Building Control Regulations 2020 (S.I. No. 113 of 2020)
Made 2020-04-03 · Text as of 2026-10-01
Public law and official guidance, published as research. Not legal, tax or financial advice.
About this law
- Language
- English
- Kind
- Regulation
- Country
- Ireland
- Subjects
- Land and soil, General
- Keywords
- hazards, early warning system, coronavirus disease (COVID-19), land-use planning
Where to read it
No source link is recorded for this law.
Text
The law's own text, section by section, as held. Each section has its own link.
1. (1) These Regulations may be cited as the Building Control Regulations 2020. (2) The Building Control Regulations 1997 to 2018 and these Regulations may be cited together as the Building Control Regulations 1997 to 2020.
2. In these Regulations – “material change of use” has the meaning assigned to it by the Principal Regulations; “Principal Regulations” means Building Control Regulations 1997 (No. 496 of 1997); “relevant period” means the period commencing on 13 March 2020 and ending on the day on which Part 3 of the Health (Preservation and Protection and other Emergency Measures in the Public Interest) Act 2020 (No. 1 of 2020) ceases to have effect by virtue of subsection (3) of section 2 of that Act; “State authority” means – (a) a Minister of the Government, or (b) the Commissioners of Public Works in Ireland.
3. (1) Parts II, III, IIIA (other than Article 20C), IIIB and IIIC and Article 43 of the Principal Regulations shall not apply in relation to – (a) works consisting of, or in connection with, the construction, extension, alteration, repair, or renewal of a building of a class specified in Schedule 1 carried out and completed during the relevant period by, or on behalf of, a State authority, or (b) a material change of use to use as a building of such a class during the relevant period by, or on behalf of, a State authority. (2) Subject to paragraph (3), Article 20C of the Principal Regulations shall apply in relation to works referred to in paragraph (1) as if “shall, not later than 12 months from the expiration of the relevant period (within the meaning of the Building Control Regulations 2020),” were substituted for “shall”. Notice of the making of this Statutory Instrument was published in “Iris Oifigiúil” of 7th April, 2020. [113] 3 (3) Article 20C of the Principal Regulations shall not apply to works in relation to a building to which paragraph (1) applies if the building is demolished or removed before the expiration of 12 months from the end of the relevant period.
4. (1) The Principal Regulations shall not apply in relation to a material change of use of a relevant building to the use for which it was used immediately before the material change of use referred to in subparagraph (b) of paragraph (1) of Regulation 3. (2) In this Regulation “relevant building” means a building to which a material change of use referred to in subparagraph (b) of paragraph (1) of Regulation 3 applies.
5. (1) Where works referred to in Regulation 3 are carried out by, or on behalf of a State authority, during the relevant period the State authority shall, not later than 28 days after the commencement of those works, serve a notice (in these Regulations referred to as a “works (Covid-19 crisis) notice”) in the form specified in Schedule 2 on the building control authority within whose functional area those works are carried out. (2) A works (Covid-19 crisis) notice shall be accompanied by a declaration in the form specified in Schedule 3 made by the State authority concerned. (3) A building control authority upon which a works (Covid-19 crisis) notice and declaration referred to in paragraph (2) is served shall – (a) if satisfied that the works (Covid-19 crisis) notice and declaration are in the proper form and contain the information required by these Regulations to be provided in that form, notify the State authority in writing that the State authority has complied with paragraphs (1) and (2), or (b) if not so satisfied, request the State authority to provide such information to the building control authority as it may reasonably require for the purposes of these Regulations. (4) A building control authority that has made a request in accordance with subparagraph (b) of paragraph (3) shall, upon receipt of the information requested, notify the State authority in writing that the building control authority is satisfied that the State authority has complied with paragraphs (1) and (2). 4 [113]
SCHEDULE 1 (Regulation 3) CLASSES OF BUILDING FOR PURPOSES OF REGULATION 3 1. Acute and other health and social care accommodation. 2. Self-isolation short stay accommodation. 3. Covid-19 and other step down accommodation. 4. Medical testing centre or laboratory. 5. Emergency management coordination facilities. 6. Mortuary facilities. 7. Other accommodation or buildings ancillary to the classes of building referred to above, including storage facilities. [113] 5
SCHEDULE 2 (Regulation 5(1)) WORKS (COVID-19 CRISIS) NOTICE (Notice to a Building Control Authority pursuant to Regulation 5(1) of the Building Control Regulations 2020) Building Control Authority: ____________________ Unique Identifier:___________ (for official use only) Date of receipt: ___________ 1. I / We, _________________________, hereby give notice in accordance with Regulation 5(1) of the Building Control Regulations 2020 that it is intended to carry out the works and / or Material Change of Use (hereinafter referred to as “development”) as described below, by or on or behalf of ____________________________________________________________(State authority): Name of State authority (or organisation acting on behalf of the State authority): ________________________________________________________________________ Address:_________________________________________________________________ _________________________________________________________________________ Eircode: _____________________________ Name of Contact Person: __________________________________ Telephone: __________________________________ Email: ___________________________________ 2. Project Particulars: Description of the proposed development: ______________________________________ ________________________________________________________________________ ________________________________________________________________________ Location of the proposed development: _________________________________________ ________________________________________________________________________ ________________________________________________________________________ Number of existing buildings to which this notice relates: _____________ Number of new buildings to which this notice relates: _____________ Use of buildings: ________________________________________________________ 6 [113] 3. Builder(s): Works: ____________________________________________________________________ Name: ____________________________________________________________________ Address:_________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Eircode: __________________________________ Telephone: ________________________________ Email: ___________________________________ Construction Industry Register Ireland Registration No. (where applicable):____________ 4. Building Designer(s): Works: ____________________________________________________________________ Name:___________________________________________________________________ Address:_________________________________________________________________ _________________________________________________________________________ Eircode: _____________________________ Telephone: ______________________________ Email: ___________________________________ Practice Registration No. (where relevant): ______________ 5. Signature Signature of Contact Person:________________________________________________ By or on behalf of ___________________ (State authority). Date:___________________ Note: This Notice is required to be accompanied by the DECLARATION TO ACCOMPANY WORKS (COVID-19 CRISIS) NOTICE. [113] 7
SCHEDULE 3 (Regulation 5(2)) DECLARATION TO ACCOMPANY WORKS (COVID-19 CRISIS) NOTICE Declaration of intention to carry out Works or a Material Change of Use, in response to the Covid-19 crisis, in accordance with the Building Regulations Building Control Authority_______________ Unique Identifier: _____________ (for official use only) 1. This declaration relates to the following works or a building as regards which a material change of use takes place: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 2. I /we __________________________ on behalf of ________________________ (State authority organisation acting on behalf of the State authority) hereby declare that works referred to above (being works or a building as regards which a material change of use take place, carried out in response to the Covid-19 crisis as set out in Regulation 3 of the Building Control Regulations 2020) will have adequate oversight, supervision, inspection and certification procedures in place to be carried out by competent persons to ensure that they are designed and constructed in accordance with the relevant applicable requirements of the second schedule to the Building Regulations 1997, having due regard to any dispensation or relaxation in respect of, or which is relevant. Signature of Contact Person: ________________________ Date: ______________ Name of State authority or organisation acting on behalf of the State authority: ______________________________________________________________________ Address: ______________________________________________________________ Eircode: ____________________________ Name of Contact Person: ___________________________________ Tel: ___________________________________ Email: ___________________________________ 8 [113] GIVEN under my Official Seal, 3 April, 2020. EOGHAN MURPHY, Minister for Housing, Planning and Local Government. [113] 9 EXPLANATORY NOTE (This note is not part of the instrument and does not purport to be a legal interpretation). The purpose for which these Regulations are made is to provide that temporarily, certain provisions of the Building Control Regulations 1997 (No. 496 of 1997) shall not apply in relation to works that are being carried out in response to COVID-19 and to provide for a new notification process in respect of those works. 10 [113] BAILE ÁTHA CLIATH ARNA FHOILSIÚ AG OIFIG AN tSOLÁTHAIR Le ceannach díreach ó FOILSEACHÁIN RIALTAIS, 52 FAICHE STIABHNA, BAILE ÁTHA CLIATH 2, D02 DR67. Teil: 076 110 6834 r-post: publications@opw.ie —————— DUBLIN PUBLISHED BY THE STATIONERY OFFICE To be purchased from GOVERNMENT PUBLICATIONS, 52 ST. STEPHEN'S GREEN, DUBLIN 2, D02 DR67. Tel: 076 110 6834 E-mail: publications@opw.ie —————— € 3.00 (BSDDHPLG-6) 85. 04/20. Propylon.