Subjects
Water
Keywords
waterworks, authorization/permit, inspection, certification

Where to read it

    No source link is recorded for this law.

Text

The law's own text, section by section, as held. Each section has its own link.

  1. 17 Chapter 7. Inspection and Approval Article 1. New or Enlarged Dams and Reservoir 6350. Immediately upon completion of a new dam or reservoir or enlargement of a dam or reservoir, the owner shall give a notice of completion to the department and as soon thereafter as possible shall file with the department supplementary drawings or descriptive matter showing or describing the dam or reservoir as actually constructed, including the following: (a) A record of all grout holes and grouting. (b) A record of permanent location points and bench marks. (c) A record of tests of concrete or other material used in the construction of the dam or reservoir. (d) Any other items which may be of permanent value and have a bearing on the safety and permanency of the dam or reservoir. 6351. In connection with the enlargement of a dam or reservoir, the supplementary drawings and descriptive matter need apply only to the new work. 6352. As soon as possible after giving notice of completion, the owner shall file an affidavit with the department stating the actual cost of the dam or reservoir in such detail as the department requires to determine whether a further fee is due. In the event the owner of a new or enlarged dam or reservoir, because of loss of records, recent change of ownership, or other causes beyond his control, is unable to report the actual cost of construction or enlargement, he shall file an affidavit to this effect, stating the reasons therefore, within 30 days after receiving a written request therefore from the department. The department shall then make its own appraisal of the cost of construction or enlargement and determine what further fee, if any, is required. Upon making a determination that a further fee is required, the department shall notify the owner by certified mail of the amount of such fee within 15 days and shall notify the owner that he may appear within 60 days thereafter before an authorized representative of the department to protest the amount of the fee, in whole or in part, determined by the department to be required, and the sufficiency of the appraisal upon which such determination was based. 18 6354. As soon as practicable the completed dam or reservoir shall be inspected by the department. 6355. A certificate of approval shall be issued upon a finding that the dam or reservoir is safe to impound water within the limitations prescribed in the certificate. Upon written request by an owner for a certificate of approval, the department shall issue the certificate if it finds that the dam or reservoir is safe to impound water within the limitations prescribed in the certificate. Pending issuance of a certificate of approval by the department, the owner of the dam or reservoir shall not, through action or inaction, cause the dam or reservoir to impound water. Article 1.5. Certificates of Approval 6357. Each certificate of approval issued by the department under this part may contain such terms and conditions as the department may prescribe. 6357.1 The department may revoke any certificate of approval whenever it determines that the dam or reservoir constitutes a danger to life and property. Whenever it deems such action necessary to safeguard life and property, the department may also amend the terms and conditions of any such certificate by issuing a new certificate containing the revised terms and conditions. 6357.2 The owner of a dam or reservoir for which a certificate of approval has been issued shall not, through action or inaction, cause the dam or reservoir to impound water after the certificate terminates unless a new certificate is issued for the dam or reservoir. A new certificate shall be issued upon a finding by the department that the dam or reservoir is safe to impound water within the limits prescribed in the certificate. 6357.3 With respect to each certificate of approval or written consent for use of a dam which has been issued by the department or a predecessor of the department and which is in effect prior to the effective date of this article, the department shall, within one year from such effective date, issue a new certificate of approval, which shall supersede the previous certificate or written consent for use, or shall revoke the existing certificate or written consent for use if it finds that the dam or reservoir is not safe to impound water. 6357.4 Before any certificate of approval is revoked by the department, the department shall hold a hearing. Written notice of the time and place of the hearing shall be mailed, at least 20 days prior to the date set for the hearing, to the holder of the certificate. Any interested persons may appear at the hearing and 19 present their views and objections to the proposed action. Any petition for a writ of mandate to inquire into the validity of action of the department revoking a certificate of approval shall be commenced within 30 days after service of notice of the revocation on the holder of the certificate. Article 2. Repaired or Altered Dams and Reservoirs 6360. Immediately upon completion of the repair or alteration of any dam or reservoir, the owner shall give notice of completion to the department and as soon thereafter as possible shall file with it supplementary drawings or descriptive matter showing or describing the dam or reservoir as actually repaired or altered together with such maps, data, records, and information pertaining to the dam or reservoir as repaired or altered as the department requires. 6362. As soon as practicable the dam or reservoir as repaired or altered shall be inspected by the department. 6363. A certificate of approval shall be issued upon a finding that the dam or reservoir is safe to impound water within the limitations prescribed in the certificate. Pending issuance of a new certificate of approval, the owner of the dam or reservoir shall not, through action or inaction, cause the dam or reservoir to impound water beyond the limitations prescribed in the existing certificate. 6364. The certificate of approval shall supersede any previous certificate of approval issued for the dam or reservoir so repaired or altered. Article 3. Removal of Dams and Reservoirs 6370. Upon completion of the removal of a dam or reservoir such evidence as to the manner in which the work was performed and as to the conditions obtaining after the removal as the department requires shall be filed with the department. 6371. This evidence shall show that a sufficient portion of the dam has been removed to permit the safe passage of floods down the watercourse across which the dam was located. 6372. Before final approval of the removal of a dam or reservoir is issued, the department shall inspect the work and determine that all danger to life and property has been eliminated. 20 Article 4. Dams Completed Prior to August 14, 1929 6380. The department shall make inspections at State expense of all dams in the State completed prior to August 14, 1929. 6381. The department shall require owners to perform at their expense such work or tests as necessary to disclose information sufficient to enable the department to determine whether to issue certificates of approval or to issue orders directing further work at the owners’ expense necessary to safeguard life and property. 6382. If, upon inspection or upon completion to the satisfaction of the department of all work that may be ordered, the department finds that the dam is safe to the full extent for which use is or will be made, a certificate of approval shall be issued. Article 5. Complaints as to Unsafe Conditions 6390. Upon receipt of a written complaint alleging that the person or property of the complainant is endangered by the construction, maintenance, or operation of any dam or reservoir the department shall cause an inspection to be made unless the data, records, and inspection reports on file with it are found adequate to enable a determination whether or not the complaint is meritorious. 6391. If the complainant insists upon an inspection and deposits with the department a sum estimated by it to be sufficient to cover costs of an inspection, the department shall cause an inspection to be made despite its finding as to the sufficiency of its records to determine the alleged danger. 6392. If it is found that an unsafe condition exists, the department shall take such action as is necessary to render or cause the condition to be rendered safe and any money deposited to secure an inspection shall be returned. 6393. If, after an inspection is made on account of a complaint, the complaint is found by the department to have been without merit, any money deposited therefore shall be payable into the State Treasury. Article 6. Inspection During Progress of Work 6400. During the construction, enlargement, repair, alteration, or removal of any dam or reservoir the department shall make continuous or periodical inspections at state expense for the purpose 21 of securing conformity with the approved plans and specifications but shall require the owner to perform at his expense such work or tests as necessary to disclose information sufficient to enable the department to determine that conformity with the approved plans and specifications is being secured. 6401. If, after any inspections, investigations, or examinations, or at any time as the work progresses, or at any time prior to issuance of a certificate of approval it is found by the department that amendments, modifications, or changes are necessary to insure safety, the department may order the owner to revise the plans and specifications. 6402. If conditions are revealed which will not permit the construction of a safe dam or reservoir the approval may be revoked. 6403. In the event that conditions imposed may be waived or made less burdensome without sacrificing a proper margin of safety, the department may authorize an owner to revise the plans and specifications accordingly. 6404. If at any time during construction, enlargement, repair, or alterations of any dam or reservoir the department finds that the work is not being done in accordance with the provisions of the approval and the approved plans and specifications or in accordance with the approval and revised plans and specifications, it shall give a written notice and order by registered mail or by personal service to the owner. 6405. The notice and order shall state the particulars in which the approval and approved plans and specifications or the approval and approved plans and specifications as revised are not being or have not been complied with shall order the immediate compliance with the approval and approved plans and specifications or with the approval and approved revised plans and specifications as the case may be. 6406. The department may order that no further work be done until such compliance has been effected and approved by the department. 6407. A failure to comply with the approval and approved plans and specifications as originally approved or as revised shall render the approval subject to revocation by the department, if compliance is not made in accordance therewith after notice and order from the department as provided in this article.

Water Code - Division 3: Dams and Reservoirs - Chapter 5: Inspection and Approval (secs. 6350 - 6407) · Nelum