celui-ci aura ou risque d’avoir de tels effets mais que ceux-ci peuvent être atténués grâce à ces conditions; c) il leur recommande de refuser la réalisation du projet dans le cas où il conclut que celui-ci aura ou risque d’avoir de tels effets qu’il est impossible d’atté nuer; d) il renvoie l’affaire au comité de direction pour exa men dans le cas où il est incapable d’établir, malgré les mesures d’atténuation prévues, si le projet aura ou risque d’avoir des effets négatifs importants sur l’envi ronnement ou la vie socioéconomique. Excluded period Période exclue (1.1) If the designated office requires the proponent of the project to provide or collect information or to under take a study, the period that, in the designated office’s opinion, is taken by the proponent to comply with the re quirement is not included in the calculation of the time limit under subsection (1) or of its extension. (1.1) Dans le cas où le bureau désigné exige du promo teur du projet de développement qu’il lui fournisse des renseignements ou qu’il procède à une étude ou à la col lecte de renseignements relativement au projet, la pé riode prise, à son avis, par le promoteur pour remplir cette exigence n’est pas comprise dans le calcul du délai ou de sa prolongation. Extension of time limit by federal minister Prolongation du délai par le ministre fédéral (1.2) The federal minister may, at the request of the Board, extend the time limit referred to in subsection (1) by a maximum of two months to take into account cir cumstances that are specific to the proposal for a project. (1.2) Le ministre fédéral peut, sur demande de l’Office, prolonger d’au plus deux mois le délai prévu au para graphe (1) pour tenir compte des circonstances particu lières à une proposition relative à un projet de dévelop pement. Extension of time limit by Governor in Council Prolongation du délai par le gouverneur en conseil (1.3) The Governor in Council may, by order, on the rec ommendation of the federal minister, further extend the time limit any number of times by periods of any length. (1.3) Le gouverneur en conseil peut, par décret pris sur la recommandation du ministre fédéral, accorder une ou plusieurs prolongations supplémentaires de toute durée. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Evaluation of Projects by Designated Offices Examen par le bureau désigné Sections 56-57 Articles 56-57 Current to November 9, 2016 Last amended on June 18, 2015 33 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Notification Communication des recommandations (2) A recommendation under any of paragraphs (1)(a) to (c) shall be made in writing with reasons and a copy pro vided to the proponent. (2) Les recommandations visées aux alinéas (1)a) à c) sont communiquées par écrit, motifs à l’appui, avec copie au promoteur. Notice of reasons for referral Communication des motifs (3) The designated office shall provide written reasons for a referral under paragraph (1)(d) to the proponent, to any first nation identified under paragraph 55(1)(b) and to any government agency, independent regulatory agen cy or first nation that has notified the designated office of its interest in the project or in projects of that kind. (3) Le bureau désigné communique par écrit les motifs du renvoi effectué en vertu de l’alinéa (1)d) au promo teur, à la première nation dont le territoire est touché aux termes de l’alinéa 55(1)b), ainsi qu’aux autorités pu bliques, aux organismes administratifs autonomes et aux premières nations l’ayant avisé de leur intérêt dans le projet de développement ou dans les projets de même ca tégorie. Revised proposal Révision de la proposition (4) Following receipt of the reasons for referral, the pro ponent shall submit a revised proposal to the executive committee that takes into account the matters referred to in paragraphs 42(1)(b), (c) and (e) to (h). (4) Le promoteur, après réception des motifs du renvoi, révise la proposition soumise en application du para graphe 50(1) pour y tenir compte, en plus des points déjà soulevés, de ceux énumérés aux alinéas 42(1)g) et h) et l’adresse au comité de direction. Documentation Communication de documents (5) Where a designated office refers a project to the exec utive committee, it shall provide the executive committee with copies of its documentation relating to the project. 2003, c. 7, s. 56; 2015, c. 19, s. 16. (5) Le bureau désigné adresse au comité de direction co pie de tous les documents en sa possession relatifs au projet de développement qui fait l’objet du renvoi. 2003, ch. 7, art. 56; 2015, ch. 19, art. 16. Screening of Projects by Executive Committee Avis et préétude par le comité de direction Preliminary determination Détermination par le comité de direction 57 (1) Where a proposal for a project is submitted or re ferred to the executive committee under para graph 50(1)(a) or 56(1)(d), the executive committee shall consider whether the applicable rules have, in its opin ion, been complied with and notify the proponent ac cordingly. 57 (1) Saisi d’une proposition relative à un projet de dé veloppement en application du paragraphe 50(1) ou de l’alinéa 56(1)d), le comité de direction adresse au promo teur un avis indiquant si, à son avis, les obligations pré vues par les règles ont été remplies. Screening by executive committee Préétude par le comité de direction (2) The executive committee shall commence a screening of a project as soon as possible after it notifies the propo nent affirmatively under subsection (1) and advises the proponent that, in its opinion, the proponent has in its proposal taken into consideration the matters referred to in paragraphs 42(1)(b), (c) and (e) to (h) and has consult ed first nations and the residents of communities in ac cordance with subsection 50(3). (2) Le comité de direction procède à la préétude du pro jet de développement dans les meilleurs délais suivant l’envoi d’un avis positif en vertu du paragraphe (1) qui in dique au surplus que, à son avis, le promoteur a tenu compte dans sa proposition des points énumérés aux ali néas 42(1)b), c) et e) à h) et a effectué les consultations requises par le paragraphe 50(3). Information and views Demande d’avis et de renseignements (3) The executive committee may seek any information or views that it believes relevant to its screening. (3) Le comité de direction peut demander les avis et l’in formation qu’il estime nécessaires à la préétude. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Screening of Projects by Executive Committee Avis et préétude par le comité de direction Sections 57-58 Articles 57-58 Current to November 9, 2016 Last amended on June 18, 2015 34 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Information and views Demande obligatoire (4) Before making a recommendation under para graph 58(1)(a), (b) or (c), the executive committee shall seek views about the project, and information that it be lieves relevant to the screening, from any first nation consulted under subsection 50(3) and from any govern ment agency, independent regulatory agency or first na tion that has notified the executive committee of its inter est in the project or in projects of that kind. (4) Le comité de direction ne formule ses recommanda tions au titre des alinéas 58(1)a), b) ou c) qu’après avoir, d’une part, demandé l’avis des premières nations consul tées en application du paragraphe 50(3) et des autorités publiques, organismes administratifs autonomes et pre mières nations l’ayant avisé de leur intérêt dans le projet de développement ou dans les projets de même catégorie et, d’autre part, cherché à obtenir d’eux l’information qu’il estime nécessaire à la préétude. Conclusion of screening Décision 58 (1) The executive committee shall, within 16 months after the day on which a proposal is submitted to it under paragraph 50(1)(a) or referred to it under paragraph 56(1)(d), conclude its screening of the project by (a) recommending to the decision bodies for the project that the project be allowed to proceed without a review, if it determines that the project will not have significant adverse environmental or socio-economic effects in or outside Yukon; (b) recommending to those decision bodies that the project be allowed to proceed without a review, subject to specified terms and conditions, if it determines that the project will have, or is likely to have, significant adverse environmental or socio-economic effects in or outside Yukon that can be mitigated by those terms and conditions; (c) recommending to those decision bodies that the project not be allowed to proceed and not be subject to a review, if it determines that the project will have, or is likely to have, significant adverse environmental or socio-economic effects in or outside Yukon that can not be mitigated; or (d) requiring a review of the project, if, after taking in to account any mitigative measures included in the project proposal, it cannot determine whether the project will have, or is likely to have, significant ad verse environmental or socio-economic effects. 58 (1) Dans les seize mois suivant la date où une propo sition lui est soumise aux termes du paragraphe 50(1) ou à laquelle un projet lui est renvoyé en application de l’ali néa 56(1)d), le comité de direction termine la préétude du projet de développement en prenant l’une ou l’autre des décisions suivantes : a) il recommande aux décisionnaires compétents de permettre la réalisation du projet — sans qu’une étude soit effectuée — dans le cas où il conclut que celui-ci n’aura pas d’effets négatifs importants sur l’environ nement ou la vie socioéconomique au Yukon ou à l’ex térieur de ses limites; b) il leur recommande de permettre la réalisation du projet — sans qu’une étude soit effectuée — sous ré serve de certaines conditions dans le cas où il conclut que celui-ci aura ou risque d’avoir de tels effets mais que ceux-ci peuvent être atténués grâce à ces condi tions; c) il leur recommande de refuser la réalisation du projet — sans qu’une étude soit effectuée — dans le cas où il conclut que celui-ci aura ou risque d’avoir de tels effets qu’il est impossible d’atténuer; d) il ordonne l’étude du projet dans le cas où il n’est pas en mesure d’établir si, malgré les mesures d’atté nuation prévues, celui-ci aura ou risque d’avoir des ef fets négatifs importants sur l’environnement ou la vie socioéconomique. Excluded period Période exclue (1.1) If the executive committee requires the proponent of the project to provide or collect information or to un dertake a study, the period that, in the executive commit tee’s opinion, is taken by the proponent to comply with the requirement is not included in the calculation of the time limit under subsection (1) or of its extension. (1.1) Dans le cas où le comité de direction exige du pro moteur du projet de développement qu’il lui fournisse des renseignements ou qu’il procède à une étude ou à la collecte de renseignements relativement au projet, la pé riode prise, à son avis, par le promoteur pour remplir cette exigence n’est pas comprise dans le calcul du délai ou de sa prolongation. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Screening of Projects by Executive Committee Avis et préétude par le comité de direction Sections 58-59 Articles 58-59 Current to November 9, 2016 Last amended on June 18, 2015 35 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Extension of time limit by federal minister Prolongation du délai par le ministre fédéral (1.2) The federal minister may, at the request of the Board, extend the time limit referred to in subsection (1) by a maximum of two months to take into account cir cumstances that are specific to the proposal for a project. (1.2) Le ministre fédéral peut, sur demande de l’Office, prolonger d’au plus deux mois le délai prévu au para graphe (1) pour tenir compte des circonstances particu lières à une proposition relative à un projet de dévelop pement. Extension of time limit by Governor in Council Prolongation du délai par le gouverneur en conseil (1.3) The Governor in Council may, by order, on the rec ommendation of the federal minister, further extend the time limit any number of times by periods of any length. (1.3) Le gouverneur en conseil peut, par décret pris sur la recommandation du ministre fédéral, accorder une ou plusieurs prolongations supplémentaires de toute durée. Review required — other cases Étude obligatoire (2) Irrespective of any determination made under sub section (1), the executive committee shall require a re view of the project if (a) it determines, after taking into account any mitiga tive measures included in the project proposal, that the project might contribute significantly to cumula tive adverse environmental or socio-economic effects in Yukon or that the project is causing or is likely to cause significant public concern in Yukon; or (b) it determines that the project involves technology that is controversial in Yukon or the effects of which are unknown. (2) Toutefois, indépendamment de toute conclusion pré vue au paragraphe (1), le comité de direction est tenu d’ordonner l’étude du projet de développement dans les cas où il en vient à l’une ou l’autre des conclusions sui vantes : a) malgré les mesures d’atténuation prévues, le projet soit est susceptible de contribuer de façon importante aux effets cumulatifs négatifs sur l’environnement ou la vie socioéconomique au Yukon, soit y soulève ou y soulèvera vraisemblablement de sérieuses préoccupa tions publiques; b) le projet met en jeu des techniques qui sont contro versées au Yukon ou dont les effets sont inconnus. Notification Communication des recommandations (3) A recommendation under paragraph (1)(a), (b) or (c) shall be made in writing with reasons and a copy provid ed to the proponent. (3) Les recommandations visées aux alinéas (1)a), b) ou c) sont communiquées par écrit, motifs à l’appui, avec co pie au promoteur. Notice of reasons for review Notification (4) Where the executive committee requires a review un der paragraph (1)(d) or subsection (2), it shall provide written reasons for doing so to the proponent and any first nation consulted under subsection 50(3) as well as to any government agency, independent regulatory agency or first nation that has notified the executive committee of its interest in the project or in projects of that kind. 2003, c. 7, s. 58; 2015, c. 19, s. 17. (4) Le comité de direction notifie par écrit la décision d’ordonner l’étude, motifs à l’appui, au promoteur, aux premières nations consultées en application du para graphe 50(3), ainsi qu’aux autorités publiques, orga nismes administratifs autonomes et premières nations l’ayant avisé de leur intérêt dans le projet de développe ment ou dans les projets de même catégorie. 2003, ch. 7, art. 58; 2015, ch. 19, art. 17. Recommendation for non-referral rejected Cas particulier : rejet d’une recommandation 59 If the executive committee recommends that a project not be referred for a review, but that recommen dation is rejected by a decision body for the project and the decision body so notifies the executive committee in writing within 15 days after receiving the recommenda tion, the executive committee shall require a review of the project. 2003, c. 7, s. 59; 2015, c. 19, s. 18. 59 Dans le cas où un décisionnaire l’avise par écrit, dans les quinze jours qui suivent sa réception, qu’il rejette la recommandation faite par le comité de direction et por tant dispense d’étude, le comité de direction est tenu d’ordonner l’étude du projet de développement. 2003, ch. 7, art. 59; 2015, ch. 19, art. 18. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Request for Review Demande d’étude Section 60 Article 60 Current to November 9, 2016 Last amended on June 18, 2015 36 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Request for Review Demande d’étude Review of project Demandeurs 60 (1) A request for a review of a project may be made to the executive committee (a) by either the federal minister or the Minister of the Environment, if there is a federal decision body for the project; (b) by the territorial minister, if the territorial minis ter is a decision body for the project; or (c) by a first nation with the consent of the federal minister and, if the territorial minister is a decision body for the project, with the consent of the territorial minister. 60 (1) Peuvent présenter au comité de direction une de mande d’étude d’un projet de développement : a) le ministre fédéral ou le ministre de l’Environne ment, si le projet relève d’un décisionnaire fédéral; b) le ministre territorial, s’il est décisionnaire; c) une première nation, avec l’agrément du ministre fédéral et, s’il est décisionnaire, du ministre territorial. Joint request Demande conjointe (2) A request for a review must be made jointly by the territorial minister and either the federal minister or the Minister of the Environment if the decision bodies for the project include both the territorial minister and a federal decision body. (2) La demande doit cependant être présentée conjointe ment par le ministre territorial et soit le ministre fédéral, soit le ministre de l’Environnement, si le projet relève à la fois du ministre territorial, à titre de décisionnaire, et d’un décisionnaire fédéral. Exceptions Exception (3) A request for a review may not be made if (a) the executive committee has already required a re view of the project under paragraph 58(1)(d) or sub section 58(2); or (b) a recommendation has already been made in re spect of the project by a designated office or the execu tive committee and all decision bodies to which the recommendation was made have issued decision doc uments. (3) La demande ne peut être présentée dans les cas sui vants : a) le comité de direction a décidé de faire procéder à une étude en vertu de l’alinéa 58(1)d) ou du para graphe 58(2); b) le projet de développement a fait l’objet d’une re commandation de la part d’un bureau désigné ou du comité de direction et tous les décisionnaires à qui celle-ci a été communiquée ont rendu leur décision écrite. Form of review Précision (4) A request shall specify whether a review is to be a public review or some other form of review. (4) La demande précise si l’étude sera publique ou d’un autre type. Pending assessments Effet (5) Where a request is made for a review, any assessment of the project by a designated office or the executive com mittee or any consideration by a decision body of a rec ommendation made in respect of the project, as the case may be, shall be discontinued. (5) La présentation de la demande met fin à toute forme d’évaluation en cours sous le régime de la présente partie et à l’examen des recommandations qui en découlent. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Powers of Minister of Environment Pouvoirs du ministre de l’Environnement Section 61 Article 61 Current to November 9, 2016 Last amended on June 18, 2015 37 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Powers of Minister of Environment Pouvoirs du ministre de l’Environnement Requirement or request for review Projets relevant d’un décisionnaire fédéral 61 (1) When the executive committee, under paragraph 58(1)(d), subsection 58(2) or section 59, requires a review of a project for which there is a federal decision body, or when a public review of such a project is requested under section 60, the executive committee shall (a) notify the Minister of the Environment of its in tention to establish a panel of the Board; or (b) request that Minister to enter into negotiations for the establishment of a joint panel in accordance with section 67. 61 (1) Dans le cas où le projet de développement relève d’un décisionnaire fédéral, le comité de direction est te nu, une fois que l’étude du projet a été ordonnée en vertu de l’alinéa 58(1)d), du paragraphe 58(2) ou de l’article 59 ou après avoir reçu une demande d’étude publique pré sentée en conformité avec l’article 60, de prendre l’une ou l’autre des mesures suivantes : a) notifier au ministre de l’Environnement son inten tion d’établir un comité restreint; b) demander à ce ministre de négocier la conclusion d’un accord sous le régime de l’article 67. Consideration of effects outside Yukon Effets à l’extérieur du Yukon (2) When the executive committee, under paragraph 58(1)(d), subsection 58(2) or section 59, requires a review of a project for which there is no federal decision body, or when a public review of such a project is requested under section 60, the executive committee shall (a) if it determines that the project might have signifi cant adverse environmental or socio-economic effects outside Yukon, make a request under paragraph (1)(b); or (b) if it determines that the project will not have such effects, so notify the Minister of the Environment. (2) Dans le cas où le projet de développement ne relève pas d’un décisionnaire fédéral, le comité de direction vé rifie, après avoir ordonné l’étude en vertu de l’alinéa 58(1)d), du paragraphe 58(2) ou de l’article 59 ou reçu une demande d’étude publique présentée en conformité avec l’article 60, si le projet de développement est suscep tible d’avoir des effets négatifs importants sur l’environ nement ou la vie socioéconomique à l’extérieur du Yu kon. Dans l’affirmative, il est tenu de faire la demande prévue à l’alinéa (1)b); dans la négative, il communique sa conclusion au ministre de l’Environnement. Response by Minister of the Environment Réponse du ministre de l’Environnement (3) The Minister of the Environment may, within 30 days after receiving a notification under paragraph (1)(a), di rect the executive committee not to establish a panel of the Board, in which case the executive committee shall make a request under paragraph (1)(b). (3) Le ministre de l’Environnement peut, dans les trente jours suivant la notification faite au titre de l’alinéa (1)a), enjoindre au comité de direction de ne pas établir de co mité restreint. Le cas échéant, le comité de direction est tenu de lui faire une demande au titre de l’alinéa (1)b). Determination by Minister of the Environment Vérification par le ministre de l’Environnement (4) After receiving a notification of the executive com mittee’s determination under paragraph (2)(b), the Min ister of the Environment may consider and determine the same question and, if that Minister advises the executive committee of a contrary determination within 30 days af ter the notification, the executive committee shall make a request under paragraph (1)(b). 2003, c. 7, s. 61; 2015, c. 19, s. 19. (4) Le ministre de l’Environnement peut aussi, après la communication d’une conclusion négative au titre du pa ragraphe (2), procéder lui-même à la vérification qui y est prévue. S’il en vient à une conclusion différente et en avise le comité de direction dans les trente jours suivant cette communication, celui-ci est tenu de lui faire une de mande au titre de l’alinéa (1)b). 2003, ch. 7, art. 61; 2015, ch. 19, art. 19. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Powers of Minister of Environment Pouvoirs du ministre de l’Environnement Sections 62-65 Articles 62-65 Current to November 9, 2016 Last amended on June 18, 2015 38 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Response to request Acquiescement à la demande 62 The Minister of the Environment shall, within 30 days after receiving a request made under paragraph 61(1)(b), notify the executive committee whether he or she agrees to the request. 2003, c. 7, s. 62; 2015, c. 19, s. 19. 62 Le ministre de l’Environnement dispose d’un délai de trente jours après la réception de la demande qui lui est faite au titre de l’alinéa 61(1)b) pour notifier au comité de direction s’il y acquiesce ou non. 2003, ch. 7, art. 62; 2015, ch. 19, art. 19. 63 [Repealed, 2015, c. 19, s. 19] 63 [Abrogé, 2015, ch. 19, art. 19] 64 [Repealed, 2015, c. 19, s. 19] 64 [Abrogé, 2015, ch. 19, art. 19] Panels of the Board Comité restreint Establishment of panel Établissement 65 (1) Except where an agreement is entered into under section 67, the executive committee shall establish a pan el of the Board to conduct a review of a project where (a) a request is made under section 60 for a form of review other than a public review; or (b) the Minister of the Environment does not direct the executive committee as provided in subsection 61(3), does not advise the executive committee as pro vided in subsection 61(4) or does not agree to a re quest as provided in section 62. (c) [Repealed, 2015, c. 19, s. 20] 65 (1) Sauf si un accord est conclu en vertu de l’ar ticle 67, le comité de direction établit un comité restreint chargé de procéder à l’étude du projet de développement dans les cas suivants : a) une demande d’étude non publique est présentée au titre de l’article 60; b) il n’y a pas d’injonction, d’avis ou d’acquiescement de la part du ministre de l’Environnement au titre des paragraphes 61(3) ou (4) ou de l’article 62, respective ment. c) [Abrogé, 2015, ch. 19, art. 20] Failure to enter into agreement Échec des négociations (2) The executive committee shall establish a panel of the Board to conduct a review of a project if, despite ne gotiations entered into under paragraph 61(1)(b) for the establishment of a joint panel, no agreement is concluded under section 67. (2) Le comité de direction est aussi tenu d’établir un tel comité restreint dans le cas où, malgré l’acquiescement donné par le ministre de l’Environnement à la demande présentée en vertu de l’alinéa 61(1)b), aucun accord n’est conclu en vertu de l’article 67. Determination by executive committee Vérification par le comité de direction (3) Before a panel of the Board is established, the execu tive committee shall determine whether the project is likely to have significant adverse environmental or socio economic effects primarily on settlement land or on non settlement land. (3) Avant de procéder à l’établissement du comité res treint, le comité de direction vérifie si les effets négatifs importants du projet sur l’environnement ou la vie so cioéconomique se feront vraisemblablement sentir prin cipalement sur des terres désignées ou sur des terres non désignées. Designation of members Membres du comité restreint (4) The executive committee shall select the members of a panel of the Board for the review of a project from among the members of the Board, and shall designate one of them to be chairperson. (4) Le comité de direction choisit les membres du comité restreint — y compris le président de celui-ci — parmi les membres de l’Office. Composition of panels Composition (5) A panel of the Board shall be constituted as follows: (5) La composition du comité restreint obéit aux règles suivantes : Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Panels of the Board Comité restreint Sections 65-66 Articles 65-66 Current to November 9, 2016 Last amended on June 18, 2015 39 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (a) if the executive committee concludes under sub section (3) that effects are likely to occur primarily on settlement land, two thirds of the members of the pan el must be members nominated to the Board by the Council and one third must be members, excluding the Chairperson of the Board, who are not so nominat ed; (b) if the executive committee concludes under sub section (3) that effects are likely to occur primarily on non-settlement land, one third of the members of the panel must be members nominated to the Board by the Council and two thirds must be members, exclud ing the Chairperson of the Board, who are not so nom inated; and (c) in any other case, of the members of the panel oth er than its chairperson, one half must be members nominated to the Board by the Council and one half must be members who are not so nominated. a) les deux tiers des membres sont des personnes nommées à l’Office sur proposition du Conseil et le reste, des personnes — autres que le président de l’Of fice — qui y sont nommées autrement, dans le cas où, selon la vérification prévue au paragraphe (3), les ef fets négatifs importants se feront vraisemblablement sentir principalement sur des terres désignées; b) le tiers des membres sont des personnes nommées à l’Office sur proposition du Conseil et le reste, des personnes — autres que le président de l’Office — qui y sont nommées autrement, dans le cas où, selon cette vérification, de tels effets se feront vraisemblablement sentir principalement sur des terres non désignées; c) la moitié des membres — sans compter le président du comité — sont des personnes nommées à l’Office sur proposition du Conseil et l’autre moitié, des per sonnes qui y sont nommées autrement, dans les autres cas. Attendance Participation (6) Every member of a panel of the Board must be present at each meeting or hearing of the panel. (6) Les membres du comité restreint participent à toutes les réunions et audiences de celui-ci. Vacancies Vacance de poste (7) In the event of the absence or incapacity, or a vacan cy in the office, of a member of a panel of the Board, the executive committee shall, in a manner consistent with the proportions set out in subsection (5), (a) direct some or all of the remaining members of the panel to resume the review; (b) appoint another member to the panel and direct the panel to resume or recommence the review; or (c) appoint a new panel and direct the panel to recom mence the review. 2003, c. 7, s. 65; 2015, c. 19, s. 20. (7) En cas d’absence ou d’empêchement d’un membre du comité restreint, ou de vacance de son poste, le comité de direction, à la condition que la composition obéisse dans tous les cas aux règles du paragraphe (5) : a) ordonne aux autres membres ou à certains d’entre eux de poursuivre l’étude; b) nomme un remplaçant et ordonne au comité de poursuivre ou de recommencer l’étude; c) établit un nouveau comité restreint qu’il charge de recommencer l’étude. 2003, ch. 7, art. 65; 2015, ch. 19, art. 20. Terms of reference Mandat 66 (1) Subject to any specification as to the form of re view referred to in subsection 60(4), the executive com mittee shall establish the terms of reference of a panel of the Board. 66 (1) Le comité de direction fixe, en conformité avec les précisions formulées au titre du paragraphe 60(4) dans le cas d’une demande d’étude, le mandat du comité restreint chargé de l’étude d’un projet de développement. Publication of notice Publication (2) The executive committee shall publish, in a periodi cal that, in its opinion, has a large circulation in Yukon, (a) a notice of the establishment of a panel of the Board, and of the manner in which the public may ob tain copies of the panel’s terms of reference; and (2) Le comité de direction donne avis de l’établissement du comité restreint dans un périodique qui, à son avis, est largement diffusé au Yukon. L’avis indique la marche à suivre pour obtenir des copies du mandat, des modifi cations apportées à ce dernier et des motifs de celles-ci. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Panels of the Board Comité restreint Sections 66-66.1 Articles 66-66.1 Current to November 9, 2016 Last amended on June 18, 2015 40 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (b) if the panel’s terms of reference are subsequently modified, a notice of the manner in which the public may obtain copies of the modification and of the rea sons for it. Determination by executive committee Détermination par le comité de direction (3) In the case of a project that is the subject of a request referred to in paragraph 65(1)(a), the executive commit tee shall determine whether it will be located, or might have significant environmental or socio-economic effects, in the territory of a first nation. (3) Dans le cas visé à l’alinéa 65(1)a), le comité de direc tion établit si le lieu de réalisation se trouve dans le terri toire d’une première nation ou si le projet est susceptible d’avoir, dans un tel territoire, des effets importants sur l’environnement ou la vie socioéconomique. Distribution of terms of reference Copie du mandat (4) The executive committee shall provide copies of the terms of reference of a panel of the Board, and of any modification made to them with the reasons for it, to the proponent and any first nation identified under subsec tion (3) or consulted under subsection 50(3), as well as to any government agency, independent regulatory agency or first nation that has notified the executive committee of its interest in the project or in projects of that kind. (4) Le comité de direction adresse copie du mandat du comité restreint et de toute modification qui lui est ap portée — avec, dans ce dernier cas, les motifs de celle-ci — au promoteur, aux premières nations aux premières nations consultées en application du paragraphe 50(3) ou dont le territoire est touché aux termes du para graphe (3), ainsi qu’aux autorités publiques, aux orga nismes administratifs autonomes et aux premières na tions l’ayant avisé de leur intérêt dans le projet de développement ou dans les projets de même catégorie. Time limit Délai 66.1 (1) The executive committee shall establish a panel of the Board, and fix its terms of reference, within three months after the day on which it is required to do so un der subsection 65(1) or (2). 66.1 (1) Le comité de direction établit un comité res treint et fixe son mandat dans les trois mois suivant la date où un tel comité doit être établi en application des paragraphes 65(1) ou (2). Excluded period Période exclue (2) If the executive committee requires the proponent of the project to provide or collect information or to under take a study, the period that, in the committee’s opinion, is taken by that proponent to comply with the require ment is not included in the calculation of the time limit under subsection (1) or of its extension. (2) Dans le cas où le comité de direction exige du promo teur du projet de développement qu’il lui fournisse des renseignements ou qu’il procède à une étude ou à la col lecte de renseignements relativement au projet, la pé riode prise, à son avis, par le promoteur pour remplir cette exigence n’est pas comprise dans le calcul du délai ou de sa prolongation. Extension of time limit by federal minister Prolongation du délai par le ministre fédéral (3) The federal minister may, at the request of the execu tive committee, extend the time limit referred to in sub section (1) by a maximum of two months to take into ac count circumstances that are specific to the proposal for a project. (3) Le ministre fédéral peut, sur demande du comité de direction, prolonger d’au plus deux mois le délai prévu au paragraphe (1) pour tenir compte des circonstances par ticulières à une proposition relative à un projet de déve loppement. Extension of time limit by Governor in Council Prolongation du délai par le gouverneur en conseil (4) The Governor in Council may, by order, on the rec ommendation of the federal minister, further extend the time limit any number of times by periods of any length. 2015, c. 19, s. 21. (4) Le gouverneur en conseil peut, par décret pris sur re commandation du ministre fédéral, accorder une ou plu sieurs prolongations supplémentaires de toute durée. 2015, ch. 19, art. 21. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Panels of the Board Comité restreint Sections 66.2-67 Articles 66.2-67 Current to November 9, 2016 Last amended on June 18, 2015 41 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Agreement — coordination Accord : coordination 66.2 (1) The executive committee may, with the ap proval of the federal minister, enter into an agreement with any authority that has powers, duties or functions in relation to reviewing the effects of that portion of the project that is to be carried out outside Yukon for the purpose of coordinating their reviews. 66.2 (1) Le comité de direction peut, avec l’agrément du ministre fédéral, conclure, avec l’autorité ayant des attri butions relatives à l’examen des effets de la partie du pro jet de développement devant être réalisée à l’extérieur du Yukon, un accord visant à coordonner leurs examens. Government of foreign state État étranger (2) The federal minister and the Minister of Foreign Af fairs may, after consultation with the executive commit tee, enter into an agreement referred to in subsection (1) if the authority is a government of a foreign state or of a subdivision of a foreign state, or any institution of such a government. (2) Le ministre fédéral et le ministre des Affaires étran gères peuvent conclure, après consultation du comité de direction, un accord au même effet avec l’autorité en cause si celle-ci est le gouvernement d’un État étranger ou d’une subdivision politique d’un État étranger ou l’un de leurs organismes. For greater certainty Précision (3) For greater certainty, the fact that a panel of the board is coordinating its review with another authority does not permit the panel to make a recommendation concerning the portion of the project to be carried out outside Yukon. 2015, c. 19, s. 21. (3) Il est entendu que la coordination des examens n’a pas pour effet de permettre à un comité restreint de faire une recommandation portant sur la partie du projet de développement devant être réalisée à l’extérieur du Yu kon. 2015, ch. 19, art. 21. Agreements for Joint Panels Comité mixte Conclusion of agreement with Minister of Environment Conclusion d’un accord : ministre de l’Environnement 67 (1) If the Minister of the Environment agrees to a re quest made by the executive committee under paragraph 61(1)(b), the executive committee may, with the approval of the federal minister, enter into an agreement with the Minister of the Environment for the establishment of a joint panel to conduct a review of the project. 67 (1) Le comité de direction peut, en cas d’acquiesce ment à la demande qu’il présente au titre de l’alinéa 61(1)b), conclure, avec l’agrément du ministre fédéral, un accord avec le ministre de l’Environnement visant la constitution d’un comité mixte chargé de procéder à l’é tude du projet de développement en cause. Joint panel agreement Conclusion d’un accord : ministre ou autre autorité (2) In circumstances referred to in subsection 65(1), the executive committee may, with the approval of the feder al minister, enter into an agreement for the purpose re ferred to in subsection (1) with (a) the Minister of the Environment; or (b) any authority having power to examine the envi ronmental or socio-economic effects of the project, or of an activity that is to be undertaken partly outside Yukon and of which the project forms part. (2) Dans les cas visés au paragraphe 65(1), le comité de direction peut aussi conclure, avec l’agrément du mi nistre fédéral, un accord au même effet avec le ministre de l’Environnement ou avec toute autre autorité chargée d’apprécier les effets — sur l’environnement ou la vie so cioéconomique — du projet ou de toute activité qui doit être exercée en partie à l’extérieur du Yukon et dont le projet fait partie. Contents of agreement Teneur (3) An agreement for the establishment of a joint panel must (3) Les éléments suivants figurent dans l’accord : a) la composition du comité mixte, le mode de nomi nation de ses membres ainsi que la nomination du Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Agreements for Joint Panels Comité mixte Section 67 Article 67 Current to November 9, 2016 Last amended on June 18, 2015 42 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (a) provide for the composition of the joint panel, the manner of appointment of its members and the selection of a chairperson; (b) contain the terms of reference of the joint panel and indicate how they may be modified; (c) require the joint panel to take into consideration the matters set out in subsections 42(1) to (3) in its re view and permit it to take into consideration any other matter that it considers relevant; (d) prescribe rules to be followed in the conduct of the review, including rules about the information to be provided by the proponent, the scheduling of the re view, the quorum, the mode of participation of inter ested persons and the integration of scientific infor mation, traditional knowledge and other information; (e) name a person or body that consents to indemnify the members of the joint panel in accordance with subsection (5) and, if it is the Board, indicate that the federal minister concurs; and (f) require that, on completion of the review, the joint panel submit a report to the decision bodies for the project and publish the report. président ou les modalités applicables au choix de ce dernier; b) le mandat du comité et la marche à suivre pour le modifier; c) l’obligation pour le comité mixte de prendre en compte les points visés aux paragraphes 42(1) à (3) dans l’étude du projet de développement et la possibi lité de tenir compte de tout point qu’il juge pertinent; d) les règles applicables à l’étude, notamment en ce qui a trait à l’information qui doit être fournie par le promoteur, le calendrier, le quorum, la participation des intéressés et l’intégration de l’information scienti fique, des connaissances traditionnelles et de toute autre information; e) la mention de la personne ou de l’organisme ayant accepté d’indemniser les membres selon les règles du paragraphe (5) et, s’il s’agit de l’Office, la mention de l’agrément du ministre fédéral sur ce point; f) l’obligation pour le comité de publier le rapport de son étude et de l’adresser aux décisionnaires compé tents. Publication of notice Publication (4) The executive committee shall publish, in a periodi cal that, in its opinion, has a large circulation in Yukon, (a) a notice of the conclusion of an agreement for the establishment of a joint panel and the manner in which copies of the agreement may be obtained by the public; and (b) a notice of any amendments made to the agree ment and the manner in which copies of the amend ments and the reasons for them may be obtained by the public. (4) Le comité de direction donne avis de la conclusion de l’accord et de toute modification qui est apportée à celui ci dans un périodique qui, à son avis, est largement diffu sé au Yukon. L’avis indique la marche à suivre pour obte nir des copies des documents pertinents, y compris les motifs de la modification. Indemnification of panel members Indemnisation (5) The members of a joint panel shall be indemnified by the person or body referred to in paragraph (3)(e) for all damages awarded against them, for any settlement paid by them with the approval of the federal minister and that person or body and for all expenses reasonably in curred by them, in respect of any claim arising out of their functions as members that were carried out honest ly and in good faith with a view to the best interests of the joint panel. 2003, c. 7, s. 67; 2015, c. 19, s. 22. (5) Les membres du comité mixte sont indemnisés, par la personne ou l’organisme mentionné dans l’accord, de tous les dommages-intérêts mis à leur charge en cette qualité et des frais entraînés par toute demande qui leur est adressée en ce sens s’ils ont agi avec intégrité et de bonne foi pour servir au mieux les intérêts du comité. Sont cependant exclues les sommes versées, sans l’agré ment du ministre fédéral et celui de cette personne ou de cet organisme, à la suite d’un règlement amiable. 2003, ch. 7, art. 67; 2015, ch. 19, art. 22. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Agreements for Joint Panels Comité mixte Sections 68-70 Articles 68-70 Current to November 9, 2016 Last amended on June 18, 2015 43 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Preliminary determination Vérification par le comité de direction 68 (1) Following the conclusion of an agreement for a joint panel, the executive committee shall determine whether the project will be located, or might have signifi cant environmental or socio-economic effects, in the ter ritory of a first nation. 68 (1) Le comité de direction est tenu de vérifier si le lieu de réalisation du projet de développement visé par l’accord conclu en vertu de l’article 67 se trouve dans le territoire d’une première nation ou si ce projet est sus ceptible d’avoir, dans un tel territoire, des effets impor tants sur l’environnement ou la vie socioéconomique. Distribution of terms of reference Copie du mandat (2) The executive committee shall provide copies of the terms of reference of a joint panel, and of any modifica tion made to them with the reasons for the modification, to the proponent of the project, to any first nation identi fied under subsection (1) and to any government agency, independent regulatory agency or first nation that has notified the executive committee of its interest in the project or in projects of that kind. (2) Le comité de direction adresse copie du mandat du comité mixte et de toute modification qui lui est apportée — avec, dans ce dernier cas, les motifs de celle-ci — au promoteur, aux premières nations dont le territoire est touché aux termes du paragraphe (1), ainsi qu’aux autori tés publiques, aux organismes administratifs autonomes et aux premières nations l’ayant avisé de leur intérêt dans le projet de développement ou dans les projets de même catégorie. Equivalence of joint panel review Évaluation par le comité mixte 69 A review by a joint panel fulfils the requirements of any provision of this Act for a review by a panel of the Board. 69 L’évaluation effectuée par le comité mixte tient lieu de celle devant être effectuée, en application des autres dispositions de la présente loi, par un comité restreint. Reviews of Projects by Panels Étude du projet de développement Conduct of panel review Pouvoirs du comité restreint ou mixte 70 (1) Subject to its terms of reference and any specifi cation referred to in subsection 60(4), a panel of the Board or a joint panel established to review a project may determine any matter that it considers appropriate for the conduct of the review and shall determine (a) a schedule for the review; (b) the information to be provided by the proponent; and (c) the manner of participation by first nations, resi dents of communities, the federal and territorial gov ernments and interested persons. 70 (1) En conformité avec son mandat et avec les préci sions formulées au titre du paragraphe 60(4), le comité restreint ou mixte chargé de l’étude d’un projet de déve loppement peut régler toute question de procédure qu’il juge pertinente et est tenu : a) de fixer les modalités de temps relatives au dérou lement de l’étude; b) de préciser les renseignements que doit fournir le promoteur; c) de fixer les modalités de participation des intéres sés, des premières nations, des résidents des localités, et des gouvernements fédéral et territorial. Determination by panel Vérification (2) Before commencing public hearings, a panel of the Board or a joint panel shall determine whether the project will be located, or might have significant adverse environmental or socio-economic effects, on the settle ment land of a first nation or on non-settlement land. (2) Le comité restreint ou mixte est tenu de vérifier, avant la tenue de ses audiences publiques, si le lieu de réalisation du projet de développement se trouve sur des terres désignées ou des terres non désignées ou si celui-ci est susceptible d’avoir, sur de telles terres, des effets né gatifs importants sur l’environnement ou la vie socioéco nomique. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Reviews of Projects by Panels Étude du projet de développement Sections 70-71 Articles 70-71 Current to November 9, 2016 Last amended on June 18, 2015 44 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Location of hearings Lieu de l’instruction (3) A review of a project by a panel of the Board or a joint panel may include public hearings in any location chosen by the panel and, except in the case of a review requested under subsection 60(4) that is not a public re view, shall include public hearings (a) in a community within the territory of each first nation, other than the Tetlit Gwich’in, whose settle ment land is identified under subsection (2) — unless the panel and the first nation agree otherwise; (b) in a community within the Gwich’in settlement area referred to in the Gwich’in Agreement, if Tetlit Gwich’in Yukon land is settlement land identified un der subsection (2) — unless the panel and the Gwich’in Tribal Council agree otherwise; and (c) in the community in Canada closest to the project, if non-settlement land is identified under subsec tion (2) — unless another location in Canada is agreed on for that purpose by the panel, the proponent, the decision bodies for the project and any first nation whose settlement land is identified under subsec tion (2). (3) Le comité restreint ou mixte peut tenir des audiences publiques dans tout lieu qu’il fixe. Toute étude — à l’ex ception de celle qui fait suite à une demande d’étude d’un autre type que publique — comprend cependant de telles audiences dans les lieux suivants : a) une localité située dans le territoire de chaque pre mière nation — exception faite des Gwich’in Tetlit — dont les terres désignées sont touchées aux termes du paragraphe (2), sauf entente contraire entre celle-ci et le comité; b) une localité située dans la région désignée des Gwi ch’in visée dans l’accord gwich’in, dans le cas où des terres gwich’in tetlit sont touchées aux termes du pa ragraphe (2), sauf entente contraire entre le Conseil tribal des Gwich’in et le comité; c) la localité du Canada la plus proche du lieu de réa lisation du projet, dans le cas où des terres non dési gnées sont touchées aux termes du paragraphe (2), sauf entente contraire entre les premières nations dont les terres désignées sont touchées aux termes de ce paragraphe, le promoteur, les décisionnaires com pétents et le comité. Combined public hearings Coopération : audiences (4) A public hearing held by a panel of the Board or a joint panel for the purposes of the review of a project may be combined with a public hearing held by any other body in relation to the project (a) with the approval of the executive committee, in the case of a panel of the Board; or (b) in accordance with an agreement made under sec tion 67, in the case of a joint panel. (4) Dans le cadre de son étude, le comité restreint peut, avec l’agrément du comité de direction, tenir des au diences publiques de concert avec tout organisme chargé de tenir de telles audiences relativement au projet visé. Le comité mixte peut aussi exercer ce pouvoir, mais en conformité, dans ce cas, avec l’accord conclu en vertu de l’article 67. Judicial powers of panels Attributions d’une cour supérieure 71 (1) A panel of the Board or a joint panel has, for the purposes of a review of a project, the powers, rights and privileges of a superior court with respect to the atten dance and examination of witnesses and the production and inspection of documents and other evidence. 71 (1) Le comité restreint ou mixte chargé de l’étude d’un projet de développement a, pour la comparution et l’interrogatoire de témoins, ainsi que pour la production et l’examen de tout élément de preuve, les attributions d’une juridiction supérieure. Enforcement by court process Assignations et ordonnances (2) A summons issued or an order made by a panel of the Board or a joint panel under subsection (1) may be made a summons or order of a superior court by filing a certi fied copy of it with the registrar of the court and, when so made, is enforceable in the same manner as a summons or order of that court. (2) Les assignations délivrées et les ordonnances ren dues sous le régime du paragraphe (1) peuvent être ho mologuées par toute juridiction supérieure, sur dépôt d’une copie certifiée conforme au greffe du tribunal; leur exécution s’effectue dès lors selon les mêmes modalités que les ordonnances de cette juridiction. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Reviews of Projects by Panels Étude du projet de développement Section 72 Article 72 Current to November 9, 2016 Last amended on June 18, 2015 45 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Commencement of panel review Étude par le comité restreint ou mixte 72 (1) A panel of the Board or a joint panel established to review a project shall (a) consider whether the applicable rules have been complied with and notify the proponent accordingly; and (b) commence the review as soon as possible after it notifies the proponent that, in its opinion, the applica ble rules have been complied with. 72 (1) Le comité restreint ou mixte chargé de l’étude d’un projet de développement adresse au promoteur un avis indiquant si, à son avis, les obligations prévues par les règles ont été remplies. Il procède à l’étude du projet dans les meilleurs délais après avoir donné un avis posi tif. Other information Demande d’avis et de renseignements (2) A panel of the Board or a joint panel may seek any in formation or views that it believes relevant to its review. (2) Le comité restreint ou mixte peut demander les avis et l’information qu’il estime nécessaires à l’étude. Other information Demande obligatoire (3) Before making a recommendation under this section, a panel of the Board or a joint panel shall seek views about the project, and information that it believes rele vant to the review, from any first nation consulted under subsection 50(3) or identified under subsection 66(3) or 68(1) and from any government agency, independent reg ulatory agency or first nation that has notified the execu tive committee of its interest in the project or in projects of that kind. (3) Le comité restreint ou mixte ne formule ses recom mandations qu’après avoir, d’une part, demandé l’avis des premières nations consultées en application du para graphe 50(3) ou dont le territoire est touché aux termes des paragraphes 66(3) ou 68(1) et des autorités pu bliques, organismes administratifs autonomes et pre mières nations ayant avisé le comité de direction de leur intérêt dans le projet de développement ou dans les pro jets de même catégorie et, d’autre part, cherché à obtenir d’eux l’information qu’il estime nécessaire à l’étude. Recommendations of panel Décision (4) At the conclusion of its review, a panel of the Board or a joint panel shall recommend to the decision bodies for the project that (a) the project be allowed to proceed, if it determines that the project will have no significant adverse envi ronmental or socio-economic effects in or outside Yukon; (b) the project be allowed to proceed, subject to speci fied terms and conditions, if it determines that the project will have, or is likely to have, significant ad verse environmental or socio-economic effects in or outside Yukon that can be mitigated by those terms and conditions; or (c) the project not be allowed to proceed, if it deter mines that the project will have, or is likely to have, significant adverse environmental or socio-economic effects in or outside Yukon that cannot be mitigated. (4) Au terme de l’étude, le comité restreint ou mixte re commande aux décisionnaires compétents : a) de permettre la réalisation du projet de développe ment dans le cas où il conclut que celui-ci n’aura pas d’effets négatifs importants sur l’environnement ou la vie socioéconomique au Yukon ou à l’extérieur de ses limites; b) de permettre la réalisation du projet sous réserve de certaines conditions dans le cas où il conclut que celui-ci aura ou risque d’avoir de tels effets, mais que ceux-ci peuvent être atténués grâce à ces conditions; c) de refuser la réalisation du projet dans le cas où il conclut que celui-ci aura ou risque d’avoir de tels ef fets qu’il est impossible d’atténuer. Time limit — panel of the Board Délai : comité restreint (4.1) A panel of the Board shall make the recommenda tions referred to in subsection (4) within 15 months after the day on which the panel is established under subsec tion 65(1) or (2). (4.1) Le comité restreint fait les recommandations men tionnées au paragraphe (4) dans les quinze mois suivant son établissement par le comité de direction en applica tion des paragraphes 65(1) ou (2). Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Reviews of Projects by Panels Étude du projet de développement Sections 72-75 Articles 72-75 Current to November 9, 2016 Last amended on June 18, 2015 46 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Excluded period Période exclue (4.2) If a panel of the Board requires the proponent of the project to provide or collect information or to under take a study, the period that, in the panel’s opinion, is taken by the proponent to comply with the requirement is not included in the calculation of the time limit under subsection (4.1) or of its extension. (4.2) Dans le cas où le comité restreint exige du promo teur du projet de développement qu’il lui fournisse des renseignements ou qu’il procède à une étude ou à la col lecte de renseignements relativement au projet, la pé riode prise, à son avis, par le promoteur pour remplir cette exigence n’est pas comprise dans le calcul du délai ou de sa prolongation. Extension of time limit by federal minister Prolongation du délai par le ministre fédéral (4.3) The federal minister may, at the request of the Board, extend the time limit referred to in subsection (4.1) by a maximum of two months to take into account circumstances that are specific to a proposal for a project. (4.3) Le ministre fédéral peut, sur demande de l’Office, prolonger d’au plus deux mois le délai prévu au para graphe (4.1) pour tenir compte des circonstances particu lières à une proposition relative à un projet de dévelop pement. Extension of time limit by Governor in Council Prolongation du délai par le gouverneur en conseil (4.4) The Governor in Council may, by order, on the rec ommendation of the federal minister, further extend the time limit any number of times by periods of any length. (4.4) Le gouverneur en conseil peut, par décret pris sur recommandation du ministre fédéral, accorder une ou plusieurs prolongations supplémentaires de toute durée. Other recipient of recommendation Communication des recommandations (5) A recommendation of a panel of the Board or a joint panel shall be made in writing with reasons and a copy provided to the proponent. 2003, c. 7, s. 72; 2015, c. 19, s. 23. (5) Les recommandations sont communiquées par écrit, motifs à l’appui, avec copie au promoteur. 2003, ch. 7, art. 72; 2015, ch. 19, art. 23. 73 [Repealed, 2015, c. 19, s. 24] 73 [Abrogé, 2015, ch. 19, art. 24] Consideration of Recommendations and Issuance of Decision Documents Examen des recommandations et prise des décisions écrites Consideration of accompanying information Connaissances traditionnelles et autres 74 (1) A decision body considering a recommendation in respect of a project shall give full and fair considera tion to scientific information, traditional knowledge and other information that is provided with the recommenda tion. 74 (1) Dans le cadre de l’examen des recommandations qui lui sont adressées au sujet d’un projet de développe ment, le décisionnaire tient compte pleinement et équita blement des connaissances traditionnelles et de l’infor mation d’ordre scientifique ou autre qu’elles comportent. First nations without final agreements Premières nations sans accord définitif (2) A decision body considering a recommendation in re spect of a project shall consult a first nation for which no final agreement is in effect if the project is to be located wholly or partly, or might have significant adverse envi ronmental or socio-economic effects, in the first nation’s territory. (2) Le décisionnaire est en outre tenu de consulter toute première nation qui n’est pas partie à un accord définitif en vigueur dans les cas où le projet de développement doit être réalisé — même en partie — dans le territoire de celle-ci ou est susceptible d’avoir, dans ce territoire, des effets négatifs importants sur l’environnement ou la vie socioéconomique. Decision on recommendation from designated office or joint panel Recommandation du bureau désigné ou du comité mixte 75 If a designated office or a joint panel makes a recom mendation to a decision body, the decision body shall 75 Le décisionnaire est tenu, dans sa décision écrite prise dans le délai réglementaire, d’accepter, de modifier Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Consideration of Recommendations and Issuance of Decision Documents Examen des recommandations et prise des décisions écrites Sections 75-77 Articles 75-77 Current to November 9, 2016 Last amended on June 18, 2015 47 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 issue a decision document within the period prescribed by the regulations accepting, rejecting or varying the rec ommendation. 2003, c. 7, s. 75; 2015, c. 19, s. 25. ou de rejeter la recommandation qui lui est faite par le bureau désigné ou le comité mixte. 2003, ch. 7, art. 75; 2015, ch. 19, art. 25. Decision on recommendation from executive committee or panel of Board Recommandation du comité de direction ou du comité restreint 76 (1) Subject to section 59, if the executive committee or a panel of the Board makes a recommendation to a de cision body, the decision body shall, within the period prescribed by the regulations, (a) issue a decision document accepting the recom mendation; or (b) refer the recommendation back to the executive committee or the panel for reconsideration by it, un less that recommendation was made in response to a previous referral under this paragraph. 76 (1) Sous réserve de l’article 59, le décisionnaire est tenu, dans le délai réglementaire, soit d’accepter la re commandation qui lui est faite par le comité de direction ou le comité restreint dans une décision écrite, soit de la leur renvoyer pour réexamen, ce renvoi ne pouvant tou tefois être effectué qu’une seule fois. Notice of referral back Avis (2) When a decision body refers a recommendation back to the executive committee or a panel of the Board for re consideration, it shall give notice of the referral to every person or body referred to in paragraphs 81(1)(a), (b) and (f) to (i). (2) S’il renvoie la recommandation pour réexamen, le décisionnaire est tenu d’en donner avis aux personnes et organismes visés aux alinéas 81(1)a), b) et f) à i). Effect of referral back Effet (3) On being notified under subsection (2), (a) every other decision body for the project shall dis continue its consideration of the recommendation; and (b) no person or body required under sections 82 to 88 to implement a decision document already issued shall take any action that would enable the project to be undertaken. 2003, c. 7, s. 76; 2015, c. 19, s. 26. (3) Sur réception de l’avis, tout autre décisionnaire met fin à l’étude de la recommandation et quiconque est tenu, en vertu des articles 82 à 88, de mettre en œuvre une dé cision écrite s’abstient de prendre toute mesure visant à permettre la réalisation du projet de développement en question. 2003, ch. 7, art. 76; 2015, ch. 19, art. 26. Reconsideration on referral back Réexamen 77 (1) When it reconsiders a recommendation that is referred back to it under paragraph 76(1)(b), the execu tive committee and the panel of the Board may exercise the powers and shall perform the duties that they have, respectively, in relation to screenings and reviews. 77 (1) Dans le cadre du réexamen des recommanda tions, le comité de direction et le comité restreint exercent les pouvoirs et fonctions qui leur sont conférés en matière d’examen et d’étude, respectivement. Time limits Délai (2) The executive committee or panel of the Board shall make a new recommendation to the decision bodies in respect of the project within the period prescribed by the rules, which is not to exceed 60 days for a screening by the executive committee or 90 days for a review by a pan el of the Board. If it does not make such a recommenda tion, it is deemed to have made the same (2) Le comité de direction ou le comité restreint adresse aux décisionnaires compétents ses nouvelles recomman dations dans le délai prévu par les règles, lequel ne peut dépasser soixante jours dans le cas d’une préétude par le comité de direction et quatre-vingt-dix jours dans le cas d’une étude par un comité restreint. À défaut, il est répu té leur avoir adressé ses recommandations initiales. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Consideration of Recommendations and Issuance of Decision Documents Examen des recommandations et prise des décisions écrites Sections 77-80 Articles 77-80 Current to November 9, 2016 Last amended on June 18, 2015 48 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 recommendation that it made at the conclusion of its screening or review. New recommendation Nouvelle décision écrite (3) Every decision body shall, within the period pre scribed by the regulations, issue a decision document ac cepting, rejecting or varying the new recommendation, and that decision document replaces any previous deci sion document issued by it in respect of the project. 2003, c. 7, s. 77; 2015, c. 19, s. 27. (3) Chacun de ces décisionnaires peut, dans sa décision écrite prise dans le délai réglementaire, accepter, rejeter ou modifier les nouvelles recommandations. Cette nou velle décision se substitue à toute décision antérieure prise par lui sur le sujet. 2003, ch. 7, art. 77; 2015, ch. 19, art. 27. Consultation between decision bodies Consultations entre décisionnaires 78 (1) Where decision documents must be issued in re lation to a project by more than one decision body, the decision bodies shall, before issuing the decision docu ments, consult one another in accordance with the regu lations with a view to making their decision documents conform. 78 (1) Les décisionnaires appelés à rendre des décisions écrites au sujet d’un projet de développement sont tenus de se consulter, conformément aux règlements, afin de tenter de les uniformiser. Consolidation of decision documents Fusion (2) Any two or more decision bodies in respect of a project may agree to consolidate their decision docu ments. (2) Ils peuvent en outre convenir de réunir en un seul document leurs décisions écrites respectives. Mining interest on settlement lands Droit d’exploitation de minéraux 79 Notwithstanding sections 75 and 76, where a project involves a right to work mines and minerals situated in category B or fee simple settlement land or Tetlit Gwich’in Yukon land, and decision documents must be issued in relation to the project by a first nation as well as by a federal decision body or the territorial minister, nei ther of those decision bodies may reject or vary any rec ommendation made in respect of the project except on the ground that a recommended term or condition is (a) insufficient to prevent unacceptable environmen tal or socio-economic effects in Yukon; (b) more onerous than necessary to prevent such ef fects; or (c) so onerous as to undermine the economic viability of the project. 79 Par dérogation aux articles 75 et 76, dans le cas où un projet de développement entraîne l’exercice, sur des terres désignées de catégorie B ou en fief simple ou sur des terres gwich’in tetlit, d’un droit d’exploitation de mines et minéraux et où une décision écrite doit être prise, d’une part, par une première nation et, d’autre part, par un décisionnaire fédéral ou le ministre territo rial, aucun d’eux ne peut modifier ou rejeter les recom mandations faites au sujet du projet, si ce n’est au motif que : a) les conditions qui en font partie sont insuffisantes pour éviter des effets inacceptables sur l’environne ment ou la vie socioéconomique au Yukon; b) ces conditions sont excessivement lourdes compte tenu des effets à éviter; c) ces conditions sont si lourdes qu’elles mettent en péril la viabilité économique du projet. Decision body’s reasons Motifs 80 (1) A decision body shall include in a decision docu ment the reasons for which it rejected or varied any rec ommendation. 80 (1) Toute décision écrite précise les motifs du rejet ou de la modification de la recommandation qu’elle vise. Statutory Instruments Act Loi sur les textes réglementaires (2) A decision document is not a statutory instrument for the purposes of the Statutory Instruments Act. (2) La décision écrite n’est pas un texte réglementaire pour l’application de la Loi sur les textes réglementaires. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Consideration of Recommendations and Issuance of Decision Documents Examen des recommandations et prise des décisions écrites Sections 81-82 Articles 81-82 Current to November 9, 2016 Last amended on June 18, 2015 49 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Distribution of decision documents Copie des décisions écrites 81 (1) A decision body shall provide copies of a decision document to (a) every other decision body for the project; (b) the proponent of the project; (c) the designated office in whose assessment district the project is proposed to be undertaken; (d) the executive committee, if the recommendation to the decision body was made by the executive com mittee, a panel of the Board or a joint panel; (e) [Repealed, 2015, c. 19, s. 28] (f) any independent regulatory agency from which an authorization is required, or to which an application is made for financial assistance, to enable the project to be undertaken; (g) the Yukon Surface Rights Board, if an access order is required for the project under the Yukon Surface Rights Board Act; (h) a body established by territorial law and having ju risdiction in relation to rights in respect of waters, if the grant of rights from that body is required for the project under territorial law; and (i) any other person or body that is required to imple ment the decision document under subsection 82(2), 83(2) or 84(2) or (3). 81 (1) Le décisionnaire adresse une copie de sa décision écrite : a) à tout autre décisionnaire compétent; b) au promoteur du projet de développement en cause; c) au bureau désigné de toute circonscription où le projet doit être réalisé; d) au comité de direction, si la recommandation pro vient de celui-ci ou d’un comité restreint ou mixte; e) [Abrogé, 2015, ch. 19, art. 28] f) à tout organisme administratif autonome chargé de délivrer une autorisation nécessaire à la réalisation du projet de développement ou ayant reçu une demande d’aide financière à cette fin; g) à l’Office des droits de surface du Yukon, dans le cas où il est appelé, en vertu de la Loi sur l’Office des droits de surface du Yukon, à rendre une ordonnance d’accès relativement au projet de développement; h) à l’organisme compétent en matière de droits rela tifs aux eaux dans les cas où il est appelé, en vertu des textes législatifs territoriaux, à attribuer ou à renouve ler de tels droits relativement au projet de développe ment; i) à quiconque n’est pas par ailleurs visé au présent paragraphe mais est tenu de mettre en œuvre la déci sion écrite aux termes des paragraphes 82(2), 83(2) ou 84(2) ou (3). Decision not in conformity with land use plan Office d’aménagement (2) If a decision document allows a project to be under taken not in conformity with a regional land use plan re ferred to in section 44, the decision body shall provide a copy of the decision document to the planning commis sion and to any person or body that approved the plan. 2003, c. 7, ss. 81, 133; 2015, c. 19, s. 28. (2) Copie de la décision écrite autorisant la réalisation d’un projet de développement non conforme au plan d’a ménagement régional visé à l’article 44 est adressée à l’office d’aménagement concerné ainsi qu’à quiconque a approuvé le plan d’aménagement. 2003, ch. 7, art. 81 et 133; 2015, ch. 19, art. 28. Implementation of Decision Documents Mise en œuvre des décisions écrites Federal agencies Autorité fédérale 82 (1) A federal agency that is a decision body for a project shall not undertake the project, require that it be undertaken or take any action that would enable it to be undertaken until it has issued a decision document under section 75, 76 or 77 allowing the project to be undertaken. 82 (1) L’autorité fédérale, si elle est décisionnaire, ne peut entreprendre ou ordonner la réalisation d’un projet de développement, ni prendre de mesure visant à per mettre celle-ci, avant la prise, au titre des articles 75, 76 Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Implementation of Decision Documents Mise en oeuvre des décisions écrites Sections 82-84 Articles 82-84 Current to November 9, 2016 Last amended on June 18, 2015 50 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 ou 77, de sa décision écrite permettant la réalisation du projet. Implementing decision document Mise en œuvre (2) Notwithstanding the limitations in any other federal law, a federal agency undertaking a project, requiring it to be undertaken or taking any action that enables it to be undertaken shall implement a decision document is sued by it in respect of the project. (2) Malgré les limites prévues par toute autre loi fédérale relativement à ses pouvoirs, l’autorité fédérale est tenue de mettre en œuvre cette décision écrite en ce qui touche tant la réalisation du projet de développement que la prise de mesures visant à permettre celle-ci. Territorial agencies and municipal governments Autorité territoriale et municipalité 83 (1) Where the territorial minister is a decision body for a project, no territorial agency or municipal govern ment shall undertake the project, require that it be un dertaken or take any action that would enable it to be un dertaken until the territorial minister has issued a decision document under section 75, 76 or 77 allowing the project to be undertaken. 83 (1) Dans le cas où le ministre territorial est décision naire, l’autorité territoriale ou la municipalité ne peut en treprendre ou ordonner la réalisation d’un projet de dé veloppement, ni prendre de mesure visant à permettre celle-ci, avant la prise par le ministre, au titre des ar ticles 75, 76 ou 77, de la décision écrite permettant la réa lisation du projet. Implementing decision document Mise en œuvre (2) To the extent of its authority under the Yukon Act, territorial laws or municipal by-laws, every territorial agency and every municipal government undertaking a project, requiring it to be undertaken or taking any action that enables it to be undertaken shall implement a deci sion document issued by the territorial minister in re spect of the project. (2) L’autorité territoriale ou l’administration municipale est tenue, dans la mesure de sa compétence au titre de la Loi sur le Yukon, des textes législatifs territoriaux ou des règlements municipaux, de mettre en œuvre la décision écrite en ce qui touche tant la réalisation du projet de dé veloppement que la prise de mesures visant à permettre celle-ci. First nations Première nation 84 (1) A first nation that is a decision body for a project shall not undertake the project, require that it be under taken or take any action that would enable it to be under taken until it has issued a decision document under sec tion 75, 76 or 77 allowing the project to be undertaken. 84 (1) La première nation, si elle est décisionnaire, ne peut entreprendre ou ordonner la réalisation d’un projet de développement, ni prendre de mesure visant à per mettre celle-ci, avant la prise, au titre des articles 75, 76 ou 77, de sa décision écrite permettant la réalisation du projet. Implementing decision document Mise en œuvre (2) To the extent of its authority under the Yukon First Nations Self-Government Act, first nation laws or its fi nal agreement, a first nation undertaking a project, re quiring it to be undertaken or taking any action that en ables it to be undertaken shall implement a decision document issued by it in respect of the project. (2) La première nation est tenue, dans la mesure de sa compétence au titre de la Loi sur l’autonomie gouverne mentale des premières nations du Yukon, de ses textes législatifs ou de son accord définitif, de mettre en œuvre sa décision écrite en ce qui touche tant la réalisation du projet de développement que la prise de mesures visant à permettre celle-ci. Decision document relating to mines Incompatibilité (3) Notwithstanding subsection (2), if a project involves a right to work mines and minerals in category B or fee simple settlement land or Tetlit Gwich’in Yukon land, a first nation taking any action that enables the project to be undertaken shall implement (a) a decision document issued in respect of the project by the territorial minister to the extent that it (3) S’agissant de la prise de mesures entraînant l’exer cice, sur des terres désignées de catégorie B ou en fief simple ou sur des terres gwich’in tetlit, d’un droit d’ex ploitation de mines et minéraux, la première nation est toutefois tenue de mettre en œuvre, dans la mesure de son incompatibilité avec sa propre décision écrite, la dé cision écrite prise par le ministre territorial, dans le cas où le commissaire du Yukon a la gestion et la maîtrise Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Implementation of Decision Documents Mise en oeuvre des décisions écrites Sections 84-87 Articles 84-87 Current to November 9, 2016 Last amended on June 18, 2015 51 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 is inconsistent with the first nation’s decision docu ment, where the Commissioner of Yukon has the ad ministration and control of those mines and minerals; or (b) a decision document issued in respect of the project by a federal agency to the extent that it is in consistent with the first nation’s decision document, where the federal agency has the administration of those mines and minerals. des biens-fonds sur lesquels se trouvent ces ressources, ou par l’autorité fédérale, dans le cas où c’est cette der nière qui en a la gestion. Interpretation Exception 85 The obligation to implement decision documents un der subsections 82(2), 83(2) and 84(2) and (3) does not require the making of any regulation, municipal by-law, first nation law or other law. 85 L’obligation de mise en œuvre prévue aux para graphes 82(2), 83(2) ou 84(2) ou (3) ne s’étend pas à la prise de règlements — municipaux ou autres — ou d’autres textes législatifs. Water licences Droits relatifs aux eaux 86 A body established by territorial law and having ju risdiction in relation to rights in respect of waters may not, under territorial law, (a) grant or renew rights in respect of waters contrary to a decision document issued by a federal agency or a decision document that is to be implemented by a ter ritorial agency, municipal government or first nation under subsection 83(2) or 84(2) or (3); or (b) set terms of such rights that conflict with such a decision document, to the extent that the decision document is required to be implemented by a federal agency or a territorial agency, municipal government or first nation. 2003, c. 7, ss. 86, 133. 86 L’organisme compétent en matière de droits relatifs aux eaux ne peut procéder à l’attribution ou au renouvel lement de tels droits, sous le régime des textes législatifs territoriaux — ou assortir ceux-ci de conditions — qu’en conformité avec les décisions écrites prises par les déci sionnaires fédéraux ou celles devant être mises en œuvre par les autorités fédérales, les autorités territoriales, les municipalités et les premières nations aux termes des pa ragraphes 83(2) ou 84(2) ou (3). 2003, ch. 7, art. 86 et 133. Federal independent regulatory agencies Organismes administratifs autonomes fédéraux 87 (1) A federal independent regulatory agency shall not require that a project be undertaken or take any ac tion that enables a project to be undertaken until every federal decision body for the project and, in the case of the National Energy Board, the territorial minister has is sued a decision document in respect of the project under section 75, 76 or 77. 87 (1) Les organismes administratifs autonomes fédé raux ne peuvent ordonner la réalisation d’un projet de développement, ni prendre de mesure visant à permettre celle-ci, avant la prise, par tout décisionnaire fédéral et, dans le cas de l’Office national de l’énergie, par le mi nistre territorial, d’une décision écrite au titre des ar ticles 75, 76 ou 77. Conformity with decision document Mise en œuvre des décisions écrites (2) A federal independent regulatory agency, other than the National Energy Board, shall (a) when it requires that a project be undertaken or takes any action that enables a project to be undertak en, endeavour to the extent practicable to implement any decision document issued by a federal decision body; and (2) Ces organismes — exception faite de l’Office national de l’énergie — sont tenus, dans la mesure du possible, d’une part, de veiller à mettre en œuvre, en ce qui touche tant l’ordre de réaliser le projet de développement que la prise de mesures visant à en permettre la réalisation, la décision écrite prise par tout décisionnaire fédéral et, d’autre part, de veiller à la conformité avec cette décision de toute autorisation qu’ils délivrent à cette fin. Les mo tifs justifiant la non-conformité doivent être communi qués par écrit au décisionnaire. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Implementation of Decision Documents Mise en oeuvre des décisions écrites Sections 87-88.1 Articles 87-88.1 Current to November 9, 2016 Last amended on June 18, 2015 52 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (b) when it issues an authorization that enables a project to be undertaken, endeavour to the extent practicable to make the authorization conform with any decision document issued by a federal decision body, and provide written reasons to that decision body for any want of conformity. National Energy Board Office national de l’énergie (3) The National Energy Board shall (a) when it requires that a project be undertaken or provides financial assistance for a project, take into consideration any decision document issued by a fed eral decision body or the territorial minister; and (b) when it issues an authorization to enable a project to be undertaken, take into consideration any decision document issued by a federal decision body or the ter ritorial minister and provide written reasons to the de cision body or the minister for any want of conformity. (3) L’Office national de l’énergie tient compte, en ce qui touche tant l’ordre de réaliser un projet de développe ment que l’attribution d’une autorisation nécessaire à la réalisation de celui-ci ou d’une aide financière à son égard, de la décision écrite prise par tout décisionnaire fédéral ou par le ministre territorial à cet égard. Les mo tifs justifiant la non-conformité de l’autorisation doivent être communiqués par écrit à ces derniers. Territorial independent regulatory agencies Organismes administratifs autonomes territoriaux 88 (1) A territorial independent regulatory agency shall not require that a project be undertaken, or take any ac tion that enables a project to be undertaken, until the ter ritorial minister has issued a decision document in re spect of the project under section 75, 76 or 77. 88 (1) Les organismes administratifs autonomes territo riaux ne peuvent ordonner la réalisation d’un projet de développement, ni prendre de mesure visant à permettre celle-ci, avant la prise par le ministre territorial, au titre des articles 75, 76 ou 77, de sa décision écrite. Conformity with decision document Mise en œuvre des décisions écrites (2) A territorial independent regulatory agency shall (a) when it requires that a project be undertaken or takes any action that enables a project to be undertak en, endeavour to the extent practicable to implement any decision document issued by the territorial minis ter; and (b) when it issues an authorization that enables a project to be undertaken, endeavour to the extent practicable to make the authorization conform with any decision document issued by the territorial minis ter, and provide written reasons to the minister for any want of conformity. (2) Ces organismes sont tenus, dans la mesure du pos sible, d’une part, de veiller à mettre en œuvre, en ce qui touche tant l’ordre de réaliser un projet de développe ment que la prise de mesures visant à en permettre la réalisation, la décision écrite du ministre territorial et, d’autre part, de veiller à la conformité avec cette décision de toute autorisation qu’ils délivrent à cette fin. Les mo tifs justifiant la non-conformité de l’autorisation doivent être communiqués par écrit à ce ministre. For greater certainty Précision 88.1 For greater certainty, an independent regulatory agency, a government agency or a first nation may im pose, to the extent of its jurisdiction and authority to do so, terms and conditions that are in addition to, or more stringent than, those referred to in the decision docu ments. 2015, c. 19, s. 29. 88.1 Il est entendu qu’un organisme administratif auto nome, une autorité publique ou une première nation peut, dans la mesure de ses pouvoirs et de ses compé tences respectifs, assortir les décisions écrites de condi tions supplémentaires ou plus rigoureuses. 2015, ch. 19, art. 29. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Implementation of Decision Documents Mise en oeuvre des décisions écrites Sections 89-90 Articles 89-90 Current to November 9, 2016 Last amended on June 18, 2015 53 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Notice of actions taken following decision Notification 89 Following the issuance of a decision document allow ing a project to be undertaken, every government agency, municipal government, independent regulatory agency and first nation shall notify the Board whenever it (a) issues any authorization required for the project to be undertaken, or amends or revokes that authoriza tion; (b) grants any interest in land required for the project to be undertaken, or modifies or withdraws that inter est; or (c) provides any financial assistance that enables the project to be undertaken, or alters or cancels that as sistance. 89 L’autorité publique, l’organisme administratif auto nome, la première nation et la municipalité sont tenus, une fois prise la décision écrite permettant la réalisation d’un projet de développement, de notifier à l’Office, d’une part, l’attribution d’une autorisation, de droits fonciers nécessaires à la réalisation de ce projet ou d’une aide fi nancière à cette fin et, d’autre part, toute modification ou tout retrait y faisant suite. Projects on Yukon North Slope Versant nord du Yukon Definitions Définitions 90 (1) The following definitions apply in this section and section 91. Agreement means the Inuvialuit Final Agreement, given effect by the Western Arctic (Inuvialuit) Claims Settle ment Act, chapter 24 of the Statutes of Canada, 1984, as it read on the date that the Yukon First Nations Land Claims Settlement Act came into force. (convention) Screening Committee and Review Board mean the Environmental Impact Screening Committee and the En vironmental Impact Review Board, respectively, estab lished by section 11 of the Agreement. (Bureau d’exa men des répercussions environnementales et Comité d’étude des répercussions environnementales) Yukon North Slope has the same meaning as in sec tion 12 of the Agreement. (Versant nord du Yukon) 90 (1) Les définitions qui suivent s’appliquent au pré sent article et à l’article 91. Bureau d’examen des répercussions environnemen tales et Comité d’étude des répercussions environne mentales Le bureau et le comité établis par l’article 11 de la convention. (Screening Committee and Review Board) convention La Convention définitive des Inuvialuit, mise en œuvre par la Loi sur le règlement des revendica tions des Inuvialuit de la région ouest de l’Arctique, cha pitre 24 des Statuts du Canada de 1984, dans sa version en vigueur à la date d’entrée en vigueur de la Loi sur l’au tonomie gouvernementale des premières nations du Yu kon. (Agreement) Versant nord du Yukon S’entend au sens de l’article 12 de la convention. (Yukon North Slope) Additional consideration Prise en compte (2) In an assessment of a project located on the Yukon North Slope, a designated office, the executive committee or a panel of the Board shall take into consideration, in addition to the matters set out in subsections 42(1) to (3), the need to protect the rights of the Inuvialuit under the Agreement, and may take into consideration any matter that it considers relevant. (2) Le bureau désigné, le comité de direction et le comité restreint tiennent compte, dans l’évaluation de tout pro jet de développement devant être réalisé sur le Versant nord du Yukon, outre de ce qui est prévu aux para graphes 42(1) à (3), du besoin de protéger les droits conférés aux Inuvialuits sous le régime de la convention. Ils peuvent en outre tenir compte des autres éléments qu’ils jugent pertinents. Recommendations re project Copie des recommandations (3) Where a recommendation is made by a designated office, the executive committee or a panel of the Board in (3) Le bureau désigné, le comité de direction ou le comi té restreint adresse au Comité d’étude des répercussions Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Projects on Yukon North Slope Versant nord du Yukon Sections 90-92 Articles 90-92 Current to November 9, 2016 Last amended on June 18, 2015 54 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 respect of a project located on the Yukon North Slope, a copy of the recommendation including reasons shall be provided to the Screening Committee. environnementales copie de sa recommandation — mo tifs à l’appui — concernant un tel projet de développe ment. Reasons for panel review Copie de la décision (4) Where the executive committee requires that a project located on the Yukon North Slope be reviewed by a panel of the Board, the executive committee shall pro vide its reasons for doing so to the Screening Committee. (4) Le comité de direction est aussi tenu de communi quer par écrit au Comité d’étude des répercussions envi ronnementales, motifs à l’appui, sa décision de faire pro céder à l’étude du projet. Examination by Screening Committee or Review Board Communication d’information à l’Office et au bureau désigné 91 (1) When the Screening Committee or Review Board examines a project located on the Yukon North Slope, the competent government authority that receives its report or recommendation pursuant to the Agreement shall pro vide a copy of the authority’s response to the report or recommendation to the Board and to the designated of fice in whose assessment district the project is located. 91 (1) Le destinataire du rapport ou des recommanda tions du Comité d’étude des répercussions environne mentales ou du Bureau d’examen des répercussions envi ronnementales relatif à l’appréciation des effets — sur l’environnement ou la vie socioéconomique — de tout projet devant être réalisé sur le Versant nord du Yukon adresse copie de sa réponse à l’Office et au bureau dési gné de la circonscription où le projet doit être réalisé. Referral by Screening Committee to Review Board Renvoi au Bureau d’examen des répercussions environnementales (2) Where a project located on the Yukon North Slope is referred to the Review Board by the Screening Commit tee, (a) the provisions of this Part relating to assessments and decision documents cease to apply in respect of the project; and (b) any panel of the Board already established to re view the project shall provide the Review Board with copies of all documents relating to the project. (2) Dans le cas où le Comité d’étude des répercussions environnementales renvoie un tel projet de développe ment au Bureau d’examen des répercussions environne mentales : a) les dispositions de la présente partie relatives à l’é valuation et aux décisions écrites cessent de s’appli quer en ce qui touche le projet; b) le comité restreint déjà saisi du projet remet au Bu reau d’examen des répercussions environnementales copie de tous les documents relatifs au projet. Collaboration and External Activities Coopération Collaboration on projects Collaboration avec d’autres autorités 92 (1) In the assessment of a project that forms part of an activity to be located wholly or partly in Yukon, a des ignated office or the executive committee shall collabo rate, to the extent practicable, with any other body proposing to examine the activity’s environmental or so cio-economic effects. 92 (1) Le bureau désigné et le comité de direction sont tenus, dans l’évaluation de tout projet de développement faisant partie d’une activité qui doit être exercée, en tout ou en partie, au Yukon, de collaborer, dans la mesure du possible, avec toute autre autorité chargée d’apprécier les effets de cette activité sur l’environnement ou la vie so cioéconomique. Adoption of report Adoption d’un rapport d’étude (2) Where a body referred to in subsection (1) issues a report of its examination, the designated office or the ex ecutive committee may, in lieu of all or part of its assess ment of the project, adopt any portions of the report that, in its opinion, fulfil any of the requirements of this Act. (2) Ils peuvent, dans le cadre de cette évaluation, adop ter toute partie du rapport établi par une telle autorité re lativement à l’activité dans la mesure où ils estiment qu’elle satisfait aux exigences prévues par la présente loi. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Collaboration and External Activities Coopération Sections 93-93.1 Articles 93-93.1 Current to November 9, 2016 Last amended on June 18, 2015 55 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 External activities affecting Yukon Activités à l’extérieur du Yukon 93 (1) At the request of the federal minister or the Min ister of the Environment — or at the request of the terri torial minister or a first nation and at their expense, un less the federal minister consents to the request — the executive committee may, in respect of an activity out side Yukon that, in its opinion, has or will have signifi cant adverse environmental or socio-economic effects in Yukon, (a) establish a panel of the Board to conduct a review of the activity, in accordance with an agreement en tered into by the executive committee with the re questing minister or first nation; or (b) participate in a consideration of the environmen tal and socio-economic effects of the activity conduct ed by a public body outside Yukon, in a manner speci fied in the request and accepted by that body. 93 (1) À la demande soit du ministre fédéral ou du mi nistre de l’Environnement, soit du ministre territorial ou d’une première nation — s’ils obtiennent l’agrément du ministre fédéral ou en supportent les frais — , le comité de direction peut : a) en conformité avec l’accord conclu avec le deman deur, établir un comité restreint et le charger de l’é tude d’une activité à l’extérieur du Yukon qui a ou au ra, à son avis, des effets négatifs importants sur l’environnement ou la vie socioéconomique au Yukon; b) participer à l’évaluation environnementale effec tuée par un organisme public à l’extérieur du Yukon à l’égard d’une telle activité, et ce selon les modalités précisées dans la demande et acceptées par l’orga nisme. Report by panel Rapport (2) A panel of the Board referred to in paragraph (1)(a) shall issue a report in relation to any significant adverse environmental or socio-economic effects of the activity to the proponent of the activity, the minister or first nation that requested the review and, if the federal minister con sented to the request, the federal minister. (2) Le comité restreint établi sous le régime de l’alinéa (1)a) adresse au promoteur et à quiconque a présenté la demande d’étude ou l’a agréée un rapport au sujet des ef fets négatifs importants de l’activité en question sur l’en vironnement ou la vie socioéconomique. Response to Board Observations (3) A minister or first nation that requests a review shall provide the Board with a written response to the report of a panel of the Board. (3) Après avoir reçu le rapport, le demandeur commu nique par écrit à l’Office ses observations à cet égard. Cost Recovery Recouvrement des coûts Proponent’s obligation to pay costs Obligation du promoteur 93.1 (1) In order for the federal minister to recover costs that are incurred in the course of a review of a project, the proponent of the project must pay to the fed eral minister (a) any amounts that are prescribed by the regulations and that are related to the exercise of the powers and performance of the functions of the Board or its mem bers or of members of a panel of the Board or a joint panel; (b) any costs incurred by the Board for services that are prescribed by the regulations and that are provid ed to it by a third party; and (c) any amounts that are prescribed by the regulations and that are related to the exercise of the powers and 93.1 (1) Le promoteur d’un projet de développement est tenu de verser au ministre fédéral afin de permettre à celui-ci de recouvrer les coûts liés à l’étude du projet : a) les sommes réglementaires afférentes à l’exercice des attributions de l’Office ou de celles de ses membres ou des membres des comités restreints ou des comités mixtes; b) les frais engagés par l’Office pour les services régle mentaires qui lui ont été fournis par des tiers; c) les sommes réglementaires afférentes à l’exercice des attributions du ministre fédéral. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Cost Recovery Recouvrement des coûts Sections 93.1-95 Articles 93.1-95 Current to November 9, 2016 Last amended on June 18, 2015 56 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 performance of the duties and functions of the federal minister. Limited period Limite de temps (2) For the purposes of subsection (1), the services, pow ers, duties or functions described in that subsection are limited to those provided, exercised or performed during the period that begins when the executive committee is required to establish a panel of the Board under subsec tion 65(1) or (2) and ends when a decision document is issued by each of the decision bodies to whom the panel of the Board or joint panel, as the case may be, made a recommendation in respect of the project. (2) Pour l’application du paragraphe (1), les services ou les attributions en cause se limitent à ceux fournis ou exercés à partir du moment où le comité de direction est tenu d’établir un comité restreint en application des pa ragraphes 65(1) ou (2) jusqu’au moment où une décision écrite est rendue par chacun des décisionnaires auxquels le comité restreint ou le comité mixte, selon le cas, a communiqué des recommandations à l’égard du projet. Debt due to Her Majesty Créances de Sa Majesté (3) The amounts and costs that the proponent must pay under subsection (1) constitute a debt due to Her Majesty in right of Canada and may be recovered as such in any court of competent jurisdiction. 2015, c. 19, s. 30. (3) Les sommes et les frais que le promoteur est tenu de verser au titre du paragraphe (1) constituent des créances de Sa Majesté du chef du Canada dont le recouvrement peut être poursuivi à ce titre devant tout tribunal compé tent. 2015, ch. 19, art. 30. Existing Projects Ouvrages Definition of administrative authority Définition de entité administrative 94 (1) In sections 95 to 101, administrative authority, in relation to a review of an existing project, means a government agency, an independent regulatory agency, a municipal government or a first nation that (a) is the operator of the existing project, (b) has the power to assume the operation of or to shut down the existing project, or (c) has the power to amend, suspend or revoke an au thorization that was issued, or to modify, suspend or withdraw an interest in land that was granted, to en able the existing project to be undertaken or complet ed, and includes the Governor in Council, if the Governor in Council has a power referred to in paragraph (b) or (c). 94 (1) Aux articles 95 à 101, entité administrative s’en tend de la première nation, de l’autorité publique, de l’or ganisme administratif autonome ou de la municipalité qui, selon le cas : a) est l’exploitant de l’ouvrage; b) a le pouvoir d’assumer l’exploitation de l’ouvrage ou d’y mettre fin; c) peut modifier, suspendre ou annuler une autorisa tion ou un droit foncier nécessaires à la réalisation de l’ouvrage. Est également visé par la présente définition le gouver neur en conseil s’il a les pouvoirs visés aux alinéas b) et c). Definition of operator Définition de exploitant (2) In subsection (1) and sections 95 to 101, operator, in relation to an existing project, means the person or body responsible for its operation. (2) Au paragraphe (1) et aux articles 95 à 101, exploitant s’entend, relativement à un ouvrage, de la personne ou de l’organisme responsable de son exploitation. Request for panel review Demande d’étude 95 (1) The executive committee shall establish a panel of the Board to conduct a review of an existing project, of a proposed abandonment, decommissioning or tempo rary shutdown of an existing project, or of a proposed 95 (1) Le comité de direction établit un comité restreint qu’il charge de l’étude soit d’un ouvrage, soit de tout pro jet de fermeture — même temporaire — ou d’abandon de celui-ci, soit encore de tout projet de changement Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Existing Projects Ouvrages Sections 95-96 Articles 95-96 Current to November 9, 2016 Last amended on June 18, 2015 57 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 significant change to an existing project other than a change that is subject to assessment under any other pro vision of this Act, (a) at the request of the federal minister, if there is an administrative authority for the existing project that is a federal agency or federal independent regulatory au thority; (b) at the request of the territorial minister, if there is an administrative authority for the existing project that is established by or under the Yukon Act; or (c) at the request of a first nation and with the con sent of (i) the federal minister, and (ii) the territorial minister, where a territorial agency, a municipal government or a territorial in dependent regulatory agency is an administrative authority for the existing project. important à lui apporter qui n’est pas par ailleurs assujet ti à une évaluation au titre de la présente loi, sur de mande présentée : a) par le ministre fédéral, si l’entité administrative compétente est une autorité fédérale ou un organisme administratif autonome fédéral; b) par le ministre territorial, si l’entité administrative compétente a été constituée sous le régime de la Loi sur le Yukon; c) par une première nation avec l’agrément du mi nistre fédéral et, dans les cas où l’entité administrative compétente est une autorité territoriale, une munici palité ou un organisme administratif autonome terri torial, avec celui du ministre territorial. Joint request Demande conjointe (2) A request for a review must be made jointly by the federal and territorial ministers if there are administra tive authorities described in paragraphs (1)(a) and (b). (2) La demande doit être présentée conjointement par le ministre territorial et le ministre fédéral si l’ouvrage re lève d’entités administratives visées aux alinéas (1)a) et b). Consent of first nation Agrément de la première nation (3) If a first nation is an administrative authority for an existing project, a request for a review by the federal or territorial minister may only be made with the first na tion’s consent. (3) La demande présentée par le ministre fédéral ou ter ritorial est subordonnée à l’agrément de la première na tion qui est l’entité administrative compétente. Form of review Type d’étude (4) A request for a review shall specify whether the re view is to be a public review or some other form of re view. (4) La demande précise si l’étude sera publique ou d’un autre type. Discontinuance Interruption (5) If any minister or first nation that requested a review withdraws the request, the panel conducting the review shall discontinue it. (5) La demande peut être retirée par quiconque l’a pré sentée. Le retrait met fin à l’étude. Designation of members Membres de l’Office 96 (1) The executive committee shall select the mem bers of a panel of the Board, including its chairperson, from among the members of the Board. 96 (1) Le comité de direction choisit parmi les membres de l’Office les membres du comité restreint — y compris le président de celui-ci — chargé de l’étude d’un ouvrage. Determination by executive committee Vérification par le comité de direction (2) Before the executive committee establishes a panel of the Board, it shall (2) Avant de procéder à l’établissement du comité res treint, le comité de direction vérifie, dans le cas où la de mande d’étude porte sur l’ouvrage lui-même, si celui-ci a Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Existing Projects Ouvrages Section 96 Article 96 Current to November 9, 2016 Last amended on June 18, 2015 58 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (a) if the request is for the review of the existing project, determine whether the existing project is hav ing or might subsequently have significant adverse en vironmental or socio-economic effects primarily on settlement land of a first nation or on non-settlement land; or (b) if the request is for the review of a proposed aban donment, decommissioning, temporary shutdown or significant change, determine whether it might have significant adverse environmental or socio-economic effects primarily on settlement land of a first nation or on non-settlement land. ou est susceptible d’avoir des effets négatifs importants sur l’environnement ou la vie socioéconomique principa lement sur des terres désignées ou sur des terres non dé signées et, dans le cas où elle porte sur un projet de fer meture, d’abandon ou de changement important, si le projet est susceptible d’avoir de tels effets principalement sur de telles terres. Composition of panels Composition (3) A panel of the Board shall be constituted as follows: (a) if the executive committee concludes under sub section (2) that effects are occurring or might occur primarily on settlement land, two thirds of the mem bers of the panel must be members nominated to the Board by the Council and one third must be members, excluding the Chairperson of the Board, who are not so nominated; (b) if the executive committee concludes under sub section (2) that effects are occurring or might occur primarily on non-settlement land, one third of the members of the panel must be members nominated to the Board by the Council and two thirds must be members, excluding the Chairperson of the Board, who are not so nominated; and (c) in any other case, of the members of the panel oth er than its chairperson, one half must be members nominated to the Board by the Council and one half must be members who are not so nominated. (3) La composition du comité restreint obéit aux règles suivantes : a) les deux tiers des membres sont des personnes nommées à l’Office sur proposition du Conseil et le reste, des personnes — autres que le président de l’Of fice — qui y sont nommées autrement, dans le cas où, selon la vérification prévue au paragraphe (2), les ef fets négatifs importants se font sentir ou sont suscep tibles de se faire sentir principalement sur des terres désignées; b) le tiers des membres sont des personnes nommées à l’Office sur proposition du Conseil et le reste, des personnes — autres que le président de l’Office — qui y sont nommées autrement, dans le cas où, selon cette vérification, ces effets se font sentir ou sont suscep tibles de se faire sentir principalement sur des terres non désignées; c) la moitié des membres — sans compter le président du comité — sont des personnes nommées à l’Office sur proposition du Conseil et l’autre moitié, des per sonnes qui y sont nommées autrement, dans les autres cas. Attendance Participation (4) Every member of a panel of the Board must be present at each meeting or hearing of the panel. (4) Les membres du comité restreint participent à toutes les réunions et audiences de celui-ci. Vacancies Vacance (5) In the event of the absence or incapacity, or a vacan cy in the office, of a member of a panel of the Board, the executive committee shall, in a manner consistent with the proportions set out in subsection (3), (a) direct some or all of the remaining members of the panel to resume the review; (5) En cas d’absence ou d’empêchement d’un membre du comité restreint, ou de vacance de son poste, le comité de direction, à la condition que la composition obéisse, dans tous les cas, aux règles du paragraphe (3) : a) ordonne aux autres membres ou à certains d’entre eux de poursuivre l’étude; Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Existing Projects Ouvrages Sections 96-99 Articles 96-99 Current to November 9, 2016 Last amended on June 18, 2015 59 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (b) appoint another member to the panel and direct the panel to resume or recommence the review; or (c) appoint a new panel and direct it to recommence the review. b) nomme un remplaçant et ordonne au comité de poursuivre ou de recommencer l’étude; c) établit un nouveau comité restreint qu’il charge de recommencer l’étude. Terms of reference Mandat 97 (1) Subject to any specification as to the form of re view referred to in subsection 95(4), the executive com mittee shall set the terms of reference of the panel of the Board. 97 (1) Le comité de direction fixe, en conformité avec les exigences formulées en vertu du paragraphe 95(4), le mandat du comité restreint chargé de l’étude d’un ou vrage. Publication of notice Publication (2) The executive committee shall publish, in a periodi cal that in its opinion has a large circulation in Yukon, a notice of the establishment of a panel of the Board and of the manner in which the public may obtain copies of the panel’s terms of reference. (2) Le comité de direction donne avis de l’établissement du comité restreint dans un périodique qui, à son avis, est largement diffusé au Yukon. L’avis indique la marche à suivre pour obtenir des copies du mandat. Modification of terms of reference Avis de modification (3) If a panel’s terms of reference are modified, the exec utive committee shall publish in a periodical referred to in subsection (2) a notice of the manner in which the public may obtain copies of the modification and of the reasons for it. (3) En cas de modification du mandat du comité res treint, le comité de direction donne dans un périodique visé au paragraphe (2) avis de la marche à suivre pour obtenir des copies des modifications et des motifs de celles-ci. Distribution of terms of reference Copie du mandat (4) The executive committee shall provide copies of the terms of reference, and of any modification made to them with the reasons for the modification, to the operator of the existing project, to any minister or first nation that requested or consented to the review, to any first nation identified under subsection 96(2) and to any government agency, independent regulatory agency or first nation that has notified the executive committee of its interest in the existing project or in existing projects of that kind. (4) Le comité de direction adresse copie du mandat et de toute modification qui lui est apportée — avec, dans ce dernier cas, les motifs de celle-ci — à l’exploitant, à qui conque a présenté la demande d’étude ou l’a agréée, aux premières nations dont le territoire est touché aux termes du paragraphe 96(2) ainsi qu’aux autorités publiques, aux organismes administratifs autonomes et aux premières nations l’ayant avisé de leur intérêt dans l’ouvrage ou dans les ouvrages de même catégorie. Commencement of review Étude 98 (1) A panel of the Board established under section 95 shall commence its review as soon as possible after it no tifies the operator and the administrative authority that, in its opinion, the applicable rules have been complied with. 98 (1) Le comité restreint procède à l’étude dans les meilleurs délais après avoir donné à l’exploitant de l’ou vrage en cause et à l’entité administrative compétente un préavis indiquant qu’il estime que les obligations prévues par les règles ont été remplies. Power to require additional information Renseignements supplémentaires (2) A panel of the Board may, before or after commenc ing its review, require the operator to provide any sup plementary information that it considers necessary for the review. (2) Le comité restreint peut, tant avant l’étude qu’au cours de celle-ci, exiger de l’exploitant la communication des renseignements supplémentaires qu’il estime néces saires à l’étude. Judicial powers of panels Attributions d’une cour supérieure 99 (1) A panel of the Board has, for the purposes of its review, the powers, rights and privileges of a superior court with respect to the attendance and examination of 99 (1) Le comité restreint chargé de l’étude d’un ou vrage a, pour la comparution et l’interrogatoire de té moins, ainsi que la production et l’examen de tout Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Existing Projects Ouvrages Sections 99-100 Articles 99-100 Current to November 9, 2016 Last amended on June 18, 2015 60 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 witnesses and the production and inspection of docu ments and other evidence. élément de preuve, les attributions d’une juridiction su périeure. Enforcement by court process Assignations et ordonnances (2) A summons issued or order made by a panel of the Board under subsection (1) may be made a summons or order of a superior court by filing a certified copy of it with the registrar of the court and, when so made, is en forceable in the same manner as a summons or order of that court. (2) Les assignations délivrées et les ordonnances ren dues au titre du paragraphe (1) peuvent être homolo guées par toute juridiction supérieure sur dépôt d’une co pie certifiée conforme au greffe de celle-ci; leur exécution s’effectue dès lors selon les mêmes modalités que les or donnances de cette juridiction. Preliminary determination Vérification de l’emplacement 100 (1) A panel of the Board established pursuant to a request that specified a public review shall determine whether the existing project is located on the settlement land of a first nation or on non-settlement land. 100 (1) En cas de demande d’étude publique, le comité restreint est tenu de vérifier, avant la tenue de ses au diences, si l’ouvrage en cause se trouve sur des terres dé signées ou des terres non désignées. Determination by panel Décision quant au lieu des effets (2) A panel of the Board referred to in subsection (1) shall (a) if the request is for the review of the existing project, determine whether the existing project is hav ing, or might subsequently have, significant adverse environmental or socio-economic effects on settle ment land of a first nation or on non-settlement land; or (b) if the request is for the review of a proposed aban donment, decommissioning, temporary shutdown or significant change, determine whether it might have significant adverse environmental or socio-economic effects on settlement land of a first nation or on non settlement land. (2) Le comité restreint est aussi tenu de décider, dans le cas où la demande porte sur l’ouvrage lui-même, si celui ci a ou est susceptible d’avoir, sur des terres désignées ou des terres non désignées, des effets négatifs importants sur l’environnement ou la vie socioéconomique et, dans le cas où elle porte sur un projet de fermeture, d’abandon ou de changement important, si le projet est susceptible d’avoir de tels effets sur ces terres. Location of hearings Lieu de l’instruction (3) A review by a panel of the Board established under section 95 may include public hearings in any location chosen by the panel and, where the request under that section is for a public review, shall include public hear ings in the following locations: (a) in a community within the territory of each first nation, other than the Tetlit Gwich’in, whose settle ment land is identified under subsection (1) or (2) — unless the panel and the first nation agree otherwise; (b) in a community within the Gwich’in settlement area referred to in the Gwich’in Agreement, if Tetlit Gwich’in Yukon land is settlement land identified un der subsection (1) or (2) — unless the panel and the Gwich’in Tribal Council agree otherwise; and (c) in the community in Canada closest to the existing project, if non-settlement land is identified under (3) Le comité restreint peut, dans tous les cas, tenir des audiences publiques dans tout lieu qu’il fixe. L’étude qui fait suite à une demande d’étude publique comprend ce pendant de telles audiences dans les lieux suivants : a) une localité située sur le territoire de chaque pre mière nation — exception faite des Gwich’in Tetlit — dont les terres désignées sont touchées aux termes des paragraphes (1) ou (2), sauf entente contraire entre la première nation et le comité; b) une localité située dans la région désignée des Gwi ch’in visée dans l’accord gwich’in, dans le cas où des terres gwich’in tetlit sont touchées aux termes des pa ragraphes (1) ou (2), sauf entente contraire entre le Conseil tribal des Gwich’in et le comité; c) la localité du Canada la plus proche de l’emplace ment de l’ouvrage, dans le cas où des terres non Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Existing Projects Ouvrages Sections 100-103 Articles 100-103 Current to November 9, 2016 Last amended on June 18, 2015 61 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 subsection (1) or (2) — unless another location in Canada is agreed on for that purpose by the panel, the operator, the decision bodies for the project and any first nation whose settlement land is identified under subsection (1) or (2). désignées sont touchées aux termes des para graphes (1) ou (2), sauf entente contraire entre les pre mières nations dont les terres désignées sont touchées aux termes de ces paragraphes, l’exploitant et l’entité administrative compétente. Recommendations of panel Rapport du comité restreint 101 (1) A panel of the Board established under sec tion 95 shall make a written report of its review to the minister or first nation that requested the review, in which the panel may make any recommendation based on the review that it considers to be appropriate. 101 (1) Au terme de son étude, le comité restreint com munique par écrit son rapport au ministre ou à la pre mière nation qui a présenté la demande visée à l’ar ticle 95. Le comité y fait les recommandations qu’il juge indiquées. Copy of report Copie (2) A copy of the report of a panel of the Board shall be provided to the operator of the existing project, every ad ministrative authority in respect of the existing project and any minister that consented to the request for the re view. (2) Copie du rapport est adressée à l’exploitant, à toute entité administrative compétente et à quiconque a agréé la demande d’étude. Consideration of recommendations Étude et suivi (3) The minister or first nation that requested a review shall give full and fair consideration to any recommenda tions made by a panel of the Board and shall provide a written response to the Board describing any action that they plan to take in response to the report. (3) Le ministre ou la première nation tient pleinement et équitablement compte des recommandations qui lui sont communiquées et adresse à l’Office un préavis détaillé des mesures qu’il entend prendre à cet égard. Plans Plans Definition of originator Définition de concepteur 102 In sections 103 to 109, originator means the gov ernment agency, first nation or other body by or for which a plan is prepared. 102 Aux articles 103 à 109, concepteur s’entend de l’au torité publique, de la première nation ou de l’organisme par lequel ou pour le compte duquel le plan a été préparé. Request for panel review Demande d’étude 103 (1) If the executive committee considers that the implementation of a plan might have significant adverse environmental or socio-economic effects in Yukon, it may establish a panel of the Board to conduct a review of the plan (a) at the request of the federal minister, if a federal agency is the originator; (b) at the request of the territorial minister, if a terri torial agency or municipal government is the origina tor; or (c) at the request of a first nation, and either at the first nation’s expense or with the consent of the feder al minister and, where a territorial agency or munici pal government is the originator, the consent of the territorial minister. 103 (1) Le comité de direction peut établir un comité restreint et le charger de l’étude de tout plan dont il es time la mise en œuvre susceptible d’avoir des effets néga tifs importants sur l’environnement ou la vie socioécono mique au Yukon, sur demande présentée : a) par le ministre fédéral, si le concepteur est une au torité fédérale; b) par le ministre territorial, si le concepteur est une autorité territoriale ou une municipalité; c) par la première nation qui supporte les frais de l’é tude ou qui obtient l’agrément du ministre fédéral et, si le concepteur est une autorité territoriale ou une municipalité, celui du ministre territorial. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Plans Plans Sections 103-105 Articles 103-105 Current to November 9, 2016 Last amended on June 18, 2015 62 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Joint request Demande conjointe (2) A request for a review shall be made jointly by the territorial minister and the federal minister if both a ter ritorial agency or municipal government and a federal agency are originators of the plan. (2) La demande doit être présentée conjointement par le ministre territorial et le ministre fédéral si les concep teurs sont une autorité fédérale et soit une autorité terri toriale, soit une municipalité. Consent of municipal government Approbation de la municipalité (3) If a municipal government is an originator of a plan, a request for a review, or consent to a review, by the terri torial minister may only be made or given with the agree ment of the municipal government. (3) La demande présentée par le ministre territorial ou l’agrément donné par lui en vertu de l’alinéa (1)c) est su bordonné à l’approbation de la municipalité qui est concepteur. Form of review Type d’étude (4) A request for a review shall specify whether the re view is to be a public review or some other form of re view. (4) La demande précise si l’étude sera publique ou d’un autre type. Discontinuance Interruption (5) If a minister or first nation that requests a review of a plan withdraws the request, the review shall be discon tinued. (5) La demande peut être retirée par quiconque l’a pré sentée. Le retrait met fin à l’étude. Criteria for review Facteurs à prendre en compte 104 (1) In determining whether to establish a panel of the Board, the executive committee shall consider (a) whether the matters referred to in subsec tion 108(3) were considered in the preparation of the plan; (b) whether there is a need for the plan to be reviewed by an independent body such as a panel of the Board and whether there is a more appropriate body by which, or process under which, the plan could be re viewed; and (c) whether the originator of the plan agrees to the re view. 104 (1) Afin de rendre sa décision au sujet de la de mande d’étude, le comité de direction vérifie : a) si les facteurs mentionnés au paragraphe 108(3) ont été pris en compte dans la conception du plan; b) s’il est nécessaire qu’un organisme indépendant de la nature d’un comité restreint procède à l’étude du plan ou si celle-ci pourrait être effectuée par un orga nisme mieux qualifié ou suivant une méthode plus in diquée; c) si le concepteur du plan consent à l’étude. Notice of review Avis au concepteur (2) The executive committee shall notify the originator of its determination. (2) Le comité de direction donne au concepteur un avis de sa décision. Terms of reference Mandat (3) Subject to any specification as to the form of review referred to in subsection 103(4), the executive committee shall establish the terms of reference of a panel of the Board. (3) Le comité de direction fixe, en conformité avec les exigences formulées en vertu du paragraphe 103(4), le mandat du comité restreint chargé de l’étude d’un plan. Review of plans specified in regulations Plan de catégorie réglementaire 105 (1) The executive committee may establish a panel of the Board to conduct a review of any plan of a type specified in the regulations and whose implementation it 105 (1) Le comité de direction peut aussi établir un co mité restreint et le charger de l’étude de tout plan qui fait partie d’une catégorie réglementaire et dont il estime la Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Plans Plans Sections 105-107 Articles 105-107 Current to November 9, 2016 Last amended on June 18, 2015 63 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 considers might have significant adverse environmental or socio-economic effects in Yukon. mise en œuvre susceptible d’avoir des effets négatifs im portants sur l’environnement ou la vie socioéconomique au Yukon. Notice of review Préavis (2) The executive committee shall notify the originator of the establishment of a panel of the Board. (2) Le comité de direction donne au concepteur un avis de l’établissement du comité restreint. Scope and terms of reference Portée, mandat, etc. (3) The executive committee shall specify the scope of the review of the plan, the panel’s terms of reference and a schedule for the review. (3) Le comité de direction fixe la portée de l’étude, le mandat du comité restreint et le calendrier. Publication of notice Publication 106 (1) The executive committee shall publish, in a pe riodical that in its opinion has a large circulation in Yukon, a notice of the establishment of a panel of the Board under section 103 or 105 and of the manner in which the public may obtain copies of the panel’s terms of reference. 106 (1) Le comité de direction donne avis de l’établisse ment du comité restreint au titre des articles 103 ou 105 dans un périodique qui, à son avis, est largement diffusé au Yukon. L’avis indique la marche à suivre pour obtenir des copies du mandat. Modification of terms of reference Avis de modification (2) If a panel’s terms of reference are modified, the exec utive committee shall publish, in a periodical referred to in subsection (1), a notice of the manner in which the public may obtain copies of the modification and of the reasons for it. (2) En cas de modification du mandat du comité res treint, le comité de direction donne dans un périodique visé au paragraphe (1) avis de la marche à suivre pour obtenir des copies des modifications et des motifs de celles-ci. Distribution of terms of reference Copie du mandat (3) The executive committee shall provide copies of the terms of reference, and of any modification made to them with the reasons for the modification, to the originator of the plan, to the minister or first nation that requested or consented to the review, if any, and to any government agency, independent regulatory agency or first nation that has notified the executive committee of its interest in the plan or in plans of that kind. (3) Le comité de direction adresse copie du mandat et de toute modification qui lui est apportée — avec, dans ce dernier cas, les motifs de celle-ci — au concepteur du plan, à quiconque a présenté la demande d’étude ou l’a agréée, ainsi qu’aux autorités publiques, aux organismes administratifs autonomes et aux premières nations l’ayant avisé de leur intérêt dans le plan ou dans les plans de même catégorie. Designation of members Membres de l’Office 107 (1) The executive committee shall select the mem bers of a panel of the Board, including its chairperson, from among the members of the Board. 107 (1) Le comité de direction choisit parmi les membres de l’Office les membres du comité restreint — y compris le président de celui-ci — chargé de l’étude d’un plan. Attendance Participation (2) Every member of a panel of the Board must be present at each meeting or hearing of the panel. (2) Les membres du comité restreint participent à toutes les réunions et audiences de celui-ci. Vacancies Vacance (3) In the event of the absence or incapacity, or a vacan cy in the office, of a member of a panel of the Board, the executive committee shall (3) En cas d’absence ou d’empêchement d’un membre du comité restreint, ou de vacance de son poste, le comité de direction : Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Plans Plans Sections 107-108 Articles 107-108 Current to November 9, 2016 Last amended on June 18, 2015 64 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (a) direct some or all of the remaining members of the panel to resume the review; (b) appoint another member to the panel and direct the panel to resume or recommence the review; or (c) establish a new panel and direct the panel to recommence the review. a) ordonne aux autres membres ou à certains d’entre eux de poursuivre l’étude; b) nomme un remplaçant et ordonne au comité de poursuivre ou de recommencer l’étude; c) établit un nouveau comité restreint qu’il charge de recommencer l’étude. Commencement of review Commencement de l’étude 108 (1) A panel of the Board established to review a plan shall commence the review as soon as possible after it notifies the originator that, in its opinion, the applica ble rules have been complied with. 108 (1) Le comité restreint procède à l’étude du plan dans les meilleurs délais après avoir donné au concepteur un préavis indiquant qu’il estime que les obligations pré vues par les règles ont été remplies. Power to require additional information Renseignements supplémentaires (2) A panel of the Board may, before or after commenc ing a review of a plan, require the originator of the plan to provide any supplementary information that it consid ers necessary for the review. (2) Le comité restreint peut, tant avant l’étude qu’au cours de celle-ci, exiger du concepteur la communication des renseignements supplémentaires qu’il estime néces saires à l’étude. Matters to be considered Prise en compte (3) In conducting a review of a plan, a panel of the Board shall take the following matters into consideration: (a) the significance of any environmental or socio economic effects in or outside Yukon that might occur from the implementation of the plan; (b) the significance of any adverse cumulative envi ronmental or socio-economic effects that might occur from the implementation of the plan in combination with (i) projects for which proposals have been submit ted under subsection 50(1), or (ii) existing or proposed activities, or the imple mentation of other plans, in or outside Yukon, that are known to the panel from information provided to it or obtained by it under this Part; (c) alternatives to the plan that would avoid or mini mize any significant adverse environmental or socio economic effects; (d) mitigative measures and measures to compensate for any significant adverse effects; (e) the need to protect the rights of Yukon Indian per sons under final agreements, the special relationship between Yukon Indian persons and the wilderness en vironment of Yukon and the cultures, traditions, health and lifestyles of Yukon Indian persons and oth er residents of Yukon; (3) Le comité restreint tient compte, dans l’étude du plan, des facteurs suivants : a) l’importance des effets de sa mise en œuvre sur l’environnement ou la vie socioéconomique au Yukon ou à l’extérieur de ses limites; b) l’importance des effets cumulatifs négatifs pro bables, sur l’environnement ou la vie socioécono mique, de sa mise en œuvre combinée soit à la réalisa tion de projets de développement ayant fait l’objet d’une proposition en vertu du paragraphe 50(1), soit à l’exercice — même projeté — d’activités ou à la mise en œuvre de plans, au Yukon ou à l’extérieur de ses li mites, dont il a pris connaissance sous le régime de la présente partie; c) les solutions de rechange susceptibles d’éviter ou de réduire les effets négatifs importants sur l’environ nement ou la vie socioéconomique; d) les mesures d’atténuation et d’indemnisation indi quées dans les circonstances; e) la nécessité de protéger les droits conférés aux In diens du Yukon sous le régime des accords définitifs, la relation particulière entre ces derniers et l’environ nement du Yukon dans son état sauvage ainsi que les cultures, les traditions, la santé et le mode de vie tant des Indiens du Yukon que des autres résidents du Yu kon; f) les intérêts des résidents du Yukon et des autres ré sidents du Canada; Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Plans Plans Sections 108-110 Articles 108-110 Current to November 9, 2016 Last amended on June 18, 2015 65 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (f) the interests of residents of Yukon and Canadian residents outside Yukon; (g) the capacity of any renewable resources that are likely to be significantly affected by the implementa tion of the plan to meet present and future needs; and (h) the need for effects monitoring. g) la capacité des ressources renouvelables qui risquent le plus de subir le contrecoup du projet de ré pondre aux besoins actuels et à ceux des générations futures; h) la nécessité de prendre des mesures de contrôle. Other matters Autres points (4) A panel of the Board conducting a review of a plan may take into consideration any other matter that it con siders relevant. (4) Le comité restreint peut en outre tenir compte, dans son étude, de tout autre facteur qu’il juge pertinent. Recommendations of panel Recommandations 109 (1) On the completion of its review of a plan, a pan el of the Board shall provide the originator with written recommendations, which may include a recommendation that the plan be implemented, with or without modifica tions, or that it not be implemented. 109 (1) Au terme de l’étude, le comité restreint commu nique par écrit ses recommandations au concepteur; il peut notamment recommander la mise en œuvre du plan — avec ou sans modifications — ou son rejet. Copy Copie (2) A panel shall provide a copy of its recommendations to any minister, municipal government or first nation that requested or consented to the review. (2) Copie des recommandations est adressée à qui conque a présenté ou agréé la demande d’étude. Consideration to be given Examen des recommandations (3) The originator of a plan shall give full and fair con sideration to the recommendations provided to it by a panel and shall provide the Board with its reasons in writing for declining any of the recommendations. (3) Le concepteur tient compte pleinement et équitable ment des recommandations du comité restreint et com munique par écrit à l’Office les motifs de tout refus. Audits and Effects Monitoring Mesures de contrôle et de vérification Recommendation for audit or monitoring of project Recommandations : projet de développement 110 (1) When a designated office, the executive com mittee, a panel of the Board or a joint panel recommends to a decision body that a project be allowed to proceed, with or without terms and conditions, it may recommend that a project audit or that effects monitoring be conduct ed in respect of the project. 110 (1) Le bureau désigné, le comité de direction ou le comité restreint ou mixte, en recommandant au décision naire la réalisation d’un projet de développement — avec ou sans conditions —, peut aussi recommander la prise de mesures de contrôle ou de vérification relativement à celui-ci. Results Communication des résultats (2) A decision body that accepts a recommendation for a project audit or effects monitoring shall provide the re sults of it to the designated office that made the recom mendation or, in the case of a recommendation made by the executive committee, a panel of the Board or a joint panel, to the executive committee. (2) S’il accepte ces recommandations, le décisionnaire est tenu de communiquer au bureau désigné ou, si celles ci émanent d’un comité restreint ou mixte ou du comité de direction, à ce dernier les résultats de la prise des me sures qui en font l’objet. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Audits and Effects Monitoring Mesures de contrôle et de vérification Sections 110-112 Articles 110-112 Current to November 9, 2016 Last amended on June 18, 2015 66 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Advice to decision body Conseils (3) After reviewing the results of any project audit or ef fects monitoring provided to it by a decision body, the designated office or executive committee may provide advice to the decision body on the basis of those results. (3) Le bureau désigné et le comité de direction peuvent, au terme de l’étude des résultats, donner au décision naire des conseils sur le sujet. Request for audit or monitoring of existing project Demande 111 (1) A request for a project audit or for effects moni toring of an existing project may be made by ministers and first nations to the extent that and in the manner in which a request for a review may be made under subsec tions 95(1) to (3). 111 (1) Les ministres fédéral ou territorial et les pre mières nations peuvent, en conformité avec les para graphes 95(1) à (3), demander la prise de mesures de contrôle ou de vérification relativement à un ouvrage. Report of results Prise de mesures et rapport (2) The executive committee shall conduct a project au dit or effects monitoring of an existing project where so requested, and shall make a report of the results to the minister or first nation that made or consented to the re quest, and may include recommendations in the report. (2) Le comité de direction prend les mesures visées par la demande et communique à quiconque l’a présentée ou agréée le rapport des résultats des mesures de contrôle et de vérification. Il peut y faire des recommandations. Consideration of report Recommandations (3) The federal minister, the territorial minister or a first nation shall give full and fair consideration to any recom mendations of the executive committee. (3) Le destinataire du rapport tient pleinement et équita blement compte des recommandations qui y sont formu lées. Studies and Research Études et recherches Request for studies or research Demande d’études ou de recherches 112 (1) At the request of the federal minister, or at the request of the territorial minister or a first nation and with the consent of the federal minister, or at the request of a first nation or the territorial minister and at its or his or her expense, the executive committee may undertake (a) studies of environmental or socio-economic effects that are cumulative geographically or over time; or (b) research into any aspect of the assessment of ac tivities. 112 (1) À la demande soit du ministre fédéral, soit du ministre territorial ou d’une première nation — s’ils ob tiennent l’agrément du ministre fédéral ou encore en supportent les frais —, le comité de direction peut entre prendre : a) une étude, dans le temps ou l’espace, des effets cu mulatifs sur l’environnement ou la vie socioécono mique; b) des recherches sur l’évaluation d’activités en géné ral. Collaboration Collaboration (1.1) With the approval of the ministers and first nations that request or consent to a study or research under sub section (1), the executive committee may conduct the study or research in collaboration with any other body. (1.1) Avec l’approbation de quiconque présente la de mande ou l’agrée, le comité de direction peut entre prendre une telle étude et de telles recherches en collabo ration avec tout organisme. Agreement Entente (2) The executive committee may conclude agreements respecting the terms of reference, scope and scheduling of studies or research with the ministers and first nations that request or consent to them. (2) Le comité de direction peut conclure avec quiconque présente la demande ou l’agrée une entente au sujet du mandat et du calendrier applicables à l’étude ou aux re cherches, ainsi que leur portée. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Studies and Research Études et recherches Sections 112-114 Articles 112-114 Current to November 9, 2016 Last amended on June 18, 2015 67 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Obtaining information Obtention de renseignements (3) Subject to any other Act of Parliament, territorial law or first nation law, the executive committee may obtain from any first nation, government agency or independent regulatory agency any information in their possession that the executive committee requires for the purpose of conducting a study or research. 2003, c. 7, s. 112; 2015, c. 19, s. 31. (3) Le comité de direction peut, sous réserve de toute autre loi fédérale, de tout texte législatif territorial ou de tout texte législatif d’une première nation, obtenir de toute première nation, de toute autorité publique ou de tout organisme administratif autonome les renseigne ments qui sont en leur possession et dont il a besoin dans le cadre de toute étude ou de toutes recherches. 2003, ch. 7, art. 112; 2015, ch. 19, art. 31. Report of executive committee Rapport du comité de direction 113 (1) The executive committee shall submit a report on the results of a study or of research undertaken under section 112 to the minister or first nation that requested or consented to it and shall, as soon as feasible after sub mitting the report, make it available to the public. The executive committee may include recommendations in the report. 113 (1) Le comité de direction communique à qui conque a présenté la demande visée à l’article 112 ou l’a agréée son rapport sur l’étude ou les recherches et, dans les meilleurs délais par la suite, le met à la disposition du public. Il peut y faire des recommandations. Consideration of report Recommandations (2) The minister or first nation shall give full and fair consideration to any recommendations of the executive committee. 2003, c. 7, s. 113; 2015, c. 19, s. 32. (2) Le destinataire du rapport tient pleinement et équita blement compte des recommandations qui y sont formu lées. 2003, ch. 7, art. 113; 2015, ch. 19, art. 32. Violation of Decision Document Violation des prescriptions des décisions écrites Recommendation by Board to decision body Recommandation en cas de violation 114 (1) The Board may recommend to a decision body that a public hearing be held by the Board, or another body to be designated by the decision body, if the Board considers that any person or body has violated any of the provisions of a decision document issued by that decision body. 114 (1) Dans le cas où il soupçonne la violation des prescriptions d’une décision écrite, l’Office peut recom mander au décisionnaire l’ayant prise la tenue d’une en quête publique sur le sujet. Il peut offrir de la tenir lui même ou lui demander de désigner à cette fin un autre organisme. Hearing Enquête publique (2) If a decision body accepts a recommendation made to it, the Board or the body designated by the decision body shall hold a public hearing with respect to the violation, and may make recommendations to the decision body for the disposition of the matter. (2) Une fois cette recommandation acceptée, l’Office ou l’organisme désigné à cette fin tient une enquête pu blique au sujet de la violation en question et peut par la suite faire au décisionnaire les recommandations qui s’imposent. Response to recommendation Réponse (3) A decision body shall respond with written reasons to any recommendation made to it. (3) Le décisionnaire communique par écrit, motifs à l’ap pui, sa réponse à toute recommandation faite en vertu du présent article. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Court Jurisdiction Compétence judiciaire Sections 115-118 Articles 115-118 Current to November 9, 2016 Last amended on June 18, 2015 68 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Court Jurisdiction Compétence judiciaire Court reference by Board Renvoi de questions par l’Office 115 At the request of a designated office, the executive committee, a panel of the Board, a joint panel or a deci sion body, the Board may refer a question of law or juris diction arising in any proceedings under this Act to the Supreme Court of Yukon. 2003, c. 7, ss. 115, 133(E). 115 L’Office peut, à la demande d’un bureau désigné, du comité de direction, d’un comité restreint ou mixte ou d’un décisionnaire, déférer toute question de droit ou de compétence soulevée dans le cadre des instances tenues sous le régime de la présente loi à la Cour suprême du Yukon. 2003, ch. 7, art. 115 et 133(A). Application for judicial review Demande de contrôle judiciaire 116 Notwithstanding the exclusive jurisdiction referred to in section 18 of the Federal Courts Act, the Attorney General of Canada, the territorial minister or anyone di rectly affected by the matter in respect of which relief is sought may make an application to the Supreme Court of Yukon for any relief against the Board, a designated of fice, the executive committee, a panel of the Board, a joint panel or a decision body, by way of an injunction or declaration or by way of an order in the nature of certio rari, mandamus, quo warranto or prohibition. 2003, c. 7, ss. 116, 132. 116 Indépendamment de la compétence exclusive ac cordée par l’article 18 de la Loi sur les Cours fédérales, le procureur général du Canada, le ministre territorial ou quiconque est directement touché par l’affaire peut pré senter une demande à la Cour suprême du Yukon afin d’obtenir, contre l’Office, un bureau désigné, le comité de direction, un comité restreint ou mixte ou un décision naire, toute réparation par voie d’injonction, de jugement déclaratoire, de bref — certiorari, mandamus, quo war ranto ou prohibition — ou d’ordonnance de même na ture. 2003, ch. 7, art. 116 et 132. Maintenance of Records and Public Access Dossiers et accès à l’information Records of Board and designated offices Documents conservés par l’Office et les bureaux désignés 117 The Board and each designated office shall main tain (a) a document indicating the boundaries of assess ment districts and the location of the designated office for each assessment district; (b) copies of any by-laws and rules that are in force under this Act; (c) a record of the results of project audits and effects monitoring; (d) reports of studies and research undertaken under section 112; and (e) descriptions of any standard mitigative measures developed under section 37. 117 Sont conservés par l’Office et chacun des bureaux désignés : a) un document indiquant l’emplacement des bureaux désignés et les limites de leurs circonscriptions respec tives; b) une série à jour des diverses règles établies sous le régime de la présente loi et des règlements adminis tratifs pris en vertu de celle-ci; c) un registre des résultats de la prise des mesures de contrôle et de vérification; d) le rapport sur les études et recherches entreprises en vertu de l’article 112; e) l’explication des mesures d’atténuation types éla borées en vertu de l’article 37. Records of Board Documents conservés par l’Office 118 The Board shall maintain 118 Sont conservés par l’Office : Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Maintenance of Records and Public Access Dossiers et accès à l’information Sections 118-121 Articles 118-121 Current to November 9, 2016 Last amended on June 18, 2015 69 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (a) a register containing all documents that are pro duced, collected or received by the executive commit tee, panels of the Board and joint panels in relation to assessments, together with any documents provided to them under subsection 91(1); (b) a list of the projects, existing projects, other activi ties and plans for which an assessment is pending be fore, or has been completed by, the designated offices, the executive committee, panels of the Board and joint panels, together with their location and stage of as sessment; and (c) a record of authorizations, grants of interest in land and provisions of financial assistance in respect of which the Board has been notified under section 89. 2003, c. 7, s. 118; 2015, c. 19, s. 33(E). a) un registre où sont versés tous les documents pro duits, recueillis ou reçus par le comité de direction et les comités restreints ou mixtes relativement aux éva luations ainsi que tous les documents qu’il reçoit en application du paragraphe 91(1); b) la liste des projets de développement, des ou vrages, des autres activités et des plans qui font ou ont fait l’objet d’une évaluation par un bureau désigné, le comité de direction ou un comité restreint ou mixte, avec mention du lieu de réalisation, d’exploitation, d’exercice ou de mise en œuvre et de leur état d’avan cement; c) un document indiquant les autorisations, les droits fonciers et l’aide financière ayant fait l’objet de la noti fication prévue à l’article 89. 2003, ch. 7, art. 118; 2015, ch. 19, art. 33(A). Records of designated office Documents conservés par les bureaux désignés 119 Each designated office shall maintain (a) a register containing all documents that are pro duced, collected or received by it in relation to assess ments and a copy of all documents referred to in para graph 118(a) that relate to projects located in its assessment district, together with any documents pro vided to it under subsection 91(1); and (b) a list of the projects, existing projects and plans in its assessment district for which assessments are pending or have been completed, together with their location and stage of assessment. 119 Sont conservés par chacun des bureaux désignés : a) un registre où sont versés tous les documents pro duits, recueillis ou reçus par lui relativement aux éva luations effectuées sous le régime de la présente loi et copie de tous les documents visés à l’alinéa 118a) et re latifs aux projets de développement devant être réali sés dans son ressort, ainsi que tous les documents qu’il reçoit en application du paragraphe 91(1); b) la liste des projets de développement, des ouvrages et des plans qui font ou ont fait l’objet, dans son res sort, d’évaluations, avec mention du lieu de réalisation ou d’exploitation ou de mise en œuvre et de leur état d’avancement. Public access Consultation 120 (1) Any person has the right to inspect the registers and records referred to in sections 117 to 119 during nor mal business hours. 120 (1) Les registres et autres documents visés aux ar ticles 117 à 119 peuvent être consultés pendant les heures normales de bureau. Information kept Obligation de l’Office et des bureaux désignés (2) The Board and the designated offices shall keep their registers and records in a manner that facilitates public access to them. (2) L’Office et les bureaux désignés sont en outre tenus de prendre les mesures nécessaires pour faciliter l’accès du public aux documents. Information held in confidence Refus de communication 121 Notwithstanding any other provision of this Part, the executive committee, the designated offices, panels of the Board and decision bodies may not disclose (a) traditional knowledge that is determined to be confidential under the applicable rules and that is pro vided in confidence to them for the purposes of this Act; or 121 Malgré toute disposition contraire de la présente partie, le bureau désigné, le comité de direction, le comi té restreint et le décisionnaire sont tenus de refuser la communication : a) des connaissances traditionnelles de nature confi dentielle, au sens des règles applicables, qui leur sont Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Maintenance of Records and Public Access Dossiers et accès à l’information Sections 121-122 Articles 121-122 Current to November 9, 2016 Last amended on June 18, 2015 70 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (b) information to any person or body that a govern ment institution, within the meaning of the Access to Information Act, would not be required to disclose pursuant to a request by that person or body under that Act, unless (i) the provider of the information consents to its disclosure, and (ii) the person or body is not required to disclose the information pursuant to a request under a terri torial or first nation law, and agrees to keep the in formation confidential. fournies pour l’application de la présente loi sous le sceau de la confidentialité; b) de l’information qu’une institution fédérale, au sens de la Loi sur l’accès à l’information, ne serait pas tenue de communiquer à la suite d’une demande pré sentée sous le régime de cette loi, sauf si, d’une part, la partie qui a fourni l’information consent à sa commu nication et, d’autre part, le destinataire s’engage à res treindre la communication et n’est obligé par aucun texte législatif territorial ni aucun texte législatif d’une première nation à communiquer l’information. Policy Directions Instructions générales Minister’s policy directions Instructions ministérielles 121.1 (1) The federal minister may, after consultation with the Board, give written policy directions that are binding on the Board with respect to the exercise or per formance of any of its powers, duties or functions under this Act. 121.1 (1) Le ministre fédéral peut, après consultation de l’Office, donner par écrit à celui-ci des instructions gé nérales obligatoires relativement à l’exercice des attribu tions que lui confère la présente loi. Limitation Réserve (2) Policy directions do not apply in respect of any pro posal for a project that, at the time the directions are giv en, has been submitted to a designated office, the execu tive committee or a panel of the Board. (2) Les instructions ne visent toutefois pas la proposition relative à un projet de développement qui, au moment où elles sont données, a été soumis à un bureau désigné, au comité de direction ou à un comité restreint. Publication Publication (3) Immediately after giving a policy direction to the Board, the federal minister shall cause a notice to be pub lished in the Canada Gazette stating that the direction will be published by the Board on its Internet site. Imme diately after receiving the direction, the Board shall pub lish them on its Internet site and may also make it acces sible by any other means that the Board considers appropriate. (3) Dès que le ministre fédéral donne des instructions, il fait publier dans la Gazette du Canada un avis indiquant que l’Office les publiera sur son site Internet. Dès que l’Office reçoit les instructions, il les publie sur son site In ternet et, s’il l’estime indiqué, les rend accessibles par tout autre moyen. Statutory Instruments Act Loi sur les textes réglementaires (4) Sections 3, 5 and 11 of the Statutory Instruments Act do not apply in respect of the policy directions. 2015, c. 19, s. 34. (4) Les articles 3, 5 et 11 de la Loi sur les textes régle mentaires ne s’appliquent pas aux instructions. 2015, ch. 19, art. 34. Regulations and Orders Règlements et décrets Regulations of Governor in Council Pouvoir du gouverneur en conseil 122 The Governor in Council may, following consulta tion by the federal minister with the territorial minister and first nations, make regulations (a) defining resident for the purposes of section 9, re specting proceedings for removal of a member from 122 Le gouverneur en conseil peut, par règlement pris après consultation, par le ministre fédéral, du ministre territorial et des premières nations : a) définir, pour l’application de l’article 9, la notion de résidence, fixer la procédure de révocation applicable Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Regulations and Orders Règlements et décrets Sections 122-123 Articles 122-123 Current to November 9, 2016 Last amended on June 18, 2015 71 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 office under subsection 11(2) and determining which member is to be removed if more than one member changes residence during a given period; (b) specifying any matter to be taken into considera tion in the conduct of an assessment of a project or ex isting project, for the purposes of paragraph 42(1)(j); (c) specifying the projects for which proposals are to be submitted to the executive committee under sub section 50(1); (d) prescribing periods for the purposes of section 75 or subsection 76(1) or 77(3); (e) respecting the manner of consultation between de cision bodies under subsection 78(1); (f) specifying the types of plans that may be reviewed by a panel of the Board under subsection 105(1); and (g) establishing a funding program to facilitate the participation of specified classes of persons or groups in reviews of projects. 2003, c. 7, s. 122; 2015, c. 19, s. 35. dans le cas visé au paragraphe 11(2) et préciser auquel des membres ayant changé de résidence dans une pé riode donnée cette procédure s’applique; b) préciser les éléments dont il doit être tenu compte dans l’évaluation des projets de développement et d’ouvrages au titre de l’alinéa 42(1)j); c) préciser les projets de développement pour lesquels des propositions doivent être soumises au comité de direction en application du paragraphe 50(1); d) fixer les délais nécessaires à l’application de l’ar ticle 75 ou des paragraphes 76(1) ou 77(3); e) régir les consultations entre décisionnaires visées au paragraphe 78(1); f) établir des catégories de plans pouvant être soumis à l’étude d’un comité restreint en vertu du para graphe 105(1); g) mettre sur pied un programme de financement afin de permettre la participation des personnes ou groupes qu’il précise aux études de projets de dévelop pement. 2003, ch. 7, art. 122; 2015, ch. 19, art. 35. Power of Governor in Council Pouvoir du gouverneur en conseil 122.1 The Governor in Council may, following consulta tion by the federal minister with the territorial minister, first nations, the Council and the Board, make regula tions respecting the recovery of costs for the purposes of section 93.1, including prescribing amounts and services for that section and exempting any class of proponents or class of projects from the application of that section. 2015, c. 19, s. 36. 122.1 Le gouverneur en conseil peut, après consulta tion, par le ministre fédéral, du ministre territorial, des premières nations, du Conseil et de l’Office, prendre des règlements concernant le recouvrement des coûts pour l’application de l’article 93.1, notamment pour prévoir des services et des sommes et pour soustraire à l’applica tion de cet article toute catégorie de promoteurs ou de projets de développement. 2015, ch. 19, art. 36. Amendment of schedule Modification de l’annexe 123 The Governor in Council may, by order, following consultation by the federal minister with the territorial minister and first nations, (a) amend Part 1 of the schedule by adding to it the name of any body having power under a federal law, other than the Yukon Act, to issue authorizations whose terms and conditions are not subject to varia tion by the Governor in Council or a minister of the Crown; (b) amend Part 2 of the schedule by adding to it the name of any body having the power under the Yukon Act to issue authorizations whose terms and condi tions are not subject to variation by the Commissioner 123 Le gouverneur en conseil peut, par décret pris après consultation, par le ministre fédéral, du ministre territo rial et des premières nations : a) ajouter à la partie 1 de l’annexe le nom de tout or ganisme chargé, aux termes d’un texte législatif fédé ral autre que la Loi sur le Yukon, de délivrer des auto risations dont les conditions ne sont pas susceptibles d’être modifiées par le gouverneur en conseil ou un ministre du gouvernement fédéral; b) ajouter à la partie 2 de l’annexe le nom de tout or ganisme chargé, sous le régime de la Loi sur le Yukon, de délivrer des autorisations dont les conditions ne Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 2 Assessment Process and Decision Documents PARTIE 2 Processus d’évaluation et décisions écrites Regulations and Orders Règlements et décrets Sections 123-124 Articles 123-124 Current to November 9, 2016 Last amended on June 18, 2015 72 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 of Yukon or by a minister of the territorial government; or (c) amend the schedule by deleting the name of any body. 2003, c. 7, s. 123; 2015, c. 19, s. 37(F). sont pas susceptibles d’être modifiées par le commis saire du Yukon ou un ministre du gouvernement territorial; c) supprimer de l’annexe le nom de tout organisme. 2003, ch. 7, art. 123; 2015, ch. 19, art. 37(F). PART 3 PARTIE 3 Transitional Provisions, Consequential and Coordinating Amendments and Commencement Dispositions transitoires, modifications connexes, dispositions de coordination et entrée en vigueur Transitional Provisions Dispositions transitoires Application of EARP Guidelines Order Maintien de l’application du décret 124 (1) The Environmental Assessment and Re view Process Guidelines Order, approved by Or der in Council P.C. 1984-2132 of June 21, 1984, and registered as SOR/84-467, continues to apply — to the exclusion of the provisions of this Act re specting projects — in respect of any proposal for a project that is, on the coming into force of Part 2 of this Act, before an environmental as sessment panel established pursuant to that Or der. 124 (1) Le Décret sur les lignes directrices vi sant le processus d’évaluation et d’examen en matière d’environnement, approuvé par le dé cret C.P. 1984-2132 du 21 juin 1984 et enregistré sous le numéro DORS/84-467, continue de s’appli quer aux projets de développement pour lesquels une commission d’évaluation environnementale a été constituée sous son régime avant l’entrée en vigueur de la partie 2 de la présente loi. Ces pro jets sont dès lors soustraits au processus mis en place par la présente loi en ce qui touche les pro jets de développement. Application of EARP Guidelines Order Examens préalables en cours et évaluations initiales (2) The Order referred to in subsection (1) con tinues to apply — to the exclusion of the provi sions of this Act respecting projects — in respect of any proposal for a project for which an envi ronmental screening or initial assessment under that Order was commenced before the coming in to force of Part 2 of this Act, but where such a proposal is referred to the Minister of the Envi ronment for public review pursuant to section 20 of that Order, that Order ceases to apply and this Act applies in respect of the proposal as if that Minister had agreed to a request made by the ex ecutive committee under paragraph 61(1)(b) of this Act. (2) Il en va de même des projets pour lesquels un examen préalable ou une évaluation initiale a été entrepris, aux termes du décret visé au para graphe (1), avant l’entrée en vigueur de la par tie 2 de la présente loi. Le ministre de l’Environ nement, s’il est saisi d’un tel projet pour examen public aux termes de l’article 20 du décret, est ré puté, pour l’application de la présente loi, avoir acquiescé à une demande faite par le comité de direction au titre de l’alinéa 61(1)b) et le décret cesse de s’appliquer. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 3 Transitional Provisions, Consequential and Coordinating Amendments and Commencement PARTIE 3 Dispositions transitoires, modifications connexes, dispositions de coordination et entrée en vigueur Transitional Provisions Dispositions transitoires Sections 125-126 Articles 125-126 Current to November 9, 2016 Last amended on June 18, 2015 73 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Application of Canadian Environmental Assessment Act Loi canadienne sur l’évaluation environnementale 125 (1) Notwithstanding section 6, the Canadian Environmental Assessment Act continues to ap ply — to the exclusion of the provisions of this Act respecting projects — in respect of a proposal for a project that was referred, before the coming into force of Part 2 of this Act, to a mediator or a review panel pursuant to that Act. 125 (1) Malgré l’article 6, la Loi canadienne sur l’évaluation environnementale continue de s’ap pliquer aux projets de développement qui, avant l’entrée en vigueur de la partie 2 de la présente loi, ont fait l’objet d’un renvoi à un médiateur ou à une commission en vertu de cette loi. Ces pro jets sont dès lors soustraits au processus mis en place par la présente loi en ce qui touche les pro jets de développement. Application of Canadian Environmental Assessment Act Loi canadienne sur l’évaluation environnementale (2) Notwithstanding section 6, the Canadian En vironmental Assessment Act continues to apply — to the exclusion of the provisions of this Act re specting projects — in respect of a proposal for a project for which a screening or comprehensive study was commenced under that Act before the coming into force of Part 2 of this Act, but where the project is referred to a review panel pursuant to subsection 29(1) of that Act, that Act ceases to apply and section 63 of this Act applies as if the Minister of the Environment had agreed to a re quest made by the executive committee under paragraph 61(1)(b). (2) Il en va de même des projets pour lesquels, avant l’entrée en vigueur de la partie 2 de la pré sente loi, un examen préalable ou une étude ap profondie a été entrepris sous le régime de la Loi canadienne sur l’évaluation environnementale. Toutefois, en cas de renvoi à une commission en vertu du paragraphe 29(1) de cette loi, l’article 63 de la présente loi s’applique, le ministre de l’En vironnement étant réputé avoir acquiescé à une demande faite au titre de l’alinéa 61(1)b) de la présente loi, et la Loi canadienne sur l’évalua tion environnementale cesse de s’appliquer. Pending applications to territorial agencies and first nations Demandes adressées aux autorités territoriales ou aux premières nations 126 (1) This Act does not apply in respect of a project for which, before the coming into force of Part 2, an application was made to a territorial agency under a territorial law, or to a first nation under a first nation law or the first nation’s final agreement, for the issuance of an authorization, the grant of an interest in land or the grant of fi nancial assistance, unless (a) the project becomes subject to this Act by virtue of subsection 124(2) or 125(2); or (b) before the application is accepted, the ter ritorial minister or the first nation, as the case may be, requires the applicant to submit a pro posal under section 50. 126 (1) La présente loi ne s’applique pas aux pro jets de développement pour lesquels une pre mière nation ou une autorité territoriale a été saisie, avant l’entrée en vigueur de la partie 2, d’une demande d’autorisation, de droits fonciers ou d’aide financière en vertu d’un texte législatif territorial, des textes législatifs de la première nation ou d’un accord définitif, sauf si : a) les circonstances mentionnées aux para graphes 124(2) ou 125(2) existent; b) avant d’accueillir la demande, la première nation ou, dans le cas de l’autorité territoriale, le ministre territorial demande au promoteur de soumettre une proposition en conformité avec l’article 50. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon PART 3 Transitional Provisions, Consequential and Coordinating Amendments and Commencement PARTIE 3 Dispositions transitoires, modifications connexes, dispositions de coordination et entrée en vigueur Transitional Provisions Dispositions transitoires Sections 126-134 Articles 126-134 Current to November 9, 2016 Last amended on June 18, 2015 74 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 Projects already initiated Projet entrepris par l’autorité territoriale ou la première nation (2) This Act does not apply in respect of any project that the territorial agency or first nation has initiated as proponent before the coming in to force of Part 2 unless the project becomes sub ject to this Act by virtue of subsection 124(2) or 125(2). (2) La présente loi ne s’applique pas non plus aux projets de développement dont l’autorité territo riale ou la première nation a entrepris la réalisa tion, à titre de promoteur, avant l’entrée en vi gueur de la partie 2 sauf si les circonstances mentionnées aux paragraphes 124(2) ou 125(2) existent. Consequential Amendments Modifications connexes Access to Information Act Loi sur l’accès à l’information 127 [Amendment] 127 [Modification] 128 [Amendment] 128 [Modification] Privacy Act Loi sur la protection des renseignements personnels 129 [Amendment] 129 [Modification] Yukon First Nations Self Government Act Loi sur l’autonomie gouvernementale des premières nations du Yukon 130 [Amendment] 130 [Modification] Yukon Surface Rights Board Act Loi sur l’Office des droits de surface du Yukon 131 [Amendment] 131 [Modification] Coordinating Amendments Dispositions de coordination 132 [Amendment] 132 [Modification] 133 [Amendment] 133 [Modification] Coming Into Force Entrée en vigueur Order of Governor in Council Décret *134 Section 6, Part 2 and sections 124 to 126 and 131 come into force eighteen months after the day on which this Act receives royal assent or on any earlier day that may be fixed by order of the Gov ernor in Council. * [Note: Act, except section 6, Part 2 and sections 124 to 126 and 131, in force on assent May 13, 2003; section 6, Part 2 and sections 124 to 126 and 131, in force November 13, 2004.] *134 L’article 6, la partie 2 et les articles 124 à 126 et 131 entrent en vigueur dix-huit mois après la date de sanction de la présente loi ou, dans cet intervalle, à la date fixée par décret. * [Note : Loi, sauf article 6, partie 2 et articles 124 à 126 et 131, en vigueur à la sanction le 13 mai 2003; l’article 6, la partie 2 et articles 124 à 126 et 131 en vigueur le 13 novembre 2004.] Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon SCHEDULE ANNEXE Current to November 9, 2016 Last amended on June 18, 2015 75 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 SCHEDULE (Subsection 2(1) and section 123) ANNEXE (paragraphe 2(1) et article 123) PART 1 PARTIE 1 Federal Independent Regulatory Agencies Organismes administratifs autonomes fédéraux Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire National Energy Board Office national de l’énergie Commission canadienne de sûreté nucléaire Canadian Nuclear Safety Commission Office national de l’énergie National Energy Board PART 2 PARTIE 2 Territorial Independent Regulatory Agencies 2003, c. 7, Sch.; 2015, c. 19, s. 38. Organismes administratifs autonomes territoriaux 2003, ch. 7, ann.; 2015, ch. 19, art. 38. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon RELATED PROVISIONS DISPOSITIONS CONNEXES Current to November 9, 2016 Last amended on June 18, 2015 76 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 RELATED PROVISIONS DISPOSITIONS CONNEXES — 2015, c. 19, s. 39 — 2015, ch. 19, art . 39 Ongoing projects Projet de développement en cours 39 (1) Subject to subsection (2), the Yukon Environmental and Socio-economic Assessment Act, as it read immediately before the day on which this Act receives royal assent, contin ues to apply to a proposal for a project that was submitted be fore that day. 39 (1) Sous réserve du paragraphe (2), la Loi sur l’évalua tion environnementale et socioéconomique au Yukon, dans sa version antérieure à la date de sanction de la présente loi, continue de s’appliquer aux propositions visant un projet de développement soumises avant cette date. Time limits Délais (2) Section 46.1 and subsections 56(1) to (1.3), 58(1) to (1.3) and 72(4.1) to (4.4) of the Yukon Environmental and Socio economic Assessment Act, as they read on the day on which this Act receives royal assent, apply to any project in respect of which the evaluation, screening or review has begun before that day but no decision has yet been made, and the time lim its, including any extensions, that are referred to in those sub sections are counted from that day. (2) L’article 46.1 et les paragraphes 56(1) à (1.3), 58(1) à (1.3) et 72(4.1) à (4.4) de la Loi sur l’évaluation environnementale et socioéconomique au Yukon, dans leur version à la date de sanction de la présente loi, s’appliquent relativement à tout projet de développement dont l’examen, la préétude ou l’é tude a été entrepris avant cette date et pour lequel aucune dé cision n’a été prise, les délais et prolongations qui sont men tionnés dans ces paragraphes commençant à courir à compter de cette date. — 2015, c. 19, s. 40 — 2015, ch. 19, art . 40 Northern Pipeline Pipe-line du Nord 40 The Yukon Environmental and Socio-economic Assess ment Act, as it read immediately before the day on which this Act receives royal assent, continues to apply to the pipeline that is referred to in the Northern Pipeline Act. 40 La Loi sur l’évaluation environnementale et socioécono mique au Yukon, dans sa version antérieure à la date de sanc tion de la présente loi, continue de s’appliquer au pipe-line vi sé par la Loi sur le pipe-line du Nord. Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon AMENDMENTS NOT IN FORCE MODIFICATIONS NON EN VIGUEUR Current to November 9, 2016 Last amended on June 18, 2015 77 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 AMENDMENTS NOT IN FORCE MODIFICATIONS NON EN VIGUEUR — 2003, c. 7, ss. 133 (1), (2) , (4) — 2003, ch. 7, par. 133 (1), (2) et (4) Yukon Act Loi sur le Yukon 133 (1) On the later of the day on which this Act is assented to and the day on which section 283 of the Yukon Act, chapter 7 of the Statutes of Canada, 2002 (the “other Act”), comes into force, the portion of the definition authorization after paragraph (b) in subsec tion 2(1) of this Act is replaced by the following: 133 (1) À l’entrée en vigueur de l’article 283 de la Loi sur le Yukon, chapitre 7 des Lois du Canada (2002) (appelée « autre loi » au présent article), ou, si elle est postérieure, à la date de sanction de la présente loi, la définition de autorisation, au paragraphe 2(1) de la présente loi, est remplacée par ce qui suit : but does not include an access order issued by a body estab lished by territorial law and having jurisdiction with respect to surface rights, or a consent given by a first nation for access to settlement land in circumstances where an access order could be issued by that body. autorisation Toute forme d’autorisation — notamment un permis — délivrée ou accordée soit par le gouverneur en conseil, une autorité publique, un organisme administratif autonome ou une municipalité, soit par une première nation en vertu d’un accord définitif ou de ses textes législatifs. Sont exclues les ordonnances d’accès rendues par l’organisme éta bli par les textes législatifs territoriaux et compétent en ma tière de droits de surface ainsi que l’autorisation accordée, en ce qui touche l’accès à des terres désignées, par une première nation dans les circonstances où une telle ordonnance pour rait être rendue. (authorization) (2) On the later of the day on which this Act is assent ed to and the day on which section 283 of the other Act comes into force, the definitions federal agency, settlement land and territorial agency in subsection 2(1) of this Act are replaced by the following: (2) À l’entrée en vigueur de l’article 283 de l’autre loi ou, si elle est postérieure, à la date de sanction de la présente loi, les définitions de autorité fédérale, auto rité territoriale et terres désignées, au paragraphe 2(1) de la présente loi, sont respectivement remplacées par ce qui suit : federal agency means a minister of the federal government or a person or body carrying out a function of government un der a federal law other than the Yukon Act, the Yukon First Nations Self-Government Act or the Yukon First Nations Land Claims Settlement Act, but does not include the Gover nor in Council or an independent regulatory agency. (autori té fédérale) settlement land means land that is category A settlement land, category B settlement land or fee simple settlement land under a final agreement or under an order of a body estab lished by territorial law and having jurisdiction with respect to surface rights, or land that is to be treated as such by virtue of a self-government agreement, and includes Tetlit Gwich’in Yukon land, but does not include water or mines and miner als defined to be non-settlement land. (terres désignées) territorial agency means a member of the Executive Council of Yukon or a person or body carrying out a function of gov ernment under the Yukon Act, but does not include an inde pendent regulatory agency, a municipal government or a body having jurisdiction with respect to surface rights. (autorité territoriale) autorité fédérale Ministre du gouvernement fédéral ainsi que toute personne ou tout organisme remplissant des fonc tions administratives sous le régime d’une loi fédérale, excep tion faite de la Loi sur le Yukon, de la Loi sur le règlement des revendications territoriales des premières nations du Yukon et de la Loi sur l’autonomie gouvernementale des premières nations du Yukon. Sont exclus le gouverneur en conseil et les organismes administratifs autonomes. (federal agency) autorité territoriale Membre du Conseil exécutif du Yukon, ainsi que toute personne ou tout organisme remplissant des fonctions administratives sous le régime de la Loi sur le Yu kon. Sont exclus les organismes administratifs autonomes, les municipalités et l’organisme établi par les textes législatifs territoriaux et compétent en matière de droits de surface. (territorial agency) terres désignées Les terres gwich’in tetlit ainsi que les terres qui, aux termes d’un accord définitif ou d’une ordon nance de l’organisme établi par les textes législatifs territo riaux et compétent en matière de droits de surface, sont soit affectées aux catégories A ou B, soit détenues en fief simple, ou qui sont tenues pour telles aux termes d’un accord sur l’au tonomie gouvernementale. Sont exclus les étendues d’eau ainsi que les mines et les minéraux visés par la définition de terres non désignées. (settlement land) Yukon Environmental and Socio-economic Assessment Évaluation environnementale et socioéconomique au Yukon AMENDMENTS NOT IN FORCE MODIFICATIONS NON EN VIGUEUR Current to November 9, 2016 Last amended on June 18, 2015 78 À jour au 9 novembre 2016 Dernière modification le 18 juin 2015 (4) On the later of the coming into force of Part 2 of this Act and section 283 of the other Act, paragraph 81(1)(g) of this Act is replaced by the following: (4) À l’entrée en vigueur de l’article 283 de l’autre loi ou à celle de la partie 2 de la présente loi, selon ce qui se produit en dernier lieu, l’alinéa 81(1)g) de la pré sente loi est remplacé par ce qui suit : (g) a body established by territorial law and having juris diction with respect to surface rights, if an access order from that body is required for the project under territorial law; g) à l’organisme compétent en matière de droits de sur face dans les cas où il est appelé, en vertu des textes légis latifs territoriaux, à rendre une ordonnance d’accès relati vement au projet de développement;