About this law
- Language
- English
- Kind
- Regulation
- Organisation
- Mekong River Commission (MRC)
- Country
- Vietnam
- Subjects
- Water
- Keywords
- drainage/land reclamation, effluent waste water/discharge, sewerage, basin/catchment/watershed, pollution control, freshwater pollution, inland waters
Where to read it
No source link is recorded for this law.
Text
The law's own text, section by section, as held. Each section has its own link.
THE PRIME MINISTER DECISION No. 1381/QD-TTg OF OCTOBER 24, 2001 APPROVING THE FEASIBLE PROJECT ON IMPROVING THE WATER ENVIRONMENT IN HO CHI MINH CITY, TAU HU - BEN NGHE - DOI - TE CANAL BASIN, PHASE I {2001-2006) THE PRIME MINISTER Pursuant to the Law on Organization of the Government of September 30, 1992, Pursuant to the Government's Decree No. 521 1999/ND-CP of July, 8, 1999 promulgating the Regulation on Construction and Investment Management; Pursuant to the Government's Decree No. 171 2001/ND-CP of May 4, 2001 on the Regulation on the management and use of official development assistance; Considering the proposals of Ho Chi Minh City People's Committee in Officials Disp8tches No. 1085/ UB-DA of April 4, 2001, No. 2532/UB-DT of July 26. 2001, No. 3316/UB-DT of September 18, 2001 and No. 3426/UB-DT of September 26, 2001 and the evaluating opinions of the Ministry of Planning and Investment in Official Dispatches No. 5623 BKHI VPTD of August 20, 2001 and No, 6811 BKHIVPTD of October 9, 2001, DECIDES: Article 1~- To approve the Feasible Project on improving the water environment in Ho Chi Minh City, Tau Hu -Ben Nghe - Doi - Te canal basin, phase I (2001-2006), with the following major contents: 1. The project's name: Feasrbie Project on improving the water environment in Ho Chi Minh City, Tau Hu - Ben Nghe ~ Doi - Te Cf)nal basin, phase I (2001-2006): 2. Investment objectives: To renovate the rain water drainage system and waste water-gathering and treatment system. To restore and renovate the canal system, to refurbish the city, combine waterway traffic with land road traffic, aiming to minimize the environmental pollution in the areas. 3. The investor: The Management Board of the Project on improving the water environment in Ho Chi Minh City. 4. Construction site: The Tau Hu - Ben Nghe Doi - Te canal basin which covers 3,046 hectares in 11 urban and rural districts: the urban districts 1, 3, 4, 5, 6, 8, 10, 11, Tan Binh and Binh Thanh, and the rural district of Binh Chanh. 5. Major investment items: To improve Ben Nghe canal, the 3,158 m-long section, and Tau Hu canal of 4,130 m long. To improve the rain water drainage with pumps in Thanh Da area, Binh Thanh district (15.4 hectares), Me Coe I wharf (70.9 hectares) and Me Coe II wharf, District 8 (46 hectares); To renovate the existing common culvert system in the basin area: To renovate and replace 3,182 rn of the slab culvert system of a size of2,000 x2,000 mm and 2,500 x 2,500 mm. To build 6,530 m,of pipe culverts of 1,000 mm in diarneter, and· slab culvert of a size of 2,500 x 2,000 mm~ To build a surrounding culvert line for gathering waste water: To buiid 6,594 mof main surrounding culverts (of from 300 to 2,000 mm in diameter) and 7.018 m of surrounding branch culverts (of from 300 to 1,200-mm in diamet~r) and 32 overflow-control wells. To build a wastewaterapumping station in Dong Dieu: with each pump having a capacity of 66.7 m3/ minute X three pur:rips (one reserve pump). To build a 3,5:mm~long system ofslab culverts, of a size of 1,300 x 1,300 mm; for conducting waste water from the pumpirlg stations to waste water treatment plants (District 8 and Bir1h Chanh District),: To build ~.~aste water tr~atrnent plant using the biological technOJogy of activated sludge, with a capacity of 141,000 m3/dav To procure dredging equipment.. 6. Total investment amount: VND 4,163:94 billion, which is the maximum level to serve as basis for negotiation on capital borrowing. 7. Investment capital sources: Loans borrowed from Japan International.· Cooperation Bank: JP¥ 24,426,million (equivalent to VND 3,213.980 billion). Reciprocal capital: VND 949.970 billion. 8. Investment capital mechanism: The loans borrowed from Japan International Cooperation Bank shall be reallocated to Ho Chi Minh City according to the mechanism of allocating the State's investment for capital construction. The amount of reciprocal capital shall be granted from Ho Chi Minh City's budget. 9. The project1s implementation duration: From 2001 to 2006. Article 2.- To .. ssign Ho Chi Minh City People's Committee the responsibility to direct and manage the implementation of the project, from the stage of designing to the stage of constructing, and putting the project to efficient use; attention should be paid to the following issues: ~- To coordinate with the ministries and branches in complet~if handling the remRining problems relatedtothe project before starting the construction (espedally. contents 'relating to technological and technical solutions, environmental treatment and land management and use), To thoroughly revisP. all ir'iVestment items to reduce investment costs, r6,ise. the proJect's ·· effectiveness and bear full r'esponsibilityforthe project. Article 3.- This Decision takes cffer,t after its signing. Article 4.- The Ministers of Planning and Invest ment; construction: Finance; Science: Technology and Environmenl;Agricult1.1re andHural Development; and Communications ·and Transport; the State Bank Governor; the preside11fofHo Chi Minh City People's Committee and the heads of the concerned agencies shall have to implement t! 's !Jecisi!n ... For r) i e Prime .Minister D~puty Pi'imeNlinister NGUYEN TAN DUNG