Skip to content
Nelum
Laws of Lebanon

Updated National Water Sector Strategy (NWSS) 2020 - Volume V

Made 2020-05 · Text as of 2026-10-01

Public law and official guidance, published as research. Not legal, tax or financial advice.

About this law

Language
English
Kind
policy
Country
Lebanon
Subjects
Water
Keywords
water resources management, effluent waste water/discharge, governance, groundwater, irrigation, waterworks, pollution control, freshwater pollution, meteorology

Where to read it

Text

The law's own text, section by section, as held. Each section has its own link.

  1. REPUBLIC OF LEBANON MINISTRY OF ENERGY AND WATER NATIONAL WATER SECTOR STRATEGY UPDATE - 2020 Volume I Executive summary Volume II WATER SECTOR GOVERNANCE VOLUME III Water resources management Volume IV Water sector current situation Volume V Proposed projects Volume VI Drawings May 2020 NATIONAL WATER SECTOR STRATEGY UPDATE - 2020 VOLUME V PROPOSE PROJECTS May 2020 V - i FOREWORD The present volume is part of the National Water Sector Strategy Update – 2020, which includes the following volumes : VOLUME I : EXECUTIVE SUMMARY VOLUME II : WATER SECTOR GOVERNANCE Section II A Strategy pillar – SDG 6 Section II B Current legal and Institutional frameworks Section II C Human Resources of the WEs Section II D Water tariff analysis Section II E Strategic action - Recommendations VOLUME III : WATER RESOURCES MANAGEMENT Section III A Available water resources - Impact pf climate change Section III B Surface water resources management Section III C Groundwater resources management Section III D Guidelines for monitoring water quality Section III E Wastewater and sludge management Section III F Strategic Environmental and Social Assessment Annexes VOLUME IV : WATER SECTOR CURRENT SITUATION Section IV A Tapped water resources and wastewater facilities Section IV B Demand criteria, assumptions and water balance Section IV C Appendices to Volume IV VOLUME V : PROPOSED PROJECTS (this volume) Section V A Criteria for projects and priorities selection Section V B Proposed Projects Section V C Appendices to Proposed Projects VOLUME VI : DRAWINGS NATIONAL WATER SECTOR STRATEGY UPDATE - 2020 VOLUME V PROPOSE PROJECTS May 2020 V - ii PREAMBLE The Ministry of Energy and Water prepared and adopted the Lebanese National Water Sector Strategy (NWWSS) in 2010 which, in turn, was endorsed by the Government of Lebanon in 2012 (Resolution No.2, Date 09/03/2012). Since then, the Ministry has been implementing plans and projects identified in the strategy and, in parallel, the CDR and the Water Establishments have prepared regional water resources allocation plans, and national and regional groundwater resources studies for the catchment, treatment and distribution of water to all areas of Lebanon. In addition, regional plans for the collection and treatment of wastewater were prepared. Seven years through, time has come to review what has been realized from the original roadmap and update the Water & Wastewater strategies of 2012 by revisiting the water allocation and supply plans, wastewater collection and treatment plans, water storage / dams master plans, and irrigation plans. Seven years through, it has become time to review what has been realized from the original roadmap and update the Water & Wastewater strategies of 2012 by revisiting the water allocation and supply plans, wastewater collection and treatment plans, water storage / dams master plans, and irrigation plans. OBJECTIVE OF THE CONSULTANCY The national water sector strategy of 2012 has put an end to a phase and started a new phase for developing a wide and comprehensive vision and confirming the general principles of the national water policies on the short, medium and long terms. The updated strategy maintains the main strategic principles of the water policies adopted by the Government of Lebanon in 2012, but reassesses the then set priorities in light of today’s actual context. This update also merges the National Water and Wastewater strategies of 2012 into one consolidated strategy that we shall call “Updated National Water Sector Strategy 2020”, taking into account studies and projects completed between 2012 and 2019 in both fields. The objective of the Consultancy is to merge the National Water and Wastewater strategies of 2012 into one consolidated strategy, and will take into account studies and projects that were completed between 2012 and 2019 in both fields. DATA COLLECTION The first phase of the consultancy services is the Data Collection. All available data and necessary information were collected from the relevant stakeholders such as MoEW, the four Water Establishments, the Litani River Authority, the CDR, relevant Ministries such as MoE and MoA, the Council of the South, Donors involved in the water sector, UN Agencies, local and international NGOs, and else. NATIONAL WATER SECTOR STRATEGY UPDATE - 2020 VOLUME V PROPOSE PROJECTS May 2020 V - iii This information covers all what is available to date about  Water governance and tariffs of the four WEs.  Available updated data about rainfall, population count and growth, water needs  Available water resources and water balance by sector, for each WE  Status of the production, treatment, conveying and distribution systems for drinking and irrigation water  Status of the collection, conveying, and treatment of sewage  Implemented and planned projects,  Status of large scale projects in progress such as dams, hill lakes, treatment plants, big water conveyors, …  Conducted hydrogeological and hydrological studies and other relevant studies,  Available regional water, wastewater, and irrigation master plans, It needs to be pointed out that at the present stage the collected data is not comprehensive and some information such as the construction dates and the conditions of the existing infrastructure (and else) is scarcely available. However it gives an overall picture of the present status of the subjects covered under this report. STRUCTURE OF THE PRESENT VOLUME V The present volume is divided in two sections: 1. Section A : Proposed projects. Gives a list, with cost estimates, of the proposed projects, studies, and investigations, including :  The criteria used for the selection of the projects and setting out of the priorities.  A list of the required projects for water, wastewater and irrigation, grouped by WE, and by priority.  The studies and works for implementing Artificial Aquifers Recharge  The required studies and works for improving and expanding the Meteorological and Hydrometric networks at the national scale  The implementation of a PMU  The implementation the emergency action plan for improving the water governance.  The required general geological and hydrogeological studies at national scale 2. Section B : Appendices to proposed projects. Provides additional details and justification for each of the proposed projects NATIONAL WATER SECTOR STRATEGY UPDATE - 2020 VOLUME V PROPOSE PROJECTS May 2020 V - iv LIST OF ACRONYMS Bm³ Billion cubic meter BMLWE Beirut and Mount Lebanon Water Establishment BWE Beakaa Water Establishment CDR Council for Development and Reconstruction CM Customer Management EIB European Investment Bank EU European Union HR Human resources IFRS International Financial Reporting Standards IHIS Integrated Hydrological Information System IWMI International Water Management Institute l/c/d Liters per capita per day l/sec Liters per second LBP Lebanese Pound m³/d Cubic meter per day m³/h Cubic meter per hour masl Meters above sea level MCM Million cubic meter MENA Middle East and North Africa region Mm³ Million cubic meter MoA Ministry of Agriculture MoE Ministry of Environment MoEW Ministry of Energy and Water NGO Non-Governmental Organization NLWE North Lebanon Water Establishment NRW Non Revenue Water (unaccounted for water) NWSS National Water Sector Strategy NATIONAL WATER SECTOR STRATEGY UPDATE - 2020 VOLUME V PROPOSE PROJECTS May 2020 V - v ONL Office National du Litani PMU Project Management Unit SLWE South Lebanon Water Establishment UFW Unaccounted for Water UN United Nations WE Water Establishment WEs Water Establishments WES Water Establishments NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects May 2020 - V A 1 SECTION V A PROPOSED PROJECTS NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects May 2020 - V A 2 Table of contents V A.1. CRITERIA FOR PROJECTS AND PRIORITIES SELECTION .................................................................... 3 V A.1.1 GENERAL .............................................................................................................................................. 3 V A.1.2 CRITERIA FOR WATER PROJECTS SELECTION .................................................................................................. 3 IV B. 1.2.1 Priority 1 (2020 -2025) .............................................................................................................. 3 IV B. 1.2.2 Priority 2 (2025 - 2030) ............................................................................................................. 3 IV B. 1.2.3 Priority 3 (2030 – 2035) ............................................................................................................ 4 V A.1.3 CRITERIA FOR WASTEWATER PROJECTS SELECTION ......................................................................................... 4 IV B. 1.3.1 Priority 1 .................................................................................................................................... 4 IV B. 1.3.2 Priority 2 .................................................................................................................................... 4 IV B. 1.3.3 Priority 3 .................................................................................................................................... 4 V A.1.4 CRITERIA FOR IRRIGATION PROJECTS SELECTION ............................................................................................ 4 IV B. 1.4.1 Priority 1 .................................................................................................................................... 4 IV B. 1.4.2 Priority 2 .................................................................................................................................... 5 IV B. 1.4.3 Priority 3 .................................................................................................................................... 5 V A.1.5 CRITERIA FOR DAMS AND HILL LAKES SELECTION ........................................................................................... 5 IV B. 1.5.1 Priority 1 .................................................................................................................................... 5 IV B. 1.5.2 Priority 2 .................................................................................................................................... 6 IV B. 1.5.3 Priority 3 .................................................................................................................................... 6 V A.2. PROPOSED PROJECTS COST ESTIMATES AND RATIOS PER CAPITA .................................................. 7 V A.3. LIST OF PROPOSED PROJECTS ...................................................................................................... 11 NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.1 Criteria for Projects and priorities selection May 2020 - V A 3 V A.1. CRITERIA FOR PROJECTS AND PRIORITIES SELECTION V A.1.1 GENERAL The NWSS aims to identify the projects that need to be implemented in order to cover the needs of the population in terms of drinking water, wastewater, and water for irrigation. Those needs for the strategy horizon (2035), covering the whole territory, are given in Volume IV. In addition, the Consultants undertook a comprehensive assessment of the statuses and capacities of the existing infrastructures and operational systems, which allowed identifying the gaps that should be filled in order to cover the needs. These gaps were then translated into projects in all three sectors, and prioritized by order of urgency and impact:  Priority 1 is for urgent projects to be implemented as soon as can be.  Priority 2 is for projects that are required but could be delayed if no possibility to implement them now.  Priority 3 is for projects that would be required in the future, based on the foreseen evolution of the present status of the water sector. V A.1.2 CRITERIA FOR WATER PROJECTS SELECTION IV B. 1.2.1 Priority 1 (2020 -2025) Priority 1 is for projects addressing a negative water balance in a given water distribution scheme, and/or implementing missing components such as reservoirs, networks, and pumping stations in order to extend the coverage and the good performance of the distribution scheme. Namely:  Development and expansion of water resources to cover potable water needs, i.e. in water systems having a negative water balance in 2020  Provision of adequate water storage capacities, i.e. in water systems that currently have very small reservoirs compared to the required storage or in those that have very old reservoirs that need to be replaced.  Provision of adequate main transmission lines by constructing new ones, increasing the capacity of existing ones, and replacing very old ones  Construction of distribution networks, mainly in water systems that currently don’t have a distribution network or where the network is very old and in bad condition.  Monitoring main transmission and distribution lines through the installation of district water meters, in order to better control the distribution and address leakage issues. IV B. 1.2.2 Priority 2 (2025 - 2030) Priority 2 projects cover mainly :  The extension of existing distribution networks and/or replacement of old ones  The expansion of existing water storage capacities to the required standards NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.1 Criteria for Projects and priorities selection May 2020 - V A 4  The development of new (or improvement of existing) water resources to address future negative water balances, along with the construction of related works (i.e. transmission lines, pumping stations, reservoirs …) IV B. 1.2.3 Priority 3 (2030 – 2035) Priority 3 is for projects that should be implemented to address expected issues at the long term. V A.1.3 CRITERIA FOR WASTEWATER PROJECTS SELECTION The main objective of the proposed wastewater projects is to eradicate, or at least reduce, the nuisance to the environment and to groundwater by minimizing the discharge of untreated wastewater into the open or in waterbodies. For this purpose, priorities are set as follows : IV B. 1.3.1 Priority 1  Implement new WWTPs and sewers in densely populated areas with poor (or inexistent) sanitation infrastructure  Expansion and upgrade of major existing WWTPs the treatment capacity of which isn’t enough to treat the influent (in 2020) to acceptable standards.  Implementation of new WWTPs and sewers in areas that are in the watershed of proposed and existing dams IV B. 1.3.2 Priority 2  Implementation of new WWTPs and sewer networks in less densely populated areas  Expansion and upgrade of existing WWTPs if their treatment capacity isn’t enough to treat the influent wastewater flows in the near future IV B. 1.3.3 Priority 3  Implementation of small wastewater treatment units in isolated villages/areas V A.1.4 CRITERIA FOR IRRIGATION PROJECTS SELECTION A negative water balance and/or the bad status and coverage of the irrigation networks. However, proper estimation of the water balance is quite impossible due to the lack of meteorological and hydrometric data, and insufficient studies on the subject. Therefore Priorities are set as follows : IV B. 1.4.1 Priority 1 For agricultural areas requiring :  Concreting of existing earth channels  Rehabilitation of existing concrete channels  Construction of new irrigation networks (channels or pipes) NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.1 Criteria for Projects and priorities selection May 2020 - V A 5 IV B. 1.4.2 Priority 2 Increase the availability of water resources and construct all related works (i.e. irrigation transmission and distribution lines and small storage structures) IV B. 1.4.3 Priority 3 Construction of new networks and development of new resources for potential future expansions V A.1.5 CRITERIA FOR DAMS AND HILL LAKES SELECTION The expected impact of climate change (see Volume III, Section III A.2.) is that the volumes of water stored in aquifers and in the form of snow will be reduced in favour of lost runoff to the sea (at least on the western slope of Mount Lebanon, but this is exactly where the majority of the population lives). This reduction in the volumes stored naturally must be compensated artificially through artificial aquifers recharge where possible and/or through the construction of retention dams. It is a strategic option to keep groundwater resources as a strategic reserve for the future and use them only in areas where surface storage is not possible or insufficient to cover the growing needs. Therefore surface storage must be a strategic priority. The NWSS 2020 considers the construction of surface storage facilities as the first resort to compensate for water supply needs, provided it is financially, technically and environmentally feasible. It should be noted that some of the dams identified in the 2011 strategy are now dismissed due to the following:  Different criteria used to calculate the water demands leading to acceptable water balances.  Feasibility or Design studies conducted on some dams has shown that they are geotechnically not feasible  The sites selected for dam construction are now constructed and not available anymore The main objective of the proposed dams and Hill lakes is to secure new water resources to cover future potable water and/or irrigation needs in areas with high negative water balance where no other resources are available. Priorities are set depending on when the storage would be needed. IV B. 1.5.1 Priority 1 For Dams that would be needed in the next ten years, the construction of which should therefore start as soon as possible. For Hill Lakes in areas facing severe water shortages for irrigation purposes, or in areas that have witnessed a drastic and rapid increase in irrigated lands in the past few years NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.1 Criteria for Projects and priorities selection May 2020 - V A 6 IV B. 1.5.2 Priority 2 For Dams that would be needed in more than 15 years, the construction of which should therefore start in less than 10 years. For Hill Lakes in areas facing less severe water shortages for irrigation purposes, or in areas that witness a relatively stable or slight increase in irrigated area IV B. 1.5.3 Priority 3 For Dams that would be needed in more than 20 years, the construction of which should therefore start in less than 15 years. For Hill Lakes in areas that currently don’t face water shortages, but that might require additional resources in the future NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.2 Proposed projects cost estimates and ratios per capita May 2020 - V A 7 V A.2. PROPOSED PROJECTS COST ESTIMATES AND RATIOS PER CAPITA Table V A 1 below gives a list of the proposed projects with the cost estimates and the ratio per capita for each project. Table V A 2 and Table V A 3 below show the consolidated Cost Estimates of the proposed projects, sorted by water sector and by water Establishment. Table V A 1 Projects Cost Estimates and ratios per capita Project Cost Population Ratio M USD capita USD / cap NORTH LEBANON WATER ESTABLISHMENT Drinking water projects NL-W A. District of Batroun 23.15 93 578 247 NL-W B. District of Halba 72.48 377 776 192 NL-W C. District of Koura 29.84 171 508 174 NL-W D. District of Minieh 32.11 167 742 191 NL-W E. District of Ed Danniyeh 31.92 121 074 264 NL-W F. District of Zgharta 44.92 139 251 323 NL-W G. District of Tripoli 30.79 483 451 64 NL-W H. District of Qobayate 73.33 179 838 408 Wastewater projects NL-WW A. District of Akkar 358.82 635 838 564 NL-WW B. District of Koura 29.69 171 508 173 NL-WW C. District of Minieh 54.06 167 742 322 NL-WW D. District of Zgharta 41.48 139 251 298 NL-WW E. District of Batroun 8.36 93 578 89 SOUTH LEBANON WATER ESTABLISHMENT Drinking water projects SL-W A. District of Nabatiye 94.80 353 107 268 SL-W B. District of Jezzine 31.55 46 964 672 SL-W C. District of Sour 76.85 639 726 120 SL-W D. District of Zahrani 58.20 210 183 277 SL-W E. District of Saida 46.37 317 202 146 SL-W F. District of Bint Jbeil 60.93 301 366 202 SL-W G. District of Marjaayoun & Hasbaya 55.43 136 057 407 Wastewater projects SL-WW A. District of Nabatiye 78.70 353 107 223 SL-WW B. District of Sour 87.25 639 726 136 SL-WW C. District of Bint Jbeil 205.90 301 366 683 SL-WW D. District of Jezzine 15.94 46 964 339 SL-WW E. District of Saida 136.00 317 202 429 NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.2 Proposed projects cost estimates and ratios per capita May 2020 - V A 8 Table V A 1 Projects Cost Estimates and ratios per capita Project Cost Population Ratio M USD capita USD / cap BEIRUT & MOUNT LEBANON WATER EST. Drinking water projects BML-W A. District of Beirut 133.63 643 059 208 BML-W B. District of Jbeil 63.99 218 128 293 BML-W C. District of Baabda Aley 100.25 1 198 485 84 BML-W D. District of Keserwan 48.86 464 480 105 BML-W E. District of Chouf 127.35 409 006 311 BML-W F. District of Meten 92.23 1 064 429 87 Wastewater projects BML-WW A. District of Beirut 50.00 643 059 78 BML-WW B. District of Jbeil 140.10 218 128 642 BML-WW C. District of Baabda Aley 290.00 1 198 485 242 BML-WW D. District of Keserwan 23.70 464 480 51 BML-WW E. District of Chouf 138.48 409 006 339 BML-WW F. District of Metn 238.00 1 064 429 224 BEQAA WATER ESTABLISHMENT Drinking water projects BQ-W A. District of Baalbeck 60.18 588 872 102 BQ-W B. District of Hermel 38.48 107 820 357 BQ-W C. District of West Beqaa, Zahleh & Rachaiya 49.19 742 940 66 Wastewater projects BQ-WW A. District of Baalbeck 295.22 588 872 501 BQ-WW B. District of Hermel 116.70 107 820 1 082 BQ-WW C. District of Zahleh - West Beqaa 44.01 665 560 66 BQ-WW D. District of Rachaya 73.96 77 380 956 NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.2 Proposed projects cost estimates and ratios per capita May 2020 - V A 9 Table V A 2 Consolidated Cost Estimates, by water sectors In M USD, VAT and expropriations excluded Water Wastewater irrigation Dams Hill lakes Total Priority 1 projects NLWE 338.55 242.39 29.12 196.02 33.37 839.44 BWE 96.03 214.31 109.71 52.00 - 472.05 SLWE 411.52 367.05 86.55 - - 865.12 BMLWE 420.77 569.58 1.02 65.00 - 1 056.37 Aquifer Artificial Recharge (*) 3.65 Meteorological and Hydrometric networks (*) 15.61 General Studies and Investigations (**) 35.78 Total 1 266.87 1 393.33 226.40 313.02 33.37 3 288.03 Priority 2 projects NLWE - 250.03 11.20 50.00 110.72 421.95 BWE 50.28 268.08 83.00 150.00 55.20 606.55 SLWE 12.60 77.09 408.88 273.00 119.70 891.27 BMLWE 122.58 205.40 1.15 200.00 33.50 562.63 Aquifer Artificial Recharge (*) 11.60 Meteorological and Hydrometric networks (*) General Studies and Investigations (**) 2.50 Total 185.46 800.59 504.23 673.00 2 496.50 Priority 3 projects NLWE - - 103.27 150.00 22.90 276.17 BWE 1.55 47.50 4.52 107.06 - 160.63 SLWE - 79.65 299.70 480.00 - 859.35 BMLWE 22.95 105.30 5.22 53.00 - 186.47 Aquifer Artificial Recharge (*) 16.50 Meteorological and Hydrometric networks (*) General Studies and Investigations (**) 11.15 Total 24.49 232.45 412.71 790.06 1 510.26 Total Projects 1 476.82 2 426.37 1 143.34 1 776.08 7 294.79 15% Contingencies 221.52 363.96 171.50 266.41 1 094.22 Projects Grand Total 1 698.34 2 790.32 1 314.84 2 042.49 8 389.01 * Including studies and implementation ** Including General geological studies + PMU and Governance NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.2 Proposed projects cost estimates and ratios per capita May 2020 - V A 10 Table V A 3 Consolidated Cost Estimates, by Water Establishment In M USD, VAT and expropriations excluded NLWE BWE SLWE BMLWE Total Priority 1 projects Water 338.55 96.03 411.52 420.77 1 266.87 Wastewater 242.39 214.31 367.05 569.58 1 393.33 Irrigation 29.12 109.71 86.55 1.02 226.40 Dams 196.02 52.00 - 65.00 313.02 Hill Lakes 33.37 - - - 33.37 Aquifer Artificial Recharge (*) 3.65 Meteorological and Hydrometric networks (*) 15.61 General Studies and Investigations (**) 35.78 Total 839.44 472.05 865.12 1 056.37 3 288.03 Priority 2 projects Water - 50.28 12.60 122.58 185.46 Wastewater 250.03 268.08 77.09 205.40 800.59 Irrigation 11.20 83.00 408.88 1.15 504.23 Dams 50.00 150.00 273.00 200.00 673.00 Hill Lakes 110.72 55.20 119.70 33.50 319.12 Aquifer Artificial Recharge (*) 11.60 Meteorological and Hydrometric networks (*) General Studies and Investigations (**) 2.50 Total 421.95 606.55 891.27 562.63 2 496.50 Priority 3 projects Water - 1.55 - 22.95 24.49 Wastewater - 47.50 79.65 105.30 232.45 Irrigation 103.27 4.52 299.70 5.22 412.71 Dams 150.00 107.06 480.00 53.00 790.06 Hill Lakes 22.90 - - - 22.90 Aquifer Artificial Recharge (*) 16.50 Meteorological and Hydrometric networks (*) General Studies and Investigations (**) 11.15 Total 276.17 160.63 859.35 186.47 1 510.26 Total Projects 1 537.56 1 239.23 2 615.74 1 805.47 7 294.79 15% Contingencies 230.63 185.88 392.36 270.82 1 094.22 Projects Grand Total 1 768.19 1 425.12 3 008.10 2 076.29 8 389.01 * Including studies and implementation ** Including General geological studies + PMU and Governance NATIONAL WATER SECTOR STRATEGY UPDATE – 2019 VOLUME V Section V A PROPOSED PROJECTS Proposed Projects V A.3 List of proposed Projects May 2020 - V A 11 V A.3. LIST OF PROPOSED PROJECTS The tables hereinafter give a list of the proposed projects, starting with two Tables of Contents, sorted by Water Establishment and by water sector. Each project is given a code number. The same code is given to the corresponding project's appendix in Section V B, where additional details and justifications about the project can be found. NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS Section V A Proposed projects LIST OF PROJECTS Sorted by Water Establishment Page Page Table of Contents sorted by water sector 13 NORTH LEBANON WATER ESTABLISHMENT BEIRUT & MOUNT LEBANON WATER EST. Drinking water projects Drinking water projects NL-W A. District of Batroun 14 BML-W A. District of Beirut 35 NL-W B. District of Halba 15 BML-W B. District of Jbeil 36 NL-W C. District of Koura 17 BML-W C. District of Baabda Aley 37 NL-W D. District of Minieh 18 BML-W D. District of Keserwan 38 NL-W E. District of Ed Danniyeh 19 BML-W E. District of Chouf 39 NL-W F. District of Zgharta 20 BML-W F. District of Meten 39 NL-W G. District of Tripoli 21 Wastewater projects NL-W H. District of Qobayate 22 BML-WW A. District of Beirut 48 Wastewater projects BML-WW B. District of Jbeil 48 NL-WW A. District of Akkar 40 BML-WW C. District of Baabda Aley 48 NL-WW B. District of Koura 40 BML-WW D. District of Keserwan 49 NL-WW C. District of Minieh 41 BML-WW E. District of Chouf 49 NL-WW D. District of Zgharta 41 BML-WW F. District of Metn 49 NL-WW E. District of Batroun 41 Irrigation projects Irrigation projects BML-IR A. District of Jbeil 57 NL-IR A. District of Akkar 50 BML-IR B. District of Maten 58 NL-IR B. North districts 51 BML-IR C. District of Keserouane 58 Dams BML-IR D. District of Baabda 59 NL-D. Dams in North Lebanon 60 BML-IR E. District of Chouf 59 Hill Lakes Dams NL-HL.A. Hill Lakes in Akkar 62 BML-D. Dams in Beirut and Mount Lebanon 61 NL-HL.B. Hill Lakes in North Lebanon 62 Hill Lakes BML-HL. Hill Lakes in Beirut and Mount Lebanon 65 SOUTH LEBANON WATER ESTABLISHMENT Drinking water projects BEQAA WATER ESTABLISHMENT SL-W A. District of Nabatiye 28 Drinking water projects SL-W B. District of Jezzine 29 BQ-W A. District of Baalbeck 24 SL-W C. District of Sour 29 BQ-W B. District of Hermel 25 SL-W D. District of Zahrani 31 BQ-W C. District of West Beqaa, Zahleh & Rachaiya 26 SL-W E. District of Saida 32 Wastewater projects SL-W F. District of Bint Jbeil 33 BQ-WW A. District of Baalbeck 42 SL-W G. District of Marjaayoun & Hasbaya 34 BQ-WW B. District of Hermel 43 Wastewater projects BQ-WW C. District of Zahleh - West Beqaa 43 SL-WW A. District of Nabatiye 45 BQ-WW D. District of Rachaya 44 SL-WW B. District of Sour 46 Irrigation projects SL-WW C. District of Bint Jbeil 46 BQ-IR A. District of Baalbeck 52 SL-WW D. District of Jezzine 47 BQ-IR B. District of Zahle 54 SL-WW E. District of Saida 47 Dams Irrigation projects BQ-D. Dams in the Beqaa 60 SL-IR A. Major irrigation schemes 55 Hill Lakes SL-IR B. Local irrigation schemes 55 BQ-HL. Hill Lakes in the Beqaa 64 SL-IR C. Construction/Rehab of concrete channels 56 Dams ARTIFICIAL AQUIFER RECHARGE 66 SL-D. Dams in South Lebanon 60 METEOROLOGICAL & HYDROMETRIC 67 Hill Lakes REQUIRED GENERAL STUDIES 68 SL-HL. Hill Lakes in South Lebanon 64 May 2020 - V A 12 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS Section V A Proposed projects LIST OF PROJECTS Sorted by Water Sector Page Page Table of Contents sorted by Water Establishment 12 DRINKING WATER WASTEWATER North Lebanon water establishment North Lebanon water establishment NL-W A. District of Batroun 14 NL-WW A. District of Akkar 40 NL-W B. District of Halba 15 NL-WW B. District of Koura 40 NL-W C. District of Koura 17 NL-WW C. District of Minieh 41 NL-W D. District of Minieh 18 NL-WW D. District of Zgharta 41 NL-W E. District of Ed Danniyeh 19 NL-WW E. District of Batroun 41 NL-W F. District of Zgharta 20 South Lebanon water establishment NL-W G. District of Tripoli 21 SL-WW A. District of Nabatiye 45 NL-W H. District of Qobayate 22 SL-WW B. District of Sour 46 South Lebanon water establishment SL-WW C. District of Bint Jbeil 46 SL-W A. District of Nabatiye 28 SL-WW D. District of Jezzine 47 SL-W B. District of Jezzine 29 SL-WW E. District of Saida 47 SL-W C. District of Sour 29 Beirut & Mount Lebanon water est. SL-W D. District of Zahrani 31 BML-WW A. District of Beirut 48 SL-W E. District of Saida 32 BML-WW B. District of Jbeil 48 SL-W F. District of Bint Jbeil 33 BML-WW C. District of Baabda Aley 48 SL-W G. District of Marjaayoun & Hasbaya 34 BML-WW D. District of Keserwan 49 Beirut & Mount Lebanon water est. BML-WW E. District of Chouf 49 BML-W A. District of Beirut 35 BML-WW F. District of Metn 49 BML-W B. District of Jbeil 36 Beqaa water establishment BML-W C. District of Baabda Aley 37 BQ-WW A. District of Baalbeck 42 BML-W D. District of Keserwan 38 BQ-WW B. District of Hermel 43 BML-W E. District of Chouf 39 BQ-WW C. District of Zahleh - West Beqaa 43 BML-W F. District of Meten 39 BQ-WW D. District of Rachaya 44 Beqaa water establishment BQ-W A. District of Baalbeck 24 IRRIGATION BQ-W B. District of Hermel 25 North Lebanon water establishment BQ-W C. District of West Beqaa, Zahleh & Rachaiya 26 NL-IR A. District of Akkar 50 NL-IR B. North districts 51 DAMS South Lebanon water establishment NL-D. Dams in North Lebanon 60 SL-IR A. Major irrigation schemes 55 BQ-D. Dams in the Beqaa 60 SL-IR B. Local irrigation schemes 55 SL-D. Dams in South Lebanon 60 SL-IR C. Construction/Rehab of concrete channels 56 BML-D. Dams in Beirut and Mount Lebanon 61 Beirut & Mount Lebanon water est. BML-IR A. District of Jbeil 57 HILL LAKES BML-IR B. District of Maten 58 NL-HL.A. Hill Lakes in Akkar 62 BML-IR C. District of Keserouane 58 NL-HL.B. Hill Lakes in North Lebanon 62 BML-IR D. District of Baabda 59 BQ-HL. Hill Lakes in the Beqaa 64 BML-IR E. District of Chouf 59 SL-HL. Hill Lakes in South Lebanon 64 Beqaa water establishment BML-HL. Hill Lakes in Beirut and Mount Lebanon 65 BQ-IR A. District of Baalbeck 52 BQ-IR B. District of Zahle 54 ARTIFICIAL AQUIFER RECHARGE 66 METEOROLOGICAL & HYDROMETRIC 67 REQUIRED GENERAL STUDIES 68 May 2020 - V A 13 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects TOTAL COST OF WATER PROJECTS IN NORTH LEBANON Priority 1 Priority 2 Priority 3 Total 338,546,090 $ - - 338,546,090 $ Priority Project Description Estimated cost code (USD) NL-W A. District of Batroun (see drawing NL-W.A) 1 NL-W. A.1 1,653,600 1 NL-W. A.2 1,515,800 1 NL-W. A.3 238,500 1 NL-W. A.4 1,097,100 1 NL-W. A.5 3,641,100 1 NL-W. A.6 15,000,000 Total Batroun district 23,146,100 Out of which : Priority 1 23,146,100 Priority 2 Priority 3 For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Distribution system 1 supplying Tannourine Faouqa; Chatine Required works : 17 km Distribution networks Construction of 1x200 m³ + 1x 500 m³ reservoirs Distribution System 2 supplying Daraya El-Batroun; Aabdelli; Douma; Bcheaali; Tannourine Et-Tahta; Deir Mar Youssef ; rabta; Toula El Batroun; Aalali; Sghar; Jrabta El-Batroun; Racha; Ouata Houb; Douq; Mehmarch; Hadtoun; Dahr Abi Yaghi; Mar Mama; Masrah; Ram El Batroun. Required works : 6 km Transmission lines + 7 km Distribution networks Construction of 1x100 m³ + 3x300 m³ new reservoirsDistribution System 3 supplying Hamat,Ouajh El-Hajjar, Koubba and Ras Nahhach Required works : 2.5 km Transmission lines Distribution System 4 supplying Beit Kassab; Hardine; Niha El-Batroun; Kfour El-Aarbi. Required works : 11.5 km Transmission lines Distribution System 5 supplying Selaata, Rachkida, Qatnaaoun, Aabrine, Batroun, Kfar Khollos, Kfar Hay, Boqsmaiya, Bijdarfil, Ijdabra, Jebla, Basbina, Kfifane, Deir Kfifane, Jrane El-Batroun, Smar Jbayl, Mrah Ez Ziyat, Rachana, Thoum, Ghouma, Kfar Aabida, Edde El-Batroun, Mrah Chdid, Helta, Sourat El-Batroun, Kfarb Shlaimane, Deir Billa, Kfar Hilda, Beit Chlala, Daael, Bechtoudar, Assia, Ftahat El-Batroun, Zané, Chibtine, Deir Mar Youhanna EL-Batroun, Nahlé El-Batroun, Mrah El-Hajj, Kour, Harbouna, Aartiz and Kfar Hatna Required works : 30.5 km Transmission lines Construction of 9x100 m³, 1x150 m³ and 1x200 m³ new reservoirs May 2020 - V A 14 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) NL-W B. District of Halba (see drawing NL-W.B) 1 NL-W. B.1 3,052,800 1 NL-W. B.2 720,800 1 NL-W. B.3 2,363,800 1 NL-W. B.4 551,200 1 NL-W. B.5 13,737,600 1 NL-W. B.6 3,694,100 1 NL-W. B.7 3,508,600 1 NL-W. B.8 5,194,000 Distribution System 4 supplying Rahbe Required works : 4 km Transmission lines + 2 km Distribution networks Distribution System 5 and 6A supplying Beit Mallat; Dahr-Leyciné; Edbel; Hayzouk; Ilate; Jebrâil; Machha Required works : 12 km Transmission lines + 102 km Distribution networks Drilling and equipping 6 new wells Construction of 1x250 m³; 1x1500 m³; 1x500 m³; 1x3000 m³ new reservoirs Distribution System 7A supplying Al-Jédidé; Al-Zoureiribe; Cheikh Taba Montagne; Cheikh Taba Plaine; El-Kantara; Hekr el Dahiri; Karem-Asfour El-Nahrieh; Minyara and Beit Ghattas Required works : 6 km Transmission lines + 23 km Distribution networks Construction of 1x400 m³ new reservoir Drilling and equipping 2 new wells Distribution System 1 supplying Akkar el Atika. Required works : 8 km Transmission lines + 2 km Distribution networks Drilling and equipping 4 new wells Distribution System 3 supplying Aïn-Yacoub; Bazbina; Beino; El-Borge; Mimnih; Tikrite; ElAyoune; Aaiyat; Chakdouf; Qboula; Tallet Chattaha and Tshea Required works : 2 km Transmission lines + 14 km Distribution networks Construction of 1x1000 m³ and 1x2000 m³ new reservoirs Drilling and equipping 1 new well Distribution System 2 supplying Shakdouf Aakkar and Daoura. Required works : 2 km Transmission lines Drilling and equipping 1 new well Distribution System 7B supplying Beit-Ghattas; Bkarzala; Majdla; Mar Touma; Mechaïlha Hakour; Zouk el Moukachérine; Zouk-El-Habalça; Zouk-El-Hosmieh; Dahr Ayasse Required works : 11 km Transmission lines + 4 km Distribution networks Drilling and equipping 4 new wells Distribution System 9 supplying Berkayel; Bzal; Safineh el Kayteh Required works : 14.5 km Transmission lines + 11 km Distribution networks Construction of 1x1500 m³ new reservoir Drilling and equipping 5 new wells May 2020 - V A 15 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 1 NL-W. B.9 2,973,300 1 NL-W. B.10 720,800 1 NL-W. B.11 3,731,200 1 NL-W. B.12 1,393,900 1 NL-W. B.13 6,958,900 1 NL-W. B.14 2,798,400 1 NL-W. B.15 6,084,400 1 NL-W. B.16 15,000,000 Total Halba district 72,483,800 Out of which : Priority 1 72,483,800 Priority 2 Priority 3 Distribution System 14A supplying Chane; El Houaiche; Khreibet Akkar Required works : 5.5 km Transmission lines + 4 km Distribution networks Drilling and equipping 1 new well Distribution System 14B supplying Beit Ayooub; Beit Younes; El Korne; El Krayat; Sadaqa and Michmiche Required works : 15.5 km Transmission lines + 18 km Distribution networks Construction of 1x2000 m³ new reservoir Drilling and equipping 7 new wells Distribution System 14C supplying Danbou; Habchite; Harare and Qabaait Required works : 11 km Transmission lines Construction of 1x750 m³ new reservoir Drilling and equipping of 3 new wellsDistribution System 14D supplying Fneidek Required works : 14 km Transmission lines and 6 km Distribution networks Construction of 1x5000 m³ new reservoir Drilling and equipping 7 new wells For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Distribution System 12 supplying El-Karkaf; Beit-El-Haouche; Jdeidet el Kayteh and Eyoune-El-Ghouzlane Required works : 8 km Distribution networks and 5 km Distribution networks Drilling and equipping 4 new wells Construction of 1x4000 m³ new reservoir Distribution System 10 supplying Bebnine Required works : 4.5 km Transmission lines + 5 km Distribution networks Drilling and equipping 4 new wells Distribution System 11 supplying Ouadi El-Jamous Required works : 2 km Transmission lines Drilling and equipping 1 new well May 2020 - V A 16 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) NL-W C. District of Koura (see drawing NL-W.C) 1 NL-W. C.1 2,676,500 1 NL-W. C.2 2,353,200 1 NL-W. C.3 8,220,300 1 NL-W. C.4 943,400 1 NL-W. C.5 127,200 1 NL-W. C.6 519,400 1 NL-W. C.7 15,000,000 Total Koura district 29,840,000 Out of which : Priority 1 29,840,000 Priority 2 Priority 3 For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Distribution System 7 supplying Bnehrane Required works : 5 km Distribution networks Construction of 1x300 m³ new reservoir Distribution System 2 supplying Al-Boukaia; Al-Hraïché; Badbhoun; Bargoune; Barsa; Afsdik; Beitroumine; Belmand; Bkeftine; Btouratige; Déddé; En-Nakhlé; Fih; Kelhate; Kfar Kahel and Zakroune Required works : 6.5 km transmission lines + 7 km distribution networks Construction of 2x100 m³; 2x200 m³; 1x300 m³; 1x350 m³; 2x500 m³; 1x600 m³; 1x1000 m³; 1x3500 m³ new reservoirs Distribution System 3 supplying Ras Maska Required works : Drilling and equipping 2 new wells 8 km transmission lines Construction of 1x5000 m³ new reservoir Distribution System 4 supplying Aba; Amioune; Bdebba; Bechmezzine; Bsarma; Aïn Akrine; Dar Chmezzine; Kfar Akka; Kfar Hazir; Bterram; Kfar Saroun; Kousba and Rechdebbine Required works : 3 km transmission lines + 57 km distribution networks Construction of 3 pumping stations Construction of 3x1500 m³; 2x1000 m³; 1x1200 m³; 2x500 m³; 1x200 m³; 1x300 m³; 1x100 m³ new reservoirs Distribution System 5 supplying Bhabbouche; Bziza; Dar Bechtar; Kaftoune and Majdel Required works : 10 km Distribution networks Construction of 1x300 m³ new reservoir Distribution System 6 supplying Bednayel; Btaaboura; Ejdabrine; Kefraya and Kfar Hatta Required works : Construction of 2x100 m³ new reservoirs May 2020 - V A 17 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) NL-W D. District of Minieh (see drawing NL-W.D) 1 NL-W. D.1 9,932,200 1 NL-W. D.2 985,800 1 NL-W. D.3 3,333,700 1 NL-W. D.4 477,000 1 NL-W. D.5 402,800 1 NL-W. D.6 1,982,200 1 NL-W. D.7 15,000,000 Total Minieh district 32,113,700 Out of which : Priority 1 32,113,700 Priority 2 Priority 3 Distribution System 1a supplying Al Minieh Required works : 23 km Transmission lines 10 km Distribution networks Construction of 2x3000 m³ + 1x4000 m³ new reservoirs Drilling and equipping 10 new wells Distribution System 2a supplying Markabta Required works : 3 km Transmission lines 2 km Distribution networks Drilling and equipping 1 new well Distribution System 3a supplying Borge el Yahoudiyeh; Deir Omar Required works : 3 km Transmission lines 17 km Distribution networks Construction of 1x1000 m³ + 1x1500 m³ + 1x6000 m³ new reservoirs Drilling and equipping 1 new well Distribution System 4a supplying Nabi Youchaa Required works : 1 km Transmission lines 3 km Distribution networks Construction of 1x500 m³ new reservoir Distribution System 5a supplying Tourbol Required works : 1 km Transmission lines 2 km Distribution networks Construction of 1x600 m³ new reservoir Distribution System 6a supplying Zouk Bhannine; Al Rihanieh; Aadoua Required works : 5 km Transmission lines 6 km Distribution networks Construction of 2x400 m³ + 1x2000 m³ new reservoirs Drilling and equipping 1 new well For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) May 2020 - V A 18 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) NL-W E. District of Ed Danniyeh (see drawing NL-W.E) 1 NL-W. E.1 2,141,200 1 NL-W. E.2 2,263,100 1 NL-W. E.3 2,098,800 1 NL-W. E.4 869,200 1 NL-W. E.5 1,250,800 1 NL-W. E.6 715,500 1 NL-W. E.7 1,764,900 1 NL-W. E.8 938,100 1 NL-W. E.9 805,600 1 NL-W. E.10 890,400 1 NL-W. E.11 84,800 1 NL-W. E.12 678,400 1 NL-W. E.13 2,130,600 1 NL-W. E.14 286,200 1 NL-W. E.15 15,000,000 Total Danniyeh district 31,917,600 Out of which : Priority 1 31,917,600 Priority 2 Priority 3 Distribution System 17 supplying Beit Zaoud Required works : Construction of 3 km Transmission line For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Distribution System 16 supplying Deir Nebouh Required works : Construction of 5 km Transmission line + 4 km Distribution networks Drilling and equipping 2 new wells Construction of 2x500 m³ new reservoirs Distribution System 2 supplying Al-Sfiré, Assoun, Bkaa Safrine, Bkarsouna, Mrah-El-Sfiré Required works : Construction of 13.5 km Transmission line + 5 km Distribution networks Construction of 2x1000 m³ + 1x500 m³ new reservoirs Distribution System 3 supplying Azka, Btermaz, El-Watié et Harf Siad, Kfar Chlane, Kfar Habou, Mrah-el-Sreige, Tarane Required works : Construction of 7 km Transmission line + 5 km Distribution networks Construction of 3x1000 m³ + 1x500 m³ + 1x300 m³ + 1x100 m³ + 1x200 m³ new reservoirs Distribution System 4 & 5 supplying Bakhoune, Haql el Aazimé, Kattiné, Kharnoub Required works : Construction of 1 km Transmission line + 5 km Distribution networks Construction of 1x600 m³ + 1x1000 m³ new reservoirs Distribution System 6 supplying Bechhara, Izal, Jarjoura, Mazraat Ketrane Required works : Construction of 2 km Transmission line + 8 km Distribution networks Construction of 1x1000 m³ + 2x200 m³ new reservoirs Distribution System 8 supplying Aassaymout, Debaael, Jaroun, Qarhaiya Required works : Construction of 7.5 km Transmission line Distribution System 9 supplying Aïn-El-Tiné, Beit-El-Faks, El-Hazmieh, Karseita, Nemrine et Bakoura Required works : Construction of 9.5 km Transmission line + 8 km Distribution networks Construction of 1x300 m³ + 1x200 m³ new reservoirs Distribution System 10 supplying Beit Haouik, Hawara, Kfar Bibnine Required works : Construction of 6 km Transmission line + 3 km Distribution networks Construction of 1x400 m³ new reservoir Distribution System 12 supplying Kahf-El-Malloul Required works : Construction of 2 km Transmission line + 1 km Distribution networks Drilling and equipping 1 new well Distribution System 13 supplying Zaghrteghrine Required works : 2 km Distribution networks + 2 km Distribution networks Drilling and equipping 1 new well Distribution System 14 supplying Behweité Required works : 1 km Distribution networks Distribution System 15 supplying Bchnnata, Btehline, Omar Required works : Construction of 15 km Transmission line + 5 km Distribution networks Construction of 1x400 m³ new reservoir Distribution System 1 supplying Sir Required works : Construction of 1 km Transmission line + 20 km Distribution networks Construction of 1x600 m³ + 1x500 m³ + 1x200 m³ new reservoirs May 2020 - V A 19 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) NL-W F. District of Zgharta (see drawing NL-W.F) 1 NL-W. F.1 816,200 1 NL-W. F.2 1,812,600 1 NL-W. F.3 1,144,800 1 NL-W. F.4 810,900 1 NL-W. F.5 810,900 1 NL-W. F.6 593,600 1 NL-W. F.7 487,600 1 NL-W. F.8 1,590,000 1 NL-W. F.9 850,000 1 NL-W. F.10 3,063,400 1 NL-W. F.11 2,268,400 1 NL-W. F.12 1,701,300 Distribution System 1 supplying Hailan and Mzraat Kefraya Required works : 2 km Transmission lines Construction of 300 m³ new reservoir Drilling and Equipping of 1 new well Distribution System 2 supplying Aalma Required works : 2 km Transmission lines + 10 km Distribution network Construction of 2000 m³ new reservoir Drilling and Equipping of 1 new well Distribution System 3 supplying Kfarhoura Required works : 2 km Transmission lines + 5 km Distribution network Drilling and Equipping of 1 new well Distribution System 5 supplying Daraiya Zgharta Required works : 2 km transmission lines Construction of 250 m³ new reservoir Drilling and Equipping of 1 new well Distribution System 6 supplying Aarjis and Bnechaai Required works : 2 km Transmission lines Construction of 250 m³ new reservoir Drilling and Equipping of 1 new well Distribution System 7 supplying Seraal Required works : 6 km Distribution network Construction of 200 m³ new reservoir Distribution System 8 supplying Aintourine Required works : 5 km Distribution network Construction of 100 m³ new reservoir Distribution System 9 supplying Mazraat Et-Teffah Required works : 6 km Transmission lines + 12 km Distribution network Distribution System 10 supplying Arde, Mejdlaiya Zgharta, Boussit and Hraiqis Required works : 1.5 km Transmission lines Construction of 1x1500 m³, 1x750 m³, 1x3000 m³ new reservoirs Distribution System 11 supplying Aachach, Miriata, Rachaaine, Sakhra and Danha. Required works : 6.5 km transmission lines + 11 km Distribution network Construction of 1x1500 m³, 1x750 m³, 1x100 m³ new reservoirs Drilling and Equipping of 2 new wells Distribution System 12 supplying Deir Jdeide, Khaldiye, Asnoun, Iaal, Qarah Bach, Mazraat Ajbeaa, Mazraat Jnaid and Hariq Zgharta Required works : 11.5 Transmission lines + 2 km Distribution network Construction of 2x75 m³, 1x250 m³, 3x100 m³,1x50 m³ new reservoirs Drilling and Equipping of 1 new well Distribution System 13 supplying Miziara Required works : 7.5 Transmission lines Construction of 2x1500 m³ new reservoirs Drilling and Equipping of 1 new well May 2020 - V A 20 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 1 NL-W. F.13 278,990 1 NL-W. F.14 3,175,000 1 NL-W. F.15 5,353,000 1 NL-W. F.16 975,200 1 NL-W. F.17 2,793,100 1 NL-W. F.18 95,400 1 NL-W. F.19 307,400 1 NL-W. F.20 694,300 1 NL-W. F.21 296,800 1 NL-W. F.22 15,000,000 Total Zgharta district 44,918,890 Out of which : Priority 1 44,918,890 Priority 2 Priority 3 NL-W G. District of Tripoli (see drawing NL-W.G) 1 NL-W. G.1 15,794,000 1 NL-W. G.2 15,000,000 Total Tripoli district 30,794,000 Out of which : Priority 1 30,794,000 Priority 2 Priority 3 Required works : 10 km Transmission lines + 150 km Distribution networks Drilling and equipping 4 new wells For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Distribution System 18 supplying Beslouqit and Ehden Required works : 13.5 km transmission lines Construction of 1x275 m³, 1x2000 m³, 1x500 m³, 1x250 m³, 2x1000 m³ new reservoirs Drilling and Equipping of 1 new well Distribution System 19 supplying Kafar Zeina Required works : 1 km Transmission lines Distribution System 20 supplying Kfarsghab Required works : 1 km Transmission lines Construction of 1x1000 m³ new reservoirs Distribution System 21 supplying Bchannine, Bsebaal, Kfaryachit and Morh Kfarsghab. Required works : 4.5 km Transmission lines Construction of 2x250 m³, 1x200 m³ new reservoirs Distribution System 22 supplying Bhairet Toula and Toula Zgharta Required works : 1.5 km Transmission lines Construction of 1x100 m³, 1x250 m³ new reservoirs For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Distribution System 17 supplying Ijbaa Required works : 2 km Transmission lines + 8 km Distribution network Construction of 1x350 m³ new reservoir Distribution System 14 supplying Aardat, Tallet Zgharta, Kfardlaqous, Kfarhata Zgharta and Zgharta Required works : 16.3 Transmission lines + 9 km Distribution network Construction of 1x50 m³, 1x250 m³, 1x3000 m³ new reservoirs Distribution System 15 supplying Ayto and Aarbet Qozhaiya 7.5 km transmission lines + 23 km Distribution network Construction of 2x300 m³ new reservoirs Construction of 1 new pumping station Distribution System 16 supplying Karm Saddé, Kfarfou, Ras Kifa and Sebaal Zgharta Required works : 13.5 km transmission lines + 40 km Distribution network Construction of 1x200 m³, 1x250 m³, 1x500 m³ new reservoirs Construction of 1 new pumping station May 2020 - V A 21 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) NL-W H. District of Qobayate (see drawing NL-W.B) 1 NL-W. H.1 1,415,100 1 NL-W. H.2 371,000 1 NL-W. H.3 1,092,000 1 NL-W. H.4 371,000 1 NL-W. H.5 371,000 1 NL-W. H.6 5,803,500 1 NL-W. H.7 1,303,800 1 NL-W. H.8 2,983,900 1 NL-W. H.9 6,291,100 1 NL-W. H.10 2,289,600 1 NL-W. H.11 4,155,200 Distribution System 4 supplying Andeket Required works : Construction of 1 new Pumping station Distribution System 6 and 7 supplying Aaouainat; Khalsa; Khirbet Er Remmane; Mazraet-El-Nahrieh; El-Bardé; Al Moghrak and El Kobayet Required works : 3.5 km Transmission lines + 55 km Distribution networks Construction of 1x50 m³ + 1x1200 m³ + 1x5000 m³ new reservoirs Distribution System 8 supplying Aaidamoun Required works : 2 km Transmission lines Construction of 1x1000 m³ new reservoirs Drilling and equipping of 1 new well Construction of 1 new Pumping station Distribution System 9 supplying Chadra Required works : 2 km Transmission lines + 20 km Distribution networks Construction of 1x250 m³ + 1x350 m³ new reservoirs Drilling and equipping of 1 new well Construction of 1 new Pumping station Distribution System 10 supplying Machta Hammoud Required works : 6 km Transmission lines + 35 km Distribution networks Construction of 1x2500 m³ + 1x500 m³ new reservoirs Drilling and equipping of 3 new wells Construction of 2 new Pumping stations Distribution System 3 supplying Akroum Required works : Construction of 1 new Pumping station Distribution System 11 supplying Sindianet Zeidan Required works : 4 km Transmission lines + 10 km Distribution networks Drilling and equipping of 2 new wells Distribution System 13 supplying Freidice; Daoucet Baghdadi; El Kousseir; Denket el Amriyeh Required works : 2 km Transmission lines + 35 km Distribution networks Drilling and equipping of 1 new well Construction of 1x1000 m³ + 2x500 m³ new reservoirs Distribution System 0 supplying Dayret Nahr El-Kabir; Ouadi Khaled; Qarha; Hnaïder; Al-Kneissé Required works : 10 km Distribution networks Construction of 1x250 m³ and 1x350 m³ new reservoirs Construction of 1 new Pumping station Distribution System 1 supplying Mouanse Required works : Construction of 1 new Pumping station Distribution System 2 supplying Sahle, Qenia, Mrah el Khokh, Wata el Sahle and Bsatine Required works : 6 km Distribution networks Construction of 1x1000 m³ new reservoir Construction of 1 new Pumping station May 2020 - V A 22 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 1 NL-W. H.12 1,802,000 1 NL-W. H.13 1,060,000 1 NL-W. H.14 1,250,800 1 NL-W. H.15 2,840,800 1 NL-W. H.16 720,800 1 NL-W. H.17 848,000 1 NL-W. H.18 784,400 1 NL-W. H.19 6,381,200 1 NL-W. H.20 16,196,800 1 NL-W. H.21 15,000,000 Total Qobayate district 73,332,000 Out of which : Priority 1 73,332,000 Priority 2 Priority 3 Distribution System 17 supplying El Kouachra Required works : 2 km Transmission lines Construction of 1x5000 m³ new reservoir Drilling and equipping 1 new well Distribution System 21 supplying Jannine, Aarme and Srar Required works : 2 km Transmission lines Construction of 1x100 m³ new reservoir Drilling and equipping 1 new well For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Distribution System 18 supplying Dabbabieh Charkiyeh; Noura el Faouka and el Tahta Required works : 2 km Transmission lines + 25 km Distribution networks Drilling and equipping 1 new well Distribution System 19 supplying Qachlaq; Aamaret El-Baykat; Wadi el Haour Required works : 2 km Transmission lines Drilling and equipping 1 new well Distribution System 20 supplying Al-Mouzeihmé; Haytla; El-Tleil; Saïdnaya Required works : 2 km Transmission lines Construction of 1x500 m³ new reservoir Drilling and equipping 1 new well Distribution System 22 supplying El-Msallé; Aïn El-Zeit; Kafr; Charbila; Aïn Tanta; Al-Rihanié; Douair Adouiyé; Hmais Required works : 6 km Transmission lines + 42 km Distribution networks Construction of 2x100 m³ + 2x250 m³ + 1x300 m³ + 2x500 m³ new reservoirs Drilling and equipping 3 new wells Distribution System 23, 24 and 12 supplying Kherbet Daoud; Sfinet Ed Draib; Fseikine et Aïn Achma; El-Daghlé; Kherbet Char; Majdel; Barbara; Deir-Janine; Knissé; Mazraat Baldé; El-Hed; Al-Souaissé, Kfar Harra and el Bire Required works : 22 km Transmission lines + 100 km Distribution networks Construction of 1x100 m³ + 1x150 m³ + 3x200 m³ + 1x300 m³ + 2x400 m³ + 1x1000 m³ + 1x5000 m³ new reservoirs Drilling and equipping 8 new wells Distribution System 14 supplying Chikhlar; Rmah Required works : 20 km Distribution networks Construction of 1x350 m³ new reservoir Distribution System 16 supplying Kfarnoune Required works : 10 km Distribution networks Construction of 1x1000 m³ new reservoir May 2020 - V A 23 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WATER PROJECTS Section V A Proposed projects TOTAL COST OF WATER PROJECTS IN THE BEQAA Priority 1 Priority 2 Priority 3 Total 96,031,378 $ 50,277,699 $ 1,545,000 $ 147,854,077 $ Priority Project Description Estimated cost code (USD) BQ-W A. District of Baalbeck (see drawing BQ-W.A) 1 BQ-W. A.1 9,054,817 1 BQ-W. A.2 4,127,248 1 BQ-W. A.3 4,435,952 1 BQ-W. A.4 6,378,454 1 BQ-W. A.5 2,674,051 2 BQ-W. A.6 10,714,109 2 BQ-W. A.7 47,700 2 BQ-W. A.8 401,210 2 BQ-W. A.9 535,035 2 BQ-W. A.10 2,919,770 2 BQ-W. A.11 1,590,000 2 BQ-W. A.12 2,299,299 1 BQ-W. A.13 15,000,000 Total Baalbeck district 60,177,645 Out of which : Priority 1 41,670,522 Priority 2 18,507,123 Priority 3 For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Local distribution scheme Including : 3.25 km transmission lines + 20 km Distribution network Rehabilitation of 13 existing reservoirs Laboue distribution scheme, Including : 34.5 km transmission lines + 115 km Distribution network Construction of 1x200 m³ new reservoir Ouyoun Orghosh distribution scheme Including : 5.75 km transmission lines + 55 km Distribution network Construction of 6 new reservoirs Rehabilitation of 26 existing reservoirs Drilling of 2 new wells Younine, Maqne and Nahle distribution scheme, including : 20.25 km transmission lines + 25 km Distribution network Construction of 1x1000 m³ reservoir Drilling of 1 new well Yammouneh distribution scheme Including : 7.25 km transmission lines + 65 km Distribution network Construction of 1x500 m³ new reservoirs Rehabilitation of 24 existing reservoirs Drilling of 1 new well and equipping 3 existing wells Yahfoufa - Ain Sikkeh distribution scheme Including : 6.4 km transmission lines + 4 km Distribution network Construction of 2x150 m³ new reservoirs Rehabilitation of 27 existing reservoirs Drilling of 1 new well Aarsal distribution scheme Including : 16 km transmission lines + 50 km Distribution network Drilling of 15 new wells Ouyoun Orghosh distribution scheme Including : Rehabilitation of 1 existing reservoirs Yammouneh village distribution scheme Including : 0.5 km transmission lines + 1 km Distribution network Drilling of 1 new well Halbata - El Kharayeb distribution scheme Including : 3 km transmission lines + 6.75 km Distribution network Fekha & Jdeideh distribution scheme Including : 4 km transmission lines + 8.5 km Distribution network Drilling of 4 new wells Baalbeck, Aamechki & Ain Bourday distribution scheme Including : Drilling of 3 new wells May 2020 - V A 24 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BQ-W B. District of Hermel (see drawing BQ-W.B) 1 BQ-W. B.1 9,829,640 1 BQ-W. B.2 4,405,248 2 BQ-W. B.3 1,728,855 2 BQ-W. B.4 756,535 2 BQ-W. B.5 1,556,632 2 BQ-W. B.6 344,947 2 BQ-W. B.7 1,750,073 2 BQ-W. B.8 1,566,934 3 BQ-W. B.9 257,500 3 BQ-W. B.10 515,000 3 BQ-W. B.11 257,500 3 BQ-W. B.12 515,000 1 BQ-W. B.13 15,000,000 Total Hermel district 38,483,864 Out of which : Priority 1 29,234,888 Priority 2 7,703,976 Priority 3 1,545,000 Marjahin distribution scheme Including : Rehabilitation of Marjhine pumping station For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) El Qasr distribution scheme Including : Drilling and equipping of a new well Upper Hermel, Ras El Mai & Ain Zarqa distribution scheme Including : 10 km transmission lines + 71 m Distribution network Construction of 3 x 1500 m³ and 2 x 500 m³ new reservoirs Rehabilitation of 3 existing reservoirs 3,000 m³ each Rehabilitation of the catchment of Ras el Mai spring Rehabilitation of the distribution network of Hermel city Construction of a new pumping station (32 l/s @ 380 m) Equiping 3 existing wells Ain el Haour distribution scheme Including : 22.5 km transmission lines + 40 m Distribution network Construction of 2 x 100 m³ and 1 x 200 m³ and 1 x 500 m³ new reservoirs Construction of a new pumping station (32 l/s @ 250 m) Naanaah-El Kharbe and El Wardeh distribution scheme Including : 14.5 km transmission lines + 13 m Distribution network Construction of 4 x 100 m³ new reservoirs Beit Et Tochem, El Charqe, Mazraat Chelman distribution scheme Including : 1 km transmission lines + 9 m Distribution network Construction of 1 x 150 m³ new reservoir Drilling and equipping 1 new well Ouadi En Naira, Ouadi Bnit-Zouetini, Wadi El karem, Kaeb Wadi El Karem distribution scheme Including : 4.5 km transmission lines + 12 m Distribution network Construction of 1 x 200 m³ and 1 x 300 m³ new reservoirs Equipment of Wadi el Naira existing well + new control room Rehabilitation of Zoueitini existing well and pumping station Ouadi Faara, Mrah El Aaqbet distribution scheme Including : 8 m Distribution network Ain Maabour distribution scheme Including : 21 km transmission lines + 5.2 m Distribution network Construction of 1 x 200 m³ new reservoir Ain el Lezabbe distribution scheme Including : 15.5 km transmission lines Construction of 1 x 300 m³ new reservoir Construction of a new pumping station (17 l/s @ 170 m) Kouakh distribution scheme Including : Rehabilitation of well and pumping station Kouakh and Fissane distribution scheme Including : Construction of a new pumping station for existing well May 2020 - V A 25 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BQ-W C. District of West Beqaa, Zahleh & Rachaiya (see drawings BQ-W.C and BQ-W.D) 1 BQ-W. C.1 1,947,008 1 BQ-W. C.2 826,800 1 BQ-W. C.3 699,600 1 BQ-W. C.4 699,600 1 BQ-W. C.5 699,600 1 BQ-W. C.6 2,098,800 1 BQ-W. C.7 699,600 1 BQ-W. C.8 1,755,360 1 BQ-W. C.9 699,600 2 BQ-W. C.10 1,144,800 2 BQ-W. C.11 3,900,800 Ain Zarka - Baaloul system : Serving Lebbeya; Qaraoun; Qelia; Sohmor; Yohmor; Zelleya Required works : 44.5 km Distribution lines Construction of 1x500 m³ reservoir Ain Zarka - Machghara system : Serving Ain el Tineh; Maidoun Required works : 13.5 km Distribution lines Chamsine Distribution System : Serving El Salamieh; Soultan Y T Mansoura; Dalhamieh; Terbol. Required works : 1.3 km Transmission lines + 17 km Distribution networks Construction of 1x100 m³ + 1x300 m³ + + 1x1000 m³ new reservoirs Ain Zarka - Jabal el Arabi system : Serving Jabal El Arabi-Mdoukha; Ain Arab; Bireh; Dahr El Ahmar; Er Rafid; Kfardenis; Kherbet Rouha; Mdoukha; Mhaydtheh; Beit Lahia Required works : 2 km Transmission lines + Construction of 1x500 m³ Drilling 1 new well Ain Zarka - Machghara system : Serving Machghara Required works : 2 km Transmission lines Drilling 1 new well Ain Zarka - Baaloul system : Serving Sohmor Required works : 2 km Transmission lines Drilling 1 new well Deir el Achayer system : Serving Deir el Achayer Required works : 2 km Transmission lines Drilling 1 new well Rayak system : Serving Rayak, Hochemoche, Nasriyat Rizk and Haouche Hala Required works : 6 km Transmission lines Drilling 3 new wells Ablah system : Serving Ablah Required works : 6 km Transmission lines Drilling 1 new well Ain Ata system : Serving Ain Ata Required works : 20.7 km Distribution networks Fourzol system : Serving Fourzol Required works : 2 km Transmission lines Drilling 1 new well May 2020 - V A 26 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 2 BQ-W. C.12 16,000,000 2 BQ-W. C.13 148,400 2 BQ-W. C.14 84,800 2 BQ-W. C.15 975,200 2 BQ-W. C.16 84,800 2 BQ-W. C.17 137,800 2 BQ-W. C.18 127,200 2 BQ-W. C.19 212,000 2 BQ-W. C.20 381,600 2 BQ-W. C.21 869,200 1 BQ-W. C.22 15,000,000 Total West Beqaa; Zahleh; Rachaiya district 49,192,568 Out of which : Priority 1 25,125,968 Priority 2 24,066,600 Priority 3 For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Ain Zarka - Jabal el Arabi system : Serving; Bireh; Aazzi Dahr el Ahmar; Ed Rafid; Kfardenis; Kherbet Rouha; Mdoukha; Mhaydtheh; Ain Arab; Kfarmechki Required works : 4 km Transmission lines Construction of 1x500 m³ reservoir 170.5 km Distribution lines Drilling 2 new wells Bab Mareh system : Serving Bab Mareh Required works : 1 km Distribution lines Construction of 1x100 m³ reservoir Chamsine system : Serving Ain el Fokhar Required works : 1 km Distribution lines Niha system : Serving Niha Required works : 11.5 km Distribution lines Kfarqouq system : Serving Kfarqouq Required works : 1 km Distribution lines Yanta system : Serving Yanta Required works : 0.5 km Distribution lines Construction of 1x300 m³ reservoir Bouareij system : Serving Bouareij Required works : Construction of 1x500 m³ reservoir Fourzol system : Serving Fourzol Required works : Construction of 1x1000 m³ reservoir Ablah system : Serving Ablah Required works : 3 km Transmission lines Construction of 1x500 m³ reservoir Jdita System : Serving Saadnayel; Taalabaya; Taanayel Required works : 4 km Transmission lines Construction of 1x100 m³ water tower + 2x1000 m³ new reservoirs May 2020 - V A 27 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects TOTAL COST OF WATER PROJECTS IN SOUTH LEBANON Priority 1 Priority 2 Priority 3 Total 411,520,000 $ 12,600,000 $ - 424,120,000 $ Priority Project Description Estimated cost code (USD) SL-W A. District of Nabatiye (see drawing SL-W.A) 1 SL-W. A.1 12,800,000 1 SL-W. A.2 18,000,000 1 SL-W. A.3 3,500,000 1 SL-W. A.4 400,000 1 SL-W. A.5 6,800,000 1 SL-W. A.6 14,400,000 1 SL-W. A.7 16,000,000 2 SL-W. A.8 2,100,000 Northern Distribution system supplying Aarab Salim, Deir El Zahrani, Habbouch, Jarjouaa, Kfar Roummane, Kfaroue Required works : Construction of the Northern regional reservoir at Jarjouaa Construction of gravity lines to supply the localities reservoirs of the Northern sub-system (Aarab Salim, Deir El Zahrani, Habbouch, Jarjouaa, Kfar Roummane and Kfaroue) from the Northern reservoir At Nabatieh district level : Expansion and upgrade of water supply networks, including 20 reservoirs and 320 km pipelines At Nabatiyeh district level : Construction of a new WTP at Yohmor including the raw water transmission line from Taybeh catchment Northern Distribution system supplying Aarab Salim, Deir El Zahrani, Habbouch, Jarjouaa, Kfar Roummane, Kfaroue Required works : Rehabilitation and upgrading of Nabaa El Tasse pumping system Rehabilitation and upgrading of Kfar Roummane pumping system Gravity conveyor line to supply Zahrani and Nabatiyeh districts in wet season Western Distribution system supplying Toul, El Kfour, Ed Douair, Zebdine Required works : Rehabilitation and upgrading of Fakhr El Din water system Rehabilitation and upgrading of El Rejem water system Nabatiyeh Distribution system supplying Kfar Tibnit, Nabatiyeh el Faouqa, Nabatiyeh el Tahta - Kfar Joz Required works : Gravity line Yohmor regional reservoir and WTP to Nabatieh reservoirs and Aadchit regional reservoir Construction of Galle water system Construction of Kfar Tibnit Regional reservoir Gravity line connecting regional reservoir of Nabatiye-Kfartibnit to regional reservoirs and local reservoirs of Choukine, Maifadoun and Qaaqaiet Ej Jisr Gravity lines from Nabatiye Kfar Tibnit regional reservoir to the local reservoirs Arnoun Yohmor Distribution system supplying Arnoun, Yohmor Required works : Construction of the Arnoun Yohmor regional reservoir at Yohmor Gravity line from Yohmor regional reservoir to local reservoirs in Yohmor and Arnoun Zaoutar system supplying Zaoutar el Charqiyeh, Zaoutar el Gharbiyeh Required works : Construction of Aalman pumping system Rehabilitation and upgrading of Aalman Zawtar Eh Charqiye pumping system May 2020 - V A 28 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 2 SL-W. A.9 2,300,000 2 SL-W. A.10 3,500,000 1 SL-W. A.11 15,000,000 Total Nabatiye district 94,800,000 Out of which : Priority 1 86,900,000 Priority 2 7,900,000 Priority 3 SL-W B. District of Jezzine (see drawing SL-W.B) 1 SL-W. B.1 11,100,000 1 SL-W. B.2 1,250,000 1 SL-W. B.3 4,200,000 1 SL-W. B.4 15,000,000 Total Jezzine district 31,550,000 Out of which : Priority 1 31,550,000 Priority 2 Independent systems supplying Ouardiye, Mazraat El-Aarqoub, Mazraat Ouazaiye, Mazraat Khallet Khazen, Mazraat Zighrine Jezzine, Mazraat Tamra, El-Demachkiyeh, Mahmoudiye Jezzine, Mazraat Qrouh, Mazraat Er-Rouhbane, Mazraat Louzid (Louayziye), Required works: Catchment and protection of major springs: Ain Qobays, Aazibe el Faouka, Ain Zarka Southern Distribution system supplying Aadchit, Braiqaa, El Qsaibe, Kfar Sir, Qaaqaiet Ej Jisr, Sir El Gharbiyeh Required works : Construction of the Southern regional reservoir at Aadchit Kfar Dajjal Gravity lines to supply local reservoirs of the Southern regional reservoir At Jezzine district level : Expansion and upgrade of the water supply networks in the Caza of Jezzine, including the construction of 8 reservoirs and 75 km pipelines.For All Systems : Remote Control And Monitoring Of Water Systems (SCADA and DMA) Middle Distribution system supplying Aabba, Harouf, Jibchit, Choukine, Choukine-Ain Dahab, Maifadoun Required works : Construction of the Middle regional reservoir at Zebdine (Jabal Al Ahmar) Construction of gravity lines to supply local reservoirs from the Middle regional reservoir For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Ain Toghra system supplying Wadi Jezzine, Baba, Btedine El-Leqch, Taaid, Bisri, Harf Jezzine, Machmouche, Sabbah, El-Ghabbatieh, Midane Jezzine Homsiye, Roum, Aazour, Anane, Qtale Jezzine, Mazraat El Mathane, Qabaa Jezzine, Qaytoule, Mrah Bou Chedid, Maknounet Jezzine, Haytoura, Zhilta, Sanaya, Bouslaya, Hidab, Saydoun, Rimat, Sfaray, Required works: Expansion of Ain Toghra storage capacity by 3000 m³ to accommodate 1 Mm³ of treated water per year from Bisri dam Construction of a new regional reservoir in the outskirts of Sfaray Supplied in wet season from local sources and in dry season from Bisri dam Construction of Qtale water scheme including: 12 000 m³ regional reservoir in Qtale 350 mm pumping transmission line from Bisri dam Water treatment plant May 2020 - V A 29 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) Priority 3 SL-W C. District of Sour (see drawing SL-W.C) 1 SL-W. C.1 3,500,000 1 SL-W. C.2 2,500,000 1 SL-W. C.3 12,700,000 1 SL-W. C.4 3,300,000 1 SL-W. C.5 3,500,000 1 SL-W. C.6 3,400,000 1 SL-W. C.7 2,550,000 1 SL-W. C.8 320,000 1 SL-W. C.9 6,000,000 1 SL-W. C.10 2,500,000 Chehabiyeh system supplying Chehabiyeh, El Majdel, Jouaiya, Mahrouna Required works : Construction of Ouadi Jilou PS1 - Chhabiye Lift line Rehabilitation of Ech Chhabiye Pumping station Ouadi Jilo 2 supplying Maarake, Tayr Debbe, Required Works: Rehabilitation of Ouadi Jilou PS2 pumping station Kfardounine system supplying Kfar Dounine, Qalaouiye, Tair Falsay, Silaa, Deir Kifa, Froun, Srifa-Niha, Naffakhiye, Derdaghaiya, Arzoun, Chehour, Ghandouriye, Borj Qalaouiye, Bestiyat, Hmairi, Hallousiye, Bafliye, Barich, Debaal Required works : Construction of Ech Chhabiye - Kfardounin lift line Gravity lines from Kfardounin regional reservoir to local reservoirs Saddiqine system supplying Qana El Jalil, Hanaouay, Deir Qanoun, Rmaidiye, Knaisse, Ech Chaaitiye-El Malkiye Required works : Rehabilitation of Siddiquin Pumping station Construction of Batoulay - Siddiquin Lift line Maaroub system supplying Maaroub, Jennata, Toura El Mantra, Deir Qanoun, Aabbassiye, Bedias, Borj Rahhal Required works : Gravity lines from Maaroub regional reservoir to local reservoirs Borj ech Chemali system supplying Borj ech Chemali-Maachouk, Sour Required works : Construction of Borj el Chmali pumping station and lift line to regional reservoir Rehabilitation of Ras El Ain Treatment plant and pumping station Rehabilitation of El Bass pumping station and treatment plant Hanaouay system supplying Ain Baal-el Hoch, Batoulay Required works : Rehabilitation of Batoulay Pumping station Haddethta system supplying Haddethta, Aita el Jabal, Rachaf, Haris Required works : Construction of Haddetha Regional Reservoir 3000 m³ El Soultaniyeh system supplying Es Soultaniye, Tibnine, Baraachit, Safad El Batikh, Majdel Selm, Jmaijme, Khirbet Selm, Deir Ntar Required works : Rehabilitation of Ouadi Jilou PS1 pumping station Kafra & Ramieh system supplying Kafra, Aalma, Aita Ech Chaab, Beit Lif, Boustane Al Kasayer, Chamaa Al Qalaa, Chihine, Debel, Ed Dhaira, Ej Jibbain, En Naqoura, Hanine, Jbal El Botm, Majdel Zoun, Marouahine, Mazraat Ez-Zalloutiyeh, Qaouzah, Ramiye, Rmaysh, Srobbine, Yarine, Yater, Zebqine, Tair , arfa Required works : Rehabilitation of Kafra Pumping station Construction of Ramya pumping station, including lift and gravity lines May 2020 - V A 30 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 1 SL-W. C.11 21,575,000 1 SL-W. C.12 15,000,000 Total Sour district 76,845,000 Out of which : Priority 1 76,845,000 Priority 2 Priority 3 Expansion and upgrade of water supply networks in the Caza of Sour, including construction of 30 reservoirs and 350 km of pipelines. For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) May 2020 - V A 31 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) SL-W D. District of Zahrani (see drawing SL-W.D) 1 SL-W. D.1 2,900,000 1 SL-W. D.2 19,100,000 1 SL-W. D.3 5,100,000 1 SL-W. D.4 4,200,000 2 SL-W. D.5 2,300,000 2 SL-W. D.6 300,000 2 SL-W. D.7 2,100,000 1 SL-W. D.8 7,200,000 1 SL-W. D.9 15,000,000 Total Zahrani district 58,200,000 Southern Distribution system supplying Arzai, El Kharayeb, Ez Zeariyeh Required works : Gravity lines to supply local reservoirs from Ez Zrariyeh regional reservoir Lift line from Arzai P.S. to Ez Zrariye regional reservoir Northern & Eastern Distribution system supplying Ech Charqiye, El Aaddoussiye. El Merouaniye, En Najjariye, En Nmairiye, Zefta. Insar, Kaoutariet Es Siyad, Khartoum, Mazraat Kaoutariyet er Rizz, Mazraat Sinai Required works : Upgrade of the storage capacity of Ech Charqiyeh regional reservoir. Replacement of the gravity line to supply the regional reservoir in Ez Zrariyeh from Ech Charqiyeh Middle Distribution system supplying Bissariyeh, Ghassniyeh, Qaaqaiet Es Sanaoubar Required works : Upgrade of the storage capacity of Teffahta regional reservoir. Southern Distribution system supplying Arzai, El Kharayeb, Ez Zeariyeh Required works : Upgrade of the regional reservoir at Ez Zrarie Expansion and upgrade of water supply networks in the Caza of Zahrani, including construction 15 reservoirs and 150 km pipelines. For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Northern & Eastern Distribution system supplying Ech Charqiye, El Aaddoussiye. El Merouaniye, En Najjariye, En Nmairiye, Zefta. Insar, Kaoutariet Es Siyad, Khartoum, Mazraat Kaoutariyet er Rizz, Mazraat Sinai Required works : 8 000 m gravity line to supply the regional reservoir of Ez Zrariyeh from Ech Charqiyeh Gravity tie line between Zefta and El Merouaniye existing pipes Gravity lines to supply local reservoirs in Kaoutariet Es Siyad and Khartoum from Ech Charqiye regional reservoir Middle Distribution system supplying Bissariyeh, Ghassniyeh, Qaaqaiet Es Sanaoubar Required works : 8 000 m gravity line to supply the regional reservoir of Ez Zrariyeh from Ech Charqiyeh Lift line from el Brak to Ghassaniye regional reservoir Construction of Ghassaniyeh regional reservoir Gravity line from Ghassaniyeh regional reservoir to existing pipeline Rehabilitation and upgrade of Teffahta pumping scheme Construction of Arzai pumping system (2 wells, and pump sets to Ez Zrariye) along with Adloun P.S. and the lift lines from Arzai to Adloun to El Ghassaniye Coastal Distribution system supplying Aadloun, El Babliye, Loubiye, Es Saksakiye, Insariye, Sarafand Required works : El Brak wells and pumping system Lift line from el Brak to Ghazieh regional reservoir May 2020 - V A 32 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) Out of which : Priority 1 53,500,000 Priority 2 4,700,000 Priority 3 May 2020 - V A 33 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) SL-W E. District of Saida (see drawing SL-W.E) 1 SL-W. E.1 4,320,000 1 SL-W. E.2 5,450,000 1 SL-W. E.3 150,000 1 SL-W. E.4 4,550,000 1 SL-W. E.5 300,000 1 SL-W. E.6 6,880,000 1 SL-W. E.7 9,720,000 Expansion and upgrade of water supply networks in the Caza of Saida, including construction of 34 reservoirs and 145km of pipelines. Majdelyoun and Saydoun Wells supplying Haret Saida, Hlaliye Saida, Bramie Aabra Saida, Bqosta, Majdelyoun, Required works: Inspection, Rehabilitation, and Testing of Saidoun 1 Well. Arkey system supplying Arkey, Required works: Barti Reservoir and Pipeline: A 400 mm pipeline from the Kfar Melki bifurcation to Barti bifurcation. Barti Reservoir and Pipeline: A 100 mm pipeline from Barti bifurcation until the proposed reservoir 450 m³. DN 400 line from Barti bifurcation to Kfar Falous Sub Regional reservoir. Fouar-Serail system supplying Saida Ed-Dekermane, Saida El-Qadimeh, Saida El-Oustani, Haret Saida, Hlaliye Saida, Bramie, Miye ou Miye, Ghaziye, Bqosta, Required works: Inspection and Rehabilitation of Serail 1 Well Inspection and Rehabilitation of Faouar 5 and Faouar 6 Wells Rehabilitation/upgrading of existing Faouar Water Treatment Plant Investigation of Potential Seawater Intrusion – Serail Pumping Station and Faouar Pumping Stations Kfar Falous system supplying Kfar Falous, Ouaid El-Laymoun, Mharbiye, Required works: DN 400 line from Barti bifurcation to Kfar Falous Sub Regional reservoir. Small Retention Dam Ein Bou Younes – Kfar Melki Construction of Kfar Falous sub-regional reservoir Construction of Qtale water scheme including: 12 000 m³ regional reservoir in Qtale 350 mm pumping transmission line from Bisri dam Water treatment plant 400 mm gravity transmission line qtale-Kfar Falous Kfaroue system supplying Kfaroue, Required works: Catchment and protection of major springs : Kfaroue and Oum Chemmas Nabeh el Tasse system supplying Hassaniye, Khzaiz, Lebaa, Mazraat Aarab Soukkar, Aarab Ej-Jall, Sarba, Mazraat El Khraibe, Houmine El-Faouqa, Hmaile, Mazraat Kaleit Mais, Required works: Twin DN 450 transmission line from Nabaa El Tasse to Houmine El Fawka Houmine El Fawka Reservoir and Pipeline Two compartments reservoir 1,000 m³ eah + DN 100 connection to the twin DN 450 line Sarba Sub Regional Reservoir and Pipeline Two compartments reservoir 2,500 m³ each + DN 300 connection to the twin DN 450 line Anane – Lebaa Rehabilitation/Upgrade of Existing Irrigation and Domestic System May 2020 - V A 34 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 1 SL-W. E.8 15,000,000 Total Saida district 46,370,000 Out of which : Priority 1 46,370,000 Priority 2 Priority 3 For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) May 2020 - V A 35 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) SL-W F. District of Bint Jbeil (see drawings SL-W.F and SL-W.C) 1 SL-W. F.1 16,570,000 1 SL-W. F.2 3,650,000 1 SL-W. F.3 1,670,000 1 SL-W. F.4 300,000 1 SL-W. F.5 23,735,000 1 SL-W. F.6 15,000,000 Total Bint Jbeil district 60,925,000 Out of which : Priority 1 60,925,000 Priority 2 Priority 3 Expansion and upgrade of water supply networks in the Caza of Bint Jbeil, including construction of 32 reservoirs and 400 km of distribution pipelines. For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Taybeh system supplying Aadaisseh, Aadchit Al Qser, Aalman, Aynata, Bani Hayyan, Baraachit, Chahabiah, Chaqra, Deir Seriane, Kounin, Majdel Selm, Qabrikha, Qantara, Saf el Hawa, Safad Al Battikh, Salaa, Souwana, Tamriyyeh, Taybeh, Touline Required works : Rehabilitation of the Taybeh raw water catchment scheme including a new pumping station and a transmission line to the Taybeh WTP Rehabilitation of Taybeh water treatment plant Construction of a 3,000 m³ new regional reservoir at Baraachit, including transmission lines to local reservoirs Rehabilitation of Chaqra pumping station Kafra PS system supplying Tibnine, Ayta El Jabal (Ayta Al Zot), Hadatha , Tiri, Bait Yahoon, Kounin, Ain Ebel, Saf el Hawa, Srebbine, Bait Lif, Qaouzah, Ayta Al Shaab, Rmaich Required works : Rehabilitation of Saf El Hawa pumping station Transmission pipeline from Kafra pumping station to Bint Jbeil Saf el Hawa Markaba PS system supplying Talloussa, Rob Tlateen, Markaba, Aadaisseh, Houla, Mais el Jabal , Mhaybib, Blida Required works : Markaba 3,000 m³ regional reservoir Rehabilitation of Markaba pumping station Saf el Hawa system supplying Yaroun, Bint Jbeil, Aynata, Aytaroun, Maroun El Ras Required works : Rehabilitation of Slouki Pumping station May 2020 - V A 36 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) SL-W G. District of Marjaayoun & Hasbaya (see drawing SL-W.G and SL-W.F) 1 SL-W. G.1 810,000 1 SL-W. G.2 2,050,000 1 SL-W. G.3 19,450,000 1 SL-W. G.4 500,000 1 SL-W. G.5 500,000 1 SL-W. G.6 2,500,000 1 SL-W. G.7 2,500,000 1 SL-W. G.8 12,120,000 1 SL-W. G.9 15,000,000 Total Bint Marjaayoun & Hasbaya district 55,430,000 Out of which : Priority 1 55,430,000 Priority 2 Priority 3 For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Halta system supplying Halta, Kfarchouba, Kfarhamam, Dahayrjet Required works : New well with 3 km transmission lines Hebbariyeh system supplying Rachaya El Foukhar, Kfarhamam, Meri, Hebbariye, Fardis, Abou Qamha, Kawkaba, Ain , arfa, Chwayya, Ain Qenia Required works : Rehabilitation of Hebbariye pumping station Rehabilitation of Ain Jarfa pumping station Wazzani/Hasbani system supplying Kfarkila, Khiam, Abbassieh, Ain Arab, Rihanet Berri Required works : Construction of Wazzani new pumping station including catchment works and transmission line Hasbani system supplying Hasbaya, Ain jarfa Required works : Rehabilitation of Hasbani pumping station Construction of a new regional reservoir 30,000 m³ and treatment facility at Mayssat including the rehabilitation of the existing pumping station New Wells Field & pumping station Ebl el Saqi/Snoubar system supplying Ebel el Saqi, Blat,Debbine, Khiam Required works : Rehabilitation of Ebl Saqui pumping station Marj el Khaoukh system supplying Deir Mimas, Kfarkila, Qlaiaa, Marjeyoun, Khiam, Borj Al Mlouk (Khirbe) Required works : Rehabilitation of Marj el Khaoukh pumping station Local systems supplying El Majidiyé, Al Dellafé, Burghoz, Chebaa, El Kfeir, Mimas, El Amra, Mazraet el Sarada, Mazraet el Jrein Required works : Construction of 3 new wells and pumping station in Chebaa Expansion and upgrade of water supply networks in the Caza of Marjaayoun & Hasbaya, including construction of 9 reservoirs and 285 km of pipelines. May 2020 - V A 37 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WATER PROJECTS Section V A Proposed projects TOTAL COST OF WATER PROJECTS IN BEIRUT AND MOUNT LEBANON Priority 1 Priority 2 Priority 3 Total 420,773,073 $ 122,581,083 $ 22,946,456 $ 566,300,612 $ Priority Project Description Estimated cost code (USD) BML-W A. District of Beirut (see drawing BML-W.A and BML-W.G) 1 BML-W. A.1 51,500,000 1 BML-W. A.2 28,408,739 1 BML-W. A.3 4,016,794 2 BML-W. A.4 25,065,256 2 BML-W. A.5 9,636,165 1 BML-W. A.6 15,000,000 Total Beirut district 133,626,954 Out of which : Priority 1 98,925,533 Priority 2 34,701,421 Priority 3 For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Construction of 21 km transmission Line between Janneh Dam and Dbayeh Water Treatment Plant Tallet El Khayat and Borj Abi Haidar Networks System including: 3 km Transmission lines + 46 km Distribution networks Rehabilitation of TEK and BAH Reservoirs Rehabilitation of TEK and BAH pumping stations Installation of 9000 Service connection + 120000 Water Meters Achrafieh Lower and Upper Networks System including: 20 km Distribution networks Rehabilitation of Achrafieh Inf. and Sup. Reservoirs Rehabilitation of Achrafieh Inf. and Sup. Pumping Stations Supply of Tallet El Khayat and Borj Abi Haidar from Naameh reservoirs (Awali project) including: 18 km Transmission lines + 85 km Distribution networks Rehabilitation of Naameh Inferior and Superior Reservoirs Rehabilitation of Naameh Inferior Pumping Station Achrafieh Lower and Upper Networks System; replacement of old pipes (before 1980) including 9 km Transmission lines + 20 km Distribution networks May 2020 - V A 38 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BML-W B. District of Jbeil (see drawing BML-W.B) 1 BML-W. B.1 20,109,406 2 BML-W. B.2 1,722,922 2 BML-W. B.3 3,229,081 2 BML-W. B.4 1,101,101 2 BML-W. B.5 3,163,202 2 BML-W. B.6 15,488,100 2 BML-W. B.7 2,840,483 2 BML-W. B.8 1,336,425 1 BML-W. B.9 15,000,000 Total Jbeil district 63,990,720 Out of which : Priority 1 35,109,406 Priority 2 28,881,314 Priority 3 Afqa Spring Lower Region + Coastal Area System including: 18.5 Transmission lines + 139.75 km Distribution networks Construction of 23 reservoirs Well Equipment of Fatre + PS + WTP 800 m³/d Janneh Dam PS & WTP 6 000 m³/d El Aaqoura Region distribution system including: 4.25 km Transmission lines + 15.75 km Distribution networks Construction of 1*200 m³ + 1*500 m³ reservoirs Construction of 1 pumping station 2.5 l/s @ 250 m El Mejdel Region distribution system including: 12.50 km Transmission lines + 46.75 km Distribution lines Construction of 1*100 m³ + 1*500 m³ reservoirs Afqa Region distribution system including: 3.25 km Transmission lines + 9.75 km Distribution networks Construction of 1*100 m³ reservoir Construction of 1 pumping station 1.25 l/s @ 180 m El Ghabet and Lassa Region distribution system including: 6.50 km Transmission lines + 40.75 km Distribution networks Construction of 1*300 m³ + 1*500 m³ reservoirs Construction of 2 pumping stations : 2.5 l/s @ 100 m & 0.9 l/s @ 60 m Qartaba-Aouaini Region distribution system including: 23.75 km Transmission lines + 167.75 km Distribution networks Construction of 9 reservoirs Equipment of 3 wells Construction of 5 pumping stations : 2.5 l/s @ 100 m & 0.9 l/s @ 60 m El Kharbe-Qatra and Afqa Spring distribution system including: 5.50 km Transmission lines + 32.75 km Distribution networks Construction of 7 reservoirs El Moukhada System distribution system including: 8.25 km Transmission lines + 3 km Distribution networks Construction of 2 reservoirs Construction of 1 pumping station : 5.56 l/s @200m For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) May 2020 - V A 39 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BML-W C. District of Baabda Aley (see drawing BML-W.C) 1 BML-W. C.1 3,828,084 1 BML-W. C.2 5,830,000 1 BML-W. C.3 11,754,340 1 BML-W. C.4 32,522,920 2 BML-W. C.5 733,520 2 BML-W. C.6 127,200 2 BML-W. C.7 6,036,488 2 BML-W. C.8 2,685,000 2 BML-W. C.9 3,645,340 3 BML-W. C.10 10,056,220 3 BML-W. C.11 5,319,504 3 BML-W. C.12 2,711,692 1 BML-W. C.13 15,000,000 Total Baabda Aley district 100,250,308 Out of which : Priority 1 68,935,344 Priority 2 13,227,548 Priority 3 18,087,416 Raayan Distribution systems including: Rehabilitation of 30 km old transmission Asbestos Cement Lines 343 km Distribution networks Construction of 3 x 150 m³, 2 x 100 m³, 2 x 500 m³, 1 x 200 m³ reservoirs Bmaryam Distribution system including: 7.9 km Distrbution networks Construction of 1 X 100 m³ reservoir Ain El Delbeh Distribution system including: 1.5 km Distribution networks Daychounieh Distribution system including: 5.975 km Transmission lines Drilling and equiping 9 wells Local systems including: 4.8 km Distribution networks Construction of 1 x 300 m³ reservoir truction of 20 km transmission lines Constructon of 3 pumping stations Raayan Distribution systems including: 28.3 km Distribution networks Construction of 1 x 400 m³ and 1 x 150 m³ reservoirs Catchment Works Of Ain El Saouda And Ain El Jawzeh Spring Local systems including: 116.65 km Distribution networks Construction of 1 x 300 m³ and 1 x 100 m³ reservoirs Bmaryam Distribution system including: 62.73 km Distribution networks Daychounieh Distribution system including: 150 m Transmission lines 10.5 km Distribution networks Drilling and equiping 3 wells For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Local systems including: 125 km Distribution networks Construction of 1 x 1500 m³ reservoir Drilling, equiping and casing of "Chbaniyeh 1" well Bmaryam Distribution system including: 42.33 km Distrbution networks Construction of 1 X 250 m³, 2 x 150 m³ reservoirs Daychouniyeh Distribution system including: Rehabilitation of Daychouniyeh WTP Treatment for Galery Semaan Well Rehabilitation of Jamhour Pumping Station May 2020 - V A 40 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BML-W D. District of Keserwan (see drawing BML-W.D) 1 BML-W. D.1 2,067,530 1 BML-W. D.2 3,370,800 1 BML-W. D.3 10,574,560 2 BML-W. D.4 2,857,760 2 BML-W. D.5 212,000 2 BML-W. D.6 5,088,000 2 BML-W. D.7 9,687,340 1 BML-W. D.8 15,000,000 Total Keserwan district 48,857,990 Out of which : Priority 1 31,012,890 Priority 2 17,845,100 Priority 3 Chabrouh-Ain El Delbe-Afqa Distribution system including: 79 km Transmission lines Construction of 1 x 500 m³ reservoir Al Moudiq Distribution system including: 33.7 km Distribution networks Chabrouh-Assal Distribution system including: Construction of 1 x 1000 m³ reservoir Al Assal Distribution system including: 60 km Distribution networks Chabrouh-Ain El Delbe-Afqa Distribution system including: 106.8 km Distribution networks Construction of 3 x 200 m³ reservoir, 1 x 500 m³ reservoir, 1 x 250 m³ reservoir + 1 elevated reservoir DMA Modeling For All Distribution Networks For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Chabrouh-Assal Distribution system including: 6 km Transmission lines 32.1 km Distribution networks Construction of 1 x 300 + 1 x 500 m³ reservoirs Al Moudiq Distribution system including: 1.5 km Transmission lines 21 km Distribution networks Construction of 1 x 500 m³ reservoir Rehabilitation of Ouadi Hantouche Pumping Station May 2020 - V A 41 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WATER PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BML-W E. District of Chouf (see drawing BML-W.E) 1 BML-W. E.1 32,893,920 1 BML-W. E.2 47,937,440 1 BML-W. E.3 2,043,680 1 BML-W. E.4 4,519,840 1 BML-W. E.5 14,441,440 2 BML-W. E.6 111,300 2 BML-W. E.7 609,500 2 BML-W. E.8 4,933,240 3 BML-W. E.9 2,429,520 3 BML-W. E.10 2,429,520 1 BML-W. E.11 15,000,000 Total Chouf district 127,349,400 Out of which : Priority 1 116,836,320 Priority 2 5,654,040 Priority 3 4,859,040 BML-W F. District of Meten (see drawing BML-W.F) 1 BML-W. F.1 54,953,580 2 BML-W. F.2 7,362,760 2 BML-W. F.3 14,908,900 1 BML-W. F.4 15,000,000 Total Meten district 92,225,240 Out of which : Priority 1 69,953,580 Priority 2 22,271,660 Priority 3 Upper Metn system including: 69.7 km Distribution networks Construction of 5 x 200 m³, 2 x 300 m³, 2 x 500 m³ and 2 x 2000 m³ reservoirs Coastal Metn system including: 146 km Distribution networks Construction of 2 x 500 m³, 2 x 1000 m³, 1 x 1500 m³, 1 x 2000 m³, 1 x For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) El Qaa system including: Construction of 1 x 500 m³, 1 x 300 m³, 1 x 250 m³, 1 x 450 m³, 1 x 350 m³ and 1 x 150 m³ reservoirs Independent systems including: 18 km Transmission lines Construction of 1 x 150 m³ reservoir Drilling and equiping 6 wells El Qaa system including: 9 km Transmission lines Drilling and equiping 3 wells Damour wells system including: 9 km Transmission lines Drilling and equiping 3 wells For All Systems: Remote Control And Monitoring Of Water Systems (SCADA and DMA) Upper Metn system including: 30 km new transmission lines Rehabilitation of 20 km Transmission lines 81.6 km Distribution networks Construction of 1 x 5000 m³, 1 x 1500 m³ and 1 x 1000 m³ reservoirs Drilling and equiping 10 wells Water Treatment Plant, Transmission Lines And Reservoirs For Boqaata Dam Barouk Kafra system including: Construction of 1 x 400 m³ reservoir Barouk Kafra system including: 14 km Transmission lines 360 km Distribution networks Drilling and equiping 2 wells El Qaa system including: 28 km Transmission lines 517 km Distribution networks Rehabilitation of El Qaa spring catchment Mristi system including: 1 km Transmission lines 23 km Distribution networks Raayan system including: 13 km Transmission lines 39 km Distribution networks Independent systems including: 3 km Transmission lines 167 km Distribution networks May 2020 - V A 42 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WW PROJECTS Section V A Proposed projects TOTAL COST OF WASTEWATER PROJECTS IN NORTH LEBANON Priority 1 Priority 2 Priority 3 Total 242,388,258 $ 250,030,443 $ - 492,418,701 $ Priority Project Description Estimated cost code (USD) NL-WW A. District of Akkar (see drawing NL-WW.A) 1 NL-WW. A.1 20,857,500 1 NL-WW. A.2 52,839,000 1 NL-WW. A.3 35,096,787 2 NL-WW. A.4 250,030,443 Total Akkar district 358,823,730 Out of which : Priority 1 108,793,287 Priority 2 250,030,443 Priority 3 NL-WW B. District of Koura (see drawing NL-WW.B) 1 NL-WW. B.1 7,125,012 1 NL-WW. B.2 725,343 1 NL-WW. B.3 18,409,447 1 NL-WW. B.4 3,434,400 Total Koura district 29,694,202 Out of which : Priority 1 29,694,202 Priority 2 Priority 3 Other Collection systems covering 46 villages in Akkar District Required works : 475 km Collection network 1 WWTP Activated sludge 30 WWTP Trickling filter 14 WWTP Wetland Collection system Sahel 2 Required works : 150 km Collection network Collection system Sahel 3 Required works : 380 km Collection network Collection system Jebrayel Required works : 135 km Collection network 1 WWTP activated sludge Ejdabrine Collection systems Required works : 15 km Collection network 1 WWTP Trickling filter Btaaboura Collection systems Required works : 1 km Collection network 1 WWTP Wetland Kaftoune Collection systems Required works : 74 km Collection network 1 WWTP Trickling filter Connection to Chekka main collector Required works : 24 km Collector May 2020 - V A 43 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WW PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) NL-WW C. District of Minieh (see drawing NL-WW.C) 1 NL-WW. C.1 54,060,169 Total Minieh district 54,060,169 Out of which : Priority 1 54,060,169 Priority 2 Priority 3 NL-WW D. District of Zgharta (see drawing NL-WW.D) 1 NL-WW. D.1 1,860,300 1 NL-WW. D.2 3,935,336 1 NL-WW. D.3 4,413,008 1 NL-WW. D.4 1,006,611 1 NL-WW. D.5 4,184,446 1 NL-WW. D.6 3,577,500 1 NL-WW. D.7 22,500,000 Total Zgharta district 41,477,200 Out of which : Priority 1 41,477,200 Priority 2 Priority 3 NL-WW E. District of Batroun (see drawing NL-WW.E) 1 NL-WW. E.1 2,491,000 1 NL-WW. E.2 4,595,100 1 NL-WW. E.3 1,277,300 Total Batroun district 8,363,400 Out of which : Priority 1 8,363,400 Priority 2 Priority 3 Tourza Collection systems Required works : 13 km Collection network Construction of 16 local collection and treatment schemes (excluding the cities conneced to Tripoli WWTP) Total required works : 63 km Collection network 5 WWTP Trickling filter 1 WWTP Activated sludge Kfar Zghab Collection systems Required works : 3.5 km Collection network 1 WWTP Trickling filter Jrabta Collection system Required works : 21 km Collection network 1 WWTP Ram Collection system Required works : 3 km Collection network 1 WWTP Dahr Abi Yaghi Collection system Required works : 10 km Collection network 1 WWTP Collection system directed to Tripoli WWTP Required works : 166 km Collection network + collector Arbet Qozhaiya Collection systems Required works : 5.3 km Collection network 1 WWTP Trickling filter El Buhaira Collection systems Required works : 1.5 km Collection network 1 WWTP Wetland Asloute Collection systems Required works : 5.2 km Collection network 1 WWTP Trickling filter Collection system directed to Ehden WWTP Required works : 25 km Collection network May 2020 - V A 44 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WW PROJECTS Section V A Proposed projects TOTAL COST OF WASTEWATER PROJECTS IN THE BEQAA Priority 1 Priority 2 Priority 3 Total 214,310,500 $ 268,075,000 $ 47,500,000 $ 529,885,500 $ Priority Project Description Estimated cost code (USD) BQ-WW A. District of Baalbeck (see drawing BQ-WW.A) 1 BQ-WW. A.1 84,225,000 1 BQ-WW. A.2 22,600,000 1 BQ-WW. A.10 11,135,000 2 BQ-WW. A.3 23,475,000 2 BQ-WW. A.4 56,945,000 2 BQ-WW. A.5 35,225,000 2 BQ-WW. A.7 22,770,000 3 BQ-WW. A.6 22,525,000 3 BQ-WW. A.8 8,250,000 3 BQ-WW. A.9 1,010,000 3 BQ-WW. A.11 1,645,000 3 BQ-WW. A.12 2,620,000 3 BQ-WW. A.13 1,815,000 3 BQ-WW. A.14 975,000 Total Baalbeck district 295,215,000 Out of which : Priority 1 117,960,000 Priority 2 138,415,000 Priority 3 38,840,000 Iaat collection system Required works : 60 km Collection network 1 WWTP activated sludge Qaa collection system Required works : 145 km Collection network 1 WWTP activated sludge Ras Baalbeck collection system Required works : 207 km Collection network 1 WWTP activated sludge Chaat collection system Required works : 135 km Collection network 1 WWTP activated sludge Boudai collection system Required works : 115 km Collection network 1 WWTP activated sludge Ainata collection system Required works : 7 km Collection network 1 WWTP activated sludge Maaraboun collection system Required works : 12 km Collection network 1 WWTP activated sludge Jenta collection system Required works : 10 km Collection network 1 WWTP activated sludge Tfeil collection system Required works : 5 km Collection network 1 WWTP activated sludge Temnine collection system Required works : 335 km Collection network 1 WWTP activated sludge Deir el Ahmar collection system Required works : 82 km Collection network 1 WWTP activated sludge Chlifa collection system Required works : 50 km Collection network 1 WWTP activated sludge Ouypun Orghoch collection system Required works : 6 km Collection network 1 WWTP activated sludge Aarsal collection system Required works : 61 km Collection network 1 WWTP trickling filter May 2020 - V A 45 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WW PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BQ-WW B. District of Hermel (see drawing BQ-WW.B) 1 BQ-WW. B.1 66,290,000 2 BQ-WW. B.2 33,485,000 2 BQ-WW. B.3 9,650,000 2 BQ-WW. B.4 3,300,000 2 BQ-WW. B.5 3,975,000 Total Hermel district 116,700,000 Out of which : Priority 1 66,290,000 Priority 2 50,410,000 Priority 3 BQ-WW C. District of Zahleh - West Beqaa (see drawings BQ-WW.C and BQ-WW.E) 1 BQ-WW. C.1 1,160,500 1 BQ-WW. C.2 2,300,000 1 BQ-WW. C.3 18,900,000 1 BQ-WW. C.4 7,700,000 2 BQ-WW. C.5 6,340,000 2 BQ-WW. C.6 4,050,000 2 BQ-WW. C.7 3,560,000 Total Zahleh - West Beqaa districts 44,010,500 Out of which : Priority 1 30,060,500 Priority 2 13,950,000 Priority 3 Marjhine Collection system Required works : 20 km Collection network 1 WWTP (Mdaouiche) MBBR Hermel Phase 1 Collection system Required works : 354 km Collection network 1 WWTP activated sludge Wadi Faara Collection system Required works : 70 km Collection network 1 WWTP (Mrah Yassine) MBBR Hermel Phase 2 Collection system Required works : 111 km Collection network 1 WWTP activated sludge East Zahleh Collection system, serving Ali el Nahri, Delhamiyeh Required works : 25 km Collection network Jouar el Hachiche Collection system Required works : 25 km Collector 1 WWTP (El Boustane) MBBR Joub Jannine System, serving Ana Required works : 8.1 km Collection network Majdel Anjar / Marj System; serving Jdita Required works : 16 km Collection network Es Srairi WWTP collection system; serving Ain el Tineh, Maidoun, Zelleya, Yohmor, Loucia, Qelia and Lebbeya Required works : 85 km Collection network 1 pumping station 1 WWTP Activated sludge 2000 m³/day Sohmor Collection system, serving Sohmor Required works : 8.5 km Collection network 1 WWTP Trickling filter 2 000 m³/day Majd el Anjar - Marj system, serving Marj Required works : 44.5 km Collectin network Joub Jannine system, serving Haouch el Harime, Kefraya Required works : 28 km Collection network 1 WWTP Wetland 50 m³/day May 2020 - V A 46 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WW PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BQ-WW D. District of Rachaya (see drawing BQ-WW.D) 2 BQ-WW. D.1 18,900,000 2 BQ-WW. D.2 11,800,000 2 BQ-WW. D.3 18,600,000 2 BQ-WW. D.4 16,000,000 3 BQ-WW. D.5 2,060,000 3 BQ-WW. D.6 800,000 3 BQ-WW. D.7 5,800,000 Total Rachaya district 73,960,000 Out of which : Priority 1 Priority 2 65,300,000 Priority 3 8,660,000 Majdel Balhis System Required works : 26 km Collection network 1 WWTP Haouche el Kennabe System Required works : 140 km Collection network 1 WWTP Beit Lahia System Required works : 77 km Collection network 1 WWTP Deir el Achayer System Required works : 6.25 km Collection network 1 WWTP Helouet Rachaya System Required works : 3.5 km Collection network 1 WWTP Hasbaiya WWTP System Required works : 90 km Collection network 1 WWTP Kfar Qouq System Required works : 53 km Collection network 1 WWTP May 2020 - V A 47 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WW PROJECTS Section V A Proposed projects TOTAL COST OF WASTEWATER PROJECTS IN SOUTH LEBANON Priority 1 Priority 2 Priority 3 Total 367,050,000 $ 77,088,000 $ 79,647,000 $ 523,785,000 $ Priority Project Description Estimated cost code (USD) SL-WW A. District of Nabatiye (see drawing SL-WW.A) 1 SL-WW. A.1 34,200,000 1 SL-WW. A.2 11,550,000 1 SL-WW. A.3 25,000,000 3 SL-WW. A.4 2,147,000 3 SL-WW. A.5 5,800,000 Total Nabatiyeh district 78,697,000 Out of which : Priority 1 70,750,000 Priority 2 Priority 3 7,947,000 Sir el Gharbiyeh Collection system Required works : 22 km Collection network 1 WWTP Nabaa el Taseh Collection system Required works : 80 km Collection network Braiqeaa Collection system Required works : 100 km Collection network 1 WWTP Charquieh Collection system Required works : 64 km Collection network 1 WWTP Activated sludge Yohmor En-Nabatiyeh system Required works : 1 5 km Collection network May 2020 - V A 48 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WW PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) SL-WW B. District of Sour (see drawing SL-WW.B) 1 SL-WW. B.1 38,000,000 2 SL-WW. B.2 4,200,000 2 SL-WW. B.3 4,500,000 3 SL-WW. B.4 7,400,000 3 SL-WW. B.5 3,400,000 3 SL-WW. B.6 14,250,000 3 SL-WW. B.7 15,500,000 Total Sour district 87,250,000 Out of which : Priority 1 38,000,000 Priority 2 8,700,000 Priority 3 40,550,000 SL-WW C. District of Bint Jbeil (see drawing SL-WW.C) 1 SL-WW. C.1 122,300,000 2 SL-WW. C.2 17,100,000 2 SL-WW. C.3 51,200,000 3 SL-WW. C.4 15,300,000 Total Bint Jbeil district 205,900,000 Out of which : Priority 1 122,300,000 Priority 2 68,300,000 Priority 3 15,300,000 Mansouri Sour system Required works : 47 km Collection network 1 WWTP Burj el Naqoura system Required works : 25 km Collection network Chabriha system Required works : 225 km Collection network 1 WWTP Hallousiyeh system Required works : 202 km Collection network Bafliyeh system Required works : 32 km Collection network Jabal el Botm system Required works : 17 km Collection network 1 WWTP Jijim system Required works : 26 km Collection network 1 WWTP Tibnine system Required works : 120 km Collection network 1 WWTP Activated sludge Kafra Bint Jbeil system Required works : 44 km Collection network 1 WWTP Salhani system Required works : 218 km Collection network 1 WWTP Wadi el Houjair system Required works : 623 km Collection network 1 WWTP May 2020 - V A 49 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WW PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) SL-WW D. District of Jezzine (see drawing SL-WW.A) 2 SL-WW. D.1 88,000 3 SL-WW. D.2 2,300,000 3 SL-WW. D.3 1,400,000 3 SL-WW. D.4 5,200,000 3 SL-WW. D.5 1,500,000 3 SL-WW. D.6 950,000 3 SL-WW. D.7 4,500,000 Total Jezzine district 15,938,000 Out of which : Priority 1 Priority 2 88,000 Priority 3 15,850,000 SL-WW E. District of Saida (see drawing SL-WW.A) 1 SL-WW. E.1 75,000,000 1 SL-WW. E.2 61,000,000 Total Saida district 136,000,000 Out of which : Priority 1 136,000,000 Priority 2 Priority 3 Construction of sewer networks serving : Azour Required works : 3 km Collection network 1 WWTP Reed bed Construction of sewer networks serving : El Rihane Required works : 10 km Collection network 1 WWTP Activated sludge Sainik system Required works : 230 km Collection network 1 WWTP Sarafand system Required works : 610 km Collection network 1 WWTP Construction of sewer networks serving : Qaytouleh Required works : 1 km Collection network 1 WWTP Activated sludge Construction of sewer networks serving : Roum Required works : 10 km Collection network 1 WWTP Reed bed Construction of sewer networks serving : Sfaray Required works : 14 km Collection network 1 WWTP Reed bed Construction of sewer networks serving : Bisri Required works : 23 km Collection network 1 WWTP Reed bed Construction of sewer networks serving : Zhilta Required works : 3 km Collection network 1 WWTP Reed bed May 2020 - V A 50 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WW PROJECTS Section V A Proposed projects TOTAL COST OF WASTEWATER PROJECTS IN SOUTH LEBANON Priority 1 Priority 2 Priority 3 Total 569,580,000 $ 205,400,000 $ 105,300,000 $ 880,280,000 $ Priority Project Description Estimated cost code (USD) BML-WW A. District of Beirut (see drawing BML-WW.A) 1 BML-WW. A.1 50,000,000 Total Beirut district 50,000,000 Out of which : Priority 1 50,000,000 Priority 2 Priority 3 BML-WW B. District of Jbeil (see drawing BML-WW.B) 1 BML-WW. B.1 51,000,000 2 BML-WW. B.2 46,600,000 3 BML-WW. B.3 42,500,000 Total Jbeil district 140,100,000 Out of which : Priority 1 51,000,000 Priority 2 46,600,000 Priority 3 42,500,000 BML-WW C. District of Baabda Aley (see drawing BML-WW.C) 1 BML-WW. C.1 174,000,000 2 BML-WW. C.2 97,000,000 3 BML-WW. C.3 19,000,000 Total Baabda Aley district 290,000,000 Out of which : Priority 1 174,000,000 Priority 2 97,000,000 Priority 3 19,000,000 Rehabilitation, Replacement and upgrade of sewer in various sectors of Beirut Construction of sewer networks serving : El Kneisseh, El Halaliyeh, El Ghadir and Chourit systems Required works: 630 Km collection networks 4 WWTP Construction of sewer networks serving : Bhamdoun and Aghmid Required works: 50 Km collection networks 2 WWTP activated sludge Construction of sewer networks serving : Bchetfine, Bou Zride, El Abadiyeh and Kartada Required works: 270 Km collection networks 4 WWTP Construction of sewer networks serving : Additional villages to be connected to Jbeil WWTP, Hdeine and Lassa Required works: 170 Km collection networks 3 WWTP Construction of sewer networks serving : Additional villages to be connected to Ghalboun, Ferhet and Kfar Mashoun Required works: 205 Km collection networks 3 WWTP Construction of sewer networks serving : Kherbet Jbail, Fatre, Zibdine, Tartij, Haqel, Qorqraiya. Required works: 180 Km collection networks 6 WWTP May 2020 - V A 51 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WW PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BML-WW D. District of Keserwan (see drawing BML-WW.D) 1 BML-WW. D.1 2,700,000 2 BML-WW. D.2 21,000,000 Total Keserwan district 23,700,000 Out of which : Priority 1 2,700,000 Priority 2 21,000,000 Priority 3 BML-WW E. District of Chouf (see drawing BML-WW.E) 1 BML-WW. E.1 95,180,000 1 BML-WW. E.2 12,300,000 2 BML-WW. E.3 6,500,000 3 BML-WW. E.4 24,500,000 Total Chouf district 138,480,000 Out of which : Priority 1 107,480,000 Priority 2 6,500,000 Priority 3 24,500,000 BML-WW F. District of Metn (see drawing BML-WW.F) 1 BML-WW. F.1 184,400,000 2 BML-WW. F.2 34,300,000 3 BML-WW. F.3 19,300,000 Total Metn district 238,000,000 Out of which : Priority 1 184,400,000 Priority 2 34,300,000 Priority 3 19,300,000 Construction of sewer networks serving Achqout Required works: 71 Km collection networks 1 WWTP Construction of sewer networks serving : Deir Baba, Sirjbal and Ras nabi Younes (including Nahr el Hamam area) Required works: 420 Km collection networks 1 WWTP Activated sludge 2 WWTP Biofilters Construction of sewer networks serving Hrajel Required works: 64 Km collection networks 1 WWTP Construction of sewer networks serving El Souan and Mchikha Required works: 120 Km collection networks 2 WWTP Costruction of sewer networks serving Abou Mizane and Hasbaya el Maten Required works: 75 Km collection networks 2 WWTP Costruction of sewer networks serving : Borge Hammoud and Zabbougha Required works: 105 Km collection networks 2 WWTP Construction of sewer networks serving : El Fouara, Mazraat el Mahtaqra and Bkifa Required works: 100 Km collection networks 3 WWTP Construction of sewer networks serving : Ainbal Required works: 8 Km collection networks 1 WWTP Remaining budget regarding protection of Bisri dam project Required works: 185 Km collection networks 10 WWTP in Chouf (El-Jdeidé, Mazraet El-Chouf, Maasser el-Chouf, El-Moukhtara, Ammatour, Baadarane, Mristé, El-Khreibé, Bater and Jebah) May 2020 - V A 52 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL IRR PROJECTS Section V A Proposed projects TOTAL COST OF IRRIGATION PROJECTS IN NORTH LEBANON Priority 1 Priority 2 Priority 3 Total 29,120,000 $ 11,200,000 $ 103,265,000 $ 143,585,000 $ Priority Project Description Estimated cost code (USD) NL-IR A. District of Akkar (see drawings NL-IR.A) 1 NL-IR. A.1 600,000 1 NL-IR. A.2 4,000,000 1 NL-IR. A.3 1,820,000 1 NL-IR. A.4 450,000 1 NL-IR. A.5 2,500,000 1 NL-IR. A.6 10,600,000 3 NL-IR. A.8 30,000,000 3 NL-IR. A.9 4,900,000 3 NL-IR. A.10 5,700,000 Total Akkar district 60,570,000 Out of which : Priority 1 19,970,000 Priority 2 Priority 3 40,600,000 Akkar el Atika Scheme Required works : 2 km Concrete channels to rehabilitate 29 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Akkar el Bared Scheme Required works : 0.3 km Concrete channels to rehabilitate 3.3 km Earth channels to concrete Akkar plain Scheme Required works : 50 m Concrete channels to rehabilitate 78 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Bouqaiaa - Machta Hamoud - Machta Hassan Scheme Required works : 42 km Earth channels to concrete El Koubayet Scheme Required works : 1.5 km Concrete channels to rehabilitate 15 km Earth channels to concrete Fneidek and Michmich Scheme Required works : 14 km Concrete channels to rehabilitate 18 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Mounjez Scheme Required works : 26 km Earth channels to concrete Dry Farm ExpensionOmar el Breikat Scheme Required works : 18 km Earth channels to concrete Rahbeh Scheme Required works : 3 km Earth channels to concrete May 2020 - V A 53 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL IRR PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) NL-IR B. North districts (see drawings NL-IR.B) 1 NL-IR. B.1 1,050,000 1 NL-IR. B.2 300,000 1 NL-IR. B.3 1,100,000 1 NL-IR. B.4 4,600,000 1 NL-IR. B.5 400,000 1 NL-IR. B.6 1,700,000 2 NL-IR. B.8 11,200,000 3 NL-IR. B.7 5,215,000 3 NL-IR. B.9 56,000,000 3 NL-IR. B.10 1,450,000 Total North district 83,015,000 Out of which : Priority 1 9,150,000 Priority 2 11,200,000 Priority 3 62,665,000 Noura Tahta Dam related network Required works : Network to cover 3 500 ha of additional land to irrigate Ehden Scheme Required works : 21 km Concrete channels to rehabilitate El Minieh scheme Required works : 19 km Concrete channels to rehabilitate 0.6 km Earth channels to concrete Kfar Helda Scheme Required works : 14 km Concrete channels to rehabilitate Extention Of Networks to Cover Present Dry Farm Area Tannourine Scheme Required works : 37 km Concrete channels to rehabilitate 17 km Earth channels to concrete Tripoli Scheme Required works : 2.5 km Earth channels to concrete Zghorta Scheme Required works : 11.5 km Concrete channels to rehabilitate 7 km Earth channels to concrete Danniyeh Scheme Required works : 29 km Earth channels to concrete Extention Of Networks to Cover Present Dry Farm Area Dar Baachtar Dam related network Required works : Network to cover 700 ha of additional land to irrigate Bcharreh Scheme Required works : 22 km Concrete channels to rehabilitate May 2020 - V A 54 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ IRR PROJECTS Section V A Proposed projects TOTAL COST OF IRRIGATION PROJECTS IN THE BEQAA Priority 1 Priority 2 Priority 3 Total 109,709,000 $ 83,000,000 $ 4,524,000 $ 197,233,000 $ Priority Project Description Estimated cost code (USD) BQ-IR A. District of Baalbeck (see drawings BQ-IR.A, BQ-IR.B and BQ-IR.C) 1 BQ-IR. A.1 28,000 1 BQ-IR. A.2 830,000 1 BQ-IR. A.3 1,900,000 1 BQ-IR. A.4 29,000 1 BQ-IR. A.5 940,000 1 BQ-IR. A.6 500,000 1 BQ-IR. A.7 135,000 1 BQ-IR. A.8 3,900,000 1 BQ-IR. A.9 43,000 1 BQ-IR. A.10 78,000 1 BQ-IR. A.11 200,000 1 BQ-IR. A.12 175,000 1 BQ-IR. A.13 990,000 1 BQ-IR. A.14 2,600,000 1 BQ-IR. A.15 1,300,000 1 BQ-IR. A.16 3,500,000 Ras Baalbeck Scheme Required works : 2 km Concrete channels to rehabilitate 0.5 km Earth channels to concrete Taibet Baalbeck Scheme Required works : 1.2 km Earth channels to concrete Taraya Scheme Required works : 7 km Earth channels to concrete Wadi Nahle and Maqne Scheme Required works : 6 km Concrete channels to rehabilitate 10 km Earth channels to concrete Yahfoufa, Jenta and Serraine Scheme Required works : 15 km Concrete channels to rehabilitate 10 km Earth channels to concrete Yammoune Scheme Required works : 1.5 km Concrete channels to rehabilitate 11 km Earth channels to concrete Marjhine and Jbab Scheme Required works : 5 km Concrete channels to rehabilitate Ayneta Baalbeck Scheme Required works : 2 km Concrete channels to rehabilitate Baalbeck Plain Scheme Required works : 8 km Concrete channels to rehabilitate 4 km Earth channels to concrete Chmistar Scheme Required works : 0.1 km Concrete channels to rehabilitate 1.5 km Earth channels to concrete Ham Scheme Required works : 0.8 km Concrete channels to rehabilitate 0.2 km Earth channels to concrete Haouch Er-Rafqa Scheme Required works : 2 km Concrete channels to rehabilitate 2 km Earth channels to concrete Hizzine Scheme Required works : 3.5 km Earth channels to concrete Kfar Dabach Scheme Required works : 1 km Earth channels to concrete Labboue Scheme Required works : 20 km Concrete channels to rehabilitate 40 km Earth channels to concrete Maaraboun Scheme Required works : 0.5 km Earth channels to concrete May 2020 - V A 55 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ IRR PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 1 BQ-IR. A.17 330,000 3 BQ-IR. A.18 3,600,000 1 BQ-IR. A.19 84,272,000 2 BQ-IR. A.20 83,000,000 Total Baalbeck district 188,350,000 Out of which : Priority 1 101,750,000 Priority 2 83,000,000 Priority 3 3,600,000 Assi Dam Phase II related irrigation network Required works : Network to cover 3 870 ha of land to irrigate Assi Dam Phase I related irrigation network Required works : Network to cover 3 254 ha of land to irrigate Younine Scheme Required works : 2.5 km Concrete channels to rehabilitate 1.2 km Earth channels to concrete Temnine and Bednayel Scheme Required works : 0.2 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area May 2020 - V A 56 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ IRR PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BQ-IR B. District of Zahle (see drawings BQ-IR.A, BQ-IR.B and BQ-IR.C) 1 BQ-IR. B.1 29,000 1 BQ-IR. B.2 2,100,000 1 BQ-IR. B.3 3,000,000 1 BQ-IR. B.4 630,000 1 BQ-IR. B.5 2,200,000 3 BQ-IR. B.6 31,000 3 BQ-IR. B.7 53,000 3 BQ-IR. B.8 840,000 Total Zahle district 8,883,000 Out of which : Priority 1 7,959,000 Priority 2 Priority 3 924,000 Mrayjet Zahle Scheme Required works : 2 km Concrete channels to rehabilitate Touaite Zahle Scheme Required works : 0.2 km Concrete channels to rehabilitate 1 km Earth channels to concrete Zahle Scheme Required works : 3 km Earth channels to concrete Aanjar (Haouch Moussa) Scheme Required works : 0.1 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Ablah and Niha Scheme Required works : 4.5 km Earth channels to concrete Bouarej Scheme Required works : 2.5 km Concrete channels to rehabilitate Chtaura Scheme Required works : 9 km Concrete channels to rehabilitate 1 km Earth channels to concrete Kfarzabad Scheme Required works : 4 km Earth channels to concrete May 2020 - V A 57 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL IRR PROJECTS Section V A Proposed projects TOTAL COST OF IRRIGATION PROJECTS IN SOUTH LEBANON Priority 1 Priority 2 Priority 3 Total 86,550,000 $ 408,880,000 $ 299,700,000 $ 795,130,000 $ Priority Project Description Estimated cost code (USD) SL-IR A. Major irrigation schemes (see drawing SL-IR.A) 1 SL-IR. A.1 7,650,000 1 SL-IR. A.2 78,900,000 2 SL-IR. A.3 227,100,000 3 SL-IR. A.4 221,000,000 2 SL-IR. A.5 112,200,000 Total Major schemes 646,850,000 Out of which : Priority 1 86,550,000 Priority 2 339,300,000 Priority 3 221,000,000 SL-IR B. Local irrigation schemes (see drawing SL-IR.A) 2 SL-IR. B.1 20,400,000 2 SL-IR. B.2 1,650,000 2 SL-IR. B.3 2,650,000 Bint Jbeil district Villages covered : Ayta El Jabal, Beit Lif, Debel, El Tairi, Es Salhani, Haddatha, Rouaisse, Srobbine, Yatar Total Irrigated area : 1100 ha Required works : 100 km distribution network Choumariyeh Dam scheme distribution networks Required Works : 660 km Distribution networks Saida - Jezzine scheme Irrigated area : 430 ha Required works : 45 km Distribution Networks Khardaleh Dam scheme distribution networks Required Works : 1 300 km Distribution networks Conveyor 800 Distribution Networks Phase II - B Irrigated area : 9830 ha Required Works : 1 335 km Distribution networks Hasbaya district Villages covered : Mazraat Islamiyeh Total Irrigated area : 94 ha Required works : 8 km distribution network Jezzine district Villages covered : Haffet Bou Hajli, Mazraat Khallet Khazene, Fouzour, Qalaat Dabboura Total Irrigated area : 142 ha Required works : 13 km distribution network Conveyor 800 Distribution Networks Phase II - A Irrigated area : 3420 ha Required Works : 465 km Distribution networks May 2020 - V A 58 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL IRR PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 2 SL-IR. B.4 1,225,000 2 SL-IR. B.5 205,000 2 SL-IR. B.6 43,450,000 Total Local schemes 69,580,000 Out of which : Priority 1 Priority 2 69,580,000 Priority 3 SL-IR C. Construction/Rehab of concrete channels (see drawing SL-IR.A) 3 SL-IR. C.1 14,100,000 3 SL-IR. C.2 64,600,000 Total concrete channels 78,700,000 Out of which : Priority 1 Priority 2 Priority 3 78,700,000 Ibl es Saqi Dam scheme distribution networks Irrigated area : 3800 ha Required works : 380 km Distribution network Saida district Bqosta scheme Total Irrigated area : 19 ha Required works : 1 km distribution network Sour district Villages covered : Aaitit, Ain Baal, Al Aabsiye, Bafliye, Chehour, El Bazouniye, El Izziye, El Khraybeh, El Malkiyeh, Jabal El Botm, Jennata, Jouaya, Knaisse, Maaroub, Recheknanay, Saddiqine, Tair Debba, Zebqine Total Irrigated area : 2 240 ha Required works : 213 km distribution network Construction of new (or rehabilitation of existing) concrete channels within the following schemes : Ain el Kbiri, Ain el Rihane, Ain el Tineh, Ain Rkiz, Ain Toghra, Baklleh, Berket el Djej, Chamaliye, El Aaichiye, El Bayad, El Choab - Ain Saha, El Fawar , El Fawar, El Harf, El Jawz - Wadih, El Meshreh, El Mghara, El Rabiaa - Jawzeh -Qaitoule, El Tineh, El-Dayaa, Ghraybeh - Azzoubiyeh, Jezzine, Jlikha, Kobay - Cheikh, Machereh, Majdaleen, Nabaa Ain Jbaa, Nabaa el Ain, Nabaa Sader, Nahr el Zahrani, Qobeiss - Majdaline, Wadi Chebaa, Zaarour Required works : 141 km concrete channels Nabatiyeh district Villages covered : Nabaa el Tasse, Tahounet el Badaouiyeh Total Irrigated area : 75 ha Required works : 6 km distribution network May 2020 - V A 59 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML IRR PROJECTS Section V A Proposed projects TOTAL COST OF IRRIGATION PROJECTS IN BEIRUT AND MOUNT LEBANON Priority 1 Priority 2 Priority 3 Total 1,020,000 $ 1,150,000 $ 5,220,000 $ 7,390,000 $ Priority Project Description Estimated cost code (USD) BML-IR A. District of Jbeil (see drawings BML-IR.A) 3 BML-IR. A.1 390,000 3 BML-IR. A.2 300,000 2 BML-IR. A.3 1,150,000 Total Jbeil district 1,840,000 Out of which : Priority 1 Priority 2 1,150,000 Priority 3 690,000 Aaqoura and Laqlouq Scheme Required works : 6 km Concrete channels to rehabilitate 2 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Lassa, Ghabat, Mezarib,Mghairi, Afqa & Surrounding Scheme Required works : 2 km Concrete channels to rehabilitate 2.5 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Qartaba and Surrounding Scheme Required works : 8 km Concrete channels to rehabilitate 10 km Earth channels to concrete May 2020 - V A 60 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML IRR PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BML-IR B. District of Maten (see drawings BML-IR.A) 3 BML-IR. B.1 1,050,000 Total Halba district 1,050,000 Out of which : Priority 1 Priority 2 Priority 3 1,050,000 BML-IR C. District of Keserouane (see drawings BML-IR.A) 1 BML-IR. C.1 530,000 3 BML-IR. C.3 230,000 3 BML-IR. C.4 1,900,000 3 BML-IR. C.5 145,000 Total Keserouane district 2,805,000 Out of which : Priority 1 530,000 Priority 2 Priority 3 2,275,000 Mayrouba and Hrajel Scheme Required works : 9 km Concrete channels to rehabilitate 3 km Earth channels to concrete Nahr el Kalb Wata Scheme Required works : 5 km Concrete channels to rehabilitate Kfar Dibiane and Faraya Scheme Required works : 25 km Concrete channels to rehabilitate 8 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Baskinta Scheme Required works : 16 km Concrete channels to rehabilitate 8 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Adonis (Keserouane) Scheme Required works : Extention of Networks to Cover Present Dry Farm Area May 2020 - V A 61 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML IRR PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BML-IR D. District of Baabda (see drawings BML-IR.B) 3 BML-IR. D.1 280,000 3 BML-IR. D.2 85,000 Total Baabda district 365,000 Out of which : Priority 1 Priority 2 Priority 3 365,000 BML-IR E. District of Chouf (see drawings BML-IR.B) 1 BML-IR. E.1 490,000 3 BML-IR. E.2 610,000 3 BML-IR. E.3 230,000 Total Chouf district 1,330,000 Out of which : Priority 1 490,000 Priority 2 Priority 3 840,000 Damour Scheme Required works : 16 km Concrete channels to rehabilitate Nbaa El Safa Scheme Required works : Extention of Networks to Cover Present Dry Farm Area Baabda Scheme Required works : 4 km Concrete channels to rehabilitate 1.5 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Tarchich Scheme Required works : 0.5 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area Barouk Scheme Required works : 17 km Concrete channels to rehabilitate 0.8 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area May 2020 - V A 62 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS DAMS PROJECTS Section V A Proposed projects TOTAL COST OF DAMS PROJECTS IN LEBANON Priority 1 Priority 2 Priority 3 Total 313,020,000 $ 673,000,000 $ 790,060,000 $ 1,776,080,000 $ Priority Project Description Estimated cost code (USD) NL-D. Dams in North Lebanon 1 NL-D. 1 196,020,000 3 NL-D. 4 150,000,000 2 NL-D. 6 50,000,000 Total dams in North Lebanon 396,020,000 Out of which : Priority 1 196,020,000 Priority 2 50,000,000 Priority 3 150,000,000 BQ-D. Dams in the Beqaa 1 BQ-D. 1 52,000,000 2 BQ-D. 2 150,000,000 3 BQ-D. 3 69,960,000 3 BQ-D. 4 37,100,000 Total dams in the Bekaa 309,060,000 Out of which : Priority 1 52,000,000 Priority 2 150,000,000 Priority 3 107,060,000 SL-D. Dams in South Lebanon 2 SL-D. 1 145,000,000 2 SL-D. 2 128,000,000 3 SL-D. 3 480,000,000 Total dams in South Lebanon 753,000,000 Out of which : Priority 1 Priority 2 273,000,000 Priority 3 480,000,000 Dar Baachtar Dam: Construction of Water and Irrigation Dam (7 MCM) for Koura and Batroun Assi Phase I Dam: Completion of execution works for Assi Phase 1 Water and Irrigation Dam, and supervision works. El Bared dam: Construction of Water Supply dam (37-90 MCM) and associated water treatment plant and transmission network Noura el Tahta Dam: Construction of dam (35-50MCM) for Nour el Tahta and surrounding villages for drinking water and irrigation Khardali Dam: Construction of Irrigation and Water supply dam (128 MCM) on Litani river (Khardali segment) including downstream works (transmission lines and reservoirs) Assi Phase 2 Dam: Construction of Assi Phase 2 Water and Irrigation Dam (15 MCM). Younine Dam: Providing additional storage capacity of 5.8 MCM for the irrigation of 1200 ha Massa Dam: Providing additional storage capacity of 8 MCM for the irrigation of 1600 ha Choumariye Dam: Construction of Water supply and Irrigation DAM (28 MCM) on Litani River with related transmission lines and reservoirs Ibl es Saqi Dam: Construction of Irrigation and Water supply dam (50 MCM) on the Hasbani river next to Ibl es Saqi, with related transmission lines and reservoirs May 2020 - V A 63 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS DAMS PROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) BML-D. Dams in Beirut and Mount Lebanon 1 BML-D. 1 65,000,000 2 BML-D. 2 200,000,000 3 BML-D. 3 53,000,000 Total dams in Beirut & Mount Lebanon 318,000,000 Out of which : Priority 1 65,000,000 Priority 2 200,000,000 Priority 3 53,000,000 Damour Dam: Construction of Water and Irrigation DAM (42-106 MCM) for Beirut and Damour region. Maaser Chouf Dam: Construction of Water Supply hill lake (2.2 MCM) Ain Dara - Azounieh Dam: Construction of Water Supply dam (4-5 MCM) May 2020 - V A 64 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS HILL LAKES ROJECTS Section V A Proposed projects TOTAL COST OF HILL LAKES PROJECTS IN LEBANON Priority 1 Priority 2 Priority 3 Total 33,370,000 $ 319,120,000 $ 22,900,000 $ 375,390,000 $ Priority Project Description Estimated cost code (USD) NL-HL.A. Hill Lakes in Akkar 1 NL-HL.A. 1 1,170,000 2 NL-HL.A. 2 1,170,000 Total hill lakes in Akkar 2,340,000 Out of which : Priority 1 1,170,000 Priority 2 1,170,000 Priority 3 NL-HL.B. Hill Lakes in North Lebanon (other than Akkar) 1 NL-HL.B. 1 5,000,000 1 NL-HL.B. 2 2,200,000 1 NL-HL.B. 3 25,000,000 2 NL-HL.B. 4 8,750,000 2 NL-HL.B. 5 3,500,000 2 NL-HL.B. 6 7,000,000 2 NL-HL.B. 7 400,000 2 NL-HL.B. 8 14,000,000 2 NL-HL.B. 9 7,000,000 2 NL-HL.B. 10 30,000,000 2 NL-HL.B. 11 4,500,000 2 NL-HL.B. 12 400,000 Bouqaiaa - Machta Hamoud - Machta Hassan Scheme Hill Lakes: Construction of Hill Lakes Blaita Hill Lake: Construction of Hill Lake (0.18 MCM) Tim Rbita Hill Lake: Construction of Hill Lake (0.1 MCM) Rahwe Hill Lake: Construction of 20 m high Hill Lake (2.2 MCM), providing an additional capacity for the irrigation of 200 ha Bcharre Scheme Hill Lakes: Construction of Hill Lakes Rahban Hill Lake: Construction of Hill Lake (0.3 MCM) Ain Rouana Hill Lake: Construction of Hill Lake (1.43 MCM) Omar El Breiket Hill Lake: Construction of Hill Lake Ehden Scheme Hill Lakes: Construction of Hill Lakes Laqlouq Hill Lake: Construction of Hill Lake (0.06 MCM) Arez Tannourine Hill Lake: Construction of Hill Lake (0.4 MCM) Hourayta Hill Lake: Construction of Hill Lake (0.21 MCM) Ech Chir Hill Lake: Construction of Hill Lake (0.3 MCM) Ain Saouda Hill Lake: Construction of Hill Lake (0.06 MCM) May 2020 - V A 65 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS HILL LAKES ROJECTS Section V A Proposed projects Priority Project Description Estimated cost code (USD) 2 NL-HL.B. 13 34,000,000 3 NL-HL.B. 14 400,000 3 NL-HL.B. 15 500,000 3 NL-HL.B. 16 22,000,000 Total hill lakes in North Lebanon (other than Akkar) 164,650,000 Out of which : Priority 1 32,200,000 Priority 2 109,550,000 Priority 3 22,900,000 Midane Hill Lake: Construction of Hill Lake (0.79 MCM) El Khaf Hill Lake: Construction of Hill Lake (0.07 MCM) Ain Lebne Hill Lake: Construction of Hill Lake (1.86 MCM) Ain Es Safsafe Hill Lake: Construction of Hill Lake (0.3 MCM) May 2020 - V A 66 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS GROUND WATER MANAGEMENT Section V A Proposed projects See Volume III - Section III-C for details TOTAL COST OF ARTIFICIAL AQUIFER RECHARGE Priority 1 Priority 2 Priority 3 Total 3,650,000 $ 11,600,000 $ 16,500,000 $ 31,750,000 $ Priority Project Description Estimated cost code (USD) AAR A. Artificial recharge at Berdaouni pilot site 1 AAR A.1. 150,000 1 AAR A.2. 3,500,000 Total artificial recharge at Berdaouni pilot site 3,650,000 Out of which : Priority 1 3,650,000 Priority 2 Priority 3 AAR B. Artificial recharge at Abou Ali site 2 AAR B.1. 500,000 2 AAR B.2. 5,000,000 Total artificial recharge at Abou Ali site 5,500,000 Out of which : Priority 1 Priority 2 5,500,000 Priority 3 AAR C. Artificial recharge at Damour site 2 AAR C.1. 500,000 2 AAR C.2. 5,000,000 Total artificial recharge at Damour site 5,500,000 Out of which : Priority 1 Priority 2 5,500,000 Priority 3 AAR D. Artificial recharge at Hadath-Hazmieh pilot site 2 AAR D.1. 200,000 3 AAR D.2. 500,000 3 AAR D.3. 5,000,000 Total artificial recharge at Hazmieh-Hadath pilot site 5,700,000 Out of which : Priority 1 Priority 2 200,000 Priority 3 5,500,000 AAR E. Artificial recharge at Daichounie site 2 AAR E.1. 200,000 3 AAR E.2. 500,000 3 AAR E.3. 5,000,000 Total artificial recharge at Daichouniye pilot site 5,700,000 Out of which : Priority 1 Priority 2 200,000 Priority 3 5,500,000 AAR F. Artificial recharge in Akkar plain 2 AAR F.1. 200,000 3 AAR F.2. 500,000 3 AAR F.3. 5,000,000 Total artificial recharge at Daichouniye pilot site 5,700,000 Out of which : Priority 1 Priority 2 200,000 Priority 3 5,500,000 Construction of Abou Ali AAR facility Detailed design of the AAR facility at Abou Ali site Detailed design of the AAR pilot project facility at Berdaouni site Construction of Berdaouni AAR facility Detailed design of the AAR facility in Akkar plain Construction of Akkar plain AAR facility Detailed design of the AAR facility at Damour site Construction of Damour AAR facility Detailed design of the AAR facility at Hadath-Hazmieh site Construction of Hadath-Hazmieh AAR facility Feasibility study of the AAR pilot project at Hadath-Hazmieh Detailed design of the AAR facility at Daichouniye site Feasibility study of the AAR pilot project in Akkar plain Feasibility study of the AAR pilot project at Daichouniye Construction of Daichouniye AAR facility May 2020 - V A 67 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SURFACE WATER MANAGEMENT Section V A Proposed projects See Volume III - Section III-A.6 for details TOTAL COST FOR METEOROLOGICAL AND HYDROMETRIC NETWORKS Priority 1 Priority 2 Priority 3 Total 15,614,000 $ - - 15,614,000 $ Priority Project Description Estimated cost code (USD) MH A. Meteorological and Hydrometric network expansions and improvements 1 MH-A.1 790,000 1 MH-A.2 200,000 1 MH-A.3 100,000 1 MH-A.4 250,000 1 MH-A.5 4,726,000 Total 6,066,000 Out of which : Priority 1 6,066,000 Priority 2 Priority 3 MH-B. Integrated Hydrological Information System 1 MH-B.1 7,180,000 1 MH-B.2 2,000,000 1 MH-B.3 288,000 1 MH-B.4 80,000 Total 9,548,000 Out of which : Priority 1 9,548,000 Priority 2 Priority 3 WEAP Operation and Implementation LRA Hydrometric Network Expansion: Improvement of hydrometric stations as per LWP assessment report Hydrometric monitoring stations for stream connections coverage Hydrometric monitoring stations for hydrogeology coverage Main springs ADCP Installation Groundwater wells monitoring LMS + LRA Meteorological Network Expansion Interior Catchments: 1 Uncovered Catchments (+5 stations) 3 Semi-covered Catchments (+3 stations) Snow monitoring stations (+1 station per catchment above 2000m) LARI Meteorological Network Expansion Maintenance instruments for 10 stations LMS + LRA Meteorological Network Expansion Coastal Catchments: 9 Uncovered Catchments (+5 stations) 6 Semi-covered Catchments (+3 stations) Snow monitoring stations (+1 station per catchment above 2000m) MoEW Meteorological Network Expansion Natural reserves and Forests Required studies for IHIS implementation: Assessment studies Update and Analysis of the NLUMP and annexed geodatabase Lebanese Data Rescue Project Design studies for the IHIS implementation Integrated water resources management studies Flood Risk Management plan Drought Mitigation plan Rainwater Harvesting plan IHIS Operation for 24 months IHIS implementation May 2020 - V A 68 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS GROUND WATER MANAGEMENT Section V A Proposed projects See Volume III - Section III-C for details TOTAL COST OF GENERAL STUDIES AND INVESTIGATIONS Priority 1 Priority 2 Priority 3 Total 35,777,500 $ 2,500,000 $ 11,150,000 $ 49,427,500 $ Priority Project Description Estimated cost code (USD) RS-A Implementation of a Project Management Unit for a 5 years period 1 RS-A.1 6,700,000 1 RS-A.2 325,000 1 RS-A.3 1,060,000 1 RS-A.4 420,000 Total Implementation of PMU 8,505,000 Out of which : Priority 1 8,505,000 Priority 2 Priority 3 RS-B Water Governance priority action plan 1 RS-B.1 1,355,000 1 RS-B.2 6,750,000 1 RS-B.3 1,257,500 1 RS-B.4 2,950,000 1 RS-B.5 660,000 Total Water Governance priority action plan 12,972,500 Out of which : Priority 1 12,972,500 Priority 2 Priority 3 RS-C General Geological and Hydrogeological Studies 1 RS-C.1 12,200,000 3 RS-C.2 2,000,000 3 RS-C.3 1,600,000 3 RS-C.4 3,000,000 3 RS-C.5 3,000,000 Total Geology and hydrogeology mapping and studies 21,800,000 Out of which : Priority 1 12,200,000 Priority 2 Priority 3 9,600,000 RS-D Drilling and testing exploratory wells 1 RS-D.1 1,500,000 1 RS-D.2 600,000 2 RS-D.3 2,500,000 3 RS-D.4 500,000 3 RS-D.5 1,050,000 Total Drilling and testing exploratory wells 6,150,000 Out of which : Priority 1 2,100,000 Priority 2 2,500,000 Priority 3 1,550,000 In Damour - 3 wells In Hadath-Hazmieh - 3 wells In Brak (Zahrani) - 1 well In Daichouniye - 2 wells In Akkar plain - 5 wells Geology ang hydrogeology mapping and studies Modeling of major porous, saline aquifer systems Mobilisation of experts Purchase of cars, IT equipment, flow monitoring equipment, flow meters, manual dipmeters, misc working tools and required software Travel and transportation expenses Office expenses Sector Governance Financial and Commercial Reporting and Monitoring Capacity building O&M of facilities and services Refreshment of water budget studies of major hydrogeological basins Groundwater vulnerability mapping for springs Q > 10 l/s Modeling of major karst aquifers hydrogeological basins May 2020 - V A 69 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V Section V B PROPOSED PROJECTS Appendices to Proposed Projects December 2019 SECTION V B APPENDICES TO PROPOSED PROJECTS V B 1 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS Section V B Appendices to Proposed Projects TABLE OF CONTENTS Page Page Appendix NL-W.A : Water North Lebanon - Batroun 3 Appendix SL-WW.B : Wastewater South Lebanon - Sour 56 Appendix NL-W.B : Water North Lebanon - Halba 5 Appendix SL-WW.C : Wastewater South Lebanon - Bint Jbeil 57 Appendix NL-W.C : Water North Lebanon - Koura 7 Appendix SL-WW.D : Wastewater South Lebanon - Jezzine 58 Appendix NL-W.D : Water North Lebanon - Minieh 8 Appendix SL-WW.E : Wastewater South Lebanon - Saida 59 Appendix NL-W.E : Water North Lebanon - Ed Danniyeh 9 Appendix BML-WW.A : Wastewater Beirut and Mount Lebanon - Beirut 60 Appendix NL-W.F : Water North Lebanon - Zgharta 11 Appendix BML-WW.B : Wastewater Beirut Mount Lebanon - Jbeil 61 Appendix NL-W.G : Water North Lebanon - Tripoli 15 Appendix BML-WW.C : Wastewater Beirut Mount Lebanon - Baabda and Aley 62 Appendix NL-W.H : Water North Lebanon - Qobayate 16 Appendix BML-WW.D : Wastewater Beirut Mount Lebanon - Keserwane 63 Appendix BQ-W.A : Water Beqaa Lebanon - Baalbeck 19 Appendix BML-WW.E : Wastewater Beirut Mount Lebanon - Chouf 64 Appendix BQ-W.B : Water Beqaa Lebanon - Hermel 20 Appendix BML-WW.F : Wastewater Beirut Mount Lebanon - Metn 65 Appendix BQ-W.C : Water Beqaa Lebanon - West Beqaa, Zahleh and Rachaiya 21 Appendix NL-IR.A : Irrigation North Lebanon - Akkar 66 Appendix SL-W.A : Water South Lebanon - Nabatiye 24 Appendix NL-IR.B : Irrigation North Lebanon - North (excluding Akkar) 67 Appendix SL-W.B : Water South Lebanon - Jezzine 25 Appendix BQ-IR.A : Irrigation Beqaa - Baalbeck 68 Appendix SL-W.C : Water South Lebanon - Sour 26 Appendix BQ-IR.B : Irrigation Beqaa - Zahle 69 Appendix SL-W.D : Water South Lebanon - Zahrani 27 Appendix SL-IR.A : Irrigation South Lebanon - Major Irrigation Schemes 70 Appendix SL-W.E : Water South Lebanon - Saida 28 Appendix SL-IR.B : Irrigation South Lebanon - Local Irrigation Schemes 71 Appendix SL-W.F : Water South Lebanon - Bint Jbeil 29 Appendix SL-IR.C : Construction-Rehabilitation of concrete channels 72 Appendix SL-W.G : Water South Lebanon - Marjaayoun and Hasbaya 30 Appendix BML-IR.A : Irrigation Beirut Mount Lebanon - Jbeil 73 Appendix BML-W.A : Water Beirut Mount Lebanon - Beirut 31 Appendix BML-IR.B : Irrigation Beirut Mount Lebanon - Meten 74 Appendix BML-W.B : Water Beirut Mount Lebanon - Jbeil 32 Appendix BML-IR.C : Irrigation Beirut Mount Lebanon - Keserouane 75 Appendix BML-W.C : Water Beirut Mount Lebanon - Baabda and Aley 33 Appendix BML-IR.D : Irrigation Beirut Mount Lebanon - Baabda 76 Appendix BML-W.D : Water Beirut Mount Lebanon - Keserwan 37 Appendix BML-IR.E : Irrigation Beirut Mount Lebanon - Chouf 77 Appendix BML-W.E : Water Beirut Mount Lebanon - Chouf 39 Appendix NL-D.A : Dams North Lebanon - Akkar 78 Appendix BML-W.F : Water Beirut Mount Lebanon - Meten 42 Appendix NL-D.B : Dams North Lebanon - All North 79 Appendix NL-WW.A : Wastewater North Lebanon - Akkar 45 Appendix BQ-D.C : Dams Beqaa - Baalbek Hermel 80 Appendix NL-WW.B : Wastewater North Lebanon - Koura 47 Appendix BQ-D.D : Dams Beqaa - Beqaa 81 Appendix NL-WW.C : Wastewater North Lebanon - Minieh 48 Appendix SL-D.E : Dams South Lebanon - All South 82 Appendix NL-WW.D : Wastewater North Lebanon - Zgharta 49 Appendix BML-D.F : Dams Beirut Mount Lebanon - All Beirut and Mount Lebanon 83 Appendix NL-WW.E : Wastewater North Lebanon - Batroun 50 Appendix NL-HL.A : Hill Lakes Akkar 84 Appendix BQ-WW.A : Wastewater Beqaa - Baalbeck 51 Appendix NL-HL.B : Hill Lakes North Lebanon 85 Appendix BQ-WW.B : Wastewater Beqaa - Hermel 52 Appendix BQ-HL. : Hill Lakes Beqaa 87 Appendix BQ-WW.C : Wastewater Beqaa - Zahle and West Beqaa 53 Appendix SL-HL. : Hill Lakes South Lebanon 88 Appendix BQ-WW.D : Wastewater Beqaa - Rachaya 54 Appendix BML-HL. : Hill Lakes Beirut and Mount Lebanon 89 Appendix SL-WW.A : Wastewater South Lebanon - Nabatiye 55 Appendice RS-B : Water Governance priority action plan 90 May 2020 - V B 2 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.A : Water North Lebanon - Batroun Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Tannourine El-Faouqa 12.00 960 000 500 120 000 1 080 000 1 144 800 Chatine 5.00 400 000 200 80 000 480 000 508 800 Daraya El-Batroun - AAbdelli 1.00 90 000 300 90 000 180 000 190 800 Douma 300 90 000 90 000 95 400 Bcheaali - Tannourine Et-Tahta 7.00 560 000 300 90 000 650 000 689 000 Deir Mar Youssef Jrabta - Toula El-Batroun - Aalali 2.50 225 000 225 000 238 500 Sghar - Jrabta El-Batroun - Racha - Ouata Houb 100 60 000 60 000 63 600 Douq 2.50 225 000 225 000 238 500 Mehmarch - Hadtoun - Dahr Abi Yaghi - Mar Mama - Masrah - Ram El-Batroun - Hamat - Ras Nahhach 1.00 90 000 90 000 95 400 Ouajh El-Hajjar 1.50 135 000 135 000 143 100 Koubba - Beit Kassab 4.00 360 000 360 000 381 600 Hardine 2.00 180 000 180 000 190 800 Niha El-Batroun 3.50 315 000 315 000 333 900 Kfour El-Aarbi 2.00 180 000 180 000 190 800 System Total Total with design and supervision Village System 1 System 2 System 3 System 4 Project Justification Served population in System 1 (in 2035) : 5613 New water distribtuion networks are proposed for tannourine el Faouqa and Chatine Since the total capacities of the existing reservoirs in the villages are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. Served population in System 2 (in 2035) : 15497 Based on the water balance in summer for System 2, a deficit occurs since 2020. 2 wells with each with a flow of 10 l/s are proposed to cover the deficit with 4 km proposed lift lines for the proposed well Proposed distribution network for Tannourine et Tahta Additional requiered storage was proposed to meet the 2035 water needs requierements New transmission lines are needed in: Aabdelli, Aalali, Douq Served population in System 3 (in 2035) : 7484 New transmission lines are needed in: Ras Nahhach Served population in System 4 (in 2035) : 2964 New transmission lines are needed in: Beit Kassab, Hardine, Niha El Batroun, Kfour El Aarbi May 2020 - V B 3 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.A : Water North Lebanon - Batroun Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) System Total Total with design and supervision Village Project Justification Selaata - Rachkida 100 60 000 60 000 63 600 Qatnaaoun 2.00 180 000 100 60 000 240 000 254 400 Aabrine 2.00 180 000 180 000 190 800 Batroun - Kfar Khollos 4.00 360 000 100 60 000 420 000 445 200 Kfar Hay 2.00 180 000 180 000 190 800 Boqsmaiya 0.50 45 000 45 000 47 700 Bijdarfil 0.50 45 000 45 000 47 700 Ijdabra 0.50 45 000 45 000 47 700 Jebla 8.00 720 000 720 000 763 200 Basbina - Kfifane - Deir Kfifane 1.50 135 000 100 60 000 195 000 206 700 Jrane El-Batroun - Smar Jbayl 100 60 000 60 000 63 600 Mrah Ez Ziyat - Rachana - Thoum - Ghouma - Kfar Aabida - Edde El-Batroun - Mrah Chdid - Helta - Sourat El-Batroun 100 60 000 60 000 63 600 Kfarb Shlaimane 100 60 000 60 000 63 600 Deir Billa 1.50 135 000 135 000 143 100 Kfar Hilda - Beit Chlala - Daael 100 60 000 60 000 63 600 Bechtoudar - Assia 2.00 180 000 180 000 190 800 Ftahat El-Batroun - Zané 3.50 315 000 315 000 333 900 Chibtine - Deir Mar Youhanna EL-Batroun - Nahlé El-Batroun - Mrah El-Hajj - Kour 2.50 225 000 200 80 000 305 000 323 300 Harbouna - Aartiz 150 70 000 70 000 74 200 Kfar Hatna 100 60 000 60 000 63 600 Chikka - Heri - For all Systems 15 000 000 Total Priority 1 50.50 4 545 000$ 24.00 1 920 000$ 17.00 1 220 000$ - -$ - -$ - -$ 7 685 000$ 23 146 100$ Remote Control And Monitoring Of Water Systems (SCADA And DMA) System 6 System 5 Served population in System 5 (in 2035): 68941 Additional requiered storage was proposed to meet the 2035 water needs requierements New transmission lines are needed in: Ouajh El Hajjar, Qatnaaoun, Aabrine, Kfar Khollos, Kfar Hay, Boqsmaiya, Bijdarfil, Ijdabra, Jebla, Deir kfifane Additional requiered storage was proposed to meet the 2035 water needs requierements New transmission lines are needed in: Deir Billa Based on the water balance in summer, a deficit occurs since 2020. 2 wells with each with a flow of 10 l/s are proposed to cover the deficit with 4 km proposed lift lines for the proposed well Additional requiered storage was proposed to meet the 2035 water needs requierements New transmission lines are needed in: Zane, Assia Additional requiered storage was proposed to meet the 2035 water needs requierements New transmission lines are needed in: Kour May 2020 - V B 4 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.B : Water North Lebanon - Halba Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 System 1 Akkar El-Atika 8.00 720 000 2.00 160 000 4.00 2 000 000 2 880 000 3 052 800 Served population in System 1 (in 2035): 34011 '‐Based on the water balance summer for Akkar El Atika system, a deficit occurs since 2020. 4 wells with a flow of 10 l/s are proposed to cover the deficit with 8 km proposed lift lines for the proposed wells ‐Proposed distribution network for Akkar El Atika Chakdouf Daoura 2.00 180 000 1.00 500 000 680 000 Aïn-Yacoub 1 000 200 000 200 000 Bazbina 12.00 960 000 960 000 Beino 2 000 230 000 230 000 El-Borge Mimnih Tikrite 2.00 160 000 160 000 ElAyoune 2.00 180 000 1.00 500 000 680 000 Aaiyat Chakdouf Qboula Tallet Chattaha Tshea System 4 Rahbé 4.00 360 000 2.00 160 000 520 000 551 200 Served population in System 4 (in 2035): 10799 ‐2 km of proposed distribution networks for Bazbina and Tikrite ‐4 km of transmission lines Beit Mallat 2.00 180 000 2.00 160 000 1.00 500 000 840 000 Dahr-Leyciné 250 85 000 - 85 000 Edbel 2.00 180 000 20.00 1 600 000 1 500 215 000 1.00 500 000 2 495 000 Hayzouk 2.00 180 000 20.00 1 600 000 1.00 500 000 2 280 000 Ilate 2.00 180 000 20.00 1 600 000 1.00 500 000 2 280 000 Jebrâil 2.00 180 000 20.00 1 600 000 500 120 000 1.00 500 000 2 400 000 Machha 2.00 180 000 20.00 1 600 000 3 000 300 000 1.00 500 000 2 580 000 Al-Jédidé 10.00 800 000 800 000 Al-Zoureiribe 1.00 90 000 400 105 000 195 000 Cheikh Taba Montagne 1.00 90 000 90 000 Cheikh Taba Plaine 2.00 180 000 1.00 500 000 680 000 El-Kantara Hekr el Dahiri Karem-Asfour-El-Nahrieh 10.00 800 000 800 000 Beit-Ghattas Minyara 2.00 180 000 3.00 240 000 1.00 500 000 920 000 Zouk el Haddara - Bkarzala 5.00 450 000 2.00 160 000 1.00 500 000 1 110 000 Majdla 2.00 180 000 1.00 500 000 680 000 Mar Touma 2.00 180 000 1.00 500 000 680 000 Mechaïlha Hakour - - Zouk el Moukachérine - 2.00 160 000 160 000 Zouk-El-Habalça - Zouk-El-Hosmieh et Dahr Ayasse 2.00 180 000 1.00 500 000 680 000 Homeira - Kloud El-Bakia - Saïssouk - Served population in System 7A (in 2035): 31406 ‐ Based on the water balance summer for System 7A, a deficit occurs since 2020. 2 wells with a flow of 20 l/s are proposed to cover the deficit with 4 km proposed lift lines for the proposed wells ‐ Proposed distribution networks for Al‐Jdeide, Karem Asfour El Nahrieh, Minyara ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ 2 km of transmission lines 3 694 100 3508600 System 8 System Project Justification Village Total Total with design and supervision Served population in System 2 (in 2035): 17683 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line Served population in System 3 (in 2035): 46463 '‐Based on the water balance summer for System 3, a deficit occurs since 2020. 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line ‐Proposed distribution networks for Bazbina and Tikrite ‐Additional required storage was proposed to meet the 2035 water needs requirements '‐Proposed distribution networks for Bazbina and Tikrite Served population in System 7B (in 2035): 25971 ‐ Proposed distribution networks for: Bkarzala, Zouk el Moukacherine ‐ Based on the water balance in summer for System 7B, a deficit occurs since 2020. 4 wells with a flow of 35 l/s are proposed to cover the deficit ‐ 11 km of transmission lines System 2 System 3 System 7A System 7B System 5 & 6A 13 737 600 Served population in System 5 & 6A (in 2035): 28570 ‐ Based on the water balance summer for System 5, a deficit occurs since 2020. 6 wells each with a flow of 15 l/s are proposed to cover the deficit with 12 km proposed lift lines for the proposed wells ‐ Proposed distribution network for Beit Mallat ‐ Proposed distribution networks for: Edbel, Hayzouk, Iiate, Jebrail, Machha ‐ Additional required storage was proposed to meet the 2035 water needs requirements 720 800 2 363 800 May 2020 - V B 5 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.B : Water North Lebanon - Halba Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) System Project Justification Village Total Total with design and supervision Berkayel 5.50 495 000 4.00 320 000 2.00 1 000 000 1 815 000 Bzal 7.00 630 000 4.00 320 000 2.00 1 000 000 1 950 000 Safiné-El-Kayteh 2.00 180 000 3.00 240 000 1 500 215 000 1.00 500 000 1 135 000 System 10 Bebnine 4.50 405 000 5.00 400 000 4.00 2 000 000 2 805 000 2 973 300 Served population in System 10 (in 2035): 55344 ‐ Based on the water balance summer for System 10, a deficit occurs since 2020. 4 wells each with a flow of 10 l/s are proposed to cover the deficit ‐ Proposed distribution networks for: Bebnine ‐ 4.5 km of transmission lines System 11 Ouadi El-Jamous 2.00 180 000 1.00 500 000 680 000 720 800 Served population in System 11 (in 2035): 10799 Proposed distribution networks for Ouadi El jamous and 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line El-Karkaf 2.00 180 000 2.00 160 000 1.00 500 000 840 000 Beit-El-Haouche 2.00 180 000 1.00 500 000 680 000 Jedeidet-El-Kayteh 2.00 180 000 3.00 240 000 4 000 400 000 1.00 500 000 1 320 000 Eyoune-El-Ghouzlane 2.00 180 000 1.00 500 000 680 000 Chane El-Houaïche 3.50 315 000 1.00 500 000 815 000 Khreibet Aakkar 2.00 180 000 4.00 320 000 500 000 Beit Ayoub 2.00 180 000 5.00 400 000 1.00 500 000 1 080 000 Beit Younes 4.50 405 000 5.00 400 000 1.00 500 000 1 305 000 Sadaqa - Michmiche 2.50 225 000 2.00 1 000 000 1 225 000 El-Korné 4.00 360 000 3.00 240 000 2 000 230 000 2.00 1 000 000 1 830 000 El-Krayat 2.50 225 000 5.00 400 000 1.00 500 000 1 125 000 Danbou 7.00 630 000 1.00 500 000 1 130 000 Habchite - 750 150 000 150 000 Qabaait 2.00 180 000 1.00 500 000 680 000 Harare 2.00 180 000 1.00 500 000 680 000 System 14D Fneidek 14.00 1 260 000 6.00 480 000 5 000 500 000 7.00 3 500 000 5 740 000 6 084 400 Served population in System 14D (in 2035): 47245 ‐ Proposed distribution networks for: Fneidek ‐Based on the water balance in summer for Fneidek system, a deficit occurs since 2020. 7 wells each with a flow of 10 l/s are proposed to cover the deficit ‐ 14 km of transmission lines For all Systems 15 000 000 Total Priority 1 120.00 10 800 000$ 196.00 15 680 000$ 12 2 750 000$ 50.00 25 000 000$ - -$ - -$ 54 230 000$ 72 483 800$ 6 958 900 Remote Control And Monitoring Of Water Systems (SCADA And DMA) Served population in System 14B (in 2035): 43649 '‐ Proposed distribution networks for: Beit Ayoub, Beit Younes, El Korne, El Krayat ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ 15.5 km of transmission lines are proposed Served population in System 14C (in 2035): 46241 ‐ Additional required storage was proposed to meet the 2035 water needs requirements 3 wells each with a flow of 10 l/s are proposed to cover the deficit ‐ 11 km of transmission lines are proposed Served population in System 14A (in 2035): 9726 ‐ Proposed distribution networks for: Khreibet Aakkar ‐ Based on the water balance in summer for System 14A, a deficit occurs since 2020. 1 well with a flow of 25 l/s is proposed to cover the deficit ‐ 5.5 km of transmission lines are proposed 2 798 400 Served population in System 12 (in 2035): 18868 ‐ Based on the water balance summer, a deficit occurs since 2020. 2 wells with a flow of 15 l/s are proposed to cover the deficit ‐ 4 km of transmission lines ‐ Proposed distribution networks for: Jdeidet El Kayteh ‐ Based on the water balance summer for System 12, a deficit occurs since 2020. 1 well with a flow of 45 l/s is proposed to cover the deficit ‐ Based on the water balance summer for System 13, a deficit occurs since 2020. 1 well with a flow of 15 l/s is proposed to cover the deficit ‐ 4 km of transmission lines 1 393 900 Served population in System 9 (in 2035): 43459 ‐ Proposed distribution networks for: Berkayel, Bzal, Safine El Kayteh ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Based on the water balance in summer for System 9, a deficit occurs since 2020. 5 wells each with a flow of 20 l/s are proposed to cover the deficit ‐ 14.5 km of transmission lines 5 194 000 3 731 200 System 14C System 14A System 14B System 9 System 12 and 13 May 2020 - V B 6 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.C : Water North Lebanon - Koura Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 System 1 Enfeh Al-Boukaia Al-Hraïché Badbhoun 1.50 135 000 100 60 000 195 000 Bargoune 1.00 90 000 200 80 000 170 000 Barsa - Afsdik - 7.00 560 000 600 120 000 680 000 Beitroumine - 1 000 200 000 200 000 Belmand - 200 80 000 80 000 Bkeftine - 500 120 000 120 000 Btouratige - 500 120 000 120 000 Déddé - En-Nakhlé - 3 500 350 000 350 000 Fih - 300 90 000 90 000 Kelhate 1.00 90 000 90 000 Kfar Kahel 1.50 135 000 350 100 000 235 000 Zakroune 1.50 135 000 100 60 000 195 000 System 3 Ras Maska 8.00 720 000 5 000 500 000 2.00 1 000 000 2 220 000 2 353 200 Served population in System 3 (in 2035): 29054 ‐ Based on the water balance in summer for Ras Maska system, a deficit occurs since 2020. 2 wells each with a flow of 15 l/s are proposed to cover the deficit ‐ 8 km of transmission lines Aba 5.00 400 000 400 000 Amioune 15.00 1 200 000 1 500 215 000 1 415 000 Bdebba 5.00 400 000 400 000 Bechmezzine Bsarma 6.00 480 000 1000 + 500 320 000 800 000 Aïn Akrine 300 90 000 90 000 Dar Chmezzine 100 60 000 60 000 Kfar Akka 1 500 215 000 215 000 Kfar Hazir 6.00 480 000 1.00 400 000 880 000 Bterram 1 200 210 000 210 000 Kfar Saroun 1 000 200 000 200 000 Kousba 3.00 270 000 10.00 800 000 1 500 215 000 1.00 400 000 1 685 000 Rechdebbine 10.00 800 000 200 + 500 200 000 1.00 400 000 1 400 000 Bhabbouche - Bziza - Dar Bechtar 10.00 800 000 300 90 000 890 000 943 400 Kaftoune - Majdel - Bednayel Btaaboura 100 60 000 60 000 Ejdabrine 100 60 000 60 000 Kefraya Kfar Hatta System 7 Bnehrane 5.00 400 000 300 90 000 490 000 519 400 Served population in System 7 (in 2035): 1315 ‐ Proposed distribution network for Bnehrane ‐ Additional required storage was proposed to meet the 2035 water needs requirements For all Systems 15 000 000 Total Priority 1 17.50 1 575 000$ 79.00 6 320 000$ 27 3 905 000$ 2.00 1 000 000$ 3.00 1 200 000$ - -$ 14 000 000$ 29 840 000$ System 4 Served population in System 4 (in 2035): 87258 ‐ Proposed distribution network for Aba, Amioune, Bdebba, Bsarma, Dar Bechtar, Kfar Hazir, Kousba and Rechdebbine ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Proposed pumping stations in Kfar Hazir, Kousba and Rechdebbine ‐ 3 km of transmission line 8 220 300 Remote Control And Monitoring Of Water Systems (SCADA And DMA) System 5 Served population in System 5 (in 2035): 13694 ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Proposed distribution network for Dar Bechtar Served population in System 6 (in 2035): 8492 ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Based on the water balance in summer for System 11, a deficit occurs since 2020.2 wells each with a flow of 10 l/s are proposed to cover the deficit 127 200 System 6 System 2 2 676 500 Served population in System 2 (in 2035): 67193 ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Proposed distribution network for Afsdik ‐ 6.5 km of transmission lines Project Justification System Village Total Total with design and supervision May 2020 - V B 7 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.D : Water North Lebanon - Minieh Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 System 1a Al-Minieh 23.00 2 070 000 10.00 800 000 3000 + 3000 + 4000 1 000 000 10.00 5 500 000 9 370 000 9 932 200 Served population in System 1a (in 2035): 135648 ‐ Proposed distribution networks for al‐Minieh ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Based on the water balance in summer for Al‐Minieh system, a deficit occurs since 2020. 10 wells each with a flow of 25 l/s are proposed to cover the deficit ‐ 23 km of transmission lines System 2a Markabta 3.00 270 000 2.00 160 000 1.00 500 000 930 000 985 800 Served population in System 2a (in 2035): 8139 ‐ Based on the water balance in summer for Markabta system, a deficit occurs since 2025. 1 well with a flow of 25 l/s is proposed to cover the deficit ‐ 3 km of transmission lines Borge-El-Yahoudié 1.00 90 000 2.00 160 000 1 000 200 000 450 000 Deir Omar 2.00 180 000 15.00 1 200 000 6000 + 1500 815 000 1.00 500 000 2 695 000 System 4a Nabi Youcheaa 1.00 90 000 3.00 240 000 500 120 000 450 000 477 000 Served population in System 4a (in 2035): 16278 ‐ Proposed distribution network for Nabi Youcheaa ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ 1 km of transmission line System 5a Tourbol 1.00 90 000 2.00 160 000 600 130 000 380 000 402 800 Served population in System 5a (in 2035): 169 ‐ Proposed distribution network for Tourbol ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ 1 km of transmission lines Zouk Bhanine 2.00 180 000 2.00 160 000 2 000 230 000 1.00 500 000 1 070 000 Al-Rihanié 2.00 180 000 3.00 240 000 400 105 000 525 000 Aadoua 1.00 90 000 1.00 80 000 400 105 000 275 000 For all Systems 15 000 000 Total Priority 1 36.00 3 240 000$ 40.00 3 200 000$ 11 2 705 000$ 13.00 7 000 000$ - -$ - -$ 16 145 000$ 32 113 700$ Project Justification Remote Control And Monitoring Of Water Systems (SCADA And DMA) System Village Total Total with design and supervision System 3a System 6a Served population in System 3a (in 2035): 29842 ‐ Proposed distribution network for Deir Omar ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Based on the water balance in summer for System 3a, a deficit occurs since 2025. 1 well with a flow of 25 l/s is proposed to cover the deficit ‐ 3 km of transmission lines Served population in System 6a (in 2035): 19991 ‐ Proposed distribution network for Zouk Bhanine, Al Rihanié and Aadoua ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Based on the water balance in summer for System 6a, a deficit occurs since 2030. 1 well with a flow of 25 l/s is proposed to cover the deficit ‐ 5 km of transmission lines 3 333 700 1 982 200 May 2020 - V B 8 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.E : Water North Lebanon - Ed Danniyeh Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 System 1 Sir 1.00 90 000 20.00 1 600 000 600 + 500 + 200 330 000 2 020 000 2 141 200 Served population in System 1 (in 2035): 16022 ‐ Proposed distribution network for Sir ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ 1 km of transmission lines Al-Sfiré 5.00 450 000 450 000 Assoun 2.50 225 000 3.00 240 000 1 000 200 000 665 000 Bkaa Safrine 2.50 225 000 2.00 160 000 1000 + 500 320 000 705 000 Bkarsouna 3.50 315 000 315 000 Mrah-El-Sfiré - Azka 4.00 360 000 2.00 160 000 1 000 200 000 720 000 Btermaz - 500 + 300 210 000 210 000 El-Watié et Harf Siad - 1.00 80 000 100 60 000 140 000 Kfar Chlane 2.00 180 000 2.00 160 000 200 80 000 420 000 Kfar Habou - 1 000 200 000 200 000 Mrah-el-Sreige - 1 000 200 000 200 000 Tarane 1.00 90 000 90 000 Bakhoune 1.00 90 000 1.00 80 000 170 000 Haql el Aazimé - 2.00 160 000 600 130 000 290 000 Kattiné - 2.00 160 000 1 000 200 000 360 000 Kharnoub - Bechhara - Izal 2.00 180 000 6.00 480 000 200 + 200 + 1000 360 000 1 020 000 Jarjoura - Mazraat Ketrane - 2.00 160 000 160 000 Mazraet El-Krême - Mrabine - Qemmamine - Qraine - Aassaymout - Debaael 7.50 675 000 675 000 Jaroun - Qarhaiya - Project Justification System Village Total Total with design and supervision System 2 System 3 System 4 & 5 System 6 System 7 System 8 Served population in System 2 (in 2035): 37408 ‐ Proposed distribution networks for Assoun and Bkaa Safrine ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ 13.5 km of transmission lines Served population in System 3 (in 2035) : 28768 ‐ Proposed distribution networks for Azka, Kfar Chlane and El Watie et Harf Siad ‐ Since the total capacities of the existing reservoirs in the villages are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. ‐ 7 km of transmission lines Served population in System 4&5 (in 2035): 17081 ‐ New water distribution networks are proposed for Bakhoune, Haql el Azime and Kattine ‐ Since the total capacities of the existing reservoirs in the villages are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. ‐ 1 km proposed transmission lines Served population in System 6 (in 2035): 10717 ‐ New water distribution networks are proposed for Izal and Mazraat Ketrane ‐ Since the total capacities of the existing reservoirs in the villages are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. ‐ 2 km proposed transmission lines Served population in System 8 (in 2035): 5449 ‐ 7.5 km proposed transmission lines 715 500 2 263 100 2 098 800 869 200 1 250 800 May 2020 - V B 9 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.E : Water North Lebanon - Ed Danniyeh Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Project Justification System Village Total Total with design and supervision Aïn-El-Tiné - Beit-El-Faks 1.00 90 000 2.00 160 000 250 000 El-Hazmieh 2.00 180 000 2.00 160 000 300 90 000 430 000 Karseita 2.00 180 000 180 000 Nemrine et Bakoura 4.50 405 000 4.00 320 000 200 80 000 805 000 Beit Haouik - Hawara 3.00 270 000 3.00 240 000 400 105 000 615 000 Kfar Bibnine 3.00 270 000 270 000 System 11 Karm el Mahr - System 12 Kahf-El-Malloul 2.00 180 000 1.00 80 000 1.00 500 000 760 000 805 600 Served population in System 12 (in 2035): 814 ‐ Distribution network for Kahf el Malloul ‐ Based on the water balance in summer for Kahf‐El‐ Malloul system, a deficit occurs since 2020. 1 well with a flow of 10 l/s is proposed to cover the deficit ‐ 2 km of transmission lines System 13 Zaghrteghrine 2.00 180 000 2.00 160 000 1.00 500 000 840 000 890 400 Served population in System 13 (in 2035): 949 ‐ Distribution network for Zgharteghrine ‐ Based on the water balance in summer for Zgharteghrine system, a deficit occurs since 2020. 1 well with a flow of 10 l/s is proposed to cover the deficit ‐ 2 km of transmission lines System 14 Behweité - 1.00 80 000 80 000 84 800 Served population in System 14 (in 2035): 649 ‐New water distribution networks are proposed for Behweité. Bchnnata - Btehline - Omar 1.50 135 000 5.00 400 000 400 105 000 640 000 System 16 Deir Nebouh 5.00 450 000 4.00 320 000 500 + 500 240 000 2.00 1 000 000 2 010 000 2 130 600 Served population in System 16 (in 2035) : 10174 ‐ Distribution network for Deir Nebouh ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Based on the water balance in summer for Deir Nebouh system, a deficit occurs since 2020. 2 wells each with a flow of 10 l/s are proposed to cover the deficit ‐ 5 km of transmission lines System 17 Beit Zaoud 3.00 270 000 270 000 286 200 Served population in System 17 (in 2035) : 814 ‐3 km proposed transmission lines For all Systems 15 000 000 Total Priority 1 61.00 5 490 000$ 67.00 5 360 000$ 24 3 110 000$ 4.00 2 000 000$ - -$ - -$ 15 960 000$ 31 917 600$ Remote Control And Monitoring Of Water Systems (SCADA And DMA) System 9 System 10 System 15 Served population in System 9 (in 2035): 14288 ‐ Distribution networks ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ 9.5 km of transmission lines Served population in System 10 (in 2035): 3182 ‐ New water distribution networks are proposed for Hawara ‐ Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs capacities in the village. ‐ 6 km proposed transmission lines Served population in System 15 (in 2035): 2385 ‐New water distribution networks are proposed for Omar ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs capacities in the village. ‐Replacement of 1.5 km of transmission lines 1 764 900 938 100 678 400 May 2020 - V B 10 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.F : Water North Lebanon - Zgharta Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Hailan 2.00 180 000 300 90 000 1.00 500 000 770 000 816 200 Mzraat Kefraya - System 2 Aalma 2.00 180 000 10.00 800 000 2 000 230 000 1.00 500 000 1 710 000 1 812 600 Served population in System 2 (in 2035) : 6495 ‐New water distribution network are proposed for Aalma. ‐Based on the water balance, a deficit occurs since 2025 (‐14 m³/d deficit in 2020). One well with a flow of 10 l/s is proposed to cover the deficit with 2 km of proposed transmission lines for the proposed well. ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. System 3 Kfarhoura 2.00 180 000 5.00 400 000 1.00 500 000 1 080 000 1 144 800 Served population in System 3 (in 2035): 2496 ‐Proposed distribution network for Kfarhoura ‐Based on the water balance, a deficit occurs since 2020 (‐111 m³/d deficit in 2020). One well with a flow of 10 l/s is proposed to cover the deficit with 2 km of proposed transmission lines for the proposed well. System 4 Kfarchakhna - System 5 Daraiya Zgharta 2.00 180 000 250 85 000 1.00 500 000 765 000 810 900 Served population in System 5 (in 2035): 2830 ‐Based on the water balance, a deficit occurs since 2020 (‐222 m³/d deficit in 2020). One well with a flow of 10 l/s is proposed to cover the deficit with 2 km of proposed transmission lines for the proposed well. ‐Additional required storage was proposed to meet the 2035 water needs requirements.The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs capacities in the village. Aarjis 2.00 180 000 1.00 500 000 680 000 720 800 Bnechaai 250 85 000 85 000 90 100 Total Total with design and supervision Project Justification System Village Served population in System 1 ( in 2035) : 2078 ‐Based on the water balance, a deficit occurs since 2020 (‐116 m³/d deficit in 2020). One well with a flow of 10 l/s is proposed to cover the deficit with 2 km of proposed transmission lines for the proposed well. ‐Additional required storage was proposed to meet the 2035 water needs requirements Served population in System 6 (in 2035): 2706 ‐1 well with a flow of 10 l/s is proposed to cover the deficit of the water balance that occurs in 2020 with 2 km of proposed transmission lines ‐Additional required storage was proposed to meet the 2035 water needs requirements. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs capacities in the village. System 1 System 6 May 2020 - V B 11 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.F : Water North Lebanon - Zgharta Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Total Total with design and supervision Project Justification System Village System 7 Seraal 6.00 480 000 200 80 000 560 000 593 600 Served population in System 7 (in 2035): 669 ‐Proposed distribution network for Seraal ‐Additional required storage was proposed to meet the 2035 water needs requirements.The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs capacities in the village. System 8 Aintourine 5.00 400 000 100 60 000 460 000 487 600 Served population in System 8 (in 2035): 552 ‐Proposed distribution network for Aintourine ‐Additional required storage was proposed to meet the 2035 water needs requirements.The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs capacities in the village. System 9 Mazraat Et-Teffah 6.00 540 000 12.00 960 000 1 500 000 1 590 000 Served population in System 9 (in 2035): 844 ‐Proposed distribution network for Mazraat Et‐Teffah ‐Replacement of 6km of transmission lines that are old. Arde 1 500 215 000 215 000 227 900 Mejdlaiya Zgharta 1.50 135 000 3000 + 750 450 000 585 000 620 100 Boussit - Hraiqis - Aachach 1.00 90 000 90 000 95 400 Miriata 3.00 270 000 6.00 480 000 750 150 000 1.00 500 000 1 400 000 1 484 000 Rachaaine 2.50 225 000 5.00 400 000 1 500 215 000 1.00 500 000 1 340 000 1 420 400 Sakhra 100 60 000 60 000 63 600 Danha - Served population in System 10 (in 2035) : 9003 ‐2 wells with a flow of 12 l/s each are proposed to cover the deficit of the water balance that occurs in 2020, with new or renovated transmission lines ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. Served population in System 11 (in 2035): 18789 ‐Proposed distribution networks for Miriata and Rachaaine ‐2 wells with a flow of 12 l/s each are proposed to cover the deficit of the water balance that occurs in 2020 with 6.5 km of proposed transmission lines ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. System 10 System 11 May 2020 - V B 12 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.F : Water North Lebanon - Zgharta Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Total Total with design and supervision Project Justification System Village Deir Jdeide 0.50 45 000 2.00 160 000 100 60 000 265 000 280 900 Khaldiyé 1.50 135 000 250 85 000 220 000 233 200 Asnoun 1.00 90 000 75 60 000 150 000 159 000 Iaal 4.50 405 000 100 60 000 1.00 500 000 965 000 1 022 900 Qarah Bach 1.00 90 000 100 60 000 150 000 159 000 Mazraat Ajbeaa 2.50 225 000 50 60 000 285 000 302 100 Mazraat Jnaid - - Hariq Zgharta 0.50 45 000 75 60 000 105 000 111 300 System 13 Miziara 7.50 675 000 1500 + 1500 430 000 1.00 500 000 1 605 000 1 701 300 Served population in System 13 (in 2035) : 12989 ‐1 well with a flow of 10 l/s is proposed to cover the deficit of the water balance that occurs in 2025 with 7.5 km of proposed transmission lines ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. Aardat 5.50 495 000 50 60 000 555 000 588 300 Tallet Zgharta 1.00 90 000 250 85 000 175 000 185 500 Kfardlaqous 2.00 180 000 5.00 400 000 580 000 614 800 Kfarhata Zgharta 6.30 567 000 4.00 320 000 887 000 940 220 Zgharta 1.50 135 000 3 000 300 000 435 000 461 100 Ayto 4.00 360 000 8.00 640 000 300 90 000 1.00 300 000 1 390 000 1 473 400 Aarbet Qozhaiya 3.50 315 000 15.00 1 200 000 300 90 000 1 605 000 1 701 300 Served population in System 12 (in 2035) : 8053 ‐Proposed distribution network for Deir Jdeide ‐1 well with a flow of 10 l/s is proposed to cover the deficit of the water balance that occurs in 2020 with 7.5 km of new transmission lines and 4 km of renovated transmission lines ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. Served population in System 14 (in 2035): 75470 ‐Proposed distribution network for Kfardlaqous and Kfarhata Zgharta ‐New transmission lines of 7.8 km and replacement of 8.5 km of old transmission lines ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. Served population in System 15 (in 2035) : 1722 ‐Proposed distribution networks for Ayto and Aarbet qozhaiya ‐2 wells with a flow of 10 l/s each are proposed to cover the deficit of the water balance that occurs in 2020 with 6.5 km of renovated transmission lines and 5 km of new transmission lines ‐Additional required storage was proposed to meet the 2035 water needs requirements ‐Proposed pumping station in Ayto System 12 System 15 System 14 May 2020 - V B 13 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.F : Water North Lebanon - Zgharta Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Total Total with design and supervision Project Justification System Village Karm Saddé 1.50 135 000 15.00 1 200 000 1 335 000 1 415 100 Kfarfou 200 80 000 80 000 84 800 Ras Kifa 4.00 360 000 15.00 1 200 000 500 120 000 1 680 000 1 780 800 Sebaal Zgharta 8.00 720 000 10.00 800 000 250 85 000 1.00 350 000 1 955 000 2 072 300 System 17 Ijbaa 2.00 180 000 8.00 640 000 350 100 000 920 000 975 200 Served population in System 17 (in 2035) : 1299 ‐Proposed distribution network for Ijbaa ‐Replacement of 2 km of old transmission lines ‐Additional required storage was proposed to meet the 2035 water needs requirements Beslouqit 6.00 540 000 275 85 000 1.00 500 000 1 125 000 1 192 500 Ehden 7.50 675 000 2000 + 500 + 250 + 1000 + 1000 835 000 1 510 000 1 600 600 System 19 Kafar Zeina 1.00 90 000 90 000 95 400 Served population in System 19 (in 2035): 3602 ‐Proposed transmission lines of 1 km System 20 Kfarsghab 1.00 90 000 1 000 200 000 290 000 307 400 Served population in System 20 (in 2035): 3150 ‐Proposed transmission lines of 1 km ‐Additional required storage was proposed to meet the 2035 water needs requirements Bchannine 2.00 180 000 250 85 000 265 000 280 900 Bsebaal - Kfaryachit 1.00 90 000 200 80 000 170 000 180 200 Morh Kfarsghab 1.50 135 000 250 85 000 220 000 233 200 Bhairet Toula 1.00 90 000 100 60 000 150 000 159 000 Toula Zgharta 0.50 45 000 250 85 000 130 000 137 800 For all Systems 15 000 000 Total Priority 1 103.80 9 342 000$ 131.00 10 480 000$ 42 5 120 000$ 10.00 5 000 000$ 2.00 650 000$ - -$ 30 592 000$ 47 427 520$ System 21 System 22 Served population in System 16 (in 2035) : 5649 ‐Proposed distribution network for Karm Saddé, Ras Kifa, Sebaal Zgharta ‐New transmission lines of 5 km and replacement of 8.5 km of old transmission lines ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. ‐Proposed pumping station in Sebaal Zgharta Served population in System 18 (in 2035) : 8573 ‐1 well with a flow of 10 l/s is proposed to cover the deficit of the water balance that occurs in 2030, with 7 km of new transmission lines and 6.5 km of renovated transmission lines ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. Served population in System 21 (in 2035) : 5736 ‐Proposed transmission lines of 4.5 km ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. Served population in System 22 (in 2035): 1039 ‐Proposed transmission lines of 1.5 km ‐Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs capacities in the villages. Remote Control And Monitoring Of Water Systems (SCADA And DMA) System 16 System 18 May 2020 - V B 14 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.G : Water North Lebanon - Tripoli Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Tripoli Tripoli 10.00 900 000 150.00 12 000 000 4.00 2 000 000 14 900 000 15 794 000 Served population in Tripoli (in 2035): 674187 Due to the salt water intrusion inside some existing wells, 4 wells are proposed to cover the water balance in the year 2035 with 10 km proposed lift lines for the proposed wells. Proposed 150 km of distribution networks to replace the old existing ones of more than 60 years old, in order to reduce losses. For all Systems 15 000 000 Total Priority 1 10.00 900 000$ 150.00 12 000 000$ - -$ 4.00 2 000 000$ - -$ - -$ 14 900 000$ 30 794 000$ Project Justification Remote Control And Monitoring Of Water Systems (SCADA And DMA) System Village Total Total with design and supervision May 2020 - V B 15 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.H : Water North Lebanon - Qobayate Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Dayret Nahr El-Kabir 250 + 350 185 000 1.00 350 000 535 000 Ouadi Khaled - - Qarha - - Hnaïder - - Al-Kneissé - 10.00 800 000 800 000 System 1 Mouanse - - 1.00 350 000 350 000 371 000 Served population in System 1 (in 2035): 1577 ‐Proposed pumping station Bsatine - Wata el Sahle - 1 000 200 000 200 000 Mrah el Khokh - Qenia - Sahle - 6.00 480 000 1.00 350 000 830 000 System 3 Akroum - 1.00 350 000 350 000 371 000 Served population in System 3 (in 2035): 10258 ‐ Proposed pumping station System 4 Andeket - - 1.00 350 000 350 000 371 000 Served population in System 4 (in 2035): 4725 ‐ Proposed pumping station System 5 Qatlabeh - - - Aaouainat - 10.00 800 000 50 50 000 850 000 Khalsa - - Khirbet Er Remmane - 10.00 800 000 800 000 Mazraet-El-Nahrieh 3.50 315 000 - 1 200 210 000 525 000 El-Bardé - 10.00 800 000 800 000 Al Moghrak - 10.00 800 000 800 000 El-Koubayet - 15.00 1 200 000 5 000 500 000 1 700 000 System 8 Aaidamoun 2.00 180 000 - 1 000 200 000 1.00 500 000 1.00 350 000 1 230 000 1 303 800 Served population in System 8 (in 2035): 5139 ‐ Proposed pumping station 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line System 9 Chadra 2.00 180 000 20.00 1 600 000 250 + 350 185 000 1.00 500 000 1.00 350 000 2 815 000 2 983 900 Served population in System 9 (in 2035): 8099 ‐ Proposed distribution networks for: Chadra ‐ Proposed pumping station 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line System 10 Machta Hammoud 6.00 540 000 35.00 2 800 000 2500 + 500 395 000 3.00 1 500 000 2.00 700 000 5 935 000 6 291 100 Served population in System 10 (in 2035): 15928 ‐ Proposed distribution networks for: Machta Hammoud ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Proposed pumping stations 3 wells with a flow of 10 l/s are proposed to cover the deficit with 6 km proposed lift lines System 11 Sindianet Zeidan 4.00 360 000 10.00 800 000 2.00 1 000 000 2 160 000 2 289 600 Served population in System 11 (in 2035): 7154 ‐ Proposed distribution networks for: Sindianet Zeidan ‐ Additional required storage was proposed to meet the 2035 water needs requirements 2 wells with a flow of 10 l/s are proposed to cover the deficit with 4 km proposed lift lines System 2 1 415 100 1 091 800 Served population in System 2 (in 2035): 11990 ‐ Proposed distribution network for Sahle ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Proposed pumping station 5 803 500 Served population in System 0 (in 2035): 51454 ‐ Proposed distribution networks for Al‐Kneisse ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Proposed pumping station Served population in System 6 and 7 (in 2035):17408 '‐ Proposed distribution networks for: Aouainat, Khirbet Er Remmane, El Barde, Al Moghrak ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Renovation OF the transmission lines in Mazraet El Nahrieh ‐ Proposed distribution networks for: El Koubayet Project Justification System 0 System 6 System Village Total Total with design and supervision May 2020 - V B 16 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.H : Water North Lebanon - Qobayate Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Project Justification System Village Total Total with design and supervision Freidice - 10.00 800 000 800 000 Daoucé et Baghdadi 2.00 180 000 10.00 800 000 1 000 200 000 1.00 500 000 1 680 000 El-Kousseir - - 500 120 000 120 000 Denké et El-Amriyeh - 15.00 1 200 000 500 120 000 1 320 000 Chikhlar - 10.00 800 000 350 100 000 900 000 Rmah - 10.00 800 000 800 000 System 15 Mounjez - - - System 16 Kfarnoune - 10.00 800 000 1 000 200 000 1 000 000 1 060 000 Served population in System 16 (in 2035): 607 ‐ Proposed distribution network for Kfarnoune ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Based on the water balance in summer for Kfarnoune, a deficit occurs since 2020. System 17 El-Kouachra 2.00 180 000 - 5 000 500 000 1.00 500 000 1 180 000 1 250 800 Served population in System 17 (in 2035): 6074 ‐ Based on the water balance in summer for El kouachra system, a deficit occurs since 2020. 1 well with a flow of 15 l/s is proposed to cover the deficit with 2 km proposed lift lines for the proposed well ‐ Additional required storage was proposed to meet the 2035 water needs requirements Dabbabiyé Charkié 2.00 180 000 10.00 800 000 1.00 500 000 1 480 000 Noura El-Faouka et Tahta - 15.00 1 200 000 1 200 000 Kachlak - - Omar el-Beikate 2.00 180 000 - 1.00 500 000 680 000 Wadi el-Haour - - Al-Mouzeihmé - - Haytla - - El-Tleil 2.00 180 000 - 500 120 000 1.00 500 000 800 000 Saïdnaya - - Janine - - Aarme - - Srar 2.00 180 000 - 100 60 000 1.00 500 000 740 000 El-Msallé - - 100 60 000 60 000 Aïn El-Zeit 2.00 180 000 11.00 880 000 500 120 000 1.00 500 000 1 680 000 Kafr - Charbila - 10.00 800 000 250 85 000 885 000 Aïn Tanta 2.00 180 000 11.00 880 000 300 90 000 1.00 500 000 1 650 000 Al-Rihanié 2.00 180 000 - 250 85 000 1.00 500 000 765 000 Douair Adouiyé - 10.00 800 000 500 120 000 920 000 Hmais - - 100 60 000 60 000 784 400 6 381 200 4 155 200 1 802 000 2 840 800 720 800 848 000 Served population in System 20 (in 2035): 5053 ‐ Additional required storage was proposed to meet the 2035 water needs requirements 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line Served population in System 21 (in 2035): 1309 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line Served population in System 22 (in 2035): 11173 ‐ Based on the water balance in summer for System 22, a deficit occurs since 2020. 3 wells each with a flow of 10 l/s are proposed to cover the deficit with 6 km proposed lift lines for the proposed wells ‐ Proposed distribution networks for: Ain El Zeit, Ain Tanta, Charbila, Douair Adouiye ‐ Additional required storage was proposed to meet the 2035 water needs requirements Served population in System 13 (in 2035): 5548 ‐ Proposed distribution networks for: Freidice, Daouce et Baghdadi, Denke et El‐Amriyeh ‐ Additional required storage was proposed to meet the 2035 water needs requirements 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line Served population in System 14 (in 2035): 2252 ‐ Based on the water balance in summer for system 14, a deficit occurs since 2020. 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km of proposed lift lines ‐ Proposed distribution networks for: chikhlar, rmah ‐ Additional required storage was proposed to meet the 2035 water needs requirements Served population in System 18 (in 2035): 4476 ‐Proposed distribution networks for: Dabbabiye Charkie and Noura El Faouka et Tahta 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed lift line System 22 System 13 System 14 System 18 System 19 System 20 System 21 Served population in System 19 (in 2035): 4882 ‐ Based on the water balance in summer for system 19, a deficit occurs since 2020. 1 well with a flow of 10 l/s is proposed to cover the deficit with 2 km proposed of lift lines. May 2020 - V B 17 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-W.H : Water North Lebanon - Qobayate Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Project Justification System Village Total Total with design and supervision Kherbet Daoud 5.00 450 000 10.00 800 000 1 000 200 000 1.00 500 000 1 950 000 Sfinet Ed-Draib Fseikine et Aïn Achma - 10.00 800 000 200 80 000 880 000 El-Daghlé - 10.00 800 000 200 80 000 880 000 Kherbet Char - 10.00 800 000 400 105 000 905 000 Majdel 4.00 360 000 10.00 800 000 5000 + 300 590 000 2.00 1 000 000 2 750 000 Barbara - 10.00 800 000 400 105 000 905 000 Deir-Janine - 10.00 800 000 800 000 Knissé - - Mazraat Baldé 2.00 180 000 - 1.00 500 000 680 000 El-Hed - 10.00 800 000 800 000 Al-Souaissé 4.00 360 000 - 100 60 000 2.00 1 000 000 1 420 000 El-Biré 4.00 360 000 10.00 800 000 2.00 1 000 000 2 160 000 Kfar Harra 3.00 270 000 10.00 800 000 200 80 000 1 150 000 For all Systems 15 000 000 Total Priority 1 57.50 5 175 000$ 368.00 29 440 000$ 35 5 265 000$ 24.00 12 000 000$ 9.00 3 150 000$ - -$ 55 030 000$ 73 331 800$ System 23, 24 and 12 16 196 800 Served population in System 23 (in 2035): 47275 ‐ Based on the water balance in summer for System 23, a deficit occurs since 2020. 6 wells each with a flow of 30 l/s are proposed to cover the deficit with 15 km proposed lift lines for the proposed wells ‐Proposed distribution networks for: Kherbet Daoud, Fseikine et Ain Achma, El Daghle, Kherbet Char, Majdel, Barbara, Deir Janine, El Hed ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Renovation in the transmission lines in Kherbet Daoud ‐ Proposed distribution networks for: El Bire ‐ Based on the water balance in summer for El Bire system, a deficit occurs since 2020. 2 wells with a flow of 25 l/s each are proposed to cover the deficit ‐ Proposed distribution networks for: Kfar Harra ‐ Additional required storage was proposed to meet the 2035 water needs requirements ‐ Renovation of the transmission lines in Kfar Harra Remote Control And Monitoring Of Water Systems (SCADA And DMA) May 2020 - V B 18 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-W.A : Water Beqaa Lebanon - Baalbeck Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Others Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Laboue Laboue 34.50 3 287 280 115.00 5 175 000 1 80 000 8 542 280 9 054 817 Served population for Labboue system (in 2020): 69472 Ouyoun Orgosh Ouyoun Orgosh 5.75 460 000 55.00 1 768 630 6 380 000 2.00 200 000 Rehabilitation of 26 Existing Reservoirs 1 085 000 3 893 630 4 127 248 Served population for Ouyoun Orgosh system (in 2020): 42195 Qarha Well Need Rehabilitation and to be putted in service Kneisseh Well to be equipped. Younine, Maqne & Nahle Younine, Maqne & Nahle 20.25 2 459 860 25.00 1 125 000 1 200 000 1.00 400 000 4 184 860 4 435 952 Served population for Younine, Maqne and Nahle system (in 2020): 32211 Yammouneh Yammouneh 7.25 568 490 65.00 2 411 455 1 120 000 4.00 950 000 Rehabilitation of 24 Existing Reservoirs+ Rehabilition of Networks 1 967 464 6 017 409 6 378 454 Served population for Yammouneh system (in 2020): 64244 3 wells to be equipped and one new well to be executed. Yahfoufa-Ain Sikkeh Yahfoufa-Ain Sikkeh 6.40 1 702 690 4.00 180 000 2 140 000 1.00 500 000 2 522 690 2 674 051 Served population for Yahfoufa-Ain Sikkeh system (in 2020): 2485 persons No existing network For all Systems 15 000 000 Total Priority 1 74.15 8 478 320$ 264.00 10 660 085$ 11 920 000$ 7.00 1 550 000$ 1.00 500 000$ - 3 052 464$ 25 160 869$ 41 670 521$ Priority 2 Aarsal Aarsal 16.00 1 607 650 50.00 2 250 000 15.00 6 250 000 10 107 650 10 714 109 Served population for Aarsal system (in 2020): 49420 Ouyoun Orgosh Village Ouyoun Orgosh Village Rehabilitation of 1 Existing Reservoir 45 000 45 000 47 700 Served population for Ouyoun Orgosh village system (in 2020): 500 Yammouneh Village Yammouneh Village 0.50 33 500 1.00 45 000 1.00 300 000 378 500 401 210 Served population for Yammouneh village system (in 2020): 4450 Halbata - El Kharayeb Halbata - El Kharayeb 3.00 201 000 6.75 303 750 504 750 535 035 Served population for Halbata - El Kharayeb system (in 2020): 2675 Fekha & Jdaide Fekha & Jdaide 4.00 572 000 8.50 382 500 4.00 1 800 000 2 754 500 2 919 770 Served population for Fekha & Jdaide system (in 2020): 17452 Baalbeck, Aamechki & Ain Bourday Baalbeck, Aamechki & Ain Bourday 3.00 1 500 000 1 500 000 1 590 000 Served population for Baalbeck, Aamechki & Ain Bourday system (in 2020): 96810 Separate Systems Separate Systems 3.25 129 150 20.00 900 000 Rehabilitation of 13 Existing Reservoirs 1 140 000 2 169 150 2 299 299 Served population for Miscellaneous Separate System (in 2020): 146888 Total Priority 2 26.75 2 543 300$ 86.25 3 881 250$ - -$ 23.00 9 850 000$ - -$ - 1 185 000$ 17 459 550$ 18 507 123$ Project Justification Remote Control And Monitoring Of Water Systems (SCADA And DMA) System Village Total Total with design and supervision May 2020 - V B 19 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-W.B : Water Beqaa Lebanon - Hermel Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Hermel Upper, Ras El Mal & Ain Zarqa Spring Hermel Upper, Ras El Mal & Ain Zarqa Spring 10.00 1 828 300 71.00 4 385 440 5 885 000 3.00 159 600 1.00 1 000 000 Ras El Mal Spring rehabilitation Rehabilitaion of existing networks inside hermel Rehabilitation of existing reservoirs (3*2000m3) 1 285 000 9 543 340 9 829 640 Served population for Hermel Upper, Ras El Mal & Ain Zarqa Spring system (in 2020): 56625 PS (Q=32l/s; TDH=380m) 5 Reservoirs (3*1500+2*500) Ain El Haour Spring Ain El Haour Spring 22.50 1 670 400 40.00 1 586 540 4 320 000 1.00 700 000 4 276 940 4 405 248 Served population for Ain el Haour spring system (in 2020): 8245 PS (Q=33l/s; TDH=250m) 4 reservoirs (2*100+1*200+1*500) For all Systems 15 000 000 Total Priority 1 32.50 3 498 700$ 111.00 5 971 980$ 9 1 205 000$ 3.00 159 600$ 2.00 1 700 000$ - 1 285 000$ 13 820 280$ 29 234 888$ Priority 2 Naanaah-El Kharbe & El Wardeh Springs Naanaah-El Kharbe & El Wardeh Springs 14.50 931 000 13.00 507 500 4 240 000 1 678 500 1 728 855 Served population for Naanaah-El Kharbe & El Wardeh Springs system (in 2020): 3055 4 Reservoirs (4*100) Beit Et Tochem + El Charqe+Mazraat Chelman Beit Et Tochem + El Charqe+Mazraat Chelman 1.00 67 000 9.00 397 500 1 70 000 1.00 200 000 734 500 756 535 Served population for Beit Et Tochem + El Charqe+Mazraat Chelman system (in 2020): 1137 1 Reservoir (1*150) No existing network Ouadi En Naira Ouadi Bnit-Zouetini, Wadi El karem & Kaeb Wadi El Karem Ouadi En Naira Ouadi Bnit-Zouetini, Wadi El karem & Kaeb Wadi El Karem 4.50 301 500 12.00 539 793 2 170 000 Ouadi En Naira Existing Well: equipment and construction of control room in Ouadi En Naira. Zoueitini Existing Well Pumping Station: rehabilitation and development 500 000 1 511 293 1 556 632 Served population for Ouadi En Naira Ouadi Bnit-Zouetini, Wadi El karem & Kaeb Wadi El Karem system (in 2020): 1949 2 Reservoirs (1*200+1*300) Ouadi Faara Mrah El Aaqbet Ouadi Faara Mrah El Aaqbet 8.00 334 900 334 900 344 947 Served population for Ouadi Faara Mrah El Aaqbet system (in 2020): 102 No existing network Maabour Spring Maabour Spring 21.00 1 434 225 5.20 204 875 1 60 000 1 699 100 1 750 073 Served population for Maabour Spring system (in 2020): 2882 1 Reservoir (1*100) Lezabbe Spring Lezabbe Spring 15.50 1 066 295 1 90 000 1.00 365 000 1 521 295 1 566 934 Served population for Lezabbe Spring system (in 2020): 4158 PS (Q=17l/s; TDH=170m) 1 Reservoir (1*300) Total Priority 2 56.50 3 800 020$ 47.20 1 984 568$ 9 630 000$ 1.00 200 000$ 1.00 365 000$ - 500 000$ 7 479 588$ 7 703 976$ Priority 3 Kouakh Kouakh Rehabilitation of Existing Well Pumping Station 250 000 250 000 257 500 Served population for Kouakh system (in 2020): 1550 Kouakh & Fissane Kouakh & Fissane Construction of Pumping Station for Existing Well 500 000 500 000 515 000 Served population for Kouakh & Fissane system (in 2020): 2357 El Qasr El Qasr 1.00 250 000 250 000 257 500 Served population for El Qasr system (in 2020): 9849 Additional well is needed, there is an existing operational system Marjahin Marjahin Rehabilitation of Marjahine Pumping Station 500 000 500 000 515 000 Agricultural area (PS intended to be used for irrigation) It can be used to irrigate Charbine region Total Priority 3 - -$ - -$ - -$ 1.00 250 000$ - -$ - 1 250 000$ 1 500 000$ 1 545 000$ Remote Control And Monitoring Of Water Systems (SCADA And DMA) Others Project Justification System Village Total Total with design and supervision May 2020 - V B 20 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-W.C : Water Beqaa Lebanon - West Beqaa, Zahleh and Rachaiya Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Es Salamieh 100m3 60 000 60 000 63 600 Dalhamiye 1 300.00 104 000 17 285.00 1 382 800 300m³ 90 000 1 576 800 1 671 408 Terbol 1000 m³ 200 000 200 000 212 000 Tannoura 500 m³ 120 000 120 000 127 200 Beit Lahia 2 000.00 160 000 1.00 500 000 660 000 699 600 Ain Zarka - Machghara system Machghara 2 000.00 160 000 1.00 500 000 660 000 699 600 Ain Zarka - Baaloul system Sohmor 2 000.00 160 000 1.00 500 000 660 000 699 600 Deir El Achayer system Deir El Achayer 2 000.00 160 000 1.00 500 000 660 000 699 600 Served population in Deir El Achayer system (in 2035): 2055 Based on the water balance, a deficit occurs since 2020 (-112 m³/d deficit in 2020). One well is proposed to cover the deficit with 2 km proposed transmission lines for the proposed well. Ryak system Ryak 6 000.00 480 000 3.00 1 500 000 1 980 000 2 098 800 Served population in Ryak system (in 2035): 32282 Based on the water balance, a deficit occurs since 2020 (-1999m³/d deficit in 2020). Three wells with are proposed to cover the deficit with 6 km proposed transmission lines for the proposed wells. Ablah system Ablah 2 000.00 160 000 1.00 500 000 660 000 699 600 Served population in Ablah system (in 2035): 14670 Based on the water balance, a deficit occurs since 2020 (-1101 m³/d deficit in 2020). One well is proposed to cover the deficit with 2 km proposed transmission lines for the proposed well. Ain Ata system Ain Ata 20 700.00 1 656 000 1 656 000 1 755 360 Served population in Ain Ata system (in 2035): 4695 New water distribution pipelines are proposed for Ain Ata village Fourzol system Fourzol 2 000.00 160 000 1.00 500 000 660 000 699 600 Served population in Fourzol system (in 2035): 15858 Based on the water balance, a deficit occurs since 2020 (-1279 m³/d deficit in 2020). One well is proposed to cover the deficit with 2 km proposed transmission lines for the proposed well. For all Systems 15 000 000 Total Priority 1 19 300.00 1 544 000$ 37 985.00 3 038 800$ - 470 000$ 9.00 4 500 000$ - -$ - -$ 9 552 800$ 25 125 968$ Project Justification Served population in Chamsine system (in 2035): 212888 Since the total capacities of the existing reservoirs in the villages (Dalhamiye and Terbol) are not sufficient to cover the future demands, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on the future water needs taking into consideration the existing reservoirs' capacities. Already designed reservoirs in Es Salamieh and Dalhamiyeh are proposed as well as a new reservoir for Terbol. A new distribution network is proposed with 1.3 km new transmission lines for Dalhamiye Served population in Ain Zarka system (in 2035): 178305 Since the total capacities of the existing reservoirs in the village (Tannoura) are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs' capacities. Ain Zarka distribution networks are already designed. Ain Zarka pumping station was designed to feed all the region. However, the operation of this pumping station remains a big issue for the concerned authorities. Therefore, additional wells are proposed as another alternative to cover Ain Zarka system needs. Scenario 1 : Supplying water from Ain Zarka spring Scenario 2 : Machghara well , Dahr El Ahmar well, Rafid well, Beit Lahia well and Sohmor well are proposed to cover the deficit that occurs in this system (along with 2 km proposed transmission lines). System Chamsine system Ain Zarka - Jabal el Arabi system Village Others Total Total with design and supervision Remote Control And Monitoring Of Water Systems (SCADA And DMA) May 2020 - V B 21 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-W.C : Water Beqaa Lebanon - West Beqaa, Zahleh and Rachaiya Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Project Justification System Village Others Total Total with design and supervision Priority 2 Ain El Tineh 4 500.00 360 000 360 000 381 600 Maidoun 9 000.00 720 000 720 000 763 200 Lebbeya 4 500.00 360 000 360 000 381 600 Qaraoun 3 000.00 240 000 500 m³ 120 000 360 000 381 600 Qelia 6 500.00 520 000 520 000 551 200 Sohmor 20 000.00 1 600 000 1 600 000 1 696 000 Yohmor 7 500.00 600 000 600 000 636 000 Zelleya 3 000.00 240 000 240 000 254 400 Bireh 5 000.00 400 000 400 000 424 000 Aazzi 16 000.00 1 280 000 500m³ 120 000 1 400 000 1 484 000 Dahr El Ahmar 2 000.00 160 000 16 000.00 1 280 000 1.00 500 000 1 940 000 2 056 400 Er Rafid 2 000.00 160 000 19 000.00 1 520 000 1.00 500 000 2 180 000 2 310 800 Kfardenis 25 000.00 2 000 000 2 000 000 2 120 000 Kherbet Rouha 35 000.00 2 800 000 2 800 000 2 968 000 Mdoukha 20 000.00 1 600 000 1 600 000 1 696 000 Mhaydtheh 29 000.00 2 320 000 2 320 000 2 459 200 Ain Arab 4 000.00 320 000 320 000 339 200 Kfarmechki 1 500.00 120 000 120 000 127 200 Extension of the existing water network is needed to cover Kfarmechki village Bab Mareh System Bab Mareh 1 000.00 80 000 100m³ 60 000 140 000 148 400 Served population in Bab Mareh system (in 2035): 785 Extension of the existing water network in Bab Mareh is needed. Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs' capacities. Chamsine system Aita El Fokhar 1 000.00 80 000 80 000 84 800 Extension of the existing water network is needed to cover Aita El Fokhar village Niha system Niha 11 500.00 920 000 920 000 975 200 Served population in Niha system (in 2035): 3572 Replacement of the water distribution network in Niha village is proposed. Kfarqouq system Kfarqouq 1 000.00 80 000 80 000 84 800 Served population in Kfarqouq system (in 2035): 4695 Extension of the existing water network is needed to cover Kfarqouq village Yanta system Yanta 500.00 40 000 300 m³ 90 000 130 000 137 800 Served population in Yanta system (in 2035): 4695 Extension of the existing water network is needed to cover Yanta village Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs' capacities. (One proposed reservoir for Yanta) Bouareij system Bouareij 500 m³ 120 000 120 000 127 200 Served population in Bouareij system (in 2035): 10504 Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs' capacities. (One proposed reservoir for Bouareij) Since the total capacities of the existing reservoirs in the village (Qaraaoun) are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs' capacities. Extensions of the distribution network are proposed in order to cover all regions (in Ain El Tine, Maisoun, Lebbeya, Qaraoun, Qelia, Sohmor, Yohmor, Zelleya) Proposed new reservoir in Azzi Ain Zarka distribution networks are already designed. Ain Zarka pumping station was designed to feed all the region. However, the operation of this pumping station remains a big issue for the concerned authorities. Therefore, additional wells are proposed as another alternative to cover Ain Zarka system needs. Scenario 1 : Supplying water from Ain Zarka spring Scenario 2 : Machghara well , Dahr El Ahmar well, Rafid well, Beit Lahia well and Sohmor well are proposed to cover the deficit that occurs in this system (along with 2 km proposed transmission lines). Ain Zarka - Machghara system Ain Zarka - Baaloul system Ain Zarka - Jabal el Arabi system May 2020 - V B 22 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-W.C : Water Beqaa Lebanon - West Beqaa, Zahleh and Rachaiya Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Project Justification System Village Others Total Total with design and supervision Fourzol system Fourzol 1000 m³ 200 000 200 000 212 000 Served population in Fourzol system (in 2035): 15858 Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs' capacities. (One proposed reservoir for Fourzol) Ablah system Ablah 3 000.00 240 000 500m³ 120 000 360 000 381 600 Served population in Ablah system (in 2035): 14670 Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs' capacities. (One proposed reservoir for Ablah with 3 km of transmission lines) Saadnayel 2 000.00 160 000 1000 m³ 200 000 360 000 381 600 Taalabaya 2 000.00 160 000 1000 m³ 200 000 360 000 381 600 Taanayel 100m³ 100 000 100 000 106 000 Total Priority 2 11 000.00 880 000$ 243 500.00 19 480 000$ - 1 330 000$ 2.00 1 000 000$ - -$ - -$ 22 690 000$ 24 051 400$ Served population in Jdita system (in 2035): 92841 Since the total capacities of the existing reservoirs in the village are not sufficient to cover the future demands, new reservoir is proposed for more water storage. The proposed reservoir capacity was calculated based on the future water needs taking into consideration the existing reservoirs' capacities. (One proposed reservoir for Saadnayel and Taalabaya with 4 km of transmission lines and one proposed reservoir for Taanayel) Jdita system May 2020 - V B 23 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-W.A : Water South Lebanon - Nabatiye (USD) Priority 1 Construction of Aalman pumping system 6 300 000 Rehabilitation and upgrading of Aalman Zawtar Eh Charqiye pumping system 500 000 Rehabilitation and upgrading of Nabaa El Tasse pumping system 900 000 Rehabilitation and upgrading of Fakhr El Din water system 2 400 000 Rehabilitation and upgrading of El Rejem water system 1 100 000 Rehabilitation and upgrading of Kfar Roummane pumping system 800 000 Construction of a new WTP at Yohmor 13 000 000 New transmission line from Taybe intake to Yohmor new WTP 3 000 000 Construction of the Arnoun Yohmor regional reservoir at Yohmor. 200 000 Construction of the gravity line connecting yohmor Reg. Res. and WTP with localities reservoirs of Yohmor and Arnoun 200 000 Construction of the gravity line connecting yohmor Reg. Res. and WTP with nabatieh reservoirs and Aadchit reg. Res. 1 600 000 Construction of Galle water system 8 900 000 Construction of the regional reservoir at Kfar Tibnit Regional reservoir 1 000 000 Construction of the gravity line connecting the regional reservoir of Nabatiye-Kfartibnit to the regional reservoirs, the locality reservoir of and to the localities reservoirs of Choukine, Maifadoun and Qaaqaiet Ej Jisr 5 700 000 Construction of gravity lines to supply the localities reservoirs of the Nabatiye Kfar Tibnit sub system (Kfar Tibnit, Nabatiye El Faouqa and Nabatiye El Tahta) from Nabatiye Kfar Tibnit regional reservoir 800 000 Construction of the winter gravity conveyor line to supply Zahrani and Nabatiye areas during the winter period 11 100 000 Nabatiye Water Supply system Expansion and upgrade of water supply networks in the Caza of Nabatiye including 20 reservoirs and 320km of pipelines 14 400 000 For all villages in the System Remote Control And Monitoring Of Water Systems (SCADA And DMA) 15 000 000 Total Priority 1 86 900 000$ Priority 2 Construction of the Northern regional reservoir at Jarjouaa 500 000 Construction of gravity lines to supply the localities reservoirs of the Northern sub-system (Aarab Salim, Deir El Zahrani, Habbouch, Jarjouaa, Kfar Roummane and Kfaroue) from the Northern reservoir 1 600 000 Construction of the Middle regional reservoir at Zebdine (Jabal Al Ahmar) 300 000 Construction of gravity lines to supply the localities reservoirs of the Middle sub-system (Aabba, Harouf, Jibchit, Choukine, and Maifadoun) from the Middle regional reservoir 2 000 000 Construction of the Southern regional reservoir at Aadchit Kfar Dajjal 400 000 Construction of gravity lines to supply the localities reservoirs of the Southern sub-system (Aadchit, Braiqaa, El Qsaibe, Kfar Sir, Qaaqaiet Ej Jisr and Sir El Gharbiye) from the Southern regional reservoir 3 100 000 Total Priority 2 7 900 000$ Nabatiye Main Water Sources, Regional Reservoirs and Transmission Lines Nabatiye Main Water Sources, Regional Reservoirs and Transmission Lines Total with design and supervision Project Justification System Project Description Nabatiye System The served population of Nabatiye system entirely in 2020 is 353107 . The water needs of Nabatiye system entirely in 2020 are: 71709 m3/d. The served population of Nabatiye system entirely in 2035 is 476645. The water needs of Nabatiye system entirely are: 75949 m3/d while the major resources available (excluding public localities wells) are 53088 m3/d resulting in a deficit of 22861 m3/d. That explains the need for the following works : New pumping station in Aalman to cover the projected deficit in water demand. New pumping station in Ghalle to cover the projected deficit in water demand. 5 new regional reservoirs (Arnoun Yohmor regional reservoir, Kfar Tibnit regional reservoir, Northern regional reservoir Middle regional reservoir and Southern regional reservoir) in addition to other local reservoirs in designated localities. Construction of all gravity and pumping lines from proposed regional reservoirs to existing and/or proposed reservoirs. Rehabilitiation and upgrade of 5 pumping stations which are: Aalman-Zawtar El Charqiye P.S., Fakhr El Din P.S., Nabaa el Tasse P.S., Kfar Roummane P.S. and El Rejem P.S.) in order to cover the increasing demand. May 2020 - V B 24 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-W.B : Water South Lebanon - Jezzine (USD) Priority 1 Ain Toghra proposed reservoir (adjacent to the existing): The proposed scheme consists of pumping 1 MCM of the Bisri Dam water (after being treated at Bisri) up to Ain Toghra proposed reservoir (adjacent to the existing) 3000 m3 300 000 Sfaray regional reservoir : to be located in the outskirts of Sfaray , will be supplied from the Bisri Dam during summer; in winter from any available resources from Jezzine Division 3500 m3 350 000 Bisri – Qtale pumping transmission line with Qtale Regional reservoir and treatment plant: 350 mm transmission pumping line from bisri dam to Qtale village, a raw water treatment plant. And the construction of a 12,000m3 regional reservoir to treat and store the water from the dam. 7 450 000 Qtale – Kfar Falous Gravity Transmission Line (Lot 2): 400mm gravity transmission pipeline from Qtale regional reservoir to Kfar Falous sub regional reservoir 3 000 000 Utilization, Capture, Protection and Regulation of Major Springs: Ain Qobays, Aazibe Faouqa and Ain Zarka 1 250 000 Jezzine Water Supply system Expansion and upgrade of water supply networks in the Caza of Jezzine, including construction of 8 reservoirs and 75km of pipelines. 4 200 000 For all villages in the System Remote Control And Monitoring Of Water Systems (SCADA And DMA) 15 000 000 Total Priority 1 31 550 000$ Jezzine Main Water Sources, Regional Reservoirs and Transmission Lines Project Justification System Project Description Total with design and supervision Ain Toghra system: The served population of Ain Toghra system in 2020 is 18013 . The water needs of Ain Toghra system in 2020 are: 3242 m3/d. The served population of Ain Toghra system in 2035 is 24315. The water needs of Ain Toghra system in 2035 are: 5106 m3/d. The sources available in Ain Toghra system are not enough to cover the demand projected for 2035. That explains the need to pump a specific volume from the Bisri Dam water (post-treatment) to the following localities: Ain Toghra, Sfaray, Qtale. Followingly, to accomodate this future water supply, the existing storage capacity must be upgraded through the construction of Ain Toghra proposed reservoir (3000m3), Sfaray regional reservoir (3500m3) and Qtale regional reservoir (12,000m3) & treatment plant (with all necessary transmission lines). May 2020 - V B 25 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-W.C : Water South Lebanon - Sour (USD) Priority 1 Rehabilitation of Ras El Ain Treatment plant and pumping station 7 500 000 Rehabilitation of Ouadi Jilou PS1 pumping station 6 000 000 Construction of Ouadi Jilou PS1 - Chhabiye Lift line 1 200 000 Rehabilitation of Ech Chhabiye Pumping station 1 350 000 Rehabilitation of Kafra Pumping station 900 000 Rehabilitation of Siddiquin Pumping station 1 500 000 Rehabilitation of Batoulay Pumping station 3 500 000 Rehabilitation of Ouadi Jilou PS2 Pumping station 2 500 000 Construction of Batoulay - Siddiquin Lift line 1 800 000 Construction of Borj El chmali Pumping station and Lift Line to Regional Reservoir 1 200 000 Construction of Ech Chhabiye - Kfardounin Lift Line 500 000 Construction of gravity Lines from Kfardounin regional to the localities reservoirs 3 000 000 Construction of gravity lines from Maaroub regional reservoir to the localities reservoirs 2 500 000 Rehabilitation of El Bass pumping station and treatment plant 4 000 000 Construction of Haddetha Regional Reservoir 3000 m3 320 000 Construction of Ramya Pumping station, lift lines and gravity lines 2 500 000 Sour Water Supply system Expansion and upgrade of water supply networks in the Caza of Sour, including construction of 30 reservoirs and 350km of pipelines. 21 575 000 For all villages in the System Remote Control And Monitoring Of Water Systems (SCADA And DMA) 15 000 000 Total Priority 1 76 845 000$ Sour Main Water Sources, Regional Reservoirs and Transmission Lines Total with design and supervision Project Justification System Project Description Sour System: The served population of Sour system entirely in 2020 is 639703 . The water needs of Sour system entirely in 2020 are: 129909 m3/d while the major resources available (including public localities wells) are 121186 m3/d resulting in a deficit of 8723 m3/d. The served population of Sour system entirely in 2035 is 863511. The water needs of Sour system entirely in 2035 are: 166168 m3/d while the major resources available (including public localities wells) are 121186 m3/d resulting in a deficit of 44982 m3/d. That explains the need for the following works: Rehabilitation of 8 pumping stations which are: Ras El Ain P.S. (and treatment plant), Ouadi Jilo P.S. 1, Ech Chehabiye P.S., Kafra P.S., Saddiqine P.S., Batoulay P.S., Ouadi Jilo P.S. 2 and El Bass P.S. (and treatment plant) in order to cover the increasing demand. Construction of 4 lift lines which are: Ouadi Jilo PS1 - Chehabiye lift line, Batoulay - Saddiqine lift line, Borj Ech Chemali lift line to the regional reservoir and Ech Chehabiye - Kfar Dounine lift line in order to meet the projected needs. Construction of gravity lines from from Kfar Dounine regional reservoir to locality reservoirs in order to meet the projected needs. Construction of gravity lines from from Maaroub regional reservoir to locality reservoirs in order to meet the projected needs. Construction of 2 new pump stations which are: Borj Ech Chemali P.S. and Ramya P.S. (with all necessary lift and gravity lines). Construction of Haddatha regional reservoir of 3000 m3 capacity to cover the increasing storage demand. May 2020 - V B 26 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-W.D : Water South Lebanon - Zahrani (USD) Priority 1 Construction of El Brak pumping system (Wells, E&M, Civil works) 3 100 000 Construction of the lift line from El Brak to Ghassaniye regional reservoir (Civil, and accessories). 4 500 000 Construction of the regional reservoir at Ghassaniyeh 700 000 Construction of the gravity line connecting the regional reservoir of Ghassaniyeh with the existing pipe 700 000 Construction of the lift line from El Brak to Ghazie regional reservoir. 2 000 000 Rehabilitation and upgrade of Teffahta pumping system (Wells, E&M, Civil works). 900 000 Construction of gravity lines to supply the localities reservoirs of the middle sub-system (Kaoutariet Es Siyad, Khartoum ) from Ech Charqiye regional reservoir 400 000 Construction of gravity lines to connect the existing pipes between Zefta and El Merouaniye. 200 000 Northern and Eastern Sub-system: The served population of the Northern and Eastern Sub-systems in 2020 is 75757. The water needs of the Northern and Eastern Sub-systems in 2020 are: 15386 m3/d The served population of the Northern and Eastern Sub-systems in 2035 is 102261. The water needs of the Northern and Eastern Sub-systems in 2035 are:19678 m3/d The sources available in the Northern and Eastern Sub-systems (Teffahta wells & other public wells) are not enough to cover the demand projected for 2035, therefore Teffahta P.S. must be rehabilitated in order to cover the projected needs/deficit. The capacity of the existing reservoirs is not enough to cover the future demand of the village, therefore the storage capacity of Ech Charqiyeh regional reservoir must be upgraded. Construction of the gravity line to supply the regional reservoir of Ez Zrariyeh from Ech Charqiyeh (constructing of about 8000m to connect the regional reservoir of Ez Zrariye with the existing line at Insar ) 2 300 000 Construction of gravity lines to supply the localities reservoirs of the southern sub-system from Ez Zrariyeh regional reservoir 2 100 000 Construction of Arzai pumping system (2 wells, and pump sets to Ez Zrariye) along with adloun P.S. and the lift lines from Arzai to Adloun to El Ghassaniye 12 300 000 Construction of the lift line from Arzai P.S. to Ez Zrariye regional reservoir. 2 100 000 Zahrani Water Supply system Expansion and upgrade of water supply networks in the Caza of Zahrani, including construction 15 reservoirs and 150 km of pipelines. 7 200 000 For all villages in the System Remote Control And Monitoring Of Water Systems (SCADA And DMA) 15 000 000 Total Priority 1 53 500 000$ Priority 2 Upgrade the storage capacity of Ech Charqiyeh regional reservoir. 400 000 Upgrade the storage capacity of Teffahta regional reservoir. 300 000 Upgrade of the regional reservoir at Ez Zrarie 2 100 000 Replacement of the gravity line to supply the regional reservoir in Ez Zrariyeh from Ech Charqiyeh 1 900 000 Total Priority 2 4 700 000$ Total with design and supervision Project Justification Zahrani Main Water Sources, Regional Reservoirs and Transmission Lines Zahrani Main Water Sources, Regional Reservoirs and Transmission Lines System Project Description Coastal Sub-system: The served population of the Coastal Sub-system in 2020 is 72684. The water needs of the Coastal Sub-system in 2020 are: 14762 m3/d The served population of the Coastal Sub-system in 2035 is 98113. The water needs of the Coastal Sub-system in 2035 are: 18880 m3/d The existing storage in the Coastal Sub-system is only restricted to local reservoirs in each designated locality. The capacity of the existing reservoirs is not enough to cover the future demand of the village. The sources available in the Coastal Sub-system (Teffahta wells & other public wells) are not enough to cover the demand projected for 2035. No regional reservoir exists in the sub-system, therefore it is proposed to construct a regional reservoir in Ghassaniye of capacity 7500m3 by the year 2050. El Brak locality suffers from a large deficit in water supply, therefore 3 wells will be drilled alongside a pump station (Brak P.S.). Ghazie locality suffers from a large deficit in water supply, and although its cadastral limit falls within Saida Caza, a lift line from El Brak P.S. will be constructed to supply Ghazie regional reservoir at a rate of 100 l/s. Middle Sub-system: The served population of the Middle Sub-system in 2020 is 34498. The water needs of the Middle Sub-system in 2020 are: 7006 m3/d The served population of the Middle Sub-system in 2035 is 46567. The water needs of the Middle Sub-system in 2035 are: 8961 m3/d The sources available in the Middle Sub-system (Teffahta wells & other public wells) are not enough to cover the demand projected for 2035, therefore Teffahta P.S. must be rehabilitated in order to cover the projected needs/deficit. The capacity of the existing reservoirs is not enough to cover the future demand of the village, therefore the storage capacity of Teffahta regional reservoir must be upgraded. Southern Sub-system: The served population of the Southern Sub-system in 2020 is 33445. The water needs of the Southern Sub-system in 2020 are: 6792 m3/d The served population of the Southern Sub-system in 2035 is 45146. The water needs of the Southern Sub-system in 2035 are: 8688m3/d The capacity of the existing reservoirs is not enough to cover the future demand of the village, therefore the storage capacity of Ez Zrariye regional reservoir must be upgraded. In order to cover the projected water demand/deficit, Arzai P.S. will be constructed alongside 2 wells. May 2020 - V B 27 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-W.E : Water South Lebanon - Saida (USD) Priority 1 Transmission Twin Pipeline From Nabaa El Tasse to Houmine El Fawka: Twin 450mm pipelines conveying water from Nabaa El Tasse to Houmine El Fawka bifurcation. 4 000 000 Houmine El Fawka Reservoir and Pipeline: A 100 mm branch from the twin 450mm connection 90 000 Houmine El Fawka Reservoir and Pipeline: A reservoir composed of two compartments to be implemented. The capacity of each compartment is 1,000 m3. 600 000 Sarba Sub Regional Reservoir and Pipeline: A 300 mm pipeline from the twin 450mm connection, until the proposed reservoir. 575 000 Sarba Sub Regional Reservoir and Pipeline: A reservoir composed of two compartments to be implemented. The capacity of each compartment is 2,500 m3. 1 200 000 Kfar Melki Sub Regional Reservoir and Pipeline: A 400 mm pipeline from the twin 450mm connection (Houmine El Fawka bifurcation), until the bifurcation to Kfar Melki. 2 200 000 Kfar Melki Sub Regional Reservoir and Pipeline: A 250 mm pipeline from the bifurcation till the proposed sub regional reservoir. 135 000 Kfar Melki Sub Regional Reservoir and Pipeline: A reservoir composed of two compartments to be implemented. The capacity of each compartment is 1,000 m3. 600 000 Small Retention Dam Ein Bou Younes – Kfar Melki 2 500 000 Barti Reservoir and Pipeline: A 400 mm pipeline from the Kfar Melki bifurcation to Barti bifurcation. 1 250 000 Barti Reservoir and Pipeline: A 100 mm pipeline from Barti bifurcation until the proposed reservoir 450 m3. 135 000 Pipeline to Kfar Falous Sub Regional Reservoir from Barti Bifurcation: A 400 mm pipeline from Barti bifurcation to Kfar Falous Sub Regional reservoir. 1 550 000 Construction of Kfar Falous sub-regional reservoir 500 000 Inspection and Rehabilitation of Serail 1 Well 150 000 Inspection and Rehabilitation of Faouar 5 and Faouar 6 Wells 300 000 Rehabilitation/upgrading of existing Faouar Water Treatment Plant 1 500 000 Investigation of Potential Seawater Intrusion – Serail Pumping Station and Faouar Pumping Stations 3 500 000 Inspection, Rehabilitation, and Testing of Saidoun 1 Well. 150 000 Majdelyoun and Saidoun wells: Existing Saidoun 1 well in poor condition. Anane – Lebaa Rehabilitation/Upgrade of Existing Irrigation and Domestic System 415 000 Existing Anane–Lebaa Irrigation and Domestic System in poor condition. The system must be upgraded to meet the projected/increasing needs. Utilization, Capture, Protection and Regulation of Major Springs: Kfaroue 150 000 Utilization Capture Protection and Regulation of Oum Chemmas Spring 150 000 Saida Water Supply system Expansion and upgrade of water supply networks in the Caza of Saida, including construction of 34 reservoirs and 145km of pipelines. 9 720 000 For all villages in the System Remote Control And Monitoring Of Water Systems (SCADA And DMA) 15 000 000 Total Priority 1 46 370 000$ Saida Main Water Sources, Regional Reservoirs and Transmission Lines Total with design and supervision Project Justification System Project Description Nabaa El Tasse Sub-system: The served population of Houmine El Faouqa locality in 2020 is 4256. The water needs of Houmine El Faouqa in 2020 are: 766 m3/d The served population of Houmine El Faouqa in 2035 is 5745. The water needs of Houmine El Faouqa in 2035 are 1207m3/d while the sources available are 149 m3/d resulting in a deficit of 1057m3/d. That explains the need to install a 100mm branch from the twin 450mm connection of Nabaa el Tasse and therefore expand the existing storage capacity of Houmine El Faouqa by 2000m3 (two reservoirs of 1000m3 each). The served population of Sarba locality in 2020 is 2301. The water needs of Sarba in 2020 are: 414 m3/d The served population of Sarba in 2035 is 3106. The water needs of Sarba in 2035 are 652m3/d while the sources available are 149 m3/d resulting in a deficit of 503m3/d. That explains the need to install a 300 mm pipeline from the twin 450mm connection of Nabaa El Tasse and therefore expand the existing storage capacity of Sarba by 5000m3 (two reservoirs of 2500m3 each). Kfar Melki system: The served population of Kfar Melki locality in 2020 is 4774. The water needs of Kfar Melki in 2020 are: 859 m3/d The served population of Kfar Melki in 2035 is 6444. The water needs of Kfar Melki in 2035 are 1353m3/d while the sources available are 2421m3/d resulting in a surplus of 1068m3/d. That explains the need to expand the existing storage capacity by constructing a sub-regional reservoir of 2000m3 capacity (two compartments of 1000m3 each) as well as all necessary transmission lines from this P.S. Barti system: The served population of Barti locality in 2020 is 1415. The water needs of Barti and Sfenta localities in 2020 are: 260 m3/d The served population of Barti locality in 2035 is 1910. The water needs of Barti and Sfenta localities in 2035 are 409m3/d while the sources available are 890m3/d resulting in a surplus of 481m3/d. That explains the need to expand the existing storage capacity by constructing reservoir of 450m3 capacity (with all necessary transmission lines from this P.S.). Kfar Falous system: The served population of Kfar Falous locality in 2020 is 224. The water needs of Kfar Falous, Ouadi El-Laymoun and Mharbiye localities in 2020 are: 210 m3/d The served population of Kfar Falous locality in 2035 is 303. The water needs of Kfar Falous, Ouadi El-Laymoun and Mharbiye localities in 2035 are 331m3/d while the sources available are 1281m3/d resulting in a surplus of 950m3/d. That explains the need to expand the existing storage capacity by constructing Kfar falous sub-regional reservoir (with all necessary transmission lines). Fouar-Serail system: Existing Serail 1 well in poor condition. Existing Faouar 5 and Faouar 6 wells in poor condition. Existing Faouar Water Treatment plant in poor condition. May 2020 - V B 28 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-W.F : Water South Lebanon - Bint Jbeil (USD) Priority 1 Rehabilitation of Taybeh water treatment plant and pumping station & Reservoir 5 400 000 Taybeh intake rehabilitation wokrs 1 250 000 Taybe new pumping station next at the intake location 5 800 000 New transmission line from Taybe intake to the Taybe existing water treatment plants 2 000 000 Regional Reservoir at Baraachit village (3000 m3) 320 000 transmission lines from Baraachit regional reservoir to locality's reservoirs 1 600 000 Regional Reservoir at Markaba village (3000 m3) 320 000 Rehabilitation of Markaba pumping station 1 350 000 Rehabilitation of Slouki Pumping station 300 000 - Existing Slouki pumping station in poor condition. Rehabilitation of Chaqra pumping station 200 000 - Existing Chaqra pumping station in poor condition. Rehabilitation of Saf El Hawa pumping station 1 400 000 - Existing Saf el Hawa pumping station in poor condition. Transmission pipeline from Kafra pumping station to Bnt Jbeil Saf el hawa 2 250 000 Bint Jbeil Water Supply system Expansion and upgrade of water supply networks in the Caza of Bnt Jbeil, including construction of 32 reservoirs and 400 km of pipelines. 23 735 000 For all villages in the System Remote Control And Monitoring Of Water Systems (SCADA And DMA) 15 000 000 Total Priority 1 60 925 000$ Bint Jbeil Main Water Sources, Regional Reservoirs and Transmission Lines Total with design and supervision Project Justification System Project Description Markaba PS system: The capacity of the existing reservoirs is not enough to cover the future demand of the village, therefore the need to construct a new regional reservoir in Markaba village of 3000m3 capacity. Existing Markaba pumping station in poor condition. y y The served population of the Taybeh system in 2020 is 77810 . The water needs of the Taybeh system in 2020 are: 15801 m3/d The served population of the Taybeh system in 2035 is 105032. The water needs of the Taybeh system in 2035 are: 20212 m3/d while the sources available are 10368 m3/d resulting in a deficit of 9844 m3/d. That explains the need to install a new Taybeh pumping station next to the intake location (with all necessary transmission lines) and therefore expand the existing storage capacity of Taybe system by 300 m3 (one regional reservoir in Baraachit with all necessary lines). Existing Taybeh water treatment plant and pumping station & reservoir in poor condition. May 2020 - V B 29 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-W.G : Water South Lebanon - Marjaayoun and Hasbaya (USD) Priority 1 Rehabilitation of Hebbariye pumping station 1 600 000 - Existing Hebbariye pumping station in poor condition. Rehabilitation of Ain Jarfa pumping station 450 000 - Existing Ain Jarfa pumping station in poor condition. Rehabilitation of Hasbani pumping station 850 000 - Existing Hasbani pumping station in poor condition. Rehabilitation of Ebl Saqui pumping station 500 000 - Existing Ebl Saqui pumping station in poor condition. Rehabilitation of Marj El Khoukh pumping station 500 000 - Existing Marj El Khoukh pumping station in poor condition. Rehabilitation of Mayssat pumping station 1 350 000 - Existing Mayssat pumping station in poor condition. Wazzani new pumping station, Masonry intake wall and TL 2 500 000 - In order to cover the projected water demand, a new pumping station must be built in Wazzani. Regional Reservoir at Mayssat/or Adaisseh (30,000 m3) 3 250 000 The capacity of the existing reservoirs is not enough to cover the future demand of the village, therefore the need to construct a new regional reservoir of 30,000 m3 capacity. Treatment Facilities at Mayssat 12 000 000 New well for Halta system with 3 km transmission lines 809 840 In order to cover the projected water demand, a new well with its transmission lines is proposed New Well's Field & PS 2 000 000 Chebaa Wells And pumping station ( 3 Wells ) 2 500 000 In order to cover the projected water demand, a new pumping station must be built in Chebaa alongside 3 wells. Marjaayoun and Hasbaya Water Supply system Expansion and upgrade of water supply networks in the Caza of Marjaayoun & Hasbaya, including construction of 9 reservoirs and 285 km of pipelines. 12 120 000 For all villages in the System Remote Control And Monitoring Of Water Systems (SCADA And DMA) 15 000 000 Total Priority 1 55 429 840$ Marjaayoun and Hasbaya Main Water Sources, Regional Reservoirs and Transmission Lines Total with design and supervision Project Justification System Project Description May 2020 - V B 30 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.A : Water Beirut Mount Lebanon - Beirut Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 All Beirut City Water Systems 21.00 50 000 000 50 000 000 51 500 000 All Beirut City Water Systems is only a transmission system for the 2 regional reservoirs “Borj Abi Haidar and Tallet El Khayat” & “ Achrafiyeh Lower and Upper”. Construction of a Transmission Line between Janneh Dam and Dbayeh Water Treatment Plant to provide additional water supply from Janneh dam to Beirut area. Design already achieved. Tallet El Khayat and Borj Abi Haidar Networks System 3.00 2 215 500 46.00 5 485 800 2 rehabilitation 1 100 000 2 rehabilitation 1 200 000 9000 Service Connections 120000 Water meters 17 580 000 27 581 300 28 408 739 Served population for Tallet El Khayat and Borj Abi Haidar Networks System (in 2020): 414223 Remove all connections on transmission lines and replace old distribution lines (before year 1960) Revise distribution networks subdivisions. Design review is needed. Install HC and related Water meters Rehabilitation of Reservoirs and Pumping stations is currently under study Achrafieh Lower and Upper Networks System 20.00 2 549 800 2 rehabilitation 750 000 2 rehabilitation 600 000 3 899 800 4 016 794 Served population for Achrafiyeh Lower and Upper Networks System (in 2020): 219003 Replace old distribution lines (before year 1960) Revise distribution networks subdivisions Design review is needed. Reservoirs and Pumping stations need rehabilitation For all Systems 15 000 000 Total Priority 1 24.00 52 215 500$ 66.00 8 035 600$ 4 1 850 000$ - -$ 4 1 800 000$ - 17 580 000$ 81 481 100$ 98 925 533$ Priority 2 Tallet El Khayat and Borj Abi Haidar Networks System 18.00 15 751 000 85.00 7 884 200 2 rehabilitation 350 000 1 rehabilitation 350 000 24 335 200 25 065 256 Replacement of old transmission and distribution piplines (before 1980). Ensure supplying Tallet El Khayyat Reservoirs by Gravity from Naameh Sup reservoir, rather than by pumping directly from Damour and Naameh Boreholes. Achrafieh Lower and Upper Networks System 9.00 7 794 000 20.00 1 561 500 9 355 500 9 636 165 Replacement of old transmission and distribution piplines (before 1980) Total Priority 2 27.00 23 545 000$ 105.00 9 445 700$ 2 350 000$ - -$ 1 350 000$ - -$ 33 690 700$ 34 701 421$ Project Justification Total with design and supervision Remote Control And Monitoring Of Water Systems (SCADA And DMA) System Others Total May 2020 - V B 31 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.B : Water Beirut Mount Lebanon - Jbeil Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Afqa Spring Lower Region + Coastal Area System 18.50 1 855 010 139.75 7 598 685 23 3 270 000 1.00 1 800 000 1.00 5 000 000 19 523 695 20 109 406 Served population for Afqa Spring Lower Region + Coastal Area System (in 2020): 142730 Jbeil City Reservoir (1*3000), Dhour Adonis (1*5000) to be excuted in a later stage. Dhour Adonis Regional Reservoir (1*6000) is considered under tendering by EBML (1000m3); it remains 5000m3 (to be tendered and executed). Well Equipment of Fatre +PS + WTP (800m3/d) Janneh Dam PS & WTP (6000m3/d) For all Systems 15 000 000 Total Priority 1 18.50 1 855 010$ 139.75 7 598 685$ 23 3 270 000$ - -$ 1 1 800 000$ 1.00 5 000 000$ 19 523 695$ 35 109 406$ Priority 2 El Aaqoura Region 4.25 390 800 15.75 681 940 2 200 000 1 400 000 1 672 740 1 722 922 Served population for El Aaqoura System (in 2020): 4497 1 PS (Q=2.50l/s; TDH=250m) 2 Reservoirs (1*200+1*500) El Mejdel Region 12.50 957 320 46.75 1 997 710 2 180 000 3 135 030 3 229 081 Served population for El Mejdel System (in 2020): 2905 1 Reservoir (1*100) to be excuted in a later stage for yanouh. El Mejdel Reservoir (1*500) is considered under tendering by EBML. Afqa Region 3.25 217 750 9.75 411 280 1 60 000 1 380 000 1 069 030 1 101 101 Served population for Afqa System (in 2020): 747 1 PS (Q=1.25l/s; TDH=180m) 1 Reservoir (1*100) El Ghabet and Lassa Region 6.50 565 700 40.75 1 845 370 2 210 000 2 450 000 3 071 070 3 163 202 Served population for El Ghabet and Lassa System (in 2020): 5268 1 PS (Q=2.50l/s; TDH=100m) 1 BS (Q=0.9l/s; TDH=60m) 2 Reservoirs (1*300+1*500) Qartaba-Aouaini Region 23.75 2 338 050 167.75 8 157 440 9 720 000 3 700 000 5 3 121 500 15 036 990 15 488 100 Served population for Qartaba-Aouaini System (in 2020): 39460 Lehfed Well (11l/s; d= 505m); price include PS Civil works, reservoir, lift lines, and EM works Mechmech Well (15l/s; d= 500m); price include PS Civil works, reservoir, lift lines, and EM works Ehmej Well (5l/s; d=550m) Jaj PS (1.39l/s; H= 119m) El Kharbe-Qatra-and Afqa Spring 5.50 493 550 32.75 1 454 200 7 810 000 2 757 750 2 840 483 Served population for El Kharbe-Qatra and Afqa System (in 2020): 19071 El Moukhada System 8.25 652 500 3.00 105 000 2 240 000 1 300 000 1 297 500 1 336 425 - Moukhada PS (5.56l/s; H= 200m) Total Priority 2 64.00 5 615 670$ 316.50 14 652 940$ 25 2 420 000$ 3 700 000$ 10 4 651 500$ - -$ 28 040 110$ 28 881 313$ Total with design and supervision Project Justification Remote Control And Monitoring Of Water Systems (SCADA And DMA) System Others Total May 2020 - V B 32 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.C : Water Beirut Mount Lebanon - Baabda and Aley Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Btekhnay 250 m3 85 000 85 000 90 100 Served population in Bmaryam system (in 2020): 48,473 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Deir El Harf 6.00 480 000 480 000 508 800 - Existing network in poor condition El-Dleibe 2.50 200 000 200 000 212 000 - Existing network in poor condition El-Erbaniyeh 3.50 280 000 150 m3 70 000 350 000 371 000 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Existing network in poor condition El-Kalaa 12.85 1 028 000 1 028 000 1 089 680 - Existing network in poor condition El-Kraye 4.10 328 000 328 000 347 680 - Existing network in poor condition Haret Hamze 5.90 472 000 150 m3 70 000 542 000 574 520 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Existing network in poor condition Jouret Arsoune 1.63 130 400 130 400 138 224 - Existing network in poor condition Ktale 5.85 468 000 468 000 496 080 - Existing network in poor condition Daychounieh Rehabilitation of Daychouniyeh WTP,Treatment for Galery Semaan Well,Rehabilitation Of Jamhour Pumping Station 2 500 000 2 500 000 2 650 000 Served population in Daychounieh system (in 2020): 393,461 These projects are necessary to ensure the supply of clean water Hadath(Lower) Artificial Recharge of Hadath Hazmieh Underground Water Basin 3 000 000 3 000 000 3 180 000 Bedghane 14.00 1 120 000 1 120 000 1 187 200 Served population in local systems (in 2020): 76,961 Existing network in poor condition Bsaba 21.50 1 720 000 1 720 000 1 823 200 - Existing network in poor condition Chbaniyeh 1.00 882 000 882 000 934 920 The village suffers from a water deficit in 2020. The deficit will reach around 960 m3/d in 2035. Therefore, 1 well is needed to cover this deficit Deir Khouna 0.40 32 000 32 000 33 920 - Existing network in poor condition Deir-Koubel 13.30 1 064 000 1 064 000 1 127 840 - Existing network in poor condition El Chmeice 1.10 88 000 88 000 93 280 - Existing network in poor condition El-Khalouat 1.50 120 000 120 000 127 200 - Existing network in poor condition Hammana 1500 m3 215 000 215 000 227 900 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Mazraet-el-Mzeiraa 2.40 192 000 192 000 203 520 - Existing network in poor condition Mecherfeh 12.80 1 024 000 1 024 000 1 085 440 - Existing network in poor condition Sawfar 24.90 1 992 000 1 992 000 2 111 520 - Existing network in poor condition Tarchiche 33.00 2 640 000 2 640 000 2 798 400 - Existing network in poor condition Local Systems Project Justification System Village Others Total Total with design and supervision Bmaryam Daychounieh May 2020 - V B 33 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.C : Water Beirut Mount Lebanon - Baabda and Aley Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Project Justification System Village Others Total Total with design and supervision Abey 23.10 1 848 000 1 848 000 1 958 880 - Served population in Raayan system (in 2020): 229,968 Existing network in poor condition Aghmide 17.20 1 376 000 1 376 000 1 458 560 - Existing network in poor condition Ain Drafile 1.50 120 000 150 m3 70 000 190 000 201 400 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Existing network in poor condition Ain es Saideh 100 m3 60 000 60 000 63 600 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Ain Ksour 11.40 912 000 150 m3 70 000 982 000 1 040 920 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Existing network in poor condition Ainab 24.80 1 984 000 1 984 000 2 103 040 - Existing network in poor condition Aramoun 48.80 3 904 000 3 904 000 4 138 240 - Existing network in poor condition Baissour 47.60 3 808 000 3 808 000 4 036 480 - Existing network in poor condition Baouarta 21.40 1 712 000 200 m3 80 000 1 792 000 1 899 520 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Existing network in poor condition Bisrine 3.00 240 000 240 000 254 400 - Existing network in poor condition Bmakkine 150 m3 70 000 70 000 74 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Bsatine 10.00 800 000 800 000 848 000 - Existing network in poor condition Chanay 10.00 800 000 500 m3 120 000 920 000 975 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Existing network in poor condition El Halaliyeh 4.80 384 000 384 000 407 040 - Existing network in poor condition El-Azouniyeh 8.10 648 000 648 000 686 880 - Existing network in poor condition El-Bennaye 14.50 1 160 000 1 160 000 1 229 600 - Existing network in poor condition El-Ghaboun 6.50 520 000 520 000 551 200 - Existing network in poor condition El-Kamatiyeh 500 m3 120 000 120 000 127 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities El-Ramliyeh 19.90 1 592 000 1 592 000 1 687 520 - Existing network in poor condition Habramoun 1.70 136 000 136 000 144 160 - Existing network in poor condition Jisr El Qadi 100 m3 60 000 60 000 63 600 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Maasraiti 3.60 288 000 288 000 305 280 - Existing network in poor condition Majdel Baana 45.00 3 600 000 3 600 000 3 816 000 - Existing network in poor condition Mazraet el-Nahr 2.60 208 000 208 000 220 480 - Existing network in poor condition Roueissat el-Ballout 6.60 528 000 528 000 559 680 - Existing network in poor condition For Entire System 30 2 640 000 2 640 000 2 798 400 -Transmission lines are old and in poor condition Roueissat el-Naaman 10.30 824 000 824 000 873 440 - Existing network in poor condition For all Systems 15 000 000 Total Priority 1 30.00 2 640 000$ 509.63 40 770 400$ 12 1 090 000$ 1 882 000$ -$ - 5 500 000$ 50 882 400$ 68 935 344$ Raayan Remote Control And Monitoring Of Water Systems (SCADA And DMA) May 2020 - V B 34 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.C : Water Beirut Mount Lebanon - Baabda and Aley Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Project Justification System Village Others Total Total with design and supervision Priority 2 Bmariam 1.50 120 000 120 000 127 200 - Network extensions Falougha 1.50 120 000 120 000 127 200 - Network extensions Hasbaya El Meten 100 m3 60 000 60 000 63 600 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Jouar el Haouz 2.20 176 000 176 000 186 560 - Network extensions Kobbaï 2.70 216 000 216 000 228 960 - Network extensions Ain El Delbe Wadi Chahrour 1.50 120 000 120 000 127 200 - Network extensions Daychounieh 0.05 4 400 1.00 573 000 577 400 612 044 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Daychounieh 0.05 4 400 1.00 602 000 606 400 642 784 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Daychounieh 0.05 4 400 1.00 589 000 593 400 629 004 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Daychounieh 0.05 4 400 1.00 559 000 563 400 597 204 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Hadace 1.47 129 360 1.00 641 000 770 360 816 582 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Hadace 1.62 142 560 1.00 745 000 887 560 940 814 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Hadace 1.69 148 280 1.00 735 000 883 280 936 277 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Hadace 1.00 88 000 2.00 725 000 813 000 861 780 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Ain Mouaffak 1.50 120 000 120 000 127 200 - Network extensions Charoun 6.00 468 000 1.80 120 000 1 260 000 848 000 898 880 Network extensions Lift line and pumping station for supply from Raayan system Kfarchima 1.50 120 000 120 000 127 200 - Network extensions Kfar Selwan 7.00 546 000 1 190 000 736 000 780 160 - Lift line and pumping station for supply from Bmariam system Qornayel 300 m3 90 000 90 000 95 400 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Tarchiche 7.00 469 000 1 150 000 619 000 656 140 - Lift line and pumping station for supply from Bmariam system Ain El-Halzoune 2.00 160 000 160 000 169 600 - Network extensions Ain-Dara 3.00 240 000 Catchment Works Of Ain El Saouda And Ain El Jawzeh Spring 1 000 000 1 240 000 1 314 400 Network extensions The catchment works of Ain El Souada and Ain El Jawzeh are necessary for additional water supply to Raayan system Aïn-El-Jdeidé 4.40 352 000 352 000 373 120 - Network extensions Aïn-Rommané 7.10 568 000 568 000 602 080 - Network extensions Aitate 8.80 704 000 704 000 746 240 - Network extensions Bkhichtay 400 m3 105 000 105 000 111 300 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Chartoun 1.50 120 000 120 000 127 200 - Network extensions El-Rejmeh 1.50 120 000 120 000 127 200 - Network extensions Mejdlaya 150 m3 70 000 70 000 74 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Total Priority 2 25.98 2 008 800$ 42.50 3 376 000$ 4 325 000$ 9 5 169 000$ 600 000$ - 1 000 000$ 12 478 800$ 13 227 528$ Bmaryam Daychounieh Local Systems Raayan May 2020 - V B 35 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.C : Water Beirut Mount Lebanon - Baabda and Aley Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Project Justification System Village Others Total Total with design and supervision Priority 3 Arsoune 3.50 280 000 280 000 296 800 - Network extensions Bchamoune 46.00 3 680 000 3 680 000 3 900 800 - Network extensions Bleibel 6.85 548 000 548 000 580 880 - Network extensions Bsous 5.20 416 000 416 000 440 960 - Network extensions Charoun 300 m3 95 000 95 000 100 700 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Chbaniyeh 24.20 1 936 000 1 936 000 2 052 160 - Network extensions Kernayel 30.90 2 472 000 2 472 000 2 620 320 - Network extensions Mecherfeh 100 m3 60 000 60 000 63 600 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Btebiat 1.54 123 200 123 200 130 592 - Network extensions Btekhnay 10.10 808 000 808 000 856 480 - Network extensions El-Khreibe 4.50 360 000 360 000 381 600 - Network extensions El-Kneisse 1.59 127 200 127 200 134 832 - Network extensions El-Ksaibeh 2.40 192 000 192 000 203 520 - Network extensions Kartada 2.70 216 000 216 000 228 960 - Network extensions Ras el Meten 19.00 1 520 000 1 520 000 1 611 200 - Network extensions Ras-el-Harf 3.90 312 000 312 000 330 720 - Network extensions Salima 15.00 1 200 000 1 200 000 1 272 000 - Network extensions Zandouka 2.00 160 000 160 000 169 600 - Network extensions Bzebdine 10.50 840 000 840 000 890 400 - Network extensions Daychounieh 0.05 4 400 1.00 573 000 577 400 612 044 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Daychounieh 0.05 4 400 1.00 573 000 577 400 612 044 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Daychounieh 0.05 4 400 1.00 559 000 563 400 597 204 Wells to account for the very large deficit in the system (around 50,000m3). These will be used in dry years and in case Al Awali project is postponed Transmission line for well Total Priority 3 0.15 13 200$ 189.88 15 190 400$ 2 155 000$ 3.00 1 705 000$ -$ - -$ 17 063 600$ 18 087 416$ Local Systems Bmaryam Daychounieh May 2020 - V B 36 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.D : Water Beirut Mount Lebanon - Keserwan Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Djounie Ghadir 3.00 240 000 240 000 254 400 Served population in Al Moudiq system (in 2020): 237,123 Extension of distribution network Haret Sakher 3.00 240 000 Rehabilitation of Ouadi Hantouche Pumping Station 50 000 290 000 307 400 Extension of distribution network Wadi Hantouche Pumping station in poor condition Kferyacine 3.00 240 000 240 000 254 400 - Extension of distribution network Safra 1.50 100 500 500 m3 120 000 220 500 233 730 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Transmission line from pumping station to new reservoir Djounie Sahel Alma 3.00 240 000 240 000 254 400 - Extension of distribution network Tabarja 3.00 240 000 240 000 254 400 - Extension of distribution network Wata Salam 3.00 240 000 240 000 254 400 - Extension of distribution network Zouk Mkael 3.00 240 000 240 000 254 400 - Extension of distribution network Ain El Delbe 3.00 201 000 6.10 488 000 689 000 730 340 Served population in Chabrouh-Assal system (in 2020): 146,517 Transmission lines from regional reservoirs to proposed reservoirs in Wata El Jaouz and Ain El Delbeh Construction of a new distribution network because the existing network is in poor condition. Currently Wata El Jaouz and Ein El Delbeh are supplied with water by pumping directly into the network Boqaatet Achkout 300 m3 90 000 90 000 95 400 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Watta El Jaouz 3.00 201 000 26.00 2 080 000 500 m3 120 000 2 401 000 2 545 060 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Transmission lines from regional reservoirs to proposed reservoirs in Wata El Jaouz and Ain El Delbeh Construction of a new distribution network because the existing network is in poor condition For Entire System 18.00 4 158 000 4 158 000 4 407 480 Served population in Chabrouh'- Ain El Delbeh'- Afqa system (in 2020): 39,929 Replacement of Afqa spring transmission line because it is in a very poor condition. This source currently supplies the system with 8,000m3/d during winter. With this project, the flow will be increased to 10,000 m3/d For Entire System 55.00 4 840 000 4 840 000 5 130 400 Replacement of transmission lines in the entire system because they are in very poor condition For Entire System 6.00 858 000 858 000 909 480 Transmission line to convey an additional 4,000m3 of water to the system from Chabrouh dam to cover the water deficit. Currently only 6,000 m3/d are conveyed to this system from Chabrouh. Harhraya-El Qattine 500 m3 120 000 120 000 127 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities For all Systems 15 000 000 Total Priority 1 86.50 10 358 500$ 53.10 4 248 000$ 4 450 000$ - -$ -$ - 50 000$ 15 106 500$ 31 012 890$ Total with design and supervision Project Justification Remote Control And Monitoring Of Water Systems (SCADA And DMA) System Village Others Total Al Moudiq Chabrouh-Assal Chabrouh-Ain El Delbe-Afqa May 2020 - V B 37 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.D : Water Beirut Mount Lebanon - Keserwan Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Total with design and supervision Project Justification System Village Others Total Priority 2 Aaqaybe and Bqaq El Dine 21.20 1 696 000 1 696 000 1 797 760 Construction of a new distribution network because the existing network is in poo condition Bouar 12.50 1 000 000 1 000 000 1 060 000 Construction of a new distribution network because the existing network is in poo condition Chabrouh-Assal El-Kleiyate 1000 m3 200 000 200 000 212 000 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Al Assal Kfardebian 60.00 4 800 000 4 800 000 5 088 000 Served population in Assal system (in 2020): 26,282 Construction of a new distribution network because the existing network is in poor condition Bezhel 7.80 624 000 250 m3 85 000 709 000 751 540 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of a new distribution network because the existing network is in poor condition Eghbeh 8.00 640 000 640 000 678 400 Construction of a new distribution network because The Existing network is in poo condition El Abri et Chouan 8.00 640 000 640 000 678 400 Construction of a new distribution network because the existing network is in poo condition El Mouaisra 30.00 2 400 000 200 m3 80 000 2 480 000 2 628 800 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of a new distribution network because the existing network is in poor condition Fatka 30.00 2 400 000 500 m3 120 000 2 520 000 2 671 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of a new distribution network because the existing network is in poor condition Ghodrace 200 m3 80 000 80 000 84 800 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Jouret Bedrane 10.00 800 000 Elevated reservoir 150 000 950 000 1 007 000 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of a new distribution network because the existing network is in poor condition Nahr Ed Dahab 13.00 1 040 000 1 040 000 1 102 400 Construction of a new distribution network because the existing network is in poo condition Nammoura Et Kfar Jerif 200 m3 80 000 80 000 84 800 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Total Priority 2 - -$ 200.50 16 040 000$ 7 795 000$ - -$ -$ - -$ 16 835 000$ 17 845 100$ Al Moudiq Chabrouh-Ain El delbe-Afqa May 2020 - V B 38 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.E : Water Beirut Mount Lebanon - Chouf Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 For all the system villages 6.00 528 000 2 1 000 000 1 528 000 1 619 680 Served Population in Barouk-Kafra system (in 2020): 90554 Based on the water balance in summer for Barouk-Kafra system, a deficit occurs since 2020 (-3000 m3/d deficit in 2020). Two wells each with a flow of 50 l/s are proposed downstream Barouk spring to cover the deficit with 6 km proposed lift lines for the proposed wells. 8.00 704 000 704 000 746 240 Replacement of 8 km of transmission lines that are in Asbestos Cement and more than 40 years old. 360.00 28 800 000 28 800 000 30 528 000 Most of the villages in Barouk-Kafra system have very old water distribution networks; or else no water distribution networks exist at all. Therefore, new water distribution networks are proposed for the following villages: Aïn Ouzaïn, Ammik, Baïkoun, Batloune, Bchatfine, Botmé, Brih et Mteilé, Deir Baba, Deir Couché, Douair Bsennaï, El Barouk, El-Biré, El-Fouara, El-Freidice, El-Jdeidé, El Kahlouniyeh, El-Kneissé, El-Moukhtara, El-Samkanieh, El Werhaniyeh, Ghabet Jaafar, Kfar Fakoud, Kfar Haml, Kfar Katra, Kfar Nabrakh, Kfarhime, Maasser Beit Eddine, Sirjbal and Wadi Bnahley. For all the system villages 28.00 2 464 000 2 464 000 2 611 840 Served Population in el Qaa system (in 2020): 197319 Replacement of 28 km of transmission lines that are in Asbestos Cement and more than 40 years old. 517.00 42 260 000 42 260 000 44 795 600 Most of the villages in El Qaa system have very old water distribution networks; or else no water distribution networks exist at all. Therefore, new water distribution networks are proposed for: Almane, Anbal, Anoute, Atrine, Baakline, Baassir, Barja (rehabilitation of the existing network only), Beit Eddine, Benouaïti, Bkhchtaine, Bkifa, Bsaba, Chehime, Dalhoune, Daraya, Debbiyeh, Debbiyeh (Ain el Haour), Deir Mkhallesse, El-Berjaine, El-Bkaya, El Jleiliyeh, El-Maaniyeh, El-Wardaniyeh, Gharifé, Hasroute, Jadra, Katermaya, Kherbet Bisri, Kraya, Mazboud, Mazraet El-Dahr, Mtoullé Bzina, Sebline, Wadi Abou Youssef and Zaarouriyeh. Rehabilitation of El Qaa spring Catchment 500 000 500 000 530 000 The rehabilitation of el Qaa spring catchment is a must to reduce The leaks to The maximum. For all the system villages 1.00 88 000 88 000 93 280 Served Population in Mristi system (in 2020): 5300 Replacement of 1 km of transmission lines that are in Asbestos Cement and more than 40 years old. 23.00 1 840 000 1 840 000 1 950 400 New water distribution networks are proposed for Baadrane and El Khreibe villages to replace the very old existing networks. For all the system villages within Chouf caza 13.00 1 144 000 1 144 000 1 212 640 Raayan system includes different villages in Baabda, Aley and Chouf cazas: The served population within Chouf caza only is around 9000 in 2020. Replacement of 13 km of transmission lines that are in Asbestos Cement and more than 40 years old. 39.00 3 120 000 3 120 000 3 307 200 New water distribution networks are proposed for Aïn Zhalta, Jdael Kfarhay and Kfar Matta (Klaliyé) villages to replace the very old existing networks. For all the system villages 3.00 264 000 264 000 279 840 Chouf caza contains a total of 15 local systems that are mainly supplied with water from local wells or springs: The total population of these local systems is around 52000 in 2020. Replacement of 3 km of transmission lines that are in Asbestos Cement and more than 40 years old. 167.00 13 360 000 13 360 000 14 161 600 All these local independent villages have very old water distribution networks; or else no water distribution networks exist at all. Therefore, new water distribution networks are proposed for: Bater, Chemaarine, Dardourite, Dmite, El-Jahliyeh, Jebah, Maasser el-Chouf, Niha (extensions on the existing network), Mristé, Deir El-Kamar and Wadi El-Deir. For all Systems 15 000 000 Total Priority 1 59.00 5 192 000$ 1 106.00 89 380 000$ -$ 2 1 000 000$ -$ - 500 000$ 96 072 000$ 116 836 320$ System Village Others Barouk Kafra El Qaa Mristi Raayan Independent Total Total with design and supervision Project Justification Remote Control And Monitoring Of Water Systems (SCADA And DMA) May 2020 - V B 39 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.E : Water Beirut Mount Lebanon - Chouf Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) System Village Others Total Total with design and supervision Project Justification Priority 2 Barouk Kafra Kfar Nabrakh 400 m3 105 000 105 000 111 300 Since the total capacities of the existing reservoirs in the village are not sufficient to cover the peak of the future demands, new reservoirs are proposed for more water storage. The proposed reservoir capacity was calculated based on 30% of the future water needs taking into consideration the existing reservoirs' capacities. Baakline 500 m3 120 000 120 000 127 200 Since the total capacity of the existing reservoirs in these villages is not sufficient to cover the peak of the future demands of each village, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on 30% of the future water needs taking into consideration the existing reservoirs' capacitiess. Chehime 300 m3 90 000 90 000 95 400 Since the total capacity of the existing reservoirs in these villages is not sufficient to cover the peak of the future demands of each village, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on 30% of the future water needs taking into consideration the existing reservoirs' capacitiess. Gharife 250 m3 85 000 85 000 90 100 Since the total capacity of the existing reservoirs in these villages is not sufficient to cover the peak of the future demands of each village, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on 30% of the future water needs taking into consideration the existing reservoirs' capacitiess. Joun 450 m3 110 000 110 000 116 600 Since the total capacity of the existing reservoirs in these villages is not sufficient to cover the peak of the future demands of each village, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on 30% of the future water needs taking into consideration the existing reservoirs' capacitiess. Katermaya 350 m3 100 000 100 000 106 000 Since the total capacity of the existing reservoirs in these villages is not sufficient to cover the peak of the future demands of each village, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on 30% of the future water needs taking into consideration the existing reservoirs' capacitiess. Aanout 150 m3 70 000 70 000 74 200 Since the total capacity of the existing reservoirs in these villages is not sufficient to cover the peak of the future demands of each village, new reservoirs are proposed for more water storage. The proposed reservoirs capacities were calculated based on 30% of the future water needs taking into consideration the existing reservoirs' capacitiess. Mazraet El Chouf 6.00 528 000 150 m3 70 000 2 1 000 000 1 598 000 1 693 880 Two wells are proposed to cover the deficit of the water balance that occurs in 2020 (around 1400 m3/d) , with 6 km proposed lift lines. Since the total capacities of the existing reservoirs in the village are not sufficient to cover the peak of the future demands, new reservoirs are proposed for more water storage. The proposed reservoir capacity was calculated based on 30% of the future water needs taking into consideration the existing reservoirs' capacities. Dmit 3.00 264 000 1 500 000 764 000 809 840 One well is proposed to cover the deficit of the water balance that occurs in 2020 (around 220 m3/d), with 3 km proposed lift lines. El Jahliyeh 3.00 264 000 1 500 000 764 000 809 840 One well is proposed to cover the deficit of the water balance that occurs in 2020 (around 500 m3/d), with 3 km proposed lift lines. El Mouchhref 3.00 264 000 1 500 000 764 000 809 840 One well is proposed to cover the deficit of the water balance that occurs in 2020 (around 250 m3/d), with 3 km proposed lift lines. Aammatour 3.00 264 000 1 500 000 764 000 809 840 One well is proposed to cover the deficit of the water balance that occurs in 2020 (around 100 m3/d), with 3 km proposed lift lines. Total Priority 2 18.00 1 584 000$ - -$ 8 750 000$ 6 3 000 000$ -$ - -$ 5 334 000$ 5 654 040$ Independent El Qaa May 2020 - V B 40 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.E : Water Beirut Mount Lebanon - Chouf Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) System Village Others Total Total with design and supervision Project Justification Priority 3 El Qaa For all the system villages 9.00 792 000 3.00 1 500 000 2 292 000 2 429 520 Based on the water balance in summer for El Qaa system, a deficit will occur in 2035 (around 3500 m3/d deficit in 2035). Three wells are proposed to cover this future deficit along with 9 km of proposed lift lines for the new wells. Damour Wells For all the system villages 9.00 792 000 3.00 1 500 000 2 292 000 2 429 520 Served Population in Damour wells system (in 2020): 65944 Based on the water balance in summer for Damour wells system, a deficit will occur in 2035 (around 1000 m3/d deficit in 2035). Three wells (each 350m depth) are proposed to cover this future deficit along with 9 km of proposed lift lines for the new wells. Total Priority 3 18.00 1 584 000$ - -$ -$ 6.00 3 000 000$ -$ - -$ 4 584 000$ 4 859 040$ May 2020 - V B 41 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.F : Water Beirut Mount Lebanon - Meten Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) Priority 1 Ain Aalak 7.70 616 000 616 000 652 960 Served population in Upper Metn system (in 2020): 430,198 Ain Saadeh 29.10 2 328 000 2 328 000 2 467 680 Construction of new distribution network because the existing network is in poor condition Beit Merry 44.80 3 584 000 3 584 000 3 799 040 Construction of new distribution network because the existing network is in poor condition Boqaata Water Treatment Plant, Transmission Lines And Reservoirs For Boqaata Dam 35 000 000 35 000 000 37 100 000 Boqaata Dam still requires the construction of a WTP, transmission lines and reservoirs. Boqaata is expected to supply Upper Metn with around 38,000 m3/d. Dhour El Choueir 5000 m3 500 000 500 000 530 000 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities For All Villages 30.00 2 640 000 10.00 5 000 000 7 640 000 8 098 400 Drilling of 10 new wells to account for the water deficit in Upper Metn which currently reaches around 28,000 m3/d in the summer season Transmission lines for proposed wells (average of 3km per well) For All Villages 20.00 (rehabilitation) 1 760 000 1 760 000 1 865 600 Replacement of old transmission lines since they are in poor condition Mrouj 1500 m3 215 000 215 000 227 900 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Zekrit 1000 m3 200 000 200 000 212 000 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities For all Systems 15 000 000 Total Priority 1 50.00 4 400 000$ 81.60 6 528 000$ 3 915 000$ 10 5 000 000$ -$ - 35 000 000$ 51 843 000$ 69 953 580$ Remote Control And Monitoring Of Water Systems (SCADA And DMA) System Village Others Total Total with design and supervision Project Justification Upper Metn May 2020 - V B 42 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.F : Water Beirut Mount Lebanon - Meten Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) System Village Others Total Total with design and supervision Project Justification Priority 2 Abou Mizane 3.00 240 000 240 000 254 400 Construction of new distribution network because the existing network is in poor condition Ain El Zeitoune 0.70 56 000 56 000 59 360 Construction of new distribution network because the existing network is in poor condition Baabdat Et Sfaile 300 m3 90 000 90 000 95 400 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Beit Chebab 200 m3 80 000 80 000 84 800 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Beit Merry 2000 m3 230 000 230 000 243 800 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Bsalim 8.00 640 000 200 m3 80 000 720 000 763 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of new distribution network because the existing network is in poor condition Chaouié, Knaitré et Mar gergesse Bhurdok 3.20 256 000 256 000 271 360 Construction of new distribution network because the existing network is in poor condition Chrine 200 m3 80 000 80 000 84 800 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Deir Chamra 9.80 784 000 200 m3 80 000 864 000 915 840 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of new distribution network because the existing network is in poor condition El Dechouniyeh 9.70 776 000 776 000 822 560 Construction of new distribution network because the existing network is in poor condition El Freike 300 m3 90 000 90 000 95 400 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities El Khelle 0.90 72 000 72 000 76 320 Construction of new distribution network because the existing network is in poor condition El Mtein 28.20 2 256 000 2 256 000 2 391 360 Construction of new distribution network because the existing network is in poor condition Hemlaya 2000 m3 230 000 230 000 243 800 Proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Kannabet Salima 300 m3 90 000 90 000 95 400 Proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Mar Boutous Karm El Tine 500 m3 120 000 120 000 127 200 Proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Mar Mikhael Bnabil 2.80 224 000 224 000 237 440 Construction of new distribution network because the existing network is in poor condition Mchikha 3.40 272 000 272 000 288 320 Construction of new distribution network because the existing network is in poor condition Sakiet El Misk Et Bhorsaf 500 m3 120 000 120 000 127 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Zabbougha 200 m3 80 000 80 000 84 800 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Upper Metn May 2020 - V B 43 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML W PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-W.F : Water Beirut Mount Lebanon - Meten Transmission Lines Disrtibution networks Reservoirs Wells (Drilling, Casing, Testing and Equipping) Pumping Stations Length Cost Estimate Length Cost Estimate Nb/capacity Cost Estimate Nb of Cost Estimate Nb of Cost Estimate Description Cost Estimate (km) (USD) (km) (USD) of reservoirs (USD) wells (USD) PS (USD) (USD) (USD) (USD) System Village Others Total Total with design and supervision Project Justification Baouchariat 5000 m3 500 000 500 000 530 000 Served population in Coastal Metn system (in 2020): 632,948 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Borge Hammoud 56.90 4 552 000 5000 m3 500 000 5 052 000 5 355 120 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of new distribution network because the existing network is in poor condition Dekouanet 3000 m3 300 000 300 000 318 000 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Deir Tamiche 5.00 400 000 400 000 424 000 Construction of new distribution network because the existing network is in poor condition Jal El Dib 10.00 800 000 500 m3 120 000 920 000 975 200 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities '- Construction of new distribution network because the existing network is in poor condition Naccache 1000 m3 200 000 200 000 212 000 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Sin El Fil 2000 m3 230 000 230 000 243 800 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Wata Amaret Chalhoub 6.20 496 000 500 m3 120 000 616 000 652 960 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Dbaye 21.70 1 736 000 1 736 000 1 840 160 Construction of new distribution network because the existing network is in poor condition Haret El Belleni 6.00 480 000 480 000 508 800 Construction of new distribution network because the existing network is in poor condition Mazraet Deir Aoukar 7.10 568 000 568 000 602 080 Construction of new distribution network because the existing network is in poor condition Zouk-Khrab 22.00 1 760 000 1000 m3 200 000 1 960 000 2 077 600 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of new distribution network because the existing network is in poor condition Zalka 11.10 888 000 1500 m3 215 000 1 103 000 1 169 180 The capacity of the existing reservoir is not enough to cover the peak of the future demand of the village. The proposed reservoir capacity was calculated based on 30% of the water needs and taking into consideration the existing reservoirs' capacities Construction of new distribution network because the existing network is in poor condition Total Priority 2 - -$ 215.70 17 256 000$ 21 3 755 000$ -$ -$ - -$ 21 011 000$ 22 271 660$ Coastal Metn May 2020 - V B 44 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-WW.A : Wastewater North Lebanon - Akkar Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Sahel 2 150.00 20 250 000 20 250 000 20 857 500 Proposed networks only Sahel 3 380.00 51 300 000 51 300 000 52 839 000 Proposed networks only Jebrayel 135.00 18 225 000 Activated Sludge 17 275 15 918 670 34 143 670 35 167 980 Proposed wastewater treatment plant and network Total Priority 1 665.00 89 775 000$ 15 918 670$ 105 693 670$ 108 864 480$ Priority 2 To Machta Hammoud WWTP 20.00 2 700 000 2 700 000 2 862 000 Proposed networks only Aaouadi 40.17 5 422 950 Activated Sludge 8 880 12 643 787 18 066 737 19 150 741 Proposed wastewater treatment plant and network Aaouinat 7.04 950 400 Wetland 410 859 794 1 810 194 1 918 806 Proposed wastewater treatment plant and network Aarida 3.62 488 700 Trickling Filter 510 3 022 435 3 511 135 3 721 803 Proposed wastewater treatment plant and network Ain Tanta 23.38 3 156 300 Trickling Filter 2 860 6 983 044 10 139 344 10 747 705 Proposed wastewater treatment plant and network Akkar el atika 1 26.19 3 535 650 Trickling Filter 3 410 7 611 248 11 146 898 11 815 712 Proposed wastewater treatment plant and network Akkar el atika 2 31.23 4 216 050 Trickling Filter 4 260 8 485 227 12 701 277 13 463 353 Proposed wastewater treatment plant and network Akroum 4.19 565 650 Trickling Filter 1 020 4 217 853 4 783 503 5 070 513 Proposed wastewater treatment plant and network Chane 0.84 113 400 Trickling Filter 1 080 4 353 179 4 466 579 4 734 574 Proposed wastewater treatment plant and network Cheikh Zennad 2.31 311 850 Trickling Filter 1 360 4 865 544 5 177 394 5 488 037 Proposed wastewater treatment plant and network Chiklar 3.20 432 000 Wetland 200 565 290 997 290 1 057 127 Proposed wastewater treatment plant and network Chir Hmairine 29.22 3 944 700 Trickling Filter 5 850 9 897 999 13 842 699 14 673 261 Proposed wastewater treatment plant and network Dabbabiye 1 1.14 153 900 Wetland 220 593 474 747 374 792 217 Proposed wastewater treatment plant and network Dabbabiye 2 2.45 330 750 Wetland 220 593 474 924 224 979 678 Proposed wastewater treatment plant and network Danbo 35.00 4 725 000 Trickling Filter 6 770 10 626 933 15 351 933 16 273 048 Proposed wastewater treatment plant and network Darine 1.08 145 800 Wetland 440 896 442 1 042 242 1 104 777 Proposed wastewater treatment plant and network El Barde 1.90 256 500 Wetland 100 372 769 629 269 667 025 Proposed wastewater treatment plant and network El Majdal 4.28 577 800 Trickling Filter 1 150 4 484 212 5 062 012 5 365 733 Proposed wastewater treatment plant and network Fraidis 4.12 556 200 Wetland 310 724 599 1 280 799 1 357 647 Proposed wastewater treatment plant and network Habchit 10.72 1 447 200 Trickling Filter 580 3 222 445 4 669 645 4 949 824 Proposed wastewater treatment plant and network Hekr ed Dahri 2.10 283 500 Trickling Filter 980 4 148 445 4 431 945 4 697 861 Proposed wastewater treatment plant and network Hnaider 14.10 1 903 500 Trickling Filter 1 320 4 786 522 6 690 022 7 091 424 Proposed wastewater treatment plant and network Houaich 1 7.34 990 900 Trickling Filter 660 3 420 270 4 411 170 4 675 840 Proposed wastewater treatment plant and network Houaich 2 1.76 237 600 Wetland 400 846 919 1 084 519 1 149 590 Proposed wastewater treatment plant and network Hrar 23.18 3 129 300 Trickling Filter 1 430 4 987 544 8 116 844 8 603 855 Proposed wastewater treatment plant and network Karha 3.60 486 000 Trickling Filter 680 3 462 894 3 948 894 4 185 827 Proposed wastewater treatment plant and network Kfar Noun 4.22 569 700 Wetland 410 859 794 1 429 494 1 515 264 Proposed wastewater treatment plant and network Kfartoun 1 12.14 1 638 900 Trickling Filter 970 4 115 355 5 754 255 6 099 510 Proposed wastewater treatment plant and network Kfartoun 2 10.33 1 394 550 Trickling Filter 970 4 115 355 5 509 905 5 840 499 Proposed wastewater treatment plant and network Knaisseh Massoudiye 6.86 926 100 Trickling Filter 1 390 4 922 644 5 848 744 6 199 669 Proposed wastewater treatment plant and network Project Justification TotalSystem WWTP Total with design and supervision May 2020 - V B 45 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-WW.A : Wastewater North Lebanon - Akkar Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Project Justification TotalSystem WWTP Total with design and supervision Mazraet El Nahriye 1 12.20 1 647 000 Trickling Filter 630 3 333 298 4 980 298 5 279 116 Proposed wastewater treatment plant and network Mazraet El Nahriye 2 8.05 1 086 750 Wetland 370 815 483 1 902 233 2 016 367 Proposed wastewater treatment plant and network Memneaa 13.19 1 780 650 Trickling Filter 580 3 198 164 4 978 814 5 277 543 Proposed wastewater treatment plant and network Menjez 4.96 669 600 Wetland 510 984 654 1 654 254 1 753 510 Proposed wastewater treatment plant and network Mouanse 4.22 569 700 Wetland 410 859 794 1 429 494 1 515 264 Proposed wastewater treatment plant and network Mrah El Khaoukh 9.10 1 228 500 Trickling Filter 1 160 4 495 581 5 724 081 6 067 526 Proposed wastewater treatment plant and network Noura el Tahta 5.00 675 000 Trickling Filter 580 3 208 980 3 883 980 4 117 018 Proposed wastewater treatment plant and network Qatlabe 5.71 770 850 Wetland 340 769 539 1 540 389 1 632 813 Proposed wastewater treatment plant and network Qochloq 1.85 249 750 Trickling Filter 580 3 198 164 3 447 914 3 654 789 Proposed wastewater treatment plant and network Qraiyat 3.22 434 700 Trickling Filter 510 3 010 912 3 445 612 3 652 349 Proposed wastewater treatment plant and network Rahbe 18.31 2 471 850 Trickling Filter 1 650 5 348 615 7 820 465 8 289 693 Proposed wastewater treatment plant and network Sahle 11.14 1 503 900 Trickling Filter 530 3 084 999 4 588 899 4 864 233 Proposed wastewater treatment plant and network Semmaqiye 3.66 494 100 Trickling Filter 970 4 125 725 4 619 825 4 897 015 Proposed wastewater treatment plant and network Sindianet Zeidan 35.38 4 776 300 Trickling Filter 5 850 9 895 526 14 671 826 15 552 136 Proposed wastewater treatment plant and network Srar 0.91 122 850 Wetland 30 191 770 314 620 333 497 Proposed wastewater treatment plant and network Tall Bire 0.37 49 950 Trickling Filter 1 190 4 548 239 4 598 189 4 874 081 Proposed wastewater treatment plant and network Total Priority 2 474.98 64 122 300$ 171 754 936$ 235 877 236$ 250 029 871$ May 2020 - V B 46 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-WW.B : Wastewater North Lebanon - Koura Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Ejdabrine 14.24 1 922 805 Trickling Filter 1 323 4798904.737 6 721 710 7 125 012 Btaaboura 1.03 139 455 Wetland 191 544830.5411 684 286 725 343 Kaftoune 73.45 9 915 480 Trickling Filter 3 266 7451923.101 17 367 403 18 409 447 To Chekka WWTP 24.00 3 240 000 3 240 000 3 434 400 Proposed network only Total Priority 1 112.72 15 217 740$ 12 795 658$ 28 013 398$ 29 694 202$ Proposed wastewater treatment plants and networks in Ejdabrine, Btaaboura and Kaftoune Project Justification System WWTP Total Total with design and supervision May 2020 - V B 47 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-WW.C : Wastewater North Lebanon - Minieh Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Behouaita 1.00 135 000 Wetland 116 402 933 537 933 570 209 Bchernata 2.29 308 880 Wetland 132 435 696 744 576 789 250 Karm El Moher 5.26 709 560 Wetland 360 799 465 1 509 025 1 599 566 Izal 6.28 848 070 Trickling Filter 1 258 4 682 599 5 530 669 5 862 509 Qattine 23.84 3 218 400 Activated Sludge 8 988 12 697 773 15 916 173 16 871 143 Tarane 0.55 74 250 Trickling Filter 993 4 173 081 4 247 331 4 502 170 Beit Zoud 0.60 81 000 Wetland 199 558 525 639 525 677 896 Bakhaoun 50.30 6 790 770 Activated Sludge 24 492 17 962 324 24 753 094 26 238 280 Haoura 2 0.69 92 610 Wetland 414 870 004 962 614 1 020 371 Qemmamine 2.02 272 970 Wetland 215 585 277 858 247 909 742 Btoumaz 1 13.09 1 767 150 Trickling Filter 3 413 7 613 421 9 380 571 9 943 405 Haoura 1 4.16 562 140 Trickling Filter 1 474 5 058 255 5 620 395 5 957 619 Btoumaz 2 0.14 19 170 Trickling Filter 545 3 115 786 3 134 956 3 323 053 Jairoun 1.01 136 080 Wetland 248 638 086 774 166 820 616 Qarn 0.37 50 220 Wetland 80 321 815 372 035 394 357 Azqey 0.42 56 700 Wetland 83 329 063 385 763 408 908 Terbol 0.62 84 240 Wetland 72 301 941 386 181 409 352 Total Priority 1 112.65 15 207 210$ 60 546 044$ 75 753 254$ 80 298 449$ 17 Wastewater treatment plants and networks are proposed Project Justification System WWTP Total Total with design and supervision May 2020 - V B 48 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-WW.D : Wastewater North Lebanon - Zgharta Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Kfar Sghabe 3.57 482 085 Trickling Filter 587 3230496.24 3 712 581 3 935 336 Arbet Qozhaiya 5.28 712 800 Trickling Filter 672 3450414.9 4 163 215 4 413 008 El Buhaira 1.55 209 385 Wetland 317 740247.78 949 633 1 006 611 Asloute 5.19 701 055 Trickling Filter 593 3246535.23 3 947 590 4 184 446 To Tourza WWTP 13.00 1 755 000 1 755 000 1 860 300 To Ehden WWTP 25.00 3 375 000 3 375 000 3 577 500 To Tripoli WWTP 166.00 22 500 000 22 500 000 22 500 000 Proposed 166 km in Zgharta caza to cover the whole Tripoli WWTP drainage basin. It will serve about 140,000 inhabitants and the expected flow is 20,000 m³/d in the year 2035. Total Priority 1 219.60 29 735 325$ 10 667 694$ 40 403 019$ 41 477 200$ Wastewater treatment plants and networks in Kfar Sghabe, Arbet Qozhaiya, El Buhaira and Asloute are proposed Proposed networks Project Justification System WWTP Total Total with design and supervision May 2020 - V B 49 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-WW.E : Wastewater North Lebanon - Batroun Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Dahr Abi Yaghi 10.00 1 350 000 Activated sludge with nutrient removal 150 1000000 2 350 000 2 491 000 Jrabta 21.00 2 835 000 Activated sludge with nutrient removal 300 1500000 4 335 000 4 595 100 Ram 3.00 405 000 Activated sludge with nutrient removal 100 800000 1 205 000 1 277 300 Total Priority 1 34.00 4 590 000$ 3 300 000$ 7 890 000$ 8 363 400$ Local wastewater treatment plants and networks in Dahr Abi Yaghi, Jrabta and Ram System WWTP Total Total with design and supervision Project Justification May 2020 - V B 50 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-WW.A : Wastewater Beqaa - Baalbeck Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Temnine 335.00 45 225 000 Conventional activated sludge 36 074 39000000 84 225 000 84 225 000 Phase I of WWTP and Networks is under execution Networks to be accomplished Iaat 60.00 8 100 000 Conventional activated sludge 20 308 14500000 22 600 000 22 600 000 WWTP to be rehabilated and upgraded (under design) Aarsal 61.00 8 235 000 Trickling filters 9 121 2 900 000 11 135 000 11 135 000 Networks and WWTP design (study for 2027) Total Priority 1 456.00 61 560 000$ 56 400 000$ 117 960 000$ 117 960 000$ Priority 2 Qaa 145.00 19 575 000 Conventional activated sludge 2 318 3 900 000 23 475 000 23 475 000 Install complete system Ras Baalbek 207.00 27 945 000 Conventional activated sludge 19 895 29 000 000 56 945 000 56 945 000 Install complete system Chaat 135.00 18 225 000 Conventional activated sludge 11 893 17 000 000 35 225 000 35 225 000 Install complete system Deir El Ahmar 82.00 11 070 000 Conventional activated sludge 6 870 11 700 000 22 770 000 22 770 000 WWTP to be replaced Total Priority 2 569.00 76 815 000$ 61 600 000$ 138 415 000$ 138 415 000$ Priority 3 Boudai 115.00 15 525 000 Conventional activated sludge 4 220 7 000 000 22 525 000 22 525 000 Install complete system Chlifa 50.00 6 750 000 MBBR 1 281 1 500 000 8 250 000 8 250 000 Install complete system Ouyoun Orghoch 6.00 810 000 MBBR 103 200 000 1 010 000 1 010 000 Install complete system Ainata 7.00 945 000 MBBR 618 700 000 1 645 000 1 645 000 Install complete system Maaraboun 12.00 1 620 000 MBBR 822 1 000 000 2 620 000 2 620 000 Install complete system Jenta 9.00 1 215 000 MBBR 512 600 000 1 815 000 1 815 000 Install complete system Tfeil 5.00 675 000 MBBR 268 300 000 975 000 975 000 Install complete system Total Priority 3 204.00 27 540 000$ 11 300 000$ 38 840 000$ 38 840 000$ Project Justification System WWTP Total Total with design and May 2020 - V B 51 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-WW.B : Wastewater Beqaa - Hermel Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Hermel Phase 1 354.00 47 790 000 Conventional activated sludge 19 144 18500000 66 290 000 66 290 000 Parts of the funds may be insured by Italian Protocol Total Priority 1 354.00 47 790 000$ 18 500 000$ 66 290 000$ 66 290 000$ Priority 2 Wadi Faara 70.00 9 450 000 MBBR 275 200 000 9 650 000 9 650 000 Dismantled parts of existing WWTP (MBBR) from Hermel Site after completion of CAS WWTP to be used Marjahine 20.00 2 700 000 MBBR 858 600 000 3 300 000 3 300 000 Dismantled parts of existing WWTP (MBBR) from Hermel Site after completion of CAS WWTP to be used Jwar El Hachich 25.00 3 375 000 MBBR 849 600 000 3 975 000 3 975 000 Dismantled parts of existing WWTP (MBBR) from Hermel Site after completion of CAS WWTP to be used Hermel Phase 2 111.00 14 985 000 Conventional activated sludge 19 144 18 500 000 33 485 000 33 485 000 Extension of WWTP and Networks outside dense populated area Total Priority 2 226.00 30 510 000$ 19 900 000$ 50 410 000$ 50 410 000$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 52 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-WW.C : Wastewater Beqaa - Zahle and West Beqaa Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Joub Jannine System Ana 8.1 1 094 850 1 094 850 1 160 541 Proposed wastewater networks in Ana Majdel Anjar -Marj System Jdita 16.0 2 153 925 2 153 925 2 283 161 Proposed wastewater networks in Jdita Maidoun 16 + PS 2 292 150 Ain El Tine 5.9 796 500 Zelleya 7.1 961 200 Loucia 11.4 1 540 350 Yohmor 26.7 3 600 450 Qelia 18.2 2 457 000 Lebbeya 2.7 358 830 Sohmor System Sohmor 4.6 614 250 Activated Sludge 2 000 6 856 413 7 470 663 7 694 783 Proposed wastewater treatment plant and network in Sohmor Project under design Total Priority 1 116.7 15 869 505$ 42 243 941$ 29 056 723$ 30 025 888$ Priority 2 Majdel Anjar -Marj System Marj 44.3 5 980 500 5 980 500 6 339 330 Proposed wastewater networks in Marj Haouch El Harime 14.8 1 998 000 1 998 000 2 117 880 Kefraya 13.5 1 822 500 1 822 500 1 931 850 Ali El Nahri 17.1 2 310 525 2 310 525 2 449 157 Delhamiyeh 7.8 1 046 925 1 046 925 1 109 741 Total Priority 2 97.5 13 158 450$ -$ 13 158 450$ 13 947 957$ Villages Project Justification System WWTP Total Total with design and supervision 18 887 404 Proposed wastewater networks in Maidoun, Ain El Tine, Zelleya, Loucia, Yohmor, Qelia, Lebbeya Proposed pumping station in Maidoun Proposed wastewater treatment plant in Srayri Project under design Proposed wastewater networks in Haouch El Harime and Kefraya Proposed wastewater networks in Ali El Nahri and Delhamiyeh Joub Jannine System East Zahle system Es Srairi WWTP (Qelia, Yohmor, Zelleya, Dellafi, Saryra, Ain El Tine, Maidoun and Lebbeya (15%)) Activated Sludge (secondary treatment) 2 000 6 330 805 18 337 285 May 2020 - V B 53 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-WW.D : Wastewater Beqaa - Rachaya Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 2 Kfar Qouq system 52.80 7 127 628 1 243 3 995 903 11 123 531 11 790 943 Feasibility study ongoing for CDR by Nazih Taleb Beit Lahia system 77.02 10 397 620 2 843 7 187 872 17 585 492 18 640 621 Feasibility study ongoing for CDR by Nazih Taleb Haouch El Qinnabé system 138.72 18 727 188 4 824 10 462 161 29 189 348 15 940 709 Feasibility study ongoing for CDR by Nazih Taleb Available budget of 15,000,000 is accounted for this project Total Priority 2 268.54 36 252 435$ 21 645 936$ 57 898 371$ 46 372 274$ Priority 3 Deir El-Aachayer system 6.25 844 303 203 1 103 005 1 947 307 2 064 146 Feasibility study ongoing for CDR by Nazih Taleb Helouet Rachaiya system 3.51 473 194 27 266 602 739 796 784 184 Feasibility study ongoing for CDR by Nazih Taleb Majdel Balhiss system 25.54 3 447 633 482 2 040 276 5 487 908 5 817 183 Feasibility study ongoing for CDR by Nazih Taleb Total Priority 3 35.30 4 765 129$ 3 409 883$ 8 175 012$ 8 665 513$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 54 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-WW.A : Wastewater South Lebanon - Nabatiye Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Braiqeaa System 99.84 13 478 796 962 18785387.68 32 264 184 34 200 035 Based on the study by WET, the network is considered proposed and not yet executed Needs detailed design Nabaa al Tase System 80.70 10 894 895 10 894 895 11 548 589 Nabaa El Tassé System - Needs detailed design Charquieh System 64.01 8 641 630 Activated Sludge 1 800 14978157.72 23 619 788 25 036 975 Needs detailed design Total Priority 1 244.56 33 015 321$ 33 763 545$ 66 778 866$ 70 785 598$ Priority 3 Yohmor En-Nabatiyeh WWTP 15.00 2 025 000 2 025 000 2 146 500 The Sewer Network is considered existing except in Arnoune The WWTP is existing according to MoEW Sir El-Gharbiyé WWTP 22.15 2 990 750 2 449 033 5 439 782 5 766 169 Based on the study by WET, the network is considered proposed and not yet executed The WWTP cost estimation is based on the 2035 projection of the received population Total Priority 3 37.15 5 015 750$ 2 449 033$ 7 464 782$ 7 912 669$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 55 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-WW.B : Wastewater South Lebanon - Sour Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Chabriha System (Sour WWTP) 224 30 235 406 Activated sludge 55 000 21 421 852 51 657 258 38 090 026 A pipeline along Litani River starting from Chehour to the coast is already under construction for a budget of 25,000,000,000 L.P. Available fund of 16666667 has been accounted for this project Total Priority 1 223.97 30 235 406$ 21 421 852$ 51 657 258$ 38 090 026$ Priority 2 Hallousiyé System 29 3 964 368 1 816 3 964 368 4 202 230 Needs detailed design Bafliyé System 31 4 251 697 2 300 4 251 697 4 506 798 Needs detailed design Total Priority 2 61 8 216 065$ -$ 8 216 065$ 8 709 029$ Priority 3 Jijim System 25.82 3 485 850 4 500 9 958 920 13 444 770 14 251 456 No works have been done for this area Borj En-Naqoura System 23.68 3 197 185 3 197 185 3 389 016 The WWTP has been constructed by UNRWA Jabal El-Botm System 18 2 367 183 1 500 4 565 162 6 932 345 7 348 285 No works have been done for this area Mansouri Sour System 46.88 6 328 470 3 500 8 331 432 14 659 902 15 539 496 No works have been done for this area Total Priority 3 113.92 15 378 688$ 22 855 514$ 38 234 202$ 40 528 254$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 56 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-WW.C : Wastewater South Lebanon - Bint Jbeil Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Wadi el Houjair system 623 84 111 858 26 093 34 634 610 118 746 468 122 308 862 Detailed design ongoing by Dar Al Handasah Shair Total Priority 1 623.05 84 111 858$ 34 634 610$ 118 746 468$ 122 308 862$ Priority 2 Salhani system 218.14 29 448 302 11 000 18 785 388 48 233 689 51 127 711 No works have been done for this area Tibnine system 119.18 16 088 826 Activated Sludge 4 312 - 16 088 826 17 054 155 Need detailed design Total Priority 2 337 45 537 127$ 18 785 388$ 64 322 515$ 68 181 866$ Priority 3 Kafra Bint Jbeil system 43.82 5 915 251 3 621 8 535 626 14 450 877 15 317 930 No works have been done for this area Total Priority 3 43.82 5 915 251$ 8 535 626$ 14 450 877$ 15 317 930$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 57 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-WW.D : Wastewater South Lebanon - Jezzine Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 2 Qaytouleh system 0.63 85 050 Activated Sludge 985 85 050 87 602 Detailed design completed Total Priority 2 1 85 050$ 85 051$ 85 050$ 87 602$ Priority 3 El Rihane system 9.66 1 304 624 Activated Sludge 1 550 791 776 2 096 400 2 222 184 Needs detailed design Azour system 3 412 971 Reed Bed 2 185 909 296 1 322 267 1 401 603 Needs detailed design Roum system 10.20 1 376 438 Reed Bed 635 1 376 438 1 459 025 Needs detailed design Bisri system 23 3 168 058 Reed Bed 1 480 1 653 762 4 821 819 5 111 129 Needs detailed design Zhilta system 3 337 500 Reed Bed or small scale activated sludge 74 540 000 877 500 930 150 Needs detailed design Sfaray system 14.07 1 900 019 Reed Bed 402 2 292 786 4 192 805 4 444 373 Needs detailed design Total Priority 3 62.96 8 499 611$ 4 486 547$ 14 687 230$ 15 568 464$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 58 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-WW.E : Wastewater South Lebanon - Saida Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Sainik system 229.96 31 044 600 Preliminary Treatment 1 443 39 659 540 70 704 140 74 946 388 Needs detailed design The WWTP must be urgently upgraded since it is only for preliminary treatment Possibility of funding the WWTP by EIB Sarafand system 609.56 82 290 180 47 179 233 129 469 413 60 737 578 Needs detailed design 76,500,000 USD Available budget according to CEDRE Report Houmine El Tahta WWTP is cancelled. The cost of collecting Houmine and upstream area was added to Sarafand System cost Total Priority 1 839.52 113 334 780$ 86 838 773$ 200 173 553$ 135 683 966$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 59 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-WW.A : Wastewater Beirut and Mount Lebanon - Beirut Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Rehabilitation, Replacement and upgrade of sewers in Beirut 50 000 000 50 000 000 50 000 000 Assessment and Review of the Master Plan Rehabilitation, Replacement and Upgrade Total Priority 1 - 50 000 000$ -$ 50 000 000$ 50 000 000$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 60 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-WW.B : Wastewater Beirut Mount Lebanon - Jbeil Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Jbayl System 78 10 496 566 Biofilters 17 132 17 953 997 28 450 563 30 157 597 Project Under Construction, some villages need to be included to the network; the network cost mentioned is the network cost related to these villages that are still not included in this project (the under construction network budget is considered already provided and is not included in the cost estimation mentioned here) Jbeil WWTP is already constructed but needs capacity upgrade. The estimated cost is based on the cost of a new WWTP with the needed additional capacity (the upgrade of the WWTP found impossible --> we need to construct a new one adjacent to the existing) Lassa System 41.28 5 572 321 962 3 330 681 8 903 002 9 437 182 Requires Feasibility study Hdeine System 48 6 426 824 1 443 4 440 779 10 867 603 11 519 659 Requires Feasibility study Total Priority 1 167 22 495 710$ 25 725 458$ 48 221 168$ 51 114 438$ Priority 2 Ghalboun System 80 13 493 876 Activated Sludge 1 875 4 833 000 18 326 876 19 426 489 Requires detailed design (Cost estimation based on LC Feasibility Study) Kfar Mashoun System 36.12 5 415 943 Activated Sludge 985 3 330 872 8 746 815 9 271 624 Requires detailed design (Cost estimation based on LC Feasibility Study) Ferhet System 88 11 903 843 Activated Sludge 2 185 5 016 000 16 919 843 17 935 034 Requires detailed design (Cost estimation based on LC Feasibility Study) Total Priority 2 204 30 813 662$ 13 179 872$ 43 993 534$ 46 633 146$ Priority 3 Kharbet Jbayl System 61.17 9 681 010 Activated Sludge 1 480 4 290 000 13 971 010 14 809 271 Requires detailed design (Cost estimation based on LC Feasibility Study) Fatre System 56 7 814 714 MBBR 1 550 4 125 000 11 939 714 12 656 097 Requires detailed design (Cost estimation based on LC Feasibility Study) Haqel System 8 1 124 733 111 717 038 1 841 771 1 952 277 Requires Feasibility study Zibdine System 29.41 3 854 781 Activated Sludge 635 2 681 250 6 536 031 6 928 193 Requires detailed design (Cost estimation based on LC Feasibility Study) Tartij System 13.67 1 844 964 402 1 791 779 3 636 743 3 854 948 Requires Feasibility study Qorqraiya System 12.93 1 745 685 49 402 832 2 148 517 2 277 428 Requires Feasibility study Total Priority 3 181.14 26 065 887$ 14 007 899$ 40 073 786$ 42 478 213$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 61 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-WW.C : Wastewater Beirut Mount Lebanon - Baabda and Aley Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 El-Kneissé System 80 10 743 946 Activated Sludge 9 500 16 928 369 27 672 315 29 332 654 Detailed design ongoing by ACE El Halaliyeh System 57 7 754 649 Activated Sludge 17 400 19 982 510 27 737 159 29 401 389 Detailed design ongoing by ACE Ghadir System 328 44 340 588 Pretreatment 306 430 139 640 151 183 980 739 68 900 161 Needs WWTP Upgrade 170,600,000 USD is an available budget according to CEDRE Report Beirut Part is included in the needed budget (50 MUSD) Chourit System 164 22 140 798 13 000 21 151 000 43 291 798 45 889 306 Included in Zone 8 & 9 - Pre-feasibility stage Total Priority 1 629 84 979 981$ 197 702 030$ 282 682 011$ 173 523 509$ Priority 2 Bchetfine system 49.84 6 728 541 10 200 17 809 200 24 537 741 26 010 005 Pre-feasibility stage Bou Zridé System 141 19 014 899 9 152 16 485 713 35 500 611 37 630 648 Included in Zone 7 - Pre-feasibility stage El-Abadiyeh System 55 7 439 467 5 090 10 869 285 18 308 752 19 407 277 Detailed design ongoing by ACE Kartada System 23.93 3 230 587 Activated Sludge 4 700 10 271 192 13 501 779 13 906 832 Detailed design ongoing by ACE Total Priority 2 269.73 36 413 493$ 55 435 389$ 91 848 883$ 96 954 762$ Priority 3 Bhamdoun System 23.10 3 118 500 1 648 4 881 376 7 999 876 8 479 869 No studies have been done for this area, possibility to be joined with Bouzride system but needs further investigations and site visits Aghmid System 26.41 3 564 993 2 253 6 094 365 9 659 358 10 238 920 Included in Zone 8 & 9 - Pre-feasibility stage Total Priority 3 49.51 6 683 493$ 10 975 741$ 17 659 234$ 18 718 788$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 62 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-WW.D : Wastewater Beirut Mount Lebanon - Keserwane Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Hrajel system 63.60 8 586 627 Activated sludge 5 148 10 957 773 19 544 400 2 717 064 The PE is under estimated because it does not include Kfar Tay El-Matn and Mchaa Kfar Dibiane. When added, the cost estimate for WWTP shall be increased Detailed design phase Upper area is under pre-feasibility phase 18,000,000 USD available budget for this project according to CEDRE Report Total Priority 1 63.60 8 586 627$ 10 957 773$ 19 544 400$ 2 717 064$ Priority 2 Achqout system 71.24 9 617 637 4 477 9 922 753 19 540 390 20 712 813 Master Plan completed Total Priority 2 71.24 9 617 637$ 9 922 753$ 19 540 390$ 20 712 813$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 63 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-WW.E : Wastewater Beirut Mount Lebanon - Chouf Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Deir Baba System 67.80 9 152 359 Activated Sludge 2 464 6 492 640 15 644 999 16 114 349 Detailed design completed Sirjbal System 192.90 36 877 000 Biofilters 10 780 18 517 855 55 394 855 7 056 701 Sewer pipes Cost estimation using the 135$ per m gave us a lower price(26 MUSD) compared to the price proposed in the study by LC(36 MUSD) due to the high prices given to the Collectors . The budget includes collection of Nahr Al Hamam Area Cost (7,500,000 USD) Detailed design completed 50,000,000 USD available budget according to CEDRE Report Ras Nabi Younes System (including Nahr el Hamam area) 158.23 21 361 625 Biofilters 38 000 41 263 715 62 625 340 72 004 100 Networks designed El-Jdeidé System - under protection of Bisri dam project 35.29 4 763 974 Activated Sludge 4 928 8 615 000 13 378 974 13 780 343 Mazraet El-Chouf System - under protection of Bisri dam project 26.62 3 593 767 Activated Sludge 2 182 4 340 000 7 933 767 8 171 780 Maasser el-Chouf System - under protection of Bisri dam project 1.12 151 628 mixture of trickling filter and activated sludge 450 - 151 628 156 176 El-Moukhtara System - under protection of Bisri dam project 6.19 835 509 mixture of trickling filter and activated sludge 450 - 835 509 860 574 Ammatour System - under protection of Bisri dam project 14.15 1 910 525 mixture of trickling filter and activated sludge 900 - 1 910 525 1 967 840 Baadarane System - under protection of Bisri dam project 2.96 399 653 Activated Sludge 250 - 399 653 411 643 Mristé System - under protection of Bisri dam project 2.28 307 395 mixture of trickling filter and activated sludge 225 - 307 395 316 617 El-Khreibé System - under protection of Bisri dam project 1.84 247 730 mixture of trickling filter and activated sludge 450 - 247 730 255 161 Bater System - under protection of Bisri dam project 16.19 2 186 011 mixture of trickling filter and activated sludge 1 800 3 800 000 5 986 011 6 165 592 Jebah System - under protection of Bisri dam project 7.55 1 019 218 mixture of trickling filter and activated sludge 300 - 1 019 218 1 049 794 Jezzine Bhannine System - under protection of Bisri dam project 68.94 9 306 806 Activated Sludge 3 920 9 029 516 18 336 322 18 886 412 Bteddine El-Lekche System under protection of Bisri dam project 2.02 272 715 Small scale activated sludge 158 - 272 715 280 896 Available budget for protection of Bisri dam project - 40 000 000 Total Priority 1 - -$ -$ -$ 107 477 978$ Priority 2 Ainbal WWTP 8.30 1 120 129 Activated Sludge to be upgraded using MBBR 4 200 5 250 000 6 370 129 6 561 233 Needs detailed design Total Priority 2 8.30 1 120 129$ 5 250 000$ 6 370 129$ 6 561 233$ Priority 3 El-fouara WWTP 35.58 4 803 475 2 353 6 284 676 11 088 151 11 420 796 Included in Zone 8 & 9 - Pre-feasibility stage Mazraat el Mahtaqra WWTP 9.00 1 215 000 118 750 702 1 965 702 2 083 644 Pre-feasibility stage Bkifa WWTP 56.90 7 681 149 700 2 657 363 10 338 513 10 958 823 Pre-feasibility stage Total Priority 3 101.48 13 699 624$ 9 692 742$ 23 392 366$ 24 463 263$ Under detailed design - Included within Bisri Dam Protection Project Budget available from the ISDB --> 40,000,000 USD Project Justification System WWTP Total Total with design and supervision May 2020 - V B 64 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML WW PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-WW.F : Wastewater Beirut Mount Lebanon - Metn Sewer line Length Cost Estimate Type Flow Cost estimate (km) (USD) (m³/day) (USD) (USD) (USD) Priority 1 Zabbougha System 45.37 6 125 242 MBR 2 000 5 599 673 11 724 915 12 428 410 Networks designed. WWTP not designed Borge Hammoud System 206.59 27 889 318 325 000 208 000 000 235 889 318 171 965 997 WWTP under design Networks designed 71,000,000 availlable budget according to CEDRE Report Total Priority 1 206.59 27 889 318$ 208 000 000$ 235 889 318$ 184 394 407$ Priority 2 Es Souan System 57.44 7 755 051 5 681 11 750 949 19 506 000 20 676 360 Master Plan completed Mchikha System 59.44 8 024 400 Activated Sludge 1 812 5 220 565 13 244 965 13 642 314 The cost Estimate as per Dar Shair is 14,245,200 USD not including the expropriation and using a 200 l/cap/day as design criteria and for 2050 horizon Detailed design done by Dar Al Handasah Shair Total Priority 2 59.44 8 024 400$ 5 220 565$ 13 244 965$ 34 318 674$ Priority 3 Abou-Mizane System 23.22 3 134 937 1 018 3 467 308 6 602 245 6 998 380 Master Plan completed Hasbaya El Maten System 51.13 6 903 050 1 567 4 709 724 11 612 774 12 309 540 All numbers are based on estimations because no studies were done in this area except Ace master Plan which changed with Shair Study concerning Mchikha WWTP Total Priority 3 74.36 10 037 987$ 8 177 032$ 18 215 019$ 19 307 920$ Project Justification System WWTP Total Total with design and supervision May 2020 - V B 65 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-IR.A : Irrigation North Lebanon - Akkar (USD) Priority 1 Akkar el Bared Scheme 0.3 km Concrete channels to rehabilitate 3.3 km Earth channels to concrete 560 836 Mounjez Scheme 26 km Earth channels to concrete Dry Farm Expension 3 997 132 Omar el Breikat Scheme - 18 km Earth channels to concrete 1 821 080 Rahbeh Scheme - 3 km Earth channels to concrete 434 537 El Koubayet Scheme 1.5 km Concrete channels to rehabilitate 15 km Earth channels to concrete 2 506 993 Bouqaiaa - Machta Hamoud - Machta Hassan Scheme 42 km Earth channels to concrete 10 617 185 Total Priority 1 19 937 763$ Priority 3 Akkar plain Scheme 50 m Concrete channels to rehabilitate 78 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 29 994 518 Akkar el Atika Scheme 2 km Concrete channels to rehabilitate 29 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 4 875 578 Fneidek and Michmich Scheme 14 km Concrete channels to rehabilitate 18 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 5 688 774 Total Priority 3 40 558 871$ Justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated May 2020 - V B 66 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-IR.B : Irrigation North Lebanon - North (excluding Akkar) (USD) Priority 1 Bcharreh Scheme - 22 km Concrete channels to rehabilitate 1 048 847 Ehden Scheme - 21 km Concrete channels to rehabilitate 281 956 El Minieh scheme 19 km Concrete channels to rehabilitate 0.6 km Earth channels to concrete 1 108 745 Tannourine Scheme 37 km Concrete channels to rehabilitate 17 km Earth channels to concrete 4 585 412 Tripoli Scheme - 2.5 km Earth channels to concrete 388 401 Zghorta Scheme 11.5 km Concrete channels to rehabilitate 7 km Earth channels to concrete 1 722 907 Total Priority 1 9 136 269$ Priority 3 Danniyeh Scheme 29 km Earth channels to concrete Extention Of Networks to Cover Present Dry Farm Area 5 214 644 Kfar Helda Scheme 14 km Concrete channels to rehabilitate Extention Of Networks to Cover Present Dry Farm Area 1 435 216 Total Priority 3 6 649 860$ Justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated May 2020 - V B 67 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-IR.A : Irrigation Beqaa - Baalbeck (USD) Priority 1 Ayneta Baalbeck Scheme - 2 km Concrete channels to rehabilitate 28 242 Baalbeck Plain Scheme 8 km Concrete channels to rehabilitate 4 km Earth channels to concrete 829 377 Chmistar Scheme 0.1 km Concrete channels to rehabilitate 1.5 km Earth channels to concrete 1 903 196 Ham Scheme 0.8 km Concrete channels to rehabilitate 0.2 km Earth channels to concrete 28 811 Haouch Er-Rafqa Scheme 2 km Concrete channels to rehabilitate 2 km Earth channels to concrete 939 739 Hizzine Scheme - 3.5 km Earth channels to concrete 494 169 Kfar Dabach Scheme - 1 km Earth channels to concrete 131 051 Labboue Scheme 20 km Concrete channels to rehabilitate 40 km Earth channels to concrete 3 889 628 Maaraboun Scheme - 0.5 km Earth channels to concrete 43 148 Marjhine and Jbab Scheme - 5 km Concrete channels to rehabilitate 78 162 Ras Baalbeck Scheme 2 km Concrete channels to rehabilitate 0.5 km Earth channels to concrete 200 973 Taibet Baalbeck Scheme - 1.2 km Earth channels to concrete 173 355 Taraya Scheme - 7 km Earth channels to concrete 983 622 Wadi Nahle and Maqne Scheme 6 km Concrete channels to rehabilitate 10 km Earth channels to concrete 2 553 911 Yahfoufa, Jenta and Serraine Scheme 15 km Concrete channels to rehabilitate 10 km Earth channels to concrete 1 315 258 Yammoune Scheme 1.5 km Concrete channels to rehabilitate 11 km Earth channels to concrete 3 451 531 Younine Scheme 2.5 km Concrete channels to rehabilitate 1.2 km Earth channels to concrete 328 327 Total Priority 1 17 372 501$ Priority 3 Temnine and Bednayel Scheme 0.2 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 3 588 918 Total Priority 3 3 588 918$ Justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated May 2020 - V B 68 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-IR.B : Irrigation Beqaa - Zahle (USD) Priority 1 Aanjar (Haouch Moussa) Scheme 0.1 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 28 415 Zahle Scheme - 3 km Earth channels to concrete 2 103 178 Ablah and Niha Scheme - 4.5 km Earth channels to concrete 2 982 279 Chtaura Scheme 9 km Concrete channels to rehabilitate 1 km Earth channels to concrete 626 431 Kfarzabad Scheme - 4 km Earth channels to concrete 2 205 944 Total Priority 1 7 946 247$ Priority 3 Mrayjet Zahle Scheme - 2 km Concrete channels to rehabilitate 31 086 Bouarej Scheme - 2.5 km Concrete channels to rehabilitate 52 253 Touaite Zahle Scheme 0.2 km Concrete channels to rehabilitate 1 km Earth channels to concrete 832 694 Total Priority 3 916 033$ Justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated May 2020 - V B 69 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-IR.A : Irrigation South Lebanon - Major Irrigation Schemes (USD) Priority 1 Saida - Jezzine scheme Saida - Jezzine Project: Irrigated area : 430 ha Required works : Replacement of all the irrigation networks according to LRA requirements 45 km Distribution Networks 7 650 000 Justified because it is an existing project presently under the management of the litani river authority and needs extensive rehabilitation Conveyor 800 Distribution Networks Conveyor 800 - Phase II A - Distribution Networks: Irrigated area : 3420 ha Required Works : 465 km Distribution networks 78 900 000 Justified because it completes the goal of the first,under construction, phase composed of transmission system and reservoirs/dams Total Priority 1 86 550 000$ Priority 2 Khardaleh Dam scheme Khardaleh Dam scheme distribution networks (Phase 2 of the dam project) Required Works : 1 300 km Distribution networks 221 000 000 Justified because it completes the goal of the first phase composed of transmission system and reservoirs/dams Conveyor 800 Distribution Networks Conveyor 800 - Phase II - B Distribution Networks: Irrigated area : 9830 ha Required Works : 1 335 km Distribution networks 227 100 000 Justified because it completes the goal of the first,under construction, phase composed of transmission system and reservoirs/dams Choumariyeh Dam scheme Choumariyeh Dam scheme distribution networks (Phase 2 of the dam project) Required Works : 660 km Distribution networks 112 200 000 Justified because it completes the goal of the first phase composed of transmission system and reservoirs/dams Total Priority 2 560 300 000$ System Project Description Total with design and supervision Project Justification May 2020 - V B 70 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-IR.B : Irrigation South Lebanon - Local Irrigation Schemes (USD) Priority 2 Bint Jbeil district Villages covered : Ayta El Jabal, Beit Lif, Debel, El Tairi, Es Salhani, Haddatha, Rouaisse, Srobbine, Yatar, Es Soultaniye Total Irrigated area : 1092 ha Required works : 100 km distribution network 20 400 000 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated Hasbaya district Villages covered : Mazraat Islamiyeh, El Saqi Total Irrigated area : 94 ha Required works : 8 km distribution network 1 632 000 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated Jezzine ditrict Villages covered : Haffet Bou Hajli, Mazraat Khallet Khazene, Fouzour, Qalaat Dabboura Total Irrigated area : 142 ha Required works : 13 km distribution network 2 652 000 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated Nabatiyeh district Villages covered : Nabaa el Tasse, Tahounet el Badaouiyeh Total Irrigated area : 75 ha Required works : 6 km distribution network 1 224 000 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated Saida district Villages covered : Bqosta Total Irrigated area : 19 ha Required works : 1 km distribution network 204 000 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated Sour district Villages covered : Aaitit, Ain Baal, Al Aabsiye, Bafliye, Chehour, El Bazouniye, El Izziye, El Khraybeh, El Malkiyeh, Jabal El Botm, Jennata, Jouaya, Knaisse, Maaroub, Recheknanay, Saddiqine, Tair Debba, Zebqine Total Irrigated area : 2 237 ha Required works : 213 km distribution network 43 452 000 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures by; selecting this (these) project(s) negative water balance at farm level will be mitigated Total Priority 2 69 564 000$ System Project Description Total with design and supervision Project Justification May 2020 - V B 71 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-IR.C : Construction-Rehabilitation of concrete channels (USD) Priority 3 Ibl es Saqi Dam scheme Ibl es Saqi Dam scheme distribution networks (Phase 2 of the dam project): Irrigated area : 3800 ha Required works : 380 km Distribution Networks 64 600 000 Justified because it completes the goal of the first phase composed of transmission system and reservoirs/dams Concerned schemes : Ain el Kbiri, Ain el Rihane, Ain el Tineh, Ain Rkiz, Ain Toghra, Baklleh, Berket el Djej, Chamaliye, El Aaichiye, El Bayad, El Choab Ain Saha, El Fawar , El Fawar, El Harf, El Jawz - Wadih, El Meshreh, El Mghara, Rabiaa Jawzeh -Qaitoule, El Tineh, El-Dayaa, Ghraybeh - Azzoubiyeh, Jezzine, Jlikha, Kobay Cheikh, Machereh, Majdaleen, Nabaa Ain Jbaa, Nabaa el Ain, Nabaa Sader, Nahr el Zahrani, Qobeiss - Majdaline, Wadi Chebaa, Zaarour Construction of new (or rehabilitation of existing) concrete channels: Total Irrigated area : 836 ha Required works : 141 km concrete channels 14 100 000 Justified to modernize small schemes outside the LRA systems Total Priority 3 78 700 000 $ System Project Description Total with design and supervision Project Justification May 2020 - V B 72 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-IR.A : Irrigation Beirut Mount Lebanon - Jbeil (USD) Priority 2 Qartaba and Surrounding Scheme 8 km Concrete channels to rehabilitate 10 km Earth channels to concrete 1 145 975 Total Priority 2 1 145 975$ Priority 3 Lassa, Ghabat, Mezarib,Mghairi, Afqa & Surrounding Scheme 2 km Concrete channels to rehabilitate 2.5 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 298 381 Aaqoura and Laqlouq Scheme 6 km Concrete channels to rehabilitate 2 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 387 856 Total Priority 3 686 237$ Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated May 2020 - V B 73 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-IR.B : Irrigation Beirut Mount Lebanon - Meten (USD) Priority 3 Baskinta Scheme 16 km Concrete channels to rehabilitate 8 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 1 043 540 Total Priority 3 1 043 540$ System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor May 2020 - V B 74 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-IR.C : Irrigation Beirut Mount Lebanon - Keserouane (USD) Priority 1 Mayrouba and Hrajel Scheme 9 km Concrete channels to rehabilitate 3 km Earth channels to concrete 524 536 Total Priority 1 524 536$ Priority 3 Adonis (Keserouane) Scheme - Extention of Networks to Cover Present Dry Farm Area 230 000 Kfar Dibiane and Faraya Scheme 25 km Concrete channels to rehabilitate 8 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 1 839 298 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor Nahr el Kalb Wata Scheme - 5 km Concrete channels to rehabilitate 144 690 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated Total Priority 3 2 213 988$ justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated May 2020 - V B 75 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-IR.D : Irrigation Beirut Mount Lebanon - Baabda (USD) Priority 3 Tarchich Scheme 0.5 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 83 066 Baabda Scheme 4 km Concrete channels to rehabilitate 1.5 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 276 993 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor Total Priority 3 360 058$ System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor May 2020 - V B 76 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML IR PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-IR.E : Irrigation Beirut Mount Lebanon - Chouf (USD) Priority 1 Damour Scheme - 16 km Concrete channels to rehabilitate 486 467 Total Priority 1 486 467$ Priority 3 Barouk Scheme 17 km Concrete channels to rehabilitate 0.8 km Earth channels to concrete Extention of Networks to Cover Present Dry Farm Area 608 334 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor Nbaa El Safa Scheme - Extention of Networks to Cover Present Dry Farm Area 230 000 Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated justified in order to increase scheme total area, and direct increase of beneficiaries number. The project(s) will lead to a horizontal expantion since arable land presence is not a limiting factor Total Priority 3 838 334$ System Project Description Total with design and supervision Project Justification Justified in order to increase canal conveyance efficiency by rehabilitation of existing poorly maintained concrete channels and converting earth canals to concrete structures; by selecting this (these) project(s) negative water balance at farm level will be mitigated May 2020 - V B 77 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL DAMS PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-D.A : Dams North Lebanon - Akkar (USD) Priority 1 Akkar Caza El Bared dam: Construction of Water Supply dam (37-90 MCM) and associated water treatment plant and transmission network 196 020 000 Total Priority 1 196 020 000$ Priority 3 Atolbe Dam: Construction of Water Supply hill lake (0.70 MCM) to supply Qbayat 12 000 000 Qarqaf Dam: Construction of Irrigation DAM (20-25 MCM) for Akkar coastal region 81 000 000 Noura el Tahta Dam: Construction of dam (35-50MCM) for Nour el Tahta and surrounding villages 150 000 000 Total Priority 3 243 000 000$ Akkar Caza System Project Description Total with design and supervision May 2020 - V B 78 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL DAMS PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-D.B : Dams North Lebanon - All North (USD) Priority 3 North Lebanon (excluding Akkar) Dar Baachtar Dam: Construction of Water and Irrigation Dam (7 MCM) for Koura and Batroun 50 000 000 Total Priority 3 50 000 000$ System Project Description Total with design and supervision May 2020 - V B 79 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ DAMS PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-D.C : Dams Beqaa - Baalbek Hermel (USD) Priority 1 Baalbeck and Hermel cazas Assi Phase I Dam: Completion of execution works for Assi Phase 1 Water and Irrigation Dam (63 MCM), and supervision works. 52 000 000 Total Priority 1 52 000 000$ Priority 2 Baalbeck and Hermel cazas Assi Phase 2 Dam: Construction of Assi Phase 2 Water and Irrigation Dam (15 MCM). 150 000 000 Total Priority 2 150 000 000$ Priority 3 Baalbeck and Hermel cazas Younine Dam: Providing additional storage capacity of 5.8 MCM for the irrigation of 1200 ha 69 960 000 Total Priority 3 69 960 000$ System Project Description Total with design and supervision May 2020 - V B 80 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ DAMS PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-D.D : Dams Beqaa - Beqaa (USD) Priority 3 Beqaa Massa Dam: Providing additional storage capacity of 8 MCM for the irrigation of 1600 ha 37 100 000 Total Priority 3 37 100 000$ System Project Description Total with design and supervision May 2020 - V B 81 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL DAMS PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-D.E : Dams South Lebanon - All South (USD) Priority 2 South Lebanon Ibl es Saqi Dam: Construction of Irrigation and Water supply dam (50 MCM) on the Hasbani river next to Ibl es Saqi, with related transmission lines and reservoirs 145 000 000 Total Priority 2 145 000 000$ Priority 3 Choumariye Dam: Construction of Water supply and Irrigation DAM (28 MCM) on Litani River with related transmission lines and reservoirs (25 km transmission lines and 1 reservoir) 128 000 000 Khardali Dam: Construction of Irrigation and Water supply dam (128 MCM) on Litani river (Khardali segment) including downstream works (145 km transmission lines, 2 pumping stations, 4 reservoirs and 3m diameter tunnel) 480 000 000 Total Priority 3 608 000 000$ South Lebanon System Project Description Total with design and supervision May 2020 - V B 82 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML DAMS PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-D.F : Dams Beirut Mount Lebanon - All Beirut and Mount Lebanon (USD) Priority 1 Beirut Mount Lebanon Azounieh Dam: Construction of Water Supply dam (4-5 MCM) 65 000 000 Total Priority 2 65 000 000$ Priority 2 Beirut Mount Lebanon Damour Dam: Construction of Water and Irrigation DAM (42-106 MCM) for Beirut and Damour region. 200 000 000 Total Priority 2 200 000 000$ Priority 3 Beirut Mount Lebanon Maaser Chouf Dam: Construction of Water Supply hill lake (2.2 MCM) 53 000 000 Total Priority 3 53 000 000$ System Project Description Total with design and supervision May 2020 - V B 83 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL HILL LAKES PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-HL.A : Hill Lakes Akkar (USD) Priority 1 Akkar Omar El Breiket Hill Lake: Construction of Hill Lake 1 170 000 Total Priority 1 1 170 000$ Priority 2 Akkar Bouqaiaa - Machta Hamoud - Machta Hassan Scheme Hill Lakes: Construction of Hill Lakes 1 166 000 Total Priority 2 1 166 000$ System Project Description Total with design and supervision May 2020 - V B 84 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL HILL LAKES PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-HL.B : Hill Lakes North Lebanon (USD) Priority 1 Blaita Hill Lake: Construction of Hill Lake (0.18 MCM) 5 000 000 Tim Rbita Hill Lake: Construction of Hill Lake (0.1 MCM) 2 200 000 Rahwe Hill Lake: Construction of 20 m high Hill Lake (2.2 MCM), providing an additional capacity for the irrigation of 200 ha 25 000 000 Total Priority 1 32 200 000$ Priority 2 Bcharre Scheme Hill Lakes: Construction of Hill Lakes 8 745 000 Ehden Scheme Hill Lakes: Construction of Hill Lakes 3 498 000 Rahban Hill Lake: Construction of Hill Lake (0.3 MCM) 7 000 000 Laqlouq Hill Lake: Construction of Hill Lake (0.06 MCM) 400 000 Arez Tannourine Hill Lake: Construction of Hill Lake (0.4 MCM) 14 000 000 Hourayta Hill Lake: Construction of Hill Lake (0.21 MCM) 7 000 000 Ain Rouana Hill Lake: Construction of Hill Lake (1.43 MCM) 30 000 000 Ech Chir Hill Lake: Construction of Hill Lake (0.3 MCM) 4 500 000 Ain Saouda Hill Lake: Construction of Hill Lake (0.06 MCM) 400 000 System Project Description Total with design and supervision North Lebanon North Lebanon May 2020 - V B 85 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS NL HILL LAKES PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix NL-HL.B : Hill Lakes North Lebanon (USD) System Project Description Total with design and supervision Ain Lebne Hill Lake: Construction of Hill Lake (1.86 MCM) 34 000 000 Total Priority 2 109 543 000$ Priority 3 Ain Es Safsafe Hill Lake: Construction of Hill Lake (0.3 MCM) 400 000 El Khaf Hill Lake: Construction of Hill Lake (0.07 MCM) 500 000 Midane Hill Lake: Construction of Hill Lake (0.79 MCM) 22 000 000 Total Priority 3 22 900 000$ North Lebanon May 2020 - V B 86 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BQ HILL LAKES PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BQ-HL. : Hill Lakes Beqaa (USD) Priority 2 Ablah and Niha Scheme Hill Lakes: Construction of Hill Lakes 5 900 000 Baalbeck Plain Scheme Hill Lakes: Construction of Hill Lakes 10 000 000 Chmistar Scheme Hill Lakes: Construction of Hill Lakes 9 000 000 Taibet Baalbeck Scheme Hill Lakes: Construction of Hill Lakes 2 300 000 Taraya Scheme Hill Lakes: Construction of Hill Lakes 9 300 000 Yahfoufa, Janta, Serraine Scheme Hill Lakes: Construction of Hill Lakes 5 900 000 Younine Scheme Hill Lakes: Construction of Hill Lakes 12 800 000 Total Priority 2 55 200 000$ System Project Description Total with design and supervision Beqaa May 2020 - V B 87 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SL HILL LAKES PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix SL-HL. : Hill Lakes South Lebanon (USD) Priority 2 Kounine Hill Lakes: Construction of Hill Lakes 13 300 000 El Houranieh Hill Lakes: Construction of Hill Lakes 13 300 000 Chhour Hill Lakes: Construction of Hill Lakes 13 300 000 Barich Hill Lakes: Construction of Hill Lakes 13 300 000 Ansar Hill Lakes: Construction of Hill Lakes 13 300 000 Jermoq Hill Lakes: Construction of Hill Lakes 13 300 000 Alsalaa-Mimas Hill Lakes: Construction of Hill Lakes 13 300 000 El Khiyam Hill Lakes: Construction of Hill Lakes 13 300 000 Banaafoul Hill Lakes: Construction of Hill Lakes 13 300 000 Total Priority 2 119 700 000$ System Project Description Total with design and supervision South Lebanon May 2020 - V B 88 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS BML HILL LAKES PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendix BML-HL. : Hill Lakes Beirut and Mount Lebanon (USD) Priority 2 Birket El Safa, El Mtein Hill Lake: Construction of Hill Lake (0.5 MCM) 5 200 000 El Mtein 7 Hill Lake: Construction of Hill Lake (0.3 MCM) 2 800 000 El Sannine 1 Hill Lake: Construction of Hill Lake (0.2 MCM) 2 600 000 Kfardebiane, Wadi El Boud Hill Lake: Construction of Hill Lake (0.7 MCM) 6 600 000 Kfardebiane, Wadi Nabaa Es Saquieh Hill Lake: Construction of Hill Lake (0.4 MCM) 6 200 000 Kfardebiane 6 Hill Lake: Construction of Hill Lake (0.17 MCM) 1 900 000 Damour Hill Lakes: Construction of Hill Lakes 4 664 000 Mayrouba and Hrajel Hill Lakes: Construction of Hill Lakes 3 500 000 Total Priority 2 33 464 000$ System Project Description Total with design and supervision Beirut and Mount Lebanon May 2020 - V B 89 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SECTOR GOVERNANCE PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendice RS-B : Water Governance priority action plan Stakeholder Means to mobilize Deadline Indicators Funding Cost Lead Involved (USD) RS-B.1. Sector Governance RS-B.1.1 Implement the legal and regulatory framework reform (Water Code) RS-B.1.1.1 Prepare, adopt and implement the Water Code bylaws as already listed High MoEW WE, LRA, MoE, MoA Recruitment of legal consultant Phase 1 : Q1 2021 Revision : end 2025 Adopted Decrees INT 40 000 RS-B.1.1.2 Draft revised WE organisation bylaws, support the approval process and follow up on their enactment High MoEW WE Recruitment of legal consultant Phase 1 : end 2020 Revision : end 2025 Adopted Decrees INT 35 000 RS-B.1.2 Rationalise the tutelage framework with a view for clear dispatching between operational and regulatory activities Total A.1 75 000 RS-B.1.2.1 Restructure the Ministry's supervisory functions and introduce a substitute function in the event of WE failure (incl. direct procurement of external audit if not conducted by WEs and cost deduction from their budget) MoEW Recruitment of legal consultant End of 2020 Revised Decree INT 5 000 RS-B.1.2.2 Review the organisational decrees by focusing them on defining guidelines for WEs organisation and streamline specific procedures High MoEW Recruitment of legal consultant Phase 1 : end 2020 Revision : end 2025 Adopted Decrees INT a. Define guidelines for the WEs' HR recruitment and organisation structures / simplify the organisation chart validation procedure WE b. Streamline the HR recruitment process and make it possible to enhance recruitment outside the public service procedures WE c. Raise the expenditure and procurement validation thresholds WE, MoF d. Define guidelines for WE performance monitoring WE e. Define guidelines for pricing services and simplify the validation procedure WE f. Define guidelines for procurement management and the management of performance-based contracts WE RS-B.1.2.3 Conduct an assessment of the administrative supervision department roles and capacities and develop a specific staff capacity-building plan High MoEW Assessment : End of 2020 75 000 Implementing the capacity building plan : End 2025 300 000 RS-B.1.3 Develop proper mechanisms for performance monitoring Total A.2 380 000 RS-B.1.3.1 Set up a unit in charge of performance monitoring within the MoEW administrative supervision department Short Term MoEW RS-B.1.3.2 Standardise the structure of annual reports incl. financial and business reports Mid Term MoEW WE RS-B.1.3.3 Define the monthly activity report submission and validation structure and procedure High MoEW WE RS-B.1.3.4 Develop the framework for the annual external audit and evaluation of WE High MoEW WE RS-B.1.3.5 Define key performance indicators to be monitored in the short, medium and long term (in alignment with the WE monitoring capacities) High MoEW WE RS-B.1.3.6 Establish performance contracts between the MoEW and WE High MoEW WE RS-B.1.3.7 Set up the performance monitoring committee as required by law 221 High MoEW WE, MoF Total A.3 900 000 Total RS-B.1. Sector Governance : 1 355 000 USD Activity Priority Covered under item A.1.2 Recruitment of consultants / experts (water services management, HR, capacity building) Assessment and CB plan validated by MoEW and activity reports of the supporting activities INT Recruitment of technical assitants (to 2 Experts in water services management and performance monitoring) Recruitment : End 2020 TA until end 2025 *Standardized reports prepared by WEs *Conduction of external annual audits starting in 2021 *Production of KPI *Performance contracts between MoEW and WEs INT 900 000 May 2020 - V B 90 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SECTOR GOVERNANCE PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendice RS-B : Water Governance priority action plan Stakeholder Means to mobilize Deadline Indicators Funding Cost Lead Involved (USD) Activity Priority RS-B.2. Financial and commercial RS-B.2.1 Conduct a customer and user census RS-B.2.1.1 Identify customers connected to piped water and convert unknown customers tapping into the network into legal users High WE MoEW Recruitment of consultants (technical experts and census experts) - Census to be conducted for all customers / estimated to 1 500 000 of households (price: $3 for 1 household) Phase 1 : End 2020 Complete census : Beginning 2021 Census reports and updated WEs' consumers database INT 4 500 000 RS-B.2.1.2 Identify users of collective wastewater services (network or network+WWTP) / identify those who are / are not WE customers (cross-reference with the water supply customer census) in order to define specific approaches for tariff-setting High WE MoEW Recruitment of consultants (technical experts and census experts) Complete census for zone 1 by mid 2021 Census reports and updated WEs' wastewater services users database INT 2 000 000 RS-B.2.1.3 Ensure the take over of new customers/users by WEs and their inclusion in the customer/users database for the billing/collection cycle WE MoEW if needed support from specific TA Beginning 2022 Increasing subscribers base INT No Cost RS-B.2.2 Implement consumption-based tariffs for water service Total B.1 6 500 000 RS-B.2.2.1 Streamline the water meter billing procedure MoEW Recruitment of financial and water tariff expert(s) Mid 2022 Harmonized guidelines and procedures for water meter billing INT 50 000 RS-B.2.3 Revise the tariff structure for sanitation services Total B.2 50 000 RS-B.2.3.1 Conduct a proper cost analysis of facilities O&M MoEW End 2020 RS-B.2.3.2 Base the tariff on the cost analysis and, as a minimum, cover O&M costs WEs Mid 2021 Total B.3 200 000 Total RS-B.2. Financial and commercial : 6 750 000 USD Recruitment of technical and financial experts on wastewater management Adoption and implementation of new tariff policy for wastewater management INT 200 000 May 2020 - V B 91 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SECTOR GOVERNANCE PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendice RS-B : Water Governance priority action plan Stakeholder Means to mobilize Deadline Indicators Funding Cost Lead Involved (USD) Activity Priority RS-B.3. Reporting and monitoring RS-B.3.1 Enhance sector monitoring RS-B.3.1.1 Create a Monitoring Department within the Ministry MoEW Recruitment of legal consultant End of 2020 Revised Decree or Amendment to the Law 247 INT 7 500 MoEW Mid 2021 *TA recruitment *TA activity reports *Establishment and regular update of the sector database Mid 2022 Database RS-B.3.1.3 Set up an annual sector review involving the main stakeholders and partners MoEW Organisation of annual sector workshop Mid 2020 Workshop / annual review and annual sector review report National No Cost RS-B.3.1.4 Set up the process for monitoring the Strategy implementation status MoEW Analysis of sector data Mid 2025 Strategy implementation status report National No Cost RS-B.3.2 Enhance sector transparency Total C.1 757 500 RS-B.3.2.1 Ensure a transparent flow of information between WEs and MoEW through regular reporting (annual report, financial report, business report) MoEW Reports production and publication / TA support Continuious activity Meeting minutes, reports National No Cost RS-B.3.2.2 Publish annual WE reports (incl. results of audits performed by independent auditors) WEs Recruitment of external auditors starting from mid 2021 Annual WEs' reports publication National No Cost RS-B.3.2.3 Prepare financial reports based on IFRS book-keeping standards WEs Reports preparation with TA support if needed starting from mid 2021 Financial report National and INT TA No Cost RS-B.3.2.4 Publish the main sector indicators, ensuring these are updated on a regular basis MoEW Update of sector indicators (with TA - see C.1.1) starting from mid 2021 Publication of main sector indicators National and INT No Cost RS-B.3.2.5 Publish the breakdown of the water bill WEs Publication and communication support starting from mid 2021 Publication by each WE of the water bill breakdown National No Cost RS-B.3.3 Enhance sector coordination Total C.2 RS-B.3.3.1 Improve coordination between CDR and WEs on infrastructure project planning and management MoEW Regular meetings, MoEW follow up on coordination, support from donors and sector partners Continuious activity Participation of WEs in the projects design and implementation National No Cost RS-B.3.3.2 Organise an annual sector review involving all stakeholders and partners MoEW Organisation of annual sector workshop Mid 2020 Workshop / annual review and annual sector review report National No Cost RS-B.3.4 Enhance communication with user Total C.3 RS-B.3.4.1 Develop a communication strategy for MoEW and WE MoEW End 2020 RS-B.3.4.2 Design and launch a national communication campaign on the water sector MoEW Beginning 2021 Total C.4 500 000 Total RS-B.3. Reporting and monitoring : 1 257 500 USD 750 000 RS-B.3.1.2 Establish a unified database to include all sector monitoring data and ensure it is regularly updated (incl. the WE KPI) Recruitment of water sector monitoring (part-time assistance) and 1 IT expert (full time assistance) INT Recruitment of communication experts Communication strategy, tools and supports Internatio nal 500 000 May 2020 - V B 92 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SECTOR GOVERNANCE PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendice RS-B : Water Governance priority action plan Stakeholder Means to mobilize Deadline Indicators Funding Cost Lead Involved (USD) Activity Priority RS-B.4. Capacity-building RS-B.4.1 Strengthen the MoEW monitoring capacities RS-B.4.1.1 Appoint specific technical assistance to the MoEW to help develop monitoring MoEW RS-B.4.1.2 Support the MoEW in defining sector key performance indicators MoEW RS-B.4.1.3 Support the MoEW and the WEs in developing a performance monitoring f k MoEW RS-B.4.1.4 Identify the MoEW staff to be trained and supported in monitoring activities MoEW RS-B.4.2 Streamline and structure WE internal organisation and management Total D.1 RS-B.4.2.1 Conduct an overall internal audit in each WE (organisational, HR management, financial - assets, commercial, technical), propose measures and guidelines for streamlining internal WE organisation WEs Beginning 2021 Audit report validated by MoEW and the four WEs INT 450 000 RS-B.4.2.2 Prepare a handbook of jobs in the WEs with minimum skills required per position and standard training / capacity-building plan to be implemented WEs *Beginning of 2022 for the hanbook validation *End of 2025 for implementing the capacity-building plan and TA support *Handbook *Capacity-building plan *TA activity reports and specific studies INT 2 500 000 Total D.2 2 950 000 Total RS-B.4. Capacity-building : 2 950 000 USD RS-B.5. O&M of facilities and services RS-B.5.1 Improve operating cost control RS-B.5.1.1 Develop a specific strategy to control the energy costs of the facilities (based on ongoing studies) MoEW Recruitment of technical and financial experts End of 2021 Validated reports and strategic guidelines INT 150 000 RS-B.5.1.2 Define guidelines to ensure that facilities design is adapted to the capacity to cover their operating costs MoEW Recriutment of technical and financial experts (coordinate with other financial and technical studies) End of 2021 Publication of guidelines INT 100 000 RS-B.5.2 Enhance private sector involvement Total E.1 250 000 RS-B.5.2.1 Review existing contracts with private operators and develop a new contracting framework and performance-based contracts WEs Recruitment of institutional, legal and technical experts in overseeing water facilities O&M contracts Mid 2021 for pilot contract for wastewater facilities management End of 2025 to assess the contracts and revise the framework (if needed) Implementation of performance based contracts Assessment report of the efficiency and ownership by WEs of this framework and propose improvements INT 160 000 RS-B.5.2.2 Identify the tasks or activities to be outsourced and the outsourcing arrangements to be adopted WEs Recruitment of the following experts: institutional, O&M of water utilities, capacity-building and HR management, water and wastewater Mid 2021 Reports and validation of the proposed framework by WEs and MoEW INT No Cost Recruitment of the following experts: institutional, O&M of water utilities, capacity-building and HR management, water and wastewater Covered under item C.1.1 Covered under item A3 May 2020 - V B 93 NATIONAL WATER SECTOR STRATEGY UPDATE - 2019 VOLUME V PROPOSED PROJECTS SECTOR GOVERNANCE PROJECTS APPENDICES Section V B Appendices to Proposed Projects Appendice RS-B : Water Governance priority action plan Stakeholder Means to mobilize Deadline Indicators Funding Cost Lead Involved (USD) Activity Priority RS-B.5.3 Adopt a shared wastewater management framework Total E.2 160 000 RS-B.5.3.1 Address the issue of the organization(s) responsible for managing the WW network and treatment plants (WEs, municipalities, private operators.) and determine the financing method MoEW Recruitment of institutional, financial and technical experts in wastewater facilities operation and management Mid 2021 Publication of the wastewater management framework INT 250 000 Total E.3 250 000 Total : 660 000 USD May 2020 - V B 94

Updated National Water Sector Strategy (NWSS) 2020 - Volume V · Nelum