跳到主要内容
Nelum
澳大利亚的法律

Water Regulation 2016

颁布于 2016-12-01 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

关于这部法律

语言
English
类型
条例
国家
澳大利亚 · Queensland
主题
Water
关键词
allocation/quota, water charges, groundwater, water rights, fees/royalties, well sinking/boreholes, non-governmental entity, offences/penalties, water resources management, legal proceedings/administrative proceedings, sustainable development

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. 1 Short title . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

  2. 2 Commencement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

  3. 3 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Division 2 Watercourse identification and outer bank location Subdivision 1 Preliminary

  4. 4 Purpose of division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

  5. 5 Meaning of terms used in division . . . . . . . . . . . . . . . . . . . . . . . . 12 Subdivision 2 Supporting provisions

  6. 6 Diagram depicting different valley reaches . . . . . . . . . . . . . . . . . 12

  7. 7 Explanations and accompanying cross-section diagrams for typical upper valley reach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

  8. 8 Explanations and accompanying cross-section diagrams for typical middle valley reach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

  9. 9 Explanations and accompanying cross-section diagrams for typical lower valley reach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

  10. 10 Additional information about applicability of cross-section diagrams 14

  11. 11 Explanation about valley margins . . . . . . . . . . . . . . . . . . . . . . . . 14

  12. 12 Explanation about terraces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Part 2 Water rights and planning Division 1 Collecting information about water

  13. 13 Notice of works and water use—Act, s 36 . . . . . . . . . . . . . . . . . . 15 Division 2 Unallocated water Subdivision 1 Reserving unallocated water

  14. 14 Particular unallocated water reserved—Act, s 39 . . . . . . . . . . . . 16

  15. 15 Public consultation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Subdivision 2 Processes for releasing unallocated water Water Regulation 2016 Contents

  16. 16 Public auction, tender, fixed price sale or grant for a particular purpose— Act, ss 39 and 40 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

  17. 17 Public notice of availability of water . . . . . . . . . . . . . . . . . . . . . . . 17

  18. 18 Terms of sale or grant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

  19. 19 Failure to complete purchase . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

  20. 21 Sale of water may be withdrawn . . . . . . . . . . . . . . . . . . . . . . . . . 18 Division 3 Minister’s reports on water plans

  21. 22 Minister’s reports on water plans—Act, s 49 . . . . . . . . . . . . . . . . 19 Part 3 Statutory authorisations to take or interfere with water Division 1 Constructing authorities

  22. 23 Prescribed purpose for which constructing authority may take water— Act, s 99 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

  23. 24 Prescribed conditions on taking water by constructing authority—Act, s 99 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Division 2 Authorised taking of, or interference with, water without water entitlement

  24. 25 Prescribed activities—Act, s 101 . . . . . . . . . . . . . . . . . . . . . . . . . 21 Part 4 Matters relating to water licences Division 1 Preliminary

  25. 26 Prescribed entities—Act, s 104, definition prescribed entity . . . . 21 Division 2 Water sharing rules

  26. 27 Water sharing rules—Act, schedule 4, definition water sharing rules 22

  27. 28 Nominal entitlement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

  28. 29 Announced entitlement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

  29. 30 Annual entitlement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Division 3 Relocation of water licences

  30. 32 Purpose of division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

  31. 33 Definitions for division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

  32. 34 Application to relocate water licences . . . . . . . . . . . . . . . . . . . . . 25

  33. 35 Criteria for deciding application . . . . . . . . . . . . . . . . . . . . . . . . . . 26

  34. 36 Deciding application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

  35. 37 Intention to proceed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

  36. 38 Completion of relocation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Division 4 Seasonal water assignments and rules—Act, section 127

  37. 39 Seasonal water assignments and rules—Act, s 127 . . . . . . . . . . 29 Division 5 Effects of land dealings or acquisition of land on water licences Subdivision 1 Effects of land dealings on water licences Page 2 Water Regulation 2016 Contents

  38. 40 Effect of licensee ceasing to be an owner of land . . . . . . . . . . . . 30 41 Effect of disposal of part of land to which water licence to take water attaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

  39. 42 Effect of disposal of part of land to which water licence to interfere with water attaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Subdivision 2 Effects of acquisition or disposal of land on water licences

  40. 43 Effect of acquisition or disposal of part of land . . . . . . . . . . . . . . 31 Part 5 Water allocations Division 1 Criteria for establishing elements of particular proposed water allocations Subdivision 1 Criteria

  41. 44 Criteria and application of criteria—Act, s 39 . . . . . . . . . . . . . . . 32 Subdivision 2 Establishing nominal volumes

  42. 45 Nominal volume based on nominal entitlement . . . . . . . . . . . . . . 33

  43. 46 Nominal volume based on assessment of water taken under existing authorisation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Subdivision 3 Establishing volumetric limits

  44. 47 Volumetric limit based on limit stated on existing authorisation . 34

  45. 48 Volumetric limit based on area stated on existing authorisation . 35

  46. 49 Volumetric limit if no limit is stated on existing authorisation . . . . 35

  47. 50 Maximum rate for water allocation based on rate stated on existing authorisation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

  48. 51 Maximum rate for water allocation based on related development permit 36

  49. 52 Maximum rate for water allocation based on other considerations 37 53 Daily volumetric limit for water allocation based on rate stated on existing authorisation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

  50. 54 Daily volumetric limit for water allocation based on related development permit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 55 Daily volumetric limit for water allocation based on other considerations 39 Subdivision 4 Establishing conditions of water allocation

  51. 56 Conditions for taking water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 Division 2 Seasonal water assignments Subdivision 1 Seasonal water assignments for water allocations not managed under resource operations licence

  52. 57 Application of subdivision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40

  53. 58 Applying for a seasonal water assignment . . . . . . . . . . . . . . . . . 40

  54. 59 Deciding application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 Page 3 Water Regulation 2016 Contents

  55. 60 Conditions of seasonal water assignment notice . . . . . . . . . . . . 42 Subdivision 2 Seasonal water assignments for water allocations managed under resource operations licence

  56. 61 Arrangement for seasonal water assignment . . . . . . . . . . . . . . . 43 Division 3 Water allocation dealing rules applying to the whole of the State Subdivision 1 Purpose and application of division

  57. 62 Purpose and application of division—Act, s 158 . . . . . . . . . . . . . 44 Subdivision 2 Process for applying for and deciding particular water allocation dealings

  58. 63 How application must be made . . . . . . . . . . . . . . . . . . . . . . . . . . 44 64 Public notice of application for water allocation dealing . . . . . . . 44

  59. 65 Additional information may be required . . . . . . . . . . . . . . . . . . . . 45

  60. 66 Applicant to pay reasonable cost of investigating application . . . 46

  61. 67 Deciding application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

  62. 68 Chief executive to give notice of decision . . . . . . . . . . . . . . . . . . 47 Subdivision 3 Permitted water allocation dealings

  63. 69 Permitted amalgamation of water allocations . . . . . . . . . . . . . . . 48

  64. 70 Permitted subdivision of a water allocation . . . . . . . . . . . . . . . . . 48 Subdivision 4 Assessed water allocation dealings

  65. 71 Main purpose of this subdivision . . . . . . . . . . . . . . . . . . . . . . . . . 49

  66. 72 Particular water allocation dealings to be assessed and notice of application published . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

  67. 73 Criteria for assessing particular dealings . . . . . . . . . . . . . . . . . . 50 Division 4 Registering water allocations and interests and dealings for water allocations

  68. 74 Prescribed registration details for water allocations—Act, s 152 51 Part 6 Water supply and demand management Division 1 Desired level of service objectives and water security program Subdivision 1 Definitions for division

  69. 77 Definitions for division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 Subdivision 2 Desired level of service objectives

  70. 78 Desired level of service objectives—Act, s 344 . . . . . . . . . . . . . . 52

  71. 79 Projected regional average urban demand for SEQ region . . . . 53

  72. 80 Bulk water drought supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53

  73. 81 Minimum operating levels and essential minimum supply volume 55 Subdivision 3 Water security program

  74. 82 Content of water security program—Act, s 353 . . . . . . . . . . . . . . 55 Page 4 Water Regulation 2016 Contents Division 2 Water supply arrangements for SEQ region

  75. 83 Declaration of bulk water customers—Act, s 360C, definition bulk water customer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

  76. 83A Declaration of SEQ bulk suppliers—Act, s 360C, definition SEQ bulk supplier . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 Part 7 Annual levy for underground water management—Act, section 479 Division 1 Preliminary

  77. 84 Purpose of part . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

  78. 85 Definitions for part . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

  79. 86 Office’s estimated costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

  80. 87 Relevant sub-blocks for petroleum tenures and classes of relevant sub- blocks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

  81. 87A Classes of levyable mining tenures . . . . . . . . . . . . . . . . . . . . . . . 59 Division 2 Working out annual levy Subdivision 1 Total annual levy and office’s estimated costs

  82. 88 Amount of total annual levy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

  83. 88A Apportionment between office’s estimated petroleum costs and office’s estimated mining costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 Subdivision 2 Apportionment of annual levy for petroleum tenure holders

  84. 89 Apportionment of office’s estimated petroleum costs to each relevant sub-block . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62

  85. 90 Apportionment of annual levy among petroleum tenure holders . 62 Subdivision 3 Apportionment of annual levy for mining tenure holders

  86. 90A Apportionment of office’s estimated mining costs . . . . . . . . . . . . 63

  87. 90B Apportionment of annual levy among mining tenure holders . . . 64 Division 3 Collecting annual levy

  88. 91 Requirements for notice of annual levy . . . . . . . . . . . . . . . . . . . . 64

  89. 92 Payment of annual levy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 Part 8 Water authorities Division 1 Continuation

  90. 93 Continuation of water authorities established under establishment regulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66

  91. 94 Continuation of amalgamated water authorities . . . . . . . . . . . . . 66 Division 2 Dissolution 94A Dissolution of particular water authorities for conversion to alternative institutional structures—Act, s 691 . . . . . . . . . . . . . . . . . . . . . . . 66

  92. 94B Old entity document—Act, s 691A . . . . . . . . . . . . . . . . . . . . . . . 67 Part 9 Investigations, enforcement and offences Page 5 Water Regulation 2016 Contents

  93. 95 Authorised taking of water—Act, s 808 . . . . . . . . . . . . . . . . . . . . 67

  94. 96 Destroying vegetation, excavating or placing fill in a watercourse, lake or spring—Act, s 814 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

  95. 97 Requirements for decommissioning a water bore—Act, s 817 . . 68 Part 10 Relationship with Planning Act Division 1 Works for taking or interfering with water

  96. 98 Works that are or are not assessable development—Act, s 39 . 69

  97. 99 Requirements for accepted development for operational work for taking water—Act, s 1014 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70 Division 2 Levees

  98. 100 Prescribed volume of material for fill—Act, sch 4, definition levee 71

  99. 101 Construction of new levees and modification of existing levees . 71

  100. 101A Requirements for accepted development for category 1 levees—Act, s 1014 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72

  101. 102 Assessment benchmarks for particular levees—Act, s 967 . . . . 73 Part 11 Measurement requirements for taking water Division 1 General

  102. 103 Definitions for part . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73

  103. 104 Duly qualified persons—Act, s 217B . . . . . . . . . . . . . . . . . . . . . . 74

  104. 105 When a measurement device is faulty—Act, s 217B . . . . . . . . . 76 Division 2 Measurement requirements for using measurement devices Subdivision 1 Preliminary

  105. 106 Purpose of division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77

  106. 107 Relevant authorisations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77 Subdivision 2 General requirements

  107. 108 Attaching and maintaining measurement device . . . . . . . . . . . . . 78

  108. 109 Taking water under relevant authorisation . . . . . . . . . . . . . . . . . 79

  109. 110 Ongoing certification requirements . . . . . . . . . . . . . . . . . . . . . . . 79

  110. 111 Information about water taken . . . . . . . . . . . . . . . . . . . . . . . . . . . 80 Subdivision 3 Alternative requirements

  111. 112 Purpose of subdivision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80

  112. 113 Alternative measurement requirements . . . . . . . . . . . . . . . . . . . 80 Subdivision 4 Contravention of particular requirements

  113. 114 Offence to contravene requirement to give particular information 81 Division 3 Faulty measurement devices

  114. 115 Application of division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82

  115. 116 When holder of relevant authorisation is taken to be aware or suspect Page 6 Water Regulation 2016 Contents measurement device is faulty . . . . . . . . . . . . . . . . . . . . . . . . . . . 82

  116. 117 Notifying and rectifying faults . . . . . . . . . . . . . . . . . . . . . . . . . . . 83

  117. 118 Chief executive may give notice of suspected faulty measurement device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84 Division 4 Record keeping

  118. 119 Application of division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85

  119. 120 Requirement to keep copies of records . . . . . . . . . . . . . . . . . . . . 85

  120. 121 Requirement to give copies of records . . . . . . . . . . . . . . . . . . . . 86 Division 5 Duly qualified persons Subdivision 1 Appointment of duly qualified persons

  121. 121A Appointment of duly qualified person . . . . . . . . . . . . . . . . . . . . . 87 Subdivision 2 Performance of functions

  122. 121B Inspection by duly qualified person . . . . . . . . . . . . . . . . . . . . . . . 87

  123. 121C Chief executive may require further inspection . . . . . . . . . . . . . . 88 Subdivision 3 Action for improper conduct

  124. 121D Application of subdivision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

  125. 121E Action chief executive may take . . . . . . . . . . . . . . . . . . . . . . . . . 89

  126. 121F Process for cancelling appointment . . . . . . . . . . . . . . . . . . . . . . 90 Part 12 Water bore drillers

  127. 122 Classes of licence—Act, s 981 . . . . . . . . . . . . . . . . . . . . . . . . . . 91 123 Water bore driller’s licence endorsements—Act, s 981 . . . . . . . . 91

  128. 124 Qualifications or experience for class 1 licence—Act, s 981 . . . . 92

  129. 125 Qualifications or experience for class 2 licence—Act, s 981 . . . . 94

  130. 126 Qualifications or experience for class 3 licence—Act, s 981 . . . . 96 127 Conditions of water bore driller’s licence—Act, s 983A . . . . . . . . 97

  131. 128 Records of water bores drilled—Act, s 983L . . . . . . . . . . . . . . . . 98 Part 13 Declarations about watercourses

  132. 129 Water declared to be water in a watercourse—Act, s 1006 . . . . 99 Part 14 Fees, charges etc. Division 1 Fees Subdivision 1 General provisions

  133. 130 Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100 Subdivision 2 Water licence fees

  134. 131 Water licence fee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100 Subdivision 3 Fees for continuing interim water allocations

  135. 132 Fees for continuing interim water allocations . . . . . . . . . . . . . . . 101 Page 7 Water Regulation 2016 Contents Division 2 Charges for water allocated, supplied or taken

  136. 133 Charges for water allocated, supplied or taken . . . . . . . . . . . . . . 101

  137. 134 Notice for payment of charges . . . . . . . . . . . . . . . . . . . . . . . . . . 102 Division 3 Royalty for State quarry material

  138. 135 Royalty for State quarry material—Act, s 240 . . . . . . . . . . . . . . . 103 Division 4 Drainage rates

  139. 136 Drainage rates—Act, s 993 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103 Part 15 Miscellaneous provisions Division 1 Water management areas

  140. 137 Water management areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103

  141. 138 Changing boundaries of water management areas . . . . . . . . . . 104 Division 2 Underground water areas

  142. 139 Declared underground water areas—Act, s 1046 . . . . . . . . . . . . 105

  143. 140 Critical distances for non-stock or domestic water bores in particular underground water areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106 Division 3 Former water areas

  144. 141 Continuing former water areas—Act, s 1083 . . . . . . . . . . . . . . . 107 Division 4 Other matters

  145. 141A Prescribed ADR institutes—Act, s 426 . . . . . . . . . . . . . . . . . . . . 107

  146. 141B Arbitration election notice—Act, s 433A . . . . . . . . . . . . . . . . . . . 107

  147. 141C Prescribed arbitration institutes—Act, s 433A . . . . . . . . . . . . . . . 108

  148. 142 Accounting period—Act, sch 4, definition water year . . . . . . . . . 108 Part 16 Repeal and transitional provisions Division 1 Repeal provision

  149. 143 Repeal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109 Division 2 Transitional provisions for SL No. 216 of 2016

  150. 144 Declared water management areas . . . . . . . . . . . . . . . . . . . . . . 109

  151. 145 References to repealed regulation . . . . . . . . . . . . . . . . . . . . . . . 109 Division 3 Transitional provisions for Mineral Resources and Other Legislation Amendment Regulation 2019

  152. 146 References to transfers, amendments or amalgamations . . . . . . 110

  153. 147 Non-compliance with revalidation of meter before commencement 110 Division 4 Transitional provisions for Water Amendment Regulation 2022

  154. 148 Application of new s 59 to existing applications for seasonal water assignments for particular water allocations . . . . . . . . . . . . . . . . 111

  155. 149 Continued application of former ss 99 and 101A to particular operational work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111 Page 8 Water Regulation 2016 Contents Division 5 Transitional provisions for Water and Other Legislation Amendment Regulation 2024 Subdivision 1 Preliminary

  156. 150 Definitions for division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112 Subdivision 2 General arrangements

  157. 151 Approved meters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113

  158. 152 Approved telemetry devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114

  159. 153 Application of measurement requirements requiring measurement device from stated day . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115 Subdivision 3 Arrangements relating to faulty meters

  160. 154 Faulty meters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115 155 Requirement if holder of relevant authorisation aware of faulty meter 116 Subdivision 4 Arrangements for validation inspections not started or finalised

  161. 156 Starting validation inspection on approved meter in particular circumstances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117 157 Starting validation inspection if meter notice given before commencement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118

  162. 158 Finalising validation inspection started before commencement . 119

  163. 159 Further validation inspection may be started . . . . . . . . . . . . . . . . 119

  164. 160 Status of particular meters if section 159 applies . . . . . . . . . . . . 120 Subdivision 5 Outcome of validation inspections

  165. 161 Effect of notice of noncompliance on approved meters . . . . . . . 121

  166. 162 Effect of validation certificate on approved meters . . . . . . . . . . . 122

  167. 163 Effect of validation certificate on other meters . . . . . . . . . . . . . . 122 Subdivision 6 Chief executive powers

  168. 164 Chief executive may require new certification . . . . . . . . . . . . . . . 123

  169. 165 Meter reading required by chief executive under former section 113 not yet complied with . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124 Subdivision 7 Charges

  170. 166 Meter operating charge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124

  171. 167 Meter use charge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125

  172. 168 Metering exit charge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125

  173. 169 Unpaid charges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126 Subdivision 8 Miscellaneous

  174. 170 Continued appointment of authorised meter validators . . . . . . . . 126 Division 6 Transitional provision for Water Amendment Regulation 2025

  175. 171 Application of new s 64 to notice of applications for water allocation Page 9 Water Regulation 2016 Contents dealing not published before commencement . . . . . . . . . . . . . . . 126 Schedule 1 Valley reaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 128 Schedule 2 Particular unallocated water reserved . . . . . . . . . . . . . . . . . . 136 Schedule 3 Prescribed activities, Act, section 101(1)(a) . . . . . . . . . . . . . . 137 Schedule 4 Prescribed entities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 140 Schedule 5 Water sharing rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 143 Schedule 6 Seasonal water assignments . . . . . . . . . . . . . . . . . . . . . . . . . . 144 Schedule 7 Rates and pump sizes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145 Schedule 8 Water authorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147 Schedule 9 Assessable development or accepted development . . . . . . . 150 Schedule 10 Code for assessment of development for construction or modification of particular levees . . . . . . . . . . . . . . . . . . . . . . . 169 Schedule 11 Measurement requirements—relevant authorisations and measurement devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172 Schedule 11A Measurement requirements— information about water taken 203 Schedule 12 Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 206 Schedule 13 Fees for continuing interim water allocations . . . . . . . . . . . . 209 Schedule 14 Water charges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 210 Schedule 15 Royalties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214 Schedule 16 Drainage rates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215 Schedule 17 Underground water areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 216 Schedule 18 Authority areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 219 Schedule 19 Dictionary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 221 Page 10 Water Regulation 2016 Part 1 Preliminary [s 1] Water Regulation 2016 Part 1 Preliminary Division 1 Introduction

  176. 1 Short title This regulation may be cited as the Water Regulation 2016.

  177. 2 Commencement This regulation commences on the commencement of the Water Reform and Other Legislation Amendment Act 2014, section 68.

  178. 3 Definitions The dictionary in schedule 19 defines particular words used in this regulation. Division 2 Watercourse identification and outer bank location Subdivision 1 Preliminary

  179. 4 Purpose of division The purpose of this division is to support the application of the provisions of the Act relating to the identification of watercourses and establishing the location of outer banks of watercourses. Current as at 27 June 2025 Page 11 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 1 Preliminary [s 5]

  180. 5 Meaning of terms used in division (1) If a term used in this division is defined in chapter 1, part 2 of the Act, or in schedule 4 of the Act to the extent it supports the operation of chapter 1, part 2 of the Act, the term has the same meaning in this division and in schedule 1. (2) However, a reference to a watercourse is not intended to be limited in the way provided for in section 5(4) of the Act. Subdivision 2 Supporting provisions

  181. 6 Diagram depicting different valley reaches Diagram A in schedule 1, part 1 depicts in overview the upper, middle and lower valley reaches of a valley drained by a typical watercourse.

  182. 7 Explanations and accompanying cross-section diagrams for typical upper valley reach Schedule 1, part 2— (a) gives an explanation of the characteristics of a typical upper valley reach and associated watercourse; and (b) includes a diagram (diagram B) in cross-section form that depicts the natural features that are likely to be found in a typical upper valley reach; and (c) includes a diagram (diagram C) in cross-section form that depicts the natural features that are likely to be found in a typical watercourse in an upper valley reach and that can help in locating outer banks.

  183. 8 Explanations and accompanying cross-section diagrams for typical middle valley reach Schedule 1, part 3— (a) gives an explanation of the characteristics of a typical middle valley reach and associated watercourse; and Page 12 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 1 Preliminary [s 9] (b) includes a diagram (diagram D) in cross-section form that depicts the natural features that are likely to be found in a typical middle valley reach; and (c) includes a diagram (diagram E) in cross-section form that depicts the natural features that are likely to be found in a typical watercourse in a middle valley reach and that can help in locating outer banks.

  184. 9 Explanations and accompanying cross-section diagrams for typical lower valley reach (1) Schedule 1, part 4— (a) gives an explanation of the characteristics of a typical lower valley reach and associated watercourse; and (b) includes a diagram (diagram F) in cross-section form that depicts the natural features that are likely to be found in a typical lower valley reach; and (c) includes a diagram (diagram G) in cross-section form that depicts the natural features that are likely to be found in a typical watercourse in a lower valley reach and that can help in locating outer banks. (2) Schedule 1, part 4 also includes— (a) a diagram (diagram H) in cross-section form that depicts the natural features that are likely to be found in a typical lower valley reach where 2 or more watercourses in the form of anabranches are contained within the valley; and (b) a diagram (diagram I) in cross-section form that depicts the natural features that are likely to be found in typical watercourses in a lower valley reach where the valley contains 2 or more watercourses in the form of anabranches, and that can help in locating outer banks in a multiple watercourse environment. Current as at 27 June 2025 Page 13 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 1 Preliminary [s 10]

  185. 10 Additional information about applicability of cross-section diagrams (1) For any valley, a particular valley reach could contain a section of valley reach, or a section of watercourse within a section of valley reach, that is not typical, having regard to the valley reach and watercourse cross-sections depicted in schedule 1, parts 2, 3 and 4. Example— The cross-section of part of a middle valley reach of a particular watercourse might more closely resemble what is typical for an upper valley reach cross-section, and the cross-section of part of a lower valley reach of a particular watercourse might more closely resemble what is typical for a middle valley reach cross-section. (2) Accordingly, a cross-section diagram could be used to help in the location of an outer bank, regardless of the valley reach in which the section of watercourse under consideration is located.

  186. 11 Explanation about valley margins (1) Schedule 1 includes a number of references to valley margins. (2) A reference to a valley margin, in relation to a valley drained by a watercourse, is intended as a reference to the bedrock feature that forms a lateral extent of the valley floor. (3) A valley margin could consist of a hill, cliff, ridge or mountain, but this will generally vary according to where the valley margin is situated in the valley as a whole. Example— A valley margin in an upper valley reach could be a mountain, but in a lower valley reach, a valley margin is likely to be no higher than a ridge.

  187. 12 Explanation about terraces (1) Schedule 1 includes a number of references to terraces. (2) A reference to a terrace, in relation to a valley drained by a watercourse, is intended as a reference to an abandoned Page 14 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 2 Water rights and planning [s 13] floodplain that is situated above an active floodplain associated with the watercourse. (3) A terrace is formed when floodplains are abandoned during down-cutting into the valley floor by base level change in the form of tectonic activity, by shifts in sediment load or by changes in the flow regime of the watercourse. Part 2 Water rights and planning Division 1 Collecting information about water

  188. 13 Notice of works and water use—Act, s 36 For section 36(3)(b) of the Act, a chief executive’s notice must state the following matters— (a) the land to which the notice applies; (b) the type of works required to be notified by the owner, including the purpose and size of the works; (c) which 1 or more of the following the notice relates to— (i) existing works; (ii) works under construction; (iii) on their completion, works constructed in the future; (d) an expiry date of the notice; (e) the proposed consultation arrangements for the notice. Current as at 27 June 2025 Page 15 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 2 Water rights and planning [s 14] Division 2 Unallocated water Subdivision 1 Reserving unallocated water

  189. 14 Particular unallocated water reserved—Act, s 39 For section 39(a) of the Act, unallocated water, that is described in schedule 2, is reserved for a part of the State or for particular water to which no water plan applies.

  190. 15 Public consultation (1) If the Minister proposes to reserve unallocated water, the Minister may decide whether public consultation on the proposal is required. (2) If the Minister decides public consultation is required, the Minister must publish a notice of the proposal stating— (a) the location of the unallocated water; and (b) the type of water to be reserved; and (c) the purpose for which the water is to be reserved; and (d) the volume of water to be reserved; and (e) the proposed consultation arrangements; and (f) where information about the proposed unallocated water reserve is available for public access. Subdivision 2 Processes for releasing unallocated water

  191. 16 Public auction, tender, fixed price sale or grant for a particular purpose—Act, ss 39 and 40 This subdivision prescribes, for sections 39(b) and 40(2) of the Act, the processes for releasing unallocated water by— Page 16 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 2 Water rights and planning [s 17] (a) public auction; or (b) tender; or (c) fixed price sale; or (d) grant for a particular purpose.

  192. 17 Public notice of availability of water (1) The chief executive must publish a notice about the availability of the water by auction or tender. (2) The notice must be published before— (a) the day the auction is held; or (b) the start of the period in which tenders may be made. (3) The notice must state the following— (a) whether the water is being sold by public auction or tender; (b) the type of water entitlement to be granted for the sale; (c) details as follows for identifying the water— (i) any water plan or water management protocol under which the water is available; (ii) the purpose for which the water is available; (d) other details, if any, sufficient to identify the water, including, for example— (i) if the water is described in schedule 2—the water so described; and (ii) the volume of water available to be sold; and (iii) the location from which the water may be taken; (e) for an auction—where and when the auction is to be held; (f) for a tender— (i) the day (the closing day) by which tenders must be made; and Current as at 27 June 2025 Page 17 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 2 Water rights and planning [s 18] (ii) the place where tenders must be lodged or the way tenders must be lodged electronically; (g) where the terms of sale are available; (h) anything else relating to the proposed sale the chief executive considers appropriate. (4) The chief executive may publish a notice about the availability of the water by fixed price sale.

  193. 18 Terms of sale or grant The chief executive may decide the terms— (a) of a sale of water under this division; or Note— Under section 40 of the Act, the chief executive may set a price for the sale of the water. (b) for granting water for a particular purpose under this division.

  194. 19 Failure to complete purchase (1) This section applies if— (a) a person enters into an agreement under this division to purchase water; and (b) the person does not complete the purchase in accordance with the terms of sale. (2) Any deposit paid by the person is forfeited to the State and the State may otherwise deal with the water under this division.

  195. 21 Sale of water may be withdrawn (1) The chief executive may withdraw a sale under this division of all or part of the water— (a) for a sale by auction— (i) before the auction; or Page 18 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 2 Water rights and planning [s 22] (ii) if the water is not sold at the auction, after the auction; or (b) for a sale by tender—before the closing day for the tender; or (c) for a fixed price sale—before an agreement is entered into under this division for the sale. (2) If a sale is withdrawn under subsection (1)(a) or (b), the chief executive must publish a notice about the withdrawal. Division 3 Minister’s reports on water plans

  196. 22 Minister’s reports on water plans—Act, s 49 (1) This section prescribes, for section 49(2)(a) of the Act, the times at which the Minister must prepare reports about each water plan and the matters a report must state. (2) The Minister must prepare the following reports about each water plan— (a) an initial report within 5 years after the commencement of the plan; and (b) a subsequent report each no more than 5 years after the previous report unless subsection (3) applies. (3) However, if a notice under section 44(2) of the Act states, for a water plan, the matters mentioned in subsection (4), the notice is taken to be a subsequent report prepared by the Minister under subsection (2)(b) for the water plan. (4) The Minister’s report about a water plan must state the following— (a) whether the plan is advancing the sustainable management of Queensland’s water resources; (b) an assessment of the effectiveness of the implementation of the plan in achieving the plan’s outcomes; Current as at 27 June 2025 Page 19 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 3 Statutory authorisations to take or interfere with water [s 23] (c) information on water use and authorisations in the plan area, including— (i) water entitlements; and (ii) water taken or interfered with under statutory authorisations; (d) a summary of the findings of research and monitoring for the plan; (e) any identified risks to the plan’s outcomes; (f) what amendments, if any, have been made to the plan since its commencement; (g) any noncompliance under a water entitlement or other authorisation in the plan area. Part 3 Statutory authorisations to take or interfere with water Division 1 Constructing authorities

  197. 23 Prescribed purpose for which constructing authority may take water—Act, s 99 For section 99(2)(b) of the Act, the taking of water by a constructing authority for the purpose of constructing or maintaining infrastructure that the constructing authority may lawfully construct or maintain is prescribed.

  198. 24 Prescribed conditions on taking water by constructing authority—Act, s 99 For section 99(2)(c)(i) of the Act, the taking of water by a constructing authority is subject to the condition that the taking of water by the constructing authority is done in accordance with the document called ‘Exemption requirements for constructing authorities for the taking of Page 20 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 25] water without a water entitlement’ approved by the chief executive. Division 2 Authorised taking of, or interference with, water without water entitlement

  199. 25 Prescribed activities—Act, s 101 (1) Each activity mentioned in schedule 3 is prescribed for section 101(1)(a) of the Act. (2) However, subsection (1) does not apply to the extent the water for the activity is taken from an area to which a water supply scheme applies, unless the water is taken by a person who holds— (a) a resource operations licence for the water supply scheme; or (b) an interim resource operations licence for the water supply scheme; or (c) a distribution operations licence for the water supply scheme. Part 4 Matters relating to water licences Division 1 Preliminary

  200. 26 Prescribed entities—Act, s 104, definition prescribed entity For section 104 of the Act, definition prescribed entity, paragraph (l), the entities mentioned in schedule 4 are prescribed. Current as at 27 June 2025 Page 21 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 27] Division 2 Water sharing rules

  201. 27 Water sharing rules—Act, schedule 4, definition water sharing rules (1) For schedule 4 of the Act, definition water sharing rules, paragraph (c), the water sharing rules for taking water from a water management area, or a part of the area, mentioned in schedule 5, column 1, are opposite the area in column 2. Editor's note— A copy of the water sharing rules for a water management area, or a part of the area, may be obtained from the department’s regional office for the area. (2) The water sharing rules for taking water from a particular water management area, or a part of the area, may state the following— (a) if, under the rules, the chief executive is required to decide an announced entitlement— (i) how the announced entitlement is decided; and (ii) whether the announced entitlement may be varied during the water year; and (iii) whether the announced entitlement applies in relation to the taking of water for a particular purpose; (b) the extent to which, and the conditions on which, carry overs and forward draws may be authorised in the area, or the part of the area. (3) Subsection (2) does not limit the matters that may be stated in the water sharing rules.

  202. 28 Nominal entitlement (1) A nominal entitlement is the volume of water authorised to be taken during a water year under a water licence. Page 22 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 29] (2) However, the volume of water that may be taken during a particular water year is the annual entitlement for the water year.

  203. 29 Announced entitlement (1) If the water sharing rules for taking water from a water management area, or a part of the area, require the chief executive to decide an announced entitlement, the chief executive must— (a) decide the announced entitlement before the start of the water year to which the announced entitlement relates; and (b) publish the announced entitlement. (2) An announced entitlement is a percentage of a nominal entitlement. (3) In deciding an announced entitlement, the chief executive must consider— (a) the following to the extent appropriate for the water management area, or the part of the area, to which the entitlement relates— (i) trends in underground water levels; (ii) long-term average sustainable yield; (iii) historical water use; (iv) anticipated water use; (v) water available to supplement water licences in the area; (vi) weather conditions, including weather forecasts; and (b) the water sharing rules for taking water from the area. (4) If the chief executive varies an announced entitlement during a water year, subsection (1)(b) applies to the varied announced entitlement. Current as at 27 June 2025 Page 23 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 30]

  204. 30 Annual entitlement (1) If, for a water year, the chief executive has decided an announced entitlement for a water management area, or a part of the area, the annual entitlement for a water licence to which the announced entitlement relates is calculated by— (a) multiplying the nominal entitlement for the water licence by the announced entitlement; and (b) adjusting the volume for any carry over or forward draw that applies to the licence for the water year. (2) If, for a water year, the chief executive has not decided an announced entitlement for a water management area, or a part of the area, the annual entitlement for a water licence in the area or the part of the area is the nominal entitlement for the licence adjusted for any carry over or forward draw that applies to the licence for the water year. Division 3 Relocation of water licences

  205. 32 Purpose of division This division states, for section 126(3) of the Act, the process for dealing with an application for relocation of— (a) a water licence for the taking of water from a location in a water management area— (i) declared by the chief executive under section 137(1); and (ii) for which water sharing rules mentioned in schedule 5 for the taking of water from the area allow all or part of the licence to be relocated under section 126 of the Act; or (b) a water licence if a water management protocol allows all or part of the licence to be relocated under section 126 of the Act. Page 24 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 33]

  206. 33 Definitions for division In this division— amalgamation, in relation to a water licence, means amalgamation of the licence with another water licence held or to be held by the transferee. amendment, in relation to a water licence, means amendment of the licence to change the purpose for which water may be taken under the licence. new licence means the water licence that the chief executive may issue under this division after an application for relocation is decided. transfer, in relation to a water licence, means transfer of the licence to a prescribed person within the meaning of section 126(4) of the Act. transfer notice see section 37(2).

  207. 34 Application to relocate water licences (1) This section applies to an application to relocate a water licence. (2) The application must be— (a) made to the chief executive in the approved form; and (b) if the application includes a transfer or amalgamation—made jointly by the following— (i) the holder of the licence; (ii) the proposed transferee. (3) The application must— (a) state each of the following— (i) details of the licence; (ii) if the licence, or part of the licence, is to be amalgamated with the transferee’s water licence—details of the transferee’s licence; Current as at 27 June 2025 Page 25 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 35] (iii) the purpose for which the water will be taken under the new licence; (iv) details of the location of the proposed taking of water under the new licence; (v) the volume of water proposed to be taken under the new licence; and (b) be accompanied by— (i) a statutory declaration by the holder of the licence that each person (an interested entity) who has a financial or other interest in the land of the holder for which the licence is held has been given notice of the proposed relocation; and (ii) the written consent of each interested entity to the proposed relocation; and (iii) the application fee. (4) The application to relocate may include 1 or more transfers, amendments or amalgamations.

  208. 35 Criteria for deciding application (1) In deciding whether to approve the application, the chief executive must consider— (a) any additional information given about the application; and (b) each of the following that apply to the water licence that is the subject of the application— (i) a water plan; (ii) a water management protocol, including, in particular, the rules stated in the protocol for relocating water licences; (iii) water sharing rules mentioned in schedule 5, to the extent the rules are about relocating water licences. (2) Subsection (1) does not limit the matters the chief executive may consider. Page 26 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 36]

  209. 36 Deciding application (1) After considering the matters mentioned in section 35, the chief executive may— (a) refuse the application; or (b) approve the application with or without conditions. (2) Subsection (3) applies if approving the application would be inconsistent with the matters the chief executive must consider under section 35(1)(b). (3) The chief executive must refuse the application and give notice of the decision, including the reasons for the decision, within 30 business days after deciding the application. (4) Subsection (5) applies if the chief executive makes a decision consistent with the matters the chief executive must consider under section 35(1)(b) and if no other decision could have been made. (5) The chief executive must give notice of the decision, including the reasons for the decision, within 30 business days after deciding the application. (6) Subsection (7) applies if— (a) water sharing rules mentioned in schedule 5 apply to the relocation of the licence that is the subject of the application; or (b) the chief executive makes a decision consistent with the water plan or water management protocol and a different decision consistent with the plan or protocol could have been made. (7) The chief executive must give the applicant an information notice about the decision within 30 business days after deciding the application.

  210. 37 Intention to proceed (1) This section applies if the applicant— (a) is given an information notice for the decision; and Current as at 27 June 2025 Page 27 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 38] (b) is eligible and intends to proceed with the relocation. (2) The applicant must give the chief executive notice in the approved form (a transfer notice) within 30 business days after— (a) if the applicant appeals against the decision—the day the appeal is finally decided; or (b) otherwise—the day the applicant receives the information notice. (3) For subsection (1)(b), the applicant is eligible to proceed with the relocation if— (a) the chief executive has approved the application with or without conditions; or (b) the applicant appeals against the decision and the decision is confirmed, amended or substituted so that the application is approved with or without conditions.

  211. 38 Completion of relocation (1) This section applies if the chief executive— (a) gives the applicant notice of the decision, other than an information notice; or (b) receives a transfer notice within the period mentioned in section 37(2). (2) The chief executive may require the proposed transferee to give a document evidencing ownership of land to which the new licence will attach. (3) The chief executive must cancel, amend or subdivide the water licence the subject of the application, or issue a new licence, necessary to give effect to the relocation within 30 business days after— (a) if the chief executive has, under subsection (2), required the proposed transferee to give a document—the day the chief executive receives the document; or Page 28 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 39] (b) if the chief executive receives a transfer notice—the day the chief executive receives the notice; or (c) otherwise—the day the chief executive gives notice of the decision under section 36(3) or (5). Division 4 Seasonal water assignments and rules—Act, section 127

  212. 39 Seasonal water assignments and rules—Act, s 127 For section 127(2)(b) of the Act— (a) seasonal water assignments are allowed in a water management area, or a part of the area, mentioned in schedule 6, column 1, for a water licence mentioned for the area in column 2; and (b) the seasonal water assignment rules for a water management area, or a part of the area, stated, for the area, in column 3 are prescribed. Editor's note— A copy of seasonal water assignment rules mentioned in schedule 6 may be obtained from the department’s regional office for the area to which the rules relate. Current as at 27 June 2025 Page 29 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 40] Division 5 Effects of land dealings or acquisition of land on water licences Subdivision 1 Effects of land dealings on water licences

  213. 40 Effect of licensee ceasing to be an owner of land (1) If a water licence attaches to land and the licensee ceases to be an owner of the land, on the day the licensee ceases to be the owner— (a) the licensee ceases to be the holder of the licence; and (b) the registered owner of the land becomes the new licensee. (2) The chief executive must give the new licensee a new licence that has the same effect as the previous licence.

  214. 41 Effect of disposal of part of land to which water licence to take water attaches (1) This section applies if— (a) a water licence of either of the following types attaches to land— (i) a licence to take water; (ii) a licence mentioned in section 107(1)(c) of the Act; and (b) the registered owner (the disposer) of the land disposes of part of the land. (2) On the day the disposer disposes of the part, the water licence is taken to be held jointly by all owners of the land to which the licence attaches. Page 30 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 4 Matters relating to water licences [s 42] Note— See section 121 of the Act about who may apply for a dealing with a water licence. (3) The chief executive must give all owners of the land to which the water licence attaches, other than the disposer, a copy of the licence.

  215. 42 Effect of disposal of part of land to which water licence to interfere with water attaches (1) This section applies if— (a) a water licence to interfere with the flow of water on, under or adjoining land is attached to land; and (b) the registered owner of the land disposes of part of the land. (2) Subsection (3) applies if the location at which water may be interfered with is on, under or adjoining either the part of the land disposed of or the part retained by the owner. (3) The licence attaches to the part and the chief executive must amend the licence under section 132 of the Act, to show the change. (4) Subsection (5) applies if the location at which water may be interfered with is on, under or adjoining both the part of the land disposed of and the part retained. (5) The chief executive must amend the licence under section 132 of the Act, so that the licence is held jointly by both the owner of the part retained and the owner of the part disposed of. Subdivision 2 Effects of acquisition or disposal of land on water licences

  216. 43 Effect of acquisition or disposal of part of land (1) This section applies to a water licence if part of the land to which the licence attaches— Current as at 27 June 2025 Page 31 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 44] (a) is taken under the Acquisition of Land Act 1967; or (b) is disposed of by the registered owner of the land to a constructing authority for a purpose for which land may be taken under that Act. (2) If the acquisition or disposal includes a transfer of the licence, the chief executive must record the transfer in the department’s records as if the transfer were a proposed dealing mentioned in section 131(1) of the Act. (3) If water that may be taken under the licence can still be taken from the original source on or adjoining the remaining part of the land, the chief executive must amend the licence under section 132 of the Act, so the licence attaches to the remaining part of the land. (4) If the remaining part of the land no longer adjoins the original source, on the day the acquisition or disposal happens the water licence is taken to be held jointly by all owners of the land to which the licence attaches. Note— See section 121 of the Act about who may apply for a dealing with a water licence. Part 5 Water allocations Division 1 Criteria for establishing elements of particular proposed water allocations Subdivision 1 Criteria

  217. 44 Criteria and application of criteria—Act, s 39 (1) For section 39(c) of the Act, the criteria for establishing the elements of proposed water allocations to be granted on Page 32 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 45] conversion from a water entitlement or other authorisation (each an existing authorisation) are— (a) to the extent a relevant water plan applies the criteria stated in subdivision 2 or 3—the criteria; and (b) any criteria in a relevant water plan for converting an existing authorisation to a water allocation. (2) If there is an inconsistency between criteria mentioned in subsection (1)(a) and criteria mentioned in subsection (1)(b), the criteria mentioned in subsection (1)(b) prevail. Subdivision 2 Establishing nominal volumes

  218. 45 Nominal volume based on nominal entitlement (1) If a water plan states that the nominal volume for a water allocation is to be based on the nominal entitlement for the existing authorisation, the nominal volume for the allocation is the nominal entitlement stated on the existing authorisation. (2) In this section— nominal entitlement means— (a) for a water licence—see section 28; or (b) for a continuing interim water allocation—the volume of water stated on the allocation that may be taken in a period of 12 months.

  219. 46 Nominal volume based on assessment of water taken under existing authorisation (1) If a water plan states that the nominal volume for a water allocation is to be based on an assessment of the water taken under the existing authorisation, the chief executive must decide the nominal volume having regard to the following— (a) the local availability of water; Current as at 27 June 2025 Page 33 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 47] (b) the conditions under which water may be taken under the existing authorisation; (c) if the existing authorisation states the maximum volume of water that may be taken under the existing authorisation during a stated period—the volume; (d) the average annual volume of water for the period stated in the relevant water plan worked out or estimated by the chief executive to have been able to be taken under the existing authorisation; (e) any other criteria, for making the decision, stated in the relevant water plan. (2) For subsection (1)(a), the local availability of water includes consideration of the volume of water worked out or estimated by the chief executive to have been able to be taken by authorisations, other than the existing authorisation, that would have affected access to water under the existing authorisation. Subdivision 3 Establishing volumetric limits

  220. 47 Volumetric limit based on limit stated on existing authorisation (1) If a water plan states that the volumetric limit for a water allocation is to be based on the limit stated on the existing authorisation, the volumetric limit for the allocation is the volume of water that may be taken in a period of 12 months stated on the allocation. (2) However, if the water plan states an alternative period, the volumetric limit for the water allocation is the volume of water allowed to be taken under the existing authorisation in the period stated in the water plan. Page 34 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 48]

  221. 48 Volumetric limit based on area stated on existing authorisation If a water plan states that the volumetric limit for a water allocation is to be based on the area able to be irrigated that is stated on the existing authorisation, the volumetric limit for the allocation is the area stated as being able to be irrigated on the existing authorisation multiplied by the factor stated in the water plan.

  222. 49 Volumetric limit if no limit is stated on existing authorisation If a water plan states that the volumetric limit for a water allocation is to be based on an assessment of water taken under the existing authorisation and the efficiency of the use of the water, the volumetric limit for the allocation is the volume decided by the chief executive having regard to the following— (a) the conditions under which water may be taken under the existing authorisation; (b) the water taking capacity of any works for taking water under the allocation; (c) the volume of water required for the allocation’s intended purpose; (d) the annual volumes of water for the period stated in the relevant water plan estimated by the chief executive to have been taken under the existing authorisation with the works that were in place immediately before the commencement of this section; (e) the efficiency of the use of the water mentioned in paragraph (d); (f) any other criteria, for making the decision, stated in the relevant water plan. Current as at 27 June 2025 Page 35 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 50]

  223. 50 Maximum rate for water allocation based on rate stated on existing authorisation If a water plan states that the maximum rate for a water allocation is to be based on the maximum rate for the existing authorisation, the maximum rate for the allocation is the maximum rate for taking water under the existing authorisation.

  224. 51 Maximum rate for water allocation based on related development permit (1) Subsection (2) applies if a water plan states that the maximum rate for a water allocation is to be based on the pump size stated on a development permit related to the existing authorisation. (2) The maximum rate for the allocation is— (a) if the water plan states the maximum rate for taking water in litres per second and— (i) the pump size is mentioned in schedule 7, column 1—the rate stated in schedule 7, column 2, for the pump size; or (ii) the pump size is not mentioned in schedule 7, column 1—the rate decided by the chief executive having regard to the rates stated for similar pump sizes in schedule 7, column 2; or (b) if the water plan states the maximum rate for taking water in megalitres per day and— (i) the pump size is mentioned in schedule 7, column 1—the rate stated in schedule 7, column 3, for the pump size; or (ii) the pump size is not mentioned in schedule 7, column 1—the rate decided by the chief executive having regard to the rates stated for similar pump sizes in schedule 7, column 3. (3) Subsection (4) applies if the chief executive, in finalising a water entitlement notice under section 75 of the Act, is Page 36 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 52] satisfied the maximum rate for the allocation is different from the maximum rate decided under subsection (2) for the allocation. (4) Despite subsection (2), the maximum rate for the allocation is the rate decided by the chief executive having regard to the following— (a) the conditions under which water may be taken under the existing authorisation; (b) the water taking capacity of the pump to which the development permit relates; (c) any other criteria, for making the decision, stated in the relevant water plan.

  225. 52 Maximum rate for water allocation based on other considerations (1) This section applies if a water plan states that the maximum rate for a water allocation is to be decided by the chief executive, other than if— (a) the existing authorisation states a maximum rate; or (b) a related development permit states a pump size for taking water. (2) The maximum rate for the allocation is the rate decided by the chief executive having regard to— (a) the purpose stated on the existing authorisation; and (b) the chief executive’s estimate or measurement of the rate at which water can be taken under the existing authorisation; and (c) any other criteria, for making the decision, stated in the relevant water plan. Current as at 27 June 2025 Page 37 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 53]

  226. 53 Daily volumetric limit for water allocation based on rate stated on existing authorisation If a water plan states that the daily volumetric limit for a water allocation is to be based on the existing authorisation, the daily volumetric limit for the allocation is the maximum rate for taking water in a day, stated on the existing authorisation.

  227. 54 Daily volumetric limit for water allocation based on related development permit (1) This section applies if a water plan states that the daily volumetric limit for a water allocation is to be based on the pump size stated on a development permit related to the existing authorisation. (2) The daily volumetric limit for the allocation is— (a) if the pump size is mentioned in schedule 7, column 1—the daily volumetric limit stated in schedule 7, column 3, for the pump size; or (b) if the pump size is not mentioned in schedule 7, column 1—the daily volumetric limit for the allocation decided by the chief executive having regard to the daily volumetric limits for similar pump sizes stated in schedule 7, column 3. (3) Subsection (4) applies if the chief executive, in finalising a water entitlement notice under section 75 of the Act, is satisfied the daily volumetric limit for the allocation is different from the daily volumetric limit decided under subsection (2) for the allocation. (4) Despite subsection (2), the daily volumetric limit for the water allocation is the volume decided by the chief executive having regard to the following— (a) the conditions under which water may be taken under the existing authorisation; (b) the efficiency of the use of water taken under the existing authorisation; Page 38 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 55] (c) the water taking capacity of the pump to which the development permit relates under normal operating conditions; (d) any other criteria, for making the decision, stated in the relevant water plan. (5) However, if the allocation states a maximum rate for the allocation, the chief executive must ensure the daily volumetric limit for the allocation is no more than the volume that may be taken in a day at that rate.

  228. 55 Daily volumetric limit for water allocation based on other considerations (1) This section applies if a water plan states that the daily volumetric limit is to be decided by the chief executive, other than if— (a) the existing authorisation states a daily volumetric limit; or (b) a related development permit states a pump size for taking water relating to the permit. (2) The daily volumetric limit for the water allocation is the daily volumetric limit decided by the chief executive having regard to— (a) the purpose stated on the existing authorisation; and (b) the chief executive’s estimate or measurement of the rate at which water can be taken under the existing authorisation; and (c) any other criteria, for making the decision, stated in the relevant water plan. (3) However, if the allocation states a maximum rate for taking water for the allocation, the chief executive must ensure the daily volumetric limit for the allocation is no more than the volume that may be taken in a day at that rate. Current as at 27 June 2025 Page 39 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 56] Subdivision 4 Establishing conditions of water allocation

  229. 56 Conditions for taking water (1) The chief executive may impose on a water allocation any condition the chief executive is satisfied is necessary to ensure the purpose and outcomes of the relevant water plan are achieved. (2) In deciding the flow conditions under which water may be taken under the allocation, the chief executive must have regard to— (a) any conditions stated on the existing authorisation; and (b) any other criteria, for making the decision, stated in the relevant water plan. Division 2 Seasonal water assignments Subdivision 1 Seasonal water assignments for water allocations not managed under resource operations licence

  230. 57 Application of subdivision This subdivision applies to a water allocation if— (a) the allocation is not managed under a resource operations licence; and (b) a water management protocol allows seasonal water assignments for the allocation.

  231. 58 Applying for a seasonal water assignment (1) The holder of a water allocation may apply to the chief executive for a seasonal water assignment for the water Page 40 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 59] allocation for the water year, or shorter period prescribed by a water management protocol, in which the application is made. (2) The holder of a seasonal water assignment notice for a water allocation may apply to the chief executive for a seasonal water assignment for the seasonal water assignment notice for the water year, or shorter period prescribed by a water management protocol, in which the application is made. (3) An application under subsection (1) or (2) must be— (a) in the approved form; and (b) accompanied by the application fee stated in schedule 12.

  232. 59 Deciding application (1) If the application is consistent with the seasonal water assignment rules (the relevant rules) stated in a water management protocol applying to the relevant water plan area, the chief executive must approve the application, with or without conditions. (2) If the application is inconsistent with the relevant rules, the chief executive must refuse the application. (3) As soon as practicable after deciding the application, the chief executive must— (a) give the applicant notice of the decision; and (b) if the application is approved—give the proposed assignee a seasonal water assignment notice. (4) The notice mentioned in subsection (3)(a) must be an information notice if, having regard to the information in the application, the chief executive could have made a different decision consistent with the relevant rules. (5) The notice mentioned in subsection (3)(a) must include the reasons for the decision if— (a) subsection (4) does not apply; and (b) the decision is to— Current as at 27 June 2025 Page 41 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 60] (i) refuse the application; or (ii) approve the application— (A) with a condition not requested in the application; or (B) if the application requested a particular condition—without the condition. (6) To the extent the application is approved, the applicant is not authorised to take water that is the subject of the seasonal water assignment. (7) Subsection (8) applies if— (a) the assignee holds a water allocation for the water management area in which the assignee proposes to take the benefit of the assignment; and (b) a water management protocol, other than a protocol that contains a multi-year accounting rule for the allocation, allows the seasonal water assignment. (8) The seasonal water assignment notice applying to the allocation increases the volume of water that may be taken under the allocation by the volume stated in the notice for the period stated in the notice. (9) The assignment has effect from the day stated in the seasonal water assignment notice mentioned in subsection (3)(b). (10) In this section— multi-year accounting rule, for a water allocation, means a water sharing rule used to work out the volume of water that may be taken under the allocation, during a particular water year, having regard to the volume of water that was or may be taken under the allocation during other water years.

  233. 60 Conditions of seasonal water assignment notice (1) The seasonal water assignment notice is subject to— (a) the conditions to which the water allocation is subject; and Page 42 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 61] (b) if the applicant for the seasonal water assignment is the holder of a seasonal water assignment notice (the existing notice) for the water allocation—the conditions to which the existing notice is subject; and (c) any conditions imposed by the chief executive under section 59(1) for the assignment. (2) If a seasonal water assignment rule, stated in a water management protocol, allows a change to a location condition of the allocation or existing notice, subsection (1)(a) or (b) does not apply in relation to the location condition. (3) In this section— location condition means a condition imposed on a water allocation or seasonal water assignment notice that states the location from which water may be taken under the allocation or notice. Subdivision 2 Seasonal water assignments for water allocations managed under resource operations licence

  234. 61 Arrangement for seasonal water assignment (1) This section applies if a person is the holder of a water allocation managed under a resource operations licence. (2) The holder of the allocation may enter into an arrangement for a seasonal water assignment in relation to the allocation if— (a) the holder of the resource operations licence consents to the arrangement; and (b) the water to which the allocation relates is distributed to the holder of the allocation by a distribution operations licence holder and the distribution operations licence holder consents to the arrangement. Current as at 27 June 2025 Page 43 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 62] Division 3 Water allocation dealing rules applying to the whole of the State Subdivision 1 Purpose and application of division

  235. 62 Purpose and application of division—Act, s 158 (1) This division prescribes, for section 158 of the Act, the water allocation dealing rules applying to the whole of the State. (2) However, this division does not apply to the extent the relevant water management protocol provides for an alternative process for— (a) making an application for a water allocation dealing; or (b) deciding a water allocation dealing. Subdivision 2 Process for applying for and deciding particular water allocation dealings

  236. 63 How application must be made An application for a water allocation dealing must be— (a) in the approved form; and (b) accompanied by the application fee stated in schedule 12.

  237. 64 Public notice of application for water allocation dealing (1) This section applies if— (a) the chief executive is satisfied the application complies with section 63; and (b) the water allocation dealing rules require a notice of the application to be published. Page 44 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 65] (2) The chief executive must publish, on a Queensland Government website, a notice (a water allocation submissions notice) that— (a) states the application has been made; and (b) includes the following information— (i) where copies of the application may be inspected; (ii) that written submissions may be made by any entity about the application; (iii) the day, that is not earlier than 30 business days after the day the notice is published, by which the submissions must be made (the closing day); (iv) the person to whom the submissions must be made. (3) The chief executive may, by notice, require the applicant to publish a copy of the water allocation submissions notice for a stated period and in a stated way. (4) Within 10 business days after the applicant publishes the copy of the water allocation submissions notice under subsection (3), the applicant must give the chief executive evidence of the publication. (5) The chief executive may— (a) send a copy of the water allocation submissions notice to any entity the chief executive considers appropriate; and (b) decide the application after the closing day. (6) The application lapses if the applicant fails, without reasonable excuse, to comply with— (a) the notice mentioned in subsection (3); or (b) the requirement under subsection (4).

  238. 65 Additional information may be required (1) The chief executive may require— Current as at 27 June 2025 Page 45 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 66] (a) the applicant to give the chief executive additional information about the application; or (b) any information included in the application, or any additional information required under paragraph (a), to be verified by statutory declaration; or (c) any submitter to give additional information about the submission. (2) If the applicant fails, without reasonable excuse, to comply with a requirement made of the applicant under subsection (1)(a) or (b) within the reasonable time stated in the requirement, the application lapses.

  239. 66 Applicant to pay reasonable cost of investigating application (1) This section applies if— (a) a person makes an application under section 63; and (b) the chief executive is satisfied there will be considerable expense in investigating the application. (2) The chief executive must— (a) estimate the likely cost of investigating the application; and (b) give the person written notice of the estimated cost. (3) The person must pay the amount of the estimated cost to the chief executive within the reasonable time stated in the notice. (4) If the applicant fails to comply with subsection (3), the application lapses. (5) If the cost of investigating the application is less than the estimated cost, the chief executive must refund to the person the difference between the cost paid and the actual cost. Page 46 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 67]

  240. 67 Deciding application (1) This section applies to an application for a water allocation dealing if neither subdivision 3 nor a water management protocol states that the dealing is permitted or prohibited. (2) The chief executive must decide the application— (a) for a dealing that must be assessed under subdivision 4—in accordance with that subdivision; and (b) for a dealing that must be assessed under a water management protocol—in accordance with the criteria for the assessment stated in the protocol. (3) In making a decision under subsection (2), the chief executive must consider— (a) the application; and (b) any additional information given by the applicant under section 65; and (c) any properly made submission about the application.

  241. 68 Chief executive to give notice of decision (1) This section applies to an application made under this division. (2) Within 10 business days of deciding the application, the chief executive must give written notice of the decision to— (a) the applicant; and (b) any entity that made a properly made submission about the application. (3) However, if the application was decided in accordance with subdivision 4, the notice must be an information notice. Current as at 27 June 2025 Page 47 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 69] Subdivision 3 Permitted water allocation dealings

  242. 69 Permitted amalgamation of water allocations An amalgamation of 2 or more water allocations into a single water allocation is permitted if— (a) for each allocation being amalgamated, the ratio between the nominal volume of the allocation and each other attribute of the allocation is the same as the ratio between the nominal volume of each other allocation being amalgamated and each attribute of that other allocation; and Example— If water allocation A has a nominal volume of 1 and a volumetric limit of 2, it may be amalgamated with water allocation B which has a nominal volume of 2 and a volumetric limit of 4, but not with water allocation C which has a nominal volume of 2 and a volumetric limit of 3. (b) the allocations being amalgamated have the same conditions; and (c) the amalgamation results in an allocation— (i) for which the ratio between the nominal volume of the allocation and each other attribute of the allocation is the same as the ratio between the nominal volume of each allocation being amalgamated and each attribute of that allocation; and (ii) that has the same conditions as the allocations being amalgamated. Note— See section 143 of the Act for the attributes and conditions of water allocations.

  243. 70 Permitted subdivision of a water allocation A subdivision of a water allocation is permitted if— Page 48 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 71] (a) the total of the nominal volumes of the resulting water allocations is the same as the nominal volume of the water allocation being subdivided; and (b) each attribute of the water allocation being subdivided is subdivided in proportion to the nominal volume of each resulting water allocation; and (c) each resulting water allocation states the same conditions as the water allocation being subdivided. Subdivision 4 Assessed water allocation dealings

  244. 71 Main purpose of this subdivision The main purpose of this subdivision is to state types of water allocation dealings that must be assessed and the criteria against which they must be assessed.

  245. 72 Particular water allocation dealings to be assessed and notice of application published (1) This section applies to an application for a water allocation dealing if— (a) neither subdivision 3 nor a water management protocol states that the dealing is permitted or prohibited (an other dealing); and (b) a water management protocol does not state that the dealing is of a type that must be assessed under the protocol. (2) A notice of the application must be published under section 64. (3) The water allocation dealing must be assessed under section 73. Current as at 27 June 2025 Page 49 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 5 Water allocations [s 73]

  246. 73 Criteria for assessing particular dealings (1) Subsection (2) applies if the chief executive is satisfied the application is for a water allocation dealing that— (a) is compatible with the objectives of the relevant water plan; and (b) is in the public interest; and (c) will not significantly adversely affect water entitlement holders, resource operations licence holders or natural ecosystems; and (d) for a water allocation managed under a resource operations licence, does not— (i) increase the water allocation’s share of the water the resource operations licence holder has available to supply the water allocations managed under the licence; or (ii) increase the water the resource operations licence holder has available to supply the water allocations managed under the licence; and (e) for a water allocation not managed under a resource operations licence, does not— (i) change the nominal volume for the water allocation; or (ii) increase the water allocation’s share of the water available to be taken under the water allocations in all water allocation groups mentioned in the relevant water plan area. (2) The chief executive must approve the application, with or without conditions. (3) If the chief executive is not satisfied as mentioned in subsection (1), the chief executive must refuse the application. Page 50 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 6 Water supply and demand management [s 74] Division 4 Registering water allocations and interests and dealings for water allocations

  247. 74 Prescribed registration details for water allocations—Act, s 152 (1) For section 152(1)(g) of the Act, this section applies if the water sharing rules for a water allocation managed under a resource operations licence are stated to be continuous sharing rules in the resource operations licence. (2) The entry on the water allocations register for the allocation must state the nominal location for the allocation. (3) In this section— nominal location, for a water allocation, means the location from which water may be taken on the day the continuous sharing rules first apply to the water allocation. Part 6 Water supply and demand management Division 1 Desired level of service objectives and water security program Subdivision 1 Definitions for division

  248. 77 Definitions for division In this division— bulk water supply system means the infrastructure for supplying water to bulk water customers in the SEQ region, including— Current as at 27 June 2025 Page 51 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 6 Water supply and demand management [s 78] (a) Baroon Pocket Dam, Cooloolabin Dam, Ewan Maddock Dam, Hinze Dam, Lake Kurwongbah, Lake McDonald, Leslie Harrison Dam, Little Nerang Dam, North Pine Dam, Somerset Dam, Wappa Dam and Wivenhoe Dam; and (b) the Western Corridor Recycled Water Scheme, and the South East Queensland (Gold Coast) Desalination Facility; and (c) the main connecting pipelines (the Northern Pipeline Inter-connector, Southern Regional Water Pipeline and Eastern Pipeline Inter-connector). minimum operating level, of a dam, means the minimum operating level of the dam stated on the resource operations licence relating to the dam. non-residential water use is water use that is not residential water use. Example— water use in industry, power stations or for a business purpose residential water use is water use at a residence or for other domestic purposes. Example of water use for another domestic purpose— watering a garden at a residence SEQ water security program means the bulk water supply authority’s water security program for the SEQ region, under section 350 of the Act. Subdivision 2 Desired level of service objectives

  249. 78 Desired level of service objectives—Act, s 344 For section 344(1)(a) of the Act, this subdivision prescribes the desired level of service objectives for water security for the SEQ region. Page 52 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 6 Water supply and demand management [s 79]

  250. 79 Projected regional average urban demand for SEQ region (1) The bulk water supply system is to be able to supply enough water to meet the projected regional average urban demand. (2) The bulk water supply authority must— (a) work out the projected regional average urban demand in collaboration with the SEQ service providers, and publicly publish the projection in the way stated in the SEQ water security program; and (b) assess annually whether the projected regional average urban demand or latest projected regional average urban demand is still current, and publicly publish the outcome of the assessment in the way stated in the SEQ water security program. (3) In this section— projected regional average urban demand means the demand, expressed in litres for each person for each day, for residential and non-residential water use that is estimated for the SEQ region for each year over the next 30 years.

  251. 80 Bulk water drought supply (1) The bulk water supply system is to be able to supply enough water so that medium level water restrictions on residential water use— (a) will not happen more than once every 10 years on average; and (b) will not restrict the average water use for the SEQ region to less than 140L for each person for each day. (2) The bulk water supply system is to be able to supply enough water so that medium level water restrictions on non-residential water use that is incidental to the purpose of a business will not happen more than once every 10 years on average. Example of water use that is incidental to the purpose of a business— watering a garden in the grounds of a factory Current as at 27 June 2025 Page 53 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 6 Water supply and demand management [s 80] (3) The bulk water supply system is to be able to supply enough water so that medium level water restrictions or more severe water restrictions last no longer than 5% of the modelled time. (4) In this section— drought response level is the level in the bulk water supply system stated in the SEQ water security program that is the trigger for taking action in response to drought. Example of action in response to drought— reducing the supply of water from the bulk water supply system medium level water restrictions means water restrictions imposed on residential and non-residential water use in response to drought, when the level in the bulk water supply system is between— (a) the drought response level; and (b) the safe minimum storage level. modelled time means the total time simulated in the stochastic model. more severe water restrictions means water restrictions imposed on residential and non-residential water use in response to drought, when the level in the bulk water supply system is below the safe minimum storage level. safe minimum storage level is the level in the bulk water supply system stated in the SEQ water security program that is the trigger for taking more severe action in response to drought, to minimise the risk of reaching the minimum operating levels. stochastic model means the model known as the Regional Stochastic Model used by the bulk water supply authority to model long-term water security. Page 54 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 6 Water supply and demand management [s 81]

  252. 81 Minimum operating levels and essential minimum supply volume (1) Each of the following dams will not reach its minimum operating level more than once in every 10,000 years on average— (a) Baroon Pocket Dam; (b) Hinze Dam; (c) Wivenhoe Dam. (2) The bulk water supply system— (a) will be able to supply the essential minimum supply volume; and (b) will not be reduced to being able to supply only the essential minimum supply volume more than once in every 10,000 years on average. (3) In this section— essential minimum supply volume means the volume needed to supply an average of 100L for each person for each day for residential and non-residential water use. Subdivision 3 Water security program

  253. 82 Content of water security program—Act, s 353 The following matters are prescribed for section 353(1)(f) of the Act— (a) the process the bulk water supply authority will use to work out the projected regional average urban demand including, for example, the authority’s key assumptions and methodology; (b) deciding the level in the bulk water supply system that is the trigger for taking action in response to drought; Example of action in response to drought— reducing the supply of water from the bulk water supply system Current as at 27 June 2025 Page 55 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 6 Water supply and demand management [s 83] (c) deciding the level in the bulk water supply system that is the trigger for taking more severe action in response to drought, to minimise the risk of reaching the minimum operating levels. Division 2 Water supply arrangements for SEQ region

  254. 83 Declaration of bulk water customers—Act, s 360C, definition bulk water customer (1) For section 360C of the Act, definition bulk water customer, paragraph (b), the following entities declared to be bulk water customers under the repealed regulation continue to be bulk water customers for chapter 2A, part 3 of the Act— (a) Toowoomba Regional Council; (b) Stanwell Corporation Limited ABN 370 788 486 74. (2) Also, for section 360C of the Act, definition bulk water customer, paragraph (b), each of the following entities is declared to be a bulk water customer for chapter 2A, part 3 of the Act— (a) CleanCo Queensland Limited ACN 628 008 159; (b) Seqwater; (c) Southern Downs Regional Council.

  255. 83A Declaration of SEQ bulk suppliers—Act, s 360C, definition SEQ bulk supplier For section 360C of the Act, definition SEQ bulk supplier, paragraph (b), the Central SEQ Distributor-Retailer Authority, established under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, section 8, is declared to be an SEQ bulk supplier for chapter 2A, part 3 of the Act. Page 56 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 84] Part 7 Annual levy for underground water management—Act, section 479 Division 1 Preliminary

  256. 84 Purpose of part This part provides for— (a) an annual levy under section 479 of the Act; and (b) the apportionment to resource tenure holders of the total annual levy payable by all resource tenure holders.

  257. 85 Definitions for part In this part— class A tenure see section 87A(1). class B tenure see section 87A(2). class C tenure see section 87A(3). levyable mining tenure see section 87A(4). office income statement, for a financial year, means the office’s income statement for the financial year, contained in the document called ‘Service Delivery Statement’ prepared by the department in which chapter 3A of the Act is administered and published in the State budget for the financial year. Editor’s note— A copy of the Service Delivery Statement is available at www.budget.qld.gov.au. office’s estimated costs means the office’s estimated costs under section 479(4)(a) of the Act. office’s estimated mining costs see section 88A(b). office’s estimated petroleum costs see section 88A(a). Current as at 27 June 2025 Page 57 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 86] relevant date, for a financial year, means 1 July of the financial year. relevant sub-block see section 87(1). resource project see the Environmental Protection Act 1994, section 112. sub-block see the Petroleum and Gas Act, section 29(2).

  258. 86 Office’s estimated costs The office’s estimated costs for a financial year must be stated in the office income statement for the financial year.

  259. 87 Relevant sub-blocks for petroleum tenures and classes of relevant sub-blocks (1) A sub-block is a relevant sub-block if— (a) either— (i) the sub-block is within a cumulative management area; or (ii) the sub-block is outside a cumulative management area and the office performs functions under the Act for the sub-block; and (b) either— (i) the sub-block is in the area of a petroleum lease; or (ii) the sub-block is in an area that is— (A) in the area of an authority to prospect, or an area to which an application for an authority to prospect applies; and (B) in which gas field development is being, or is proposed to be, carried out. (2) For this part, relevant sub-blocks are divided into the following classes— Page 58 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 87A] (a) relevant sub-blocks outside the cumulative management area; (b) relevant sub-blocks within the cumulative management area that are used, or intended to be used, for conventional petroleum or gas production; (c) relevant sub-blocks within the cumulative management area that are used, or intended to be used, for coal seam gas production. (3) In this section— authority to prospect means an authority to prospect under the Petroleum and Gas Act or the Petroleum Act 1923. coal seam gas production has the same meaning it has under the Petroleum and Gas Act. conventional petroleum or gas production means petroleum production, or gas production, that is not coal seam gas production. gas field development means the development of an area for coal seam gas production, or conventional petroleum or gas production, for which the EIS process has been completed under the Environmental Protection Act 1994. Note— See the Environmental Protection Act 1994, section 60 for when the EIS process is completed for a project. petroleum lease means a petroleum lease under the Petroleum and Gas Act or the Petroleum Act 1923.

  260. 87A Classes of levyable mining tenures (1) A mining lease is a class A tenure if the lease is a CMA tenure under chapter 3 of the Act. (2) A mineral development licence is a class B tenure if— (a) the licence is a CMA tenure under chapter 3 of the Act; and Current as at 27 June 2025 Page 59 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 87A] (b) the holder of the licence has applied for a mining lease under the Mineral Resources Act for carrying out activities; and (c) any of the following apply— (i) the proposed lease is a relevant tenure for an environmental authority or proposed environmental authority under which the activities are to be carried out as part of a resource project; (ii) the activities are part of a project for which an EIS process applies under the Environmental Protection Act 1994, section 37; (iii) the activities are part of a coordinated project for which an EIS is required under the State Development and Public Works Organisation Act 1971. (3) A mining lease is a class C tenure for a financial year if— (a) the lease is not a CMA tenure under chapter 3 of the Act; and (b) the lease is a relevant tenure for an environmental authority under which activities are carried out as part of a resource project; and (c) for the resource project, an average of at least 500ML of water each year for the levy period for the financial year has been taken or interfered with under the Mineral Resources Act, section 334ZP(1). (4) A levyable mining tenure is a class A tenure, class B tenure or class C tenure. (5) In this section— coordinated project see the State Development and Public Works Organisation Act 1971, schedule 2. levy period, for a financial year, means the period of 3 years ending immediately before the relevant day for the financial year. Page 60 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 88] mineral development licence means a mineral development licence under the Mineral Resources Act. mining lease means a mining lease under the Mineral Resources Act. relevant tenure see the Environmental Protection Act 1994, schedule 4. Division 2 Working out annual levy Subdivision 1 Total annual levy and office’s estimated costs

  261. 88 Amount of total annual levy (1) The total annual levy must be based on a financial year. (2) The total annual levy payable under section 479 of the Act for a financial year is an amount not more than the office’s estimated costs for the financial year.

  262. 88A Apportionment between office’s estimated petroleum costs and office’s estimated mining costs The office must apportion the office’s estimated costs for a financial year to— (a) the estimated cost of performing its functions for the financial year for petroleum tenure holders (the office’s estimated petroleum costs); and (b) the estimated cost of performing its functions for the financial year for mining tenure holders (the office’s estimated mining costs). Current as at 27 June 2025 Page 61 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 89] Subdivision 2 Apportionment of annual levy for petroleum tenure holders

  263. 89 Apportionment of office’s estimated petroleum costs to each relevant sub-block (1) This section provides for the apportionment of the office’s estimated petroleum costs for a financial year to each relevant sub-block. (2) The office must apportion the office’s estimated petroleum costs to each class of relevant sub-blocks according to the proportion of the office’s functions under the Act carried out in the financial year for the class of relevant sub-blocks. (3) The office must apportion the amount worked out under subsection (2) for a class of relevant sub-blocks to each relevant sub-block in that class equally, according to the number of relevant sub-blocks of that class existing on the relevant date for the financial year.

  264. 90 Apportionment of annual levy among petroleum tenure holders (1) This section provides for the apportionment of the total annual levy payable by petroleum tenure holders for a financial year to classes of petroleum tenure holders according to the number of relevant sub-blocks in the areas of the petroleum tenures held by the petroleum tenure holders on the relevant date for the financial year. (2) The total annual levy must be apportioned among petroleum tenure holders as follows— (a) for a petroleum tenure holder who does not hold any relevant sub-blocks—nil; (b) for each other petroleum tenure holder—according to the amount worked out by multiplying the number of relevant sub-blocks of each class in the areas of the petroleum tenures held by the holder on the relevant Page 62 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 90A] date by the amount worked out for each relevant sub-block of that class under section 89(3). Subdivision 3 Apportionment of annual levy for mining tenure holders

  265. 90A Apportionment of office’s estimated mining costs (1) This section provides for the apportionment of the office’s estimated mining costs for a financial year in relation to levyable mining tenures. (2) The office must apportion the office’s estimated mining costs to each class of levyable mining tenure according to the proportion of the office’s functions under the Act carried out in the financial year for the class of levyable mining tenure. (3) The office must further apportion the amount worked out under subsection (2) for a class of levyable mining tenure by— (a) for a class A tenure—dividing the amount apportioned for class A tenures by the total number of hectares in all class A tenures existing on the relevant date for the financial year; and (b) for a class B tenure—dividing the amount apportioned for class B tenures by the total number of hectares in all class B tenures existing on the relevant date for the financial year; and (c) for a class C tenure—dividing the amount apportioned for class C tenures by the total number of resource projects that include a class C tenure, worked out on the relevant date for the financial year. Current as at 27 June 2025 Page 63 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 90B]

  266. 90B Apportionment of annual levy among mining tenure holders (1) This section provides for the apportionment of the total annual levy payable by mining tenure holders for a financial year to classes of mining tenure holders. (2) The total annual levy related to mining tenure holders must be apportioned among the mining tenure holders as follows— (a) for a mining tenure holder who does not hold a levyable mining tenure on the relevant date for the financial year—nil; (b) for each mining tenure holder who holds a class A tenure or class B tenure on the relevant date for the financial year—by multiplying the number of hectares, including any part of a hectare, in the tenure by the amount worked out for the tenure under section 90A(3)(a) or (b); (c) for each mining tenure holder who holds a class C tenure on the relevant date for the financial year—by multiplying the number of resource projects that include the tenure by the amount worked out for each project under section 90A(3)(c). Division 3 Collecting annual levy

  267. 91 Requirements for notice of annual levy (1) This section applies if the annual levy payable by a resource tenure holder for a financial year is more than nil. (2) The manager must give the resource tenure holder a notice about the annual levy payable by the holder for the financial year. (3) The manager may give a notice to a resource tenure holder on a quarterly basis or at an interval decided by the manager (the levy period). (4) The notice must state the following— Page 64 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 7 Annual levy for underground water management—Act, section 479 [s 92] (a) the number of— (i) for a petroleum tenure holder—each class of relevant sub-blocks to which the notice applies; or (ii) for a mining tenure holder—each class of mining tenure to which the notice applies; (b) the financial year to which the notice applies; (c) the levy period to which the notice applies; (d) the amount of the annual levy payable by the resource tenure holder for the levy period (levy amount); (e) that the levy amount becomes payable on the day the notice is given; (f) the day by which the levy amount must be paid (the due date); (g) the way in which the levy amount must be paid; (h) that if the levy amount is not paid by the due date, the State may, under section 479A of the Act, recover from the holder the amount as a debt.

  268. 92 Payment of annual levy (1) The levy amount for a levy period becomes payable by a resource tenure holder on the day the holder is given a notice under section 91 for the levy period. (2) The resource tenure holder must pay the levy amount— (a) within 30 days after the manager gives the holder the notice; and (b) in the way stated in the notice. (3) In this section— levy amount see section 91(4)(d). levy period see section 91(3). Current as at 27 June 2025 Page 65 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 8 Water authorities [s 93] Part 8 Water authorities Division 1 Continuation

  269. 93 Continuation of water authorities established under establishment regulation (1) Each water authority mentioned in schedule 8, part 1, column 1, that was established under an establishment regulation continues as a water authority under this regulation. (2) If the authority was established for an authority area, the authority area is shown on the plan mentioned opposite the authority in column 2. Note— See the Act, section 548(4).

  270. 94 Continuation of amalgamated water authorities (1) Each amalgamated water authority mentioned in schedule 8, part 2, column 1, amalgamated under the repealed regulation, continues as an amalgamated water authority under this regulation. (2) The authority’s authority area is shown on the plan mentioned opposite the authority in column 2. Division 2 Dissolution

  271. 94A Dissolution of particular water authorities for conversion to alternative institutional structures—Act, s 691 (1) This section applies to a water authority mentioned in schedule 8, part 3, column 1. (2) For section 691(1)(b) of the Act, the water authority is dissolved for converting the authority to the alternative Page 66 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 9 Investigations, enforcement and offences [s 94B] institutional structure mentioned opposite the authority in schedule 8, part 3, column 3. (3) For section 691(2) of the Act, the authority area for the water authority shown on the plan mentioned opposite the water authority in schedule 8, part 3, column 2 is dissolved.

  272. 94B Old entity document—Act, s 691A For section 691A(2) of the Act, the document called ‘Agreement for the distribution of water under the Yambocully Water Supply Scheme Distribution Operations Licence’ dated May 2020 is identified as the old entity document held by the Yambocully Water Board. Part 9 Investigations, enforcement and offences

  273. 95 Authorised taking of water—Act, s 808 (1) For section 808(1)(b) of the Act, an authorisation to take water under a NSW access licence in accordance with the Border Rivers water management protocol and the New South Wales–Queensland Border Rivers Intergovernmental Agreement 2008 declared under the repealed regulation to be an authorisation of a similar nature and to have a similar effect to a water allocation continues to be an authorisation of that nature and effect. (2) In this section— Border Rivers water management protocol means the water management protocol to implement the Water Plan (Border Rivers and Moonie) 2019. New South Wales–Queensland Border Rivers Intergovernmental Agreement 2008 means the intergovernmental agreement of that name, signed by the Premier on 16 February 2009. Current as at 27 June 2025 Page 67 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 9 Investigations, enforcement and offences [s 96] NSW access licence means an access licence under the Water Management Act 2000 (NSW).

  274. 96 Destroying vegetation, excavating or placing fill in a watercourse, lake or spring—Act, s 814 (1) For section 814(2)(i) of the Act, destroying vegetation, excavating or placing fill in a watercourse, lake or spring is permitted if the destruction, excavation or placing of fill is carried out under— (a) a lease or authority to prospect under the Petroleum Act 1923; or (b) a licence, petroleum lease or authority to prospect under the Petroleum and Gas Act: or (c) a licence under the Fossicking Act 1994; or (d) an environmental authority for a resource activity; or (e) the document called ‘Riverine Protection Permit Exemption Requirements’ approved by the chief executive and published on a Queensland Government website. (2) In this section— resource activity see the Environmental Protection Act 1994, section 107.

  275. 97 Requirements for decommissioning a water bore—Act, s 817 For section 817(2) of the Act, the decommissioning of a water bore must be carried out in accordance with the document called ‘Minimum construction requirements for water bores in Australia’, published on a Queensland Government website. Page 68 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 10 Relationship with Planning Act [s 98] Part 10 Relationship with Planning Act Division 1 Works for taking or interfering with water Note— See sections 139(5) and 140 in relation to works for taking underground water in an underground water area.

  276. 98 Works that are or are not assessable development—Act, s 39 (1) For section 39(f) of the Act, the following works are to be regulated as assessable development— (a) works for taking overland flow water that are in an area mentioned in schedule 9, part 1, column 1; (b) works for taking underground water through a subartesian bore that are in an area mentioned in schedule 9, part 2, column 1; Note— For the regulation of works for taking or interfering with underground water through an artesian bore, other than through a water monitoring bore, see the Planning Regulation 2017. (c) works for interfering with underground water that are in an area mentioned in schedule 9, part 3, column 1. (2) However— (a) the works mentioned in schedule 9, part 1, column 2 or part 2, column 2 are to be regulated as assessable development only to the extent the operational work to which the works relate does not comply with the requirements for the work mentioned in section 99(2); and (b) the following works are not to be regulated as assessable development— Current as at 27 June 2025 Page 69 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 10 Relationship with Planning Act [s 99] (i) works mentioned in subsection (1) relating to PDA-related development; (ii) works mentioned in schedule 9, part 1, column 3, part 2, column 3 or part 3, column 2. (3) In this section— PDA-related development see the Planning Regulation 2017, schedule 24.

  277. 99 Requirements for accepted development for operational work for taking water—Act, s 1014 (1) This section applies to operational work involving works that are— (a) in an area mentioned in schedule 9, part 1, column 1 or part 2, column 1; and (b) mentioned in schedule 9, part 1, column 2 or part 2, column 2, opposite the area; and (c) not of a type mentioned in schedule 9, part 1, column 3 or part 2, column 3, opposite the area. (2) For section 1014(2)(f) of the Act, to be categorised as accepted development— (a) operational work involving taking overland flow water must comply with the requirements applying to the work mentioned in each of the following documents— (i) ‘Accepted development requirements for taking overland flow water for stock or domestic purposes, or using limited capacity works’; (ii) ‘Accepted development requirements for taking overland flow water to satisfy the requirements of an environmental authority or a development permit for carrying out an environmentally relevant activity’; and (b) operational work involving taking underground water must comply with the requirements applying to the work mentioned in the document called ‘Accepted Page 70 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 10 Relationship with Planning Act [s 100] development requirements for subartesian bores or replacement bores’. (3) A reference in this section to a document by name is a reference to the document of that name made by the chief executive and published on a Queensland Government website. Division 2 Levees

  278. 100 Prescribed volume of material for fill—Act, sch 4, definition levee The prescribed volume of material for fill for schedule 4 of the Act, definition levee, paragraph 3(b)(ii) is 50m3.

  279. 101 Construction of new levees and modification of existing levees (1) For assessing proposed development that is the construction of a new levee or the modification of an existing levee, the levee can be categorised as 1 of the following types of levees— (a) category 1 levee; (b) category 2 levee; (c) category 3 levee. (2) A category 1 levee is a levee that has no off-property impact. (3) A category 2 levee is a levee— (a) that has an off-property impact; and (b) for which the affected population is less than 3. (4) A category 3 levee is a levee— (a) that has an off-property impact; and (b) for which the affected population is at least 3. (5) In this section— Current as at 27 June 2025 Page 71 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 10 Relationship with Planning Act [s 101A] affected population, for a levee, means the total number of persons occupying all buildings on which the levee has a significant impact. levee property— (a) means the lot or parcel of land on which a levee is situated; and (b) includes another lot or parcel of land that is contiguous with the lot or parcel mentioned in paragraph (a) and owned by the same entity. off-property impact, for a levee, means an impact the levee has on people, property or the environment outside the levee property. significant impact, of a levee on a building, means each of the following— (a) an increase, caused by the levee, of more than 5cm in the flow height of water over the floorboards of the building; (b) an increase, caused by the levee, of more than 0.2 m/s in the flow velocity of water over the floorboards of the building.

  280. 101A Requirements for accepted development for category 1 levees—Act, s 1014 (1) This section applies to operational work that is— (a) the construction of a new category 1 levee; or (b) the modification of an existing levee if, after the modification, the levee will be a category 1 levee. (2) For section 1014(2)(f) of the Act, to be categorised as accepted development the operational work must comply with the requirements stated in the levee code. (3) In this section— levee code means the document called ‘Accepted development requirements for the construction of new levees or the Page 72 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 102] modification of existing levees’ made by the chief executive and published on a Queensland Government website.

  281. 102 Assessment benchmarks for particular levees—Act, s 967 (1) This section applies to a development application for, or change application relating to, the following assessable development, if a local government is the assessment manager or responsible entity under the Planning Act for the application— (a) operational work for the construction of a new category 2 levee or category 3 levee; (b) operational work for the modification of an existing levee if, after the modification, the levee will fulfil the requirements for a category 2 levee or category 3 levee. (2) For section 967(2) of the Act, the code in schedule 10 is an assessment benchmark under the Planning Act for assessing the development. Part 11 Measurement requirements for taking water Division 1 General

  282. 103 Definitions for part In this part— associated document, for a compliance certificate for a measurement device, means a document that supports or is evidence of matters considered by a duly qualified person in inspecting the device for the purpose of giving the certificate. Examples of associated documents— a calibration report, a diagnostic record, a photograph Current as at 27 June 2025 Page 73 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 104] compliance certificate, for a measurement device, means a certificate, in the approved form, given by a duly qualified person stating that the device complies with the measurement standards. duly qualified person see section 104. faulty, in relation to a measurement device, see section 105. faulty period, for a faulty measurement device attached to works through which water is taken under a relevant authorisation, means the period— (a) if section 117 applies in relation to the device— (i) starting when the holder of the relevant authorisation becomes aware, or suspects, the device is faulty; and (ii) ending when section 117(1)(b) has been complied with for the device; or (b) if section 118 applies in relation to the device— (i) starting when the chief executive gives the holder of the relevant authorisation notice under section 118 stating the chief executive suspects the device is faulty; and (ii) ending when section 118(2)(b) has been complied with for the device. measurement standards means the standards made under section 217I of the Act.

  283. 104 Duly qualified persons—Act, s 217B (1) This section prescribes, for section 217B of the Act, definition duly qualified person, persons who are duly qualified persons for the measurement requirements under this part. (2) Each of the following persons is a duly qualified person for performing a function under this part for the measurement requirements under division 2— Page 74 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 104] (a) for a function relating to a closed conduit meter or a modular meter—a person who holds certification as a certified meter installer and validator issued by Irrigation Australia; (b) for a function relating to a storage meter—a person who holds certification as a certified storage meter installer and validator issued by Irrigation Australia; (c) for a function relating to a telemetry device—a person who holds certification as a telemetry installer and validator issued by Irrigation Australia; (d) for a function relating to any measurement device—a person appointed as a duly qualified person for the device under section 121A. (3) However, the following persons are not a duly qualified person for performing a function under this part in relation to a measurement device attached to works through which water is taken under a relevant authorisation— (a) the holder of the authorisation; (b) an employee or agent of the holder of the authorisation. (4) Subsection (3) does not apply in relation to a relevant authorisation held by— (a) the State, a local government or a water authority; or (b) the holder of a resource operations licence or distribution operations licence. (5) In this section— closed conduit meter means a meter used to measure or record water volume in a full flowing pipe. Irrigation Australia means Irrigation Australia Ltd ACN 002 567 633. modular meter means a meter that has 1 or more externally attached sensors and is used to measure or record water volume. Current as at 27 June 2025 Page 75 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 105] storage meter means a meter used to measure the level of water held in storage.

  284. 105 When a measurement device is faulty—Act, s 217B (1) This section prescribes, for section 217B of the Act, definition faulty, the circumstances in which a measurement device is faulty. (2) A measurement device is faulty if— (a) the device is not capable of measuring or recording the volume of water taken through works to which the device is attached— (i) at all; or (ii) within the accuracy range for the device stated in the measurement standards; or (b) it is not possible to read or obtain information from the device to calculate or measure the volume of water taken through works to which the device is attached; or (c) the device is leaking water or air; or (d) a fitting or other thing used to attach the device to works through which water is taken is leaking water or air; (e) a seal, mark, access code or other thing attached or applied to the device by an authorised officer, a measurement contractor or a duly qualified person has been removed, damaged or otherwise tampered with; or (f) the device does not, for a period of 3 or more days, transmit or otherwise report information calculated, measured, read or recorded by the device. (3) For this part, a measurement device attached to works through which water is taken under a relevant authorisation is taken to be faulty if— (a) the holder of the authorisation is aware or suspects the device is faulty as mentioned in section 117; or Page 76 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 106] (b) the chief executive gives a notice under section 118 in relation to the device. (4) Subsection (2) applies only during the faulty period for the measurement device. Division 2 Measurement requirements for using measurement devices Subdivision 1 Preliminary

  285. 106 Purpose of division This division prescribes measurement requirements under section 217E of the Act that apply to relevant authorisations mentioned in section 107. Note— See section 808(3) of the Act for an offence for the holder of a relevant authorisation mentioned in section 107 taking water while contravening the measurement requirements under this division.

  286. 107 Relevant authorisations (1) For section 217C of the Act, the following authorisations are declared to be authorisations that are subject to the measurement requirements under this division— (a) an authorisation stated in schedule 11, column 2, for an area identified in schedule 11, column 1; (b) an authorisation that replaces an authorisation mentioned in paragraph (a); (c) a seasonal water assignment notice for taking water given in relation to an authorisation mentioned in paragraph (a) or (b). (2) For subsection (1)(b), an authorisation (the second authorisation) replaces another authorisation (the original authorisation) in the following circumstances— Current as at 27 June 2025 Page 77 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 108] (a) the original authorisation expires and the second authorisation is granted in relation to the same land; (b) the original authorisation is amalgamated with another authorisation and the second authorisation is granted in relation to the land to which the original authorisation and other authorisation related; (c) the original authorisation expires and 2 or more second authorisations are granted in relation to the same land; (d) part of the land to which the original authorisation related is disposed of and 1 or more second authorisations are granted in relation to the same land; (e) the original authorisation expires under section 146(1)(a) of the Act and the second authorisation is granted under that section to the holder of the original authorisation. Subdivision 2 General requirements

  287. 108 Attaching and maintaining measurement device (1) The holder of a relevant authorisation must ensure a measurement device stated in schedule 11, column 3 opposite the authorisation is attached to works through which water is taken under the authorisation. Note— See, however, section 153 in relation to attaching particular measurement devices on or before a particular date. (2) The holder of the relevant authorisation must ensure the measurement device is— (a) attached to the works in the way stated in the measurement standards; and (b) certified by a duly qualified person as complying with the measurement standards; and (c) not faulty. Page 78 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 109] (3) Also, the holder of the relevant authorisation must ensure the measurement device is maintained in accordance with the measurement standards. (4) The holder does not contravene subsection (2)(c) in relation to a faulty measurement device if the holder complies with subdivision 3 during the faulty period for the device.

  288. 109 Taking water under relevant authorisation The holder of a relevant authorisation must ensure that water taken under the authorisation is taken— (a) through works to which a measurement device is attached under section 108; or (b) if the measurement device becomes faulty—in accordance with the alternative requirements stated in subdivision 3 for the authorisation.

  289. 110 Ongoing certification requirements (1) This section applies in relation to a measurement device, other than a telemetry device, that is attached, under section 108, to works through which water is taken under a relevant authorisation. (2) The holder of the relevant authorisation must ensure the measurement device is certified by a duly qualified person as complying with the measurement standards every 5 years. (3) For subsection (2), if the measurement device is certified by a duly qualified person as complying with the measurement standards before the end of a 5-year period, the next 5-year period starts on the day the device is certified. Example for subsection (3)— A measurement device is certified as complying with the measurement standards on 1 December 2024. The 5-year period starts on that date meaning the device must be next certified on or before 1 December 2029. However, the device becomes faulty 2 years later and is certified as complying with the measurement standards on 23 September 2026. The Current as at 27 June 2025 Page 79 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 111] 5-year period starts again on 23 September 2026 meaning the device must be next certified on or before 23 September 2031. (4) If the holder of the relevant authorisation does not comply with subsection (2), at the end of the 5-year period mentioned in the subsection— (a) the previous compliance certificate for the measurement device is of no effect; and (b) the measurement device is taken not to be certified by a duly qualified person as complying with the measurement standards for the purposes of section 108(2)(b).

  290. 111 Information about water taken The holder of a relevant authorisation must give the chief executive the information about water taken under the authorisation— (a) stated in schedule 11A; and (b) at the times, and in the way, stated in schedule 11A. Subdivision 3 Alternative requirements

  291. 112 Purpose of subdivision This subdivision states the alternative requirements that apply if a measurement device, attached to works through which water is taken under a relevant authorisation, becomes faulty.

  292. 113 Alternative measurement requirements (1) The holder of the relevant authorisation must give the chief executive information, about water taken through the works during the faulty period for the measurement device, in accordance with all the instructions, and covering all the matters, stated in the approved form. (2) The information must be given to the chief executive— Page 80 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 114] (a) within 20 business days after the end of the faulty period for the measurement device or a later time agreed to by the chief executive; and (b) if required by the chief executive by notice during the faulty period—at each other time during the rectification period stated in the notice. (3) In this section— rectification period, for a faulty measurement device attached to works through which water is taken under a relevant authorisation, means the period within which section 117(1)(b) or 118(2)(b) must be complied with for the device. Subdivision 4 Contravention of particular requirements

  293. 114 Offence to contravene requirement to give particular information (1) The holder of a relevant authorisation who contravenes section 111 or 113 without a reasonable excuse commits an offence. Maximum penalty—20 penalty units. (2) Subsection (3) applies if an act done or omission made by the holder of a relevant authorisation constitutes both of the following— (a) an element of an offence against section 808(3) of the Act in relation to taking water under the authorisation; (b) a contravention of section 111 or 113. (3) The holder may not be punished, in relation to the act or omission, for an offence against subsection (1) if the holder is punished for an offence against section 808(3) of the Act in relation to the act or omission. Current as at 27 June 2025 Page 81 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 115] Division 3 Faulty measurement devices

  294. 115 Application of division This division prescribes, under section 217G of the Act, matters about a measurement device attached to works through which water is taken under a relevant authorisation mentioned in section 107.

  295. 116 When holder of relevant authorisation is taken to be aware or suspect measurement device is faulty (1) This section— (a) provides for circumstances in which the holder of the relevant authorisation is taken to be aware, or suspect, that the measurement device is faulty; and (b) does not limit the circumstances in which the holder may be aware of, or suspect, the matter mentioned in paragraph (a). (2) The holder of the relevant authorisation is taken to be aware, or suspect, that the measurement device is faulty if the holder— (a) knows, or ought reasonably to know, the device has been damaged; or (b) knows, or ought reasonably to know, the device is not measuring or recording the volume of water taken through works to which the device is attached, even though water has been taken through the works; or (c) for a telemetry device—knows, or ought reasonably to know, the information recorded by the device about water volume, or level of water held in storage, is not being received by the device or thing to which the information is being transferred. Page 82 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 117]

  296. 117 Notifying and rectifying faults (1) If the holder of the relevant authorisation becomes aware, or suspects, that the measurement device is faulty, the holder must, unless the holder has a reasonable excuse— (a) within 3 business days after becoming aware of, or suspecting, the fault, give the chief executive a notice complying with subsection (2) about the fault; and (b) within 30 business days after becoming aware of, or suspecting, the fault or a longer period agreed to by the chief executive— (i) rectify the fault and ensure a duly qualified person certifies the device as complying with the measurement standards; or (ii) replace the device with another measurement device that is certified by a duly qualified person as complying with the measurement standards; or (iii) if the device is found not to be faulty—ensure a duly qualified person certifies the device as complying with the measurement standards. Maximum penalty—20 penalty units. Note— See also— (a) section 109(b) and division 2, subdivision 3 for measurement requirements about taking water while a measurement device is faulty; and (b) section 808(3) of the Act for an offence for taking water while contravening the measurement requirements. (2) The notice under subsection (1)(a) must include the following information— (a) details about the device that is faulty or suspected to be faulty; (b) the date the holder became aware of, or suspected, the fault; (c) details about the fault or suspected fault; Current as at 27 June 2025 Page 83 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 118] (d) details of each other relevant authorisation held by the holder under which water is taken through the works; (e) details of each other person who takes water through the works; (f) if known at the time the notice is given—details of the duly qualified person who is or is to be engaged to certify the device under subsection (1)(b).

  297. 118 Chief executive may give notice of suspected faulty measurement device (1) This section applies if the chief executive suspects the measurement device is faulty. (2) The chief executive may give the holder of the relevant authorisation a notice stating— (a) that the chief executive suspects the measurement device is faulty; and (b) that the holder of the authorisation must within 30 business days after the notice is given or a longer period agreed to by the chief executive— (i) rectify the fault and ensure a duly qualified person certifies the device as complying with the measurement standards; or (ii) replace the device with another measurement device that is certified by a duly qualified person as complying with the measurement standards; or (iii) if the device is found not to be faulty—ensure a duly qualified person certifies the device as complying with the measurement standards. (3) The holder of the relevant authorisation must comply with a notice given to the holder under subsection (2), unless the holder has a reasonable excuse. Maximum penalty—20 penalty units. Note— See also— Page 84 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 119] (a) section 109(b) and division 2, subdivision 3 for measurement requirements about taking water while a measurement device is faulty; and (b) section 808(3) of the Act for an offence for taking water while contravening the measurement requirements. Division 4 Record keeping

  298. 119 Application of division This division prescribes requirements about records under section 217H of the Act.

  299. 120 Requirement to keep copies of records (1) The holder of a relevant authorisation must keep, for the record keeping period, the following records in relation to the measurement requirements under division 2, unless the holder has a reasonable excuse— (a) a record of, or about, the volume of water measured or recorded by a measurement device under the measurement requirements at the following times— (i) the end of each period of 5 years mentioned in section 110; (ii) each time the holder becomes aware, or suspects, the device is faulty; (b) a record of each activity carried out to maintain a measurement device attached to works through which water is taken under the authorisation; Note— See section 108(3) for the requirement to maintain measurement devices. (c) a copy of the following for the measurement device mentioned in paragraph (b)— (i) each compliance certificate for the device; Current as at 27 June 2025 Page 85 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 121] (ii) each associated document given to the holder under section 121B(2)(b)(ii) for each compliance certificate mentioned in subparagraph (i). Maximum penalty—20 penalty units. (2) In this section— record keeping period means— (a) for a record mentioned in subsection (1)(a)—12 months from when the record was made; or (b) for a record mentioned in subsection (1)(b) about a measurement device—from the day the record is made until the day a duly qualified person gives a new compliance certificate for the device; or (c) for a compliance certificate, or associated document for a compliance certificate, mentioned in subsection (1)(c)—6 years from the day the certificate is given.

  300. 121 Requirement to give copies of records (1) The chief executive may, by notice, require the holder of a relevant authorisation to give the chief executive a copy of a record kept under section 120 within 20 business days after the notice is given. (2) The holder of a relevant authorisation to whom a notice is given under subsection (1) must comply with the notice, unless the holder has a reasonable excuse. Maximum penalty—20 penalty units. Page 86 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 121A] Division 5 Duly qualified persons Subdivision 1 Appointment of duly qualified persons

  301. 121A Appointment of duly qualified person The chief executive may appoint an appropriately qualified person to be a duly qualified person for a measurement device. Subdivision 2 Performance of functions

  302. 121B Inspection by duly qualified person (1) This section applies if a duly qualified person is engaged by the holder of a relevant authorisation to certify a measurement device attached to works through which water is taken under the authorisation as complying with the measurement standards. (2) The duly qualified person must, unless the person has a reasonable excuse— (a) physically inspect the measurement device as soon as practicable; and (b) within 10 business days after the inspection, give— (i) the chief executive— (A) if the device does not comply with the measurement standards—a notice stating the non-compliance particulars for the device; or (B) if the device complies with the measurement standards—a compliance certificate for the device; and (ii) the holder of the relevant authorisation a copy of a notice or compliance certificate given to the chief Current as at 27 June 2025 Page 87 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 121C] executive under subparagraph (i) and, if a compliance certificate is given, a copy of the associated documents for the certificate. Maximum penalty—20 penalty units. (3) In this section— non-compliance particulars, for a measurement device, means— (a) how the device does not comply with the measurement standards; and (b) if the duly qualified person believes the device could comply with the measurement standards if the device is modified—the modifications needed for the device to comply with the measurement standards; and (c) if the duly qualified person believes the device can not comply with the measurement standards, even with modifications—that the device can not be modified to comply with the measurement standards.

  303. 121C Chief executive may require further inspection (1) This section applies if the chief executive— (a) is given a compliance certificate under section 121B for a measurement device attached to works through which water is taken under a relevant authorisation; and (b) is satisfied— (i) the information stated in the certificate is inaccurate, incomplete or mistaken; or (ii) the person who gave the certificate was not a duly qualified person for the measurement device when the certificate was given. (2) The chief executive may give the holder of the relevant authorisation a notice directing the holder to engage a duly qualified person to certify the measurement device as complying with the measurement standards. Page 88 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 121D] (3) The notice must state— (a) the grounds on which the notice is given; and (b) that the holder of the relevant authorisation must, within 30 business days after the notice is given or a longer period agreed to by the chief executive, ensure a duly qualified person certifies the device as complying with the measurement standards. (4) The holder of a relevant authorisation to whom a notice is given under subsection (2) must comply with the notice, unless the holder has a reasonable excuse. Maximum penalty—20 penalty units. (5) Section 121B applies to a duly qualified person engaged under this section. Subdivision 3 Action for improper conduct

  304. 121D Application of subdivision This subdivision applies if the chief executive knows or believes that a person who is a duly qualified person— (a) has contravened section 121B; or (b) has performed the work of a duly qualified person under this part incompetently; or (c) has engaged in fraudulent conduct in relation to the work of a duly qualified person under this part; or (d) has been found guilty of an offence against a provision of the Act or against a law of another State that provides for the same matter as a provision of the Act.

  305. 121E Action chief executive may take (1) The chief executive may— Current as at 27 June 2025 Page 89 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 11 Measurement requirements for taking water [s 121F] (a) if the chief executive appointed the person as a duly qualified person under section 121A—cancel the appointment; or (b) otherwise—give the relevant professional body a notice about the chief executive’s knowledge or belief of the matter mentioned in section 121D(a), (b), (c) or (d). (2) In this section— relevant professional body, for a person who is a duly qualified person, means the entity who issued the certificate mentioned in section 104(2)(a), (b) or (c) to the person.

  306. 121F Process for cancelling appointment (1) Before acting under section 121E(1)(a), the chief executive must— (a) give the person a notice (a show cause notice) stating— (i) that the chief executive intends to cancel the person’s appointment as a duly qualified person (the proposed action); and (ii) the ground for the proposed action; and (iii) an outline of the facts and circumstances forming the basis for the ground for the proposed action; and (iv) that the person may, within 14 days after the notice is given or a longer period agreed to by the chief executive, give the chief executive a written response to the proposed action; and (b) have regard to any response received under paragraph (a)(iv). (2) If the chief executive cancels a person’s appointment as a duly qualified person under this subdivision— (a) the chief executive must give the person an information notice for the decision to cancel the appointment; and Page 90 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 12 Water bore drillers [s 122] (b) the cancellation takes effect from the day the person is given the information notice. Part 12 Water bore drillers

  307. 122 Classes of licence—Act, s 981 (1) For section 981(2)(b) of the Act, the following are the classes of water bore driller’s licences— (a) class 1 water bore driller’s licence; (b) class 2 water bore driller’s licence; (c) class 3 water bore driller’s licence. (2) A class 1 licence authorises the licence holder to carry out a water bore drilling activity in relation to a subartesian bore in a formation that contains the aquifer closest to the surface of the land where the bore site is located. (3) A class 2 licence authorises the licence holder to carry out a water bore drilling activity in relation to a subartesian bore. (4) A class 3 licence authorises the licence holder to carry out a water bore drilling activity in relation to an artesian bore or subartesian bore. (5) In this section— water bore drilling activity see section 816(2) of the Act.

  308. 123 Water bore driller’s licence endorsements—Act, s 981 (1) For section 981(2)(c) of the Act, the following are the water bore driller’s licence endorsements— (a) cable tool; (b) auger; (c) rotary air; (d) rotary mud; Current as at 27 June 2025 Page 91 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 12 Water bore drillers [s 124] (e) non-drilling rig; (f) sonic. (2) A cable tool endorsement authorises drilling activities using cable tool or cable percussion drilling methods. (3) An auger endorsement authorises drilling activities using bucket auger, hollow stem auger or solid stem auger methods. (4) A rotary air endorsement authorises drilling activities using rotary drilling methods with air as the drilling fluid. (5) A rotary mud endorsement authorises drilling activities using rotary drilling methods with water as the drilling fluid or as the base for the drilling fluid. (6) A non-drilling rig endorsement authorises water bore activities using non-drilling rig methods including spear point construction, hand digging and the use of excavators or backhoes for the construction of wells, excavations and galleries. (7) A sonic endorsement authorises drilling activities using sonic drilling methods.

  309. 124 Qualifications or experience for class 1 licence—Act, s 981 (1) For section 981(2)(d) of the Act, the qualifications or experience for a class 1 water bore driller’s licence are either— (a) holding a licence, equivalent to a class 1 water bore driller’s licence granted by the entity that administers the licensing of water bore drillers in another State if the qualifications or experience required for the granting of the licence are considered equivalent by the chief executive to those stated in subsection (2); or (b) the qualifications or experience stated in subsection (2). (2) For subsection (1)(b), the qualifications or experience are— (a) successful completion of— Page 92 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 12 Water bore drillers [s 124] (i) the class 1 licence module and the drilling method endorsement module of the examinations prepared by the National Uniform Drillers Licensing Committee (NUDLC) for any licence endorsement for which the applicant is applying; or (ii) another course considered equivalent by the chief executive; and (b) demonstrated drilling and grouting knowledge; and (c) either— (i) both— (A) successful completion of the Drilling Industry Certification and Training Course (the DICAT course) or another course considered equivalent by the chief executive; and (B) employment in the operation of a drilling machine for at least 6 months during which at least 6 bores were drilled under the direct supervision of a licensed water bore driller; or (ii) employment in the operation of a drilling machine for at least 12 months during which at least 6 bores were drilled under the direct supervision of a licensed water bore driller; or (iii) employment in the operation of a drilling machine, other than in water bore drilling activities, for at least 12 months during which at least 6 bores that intersect underground water were drilled; or (iv) if the employment was undertaken in a foreign country—employment in the operation of a drilling machine in water bore drilling activities for at least 12 months during which at least 6 bores that intersect underground water were drilled; and Current as at 27 June 2025 Page 93 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 12 Water bore drillers [s 125] (d) successful completion of the class 1 water bore driller’s licence examination prepared by NUDLC and administered by the department.

  310. 125 Qualifications or experience for class 2 licence—Act, s 981 (1) For section 981(2)(d) of the Act, the qualifications or experience for a class 2 water bore driller’s licence are either— (a) holding a licence, equivalent to a class 2 water bore driller’s licence granted by the entity that administers the licensing of water bore drillers in another State if the qualifications or experience required for the granting of the licence are considered equivalent by the chief executive to those stated in subsection (2); or (b) the qualifications or experience stated in subsection (2). (2) For subsection (1)(b), the qualifications or experience are— (a) successful completion of— (i) the class 2 licence module and the drilling method endorsement module of the examinations prepared by NUDLC for any licence endorsement for which the applicant is applying; or (ii) another course considered equivalent by the chief executive; and (b) demonstrated drilling and grouting knowledge; and (c) either— (i) all of the following— (A) holding a class 1 water bore drillers licence or the qualifications and experience stated in section 124; (B) employment in the operation of a drilling machine for at least 12 months; Page 94 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 12 Water bore drillers [s 125] (C) drilling at least 6 bores for which a class 2 licence is required (a class 2 bore) under the direct supervision of the holder of a class 2 licence, or at least 6 bores for which a class 1 licence is required and at least 3 class 2 bores under the direct supervision of the holder of a class 2 licence; or (ii) all of the following— (A) successful completion of the DICAT course or another course considered equivalent by the chief executive; (B) employment in the operation of a drilling machine for at least 6 months; (C) drilling at least 6 class 2 bores under the direct supervision of the holder of a class 2 licence, or at least 6 bores for which a class 1 licence is required and at least 3 class 2 bores under the direct supervision of the holder of a class 2 licence; or (iii) employment in the operation of a drilling machine, other than in water bore drilling activities, for at least 12 months during which at least 9 bores that intersect multiple aquifer systems were drilled; or (iv) if the employment was undertaken in a foreign country—employment in the operation of a drilling machine in water bore drilling activities for at least 12 months during which at least 9 bores that intersect multiple aquifer systems were drilled; and (d) successful completion of the class 2 water bore driller’s licence examination prepared by NUDLC and administered by the department. Current as at 27 June 2025 Page 95 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 12 Water bore drillers [s 126]

  311. 126 Qualifications or experience for class 3 licence—Act, s 981 (1) For section 981(2)(d) of the Act, the qualifications or experience for a class 3 water bore driller’s licence are either— (a) holding a licence, equivalent to a class 3 water bore driller’s licence granted by the entity that administers the licensing of water bore drillers in another State if the qualifications or experience required for the granting of the licence are considered equivalent by the chief executive to those stated in subsection (2); or (b) the qualifications or experience stated in subsection (2). (2) For subsection (1)(b), the qualifications or experience are— (a) successful completion of— (i) the class 3 licence module and the drilling method endorsement module of the examinations prepared by NUDLC for any licence endorsement for which the applicant is applying; or (ii) another course considered equivalent by the chief executive; and (b) demonstrated drilling and grouting knowledge; and (c) either— (i) both— (A) employment as a licensed class 2 driller for at least 12 months, and in the operation of a drilling machine for at least 24 months; and (B) drilling at least 6 class 2 bores and, under the direct supervision of the holder of a class 3 licence, at least 3 bores for which a class 3 licence is required (a class 3 bore); or (ii) all of the following— Page 96 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 12 Water bore drillers [s 127] (A) successful completion of the DICAT course or another course considered equivalent by the chief executive; (B) employment as a licensed class 2 driller for at least 12 months, and in the operation of a drilling machine for at least 12 months; (C) drilling at least 6 class 2 bores and, under the direct supervision of the holder of a class 3 licence, at least 3 class 3 bores; or (iii) employment in the operation of a drilling machine, other than in water bore drilling activities, for at least 24 months during which at least 9 bores were drilled that intersect an aquifer with artesian pressure; or (iv) if the employment was undertaken in a foreign country—employment in the operation of a drilling machine in water bore drilling activities for at least 24 months during which at least 9 artesian bores were drilled; and (d) successful completion of the class 3 water bore driller’s licence examination prepared by NUDLC and administered by the department. (3) In this section— class 2 bore see section 125(2)(c)(i)(C).

  312. 127 Conditions of water bore driller’s licence—Act, s 983A For section 983A(1)(a) of the Act, the following are the conditions for a water bore driller’s licence— (a) water bore drilling activities that tap an aquifer in the sediments of an artesian basin must be carried out in accordance with ‘Minimum standards for the construction and reconditioning of water bores that intersect the sediments of artesian basins in Queensland’, published on a Queensland Government website; Current as at 27 June 2025 Page 97 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 12 Water bore drillers [s 128] (b) other water bore drilling activities must be carried out in accordance with ‘Minimum construction requirements for water bores in Australia’, published on a Queensland Government website; (c) if a development approval is required to carry out particular water bore drilling activities, the licence holder must see the approval and carry out the activities in accordance with the approval; (d) development that is operational work involving works for taking or interfering with underground water through a subartesian bore must comply with the requirements provided for in section 99(2) to the extent the requirements apply to the work; (e) the licence has effect for a period of 10 years.

  313. 128 Records of water bores drilled—Act, s 983L For section 983L(1) of the Act, the following is the information required to be kept about each water bore drilling activity— (a) the name and address of the owner of the land on which the activity is being carried out; (b) the location of the activity; (c) the name and water bore driller’s licence number of the driller performing the work; (d) the drilling method used; (e) the dates the water bore drilling activity started and finished; (f) details of the following— (i) the strata drilled; (ii) water produced by the strata, including the volume and quality of the water, the depth at which it is struck and the depth to which it rises naturally; (iii) the borehole diameter; Page 98 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 13 Declarations about watercourses [s 129] (iv) the type and diameter of the bore casing; (v) the diameter and location of the borehole cementing; (vi) the number and size of the slots or perforations in the casing, or screens installed, for water entry; (g) an estimation of the rate at which water may be produced from the bore. Part 13 Declarations about watercourses

  314. 129 Water declared to be water in a watercourse—Act, s 1006 For section 1006(1) of the Act, the following water declared to be water in a watercourse under the repealed regulation continues to be water in a watercourse— (a) water in an aquifer under the Kolan River, between AMTD 14.5km and AMTD 76.4km, to a depth of 10m below the bed of the river; (b) water in an alluvial aquifer under the Burnett River, between AMTD 25.9km and AMTD 333.9km, to a depth of 10m below the bed of the river; (c) water in an alluvial aquifer under the Boyne River, between AMTD 0km and AMTD 180km, to a depth of 10m below the bed of the river; (d) water in an alluvial aquifer under the Nogo River, between AMTD 0km and AMTD 23km, to a depth of 10m below the bed of the river; (e) water in an aquifer under Lockyer Creek, between AMTD 0km and AMTD 41.9km, to a depth of 10m below the bed of the creek; (f) water in an aquifer under Lockyer Creek, between AMTD 41.9km and AMTD 70.9km, to a depth of 6m below the bed of the creek; Current as at 27 June 2025 Page 99 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 14 Fees, charges etc. [s 130] (g) water in an aquifer under Barambah Creek, between AMTD 85km and AMTD 189.5km, to a depth of 15m below the bed of the creek; (h) water in an alluvial aquifer under the Stuart River, between AMTD 0km and AMTD 80km, to a depth of 10m below the bed of the river. Part 14 Fees, charges etc. Division 1 Fees Subdivision 1 General provisions

  315. 130 Fees The fees, other than titles registry fees, payable under the Act are stated in schedule 12. Subdivision 2 Water licence fees

  316. 131 Water licence fee (1) The water licence fee mentioned in schedule 12 is payable for a water licence, other than the following— (a) a water licence only to take supplemented water; (b) a water licence to take water for stock or domestic purposes, unless the licence is for taking underground water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies for stock or domestic purposes; (c) a water licence with a stated purpose of ‘CYPHA’. Note— See also the Water Plan (Cape York) 2019, section 59(1)(a)(i). Page 100 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 14 Fees, charges etc. [s 132] (2) The water licence fee for a water licence— (a) is payable for each year the licence is in force; and (b) must be paid within the period stated in a notice given to the licensee under subsection (3). (3) The chief executive must give the licensee a notice stating— (a) the amount of the water licence fee and the period to which it relates; and (b) the period, of at least 20 business days after the notice is given, in which the fee must be paid. Subdivision 3 Fees for continuing interim water allocations

  317. 132 Fees for continuing interim water allocations (1) This section applies to an interim water allocation (a continuing interim water allocation) in relation to which chapter 2, part 5 of the unamended Act continues to apply under section 1271 of the Act. (2) The fees payable for the purposes of the continued application of chapter 2, part 5 of the unamended Act are stated in schedule 13. Division 2 Charges for water allocated, supplied or taken

  318. 133 Charges for water allocated, supplied or taken The charges mentioned in schedule 14, column 3, are payable to the chief executive— (a) for the allocation, supply or taking of water in a water management area mentioned opposite the charges in column 1; and Current as at 27 June 2025 Page 101 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 14 Fees, charges etc. [s 134] (b) for the water year ending on the date mentioned opposite the charges in column 2.

  319. 134 Notice for payment of charges (1) A charge under section 133— (a) may be levied— (i) for the period decided by the chief executive; or (ii) if the chief executive does not decide a period—quarterly; and (b) may be levied by giving notice to the holder of the authorisation under which water is taken; and (c) becomes payable on the day the notice is given; and (d) must be paid within 30 business days after the notice is given. (2) If any part of the charge remains unpaid after 30 business days, the late fee prescribed under section 1013A(2) of the Act is the interest, accruing daily at the rate that is 2% above the Suncorp Metway Ltd business banking variable lending base rate, on the part of the charge. (3) The interest starts accruing on the day immediately after the charge became payable and ends on the day the charge is paid in full, both days inclusive. (4) A notice given under subsection (1)(b) must state— (a) the amount of the charge and the period for which it is levied; and (b) the time and place for payment; and (c) that a late fee is payable on any part of the charge remaining unpaid after 30 business days; and (d) how the late fee is calculated under subsections (2) and (3). Page 102 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 15 Miscellaneous provisions [s 135] Division 3 Royalty for State quarry material

  320. 135 Royalty for State quarry material—Act, s 240 (1) For section 240(1) of the Act, the rate at which royalty is payable under the Act is stated in schedule 15. (2) However, no royalty is payable for State quarry material removed under an allocation notice if the chief executive of a department issues a certificate stating that the material was supplied to the department for the department’s use. Division 4 Drainage rates

  321. 136 Drainage rates—Act, s 993 For section 993(1) of the Act, the drainage rates payable for a water year by an owner of land in a drainage area mentioned in schedule 16, column 1, are stated opposite the area in column 2. Part 15 Miscellaneous provisions Division 1 Water management areas

  322. 137 Water management areas (1) The chief executive may declare an area of the State to be a water management area for water not managed under an interim resource operations licence or a resource operations licence. (2) The declaration may be for— (a) fixing water charges payable to the chief executive; or (b) allowing seasonal water assignments and making seasonal water assignment rules; or Current as at 27 June 2025 Page 103 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 15 Miscellaneous provisions [s 138] (c) prescribing water sharing rules; or (d) implementing measurement requirements under part 11. (3) The chief executive may name the area, for example, the ‘Barker–Barambah Creeks water management area’. (4) An area that is declared to be an underground water area under section 139 is also a water management area. (5) A water plan or a water management protocol may declare a part of the plan area to be a water management area. (6) The chief executive must display a map or plan showing the boundaries of a water management area in the department’s regional office in or near the area. (7) The chief executive must— (a) give notice of the declaration to the persons authorised to take water from the area; or (b) publish a notice about the declaration. (8) Subsection (7) does not apply to a water management area declared under a water plan or a water management protocol.

  323. 138 Changing boundaries of water management areas (1) The chief executive may change the boundaries of a water management area by— (a) including land in the area; or (b) removing land from the area. (2) If the chief executive changes the boundaries of a water management area, the chief executive must— (a) give notice of the change to the persons authorised to take water from land included in, or removed from, the area; or (b) publish a notice about the change. (3) However, subsection (2) does not apply to a change made under a water plan or water management protocol. Page 104 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 15 Miscellaneous provisions [s 139] Division 2 Underground water areas

  324. 139 Declared underground water areas—Act, s 1046 (1) For section 1046(1) of the Act, each area mentioned in schedule 17, part 1, column 1 is declared to be an underground water area and is given the name mentioned for the area. (2) The exact location of the boundary for each underground water area is held in digital electronic form by the department, and may be inspected at any of the department’s service centres. Editor's note— The location of a boundary may also be inspected through the interactive online tool called the Queensland Globe. (3) A water entitlement is required to take or interfere with underground water in the Fraser Island underground water area, other than for a purpose mentioned in schedule 17, part 1, column 2 for the area. (4) A water entitlement, water permit or seasonal water assignment notice is required to take or interfere with underground water in another underground water area, other than for a purpose mentioned in schedule 17, part 1, column 2 for the area. (5) Works for taking underground water through a subartesian bore in an underground water area mentioned in schedule 17, part 1 are assessable development if they are— (a) for the Black River underground water area—not an exempt bore; and (b) for another underground water area— (i) not an exempt bore; or (ii) not works for a prescribed activity. Current as at 27 June 2025 Page 105 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 15 Miscellaneous provisions [s 140] Note— For the regulation of works for the taking or interfering with underground water through an artesian bore, other than through a monitoring bore, see the Planning Regulation 2017. (6) To remove any doubt, it is declared that the taking or interfering with water for a prescribed activity in the Black River underground water area is limited to zero. Note— See section 101 of the Act. (7) However, subsection (4), and the limitation mentioned in subsection (6), do not apply to the taking or interfering with water if the taking or interference— (a) is necessary for a prescribed activity in the Black River underground water area; and (b) is carried out using a bore lawfully constructed— (i) in the Black River underground water area; and (ii) before 6 December 2016.

  325. 140 Critical distances for non-stock or domestic water bores in particular underground water areas (1) This section applies to a non-stock or domestic water bore in an underground water area mentioned in schedule 17, part 2, column 1. (2) The critical distance of the bore from a boundary of a parcel of land is the distance stated opposite the area in schedule 17, part 2, column 2. (3) The critical distance of the bore from a watercourse is the distance stated opposite the area in schedule 17, part 2, column 3. (4) The critical distance of the bore from another water bore is the distance stated opposite the area in schedule 17, part 2, column 4. Page 106 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 15 Miscellaneous provisions [s 141] Division 3 Former water areas

  326. 141 Continuing former water areas—Act, s 1083 (1) This section applies only to former water areas— (a) taken, under the Act, section 1083(2), to be authority areas established under the Act; and (b) for which no water board was in existence immediately before the commencement of the Act, section 1083. (2) A former water area mentioned in schedule 18, column 1, is shown on the plan mentioned opposite the area in column 2. (3) The chief executive’s appointment to perform the functions of a water authority for the areas continues. Division 4 Other matters

  327. 141A Prescribed ADR institutes—Act, s 426 For section 426(11) of the Act, definition prescribed ADR institute, the Resolution Institute ABN 69 008 651 232 is prescribed.

  328. 141B Arbitration election notice—Act, s 433A (1) This section prescribes, for section 433A(3)(f) of the Act, other information for an arbitration election notice. (2) The other information is— (a) that the party who receives the notice must accept or refuse the request for arbitration within the period mentioned in section 433A(4) of the Act; and (b) either party may be represented by a lawyer at the arbitration. Current as at 27 June 2025 Page 107 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 15 Miscellaneous provisions [s 141C]

  329. 141C Prescribed arbitration institutes—Act, s 433A For section 433A(8) of the Act, definition prescribed arbitration institute, the following entities are prescribed— (a) the Queensland Law Society ABN 33 423 389 441; (b) the Resolution Institute ABN 69 008 651 232.

  330. 142 Accounting period—Act, sch 4, definition water year The accounting period for a water management protocol, resource operations licence, operations manual, interim resource operations licence or water licence for schedule 4, definition water year, paragraph (a) of the Act is— (a) if the accounting period for the protocol, licence or manual is stated in the relevant water plan, water management protocol, resource operations licence, interim resource operations licence, operations manual, water sharing rules or seasonal water assignment rules (the relevant plan, protocol, manual, licence or rules)—as stated in the relevant plan, protocol, manual, licence or rules; or (b) if the accounting period for the protocol, licence or manual is not stated in the relevant plan, protocol, manual, licence or rules—as otherwise prescribed under this regulation; or (c) if the accounting period for the protocol, licence or manual is not stated in the relevant plan, protocol, manual, licence or rules and not otherwise prescribed under this regulation—as stated in the licence; or (d) if the accounting period for the protocol, licence or manual is not stated in the relevant plan, protocol, manual, licence or rules, not otherwise prescribed under this regulation or stated in the licence—from 1 July to

  331. 30 June in the following year. Page 108 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 143] Part 16 Repeal and transitional provisions Division 1 Repeal provision

  332. 143 Repeal The following regulations are repealed— • Water Regulation 2002, SL No. 70 • Water and Other Legislation Amendment Regulation (No. 1) 2014, SL No. 334 • Water and Other Legislation Amendment Regulation (No. 2) 2015, SL No. 123. Division 2 Transitional provisions for SL No. 216 of 2016

  333. 144 Declared water management areas (1) This section applies to an area that was declared to be a water management area under section 56(1) of the repealed regulation. (2) The area continues as a water management area.

  334. 145 References to repealed regulation A reference in an Act or other document to the repealed regulation may, if the context permits, be taken to be a reference to this regulation. Current as at 27 June 2025 Page 109 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 146] Division 3 Transitional provisions for Mineral Resources and Other Legislation Amendment Regulation 2019

  335. 146 References to transfers, amendments or amalgamations (1) This section applies in relation to an application to relocate a water licence under section 126 of the Act made on or after the commencement. (2) A reference in a water plan, water management protocol or water sharing rules to the transfer, amendment or amalgamation of the licence may, if the context permits, be taken to be a reference to the relocation of the licence.

  336. 147 Non-compliance with revalidation of meter before commencement (1) This section applies in relation to a meter attached to works through which the holder of a metered entitlement takes water if, before the commencement— (a) the meter stopped being an approved meter under section 111(2); and (b) the holder had not complied with section 112. (2) Schedule 11, as in force immediately before the commencement, continues to apply to the metered entitlement until section 112(3) is complied with in relation to the meter. Page 110 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 148] Division 4 Transitional provisions for Water Amendment Regulation 2022

  337. 148 Application of new s 59 to existing applications for seasonal water assignments for particular water allocations (1) This section applies to an application under section 58(1) or (2) that was made, but not decided, before the commencement. (2) The application must be decided under new section 59. (3) In this section— new section 59 means section 59 as in force from the commencement.

  338. 149 Continued application of former ss 99 and 101A to particular operational work (1) This section applies to operational work that was started, but not completed, before the commencement. (2) Former sections 99 and 101A continue to apply in relation to the operational work as if the Water Amendment Regulation 2022 had not been enacted. (3) In this section— former, for a provision of this regulation, means the provision as in force immediately before the commencement. Current as at 27 June 2025 Page 111 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 150] Division 5 Transitional provisions for Water and Other Legislation Amendment Regulation 2024 Subdivision 1 Preliminary

  339. 150 Definitions for division In this division— amendment regulation means the Water and Other Legislation Amendment Regulation 2024. approved meter means an approved meter under former section 106 for which a validation certificate has been given as mentioned in former section 106(1)(c). authorised meter validator means— (a) a person who is accredited by Irrigation Australia Limited ACN 002 567 633 as a certified meter validator; or (b) a person who is an authorised meter validator for this division under section 170. duly qualified person see section 104. former, for a provision of this regulation, means the provision as in force from time to time before the commencement. measurement standards see section 103. metered entitlement means an authority under the Act to take or interfere with water that was a metered entitlement under the Act as in force immediately before the commencement. relevant authorisation means an authorisation that, on the commencement is a relevant authorisation mentioned in section 107. validation inspection, for a meter, means a validation inspection under former section 112. Page 112 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 151] Subdivision 2 General arrangements

  340. 151 Approved meters (1) This section applies if, immediately before the commencement, an approved meter was attached to works through which water is taken, on the commencement, under a relevant authorisation. (2) The approved meter is taken to be— (a) a measurement device attached to the works as required under section 108(2)(a); and (b) certified by a duly qualified person as complying with the measurement standards. (3) The holder of the relevant authorisation must ensure the meter is certified by a duly qualified person as complying with the measurement standards on or before the revalidation date for the meter. (4) For applying section 110(2) to the meter, the first 5-year period mentioned in the section starts on the day the meter is certified as mentioned in subsection (3). (5) If the holder of the relevant authorisation does not comply with subsection (3), subsection (2) stops applying to the meter on the revalidation date for the meter. (6) This section is subject to sections 154, 155, 156 and 160 to 162. Note— Generally speaking, sections 154 and 155 deal with meters that are faulty and sections 156 and 160 to 162 deal with meters that should be, are or have been the subject of validation inspections. (7) In this section— revalidation date, for a meter attached to works through which water is taken under a relevant authorisation, means— (a) if, immediately before the commencement, the authorisation was a metered entitlement—the later of the following— Current as at 27 June 2025 Page 113 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 152] (i) the day that is 5 years after the last validation certificate was given for the meter under former section 112(2)(b); (ii) the revalidation date for the metered entitlement under former section 111; or (b) if paragraph (a) does not apply—the day that is 5 years after the last validation certificate was given for the meter under former section 112(2)(b).

  341. 152 Approved telemetry devices (1) This section applies if an approved telemetry device is attached to works through which water is taken under a relevant authorisation, whether before or after the commencement. (2) The approved telemetry device is taken to be— (a) a measurement device attached to the works as required under section 108(2)(a); and (b) certified by a duly qualified person as complying with the measurement standards. (3) In this section— approved telemetry device means a telemetry device installed by Goanna Ag or SunWater under the Queensland Murray-Darling Basin Telemetry Project. Goanna Ag means Discovery Ag Pty Ltd, ACN 117 305 567, trading as Goanna Ag. Queensland Murray-Darling Basin Telemetry Project means the project implemented by the department to provide a subsidy for the installation of telemetry devices in particular locations in the Murray-Darling Basin. Note— Details of the Queensland Murray-Darling Basin Telemetry Project can be found on the department’s website. Page 114 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 153]

  342. 153 Application of measurement requirements requiring measurement device from stated day (1) This section applies in relation to a relevant authorisation if schedule 11 states that a particular measurement device must be attached to works through which water is taken under the authorisation from a stated day (the compliance start day). (2) The measurement requirements under part 11 apply to the holder of the relevant authorisation in relation to the measurement device from the earlier of the following— (a) the day after the commencement on which the holder first complies with section 108(2) for the device; (b) the compliance start day for the device. Subdivision 3 Arrangements relating to faulty meters

  343. 154 Faulty meters (1) This section applies in relation to an approved meter to which section 151(2) applies that is attached to works through which water is taken under a relevant authorisation if, immediately before the commencement, former section 110A(4) applied to the works. (2) Section 151(2) applies to the meter only— (a) if the holder of the relevant authorisation gives the chief executive the information required under former section 110A(4); and (b) until the end of the expiry date applying to the meter under former section 110A. (3) The holder of the relevant authorisation may arrange for a validation inspection to be carried out on the meter before the expiry date. (4) If the holder arranges a validation inspection under subsection (3), former section 112 continues to apply in Current as at 27 June 2025 Page 115 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 155] relation to the validation inspection as if the amendment regulation had not been made. Note— See subdivision 5 in relation to validation inspections finalised after the commencement.

  344. 155 Requirement if holder of relevant authorisation aware of faulty meter (1) This section applies in relation to an approved meter to which section 151(2) applies that is attached to works through which water is taken under a relevant authorisation if, immediately before the commencement— (a) the holder of the authorisation was required to give, but had not given, the chief executive notice under former section 110A(3) stating the meter is a faulty meter; and (b) the period within which the notice under former section 110A(3) was required to be given had not ended. (2) The meter is taken to be faulty for the purposes of section 109. (3) The holder of the relevant authorisation must comply with section 117 in relation to the meter and, for that purpose— (a) the holder is taken to have become aware of the fault on the day this section commences; and (b) the period within which the holder must comply with section 117(1)(a) ends on the later of the following— (i) 1 business day after the day this section commences; (ii) the day on or before which the holder was required to give the notice under former section 110A(3); and (c) the period within which the holder must comply with section 117(1)(b) is 30 business days after the day this section commences. Page 116 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 156] Subdivision 4 Arrangements for validation inspections not started or finalised

  345. 156 Starting validation inspection on approved meter in particular circumstances (1) This section applies in relation to a relevant authorisation if, immediately before the commencement— (a) a validation inspection was required to be carried out on a meter attached to works through which water is taken under the authorisation because— (i) the revalidation period for the authorisation under former section 111 had started in relation to the meter; or (ii) the chief executive had given the holder of the authorisation a notice under former section 112A requiring the holder to arrange another validation inspection on the meter; and (b) the validation inspection had not been started on the meter; and (c) the validation date for the validation inspection had not passed. (2) The holder of the relevant authorisation may arrange for a validation inspection to be carried out on the meter before the validation date. (3) If the holder of the relevant authorisation arranges a validation inspection under subsection (2), former section 112 continues to apply in relation to the validation inspection as if the amendment regulation had not been made. Note— See subdivision 5 in relation to validation inspections finalised after the commencement. (4) If the holder of the relevant authorisation does not arrange a validation inspection under subsection (2), section 151(2) stops applying to the meter on the validation date. Current as at 27 June 2025 Page 117 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 157] (5) In this section— validation date, for a validation inspection mentioned in subsection (1)(a), means— (a) if subsection (1)(a)(i) applies—the revalidation date for the relevant authorisation applying under former section 111; or (b) if subsection (1)(a)(ii) applies—the expiry date applying under former section 112A.

  346. 157 Starting validation inspection if meter notice given before commencement (1) This section applies in relation to a relevant authorisation if, immediately before the commencement— (a) the relevant authorisation was not a metered entitlement; and (b) the works through which water is taken under the relevant authorisation did not have an approved meter attached; and (c) the chief executive had given the holder of the authorisation a meter notice for the authorisation; and (d) the validation date for the meter notice had not passed. (2) The holder of the relevant authorisation may arrange for a validation inspection to be carried out on the meter before the validation date. (3) If the holder of the relevant authorisation arranges a validation inspection under subsection (2), former section 112 continues to apply in relation to the validation inspection as if the amendment regulation had not been made. Notes— See subdivision 5 in relation to validation inspections finalised after the commencement. (4) If the holder of the relevant authorisation does not arrange a validation inspection under subsection (2), part 11 applies in relation to the authorisation as provided under section 153 Page 118 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 158] disregarding the meter notice and the validation date for the meter notice. (5) In this section— meter notice, in relation to a relevant authorisation, means a notice given by the chief executive under former section 108 requiring an approved meter to be attached to works through which water is taken under the authorisation. validation date, for a meter notice, means the date stated in the meter notice as the validation date or, if applicable, a later date stated in a notice given by the chief executive under former section 108(5) in relation to the meter notice.

  347. 158 Finalising validation inspection started before commencement (1) This section applies if, immediately before the commencement, an authorised meter validator— (a) had started or completed a validation inspection on a meter attached to works through which water is taken under a relevant authorisation; but (b) had not given a notice or validation certificate under former section 112(2) in relation to the inspection. (2) Former section 112 continues to apply in relation to the validation inspection as if the amendment regulation had not been made. Note— See subdivision 5 in relation to the effect of a notice or validation certificate under former section 112(2) given after the commencement.

  348. 159 Further validation inspection may be started (1) This section applies if— (a) a validation inspection for a meter attached to works through which water is taken under a relevant authorisation was carried out before the commencement and the following applies in relation to the inspection— Current as at 27 June 2025 Page 119 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 160] (i) the authorised meter validator gave a notice for the meter under former section 112(2)(a)(ii) less than 30 days before the day of the commencement; (ii) immediately before the commencement, the meter was an approved meter; or (b) section 154, 156, 157 or 158 applies in relation to a meter attached to works through which water is taken under a relevant authorisation and an authorised meter validator gives a notice for the meter under former section 112(2)(a)(ii), as applying under section 154, 156, 157 or 158. (2) The holder of the relevant authorisation may, within 30 days after the notice under former section 112(2)(a)(ii) was or is given, arrange— (a) the meter to be modified; and (b) a further validation inspection on the modified meter to be carried out by an authorised meter validator under former section 112. (3) If the holder of the relevant authorisation arranges a further validation inspection on a meter under subsection (2), former section 112 continues to apply in relation to the further validation inspection as if the amendment regulation had not been made. (4) However, the authorised meter validator may only decide whether the meter, as modified, complies or does not comply with the non-urban metering standard, and may not give a notice under former section 112(2)(a)(ii) in relation to the meter. (5) In this section— non-urban metering standard see former section 105.

  349. 160 Status of particular meters if section 159 applies (1) This section applies in relation to a meter to which a relevant provision applies that is attached to works through which Page 120 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 161] water is taken under a relevant authorisation if section 159 applies in relation to the meter. (2) If the holder of the relevant authorisation does not arrange a validation inspection under section 159(2), the relevant provision stops applying to the meter on the day the period mentioned in section 159(2) ends. (3) If the holder of the relevant authorisation arranges a validation inspection under section 159(2), until the authorised meter validator gives a notice or certificate under former section 112(2), as applying under section 159, in relation to the inspection— (a) the relevant provision continues to apply to the meter; and (b) the meter is taken to be faulty for the purposes of section 109. (4) In this section— relevant provision means section 151(2) or 163(2). Subdivision 5 Outcome of validation inspections

  350. 161 Effect of notice of noncompliance on approved meters (1) This section applies in relation to an approved meter to which section 151(2) applies if— (a) a validation inspection on the meter is carried out or finalised under section 154, 156, 158 or 159; and (b) an authorised meter validator gives a notice under former section 112(2)(a)(iii), as applying under section 154, 156, 158 or 159, for the meter. (2) Section 151(2) stops applying to the meter on the day the notice is given. Current as at 27 June 2025 Page 121 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 162]

  351. 162 Effect of validation certificate on approved meters (1) This section applies in relation to an approved meter to which section 151(2) applies if— (a) a validation inspection on the meter is carried out or finalised under section 154, 156, 158 or 159; and (b) the authorised meter validator gives a validation certificate under former section 112(2)(b), as applying under section 154, 156, 158 or 159, for the meter. (2) Section 151(2) continues to apply to the meter except that the revalidation date for the meter for the purposes of section 151 is the day that is 5 years after the validation certificate is given.

  352. 163 Effect of validation certificate on other meters (1) This section applies in relation to a meter that is not an approved meter to which section 151(2) applies if— (a) the meter is attached to works through which water is taken under a relevant authorisation; and (b) a validation inspection on the meter is carried out or finalised under section 157, 158 or 159; and (c) the authorised meter validator gives a validation certificate under former section 112(2)(b), as applying under section 157, 158 or 159, for the meter. (2) The meter is taken to be— (a) a measurement device attached to the works as required under section 108(2)(a); and (b) certified by a duly qualified person as complying with the measurement standards. (3) The holder of the relevant authorisation must ensure the meter is certified by a duly qualified person as complying with the measurement standards within 5 years after the validation certificate is given. Page 122 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 164] (4) For applying section 110(2) to the meter, the first 5-year period mentioned in the section starts on the day the meter is certified as mentioned in subsection (3). (5) If the holder of the relevant authorisation does not comply with subsection (3), subsection (2) stops applying to the meter 5 years after the day the validation certificate is given. Subdivision 6 Chief executive powers

  353. 164 Chief executive may require new certification (1) This section applies if the chief executive— (a) is given a copy of a validation certificate for a meter attached to works through which water is taken under a relevant authorisation under former section 112 as applying under a provision of this division; and (b) is satisfied— (i) the information stated in the certificate is inaccurate, incomplete or mistaken; or (ii) the person who gave the certificate was not an authorised meter validator when the certificate was given; or (iii) the person who gave the certificate was the holder of the relevant authorisation. (2) The chief executive may give the holder of the relevant authorisation a notice under section 121C(2) for the meter. (3) If a relevant provision applies to the meter when the notice under section 121C(2) is given and the holder of the relevant authorisation engages a duly qualified person to give the certification required by the notice— (a) the relevant provision continues to apply to the meter— (i) while the duly qualified person is performing functions for the purpose of giving the certification; and Current as at 27 June 2025 Page 123 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 165] (ii) if the duly qualified person gives the chief executive a notice under section 121B(2)(b)(i)(B); and (b) the relevant provision stops applying to the meter if the duly qualified person gives the chief executive a notice under section 121B(2)(b)(i)(A). (4) If a relevant provision applies to the meter when the notice under section 121C(2) is given and the holder of the relevant authorisation does not comply with the notice, the relevant provision stops applying to the meter when the period within which the notice is required to be complied with ends. (5) In this section— relevant provision means section 151(2) or 163(2).

  354. 165 Meter reading required by chief executive under former section 113 not yet complied with (1) This section applies in relation to a notice given to a person under former section 113 if, immediately before the commencement— (a) the person had not complied with the notice; and (b) the time for complying with the notice had not passed. (2) Former section 113 continues to apply in relation to the notice as if the amendment regulation had not been made. Subdivision 7 Charges

  355. 166 Meter operating charge (1) This section applies in relation to a meter— (a) for which a meter operating charge was payable under former section 115 immediately before the commencement; and (b) that— Page 124 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 167] (i) is attached to works through which water is taken under a relevant authorisation; and (ii) is the property of the State. (2) Former section 115 continues to apply in relation to the meter as if the amendment regulation had not been made. (3) For subsection (2), the meter operating charge is payable by the holder of the relevant authorisation.

  356. 167 Meter use charge (1) This section applies in relation to a meter— (a) for which a meter use charge was payable under former section 116 immediately before the commencement; and (b) that— (i) is attached to works through which water is taken under a relevant authorisation; and (ii) is the property of the State, or was the property of the State before ownership was transferred to the holder of the relevant authorisation. (2) Former section 116 continues to apply in relation to the meter as if the amendment regulation had not been made. (3) For subsection (2), the meter use charge is payable by the holder of the relevant authorisation.

  357. 168 Metering exit charge (1) This section applies if the holder of a relevant authorisation gives the chief executive notice that the holder has decided to stop using a meter to which section 167 applies. (2) The chief executive must give the holder of the relevant authorisation notice of the charge (the metering exit charge) payable. Current as at 27 June 2025 Page 125 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 169] (3) Former section 117(3) and (4) apply in relation to the metering exit charge, as if the notice was given under that section and the amendment regulation had not been made.

  358. 169 Unpaid charges (1) This section applies in relation to a charge that was payable, but was not paid, under former section 115, 116 or 117 before the commencement. (2) The charge continues to be payable and, if not paid, may be recovered by the State as a debt. Subdivision 8 Miscellaneous

  359. 170 Continued appointment of authorised meter validators A person who, immediately before the commencement, was appointed as an authorised meter validator under former section 109 continues as an authorised meter validator for this division. Division 6 Transitional provision for Water Amendment Regulation 2025

  360. 171 Application of new s 64 to notice of applications for water allocation dealing not published before commencement (1) This section applies, if— (a) before the commencement, a person made an application for a water allocation dealing under section 63; and (b) immediately before the commencement— (i) the water allocation dealing rules required the applicant to publish a notice under former section 64; and Page 126 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Part 16 Repeal and transitional provisions [s 171] (ii) the applicant had not published that notice. (2) From the commencement— (a) new section 64 applies in relation to the application; and (b) former section 64 does not apply in relation to the application. (3) In this section— former section 64 means section 64 as in force immediately before the commencement. new section 64 means section 64 as in force from the commencement. Current as at 27 June 2025 Page 127 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 1 Schedule 1 Valley reaches sections 6 to 12 Part 1 Overview of valley reaches Diagram A—Overview of valley reaches Part 2 Upper valley reach Explanation of upper valley reach and associated watercourse The upper valley reach of a valley drained by a watercourse is typically located in the most elevated parts of the watercourse catchment, often near the catchment’s watershed. The valley floor is typically quite narrow, characterised by gorges and in some Page 128 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 1 places is only as wide as the watercourse itself. The valley floor is typically quite steep, characterised by waterfalls and cascades. The general direction and location of the reach is dictated by the valley margins which appear as significant geomorphic features. The watercourse is typically narrow and deep with a V-shaped profile carved into the bedrock. The location of the watercourse within the narrow valley floor is generally dictated by the valley margins. The flow in the watercourse has high velocity and high energy, resulting in high erosive power. High flow events are confined within the watercourse by the adjoining valley margins. Past flow levels are often evidenced by scour marks on the valley margin or the deposition of lighter material, for example sands and twigs, carried by the flow. The bed and banks of the watercourse typically consist of bedrock and very coarse material, including boulders, cobbles and gravel. The movement and deposition of material happens primarily in periods of high flow. Flow tends to respond directly to rainfall events and during dry periods there is little or no base flow. Vegetation within or along the watercourse is often sparse or immature due to the regular scouring caused by high flow energy or by the absence of deep soil profiles. Where the watercourse is wider, it could have a narrow bench adjacent to one bank or the other. These benches are typically made of finer materials, commonly cobbles and gravel. These benches tend to be short in length and disconnected, and alternate from one side of the watercourse to the other as the flow rebounds from one valley margin to the other. These benches are regularly reshaped by flow events. Current as at 27 June 2025 Page 129 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 1 Diagram B—Cross-sectional view of a typical upper valley reach Diagram C—Cross-sectional view of a typical watercourse in an upper valley reach Part 3 Middle valley reach Explanation of middle valley reach and associated watercourse The middle valley reach of a valley drained by a watercourse is typically located in the watercourse catchment’s pediment or foothills. The middle valley reach is at a higher elevation than the Page 130 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 1 lower valley reach but is not as high as the upper valley reach. The valley floor is typically of moderate width, and is characterised by narrow floodplains between valley margins of fringing hills, terraces and low ridges. The valley floor has a moderate grade, characterised by a meandering watercourse and occasional cascades. The valley floor is typically comprised of ancient sediments deposited by the watercourse in earlier geological periods, and can be interrupted by occasional bedrock ridges or bars that are exposed in the watercourse. The watercourse carries flow from several tributaries and so is typically deeper and wider than in the upper valley reach. The location of the watercourse within the valley floor is generally dictated by its meander pattern and is occasionally bounded by the valley margin. The flow in the watercourse has less energy and is not as fast as in the upper valley reach. However, it has enough energy to transport sediment eroded in the upper valley reach down to the lower valley reach. Much of the sediment being transported is temporarily stored in the watercourse (typically as in-stream benches and islands) or on adjacent floodplains before being further eroded and transported downstream in subsequent high flow events. A number of benches are typical in the watercourse, created by the mixture of flow size and frequency. The lower, narrower channel of the watercourse is shaped by the more frequent, smaller flows and the wider, deeper channel of the watercourse is shaped by less frequent large flows. High flow events commonly erupt from the watercourse onto the adjacent floodplain. The bed and banks of the watercourse typically consist of medium-sized material, such as cobbles, gravel and sand. Subject always to long-term weather cycles, almost perennial base flows occur because of the slow drainage of upper sections of the middle valley reach and underground water inflows from alluvial floodplain aquifers along the watercourse. Vegetation within or along the watercourse is well established because of the reliable base flows and stable channel profile. Current as at 27 June 2025 Page 131 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 1 Diagram D—Cross-sectional view of a typical middle valley reach Diagram E—Cross-sectional view of a typical watercourse in a middle valley reach Part 4 Lower valley reach Explanation of lower valley reach and associated watercourse The lower valley reach of a valley drained by a watercourse is typically located in the watercourse catchment’s lowest elevations, generally immediately upstream of where the watercourse becomes tidal or where it flows into a natural terminal lake. The valley floor is quite broad, characterised by extensive floodplains between distant valley margins of fringing hills and low ridges. The valley floor has a low gradient, characterised by a strongly meandering watercourse with oxbows and occasional anabranches. Page 132 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 1 The valley floor is typically comprised of ancient sediments deposited by the watercourse in earlier geological periods. The watercourse gradient is quite low, resulting in slow moving flow. However, the watercourse is now carrying water from all upstream reaches and so dissipates this kinetic energy by meandering across the valley floor, eroding and depositing sediment along the way. This results in a comparatively wide, shallow channel, often with large sediment accumulations such as in-stream benches and islands. Sediment that makes up the channel of the watercourse and adjoining floodplains tends to be fine, commonly gravel, sand and silt, with low resistance to erosion. Large flows result in floods that spread across the floodplains, depositing fine sediment. Perennial base flows occur because of the slow drainage of upper sections of the lower valley reach and underground water inflows from alluvial floodplain aquifers along the watercourse. Vegetation within or along the watercourse is well established due to the reliable base flows and stable channel profile. Diagram F—Cross-sectional view of a typical lower valley reach Current as at 27 June 2025 Page 133 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 1 Diagram G—Cross-sectional view of a typical watercourse in a lower valley reach Diagram H—Cross-sectional view of a typical lower valley reach with multiple watercourses Page 134 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016

  361. Schedule 1 Diagram I—Cross-sectional view of typical watercourses in a lower valley reach with multiple watercourses Current as at 27 June 2025 Page 135 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 2

  362. Schedule 2 Particular unallocated water reserved section 14 Location of Type of water Purpose for Volume of water unallocated reserved which water is reserved water reserved North Stradbroke water in a planning for the 30,595ML Island watercourse, lake sustainable (Minjerribah) or spring, or management, use underground and allocation of water water for the economic or social benefit of the Quandamooka people North Stradbroke water in a planning for the 30,595ML Island watercourse, lake sustainable (Minjerribah) or spring, or management, use underground and allocation of water water to support the water-related cultural, environmental and spiritual values of the Quandamooka people Page 136 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 3 Schedule 3 Prescribed activities, Act, section 101(1)(a) section 25 1 washing, for processing or packing, produce from a single farming enterprise 2 operating a dairy 3 washing down equipment, plant or vehicles— (a) in accordance with best practice to prevent the spread of weed seeds; or (b) for safety purposes; or (c) used for private purposes 4 washing down a place used to house domestic animals kept as pets Examples of places used to house domestic animals kept as pets— • a doghouse in the backyard of a residential property • enclosures at a shelter for animals operated by a charitable organisation, for example, the RSPCA 5 filling spray units used to apply herbicides or pesticides 6 using stock dips and spray races for controlling parasites on livestock 7 supplying water for temporary camps, or living quarters, for staff, for example, for operating toilets, showers, kitchens or laundries— (a) on or for a farm; or (b) that is incidental activity for an authority to prospect administered under the Petroleum and Gas Act; or (c) as part of exercising entitlements under an exploration permit issued under the Mineral Resources Act 8 supplying non-potable water to premises used solely for education or training purposes— Current as at 27 June 2025 Page 137 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 3 (a) including for use in a building; but Examples of a building in which non-potable water may be used— toilet block, classroom, dormitory, residence, workshop or laboratory (b) not including irrigating land with an area of more than 0.5ha 9 managing a public recreation area— (a) including operating public toilets and showers; but (b) not including irrigating land with an area of more than 0.5ha 10 constructing works, infrastructure or plant— (a) on or for a farm; or Example— using water to mix cement to be used to construct a shed on a farm (b) that is an incidental activity for an authority to prospect, petroleum lease, pipeline licence or petroleum facility licence granted under the Petroleum and Gas Act; or (c) that are temporary and reasonably necessary for, or incidental to, carrying on mining under a mining lease granted under the Mineral Resources Act Examples of temporary infrastructure or plant— • mobile or temporary camps • temporary power lines 11 constructing, but not maintaining, roads within— (a) a farm; or (b) the area of a mineral development licence, or mining lease, granted under the Mineral Resources Act; or (c) the area of an authority to prospect, petroleum lease, pipeline licence or petroleum facility licence granted under the Petroleum and Gas Act Page 138 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 3 12 constructing or maintaining infrastructure approved under an interim resource operations licence, resource operations licence or distribution operations licence 13 the following activities in relation to pumps, wells or bores— (a) constructing or drilling (including site establishment and rehabilitation and drill bit lubrication); (b) proving supply; (c) testing water quality; (d) flushing out 14 rehabilitating riparian land Current as at 27 June 2025 Page 139 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 4 Schedule 4 Prescribed entities section 26 1 Hampton Irrigators Pty Ltd ACN 064 888 633 2 Hinchley Bore Pty Ltd ACN 105 498 628 3 Nuhrunda Park Co-operative Society Ltd ABN 28 992 741 260 4 Minmore Road Water Group Ltd ACN 108 178 936 5 Westaroy Progress Association Inc IA 15321 6 Walker Pastoral and Agency Company Pty Ltd ACN 001 099 261 7 Body Corporate for Coolibah Community Titles Scheme CMS 28706 8 Body Corporate for Acacias Community Titles Scheme CMS 30332 9 Australian Stockman’s Hall of Fame and Outback Heritage Centre ACN 010 007 093 10 Etgold Pty Ltd ACN 010 705 432 11 Stockyard Point Services Co-op Ltd QC 0202 12 Body Corporate for Williams’ Retreat Community Titles Scheme CMS 23581 13 Body Corporate for Crystal Waters Permaculture Village Community Titles Scheme CMS 20926 14 Body Corporate for Sandalwoods Community Titles Scheme CMS 23452 15 Body Corporate for Burdekin Riverside Community Titles Scheme CMS 18617 16 Sealink Fraser Island Pty Ltd ACN 624 478 280 17 Rosedale Water Supply Association Inc ABN 37 265 819 522 Page 140 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 4 18 Aurizon Operations Limited ACN 124 649 967 19 Stanwell Corporation Limited ACN 078 848 674 20 The Conondale Water Supply Co-op Ltd QC 0317 21 Callide Power Management Pty. Limited ACN 082 468 700 22 C S Energy Limited ACN 078 848 745 23 Meridian Energy Australia Pty Limited ACN 143 533 322 24 Troy Peter Sobczak and Kate Louise Sobczak, in their capacity as trustees for the Evergreen Trust under instrument 713266609, as joint holders of licences with licence numbers 61070B and 17990B or a licence that replaces either licence 25 CP Water Pty Ltd ACN 164 388 612 26 Coreen Water Pty Ltd ACN 165 776 036 27 Grevillea Water Pty Ltd ACN 165 645 081 28 Kooingal Water Pty Ltd ACN 165 779 322 29 The parties to the ‘Middle Park Closed Water Agreement’, registered dealing number 715140398 30 Mulgildie Water Pty Ltd ACN 165 779 331 31 Myall Plains Water Co-operative Ltd QC 0316 32 Oaky Creek Water Pty Ltd ACN 165 779 340 33 The parties to the ‘Juandah Bore Water Group Closed Water Authority Agreement’, registered dealing number 715578077 34 Washpool Water Pty Ltd ACN 167 582 514 35 The parties to the ‘Marathon Bore Water Group Agreement’, registered dealing number 715961002 36 The parties to the ‘Palmgrove Bore Water Group Agreement’, registered dealing number 715662828 37 Crowley Vale Water Co-operative Limited QC 0333 38 The parties to the ‘Weengallon Bore Water Group Agreement’, registered dealing number 716094379 39 Adani Infrastructure Pty Ltd ACN 606 764 827 Current as at 27 June 2025 Page 141 Authorised by the Parliamentary Counsel Water Regulation 2016

  363. Schedule 4 40 an eligible person under the Water Plan (Cape York) 2019, section 32(6) 41 CleanCo Queensland Limited ACN 628 008 159 42 Granite Belt Water Limited ACN 631 442 129 43 Carmichael Rail Network Pty Ltd ACN 601 738 685 44 Merlwood Water Pty Ltd ACN 611 379 278 45 Mondure Water Supply Inc. IA56117 46 Quandamooka Yoolooburrabee Aboriginal Corporation RNTBC ABN 30 457 275 826 47 Elanda Point Pty Ltd ACN 679 138 071 48 Tangalooma Island Resort Pty. Ltd. ACN 010 170 902 Page 142 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 5

  364. Schedule 5 Water sharing rules section 27 Column 1 Column 2 Water management area Water sharing rules Bowen groundwater Bowen groundwater management area management area water sharing rules Burdekin groundwater Burdekin groundwater management management area area water sharing rules Current as at 27 June 2025 Page 143 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 6

  365. Schedule 6 Seasonal water assignments section 39 Column 1 Column 2 Column 3 Water management area Type of water licence Seasonal water assignment rules Bowen groundwater water licence to take Bowen groundwater management area underground water management area seasonal water assignment rules Burdekin groundwater water licence to take Burdekin groundwater management area underground water management area seasonal water assignment rules Page 144 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 7 Schedule 7 Rates and pump sizes sections 51 and 54 Column 1 Column 2 Column 3 Pump size (mm) Maximum rate Maximum rate per day (litres/second) or daily volumetric limit (megalitres) 32 6.9 0.6 40 11.6 1 50 25.5 2.2 65 45.1 3.9 80 64.8 5.6 100 84.5 7.3 125 90.3 7.8 150 140 12.1 200 180 15.6 250 250 21.6 300 300 25.9 350 400 34.6 375 430 37.2 400 500 43.2 500 550 47.5 600 1,000 86.4 660 1,390 120 700 1,740 150 Current as at 27 June 2025 Page 145 Authorised by the Parliamentary Counsel Water Regulation 2016

  366. Schedule 7 Column 1 Column 2 Column 3 Pump size (mm) Maximum rate Maximum rate per day (litres/second) or daily volumetric limit (megalitres) 750 2,080 180 780 2,320 200 Page 146 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 8 Schedule 8 Water authorities sections 93, 94 and 94A Part 1 Established water authorities Column 1 Column 2 Water authority Plan Avondale Water Board AP4014 Babinda Swamp Drainage Board AP4045 Bollon South Water Authority AP6513 Bollon West Water Authority AP7351 Bones Knob Water Board AP4016 Eugun Bore Water Authority AP7343 Fernlee Water Authority AP6941 Gladstone Area Water Board — Glamorgan Vale Water Board AP22179 Ingie Water Authority AP7350 Kaywanna Bore Water Board AP13400 Mount Isa Water Board AP7346 Roadvale Water Board AP4038 South Maroochy Drainage Board AP4059 Current as at 27 June 2025 Page 147 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 8 Part 2 Amalgamated water authorities Column 1 Column 2 Water authority Plan Lower Burdekin Water AP22327 Lower Herbert Water Management Authority AP4064 Note— The formation of the Lower Herbert Water Management Authority is confirmed and validated under the Act, section 1282. Orchard Creek and East Euramo Drainage AP22324 Board Part 3 Water authorities dissolved for conversion to alternative institutional structures Column 1 Column 2 Column 3 Dissolved water Plan of Alternative institutional authority dissolved structure authority area Brigooda Water Board AP4018 the institutional structure consisting of all the parties to the Brigooda Water Supply Agreement (dealing number 716109624) Callandoon Water AP4019 Callandoon Water Users Supply Board Limited ACN 636 809 400 Page 148 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016

  367. Schedule 8 Column 1 Column 2 Column 3 Dissolved water Plan of Alternative institutional authority dissolved structure authority area East Deeral Drainage AP4047 the institutional structure Board consisting of all the parties to the East Deeral Drainage Scheme Agreement (dealing numbers 719616504 and 719616508) Matthews Road AP4052 the institutional structure Drainage Board consisting of all the parties to the Matthews Road Drainage Scheme Agreement (dealing number 720157247) Merlwood Water Board AP7342 Merlwood Water Pty Ltd ACN 611 379 278 Silkwood Drainage AP4057 Silkwood Draining Group Board (dealing number 723270116) Yambocully Water AP4044 Yambocully Water Pty Ltd Board ACN 641 083 409 Current as at 27 June 2025 Page 149 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Schedule 9 Assessable development or accepted development section 98 Part 1 Works for taking overland flow water Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Baffle Creek Works for stock or domestic Repair or maintenance of Basin) 2010 plan area purposes either of the following Works of a capacity of not works if the repair or more than 20ML maintenance does not alter the design of the works— Works constructed to satisfy the requirements of— (a) existing works mentioned in (a) an environmental section 52(1) of that authority; or plan; (b) a development permit (b) works constructed for carrying out an under a development environmentally permit relevant activity Page 150 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Border Rivers Works for stock or domestic Repair or maintenance of and Moonie) 2019 plan area purposes any of the following works Works of a capacity of not if the repair or maintenance more than 5ML for taking does not alter the design of water under section 99(2) of the works— the Act (a) notified existing overland flow works within the meaning of the Water Plan (Border Rivers and Moonie) 2019; (b) works constructed for the taking of, or interfering with, water under section 97 of the Act; (c) works constructed under a development permit Construction, repair or maintenance of existing works, within the meaning of the Water Plan (Border Rivers and Moonie) 2019, section 38(3), used to take water for prescribed activities mentioned in schedule 3 Current as at 27 June 2025 Page 151 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Burdekin Works for stock or domestic Repair or maintenance of Basin) 2007 plan area purposes either of the following Works of a capacity of not works if the repair or more than 250ML maintenance does not alter the design of the works— Works constructed to satisfy the requirements of— (a) existing works mentioned in (a) an environmental section 80(1) of that authority; or plan; (b) a development permit (b) works constructed for carrying out an under a development environmentally permit relevant activity Coastal Burnett overland Works for stock or domestic Repair or maintenance of flow area under the Water purposes works if the repair or Plan (Burnett Basin) 2014 Works of a capacity of not maintenance does not alter more than 20ML the design of the works— Works constructed to satisfy (a) existing works the requirements of— mentioned in section 91(2)(g) of that (a) an environmental plan; authority; or (b) works constructed (b) a development permit under a development for carrying out an permit environmentally relevant activity Water Plan (Calliope River Works for stock or domestic Repair or maintenance of Basin) 2006 plan area purposes either of the following Works of a capacity of not works if the repair or more than 5ML maintenance does not alter the design of the works— Works constructed to satisfy the requirements of— (a) existing works mentioned in (a) an environmental section 15(1) of that authority; or plan; (b) a development permit (b) works constructed for carrying out an under a development environmentally permit relevant activity Page 152 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Cape York) Works for stock or domestic Repair or maintenance of 2019 plan area purposes any of the following works Works to take overland flow if the repair or maintenance water with a capacity of not does not alter the design of more than 50ML situated in the works— a catchment, other than the (a) existing works Normanby catchment, mentioned in mentioned in schedule 2 of section 28(c) and (d) of that plan that plan; Works constructed to satisfy (b) works constructed for the requirements of— the taking of, or (a) an environmental interfering with, water authority; or under section 97 of the Act; (b) a development permit for carrying out an (c) works constructed environmentally under a development relevant activity permit Works of a capacity of not more than 5ML situated in the Normanby catchment for taking water under section 99(2) of the Act Current as at 27 June 2025 Page 153 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Condamine and Works for stock or domestic Repair or maintenance of Balonne) 2019 plan area purposes any of the following works Works of a capacity of not if the repair or maintenance more than 5ML for taking does not alter the design of water under section 99(2) of the works— the Act (a) notified existing overland flow works within the meaning of the Water Plan (Condamine and Balonne) 2019; (b) works constructed for the taking of, or interfering with, water under section 97 of the Act; (c) works constructed under a development permit Construction, repair or maintenance of existing works, within the meaning of the Water Plan (Condamine and Balonne) 2019, section 36(3), used to take water for prescribed activities mentioned in schedule 3 Page 154 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Cooper Creek) Works for stock or domestic Repair or maintenance of 2011 plan area purposes either of the following Works, for taking water for works if the repair or a purpose other than maintenance does not alter irrigation, of a capacity of the design of the works— not more than 10ML (a) existing works Works constructed to satisfy mentioned in section 37 the requirements of— of that plan; (a) an environmental (b) works constructed authority; or under a development permit (b) a development permit for carrying out an environmentally relevant activity Water Plan (Fitzroy Basin) Works for stock or domestic Repair or maintenance of 2011 plan area purposes either of the following Works downstream of the works if the repair or Fitzroy Barrage of a maintenance does not alter capacity of not more than the design of the works— 5ML (a) existing works Other works of a capacity of mentioned in not more than 50ML section 111 of that plan; Works constructed to satisfy (b) works constructed the requirements of— under a development permit (a) an environmental authority; or (b) a development permit for carrying out an environmentally relevant activity Current as at 27 June 2025 Page 155 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Georgina and Works for stock or domestic Repair or maintenance of Diamantina) 2004 plan area purposes any of the following works Works of a capacity of not if the repair or maintenance more than 5ML for taking does not alter the design of water under section 99(2) of the works— the Act (a) existing works mentioned in section 12 of that plan; (b) works constructed for the taking of, or interfering with, water under section 97 of the Act; (c) works constructed under a development permit Water Plan (Gulf) 2007 plan Works for stock or domestic Repair or maintenance of area purposes either of the following Works of a capacity of not works if the repair or more than 250ML maintenance does not alter the design of the works— Works constructed to satisfy the requirements of— (a) existing works mentioned in section 79 (a) an environmental of that plan; authority; or (b) works constructed (b) a development permit under a development for carrying out an permit environmentally relevant activity Page 156 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Mitchell) 2007 Works for stock or domestic Repair or maintenance of plan area purposes either of the following Works of a capacity of not works if the repair or more than 250ML maintenance does not alter the design of the works— Works constructed to satisfy the requirements of— (a) existing works mentioned in section 55 (a) an environmental of that plan; authority; or (b) works constructed (b) a development permit under a development for carrying out an permit environmentally relevant activity Water Plan (Moreton) 2007 Works for stock or domestic Repair or maintenance of plan area purposes either of the following Works of a capacity of not works if the repair or more than 5ML maintenance does not alter the design of the works— Works constructed to satisfy the requirements of— (a) works mentioned in sections 86 and 87 of (a) an environmental that plan; authority; or (b) works constructed (b) a development permit under a development for carrying out an permit environmentally relevant activity Current as at 27 June 2025 Page 157 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area Works that are Works that are not accepted development assessable if relevant requirements development complied with Water Plan (Warrego, Works for stock or domestic Repair or maintenance of Paroo, Bulloo and Nebine) purposes either of the following 2016 plan area Works constructed to satisfy works if the repair or the requirements of— maintenance does not alter the design of the works— (a) an environmental authority; or (a) existing works mentioned in section 26 (b) a development permit of that plan; for carrying out an environmentally (b) works constructed relevant activity under a development permit Works of a capacity of not more than 5ML for taking Works for prescribed water under section 99(2) of activities mentioned in the Act schedule 3 Water Resource Works for stock or domestic Repair or maintenance of (Whitsunday) Plan 2010 purposes either of the following plan area Works of a capacity of not works if the repair or more than 20ML maintenance does not alter the design of the works— Works constructed to satisfy the requirements of— (a) existing works mentioned in section 68 (a) an environmental of that plan; authority; or (b) works constructed (b) a development permit under a development for carrying out an permit environmentally relevant activity Part 2 Works for taking underground water through a subartesian bore Page 158 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with Atherton underground water An exempt bore management area or the A water bore (the first bore) Cairns Northern Beaches constructed more than 200m underground water from a watercourse and— management area under the Water Plan (Barron) 2023 (a) more than 400m from another water bore; or (b) if the first bore is constructed within 400m of another water bore (the second bore)— (i) the second bore is situated on land owned by the landholder constructing the first bore; or (ii) the owner of the land on which the second bore is situated has given written consent to the construction of the first bore Current as at 27 June 2025 Page 159 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with Underground water in the An exempt bore parts of an underground A water bore that— water unit that are within the underground water (a) is constructed more management area under the than— Water Plan (Border Rivers (i) 200m from a and Moonie) 2019 boundary of a parcel of land; and (ii) 400m from another water bore; and (b) takes water from an aquifer other than the Border Rivers Alluvium (deep) Page 160 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with Groundwater management An exempt bore areas under the Water Plan Prescribed existing (Burnett Basin) 2014 groundwater works as defined under that plan, schedule 12 A water bore for prescribed activities mentioned in

  368. schedule 3 A water bore that is constructed more than— (a) 100m from a boundary of a parcel of land; and (b) 200m from another water bore; and (c) for the Barambah Creek groundwater management area—200m from Barambah Creek between AMTD 101km and AMTD 143km; and (d) for the Central Burnett River groundwater management area—200m from the Burnett River between AMTD 250km and AMTD 295km; and (e) for the Coastal Burnett groundwater management area—200m from the Elliott River Current as at 27 June 2025 Page 161 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with Water Plan (Cape York) An exempt bore 2019 plan area A water bore that is constructed— (a) more than 200m from a watercourse, lake or spring; and (b) more than 200m from a boundary of a parcel of land; and (c) more than 400m from another water bore. A water bore that is constructed more than 200m from a watercourse, lake or spring if— (a) the water bore is located within 200m of a boundary of a parcel of land (the neighbouring land), other than the land on which the bore is being constructed, and the person constructing the bore— (i) is the owner of the neighbouring land; or (ii) has the written consent of the owner of the neighbouring land; or Page 162 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with (b) the water bore (the new water bore) is located within 400m of another water bore and the person constructing the new water bore— (i) is the owner of the land on which the other water bore is situated; or (ii) has the written consent of the owner of the land on which the other water bore is situated. Current as at 27 June 2025 Page 163 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with Underground water in an An exempt bore underground water unit A water bore that is under the Water Plan constructed— (Condamine and Balonne) 2019 (a) more than 200m from a boundary of a parcel of land; and (b) more than 400m from another water bore; and (c) outside of the following underground water sub-areas under the Water Plan (Condamine and Balonne) 2019— (i) Central Condamine Alluvium; (ii) Cunningham Alluvium; (iii) Dalrymple Creek Alluvium; (iv) Oakey Creek Alluvium Groundwater management An exempt bore areas under the Water Plan A water bore that is (Fitzroy Basin) 2011 constructed more than— (a) 200m from a boundary of a parcel of land; and (b) 400m from another water bore groundwater units, other A replacement water bore An exempt bore than the south-eastern that is a subartesian bore groundwater units and groundwater sub-areas, under the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 Page 164 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with south-eastern groundwater Works for stock or domestic An exempt bore units and groundwater purposes sub-areas under the Water Works for a replacement Plan (Great Artesian Basin water bore that is a and Other Regional subartesian bore Aquifers) 2017 Water Plan (Gulf) 2007 plan An exempt bore area Works that are more than— (a) 200m from a boundary of a parcel of land; and (b) 400m from another water bore Cooloola Sandmass An exempt bore subartesian area under the Water Plan (Mary Basin) 2006 plan area Water Plan (Mitchell) 2007 An exempt bore plan area Works that are more than— (a) 200m from a boundary of a parcel of land; and (b) 400m from another water bore Warrill-Bremer Alluvial Works replacing works in An exempt bore groundwater management the watercourse buffer zone area and the watercourse buffer zone under the Water Plan (Moreton) 2007 Current as at 27 June 2025 Page 165 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with Cressbrook Creek Alluvial An exempt bore groundwater management A water bore that is area and Lockyer Valley constructed more than— groundwater management area under the Water Plan (a) 100m from a boundary (Moreton) 2007 of a parcel of land; and (b) 200m from another water bore; and (c) 50m from a watercourse Water Plan (Pioneer Valley) An exempt bore 2002 plan area Repair or maintenance of works if the repair or maintenance does not alter the design of the works A water bore that is constructed more than— (a) 200m from— (i) a boundary of a parcel of land; and (ii) a boundary of subcatchment area 10; and (iii) a relevant watercourse; and (b) 400m from another water bore; and (c) 100m from a watercourse, other than a relevant watercourse Page 166 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with Groundwater in a An exempt bore groundwater unit under the A water bore for prescribed Water Plan (Warrego, activities mentioned in Paroo, Bulloo and Nebine) schedule 3 2016 A water bore that is constructed more than— (a) 200m from a boundary of a parcel of land; and (b) 400m from another water bore Groundwater management A water bore that is within An exempt bore areas under the Water Plan 400m of a watercourse, A water bore that is (Wet Tropics) 2013 lake, spring or water bore constructed more than 400m from— (a) a watercourse; and (b) another water bore Current as at 27 June 2025 Page 167 Authorised by the Parliamentary Counsel Water Regulation 2016

  369. Schedule 9 Column 1 Column 2 Column 3 Area or groundwater Works that are Works that are not unit accepted development assessable if relevant requirements development complied with Water Resource An exempt bore (Whitsunday) Plan 2010 Repair or maintenance of plan area either of the following works if the repair or maintenance does not alter the design of the works— (a) existing works mentioned in section 73 of that plan; (b) works constructed under a development permit A water bore that is constructed more than— (a) 200m from a boundary of a parcel of land; and (b) 400m from another water bore; and (c) 200m from a watercourse Part 3 Works that interfere with underground water Column 1 Column 2 Area or groundwater Works that are not assessable unit development Water Plan (Pioneer Valley) 2002 plan area An excavation that interferes with underground water, other than an excavation in sub-area 3, 15, 16 or 17 Page 168 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 10 Schedule 10 Code for assessment of development for construction or modification of particular levees section 102 1 Application of code (1) The code applies for the assessment of assessable development for— (a) the construction of a new category 2 levee or new category 3 levee (each a new levee); or (b) the modification of an existing levee if, after the modification, the levee (the modified levee) will fulfil the requirements for a category 2 levee or category 3 levee. (2) The code should be read together with the document called ‘Guidelines for the construction or modification of category 2 and 3 levees’ published by the department. Editor's note— A copy of the document called ‘Guidelines for the construction or modification of category 2 and 3 levees’ is available on the department’s website. 2 Purpose of code The purpose of the code is to ensure that a new levee or modified levee meets a set of criteria. 3 Definitions In this schedule— modified levee see section 1(1)(b). new levee see section 1(1)(a). Current as at 27 June 2025 Page 169 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 10 off-property impact, for a levee, see section 101(5) of this regulation. 4 Compliance with code (1) The code is complied with if each of the performance outcomes stated in column 1 of the table is complied with for a new levee or modified levee. (2) A performance outcome is complied with if the new levee or modified levee— (a) complies with an acceptable outcome stated in column 2 of the table; or (b) otherwise satisfies the performance outcome mentioned in column 1 of the table. Column 1 Column 2 Performance outcome Acceptable outcome 1 any off-property impact from the levee does not result in— the levee is minimised and acceptable having regard to the (a) an unacceptable change in following— hydraulic effects that occur off-property; and • the environment in which the levee is located; (b) an unacceptable impact on people, property or the • the measures proposed to environment be taken to mitigate any off-property impact; • any compensation measures for an impact that are proposed by the applicant 2 the levee is a safe and stable the design, construction, operation structure and maintenance for the levee is appropriate for the materials used and the levee’s intended function Page 170 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016

  370. Schedule 10 Column 1 Column 2 Performance outcome Acceptable outcome 3 community safety is ensured in appropriate emergency action the event a category 3 levee procedures are in place for category fails or overtops 3 levees Current as at 27 June 2025 Page 171 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Schedule 11 Measurement requirements—relevant authorisations and measurement devices sections 107(1)(a) and 108(1) Water Plan (Barron) 2023 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device the plan area all water entitlements, other than a meter water entitlements to take water for stock or domestic purposes only Water Plan (Border Rivers and Moonie) 2019 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Border Rivers Alluvium all water allocations a meter (deep) underground water sub-unit Page 172 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Border Rivers Alluvium all water entitlements, other than from 1 April 2025—a (shallow) underground the following— meter water sub-unit (a) water entitlements to take water for stock or domestic purposes only; (b) water entitlements to take water for public amenity or education premises purposes only; (c) water entitlements for which the annual volumetric limit is not more than 5ML Border Rivers water all water entitlements, other than from 1 April 2025 to management area the following— 30 November (a) water entitlements to take 2027—a meter overland flow water only; (b) water entitlements to take from 1 December water for stock or domestic 2027—a meter and a purposes only; telemetry device (c) water entitlements to take water for public amenity or education premises purposes only; (d) water entitlements for which the annual volumetric limit is not more than 5ML Current as at 27 June 2025 Page 173 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Callandoon Creek water all water entitlements, other than from 1 April 2025 to management area the following— 30 November (a) water entitlements to take 2027—a meter overland flow water only; (b) water entitlements to take from 1 December water for stock or domestic 2027—a meter and a purposes only; telemetry device (c) water entitlements to take water for public amenity or education premises purposes only; (d) water entitlements for which the annual volumetric limit is not more than 5ML Lower Weir River water all water allocations to take until 30 November management area unsupplemented surface water 2027—a meter from 1 December 2027—a meter and a telemetry device Macintyre Brook water all water entitlements, other than from 1 April 2025 to management area the following— 30 November (a) water entitlements to take 2027—a meter overland flow water only; (b) water entitlements to take from 1 December water for stock or domestic 2027—a meter and a purposes only; telemetry device (c) water entitlements to take water for public amenity or education premises purposes only; (d) water entitlements for which the annual volumetric limit is not more than 5ML Page 174 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Moonie water management all water entitlements to take until 30 November area surface water, other than the 2025—a meter following— (a) water entitlements to take overland flow water only; from 1 December 2025—a meter and a (b) water licences to take water telemetry device for stock or domestic purposes only Northern Weir River water all water entitlements, other than from 1 April 2025 to management area the following— 30 November (a) water entitlements to take 2027—a meter overland flow water only; (b) water licences to take water from 1 December for stock or domestic 2027—a meter and a purposes only; telemetry device (c) water licences to take water for public amenity or education premises purposes only; (d) water licences for which the annual volumetric limit is not more than 5ML Current as at 27 June 2025 Page 175 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Stanthorpe water 1 all water allocations that were until 30 November management area in effect on the 2025—a meter commencement of the water plan 2 all water entitlements, other from 1 December than the following— 2025—a meter and a telemetry device (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML underground water all water entitlements, other than from 1 April 2025—a management area the following— meter (a) all underground water allocations Border Rivers Alluvium (deep) underground water sub-unit under the water plan; (b) water entitlements to take water for stock or domestic purposes only; (c) water entitlements to take water for public amenity or education premises purposes only; (d) water entitlements for which the annual volumetric limit is not more than 5ML Page 176 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Upper Weir River water all water allocations to take until 30 November management area unsupplemented surface water 2027—a meter from 1 December 2027—a meter and a telemetry device Water Plan (Boyne River Basin) 2013 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device the plan area all water licences a meter Water Plan (Burdekin Basin) 2007 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device subcatchment area E water licence 620909 and water a meter licence 621164 Current as at 27 June 2025 Page 177 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device subcatchment area E all water licences, other than the from 1 December following— 2024—a meter (a) water licence 620909 and water licence 621164; (b) water licences to take water for stock or domestic purposes only; (c) water licences to take water for public amenity or education premises purposes only; (d) water licences for which the annual volumetric limit is not more than 5ML subcatchment area F all water entitlements, other than a meter water entitlements to take water for stock or domestic purposes only subcatchment area G all water entitlements, other than a meter water entitlements to take water for stock or domestic purposes only Water Plan (Burnett Basin) 2014 Note— The water management areas under the Water Plan (Burnett Basin) 2014 are identified in provisions of the Burnett Basin Resource Operations Plan 2003 taken to be included in the water plan under sections 1259 and 1264 of the Act. A copy of the provisions is available on the department’s website. Page 178 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Barambah Creek all water entitlements from 1 April 2026—a groundwater management meter area Barker–Barambah Creeks water allocation 2189/AP6975 a meter water management area Boyne and Stuart Rivers all water entitlements a meter water management area Coastal Burnett all water entitlements, other than a meter groundwater management the following— area (a) water entitlements to take water for dewatering purposes only; (b) water entitlements to take water for agricultural dewatering purposes only; (c) water entitlements for which the annual volumetric limit is not more than 2ML Lower Burnett and Kolan all water entitlements from 1 April 2027—a Rivers water management meter area subcatchment area R the following water licences— from 1 April 2027—a (a) water licences 177472; meter (b) water licence 177470; (c) water licence 177450; (d) water licence 177451; (e) water licence 177464; (f) water licence 53394M; (g) water licence 60631M Upper Burnett and Nogo all water entitlements from 1 April 2027—a Rivers water management meter area Current as at 27 June 2025 Page 179 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Water Plan (Calliope River Basin) 2006 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device the plan area all water licences, other than a meter water licences to take water for stock or domestic purposes only Water Plan (Cape York) 2019 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Lakeland water licence all water licences to take a meter zones 1 and 2 underground water, other than water licences to take underground water for stock or domestic purposes only the plan area, other than all water entitlements, other than a meter Lakeland water licence the following— zones 1 and 2 (a) water entitlements to take water for stock or domestic purposes only; (b) water licences for which the annual volumetric limit is not more than 5ML Page 180 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Water Plan (Condamine and Balonne) 2019 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Central Condamine all water licences to take a meter Alluvium underground underground water, other than water sub-area water licences to take underground water for stock or domestic purposes only Condamine and Balonne all water entitlements to take from 1 April 2025 to Tributaries water unsupplemented surface water, 30 November management area, water other than the following— 2025—a meter management area zones (a) water entitlements to take CBT-01, CBT-02 and overland flow water; CBT-03 from 1 December (b) water entitlements to take 2025—a meter and a unsupplemented surface telemetry device water for stock or domestic purposes only; (c) water entitlements to take unsupplemented surface water for public amenity or education premises purposes only; (d) water entitlements for which the annual volumetric limit is not more than 5ML Current as at 27 June 2025 Page 181 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Condamine and Balonne all water entitlements to take from 1 October 2024 Tributaries water unsupplemented surface water, to 30 November management area, water other than the following— 2025—a meter management area zones (a) water entitlements to take CBT-04, CBT-05, CBT-06, overland flow water; CBT-07, CBT-08 and from 1 December CBT-09 (b) water entitlements to take 2025—a meter and a unsupplemented surface telemetry device water for stock or domestic purposes only; (c) water entitlements to take unsupplemented surface water for public amenity or education premises purposes only; (d) water entitlements for which the annual volumetric limit is not more than 5ML Condamine and Balonne all water allocations to take until 30 November water management area, unsupplemented surface water, 2025—a meter water management area other than water allocations to zones CBU-01, CBU-02, take overland flow water only CBU-03, CBU-04, CBU-05, from 1 December CBU-06, CBU-07, CBU-08 2025—a meter and a and CBU-09 telemetry device Page 182 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Condamine and Balonne all water entitlements to take from 1 April 2025 to water management area, unsupplemented surface water, 30 November water management area other than the following— 2025—a meter zones CBU-010, CBU-11, (a) water entitlements to take CBU-12, CBU-13, CBU-14, overland flow water only; CBU-15, CBU-16, CBU-17, from 1 December CBU-18, CBU-21 and (b) water entitlements to take 2025—a meter and a CBU-22 unsupplemented surface telemetry device water for stock or domestic purposes only; (c) water entitlements to take unsupplemented surface water for public amenity or education premises purposes only; (d) water entitlements for which the annual volumetric limit is not more than 5ML Cunningham Alluvium all water entitlements, other than a meter underground water sub-area the following— (a) water entitlements to take unsupplemented surface water for stock or domestic purposes only; (b) water entitlements to take unsupplemented surface water for public amenity or education premises purposes only; (c) water entitlements for which the annual volumetric limit is not more than 5ML Dalrymple Creek Alluvium all water allocations to take a meter underground water sub-area underground water Current as at 27 June 2025 Page 183 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Gowrie and Oakey Creek all water entitlements to take until 30 November water management area, unsupplemented surface water, 2027—a meter water management area other than the following— zones GOU-01, GOU-02, (a) water entitlements to take GOU-03 and GOU-04 overland flow water; from 1 December 2027—a meter and a (b) water entitlements to take telemetry device unsupplemented surface water for stock or domestic purposes only Gowrie and Oakey Creek all water entitlements to take from 1 April 2025 to water management area, unsupplemented surface water, 30 November water management area other than the following— 2027—a meter zones GOU-05, GOU-06, (a) water entitlements to take GOU-07, GOU-08 and overland flow water; GOU-09 from 1 December (b) water entitlements to take 2027—a meter and a water for stock or domestic telemetry device purposes only; (c) water entitlements to take water for public amenity or education premises purposes only; (d) water entitlements for which the annual volumetric limit is not more than 5ML Jimbour Creek Alluvium all water licences to take a meter underground water sub-area underground water, other than water licences to take underground water for stock or domestic purposes only Lower Balonne water all water entitlements to take until 30 November management area unsupplemented surface water, 2025—a meter other than water entitlements to take overland flow water only from 1 December 2025—a meter and a telemetry device Page 184 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Lower Balonne water all water licences to take overland until 30 November management area flow water only 2027—a meter from 1 December 2027—a storage meter and a telemetry device Nobby Basalts underground all water entitlements, other than a meter water sub-area the following— (a) water entitlements to take unsupplemented surface water for stock or domestic purposes only; (b) water entitlements to take unsupplemented surface water for public amenity or education premises purposes only; (c) water entitlements for which the annual volumetric limit is not more than 5ML Oakey Creek Alluvium all water allocations to take a meter underground water sub-area underground water Toowoomba City Basalts all water licences to take a meter underground water sub-area underground water, other than water licences to take underground water for stock or domestic purposes only Current as at 27 June 2025 Page 185 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Upper Condamine Alluvium all water entitlements to take from 1 October (Tributaries) underground underground water, other than the 2024—a meter water unit, other than Oakey following— Creek Alluvium, Dalrymple (a) water entitlements to take Creek Alluvium, Jimbour underground water for stock Creek Alluvium and or domestic purposes only; Cunningham Alluvium underground water (b) water entitlements to take sub-areas underground water for public amenity or education premises purposes only; (c) water entitlements for which the annual volumetric limit is not more than 5ML Upper Condamine Basalts all water entitlements to take from 1 October underground water unit, underground water, other than the 2024—a meter other than Toowoomba City following— Basalts, Upper Hodgson (a) water entitlements to take Creek Basalts, Nobby unsupplemented surface Basalts underground water water for stock or domestic sub-areas purposes only; (b) water entitlements to take unsupplemented surface water for public amenity or education premises purposes only; (c) water entitlements for which the annual volumetric limit is not more than 5ML Page 186 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Upper Condamine water all water allocations to take from 1 April 2025 to management area, water unsupplemented surface water, 30 November management area zones other than the following— 2025—a meter UCU-01, UCU-02, (a) water allocations to take UCU-03, UCU-04, overland flow water; UCU-05, UCU-06, from 1 December UCU-07, UCU-08, (b) water allocations to take 2025—a meter and a UCU-09, UCU-10 and unsupplemented surface telemetry device UCU-11 water for stock or domestic purposes only; (c) water allocations to take unsupplemented surface water for public amenity or education premises purposes only; (d) water allocations for which the annual volumetric limit is not more than 5ML Upper Condamine water all water allocations to take until 30 November management area, water unsupplemented surface water, 2025—a meter management area zones other than water allocations to UCU-12, UCU-13, take overland flow water UCU-14, UCU-15 and from 1 December UCU-16 2025—a meter and a telemetry device Upper Hodgson Creek all water licences to take a meter Basalts underground water underground water, other than sub-area water licences to take underground water for stock or domestic purposes only Current as at 27 June 2025 Page 187 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Water Plan (Fitzroy Basin) 2011 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Comet water management all water allocations a meter area Dawson Valley water all water allocations a meter management area Don and Dee groundwater all water licences to take a meter sub-area underground water Don and Dee Rivers and all water licences to take surface a meter Alma Creek water water, other than water licences to management area take surface water for stock or domestic purposes only Fitzroy water management all water allocations a meter area, other than water management area zone Fitzroy B Isaac Connors subcatchment all water licences, other than water a meter area licences to take water for stock or domestic purposes only Lower Callide groundwater all water entitlements a meter sub-area Nogoa Mackenzie water all water allocations a meter management area Prospect Creek groundwater all water licences a meter sub-area Theresa Retreat water all water allocations a meter management area Upper Callide groundwater all water licences a meter sub-area Page 188 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Water Plan (Gold Coast) 2006 Note— The water management areas under the Water Plan (Gold Coast) 2006 are identified in provisions of the Gold Coast Resource Operations Plan 2010 taken to be included in the water plan under sections 1259 and 1264 of the Act. A copy of the provisions is available on the department’s website. Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Lower Nerang water all water entitlements a meter management area Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Eastern Downs Marburg water licence 100875 a meter groundwater sub-area Gatton Esk Road Marburg all water licences, other than water a meter groundwater sub-area licences to take water for stock or domestic purposes only Current as at 27 June 2025 Page 189 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Gatton Esk Road Woogaroo all water licences, other than the a meter groundwater sub-area following— (a) water licences to take water for stock or domestic purposes only; (b) water licence 406711; (c) water licence 406717; (d) water licence 406725; (e) water licence 406732; (f) water licence 406735; (g) water licence 406738; (h) water licence 406755; (i) water licence 406807; (j) water licence 406867; (k) water licence 407196; (l) water licence 409175 Mulgildie North Hutton all water licences a meter groundwater unit Mulgildie North Precipice all water licences a meter groundwater sub-area Mulgildie South Precipice all water licences a meter groundwater sub-area Surat Hutton groundwater all water licences, other than the from 1 April 2025—a sub-area following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Page 190 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Water Plan (Gulf) 2007 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Flinders River catchment all water entitlements a meter area Gilbert River catchment all water entitlements a meter area Water Plan (Logan Basin) 2007 Note— The water management areas under the Water Plan (Logan Basin) 2007 are identified in provisions of the Logan Basin Resource Operations Plan 2009 taken to be included in the water plan under sections 1259 and 1264 of the Act. A copy of the provisions is available on the department’s website. Current as at 27 June 2025 Page 191 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Burnett Creek water all water entitlements, other than from 1 December management area the following— 2025—a meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Christmas Creek water all water allocations a meter management area Logan River water all water allocations from 1 December management area 2025—a meter Running Creek water all water allocations a meter management area Page 192 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Water Plan (Mary Basin) 2024 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Amamoor Creek all water licences, other than the from 1 July 2030—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Burrum River subcatchment all water licences, other than the from 1 July 2031—a following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Cooloola Sandmass all water licences, other than the a meter underground water following— management area (a) water licence 190197; (b) water licence 190200 Current as at 27 June 2025 Page 193 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Deep Creek subcatchment all water licences, other than the from 1 April 2031—a following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Glastonbury Creek all water licences, other than the from 1 April 2031—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Kandanga Creek all water licences, other than the from 1 July 2030—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Page 194 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Lower Mary River all water licences, other than the from 1 April 2031—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Maroochy River all water licences, other than the from 1 April 2031—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Mid Mary River including all water licences, other than the from 1 April 2031—a Eel Creek subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Current as at 27 June 2025 Page 195 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Mooloolah River all water licences, other than the from 1 July 2031—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Munna Creek subcatchment all water licences, other than the from 1 July 2031—a following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Myrtle Creek subcatchment all water licences, other than the from 1 July 2031—a following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Page 196 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Noosa River and coastal all water licences, other than the from 1 July 2031—a streams north of the Noosa following— meter River subcatchment (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Obi Obi Creek all water licences, other than the from 1 July 2030—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Pie and Calico Creeks all water licences, other than the from 1 July 2030—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Current as at 27 June 2025 Page 197 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Six Mile Creek all water licences, other than water a meter subcatchment licences to take water for stock or domestic purposes only Tinana Creek subcatchment all water licences, other than water a meter licences to take water for stock or domestic purposes only Upper Mary River all water licences, other than the from 1 July 2030—a subcatchment following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Wide Bay Creek all water licences, other than water a meter subcatchment licences to take water for stock or domestic purposes only Widgee Creek all water licences, other than water a meter subcatchment licences to take water for stock or domestic purposes only Yabba Creek subcatchment all water licences, other than the from 1 July 2030—a following— meter (a) water licences to take water for stock or domestic purposes only; (b) water licences to take water for public amenity or education premises purposes only; (c) water licences for which the annual volumetric limit is not more than 5ML Page 198 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Water Plan (Mitchell) 2007 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device the plan area all water licences, other than water a meter licences to take water for stock or domestic purposes only Water Plan (Moreton) 2007 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Cressbrook Creek alluvial all water licences, other than water a meter groundwater management licences to take water for stock or area domestic purposes only implementation area 1 for all water licences, other than water a meter Lockyer Valley groundwater licences to take water for stock or management area domestic purposes only Current as at 27 June 2025 Page 199 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Water Plan (Pioneer Valley) 2002 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device the plan area all water entitlements, other than a meter water entitlements to take water for stock or domestic purposes only Water Plan (Warrego, Paroo, Bulloo and Nebine) 2016 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Bulloo catchment area all water entitlements to take a meter surface water, other than the following— (a) water entitlements to take supplemented water; (b) water entitlements to take water for stock or domestic purposes only Nebine catchment area all water entitlements to take until 30 November surface water, other than the 2027—a meter following— (a) water entitlements to take supplemented water; from 1 December 2027—a meter and a (b) water entitlements to take telemetry device water for stock or domestic purposes only Page 200 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Paroo catchment area all water entitlements to take until 30 November surface water, other than the 2027—a meter following— (a) water entitlements to take supplemented water; from 1 December 2027—a meter and a (b) water entitlements to take telemetry device water for stock or domestic purposes only Warrego catchment area all water entitlements to take until 30 November surface water, other than the 2027—a meter following— (a) water entitlements to take supplemented water; from 1 December 2027—a meter and a (b) water entitlements to take telemetry device water for stock or domestic purposes only Water Plan (Wet Tropics) 2013 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device Mulgrave–Russell all water entitlements, other than a meter catchment area the following— (a) water entitlements to take water for stock or domestic purposes only; (b) water entitlements for which the annual volumetric limit is not more than 2ML Current as at 27 June 2025 Page 201 Authorised by the Parliamentary Counsel Water Regulation 2016

  371. Schedule 11 Water Resource (Whitsunday) Plan 2010 Column 1 Column 2 Column 3 Area under water plan Relevant authorisation Measurement device subcatchment areas A, B, C all water licences, other than the a meter and F following— (a) water licences to take overland flow water; (b) water licences to take water for stock or domestic purposes only subcatchment areas D and E all water licences, other than the from 1 December following— 2027—a meter (a) water licences to take overland flow water; (b) water licences to take water for stock or domestic purposes only Other areas Column 1 Column 2 Column 3 Area Relevant authorisation Measurement device Bowen underground water all water licences, other than a meter area on plan CAS3065 water licences to take water for stock or domestic purposes only Burdekin underground all water licences, other than a meter water area on plan AP10054 water licences to take water for stock or domestic purposes only Page 202 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11A Schedule 11A Measurement requirements— information about water taken section 111 Table 1—Requirements Column 1 Column 2 Column 3 Information to be given When information Way information to to be given be given details of the following for the works within 20 business in the approved form through which the water is taken— days after each time (a) the works; the measurement device attached to the (b) each measurement device attached works is inspected to the works; under section 121B (c) each other relevant authorisation held by the holder under which water is taken using the works; (d) each other person who takes water using the works details of each change to any of the within 10 business in the approved form following for the works through which days after the change the water is taken— (a) the works; (b) the relevant authorisations held by the holder under which water is taken using the works; (c) the persons who take water using the works the reading from a meter, or record within 10 business in the approved form made by a telemetry device, attached to days after the the works through which the water is replacement taken at each time the meter or telemetry device is replaced Current as at 27 June 2025 Page 203 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 11A Table 1—Requirements Column 1 Column 2 Column 3 Information to be given When information Way information to to be given be given the reading from a meter, attached to the within 10 business in the way stated in works through which the water is taken, days after the water the measurement of water taken in each water period period ends standards stated in table 2 for the authorisation the record made by a telemetry device, at the end of the day in the way stated in attached to the works through which the the measurement water is taken, of water taken in each standards day Table 2—Water periods for relevant authorisations Column 1 Column 2 Relevant authorisation Water period relevant authorisation for taking water in both of the following— any of the following areas— (a) the period from 1 July of a year to 1 (a) the Border Rivers Alluvium (deep) March of the following year; underground water sub-unit under the (b) the period from 1 July of a year to 30 Water Plan (Border Rivers and June of the following year Moonie) 2019; (b) the Central Condamine Alluvium underground water sub-area under the Water Plan (Condamine and Balonne) 2019; (c) the Coastal Burnett groundwater management area under the Water Plan (Burnett Basin) 2014; (d) the Don and Dee groundwater sub-area under the Water Plan (Fitzroy Basin) 2011 relevant authorisation for taking water in the period from 1 October of a year to 30 the Dawson Valley water management area September of the following year under the Water Plan (Fitzroy Basin) 2011 relevant authorisation for taking water in the period from 1 July of a year to 30 June the Lockyer Valley groundwater of the following year management area under the Water Plan (Moreton) 2007 Page 204 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016

  372. Schedule 11A Table 2—Water periods for relevant authorisations Column 1 Column 2 Relevant authorisation Water period relevant authorisation for taking water in both of the following— the Bowen underground water area on plan (a) the period from 1 April to 1 November CAS3065 of a year; (b) the period from 1 April of a year to 31 March of the following year relevant authorisation not otherwise the period from 1 July of a year to 30 June mentioned in this table of the following year Current as at 27 June 2025 Page 205 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 12 Schedule 12 Fees sections 58(3), 63(b), 130 and 131(1) Fee units 1 Application for a seasonal water assignment (s 58(3)(b))— (a) for a water allocation 184.00 (b) for a seasonal water assignment notice 184.00 2 Application for a water allocation dealing (s 63(b)) 137.90 3 Application for a water licence (Act, s 110(b)) 137.90 4 Application for a dealing with a water licence to renew the licence (Act, s 122(1)(b)) nil 5 Application for a dealing with a water licence to relocate the licence (Act, s 122(1)(b)) 405.10 6 Application for a dealing with a water licence for a seasonal water assignment notice for a seasonal water assignment (Act, s 122(1)(b)) 184.00 7 Application for 1 or more other dealings with a water licence (Act, s 122(1)(b)) 137.90 8 Water licence fee—for each year (s 131(1)) 86.80 9 Application for an operations licence (Act, s 206(2)(d)) 137.90 10 Application for an allocation of quarry material (Act, s 227(2)(c))—for each 6-month period, or part of a 6-month period, the allocation notice has effect 189.10 11 Application to renew an allocation notice (Act, s 236(2)(b))—for each 6-month period, or part of a 6-month period, the renewed allocation notice has effect 189.10 Page 206 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 12 Fee units 12 Application for a water bore driller’s licence (Act, s 981(2)(e))— (a) if the applicant relies on section 124(2)(c)(iii) or (iv) 1,116.00 (b) if the applicant relies on section 125(2)(c)(iii) or (iv) 1,630.00 (c) if the applicant relies on section 126(2)(c)(iii) or (iv) 1,974.00 (d) if paragraphs (a) to (c) do not apply 621.00 13 Application to amend a water bore driller’s licence under section 983B of the Act (Act, s 981(2)(e)) 184.00 14 Application to renew a water bore driller’s licence (Act, s 983F(2)(c)) 597.00 15 Application to reinstate an expired water bore driller’s licence (Act, s 983G(2)(b)) 621.00 16 Purchase a copy of a document available for inspection under section 1009(1) of the Act (Act, s 1009(3))— (a) if the copy is generated at an office of the department 18.65 (b) if the copy is generated electronically 14.90 17 Certifying a copy of a document available for inspection under section 1009(1) of the Act 38.15 18 Investigative search, by the chief executive, of the department’s water entitlement database (not including providing copies of documents)— (a) if no additional computer programming time is required—for each hour or part of an hour 76.85 (b) if additional computer programming time is required—for each hour or part of an hour 189.80 Current as at 27 June 2025 Page 207 Authorised by the Parliamentary Counsel Water Regulation 2016

  373. Schedule 12 Fee units 19 Copy of a report on an entry in the department’s water entitlement database 9.15 Page 208 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 13

  374. Schedule 13 Fees for continuing interim water allocations section 132(2) Fee units 1 Application under section 193 of the unamended Act to transfer all or part of a continuing interim water allocation 405.10 2 Application under section 195 of the unamended Act to transfer all or part of a continuing interim water allocation— (a) for 1 application 405.10 (b) for each additional application, made at the same time, to transfer to the same land 89.10 3 Application under section 198 of the unamended Act to replace jointly held continuing interim water allocation 137.90 4 Application under section 216 of the unamended Act to amend continuing interim water allocation 137.90 5 Application under section 224 of the unamended Act to amalgamate continuing interim water allocations 137.90 6 Application under section 225 of the unamended Act to replace continuing interim water allocation with 2 or more new continuing interim water allocations 137.90 Note— For items 4, 5 and 6 see section 192 of the unamended Act. Current as at 27 June 2025 Page 209 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 14 Schedule 14 Water charges section 133 Column 1 Column 2 Column 3 Water management Date water year Water charges area ends Barker–Barambah 30 June Water harvesting—4.90 fee units Creeks water for each megalitre management area Border Rivers water 30 June Water harvesting—4.90 fee units management area for each megalitre Bowen–Broken 30 June Water harvesting—4.90 fee units Rivers water for each megalitre management area Boyne and Stuart 30 June Water harvesting—4.90 fee units Rivers water for each megalitre management area Central Lockyer 30 June Water harvesting—4.90 fee units water management for each megalitre area Dawson Valley water 30 September Water harvesting from zone management area Dawson B to M as identified in the Fitzroy Basin water management protocol—4.90 fee units for each megalitre Dumaresq River 30 June Water from a watercourse water management flowing from Glenlyon Dam— area (a) part A—12.20 fee units (b) part B—14.95 fee units Page 210 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 14 Column 1 Column 2 Column 3 Water management Date water year Water charges area ends Fitzroy water 30 June Water harvesting from zone management area Fitzroy A as identified in the Fitzroy Basin water management protocol—4.90 fee units for each megalitre Logan River water 30 June Water harvesting from Burnett management area Creek or Logan River—4.90 fee units for each megalitre Lower Balonne water 30 June Water harvesting— management area (a) from a supplemented section of the Thuraggi watercourse or Thuraggi diversion channel—4.90 fee units for each megalitre (b) from Beardmore Dam or from any watercourse downstream of Beardmore Dam to the Queensland/New South Wales border—4.90 fee units for each megalitre Lower Burnett and 30 June Water harvesting—4.90 fee units Kolan Rivers water for each megalitre management area Lower Lockyer water 30 April Water harvesting—4.90 fee units management area for each megalitre Macintyre Brook 30 June Water harvesting—4.90 fee units water management for each megalitre area Current as at 27 June 2025 Page 211 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 14 Column 1 Column 2 Column 3 Water management Date water year Water charges area ends Nogoa Mackenzie 30 June Water harvesting from Lake water management Maraboon or Nogoa River or area Mackenzie River to the junction with Springton Creek—4.90 fee units for each megalitre Pioneer River water 30 June Water harvesting from zones management area Cattle 01, Cattle 02, Pioneer 01, Pioneer 02, Pioneer 03, Pioneer 04 or Silver/McGregor 01 under the Water Plan (Pioneer Valley) 2002 as having effect under section 1259(2)(e) of the Act—4.90 fee units for each megalitre Three Moon Creek 30 June Water harvesting—4.90 fee units water management for each megalitre area Upper Burnett and 30 June Water harvesting from Nogo Nogo Rivers water River or Burnett River—4.90 fee management area units for each megalitre Upper Condamine 30 June Water harvesting from zones water management UCU-03 (excluding the ponded area area of Leslie Dam), UCU-04, UCU-05, UCU-06, UCU-07, UCU-08, UCU-09 or UCU-11 identified in the Condamine and Balonne water management protocol—4.90 fee units for each megalitre Page 212 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016

  375. Schedule 14 Column 1 Column 2 Column 3 Water management Date water year Water charges area ends Warrill Valley water 30 June Water harvesting— management area (a) from Reynolds Creek, Warrill Creek from its junction with Reynolds Creek or Bremer River from the junction of Warrill Creek downstream to Berry’s Lagoon—4.90 fee units for each megalitre (b) from Black Gully, Kent’s Lagoon, Normanby Gully, West Branch, Waroolaba Creek or the Upper Warrill systems—4.90 fee units for each megalitre Current as at 27 June 2025 Page 213 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 15

  376. Schedule 15 Royalties section 135(1) Fee units Removing State quarry material—for each cubic metre removed— (a) by a local government or other entity established under an Act and that does not represent the State (a statutory body), for its own use 0.79 (b) by another person for a statutory body if the statutory body issues a certificate stating that the material was supplied to the statutory body for its own use 0.79 (c) if paragraphs (a) and (b) do not apply 2.30 Page 214 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 16

  377. Schedule 16 Drainage rates section 136 Drainage area Drainage rate Burdekin River drainage area, 29.75 fee units for each hectare of land shown on AP23668 Current as at 27 June 2025 Page 215 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 17 Schedule 17 Underground water areas sections 139 and 140 Part 1 Areas and purposes Column 1 Column 2 Area and plan Purposes for which water entitlement, water permit or seasonal water assignment notice not required Black River underground water area stock or domestic purposes if the on plan WM3085 land concerned does not have access to a reticulated supply, and— (a) the land exists in the same surveyed form it was in at the commencement of this entry; or (b) if the land is subdivided after the commencement of this entry, for each individual parcel of land resulting from the subdivision—the size of the individual parcel is at least 40ha Bowen underground water area on (a) stock or domestic purposes plan CAS3065 (b) a prescribed activity Burdekin underground water area (a) stock or domestic purposes on plan AP10054 (b) a prescribed activity Dryander underground water area (a) stock or domestic purposes on plan CAS1827 (b) a prescribed activity Page 216 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 17 Column 1 Column 2 Area and plan Purposes for which water entitlement, water permit or seasonal water assignment notice not required Farnborough underground water (a) stock or domestic purposes area on plan AP10058 (b) a prescribed activity Fraser Island underground water (a) domestic purposes area on plan AP10063 (b) a prescribed activity Greater Western underground water (a) stock purposes from aquifers area on plan WM3083 not dealt with under the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 (b) domestic purposes (c) a prescribed activity Highlands underground water area (a) stock or domestic purposes on plan CAS2055 (b) a prescribed activity Moreton Island underground water (a) stock or domestic purposes area on plan AP10065 (b) a prescribed activity North Stradbroke Island (a) stock or domestic purposes underground water area on plan (b) a prescribed activity AP10067 Sarina underground water area on (a) stock or domestic purposes plan CAS1672 (b) a prescribed activity Upper Georgina underground water (a) stock or domestic purposes area on plan WM3088 (b) a prescribed activity Current as at 27 June 2025 Page 217 Authorised by the Parliamentary Counsel Water Regulation 2016

  378. Schedule 17 Part 2 Critical distances for non-stock or domestic water bores Column 1 Column 2 Column 3 Column 4 Underground Critical distance Critical distance Critical distance water area as from a boundary from a from another mentioned in of a parcel of watercourse water bore part 1, column 1 land Black River — — 300m underground water area Bowen 100m — — underground water area Burdekin — — 400m underground water area Dryander 200m 40m 400m underground water area Greater Western 200m — 400m underground water area Highlands 200m — 400m underground water area Moreton Island 100m — 200m underground water area Sarina 200m 40m 400m underground water area Page 218 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 18 Schedule 18 Authority areas section 141 Column 1 Column 2 Former water area Plan Alva Bore Water Supply Area AP3961 Ardoch Bore Water Area AP3962 Bindebango Bore Water Supply Area AP3964 Cabanda Bore Water Supply Area AP3965 Chesterfield Bore Water Supply Area AP3967 Chippeway Bore Water Supply Area AP3968 Coongoola Bore Water Supply Area AP3969 Cypress Downs Bore Water Supply Area AP3970 Dillalah No. 1 Bore Water Area AP3971 Dillalah No. 2 Bore Water Area AP3972 Euthella Bore Water Supply Area AP3974 Glenlyon Bore Water Supply Area AP3976 Hopeland Bore Water Supply Area AP3977 Jabiru Bore Water Area AP3979 Juanbong Bore Water Area AP3980 Julia Creek Bore Water Supply Area AP3981 Mackunda Downs Bore Water Supply Area AP3983 Maroungle Bore Water Supply Area AP7344 Maxwelton Bore Water Supply Area AP3985 Current as at 27 June 2025 Page 219 Authorised by the Parliamentary Counsel Water Regulation 2016

  379. Schedule 18 Column 1 Column 2 Former water area Plan Merridew Bore Water Supply Area AP3986 Minetta Bore Water Supply Area AP3987 Mona Bore Water Area AP3988 Mooro Bore Water Supply Area AP3989 Moselle Bore Water Supply Area AP3990 Murweh Bore Water Supply Area AP3991 Neabul Bore Water Supply Area AP3993 Nebine Bore Water Supply Area AP3994 Nelia Ponds Bore Water Supply Area AP3995 Noondoo Bore Water Area AP3996 Oakhampton Bore Water Supply Area AP3998 Pigurra Bore Water Supply Area AP3999 Sesbania Bore Water Supply Area AP4000 Stamfordham Bore Water Supply Area AP4001 Thomby Bore Water Area AP4002 Toorak Bore Water Supply Area AP4003 Weengallon No. 2 Bore Water Supply Area AP4005 Wellshot Bore Water Supply Area AP4006 Whyenbah Bore Water Supply Area AP4007 Whynot Bore Water Area AP4008 Wierbolla Bore Water Supply Area AP4009 Winbin Bore Water Supply Area AP4011 Yanborra Bore Water Supply Area AP4013 Page 220 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 19 Schedule 19 Dictionary section 3 amalgamation, for part 4, division 3, see section 33. amendment, for part 4, division 3, see section 33. AMTD means the adopted middle thread distance which is the distance in kilometres, measured along the middle of a watercourse, that a specific point in the watercourse is from the watercourse’s mouth or junction with the main watercourse. announced entitlement see section 29. annual entitlement see section 30. associated document, for a compliance certificate for a measurement device, for part 11, see section 103. authorisation means a water licence, water permit, water allocation or other authority to take or interfere with water under the Act. Border Rivers Alluvium (deep) means the underground water sub-unit with that name under the Water Plan (Border Rivers and Moonie) 2019. bulk water supply authority means the Queensland Bulk Water Supply Authority under the South East Queensland Water (Restructuring) Act 2007, section 6. bulk water supply system, for part 6, see section 77. camp means a camp, with an area of no more than 1ha, that does not accommodate more than 60 persons at a time. category 1 levee see section 101(2). category 2 levee see section 101(3). category 3 levee see section 101(4). class A tenure, for part 7, see section 87A(1). class B tenure, for part 7, see section 87A(2). Current as at 27 June 2025 Page 221 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 19 class C tenure, for part 7, see section 87A(3). closing day, for a tender, see section 17(3)(f)(i). compliance certificate, for a measurement device, for part 11, see section 103. continuing interim water allocation, see section 132(1). critical distance, of a non-stock or domestic water bore in a an underground water area mentioned in schedule 17, part 2, column 1, from— (a) a boundary of a parcel of land—see section 140(2); or (b) a watercourse—see section 140(3); or (c) another water bore—see section 140(4). DICAT course, for part 12, see section 124(2)(c)(i)(A). duly qualified person, for part 11, see section 104. education premises purpose, for schedule 11, means supplying non-potable water to premises used solely for education or training purposes. excavation means a cavity, of a capacity of more than 2 megalitres, in the surface of land that— (a) is open: and (b) results from digging or scooping out material; and (c) exposes the water table at its intersection with the upper zone of saturation. exempt bore means— (a) a water bore used for monitoring— (i) the physical characteristics of an aquifer: or (ii) the physical, chemical or biological characteristics of water in an aquifer; or Examples of physical characteristics of water— standing water level, water discharge rate, water pressure Page 222 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 19 (b) for taking or interfering with water that is not Great Artesian Basin plan related water—any of the following— (i) a water bore for testing the water production capacity, water production quality or hydraulic properties of an aquifer; (ii) a water bore for taking water for stock or domestic purposes; (iii) a non-stock or domestic water bore constructed, erected or installed in an underground water area mentioned in schedule 17, part 2, column 1, but not within the critical distance from a boundary of a parcel of land, a watercourse or another water bore; (iv) a replacement water bore. existing authorisation see section 44(1). existing levee see section 1247(2) of the Act. faulty, in relation to a measurement device, for part 11, see section 105. faulty period, for a faulty measurement device attached to works through which water is taken under a relevant authorisation, for part 11, see section 103. Great Artesian Basin plan related water means— (a) water to which the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017 applies, other than the water in— (i) the Betts Creek beds groundwater unit; and (ii) the Cape Rolling Downs groundwater sub-area; and (iii) the Normanton groundwater area; and (iv) the Winton Mackunda groundwater unit; and (b) water that is accessible by drilling through water mentioned in paragraph (a). Current as at 27 June 2025 Page 223 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 19 interested entity, for part 4, division 3, subdivision 2, see section 34(3)(b)(i). levyable mining tenure, for part 7, see section 87A(4). measurement standards, for part 11, see section 103. minimum operating level, for part 6, see section 77. modify, for an existing levee, means any or all of the following— (a) to raise or lower the height of the levee; (b) to extend or reduce the length of the levee; (c) to make another change to the levee that affects the flow of water. new licence, for part 4, division 3, see section 33. nominal entitlement see section 28. non-residential water use, for part 6, see section 77. non-stock or domestic water bore means a water bore for taking water for a purpose other than a stock or domestic purpose. NUDLC, for part 12, see section 124(2)(a)(i). office income statement, for part 7, see section 85. office’s estimated costs, for part 7, see section 85. office’s estimated mining costs, for part 7, see section 88A(b). office’s estimated petroleum costs, for part 7, see section 88A(a). part A, for water charges mentioned in schedule 14, means the amount payable for each megalitre of nominal entitlement. part B, for water charges mentioned in schedule 14, means the amount payable for each megalitre of water taken up to the annual entitlement. prescribed activity means an activity mentioned in schedule 3 for a general authorisation to take water. Page 224 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 19 priority notice see the Land Title Act 1994, section 139(1). public amenity purpose, for schedule 11, means taking water to operate public toilets, showers or laundry rooms. relevant date, for part 7, see section 85. relevant sub-block, for part 7, see section 87(1). relevant watercourse means any of the following— (a) Cattle Creek; (b) Finch Hatton Creek; (c) McGregor Creek; (d) Owen Creek; (e) Sandringham Lagoon. repealed regulation means the Water Regulation 2002. replacement water bore means a water bore that— (a) is constructed, installed or erected— (i) to replace a water bore (the previous bore) used for the taking of, or interfering with, water— (A) for which a development permit was held or, under section 1048A of the Act, was taken to be held; or (B) for which a development permit was not required; or (C) which, under the repealed Sustainable Planning Act 2009, section 681(1), was taken to be a lawful use of the premises in which the previous bore was constructed, installed or erected; and (ii) within 10m of the location of the previous bore; and (b) taps the same aquifer tapped by the previous bore. residential water use, for part 6, section 77. resource project, for part 7, see section 85. Current as at 27 June 2025 Page 225 Authorised by the Parliamentary Counsel Water Regulation 2016 Schedule 19 SEQ water security program, for part 6, see section 77. settlement notice means a settlement notice under the Land Title Act 1994, part 7A. south-eastern groundwater units and groundwater sub-areas, in relation to the Water Plan (Great Artesian Basin and Other Regional Aquifers) 2017, means— (a) the Mulgildie North Hutton groundwater unit under that plan; and (b) the following groundwater sub-areas under that plan— • Crows Nest Marburg • Crows Nest Woogaroo • Eastern Downs Marburg • Eastern Downs Precipice • Eastern Downs Springbok Walloon • Gatton Esk Road Marburg • Gatton Esk Road Woogaroo • Mulgildie North Precipice • Mulgildie South Precipice • Murphys Creek Marburg • Murphys Creek Woogaroo • Redbank Creek Woogaroo • Southern Clarence Moreton Marburg • Southern Clarence Moreton Walloon • Southern Clarence Moreton Woogaroo. standard terms document see the Land Title Act 1994, section 168. sub-block, for part 7, see section 85. Suncorp Metway Ltd business banking variable lending base rate means the variable base interest rate set by the Suncorp Metway Bank for loans to business entities. Page 226 Current as at 27 June 2025 Authorised by the Parliamentary Counsel Water Regulation 2016

  380. Schedule 19 supplemented water means water supplied under an interim resource operations licence, resource operations licence or other authority to operate infrastructure. surface water means water in a watercourse. telemetry device means an electronic device that records information received from a device that measures or records water volume or the level of water held in storage, and transfers the information to another device or thing. transfer, for part 4, division 3, see section 33. transfer notice, for part 4, division 3, see section 37(2). unamended Act means the Act as in force immediately before the commencement of section 1250 of the Act. water entitlement database means a database kept by the chief executive containing details of water entitlements. water licence, for sections 28, 29 and 30, means a water licence not managed under a water management protocol. water management area see section 137. Current as at 27 June 2025 Page 227 Authorised by the Parliamentary Counsel

Water Regulation 2016 · Nelum