Nova Scotia Offshore Petroleum Installations Regulations (S.O.R./95-191)
Made 1995-04-04 · Text as of 2026-10-01
Public law and official guidance, published as research. Not legal, tax or financial advice.
About this law
- Language
- English
- Kind
- Regulation
- Organisation
- European Union
- Country
- Canada
- Subjects
- Energy
- Keywords
- energy conservation/energy production, oil, policy/planning, enforcement/compliance
- Categories
- energy
Where to read it
No source link is recorded for this law.
Text
The law's own text, section by section, as held. Each section has its own link.
1 SHORT TITLE 1 1 TITRE ABRÉGÉ 1
2 INTERPRETATION 1 2 DÉFINITIONS 1
3 PART I 3 PARTIE I GENERAL REQUIREMENTS 8 EXIGENCES GÉNÉRALES 8
3 GENERAL 8 3 DISPOSITIONS GÉNÉRALES 8
4 QUALITY ASSURANCE 8 4 ASSURANCE DE LA QUALITÉ 8
5 HELICOPTER DECK 8 5 HÉLIPONT 8
6 FACILITIES FOR INSPECTION AND 6 MATÉRIEL DESTINÉ À L’INSPECTION ET À MAINTENANCE 9 LA MAINTENANCE 9
7 SECONDARY STRUCTURES AND FITTINGS 9 7 DISPOSITIFS ET STRUCTURES SECONDAIRES 9
8 ARRANGEMENTS OF MATERIALS AND 8 DISPOSITION DES MATÉRIAUX ET DE EQUIPMENT 10 L’ÉQUIPEMENT 10
9 ACCESS TO HAZARDOUS AREAS 12 9 ACCÈS AUX ZONES DANGEREUSES 12
10 VENTILATION OF HAZARDOUS AREAS 13 10 VENTILATION DES ZONES DANGEREUSES 13
11 GENERAL ELECTRICAL STANDARDS 14 11 NORMES ÉLECTRIQUES GÉNÉRALES 14
12 EMERGENCY ELECTRICAL POWER 15 12 SOURCE D’ÉNERGIE ÉLECTRIQUE DE SECOURS 15
13 MECHANICAL EQUIPMENT 19 13 ÉQUIPEMENT MÉCANIQUE 19
14 WINTERIZATION 22 14 HIVÉRISATION 22
15 CORROSION PROTECTION 24 15 PROTECTION CONTRE LA CORROSION 24
16 CRANES 24 16 GRUES 24
17 GAS RELEASE SYSTEM 25 17 SYSTÈME DE DÉCHARGE DE GAZ 25
18 EMERGENCY SHUTDOWN SYSTEM 27 18 SYSTÈME D’ARRÊT D’URGENCE 27
19 ESCAPE ROUTES 29 19 VOIES DE SECOURS 29
20 PROTECTION AGAINST IMPACT 30 20 PROTECTION ANTI-COLLISION 30
21 NAVIGATIONAL EQUIPMENT 31 21 ÉQUIPEMENT DE NAVIGATION 31
22 LIFESAVING EQUIPMENT FOR 22 ENGINS DE SAUVETAGE DE INSTALLATIONS 31 L’INSTALLATION 31
23 PASSIVE FIRE AND BLAST PROTECTION 36 23 PROTECTION PASSIVE CONTRE L’INCENDIE ET LES EXPLOSIONS 36 3 SOR/95-191 — September 29, 2014 Section Page Article Page
24 FIRE HYDRANT SYSTEMS 41 24 SYSTÈMES DE BOUCHES D’INCENDIE 41
25 WATER DELUGE AND WATER MONITOR 25 SYSTÈME DÉLUGE ET SYSTÈME DE SYSTEMS IN AREAS WITH PETROLEUM 42 RÉGULATION D’EAU POUR LES ZONES CONTENANT DU PÉTROLE 42
26 GENERAL REQUIREMENTS FOR FIRE PUMP 26 EXIGENCES GÉNÉRALES VISANT LES SYSTEMS AND WATER MAINS 43 SYSTÈMES DE POMPES ET LES CONDUITES PRINCIPALES D’EAU 43
27 SPRINKLER SYSTEM IN ACCOMMODATION 27 RÉSEAU D’EXTINCTEURS DANS LES AREAS 45 SECTEURS D’HABITATION 45
28 FIRE EXTINGUISHING SYSTEMS IN 28 SYSTÈMES D’EXTINCTEURS D’INCENDIE MACHINERY AND FLAMMABLE LIQUID DANS LES ZONES DES MACHINES OU DE STORAGE SPACES 46 STOCKAGE DE LIQUIDES INFLAMMABLES 46
29 FIRE EXTINGUISHERS 49 29 EXTINCTEURS D’INCENDIE 49
30 FIREFIGHTING EQUIPMENT 51 30 ÉQUIPEMENT DE LUTTE CONTRE L’INCENDIE 51
31 AUTOMATIC FIRE DETECTION SYSTEMS 52 31 SYSTÈMES AUTOMATIQUES DE DÉTECTION D’INCENDIE 52
32 GAS DETECTION SYSTEMS 53 32 SYSTÈMES DE DÉTECTION DE GAZ 53
33 ALARM PANELS AND SIGNALS 54 33 PANNEAUX ET SIGNAUX D’ALARME 54
34 GENERAL ALARM SYSTEM 55 34 SYSTÈME D’ALARME GÉNÉRAL 55
35 PIPING SYSTEMS 56 35 RÉSEAU DE TUYAUTERIE 56
36 COMMUNICATION SYSTEMS 57 36 SYSTÈMES DE COMMUNICATION 57
37 PART II 37 PARTIE II ANALYSIS AND DESIGN 59 ANALYSE ET CONCEPTION 59
37 GENERAL DESIGN CONSIDERATIONS 59 37 CONSIDÉRATIONS GÉNÉRALES EN MATIÈRE DE CONCEPTION 59
38 DESIGN OF INSTALLATIONS 59 38 CONCEPTION DES INSTALLATIONS 59
39 DESIGN OF PLATFORMS 60 39 CONCEPTION DES PLATES-FORMES 60
40 ANALYSES 60 40 ANALYSES 60
41 INNOVATIONS FOR INSTALLATIONS 62 41 INNOVATIONS POUR LES INSTALLATIONS 62
42 REMOVAL AND ABANDONMENT OF FIXED 42 ENLÈVEMENT ET ABANDON DES PRODUCTION INSTALLATIONS 62 INSTALLATIONS FIXES DE PRODUCTION 62
43 CONCEPT SAFETY ANALYSIS FOR 43 ANALYSE DE SÉCURITÉ CONCEPTUELLE PRODUCTION INSTALLATIONS 62 POUR INSTALLATIONS DE PRODUCTION 62
44 ENVIRONMENTAL CRITERIA AND LOADS 65 44 CHARGES ET CRITÈRES ENVIRONNEMENTAUX 65
45 SITE INVESTIGATIONS 65 45 ÉTUDES VISANT LES EMPLACEMENTS 65
46 GEOTECHNICAL PARAMETERS 66 46 PARAMÈTRES GÉOTECHNIQUES DU FOND MARIN 66 4 DORS/95-191 — 29 septembre 2014 Section Page Article Page
47 SOIL DEFORMATION 66 47 DÉFORMATION DU FOND MARIN 66
48 EROSION OFFSHORE 66 48 ÉROSION DU FOND MARIN 66
49 MATERIALS FOR INSTALLATIONS 66 49 MATÉRIAUX POUR INSTALLATIONS 66
50 AIR GAP AND FREEBOARD 67 50 TIRANT D’AIR ET FRANC-BORD 67
51 LOAD MEASURING SYSTEM 68 51 SYSTÈME DE MESURE DES CHARGES 68
52 GRAVITY-BASE, FILL, FILL-RETENTION 52 PLATES-FORMES À EMBASE-POIDS, À AND SELF-ELEVATING PLATFORMS 68 REMBLAI, À RÉTENTION DE REMBLAI ET AUTO-ÉLÉVATRICES 68
53 PILE FOUNDATIONS 68 53 FONDATIONS SUR PILOTIS 68
54 STRUCTURAL STRENGTH OF MOBILE 54 RÉSISTANCE STRUCTURALE DES PLATES- PLATFORMS 69 FORMES MOBILES 69
55 MOTION RESPONSE CHARACTERISTICS 71 55 RÉACTION CARACTÉRISTIQUE AU MOUVEMENT 71
56 STABILITY OF MOBILE PLATFORMS 72 56 STABILITÉ DES PLATES-FORMES MOBILES 72
57 BALLAST AND BILGE SYSTEMS 74 57 SYSTÈMES DE LEST ET DE CALE 74
58 WATERTIGHT INTEGRITY OF FLOATING 58 ÉTANCHÉITÉ À L’EAU DES PLATES-FORMES PLATFORMS 77 FLOTTANTES 77
59 MOORING 81 59 AMARRAGE 81
60 DYNAMIC POSITIONING 84 60 POSITIONNEMENT DYNAMIQUE 84
61 SUBSEA PRODUCTION SYSTEMS 85 61 SYSTÈMES DE PRODUCTION SOUS-MARINS 85
62 PART III 62 PARTIE III CONSTRUCTION AND CONSTRUCTION ET MISE EN INSTALLATION 88 PLACE 88
62 GENERAL 88 62 DISPOSITIONS GÉNÉRALES 88
63 PART IV 63 PARTIE IV OPERATIONS AND EXPLOITATION ET MAINTENANCE 89 MAINTENANCE 89
63 MANUAL, PLANS AND PROGRAMS FOR 63 MANUEL, PLANS ET PROGRAMMES DES INSTALLATIONS 89 INSTALLATIONS 89
67 REPAIR, REPLACEMENT AND 67 RÉPARATIONS, REMPLACEMENTS ET MODIFICATION OF INSTALLATIONS 94 MODIFICATIONS DES INSTALLATIONS 94
68 REMEDIAL ACTION 95 68 MESURES CORRECTIVES 95
69 PART V 69 PARTIE V RECORDS AND REPORTING 95 REGISTRES ET RAPPORTS 95
69 GENERAL 95 69 DISPOSITIONS GÉNÉRALES 95
70 REPORT OF LOSS, EMERGENCY OR 70 RAPPORT DE PERTE, D’URGENCE OU ACCIDENT 95 D’ACCIDENT 95 5 SOR/95-191 — September 29, 2014 Section Page Article Page
71 PART VI 71 PARTIE VI OFFENCES 96 INFRACTIONS 96 6 Registration Enregistrement SOR/95-191 April 11, 1995 DORS/95-191 Le 11 avril 1995 CANADA-NOVA SCOTIA OFFSHORE PETROLEUM LOI DE MISE EN ŒUVRE DE L’ACCORD CANADA — RESOURCES ACCORD IMPLEMENTATION ACT NOUVELLE-ÉCOSSE SUR LES HYDROCARBURES EXTRACÔTIERS Nova Scotia Offshore Petroleum Installations Règlement sur les installations pour hydrocarbures Regulations de la zone extracôtière de la Nouvelle-Écosse P.C. 1995-606 April 4, 1995 C.P. 1995-606 Le 4 avril 1995 Whereas, pursuant to subsection 154(1) of the Attendu que, conformément au paragraphe 154(1) de Canada-Nova Scotia Offshore Petroleum Resources Ac- la Loi de mise en œuvre de l’Accord Canada — Nou- cord Implementation Act*, a copy of the proposed Regu- velle-Écosse sur les hydrocarbures extracôtiers*, le pro- lations respecting petroleum installations used in areas jet de Règlement concernant les installations relatives offshore Nova Scotia under the Canada-Nova Scotia aux hydrocarbures dans la zone extracôtière de la Nou- Offshore Petroleum Resources Accord Implementation velle-Écosse assujettie à la Loi de mise en œuvre de Act*, substantially in the form annexed hereto, was pub- l’Accord Canada — Nouvelle-Écosse sur les hydrocar- lished in the Canada Gazette Part I on February 19, bures extracôtiers, conforme en substance au texte ci- 1994 and a period of 30 days was thereafter afforded to après, a été publié dans la Gazette du Canada Partie I le interested persons to make representations to the Minis- 19 février 1994 et que, dans les 30 jours suivant cette ter of Natural Resources with respect thereto; date, les intéressés ont eu la possibilité de présenter leurs observations à cet égard au ministre des Ressources na- turelles; And Whereas, pursuant to section 6 of the Canada- Attendu que, conformément à l’article 6 de cette loi, le Nova Scotia Offshore Petroleum Resources Accord Im- ministre des Ressources naturelles a consulté son homo- plementation Act*, the Minister of Natural Resources has logue provincial de la province de la Nouvelle-Écosse consulted the Provincial Minister for the Province of No- sur le projet de règlement et que ce dernier a donné son va Scotia with respect to the proposed Regulations and approbation à la prise du règlement, the latter has given his approval for the making of those Regulations; Therefore, His Excellency the Governor General in À ces causes, sur recommandation du ministre des Council, on the recommendation of the Minister of Nat- Ressources naturelles et en vertu de l’article 153** de la ural Resources, pursuant to section 153** of the Canada- Loi de mise en œuvre de l’Accord Canada — Nouvelle- Nova Scotia Offshore Petroleum Resources Accord Im- Écosse sur les hydrocarbures extracôtiers*, il plaît à Son plementation Act*, is pleased hereby to make the Excellence le Gouverneur général en conseil de prendre annexed Regulations respecting petroleum installations le Règlement concernant les installations relatives aux used in areas offshore Nova Scotia under the Canada- hydrocarbures dans la zone extracôtière de la Nouvelle- Nova Scotia Offshore Petroleum Resources Accord Im- Écosse assujettie à la Loi de mise en œuvre de l’Accord plementation Act. Canada — Nouvelle-Écosse sur les hydrocarbures ex- tracôtiers, ci-après. * * S.C. 1988, c. 28 L.C. 1988, ch. 28 ** ** S.C. 1992, c. 35, s. 101 L.C. 1992, ch. 35, art. 101 REGULATIONS RESPECTING PETROLEUM RÈGLEMENT CONCERNANT LES INSTALLATIONS USED IN AREAS OFFSHORE INSTALLATIONS RELATIVES AUX NOVA SCOTIA UNDER THE CANADA-NOVA HYDROCARBURES DANS LA ZONE SCOTIA OFFSHORE PETROLEUM EXTRACÔTIÈRE DE LA NOUVELLE-ÉCOSSE RESOURCES ACCORD IMPLEMENTATION ASSUJETTIE À LA LOI DE MISE EN ŒUVRE ACT DE L’ACCORD CANADA — NOUVELLE- ÉCOSSE SUR LES HYDROCARBURES EXTRACÔTIERS SHORT TITLE TITRE ABRÉGÉ 1. These Regulations may be cited as the Nova Scotia 1. Règlement sur les installations pour hydrocarbures Offshore Petroleum Installations Regulations. de la zone extracôtière de la Nouvelle-Écosse. INTERPRETATION DÉFINITIONS 2. (1) In these Regulations, 2. (1) Les définitions qui suivent s’appliquent au pré- “accidental event” means an unplanned or unexpected sent règlement. event or circumstance or series of events or circum- « activité maritime » Activité relative au maintien de la stances that may lead to loss of life or damage to the en- position et à l’évitement des abordages des plates-formes vironment; (événement accidentel) mobiles. La présente définition comprend l’amarrage, le “accommodation area” means dependent personnel ac- positionnement dynamique et le lestage. (marine activi- commodation or an accommodation installation (secteur ties) d’habitation) « appareil de forage » Ensemble des dispositifs utilisés “accommodation installation” means an installation that pour faire un puits par forage ou autrement, notamment is used to accommodate persons at a production site or une tour de forage, un treuil, une table de rotation, une drill site and that functions independently of a produc- pompe à boue, un obturateur anti-éruption, un accumula- tion installation, drilling installation or diving installa- teur, un collecteur de duses, tout logement du personnel tion, and includes any associated dependent diving sys- connexe et tout matériel connexe, y compris les installa- tem; (installation d’habitation) tions de force motrice et les systèmes de surveillance et de contrôle. (drilling rig) “Act” means the Canada-Nova Scotia Offshore Petroleum Resources Accord Implementation Act; (Loi) « approbation de plan de mise en valeur » Approbation d’un plan de mise en valeur accordée en vertu de l’ar- “certificate of fitness” means a certificate, in the form ticle 143 de la Loi. (development plan approval) fixed by the Board, issued by a certifying authority in accordance with section 4 of the Nova Scotia Offshore « autorisation de programme de forage » Autorisation Certificate of Fitness Regulations; (certificat de confor- d’exécuter un programme de forage délivrée par l’Office mité) à une personne en vertu de l’alinéa 142(1)b) de la Loi. (Drilling Program Authorization) “certifying authority” has the same meaning as in section 2 of the Nova Scotia Offshore Certificate of Fitness Reg- « autorisation de programme de plongée » Autorisation ulations; (autorité) d’exécuter un programme de plongée délivrée par l’Of- fice à l’exploitant conformément à l’alinéa 142(1)b) de “Chief” means the Chief Safety Officer; (délégué) la Loi. (Diving Program Authorization) “classification society” means an independent organiza- « autorisation d’exécuter des travaux de production » Au- tion whose purpose is to supervise the construction, on- torisation d’exécuter des travaux de production délivrée 1 SOR/95-191 — September 29, 2014 going maintenance and any modifications of a platform par l’Office à l’exploitant en vertu de l’alinéa 142(1)b) in accordance with the society’s rules for classing plat- de la Loi. (production operations authorization) forms and includes the American Bureau of Shipping, « autorité » S’entend au sens de l’article 2 du Règlement Lloyd’s Register of Shipping, Det norske Veritas Classi- sur les certificats de conformité liés à l’exploitation des fication A/S and Bureau Veritas; (société de classifica- hydrocarbures dans la zone extracôtière de la Nouvelle- tion) Écosse. (certifying authority) “contingency plan” means a plan that addresses abnor- « base de forage » Base stable sur laquelle est installé un mal conditions or emergencies that can reasonably be appareil de forage, notamment la surface terrestre, une anticipated; (plan d’urgence) île artificielle, une plate-forme de glace, une plate-forme “control point” means a work area other than a control fixée au sol ou au fond marin et toute autre fondation station from which systems and equipment critical to the spécialement construite pour des travaux de forage. safety of the installation can be monitored and con- (drilling base) trolled; (poste de commande) « certificat de conformité » Certificat, en la forme établie “control station” means a continuously manned work par l’Office, délivré par l’autorité conformément à l’ar- area from which process and export equipment, wellhead ticle 4 du Règlement sur les certificats de conformité de manifold and christmas trees, main and emergency pow- la zone extracôtière de la Nouvelle-Écosse. (certificate er, fire and gas detection, fire control, communications of fitness) equipment, emergency shutdown systems, ballast control « charge environnementale » Charge due aux vagues, aux system, dynamic positioning systems and other systems courants, aux marées, au vent, à la glace, aux glaces ma- and equipment critical to the safety of the installation are rines, à la neige, à un tremblement de terre ou à tout remotely controlled or monitored; (salle de commande) autre phénomène naturel ou à toute combinaison de ces “damaged condition” means, with respect to a floating phénomènes. (environmental load) platform, the condition of the platform after it has suf- « condition avariée » Condition d’une plate-forme flot- fered damage to the extent described in the Code re- tante après que celle-ci a subi une avarie dont l’étendue ferred to in subsection 56(9); (condition avariée) est décrite dans le document visé au paragraphe 56(9). “dependent diving system” means a diving system that is (damaged condition) associated with an installation other than a diving instal- « condition de survie » Condition d’une plate-forme mo- lation and that does not function independently of the in- bile lorsqu’elle est soumise aux conditions environne- stallation; (système de plongée non autonome) mentales les plus rigoureuses déterminées conformément “dependent personnel accommodation” means personnel à l’article 44. (survival condition) accommodation that is associated with an installation « condition d’exploitation » Condition d’une plate-forme other than an accommodation installation and that does mobile au tirant d’eau d’exploitation. (operating condi- not function independently of the installation; (logement tion) du personnel connexe) « condition intacte » Condition d’une plate-forme flot- “development plan” means a development plan relating tante qui n’est pas en condition avariée. (intact condi- to the development of a pool or field that is referred to in tion) section 143 of the Act; (plan de mise en valeur) « conduite d’écoulement » Pipeline utilisé pour transpor- “development plan approval” means the approval of a ter des fluides entre un puits et le matériel de production, development plan pursuant to section 143 of the Act; (approbation de plan de mise en valeur) 2 DORS/95-191 — 29 septembre 2014 “diving installation” means a diving system and any as- notamment les pipelines à l’intérieur d’un champ et les sociated vessel that function independently of an accom- conduites d’amenée. (flowline) modation installation, production installation or drilling « délégué » Délégué à la sécurité. (Chief) installation; (installation de plongée) « dommage majeur » Dommage qui cause de la pollution “Diving Program Authorization” means an authorization incontrôlée ou la perte de vies, ou qui menace des vies. to conduct a diving program that is issued to an operator (major damage) by the Board pursuant to paragraph 142(1)(b) of the Act; (autorisation de programme de plongée) « emplacement de forage » Emplacement où un appareil de forage est ou est censé être installé. (drill site) “diving system” means the plant or equipment used in or in connection with a diving operation, and includes the « emplacement de production » Emplacement où une ins- plant and equipment that are essential to a diver or to a tallation de production est ou est censée être installée. pilot of a manned submersible; (système de plongée) (production site) “drilling base” means the stable foundation on which a « étanche à l’eau » Se dit de ce qui est conçu et construit drilling rig is installed, and includes the ground surface, pour résister, sans fuite, à une charge statique d’eau. an artificial island, an ice platform, a platform fixed to (watertight) the ground or seafloor and any other foundation special- « événement accidentel » Événement ou circonstance im- ly constructed for drilling operations; (base de forage) prévu ou inattendu, ou série de tels événements ou cir- “drilling installation” means a drilling unit or a drilling constances qui peut entraîner la perte de vies ou des rig and its associated drilling base, and includes any as- dommages à l’environnement. (accidental event) sociated dependent diving system; (installation de fo- « exploitant » Personne qui a demandé ou qui a reçu une rage) autorisation d’exécuter des travaux de production, une “Drilling Program Authorization” means an authoriza- autorisation de programme de forage ou une autorisation tion to conduct a drilling program that is issued to a per- de programme de plongée. (operator) son by the Board pursuant to paragraph 142(1)(b) of the « installation » Installation de plongée, de forage, de pro- Act; (autorisation de programme de forage) duction ou d’habitation. (installation) “drilling rig” means the plant used to make a well by « installation de forage » Unité de forage ou appareil de boring or other means, and includes a derrick, draw- forage ainsi que sa base de forage, notamment tout sys- works, rotary table, mud pump, blowout preventer, accu- tème de plongée non autonome connexe. (drilling instal- mulator, choke manifold, dependent personnel accom- lation) modation and other associated equipment, including « installation de plongée » Système de plongée et tout na- power, control and monitoring systems; (appareil de fo- vire connexe qui fonctionnent indépendamment d’une rage) installation de forage, de production ou d’habitation. “drilling unit” means a drillship, submersible, semi-sub- (diving installation) mersible, barge, jack-up or other vessel that is used in a « installation de production » Matériel de production ain- drilling program and is fitted with a drilling rig, and in- si que toute plate-forme, toute île artificielle, tout sys- cludes other facilities related to drilling and marine ac- tème de production sous-marin, tout système de charge- tivities that are installed on a vessel or platform; (unité ment, tout matériel de forage, tout matériel afférent aux de forage) activités maritimes et tout système de plongée non auto- “drill site” means a location where a drilling rig is or is nome connexes. (production installation) proposed to be installed; (emplacement de forage) 3 SOR/95-191 — September 29, 2014 “environmental load” means a load imposed by waves, « installation d’habitation » Installation qui sert à loger currents, tides, wind, ice, sea ice, snow, an earthquake or des personnes à un emplacement de production ou de fo- any other naturally occurring phenomenon, or by any rage et qui fonctionne indépendamment de toute installa- combination of those phenomena; (charge environne- tion de production, de forage ou de plongée. La présente mentale) définition comprend tout système de plongée non auto- “floating platform” means a column-stabilized mobile nome connexe. (accommodation installation) platform or a surface mobile platform; (plate-forme flot- « installation habitée » Installation où des personnes sont tante) habituellement présentes. (manned installation) “flowline” means a pipeline that is used to transport flu- « installation inhabitée » Installation habituellement inoc- ids from a well to a production facility or vice versa, and cupée où, lorsque s’y trouvent des personnes, elles effec- includes intrafield export and all gathering lines; tuent des travaux opérationnels, de la maintenance ou (conduite d’écoulement) des inspections qui ne nécessitent pas un séjour de plus “gastight door” means a solid, close-fitting door de- d’une journée. (unmanned installation) signed to resist the passage of gas under normal operat- « logement du personnel connexe » Logement du person- ing conditions; (porte étanche aux gaz) nel qui fait partie d’une installation, autre qu’une instal- “hazardous area” means an area classified as hazardous lation d’habitation, et qui ne peut fonctionner indépen- in the Recommended Practice referred to in subsection damment de l’installation. (dependent personnel (2); (zone dangereuse) accommodation) “installation” means a diving installation, a drilling in- « Loi » La Loi de mise en œuvre de l’Accord Canada — stallation, a production installation or an accommodation Nouvelle-Écosse sur les hydrocabures extracôtiers. (Act) installation; (installation) « manuel d’exploitation » Manuel visé à l’article 63. (op- “intact condition” means, with respect to a floating plat- erations manual) form, that the platform is not in a damaged condition; « matériau incombustible » Matériau qui ne brûle pas ou (condition intacte) ne dégage pas de vapeurs inflammables en quantité suf- “machinery space” means a space on an installation fisante pour s’enflammer lorsqu’il est chauffé à 750 °C. where equipment incorporating rotating or reciprocating (non-combustible material) mechanical equipment in the form of an internal com- « matériel de production » Matériel de production du pé- bustion engine, a gas turbine, an electric motor, a gener- trole ou du gaz se trouvant à l’emplacement de produc- ator, a pump or a compressor is located; (zone des ma- tion, y compris les équipements de séparation, de traite- chines) ment et de transformation, le matériel et les équipements “major damage” means damage that results in uncon- utilisés à l’appui des travaux de production, les aires trolled pollution or loss of or serious threat to life; (dom- d’atterrissage, les héliports, les aires ou les réservoirs de mage majeur) stockage et les logements du personnel connexes. La présente définition exclut toute plate-forme, toute île ar- “manned installation” means an installation on which tificielle, tout système de production sous-marin, tout persons are normally present; (installation habitée) équipement de forage et tout système de plongée “marine activities” means activities related to position connexes. (production facility) keeping and collision avoidance of mobile platforms, in- « nouvelle installation » Installation construite après l’en- cluding mooring, dynamic positioning and ballasting; trée en vigueur du présent règlement. (new installation) (activité maritime) 4 DORS/95-191 — 29 septembre 2014 “mobile platform” means a platform that is designed to « plan de mise en valeur » Plan afférent à la mise en va- operate in a floating or buoyant mode or that can be leur d’un gisement ou d’un champ qui est visé à l’article moved from place to place without major dismantling or 143 de la Loi. (development plan) modification, whether or not it has its own motive pow- « plan d’urgence » Plan qui traite des situations anor- er; (plate-forme mobile) males ou d’urgence qui sont prévisibles. (contingency “new installation” means an installation that is construct- plan) ed after the coming into force of these Regulations; « plate-forme » Plate-forme liée à une installation. (plat- (nouvelle installation) form) “non-combustible material” means material that does not « plate-forme flottante » Plate-forme mobile stabilisée burn or give off flammable vapours in sufficient quantity par colonnes ou une plate-forme mobile qui est une for self- ignition when heated to 750°C; (matériau in- plate-forme de surface. (floating platform) combustible) « plate-forme mobile » Plate-forme qui est conçue pour “operating condition”, with respect to a mobile platform, fonctionner à flot ou qui peut être déplacée sans déman- means the condition of operating at the operating draft; tèlement ou modification d’importance, qu’elle soit au- (condition d’exploitation) topropulsée ou non. (mobile platform) “operating draft”, with respect to a mobile platform, « porte étanche aux gaz » Porte pleine et ajustée, conçue means the vertical distance in metres from the moulded pour résister au passage des gaz dans des conditions d’u- base line to the assigned waterline, where the platform is sage normales. (gastight door) operating under combined environmental and opera- tional loads that are within the limits for which the plat- « poste de commande » Zone de travail, autre que la salle form was designed to operate; (tirant d’eau d’exploita- de commande, d’où peuvent être contrôlés et surveillés tion) les systèmes et les équipements essentiels à la sécurité de l’installation. (control point) “operations manual” means the manual referred to in section 63; (manuel d’exploitation) « salle de commande » Zone de travail continuellement occupée d’où sont contrôlés ou surveillés à distance “operator” means a person who has applied for or has l’équipement de traitement et d’exportation, le collecteur been granted a production operations authorization, a de tête de puits et d’éruption, les sources d’énergie prin- Drilling Program Authorization or a Diving Program cipale et de secours, le système de détection d’incendie Authorization; (exploitant) et de gaz, le système de lutte contre l’incendie, l’équipe- “platform” means a platform associated with an installa- ment de communication, les systèmes d’arrêt d’urgence, tion; (plate-forme) les systèmes de régulation du lest, les systèmes de posi- “production facility” means equipment for the produc- tionnement dynamique et tout autre système ou équipe- tion of oil or gas located at a production site, including ment essentiels à la sécurité de l’installation. (control separation, treating and processing facilities, equipment station) and facilities used in support of production operations, « secteur d’habitation » Installation d’habitation ou loge- landing areas, heliports, storage areas or tanks and de- ment du personnel connexe. (accommodation area) pendent personnel accommodations, but not including « société d’accréditation » [Abrogée, DORS/2009-317, any associated platform, artificial island, subsea produc- art. 99] tion system, drilling equipment or diving system; (maté- riel de production) « société de classification » Organisme indépendant ayant pour objet de superviser la construction, l’entretien 5 SOR/95-191 — September 29, 2014 “production installation” means a production facility and courant et la modification des plates-formes effectués any associated platform, artificial island, subsea produc- conformément à ses règles de classification de telles tion system, offshore loading system, drilling equipment, plates-formes. La présente définition comprend l’Ameri- facilities related to marine activities and dependent div- can Bureau of Shipping, le Lloyd’s Register of Shipping, ing system; (installation de production) le Det norske Veritas Classification A/S et le Bureau Ve- “production operation” means an operation that is related ritas. (classification society) to the production of oil or gas from a pool or field; (tra- « système de plongée » Ensemble des dispositifs ou du vaux de production) matériel utilisés directement ou indirectement pour les “production operations authorization” means an autho- opérations de plongée, notamment les dispositifs et le rization to conduct production operations issued to an matériel essentiels au plongeur ou au pilote d’un sub- operator by the Board pursuant to paragraph 142(1)(b) of mersible habité. (diving system) the Act; (autorisation d’exécuter des travaux de produc- « système de plongée non autonome » Système de plon- tion) gée qui est lié à une installation, autre qu’une installation “production site” means a location where a production de plongée, et qui ne peut fonctionner indépendamment installation is or is proposed to be installed; (emplace- de l’installation. (dependent diving system) ment de production) « système de production sous-marin » Matériel et struc- “subsea production system” means equipment and struc- tures, y compris les tubes prolongateurs de production, tures that are located on or below or buried in the les conduites d’écoulement et les systèmes connexes de seafloor for the production of oil or gas from, or for the contrôle de la production, situés à la surface ou sous la injection of fluids into, a field under a production site, surface du fond marin ou dans le fond marin et utilisés and includes production risers, flow lines and associated pour la production de pétrole ou de gaz d’un gisement production control systems; (système de production qui se trouve sous un emplacement de production ou sous-marin) pour l’injection de fluides dans un tel gisement. (subsea production system) “survival condition”, with respect to a mobile platform, means the condition of the platform when it is subjected « tirant d’eau de survie » La distance verticale en mètres to the most severe environmental conditions determined entre la ligne de base et la ligne de flottaison attribuée de pursuant to section 44; (condition de survie) la plate-forme mobile lorsque celle-ci est soumise aux charges environnementales les plus rigoureuses détermi- “survival draft”, with respect to a mobile platform, nées conformément à l’article 44. (survival draft) means the vertical distance in metres from the moulded baseline to the assigned waterline, where the platform is « tirant d’eau de transit » La distance verticale en mètres subjected to the most severe environmental conditions entre la ligne de base et la ligne de flottaison attribuée de determined pursuant to section 44; (tirant d’eau de sur- la plate-forme mobile lorsque celle-ci se déplace d’un vie) lieu géographique à un autre. (transit draft) “transit draft”, with respect to a mobile platform, means « tirant d’eau d’exploitation » La distance verticale en the vertical distance in metres from the moulded base mètres entre la ligne de base et la ligne de flottaison at- line to the assigned waterline, when the platform is mov- tribuée de la plate-forme mobile lorsque celle-ci fonc- ing from one geographical location to another; (tirant tionne en présence de charges combinées d’exploitation d’eau de transit) et environnementales en deçà de ses limites nominales. (operating draft) “unmanned installation” means an installation on which persons are not normally present and in those instances 6 DORS/95-191 — 29 septembre 2014 when persons are present on the installation, their pres- « travaux de production » Travaux liés à la production de ence is for the purpose of performing operational duties, pétrole ou de gaz à partir d’un champ ou d’un gisement. maintenance or inspections that will not necessitate an (production operation) overnight stay; (installation inhabitée) « unité de forage » Navire de forage, submersible, semi- “watertight” means designed and constructed to with- submersible, barge, plate-forme auto-élévatrice ou autre stand a static head of water without any leakage; navire utilisés pour l’exécution d’un programme de fo- (étanche à l’eau) rage et munis d’un appareil de forage. La présente défi- “working area” means any area of an installation that a nition comprend tout autre matériel afférent aux activités person may occupy during the normal course of duties, maritimes et de forage qui est installé sur un navire ou and includes a control room, workshop, machinery une plate-forme. (drilling unit) space, storage area and paint locker. (zone de travail) « zone dangereuse » Espace classé comme dangereux dans le document visé au paragraphe (2). (hazardous area) « zone des machines » Espace d’une installation où est situé de l’équipement comprenant de l’équipement mé- canique rotatif ou alternatif, soit des moteurs à combus- tion interne, des turbines à gaz, des moteurs électriques, des génératrices, des pompes ou des compresseurs. (ma- chinery space) « zone de travail » Tout espace de l’installation qu’une personne peut occuper dans l’exercice de ses fonctions, y compris la salle de commande, les ateliers, les zones des machines, les zones d’entreposage et les magasins de peinture. (working area) (2) Subject to subsection 9(2), for the purposes of (2) Sous réserve du paragraphe 9(2) et pour l’applica- sections 10, 11, 13, 14, 19 and 33, the classification of tion des articles 10, 11, 13, 14, 19 et 33, la classification hazardous areas with respect to hazards caused by com- des zones dangereuses quant aux risques dus aux gaz bustible gases on an installation shall be made in accor- combustibles dans une installation doit être faite confor- dance with American Petroleum Institute RP 500, Rec- mément au document RP 500 de l’American Petroleum ommended Practice for Classification of Locations for Institute intitulé Recommended Practice for Classifica- Electrical Installations at Petroleum Facilities. tion of Locations for Electrical Installations at Petro- leum Facilities. (3) A reference to a standard or specification shall be (3) Le renvoi à une norme ou à une spécification est considered to be a reference to that standard or specifica- réputé se rapporter à celle-ci compte tenu de ses modifi- tion as amended from time to time. cations successives. SOR/2009-317, ss. 99, 102(F). DORS/2009-317, art. 99 et 102(F). 7 SOR/95-191 — September 29, 2014 PART I PARTIE I GENERAL REQUIREMENTS EXIGENCES GÉNÉRALES GENERAL DISPOSITIONS GÉNÉRALES 3. For the purpose of ensuring the safety of an instal- 3. En vue d’assurer la sécurité d’une installation, il lation, no operator shall use the installation unless the est interdit à l’exploitant d’utiliser l’installation, sauf si equipment on the installation is arranged in accordance son équipement est disposé conformément au présent rè- with these Regulations to glement de façon à : (a) provide for the safety of personnel; a) assurer la sécurité du personnel; (b) minimize damage to the environment; and b) réduire au minimum les dommages à l’environne- (c) enable easy access to the equipment. ment; c) être facilement accessible. QUALITY ASSURANCE ASSURANCE DE LA QUALITÉ 4. (1) Every new installation shall be designed, con- 4. (1) Toute nouvelle installation doit être conçue, structed, installed and commissioned in accordance with construite, mise en place et mise en service aux termes a quality assurance program that complies with subsec- d’un programme d’assurance de la qualité établi confor- tion (2) and that is selected in accordance with Canadian mément au paragraphe (2) et choisi conformément au Standards Association CAN3-Z299.0-86, Guide for Se- Guide de sélection et de mise en pratique des normes lecting and Implementing the CAN3-Z299-85 Quality CAN3-Z299-85 de programme d’assurance de la quali- Assurance Program Standards. té, CAN3-Z299.0-86 de l’Association canadienne de normalisation. (2) A quality assurance program shall be developed (2) Les programmes d’assurance de la qualité sont in accordance with établis selon les prescriptions suivantes de l’Association (a) Canadian Standards Association CAN3- canadienne de normalisation : Z299.l-85, Quality Assurance Program — Category 1; a) Programme d’assurance de la qualité-Catégorie 1, (b) Canadian Standards Association CAN3- CAN3-Z299.1-85; Z299.2-85, Quality Control Program — Category 2; b) Programme d’assurance de la qualité-Catégorie 2, (c) Canadian Standards Association CAN3- CAN3-Z299.2-85; Z299.3-85, Quality Verification Program — Category c) Programme d’assurance de la qualité-Catégorie 3, 3; and CAN3-Z299.3-85; (d) Canadian Standards Association CAN3- d) Programme d’assurance de la qualité-Catégorie 4, Z299.4-85, Inspection Program — Category 4. CAN3-Z299.4-85. HELICOPTER DECK HÉLIPONT 5. (1) Every helicopter deck or facility that forms 5. (1) Tout hélipont ou installation d’hélicoptères fai- part of an installation shall sant partie de l’installation doit : 8 DORS/95-191 — 29 septembre 2014 (a) conform to Transport Canada TP 4414, Guide- a) être conforme aux Lignes directrices applicables lines Respecting Helicopter Facilities on Ships; and aux installations destinées aux hélicoptères à bord des (b) be equipped so that any fuel stored on or adjacent navires de Transports Canada, TP 4414; to the helicopter deck or to the accommodation areas b) être équipé de sorte que tout carburant qui y est en- (i) can be jettisoned by action taken at another lo- treposé dans un endroit adjacent à l’hélipont ou aux cation on the installation, or secteurs d’habitation puisse : (ii) is protected against damage or impact. (i) soit être jeté par-dessus bord par le truchement d’une mesure prise d’un autre lieu de l’installation, (ii) soit être protégé contre tout dommage ou im- pact. (2) Every helicopter deck that forms part of an instal- (2) Tout hélipont faisant partie de l’installation doit lation shall be in a location that is readily accessible to être situé en un lieu facilement accessible à partir du lo- and from the dependent personnel accommodation of the gement du personnel connexe de l’installation. installation. FACILITIES FOR INSPECTION AND MAINTENANCE MATÉRIEL DESTINÉ À L’INSPECTION ET À LA MAINTENANCE 6. An installation shall be designed and equipped in 6. L’installation doit être conçue et équipée de ma- such a manner as to allow for the monitoring, mainte- nière à en permettre la surveillance, la maintenance et nance and periodic inspection of the installation, includ- l’inspection périodique, notamment grâce à : ing a) l’identification et au marquage précis des zones à (a) clear marking and identification of the areas to be inspecter; inspected; b) l’accès en toute sécurité aux zones à inspecter et à (b) provision for safe access to and adequate inspec- l’espace suffisant pour leur inspection; tion space for the areas to be inspected; c) des espaces réservés à l’entreposage et à l’utilisa- (c) space for the storage and operation of diving tion de l’équipement de plongée; equipment; d) des moyens destinés à faciliter le travail des plon- (d) means to facilitate the work of divers, where in- geurs lorsqu’ils doivent procéder à une inspection; spection by divers is required; e) des moyens destinés à aider le personnel de main- (e) means to assist maintenance personnel, including tenance, y compris celui de maintenance sous-marine, those doing underwater maintenance, to perform their à effectuer son travail efficacement et en toute sécuri- work safely and effectively; and té; (f) in the case of a mobile platform that is not intend- f) dans le cas d’une plate-forme mobile qui n’est pas ed to be periodically drydocked, means to facilitate censée être périodiquement mise en cale sèche, des on-location inspection of the hull. moyens destinés à faciliter l’inspection sur place de la coque. SECONDARY STRUCTURES AND FITTINGS DISPOSITIFS ET STRUCTURES SECONDAIRES 7. All decks, deckhouses, skids, modules and other 7. Les ponts, superstructures, patins, modules et structures located or installed on an installation shall be autres structures situés ou montés sur une installation 9 SOR/95-191 — September 29, 2014 capable of withstanding all the loads and forces to which doivent pouvoir résister à toutes les charges et les forces they will be subjected, as determined in accordance with auxquelles ils seront soumis, selon ce qui est déterminé section 44. conformément à l’article 44. ARRANGEMENTS OF MATERIALS AND EQUIPMENT DISPOSITION DES MATÉRIAUX ET DE L’ÉQUIPEMENT 8. (1) In this section 8. (1) Les définitions qui suivent s’appliquent au pré- “flame-type equipment” means any electric or fired heat- sent article. ing equipment that uses an open flame, electric arc or el- « équipement de type à flamme » Tout équipement de ement, and includes a space heater, a torch, a heated pro- chauffage électrique ou alimenté en carburant qui com- cess vessel, a boiler, an electric arc or an open flame prend une flamme nue, un arc électrique ou un élément welder, or an open element electric heater or appliance; électrique. La présente définition comprend les radia- (équipement de type à flamme) teurs de chauffage, les chalumeaux, les récipients de fa- “process vessel” means a heater, dehydrator, separator, brication chauffés, les chaudières, les appareils de sou- treater or vessel used in the processing or treatment of dage à arc électrique ou à flamme nue, les radiateurs et produced gas or oil. (récipient de fabrication) les appareils électriques dont l’élément est à découvert. (flame-type equipment) « récipient de fabrication » Radiateur, déshydrateur, sé- parateur, purificateur ou récipient utilisé pour le traite- ment ou le raffinage du pétrole ou du gaz produit. (pro- cess vessel) (2) No person shall create or cause to be created any (2) Il est interdit d’allumer ou de faire en sorte que unprotected flame or source of ignition within 50 m of a soit allumée une flamme nue ou une source d’inflamma- well, an oil storage tank or other source of ignitable tion dans un rayon de 50 m d’un puits, d’un réservoir de vapour. stockage de pétrole ou d’une autre source de vapeurs in- flammables. (3) No flame-type equipment shall be placed or oper- (3) Aucun équipement de type à flamme ne doit être ated within 25 m of a well, an oil storage tank or other placé ni ne doit fonctionner dans un rayon de 25 m d’un source of ignitable vapour, except puits, d’un réservoir de stockage de pétrole ou d’une (a) where the well is autre source de vapeurs inflammables, sauf dans les cas suivants : (i) a water supply well, or a) il s’agit : (ii) a water injection well equipped with a suitable packer and with the surface casing annulus vented (i) d’un puits d’eau, outside any building; or (ii) d’un puits d’injection d’eau muni d’une garni- (b) where emergency works requires the use of flame- ture d’étanchéité appropriée et ayant une tubulure type equipment and the wellhead valves and blow-out de surface dont l’espace annulaire est déchargé à preventer, if any, are closed. l’air libre; b) des travaux d’urgence exigent l’utilisation d’équi- pement du type à flamme et les vannes de tête de puits 10 DORS/95-191 — 29 septembre 2014 et, le cas échéant, l’obturateur anti-éruption sont fer- més. (4) No flame-type equipment shall be placed or oper- (4) Aucun équipement de type à flamme ne doit être ated within 25 m of a process vessel, unless the flame- placé ni ne doit fonctionner dans un rayon de 25 m d’un type equipment is fitted with an adequate flame arrester. récipient de fabrication, sauf si l’équipement est muni d’un coupe-flamme adéquat. (5) No flame-type equipment shall be located in the (5) Aucun équipement de type à flamme ne doit être same building as a process vessel or other source of ig- situé dans le même bâtiment qu’un récipient de fabrica- nitable vapour, unless tion ou qu’une autre source de vapeurs inflammables à (a) the air intakes and flues of all burners are located moins que : outside the building; a) les prises d’air et les carneaux des brûleurs ne (b) relief valves, safety heads and other sources of ig- soient situés à l’extérieur du bâtiment; nitable vapours are vented outside the building and b) les vannes de détente, les plaques d’éclatement et discharged above roof level; and les autres sources de vapeurs inflammables ne soient (c) the building is adequately cross-ventilated. déchargées au-dessus des toits à l’extérieur du bâti- ment; c) le bâtiment ne fasse l’objet d’une ventilation trans- versale suffisante. (6) All process vessels and equipment from which ig- (6) Les récipients de fabrication et les équipements nitable vapour may issue shall be vented to the atmo- pouvant émettre des vapeurs inflammables doivent être sphere, and all vent lines from every storage tank that is déchargés à l’air libre et les conduites de décharges des vented to flare pits or flare stacks shall be provided with réservoirs de stockage de pétrole qui mènent à une fosse flame arresters or other equivalent safety devices. de brûlage ou à une cheminée de brûlage doivent être munies de coupe-flammes ou de dispositifs de sécurité équivalents. (7) An exhaust pipe from an internal combustion en- (7) Le tuyau d’échappement d’un moteur à combus- gine located within 25 m of a well, a process vessel, an tion interne situé dans un rayon de 25 m d’un puits, d’un oil storage tank or other source of ignitable vapour shall récipient de fabrication, d’un réservoir de stockage de be constructed so that pétrole ou d’une autre source de vapeurs inflammables (a) any emergence of flame along its length or at its doit être construit de façon : end is prevented; and a) à prévenir l’émission de flammes sur sa longueur (b) the end is at least 6 m from the vertical centre line ou à son extrémité; of the well projected upward and shall be directed b) que son extrémité soit située à au moins 6 m d’une away from the well. projection vers le haut de l’axe vertical du puits et soit dirigée vers le côté opposé au puits. (8) All equipment at or near a well, a process vessel, (8) L’équipement situé sur un puits, un récipient de an oil storage tank or other source of ignitable vapour fabrication, un réservoir de stockage de pétrole ou une shall be constructed in accordance with Part I of the autre source de vapeurs inflammables ou près de ceux-ci doit être construit conformément au Code canadien de 11 SOR/95-191 — September 29, 2014 Canadian Electrical Code Part I and the Oil and Gas l’électricité, Première partie et au Règlement sur la sé- Occupational Health and Safety Regulations. curité et la santé au travail (pétrole et gaz). ACCESS TO HAZARDOUS AREAS ACCÈS AUX ZONES DANGEREUSES 9. (1) Subject to subsection (2), there shall not be di- 9. (1) Sous réserve du paragraphe (2), un accès direct rect access or any opening in an installation between ou des ouvertures ne doivent pas être prévus dans une (a) a non-hazardous area and a hazardous area; or installation entre : (b) a Class I, Division 2, hazardous area and a Class a) une zone non dangereuse et une zone dangereuse; I, Division 1, hazardous area. b) une zone dangereuse de classe I, division 2 et une zone dangereuse de classe I, division 1. (2) Subject to subsections (3) to (5), an enclosed area (2) Sous réserve des paragraphes (3) à (5), un espace that has direct access to, and that is classified as less haz- fermé qui donne directement sur une zone dangereuse de ardous than, a Class I, Division 1, hazardous area or a classe I, division 1 ou 2 et qui est classé comme étant Class I, Division 2, hazardous area shall be considered to moins dangereux doit être considéré comme ayant la have the same classification as the area to which it has même classification que la zone. direct access. (3) An enclosed area that has direct access to a Class (3) Un espace fermé qui donne directement sur une I, Division 1, area shall be considered to be a Class I, Di- zone de classe I, division 1 est considéré comme une vision 2, hazardous area if zone dangereuse de classe I, division 2 si : (a) the access is fitted with a self-closing gastight a) d’une part, est installée entre l’espace et la zone door that opens into the enclosed area; and une porte étanche aux gaz à fermeture automatique (b) when the door is open, the air flows from the en- s’ouvrant sur l’espace; closed area into the Class I, Division 1, hazardous b) d’autre part, quand la porte est ouverte, l’air area. s’écoule de l’espace vers la zone. (4) An enclosed area shall not be considered to be a (4) Un espace fermé qui donne directement sur une hazardous area because of its direct access to a Class I, zone dangereuse de classe I, division 2 n’est pas consi- Division 2, hazardous area if déré comme une zone dangereuse si : (a) the access is fitted with a self-closing gastight a) d’une part, est installée entre l’espace et la zone door that opens into the enclosed area; and une porte étanche aux gaz à fermeture automatique (b) when the door is open, the air flows from the en- s’ouvrant sur l’espace; closed area into the Class I, Division 2, hazardous b) d’autre part, quand la porte est ouverte, l’air area. s’écoule de l’espace vers la zone. (5) An enclosed area shall not be considered to be a (5) Un espace fermé qui donne directement sur une hazardous area because of its direct access to a Class I, zone dangereuse de classe I, division 1 n’est pas consi- Division 1, hazardous area if déré comme une zone dangereuse si : (a) the access is fitted with self-closing gastight doors a) d’une part, est installée entre l’espace et la zone forming an air-lock; and une porte étanche aux gaz à fermeture automatique qui forme un sas pneumatique; 12 DORS/95-191 — 29 septembre 2014 (b) the enclosed area is maintained at a pressure that b) d’autre part, l’espace est maintenu à une pression is higher than the pressure maintained in the Class I, supérieure à celle de la zone. Division 1, hazardous area. (6) Piping systems on an installation shall be de- (6) Les canalisations d’une installation doivent être signed to preclude direct communications between haz- conçues de façon à empêcher la communication directe ardous areas of different classifications and between haz- entre zones dangereuses de classes différentes et entre ardous and non-hazardous areas. zones dangereuses et non dangereuses. VENTILATION OF HAZARDOUS AREAS VENTILATION DES ZONES DANGEREUSES 10. (1) Every enclosed hazardous area on an installa- 10. (1) Toute zone dangereuse fermée de l’installa- tion shall be ventilated. tion doit être ventilée. (2) The ventilation systems fitted on an installation (2) Les systèmes de ventilation de l’installation for the purpose of subsection (1) shall be capable of re- doivent, aux fins du paragraphe (1), pouvoir remplacer placing the air in the hazardous area at the rate of once l’air de toute zone dangereuse toutes les cinq minutes. every five minutes. (3) Where a mechanical ventilation system is used for (3) Lorsqu’un système de ventilation mécanique est the purpose of subsection (1), the air in the enclosed haz- utilisé aux fins du paragraphe (1), l’air de la zone dange- ardous area shall be maintained at a pressure that is low- reuse fermée doit être maintenu à une pression inférieure er than the pressure of each adjacent hazardous area that à celle des zones dangereuses adjacentes de classes infé- is classified as less hazardous. rieures. (4) All air let into an enclosed hazardous area shall be (4) L’air admis dans une zone dangereuse fermée doit taken from a non-hazardous area, and where the inlet être extrait d’une zone non dangereuse et, lorsque la duct passes through a hazardous area classified as more conduite d’entrée traverse une zone dangereuse d’une hazardous than the one to which the duct leads, the air in classe supérieure à celle à laquelle mène la conduite, the inlet duct shall be maintained at a pressure that is l’air de la conduite d’entrée doit être maintenu à une higher than the pressure of the air in the hazardous area pression supérieure à celle de la zone dangereuse que through which it passes. traverse la conduite. (5) All air let out of an enclosed hazardous area shall (5) L’air extrait d’une zone dangereuse fermée doit be let into an outdoor area that would be classified as the être évacué vers une aire extérieure qui serait d’une same as or less hazardous than the enclosed hazardous classe égale ou inférieure à la zone dangereuse si elle area if it did not receive the air from the enclosed haz- n’en recevait pas l’air. ardous area. (6) The ventilation system for every non-hazardous (6) Les systèmes de ventilation de chaque zone dan- area shall be separate from the ventilation system for ev- gereuse et de chaque zone non dangereuse doivent être ery hazardous area, and the ventilation fan inlets and séparés et les conduites d’entrée et de sortie de ventila- outlets shall be arranged to prevent the air from a haz- teur doivent être disposées de façon à empêcher l’air ardous area from moving, as a result of the operation of d’une zone dangereuse de se déplacer, sous l’effet d’un any fan or the wind, into an area classified as less haz- ventilateur ou du vent, vers une zone d’une classe infé- ardous. rieure. 13 SOR/95-191 — September 29, 2014 (7) Every ventilation outlet duct leading from a non- (7) Toute conduite de sortie de ventilation qui mène hazardous area where drilling or production operations d’une zone non dangereuse où se déroulent des travaux are conducted to a Class I, Division 2, hazardous area de production ou de forage à une zone dangereuse de shall be equipped with self-closing shutters and a gas de- classe I, division 2 doit être munie de volets à ver- tector. rouillage automatique et d’un détecteur de gaz. (8) A differential pressure gauge shall be installed to (8) Une jauge à pression différentielle doit être instal- monitor any loss of ventilation pressure differential re- lée pour surveiller toute perte de la pression différen- quired by subsection (3) or (4) or maintained under sec- tielle de ventilation exigée par les paragraphes (3) ou (4) tion 9, and to activate audible and visual alarms at the ou maintenue aux termes de l’article 9 et déclencher des appropriate control point after a suitable period of delay alarmes sonores et visuelles au poste de commande ap- not exceeding 30 seconds if a loss occurs. proprié après une période d’attente appropriée d’au plus 30 secondes. (9) The control station and all accommodation areas (9) La salle de commande et les secteurs d’habitation on an installation shall de l’installation doivent : (a) be maintained at a positive overpressure relative a) être maintenus à une pression supérieure à la pres- to atmospheric pressure; and sion atmosphérique; (b) have airlock arrangements on all external doors. b) être munis de portes extérieures à sas pneumatique. (10) The power for a mechanical ventilation system (10) L’alimentation de tout système de ventilation provided in accommodation areas, working areas, mécanique des secteurs d’habitation, zones de travail et flammable liquid storage areas and other hazardous loca- d’entreposage de liquide inflammable et des autres en- tions of an installation shall be capable of being shut off droits dangereux d’une installation doit pouvoir être cou- from the control station and from a position that is out- pée aux postes de commande appropriée et à un lieu qui side the area being served by the ventilation system and est situé à l’extérieur de l’endroit ventilé qui demeure- that will remain accessible during any fire that may oc- ront accessibles advenant un incendie au sein de l’en- cur within the area being ventilated. droit. (11) The main inlets and outlets of all ventilation sys- (11) Les principales conduites d’entrée et de sortie de tems shall be capable of being closed from a position tout système de ventilation doivent pouvoir être fermées that is outside the area being served by the ventilation à un lieu qui est situé à l’extérieur de l’endroit ventilé et system and that will remain accessible during any fire qui demeurera accessible advenant un incendie au sein that may occur within the area being ventilated. de l’endroit. GENERAL ELECTRICAL STANDARDS NORMES ÉLECTRIQUES GÉNÉRALES 11. (1) Subject to subsections (2) to (4), all electric 11. (1) Sous réserve des paragraphes (2) à (4), les motors, lighting fixtures, electric wiring and other elec- moteurs électriques, les appareils d’éclairage, le câblage trical equipment on an installation shall be designed, in- électrique et autre appareillage électrique d’une installa- stalled and maintained in accordance with the American tion doivent être conçus, installés et maintenus confor- Petroleum Institute RP l4F, Recommended Practice for mément au document RP 14F de l’American Petroleum Design and Installation of Electrical Systems for Off- Institute intitulé Recommended Practice for Design and shore Production Platforms. Installation of Electrical Systems for Offshore Produc- tion Platforms. 14 DORS/95-191 — 29 septembre 2014 (2) Electrical wiring on an installation shall be (2) Le câblage électrique d’une installation doit être : (a) designed in accordance with International Elec- a) conçu conformément à la publication 92-3 de la trotechnical Commission Publication 92-3, Electrical Commission électrotechnique internationale intitulée Installations in Ships, Part 3: Cables (construction, Installations électriques à bord des navires, troisième testing and installations) and tested for Category A in partie : Câbles (construction, essais et installations) et accordance with International Electrotechnical Com- soumis à un essai de catégorie A conformément à la mission Publication 332-3, Tests on electrical cables publication 332-3 de la Commission électrotechnique under fire conditions, Part 3: Tests on bunched wires internationale intitulée Essais des câbles électriques or cables; and soumis au feu, troisième partie : Essais sur câbles en (b) tested for impact at -35°C and bending at -40°C in nappes; accordance with Canadian Standards Association b) soumis à un essai d’impact à -35 °C et de flexion à Standard C22.2 No. 0.3-M1985, Test Methods for -40 °C conformément à la norme C22.2 No. 0.3- Electrical Wires and Cables. M1985 de l’Association canadienne de normalisation intitulée Méthodes d’essai des fils et câbles élec- triques. (3) Where a primary or secondary distribution system (3) Lorsqu’un système de distribution primaire ou se- for power, heating or lighting, with no connection to condaire d’énergie, de chauffage ou d’éclairage est utili- earth, is used on an installation, a device capable of con- sé, sans mise à la terre, dans l’installation, celle-ci doit tinuously monitoring the insulation level to earth and of être dotée d’un dispositif de surveillance continuel du ni- giving an audible or visual indication of abnormally low veau d’isolation à la terre qui est capable de donner une insulation values shall be provided. indication sonore ou visuelle en cas de niveau d’isolation anormalement bas. (4) The primary source of electrical power on every (4) La source primaire d’énergie électrique de l’ins- installation shall tallation doit : (a) include at least two power plants; a) comprendre au moins deux groupes électrogènes; (b) be capable of supporting all normal operations b) être capable d’alimenter toutes les opérations cou- without recourse to the emergency source of electrical rantes sans qu’il faille recourir à la source d’énergie power required by section 12; and électrique de secours visée à l’article 12; (c) if one of the power plants is out of operation, be c) être capable, un des groupes électrogènes étant capable of supporting all operations except drilling hors d’usage, d’alimenter toutes les opérations à l’ex- and production operations. ception des travaux de production et de forage. (5) The primary circuits from the power plant serving (5) Les circuits primaires de la source d’énergie élec- an installation shall be equipped with at least two manu- trique de l’installation doivent être munis d’au moins al shut-off switches, each at a different location. deux dispositifs d’arrêt manuels situés en des endroits différents. EMERGENCY ELECTRICAL POWER SOURCE D’ÉNERGIE ÉLECTRIQUE DE SECOURS 12. (1) Every installation shall have an emergency 12. (1) L’installation doit posséder une source source of electrical power that is independent of the pri- d’énergie électrique de secours qui est indépendante de 15 SOR/95-191 — September 29, 2014 mary source of electrical power and that is capable of la source primaire d’énergie électrique et qui peut four- supplying electrical power sufficient to operate, for at nir suffisamment d’énergie électrique pour faire fonc- least twenty-four hours, the following equipment: tionner, pendant au moins 24 heures, l’équipement (a) all lights referred to in subsection (2); suivant : (b) all gas detection and alarm systems; a) les appareils d’éclairage visés au paragraphe (2); (c) all fire detection and alarm systems; b) les systèmes d’alarme et de détection de gaz; (d) all firefighting systems except any fire pump that c) les systèmes d’alarme et de détection d’incendie; is driven by a liquid fuelled combustion engine; d) les systèmes d’extinction d’incendie, sauf les (e) the general alarm system and all internal commu- pompes à incendie avec moteur à combustion interne nication systems; alimenté par combustible liquide; (f) the emergency shut-down system referred to in e) le système d’alarme général et les réseaux de com- section 18; munication internes; (g) all lifesaving systems; f) le système d’arrêt d’urgence visé à l’article 18; (h) all navigation lights, sound signal systems and il- g) les systèmes de sauvetage; luminated markings, that are required by section 21; h) les feux de navigation, les systèmes de signaux so- (i) all radio communication equipment necessary to nores et les marques d’identification illuminées visés comply with the contingency plans referred to in sec- à l’article 21; tion 43; i) l’équipement de communication radiophonique né- (j) on a mobile platform, the main ballast control sys- cessaire pour assurer la conformité aux plans d’ur- tem, one ballast pump for each individual ballast sys- gence visés à l’article 43; tem and one bilge pump for each individual bilge sys- j) dans le cas de la plate-forme mobile, le principal tem; système de régulation du lest, une pompe à lest pour (k) on a column-stabilized mobile platform, the sec- chacun des systèmes de lest et une pompe de cale pour ondary ballast control system; chacun des systèmes de cale; (l) all equipment necessary to secure the production k) dans le cas de la plate-forme mobile stabilisée par or drilling operations in progress at any one time in a colonnes, le système secondaire de régulation du lest; safe manner, including a well disconnect system; l) l’équipement nécessaire pour suspendre en toute (m) if a pumping system is required under paragraph sécurité les travaux de production ou de forage en (l), one pump that is not driven by an internal combus- cours, notamment un système de débranchement de tion engine that has sufficient capacity to kill any well puits; on the installation; m) si un système de pompes est exigé par l’alinéa l), (n) any blow-out prevention system; and une pompe de capacité suffisante pour tuer tout puits de l’installation qui est actionnée par un moteur à (o) any manned diving equipment dependent on an combustion interne qui n’est pas alimenté par un com- electrical supply. bustible liquide; n) les blocs obturateurs de puits; 16 DORS/95-191 — 29 septembre 2014 o) l’équipement de plongée habité relié à une source d’énergie électrique. (2) Every installation shall be equipped with lights (2) L’installation doit être munie de feux alimentés supplied by the emergency source of power described in par la source d’énergie électrique de secours visée au pa- subsection (1), in the following locations: ragraphe (1) aux endroits suivants : (a) every embarkation station on deck and over sides; a) les postes d’embarquement sur le pont et sur les (b) every escape route and area containing escape flancs; route markings; b) les voies de secours et les zones comportant des (c) all service corridors and corridors in accommoda- marques d’identification de telles voies; tion areas, and all stairways, exits and personnel lift c) les corridors de service et des secteurs d’habitation, cars; les escaliers, les sorties et les cabines d’ascenseur du (d) all machinery spaces and main generating sta- personnel; tions; d) les zones des machines et les groupes électrogènes (e) the control station and all control points; principaux; (f) all spaces from which the drilling and production e) les postes de commande et la salle de commande operations are controlled and at which controls of ma- des machines; chinery essential for the performance of those opera- f) les locaux d’où s’effectuent la commande des tra- tions and devices for the emergency shutdown of the vaux de production et de forage et où sont situés les power plant are located; commandes des machines essentielles à l’exécution de (g) the stowage positions for firefighting equipment; ces travaux et les dispositifs d’arrêt d’urgence du groupe électrogène; (h) each sprinkler pump and fire pump and each bal- last and bilge pump, referred to in paragraph (1)(j), g) les postes d’arrimage de l’équipement de lutte and the starting position for each pump; contre l’incendie; (i) every helicopter landing deck and every obstacle h) l’emplacement des pompes pour les extincteurs et marker on that deck; and des pompes à incendie, à lest et de cale mentionnées à l’alinéa (1)j), ainsi que la position de lancement de (j) the radio room. chacune de ces pompes; i) les héliponts et l’emplacement des marques d’iden- tification des obstacles sur ceux-ci; j) la salle de communication radiophonique. (3) Where the emergency source of electrical power (3) Lorsque la source d’énergie électrique de secours required by subsection (1) is a mechanically driven gen- exigée par le paragraphe (1) est une génératrice à entraî- erator, the installation shall be provided with nement mécanique, l’installation doit être munie de ce (a) a transitional source of electrical power, unless qui suit : the generator will automatically start and supply the a) une source d’énergie électrique transitoire, sauf si power required by subsection (1) in less than 45 sec- la génératrice démarre automatiquement et fournit onds from the time the primary source of electrical l’énergie exigée par le paragraphe (1) en moins de 45 power fails; and 17 SOR/95-191 — September 29, 2014 (b) a self-contained battery system designed to supply secondes à compter de l’arrêt de la source primaire sufficient power, automatically on failure or shutdown d’énergie électrique; of both the primary and the emergency sources of b) un système autonome de batteries destiné à fournir electrical power, to operate, for a period of at least one automatiquement l’énergie suffisante, en cas de panne hour the equipment described in subparagraphs (i) and ou d’arrêt des sources d’énergie électrique primaire et (ii) and, for a period of at least four days, the equip- de secours, pour faire fonctionner durant au moins une ment described in subparagraph (iii): heure l’équipement visé aux sous-alinéas (i) et (ii) et (i) the lights located in every emergency exit route, durant au moins quatre jours l’équipement visé au at every escape route, in every machinery space, the sous-alinéa (iii) : control station and every emergency assembly room (i) les feux situés sur le trajet menant aux sorties de and at every launching station of the lifesaving sys- secours, le long des voies de secours, dans les zones tem, des machines, dans la salle de commande, dans les (ii) the internal communication system and the salles de rassemblement d’urgence et aux postes de general alarm system, and mise à l’eau du système de sauvetage, (iii) the navigation lights, sound signal systems and (ii) le réseau de communication interne et le sys- illuminated markings referred to in section 21. tème d’alarme général, (iii) les feux de navigation, les systèmes de signaux sonores et les marques d’identification illuminées visés à l’article 21. (4) The battery system referred to in paragraph (3)(b) (4) Le système de batteries visé à l’alinéa (3)b) doit shall be capable of returning to the trickle charge state pouvoir revenir à l’état de charge de maintien lors du ré- on restoration of the primary or emergency source of tablissement des sources d’énergie électrique primaire electrical power. ou de secours. (5) The emergency source of electrical power re- (5) La source d’énergie électrique de secours exigée quired by subsection (1) shall, for a floating platform, be par le paragraphe (1) doit, dans le cas de la plate-forme designed to function at full rated power when the instal- flottante, être conçue pour pouvoir fonctionner à la lation is upright and when it is at any inclination up to a pleine puissance nominale quel que soit l’angle d’incli- maximum angle of naison de la plate-forme jusqu’à un maximum : (a) 22½ degrees about the longitudinal axis and 10 a) de 22,5° autour de l’axe longitudinal et de 10° au- degrees about the transverse axis, in the case of a sur- tour de l’axe transversal, dans le cas de la plate-forme face mobile platform; mobile qui est une plate-forme de surface; (b) 25 degrees in any direction, in the case of a col- b) de 25° en tous sens, dans le cas de la plate-forme umn- stabilized mobile platform; and mobile stabilisée par colonnes; (c) 15 degrees in any direction, in the case of a self- c) de 15° en tous sens, dans le cas de la plate-forme elevating platform. auto-élévatrice. (6) The location of the emergency source of electrical (6) L’emplacement de la source d’énergie électrique power and associated fuel storage, the transitional source de secours et des réservoirs de carburant connexes, l’em- of power, if any, and the emergency switchboard on an placement de la source de courant transitoire, le cas installation shall be 18 DORS/95-191 — 29 septembre 2014 (a) readily accessible from an open deck space; échéant, et du panneau de distribution de secours de (b) segregated by class A-60 divisions, as defined in l’installation doivent être : subsection 23(1), from any space containing the main a) facilement accessibles à partir d’un espace ouvert source of electrical power or the internal combustion du pont; engines; b) être isolés, au moyen de cloisonnements de classe (c) outside any hazardous area; and A-60 au sens du paragraphe 23(1), de tout espace (d) for a floating platform, located above the water- contenant la source d’énergie électrique principale ou line that would exist if the platform were in a dam- des moteurs à combustion interne; aged condition and in a space outside any part of the c) situés à l’extérieur de toute zone dangereuse; platform if it were in that damaged condition. d) dans le cas de la plate-forme flottante, situés au- dessus de la ligne de flottaison qui existerait si la plate-forme était en condition avariée et à l’extérieur de toute zone de la plate-forme qui serait touchée par cette avarie. (7) The emergency source of electrical power re- (7) La source d’énergie électrique de secours exigée quired by subsection (1) shall be designed to supply par le paragraphe (1) doit être conçue pour fournir auto- electrical power automatically, on failure of the primary matiquement l’énergie électrique, lors de la défaillance source of electrical power, to a switchboard that is de- de la source d’énergie électrique primaire, à un panneau signed to direct the power to the equipment listed in that de distribution conçu pour alimenter l’équipement énu- subsection. méré à ce paragraphe. MECHANICAL EQUIPMENT ÉQUIPEMENT MÉCANIQUE 13. (1) Every internal combustion engine on an in- 13. (1) Tout moteur à combustion interne de l’instal- stallation shall be installed, maintained and operated in lation doit être monté, entretenu et exploité conformé- accordance with American Petroleum Institute RP ment au document RP 7C-11F de l’American Petroleum 7C-llF, Recommended Practice for Installation, Mainte- Institute intitulé Recommended Practice for Installation, nance and Operation of Internal-Combustion Engines. Maintenance, and Operation of Internal-Combustion Engines. (2) Combustion air for every internal combustion en- (2) L’air de combustion dans tout moteur à combus- gine and fired vessel shall be taken from non-hazardous tion interne et dans toute chaudière doit provenir d’une areas. zone non dangereuse. (3) Exhaust gas from every internal combustion en- (3) Les gaz d’échappement de tout moteur à combus- gine and fired vessel shall be discharged to non-haz- tion interne et de toute chaudière doivent être évacués ardous areas. vers une zone non dangereuse. (4) The air induction system of every diesel engine (4) Le système d’admission d’air de tout moteur die- operating in a hazardous area shall be equipped with sel fonctionnant dans une zone dangereuse doit être (a) a flame arrester in the induction system; équipé à la fois : (b) a shut-off valve that is located between the engine a) d’un coupe-flamme dans le système d’admission; air inlet filter and the induction system flame arrester 19 SOR/95-191 — September 29, 2014 and that is capable of being closed automatically by b) d’une vanne d’isolement située entre le filtre d’en- the engine overspeeding device and manually; trée d’air du moteur et le coupe-flamme du système (c) a flame arrester in the exhaust system; and d’admission qui peut être fermée manuellement et au- tomatiquement par le régulateur de survitesse du mo- (d) a spark arrester in the exhaust system, down- teur; stream of the flame arrester. c) d’un coupe-flamme dans le système d’échappe- ment; d) d’un pare-étincelles dans le système d’échappe- ment en aval du coupe-flamme. (5) Subject to subsection (13), the fuel supply system (5) Sous réserve du paragraphe (13), le système d’ali- for every diesel engine shall be equipped with a manual mentation en carburant de tout moteur diesel doit être shut-off device and, except for the emergency source of muni d’un dispositif d’arrêt manuel et, sauf dans le cas electrical power required by section 12, with a device de la source d’énergie électrique de secours visée à l’ar- that will automatically shut off the fuel supply if any of ticle 12, d’un dispositif de coupure automatique de l’ali- the following occur: mentation en carburant dans l’un ou l’autre des cas (a) overspeeding; suivants : (b) high exhaust temperature; a) survitesse; (c) high cooling water temperature; or b) température élevée des gaz d’échappement; (d) low lubricating oil pressure. c) température élevée de l’eau de refroidissement; d) basse pression de l’huile de graissage. (6) The engine crankcase breather pipe on every (6) Le tuyau de prise d’air du carter de tout moteur diesel engine shall diesel doit à la fois : (a) be equipped with a flame arrester; and a) être muni d’un coupe-flamme; (b) in the case of an engine in an enclosed Class I, Di- b) dans le cas d’un moteur situé dans une zone dange- vision 2, hazardous area, lead to the atmosphere out- reuse fermée de classe I, division 2, mener à l’air side the installation. libre. (7) Basic operating instructions for every diesel en- (7) Les instructions d’utilisation de base de tout mo- gine shall give details of stop, start and emergency pro- teur diesel doivent porter sur l’arrêt, le démarrage et la cedures and be permanently attached to the engine. marche à suivre en cas d’urgence et doivent être fixées en permanence au moteur. (8) The layout of every gas turbine, including the lo- (8) La disposition de toute turbine à gaz, y compris cation of the control points, shall take into account the l’emplacement des postes de commande, doit tenir ability of the control point closest to the turbine to with- compte de la capacité du poste de commande le plus stand pressure waves in the event of an explosion in the proche de la turbine à résister aux ondes de pression ad- gas turbine exhaust duct or gas turbine hall and the ef- venant une explosion dans le conduit d’évacuation des fects of the failure of a gas turbine rotor where the frag- gaz ou dans la chambre de combustion de la turbine, ain- ments cannot be contained. si qu’aux effets d’une défaillance du rotor de la turbine lorsque les débris ne peuvent être contenus. 20 DORS/95-191 — 29 septembre 2014 (9) Every gas turbine shall have, in addition to the (9) Toute turbine à gaz doit être dotée, en plus d’un speed governor, a separate overspeed device, arranged régulateur de vitesse, d’un dispositif de survitesse dis- and adjusted so that the manufacturer’s overspeed limita- tinct, disposé et réglé de sorte que la vitesse ne dépasse tions for the turbine cannot be exceeded by more than 15 pas de plus de 15 pour cent la limite de survitesse de la per cent. turbine établie par le fabricant. (10) The air intakes and exhaust for every gas turbine (10) Les tuyaux d’admission d’air et d’échappement shall be arranged to prevent, to the extent practicable, de toute turbine à gaz doivent être disposés de façon à reingestion of combustion gases. exclure, dans la mesure du possible, la réadmission des gaz de combustion. (11) Every multi-engine gas turbine shall have a sepa- (11) La turbine à gaz à plusieurs moteurs doit com- rate air intake and exhaust, arranged so as to prevent in- porter un tuyau d’admission d’air et un tuyau d’échappe- duced circulation through a stopped turbine. ment distincts qui sont disposés de manière à empêcher la circulation induite via la turbine à l’arrêt. (12) All machinery, components and systems essen- (12) Les machines, les composants et les systèmes es- tial to the operation of a floating platform shall be de- sentiels au fonctionnement de la plate-forme flottante signed to function at full rated power at any inclination, doivent être conçus pour pouvoir fonctionner à la pleine up to a maximum angle of puissance nominale quel que soit l’angle d’inclinaison (a) in the case of a surface mobile platform, de la plate-forme jusqu’à un maximum : (i) 15 degrees in any direction under static condi- a) dans le cas de la plate-forme mobile qui est une tions, plate-forme de surface : (ii) 22½ degrees in any direction under rolling dy- (i) de 15° en tous sens, en condition stable, namic conditions, and (ii) de 22,5° en tous sens, en condition dynamique (iii) 7½ degrees by bow or stern under rolling dy- de roulis, namic conditions; (iii) de 7,5° à la poupe ou à la proue, en condition (b) for a column-stabilized mobile platform, 15 de- dynamique de roulis; grees in any direction; and b) de 15° dans n’importe quelle direction, dans le cas (c) for a self-elevating platform, 10 degrees in any di- de la plate-forme mobile stabilisée par colonnes; rection. c) de 10° en tous sens, dans le cas de la plate-forme auto-élévatrice. (13) The automatic shut-off device referred to in sub- (13) Le dispositif de coupure automatique visé au pa- section (5) shall shut off the fuel supply to engines asso- ragraphe (5) ne doit couper l’alimentation en carburant ciated with fire pump systems only where overspeeding des moteurs des systèmes de pompes à incendie qu’en occurs. cas de survitesse. (14) Jacking mechanisms for self-elevating platforms (14) Les mécanismes de levage des plates-formes au- shall, where possible, be arranged with redundancy so to-élévatrices doivent, dans la mesure du possible, être that a single failure of any component does not cause an en double afin qu’une seule défaillance de tout compo- uncontrolled descent of the platform. sant ne puisse causer la descente incontrôlée de la plate- forme. 21 SOR/95-191 — September 29, 2014 WINTERIZATION HIVÉRISATION 14. (1) Every installation shall be designed, con- 14. (1) L’installation doit être conçue, construite, structed, equipped and insulated to ensure that, at the équipée et isolée de façon qu’à la température ambiante minimum air temperature that may occur at the drill site minimale pouvant survenir durant les travaux effectués à or production site during operations, based on an annual l’emplacement de forage ou de production et déterminée probability of exceedance of 10-2, en fonction d’une probabilité annuelle de dépassement (a) in the case of a production installation, the pro- de 10-2: duction equipment and other associated equipment a) dans le cas de l’installation de production, le maté- will operate in a safe and efficient manner; riel de production et le matériel connexe fonctionnent (b) the emergency shutdown system referred to in efficacement et en toute sécurité; section 18 will perform its intended functions; b) le système d’arrêt d’urgence visé à l’article 18 (c) drilling safety systems and associated equipment remplit sa fonction prévue; will operate safely and in accordance with the manu- c) les systèmes de sécurité pour le forage et le maté- facturer’s specifications; riel connexe fonctionnent de façon sûre et conformé- (d) the fluids in the following systems and compo- ment aux spécifications du fabricant; nents will not freeze, namely, d) les fluides des systèmes et composants suivants ne (i) fresh water tanks and the associated piping, gèlent pas : (ii) vent pipes, (i) les réservoirs à eau douce et les canalisations connexes, (iii) components of the drainage system, (ii) les canalisations d’aération, (iv) the hydraulic system and its components, in- cluding operators and cylinders, and (iii) les composants du système de vidange, (v) the firefighting system, including pump drives (iv) le système hydraulique et ses composants, y and fuel supply lines, fire pumps and associated compris les actionneurs et les cylindres, piping, fire hydrants, fire hoses and nozzles; (v) le système d’extinction d’incendie, notamment (e) every pneumatic control system will remain fully les mécanismes d’entraînement des pompes et les operational at all times; canalisations d’alimentation en carburant et les pompes à incendie et les canalisations connexes, (f) the lifesaving appliances and associated devices ainsi que les bouches d’incendie et les tuyaux et will remain operational; and lances à incendie; (g) in the case of a mobile platform, e) tout système de commande pneumatique demeure (i) the fluid in an operating ballast system, includ- en état de fonctionnement; ing the pumps, control systems and associated pip- f) les engins de sauvetage et les appareils connexes ing and valves, is protected against freezing, demeurent opérationnels; (ii) the proper functioning of any thrusters is not g) dans le cas de la plate-forme mobile : impaired and the hydraulic fluid and lubricants for the thrusters have properties designed for such a (i) le fluide du système de lest en usage, notam- temperature, and ment les pompes, les systèmes de régulation et les 22 DORS/95-191 — 29 septembre 2014 (iii) the mooring winches and, where the platform canalisations et vannes connexes, soit protégé is so equipped, the quick disconnect system will re- contre le gel, main fully operational. (ii) le bon fonctionnement des propulseurs ne soit pas diminué et le fluide et les lubrifiants hydrau- liques pour les propulseurs aient les propriétés pré- vues à une telle température, (iii) les treuils d’amarrage et, le cas échéant, le sys- tème de débranchement rapide demeurent opéra- tionnels. (2) Every installation shall be equipped with steam- (2) L’installation doit être munie d’un équipement de generating equipment, or an equivalent means, that will production de vapeur ou d’un moyen équivalent qui keep the locations mentioned in subsection (3) free of ice laisse les zones mentionnées au paragraphe (3) exemptes and snow and lines thawed so as to permit drilling, pro- de glace et de neige et les conduites dégelées afin que les duction and maintenance operations to be conducted travaux de production, de forage et de maintenance s’ef- safely. fectuent en toute sécurité. (3) Every installation that is equipped with steam- (3) L’installation munie d’un équipement de produc- generating equipment, or an equivalent means, required tion de vapeur ou d’un moyen équivalent exigé par le pa- by subsection (2) shall include outlets, hoses and hose ragraphe (2) doit être munie de sortie, de tuyaux et de clamps capable of being used in the following locations: brides de tuyau pouvant être utilisés aux endroits (a) work areas; suivants : (b) walkways; and a) les zones de travail; (c) the helicopter deck and the lifeboat embarkation b) les passerelles; stations. c) dans le cas de l’installation, les postes de mise à l’eau des embarcations de sauvetage et l’hélipont. (4) Where temperatures below -20°C may occur, (4) Lorsque l’emplacement de forage ou de produc- based on an annual probability of exceedance of 10-2, at tion peut être soumis à des températures inférieures à the drill site or production site more than one day per -20 °C plus d’un jour par an en fonction d’une probabili- year and where the installation is equipped with steam- té annuelle de dépassement de 10-2 et que l’installation generating equipment, or an equivalent means, required est munie d’un équipement de production de vapeur ou by subsection (2), d’un moyen équivalent : (a) that equipment shall meet the requirements set out a) cet équipement doit pouvoir satisfaire aux exi- in subsection (2) when operating at 75 per cent capaci- gences visées au paragraphe (2) lorsqu’il fonctionne à ty; and 75 pour cent de sa capacité; (b) the installation shall be equipped with a second b) l’installation doit être dotée d’un deuxième en- set of steam-generating equipment or another means semble d’équipement de production de vapeur ou d’un of providing equivalent protection against ice, snow autre moyen permettant d’assurer une protection équi- and freezing. valente contre la glace, la neige et le gel. SOR/2009-317, s. 100. DORS/2009-317, art. 100. 23 SOR/95-191 — September 29, 2014 CORROSION PROTECTION PROTECTION CONTRE LA CORROSION 15. (1) All structural elements that are part of an in- 15. (1) Les éléments de structure qui font partie de stallation and the failure of which as a result of corrosion l’installation et dont la défaillance due à la corrosion would cause a safety hazard shall be protected or con- pourrait présenter un risque doivent être protégés ou re- structed with extra material so as to prevent the degree couverts au moyen de matériaux additionnels afin de of corrosion that may cause that structural element to fail prévenir le degré de corrosion pouvant entraîner la dé- and shall be protected against corrosion in accordance faillance et doivent être protégés contre la corrosion with section 4.15 of Canadian Standards Association conformément à l’article 4.15 de la norme CAN/CSA- CAN/CSA-S471-92, General Requirements, Design Cri- S471-92 de l’Association canadienne de normalisation teria, the Environment, and Loads. intitulée Exigences générales, critères de calcul, condi- tions environnementales et charges. (2) Corrosion protection systems for installations (2) Les systèmes de protection contre la corrosion de shall be designed, installed and maintained in accor- l’installation doivent être conçus, mis en place et dance with entretenus : (a) section 15 of Canadian Standards Association a) dans le cas d’une plate-forme en acier, conformé- CAN/CSA-S473-92, Steel Structures, Offshore Struc- ment à l’article 15 de la norme CAN/CSA-S473-92 de tures, in the case of steel platforms; and l’Association canadienne de normalisation intitulée (b) sections 4.9.5, 5.1.1, 5.3, 5.4.2, 5.6, 5.10 and Steel Structures, Offshore Structures; 11.19 of Canadian Standards Association Preliminary b) dans le cas d’une plate-forme en béton, conformé- Standard S474-M1989, Concrete Structures, in the ment aux articles 4.9.5, 5.1.1, 5.3, 5.4.2, 5.6, 5.10 et case of concrete platforms. 11.19 de la norme de l’Association canadienne de nor- malisation intitulée Preliminary Standard S474- M1989, Concrete Structures. (3) All corrosion protection systems on an installation (3) Tous les systèmes de protection contre la corro- shall be designed so that adjustment, repair or replace- sion de l’installation doivent être conçus de sorte que les ment can be done on site, except where ajustements, les réparations et les remplacements (a) dry dock surveys are possible and are scheduled at puissent être effectués sur place sauf dans l’un des cas a frequency of five years or less; or suivants : (b) the corrosion protection system is a cathodic pro- a) lorsque des examens en cale sèche sont possibles tection system that has a design life exceeding that of et sont prévus à intervalles d’au plus cinq ans; the installation. b) il s’agit d’un système de protection cathodique ayant une durée de vie nominale supérieure à celle de l’installation. CRANES GRUES 16. Every crane on an installation shall 16. Toute grue de l’installation doit : (a) be designed and constructed in accordance with a) être conçue et construite conformément au docu- American Petroleum Institute Spec 2C, Specification ment Spec 2C de l’American Petroleum Institute inti- for Offshore Cranes; and tulé Specification for Offshore Cranes; 24 DORS/95-191 — 29 septembre 2014 (b) be operated and maintained in accordance with b) être exploitée et maintenue conformément au do- American Petroleum Institute RP 2D, Recommended cument RP 2D de l’American Petroleum Institute inti- Practice for Operation and Maintenance of Offshore tulé Recommended Practice for Operation and Main- Cranes. tenance of Offshore Cranes. GAS RELEASE SYSTEM SYSTÈME DE DÉCHARGE DE GAZ 17. (1) In this section, “gas release system” means a 17. (1) Pour l’application du présent article, « sys- system for releasing gas and combustible liquid from an tème de décharge de gaz » s’entend d’un système destiné installation, and includes a flare system, a pressure relief à décharger les gaz et combustibles liquides de l’installa- system, a depressurizing system and a cold vent system. tion, notamment les systèmes de brûlage, de décharge, de décompression et de ventilation à froid. (2) Every gas release system shall be designed and lo- (2) Tout système de décharge de gaz doit être conçu cated, taking into account the amount of combustibles to et situé, compte tenu de la quantité de combustibles à dé- be released, the prevailing winds, the location of other charger, des vents dominants, de l’emplacement des equipment and facilities, including rigs, the dependent autres équipements et matériels, notamment les appareils personnel accommodation, the air intake system, em- de forage, les logements du personnel connexes, le cir- barkation points, muster areas, the helicopter approaches cuit d’admission d’air, les points d’embarquement, les and other factors affecting the safe, normal flaring or zones de rassemblement, les trajectoires d’approche des emergency release of the combustible liquid, gases or hélicoptères et autres facteurs qui influent sur le brûlage vapours, so that when the system is operating it will not sécuritaire et normal ou la décharge d’urgence des com- damage the installation, other installations, the land or bustibles liquides, des gaz ou des vapeurs, de sorte que, other platforms in the vicinity used for the exploration or lorsque le système fonctionne, il n’endommage pas l’ins- exploitation of resources, or injure any person. tallation, d’autres installations, le sol ou les plates- formes avoisinantes servant à la recherche ou à l’exploi- tation des ressources ni ne cause de blessures. (3) Every gas release system shall be designed and in- (3) Les systèmes de décharge du gaz doivent être stalled in accordance with conçus et installés conformément aux documents sui- (a) American Petroleum Institute RP 520, Recom- vants de l’American Petroleum Institute : mended Practice for the Design and Installation of a) le document RP 520 intitulé Recommended Prac- Pressure-Relieving Systems in Refineries; tice for the Design and Installation of Pressure-Relie- (b) American Petroleum Institute RP 521, Guide for ving Systems in Refineries; Pressure-Relieving and Depressuring Systems; b) le document RP 521 intitulé Guide for Pressure- (c) American Petroleum Institute Standard 526, Relieving and Depressuring Systems; Flanged Steel Safety-Relief Valves; c) la norme 526 intitulée Flanged Steel Safety-Relief (d) American Petroleum Institute Standard 527, Seat Valves; Tightness of Pressure Relief Valves; and d) la norme 527 intitulée Seat Tightness of Pressure (e) American Petroleum Institute Standard 2000, Relief Valves; Venting Atmospheric and Low-Pressure Storage e) la norme 2000 intitulée Venting Atmospheric and Tanks. Low-Pressure Storage Tanks. 25 SOR/95-191 — September 29, 2014 (4) Every gas release system shall be designed and (4) Tout système de décharge du gaz doit être conçu constructed to ensure that oxygen cannot enter the sys- et construit de façon que l’oxygène ne puisse y pénétrer tem during normal operation. durant le fonctionnement normal. (5) Any flare boom and its associated equipment shall (5) Toute torche de brûlage et son équipement be designed connexe doivent être conçus de façon à : (a) to ensure a continuous flame using an automatic a) assurer une flamme continue au moyen d’un sys- igniter system; tème d’allumage automatique; (b) to withstand the radiated heat at the maximum b) résister à la chaleur émise au débit d’aération venting rate; maximal; (c) to prevent flashback; and c) prévenir tout retour de flamme; (d) to withstand all loads to which they may be sub- d) résister à toutes les charges auxquelles ils peuvent jected. être soumis. (6) Every gas release system shall be designed to lim- (6) Tout système de décharge de gaz doit être conçu it to the acceptable levels permitted by the Oil and Gas de façon à limiter aux niveaux acceptables permis par le Occupational Safety and Health Regulations the noise Règlement sur la sécurité et la santé au travail (pétrole that may occur as the gas expands. et gaz) le bruit susceptible de se produire lors de la dila- tation de gaz. (7) With the exception of water, any liquid that can- (7) Tout liquide, sauf l’eau, qui ne peut être brûlé ef- not be safely and reliably burned at the flare tip of a gas ficacement et en toute sécurité au bec de la torche d’un release system shall be removed from the gas before it système de décharge de gaz doit être extrait du gaz avant enters the flare. d’atteindre la torche. (8) Any vent that is used to release gas to the atmo- (8) Tout évent servant à rejeter un gaz à l’air libre sphere without combustion shall be located and designed sans combustion doit être conçu et situé de façon à ré- to minimize the risk of accidental ignition of the gas. duire au minimum le risque d’inflammation accidentelle du gaz. (9) Every gas release system shall be designed and in- (9) Tout système de décharge de gaz doit être conçu stalled so that, taking into account the prevailing wind et installé de sorte que, compte tenu des vents domi- conditions, the maximum radiation on areas where per- nants, le rayonnement maximal d’une flamme de torche sonnel may be located, from the automatically ignited ou d’évent s’allumant automatiquement dans une zone flame of a flare or vent, will be où le personnel peut se trouver soit : (a) 6.3 kW/m2, where the period of exposure will not a) de 6,3 kW/m2, lorsque la période d’exposition ne be greater than one minute; dépasse pas une minute; (b) 4.72 kW/m2, where the period of exposure will be b) de 4,72 kW/m2, lorsque la période d’exposition est greater than one minute but not greater than one hour; supérieure à une minute sans dépasser une heure; and c) de 1,9 kW/m2, lorsque la période d’exposition dé- (c) l.9 kW/m2, where the period of exposure will be passe une heure. greater than one hour. 26 DORS/95-191 — 29 septembre 2014 EMERGENCY SHUTDOWN SYSTEM SYSTÈME D’ARRÊT D’URGENCE 18. (1) Every installation shall have an emergency 18. (1) L’installation doit être munie d’un système shutdown system that is capable of shutting down and d’arrêt d’urgence capable de fermer et d’isoler toutes les isolating all potential sources of ignition and sources of sources possibles d’inflammation et les sources de li- flammable liquids or gases. quides ou de gaz inflammables. (2) An emergency shutdown system shall be designed (2) Le système d’arrêt d’urgence doit être conçu et and installed so that when activated it causes installé de façon à déclencher, lorsqu’il est mis en (a) an audible and visual signal that indicates the marche : cause of its activation and the identity of the equip- a) un signal sonore et visuel au poste de commande ment that has been shut down and isolated to be given approprié qui indique la cause de son déclenchement in the appropriate control point; and et quels équipements ont été fermés ou isolés; (b) an audible alarm to be sounded through the gener- b) une alarme sonore qui se fait entendre via le sys- al alarm system required by section 34 unless the tème d’alarme général visé à l’article 34 à moins alarm is overridden by the control point operator. qu’elle ne soit annulée par l’opérateur du poste de commande approprié. (3) In the case of a production installation, an emer- (3) Dans le cas d’une installation de production, le gency shutdown system shall be designed to ensure système d’arrêt d’urgence doit être conçu de manière : (a) that there are at least two levels of shutdown; and a) à comporter au moins deux stades d’arrêt; (b) subject to subsection (13), that the following will b) sous réserve du paragraphe (13), à déclencher, se- occur within the time and in the sequence set out in lon la séquence et les délais prescrits au manuel d’ex- the operations manual, namely, ploitation, l’arrêt : (i) the shutdown of all production facilities and as- (i) de tout le matériel de production et du matériel sociated test facilities, d’essai connexe, (ii) the closure of all surface inlet manifold safety (ii) des soupapes de sûreté du collecteur d’admis- valves and production riser safety valves, sion de surface et des soupapes de sûreté des tubes (iii) the closure of all Christmas tree safety valves prolongateurs de production, and all downhole safety valves, and (iii) des soupapes de sûreté de la tête d’éruption et (iv) the shutdown of all utilities except the equip- des soupapes de sûreté de fond de puits, ment listed in subsection 12(1). (iv) des utilités, sauf celles énumérées au para- graphe 12(1). (4) In the case of a production installation, manual (4) Dans le cas de l’installation de production, le operation of an emergency shutdown system shall be in fonctionnement manuel du système d’arrêt d’urgence accordance with American Petroleum Institute RP 14C, doit être conforme au document RP 14C de l’American Recommended Practice for Analysis, Design, Installa- Petroleum Institute intitulé Recommended Practice for tion and Testing of Basic Surface Safety Systems for Off- Analysis, Design, Installation and Testing of Basic Sur- shore Production Platforms. face Safety Systems for Offshore Production Platforms. (5) In the case of a drilling installation, an emergency (5) Dans le cas de l’installation de forage, le système shutdown system shall be designed to ensure d’arrêt d’urgence doit être conçu de manière : 27 SOR/95-191 — September 29, 2014 (a) the shutdown within the time and in the sequence a) à déclencher, selon la séquence et les délais prévus set out in the operations manual of all utilities, except au manuel d’exploitation, l’arrêt de toutes les utilités, the equipment listed in subsection 12(1); and sauf celles énumérées au paragraphe 12(1); (b) that shutdown is possible from at least two strate- b) à permettre le déclenchement de l’arrêt à partir gic locations. d’au moins deux endroits stratégiques. (6) The emergency shutdown system shall be de- (6) Le système d’arrêt d’urgence doit être conçu pour signed to permit the selective shutdown of the ventila- permettre l’arrêt sélectif des systèmes de ventilation vi- tion systems required by section 10, except the fans nec- sés à l’article 10, sauf les ventilateurs nécessaires à l’ad- essary for supplying combustion air to prime movers for mission de l’air de combustion des moteurs primaires the production of electrical power. servant à la production d’énergie électrique. (7) At least one of the controls of the emergency (7) Au moins un des points de commande du système shutdown system shall be located outside hazardous ar- d’arrêt d’urgence doit être situé à l’extérieur des zones eas. dangereuses. (8) After an emergency shutdown, the emergency (8) Après un arrêt d’urgence, le système d’arrêt d’ur- shutdown system shall stay in a locked-out condition un- gence doit demeurer verrouillé jusqu’à ce qu’il soit re- til it is manually reset. mis en marche manuellement. (9) The emergency shutdown system shall be con- (9) Le système d’arrêt d’urgence doit être branché à nected to a source of power in such a way that, in the une source d’énergie électrique de sorte qu’en cas de dé- event of a failure of the primary source of power, there is faillance de la source d’énergie primaire, le passage à la automatic changeover to an emergency source of power source de secours soit automatique et des alarmes so- and audible and visual alarms indicating that failure are nores et visuelles indiquant cette défaillance soient dé- given at the appropriate control point. clenchées au poste de commande approprié. (10) Where a hydraulic or pneumatic accumulator is (10) L’accumulateur hydraulique ou pneumatique qui used to operate any part of the emergency system, the sert à faire fonctionner toute partie du système d’arrêt accumulator shall d’urgence doit : (a) be located as close as is practicable to the part that a) être situé, autant que faire se peut, près de la partie it is designed to operate, except where that part is part du système qu’il est destiné à faire fonctionner, sauf of a subsea production system; and lorsque celle-ci fait partie d’un système de production (b) have capacity for at least three operations. sous-marin; b) disposer d’une capacité suffisante pour suffire à au moins trois déclenchements du système. (11) In the event of a failure of the accumulator re- (11) En cas de défaillance de l’accumulateur visé au ferred to in subsection (10), the shutdown valves shall paragraphe (10), les soupapes du système d’arrêt d’ur- revert to a fail-safe mode. gence doivent revenir à un mode de sécurité automa- tique. (12) All cables and pneumatic and hydraulic power (12) Les câbles et les canalisations pneumatiques et lines that are part of the emergency shutdown system hydrauliques du système d’arrêt d’urgence doivent : shall 28 DORS/95-191 — 29 septembre 2014 (a) in the case of cables and power lines that are ex- a) lorsqu’ils sont exposés à des risques de dommages posed to the risk of mechanical or fire damage, be pro- mécaniques ou d’incendie, être protégés : tected (i) soit par des profilés ou des chemises métal- (i) by metal channels or casings, or liques, (ii) by being enclosed in a steel conduit or an (ii) soit en étant enfermés dans une conduite en equivalent covering; and acier ou un recouvrement analogue; (b) as far as practicable, be segregated or routed away b) autant que faire se peut, être séparés ou passer à from the process and utility control systems so that distance des systèmes de régulation du procédé et des any damage to those systems does not affect the shut- utilités afin que tout dommage subi par ces systèmes down system. n’influe pas sur le système d’arrêt. (13) In the case of a production installation, on acti- (13) Dans le cas de l’installation de production, lors vation of the emergency shutdown system, the surface- de la mise en marche du système d’arrêt d’urgence, la controlled subsurface safety valve shall close in not soupape de sûreté souterraine commandée en surface more than two minutes after the Christmas tree safety doit se fermer au plus tard deux minutes après la ferme- valve has closed, except where a longer delay is justified ture de la soupape de sûreté de la tête d’éruption à moins by the mechanical or production characteristics of the que les caractéristiques mécaniques ou de production du well. puits ne justifient un délai plus long. ESCAPE ROUTES VOIES DE SECOURS 19. On every manned installation, 19. Dans l’installation habitée : (a) every work area shall have at least two well- a) les zones de travail doivent avoir au moins deux marked separate escape routes that are situated as far voies de secours séparées, bien marquées, et aussi dis- apart as is practicable; tantes l’une de l’autre que faire se peut; (b) all escape routes shall lead to the open deck and b) toutes les voies de secours doivent mener au pont from there to an evacuation station; découvert et, de là, à un poste d’évacuation; (c) in addition to the escape routes required by para- c) outre les voies de secours visées à l’alinéa a), un graph (a), clear passage shall be provided, where prac- passage dégagé doit mener, autant que faire se peut, à ticable, to the helicopter deck and sea level and other l’hélipont, au niveau de la mer et aux autres postes embarkation locations; d’embarquement; (d) all corridors that are more than 5 m long, all ac- d) tous les corridors de plus de 5 m de longueur, tous commodation areas and, where practicable, all work les secteurs d’habitation et, autant que faire se peut, areas shall have at least two exits, located as far apart toutes les zones de travail doivent avoir au moins as is practicable, that lead to escape routes; deux sorties, aussi distantes l’une de l’autre que faire (e) every escape route and embarkation station shall se peut, menant aux voies de secours; be free of all obstructions, and each exit door along e) les voies de secours et les postes d’embarquement the route shall be a sliding door or designed to open doivent être dégagés et les issues le long de ces voies outwards; doivent être dotées de portes coulissantes ou qui s’ouvrent vers l’extérieur; 29 SOR/95-191 — September 29, 2014 (f) every escape route leading to an upper level shall, f) les voies de secours menant à un niveau supérieur where practicable, be provided in the form of ramps or doivent, autant que faire se peut, être des rampes ou stairways; des escaliers; (g) every escape route leading to a lower level shall, g) les voies de secours menant à un niveau inférieur where practicable, be provided in the form of ramps, doivent, autant que faire se peut, être des rampes, des stairways or chutes of sufficient width to accommo- escaliers ou des glissières de largeur suffisante pour li- date stretcher bearers with stretchers; vrer passage aux brancardiers transportant une civière; (h) suitable means shall be provided, where practica- h) des moyens adéquats doivent, autant que faire se ble, for persons to descend from the installation to the peut, être prévus pour permettre aux personnes de des- water; cendre de l’installation jusqu’à l’eau; (i) materials used for escape routes shall have a level i) les voies de secours doivent être construites avec of fire durability equivalent to steel; des matériaux qui ont une résistance au feu équiva- (j) the survival craft evacuation stations located adja- lente à celle de l’acier; cent to the accommodation areas and the associated j) le poste d’évacuation pour les embarcations de sur- escape routes from the accommodation areas shall vie situé près des secteurs d’habitation ainsi que la provide fire protection for a period of at least two voie de secours y menant à partir de ces secteurs hours; and doivent présenter une résistance au feu d’au moins (k) all escape routes and associated stairwells shall be deux heures; appropriately sheltered from the effects of fire and ex- k) les voies d’urgence et les cages d’escalier connexes plosion. doivent être adéquatement protégées contre les effets du feu et des explosions. PROTECTION AGAINST IMPACT PROTECTION ANTI-COLLISION 20. (1) Subject to subsection (4), every platform shall 20. (1) Sous réserve du paragraphe (4), la plate- be designed to withstand accidental impacts with a ves- forme doit être conçue pour pouvoir résister aux colli- sel. sions accidentelles avec un navire. (2) Where practicable, every platform shall have a (2) Autant que faire se peut, la plate-forme doit dispo- fender system, buoyage system or similar arrangement ser d’un système de pare-chocs, d’un système de flottai- that will permit the transfer of goods to and from the son ou d’un système similaire permettant le transfert de production installation and a vessel without endangering marchandises entre l’installation de production et un na- that production installation or vessel or any person or vire sans mettre en danger l’installation, le navire, les goods. marchandises ou toute personne. (3) Subject to subsection (4), every platform, includ- (3) Sous réserve du paragraphe (4), la plate-forme, y ing any fender system, shall be capable of absorbing the compris tout système de pare-chocs, doit pouvoir absor- impact energy of not less than 4 MJ from a vessel with- ber au moins 4 MJ d’énergie provenant de la collision out endangering any person or the environment. avec un navire sans mettre en danger les personnes ou l’environnement. 30 DORS/95-191 — 29 septembre 2014 (4) Subsections (1) and (3) do not apply to an un- (4) Est soustraite à l’application des paragraphes (1) manned platform if any impact described by those sub- et (3) toute plate-forme inhabitée si la collision visée à sections will not cause major damage. ces paragraphes ne causerait pas de dommages majeurs. (5) Every platform shall be designed so that the im- (5) La plate-forme doit être conçue de sorte que pact energy referred to in subsection (3) l’énergie provenant d’une collision mentionnée au para- (a) can be totally absorbed in the permanent deforma- graphe (3) : tion of the structural element impacted and by the a) soit entièrement absorbée par une déformation per- elastic deflection of the platform; and manente de l’élément de structure percuté et par une (b) will not be absorbed in the permanent deforma- flexion élastique de la plate-forme; tion of the vessel. b) ne soit pas absorbée par la déformation permanente du navire. (6) Where a fender system is used to comply with (6) Lorsqu’un système de pare-chocs est utilisé en subsection (2), its size and arrangement shall be such conformité avec le paragraphe (2), sa forme et sa dispo- that a vessel cannot be trapped under it at low tide. sition doivent être telles qu’un navire ne puisse rester coincé en-dessous à marée basse. NAVIGATIONAL EQUIPMENT ÉQUIPEMENT DE NAVIGATION 21. Every installation shall be equipped with the navi- 21. L’installation doit être munie des feux de naviga- gation lights and sound signal systems that are required tion et des systèmes de signaux sonores qui sont exigés : by a) dans le cas de la plate-forme mobile, par le Règle- (a) in the case of a mobile platform, the Collision ment sur les abordages, comme si l’installation était Regulations, as if the installation were a Canadian un navire canadien; vessel; or b) dans le cas de la plate-forme fixe, par les articles 8, (b) in the case of a fixed platform, sections 8, 9 and 9 et 10 du Règlement sur les ouvrages construits dans 10 of the Navigable Waters Works Regulations, as if les eaux navigables, comme si l’installation se trou- the installation were in waters to which those Regula- vait dans les eaux visées par ce règlement. tions apply. LIFESAVING EQUIPMENT FOR INSTALLATIONS ENGINS DE SAUVETAGE DE L’INSTALLATION 22. (1) Every installation shall be provided with 22. (1) L’installation doit être munie : (a) subject to subsection (2), in the case of a manned a) sous réserve du paragraphe (2), si elle est habitée, installation, two or more totally enclosed survival d’au moins deux embarcations de survie totalement craft that have a combined carrying capacity of at least fermées ayant une capacité combinée égale à au moins 200 per cent of the total number of persons on board 200 pour cent du nombre total des personnes à bord à the installation at any one time, and in the case of a un moment donné et, si elle est inhabitée, d’une ou de unmanned installation, one or more totally enclosed plusieurs embarcations de survie totalement fermées survival craft that have a combined carrying capacity ayant une capacité combinée égale à au moins 100 of at least 100 per cent of the total number of persons pour cent du nombre total de personnes à bord à un on board the installation at any one time; moment donné; 31 SOR/95-191 — September 29, 2014 (b) one or more inflatable liferafts, that have a com- b) d’un ou de plusieurs radeaux de sauvetage pneu- bined capacity for accommodating at least 100 per matiques ayant une capacité combinée égale à au cent of the total number of persons on board the in- moins 100 pour cent du nombre total des personnes à stallation at any one time, and that bord à un moment donné qui : (i) meet the requirements for inflatable liferafts set (i) répondent aux exigences pour radeaux pneuma- out in Schedule XI to the Life Saving Equipment tiques figurant à l’annexe XI du Règlement sur Regulations, as if the liferafts were in waters to l’équipement de sauvetage, comme s’ils se trou- which those Regulations apply, vaient dans des eaux visées par ce règlement, (ii) have float free capability, (ii) sont à flottaison positive, (iii) if embarkation is more than 4.5 m from the (iii) s’ils se trouvent à plus de 4,5 m du niveau de waterline at the survival draft, are equipped with a l’eau à un tirant d’eau de survie, sont munis d’un launching device, and dispositif de mise à l’eau, (iv) are equipped with Class A equipment as de- (iv) sont munis de l’armement classe A visé à l’an- scribed in Schedule II to the Life Saving Equipment nexe II du Règlement sur l’équipement de sauve- Regulations; tage; (c) in the case of a manned installation, immersion c) s’il s’agit d’une installation habitée, de combinai- suits for 200 per cent of the total number of persons sons d’immersion conformes à la norme nationale du on board the installation at any one time, that conform Canada CAN/CGSB-65.16-M89 intitulée Combinai- to National Standard of Canada CAN/CGSB-65.16- sons flottantes en cas de naufrage pour 200 pour cent M89, Marine Abandonment Immersion Suit Systems, du nombre total de personnes à bord à un moment and that are stowed such that one suit is readily avail- donné et arrimées de sorte qu’une combinaison soit able adjacent to each bed and the remaining suits are accessible à proximité de chaque lit et que le reste soit equally distributed among evacuation stations; également réparti entre les postes d’évacuation; (d) in the case of an unmanned installation, immer- d) s’il s’agit d’une installation inhabitée, de combi- sion suits for 100 per cent of the total number of per- naisons d’immersion conformes à la norme nationale sons on board the installation at any one time, that du Canada CAN/CGSB-65.16-M89 intitulée Combi- conform to the National Standard of Canada CAN/ naisons flottantes en cas de naufrage pour 100 pour CGSB-65.16-M89, Marine Abandonment Immersion cent du nombre total des personnes à bord à un mo- Suit Systems, and that are equally distributed among ment donné et également réparties entre les postes evacuation stations; d’évacuation; (e) a lifejacket for each of the persons on board the e) d’un gilet de sauvetage pour chaque personne à installation at any one time; and bord à un moment donné; (f) in the case of a manned installation, f) s’il s’agit d’une installation habitée : (i) a motor-propelled rescue boat that (i) d’un canot de secours à moteur : (A) meets the requirements for rescue boats set (A) qui répond aux exigences pour canot de sau- out in Regulation 47 of Chapter III of Interna- vetage de la règle 47 du chapitre III de la tional Maritime Organization International Con- Convention internationale pour la sauve-garde ference on Safety of Life at Sea, de la vie humaine en mer de l’Organisation mari- time internationale, 32 DORS/95-191 — 29 septembre 2014 (B) is located under a device capable of launch- (B) situé sous un appareil capable de le mettre à ing and retrieving the boat when the boat is fully l’eau et de le récupérer lorsqu’il est chargé à sa loaded with equipment and complement, and capacité maximale en matériel et en équipage, (C) is self-righting, (C) autoredressable, (ii) lifebuoys that are distributed on the decks of (ii) de bouées de sauvetage réparties sur les ponts the installation, and that are stowed in a bracket or et arrimées à des supports ou à des taquets selon le cleats, in at least the following numbers, namely, nombre minimal suivant qui est applicable : (A) 8 lifebuoys for an installation that is 100 m (A) 8 bouées dans le cas d’une installation de or less in length, 100 m ou moins de longueur, (B) 10 lifebuoys for an installation that is more (B) 10 bouées dans le cas d’une installation de than 100 m but less than 150 m in length, plus de 100 m mais de moins de 150 m de lon- (C) 12 lifebuoys for an installation that is 150 m gueur, or more but less than 200 m in length, and (C) 12 bouées dans le cas d’une installation de (D) 14 lifebuoys for an installation that is 200 m 150 m ou plus mais de moins de 200 m de lon- or more in length, gueur, (iii) a rescue basket capable of accommodating at (D) 14 bouées dans le cas d’une installation de least six persons, 200 m ou plus de longueur, (iv) 12 Type A distress signals, as defined in the (iii) d’un panier de sauvetage d’une capacité mini- Life Saving Equipment Regulations, male de six personnes, (v) a Class I emergency position indicator radio (iv) de 12 signaux de détresse du type A au sens du beacon, as defined in the EPIRB Regulations, in Règlement sur l’équipement de sauvetage, each control station, (v) à chaque poste de commande, d’une radiobalise (vi) at least two radar transponders stowed in two de localisation des sinistres de classe I au sens du widely separated locations, except in the case of Règlement sur les RLS, surface mobile platforms, (vi) d’au moins deux transbordeurs radar arrimés (vii) in the case of surface mobile platforms, at en deux endroits très éloignés l’un de l’autre, sauf least one radar transponder, and dans le cas de la plate-forme mobile qui est une plate-forme de surface, (viii) two buoyant personnel transfer baskets. (vii) dans le cas de la plate-forme mobile qui est une plate-forme de surface, d’au moins un transbor- deur radar, (viii) deux nacelles de transbordement du person- nel. (2) Each of the totally enclosed survival craft provid- (2) Chaque embarcation de survie totalement fermée ed on an installation shall dont est dotée l’installation doit : (a) meet the requirements for Class I lifeboats as set a) répondre aux exigences pour embarcation de sau- out in Schedule V to the Life Saving Equipment Regu- vetage classe I de l’annexe V du Règlement sur l’équi- 33 SOR/95-191 — September 29, 2014 lations, as if the survival craft were in waters to which pement de sauvetage, comme si l’embarcation de sur- those Regulations apply; vie se trouvait dans les eaux visées par ce règlement; (b) be equipped with b) être munie : (i) a compression ignition engine with two inde- (i) d’un moteur à allumage par compression à deux pendent starting methods and with sufficient power modes de démarrage indépendants et d’une puis- to propel the craft when fully loaded, sance suffisante pour propulser l’embarcation en (ii) an engine block heater, a head bolt heater or charge, any other means of ensuring prompt engine start in (ii) d’un chauffe-moteur, d’un réchauffeur de tête cold weather, ou de tout autre dispositif pouvant susciter le dé- (iii) a two-way fixed radio capable of permitting marrage rapide du moteur par temps froid, communications with other survival, support and (iii) d’une radio fixe bidirectionnelle permettant les rescue craft, communications avec d’autres embarcations de sur- (iv) a towing attachment, vie, de soutien et de sauvetage, (v) the equipment required by Schedule I to the (iv) d’une fixation de remorquage, Life Saving Equipment Regulations, as if the instal- (v) de l’armement exigé par l’annexe I du Règle- lation were a Class I ship to which those Regula- ment sur l’équipement de sauvetage, comme si tions apply, l’installation était un navire de classe I visé par ce (vi) a launching device, règlement, (vii) a radar reflector, (vi) d’un dispositif de mise à l’eau, (viii) a Class II emergency position indicator radio (vii) d’un réflecteur radar, beacon, as defined in the EPIRB Regulations, and (viii) d’une radiobalise de localisation des sinistres (ix) a hand-held radio; de classe II au sens du Règlement sur les RLS, (c) be self-righting; (ix) d’un poste radio portatif; (d) be fire-protected; c) être autoredressable; (e) be capable of a speed of not less than 6 knots; d) être protégée contre le feu; (f) have a self-contained air supply sufficient for at e) être capable d’atteindre une vitesse minimale de 6 least 10 minutes; nœuds; (g) be stored or equipped f) être pourvue d’une source d’air autonome suffi- sante pour une durée d’au moins 10 minutes; (i) in the case of a column-stabilized mobile plat- form and a fixed platform, so as to launch in a bow g) être remisée ou équipée : out aspect, and (i) dans le cas de la plate-forme mobile stabilisée (ii) in the case of a self-elevating mobile platform, par colonnes et de la plate-forme fixe, de sorte so as to clear each leg, column, footing, brace or qu’elle soit mise à l’eau proue en premier, mat and any other similar structure below the hull; (ii) dans le cas de la plate-forme mobile auto-éléva- (h) be positioned so that half the survival craft are trice, de sorte qu’elle évite, lors de la mise à l’eau, close to the accommodation areas and the other half les montants, colonnes, socles, croisillons ou se- 34 DORS/95-191 — 29 septembre 2014 are appropriately located on the other side of the in- melles et toute autre structure semblable sous la stallation, taking into consideration the shape of the coque; installation and the type of associated facilities; h) être placée de sorte que la moitié des embarcations (i) be stowed in a secure and sheltered position that is de survie soit à proximité des secteurs d’habitation et protected from damage by fire or explosion; and que l’autre moitié soit située en des endroits appro- (j) be stowed in such a manner that two crew mem- priés de l’autre côté de l’installation, compte tenu de bers can carry out preparations for embarkation and la forme de l’installation et du type de matériel launching in less than 5 minutes. connexe; i) être arrimée de façon sécuritaire et dans un abri protégé des dommages causés par le feu ou les explo- sions; j) être arrimée de façon que deux membres d’équi- page puissent effectuer les préparatifs pour l’embar- quement et la mise à l’eau en moins de 5 minutes. (3) The launching devices for the totally enclosed sur- (3) Les dispositifs de mise à l’eau des embarcations vival craft, the rescue boat and the inflatable liferafts de survie totalement fermées, des embarcations de sau- provided on an installation shall vetage et des radeaux de sauvetage pneumatiques de (a) meet the requirements for launching devices set l’installation doivent : out in Schedule IX to the Life Saving Equipment Reg- a) répondre aux exigences concernant les dispositifs ulations, as if the launching devices were located in de mise à l’eau visées à l’annexe IX du Règlement sur waters to which those Regulations apply; l’équipement de sauvetage, comme si les dispositifs se (b) be sufficiently strong to permit each survival trouvaient dans des eaux visées par ce règlement; craft, rescue boat or liferaft to be safely launched or b) être suffisamment solides pour permettre la mise à lowered into the water when loaded with its full com- l’eau en toute sécurité de chaque embarcation ou ra- plement of persons and equipment; and deau à la charge maximale en personnes et en maté- (c) situated so as to permit each survival craft, rescue riel; boat or liferaft to be launched clear of any obstruction c) être situés de façon à permettre la mise à l’eau de resulting from damage of the extent described in the chaque embarcation ou radeau en évitant tout obstacle Code referred to in subsection 56(9). résultant d’avaries dont l’étendue est décrite au docu- ment visé au paragraphe 56(9). (4) Half of the lifebuoys provided on an installation (4) La moitié des bouées de sauvetage de l’installa- shall be equipped with self-igniting lights, and not fewer tion doivent être munies de feux à auto-allumage et au than two of those lifebuoys shall be equipped with self- moins deux d’entre elles doivent être munies de signaux activating smoke signals. fumigènes à déclenchement automatique. (5) Two lifebuoys provided on an installation not (5) Deux des bouées de sauvetage de l’installation equipped with lights and smoke signals shall be fitted non munies de feux ou de signaux fumigènes doivent with a buoyant lifeline, the length of which shall be at être dotées d’une ligne de survie flottante dont la lon- least one-and-a-half times the distance from the stowage gueur est égale à au moins une fois et demie la distance entre le pont d’arrimage et le niveau de l’eau au tirant 35 SOR/95-191 — September 29, 2014 deck to the waterline at the transit draft, or 30 m, d’eau de transit ou à 30 m, la plus élevée de ces valeurs whichever is greater. étant à retenir. (6) There shall be posted on every installation, in- (6) Un plan de l’emplacement de tous les engins de cluding in the control station and in each accommoda- sauvetage doit être affiché dans l’installation, notamment tion area and work area, copies of a plan showing the po- dans la salle de commande, chaque secteur d’habitation sition of all the lifesaving appliances. et zone de travail. PASSIVE FIRE AND BLAST PROTECTION PROTECTION PASSIVE CONTRE L’INCENDIE ET LES EXPLOSIONS 23. (1) In this section, 23. (1) Les définitions qui suivent s’appliquent au “class A-0 division” means a division formed by a bulk- présent article. head or deck that is constructed « à faible indice de propagation des flammes » Se dit (a) of steel or an equivalent material and suitably d’une surface qui limite la propagation des flammes. stiffened, and (low flame spread) (b) to prevent the passage of smoke and flame after « cloisonnement de classe A-0 » Cloisonnement formé 60 minutes of exposure to a standard fire test; (cloi- par une cloison ou un pont : sonnement de classe A-0) a) fait d’acier ou d’un matériau équivalent et conve- “class A-60 division” means a division formed by a nablement renforcé; bulkhead or deck that is b) construit de manière à prévenir la propagation de (a) constructed of steel or an equivalent material and la fumée et des flammes après avoir subi pendant 60 suitably stiffened, minutes un essai standard de résistance au feu. (class A-0 division) (b) constructed to prevent the passage of smoke and flame after 60 minutes of exposure to a standard fire « cloisonnement de classe A-60 » Cloisonnement formé test, and par une cloison ou un pont qui est : (c) insulated with non-combustible materials so that, a) fait d’acier ou d’un matériau équivalent et conve- if either side is exposed to a standard fire test, after 60 nablement renforcé; minutes the average temperature on the unexposed b) construit de manière à prévenir la propagation de face will not increase by more than 139°C above the la fumée et des flammes après avoir subi pendant 60 initial temperature and the temperature at any point on minutes un essai standard de résistance au feu; the unexposed face, including any joint, will not in- c) isolé au moyen de matériaux incombustibles de crease by more than 180°C above the initial tempera- sorte que, si l’une ou l’autre des faces est soumise à ture; (cloisonnement de classe A-60) un essai standard de résistance au feu, au bout de 60 “class B-15 division” means a division formed by a minutes, la température moyenne de la face non expo- bulkhead, ceiling or lining that is sée n’aura pas augmenté de plus de 139 °C par rapport (a) constructed and erected entirely from non-com- à la température initiale et que la température en tout bustible materials, point de la face non exposée, notamment les articula- tions, n’aura pas augmenté de plus de 180 °C par rap- (b) constructed to prevent the passage of flame after port à la température initiale. (class A-60 division) exposure to a standard fire test for 30 minutes, and « cloisonnement de classe B-15 » Cloisonnement formé par une cloison, un plafond ou un revêtement qui est : 36 DORS/95-191 — 29 septembre 2014 (c) insulated so that if either face is exposed to the a) fait et mis en place entièrement au moyen de maté- first 30 minute period of a standard fire test, the aver- riaux incombustibles; age temperature on the unexposed face will not in- b) construit de façon à prévenir la propagation des crease at any time during the first 15 minutes of the flammes après avoir subi pendant 30 minutes un essai test by more than 139°C above that initial tempera- standard de résistance au feu; ture, and the temperature at any point on the unex- posed face, including any joint, will not increase by c) isolé de sorte que, si l’une ou l’autre des faces est more than 225°C above the initial temperature after soumise aux 30 premières minutes d’un essai standard exposure for 15 minutes; (cloisonnement de classe de résistance au feu, la température moyenne de la B-15) face non exposée n’aura pas augmenté, durant les 15 premières minutes, de plus de 139 °C par rapport à la “class H-120 division” means a division formed by a température initiale et que la température en tout point bulkhead or deck that is de la face non exposée, notamment les articulations, (a) constructed of steel or an equivalent material and n’aura pas augmenté de plus de 225 °C par rapport à suitably stiffened, la température initiale au bout de 15 minutes d’exposi- (b) constructed to prevent the passage of smoke and tion. (class B-15 division) flame after exposure to a hydrocarbon fire test for 120 « cloisonnement de classe H-120 » Cloisonnement formé minutes, and par une cloison ou un pont qui est : (c) insulated with non-combustible material so that, if a) fait d’acier ou d’un matériau équivalent et conve- either face is exposed to a hydrocarbon fire test, after nablement renforcé; 120 minutes the average temperature on the unex- b) construit de manière à prévenir la propagation de posed face will not increase by more than 139°C la fumée et des flammes après avoir subi pendant 120 above the initial temperature, and the temperature at minutes un essai de résistance au feu d’hydrocarbures; any point on the unexposed face, including any joint, will not increase by more than 180°C above the initial c) isolé au moyen de matériaux incombustibles de temperature; (cloisonnement de classe H-120) sorte que, si l’une ou l’autre des faces est soumise à un essai de résistance au feu d’hydrocarbures, au bout “hydrocarbon fire test” means a test in which a specimen de 120 minutes, la température moyenne de la face division, which division resembles as closely as possible non exposée n’aura pas augmenté de plus de 139 °C the intended construction of the division, includes, par rapport à la température initiale, et que la tempéra- where appropriate, at least one joint and has an exposed ture en tout point de la face non exposée, notamment surface of not less than 4.65 m2 and a height or a length les articulations, n’aura pas augmenté de plus de of not less than 2.44 m, and is exposed in a test furnace 180 °C par rapport à la température initiale. (class to temperatures corresponding approximately to a time- H-120 division) temperature relationship defined by a smooth curve drawn through the following temperature points mea- « essai de résistance au feu d’hydrocarbures » Essai où sured above the initial furnace temperature, namely, un cloisonnement type, construit autant que possible comme le cloisonnement en cause et comprenant, s’il y a (a) at the end of the first 3 minutes, 880°C, lieu, au moins une articulation, et ayant une surface ex- (b) at the end of the first 5 minutes, 945°C, posée d’au moins 4,65 m2 et une hauteur ou une lon- (c) at the end of the first 10 minutes, 1032°C, gueur d’au moins 2,44 m, est exposé dans un four à es- sais à des températures correspondant (d) at the end of the first 15 minutes, 1071°C, approximativement à un rapport température-temps défi- 37 SOR/95-191 — September 29, 2014 (e) at the end of the first 30 minutes, 1098°C, ni par une courbe régulière passant par les points de tem- (f) at the end of the first 60 minutes, 1100°C, and pérature suivants mesurés en progression par rapport à la température initiale du four : (g) at the end of the first 120 minutes, 1100°C; (essai de résistance au feu d’hydrocarbures) a) à la fin des 3 premières minutes, 880 °C; “low flame spread” in respect of a surface, means that b) à la fin des 5 premières minutes, 945 °C; the surface restricts the spread of flame; (à faible indice c) à la fin des 10 premières minutes, 1032 °C; de propagation des flammes) d) à la fin des 15 premières minutes, 1071 °C; “standard fire test” means a test conducted in accordance e) à la fin des 30 premières minutes, 1098 °C; with Regulation 3.2 of Chapter II-2 of International Mar- itime Organization International Conference on Safety of f) à la fin des 60 premières minutes, 1100 °C; Life at Sea. (essai standard de résistance au feu) g) à la fin des 120 premières minutes, 1100 °C. (hy- drocarbon fire test) « essai standard de résistance au feu » Essai exécuté conformément à la règle 3.2 du chapitre II-2 de la Convention internationale pour la sauvegarde de la vie humaine en mer de l’Organisation maritime internatio- nale. (standard fire test) (2) Subject to subsection (3), on an installation, (2) Sous réserve du paragraphe (3), à bord de (a) the wellhead and process areas on a production in- l’installation : stallation shall be separated from other areas by class a) les zones de têtes de puits et de traitement de l’ins- H-120 divisions; tallation de production doivent être séparées des autres (b) all control stations shall be separated from other zones par des cloisonnements de classe H-120; areas by class A-60 divisions; b) les postes de commande doivent être séparés des (c) the accommodation areas shall be separated from autres zones par des cloisonnements de classe A-60; other areas by class A-60 divisions; c) les secteurs d’habitation doivent être séparés des (d) every machinery space and every storeroom con- autres zones par des cloisonnements de classe A-60; taining paint, oil, any gaseous substance or other d) les zones des machines et les magasins contenant flammable material shall be separated from galleys or de la peinture, de l’huile, des gaz ou d’autres matières accommodation areas by class A-60 divisions and inflammables doivent être séparés des cuisines ou des from each other by class A-0 divisions; secteurs d’habitation par des cloisonnements de classe (e) galley supply and exhaust ventilator trunking A-60 et les uns des autres par des cloisonnements de within the accommodation areas or any other enclosed classe A-0; spaces shall be made of steel covered with a fire-resis- e) les entrepôts de nourriture et les gaines des ventila- tant insulation material of a type and thickness equiva- teurs aspirants à l’intérieur des secteurs d’habitation lent to that in a class A-60 division; ou de tout autre espace fermé doivent être en acier et (f) every deck and its supporting structure within the isolés avec un matériau résistant au feu d’un type et accommodation areas that is not required to be a class d’une épaisseur correspondant à ceux d’un cloisonne- A-60 division shall be constructed of material that by ment de classe A-60; 38 DORS/95-191 — 29 septembre 2014 itself or due to insulation provided will not lose its f) tout pont, ainsi que sa structure de soutien, à l’inté- structural stability and fire integrity when subjected to rieur des secteurs d’habitation qui n’a pas à être un a 60 minute standard fire test; cloisonnement de classe A-60 doit être fait d’un maté- (g) every corridor bulkhead that is not required to be riau qui, par ses qualités intrinsèques ou grâce à son a class A-60 division shall be a class B-15 division isolation, conserve sa stabilité structurale et sa résis- and extend from deck to deck or, when continuous tance au feu lorsqu’il est soumis à un essai standard de class B-15 divisions that are ceilings are fitted, from résistance au feu d’une durée de 60 minutes; the deck to the continuous ceiling; g) les cloisons de corridor qui n’ont pas à être des (h) every door in every class B-15 division that is a cloisonnements de classe A-60 doivent être des cloi- bulkhead shall meet the standard for a class B-15 divi- sonnements de classe B-15 et s’étendre d’un pont à sion, except that a door to a cabin or to a public space l’autre ou, en présence de plafonds faits de cloisonne- other than a stairway may have ventilation openings ments de classe B-15 continus, du pont au plafond; or a louvre in the lower half; h) les portes percées dans des cloisonnements de (i) no door of a division forming any part of a stair- classe B-15 qui forment des cloisons doivent être way enclosure shall be provided with ventilation conformes aux normes d’un cloisonnement de classe openings or louvres; B-15 mais une porte de cabine ou d’un espace public autre qu’une cage d’escalier peut avoir des aérateurs à (j) every opening in every bulkhead and deck in the lames ou des ouvertures d’aération en sa moitié infé- accommodation areas shall have permanently attached rieure; to it a means of closing that will maintain the fire in- tegrity of the bulkheads and decks; i) les portes percées dans un cloisonnement faisant partie d’une cage d’escalier ne peuvent être munies (k) where a class A-0 division, class A-60 division, d’aérateurs à lames ou d’ouvertures d’aération; class B-15 division or class H-120 division is pierced for the passage of electric cables, pipes, trunks or j) les ouvertures percées dans les cloisons et les ponts structural elements or for other purposes, arrange- des secteurs d’habitation doivent comporter des dispo- ments shall be made so that the fire resistance of the sitifs de fermeture permanents permettant de mainte- division is not impaired; nir la résistance au feu des cloisons et des ponts; (l) air spaces enclosed behind ceilings, panelling or k) lorsqu’un cloisonnement de classe A-0, A-60, B-15 linings shall be divided by close-fitting draught stops ou H-120 est percé pour permettre le passage de that are spaced not more than 14 m apart and that are câbles électriques, de tuyaux, de conduites, d’éléments fitted transversely if the length of the space exceeds de charpente ou autres, des mesures doivent être prises 14 m and lengthwise if the width exceeds 14 m; pour que soit maintenue la résistance au feu du cloi- sonnement; (m) every internal stairwell, ladderwell and crew ele- vator trunk within the accommodation areas shall be l) les vides d’air entre les plafonds, les lambris ou les constructed of steel or equivalent material; garnitures doivent être séparés par des dispositifs coupe-feu hermétiques espacés d’au plus 14 m et dis- (n) every stairwell in the accommodation areas shall posés transversalement, si la longueur du vide dépasse be enclosed within a trunk constructed of class A-60 14 m, et longitudinalement, si la largeur du vide dé- divisions and shall have self-closing doors, except that passe 14 m; a stairwell connecting only two decks need only be fitted at one deck level with a division that has the 39 SOR/95-191 — September 29, 2014 same fire integrity and structural stability as the deck m) les cages des escaliers, échelles et ascenseurs du and self-closing doors; personnel intérieurs au sein des secteurs d’habitation (o) for compartments that contain or are affected by doivent être faits d’acier ou d’un matériau équivalent; oil and oil vapour, the surface of insulating materials n) les escaliers des secteurs d’habitation doivent être fitted to the inside of bulkheads and decks and form- contenus dans des puits faits de cloisonnements de ing the casings and crowns shall be impervious to oil classe A-60 et comporter des portes à fermeture auto- and oil vapour; matique, à l’exception des cages d’escalier reliant (p) every door and shutter in a bulkhead opening to seulement deux ponts qui doivent être munies, au ni- hatches in the galley and pantry shall be constructed veau d’un des ponts, d’un cloisonnement présentant la so that the fire integrity of the bulkhead is maintained, même résistance au feu et la même stabilité structurale and shall be capable of being readily closed from a que le pont et les portes à fermeture automatique; position outside the galley or pantry; o) à l’égard des compartiments qui contiennent du pé- (q) primary deck coverings shall be of a type that will trole et des vapeurs de pétrole ou qui sont touchés par not readily ignite; ceux-ci, la surface des matières isolantes montées à l’intérieur des cloisons et des ponts qui forment les (r) paints, veneers and other finishes used on surfaces gaines et les couronnes doivent pouvoir résister aux on concealed or inaccessible spaces and on exposed effets du pétrole et des vapeurs de pétrole; surfaces, except furniture, furnishings and floor cover- ings, shall be such that the surfaces are of a low flame p) les portes et volets d’une cloison donnant sur des spread type; écoutilles dans la cuisine et l’office doivent être construits de sorte que la résistance au feu de la cloi- (s) overboard scuppers, sanitary discharges or other son soit maintenue et doivent pouvoir se fermer facile- outlets close to the water shall be of material unlikely ment depuis l’extérieur de la cuisine ou de l’office; to fail in the event of fire; q) les revêtements primaires des ponts doivent être (t) every load-bearing steel structural element shall be d’un type qui ne s’enflamme pas facilement; fire protected; and r) les peintures, placages et autres revêtements utili- (u) blast-resistant panels and explosion venting sys- sés sur des surfaces dans des espaces dissimulés ou in- tems shall be provided in locations that are susceptible accessibles et sur des surfaces exposées, sauf les to an explosion. meubles, les garnitures et les revêtements de plancher, doivent être d’un type à faible indice de propagation des flammes; s) les dalots, décharges sanitaires et autres sorties par- dessus bord doivent être faits d’un matériau à l’épreuve du feu; t) les éléments structuraux de portance faits d’acier doivent être protégés contre le feu; u) les endroits où des explosions sont possibles doivent être munis de panneaux résistant aux explo- sions et de circuits d’évent d’explosion. 40 DORS/95-191 — 29 septembre 2014 (3) Subsection (2) does not apply to an unmanned in- (3) Le paragraphe (2) ne s’applique pas à l’installa- stallation, if the passive fire and blast structural protec- tion inhabitée dont la protection structurale passive tion provided will prevent major damage in the case of a contre le feu et les explosions permet de prévenir les fire or explosion. dommages majeurs advenant un incendie ou une explo- sion. (4) Galleys on an installation shall be provided with (4) Les cuisines de l’installation doivent être équipées fire blankets. de couvertures anti-feu. (5) Notwithstanding subsections (2) to (4), every in- (5) Malgré les paragraphes (2) à (4), l’installation doit stallation shall be arranged in such a way that a fire in être aménagée de façon à empêcher la propagation des one area on the installation will be prevented from flammes d’une zone à une autre et à réduire au minimum spreading to other areas and the consequences of an ex- les conséquences d’une explosion, compte tenu du risque plosion on the installation are minimized, taking into ac- d’incendie ou d’explosion que présente une zone don- count the fire or explosion hazard of any particular area. née. FIRE HYDRANT SYSTEMS SYSTÈMES DE BOUCHES D’INCENDIE 24. (1) Every manned installation shall be provided 24. (1) L’installation habitée doit être dotée d’un sys- with a fire hydrant system in accordance with this sec- tème de bouches d’incendie conformément au présent ar- tion. ticle. (2) The fire hydrant system shall be connected to a (2) Le système de bouches d’incendie doit être relié à continuously pressurized wet pipe water main that une conduite principale d’eau continuellement pressuri- (a) is connected to at least two pump systems that are sée qui : situated as far apart as possible; and a) est reliée à au moins deux systèmes de pompes (b) when any one of the pump systems required by éloignés le plus possible l’un de l’autre; paragraph (a) is out of operation, b) lorsque l’un des systèmes de pompes visés à l’ali- (i) is capable of delivering at least one jet simulta- néa a) est hors d’usage, est capable : neously from each of any two fire hydrants through (i) de produire au moins un jet simultané à deux the hoses and nozzles, at a pressure at the hydrants des bouches d’incendie à une pression d’au moins of at least 350 kPa, 350 kPa au moyen des tuyaux et des lances, (ii) is capable of delivering water at a sufficient (ii) de produire un débit d’eau d’une pression et pressure and quantity so that the aggregate capacity d’une qualité suffisantes pour que la capacité com- of the pump systems that are still operating is not binée des systèmes de pompes qui restent en service less than 120 m3/hour when the pump systems are soit d’au moins 120 m3/h lorsque celles-ci ali- delivering water to the fire hydrants, and mentent les bouches d’incendie, (iii) is capable of maintaining a pressure of at least (iii) de maintenir une pression d’au moins 700 kPa 700 kPa to any foam system protecting the heli- pour tout système d’extinction à mousse de l’héli- copter deck. pont. (3) The number and position of the fire hydrants in (3) Le nombre et l’emplacement des bouches d’incen- the fire hydrant system shall be such that water from any die du système de bouches d’incendie doivent être tels two hydrants, one of which is fitted with only a single que l’eau produite par deux de ces bouches, l’une munie 41 SOR/95-191 — September 29, 2014 length of fire hose and the other of which is fitted with d’une seule longueur de tuyaux à incendie et l’autre one or two lengths of fire hose, can reach every part of d’une ou deux longueurs de tuyaux, puisse atteindre the installation where a fire may occur. toute partie de l’installation où un incendie peut se décla- rer. (4) Each fire hydrant in the fire hydrant system shall (4) Chaque bouche d’incendie du système de bouches be provided with a hose that à incendie doit être dotée d’un tuyau d’incendie qui : (a) is of not more than 18 m in length; a) a une longueur d’au plus 18 m; (b) is equipped with a 19 mm dual purpose nozzle ca- b) est muni d’une lance de 19 mm à double action de pable of spray or jet action and with the necessary pulvérisation ou de jet ainsi que des raccords néces- couplings; and saires; (c) meets the requirements of National Fire Protection c) répond aux exigences de la norme 1961 de la Na- Association 1961, Standard on Fire Hose. tional Fire Protection Association intitulée Standard on Fire Hose. WATER DELUGE AND WATER MONITOR SYSTEMS IN AREAS SYSTÈME DÉLUGE ET SYSTÈME DE RÉGULATION D’EAU POUR WITH PETROLEUM LES ZONES CONTENANT DU PÉTROLE 25. (1) In this section, 25. (1) Les définitions qui suivent s’appliquent au “water deluge system” means a system capable of delug- présent article. ing a space with water from fixed heads; (système dé- « système déluge » Système capable d’inonder un espace luge) avec de l’eau au moyen de têtes d’arrosage fixes. (water “water monitor system” means a system capable of del- deluge system) uging a space with water from monitors. (système de ré- « système de régulation d’eau » Système capable d’inon- gulation d’eau) der un espace au moyen de contrôleurs d’eau. (water monitor system) (2) Every manned production installation shall be (2) L’installation de production habitée doit être do- equipped with a water deluge system or, in the case of an tée d’un système déluge ou, si elle comporte un espace open space, a water monitor system, for each space in ouvert, d’un système de régulation d’eau pour tout es- the installation that contains equipment that stores, con- pace de l’installation qui contient de l’équipement ser- veys or processes petroleum not used as fuel on the in- vant au stockage, au transport ou au traitement du pé- stallation. trole qui ne constituera pas du combustible à bord de l’installation. (3) The systems required by subsection (2) shall be (3) Les systèmes visés au paragraphe (2) doivent (a) connected to a continuously pressurized water être : main that is connected to at least two pump systems; a) reliés à une conduite principale d’eau continuelle- and ment pressurisée munie d’au moins deux systèmes de (b) capable of discharging water at the rate of at least pompes; 12.2 L/minute/m² over the largest area served by the b) capables de produire un débit d’eau d’au moins system when any one of the pump systems is out of 12,2 L/minute/m2 pour la plus grande aire desservie operation. 42 DORS/95-191 — 29 septembre 2014 par le système lorsque l’un des systèmes de pompes est hors d’usage. (4) Every water deluge system shall (4) Tout système déluge doit : (a) operate automatically in response to a signal from a) être en mesure de fonctionner automatiquement sur the fire detection system; réception d’un signal du système de détection d’incen- (b) be capable of being operated manually from the die; control station and from locations close to but outside b) pouvoir être déclenché manuellement de la salle de of each space served by it; and commande et d’endroits situés à proximité des es- (c) when in operation, automatically activate an audi- paces qu’il dessert, mais à l’extérieur de ceux-ci; ble and visual signal at the fire and gas indicator panel c) déclencher automatiquement, lorsqu’il est mis en in the control station. marche, une alarme sonore et visuelle au panneau d’indication de gaz et d’incendie de la salle de com- mande. (5) Every water monitor system shall (5) Tout système de régulation d’eau doit : (a) be capable of being activated manually from the a) pouvoir être déclenché manuellement à partir de la control station and from locations close to but outside salle de commande et d’endroits situés à proximité des of each space served by it; espaces qu’il dessert, mais à l’extérieur de ceux-ci; (b) have sufficient movement in the horizontal and b) avoir suffisamment de mouvement, sur les plans vertical planes to permit the monitor to discharge wa- horizontal et vertical, pour que le contrôleur puisse dé- ter into any part of the space served by it; biter de l’eau en tout point de l’espace en cause; (c) be capable of being locked in any position; and c) pouvoir être bloqué dans n’importe quelle position; (d) be capable of discharging water as a jet or spray. d) pouvoir débiter de l’eau sous forme de jet ou de pulvérisation. (6) A water deluge system provided pursuant to sub- (6) Le système déluge visé au paragraphe (2) doit être section (2) shall meet the requirements of National Fire conforme aux exigences de la norme 15 de la National Protection Association 15, Standard for Water Spray Fire Protection Association intitulée Standard for Water Fixed Systems for Fire Protection. Spray Fixed Systems for Fire Protection. GENERAL REQUIREMENTS FOR FIRE PUMP SYSTEMS AND EXIGENCES GÉNÉRALES VISANT LES SYSTÈMES DE POMPES ET WATER MAINS LES CONDUITES PRINCIPALES D’EAU 26. (1) The fire hydrant system referred to in section 26. (1) Le système de bouches d’incendie visé à l’ar- 24 and a water deluge system referred to in section 25 ticle 24 et le système déluge visé à l’article 25 peuvent may be connected to the same water main and main être raccordés à la même conduite principale d’eau et pump systems. aux mêmes systèmes de pompes principaux. (2) Every water main referred to in section 24 or 25 (2) Toute conduite principale d’eau visée aux articles shall 24 et 25 doit : (a) be routed clear of hazardous areas as far as practi- a) autant que faire se peut, passer à distance des cable; zones dangereuses; 43 SOR/95-191 — September 29, 2014 (b) be arranged in relation to any thermal barriers and b) être disposée par rapport aux barrières thermiques structural elements of the installation so as to obtain et aux éléments structuraux de l’installation de ma- the maximum protection from damage due to heat; nière à être protégée au maximum contre les dom- (c) be equipped with valves that will permit a dam- mages dus à la chaleur; aged part of the system to be isolated from the undam- c) être dotée de soupapes qui permettent d’isoler une aged parts; and section endommagée du système des sections intactes; (d) be used solely for the purpose of firefighting. d) servir uniquement à la lutte contre l’incendie. (3) Every sea suction and source of power for each of (3) La source d’énergie et la prise d’eau de mer de the pump systems referred to in section 24 or 25 shall tout système de pompes visé aux articles 24 et 25 (a) be designed and arranged to start automatically in doivent : response to a) être conçues et installées de façon à démarrer auto- (i) any drop in water pressure that indicates a de- matiquement dans chacun des cas suivants : mand on the system, (i) toute baisse de la pression d’eau qui indique l’u- (ii) the receipt of a signal from the fire detection tilisation du système, system, and (ii) la réception d’un signal du système de détec- (iii) the receipt of a signal from any manual control tion d’incendie, point; (iii) la réception d’un signal d’un poste de com- (b) be capable of being started manually from the mande manuel; control station and started and stopped manually from b) pouvoir être mises en marche manuellement à par- a location close to the pump system; tir de la salle de commande et être mises en marche et (c) be capable of functioning continuously without at- arrêtées manuellement à partir d’un endroit à proximi- tendance for at least 24 hours; and té du système de pompes; (d) be designed and arranged so that a fire, explosion c) pouvoir fonctionner continuellement pendant au or flooding in any one space of the installation will moins 24 heures sans surveillance; not put more than one pump system out of operation. d) être conçues et installées de sorte qu’un incendie, une explosion ou l’inondation d’un espace de l’instal- lation n’entraîne pas la mise hors d’usage de plus d’un système de pompes. (4) When any of the pump systems referred to in sec- (4) Lors de la mise en marche de tout système de tion 24 or 25 is started, an audible alarm shall be given pompes visé aux articles 24 et 25, une alarme sonore automatically at the pump and an audible and visual doit être déclenchée automatiquement à l’emplacement alarm shall be given automatically at the fire and gas in- de la pompe et une alarme sonore et visuelle doit être dé- dicator panel in the control station. clenchée automatiquement au panneau de détection de gaz et d’incendie de la salle de commande. (5) Every pump system provided pursuant to section (5) Tout système de pompes installé aux termes des 24 or 25 shall be located in a part of the installation re- articles 24 et 25 doit être situé dans une partie de l’instal- mote from spaces that contain equipment used for stor- lation éloignée des espaces contenant de l’équipement servant au stockage, au transport ou au traitement du pé- 44 DORS/95-191 — 29 septembre 2014 ing, conveying or processing petroleum that is not used trole qui ne constituera pas du combustible à bord de as fuel on the installation. l’installation. SPRINKLER SYSTEM IN ACCOMMODATION AREAS RÉSEAU D’EXTINCTEURS DANS LES SECTEURS D’HABITATION 27. (1) The accommodation areas in every manned 27. (1) Tout secteur d’habitation de l’installation ha- installation shall be equipped with a sprinkler system bitée doit être muni d’un réseau d’extincteurs alimenté that is supplied with water from en eau par l’un des dispositifs suivants : (a) two dedicated pump systems connected to the wa- a) deux systèmes de pompes réservés et reliés à la ter main referred to in section 24 or 25 by way of a conduite principale d’eau visée aux articles 24 et 25 lockable screwdown non-return valve that will prevent au moyen d’un clapet à serrage empêchant le retour de backflow from the sprinkler system to the water main; l’eau du réseau à la conduite; or b) une pompe du réseau d’extincteurs réservée et (b) one dedicated sprinkler pump connected to reliée : (i) the water main referred to in section 24 or 25 by (i) à la conduite principale d’eau visée aux articles way of a lockable screwdown non-return valve that 24 et 25 au moyen d’un clapet à serrage empêchant will prevent backflow from the sprinkler system to le retour de l’eau du réseau à la conduite, the water main, and (ii) à un réservoir d’eau douce pressurisé ayant une (ii) a pressurized fresh water tank having a volume capacité égale à au moins deux fois le volume d’eau equal to at least twice the volume of water required à fournir pendant une minute conformément au pa- pursuant to subsection (2) to be supplied for a peri- ragraphe (2). od of one minute. (2) The volume of water supplied by the pump sys- (2) La quantité d’eau fournie par les systèmes de tems or pump and fresh water tank described in subsec- pompes ou par les pompes et le réservoir d’eau douce vi- tion (1) shall be at a pressure sufficient to ensure, at the sés au paragraphe (1) doit être à une pression suffisante, level of the highest sprinkler, continuous coverage of at au niveau de la tête d’extincteur la plus élevée, pour per- least 280 m2 at the rate of at least 6 L/minute/m2. mettre l’arrosage continuel d’une surface d’au moins 280 m2 à un débit d’au moins 6 L/minute/m2. (3) The sprinkler pump required by paragraph (1)(b) (3) La pompe du réseau d’extincteurs visée à l’alinéa shall (1)b) doit : (a) serve only the sprinkler system; a) desservir uniquement le réseau; (b) be activated automatically by a pressure drop in b) se mettre en marche automatiquement à la suite the system before the water in the fresh water tank is d’une perte de pression du système avant que le réser- depleted; and voir à eau douce soit vidé; (c) be powered from at least two sources. c) avoir au moins deux sources d’énergie. (4) When the sprinkler system is activated, an audible (4) Lorsque le réseau d’extincteurs est mis en marche, and visual alarm that shows the location of the activated une alarme sonore et visuelle montrant l’emplacement sprinklers shall be given automatically at the fire and gas des extincteurs en cause doit automatiquement se déclen- indicator panel in the control station. cher au panneau d’indication de gaz et d’incendie de la salle de commande. 45 SOR/95-191 — September 29, 2014 (5) The sprinkler system shall be designed to prevent (5) Le réseau d’extincteurs doit être conçu de façon à the passage of sea water into the fresh water tank. empêcher le passage de l’eau de mer dans le réservoir d’eau douce. (6) The sprinkler system shall be provided with at (6) Le réseau d’extincteurs doit être muni d’au moins least one stop valve for every 200 sprinklers that can un clapet d’arrêt pour chaque 200 têtes d’extincteurs de prevent the flow of water into those sprinklers without façon à arrêter l’arrivée d’eau à ces têtes sans inter- affecting the rest of the system. rompre l’arrivée d’eau au reste du réseau. (7) Each of the stop valves provided pursuant to sub- (7) Tout clapet d’arrêt visé au paragraphe (6) doit être section (6) shall be protected from accidental operation. muni d’un dispositif de sûreté pour en empêcher l’utili- sation accidentelle. (8) A gauge indicating the pressure in the sprinkler (8) Une jauge indiquant la pression du réseau d’ex- system shall be fitted at each stop valve and at the con- tincteurs doit être installée près de chaque clapet d’arrêt trol station. et à la salle de commande. (9) The sprinkler heads shall be placed in positions (9) Les têtes d’extincteurs doivent être disposées se- and spaced in a pattern that will ensure an average appli- lon une configuration qui permette de maintenir un taux cation rate of 6 L/minute/m2 throughout each space in de dispersion moyen de 6 L/minute/m2 pour chaque es- the accommodation areas. pace des secteurs d’habitation. (10) The pump system or pump and fresh water tank (10) Les systèmes de pompes ou les pompes et le ré- required by subsection (1) shall be situated outside the servoir d’eau douce visés au paragraphe (1) doivent être accommodation areas and as far as possible from the situés à l’extérieur des secteurs d’habitation et aussi éloi- main machinery space. gnés que possible de la zone des machines principale. (11) The sprinkler system shall be (11) Le réseau d’extincteurs doit être : (a) installed in accordance with National Fire Protec- a) installé conformément à la norme 13 de la National tion Association 13, Standard for the Installation of Fire Protection Association intitulée Standard for the Sprinkler Systems; and Installation of Sprinkler Systems; (b) tested and maintained in accordance with National b) mis à l’essai et entretenu conformément à la norme Fire Protection Association 13A, Recommended Prac- 13A de la National Fire Protection Association intitu- tice for the Inspection, Testing and Maintenance of lée Recommended Practice for the Inspection, Testing Sprinkler Systems. and Maintenance of Sprinkler Systems. FIRE EXTINGUISHING SYSTEMS IN MACHINERY AND SYSTÈMES D’EXTINCTEURS D’INCENDIE DANS LES ZONES DES FLAMMABLE LIQUID STORAGE SPACES MACHINES OU DE STOCKAGE DE LIQUIDES INFLAMMABLES 28. (1) On every installation, a fixed fire-extinguish- 28. (1) Un système fixe d’extincteurs d’incendie uti- ing system utilizing carbon dioxide, pressure water spray lisant une mousse à grande expansion, lorsque l’incendie or, where a fire will not involve any gases, liquefied gas- ne met pas en cause un gaz ou un gaz liquéfié ayant un es with a boiling point below ambient temperature or point d’ébullition inférieur à la température ambiante ou cryogenic liquids, high expansion foam shall be installed un liquide cryogénique, ou utilisant dans les autres cas le in every space containing gaz carbonique ou un jet d’eau sous pression doit être 46 DORS/95-191 — 29 septembre 2014 (a) internal combustion machinery having an aggre- installé dans les espaces de l’installation qui gate power of at least 750 kW; contiennent : (b) an oil- or gas-fired boiler or any other fired pro- a) soit des machines à combustion interne ayant une cess vessel having a thermal rating of at least 75 kW; puissance combinée d’au moins 750 kW; (c) paint or other flammable liquids as defined by Na- b) soit une chaudière au gaz ou à l’huile ou tout autre tional Fire Protection Association 321, Standard on récipient de fabrication chauffé ayant une puissance Basic Classification of Flammable and Combustible thermique d’au moins 75 kW; Liquids; or c) soit de la peinture ou d’autres liquides inflam- (d) mud pits or equipment used for removing drill mables au sens de la norme 321 de la National Fire solids where oil-based mud is used. Protection Association intitulée Standard on Basic Classification of Flammable and Combustible Li- quids; d) soit des bacs à boue ou de l’équipement utilisé pour éliminer les déblais de forage lorsqu’est utilisée de la boue à base d’huile. (2) On every installation, a fixed fire-extinguishing (2) Un système fixe d’extincteurs d’incendie utilisant system utilizing carbon dioxide or pressure water spray le gaz carbonique ou un jet d’eau sous pression doit être shall be provided in every compartment containing a installé dans les compartiments de l’installation qui pump for the transfer of oil. contiennent une pompe servant au transfert du pétrole. (3) A fire-extinguishing system utilizing carbon diox- (3) Le système d’extincteurs d’incendie au gaz carbo- ide referred to in subsection (1) or (2) shall meet the re- nique visé aux paragraphes (1) ou (2) doit satisfaire aux quirements of National Fire Protection Association 12, exigences de la norme 12 de la National Fire Protection Standard on Carbon Dioxide Extinguishing Systems. Association intitulée Standard on Carbon Dioxide Extin- guishing Systems. (4) A fire-extinguishing system utilizing pressure wa- (4) Le système d’extincteurs d’incendie à jet d’eau ter spray referred to in subsection (1) or (2) shall meet sous pression visé aux paragraphes (1) ou (2) doit satis- the requirements of National Fire Protection Association faire aux exigences de la norme 15 de la National Fire 15, Standard for Water Spray Fixed Systems for Fire Protection Association intitulée Standard for Water Protection. Spray Fixed Systems for Fire Protection. (5) A fire-extinguishing system utilizing high expan- (5) Le système d’extincteurs d’incendie à mousse à sion foam referred to in subsection (1) shall meet the re- grande expansion visé au paragraphe (1) doit satisfaire quirements of National Fire Protection Association 16, aux exigences de la norme 16 de la National Fire Protec- Standard on Deluge Foam-Water Sprinkler and Foam- tion Association intitulée Standard on Deluge Foam- Water Spray Systems. Water Sprinkler and Foam-Water Spray Systems. (6) When a fire-extinguishing system utilizing carbon (6) Lorsque le système d’extincteurs d’incendie au dioxide is provided pursuant to subsection (1) or (2), gaz carbonique est installé aux termes des paragraphes means shall be provided to (1) ou (2), les dispositifs suivants doivent être mis en place : 47 SOR/95-191 — September 29, 2014 (a) stop all ventilation fans serving the space protect- a) un dispositif d’arrêt automatique des ventilateurs ed by that system automatically before the system is de l’espace protégé par le système avant la mise en activated; and marche de celui-ci; (b) close all dampers in the ventilation system serving b) un dispositif de fermeture manuelle des amortis- the space protected by that system manually from a seurs de ventilation de l’espace, protégé par le sys- position that is outside that space and that will not be tème, qui est situé à l’extérieur de cet espace et qui ne made inaccessible by a fire within that space. deviendra pas inaccessible du fait d’un incendie dans celui-ci. (7) Every fire-extinguishing system referred to in (7) Le système d’extincteurs d’incendie visé aux pa- subsection (1) or (2) shall be capable of being activated ragraphes (1) ou (2) doit pouvoir être mis en marche manually manuellement : (a) from a location close to but outside each space a) depuis un emplacement hors de chaque espace des- served by it; and servi mais à proximité de celui-ci; (b) at the location where the extinguishing medium is b) depuis l’emplacement où est stocké l’agent d’ex- stored. tinction. (8) At each access to every space served by a fire-ex- (8) Tout accès à un espace protégé par un système tinguishing system referred to in subsection (1) or (2) d’extincteurs d’incendie visé aux paragraphes (1) ou (2) there shall be a notice indicating that the space contains doit porter un avis indiquant que l’espace est muni d’un such a system and stating which fire extinguishing medi- tel système et précisant l’agent d’extinction employé. um is used. (9) Visual indication of the operational status of the (9) La salle de commande et tout accès à un espace fire-extinguishing system referred to in subsection (1) or protégé par un système d’extincteurs d’incendie visé aux (2) shall be provided at each access to every space paragraphes (1) ou (2) doivent être munis d’indicateurs served by that system and at the control station. visuels indiquant l’état de fonctionnement du système. (10) Every installation provided with a fire-extin- (10) L’installation munie d’un système d’extincteurs guishing system referred to in subsection (1) or (2) shall d’incendie visé aux paragraphes (1) ou (2) doit être équi- be provided with an automatic system that will give pée d’un système automatique qui : (a) an audible warning, in every space served by that a) déclenche une alarme sonore avant l’émission de system to which personnel have access, before the fire l’agent d’extinction par le système d’extincteurs dans extinguishing medium is released from the fire extin- les espaces protégés par celui-ci auxquels a accès le guishing system; and personnel; (b) an audible and visual signal, outside the access to b) déclenche pendant le fonctionnement du système every space served by that system and at the fire and d’extincteurs une alarme visuelle et sonore à l’exté- gas indicator panel in the control station, when the fire rieur de l’accès à tout espace protégé par le système extinguishing system is in operation. d’extincteurs et au panneau indicateur de gaz et d’in- cendie de la salle de commande. (11) Every installation provided with a fire-extin- (11) L’installation munie d’un système d’extincteurs guishing system referred to in subsection (1) or (2) shall d’incendie visé aux paragraphes (1) ou (2) doit être dotée be provided with means to close all openings that may de moyens pour fermer toutes les ouvertures pouvant 48 DORS/95-191 — 29 septembre 2014 admit air to or allow gas to escape from a space served permettre l’admission d’air dans tout espace protégé par by that system. le système ou la fuite de gaz d’un tel espace. FIRE EXTINGUISHERS EXTINCTEURS D’INCENDIE 29. (1) On every installation a portable fire extin- 29. (1) L’installation doit être munie d’un extincteur guisher shall be provided d’incendie portatif aux endroits suivants : (a) within 10 m of any position accessible by person- a) dans un rayon de 10 m de tout point accessible au nel in every machinery, drilling and production and personnel dans les zones des machines ou dans celles process space; servant au forage, à la production ou au traitement; (b) within 15 m of any position accessible by person- b) dans un rayon de 15 m de tout point accessible au nel in every space other than a space described in personnel dans une zone autre que celles visées à l’ali- paragraph (a); and néa a); (c) near the entrance to each space referred to in para- c) près de l’entrée des zones visées aux alinéas a) et graphs (a) and (b). b). (2) Subject to subsection (3), the extinguishing medi- (2) Sous réserve du paragraphe (3), l’agent d’extinc- um employed by an extinguisher provided pursuant to tion utilisé dans les extincteurs visés au paragraphe (1) subsection (1) shall be suitable for extinguishing fires in doit être du type voulu pour éteindre les incendies dans spaces in which it is intended to be used. les espaces auxquels l’agent est destiné. (3) Each extinguisher provided pursuant to subsection (3) Les extincteurs visés au paragraphe (1) destinés à (1) for use in machinery spaces where oil is used as fuel une zone des machines où l’huile est employé comme shall be of a type discharging foam, carbon dioxide gas combustible doivent utiliser de la mousse, du gaz carbo- or dry powder. nique ou une poudre sèche. (4) The capacity of each portable extinguisher provid- (4) La capacité de chaque extincteur portatif visé au ed pursuant to this section shall be at least présent article doit être d’au moins : (a) 9 L, for an extinguisher that discharges foam; a) 9 L dans le cas d’un extincteur à mousse; (b) 4.5 kg, for an extinguisher that discharges dry b) 4,5 kg dans le cas d’un extincteur à poudre sèche; powder; c) 6 kg dans le cas d’un extincteur au gaz carbonique; (c) 6 kg, for an extinguisher that discharges carbon d) 9 L dans le cas d’un extincteur à eau. dioxide gas; and (d) 9 L, for an extinguisher that discharges water. (5) A spare charge shall be provided for each portable (5) Une charge de rechange doit être fournie pour extinguisher provided pursuant to this section for which chaque extincteur portatif visé par le présent article pour a duplicate extinguisher has not been provided. lequel il n’y a pas d’extincteur de réserve. (6) On an installation, every space containing internal (6) Toute zone de l’installation qui renferme des ma- combustion machinery that has an aggregate power of at chines à combustion interne ayant une puissance combi- least 750 kW shall be provided with one portable foam née d’au moins 750 kW doit être dotée d’un applicateur applicator unit and the following fire extinguishers: de mousse portatif et des extincteurs d’incendie suivants : 49 SOR/95-191 — September 29, 2014 (a) one foam type fire extinguisher of not less than 45 a) un extincteur à mousse d’une capacité d’au moins L capacity in every engine space; 45 L dans chaque zone renfermant des moteurs; (b) two portable foam extinguishers, where the aggre- b) deux extincteurs à mousse portatifs si la puissance gate power of the machinery is at least 750 kW but combinée des machines est d’au moins 750 kW sans not more than 1500 kW; dépasser 1 500 kW; (c) three portable foam extinguishers, where the ag- c) trois extincteurs à mousse portatifs si la puissance gregate power of the machinery is more than 1500 kW combinée des machines est de plus de 1 500 kW sans but not more than 2250 kW; dépasser 2 250 kW; (d) four portable foam extinguishers, where the ag- d) quatre extincteurs à mousse portatifs si la puis- gregate power of the machinery is more than 2250 kW sance combinée des machines est de plus de 2 250 kW but not more than 3000 kW; sans dépasser 3 000 kW; (e) five portable foam extinguishers, where the aggre- e) cinq extincteurs à mousse portatifs si la puissance gate power of the machinery is more than 3000 kW combinée des machines est de plus de 3 000 kW sans but not more than 3750 kW; and dépasser 3 750 kW; (f) six portable foam extinguishers, where the aggre- f) six extincteurs à mousse portatifs si la puissance gate power of the machinery is more than 3750 kW. combinée des machines est de plus de 3 750 kW. (7) On an installation, every space containing an oil- (7) Toute zone de l’installation contenant une chau- or gas-fired boiler or any other fired process vessel that dière au gaz ou à l’huile ou tout autre équipement de has a thermal rating of at least 75 kW shall be provided traitement chauffé ayant une puissance thermique d’au with moins 75 kW doit être munie : (a) two portable foam fire extinguishers plus an addi- a) de deux extincteurs portatifs à mousse et d’un ex- tional portable foam fire extinguisher for each burner tincteur additionnel de même type pour chaque up to a total capacity of 45 L; brûleur dont la capacité totale est d’au plus 45 L; (b) one portable dry powder fire extinguisher; and b) d’un extincteur portatif à poudre sèche; (c) one portable foam applicator unit. c) d’un applicateur portatif de mousse. (8) Every portable foam applicator unit provided pur- (8) Tout applicateur portatif de mousse visé au pré- suant to this section shall be provided with sent article doit comprendre : (a) an air-foam nozzle of an inductor type capable of a) un gicleur air-mousse de type induction pouvant being connected to the water main described in sub- être branché sur la conduite principale d’eau visée au section 24(2) and of producing foam effective for ex- paragraphe 24(2) et pouvant produire une mousse ca- tinguishing an oil fire at the rate of at least 1.5 m3/ pable d’éteindre un feu d’huile à un débit d’au moins minute; and 1,5 m3/min; (b) at least two tanks, each containing at least 20 L of b) au moins deux réservoirs de liquide à mousse, foam-making liquid. d’une capacité d’au moins 20 L chacune. (9) Every portable fire extinguisher on an installation (9) Les extincteurs portatifs de l’installation doivent shall be inspected, maintained and recharged in accor- être inspectés, entretenus et rechargés conformément à la dance with National Fire Protection Association 10, norme 10 de la National Fire Protection Association inti- Standard for Portable Fire Extinguishers. tulée Standard for Portable Fire Extinguishers. 50 DORS/95-191 — 29 septembre 2014 FIREFIGHTING EQUIPMENT ÉQUIPEMENT DE LUTTE CONTRE L’INCENDIE 30. (1) Every manned installation shall be provided 30. (1) L’installation habitée doit être pourvue d’au with at least ten sets of firefighter equipment and every moins dix ensembles d’équipement pour pompier et unmanned installation shall be provided with at least two l’installation inhabitée doit être pourvue d’au moins sets of firefighter equipment, each of which shall consist deux tels ensembles, chaque ensemble devant of comprendre : (a) protective clothing, including boots and gloves, a) des vêtements de protection, notamment des bottes that et des gants : (i) meets the requirements of National Fire Protec- (i) qui sont conformes aux exigences de la norme tion Association 1971, Standard on Protective 1971 de la National Fire Protection Association in- Clothing for Structural Fire Fighting, titulée Standard on Protective Clothing for Structu- (ii) will protect the skin from being burned by heat ral Fire Fighting, radiating from a fire and by steam, (ii) qui protègent la peau des brûlures causées par (iii) has a water-resistant outer surface, la chaleur rayonnant d’un incendie et par la vapeur, (iv) in the case of boots, is made of rubber or other (iii) dont la surface extérieure est imperméable, electrically non-conducting material, and (iv) dans le cas des bottes, qui sont faites en caou- (v) in the case of gloves, meets the requirements of tchouc ou d’un autre matériau non conducteur National Fire Protection Association 1973, Stan- d’électricité, dard on Gloves for Structural Fire Fighting; and (v) dans le cas des gants, qui sont conformes aux (b) a firefighter’s helmet with visor that meets the re- exigences de la norme 1973 de la National Fire Pro- quirements of Canadian Standards Association CAN/ tection Association intitulée Standard on Gloves for CSA-Z94.1-92, Industrial Protective Headwear. Structural Fire Fighting; b) un casque de pompier avec viseur qui est conforme aux exigences de la norme CAN/CSA-Z94.1-92 de l’Association canadienne de normalisation intitulée Industrial Protective Headwear. (2) In addition to any firefighting equipment required (2) En sus des équipements de lutte contre l’incendie by the Oil and Gas Occupational Safety and Health Reg- exigés par le Règlement sur la sécurité et la santé au tra- ulations, every manned installation shall be provided vail (pétrole et gaz), l’installation habitée doit être pour- with at least four sets, and every unmanned installation vue d’au moins quatre ensembles comprenant l’équipe- shall be provided with at least two sets, of the following ment suivant et l’installation inhabitée doit être pourvue equipment: d’au moins deux tels ensembles : (a) a self-contained breathing apparatus that a) un appareil respiratoire autonome qui : (i) is capable of functioning for at least 30 minutes, (i) peut fonctionner pendant au moins 30 minutes, (ii) meets the requirements of Canadian Standards (ii) est conforme aux exigences des normes de Association Z94.4-93, Selection, Use, and Care of l’Association canadienne de normalisation Respirators, and CAN3-Z 180.1-M85, Compressed Z94.4-93 et CAN3-Z 180.1-M85 intitulées respecti- Breathing Air and Systems, and vement Selection, Use, and Care of Respirators et 51 SOR/95-191 — September 29, 2014 (iii) is equipped with two spare bottles; Air comprimé respirable : Production et distribu- (b) a portable electric safety lamp that tion, (i) will operate in the conditions anticipated for a (iii) est muni de deux bouteilles de rechange; Class I, Division 1, hazardous area, b) une lampe de sécurité électrique portative qui : (ii) is operated from a rechargeable battery capable (i) peut fonctionner dans les conditions prévues of operating for at least 3 hours, and pour une zone dangereuse de classe I, division 1, (iii) can be easily attached to the clothing of a fire- (ii) est alimentée par une batterie rechargeable fighter, at or above the waist level; ayant une durée d’au moins 3 heures, (c) an axe with an insulated handle and a carrying (iii) est facile à fixer aux vêtements du pompier à la belt; and taille ou plus haut; (d) a fire-resistant life and signalling line and a safety c) une hache avec manche isolant et la ceinture belt and harness that meet the requirements of Nation- connexe; al Fire Protection Association 1983, Standard on Fire d) une corde d’assurance et de signalisation résistante Service Life Safety Rope, Harness and Hardware. au feu, une ceinture de sécurité et un harnais conformes aux exigences de la norme 1983 de la Na- tional Fire Protection Association intitulée Standard on Fire Service Life Safety Rope, Harness, and Hard- ware. (3) Each set of equipment required by subsections (1) (3) Chaque ensemble d’équipement visé aux para- and (2) shall be kept ready for use and stored so as to be graphes (1) et (2) doit être tenu prêt à utiliser et être ran- readily accessible. gé de façon à être facilement accessible. (4) One of each of the sets of equipment required by (4) L’un de chacun des ensembles visés aux para- subsections (1) and (2) shall be located within easy ac- graphes (1) et (2) doit être rangé dans un endroit facile- cess of the helicopter deck. ment accessible à partir de l’hélipont. AUTOMATIC FIRE DETECTION SYSTEMS SYSTÈMES AUTOMATIQUES DE DÉTECTION D’INCENDIE 31. (1) Every manned installation shall be equipped 31. (1) L’installation habitée doit être munie d’un with a fire detection system that is capable of detecting système de détection d’incendie capable de déceler la the presence of fire in every space where fire may occur, présence d’un incendie en tout endroit où il peut se dé- including clarer, notamment : (a) every corridor, stairway and escape route in the a) les corridors, les escaliers ou les voies de secours accommodation areas; des secteurs d’habitation; (b) the control station; b) la salle de commande; (c) every work area; and c) les zones de travail; (d) every space containing equipment in which d) les zones contenant des équipements dans lesquels petroleum or any other flammable substance is stored, le pétrole ou toute autre substance inflammable est conveyed, processed or consumed. stocké, transporté, traité ou utilisé. 52 DORS/95-191 — 29 septembre 2014 (2) Every unmanned installation shall be equipped (2) L’installation inhabitée doit être munie d’un sys- with a fire detection system that is capable of detecting tème de détection d’incendie capable de déceler la pré- the presence of fire in every space where fire may occur, sence d’un incendie en tout endroit où il peut se déclarer, including notamment : (a) every work area; and a) les zones de travail; (b) every space containing equipment in which b) les zones contenant des équipements dans lesquels petroleum or any other flammable substance is stored, le pétrole ou toute autre substance inflammable est conveyed, processed or consumed. stocké, transporté, traité ou utilisé. (3) Every fire detection system required by subsec- (3) Tout système visé aux paragraphes (1) et (2) doit tions (1) and (2) shall be selected, designed, installed être choisi, conçu, installé et entretenu conformément à and maintained in accordance with National Fire Preven- la norme 72E de la National Fire Prevention Association tion Association 72E, Standard on Automatic Fire De- intitulée Standard on Automatic Fire Detectors. tectors. (4) The fire detection systems required by subsections (4) Les systèmes visés aux paragraphes (1) et (2) (1) and (2) shall, on detection of fire, activate automati- doivent, lorsqu’un incendie est décelé, déclencher cally automatiquement : (a) an audible and visual signal on the fire and gas in- a) un signal sonore et visuel au panneau indicateur de dicator panel in the control station of a manned instal- gaz et d’incendie de la salle de commande de l’instal- lation; and lation habitée; (b) an audible alarm that has a tone different from any b) une alarme sonore qui a une tonalité différente des other alarm in any part of the installation. autres alarmes dans toute partie de l’installation. GAS DETECTION SYSTEMS SYSTÈMES DE DÉTECTION DE GAZ 32. (1) Every installation shall be equipped with a 32. (1) L’installation doit être pourvue d’un système gas detection system that is capable of detecting, in ev- de détection des gaz capable de déceler la présence de ery part of the installation in which hydrogen sulphide or tout genre d’hydrocarbone gazeux ou d’hydrogène sulfu- any type of hydrocarbon gas may accumulate, the pres- ré gazeux, dans toute partie de l’installation où ces gaz ence of those gases. peuvent s’accumuler. (2) The gas detection system required by subsection (2) Le système visé au paragraphe (1) doit, lorsqu’un (1) shall, on detection of gas, activate automatically gaz est décelé, déclencher automatiquement : (a) an audible and visual signal on the fire and gas in- a) un signal sonore et visuel au panneau indicateur de dicator panel in the control station of a manned instal- gaz et d’incendie de la salle de commande de l’instal- lation; and lation habitée; (b) an audible alarm that has a tone different from any b) une alarme sonore qui a une tonalité différente des other alarm in any part of the installation. autres alarmes dans toute autre partie de l’installation. (3) Every installation shall be equipped with (3) L’installation doit être munie : (a) at least two portable gas detectors capable of a) d’au moins deux détecteurs de gaz portatifs ca- pables de : 53 SOR/95-191 — September 29, 2014 (i) measuring the concentration of oxygen in any (i) mesurer la concentration en oxygène dans tout space, and espace, (ii) detecting hydrogen sulphide and any type of (ii) déceler, dans tout espace, la présence d’hydro- hydrocarbon gas in any space; and gène sulfuré gazeux et de tout genre d’hydrocar- (b) a means of testing the portable gas detectors de- bone gazeux; scribed in paragraph (a). b) de moyens de mise à l’essai des détecteurs de gaz portatifs visés à l’alinéa a). (4) A gas detector shall be provided (4) Un détecteur de gaz doit être installé : (a) at every ventilation inlet duct leading to a non- a) aux conduits d’entrée de ventilation qui mènent à hazardous area on every installation; and une zone non dangereuse de toute installation; (b) in every enclosed hazardous area on every instal- b) dans les zones dangereuses fermées de l’installa- lation. tion. (5) Every gas detector provided in accordance with (5) Tout détecteur de gaz fourni selon le paragraphe subsection (3) shall be appropriate for the area and in- (3) doit convenir à la zone en cause et doit être monté et stalled and operated in accordance with utilisé conformément aux dispositions suivantes : (a) Appendix C of American Petroleum Institute RP a) l’annexe C du document RP 14C de l’American 14C, Recommended Practice for Analysis, Design, In- Petroleum Institute intitulé Recommended Practice for stallation and Testing of Basic Surface Safety Systems Analysis, Design, Installation and Testing of Basic for Offshore Production Platforms; and Surface Safety Systems for Offshore Production Plat- (b) section 9.2 of American Petroleum Institute RP forms; 14F, Recommended Practice for Design and Installa- b) l’article 9.2 du document RP 14F de l’American tion of Electrical Systems for Offshore Production Petroleum Institute intitulé Recommended Practice for Platforms. Design and Installation of Electrical Systems for Off- shore Production Platforms. ALARM PANELS AND SIGNALS PANNEAUX ET SIGNAUX D’ALARME 33. (1) Every manned installation shall be equipped 33. (1) L’installation habitée doit être pourvue d’un with a fire or gas detection system that includes système de détection d’incendie et du gaz qui comprend : (a) one or more fire and gas detector indicator panels a) dans la salle de commande, un ou plusieurs pan- located at the control station, that neaux indicateurs de gaz et d’incendie : (i) indicate the source of fire and gas by means of a (i) qui indiquent la source d’un incendie et du gaz visual signal, au moyen d’un signal visuel, (ii) are capable of being functionally tested, and (ii) dont l’état de fonctionnement peut être mis à (iii) are fitted with equipment for resetting the fire l’essai, and gas detection systems; and (iii) qui sont munis de l’équipement voulu pour re- (b) an audible fire and gas alarm that has a character- mettre le système de détection en état de service; istic tone that distinguishes it from the alarms associ- b) une alarme sonore de gaz et d’incendie qui se fait ated with machinery, safety and control system faults entendre en tout point de l’installation et qui a une to- 54 DORS/95-191 — 29 septembre 2014 or any other alarm system and that is audible on all nalité caractéristique qui la distingue des alarmes re- parts of the installation. liées à la machinerie et aux systèmes de sécurité et de contrôle et de tout autre système d’alarme. (2) A fire or gas detection system referred to in sub- (2) Le système de détection d’incendie et du gaz visé section (1) shall au paragraphe (1) doit : (a) be capable of being manually activated from each a) pouvoir être déclenché manuellement aux endroits of the following locations, namely, suivants : (i) the space adjacent to each entrance to each ma- (i) près de l’entrée des zones des machines et de chinery and process space, traitement, (ii) each accommodation area, (ii) les secteurs d’habitation, (iii) the office of the manager of the installation, (iii) le bureau du directeur de l’installation, (iv) every control point in each machinery and pro- (iv) les postes de commande des zones des ma- cess space, and chines et de traitement, (v) the control station; (v) la salle de commande; (b) be designed so that, on activation of a detection b) être conçu de façon que, lorsqu’un détecteur est device in one space, any signals received at the same déclenché en un endroit, tout signal reçu au même time from a detection device in another space will reg- moment d’un détecteur dans un autre endroit puisse ister at the fire and gas indicator panel at that same être reçu au panneau indicateur de gaz et d’incendie time; en même temps; (c) be installed and maintained in accordance with c) être installé et entretenu conformément à la norme National Fire Prevention Association 72, Standard for 72 de la National Fire Prevention Association intitulée the Installation, Maintenance, and Use of Protective Standard for the Installation, Maintenance, and Use Signaling Systems; and of Protective Signaling Systems; (d) be arranged so that there will be an automatic d) en cas de perte de la source primaire d’énergie changeover to an emergency source of electrical pow- électrique, passer automatiquement à la source d’éner- er in accordance with subsection 12(9) in the event of gie électrique de secours selon le paragraphe 12(9) et a failure of the primary source of electrical power and indiquer la panne de la source d’énergie électrique pri- so that failure of the primary source of electrical pow- maire au moyen d’une alarme visuelle et sonore dis- er will be indicated both visually and audibly as a sep- tincte qui indique la défaillance. arate fault alarm. GENERAL ALARM SYSTEM SYSTÈME D’ALARME GÉNÉRAL 34. (1) Every installation shall be equipped with a 34. (1) Toute installation doit être munie d’un sys- general alarm system that is capable of alerting person- tème d’alarme général capable d’alerter le personnel en nel to any hazardous conditions other than fire or gas cas de situation dangereuse, autre qu’un incendie ou la that might présence de gaz, qui pourrait : (a) endanger the personnel; a) soit mettre en danger le personnel; (b) endanger the installation; or b) soit mettre en danger l’installation; 55 SOR/95-191 — September 29, 2014 (c) be harmful to the environment. c) soit être dangereuse pour l’environnement. (2) Every general alarm system referred to in subsec- (2) Tout système d’alarme général visé au paragraphe tion (1) shall be (1) doit : (a) operational and in operation at all times other than a) être en état de fonctionnement et fonctionner à tout when the system is being inspected, maintained or re- moment, sauf durant une inspection ou des travaux paired; d’entretien ou de réparation; (b) where applicable, flagged as being subject to in- b) le cas échéant, être désigné comme devant être ins- spection, maintenance or repair; and pecté, entretenu ou réparé; (c) designed in such a manner as to prevent tamper- c) être conçu de façon à en prévenir l’altération. ing. (3) Where a general alarm system for an installation (3) Lorsque le système d’alarme général de l’installa- is being inspected, maintained or repaired, the operator tion est inspecté, entretenu ou réparé, l’exploitant de of the installation shall ensure that the functions that the l’installation doit s’assurer que les fonctions du système system performs are performed manually. sont remplies manuellement. PIPING SYSTEMS RÉSEAU DE TUYAUTERIE 35. (1) The piping system and associated equipment 35. (1) Le réseau de tuyauterie et les équipements of every installation shall be designed and installed in connexes de toute installation doivent être conçus et mis accordance with American Petroleum Institute RP 14E, en place conformément au document RP 14E de l’Ame- Recommended Practice for Design and Installation of rican Petroleum Institute intitulé Recommended Practice Offshore Production Platform Piping Systems. for Design and Installation of Offshore Production Plat- form Piping Systems. (2) Every pressure vessel or fired vessel on a produc- (2) Tout récipient sous pression ou chaudière de l’ins- tion installation shall be designed and constructed in ac- tallation de production doivent être conçus et construits cordance with the following standards: conformément aux normes suivantes : (a) American Petroleum Institute Spec 12J, Specifica- a) le document Spec 12J de l’American Petroleum tion for Oil and Gas Separators; Institute intitulé Specification for Oil and Gas Separa- (b) sections I, II, IV, V, VII, VIII and IX of American tors; Society of Mechanical Engineers ASME Boiler & b) les articles I, II, IV, V, VII, VIII et IX du docu- Pressure Vessel Code; and ment de l’American Society of Mechanical Engineers (c) Canadian Standards Association B51-M1991, intitulé ASME Boiler & Pressure Vessel Code; Boiler, Pressure Vessel, and Pressure Piping Code. c) la norme B51-M1991 de l’Association canadienne de normalisation intitulée Code des chaudières, appa- reils et tuyauteries sous pression. (3) Every compressor in hydrocarbon service at a pro- (3) Tout compresseur affecté aux opérations touchant duction installation shall be designed in accordance with les hydrocarbures de l’installation de production doit the following standards: être conçu conformément aux normes suivantes : 56 DORS/95-191 — 29 septembre 2014 (a) Canadian Standards Association CAN/CSA- a) la norme CAN/CSA-Z184-M92 de l’Association Z184-92, Gas Pipeline Systems; canadienne de normalisation intitulée Réseaux de ca- (b) American Petroleum Institute STD 617, Centrifu- nalisations de gaz; gal Compressors for General Refinery Service; b) la norme STD 617 de l’American Petroleum Insti- (c) American Petroleum Institute STD 618, Recipro- tute intitulée Centrifugal Compressors for General cating Compressors for General Refinery Services; Refinery Service; and c) la norme STD 618 de l’American Petroleum Insti- (d) American Petroleum Institute STD 619, Rotary- tute intitulée Reciprocating Compressors for General Type Positive Displacement Compressors for General Refinery Services; Refinery Services. d) la norme STD 619 de l’American Petroleum Insti- tute intitulée Rotary-Type Positive Displacement Compressors for General Refinery Services. (4) All materials and procedures used in a production (4) Le matériel et les méthodes utilisés dans l’instal- installation used to produce and process sour gas shall lation de production produisant ou traitant du gaz sulfuré conform to National Association of Corrosion Engineers doivent être conformes à la norme MR-01-75 de la Na- (U.S.) MR-01-75, Sulfide Stress Cracking Resistant tional Association of Corrosion Engineers (U.S.) intitu- Metallic Materials for Oil Field Equipment. lée Sulfide Stress Cracking Resistant Metallic Materials for Oil Field Equipment. (5) Where an operator handles, treats or processes oil, (5) Lorsque du pétrole, du gaz ou de l’eau contenant gas or water that contains hydrogen sulphide, the opera- de l’hydrogène sulfuré doivent être manipulés, traités ou tor shall do so in accordance with good industry practice transformés, l’exploitant doit le faire selon les règles de to minimize the discharge of hydrogen sulphide into the l’art afin de limiter au minimum le rejet d’hydrogène environment and to ensure that the operation is carried sulfuré dans l’environnement et faire en sorte que les out in a safe and efficient manner. opérations se déroulent efficacement et en toute sécurité. COMMUNICATION SYSTEMS SYSTÈMES DE COMMUNICATION 36. (1) No person shall operate a manned installation 36. (1) Il est interdit d’exploiter l’installation habitée unless the installation is equipped with à moins que celle-ci ne soit munie : (a) a radio or telephone communication system; and a) d’un système de communication radiophonique ou (b) an emergency communication system. téléphonique; b) d’un système de communication d’urgence. (2) The communication systems referred to in subsec- (2) Les systèmes de communication visés au para- tion (1) shall be operational at all times. graphe (1) doivent être en état de fonctionnement conti- nuel. (3) No person shall operate a manned installation un- (3) Il est interdit d’exploiter l’installation habitée à less the installation is equipped with a two-way radio moins que celle-ci ne soit munie d’un système de com- communication system that munication radiophonique bidirectionnelle qui : (a) enables effective communication by radio to be a) permette de maintenir des communications radio- maintained between the installation and helicopters, phoniques efficaces entre l’installation et les hélico- 57 SOR/95-191 — September 29, 2014 the shore base, support vessels, standby vessels, ptères, la base terrestre, les navires de service, les na- search and rescue aircraft, and other nearby installa- vires de secours, les aéronefs de recherche et de tions; and sauvetage et les autres installations avoisinantes; (b) enables effective communication with marine traf- b) permette des communications efficaces avec le tra- fic in the vicinity. fic maritime aux alentours. (4) The operator of a manned installation shall ensure (4) L’exploitant de l’installation habitée doit s’assurer that the radio communication systems comply with the que les systèmes de communication radiophonique sont Ship Station Radio Regulations and the Ship Station conformes au Règlement sur les stations radio de na- Technical Regulations, as if the installation were a ship vires et au Règlement technique sur les stations (radio) to which those Regulations apply. de navires, comme si l’installation était un navire visé par ces règlements. (5) Each installation shall comply with the VHF Ra- (5) L’installation doit être conforme au Règlement sur diotelephone Practices and Procedures Regulations, as les pratiques et les règles de radiotéléphonie en VHF, if the installation were a ship to which those Regulations comme si l’installation était un navire visé par ce règle- apply. ment. (6) No person shall operate a manned installation un- (6) Il est interdit d’exploiter l’installation habitée à less the installation is equipped with moins que celle-ci ne soit munie : (a) an internal telephone system; a) d’un réseau téléphonique interne; (b) a public address system with loudspeakers located b) d’un système de sonorisation dont les haut-parleurs so that a voice transmission can be heard throughout sont placés de façon que les messages puissent être the installation; and entendus dans toute l’installation; (c) a means of transmitting written data to the shore c) d’un système de transmission des données écrites à base of the installation. la base terrestre de l’installation. (7) No person shall operate an installation that is usu- (7) Il est interdit d’exploiter l’installation normale- ally unmanned unless the installation is equipped with ment inhabitée à moins que celle-ci ne soit munie : (a) an operational two-way radio communication sys- a) d’un système de communication radiophonique bi- tem during any period when the installation is directionnelle en état de fonctionnement durant toute manned; and période où l’installation est habitée; (b) a system capable of detecting under ambient con- b) d’un système capable de déceler, dans les condi- ditions any hazardous conditions that could endanger tions ambiantes, une situation dangereuse qui pourrait the safety of the installation or damage the environ- mettre en danger l’installation ou causer des dom- ment and of alerting the control station about the haz- mages à l’environnement et de transmettre une alerte ardous conditions. au sujet des conditions dangereuses à la salle de com- mande. 58 DORS/95-191 — 29 septembre 2014 PART II PARTIE II ANALYSIS AND DESIGN ANALYSE ET CONCEPTION GENERAL DESIGN CONSIDERATIONS CONSIDÉRATIONS GÉNÉRALES EN MATIÈRE DE CONCEPTION 37. (1) Every installation and every component of an 37. (1) L’installation et tous ses éléments doivent installation shall be designed in accordance with good être conçus selon les règles de l’art en ingénierie, compte engineering practice, taking into account tenu de ce qui suit : (a) the nature of the activities on and around the in- a) la nature des activités effectuées à l’installation et stallation; autour de celle-ci; (b) the type and magnitude of functional loads, envi- b) le type et l’ampleur des charges de fonctionne- ronmental loads, and foreseeable accidental loads; ment, environnementales et accidentelles prévisibles; (c) operating and ambient temperatures; c) les températures ambiante et d’exploitation; (d) corrosion conditions that may be encountered dur- d) les conditions de corrosion qui peuvent survenir ing the construction, operation and maintenance of the durant la construction, l’exploitation et la maintenance installation; de l’installation; (e) the avoidance of damage to any part of the instal- e) la prévention des avaries à toute partie de l’instal- lation that may lead to the progressive collapse of the lation pouvant en entraîner l’affaissement progressif; whole installation; and f) les conditions du sol. (f) soil conditions. (2) The design of an installation shall be based on (2) La conception de l’installation doit être fondée sur such analyses or model tests of the installation, including des analyses ou des essais avec modèle, notamment des simulations to the extent practicable, as are necessary to simulations, autant que faire se peut, pour déterminer le permit the determination of the behaviour of the installa- comportement de l’installation et du sol qui la supporte tion and of the soils that support the installation or an- ou des systèmes d’ancrage dans toutes les conditions de choring systems, under all foreseeable transportation, in- transport, d’installation et d’exploitation prévisibles. stallation and operating conditions. DESIGN OF INSTALLATIONS CONCEPTION DES INSTALLATIONS 38. Every installation shall be designed in accordance 38. L’installation doit être conçue conformément aux with the normes suivantes de l’Association canadienne de (a) section 4 of Canadian Standards Association normalisation : CAN/CSA-S471-92, General Requirements, Design a) l’article 4 de la norme CAN/CSA-S471-92 de Criteria, the Environment, and Loads; l’Association canadienne de normalisation intitulée (b) for the foundation, section 5 of Canadian Stan- Exigences générales, critères de calcul, conditions en- dards Association CAN/CSA-S472-92, Foundations, vironnementales et charges; Offshore Structures; b) dans le cas des fondations, l’article 5 de la norme CAN/CSA-S472-92 intitulée Fondations; 59 SOR/95-191 — September 29, 2014 (c) for a steel platform, section 7 of Canadian Stan- c) dans le cas d’une plate-forme en acier, l’article 7 dards Association CAN/CSA-S473-92, Steel Struc- de la norme CAN/CSA-S473-92 intitulée Steel Struc- tures, Offshore Structures; tures, Offshore Structures; (d) for a concrete platform, sections 3 and 7 of Cana- d) dans le cas d’une plate-forme en béton, les articles dian Standards Association Preliminary Standard 3 et 7 de la norme intitulée Preliminary Standard S474-M1989, Concrete Structures; and S474-M1989, Concrete Structures; (e) in respect of its transportation and installation, e) pour le transport et la mise en place de l’installa- sections 5, 6 and 7 of Canadian Standards Association tion, les articles 5, 6 et 7 de la norme intitulée Prelimi- Preliminary Standard S475-M1989, Sea Operations. nary Standard S475-M1989, Sea Operations. DESIGN OF PLATFORMS CONCEPTION DES PLATES-FORMES 39. Every platform shall be designed in accordance 39. La plate-forme doit être conçue conformément with aux normes suivantes de l’Association canadienne de (a) for composite ice-resisting walls, section 13 of normalisation : Canadian Standards Association CAN/CSA-S473-92, a) dans le cas des parois composites à résistance aux Steel Structures, Offshore Structures; glaces, l’article 13 de la norme CAN/CSA-S473-92 (b) for the foundation, section 5 of Canadian Stan- intitulée Steel Structures, Offshore Structures; dards Association CAN/CSA-S472-92, Foundations, b) dans le cas des fondations, l’article 5 de la norme Offshore Structures; CAN/CSA-S472-92 intitulée Fondations; (c) for a steel platform, sections 9, 10, 11, 12 and 16 c) dans le cas d’une plate-forme en acier, les articles of Canadian Standards Association CAN/CSA- 9, 10, 11, 12 et 16 de la norme CAN/CSA-S473-92 in- S473-92, Steel Structures, Offshore Structures; titulée Steel Structures, Offshore Structures; (d) for a concrete platform, sections 8, 9, 10 and 12 of d) dans le cas d’une plate-forme en béton, les articles Canadian Standards Association Preliminary Standard 8, 9, 10 et 12 de la norme intitulée Preliminary Stan- S474-M1989, Concrete Structures; and dard S474-M1989, Concrete Structures; (e) for a gravity base, fill, fill-retention or piled plat- e) dans le cas d’une plate-forme à embase-poids, à form, section 6, 7, 8 or 9 of Canadian Standards Asso- remblai, à rétention de remblai ou sur piles, les articles ciation CAN/CSA-S472-92, Foundations, Offshore 6, 7, 8 ou 9, selon le cas, de la norme CAN/CSA- Structures, as applicable. S472-92 intitulée Fondations. ANALYSES ANALYSES 40. (1) Analyses undertaken in respect of an installa- 40. (1) Les analyses réalisées à l’égard de l’installa- tion for the purposes of subsection 37(2) shall cover all tion en application du paragraphe 37(2) doivent porter relevant structural elements of the installation, shall be sur tous les éléments de structure de l’installation, être based on good engineering practice and shall include effectuées selon les règles de l’art en ingénierie et com- (a) a structural analysis; prendre : (b) a fatigue analysis; a) un calcul des constructions; (c) a structural element stability analysis; b) une analyse de fatigue; 60 DORS/95-191 — 29 septembre 2014 (d) an overall installation stability analysis; c) une analyse de la stabilité des éléments de struc- (e) for a mobile platform, an intact and damage stabil- ture; ity analysis; and d) une analyse de la stabilité globale de l’installation; (f) a hydrodynamic analysis. e) dans le cas de la plate-forme mobile, une analyse de stabilité en condition intacte et en condition ava- riée; f) une analyse hydrodynamique. (2) Analyses undertaken in respect of a platform for (2) Les analyses réalisées à l’égard de la plate-forme the purposes of subsection 37(2) shall be carried out in en application du paragraphe 37(2) doivent être effec- accordance with tuées conformément aux normes suivantes de l’Associa- (a) section 4.6.7 of Canadian Standards Association tion canadienne de normalisation : CAN/CSA-S471-92, General Requirements, Design a) l’article 4.6.7 de la norme CAN/CSA-S471-92 inti- Criteria, the Environment, and Loads; tulée Exigences générales, critères de calcul, condi- (b) for a steel platform, section 8 of Canadian Stan- tions environnementales et charges; dards Association CAN/CSA-S473-92, Steel Struc- b) dans le cas d’une plate-forme en acier, l’article 8 tures, Offshore Structures; and de la norme CAN/CSA-S473-92 intitulée Steel Struc- (c) for a concrete platform, sections 8 and 9 of Cana- tures, Offshore Structures; dian Standards Association Preliminary Standard c) dans le cas d’une plate-forme en béton, les articles S474-M1989, Concrete Structures. 8 et 9 de la norme intitulée Preliminary Standard S474-M1989, Concrete Structures. (3) A fatigue analysis undertaken in respect of a plat- (3) L’analyse de fatigue de la plate-forme réalisée en form for the purpose of subsection 37(2) shall be carried application du paragraphe 37(2) doit être effectuée out in accordance with conformément aux normes suivantes de l’Association (a) for a steel platform, section 14 of Canadian Stan- canadienne de normalisation : dards Association CAN/CSA-S473-92, Steel Struc- a) dans le cas d’une plate-forme en acier, l’article 14 tures, Offshore Structures; and de la norme CAN/CSA-S473-92 intitulée Steel Struc- (b) for a concrete platform, section 8.5 of Canadian tures, Offshore Structures; Standards Association Preliminary Standard S474- b) dans le cas d’une plate-forme en béton, l’article 8.5 M1989, Concrete Structures. de la norme intitulée Preliminary Standard S474- M1989, Concrete Structures. (4) The foundation of major machinery and equip- (4) L’assise des machines et des équipements impor- ment on an installation shall be analysed to determine if tants de l’installation doit être analysée pour déterminer the resulting deflection, stresses and vibration are within si les déviations, les contraintes et les vibrations résul- the limits of the structural design criteria for the equip- tantes sont en deçà des limites nominales de résistance ment. structurale de l’équipement. 61 SOR/95-191 — September 29, 2014 INNOVATIONS FOR INSTALLATIONS INNOVATIONS POUR LES INSTALLATIONS 41. The design of an installation shall not involve the 41. Des méthodes de conception, des matériaux, des use of any design method, material, joining technique, or techniques d’assemblage ou des méthodes de construc- construction technique that has not previously been used tion qui n’ont pas été préalablement utilisés dans des si- in comparable situations, unless tuations comparables ne peuvent être utilisés lors de la (a) there have been engineering studies or prototype conception de l’installation à moins que : or model tests that demonstrate the adequacy of the a) des études d’ingénierie, des essais avec prototypes method, material or technique; and ou modèles ne démontrent le caractère adéquat de ces (b) the operator implements a performance monitor- méthodes, matériaux ou techniques; ing and inspection program that is designed to permit b) l’exploitant met en application un plan de sur- the determination of the correctness of the method, veillance et d’inspection destiné à déterminer l’à-pro- material or technique. pos de ces méthodes, matériaux ou techniques. REMOVAL AND ABANDONMENT OF FIXED PRODUCTION ENLÈVEMENT ET ABANDON DES INSTALLATIONS FIXES DE INSTALLATIONS PRODUCTION 42. Where the removal of a fixed production installa- 42. Lorsque l’enlèvement de l’installation fixe de tion is a condition of a development plan approval, the production est une condition de l’approbation du plan de operator shall incorporate in the design of the installation mise en valeur, l’exploitant doit incorporer dans la such measures as are necessary to facilitate its removal conception de l’installation les mesures nécessaires pour from the site without causing a significant effect on nav- en faciliter l’enlèvement sans que cela entraîne de consé- igation or the marine environment. quences importantes pour la navigation ou l’environne- ment marin. CONCEPT SAFETY ANALYSIS FOR PRODUCTION INSTALLATIONS ANALYSE DE SÉCURITÉ CONCEPTUELLE POUR INSTALLATIONS DE PRODUCTION 43. (1) Every operator shall, at the time the operator 43. (1) Au moment de demander l’approbation d’un applies for a development plan approval in respect of a plan de mise en valeur à l’égard de l’installation de pro- production installation, submit to the Chief a concept duction, l’exploitant soumet au délégué conformément safety analysis of the installation in accordance with sub- au paragraphe (5) l’analyse de sécurité conceptuelle de section (5), that considers all components and all activi- l’installation qui tient compte de tous les composants et ties associated with each phase in the life of the produc- activités connexes à chaque phase de la durée de vie de tion installation, including the construction, installation, l’installation, notamment sa construction, sa mise en operation and removal phases. place, son exploitation et son enlèvement. (2) The concept safety analysis referred to in subsec- (2) L’analyse de sécurité conceptuelle visée au para- tion (1) shall graphe (1) doit : (a) be planned and conducted in such a manner that a) être conçue et effectuée d’une manière qui per- the results form part of the basis for decisions that af- mette aux résultats d’être pris en considération dans fect the level of safety for all activities associated with les décisions sur le niveau de sécurité de toutes les ac- each phase in the life of the production installation; tivités liées à chaque phase de la durée de vie de l’ins- and tallation de production; 62 DORS/95-191 — 29 septembre 2014 (b) take into consideration the quality assurance pro- b) tenir compte du programme d’assurance de la qua- gram selected in accordance with section 4. lité choisi conformément à l’article 4. (3) Target levels of safety for the risk to life and the (3) Pour ce qui est des risques à la vie et à l’environ- risk of damage to the environment associated with all ac- nement, les niveaux de sécurité cibles propres aux activi- tivities within each phase of the life of the production in- tés de chaque phase de la durée de vie de l’installation de stallation shall be defined and shall be submitted to the production doivent être déterminés et soumis au délégué Chief at the time the operator applies for a development au moment où l’exploitant demande l’approbation du plan approval. plan de mise en valeur. (4) The target levels of safety referred to in subsec- (4) Les niveaux de sécurité visés au paragraphe (3) tion (3) shall be based on assessments that are doivent être fondés sur des évaluations : (a) quantitative, where it can be demonstrated that in- a) quantitatives, lorsqu’il peut être montré que des put data are available in the quantity and of the quality données initiales sont disponibles en quantité et en necessary to demonstrate the reliability of the results; qualité suffisantes pour démontrer la fiabilité des ré- and sultats; (b) qualitative, where quantitative assessment meth- b) qualitatives, si une méthode d’évaluation quantita- ods are inappropriate or not suitable. tive n’est pas appropriée. (5) The concept safety analysis referred to in subsec- (5) L’analyse de sécurité conceptuelle visée au para- tion (1) shall include graphe (1) doit comprendre : (a) for each potential accident, a determination of the a) pour chaque accident potentiel, une détermination probability or susceptibility of its occurrence and its de sa probabilité ou de sa possibilité et de ses consé- potential consequences without taking into account quences potentielles, compte non tenu des plans et des the plans and measures described in paragraphs (b) to mesures visés aux alinéas b) à d); (d); b) pour chaque accident potentiel, les plans d’urgence (b) for each potential accident, contingency plans de- qui permettront de prévenir ou d’atténuer un tel acci- signed to avoid the occurrence of, mitigate or with- dent ou d’y faire face; stand the accident; c) pour chaque accident potentiel, les mesures de sé- (c) for each potential accident, personnel safety mea- curité relatives au personnel qui permettront : sures designed to (i) de protéger la vie de tout le personnel hors des (i) protect, from risk to life, all personnel outside environs immédiats des lieux de l’accident, the immediate vicinity of the accident site, (ii) d’effectuer une évacuation sécuritaire et ordon- (ii) provide for the safe and organized evacuation née de tout le personnel de l’installation de produc- of all personnel from the production installation, tion lorsque l’accident pourrait entraîner une situa- where the accident could lead to an uncontrollable tion impossible à maîtriser, situation, (iii) de fournir un emplacement sécuritaire pour le (iii) provide for a safe location for personnel until personnel en attendant la mise en marche de l’éva- evacuation procedures can be implemented, where cuation lorsque l’accident pourrait entraîner une si- the accident could lead to an uncontrollable situa- tuation impossible à maîtriser, tion, and 63 SOR/95-191 — September 29, 2014 (iv) ensure that the control station, communications (iv) de vérifier que la salle de commande, les ins- facilities or alarm facilities directly involved in the tallations de communications ou les dispositifs response to the accident remain operational d’alarme directement en cause dans l’intervention throughout the time that personnel are at risk; faisant suite à l’accident demeurent en fonctionne- (d) for each potential accident, appropriate measures ment pendant que le personnel est en danger; designed to minimize the risk of damage to the envi- d) pour chaque accident potentiel, les mesures à ronment; prendre qui réduiront au minimum les risques de dom- (e) for each potential accident, an assessment of the mages à l’environnement; determination referred to in paragraph (a) and of the e) pour chaque accident potentiel, une évaluation de implementation of the plans and measures described la détermination visée à l’alinéa a) et de la mise en in paragraphs (b) to (d); œuvre des plans et des mesures visés aux alinéas b) à (f) a determination of the effects of any potential ad- d); ditional risks resulting from the implementation of the f) une détermination de l’effet de tout dommage addi- plans and measures described in paragraphs (b) to (d); tionnel potentiel résultant de la mise en œuvre des and plans et des mesures visés aux alinéas b) à d); (g) a definition of the situations and conditions and of g) un énoncé des situations et des conditions, ainsi the changes in operating procedures and practices that que des changements aux procédures ou pratiques would necessitate an update of the concept safety d’exploitation, qui nécessiteraient une mise à jour de analysis. l’analyse de sécurité conceptuelle. (6) The determinations and assessments required by (6) Les déterminations et les évaluations visées aux paragraphs (5)(a) and (e), respectively, shall be alinéas (5)a) et e) doivent être respectivement : (a) quantitative, where it can be demonstrated that in- a) quantitatives, lorsqu’il peut être montré que des put data is available in the quantity and of the quality données initiales sont disponibles en quantité et en necessary to demonstrate reliability of the results; and qualité suffisantes pour démontrer la fiabilité des ré- (b) qualitative, where quantitative assessment meth- sultats; ods are inappropriate or not suitable. b) qualitatives, si une méthode d’évaluation quantita- tive n’est pas appropriée. (7) The plans and measures identified under para- (7) Les plans et les mesures visés aux alinéas (5)b) à graphs (5)(b) to (d) shall be designed to ensure that the d) doivent être conçus pour permettre d’atteindre les ni- target levels of safety as defined pursuant to subsection veaux de sécurité cibles visés au paragraphe (3). (3) are met. (8) The operator shall maintain and update the con- (8) L’exploitant doit maintenir et mettre à jour l’ana- cept safety analysis referred to in subsection (1) in accor- lyse de sécurité conceptuelle visée au paragraphe (1) se- dance with the definition of situations, conditions and lon l’énoncé des situations, des conditions et des change- changes referred to in paragraph (5)(g) to reflect opera- ments visé à l’alinéa (5)g) pour tenir compte de tional experience, changes in activity or advances in l’expérience acquise en cours d’exploitation, des change- technology. ments survenus aux activités ou des progrès technolo- giques. 64 DORS/95-191 — 29 septembre 2014 ENVIRONMENTAL CRITERIA AND LOADS CHARGES ET CRITÈRES ENVIRONNEMENTAUX 44. (1) For the purposes of undertaking the analyses 44. (1) Aux fins de la réalisation des analyses visées referred to in section 40, the determination of environ- à l’article 40, la détermination des charges et des critères mental criteria and loads on an installation shall be made environnementaux de l’installation doit être effectuée in accordance with sections 5 and 6.5 to 6.13 of Canadi- conformément aux articles 5 et 6.5 à 6.13 de la norme an Standards Association CAN/CSA-S471-92, General CAN/CSA-S471-92 de l’Association canadienne de nor- Requirements, Design Criteria, the Environment, and malisation intitulée Exigences générales, critères de cal- Loads. cul, conditions environnementales et charges. (2) For the purposes of undertaking the analyses re- (2) Aux fins de la réalisation des analyses visées à ferred to in section 40, permanent loads, operational l’article 40, les charges permanentes, d’exploitation et loads and accidental loads shall be determined in accor- accidentelles doivent être déterminées conformément dance with sections 6.2, 6.3 and 6.4, respectively, of aux articles 6.2, 6.3 et 6.4 respectivement de la norme Canadian Standards Association CAN/CSA-S471-92, CAN/CSA-S471-92 de l’Association canadienne de nor- General Requirements, Design Criteria, the Environ- malisation intitulée Exigences générales, critères de cal- ment, and Loads. cul, conditions environnementales et charges. (3) For the purposes of undertaking the analyses re- (3) Aux fins de la réalisation des analyses visées à ferred to in section 40, for installations, load combina- l’article 40, dans le cas de l’installation, les charges com- tions shall be determined in accordance with section binées doivent être déterminées conformément à l’article 6.14 of Canadian Standards Association CAN/CSA- 6.14 de la norme CAN/CSA-S471-92 de l’Association S471-92, General Requirements, Design Criteria, the canadienne de normalisation intitulée Exigences géné- Environment, and Loads. rales, critères de calcul, conditions environnementales et charges. SITE INVESTIGATIONS ÉTUDES VISANT LES EMPLACEMENTS 45. (1) Site investigations shall be carried out, for the 45. (1) Aux fins de la réalisation des analyses visées purpose of undertaking the analyses referred to in sec- à l’article 40, les études visant un emplacement au large tion 40, in accordance with section 4 of Canadian Stan- des côtes doivent être faites conformément à l’article 4 dards Association CAN/CSA-S472-92, Foundations, de la norme CAN/CSA-S472-92 de l’Association cana- Offshore Structures. dienne de normalisation intitulée Fondations. (2) Where permafrost is present at a production site, (2) Aux fins de la réalisation des analyses visées à the geotechnical investigation for the purposes of under- l’article 40, dans le cas où du pergélisol se trouve à l’em- taking the analyses referred to in section 40 shall include placement de production, l’étude géotechnique doit com- sampling of the permafrost. prendre un échantillonnage du pergélisol. (3) The analysis of all fill sources for an installation (3) L’analyse des sources de matériau de remblayage shall meet the requirements of section 7.3.2 of Canadian de l’installation doit répondre aux exigences de l’article Standards Association CAN/CSA-S472-92, Founda- 7.3.2 de la norme CAN/CSA-S472-92 de l’Association tions, Offshore Structures, and shall include sampled canadienne de normalisation intitulée Fondations et doit boreholes and laboratory testing of the recovered sam- comprendre des échantillons prélevés dans les trous de ples. sondage et des essais en laboratoire de ces échantillons. 65 SOR/95-191 — September 29, 2014 GEOTECHNICAL PARAMETERS PARAMÈTRES GÉOTECHNIQUES DU FOND MARIN 46. For the purposes of undertaking the analyses re- 46. Aux fins de la réalisation des analyses visées à ferred to in section 40, the geotechnical parameters used l’article 40, le choix des paramètres géotechniques à uti- for stability, deformational and thermal analyses shall be liser dans les analyses de stabilité, de déformation et selected in accordance with section 5.2.5 of Canadian thermales doit être effectué conformément à l’article Standards Association CAN/CSA-S472-92, Founda- 5.2.5 de la norme CAN/CSA-S472-92 de l’Association tions, Offshore Structures. canadienne de normalisation intitulée Fondations. SOIL DEFORMATION DÉFORMATION DU FOND MARIN 47. For the purposes of undertaking the analyses re- 47. Aux fins de la réalisation des analyses visées à ferred to in section 40, the analysis for determining the l’article 40, l’analyse effectuée en vue de déterminer la deformation of foundations shall be made in accordance déformation de fondations doit être effectuée conformé- with sections 5.2.4, 6.1.3, 7.1.3, 8.1.3 and 9.2.4 of Cana- ment aux articles 5.2.4, 6.1.3, 7.1.3, 8.1.3 et 9.2.4 de la dian Standards Association CAN/CSA-S472-92, Foun- norme CAN/CSA-S472-92 de l’Association canadienne dations, Offshore Structures. de normalisation intitulée Fondations. EROSION OFFSHORE ÉROSION DU FOND MARIN 48. (1) For the purposes of undertaking the analyses 48. (1) Aux fins de la réalisation des analyses visées referred to in section 40, the analysis of the erosion off- à l’article 40, l’analyse de l’érosion du fond marin doit shore shall be made in accordance with sections 6.2.3, être effectuée conformément aux articles 6.2.3, 7.2.2 et 7.2.2 and 9.3.5 of Canadian Standards Association CAN/ 9.3.5 de la norme CAN/CSA-S472-92 de l’Association CSA-S472-92, Foundations, Offshore Structures. canadienne de normalisation intitulée Fondations. (2) Where there is a potential for erosion around a (2) Lorsque le degré d’érosion potentielle autour de la platform to a degree that would affect the stability of the plate-forme risquerait de nuire à la stabilité de cette platform, the platform shall be plate-forme, celle-ci doit être : (a) provided with means of erosion protection that a) soit dotée des moyens de protection permettant eliminate or prevent that degree of erosion; or d’éliminer ou de prévenir ce degré d’érosion; (b) designed assuming all materials that are not resis- b) soit conçue pour qu’en théorie, soient éliminés tant to erosion, determined from physical or numerical tous les matériaux non résistants à l’érosion détermi- modelling, are removed. nés selon des modèles physiques ou numériques. (3) The operator of a platform or drilling unit that is (3) L’exploitant de la plate-forme ou de l’unité de fo- placed so close to an existing platform as to cause ero- rage placée assez proche d’une plate-forme existante sion that affects the stability of the existing platform pour causer de l’érosion qui nuit à la stabilité de cette shall take measures to prevent that erosion. dernière doit prendre les mesures voulues pour prévenir cette érosion. MATERIALS FOR INSTALLATIONS MATÉRIAUX POUR INSTALLATIONS 49. (1) Notwithstanding compliance with the stan- 49. (1) Malgré l’observation des normes prévues dards referred to in this Part, all materials used in an in- dans la présente partie, tous les matériaux utilisés dans 66 DORS/95-191 — 29 septembre 2014 stallation shall be suitable for the service in which, and l’installation doivent convenir aux conditions auxquelles for the conditions under which, they are used. ils sont soumis et aux usages auxquels ils sont destinés. (2) No materials other than non-combustible materi- (2) Les matériaux qui ne sont pas incombustibles ne als shall be used in an installation except where a special peuvent être utilisés dans l’installation, à moins que ne property is required that cannot be obtained by using a soient requises des propriétés spéciales qui ne peuvent non-combustible material. être obtenues d’un matériau incombustible. (3) Subject to subsection (4), materials, such as or- (3) Sous réserve du paragraphe (4), les matériaux, tel ganic foam insulation, that may give off toxic fumes or l’isolant à mousse organique, susceptibles de dégager smoke when ignited shall not be used in an installation. des vapeurs ou de la fumée toxiques lorsqu’ils prennent feu ne peuvent être utilisés dans l’installation. (4) Combustible foam insulation may be used for (4) L’isolant à mousse combustible utilisé dans les cold storage or refrigerated spaces on an installation if chambres froides et les locaux réfrigérés de l’installation (a) the foam is of a fire retardant type; peut être utilisé si les conditions suivantes sont réunies : (b) the foam is totally enclosed in stainless steel or a) la mousse est de type ignifuge; another corrosion-resistant material that has all joints b) la mousse est entièrement enfermée dans de l’acier sealed; and inoxydable ou tout autre matériau anticorrosif aux (c) the insulation and its casing do not form any part joints scellés; of the accommodation deck or bulkhead. c) l’isolation et sa gaine ne font pas partie du pont d’habitation ou d’une cloison. (5) All structural concrete used in an installation shall (5) Le béton de structure de l’installation doit être be in accordance with sections 4, 5 and 6 of Canadian conforme aux articles 4, 5 et 6 de la norme de l’Associa- Standards Association Preliminary Standard S474- tion canadienne de normalisation intitulée Preliminary M1989, Concrete Structures. Standard S474-M1989, Concrete Structures. (6) All structural steel used in an installation shall be (6) L’acier de construction de l’installation doit être in accordance with sections 5, 6 and 17 of Canadian conforme aux articles 5, 6 et 17 de la norme CAN/CSA- Standards Association CAN/CSA-S473-92, Steel Struc- S473-92 de l’Association canadienne de normalisation tures, Offshore Structures. intitulée Steel Structures, Offshore Structures. AIR GAP AND FREEBOARD TIRANT D’AIR ET FRANC-BORD 50. (1) Subject to subsection (2), the air gap for an 50. (1) Sous réserve du paragraphe (2), le tirant d’air installation, except for a surface platform, shall be deter- de l’installation, sauf une plate-forme de surface, doit mined in accordance with section 4.8 of Canadian Stan- être déterminé conformément à l’article 4.8 de la norme dards Association CAN/CSA-S471-92, General Re- CAN/CSA-S471-92 de l’Association canadienne de nor- quirements, Design Criteria, the Environment, and malisation intitulée Exigences générales, critères de cal- Loads. cul, conditions environnementales et charges. (2) The air gap for a column-stabilized mobile plat- (2) Le tirant d’air de la plate-forme mobile stabilisée form may be calculated assuming the platform is at sur- par colonnes peut être calculé en posant comme hypo- vival draft and at its lowest position relative to sea level, thèse que la plate-forme est au tirant d’eau de survie et à as determined from its motion characteristics. sa position la plus basse relativement au niveau de la 67 SOR/95-191 — September 29, 2014 mer déterminée selon ses caractéristiques de mouve- ment. (3) Every surface mobile platform shall have suffi- (3) La plate-forme mobile qui est une plate-forme de cient freeboard, taking into consideration the environ- surface doit avoir un franc-bord suffisant, compte tenu mental criteria and loads at the drill or production site des charges et des critères environnementaux de l’empla- determined under section 44. cement de production ou de forage déterminés selon l’ar- ticle 44. (4) Every fixed production platform shall have suffi- (4) À moins d’être conçue pour résister aux charges cient freeboard to prevent ice rubble or waves from dues à l’eau et aux glaces sans dommage majeur dans les flowing over the side of the platform unless it is de- conditions les plus rigoureuses déterminées selon l’ar- signed to withstand the loads due to water and ice with- ticle 44, la plate-forme fixe doit avoir un franc-bord qui out major damage, under the most severe conditions as empêche les amas de glaces ou les vagues de passer par- determined pursuant to section 44. dessus ses flancs. LOAD MEASURING SYSTEM SYSTÈME DE MESURE DES CHARGES 51. Each leg on every self-elevating mobile platform 51. Chaque jambe de la plate-forme mobile auto-élé- shall have a load measuring system that will permit vatrice doit comporter un système de mesure des charges (a) registration of the load on the leg at any time dur- qui permette : ing jacking operations; and a) d’enregistrer à tout moment la charge exercée sur (b) measurement of the load on the leg periodically. la jambe durant les opérations d’élévation; b) de mesurer périodiquement la charge exercée sur la jambe. GRAVITY-BASE, FILL, FILL-RETENTION AND SELF-ELEVATING PLATES-FORMES À EMBASE-POIDS, À REMBLAI, À RÉTENTION DE PLATFORMS REMBLAI ET AUTO-ÉLÉVATRICES 52. Every gravity-base, fill, fill-retention and self-ele- 52. Les plates-formes à embase-poids, à remblai, à ré- vating platform shall be designed in accordance with tention de remblai et auto-élévatrices doivent être sections 5, 6, 7 and 8, respectively, of Canadian Stan- conçues conformément aux articles 5, 6, 7 et 8 respecti- dards Association CAN/CSA-S472-92, Foundations, vement de la norme CAN/CSA-S472-92 de l’Associa- Offshore Structures, and section 5.2.2 of Canadian Stan- tion canadienne de normalisation intitulée Fondations et dards Association Special Publication S472.1-1992, à l’article 5.2.2 du document de l’Association cana- Commentary to CSA Standard CAN/CSA-S472-92, dienne de normalisation intitulé Special Publication Foundations. S472.1-1992, Commentary to CSA Standard CAN/CSA- S472-92, Foundations. PILE FOUNDATIONS FONDATIONS SUR PILOTIS 53. Pile foundations of every fixed platform and, 53. Les fondations sur pilotis de la plate-forme fixe where applicable, subsea production system shall be de- et, s’il y a lieu, du système de production sous-marin signed in accordance with section 9 of Canadian Stan- doivent être conçues conformément à l’article 9 de la dards Association CAN/CSA-S472-92, Foundations, norme CAN/CSA-S472-92 de l’Association canadienne Offshore Structures, and section 5.2.2 of Canadian Stan- de normalisation intitulée Fondations et à l’article 5.2.2 68 DORS/95-191 — 29 septembre 2014 dards Association Special Publication S472.1-1992, du document de l’Association canadienne de normalisa- Commentary to CSA Standard CAN/CSA-S472-92, tion intitulé Special Publication S472.1-1992, Commen- Foundations. tary to CSA Standard CAN/CSA-S472-92, Foundations. STRUCTURAL STRENGTH OF MOBILE PLATFORMS RÉSISTANCE STRUCTURALE DES PLATES-FORMES MOBILES 54. (1) Every floating platform that is intended to be 54. (1) La plate-forme flottante censée être utilisée used in areas in which sea ice is present shall be able to en présence de glaces doit pouvoir : (a) withstand, without major damage, the ice loads to a) résister, sans dommage majeur, aux charges des which it may be subjected when it is operating in ac- glaces auxquelles elle peut être soumise lorsqu’elle est cordance with the operations manual; exploitée conformément au manuel d’exploitation; (b) stay on location in the ice concentration and under b) demeurer en place en présence des concentrations the ice forces to which it may be subjected, as stated et des charges des glaces auxquelles elle peut être sou- in the operations manual; and mise, tel qu’il est précisé dans le manuel d’exploita- (c) be moved from the production site or drill site in tion; the ice concentration to which it may be subjected, as c) être déplacée de l’emplacement de production ou stated in the operations manual. de forage en présence des concentrations des glaces auxquelles elle peut être soumise, tel qu’il est précisé dans le manuel d’exploitation. (2) In an analysis undertaken in accordance with sub- (2) Dans une analyse effectuée aux termes du para- section 37(2) for the purpose of determining the resis- graphe 37(2) afin de déterminer la résistance au bascule- tance to overturning and the resistance to sliding of a ment et au glissement de la plate-forme mobile auto-élé- self-elevating mobile platform, vatrice : (a) a lattice type leg may be analysed using equiva- a) une jambe du type à treillis peut être analysée en lent single- beam hydrodynamic coefficients as deter- utilisant les coefficients hydrodynamiques équivalents mined in accordance with Det norske Veritas Classifi- d’une poutre simple établis selon le document Classi- cation Notes, Note No. 31.5 — Strength Analysis of fication Notes, Note No. 31.5 du Det norske Veritas Main Structures of Self-Elevating Units, when deter- intitulé Strength Analysis of Main Structures of Self- mining Elevating Units lorsque sont déterminées : (i) the hydrodynamic loads to be used in calculat- (i) d’une part, les charges hydrodynamiques à em- ing overturning forces and sliding forces, if a verti- ployer pour calculer les forces de basculement et de cal load equal to 5 per cent of the horizontal load is glissement, si une charge verticale égale à 5 pour applied at the centre of the leg, and cent de la charge horizontale est appliquée au centre (ii) the hydrodynamic forces to be used in any de- de chaque jambe, tailed finite element analysis of the upper legs and (ii) d’autre part, les forces hydrodynamiques à uti- hull; liser dans une analyse détaillée des éléments finis (b) the overturning moments and sliding forces shall de la partie supérieure des jambes et de la coque; be assessed assuming no spudcan fixity and using the b) les moments de basculement et les forces de glisse- most critical combination and direction of environ- ment doivent être évalués en excluant toute stabilité mental and functional loads; des caissons de support et en utilisant la combinaison 69 SOR/95-191 — September 29, 2014 (c) the reaction point for an independent leg platform et l’orientation les plus critiques des charges environ- shall be taken as the point located at a distance above nementales et de fonctionnement; the spudcan tip that is equal to the lesser of c) le point de réaction d’une plate-forme à jambes in- (i) half the height of the spudcan, and dépendantes doit être le point situé à la distance au- (ii) half the total penetration; and dessus de l’extrémité du caisson de support égale au moindre des valeurs suivantes : (d) the reaction point for a mat-supported platform shall be determined considering the soil characteristics (i) la moitié de la hauteur du caisson de support, determined in the site investigation undertaken pur- (ii) la moitié de la pénétration totale; suant to section 45. d) le point de réaction pour une plate-forme sur se- melle doit être déterminé en tenant compte des carac- téristiques du sol établies conformément à l’étude de l’emplacement effectuée aux termes de l’article 45. (3) Where any wave frequency or seismic ground mo- (3) Lorsque la fréquence des vagues ou le mouvement tion predicted for the production site of a self-elevating sismique du sol prédits pour l’emplacement de produc- mobile production platform is close to the frequency of tion de la plate-forme mobile auto-élévatrice de produc- oscillation of the platform, a dynamic response calcula- tion sont très proches de la fréquence d’oscillation de la tion shall be performed as part of the analyses required plate-forme, un calcul de réponse dynamique doit être by section 37 and the dynamic loads determined thereby effectué dans le cadre des analyses exigées par l’article shall be included in the relevant stress and fatigue analy- 37 et les charges dynamiques ainsi déterminées doivent ses. être comprises dans les analyses pertinentes de contrainte et de fatigue. (4) The connection between each spudcan and each (4) Le raccord entre chaque caisson de support et leg of a self-elevating mobile platform shall be designed jambe de la plate-forme mobile auto-élévatrice doit être to withstand without failure the loads occurring at the conçu de façon à résister sans défaillance aux charges full spudcan fixity condition. dans des conditions de stabilité complète des caissons. (5) Each spudcan and each connection between each (5) Les caissons de support et les raccords entre spudcan and each leg of a self-elevating mobile platform chaque caisson et jambe de la plate-forme mobile auto- shall be designed for all possible penetrations or condi- élévatrice doivent être conçus en fonction de toutes les tions ranging from tip penetration to full spudcan pene- conditions ou pénétrations possibles allant de la pénétra- tration as determined by the site investigation undertak- tion de la pointe à la pleine pénétration des caissons, se- en pursuant to section 45, and the shape of the spudcan. lon l’étude de l’emplacement effectuée aux termes de l’article 45 et la forme du caisson. (6) Every spudcan of a self-elevating mobile platform (6) Les caissons de support de la plate-forme mobile shall have sufficient strength to withstand storm-induced auto-élévatrice doivent être suffisamment solides pour horizontal loads, vertical loads, and one half of the lower résister aux charges horizontales et verticales dues aux guide bending moment that is calculated assuming the tempêtes et à la moitié du moment fléchissant de l’entre- leg is pinned. toise calculée en posant comme hypothèse que la jambe est à chevilles. 70 DORS/95-191 — 29 septembre 2014 (7) The secondary bending effects of the legs of a (7) Toute analyse effectuée aux termes de l’article 37 self-elevating mobile platform shall be taken into ac- doit tenir compte des effets secondaires de flexion des count in the performance of an analysis pursuant to sec- jambes de la plate-forme mobile auto-élévatrice. tion 37. (8) The analysis required pursuant to section 37 to (8) L’analyse exigée par l’article 37 pour vérifier si la verify whether a self-elevating mobile platform is capa- plate-forme mobile auto-élévatrice peut résister aux ble of withstanding the loads imposed during transporta- charges dues à son transport doit être effectuée confor- tion shall be performed in accordance with Part 3, Chap- mément aux articles 3 C-100 et D-300, chapitre 2, partie ter 2, Sections 3 C-100 and D-300 of Det norske Veritas 3 du document du Det norske Veritas intitulé Rules for Rules for Classification of Mobile Offshore Units. Classification of Mobile Offshore Units. (9) A self-elevating mobile platform with indepen- (9) La plate-forme mobile auto-élévatrice à embase dent footing support shall be designed to withstand the indépendante doit être conçue pour résister aux charges loads that may be imposed during preload operations, in- auxquelles elle peut être soumise au cours des opérations cluding where there is préalables au chargement, notamment dans les situations (a) loss of foundation support for one leg for a dis- suivantes : tance of at least 4 m; and a) une perte complète du support des fondations pour (b) offset support of 1.5 m from the centre of the une jambe sur une distance d’au moins 4 m; spudcan tip. b) le décalage de support de 1,5 m par rapport au centre de l’extrémité du caisson de support. (10) The legs, spudcans and mats of every self-elevat- (10) Les jambes, caissons de support et semelles de la ing mobile platform shall be designed for any impact plate-forme mobile auto-élévatrice doivent être conçus load that might occur on setdown, in accordance with en fonction des charges de collision qui pourraient se Part 3, Chapter 2, Section 3 E-400 of Det norske Veritas produire lors de la mise en place conformément à l’ar- Rules for Classification of Mobile Offshore Units, using ticle 3 E-400, chapitre 2, partie 3 du document du Det the maximum environmental and functional loading con- norske Veritas, intitulé Rules for Classification of Mo- ditions for setdown operations, as specified in the opera- bile Offshore Units, compte tenu des conditions affé- tions manual. rentes aux charges environnementales et d’exploitation maximales spécifiées dans le manuel d’exploitation pour de telles opérations. (11) The legs of every self-elevating mobile platform (11) Les jambes de la plate-forme mobile auto-éléva- shall be preloaded to at least l.l times the reaction ex- trice doivent être chargées au préalable à au moins 1,1 pected at the footing or mat at the extreme loading con- fois la réaction prévue à l’embase ou à la semelle dans dition. des conditions de charge extrêmes. MOTION RESPONSE CHARACTERISTICS RÉACTION CARACTÉRISTIQUE AU MOUVEMENT 55. The motion response characteristics of every 55. La réaction caractéristique au mouvement de la floating platform shall be determined by analytical meth- plate-forme flottante doit être déterminée par des mé- ods or by model tests for the six degrees of freedom for thodes analytiques ou par des essais avec modèle pour all relevant operational, transit and survival drafts. les six degrés de liberté des tirants d’eau opérationnels, 71 SOR/95-191 — September 29, 2014 des tirants d’eau de transit et des tirants d’eau de survie pertinents. STABILITY OF MOBILE PLATFORMS STABILITÉ DES PLATES-FORMES MOBILES 56. (1) For the purpose of this section, “lightship”, in 56. (1) Pour l’application du présent article, « lège » relation to a mobile platform, means a platform with all se dit de la plate-forme mobile dotée de tous ses élé- its permanently installed machinery, equipment and out- ments montés en permanence : machines, matériel, arme- fit, including permanent ballast, spare parts normally re- ment, notamment lest fixe, pièces de rechange habituel- tained on board and liquids in machinery and piping at lement conservées à bord, liquides dans les machines et their normal working levels, but not including liquids in les canalisations à leur niveau de fonctionnement nor- storage or in reserve supply tanks, items of consumable mal, mais exception faite des liquides stockés et conte- or variable loads, stores and crew and their effects. nus dans les réservoirs d’appoint, des articles à charge consommable ou variable, des provisions et des membres d’équipage et de leurs effets personnels. (2) Subject to subsection (3), an inclining test shall be (2) Sous réserve du paragraphe (3), un essai d’incli- carried out to determine the lightship weight and the lo- naison doit être effectué pour déterminer le poids lège et cation of the centre of gravity on every mobile platform. l’emplacement du centre de gravité de la plate-forme mobile. (3) Detailed weight calculations showing the differ- (3) Des calculs de poids détaillés montrant les diffé- ences of weight and centres of gravity may be used in rences de poids et de centres de gravité peuvent être uti- lieu of the inclining test required by subsection (2), in re- lisés au lieu de l’essai d’inclinaison exigé par le para- spect of a surface or self-elevating mobile platform of a graphe (2), pour la plate-forme mobile soit de surface, design that is identical with regard to hull form and ar- soit auto-élévatrice, dont la coque est de conception rangement to that of a platform for which an inclining identique, en ce qui a trait à sa forme et à son aménage- test has been carried out, if the accuracy of the calcula- ment, à une plate-forme ayant subi un essai d’inclinai- tions is confirmed by a deadweight survey. son, si la précision des calculs est confirmée par une étude de port en lourd. (4) Subject to subsection (6), during each five-year (4) Sous réserve du paragraphe (6), au cours de survey that is required and carried out by a classification chaque inspection quinquennale exigée et exécutée par la society of a surface or self-elevating mobile platform, a société de classification relativement à la plate-forme deadweight survey shall be carried out and, where there mobile soit de surface, soit auto-élévatrice, une étude de is a significant discrepancy between the measurement port en lourd doit être effectuée et, en cas de différence obtained from that survey and the weight change as cal- importante entre la valeur obtenue par cette étude et la culated from weight records, variation de poids déterminée selon les registres de (a) in the case of a surface platform, an inclining test poids : shall be carried out; and a) dans le cas de la plate-forme de surface, un essai (b) in the case of a self-elevating platform, the allow- d’inclinaison doit être effectué; able variable load in the elevated condition shall be b) dans le cas de la plate-forme auto-élévatrice, la adjusted in accordance with the deadweight survey charge variable admissible en position élevée doit être and the stability in the floating mode shall be calculat- réglée conformément à l’étude de port en lourd et la ed. stabilité en mode flottant doit être calculée. 72 DORS/95-191 — 29 septembre 2014 (5) Subject to subsection (6), an inclining test shall be (5) Sous réserve du paragraphe (6), un essai d’incli- carried out during each five-year survey that is required naison doit être effectué au cours de chaque inspection and carried out by a classification society for every col- quinquennale exigée et exécutée par la société de classi- umn-stabilized mobile platform, except that after the fication relativement à la plate-forme stabilisée par co- second inclining test, the subsequent tests need only be lonnes, sauf que, après le deuxième essai, les essais sub- carried out during every alternate five-year survey if séquents peuvent être effectués toutes les deux there was no significant discrepancy between the weight inspections en l’absence de différences importantes entre records and the results of the second test. les registres des poids et les résultats du deuxième essai. (6) An inclining test is not required pursuant to sub- (6) Un essai d’inclinaison n’a pas à être effectué aux section (4) or (5) where the platform is equipped with in- termes des paragraphes (4) ou (5) quand la plate-forme strumentation that is capable of accurately measuring or est munie d’instruments capables de fournir des données providing data that permit an accurate calculation of the permettant un calcul précis du centre de gravité. centre of gravity. (7) A comprehensive and up-to-date record shall be (7) Il doit être tenu un registre complet et à jour des kept of every change to a mobile platform that involves a modifications apportées à la plate-forme mobile compor- change in weight or position of weight. tant un changement de poids ou de position du poids. (8) Where the weight of a mobile platform changes (8) Lorsque le poids de la plate-forme mobile varie de by more than 1 per cent of the lightship weight, a dead- plus de 1 pour cent par rapport au poids lège, une étude weight survey shall be carried out at the earliest opportu- de port en lourd doit être effectuée dès que possible et nity and an up-to-date value of the lightship centre of une valeur à jour du centre de gravité lège doit être ins- gravity shall be recorded in the operations manual. crite dans le manuel d’exploitation. (9) Subject to subsections (10) to (13), the analysis of (9) Sous réserve des paragraphes (10) à (13), l’ana- intact and damage stability of every mobile platform un- lyse de stabilité de la plate-forme mobile en condition dertaken for the purpose of paragraph 40(1)(e) shall in- intacte ou en condition avariée effectuée aux fins de clude a verification as to whether the platform complies l’alinéa 40(1)e) doit comprendre une vérification de la with Chapter 3 of International Maritime Organization conformité de la plate-forme au chapitre 3 du document Code for the Construction and Equipment of Mobile Off- de l’Organisation maritime internationale intitulé Recueil shore Drilling Units, 1989. des règles relatives à la construction et à l’équipement des unités mobiles de forage au large, 1989. (10) Every mobile platform shall be designed so that, (10) La plate-forme mobile doit être conçue de sorte in the intact condition, when subjected to the wind heel- que, en condition intacte, lorsqu’elle est soumise aux ing moments described in the Code referred to in subsec- moments d’inclinaison dus au vent décrits dans le code tion (9), it has a static angle of heel of not more than 15 visé au paragraphe (9), elle ait un angle statique de gîte degrees in any direction. d’au plus 15° en tous sens. (11) Every column-stabilized mobile platform shall (11) La plate-forme mobile stabilisée par colonnes be designed so that, in the intact condition, it has a meta- doit être conçue de sorte que, en condition intacte, elle centric height of at least 1 m when it is in the operating ait une hauteur métacentrique d’au moins 1 m, à tirant and transit draft and a metacentric height of at least 0.3 d’eau d’exploitation et à tirant d’eau de transit, et d’au m in all other draft conditions. moins 0,3 m, à tout autre tirant d’eau. 73 SOR/95-191 — September 29, 2014 (12) Every surface and self-elevating mobile platform (12) La plate-forme mobile soit auto-élévatrice, soit shall be designed so that, in the intact condition, it has a de surface doit être conçue de façon que, en condition in- metacentric height of at least 0.5 m. tacte, elle ait une hauteur métacentrique d’au moins 0,5 m. (13) Every mobile platform shall be designed so that, (13) La plate-forme mobile doit être conçue de sorte in the damaged condition or where any compartment is que, en condition avariée ou lors du noyage de tout com- flooded, the final angle of heel does not exceed 15 de- partiment, l’angle de gîte final n’excède pas 15° en tous grees in any direction and the area under the righting sens et que la surface sous la courbe du moment du re- moment curve is at least equal to the area under the heel- dressement soit au moins égale à celle sous la courbe de ing moment curve. gîte. BALLAST AND BILGE SYSTEMS SYSTÈMES DE LEST ET DE CALE 57. (1) Every mobile platform shall be equipped with 57. (1) La plate-forme mobile doit être munie de ré- ballast tanks the number, location and degree of subdivi- servoirs de lest qui, du fait de leur nombre, emplacement sion of which, together with the associated equipment, et compartimentage, et de leur matériel associé : are a) permettent de lester et d’asseoir la plate-forme effi- (a) capable of ballasting and trimming the platform cacement dans toutes les conditions environnemen- efficiently under all reasonably anticipated environ- tales prévisibles; mental conditions; and b) sont conçus pour être à sécurité automatique. (b) designed to be fail safe. (2) Every floating platform shall have a ballast sys- (2) La plate-forme flottante doit comprendre un sys- tem so arranged that any ballast tank can be filled or tème de lest disposé de sorte que les réservoirs de lestage emptied by any one of at least two ballast pumps or by puissent être remplis et vidés par flux libre contrôlé ou controlled free flow. par au moins l’une des pompes de lest qui doivent être au moins au nombre de deux. (3) Each lower hull on a floating platform with two (3) Chaque coque inférieure de la plate-forme flot- lower hulls shall be provided with at least two ballast tante à deux coques inférieures doit être munie d’au pumps each with the capacity to fill or empty any ballast moins deux pompes de lest, chacune pouvant remplir et tank in that hull. vider tout réservoir de lestage situé dans la coque en cause. (4) The ballast system for a column-stabilized mobile (4) Le système de lest de la plate-forme mobile stabi- platform shall be designed to prevent uncontrolled trans- lisée par colonnes doit être conçu pour empêcher le fer of water between tanks or through sea-connected in- transfert non restreint de l’eau entre les réservoirs ou par lets or discharges in any one of the following situations: des entrées ou des sorties reliées à la mer dans n’importe (a) the failure of any valve or valve actuator for the laquelle des situations suivantes : system; a) la défaillance des vannes ou des actionneurs de (b) the failure in the means of control or indication vannes du système; for the system; and b) la défaillance des moyens de contrôle ou de sur- veillance du système; 74 DORS/95-191 — 29 septembre 2014 (c) the flooding of any space that contains equipment c) le noyage de tout compartiment contenant du maté- associated with the system. riel lié au système de lest. (5) Ballast piping in a ballast system for a floating (5) Les canalisations de lest d’un système de lest de platform that leads from a pump to more than one tank la plate-forme flottante qui mènent d’une pompe à plus shall be led from readily accessible manifolds. d’un réservoir doivent être acheminées à partir de collec- teurs facilement accessibles. (6) All power-operated sea inlets, discharge valves (6) Les prises d’eau de mer, les vannes de décharge et and ballast tank isolating valves on a floating platform les clapets d’arrêt à commande des réservoirs de lestage shall be designed to close automatically on loss of con- de la plate-forme flottante qui fonctionnent à l’électricité trol power and remain closed when power is re-estab- doivent être conçus pour se fermer automatiquement en lished until specific action is taken to open them. cas de coupure du courant de commande et demeurer fermés lorsque le courant est rétabli jusqu’à ce que des mesures spécifiques soient prises pour les rouvrir. (7) Where crude oil is to be stored in a floating plat- (7) Lorsque du pétrole brut doit être entreposé à bord form, the platform shall have enough ballast capacity, de la plate-forme flottante, celle-ci doit posséder une ca- segregated from the crude storage, to be able to float at pacité de lestage suffisante, outre la capacité de stockage minimum operating draft with no crude oil on board. de pétrole brut, pour pouvoir flotter au tirant d’eau d’ex- ploitation minimal sans pétrole brut à bord. (8) Every floating platform shall be provided with a (8) La plate-forme flottante doit être dotée d’un poste main ballast control station equipped with de commande du lest principal muni : (a) an effective means of communication with other a) d’un moyen efficace pour communiquer avec les spaces that contain equipment relating to the operation autres compartiments contenant du matériel lié au of the ballast system; fonctionnement du système de lest; (b) a ballast pump control and status system; b) d’un système d’indication d’état et de commande (c) a ballast valve control and status system; des pompes de lest; (d) a tank level indicating system; c) d’un système d’indication d’état et de commande des vannes de lest; (e) a draft indicating system; d) d’un système d’indication du niveau des réser- (f) emergency lighting; voirs; (g) heel and trim indicators; e) d’un système d’indication du tirant d’eau; (h) bilge and flood alarms; and f) d’un éclairage de secours; (i) remote control indicators for watertight closing ap- g) d’indicateurs de gîte et d’assiette; pliances. h) d’alarmes de noyage et de cale; i) d’indicateurs à distance des appareils de fermeture étanches à l’eau. 75 SOR/95-191 — September 29, 2014 (9) Every column-stabilized mobile platform shall be (9) La plate-forme mobile stabilisée par colonnes doit equipped with a secondary ballast control station être dotée d’un poste de commande du lest secondaire equipped with muni : (a) an effective means of communication with other a) d’un moyen efficace pour communiquer avec les spaces that contain equipment relating to the operation autres compartiments contenant du matériel lié au of the ballast system; fonctionnement du système de lest; (b) a ballast pump control and status system; b) d’un système d’indication d’état et de commande (c) a ballast valve control and status system; des pompes de lest; (d) a tank level indicating system; c) d’un système d’indication d’état et de commande des vannes de lest; (e) emergency lighting; d) d’un système d’indication du niveau des réser- (f) heel and trim indicators; and voirs; (g) a permanently mounted ballast schematic dia- e) d’un éclairage de secours; gram. f) d’indicateurs de gîte et d’assiette; g) d’un schéma du système de lestage monté en per- manence. (10) The main and secondary ballast control stations (10) Les postes de commande du lest principal et se- required by subsections (8) and (9) shall be located condaire exigés par les paragraphes (8) et (9) doivent above the waterline in the final condition of equilibrium être situés au-dessus de la ligne de flottaison dans la after flooding when the platform is in a damaged condi- condition finale d’équilibre à la suite d’un noyage tion. lorsque la plate-forme est en condition avariée. (11) Every column-stabilized mobile platform shall (11) La plate-forme mobile stabilisée par colonnes have a ballast system that is capable, with any ballast doit comporter un système de lest capable, n’importe pump out of operation, quelle pompe de lest étant hors d’usage : (a) of providing safe handling and operation of the a) d’assurer la manœuvre et l’exploitation sécuritaires platform under normal operating and transit condi- de la plate-forme en conditions normales de transit et tions; d’exploitation; (b) of restoring the platform to a normal operating or b) de remettre la plate-forme à un tirant d’eau d’ex- transit draft and level trim from an inclination of 15 ploitation ou de transit normal et de redresser l’as- degrees in any direction; and siette à partir d’une inclinaison de 15° en tous sens; (c) of raising the platform from the deepest operating c) de faire passer la plate-forme, en moins de 3 h, du draft to severe storm draft within three hours. tirant d’eau d’exploitation le plus profond au tirant d’eau de tempête grave. (12) Every floating platform shall be equipped with a (12) La plate-forme flottante doit être munie d’un bilge system that has at least two bilge pumps connected système de cale qui est doté d’au moins deux pompes to the bilge main and that is capable, under all conditions d’assèchement reliées au collecteur principal de cale et from upright to 15 degrees in any direction, of pumping qui est capable à tous les angles d’inclinaison de la verti- or draining any watertight compartment except for those cale à 15° en tous sens de pomper ou de vider tout com- 76 DORS/95-191 — 29 septembre 2014 spaces permanently designated for the storage of fresh partiment étanche à l’eau, à l’exception des comparti- water, water ballast, fuel oil or liquid cargo and for ments destinés en permanence au stockage de l’eau which other effective means of pumping are provided. douce, de l’eau de lest, du mazout ou de cargaisons li- quides pour lesquels d’autres moyens efficaces de pom- page sont prévus. (13) No floating platform shall be considered to com- (13) La plate-forme flottante ne peut être considérée ply with this section until the ballast and bilge system comme conforme au présent article tant que les systèmes has been assessed through a failure modes and effects de lest et de cale n’ont pas fait l’objet d’une analyse des analysis. modes de pannes et de leurs effets. WATERTIGHT INTEGRITY OF FLOATING PLATFORMS ÉTANCHÉITÉ À L’EAU DES PLATES-FORMES FLOTTANTES 58. (1) The boundaries of watertight compartments 58. (1) Aucune cloison des compartiments étanches à in a floating platform shall contain no more openings l’eau de la plate-forme flottante ne doit contenir plus than necessary for the operation of the platform and, d’ouvertures qu’il n’en faut pour l’exploitation de la where penetration of those boundaries is necessary for plate-forme et lorsque de telles ouvertures s’imposent access, ventilation, piping and cables or any other simi- pour l’accès, l’aération ou le passage de canalisations et lar purpose, arrangements shall be made to maintain the de câbles ou pour tout autre but analogue, des mesures strength and watertight integrity of the boundaries. doivent être prises pour maintenir la résistance et l’étan- chéité à l’eau de la cloison. (2) Every watertight boundary and associated closing (2) Toute cloison d’étanchéité à l’eau et les disposi- appliance on a floating platform shall be of sufficient tifs connexes de verrouillage à bord de la plate-forme strength and tightness of closure to withstand without flottante doivent être suffisamment résistants et étanches failure the pressure and other loads likely to occur in ser- pour pouvoir résister sans défaillance à la pression et aux vice. autres charges susceptibles de survenir en cours d’ex- ploitation. (3) All watertight doors and hatches on a floating (3) Toutes les portes et écoutilles étanches à l’eau de platform shall be operable locally from both sides of the la plate-forme flottante doivent pouvoir être utilisées sur associated bulkhead or deck. place à partir des deux côtés de la cloison ou du pont en cause. (4) Side scuttles and windows on a floating platform (4) Toutes les crapaudines et tous les hublots de la shall be of the non-opening type, fitted with internal plate-forme flottante doivent être d’un type qui ne hinged deadlight covers. s’ouvre pas et être munis de panneaux de contre-hublots à gonds internes. (5) All pipes and ducts on a floating platform shall, (5) Tous les tuyaux et les conduits de la plate-forme where possible, be routed clear of those compartments flottante doivent, dans la mesure du possible, passer à that are vulnerable to penetration damage or, where such distance des compartiments vulnérables aux avaries par routing is not possible, positive means of closure of pénétration, sinon, des moyens sûrs de fermeture de ces those pipes and ducts shall be provided for each water- tuyaux et conduits doivent être prévus à chaque cloison tight boundary. étanche. 77 SOR/95-191 — September 29, 2014 (6) Every valve required at a watertight boundary on (6) Toutes les vannes requises aux cloisons étanches a floating platform shall be remotely operable from the à l’eau de la plate-forme flottante doivent pouvoir être ballast control station or by a mechanical means from télécommandées du poste de commande du lest ou par another readily accessible position that is above the wa- des moyens mécaniques d’un autre point facilement ac- terline in the final condition of equilibrium that could re- cessible qui est au-dessus de la ligne de flottaison dans la sult when the platform is in a damaged condition. condition finale d’équilibre lorsque la plate-forme est en condition avariée. (7) Every inlet or discharge port on a floating plat- (7) Tous les orifices d’entrée et de sortie de la plate- form that is submerged at maximum operating draught forme flottante qui est submergée au tirant d’eau d’ex- shall be fitted with a valve that is remotely controlled ploitation maximal doivent être munis d’une vanne télé- from the ballast control station, and each such valve commandée du poste de commande du lest, et la vanne shall close automatically when the source of power fails, doit se fermer automatiquement en cas de coupure de la unless safety considerations require that it remain open. source d’énergie à moins que, par mesure de sécurité, elle ne doive demeurer ouverte. (8) Every discharge port on a floating platform that (8) Tous les orifices de sortie de la plate-forme flot- penetrates a boundary to a compartment intended to be tante qui sont percés dans la cloison d’un compartiment watertight shall be fitted with an automatic non-return destiné à être étanche à l’eau doivent être munis d’une valve and with a second such valve or with a device vanne de retenue automatique et d’une autre vanne iden- whereby the port may be closed from a position outside tique ou d’un dispositif qui permet de fermer l’orifice and above the compartment. d’un point extérieur situé au-dessus du compartiment. (9) Every door or hatch on a floating platform used to (9) Toutes les portes et écoutilles de la plate-forme ensure the watertight integrity of internal access open- flottante utilisées pour assurer l’étanchéité à l’eau des ings during the operation of the platform shall, while the ouvertures d’accès interne durant l’exploitation de la platform is afloat, be equipped with an indicator at the plate-forme à flot doivent être munies d’un dispositif au ballast control station to indicate whether the door or poste de commande du lest indiquant qu’elles sont ou- hatch is open or closed. vertes ou fermées. (10) Every door or hatch on a floating platform that is (10) Toutes les portes et écoutilles de la plate-forme normally closed while the platform is afloat shall be flottante normalement fermées lorsque la plate-forme est equipped à flot doivent : (a) with an alarm system that is triggered in a manned a) être dotées d’un système d’alarme qui se déclenche control station when the door or hatch is open; and à un poste de commande habité lorsque l’une d’elles (b) with a notice affixed to that door or hatch cover to est ouverte; the effect that the door or hatch cover is not to be left b) porter un avis indiquant que leur couvercle ne doit open while the platform is afloat. pas demeurer ouvert lorsque la plate-forme est à flot. (11) All external openings on a floating platform, ex- (11) À l’exception des trous d’homme ayant un cou- cept manholes that are fitted with close-bolted watertight vercle étanche à l’eau à boulons rapprochés et fermés en covers and that are kept permanently closed while the permanence quand la plate-forme est à flot, les ouver- platform is afloat, shall, in the intact condition or in a tures extérieures de la plate-forme flottante doivent se damaged condition, be completely above any waterline trouver complètement au-dessus de toute ligne de flottai- 78 DORS/95-191 — 29 septembre 2014 associated with the platform being heeled because of son à laquelle la plate-forme, en condition intacte ou wind forces. avariée, gîte sous la force des vents. (12) Every external opening on a floating platform (12) Toutes les ouvertures extérieures de la plate- that becomes wholly or partially submerged when the forme flottante qui sont complètement ou partiellement platform is at the maximum angle of heel that could oc- immergées quand la plate-forme est à son angle maximal cur while the platform meets the area ratio requirement de gîte tout en satisfaisant aux exigences du rapport de for intact and damage stability set out in the Code re- zone quant à la stabilité en condition intacte ou avariée ferred to in subsection 56(9) or that may become inter- selon le recueil visé au paragraphe 56(9) ou qui peuvent mittently submerged because of wave action when the s’immerger par intermittence sous l’action des vagues platform is in a damaged condition shall quand la plate-forme est en condition avariée doivent : (a) be designed and constructed to withstand any sea a) être conçues et construites pour résister sans péné- condition without penetration; tration à toutes les conditions de la mer; (b) in the case of an opening that may become inter- b) dans le cas des ouvertures susceptibles de s’im- mittently submerged when the platform is in a dam- merger par intermittence quand la plate-forme est en aged condition, condition avariée : (i) close automatically when submerged, (i) soit se fermer automatiquement lorsqu’elles (ii) be readily and quickly closable at any time, or sont immergées, (iii) be assumed to be open in the damage stability (ii) soit pouvoir se fermer facilement et rapidement calculations made pursuant to section 56; à tout moment, (c) in the case of an external opening that cannot be (iii) soit être considérées comme ouvertes aux fins quickly closed, des calculs de résistance aux avaries faits aux termes de l’article 56; (i) be assumed to be open in the damage stability calculations made pursuant to section 56, or c) dans le cas des ouvertures extérieures qui ne peuvent se fermer rapidement : (ii) be permanently closed when the platform is afloat; (i) soit être considérées comme ouvertes aux fins des calculs de stabilité après avaries faits aux (d) in the case of a door or hatch that may be used termes de l’article 56, during operation of the platform, be equipped with closing appliances that are operable locally from both (ii) soit demeurer fermées en permanence quand la sides of the bulkhead or deck; plate-forme est à flot; (e) in the case of a door or hatch that may become in- d) dans le cas de portes ou d’écoutilles pouvant être termittently submerged when the platform is in a dam- utilisées lorsque la plate-forme est en exploitation, aged condition, être munies de dispositifs de fermeture manœuvrables sur place des deux côtés de la cloison ou du pont; (i) be equipped with an indication system to show in the ballast control station the status of the closing e) dans le cas de portes ou d’écoutilles susceptibles appliances, de s’immerger par intermittence lorsque la plate- forme est en condition avariée : (ii) be self-closing on being submerged, or readily and quickly closable, and 79 SOR/95-191 — September 29, 2014 (iii) bear a notice to the effect that the door or (i) être munies d’un système d’indication de l’état hatch is not to be left open during operation of the des dispositifs de fermeture au poste de commande platform; du lest, (f) in the case of a ventilator or ventilation intake or (ii) être à fermeture automatique lors de leur im- outlet that may be used during operation of the plat- mersion ou à fermeture facile et rapide, form, (iii) porter un avis indiquant qu’elles ne doivent (i) be equipped with a self-activating anti-flooding pas demeurer ouvertes durant l’exploitation de la device, or plate-forme; (ii) if it is an intake or outlet not subject to inter- f) dans le cas de ventilateurs, de prises d’air ou de mittent submergence when the platform is in a dam- sorties d’air qui peuvent être utilisés durant l’exploita- aged condition, be fitted with a manually operated tion de la plate-forme : means of closure that is readily accessible; (i) soit être munies d’un dispositif autodéclencheur (g) in the case of a closing appliance that is not to be d’antinoyage, opened during operation of the platform, bear a notice (ii) soit dans le cas de prises d’air ou de sorties to that effect; d’air qui ne sont pas soumises à une immersion in- (h) in the case of air pipes to a ballast tank, be termittente quand la plate-forme est en condition equipped with an anti-flooding device; and avariée, être munies d’un dispositif de fermeture (i) in the case of a chain locker opening on a column- manuel facilement accessible; stabilized platform, except where the chain locker is g) dans le cas de dispositifs de fermeture qui ne kept full of water or is designed to be free-flooding, doivent pas être ouverts durant l’exploitation de la be fitted with a device that will prevent significant plate-forme, porter un avis à cet effet; ingress of water in the event of submergence and with h) dans le cas de canalisations à air menant à un ré- a suitable means for pumping out, both of which are servoir de lest, être munies d’un dispositif antinoyage; remotely operable from a ballast control station. i) dans le cas d’un puits à chaîne s’ouvrant sur une plate-forme stabilisée par colonnes, sauf lorsque le puits à chaîne est maintenu plein d’eau ou est conçu pour être librement inondé, être munies d’un dispositif empêchant l’admission importante d’eau en cas d’im- mersion et de moyens adéquats de pompage, tous deux étant télécommandés à un poste de commande du lest. (13) All of the closing appliances required by subsec- (13) Les dispositifs de fermeture exigés par le para- tion (12) shall be able to withstand without failure any graphe (12) doivent pouvoir résister sans défaillance à wave impact load to which they may be subjected. l’action des vagues à laquelle ils peuvent être soumis. (14) Every compartment on a floating platform re- (14) Tous les compartiments de la plate-forme flot- quired to remain watertight to comply with the intact and tante qui doivent demeurer étanches à l’eau pour se damage stability criteria described in section 56 shall in- conformer aux critères de stabilité de la plate-forme en corporate a device suitably positioned to detect flooding condition intacte ou en condition avariée visés à l’article 56 doivent comporter un dispositif placé de façon à dé- 80 DORS/95-191 — 29 septembre 2014 and, where flooding occurs, trigger an alarm in a ballast celer une inondation et à déclencher une alarme à un control station. poste de commande du lest lors d’une inondation. MOORING AMARRAGE 59. (1) The mooring system for a floating platform 59. (1) Le système d’amarrage de la plate-forme flot- shall tante doit : (a) provide an anchor pattern that keeps all anchor a) comporter un réseau d’ancrage qui permette de dis- lines, anchor chains and anchors a safe distance from poser les amarres, les chaînes d’ancrage et les ancres à existing pipelines, flow lines and other platforms; une distance sécuritaire des pipelines et des conduites (b) provide an anchor pattern that gives clear access d’écoulement existants et des autres plates-formes; to any support vessel intended to be used in operations b) comporter un réseau d’ancrage qui donne libre ac- and that clears lifeboat launching areas; cès à tout navire de soutien censé servir aux opéra- (c) be sufficiently stiff so that the excursions of the tions et qui n’obstrue pas les zones de mise à l’eau des platform are within the limits established for the risers embarcations de sauvetage; in accordance with section 61 under all operating con- c) être suffisamment rigide pour que les déplacements ditions; and de la plate-forme demeurent en deçà des limites éta- (d) be sufficiently strong so that the failure of any an- blies pour les colonnes montantes conformément à chor line during operations will not lead to major l’article 61 dans toutes les conditions d’exploitation; damage. d) être suffisamment résistant pour que la défaillance d’une amarre durant l’exploitation n’entraîne pas de dommage majeur. (2) The load factor for tension in the mooring lines of (2) Le coefficient de charge relativement à la tension every floating platform, based on a quasi-static analysis, des amarres de la plate-forme flottante qui est fondé sur shall be une analyse de quasi-statisme doit être : (a) in the operating condition with all lines intact, 3.0; a) de 3,0 en condition d’exploitation, toutes les (b) in the operating condition with one line failed, amarres étant intactes; 2.0; b) de 2,0 en condition d’exploitation, une amarre (c) in the survival condition with all lines intact, 2.0; ayant rompu; (d) in the survival condition with one line failed, if c) de 2,0 en condition de survie, toutes les amarres the platform will not threaten another platform used étant intactes; for the exploration or exploitation of subsea resources, d) de 1,4 en condition de survie, une amarre ayant l.4; and rompu, si la plate-forme ne met pas en danger une (e) in the survival condition with one line failed, if autre plate-forme utilisée pour la recherche ou l’ex- the platform may threaten another platform used for ploitation des ressources sous-marines; the exploration or exploitation of subsea resources, e) de 2,0 en condition de survie, une amarre ayant 2.0. rompu, si la plate-forme peut mettre en danger une autre plate-forme utilisée pour la recherche ou l’ex- ploitation des ressources sous-marines. 81 SOR/95-191 — September 29, 2014 (3) The fatigue life of the mooring system of every (3) La durée de vie en fatigue du système d’amarrage floating platform shall be equal to at least 15 years. de la plate-forme flottante doit être égale à au moins 15 ans. (4) The mooring system of every floating platform (4) Le système d’amarrage de la plate-forme flottante that is to remain at the production site or drill site for qui doit demeurer à l’emplacement de production ou de longer than five years shall be designed so that its com- forage durant plus de cinq ans doit être conçu de sorte ponents can be inspected and replaced. que ses éléments puissent être inspectés et remplacés. (5) The design of the mooring system of every float- (5) La conception du système d’amarrage de la plate- ing platform that is intended to remain moored in the forme flottante qui est censée demeurer amarrée en survival condition shall be based on an appropriate mod- condition de survie doit être fondée sur un essai avec el test or numerical analysis. modèle ou une analyse numérique appropriés. (6) Where there is an annual probability of 10-2 of ice (6) Lorsque la présence de glaces ou d’icebergs à or icebergs being present at the site of a floating plat- l’emplacement de la plate-forme flottante comporte une form, the mooring system of the platform shall probabilité annuelle de 10-2, le système d’amarrage de la (a) incorporate a primary quick release system with a plate-forme doit : remote triggering device and at least one back-up sys- a) comprendre un système primaire de déclenchement tem; and rapide à distance et au moins un système d’appoint; (b) have been demonstrated to be capable of permit- b) avoir fait l’objet d’une démonstration établissant ting the quick release of the platform from its moor- qu’il est capable de libérer rapidement la plate-forme ings and risers. de ses amarres et de ses tubes prolongateurs. (7) Except where the floating platform may threaten (7) Sauf lorsque la plate-forme flottante met en dan- another platform used for the exploration or exploitation ger une autre plate-forme utilisée pour la recherche ou of subsea resources, the following factors may be taken l’exploitation des ressources sous-marines, il peut être into account in determining whether a thruster-assisted tenu compte des facteurs suivants pour déterminer si un mooring system using a remote control thruster system système d’amarrage à propulseurs télécommandés est complies with subsection (2): conforme au paragraphe (2) : (a) if the remote control is manual, a) s’il s’agit d’une télécommande manuelle : (i) zero thrust, for the operating condition, (i) une poussée zéro en condition d’exploitation, (ii) 70 per cent of the net thrust effect from all ex- (ii) 70 pour cent de l’effet de poussée nette de tous cept one thruster, for the survival condition, les propulseurs, sauf un, en condition de survie, (iii) zero thrust, for one mooring line failed in the (iii) une poussée zéro en condition d’exploitation, operating condition, and une amarre ayant rompu, (iv) 70 per cent of the net thrust effect from all (iv) 70 pour cent de l’effet de poussée nette de tous thrusters, for one mooring line failed in the survival les propulseurs en condition de survie, une amarre condition; and ayant rompu; (b) if the remote control is automatic, b) s’il s’agit d’une télécommande automatique : (i) the net thrust effect from all except one thruster, (i) l’effet de poussée nette de tous les propulseurs, for the operating condition, sauf un, en condition d’exploitation, 82 DORS/95-191 — 29 septembre 2014 (ii) the net thrust effect from all except one (ii) l’effet de poussée nette de tous les propulseurs, thruster, for the survival condition, sauf un, en condition de survie, (iii) the net thrust from all thrusters, for one moor- (iii) la poussée nette de tous les propulseurs en ing line failed in the operating condition, and condition d’exploitation, une amarre ayant rompu, (iv) the net thrust from all thrusters, for one moor- (iv) la poussée nette de tous les propulseurs en ing line failed in the survival condition. condition de survie, une amarre ayant rompu. (8) Mooring system components on a floating plat- (8) Les éléments du système d’amarrage de la plate- form that interface with the mooring chain or rope, ex- forme flottante servant d’interface avec la chaîne ou le cept the attachment in the chain locker for anchor chain câble d’amarrage, à l’exception des attaches du puits à and the steel rope attachment on the drum, shall be de- chaînes destinées à la chaîne d’ancrage et des attaches signed to withstand the forces due to tension required to sur tambour du câble d’acier, doivent être conçus pour break the chain or rope. résister aux tensions de rupture de la chaîne ou du câble. (9) The mooring system for a floating platform shall (9) Le système d’amarrage de la plate-forme flottante be designed to keep the platform on location, under any doit être conçu pour maintenir celle-ci en place quelles ice loads to which it may be subjected as determined que soient les charges dues aux glaces établies confor- pursuant to section 44, and the chain or rope shall be mément à l’article 44, et la chaîne ou le câble doit pou- able to withstand, without significant damage, the abra- voir résister sans dommage important à l’abrasion due à sion forces imposed by such loads. de telles charges. (10) The load factors between the estimated anchor (10) Les rapports entre la force de maintien estima- holding power in the mooring system of a floating plat- tive des ancres du système d’amarrage de la plate-forme form and maximum mooring line tension at the anchor flottante et la tension maximale des amarres au niveau shall be at least des ancres doivent être d’au moins : (a) in the operating condition with all lines intact, 2.1; a) 2,1 en condition d’exploitation, toutes les amarres (b) in the operating condition with one line failed, étant intactes; 1.4; b) 1,4 en condition d’exploitation, une amarre ayant (c) in the survival condition with all lines intact, 1.4; rompu; (d) in the survival condition with one line failed, if c) 1,4 en condition de survie, toutes les amarres étant the platform will not threaten another platform used intactes; for the exploration or exploitation of subsea resources, d) 1,0 en condition de survie, une amarre ayant rom- 1.0; and pu, si la plate-forme ne met pas en danger une autre (e) in the survival condition with one line failed, if plate-forme utilisée pour la recherche ou l’exploitation the platform may threaten another platform used for des ressources sous-marines; the exploration or exploitation of subsea resources, e) 1,4 en condition de survie, une amarre ayant rom- 1.4. pu, si la plate-forme met en danger une autre plate- forme utilisée pour la recherche ou l’exploitation des ressources sous-marines. (11) For the purposes of paragraphs (2)(d) and (e), (11) Pour l’application des alinéas (2)d) et e), du pa- subsection (7) and paragraphs (10)(d) and (e), one plat- ragraphe (7) et des alinéas (10)d) et e), une plate-forme 83 SOR/95-191 — September 29, 2014 form shall be considered to threaten another platform if en met une autre en danger si les conditions environne- the platform may drift or be pushed, by environmental mentales peuvent la faire dériver ou la pousser vers conditions, into the other platform when all lines fail, l’autre plate-forme, toutes les amarres ayant rompu, taking into account any action likely to be taken to bring compte tenu de toutes les mesures susceptibles d’être the platform under control. prises pour maîtriser la plate-forme. (12) All anchor winches and their stoppers, brakes, (12) Tous les treuils d’ancre, ainsi que leurs bosses, fairleads and sheaves, their attachments to the hull, and freins, chaumards, poulies, attaches à la coque, et tous associated load- bearing structural elements for a float- les éléments de structure connexes de la plate-forme flot- ing platform shall be designed to withstand, without risk tante doivent être conçus pour résister, sans risque de dé- of permanent deformation or failure or of loss of ability formation permanente, de défaillance ou de perte de ca- to operate, the application of the breaking load of the as- pacité de fonctionnement, à l’application de la charge de sociated anchor line with the anchor line in the most un- rupture sur l’amarre en cause lorsque celle-ci se trouve favourable direction. dans la direction la plus défavorable. (13) The catenary mooring system on every floating (13) Le système d’amarrage caténaire de la plate- platform shall be inspected in accordance with the re- forme flottante doit être inspecté conformément aux exi- quirements of American Petroleum Institute RP 21, Rec- gences du document de l’American Petroleum Institute ommended Practice for In-Service Inspection of Moor- intitulé RP 21 Recommended Practice for In-Service Ins- ing Hardware for Floating Drilling Units. pection of Mooring Hardware for Floating Drilling Units. DYNAMIC POSITIONING POSITIONNEMENT DYNAMIQUE 60. (1) The dynamic positioning system used to hold 60. (1) Le système de positionnement dynamique a floating platform in position at the production site or servant à maintenir la plate-forme flottante en place à drill site shall be designed, constructed and operated so l’emplacement de production ou de forage doit être that the failure of any main component with an annual conçu, construit et exploité de sorte que la défaillance de failure rate of greater than 0.1, as determined from a de- tout élément principal ayant un taux de défaillance an- tailed reliability analysis, cannot result in major damage nuel supérieur à 0,1, déterminé selon une analyse de fia- to the platform, as determined from a failure modes and bilité détaillée, ne puisse entraîner de dommage majeur à effects analysis of the main components, unless la plate-forme, tel qu’il est établi par une analyse des (a) operational procedures for the dynamic position- modes de panne des éléments principaux et leurs effets, ing system avoid or take into account the effect of the sauf dans l’une ou l’autre des situations suivantes : failure of the single component; or a) des méthodes d’exploitation du système de posi- (b) every such component is routinely replaced so tionnement dynamique permettent d’éviter ou de tenir that the failure rate, as determined from the detailed compte de l’effet de la défaillance d’un seul élément; reliability analysis, is not greater than 0.1 for the peri- b) chaque élément est remplacé de façon courante od between replacements. afin que le taux de défaillance, déterminé selon l’ana- lyse de fiabilité détaillée, ne dépasse pas 0,1 par pé- riode entre les remplacements. (2) Every floating platform with a dynamic position- (2) La plate-forme flottante à système de positionne- ing system shall be equipped with an alert and response ment dynamique doit être munie d’un système d’affi- display system that demonstrates chage d’alerte et d’intervention indiquant : 84 DORS/95-191 — 29 septembre 2014 (a) the position of the platform relative to the produc- a) la position de la plate-forme par rapport à l’empla- tion site or drill site; and cement de production ou de forage; (b) the percentage of the available power that is nec- b) le pourcentage de la puissance disponible néces- essary to maintain the platform in a position relative saire au maintien de la plate-forme dans une position to the site and that will permit the installation to con- par rapport à l’emplacement qui permettra à l’installa- tinue to operate. tion de continuer à fonctionner. SUBSEA PRODUCTION SYSTEMS SYSTÈMES DE PRODUCTION SOUS-MARINS 61. (1) Every subsea production system shall be de- 61. (1) Le système de production sous-marin doit signed to withstand major damage under the loads listed être conçu pour résister à des dommages majeurs lors- in Part B, Section 4, of Det norske Veritas Guideline No. qu’il est soumis aux charges énumérées à l’article 4, par- 1-85, Safety and Reliability of Subsea Production Sys- tie B, du document Guideline No. 1-85 du Det norske tems. Veritas intitulé Safety and Reliability of Subsea Produc- tion Systems. (2) Where the concept safety analysis required by (2) Lorsque l’analyse de sécurité conceptuelle exigée section 43 indicates a risk of damage to the subsea pro- par l’article 43 indique pour les éléments du système de duction system components from ice, dropped objects, production sous-marin un risque de dommage dû aux trawl board nets or anchors, the design of the system glaces, à la chute d’objets, aux filets de chaluts ou aux shall include measures to minimize such damage. ancres, la conception du système doit inclure des me- sures pour réduire ces risques. (3) The rigid risers in the subsea production system of (3) Les tubes prolongateurs rigides du système de a fixed platform and the steel flowlines and flowline production sous-marin de la plate-forme fixe ainsi que connectors in every subsea production system shall com- les conduites d’écoulement en acier et leurs raccords du ply with National Standard of Canada CAN/CSA-Z187- système de production sous-marin doivent être M87, Offshore Pipelines. conformes à la norme nationale du Canada CAN/CSA- Z187-M87 intitulée Pipelines offshore. (4) Every subsea production system and its compo- (4) Le système de production sous-marin et ses élé- nents shall be subjected to equipment integration tests in ments doivent être soumis aux essais d’intégration de accordance with section 7.2 of American Petroleum In- l’équipement conformément à l’article 7.2 du document stitute RP 17A, Recommended Practice for Design and RP 17A de l’American Petroleum Institute intitulé Re- Operation of Subsea Production Systems. commended Practice for Design and Operation of Sub- sea Production Systems. (5) Every subsea production system shall be installed (5) Le système de production sous-marin doit être in accordance with section 7.3 of American Petroleum mis en place conformément à l’article 7.3 du document Institute RP 17A, Recommended Practice for Design RP 17A de l’American Petroleum Institute intitulé Re- and Operation of Subsea Production Systems. commended Practice for Design and Operation of Sub- sea Production Systems. (6) Every subsea wellhead system and subsea tree lo- (6) Les têtes de production sous-marines et le sys- cated in a caisson, silo, or glory hole shall be designed tème de tête de puits sous-marin situés dans un caisson, and installed in such a manner that 85 SOR/95-191 — September 29, 2014 (a) the effect of silting is minimized; and un silo ou un trou de protection doivent être conçus et (b) where practicable, inspection and maintenance installés de façon : during its production or injection life is possible. a) à réduire au minimum les effets de l’envasement; b) à permettre, dans la mesure du possible, leur ins- pection et leur maintenance au cours de leur durée de vie de production ou d’injection. (7) Every subsea production riser shall be designed (7) Les tubes prolongateurs de production sous-ma- and operated in accordance with section 6 of American rins doivent être conçus et exploités conformément à Petroleum Institute RP 17A, Recommended Practice for l’article 6 du document RP 17A de l’American Petro- Design and Operation of Subsea Production Systems. leum Institute intitulé Recommended Practice for Design and Operation of Subsea Production Systems. (8) Every subsea production riser shall be designed (8) Le tube prolongateur de production sous-marin (a) to withstand the maximum pressure to which the doit être conçu de façon : riser may be subjected during its service life; a) à résister à la pression maximale à laquelle il peut (b) so that every component that is used to transport être soumis durant sa vie utile; oil or gas from the seafloor to the production installa- b) à permettre à chaque élément utilisé dans le trans- tion can withstand without failure the wellhead shut-in port du pétrole ou du gaz du fond marin à l’installa- pressure, except where the component is equipped tion de production de résister sans défaillance à la with an isolation valve at the seafloor and a pressure pression en tête de puits, sauf lorsque l’élément est relief system at the platform to relieve the internal muni d’une vanne d’isolement au fond marin et d’un pressure of the component; and système de décharge à la plate-forme pour réduire sa (c) to withstand any ice loads to which it may be sub- pression interne; ject as determined pursuant to section 44, except c) à résister à toutes les charges dues aux glaces aux- where failure of the riser will not lead to uncontrolled quelles il peut être soumis tel qu’il est déterminé selon pollution. l’article 44, sauf lorsque sa défaillance n’entraînera pas de pollution incontrôlée. (9) Flexible flowlines and risers in a subsea produc- (9) Les conduites d’écoulement et les tubes prolonga- tion system shall be designed in accordance with Ameri- teurs souples du système de production sous-marin can Petroleum Institute RP 17B, Recommended Practice doivent être conçus conformément au document RP 17B for Flexible Pipe. de l’American Petroleum Institute intitulé Recommended Practice for Flexible Pipe. (10) The end fittings of flexible flowlines or risers in (10) Les raccords des conduites d’écoulement ou des a subsea production system shall have pressure integrity tubes prolongateurs souples du système de production and load-bearing capacities greater than that of the pipe. sous-marin doivent posséder une résistance à la pression et aux charges plus grande que celle du tuyau. (11) The fatigue life of risers in a subsea production (11) La durée de vie en fatigue des tubes prolonga- system shall be at least three times the service life of the teurs du système de production sous-marin doit être au production riser. moins égale à trois fois la durée de vie utile du tube pro- longateur de production. 86 DORS/95-191 — 29 septembre 2014 (12) Adequate provision shall be made in the design (12) La conception des tubes prolongateurs du sys- of the risers in a subsea production system and in the tème de production sous-marin et la configuration de configuration of their individual components, including leurs divers éléments, notamment les conduites de pro- production, injection, control and instrumentation lines duction, d’injection, de commande, d’instrumentation et and their attachment assemblies, for the safe and effi- leurs attaches, doivent s’effectuer en accordant toute cient maintenance and inspection of the risers and their l’attention voulue à la maintenance et à l’inspection effi- components during their service life. caces et sécuritaires des tubes prolongateurs et de leurs éléments au cours de leur durée de vie utile. (13) The analysis required by section 40 of the risers (13) L’analyse exigée par l’article 40 à l’égard des in a subsea production system in relation to fatigue and tubes prolongateurs du système de production sous-ma- stress of the riser components and risk to the personnel rin relativement à la fatigue des éléments des tubes pro- and equipment as a result of failure or malfunction of in- longateurs, aux contraintes subies par ceux-ci et aux dividual components of the risers shall be performed us- risques auxquels sont exposés le personnel et le matériel ing the methodology specified in section 6.5 of Ameri- à la suite d’une défaillance ou d’un mauvais fonctionne- can Petroleum Institute RP 17A, Recommended Practice ment de ces éléments doit être effectuée selon la mé- for Design and Operation of Subsea Production Systems. thode indiquée à l’article 6.5 du document RP 17A de l’American Petroleum Institute intitulé Recommended Practice for Design and Operation of Subsea Production Systems. (14) Every riser in a subsea production system shall (14) Les tubes prolongateurs du système de produc- be equipped so that it can be disconnected tion sous-marin doivent être munis de dispositifs permet- (a) before heave or excursion limits specified in the tant de les détacher : operations manual are exceeded; or a) avant que les limites de gonflement ou de déplace- (b) when ice conditions pose a threat of major dam- ment établies au manuel d’exploitation ne soient dé- age to the production platform. passées; b) lorsque l’état des glaces présente un risque de dommage important pour la plate-forme de produc- tion. (15) Every riser on a subsea production system shall (15) Tout tube prolongateur du système de production be equipped so that after it has been disconnected and re- sous-marin doit être muni de dispositifs tels qu’après connected it can be pressure tested in accordance with avoir été détaché et de nouveau rebranché, il puisse subir the procedures stipulated in the operations manual. une épreuve sous pression conformément aux méthodes stipulées dans le manuel d’exploitation. (16) Every component of the riser in a subsea produc- (16) Tout élément d’un tube prolongateur du système tion system that is used to convey the pool fluids to the de production sous-marin utilisé pour le transport de surface, inject fluids or chemicals into the pool, or trans- fluides du gisement à la surface, pour l’injection de port processed or treated fluids to or from the production fluides ou de produits chimiques dans le gisement ou installation shall be designed and equipped so that when pour le transport des fluides traités ou transformés entre the fluids pose a threat to the environment, the compo- l’installation de production et d’autres points doit être conçu et équipé de sorte que lorsque les fluides pré- 87 SOR/95-191 — September 29, 2014 nent can be displaced with water or securely isolated be- sentent un risque pour l’environnement, il puisse être dé- fore the riser is disconnected. placé avec de l’eau ou isolé de façon sûre avant que le tube prolongateur soit détaché. (17) The templates and manifolds in a subsea produc- (17) Les gabarits et les collecteurs du système de pro- tion system shall be designed and operated in accordance duction sous-marin doivent être conçus et exploités with section 5 of American Petroleum Institute RP 17A, conformément à l’article 5 du document RP 17A de Recommended Practice for Design and Operation of l’American Petroleum Institute intitulé Recommended Subsea Production Systems. Practice for Design and Operation of Subsea Production Systems. (18) The control systems, including control lines and (18) Les systèmes de régulation, y compris les pressurized control fluids, of every subsea production conduites de commande et les fluides de commande system shall be designed and operated in accordance pressurisés, du système de production sous-marin, with section 4 of American Petroleum Institute RP 17A, doivent être conçus et exploités conformément à l’article Recommended Practice for Design and Operation of 4 du document RP 17A de l’American Petroleum Insti- Subsea Production Systems. tute intitulé Recommended Practice for Design and Ope- ration of Subsea Production Systems. (19) Every subsea production system intended for (19) Le système de production sous-marin destiné à manned intervention in an atmospheric chamber shall be une intervention humaine en chambre atmosphérique designed in accordance with the requirements of Part B, doit être conçu conformément aux exigences de l’article Section 11, of Det norske Veritas Guideline No. 1-85, 11 de la partie B du document Guideline No. 1-85 du Safety and Reliability of Subsea Production Systems. Det norske Veritas intitulé Safety and Reliability of Sub- sea Production Systems. PART III PARTIE III CONSTRUCTION AND INSTALLATION CONSTRUCTION ET MISE EN PLACE GENERAL DISPOSITIONS GÉNÉRALES 62. (1) Every platform shall be fabricated and con- 62. (1) La fabrication et la construction de la plate- structed in accordance with forme doivent être conformes aux normes suivantes de (a) for a steel platform, sections 17, 18, 19, 20 and 21 l’Association canadienne de normalisation : of Canadian Standards Association CAN/CSA- a) dans le cas d’une plate-forme en acier, aux articles S473-92, Steel Structures, Offshore Structures; 17, 18, 19, 20 et 21 de la norme CAN/CSA-S473-92 (b) for a concrete platform, section 11 of Canadian intitulée Steel Structures, Offshore Structures; Standards Association Preliminary Standard S474- b) dans le cas d’une plate-forme en béton, à l’article M1989, Concrete Structures; 11 de la norme intitulée Preliminary Standard S474- (c) for a gravity-base, fill, fill-retention or piled plat- M1989, Concrete Structures; form, sections 6.3, 7.3, 8.3 or 9.4, respectively, of c) dans le cas d’une plate-forme à embase-poids, à Canadian Standards Association CAN/CSA-S472-92, remblai, à rétention de remblai ou sur pilotis, aux ar- Foundations, Offshore Structures; and ticles 6.3, 7.3, 8.3 ou 9.4 respectivement de la norme CAN/CSA-S472-92 intitulée Fondations; 88 DORS/95-191 — 29 septembre 2014 (d) in respect of the foundation, section 5.4 of Cana- d) pour ce qui est des fondations, à l’article 5.4 de la dian Standards Association CAN/CSA-S472-92, norme CAN/CSA-S472-92 intitulée Fondations. Foundations, Offshore Structures. (2) Every vessel or barge used for the construction, (2) Tout navire ou chaland utilisé pour la construc- transportation, up-ending or positioning of an installa- tion, le transport, le redressement ou le positionnement tion or a component of an installation shall de l’installation ou de l’un de ses éléments doit : (a) be classified by a classification society or have a) être classé par une société de classification ou pos- documentation to prove that a similar verification pro- séder la documentation prouvant qu’un processus de cess has taken place; vérification semblable a été effectué; (b) if manned, be equipped with lifesaving appliances b) être, s’il est habité, muni d’engins de sauvetage in accordance with the Life Saving Equipment Regula- conformément au Règlement sur l’équipement de sau- tions, as if it were in waters to which those Regula- vetage comme s’il se trouvait dans des eaux visées par tions apply; and ce règlement; (c) be certified by the owner as being capable of per- c) faire l’objet d’une attestation par son propriétaire forming the assigned task or tasks safely and as being portant qu’il est capable de remplir les fonctions assi- otherwise fit for the services it is expected to provide. gnées en toute sécurité et qu’il convient par ailleurs aux opérations prévues. (3) All slings, wire cables, shackles and any other (3) Les élingues, câbles métalliques, manilles et component used for lifting and for securing loads during autres éléments destinés au levage et à l’assujettissement the construction, transportation, up-ending or positioning des charges durant la construction, le transport, le redres- of an installation or a component of an installation shall sement et le positionnement de l’installation ou de l’un have a minimum load factor of 3. de ses éléments doivent avoir un coefficient de charge minimal de 3. (4) Where loads developed during movement of a (4) Lorsque les charges créées par le déplacement de platform from the construction site to the production site la plate-forme du chantier de construction à l’emplace- or drill site or during installation operations are in excess ment de production ou de forage ou par les opérations de of those that will be encountered after installation, the mise en place excèdent les charges qui surviendront platform shall be provided with load- and strain-measur- après la mise en place, la plate-forme doit être munie ing devices during the movement or installation of the d’appareils de mesure des charges et des contraintes du- platform. rant son déplacement ou sa mise en place. PART IV PARTIE IV OPERATIONS AND MAINTENANCE EXPLOITATION ET MAINTENANCE MANUAL, PLANS AND PROGRAMS FOR INSTALLATIONS MANUEL, PLANS ET PROGRAMMES DES INSTALLATIONS 63. (1) Subject to subsection (2), every operator shall 63. (1) Sous réserve du paragraphe (2), l’exploitant prepare, adhere to and maintain, in respect of every in- doit préparer, respecter et conserver pour toute installa- stallation, an operations manual that contains the follow- tion un manuel d’exploitation qui contient les données ing data: suivantes : 89 SOR/95-191 — September 29, 2014 (a) limitations on the operation of the installation and a) les limites d’exploitation de l’installation et de son its equipment; équipement; (b) information as to environmental conditions at the b) des données sur les conditions environnementales site where the installation will be installed and the ef- à l’emplacement où l’installation sera mise en place et fect of those conditions on the installation, including leur effet sur elle, notamment : (i) environmental conditions for which an installa- (i) les conditions environnementales dans les- tion will be evacuated and the meteorological fore- quelles l’installation sera évacuée ainsi que les pré- cast following which such evacuation will be initi- visions météorologiques qui donneront lieu à une ated, telle évacuation, (ii) the amount of snow and ice that may be al- (ii) la quantité permise de neige et de glace qui lowed to accumulate on the installation, peuvent s’accumuler sur l’installation, (iii) the amount of marine growth that may be al- (iii) la quantité permise de flore et de faune ma- lowed to accumulate on the installation, and rines qui peuvent s’accumuler sur l’installation, (iv) for a mobile platform, any operating limits im- (iv) dans le cas de la plate-forme mobile, toute li- posed by environmental conditions and the effect of mite d’exploitation imposée par les conditions envi- wind, sea, snow, ice and marine growth on the ronnementales ainsi que les effets du vent, de la strength, stability and seaworthiness of the platform mer, de la neige, de la glace et de la flore et de la while in transit, in the operating condition or in the faune marines sur la résistance, la stabilité et la na- survival condition; vigabilité de la plate-forme en transit, et en condi- (c) for a fixed platform, the characteristics of the plat- tion d’exploitation et de survie; form foundation, bottom penetration and the maxi- c) dans le cas de la plate-forme fixe, les caractéris- mum permitted amount of scour or other changing tiques de la fondation de la plate-forme et de la péné- seabed conditions; tration dans le fond marin et le maximum permis en (d) for a mobile platform that is supported by the cas d’affouillement ou d’autres conditions variables seabed, du fond marin; (i) information concerning the different seabed d) dans le cas de la plate-forme mobile reposant sur le conditions acceptable for the installation, including fond marin : the varying capacity of the seabed, limiting values (i) des données sur les différentes conditions du of seabed slope, and maximum and minimum pene- fond marin qui conviennent pour l’installation, y trations of footings, and compris les variations de la capacité portante du (ii) a program for inspecting for scour at regular in- fond marin, les angles limites des pentes du fond tervals and after storms of a specified intensity; marin et la pénétration maximale et minimale des socles, (e) for a floating mobile platform, information con- cerning stability, including all data and instructions (ii) un programme d’inspection des affouillements necessary to determine whether any intended configu- à intervalles réguliers et après toute tempête d’une ration of, or change to, the loading or ballasting will certaine intensité précisée; satisfy the stability requirement for the platform; e) dans le cas de la plate-forme mobile flottante, des données sur la stabilité, y compris toutes les données et instructions nécessaires pour déterminer si une 90 DORS/95-191 — 29 septembre 2014 (f) information concerning permissible deck loads, configuration particulière de chargement ou de lestage variable load limits and preloading; ou une modification à celle-ci permettra de satisfaire (g) details of any colour coding system used on the aux exigences de stabilité de la plate-forme; installation for the safety of personnel; f) des données sur les charges de pont, les limites de (h) information on corrosion protection systems used charge variables et le chargement préalable permis; and any requirements for the safety and maintenance g) le détail de tout système de codage par couleur uti- of the systems; lisé à bord de l’installation pour la sécurité du person- (i) details of openings and means of closure in water- nel; tight compartments; h) des données sur les systèmes de protection contre (j) drawings that show la corrosion utilisés de même que sur les exigences en matière de sécurité et d’entretien de ces systèmes; (i) the general arrangement of the deck structure, accommodation areas, helideck and equipment con- i) le détail des ouvertures dans les compartiments tained on the topside facilities, étanches à l’eau et des moyens de fermeture de ces compartiments; (ii) for a fixed steel platform, the jacket, piling, ris- ers and conductors, j) des diagrammes montrant : (iii) for a gravity-base platform and a fill-retention (i) la disposition générale des structures de ponts, platform, the lower concrete or steel platform in- des secteurs d’habitation, de l’hélipont et de l’équi- cluding any skirt arrangements or piling, the deck pement contenu sur la superstructure, structure connection to the lower structure, the ris- (ii) dans le cas de la plate-forme fixe en acier, les ers and the conductors, treillis, les piles, les colonnes montantes et les tubes (iv) for a self-elevating mobile platform, the main prolongateurs, and supporting platforms, the equipment for the ele- (iii) dans le cas de la plate-forme à embase-poids et vating and lowering of the deck structure and any à rétention de remblai, la plate-forme inférieure en arrangements for towing, béton ou en acier, y compris la disposition des jupes (v) for a column-stabilized mobile platform, the ou des piles, les détails de connexion entre la struc- main and support structure, the method for main- ture inférieure et la structure des ponts, les colonnes taining the station and arrangement for towing, montantes et les tubes prolongateurs, (vi) for a surface mobile platform and any similar- (iv) dans le cas de la plate-forme mobile auto-élé- shaped platform, the hull structure and the position- vatrice, la plate-forme principale et celle de support, ing equipment, les équipements de levage et de descente de la structure des ponts ainsi que les dispositions de re- (vii) for a fill platform, the erosion protection and a morquage, cross-section of the platform including the locations of the conductors, (v) dans le cas de la plate-forme mobile stabilisée par colonnes, la plate-forme principale et celle de (viii) the locations of escape routes, fixed fire- ex- support, la méthode de maintien du positionnement tinguishing systems and life-saving appliances, ainsi que les dispositifs de remorquage, (ix) the fire divisions and the location of associated equipment, such as fire dampers, 91 SOR/95-191 — September 29, 2014 (x) the location of the hazardous areas on the in- (vi) dans le cas de la plate-forme mobile de surface stallation, and et de plates-formes de forme similaire, la structure (xi) for a floating mobile platform, the ballast and de la coque et l’équipement de positionnement, bilge systems and all openings and means of clo- (vii) dans le cas de la plate-forme à remblai, la pro- sure that could affect the stability of the platform; tection contre l’érosion et une vue en coupe de la (k) the operating and maintenance requirements for plate-forme montrant entre autres l’emplacement all the lifesaving appliances on the installation; des tubes prolongateurs, (l) the maximum helicopter weight and wheel centres, (viii) l’emplacement des voies de secours, des sys- and maximum size of the helicopter for which the he- tèmes fixes d’extincteurs d’incendie et des équipe- licopter deck on the installation has been designed, in- ments de survie, cluding the extent of the obstacle-free approach zone (ix) les zones d’incendie et l’emplacement de for the helicopter; l’équipement connexe tel les dispositifs d’obtura- (m) special arrangements or facilities for the inspec- tion coupe-feu, tion and maintenance of the installation, any equip- (x) l’emplacement des zones dangereuses de l’ins- ment or plant, and any crude oil storage facilities on tallation, or in the installation; (xi) dans le cas de la plate-forme mobile flottante, (n) special precautions or instructions to be followed le système de lest et de cale ainsi que toutes les ou- when repairs or alterations to the installation are to be vertures et les méthodes de fermeture qui pourraient carried out; influer sur la stabilité de la plate-forme; (o) any special operational or emergency require- k) les exigences d’exploitation et de maintenance des ments covering essential features of the installation, équipements de survie à bord de l’installation; including the shutdown systems; l) le poids maximum de l’hélicoptère et l’emplace- (p) a description of any equipment for elevating and ment des roues ainsi que les dimensions maximales de lowering the installation and of any special types of l’hélicoptère pour lequel a été conçu l’hélipont de la joints, including details of their purpose, proper opera- plate-forme, y compris l’étendue de la zone d’ap- tion and maintenance; proche dégagée pour l’hélicoptère; (q) for a fixed platform, details of the air gap or free- m) les arrangements ou aménagements spéciaux pour board; l’inspection et la maintenance de l’installation, des (r) for a mobile platform, the means of ensuring that équipements ou matériels et des aménagements pour the air gap requirements determined in accordance le stockage du pétrole brut sur ou dans l’installation; with subsection 50(1) are met; n) les instructions ou précautions spéciales à suivre (s) the environmental loads the anchors can sustain to ou à prendre lorsque sont effectuées des réparations keep the installation moored in place, including the ou des modifications à l’installation; estimated holding power of the anchors in relation to o) toute mesure spéciale d’exploitation ou d’urgence the soil at the drill site or production site; qui touche à des éléments essentiels de l’installation (t) for a floating platform, tels les systèmes de mise hors service; p) la description de tout équipement de levage et de descente de l’installation et de tout type d’accouple- 92 DORS/95-191 — 29 septembre 2014 (i) procedures for dealing with the excursion of the ment spécial, y compris leur objet, leur mode de fonc- platform because of the failure of any anchor line, tionnement et leur maintenance; as determined by analysis, q) dans le cas de la plate-forme fixe, le détail du tirant (ii) where there is a thruster-assisted mooring sys- d’air ou du franc-bord; tem, procedures to control operations when thruster r) dans le cas de la plate-forme mobile, les moyens power is lost, and employés pour satisfaire aux exigences de tirant d’air (iii) where there is a dynamic positioning system, a déterminées conformément au paragraphe 50(1); description of the capability of that system in all s) les charges environnementales que les ancres operational and survival conditions within stated peuvent supporter quand elles maintiennent en place tolerances, when any single source of thrust has une installation amarrée, notamment la force de trac- failed and full power is being supplied for all fore- tion estimative des ancres par rapport au sol à l’empla- seeable operations and emergency services; cement de production ou de forage; (u) details of the number of persons to be accommo- t) dans le cas de la plate-forme flottante : dated during normal operations; (i) la marche à suivre en cas de mouvement de la (v) brief particulars of all the equipment on the instal- plate-forme dû au bris d’un câble d’ancrage, tel lation, including flow sheets and instructions for the qu’il est déterminé par analyse, installation, operation and maintenance of the equip- ment; (ii) dans le cas du système d’amarrage à propul- seurs, la marche à suivre pour contrôler les opéra- (w) the procedure for preparing, and the description tions en cas de perte de puissance des propulseurs, and format for, periodic reports concerning the in- tegrity of the installation; and (iii) dans le cas d’un système de positionnement dynamique, la description des capacités du système (x) a procedure for notifying the Chief of any situa- dans toutes les conditions d’exploitation et de sur- tion or event described in section 67. vie à l’intérieur des limites établies lorsqu’il y a perte d’une des sources de poussée et que l’en- semble des services prévisibles d’urgence et d’ex- ploitation sont alimentés à pleine puissance; u) le nombre de personnes à loger durant les opéra- tions normales; v) un bref énoncé des caractéristiques de tous les équipements de l’installation, y compris les dia- grammes et les instructions concernant leur mise en place, leur exploitation et leur maintenance; w) la marche à suivre pour préparer les rapports pé- riodiques sur l’intégrité de l’installation, ainsi que leur format et leur présentation; x) la marche à suivre pour aviser le délégué de toute situation ou condition visée à l’article 67. 93 SOR/95-191 — September 29, 2014 (2) The part of the operations manual relating to the (2) La partie du manuel d’exploitation se rapportant subsea production system shall comply with the require- au système de production sous-marin doit être conforme ments of sections 7.4 and 7.5 of American Petroleum In- aux exigences des articles 7.4 et 7.5 du document RP stitute RP 17A, Recommended Practice for Design and 17A de l’American Petroleum Institute intitulé Recom- Operation of Subsea Production Systems. mended Practice for Design and Operation of Subsea SOR/2009-317, s. 101. Production Systems. DORS/2009-317, art. 101. 64. Every mobile platform shall be certified in accor- 64. La plate-forme mobile doit être certifiée selon la dance with the International Convention on Load Lines, convention internationale intitulée Conférence interna- 1966. tionale de 1966 sur les lignes de charge. 65. Every operator of an installation shall at all times 65. L’exploitant de l’installation doit exploiter celle- operate the installation in accordance with limitations ci conformément aux restrictions imposées par le certifi- imposed by the certificate of fitness and by these Regu- cat de conformité et le présent règlement et conformé- lations and in accordance with the operations manual. ment au manuel d’exploitation. 66. Every operator of an installation shall develop 66. L’exploitant de l’installation doit préparer et and implement an inspection and monitoring, a mainte- mettre en œuvre un programme d’inspection et de sur- nance and a weight control program. veillance, un programme de maintenance et un pro- gramme de contrôle des poids. REPAIR, REPLACEMENT AND MODIFICATION OF INSTALLATIONS RÉPARATIONS, REMPLACEMENTS ET MODIFICATIONS DES INSTALLATIONS 67. (1) Subject to subsection (2), no holder of a cer- 67. (1) Sous réserve du paragraphe (2), il est interdit tificate of fitness in respect of an installation shall make au titulaire d’un certificat de conformité relatif à une ins- any repair, replacement or modification to the installa- tallation d’effectuer des réparations, des remplacements tion, or bring on board any equipment, that could affect ou des modifications à l’égard de l’installation ou the strength, stability, integrity, operability or safety of d’amener à bord de l’équipement susceptibles de modi- the installation, without the approval of the Chief and the fier la résistance, la stabilité, l’intégrité, le fonctionne- certifying authority. ment ou la sécurité de l’installation, sans l’approbation du délégué et de l’autorité. (2) In an emergency, the operator of an installation (2) En cas d’urgence, l’exploitant de l’installation may repair or modify the installation when the manager peut réparer ou modifier l’installation si le directeur de of the installation considers that the delay required to celle-ci considère que le délai exigé pour se conformer comply with subsection (1) would endanger personnel or au paragraphe (1) mettrait en danger le personnel ou the environment. l’environnement. (3) Where an operator makes a repair or modification (3) L’exploitant qui effectue des réparations ou des to an installation pursuant to subsection (2), the operator modifications à l’égard de l’installation conformément shall immediately notify the Chief and the certifying au- au paragraphe (2) doit sans délai en informer le délégué thority. et l’autorité. (4) The operator of an installation shall notify the cer- (4) L’exploitant de l’installation doit sans délai aviser tifying authority and the Chief immediately if the opera- l’autorité et le délégué s’il décèle une détérioration de 94 DORS/95-191 — 29 septembre 2014 tor notices any deterioration of the installation that could l’installation susceptible de nuire à la sécurité de l’instal- impair the safety of the installation or damage the envi- lation ou d’endommager l’environnement. ronment. DORS/2009-317, art. 102(F). SOR/2009-317, s. 102(F). REMEDIAL ACTION MESURES CORRECTIVES 68. Where an inspection reveals conditions that 68. Lorsqu’une inspection permet de relever des threaten the integrity of the foundation or platform of an conditions présentant un risque pour l’intégrité des fon- installation, the operator shall take remedial action to re- dations ou de la plate-forme de l’installation, l’exploitant store the integrity of the installation to the satisfaction of doit prendre les mesures correctives voulues pour réta- the certifying authority. blir l’intégrité de l’installation d’une manière jugée satis- SOR/2009-317, s. 102(F). faisante par l’autorité. DORS/2009-317, art. 102(F). PART V PARTIE V RECORDS AND REPORTING REGISTRES ET RAPPORTS GENERAL DISPOSITIONS GÉNÉRALES 69. The international system of units (SI) shall be 69. Le système international des unités de mesure used for recording the data and preparing the reports re- (SI) doit être utilisé pour l’enregistrement des données et quired by these Regulations. la préparation des rapports exigés en vertu du présent rè- glement. REPORT OF LOSS, EMERGENCY OR ACCIDENT RAPPORT DE PERTE, D’URGENCE OU D’ACCIDENT 70. (1) Every operator shall inform the Chief, by the 70. (1) L’exploitant doit informer le délégué, par les most rapid and practical means, of any situation or event moyens les plus rapides et les plus pratiques, de tout involving any danger or accident to a person or property, événement ou situation comportant un danger ou un ac- including loss of life, a missing person, serious injury to cident qui met en cause une personne ou un bien, notam- a person, an imminent threat to safety of personnel or the ment la perte de vies, la disparition de personnes, des public, fire, explosion, loss of well control, hydrocarbon personnes grièvement blessées, une menace imminente or toxic fluid spills, or significant damage to a pipeline, pour la sécurité du personnel ou du public, un incendie, equipment or an installation. une explosion, la perte de maîtrise d’un puits, des déver- sements d’hydrocarbures ou de fluides toxiques ou des dommages majeurs à un pipeline, à un équipement ou à une installation. (2) Every operator shall submit a full written report to (2) L’exploitant doit soumettre au délégué aussitôt the Chief of any situation or event referred to in subsec- que possible un rapport écrit complet de tout événement tion (1) as soon as practicable. ou situation visés au paragraphe (1). (3) Every operator shall inform the Chief by the most (3) L’exploitant doit, au moins 24 heures avant le dé- rapid and practical means, at least twenty-four hours be- but de l’une des opérations suivantes, informer le délé- 95 SOR/95-191 — September 29, 2014 fore any of the following events is scheduled to take gué, par les moyens les plus rapides et les plus pratiques, place, of the time and place and the nature of the event: de l’heure, du lieu et de la nature de l’opération : (a) start of “tow out” of an installation; a) le début du remorquage d’une installation vers son (b) any lift at a production site in excess of 500 emplacement; tonnes; and b) le levage de plus de 500 tonnes métriques à un em- (c) the up-ending or setting on bottom of an installa- placement de production; tion. c) le redressement ou la mise en place d’une installa- tion. PART VI PARTIE VI OFFENCES INFRACTIONS 71. The contravention of any of the provisions of 71. Toute contravention aux dispositions des parties Parts IV and V is an offence under the Act. IV ou V constitue une infraction à la Loi. 96