Energy Resources Legislation Amendment Act 2010

颁布于 2010-09-14 · 文本截至 2026-10-01

以研究形式发布的公开法律与官方指引,不构成法律、税务或金融建议。

研究内容本身以英文撰写。标题和标签已翻译,调查结果和引文未翻译。

关于这部法律

语言
English
类型
法令
组织
European Union
国家
澳大利亚 · Victoria
主题
Energy, Mineral resources
关键词
energy conservation/energy production, oil, exploration, minerals, mining, Indigenous Peoples
类别
energy

在哪里阅读

    该法律没有记录来源链接。

文本

所收录的法律原文,按条款排列。每个条款都有自己的链接。

  1. 1 Purposes 1

  2. 2 Commencement 4 PART 2—AMENDMENT OF ELECTRICITY INDUSTRY ACT 2000 5

  3. 3 Amendment of Division heading 5

  4. 4 Definitions for purpose of Division 2A of Part 2 5

  5. 5 Relevant augmentations 5

  6. 6 Applicable charging principles 5

  7. 7 Variation or revocation of licence 6

  8. 8 Definition for purpose of Division 6A of Part 2 6

  9. 9 Orders in relation to advanced metering infrastructure 6

  10. 10 New section 46DA inserted 8

  11. 46DA Interrelationship of Orders and other provisions relating to tariffs 8

  12. 11 Statute law revision 9 PART 3—AMENDMENT OF ELECTRICITY SAFETY ACT 1998 10

  13. 12 New section 1 substituted 10

  14. 1 Purpose 10

  15. 13 Definitions 10

  16. 14 Objectives and functions of Energy Safe Victoria 11

  17. 15 New section 7A inserted 12

  18. 7A Energy Safe Victoria may have regard to the reliability and security of electricity supply in certain cases 12

  19. 16 Amendment of heading to Part 8 12 i Section Page

  20. 17 New Division 1A of Part 8 substituted 12 Division 1A—Bushfire mitigation requirements for certain operators of at-risk electric lines 12 Subdivision 1—Interpretation 12

  21. 83A Definitions 12 Subdivision 2—General duties in relation to bushfire mitigation plans 13

  22. 83B General duty of specified operators to minimise bushfire danger 13

  23. 83BA Submission of bushfire mitigation plans for acceptance 13

  24. 83BB Compliance with bushfire mitigation plan 14 Subdivision 3—Acceptance and validation of bushfire mitigation plans 16

  25. 83BC Validation of bushfire mitigation plans 16

  26. 83BD Additional information 17

  27. 83BE Acceptance of bushfire mitigation plan 17

  28. 83BF Provisional acceptance of bushfire mitigation plan 18

  29. 83BG Non-acceptance of bushfire mitigation plan 18

  30. 83BH Energy Safe Victoria may determine bushfire mitigation plan 19

  31. 83BI Duration of accepted bushfire mitigation plan 20

  32. 83BJ Compliance audits for accepted bushfire mitigation plans—independent audits 20

  33. 83BK Compliance audits—Energy Safe Victoria 21

  34. 18 New section 86A inserted 21

  35. 86A Energy Safe Victoria may give directions for restriction or prevention of tree growth 21

  36. 19 New Division 2A of Part 8 inserted 23 Division 2A—Electric lines and municipal fire prevention plans 23

  37. 86B Municipal fire prevention plans must specify procedures for the identification of trees that are hazardous to electric lines 23

  38. 20 New Division 4 of Part 8 inserted 23 Division 4—Compliance audits in relation to compliance with the Code 23

  39. 90A Application 23

  40. 90B Compliance audits for management plans— independent audits 24

  41. 90C Compliance audits—Energy Safe Victoria 25 ii Section Page

  42. 21 Constitution of Committee 25

  43. 22 New section 88A inserted 25

  44. 88A Committee to consider reliability and security of electricity supply 25

  45. 23 New Division 1AA of Part 10 inserted 26 Division 1AA—Interpretation 26

  46. 98AA Definitions 26

  47. 24 General duty of major electricity companies 26

  48. 25 Electricity safety management schemes 26

  49. 26 New section 105A inserted 27

  50. 105A Bushfire mitigation parts of initial accepted ESMS lapse by certain date 27

  51. 27 New Division 2A of Part 10 inserted 27 Division 2A—Ongoing bushfire mitigation requirements for major electricity companies 27

  52. 113A Submission of bushfire mitigation plans for acceptance 27

  53. 113B Compliance with bushfire mitigation plan 28

  54. 113C Validation, acceptance, provisional acceptance and determination of bushfire mitigation plans 30

  55. 113D Accepted bushfire mitigation plan forms part of accepted ESMS 31

  56. 113E Duration of accepted bushfire mitigation plan 32

  57. 113F Inspection of overhead private electric lines 32

  58. 28 Repeal of redundant provision 33

  59. 29 Compliance audits—independent audits 33

  60. 30 Compliance audits—Energy Safe Victoria 33

  61. 31 Definition for purpose of infringement notices 33

  62. 32 Director may give directions 33

  63. 33 New section 141AB inserted 34

  64. 141AB Information notices 34

  65. 34 New section 149A inserted 35

  66. 149A Reliability and security of electricity supply 35

  67. 35 Electric line clearance 35

  68. 36 New section 151A inserted 36

  69. 151A Bushfire mitigation 36

  70. 37 Statute law revision 37 iii Section Page PART 4—AMENDMENT OF NATIONAL ELECTRICITY (VICTORIA) ACT 2005 38

  71. 38 New section 16B inserted 38

  72. 16B Disapplication of national smart meter rollout provisions 38

  73. 39 New Division heading inserted into Part 3 38 "Division 1—Interpretation" 38

  74. 40 Definitions—Part 3 38

  75. 41 New Division heading inserted 40

  76. 42 New Division 3 of Part 3 inserted 40 Division 3—The f-factor scheme 40

  77. 16C Order in Council for establishment of f-factor scheme 40

  78. 16D Functions and powers conferred and duties imposed on AER 44

  79. 16E Application of NEL provisions after the Victorian distribution pricing determination end date 45

  80. 16F Interrelationship between f-factor determinations and distribution determinations 48

  81. 16G Power of AER to request information relating to f-factor determinations 48

  82. 43 Appeals against certain decisions or actions of the AER 50

  83. 44 Statute law revision 50 PART 5—AMENDMENT OF ENERGY SAFE VICTORIA ACT 2005 51

  84. 45 Grounds for the Director's removal from office 51

  85. 46 New Division 5A of Part 2 inserted 51 Division 5A—Other matters 51

  86. 19A Energy Safe Victoria must publish Charter 51

  87. 19B Memoranda of Understanding 52 PART 6—AMENDMENT OF MINERAL RESOURCES (SUSTAINABLE DEVELOPMENT) ACT 1990 53

  88. 47 Objectives 53

  89. 48 Definitions 53

  90. 49 Offence to carry on extractive industry without authority 53

  91. 50 Work plans 54

  92. 51 Conditions of extractive industry work authorities 54 iv Section Page

  93. 52 New sections 77KA and 77KB inserted 54

  94. 77KA Chief Inspector to be notified of reportable events in relation to quarries 54

  95. 77KB Variation application must be made if quarry is declared 54

  96. 53 Variation of an extractive industry work authority 55

  97. 54 Report to be given about entry 55

  98. 55 Regulations 55

  99. 56 Statute law revision 55 PART 7—AMENDMENT OF PETROLEUM ACT 1998 56

  100. 57 Objectives 56

  101. 58 General definitions 56

  102. 59 New section 20A inserted 56

  103. 20A Grant of exploration permit 56

  104. 60 New definition of gathering line substituted 56

  105. 82 Meaning of gathering line 56

  106. 61 Operation plan to be prepared 57

  107. 62 Emergencies 57

  108. 63 Announcement before entry 57

  109. 64 Prohibition notice 57

  110. 65 Regulations 57 PART 8—REPEALS AND AMENDMENT OF OTHER ACTS 59 Division 1—Mines Act 1958 59

  111. 66 Repeal 59 Division 2—Geothermal Energy Resources Act 2005 59

  112. 67 Objectives and principles 59

  113. 68 New section 20A inserted 60

  114. 20A Grant of exploration permit 60

  115. 69 Operation plan to be prepared 60

  116. 70 Release of factual information 60

  117. 71 Emergencies 60

  118. 72 Announcement before entry 60

  119. 73 Prohibition notice 60

  120. 74 Repeal of spent provisions 61 Division 3—Greenhouse Gas Geological Sequestration Act 2008 61

  121. 75 Operation plan to be prepared 61

  122. 76 Emergencies 61

  123. 77 Announcement before entry 61

  124. 78 Prohibition notice 61

  125. 79 Statute law revision 62 v Section Page Division 4—Offshore Petroleum and Greenhouse Gas Storage Act 2010 62

  126. 80 Statute law revision 62 Division 5—Pipelines Act 2005 64

  127. 81 Heading to section 51 amended 64

  128. 82 Pipelines register 64

  129. 83 New section 186A inserted 64

  130. 186A Other documents to be registered 64 Division 6—Victorian Energy Efficiency Target Act 2007 65

  131. 84 How many certificates may be created in respect of a prescribed activity 65

  132. 85 New section 32A inserted 65

  133. 32A Effect of specified Order made under section 32 65 Division 7—Victorian Renewable Energy Act 2006 66

  134. 86 Statute law revision 66 Division 8—Gas Industry Act 2001 66

  135. 87 Variation or revocation of licence 66 Division 9—Energy and Resources Legislation Amendment Act 2009 66

  136. 88 Part 8 repealed 66 Division 10—Aboriginal Heritage Act 2006 67

  137. 89 Definitions 67 PART 9—REPEAL OF AMENDING ACT 68

  138. 90 Repeal 68 ═══════════════ ENDNOTES 69 vi Victoria Energy and Resources Legislation Amendment Act 2010† No. 55 of 2010 [Assented to 14 September 2010] The Parliament of Victoria enacts: PART 1—PRELIMINARY

  139. 1 Purposes The main purposes of this Act are— (a) to amend the Electricity Industry Act 2000— (i) to extend the application of provisions of that Act designed to facilitate cost sharing for augmentations to distribution systems; and 1 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 1—Preliminary s. 1 (ii) to require the Essential Services Commission to have regard to a Ministerial emergency power direction under Part 6 of that Act that is in force before revoking a licence under that Act; and (iii) to make further provision in relation to matters that are consequential to the rollout of advanced metering infrastructure; and (b) to make amendments to the Electricity Safety Act 1998 relating— (i) to the functions and powers of Energy Safe Victoria; and (ii) to the clearance of vegetation around electric power lines; and (iii) to bushfire mitigation plans; and (iv) to electricity safety management schemes; and (c) to amend the National Electricity (Victoria) Act 2005— (i) to disapply the smart meter rollout provisions under the National Electricity Law to prevent an overlap with the advanced metering infrastructure arrangements under the Electricity Industry Act 2000; and (ii) to provide for an economic incentive scheme with respect to fire starts to be administered by the Australian Energy Regulator in respect of distribution companies operating in Victoria; and 2 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 1—Preliminary s. 1 (d) to amend the Energy Safe Victoria Act 2005 to make further provision in relation to Energy Safe Victoria's corporate governance arrangements; and (e) to amend the Mineral Resources (Sustainable Development) Act 1990 to improve the operation of that Act; and (f) to amend the Petroleum Act 1998 to improve the operation of that Act; and (g) to repeal the Mines Act 1958; and (h) to amend the Gas Industry Act 2001 to require the Essential Services Commission to have regard to any Ministerial emergency power direction under Part 9 of that Act that is in force before revoking a licence under that Act; and (i) to amend the Aboriginal Heritage Act 2006 to make further provision in relation to the interrelationship between cultural heritage management plans under that Act and area work plans under the Mineral Resources (Sustainable Development) Act 1990; and (j) to make miscellaneous amendments to the Geothermal Energy Resources Act 2005, the Greenhouse Gas Geological Sequestration Act 2008, the Offshore Petroleum and Greenhouse Gas Storage Act 2010, the Pipelines Act 2005, the Victorian Energy Efficiency Target Act 2007, the Victorian Renewable Energy Act 2006 and the Energy and Resources Legislation Amendment Act 2009. 3 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 1—Preliminary s. 2

  140. 2 Commencement (1) Subject to subsection (3), this Act (except sections 36 and 85) comes into operation on a day or days to be proclaimed. (2) Sections 36 and 85 come into operation on the day after the day on which this Act receives the Royal Assent. (3) If a provision of this Act does not come into operation before 1 July 2011, it comes into operation on that day. __________________ 4 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 2—Amendment of Electricity Industry Act 2000 s. 3 PART 2—AMENDMENT OF ELECTRICITY INDUSTRY ACT 2000

  141. 3 Amendment of Division heading In the heading to Division 2A of Part 2 of the See: Act No. Electricity Industry Act 2000 omit "wind 68/2000. energy". Reprint No. 5 as at 1 July 2009 and amending Act Nos 41/2009, 57/2009, 68/2009, 72/2009 and 6/2010. LawToday: www. legislation. vic.gov.au

  142. 4 Definitions for purpose of Division 2A of Part 2 (1) In section 15B of the Electricity Industry Act 2000, in the definition of relevant generator, in paragraph (b), for "activity;" substitute "activity.". (2) In section 15B of the Electricity Industry Act 2000, the definition of wind energy generation facility is repealed.

  143. 5 Relevant augmentations In section 15C(2) of the Electricity Industry Act 2000 omit "wind energy".

  144. 6 Applicable charging principles (1) In the heading to section 15D of the Electricity Industry Act 2000 omit "wind energy". (2) In section 15D(1)(a) of the Electricity Industry Act 2000 omit "wind energy". 5 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 2—Amendment of Electricity Industry Act 2000 s. 7

  145. 7 Variation or revocation of licence After section 29(3) of the Electricity Industry Act 2000 insert— "(4) In deciding whether to revoke a licence the Commission must have regard to any direction of the Minister under section 96 that is in force. (5) Anything in the procedures specified in the licence's conditions for the revocation of the licence that is inconsistent with subsection (4) is of no effect.".

  146. 8 Definition for purpose of Division 6A of Part 2 In section 46B of the Electricity Industry Act 2000 insert the following definition— "AMI tariff means— (a) a tariff (including a tariff referred to in section 35 or 36A) applying to electricity supplied and sold that is metered by means of advanced metering infrastructure; or (b) a tariff (including a tariff referred to in section 40A) applying to electricity distributed or supplied that is metered by means of advanced metering infrastructure;".

  147. 9 Orders in relation to advanced metering infrastructure (1) In section 46D(i)(ii) of the Electricity Industry Act 2000, for "supplied." substitute "supplied;". (2) After section 46D(i) of the Electricity Industry Act 2000 insert— "(j) require a relevant licensee to give a specified customer, or a customer of a specified class— 6 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 2—Amendment of Electricity Industry Act 2000 s. 9 (i) information about advanced metering infrastructure of an explanatory kind; (ii) information about when a specified AMI tariff, or a specified class of AMI tariffs, may take effect; (iii) notification of the date when, or the period within which, electricity will be supplied and sold to that specified customer, or customers of that specified class, at specified AMI tariffs; (iv) information as to the basis on which a specified AMI tariff, or a specified class of AMI tariffs, is calculated; (v) information about the supply and installation of advanced metering infrastructure; (k) specify how information referred to in paragraph (j) is to be given to a specified customer, or a customer of a specified class; (l) require a relevant licensee to prepare, publish and maintain specified information to enable a specified customer, or a customer of a specified class, to compare offers for the supply and sale of electricity that is to be supplied and sold at specified AMI tariffs; (m) specify how information referred to in paragraph (l) is to be published; (n) require a relevant licensee to provide specified information to another relevant licensee (the second licensee) for the purpose of enabling the second licensee to comply with a requirement made under paragraph (j) or (l); 7 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 2—Amendment of Electricity Industry Act 2000 s. 10 (o) specify how the information referred to in paragraph (n) is to be given to the second licensee; (p) require a relevant licensee to assist, in a specified manner, a specified customer, or a customer of a specified class, to enable the customer to determine whether the customer may benefit from being supplied and sold electricity at a specified AMI tariff; (q) require a relevant licensee to establish and maintain a specified method, process or procedure by which a specified customer, or a customer of a specified class, who is supplied and sold electricity at an AMI tariff may access data relating to past electricity consumption by that customer; (r) provide for when a specified AMI tariff, or a specified class of AMI tariffs, may have effect; (s) specify the requirements to be met by a relevant licensee before the licensee may offer to supply and sell, or distribute and supply, electricity to a specified customer, or a customer of a specified class, at a specified AMI tariff or specified AMI tariffs.".

  148. 10 New section 46DA inserted After section 46D of the Electricity Industry Act 2000 insert— "46DA Interrelationship of Orders and other provisions relating to tariffs A requirement under an Order of the Governor in Council made under section 46D(j) to (s) is in addition to, and does not limit, a requirement under section 35, 35C, 35D, 36A or 40A.". 8 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 2—Amendment of Electricity Industry Act 2000 s. 11

  149. 11 Statute law revision (1) In section 40F(1) of the Electricity Industry Act 2000, in the definition of qualifying solar energy generating facility, for "generating" (where first occurring) substitute "generation". (2) In section 40FJ(2) of the Electricity Industry Act 2000, for "day.." substitute "day.". __________________ 9 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 12 PART 3—AMENDMENT OF ELECTRICITY SAFETY ACT 1998

  150. 12 New section 1 substituted See: Act No. For section 1 of the Electricity Safety Act 1998 25/1998. substitute— Reprint No. 5 as at "1 Purpose

  151. 21 August

  152. 2008 The purpose of this Act is to make further and amending provision relating to— Act Nos 61/2007, (a) the safety of electricity supply and use; 25/2008, 59/2008, and 57/2009 and 6/2010. (b) the reliability and security of electricity LawToday: supply; and www. legislation. (c) the efficiency of electrical equipment.". vic.gov.au

  153. 13 Definitions (1) In section 3 of the Electricity Safety Act 1998, in the definition of distribution area, for "licensee" substitute "distribution company". (2) In section 3 of the Electricity Safety Act 1998, in the definition of practicable, after "in" (where first occurring) insert "section 83B or". (3) In section 3 of the Electricity Safety Act 1998 insert the following definitions— 'accepted bushfire mitigation plan means— (a) a bushfire mitigation plan accepted by Energy Safe Victoria under Subdivision 3 of Division 1A of Part 8 and includes a bushfire mitigation plan provisionally accepted by Energy Safe Victoria under that Subdivision; or 10 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 14 (b) a bushfire mitigation plan accepted by Energy Safe Victoria under Division 2A of Part 10 (and taken to form part of an accepted ESMS by operation of section 113D) and includes a bushfire mitigation plan provisionally accepted by Energy Safe Victoria under that Division; bushfire mitigation plan means a plan referred to in section 83BA(1) or 113A(1); hazardous bushfire risk area means an area— (a) to which a fire authority has assigned a fire hazard rating of "high" under section 80, whether or not the area is an urban area; or (b) that is not an urban area (other than an area a fire control authority has assigned a fire hazard rating of "low" under section 80); specified bushfire risk period means the period commencing 1 November and ending

  154. 31 March the following year;'.

  155. 14 Objectives and functions of Energy Safe Victoria (1) After section 6(c) of the Electricity Safety Act 1998 insert— "(ca) to promote the prevention and mitigation of bushfire danger;". (2) After section 7(f) of the Electricity Safety Act 1998 insert— "(fa) to regulate, monitor and enforce the prevention and mitigation of bushfires that arise out of incidents involving electric lines or electrical installations;". 11 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 15

  156. 15 New section 7A inserted After section 7 of the Electricity Safety Act 1998 insert— "7A Energy Safe Victoria may have regard to the reliability and security of electricity supply in certain cases In performing a function or exercising a power under Part 8 or 10 or regulations made for the purposes of either of those Parts, Energy Safe Victoria may have regard to the reliability and security of electricity supply.".

  157. 16 Amendment of heading to Part 8 In the heading to Part 8 of the Electricity Safety Act 1998, before "ELECTRIC" insert "BUSHFIRE MITIGATION REQUIREMENTS FOR CERTAIN OPERATORS AND".

  158. 17 New Division 1A of Part 8 substituted For Division 1A of Part 8 of the Electricity Safety Act 1998 substitute— "Division 1A—Bushfire mitigation requirements for certain operators of at-risk electric lines Subdivision 1—Interpretation

  159. 83A Definitions In this Division— at-risk electric line means an electric line (other than a private electric line) that is— (a) above the surface of land; and (b) in a hazardous bushfire risk area; 12 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 17 specified operator means the operator of an at-risk electric line but does not include a major electricity company. Subdivision 2—General duties in relation to bushfire mitigation plans

  160. 83B General duty of specified operators to minimise bushfire danger (1) A specified operator must design, construct, operate, maintain and decommission an at- risk electric line to minimise as far as practicable the bushfire danger arising from that line. Penalty: In the case of a natural person, 300 penalty units; In the case of a body corporate, 1500 penalty units. (2) It is a defence to a prosecution of a specified operator for an offence relating to a breach of a duty or obligation set out in subsection (1) if the operator has complied with the accepted bushfire mitigation plan in relation to that duty or obligation.

  161. 83BA Submission of bushfire mitigation plans for acceptance (1) A specified operator must, before 1 July in each year, prepare and submit to Energy Safe Victoria, for acceptance under Subdivision 3, a plan for the operator's proposals for the mitigation of bushfire in relation to the operator's at-risk electric lines. Penalty: In the case of a natural person, 300 penalty units; In the case of a body corporate, 1500 penalty units. 13 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 17 (2) A bushfire mitigation plan under subsection (1)— (a) must be in or to the effect of a form approved by Energy Safe Victoria; and (b) must include the prescribed particulars. (3) A specified operator must cause a copy of an accepted bushfire mitigation plan to be available for inspection— (a) on the operator's Internet site; and (b) at the operator's principal office in the State during ordinary business hours. Penalty: In the case of a natural person, 10 penalty units; In the case of a body corporate, 50 penalty units.

  162. 83BB Compliance with bushfire mitigation plan (1) During the specified bushfire risk period, a specified operator must not commence to commission, or operate, an at-risk electric line unless a bushfire mitigation plan that applies to the operator's at-risk electric lines has been accepted or provisionally accepted under Subdivision 3. Penalty: In the case of a natural person, 300 penalty units; In the case of a body corporate, 1500 penalty units. 14 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 17 (2) A specified operator must comply with an accepted bushfire mitigation plan that applies to the operator's at-risk electric lines. Penalty: In the case of a natural person, 300 penalty units; In the case of a body corporate, 1500 penalty units. (3) Subsection (1) does not apply to a specified operator who has a reasonable excuse. (4) For the purposes of subsection (1), it is a reasonable excuse for a specified operator not to comply with subsection (1) if— (a) there is no accepted bushfire mitigation plan that applies to the operator's at-risk electric lines; and (b) the reason for there being no accepted bushfire mitigation plan that applies to the operator's at-risk electric lines is that— (i) Energy Safe Victoria failed to accept the operator's bushfire mitigation plan by 31 October in the year it was submitted to Energy Safe Victoria; and (ii) that failure arose because of unreasonable delay on Energy Safe Victoria's part. (5) For the purposes of subsection (1), it is not a reasonable excuse for a specified operator not to comply with subsection (1) if— (a) there is no accepted bushfire mitigation plan that applies to the operator's at-risk electric lines; and 15 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 17 (b) the reason for there being no accepted bushfire mitigation plan that applies to the operator's at-risk electric lines is that— (i) Energy Safe Victoria failed to accept the operator's bushfire mitigation plan by 31 October in the year it was submitted to Energy Safe Victoria and that failure arose because of actions or inactions of the operator that hampered the ability of Energy Safe Victoria to make a decision whether to accept that plan by

  163. 31 October; or (ii) Energy Safe Victoria has not accepted a plan under section 83BG. (6) Subsections (4) and (5) do not limit what may constitute a reasonable excuse. Subdivision 3—Acceptance and validation of bushfire mitigation plans

  164. 83BC Validation of bushfire mitigation plans (1) If a bushfire mitigation plan has been submitted by a specified operator under section 83BA, Energy Safe Victoria may require the operator to obtain an independent validation of that plan or any part of that plan. (2) The specified operator must establish to the satisfaction of Energy Safe Victoria that each person undertaking the validation of a bushfire mitigation plan has the necessary competence and ability and access to 16 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 17 information to arrive at an independent opinion in respect of the plan. (3) If Energy Safe Victoria requires a specified operator to provide an independent validation of a bushfire mitigation plan or part of a plan, the costs of that validation must be borne by the operator. (4) Energy Safe Victoria is not required to proceed with the consideration of a bushfire mitigation plan under this Subdivision until the independent validation is provided.

  165. 83BD Additional information (1) Energy Safe Victoria may require a specified operator to provide any additional information that Energy Safe Victoria thinks fit in relation to a bushfire mitigation plan submitted by the operator under section 83BA. (2) Energy Safe Victoria is not required to proceed with the consideration of a bushfire mitigation plan under this Subdivision until the additional information is provided.

  166. 83BE Acceptance of bushfire mitigation plan (1) Energy Safe Victoria must consider a bushfire mitigation plan submitted under section 83BA with as much expedition as the requirements of this Act and the regulations and the proper consideration of the plan permit. (2) Energy Safe Victoria must accept a bushfire mitigation plan submitted under section 83BA if it is satisfied that the plan is appropriate for the at-risk electric lines to which it relates. 17 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 17 (3) Energy Safe Victoria must notify the specified operator in writing of its decision to accept a bushfire mitigation plan.

  167. 83BF Provisional acceptance of bushfire mitigation plan (1) Energy Safe Victoria may provisionally accept a bushfire mitigation plan submitted under section 83BA if it is satisfied that the plan will minimise the bushfire danger arising from the at-risk electric lines to which the plan applies. (2) Energy Safe Victoria must notify the operator that submitted the bushfire mitigation plan, in writing, of its decision to provisionally accept the plan. (3) The notice of provisional acceptance must state— (a) the period that the provisional acceptance will be in force; and (b) the extent to which the bushfire mitigation plan has been accepted; and (c) any limitations or conditions which will apply in respect of the accepted bushfire mitigation plan or part of the plan.

  168. 83BG Non-acceptance of bushfire mitigation plan (1) If Energy Safe Victoria does not accept or provisionally accept a bushfire mitigation plan submitted to it under section 83BA, it must— (a) notify the specified operator that submitted the plan in writing of the non-acceptance; and 18 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 17 (b) give the operator an opportunity to modify and re-submit the bushfire mitigation plan. (2) A modified bushfire mitigation plan must be submitted to Energy Safe Victoria within 28 days after the notice is given under subsection (1). (3) If, after considering any modified bushfire mitigation plan submitted under this section, Energy Safe Victoria decides not to accept the plan, Energy Safe Victoria must give notice in writing of that decision to the specified operator that submitted the plan. (4) A notice under this section must be accompanied by a statement of the reasons for the decision.

  169. 83BH Energy Safe Victoria may determine bushfire mitigation plan (1) Energy Safe Victoria may determine the bushfire mitigation plan which is to apply in relation to a specified operator's at-risk electric lines. (2) Energy Safe Victoria may make a determination under subsection (1) if— (a) a specified operator fails to submit a bushfire mitigation plan under section 83BA that relates to the operator's at-risk electric lines; or (b) Energy Safe Victoria has decided not to accept a bushfire mitigation plan submitted under section 83BA that relates to a specified operator's at-risk electric lines. 19 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 17 (3) If Energy Safe Victoria determines the bushfire mitigation plan to apply to a specified operator's at-risk electric lines under this section, Energy Safe Victoria must give notice in writing to the operator of that determination. (4) On notice being given to the specified operator under subsection (3), the bushfire mitigation plan determined by Energy Safe Victoria is taken for the purposes of this Act to be the accepted bushfire mitigation plan for that operator's at-risk electric lines. (5) Nothing in subsection (4) prevents a specified operator from submitting a bushfire mitigation plan under section 83BA in relation to the operator's at-risk electric lines for acceptance under this Subdivision.

  170. 83BI Duration of accepted bushfire mitigation plan An accepted bushfire mitigation plan ceases to have effect on 30 June in the year after it is accepted under this Subdivision.

  171. 83BJ Compliance audits for accepted bushfire mitigation plans—independent audits (1) Energy Safe Victoria may require a specified operator— (a) to obtain, at the intervals determined by Energy Safe Victoria, independent audits of the operator's compliance with an accepted bushfire mitigation plan; and (b) to forward a copy of each audit report to Energy Safe Victoria within a time specified by Energy Safe Victoria. 20 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 18 (2) The specified operator must establish to the satisfaction of Energy Safe Victoria that each person undertaking an audit under this section has the necessary competence and ability and access to information on the operations of the operator and the accepted bushfire mitigation plan to enable an independent audit to be carried out. (3) If Energy Safe Victoria requires a specified operator to obtain an independent audit under this section, the costs of that audit must be borne by the operator. (4) A specified operator must comply with a requirement of Energy Safe Victoria under this section. Penalty: 200 penalty units.

  172. 83BK Compliance audits—Energy Safe Victoria Energy Safe Victoria may conduct, or cause to be conducted, an audit to determine whether or not a specified operator is satisfactorily complying with an accepted bushfire mitigation plan.".

  173. 18 New section 86A inserted After section 86 of the Electricity Safety Act 1998 insert— "86A Energy Safe Victoria may give directions for restriction or prevention of tree growth (1) If Energy Safe Victoria is satisfied that it is necessary to do so in order to prevent future unsafe electrical situations, Energy Safe Victoria may, in writing, direct a specified person— 21 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 18 (a) to restrict or cease the planting of specified trees or species or classes of tree in the immediate area around an electric line; or (b) to clear specified trees or species or classes of tree from the immediate area around an electric line; or (c) to do any other thing necessary to minimise or prevent growth of specified trees or species or classes of tree in the immediate area around an electric line. (2) A direction under subsection (1) must be reasonable. (3) In this section, specified person means the owner or occupier of land in the area of an electric line or the relevant distribution company or relevant transmission company that owns or operates the electric line. (4) A specified person must comply with a direction under subsection (1) that applies to the specified person. Penalty: In the case of a natural person, 50 penalty units; In the case of a body corporate, 250 penalty units.". 22 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 19

  174. 19 New Division 2A of Part 8 inserted After Division 2 of Part 8 of the Electricity Safety Act 1998 insert— "Division 2A—Electric lines and municipal fire prevention plans

  175. 86B Municipal fire prevention plans must specify procedures for the identification of trees that are hazardous to electric lines Without limiting section 55A of the Country Fire Authority Act 1958, a municipal council must, in a municipal fire prevention plan required to be prepared and maintained under that section, specify— (a) procedures and criteria for the identification of trees that are likely to fall onto, or come into contact with, an electric line (hazard trees); and (b) procedures for the notification of responsible persons of trees that are hazard trees in relation to electric lines for which they are responsible.".

  176. 20 New Division 4 of Part 8 inserted After Division 3 of Part 8 of the Electricity Safety Act 1998 insert— "Division 4—Compliance audits in relation to compliance with the Code

  177. 90A Application (1) This Division applies to a responsible person who has prepared a management plan relating to compliance with the Code that has been approved by Energy Safe Victoria under the regulations. 23 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 20 (2) In subsection (1) responsible person means a person referred to in section 84(4), (5), (6) or (7).

  178. 90B Compliance audits for management plans—independent audits (1) Energy Safe Victoria may require a responsible person— (a) to obtain, at the intervals determined by Energy Safe Victoria, independent audits of the person's compliance with the management plan; and (b) to forward a copy of each audit report to Energy Safe Victoria within a time specified by Energy Safe Victoria. (2) The responsible person must establish to the satisfaction of Energy Safe Victoria that each person undertaking an audit under this section has the necessary competence and ability and access to information on the operations of the responsible person and the management plan to enable an independent audit to be carried out. (3) If Energy Safe Victoria requires a responsible person to obtain an independent audit under this section, the costs of that audit must be borne by the responsible person. (4) A responsible person must comply with a requirement of Energy Safe Victoria under this section. Penalty: 200 penalty units. 24 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 21

  179. 90C Compliance audits—Energy Safe Victoria Energy Safe Victoria may conduct, or cause to be conducted, an audit to determine whether or not a responsible person is satisfactorily complying with the management plan.".

  180. 21 Constitution of Committee (1) In section 87(5)(f) of the Electricity Safety Act 1998, for "6 other members" substitute "5 other members". (2) In section 87(5)(f)(iv) of the Electricity Safety Act 1998, for "1987." substitute "1987; and". (3) After section 87(5)(f) of the Electricity Safety Act 1998 insert— "(g) an officer or employee of Energy Safe Victoria nominated by the Minister administering the Energy Safe Victoria Act 2005.".

  181. 22 New section 88A inserted After section 88 of the Electricity Safety Act 1998 insert— "88A Committee to consider reliability and security of electricity supply In performing its functions under section 88, the Electric Line Clearance Consultative Committee may have regard to the reliability and security of electricity supply.". 25 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 23

  182. 23 New Division 1AA of Part 10 inserted Before Division 1 of Part 10 of the Electricity Safety Act 1998 insert— "Division 1AA—Interpretation

  183. 98AA Definitions In this Part— at-risk supply network means a supply network or a part of a supply network that is— (a) above the surface of land; and (b) in a hazardous bushfire risk area.".

  184. 24 General duty of major electricity companies (1) In section 98(b) of the Electricity Safety Act 1998, for "network." substitute "network; and". (2) After section 98(b) of the Electricity Safety Act 1998 insert— "(c) if that network is an at-risk supply network, the bushfire danger arising from that network.".

  185. 25 Electricity safety management schemes After section 99(2) of the Electricity Safety Act 1998 insert— "(2A) Without limiting subsection (2)(b), an electricity safety management scheme must include a plan for the mitigation of bushfire danger in relation to the major electricity company's at-risk supply network.". 26 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 26

  186. 26 New section 105A inserted After section 105 of the Electricity Safety Act 1998 insert— "105A Bushfire mitigation parts of initial accepted ESMS lapse by certain date The provisions of an accepted ESMS that constitute a plan for the mitigation of bushfire danger in relation to the major electricity company's at-risk supply network lapse on 30 June in the year after the year in which the accepted ESMS is accepted. Note See also Division 2A of this Part.".

  187. 27 New Division 2A of Part 10 inserted After Division 2 of Part 10 of the Electricity Safety Act 1998 insert— "Division 2A—Ongoing bushfire mitigation requirements for major electricity companies

  188. 113A Submission of bushfire mitigation plans for acceptance (1) A major electricity company must, before

  189. 1 July in each year, prepare and submit to Energy Safe Victoria, for acceptance under this Division, a plan for the company's proposals for mitigation of bushfire in relation to the company's at-risk supply network. Penalty: In the case of a natural person, 300 penalty units; In the case of a body corporate, 1500 penalty units. 27 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 27 (2) A bushfire mitigation plan under subsection (1)— (a) must be in or to the effect of a form approved by Energy Safe Victoria; and (b) must include the prescribed particulars. (3) A major electricity company must cause a copy of its accepted bushfire mitigation plan to be made available for inspection— (a) on the company's Internet site; and (b) at the company's principal office in the State during ordinary business hours. Penalty: In the case of a natural person, 10 penalty units; In the case of a body corporate, 50 penalty units.

  190. 113B Compliance with bushfire mitigation plan (1) During the specified bushfire risk period, a major electricity company must not commence to commission, or operate, an at-risk supply network unless a bushfire mitigation plan that applies to the company's at-risk electric lines has been accepted or provisionally accepted under this Division. Penalty: In the case of a natural person, 300 penalty units; In the case of a body corporate, 1500 penalty units. 28 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 27 (2) A major electricity company must comply with an accepted bushfire mitigation plan that applies to the company's at-risk supply network. Penalty: In the case of a natural person, 300 penalty units; In the case of a body corporate, 1500 penalty units. (3) Subsection (1) does not apply to a major electricity company that has a reasonable excuse. (4) For the purposes of subsection (1), it is a reasonable excuse for a major electricity company not to comply with subsection (1) if— (a) there is no accepted bushfire mitigation plan that applies to the company's at-risk supply network; and (b) the reason for there being no accepted bushfire mitigation plan that applies to the company's at-risk supply network is that— (i) Energy Safe Victoria failed to accept the company's bushfire mitigation plan by 31 October in the year it was submitted to Energy Safe Victoria; and (ii) that failure arose because of unreasonable delay on Energy Safe Victoria's part. (5) For the purposes of subsection (1), it is not a reasonable excuse for a major electricity company not to comply with subsection (1) if— 29 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 27 (a) there is no accepted bushfire mitigation plan that applies to the company's at-risk supply network; and (b) the reason for there being no accepted bushfire mitigation plan that applies to the company's at-risk supply network is that— (i) Energy Safe Victoria failed to accept the company's bushfire mitigation plan by 31 October in the year it was submitted to Energy Safe Victoria and that failure arose because of actions or inactions of the company that hampered the ability of Energy Safe Victoria to make a decision whether to accept that plan by

  191. 31 October; or (ii) Energy Safe Victoria has not accepted a plan under section

  192. 83BG (as applied and modified by section 113C). (6) Subsections (4) and (5) do not limit what may constitute a reasonable excuse.

  193. 113C Validation, acceptance, provisional acceptance and determination of bushfire mitigation plans Sections 83BC to 83BH apply to the validation, or acceptance, provisional acceptance or non-acceptance or determination by Energy Safe Victoria, of a bushfire mitigation plan under this Division— 30 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 27 (a) as if— (i) a reference to a specified operator were a reference to a major electricity company; and (ii) a reference to an at-risk electric line were a reference to an at-risk supply network; and (iii) a reference to a bushfire mitigation plan were a reference to a bushfire mitigation plan submitted under this Division; and (iv) a reference to an accepted bushfire mitigation plan were a reference to an accepted bushfire mitigation plan accepted or provisionally accepted under this Division; and (b) with any other modifications that are necessary.

  194. 113D Accepted bushfire mitigation plan forms part of accepted ESMS (1) An accepted bushfire mitigation plan applying to a major electricity company's at-risk supply network is taken to form part of the major electricity company's accepted ESMS. (2) However, despite anything to the contrary in Division 2, sections 106, 107, 109 and 110 do not apply to that part of an accepted ESMS that is constituted by an accepted bushfire mitigation plan. (3) In addition, to avoid doubt, an acceptance, provisional acceptance or determination of a bushfire mitigation plan under this Division is not a revision of an accepted ESMS for the purposes of section 108. 31 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 27

  195. 113E Duration of accepted bushfire mitigation plan The part of an accepted ESMS that is constituted by an accepted bushfire mitigation plan ceases to have effect on

  196. 30 June in the year after the accepted bushfire mitigation plan is accepted under this Division.

  197. 113F Inspection of overhead private electric lines (1) A major electricity company that has a distribution area must cause an inspection to be carried out at such times as are prescribed, and in accordance with the prescribed standards (if any), of private electric lines that are above the surface of land within its distribution area, other than any prescribed parts of those lines. Penalty: In the case of a natural person, 50 penalty units; In the case of a body corporate, 250 penalty units. (2) A major electricity company must give to the occupier of land above which there is a private electric line notice in the prescribed form (if any) during the prescribed period (if any) before an inspection under subsection (1) is carried out. (3) A major electricity company may, for the purpose of an inspection under this section, enter onto land at any reasonable time for the purposes of inspecting a private electric line under this section and remain on the land for so long as is necessary to inspect the line. 32 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 28 (4) If an inspection carried out under this section reveals that maintenance is required on a private electric line above land, the major electricity company must give the owner of the land written notice of the maintenance required.".

  198. 28 Repeal of redundant provision Section 112 of the Electricity Safety Act 1998 is repealed.

  199. 29 Compliance audits—independent audits For section 120H(1)(a)(ii) of the Electricity Safety Act 1998 substitute— "(ii) the operator's supply network (including the operator's at-risk supply network) or complex electrical installation; and".

  200. 30 Compliance audits—Energy Safe Victoria For section 120I(b) of the Electricity Safety Act 1998 substitute— "(b) the operator's supply network (including the operator's at-risk supply network) or complex electrical installation.".

  201. 31 Definition for purpose of infringement notices In section 140A of the Electricity Safety Act 1998, in the definition of prescribed offence, in paragraph (a)— (a) for "83A(1), 83A(3), 83B(1)" substitute "83BA(3),"; (b) after "110," insert "113A(3), 113F(1),".

  202. 32 Director may give directions (1) In section 141(2)(d) of the Electricity Safety Act 1998, for "safe." substitute "safe; or". 33 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 33 (2) After section 141(2)(d) of the Electricity Safety Act 1998 insert— "(e) to do any other thing necessary to prevent an unsafe electrical situation from arising.".

  203. 33 New section 141AB inserted After section 141A of the Electricity Safety Act 1998 insert— "141AB Information notices (1) Energy Safe Victoria, by written notice, may require a person to give Energy Safe Victoria information in the person's possession or control that Energy Safe Victoria reasonably requires for the purpose of preparing annual reports in relation to the performance of distribution companies in complying with Divisions 1A, 2 and 4 of Part 8, and Part 10. (2) A notice under subsection (1) must— (a) specify or describe the information that is required by Energy Safe Victoria; and (b) specify the format in which that information is to be given to Energy Safe Victoria; and (c) specify the date by which the information must be given to Energy Safe Victoria. (3) A person who is given a notice under subsection (1) must comply with the notice unless the person has a lawful excuse. Penalty: In the case of a natural person, 50 penalty units; In the case of a body corporate, 200 penalty units. 34 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 34 (4) A natual person cannot be compelled, by the giving of a notice under subsection (1), to give information if the information might tend to incriminate the person of an offence. (5) This section does not require a person to give information that is the subject of legal professional privilege or client legal privilege. (6) It is not a lawful excuse for a person to fail to comply with a notice under subsection (1) on the ground of any duty of confidence.".

  204. 34 New section 149A inserted After section 149 of the Electricity Safety Act 1998 insert— "149A Reliability and security of electricity supply The Governor in Council may make regulations for or with respect to the reliability and security of the supply of electricity.".

  205. 35 Electric line clearance (1) In section 151(d) of the Electricity Safety Act 1998, for "an approved management plan." substitute "an approved management plan;". (2) After section 151(d) of the Electricity Safety Act 1998 insert— "(e) the standards and practices to be adopted and observed in relation to— (i) tree planting, pruning or clearing in the immediate area around electric lines; 35 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 36 (ii) species of tree or classes of tree that may remain or be planted in the immediate area around electric lines; (iii) species of tree or classes of tree that must be cleared from the immediate area around electric lines; (iv) the management of trees in the immediate area around electric lines.".

  206. 36 New section 151A inserted After section 151 of the Electricity Safety Act 1998 insert— "151A Bushfire mitigation The Governor in Council may make regulations for or with respect to— (a) the prevention of bushfires arising from electric lines or electrical installations; (b) the protection of electric lines or electrical installations from the effects of bushfires; (c) the inspection of electric lines or electrical installations for the purpose of the prevention of bushfires arising from such lines or installations; (d) the training of persons conducting inspections of the kind referred to in paragraph (c); (e) the auditing of the training and performance of persons conducting inspections of the kind referred to in paragraph (c).". 36 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 3—Amendment of Electricity Safety Act 1998 s. 37

  207. 37 Statute law revision (1) In section 3 of the Electricity Safety Act 1998— (a) the definition of Committee is repealed; and (b) insert the following definition— "Committee means— (a) in Part 4, the Equipment Advisory Committee; (b) in Part 8, the Electric Line Clearance Consultative Committee; (c) in Part 9, the Victorian Electrolysis Committee;"; and (c) in the definition of voluntary ESMS operator, for "Part 10;" substitute "Part 10.". (2) In section 120C(1)(b) of the Electricity Safety Act 1998, before "complex" insert "a". __________________ 37 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 38 PART 4—AMENDMENT OF NATIONAL ELECTRICITY (VICTORIA) ACT 2005

  208. 38 New section 16B inserted See: Act No. After section 16A of the National Electricity 8/2005. (Victoria) Act 2005 insert— Reprint No. 1 as at "16B Disapplication of national smart meter

  209. 20 May 2010. LawToday: rollout provisions www. legislation. Despite section 6— vic.gov.au (a) Part 8A of the NEL does not apply as a law of Victoria; and (b) any Rule made for the purposes of that Part does not have the force of law in Victoria.".

  210. 39 New Division heading inserted into Part 3 Before section 13 of the National Electricity (Victoria) Act 2005 insert— "Division 1—Interpretation".

  211. 40 Definitions—Part 3 In section 13 of the National Electricity (Victoria) Act 2005, insert the following definitions— "Country Fire Authority means the Country Fire Authority appointed under the Country Fire Authority Act 1958; Distribution Network Service Provider has the same meaning as in the National Electricity Rules; Energy Safe Victoria means Energy Safe Victoria established under the Energy Safe Victoria Act 2005; 38 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 40 f-factor amount determination means a determination made by the AER in accordance with an Order under section 16C(1)(b); f-factor scheme determination means a determination made by the AER in accordance with an Order under section 16C(1)(a); first distribution determination period means the period— (a) commencing on the day after the day that is the Victorian distribution pricing determination end date; and (b) ending on— (i) 31 December 2015; or (ii) for a distribution determination that continues to be in force after that date, the date on which that distribution determination ceases to be in force; Metropolitan Fire and Emergency Services Board means the Metropolitan Fire and Emergency Services Board established under the Metropolitan Fire Brigades Act 1958; relevant entity means— (a) the Secretary to the Department of Sustainability and Environment; or (b) Energy Safe Victoria; or (c) the Country Fire Authority; or (d) the Metropolitan Fire and Emergency Services Board; 39 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 41 service target performance incentive scheme has the same meaning as in the National Electricity Rules;".

  212. 41 New Division heading inserted After section 13 of the National Electricity (Victoria) Act 2005 insert— "Division 2—General modifications".

  213. 42 New Division 3 of Part 3 inserted After Division 2 of Part 3 of the National Electricity (Victoria) Act 2005 insert— 'Division 3—The f-factor scheme

  214. 16C Order in Council for establishment of f-factor scheme (1) The Governor in Council, by Order published in the Government Gazette, for the purpose of reducing the risk of fire starts and reducing the risk of loss or damage caused by fire starts, may confer functions and powers, or impose duties, on the AER to make— (a) a determination for the purpose of providing incentives for Distribution Network Service Providers to reduce the risk of fire starts and reduce the risk of loss or damage caused by fire starts; (b) a determination for each year of the first distribution determination period specifying an amount that is to be treated as a positive pass through amount or a negative pass through amount for the purposes of Chapter 6 of the National Electricity Rules. 40 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42 (2) Without limiting subsection (1), an Order under that subsection may— (a) specify how the AER is to make, publish, implement and administer an f-factor scheme determination and an f-factor amount determination; (b) specify the kinds of fire starts to be covered by an f-factor scheme determination or require the AER to determine the kinds of fire starts to be covered by an f-factor scheme determination; (c) require the AER, before making an f-factor scheme determination, to consult with one or more of the following— (i) the Minister; (ii) a Distribution Network Service Provider; (iii) a relevant entity; (iv) any other person whose interests are affected and who is specified as a person with whom the AER must consult; (d) require the AER, when consulting with persons referred to in paragraph (c), to comply with specified consultation procedures; (e) require the AER to include benchmarks or targets for Distribution Network Service Providers as part of an f-factor scheme determination; (f) require the AER to assess the performance of Distribution Network Service Providers in relation to any 41 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42 benchmarks or targets included as part of an f-factor scheme determination and for the purpose of making an f-factor amount determination; (g) specify any benchmarks, targets, incentives, rewards or penalties for inclusion in an f-factor scheme determination that will apply to Distribution Network Service Providers and for the purpose of making f-factor amount determinations; (h) require the AER, in making an f-factor scheme determination, to have regard to specified criteria, including— (i) the need to ensure that the benefits to consumers likely to result from the making of an f-factor scheme determination are sufficient to warrant the determination's benchmarks, targets, incentives, rewards or penalties for Distribution Network Service Providers; (ii) any regulatory obligation or requirement to which Distribution Network Service Providers are subject; (iii) a distribution system's history of fire starts; (iv) the willingness of end users to pay for enhanced fire safety; (v) criteria for determining benchmarks, targets, incentives, rewards or penalties that will apply to Distribution Network Service Providers and for the 42 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42 purpose of making an f-factor amount determination; (vi) any interaction between the Order and a service target performance incentive scheme; (vii) any interaction between the Order and any other incentive scheme, including an incentive scheme in relation to services provided by means of a distribution system (other than a service target performance incentive scheme that applies to a Distribution Network Service Provider); (i) specify, for a Distribution Network Service Provider, the interaction between an f-factor scheme determination and a service target performance incentive scheme that apply to that Distribution Network Service Provider. (3) An Order under subsection (1) may be made so as to apply, adopt or incorporate wholly or partially or as amended by the Order, the provisions of any document, standard, rule, specification or method formulated, issued, prescribed or published by any authority or body whether— (a) as formulated, issued, prescribed or published at the time the Order is made or at any time before the Order is made; or (b) as amended from time to time. 43 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42 (4) An Order under subsection (1) may— (a) leave any matter to be decided by the AER; and (b) without limiting paragraph (a), direct the AER to make amendments to any instrument made by the AER to give effect to any matter specified in an Order made under this section. (5) The provisions of an Order under subsection (1) may— (a) be of general or limited application; (b) differ according to differences in time, place and circumstances. (6) An Order under subsection (1) has effect as from the day specified in the Order and until the day specified in the Order. (7) An f-factor scheme determination or f-factor amount determination made under an Order under subsection (1) cannot come into effect before the Victorian distribution pricing determination end date.

  215. 16D Functions and powers conferred and duties imposed on AER A function or power conferred or a duty imposed on the AER by an Order under section 16C is taken to be conferred or imposed by this Act. Note See sections 44AH and 44AI of the Trade Practices Act 1974 of the Commonwealth. 44 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42

  216. 16E Application of NEL provisions after the Victorian distribution pricing determination end date (1) Despite section 6, after the Victorian distribution pricing determination end date— (a) unless the context otherwise requires, a reference in the NEL to "the Law" or "this Law" is to be read as including a reference to an Order under section 16C; (b) a reference in the NEL to a function or power of the AER (including, but not limited to, an AER economic regulatory function or power) is to be read as including a reference to a function or power conferred or a duty imposed on the AER under section 16D; (c) section 14B of the NEL is to be read as if after "that operator" there were inserted "and an f-factor scheme determination and an f-factor amount determination that applies to that operator"; (d) sections 28F(1), 28ZC and 28ZD of the NEL are to be read as if after every reference in those sections to "or the Rules" there were inserted "or an Order under section 16C under the National Electricity (Victoria) Act 2005"; (e) Division 6 of Part 3 of the NEL is to be read as if after every reference in that Division to "or the Rules" there were inserted "or an Order under section 16C under the National Electricity (Victoria) Act 2005"; 45 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42 (f) section 28F(3)(d) of the NEL is to be read as if after "performance report" there were inserted ", other than a service provider performance report relating to a Distribution Network Service Provider's compliance with an f-factor scheme determination or f-factor amount determination"; (g) section 28V(2)(a) of the NEL is to be read as if after subparagraph (iii) there were inserted— "(iv) complying with an f-factor scheme determination and an f-factor amount determination; and". (2) Despite section 6, on and after the date the first Order made under section 16C comes into effect, the National Electricity Rules have the force of law in Victoria as if— (a) after rule 6.13 of the Rules there were inserted— "6.13A Variations to distribution determinations for purpose of f-factor scheme determinations (a) Despite anything to the contrary in these Rules and subject to this rule, the AER may, as a consequence of the making of an f-factor scheme determination (within the meaning of section 13 of the National Electricity (Victoria) Act 2005), vary a distribution determination during the course of the regulatory control period. 46 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42 (b) The AER must not vary a distribution determination under this rule unless the AER has complied with any consultation procedures specified in an Order under section 16C of the National Electricity (Victoria) Act 2005. (c) Once the AER has made a decision under this rule varying a distribution determination, the AER cannot make another decision under this rule to vary that distribution determination. (d) Despite anything to the contrary in these Rules, the AER, in varying a distribution determination under this rule, is not required to follow any process specified in the Rules in relation to the making of a distribution determination. (e) To avoid doubt— (1) a decision of the AER to vary a distribution determination under this rule is taken not to be a reviewable regulatory decision (within the meaning of section 71A of the National Electricity Law); and (2) a distribution determination (as varied by the AER under this rule) is not by reason only of that variation taken to be a reviewable regulatory decision (within the meaning of section 71A of the 47 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42 National Electricity Law)."; and (b) after paragraph (d) of the definition of pass through event in Chapter 10 of the Rules there were inserted— "(e) an f-factor amount determination (within the meaning of section 13 of the National Electricity (Victoria) Act 2005).".

  217. 16F Interrelationship between f-factor determinations and distribution determinations The making of an f-factor scheme determination or an f-factor amount determination is not to be taken as affecting the process already commenced by the AER for the making of a distribution determination that is to apply during the first distribution determination period.

  218. 16G Power of AER to request information relating to f-factor determinations (1) If the AER considers it necessary for the purposes of making an f-factor scheme determination or an f-factor amount determination, the AER may request a relevant entity to provide information relating to fire starts to the AER. (2) Before making a request under subsection (1), the AER must consult with the relevant entity about its intention to make that request. 48 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 42 (3) A request under subsection (1) must— (a) be in writing; and (b) specify the period of time within which the information requested is to be provided. (4) The period of time referred to in subsection (3)(b) must be reasonable. (5) A request under subsection (1) may request information in relation to one or more of the following— (a) the number of fire starts caused by, or believed to be caused by, electric lines or electrical installations during a specified period; (b) the date, time and location of each of those fire starts; (c) if known and determinable, the cause of each of those fire starts; (d) the nature and extent of any loss or damage caused by each of those fire starts. (6) A relevant entity must comply with a request under subsection (1) to the extent that it is reasonably practicable for the entity to do so. (7) For the purposes of subsection (6), it is reasonably practicable for a relevant entity not to comply with a request under subsection (1) if the entity is of the view that compliance with the request would impose an unreasonable administrative or financial burden on the entity.'. 49 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 4—Amendment of National Electricity (Victoria) Act 2005 s. 43

  219. 43 Appeals against certain decisions or actions of the AER For section 29(3)(a) of the National Electricity (Victoria) Act 2005 substitute— "(a) section 55(1) were omitted; and (ab) in section 55(1A), the reference to subsection (1) were a reference to subsection (2) of this section; and (ac) in those sections— (i) a reference to section 55(1)(a) were a reference to subsection (1)(a) of this section; and (ii) a reference to section 55(1)(b) were a reference to subsection (1)(b) of this section; and (iii) a reference to section 55(1)(c) were a reference to subsection (1)(c) or (d) of this section; and".

  220. 44 Statute law revision In section 41(1) of the National Electricity (Victoria) Act 2005, in the definition of VENCorp negotiated transmission service criteria, for "negotiating" substitute "negotiated". __________________ 50 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 5—Amendment of Energy Safe Victoria Act 2005 s. 45 PART 5—AMENDMENT OF ENERGY SAFE VICTORIA ACT 2005

  221. 45 Grounds for the Director's removal from office For section 14(3) of the Energy Safe Victoria See: Act No. Act 2005 substitute— 39/2005 and "(3) The Governor in Council may remove the amending Act Nos Director from office if the Director— 60/2006, 80/2006 and (a) becomes incapable of performing his or 28/2007. her duties; or LawToday: www. (b) is negligent in the performance of those legislation. vic.gov.au duties; or (c) engages in improper conduct.".

  222. 46 New Division 5A of Part 2 inserted After Division 5 of Part 2 of the Energy Safe Victoria Act 2005 insert— "Division 5A—Other matters

  223. 19A Energy Safe Victoria must publish Charter (1) Energy Safe Victoria must develop and publish a Charter of Consultation and Regulatory Practice including guidelines relating to the preparation of its corporate plan and conducting inquiries under Part 3. (2) The Charter of Consultation and Regulatory Practice— (a) must include such matters as are prescribed; and (b) may include any other matters that Energy Safe Victoria considers appropriate. 51 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 5—Amendment of Energy Safe Victoria Act 2005 s. 46 (3) The Charter of Consultation and Regulatory Practice, or any part of the Charter, must not require or allow the public release of a draft of Energy Safe Victoria's corporate plan or a draft of a part of that plan without the prior approval of Energy Safe Victoria and the Minister.

  224. 19B Memoranda of Understanding (1) In this section prescribed body means a person, body or agency which is prescribed for the purposes of this section. (2) Energy Safe Victoria and a prescribed body must enter into a Memorandum of Understanding by a date determined by the Minister. (3) A Memorandum of Understanding entered into under subsection (2)— (a) must include such matters as are prescribed; and (b) may include any other matters that the parties consider appropriate. (4) Energy Safe Victoria must ensure that a Memorandum of Understanding entered into under subsection (2) is published— (a) in the Government Gazette; and (b) on the Internet.". __________________ 52 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 6—Amendment of Mineral Resources (Sustainable Development) Act s. 47 1990 PART 6—AMENDMENT OF MINERAL RESOURCES (SUSTAINABLE DEVELOPMENT) ACT 1990

  225. 47 Objectives In section 2(1)(b)(vii) of the Mineral Resources See: Act No. (Sustainable Development) Act 1990, for "health 92/1990. and safety of people" substitute "health and Reprint No. 7 as at safety of the public". 9 February 2007 and amending Act Nos 16/2006, 63/2006, 25/2008, 54/2008, 6/2009, 57/2009, 69/2009, 82/2009 and 90/2009. LawToday: www. legislation. vic.gov.au

  226. 48 Definitions In section 4(1) of the Mineral Resources (Sustainable Development) Act 1990, the definition of accident is repealed.

  227. 49 Offence to carry on extractive industry without authority (1) In section 8AB(3) of the Mineral Resources (Sustainable Development) Act 1990 omit "workers or". (2) For the penalty at the foot of section 8AB(3) of the Mineral Resources (Sustainable Development) Act 1990 substitute— "Penalty: 20 penalty units.". 53 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 6—Amendment of Mineral Resources (Sustainable Development) Act s. 50 1990

  228. 50 Work plans After section 77G(3)(a) of the Mineral Resources (Sustainable Development) Act 1990 insert— "(ab) if the extractive industry work authority relates to a declared quarry, in addition to the prescribed information referred to in paragraph (a), prescribed quarry stability information; and".

  229. 51 Conditions of extractive industry work authorities In section 77J(1)(f) of the Mineral Resources (Sustainable Development) Act 1990 omit "workers and".

  230. 52 New sections 77KA and 77KB inserted After section 77K of the Mineral Resources (Sustainable Development) Act 1990 insert— "77KA Chief Inspector to be notified of reportable events in relation to quarries (1) The holder of an extractive industry work authority who carries out an extractive industry at a quarry must report to the Chief Inspector in accordance with the regulations a reportable event at the quarry as soon as practicable after the reportable event occurs. (2) In this section, reportable event means an event prescribed as a reportable event for the purposes of this section.

  231. 77KB Variation application must be made if quarry is declared (1) If the Minister declares by Order under section 7C that a specified quarry is a declared quarry, the holder of an extractive industry work authority in respect of the declared quarry, within 60 days after the declaration, must make an application to 54 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 6—Amendment of Mineral Resources (Sustainable Development) Act s. 53 1990 vary the approved work plan in respect of the declared quarry. (2) The application must contain the prescribed quarry stability information. (3) Section 77H(2) to (8) apply to an application lodged under this section.".

  232. 53 Variation of an extractive industry work authority In section 77M(2)(c) of the Mineral Resources (Sustainable Development) Act 1990 omit "workers or".

  233. 54 Report to be given about entry Section 95D(4) of the Mineral Resources (Sustainable Development) Act 1990 is repealed.

  234. 55 Regulations Section 124(1)(qa) of the Mineral Resources (Sustainable Development) Act 1990 is repealed.

  235. 56 Statute law revision (1) In section 77U of the Mineral Resources (Sustainable Development) Act 1990, in the definition of authority, for "(b)" (where secondly occurring) substitute "(c)". (2) In section 124(1)(ob) of the Mineral Resources (Sustainable Development) Act 1990, for "authorites" substitute "authorities". __________________ 55 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 7—Amendment of Petroleum Act 1998 s. 57 PART 7—AMENDMENT OF PETROLEUM ACT 1998

  236. 57 Objectives See: Act No. (1) In section 3(2)(a) of the Petroleum Act 1998 96/1998. omit "safe and". Reprint No. 1 as at (2) In section 3(2)(b) of the Petroleum Act 1998,

  237. 18 September 2007 after "individuals," insert "public safety,". and amending Act Nos 25/2008, 57/2009 and 10/2010. LawToday: www. legislation. vic.gov.au

  238. 58 General definitions In section 4 of the Petroleum Act 1998, the definition of good oil-field practice is repealed.

  239. 59 New section 20A inserted After section 20 of the Petroleum Act 1998 insert— "20A Grant of exploration permit The Minister may grant or refuse to grant an exploration permit.".

  240. 60 New definition of gathering line substituted For section 82 of the Petroleum Act 1998 substitute— "82 Meaning of gathering line A gathering line is a pipeline that is— (a) situated wholly within— (i) a production licence area; or (ii) a drilling authorisation area; and 56 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 7—Amendment of Petroleum Act 1998 s. 61 (b) used (or intended to be used) or designed to convey petroleum (or a petroleum product)— (i) from one place to another in that area; or (ii) between a drilling authorisation area and a production licence area.".

  241. 61 Operation plan to be prepared In section 161(1)(a) of the Petroleum Act 1998— (a) omit "of injury or damage"; (b) for "community, person, land user" substitute "member of the public".

  242. 62 Emergencies For section 200(1)(a) of the Petroleum Act 1998 substitute— "(a) to any member of the public; or".

  243. 63 Announcement before entry For section 204(2)(a) of the Petroleum Act 1998 substitute— "(a) the safety of any member of the public; or".

  244. 64 Prohibition notice For section 217(1)(a) of the Petroleum Act 1998 substitute— "(a) to any member of the public; or".

  245. 65 Regulations (1) In section 252(1)(n) of the Petroleum Act 1998 omit "safety". 57 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 7—Amendment of Petroleum Act 1998 s. 65 (2) In section 252(1)(r) of the Petroleum Act 1998 omit "safe and". (3) In section 252(2)(f) of the Petroleum Act 1998, after "Act" insert "or the regulations". __________________ 58 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 66 PART 8—REPEALS AND AMENDMENT OF OTHER ACTS Division 1—Mines Act 1958

  246. 66 Repeal The Mines Act 1958 is repealed. See: Act No. 6320. Reprint No. 6 as at

  247. 20 May 1999 and amending Act Nos 92/1990, 10/2004, 18/2005, 77/2008, 7/2009 and 68/2009. LawToday: www. legislation. vic.gov.au Division 2—Geothermal Energy Resources Act 2005

  248. 67 Objectives and principles (1) In section 3(1)(e) of the Geothermal Energy See: Act No. Resources Act 2005, for "health, safety" 7/2005. substitute "public health and safety". Reprint No. 1 as at

  249. 31 July 2008 (2) In section 3(2)(i) of the Geothermal Energy and Resources Act 2005, for "health and safety" amending Act Nos substitute "public health and safety". 4/2008 and 10/2010. LawToday: www. legislation. vic.gov.au 59 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 68

  250. 68 New section 20A inserted After section 20 of the Geothermal Energy Resources Act 2005 insert— "20A Grant of exploration permit The Minister may grant or refuse to grant an exploration permit.".

  251. 69 Operation plan to be prepared In section 96(1)(a) of the Geothermal Energy Resources Act 2005— (a) omit "of injury or damage"; and (b) for "community, person, land user" substitute "member of the public".

  252. 70 Release of factual information In section 121(1) of the Geothermal Energy Resources Act 2005, for "extraction licence that relates to the licence area," substitute "authority,".

  253. 71 Emergencies For section 126(1)(a) of the Geothermal Energy Resources Act 2005 substitute— "(a) to any member of the public; or".

  254. 72 Announcement before entry For section 131(2)(a) of the Geothermal Energy Resources Act 2005 substitute— "(a) the safety of any member of the public; or".

  255. 73 Prohibition notice For section 145(1)(a) of the Geothermal Energy Resources Act 2005 substitute— "(a) to any member of the public; or". 60 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 74

  256. 74 Repeal of spent provisions Sections 170, 171, 172, 173 and 174 of the Geothermal Energy Resources Act 2005 are repealed. Division 3—Greenhouse Gas Geological Sequestration Act 2008

  257. 75 Operation plan to be prepared In section 209(a) of the Greenhouse Gas See: Act No. Geological Sequestration Act 2008— 61/2008 and (a) omit "of injury or damage"; and amending Act No (b) for "community, person, land user" 10/2010. LawToday: substitute "member of the public". www. legislation. vic.gov.au

  258. 76 Emergencies For section 254(1)(a) of the Greenhouse Gas Geological Sequestration Act 2008 substitute— "(a) to any member of the public; or".

  259. 77 Announcement before entry For section 258(2)(a) of the Greenhouse Gas Geological Sequestration Act 2008 substitute— "(a) the safety of the public; or".

  260. 78 Prohibition notice (1) For section 271(1)(a) of the Greenhouse Gas Geological Sequestration Act 2008 substitute— "(a) to any member of the public; or". (2) In section 313 of the Greenhouse Gas Geological Sequestration Act 2008, for proposed section 271A(1)(b)(i) of that Act substitute— "(i) to any member of the public; or". 61 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 79

  261. 79 Statute law revision In section 303(2)(f) of the Greenhouse Gas Geological Sequestration Act 2008, for "people" substitute "persons". Division 4—Offshore Petroleum and Greenhouse Gas Storage Act 2010

  262. 80 Statute law revision See: Act No. (1) In section 168(4)(b) of the Offshore Petroleum 10/2010. and Greenhouse Gas Storage Act 2010, for Statute Book: www. "that:" substitute "that—". legislation. vic.gov.au (2) In section 225(6) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010 after "action in" insert "the". (3) For section 273(4)(a) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010 substitute— "(a) a person who was the registered holder of a petroleum exploration permit, petroleum retention lease, petroleum production licence, infrastructure licence or pipeline licence has not paid an amount payable by the person under this Act within the period of 90 days after the day on which the amount became payable; and". (4) In section 468(2) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010, for "lease," substitute "lease". (5) In section 642(3)(b) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010 after "submission to" insert "the". 62 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 80 (6) In section 653(3) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010— (a) for "Magistrate" substitute "magistrate"; (b) after "necessary" insert "to"; (c) in paragraph (a) omit "to". (7) In section 662(3) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010— (a) after "necessary" insert "to"; (b) in paragraph (a) omit "to". (8) In section 663(1)(a) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010 omit "used in" (where first occurring). (9) In section 682(4)(a) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010, for "Magistrate" substitute "magistrate". (10) In section 733 of the Offshore Petroleum and Greenhouse Gas Storage Act 2010, in the definition of applicable document omit "on". (11) In section 787(1) of the Offshore Petroleum and Greenhouse Gas Storage Act 2010, paragraphs (b), (c) and (f) are repealed. (12) In item 1(a) of Schedule 2 to the Offshore Petroleum and Greenhouse Gas Storage Act 2010, for "148° 06' 04.60 East" substitute '148° 06' 04.60" East'. (13) In clause 93(4) of Schedule 3 to the Offshore Petroleum and Greenhouse Gas Storage Act 2010, for "(2)," substitute "(2)". 63 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 81 Division 5—Pipelines Act 2005

  263. 81 Heading to section 51 amended See: Act No. In the heading to section 51 of the Pipelines Act 61/2005 2005, for "national park" substitute "parks". and amending Act Nos 29/2006, 60/2006, 25/2008, 30/2008, 62/2008, 6/2010 and 10/2010. LawToday: www. legislation. vic.gov.au

  264. 82 Pipelines register For section 186(2)(c) of the Pipelines Act 2005 substitute— "(c) instruments of amendment, consolidation, transfer or cancellation of licences; and (d) details of applications granted under section 67(1) or 70(3) and details of notices published in the Government Gazette under section 67(3) or 70(6); and (e) any other document that is required to be registered under section 186A.".

  265. 83 New section 186A inserted After section 186 of the Pipelines Act 2005 insert— "186A Other documents to be registered The Minister, by notice published in the Government Gazette, may require that a document of a specified kind relating to a licence be registered.". 64 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 84 Division 6—Victorian Energy Efficiency Target Act 2007

  266. 84 How many certificates may be created in respect of a prescribed activity After section 18(1) of the Victorian Energy See: Act No. Efficiency Target Act 2007 insert— 70/2007 and "(1A) If an amount of carbon dioxide equivalent of amending Act No greenhouse gases to be reduced by the 23/2009. prescribed activity is less than 1 whole tonne LawToday: www. but greater than or equal to 0·5 tonne, the legislation. accredited person may create 1 certificate in vic.gov.au respect of the carbon dioxide equivalent of greenhouse gases to be reduced by the prescribed activity.".

  267. 85 New section 32A inserted After section 32 of the Victorian Energy Efficiency Target Act 2007 insert— '32A Effect of specified Order made under section 32 (1) The specified Order has, and is taken always to have had, the same force and effect as it would have had if— (a) for "0.13501" in the Order there were substituted "0.15508"; and (b) for "0.00803" in the Order there were substituted "0.00923". (2) In this section— specified Order means the Order made under section 32 on 25 May 2010 and published in the Government Gazette on 27 May 2010.'. 65 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 86 Division 7—Victorian Renewable Energy Act 2006

  268. 86 Statute law revision See: Act No. In the heading to section 58 of the Victorian 70/2006 Renewable Energy Act 2006, for "NEMMCO" and amending substitute "AEMO". Act Nos 23/2009 and 67/2009. LawToday: www. legislation. vic.gov.au Division 8—Gas Industry Act 2001

  269. 87 Variation or revocation of licence See: Act No. After section 38(3) of the Gas Industry Act 2001 31/2001. insert— Reprint No. 4 as at "(4) In deciding whether to revoke a licence the

  270. 1 July 2009 and Commission must have regard to any amending direction of the Minister under section 207 Act Nos 57/2009, that is in force. 68/2009 and 10/2010. (5) Anything in the procedures specified in the LawToday: licence's conditions for the revocation of the www. legislation. licence that is inconsistent with subsection vic.gov.au (4) is of no effect.". Division 9—Energy and Resources Legislation Amendment Act 2009

  271. 88 Part 8 repealed See: Act No. Part 8 of the Energy and Resources Legislation 57/2009. Amendment Act 2009 is repealed. Statute Book: www. legislation. vic.gov.au 66 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 8—Repeals and Amendment of Other Acts s. 89 Division 10—Aboriginal Heritage Act 2006

  272. 89 Definitions In section 50 of the Aboriginal Heritage Act See: Act No. 2006, in the definition of statutory 16/2006 authorisation— and amending Act Nos (a) in paragraph (c), after "other than" insert 63/2006, "an authorisation approving"; 77/2008, 6/2009, (b) paragraph (d), after "authorisation" insert 56/2009, 57/2009, "(other than an amendment to an 68/2009 and authorisation that approves a variation to an 10/2010. LawToday: area work plan within the meaning of section www. 41AD(4) of the Mineral Resources legislation. vic.gov.au (Sustainable Development) Act 1990)". __________________ 67 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Part 9—Repeal of Amending Act s.90 PART 9—REPEAL OF AMENDING ACT

  273. 90 Repeal This Act is repealed on 1 July 2012. Note The repeal of this Act does not affect the continuing operation of the amendments made by it (see section 15(1) of the Interpretation of Legislation Act 1984). ═══════════════ 68 Energy and Resources Legislation Amendment Act 2010 No. 55 of 2010 Endnotes ENDNOTES † Minister's second reading speech— Legislative Assembly: 24 June 2010 Legislative Council: 29 July 2010 The long title for the Bill for this Act was "A Bill for an Act to amend the Electricity Industry Act 2000, the Electricity Safety Act 1998, the National Electricity (Victoria) Act 2005, the Energy Safe Victoria Act 2005, the Mineral Resources (Sustainable Development) Act 1990, the Petroleum Act 1998, the Gas Industry Act 2001, the Victorian Energy Efficiency Target Act 2007, to repeal the Mines Act 1958 and to amend other Acts and for other purposes." 69