Northwest Territories Mining Regulations
Text as of 2026-09-28
Public law and official guidance, published as research. Not legal, tax or financial advice.
About this law
- Kind
- Regulation
- Number
- SOR/2014-68
- Issued by
- Department of Justice Canada (Justice Laws Website consolidation)
- Country
- Canada
- Subjects
- Mineral resources
- Keywords
- mining, legal proceedings/administrative proceedings, enforcement/compliance, authorization/permit, Indigenous Peoples
- Categories
- metals-base, metals-precious, minerals-critical
Where to read it
Text
The law's own text, section by section, as held. Each section has its own link.
Section 1 Article 1 environmental baseline studies means a description of a) des frais de déplacement à l’extérieur du Canada selected environmental attributes that existed before des personnes qui ont exécuté les travaux et du mineral exploration or mining development and that are matériel utilisé; used to establish a benchmark from which to measure changes to the environment. Selected environmental at- b) des droits, taxes et impôts versés à un ordre de tributes include meteorologic, hydrologic and hydro-geo- gouvernement ou à un organisme public; logic attributes, surface water and groundwater quality, aquatic resources, soil profiling, ecosystems, wildlife and c) du coût du jalonnement ou de l’enregistrement wildlife habitat, cultural heritage and archaeology. d’un claim; (études environnementales de base) d) des frais juridiques; exploration cost means an expense incurred for the e) des frais d’administration. (cost of work) purpose of determining the existence, location, extent, quality or economic potential of a mineral deposit in the études environnementales de base Études décrivant Northwest Territories, but does not include an expense diverses caractéristiques de l’environnement présent incurred for the purpose of bringing a mine into produc- avant les activités d’exploration minière ou d’exploitation tion. (frais d’exploration) minière qui serviront d’indice de référence pour mesurer les changements sur celui-ci, notamment les caractéris- fiscal year, in respect of a mine, means the fiscal period tiques météorologiques, hydrologiques et hydrogéolo- of the mine’s operator as that period is defined in section giques, la qualité des eaux de surface et des eaux souter- 249.1 of the Income Tax Act. (exercice) raines, les ressources aquatiques, le profil des sols, l’écosystème, la faune et l’habitat ainsi que le patrimoine holder of the surface rights means the lessee or regis- culturel et archéologique. (environmental baseline stud- tered holder of the surface rights to the land. (titulaire ies) des droits de surface) évaluateur des redevances minières Personne chargée legal post means a post, tree or mound of stones set up au nom du ministre de déterminer la valeur des miné- in accordance with section 26 to serve as a boundary raux ou minéraux traités produits par une mine. (mining post, corner post or witness post. (borne légale) royalty valuer) licence means a licence to prospect referred to in section exercice S’agissant d’une mine, l’exercice de l’exploitant 3. (licence) au sens de l’article 249.1 de la Loi de l’impôt sur le reve- nu. (fiscal year) mine means an undertaking that produces or has pro- duced minerals or processed minerals from lands within fiducie de restauration minière Fiducie qui est établie the Northwest Territories Mining District, and includes à l’égard d’une mine et qui, selon le cas, est créée : the depreciable assets that are located in the Northwest Territories and used in connection with the undertaking. a) pour l’application du paragraphe 72.11(1) de la (mine) Loi sur la gestion des ressources de la vallée du Mac- kenzie; mineral means any naturally occurring inorganic sub- stance found in the Northwest Territories Mining Dis- b) à titre de condition : trict, including frac sand, but excluding material the tak- ing of which is regulated under the Territorial (i) soit d’un bail accordé en vertu du Règlement Quarrying Regulations. (minéral) sur les terres territoriales, mining property means (ii) soit d’un contrat conclu avec le ministre relati- vement à la restauration ou à la gestion environne- (a) a recorded claim or a leased claim within the mentale d’une propriété minière, boundaries of which a mine or part of a mine is situat- ed; or (iii) soit d’un permis délivré en vertu de la partie 3 ou 4 de la Loi sur la gestion des ressources de la (b) a group of contiguous recorded or leased claims vallée du Mackenzie ou en vertu du Règlement sur within the boundaries of which a mine or part of a l’utilisation des terres territoriales. (mining recla- mine is situated and mation trust) Current to September 3, 2026 2 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Interpretation Définitions et interprétation
Section 1 Article 1 (i) that belong to the same owner, or formule prescrite Toute formule prescrite par le mi- nistre en vertu de l’article 28 de la Loi. (prescribed form) (ii) if the mine is operated as a joint venture, that are owned exclusively by the members of the joint fraction non amortie venture or parties related to the members of the joint venture, regardless of the degree of ownership a) Dans le cas d’une déduction pour amortissement, of each recorded claim or leased claim. (propriété le coût d’origine des actifs amortissables à l’égard des- minière) quels la déduction est réclamée, duquel est soustrait toute déduction pour amortissement réclamée au mining reclamation trust means a trust that is estab- préalable à leur égard; lished for a mine and that is created b) dans le cas d’une déduction relative à l’aménage- (a) for the purposes of subsection 72.11(1) of the ment, la fraction non amortie des frais admissibles à la Mackenzie Valley Resource Management Act; or déduction visés à l’alinéa 70(1)i); (b) as a condition of c) dans le cas d’une déduction relative à la contribu- tion effectuée au profit d’une fiducie de restauration (i) a lease issued under the Territorial Lands Reg- minière, le total de toutes les contributions effectuées ulations, au profit de la fiducie duquel est soustrait toute déduc- tion réclamée au préalable. (undeducted balance) (ii) a contract with the Minister relating to the reclamation or environmental management of a frais d’exploration Toutes les dépenses engagées en vue mining property, or de déterminer l’existence, l’emplacement, l’étendue, la qualité ou le potentiel économique d’un gisement de mi- (iii) a permit issued under Part 3 or 4 of the néraux dans les Territoires du Nord-Ouest. Sont exclus Mackenzie Valley Resource Management Act or de la présente définition les frais de démarrage d’une under the Territorial Land Use Regulations. (fidu- mine. (exploration cost) cie de restauration minière) jour ouvrable Jour qui n’est ni un samedi, ni un jour fé- Mining Recorder means the person designated by the rié. (business day) Minister as the Mining Recorder. (registraire minier) licence Licence de prospection visée à l’article 3. (li- mining royalty valuer means a person acting on the cence) Minister’s behalf for the purpose of ascertaining the val- ue of minerals or processed minerals produced from a liées Se dit de plusieurs personnes qui sont, selon le mine. (évaluateur des redevances minières) cas : owner, in respect of a recorded claim, leased claim, mine a) des personnes liées au sens de l’article 251 de la or mining property, means any person with a legal or Loi de l’impôt sur le revenu, compte non tenu de l’ali- beneficial interest in the recorded claim, leased claim, néa 251(5)b); mine or mining property. (propriétaire) b) des sociétés associées au sens de l’article 256 de precious stone means a diamond, a sapphire, an emer- cette loi, compte non tenu du paragraphe 256(1.4); ald or a ruby. (pierre précieuse) c) des personnes affiliées au sens de l’article 251.1 de prescribed form means a form prescribed by the Minis- cette loi; ter under section 28 of the Act. (formule prescrite) d) sauf pour l’application du paragraphe 74(1), des processing means crushing, grinding, flotation, benefi- propriétaires ou des exploitants de la même mine. (re- ciation, concentrating, milling, roasting, smelting, leach- lated) ing, recrystallization or refining performed on minerals, and if the output of a mine is precious stones, cleaning Loi La Loi sur les terres territoriales. (Act) and sorting that output. (traitement) mine Ouvrage produisant ou ayant produit des miné- processing assets means tailings disposal facilities and raux ou des minéraux traités à partir des terres situées depreciable assets that are located in the Northwest dans le district minier des Territoires du Nord-Ouest, y Current to September 3, 2026 3 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Interpretation Définitions et interprétation
Section 1 Article 1 Territories and that are used directly and exclusively in compris les actifs amortissables qui sont situés dans les processing. (biens utilisés pour le traitement) Territoires du Nord-Ouest et qui sont utilisés en relation avec cet ouvrage. (mine) related, in respect of two or more persons, means that the persons are minéral Toute substance inorganique existant dans la nature, y compris le sable de fracturation, et se trouvant (a) related persons within the meaning of section 251 dans le district minier des Territoires du Nord-Ouest, à of the Income Tax Act, read without reference to para- l’exception des matières dont l’extraction est régie par le graph 251(5)(b) of that Act; Règlement sur l’exploitation de carrières territoriales. (mineral) (b) associated corporations within the meaning of section 256 of the Income Tax Act, read without refer- pierre précieuse Diamant, saphir, émeraude ou rubis. ence to subsection 256(1.4) of that Act; (precious stone) (c) affiliated persons within the meaning of section propriétaire S’agissant d’un claim enregistré, d’un claim 251.1 of the Income Tax Act; or enregistré visé par un bail, d’une mine ou d’une propriété minière, toute personne y ayant un intérêt en common (d) other than for the purpose of subsection 74(1), law ou un intérêt bénéficiaire. (owner) owners or operators of the same mine. (liées) propriété minière Selon le cas : Supervising Mining Recorder means the person desig- nated by the Minister as the Supervising Mining a) claim enregistré ou claim enregistré visé par un Recorder. (registraire minier en chef) bail, dans les limites duquel se trouve tout ou partie d’une mine; undeducted balance means b) groupe de claims enregistrés contigus — visés ou (a) in respect of a depreciation allowance, the origi- non par un bail — dans les limites duquel se trouve nal cost of the depreciable assets in respect of which tout ou partie d’une mine et qui : the depreciation allowance is claimed, less any depre- ciation allowances previously claimed in respect of (i) soit appartient au même propriétaire, those assets; (ii) soit appartient en exclusivité aux membres (b) in respect of a development allowance, the unde- d’une coentreprise ou aux personnes qui leur sont ducted balance of costs eligible for a development al- liées, si la mine est exploitée en coentreprise, quel lowance under paragraph 70(1)(i); and que soit le degré de participation des membres dans les claims ou les baux. (mining property) (c) in respect of a mining reclamation trust contribu- tion allowance, the total of all contributions made to registraire minier Personne désignée à ce titre par le the mining reclamation trust, less any allowances pre- ministre. (Mining Recorder) viously claimed. (fraction non amortie) registraire minier en chef Personne désignée à ce titre witness post means a legal post set up in accordance par le ministre. (Supervising Mining Recorder) with section 29 to provide reference to the corner of a claim or a plot of land that is being staked for the pur- titulaire des droits de surface S’entend du titulaire des pose of making it a claim. (borne témoin) droits de surface enregistré ou le preneur à bail. (holder of the surface rights) work means (a) any of the following undertakings that are per- traitement Concassage, pulvérisation, flottation, enri- formed in respect of a recorded claim — including, for chissement, concentration, broyage, grillage, fusion, les- the purposes of subsection 39(2), before the recorded sivage, recristallisation ou affinage effectué sur des miné- claim existed — or within the zone of a prospecting raux et, si une mine produit des pierres précieuses, permit, for the purpose of assessing its mineral poten- épuration et tri de celles-ci. (processing) tial: travaux Selon le cas : (i) examination of outcrops and surficial deposits, Current to September 3, 2026 4 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Interpretation Définitions et interprétation
Section 1 Article 1 (ii) excavation, a) l’un des types de travaux ci-après qui sont exécutés à l’égard d’une zone visée par un permis de prospec- (iii) sampling, tion ou d’un claim enregistré — ou, pour l’application du paragraphe 39(2), d’un claim qui n’a pas encore été (iv) geochemical study or analysis, enregistré — en vue d’en évaluer le potentiel minéral : (v) drilling, (i) l’examen d’affleurements rocheux et de dépôts de surface, (vi) geological mapping, (ii) l’excavation, (vii) geophysical study or analysis, (iii) l’échantillonnage, (viii) remote sensing, if one or more undertakings set out in subparagraphs (i) to (vii) have been per- (iv) les études ou les analyses géochimiques, formed to evaluate the results of the remote sensing and are reported on, together with the remote sens- (v) le forage, ing, in accordance with subsection 15(2) or 41(1), (vi) la cartographie géologique, (ix) the placing of grid lines in the field for the purpose of performing any of the undertakings re- (vii) les études ou les analyses géophysiques, ferred to in subparagraphs (i) to (vii), (viii) la télédétection, si des travaux visés aux (x) petrography, sous-alinéas (i) à (vii) ont été entrepris pour éva- luer les résultats de télédétection et qu’ils ont fait, (xi) data analysis, map generation and preparation avec ceux de télédétection, l’objet d’un même rap- of reports that are submitted under these Regula- port présenté conformément aux paragraphes tions in respect of undertakings referred to in sub- 15(2) ou 41(1), paragraphs (i) to (viii) and (x); (ix) l’établissement sur le terrain de lignes de réfé- (b) any of the following undertakings that are per- rence à l’appui des travaux visés aux sous-alinéas formed in respect of a recorded claim: (i) à (vii), (i) the preparation of a plan of survey under para- (x) la pétrographie, graph 57(1)(a), (xi) l’analyse de données, la production de cartes (ii) the building of roads, airstrips or docks for the et la préparation de rapports en application du pré- purpose of performing any of the undertakings re- sent règlement à l’égard des travaux visés aux sous- ferred to in paragraph (a); and alinéas (i) à (viii) et (x); (c) environmental baseline studies that are conduct- b) l’un des types de travaux ci-après qui sont exécutés ed in conjunction with undertakings referred to in à l’égard d’un claim enregistré : subparagraphs (a)(i) to (vii) and (ix) or subparagraph (b)(ii), as well as analysis of the data resulting from (i) la préparation du plan d’arpentage visé à l’ali- the studies, map generation and the preparation of an néa 57(1)a), appendix as required in paragraph 4(t) of Schedule 2. (travaux) (ii) la construction de routes, de quais et de pistes d’atterrissage effectuée afin de réaliser l’un des tra- vaux visés à l’alinéa a); c) les études environnementales de base réalisées en même temps que des travaux visés à l’un des sous-ali- néas a)(i) à (vii) et (ix) ou b)(ii), l’analyse des données résultant de ces études, la production de cartes et la préparation de l’annexe visée à l’alinéa 4t) de l’annexe 2. (work) Current to September 3, 2026 5 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Interpretation Définitions et interprétation Sections 1-4 Articles 1-4 Related person Personne liée (2) For the purposes of these Regulations, a person who (2) Pour l’application du présent règlement, une per- is related to another person is considered to be also relat- sonne liée à une autre est considérée comme étant égale- ed to any person to whom the other person is related. ment liée à toute personne liée à cette autre personne. Application Application Northwest Territories Mining District District minier des Territoires du Nord-Ouest 2 These Regulations apply in respect of the Northwest 2 Le présent règlement s’applique au district minier des Territories Mining District, the area of which is described Territoires du Nord-Ouest dont la superficie est décrite à in Schedule 1 to the Northwest Territories Mining Dis- l’annexe 1 du Décret sur les districts miniers des Terri- trict and Nunavut Mining District Order. toires du Nord-Ouest et du Nunavut. Licence to Prospect Licence de prospection Issuance of licence Délivrance 3 (1) The Mining Recorder must issue a licence to 3 (1) Le registraire minier délivre une licence de pros- prospect to a person who has applied for one and paid pection aux personnes ci-après qui en font la demande et the applicable fee set out in Schedule 1 if the person is qui paient les droits applicables prévus à l’annexe 1 : (a) an individual who is 18 years of age or older; or a) les personnes physiques âgées d’au moins dix-huit ans; (b) a company that is incorporated or registered un- der the Business Corporations Act, S.N.W.T. 1996, c. b) les personnes morales constituées ou enregistrées 19, or that is incorporated under the Canada Business sous le régime de la Loi sur les sociétés par actions, Corporations Act. L.T.N.-O. 1996, ch. 19, ou constituées sous le régime de la Loi canadienne sur les sociétés par actions. Licence not transferable Licence non transférable (2) A licence is not transferable. (2) La licence n’est pas transférable. Licence valid for one year Période de validité (3) A licence is valid from the date of its issue until (3) Elle est valide à compter de la date de sa délivrance March 31 following the date of its issue or, if renewed be- jusqu’au 31 mars suivant cette date ou, si elle est renou- fore March 31, for a period of one year beginning on velée avant le 31 mars, pour une période d’un an com- April 1 following the date of its renewal. mençant le 1er avril suivant la date du renouvellement. Copy of licence Copie (4) A licensee may, on request and payment of the appli- (4) Le titulaire de la licence peut, sur demande et paie- cable fee set out in Schedule 1, obtain from the Mining ment des droits applicables prévus à l’annexe 1, en obte- Recorder a copy of their licence. nir une copie auprès du registraire minier. Licence authorization — licensee or agent Autorisations découlant de la licence — titulaire ou personne autorisée 4 (1) Only a licensee or a person authorized to act on 4 (1) Seul le titulaire d’une licence ou une personne au- behalf of a licensee may torisée à agir en son nom peut : (a) prospect for the purpose of staking a claim; or a) faire de la prospection dans le but de jalonner un claim; (b) undertake the staking of a claim. b) entreprendre le jalonnement d’un claim. Current to September 3, 2026 6 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Licence to Prospect Licence de prospection Sections 4-5 Articles 4-5 Licence authorization — licensee Autorisations découlant de la licence — titulaire (2) Only a licensee may (2) Seul le titulaire d’une licence peut : (a) make an application to record a claim; a) présenter une demande d’enregistrement de claim; (b) make an application for a prospecting permit; b) présenter une demande de permis de prospection; (c) be issued a written confirmation under subsection 15(11), a certificate of extension under subsection c) obtenir une confirmation écrite au titre du para- 42(2) or a certificate of work under subsection 47(1); graphe 15(11), un certificat de prolongation au titre du paragraphe 42(2) ou un certificat de travaux au (d) be issued a lease of a recorded claim or a renewal titre du paragraphe 47(1); of such a lease; and d) prendre à bail un claim enregistré ou renouveler (e) acquire, by themself or with another licensee, a un tel bail; prospecting permit, recorded claim or lease of a recorded claim. e) acquérir, seul ou avec un autre titulaire de licence, un permis de prospection, un claim enregistré ou un bail à l’égard d’un tel claim. Prohibitions Respecting Interdictions relatives à la Prospecting, Staking and Mining prospection, au jalonnement de claims et aux activités minières Lands not open for prospecting or staking Terres exclues de toute prospection ou de tout jalonnement de claim 5 It is prohibited to prospect or stake a claim on any of 5 Il est interdit de prospecter les terres ci-après ou d’y the following lands: jalonner un claim : (a) lands used as a cemetery; a) celles servant de cimetière; (b) lands covered by a prospecting permit, a recorded b) celles visées par un permis de prospection, un claim or a lease of a recorded claim, unless the claim enregistré ou un bail à l’égard d’un tel claim, à prospecting or staking is done by the permittee, claim moins d’être le titulaire du permis de prospection, le holder or lessee; détenteur du claim ou le preneur à bail; (c) lands for which the minerals have been granted by c) celles dont les minéraux ont été concédés par la the Crown; Couronne; (d) lands subject to a prohibition on prospecting or d) celles faisant l’objet d’une interdiction de prospec- staking a claim under a land use plan that has been ter ou de jalonner prévue dans un plan d’aménage- approved under federal legislation or under a land ment approuvé sous le régime d’une loi fédérale ou claims agreement; d’un accord de revendication territoriale; (e) lands that have been withdrawn from disposal or e) celles qui sont déclarées inaliénables ou qui sont set apart and appropriated by the Governor in Council réservées par le gouverneur en conseil en vertu des ali- under paragraphs 23(a) to (e) of the Act; néas 23a) à e) de la Loi; (f) lands that are mentioned in subsections 22(1) and f) celles qui sont visées aux paragraphes 22(1) ou 52(5), section 56, subsection 67(2) and section 85 that 52(5), à l’article 56, au paragraphe 67(2) ou à l’article are not open for prospecting or staking. 85 et qui ne sont pas rouvertes à la prospection ou au jalonnement de claim. Current to September 3, 2026 7 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prohibitions Respecting Prospecting, Staking and Mining Interdictions relatives à la prospection, au jalonnement de claims et aux activités minières Sections 6-8 Articles 6-8 Surface rights — prohibition respecting entry Droits de surface — interdiction d’accéder à la surface 6 If the surface rights to lands have been granted or 6 Il est interdit d’accéder à la surface d’une terre afin d’y leased by the Crown, it is prohibited to go on the surface faire de la prospection ou d’y jalonner un claim si les of those lands to prospect or stake a claim unless droits de surface de cette terre ont été concédés ou cédés à bail par la Couronne, sauf si : (a) the holder of the surface rights has consented to entry for the prospecting or staking; or a) le titulaire des droits de surface y a consenti; (b) a tribunal competent to deal with surface rights in b) un tribunal compétent en matière de droits de sur- the Northwest Territories has made an order that au- face dans les Territoires du Nord-Ouest a rendu une thorizes entry on those lands and that sets the com- ordonnance autorisant l’accès à cette terre et, le cas pensation, if any, to the surface holder. échéant, prévoyant une indemnisation. Prohibition on removing minerals Interdiction de déplacer des minéraux 7 (1) It is prohibited to remove minerals or processed 7 (1) Il est interdit de déplacer des minéraux ou miné- minerals from, or develop a mine within, the area of a raux traités à l’extérieur d’un claim enregistré ou d’un recorded claim or a leased claim, except in the case of the claim enregistré visé par un bail ou d’aménager des holder of the recorded claim or the lessee. mines dans les limites d’un tel claim à moins d’en être le détenteur ou le preneur à bail. Limitation respecting holder of a recorded claim Limites imposées au détenteur d’un claim enregistré (2) It is prohibited to remove minerals or processed (2) Il est interdit de déplacer des minéraux ou minéraux minerals whose gross value exceeds $100,000 from a traités à l’extérieur d’un claim enregistré qui n’est pas vi- recorded claim that is not subject to a lease issued under sé par un bail délivré en application du paragraphe 60(5) subsection 60(5) or a renewal issued under subsection ou renouvelé en application du paragraphe 62(4) si leur 62(4), except if the removal is for the purposes of assay valeur brute s’élève à plus de 100 000 $, sauf pour des es- and testing to determine the existence, location, extent, sais ou des épreuves visant à établir l’existence, l’empla- quality or economic potential of a mineral deposit within cement, l’étendue, la qualité ou le potentiel économique the claim. d’un dépôt minéral dans les limites du claim. Prohibition on construction and disposal Interdiction de construire et de créer des zones de dépôt (3) It is prohibited to erect on a recorded claim any (3) Il est interdit de construire un bâtiment devant ser- building to be used as a dwelling or any mill, concentra- vir d’habitation, une usine de broyage, un concentrateur tor or other mine building, or to create any tailings or ou tout autre bâtiment minier sur un claim enregistré ou waste disposal area for the purpose of the commence- d’y créer une zone de dépôt de résidus ou de stériles aux ment of production from a mine, unless the claim holder fins de la production initiale d’une mine sauf si le déten- has been issued a lease of the surface rights to, or a grant teur du claim a obtenu un bail des droits de surface de la of, the land covered by the claim. terre visée par le claim ou une concession de cette terre. Prospecting Permits Permis de prospection Prospecting permit zones Zones de permis de prospection 8 (1) The mining district is divided into prospecting 8 (1) Le district minier est divisé en zones de permis de permit zones based on the National Topographic System prospection déterminées selon le Système national de ré- of Canada. Each zone consists of one quarter of the area férence cartographique du Canada. Ces zones sont cha- shown on a claim staking sheet and is designated as the cune constituées du quart de l’étendue indiquée sur une northeast, southeast, southwest or northwest quarter. feuille de jalonnement d’un claim et sont désignées : nord-est, sud-est, sud-ouest et nord-ouest. Current to September 3, 2026 8 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection Sections 8-9 Articles 8-9 Definition of claim staking sheet Définition de feuille de jalonnement (2) In this section, claim staking sheet means (2) Pour l’application du présent article, feuille de ja- lonnement s’entend : (a) south of 68° north latitude, a map of zones bounded on the north and south by 15-minute inter- a) au sud du 68e parallèle de latitude nord, d’une vals of latitude and on the east and west by 30-minute carte d’une région délimitée au nord et au sud à des intervals of longitude; and intervalles de 15 minutes de latitude et, à l’est et à l’ouest, à des intervalles de 30 minutes de longitude; (b) north of 68° north latitude, a map of zones bounded on the north and south by 15-minute inter- b) au nord du 68e parallèle de latitude nord, d’une vals of latitude and on the east and west by one-degree carte d’une région délimitée au nord et au sud à des intervals of longitude. intervalles de 15 minutes de latitude et, à l’est et à l’ouest, à des intervalles de 1 degré de longitude. Application for prospecting permit Demande de permis 9 (1) A licensee may apply to the Mining Recorder for a 9 (1) Le titulaire de licence peut demander au regis- prospecting permit for the exclusive right to prospect and traire minier un permis de prospection qui lui accorde le stake claims in a prospecting permit zone specified in the droit exclusif de prospecter et de jalonner des claims application. dans la zone de permis de prospection précisée dans la demande. Requirements for application Exigences (2) An application for a prospecting permit must (2) La demande de permis de prospection : (a) be in the prescribed form; a) est faite selon la formule prescrite; (b) be received by the Mining Recorder between b) doit être reçue par le registraire minier au plus tôt February 1 and close of business on the last business le 1er février et au plus tard à la fermeture des bureaux day of November before the year in which it is to com- le dernier jour ouvrable de novembre de l’année qui mence; précède celle au cours de laquelle le permis doit prendre effet; (c) be accompanied by payment of the applicable fee set out in Schedule 1; and c) est accompagnée des droits applicables prévus à l’annexe 1; (d) include a description of the work proposed to be carried out. d) est accompagnée d’une description des travaux que le demandeur entend exécuter. Payment of charge Prix à payer (3) In addition, the licensee must pay to the Mining (3) Le demandeur paye au registraire minier le prix visé Recorder the charge referred to in subparagraph 14(a)(i) au sous-alinéa 14a)(i) ou b)(i), selon le cas. or (b)(i), as the case may be. Remission Remise (4) If a charge has been paid under subsection (3) but (4) Une remise d’une somme égale au prix payé en ap- no prospecting permit is issued with respect to the appli- plication du paragraphe (3) est accordée si le permis de cation, the charge is remitted. prospection n’est pas délivré. Repayment Remboursement (5) Any charge referred to in subparagraph 14(a)(i) or (5) Le prix visé au sous-alinéa 14a)(i) ou b)(i) qui a été (b)(i) that has been paid to the Mining Recorder and that payé au registraire minier et qui fait l’objet d’une remise is remitted under this section must be repaid by the Min- en application du présent article est remboursé par le mi- ister to the person entitled to it. nistre à qui de droit. Current to September 3, 2026 9 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection Sections 10-11 Articles 10-11 Zones excluded Permis ne pouvant être délivré pour certaines zones 10 A prospecting permit must not be issued in respect of 10 Aucun permis de prospection à l’égard d’une zone a prospecting permit zone if, at close of business on the n’est délivré si, à la fermeture des bureaux le dernier jour last business day of January in the year the permit is to ouvrable du mois de janvier de l’année au cours de la- be issued, either of the following situations exists: quelle le permis doit être délivré, l’une des situations ci- après existe : (a) there are recorded claims or leased claims or ap- plications to record claims in that zone and the total a) des claims enregistrés, des claims visés par des area covered by those claims exceeds 1250 hectares; baux ou des claims faisant l’objet de demandes d’enre- gistrement sont situés dans cette zone et la superficie (b) there are recorded claims or leased claims in that totale de ces claims est supérieure à 1 250 hectares; zone and the total area covered by those claims is 1250 hectares or less and, in the five years preceding b) des claims enregistrés ou des claims visés par des that day, either of the following has happened with re- baux sont situés dans cette zone, la superficie totale de spect to any of those recorded claims or leased claims: ces claims est égale ou inférieure à 1 250 hectares et, dans les cinq années précédant ce jour, l’une des situa- (i) work has been done with respect to any of the tions ci-après s’est produite : recorded claims and has been reported on under section 41 of these Regulations or under section 41 (i) des travaux ont été exécutés à l’égard d’un of the Northwest Territories and Nunavut Mining claim enregistré situé dans cette zone et ont fait Regulations, l’objet d’un rapport visé à l’article 41 ou d’un état des travaux obligatoires visé à l’article 41 du Règle- (ii) there has been a transfer recorded under sec- ment sur l’exploitation minière dans les Territoires tion 66 of a majority of the interest in the recorded du Nord-Ouest et au Nunavut, claim or lease to a person who was not, immediate- ly before the transfer, recorded as a holder of the (ii) un transfert enregistré en application de l’ar- claim or lease and who is not related to anyone who ticle 66 de la majorité des intérêts dans un claim was, immediately before the transfer, a holder of enregistré ou un bail visant un claim enregistré si- the claim or lease. tué dans cette zone a eu lieu au profit d’une per- sonne qui n’était ni enregistrée comme détenteur du claim ou du bail en cause, ni liée à aucun des dé- tenteurs du claim ou du bail en cause immédiate- ment avant le transfert. Priority Priorité 11 (1) If two or more applications for a prospecting 11 (1) Si au moins deux demandes de permis de pros- permit are made in respect of a prospecting permit zone, pection sont présentées à l’égard d’une même zone, le re- the Mining Recorder must, in issuing a prospecting per- gistraire minier délivre le permis selon l’ordre de priorité mit, give priority to suivant : (a) firstly, applications presented in person at the of- a) premièrement, les demandes présentées en per- fice of the Mining Recorder on the first business day of sonne à son bureau le premier jour ouvrable de no- November, in the order of their receipt; vembre, selon l’ordre de réception; (b) secondly, applications — other than those dealt b) deuxièmement, les demandes, autre que celles vi- with in paragraph (a) — received by the Mining sées à l’alinéa a), qu’il a reçues avant le deuxième jour Recorder before the second business day of Novem- ouvrable de novembre et auxquelles un rang a été at- ber, in the order of their drawing from a lottery of tribué par tirage au sort parmi les demandes reçues; those applications; and c) troisièmement, les autres demandes qu’il a reçues (c) lastly, all other applications received after the first après le premier jour ouvrable de novembre, selon business day of November, in the order of their receipt l’ordre de réception ou, si celui-ci ne peut être établi, by the Mining Recorder, or, if the order of receipt of selon le rang qui leur est attribué par tirage au sort applications cannot be determined, then in the order parmi les demandes reçues. of their drawing from a lottery of those applications. Current to September 3, 2026 10 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection Sections 11-14 Articles 11-14 Issuance Délivrance (2) The Mining Recorder must issue the prospecting (2) Le permis est délivré dans les plus brefs délais après permit as soon as possible after January 31 in the year le 31 janvier de l’année qui suit celle au cours de laquelle following the receipt of the application. celle-ci a été reçue. Identification number Numéro d’identification du permis (3) The Mining Recorder must assign an identification (3) Le registraire minier assigne un numéro d’identifica- number to each prospecting permit. tion à chaque permis délivré. Exclusion of claim from permit zone Zone amputée visée par le permis (4) The area covered by a prospecting permit must be (4) La zone visée par le permis de prospection est ampu- modified by removing the area covered by a recorded tée de la superficie de tout claim enregistré situé dans claim within that zone if cette zone si les exigences ci-après sont remplies : (a) the claim was staked within the zone before the a) le claim a été jalonné dans cette zone avant la déli- permit was issued; and vrance du permis; (b) the application to record the claim was made after b) la demande d’enregistrement de ce claim a été pré- the permit was issued. sentée après la délivrance du permis. Duration of prospecting permits Période de validité 12 A prospecting permit takes effect on the first day of 12 Le permis de prospection prend effet le 1er février de February in the year it is issued and expires at the end of l’année de sa délivrance et expire à la fin du mois de jan- January vier : (a) three years later, in the case of a permit in respect a) de la troisième année suivante, s’il vise une zone of a zone located south of 68° north latitude; or située au sud du 68e parallèle de latitude nord; (b) five years later, in the case of a permit in respect b) de la cinquième année suivante, s’il vise une zone of a zone located north of 68° north latitude. située au nord du 68e parallèle de latitude nord. Notice respecting prospecting permits Affichage — permis de prospection 13 On or before the fifth business day in February, a no- 13 Au plus tard le cinquième jour ouvrable de février, tice must be posted in the Mining Recorder’s office iden- un avis est affiché dans le bureau du registraire minier tifying the zones in respect of which prospecting permits indiquant les zones pour lesquelles des permis de pros- were issued that year in the mining district. pection ont été délivrés pour l’année en cours dans le dis- trict minier. Charges for prospecting permit Prix à payer — permis de prospection 14 The following charges must be paid for a prospecting 14 Doit être payé pour le permis de prospection : permit: a) si la zone visée par le permis est située au sud du (a) for a prospecting permit zone located south of 68° 68e parallèle de latitude nord : north latitude, (i) le prix correspondant au produit du nombre (i) before the close of business on the last business d’hectares compris dans cette zone par 0,25 $, à ac- day of November in the year in which the applica- quitter avant la fermeture des bureaux le dernier tion for the permit is made, an amount equal to the jour ouvrable du mois de novembre de l’année au number of hectares in the permit zone multiplied cours de laquelle la demande de permis est présen- by $0.25, tée, (ii) before the start of the second year of the per- mit, an amount equal to the number of hectares in the permit zone multiplied by $0.50, and Current to September 3, 2026 11 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection Sections 14-15 Articles 14-15 (iii) before the start of the third year of the permit, (ii) le prix correspondant au produit du nombre an amount equal to the number of hectares in the d’hectares compris dans cette zone par 0,50 $, à ac- permit zone multiplied by $1.00; and quitter avant le début de la deuxième année de validité du permis, (b) for a prospecting permit zone north of 68° north latitude, (iii) le prix correspondant au produit du nombre d’hectares compris dans cette zone par 1,00 $, à ac- (i) before the close of business on the last business quitter avant le début de la troisième année de vali- day of November of the year in which the applica- dité du permis; tion for the permit is made, an amount equal to the number of hectares in the permit zone multiplied b) si la zone visée par le permis est située au nord du by $0.25, 68e parallèle de latitude nord : (ii) before the start of the third year of the permit, (i) le prix correspondant au produit du nombre an amount equal to the number of hectares in the d’hectares compris dans cette zone par 0,25 $, à ac- permit zone multiplied by $0.50, and quitter avant la fermeture des bureaux le dernier jour ouvrable du mois de novembre de l’année au (iii) before the start of the fifth year of the permit, cours de laquelle la demande de permis est présen- an amount equal to the number of hectares in the tée, permit zone multiplied by $1.00. (ii) le prix correspondant au produit du nombre d’hectares compris dans cette zone par 0,50 $, à ac- quitter avant le début de la troisième année de vali- dité du permis, (iii) le prix correspondant au produit du nombre d’hectares compris dans cette zone par 1,00 $, à ac- quitter avant le début de la cinquième année de va- lidité du permis. Report on work to obtain remission Rapport sur les travaux aux fins de remise 15 (1) A permittee who has done work in respect of a 15 (1) Le titulaire d’un permis de prospection qui a zone for which they have a prospecting permit may re- exécuté des travaux à l’égard de la zone visée par son per- quest remission of the charges the permittee has paid or mis peut demander la remise d’une somme égale au prix is obligated to pay for that permit under section 14 by payé ou à payer en application de l’article 14 sur présen- submitting a report on the work to the Mining Recorder tation au registraire minier d’un rapport sur ces travaux no later than 60 days after the expiry of the permit. au plus tard le soixantième jour suivant l’expiration de son permis. Preparation of report Préparation du rapport (2) The report must be prepared in accordance with Part (2) Il est préparé conformément à la partie 1 de l’annexe 1 of Schedule 2, but if the report deals only with excava- 2 et, dans le cas où il porte uniquement sur des travaux tion, sampling or the examination of outcrops and surfi- d’examen d’affleurements rocheux et de dépôts de sur- cial deposits — or any combination of them — and the face, d’excavation ou d’échantillonnage, ou toute combi- cost of work is less than $10,000, the report may be a naison de ceux-ci, dont le coût des travaux total est infé- simplified report prepared in accordance with Part 2 of rieur à 10 000 $, il peut être préparé sous forme de Schedule 2. rapport simplifié conformément à la partie 2 de l’annexe 2. Signature of report Signature (3) The report must be prepared and signed (3) Il est préparé et signé : (a) in the case of a simplified report, by the individual a) dans le cas du rapport simplifié, par la personne who performed or supervised the work; or qui a exécuté les travaux ou les a supervisés; Current to September 3, 2026 12 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection
Section 15 Article 15 (b) in all other cases, by a professional geoscientist or b) dans les autres cas, par un géoscientifique ou un a professional engineer as those terms are defined in ingénieur au sens du paragraphe 1(1) de la Loi sur les subsection 1(1) of the Engineering and Geoscience professions d’ingénieur et de géoscientifique, L.N.T.- Professions Act, S.N.W.T. 2006, c. 16. O. 2006, ch. 16. Associated documents Documents complémentaires (4) The following must be submitted with the report: (4) Il est accompagné des documents suivants : (a) a statement of work in the prescribed form; a) un énoncé des travaux présenté sur la formule prescrite; (b) a table setting out the cost of work by type of work, together with, for each type of work, details of b) un tableau indiquant le coût des travaux selon le the costs sufficient to enable evaluation of the report type de travaux exécutés et, pour chaque type, suffi- in accordance with subsection (8); and samment de détails pour permettre l’examen visé au paragraphe (8); (c) a table setting out the cost of work that is at- tributable to each permit. c) un tableau indiquant le coût des travaux attribué à chacun des permis. Details of costs Détails du coût des travaux (5) In respect of the details of the costs, (5) Le coût indiqué dans les détails fournis ne peut excé- der : (a) if a permittee uses their own equipment to per- form work, the cost claimed in relation to that equip- a) s’agissant de l’équipement, si le titulaire du permis ment must not be more than the cost of leasing similar utilise son propre équipement pour exécuter les tra- equipment for the period that the equipment was used vaux, le coût de location d’un équipement semblable in performing the work; and pour la période pendant laquelle l’équipement a été utilisé pour les exécuter; (b) if a permittee personally performs work, the cost claimed in relation to that work must not be more b) s’agissant des travaux, si le titulaire du permis les than an amount equal to the cost of engaging another exécute lui-même, une somme égale à celle qu’il aurait person to do that work. dû payer à une autre personne pour exécuter les mêmes travaux. Record keeping Conservation des documents justificatifs (6) The permittee must keep all supporting documents (6) Le titulaire du permis conserve tous les documents used to justify the cost of work and make them available justificatifs du coût des travaux et donne, sur demande on request by the Mining Recorder until the permittee du registraire minier, accès à ces documents jusqu’à ce has received a confirmation under subsection (11). qu’il reçoive la confirmation visée au paragraphe (11). Work reported once Rapport unique (7) Work reported in one report must not be reported in (7) Les travaux dont fait état le rapport ne peuvent faire any other report. l’objet d’un autre rapport. Evaluation of report Vérification du coût des travaux (8) The Mining Recorder must evaluate the report to de- (8) Le registraire minier examine le rapport, vérifie qu’il termine its compliance with Schedule 2 and the cost of est conforme à l’annexe 2 et établit la somme attribuée au work to be entered in a written confirmation of the cost coût des travaux à indiquer dans la confirmation écrite of work under subsection (11). du coût des travaux visée au paragraphe (11). Current to September 3, 2026 13 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection Sections 15-17 Articles 15-17 Supporting documents Documents justificatifs (9) If the Mining Recorder requests supporting docu- (9) Le registraire minier qui demande des documents ments that justify the cost of work reported, the Mining justificatifs du coût des travaux en avise par écrit le titu- Recorder must notify the permittee in writing and must laire du permis et indique le coût des travaux pour lequel specify the cost of work for which such documents are re- ils sont demandés. quested. Lack of justification Coût des travaux non justifié (10) If the permittee does not, within four months after (10) Si le titulaire du permis ne fournit pas les docu- the day the notification is sent, provide the supporting ments justificatifs demandés dans les quatre mois sui- documents requested, the cost of work to which they re- vant la date d’envoi de l’avis, le coût des travaux pour le- late must be considered to be unjustified. quel de tels documents sont demandés est considéré ne pas être justifié. Justified cost of work and allocation Coût des travaux justifié et attribution (11) After completing the evaluation of a report, the (11) Une fois l’examen terminé, le registraire minier Mining Recorder must provide to the permittee a written fournit au titulaire du permis une confirmation écrite du confirmation of the cost of work that has been justified in coût des travaux qui a été justifié dans le rapport et, dans the report and, if a request for allocation of the cost has le cas où une demande d’attribution du coût des travaux been made under subsection 17(5), of the amounts allo- a été présentée au titre du paragraphe 17(5), le détail de cated in accordance with the request. l’attribution effectuée conformément à cette demande. Request for deferral of charge and extension of Paiement différé et prolongation du permis permit 16 (1) If a permittee is unable to do work with respect 16 (1) Le titulaire d’un permis de prospection qui est, to a prospecting permit zone because the permittee is, for en raison de circonstances indépendantes de sa volonté, reasons beyond the permittee’s control, waiting for a dans l’attente d’une autorisation ou décision préalable public authority to give an authorization or decision d’une autorité publique et qui, de ce fait, se trouve dans without which the work cannot proceed, the permittee l’impossibilité d’exécuter des travaux à l’égard de la zone may request an extension of one year for the payment of visée par son permis peut demander que le paiement exi- the charge under section 14 and the duration of the per- gé à l’article 14 soit différé pour une période d’un an et mit. que la durée de validité du permis soit prolongée pour la même période. Requirements respecting request Présentation de la demande (2) The request must be made in writing to the Super- (2) La demande est présentée par écrit au registraire mi- vising Mining Recorder before the next charge under sec- nier en chef avant l’échéance du paiement subséquent tion 14 is payable and must be accompanied by docu- prévu à l’article 14 et est accompagnée de documents dé- ments showing that the permittee is waiting for the montrant que le titulaire du permis est dans l’attente de authorization or decision. l’autorisation ou de la décision. Recording of extension Consignation du paiement différé et de la prolongation (3) If the requirements of subsection (2) have been met, (3) Si les exigences prévues au paragraphe (2) sont rem- the Supervising Mining Recorder must record the exten- plies, le registraire minier en chef consigne le paiement sion. différé et la prolongation dans le registre. Grouping of prospecting permits Groupement de permis de prospection 17 (1) Prospecting permits may be grouped for the pur- 17 (1) Des permis de prospection peuvent être groupés pose of allocating the cost of work done with respect to pour l’attribution du coût des travaux, si les exigences ci- them if après sont remplies : a) le groupement vise au plus quatre permis; Current to September 3, 2026 14 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection
Section 17 Article 17 (a) there are no more than four permits in the group; b) les zones visées par ceux-ci sont situées, en tout ou and en partie, dans un rayon de 32 km. (b) the zones of the grouped permits are wholly or partly within a circle having a radius of 32 kilometres. Requirements respecting request Présentation de la demande (2) A request to group prospecting permits must be sub- (2) La demande de groupement de permis de prospec- mitted in writing to the Mining Recorder. It must be tion est présentée par écrit au registraire minier, signée signed by each of the permittees and be accompanied by par tous les titulaires des permis, et est accompagnée des the applicable fee set out in Schedule 1. droits applicables prévus à l’annexe 1. Grouping certificate Certificat de groupement (3) If the requirements of subsections (1) and (2) are (3) Si les exigences prévues aux paragraphes (1) et (2) met, the Mining Recorder must issue a grouping certifi- sont remplies, le registraire minier délivre un certificat de cate to each of the permittees. groupement à chacun des titulaires de permis. Duration of grouping certificate Période de validité (4) A grouping certificate takes effect on the day on (4) Le certificat de groupement prend effet à la date du which the fee is submitted under subsection (2) and ceas- paiement des droits visés au paragraphe (2) et cesse es to have effect on the earlier of d’avoir effet à celle des dates ci-après qui est antérieure à l’autre : (a) the 120th day after the day that any permit in the group expires or is cancelled, and a) le cent vingtième jour suivant la date d’expiration ou d’annulation d’un des permis de prospection visé (b) the day on which a new grouping certificate in re- par le certificat; spect of any permit in the group takes effect. b) la date à laquelle prend effet un nouveau certificat de groupement à l’égard d’un des permis de prospec- tion. Allocation of cost of work within group Attribution du coût des travaux à un des permis de prospection groupés (5) On request by any of the permittees referred to in a (5) Sur demande de l’un des titulaires de permis visés grouping certificate, the Mining Recorder must allocate, par un certificat de groupement, le registraire minier at- in accordance with the request, the cost of work that has tribue, conformément à la demande, le coût des travaux b e e n justified in a report in respect of any of the qui a été justifié dans un rapport à l’égard de tout permis prospecting permits referred to in the grouping certifi- de prospection visé par le certificat aux permis de pros- cate to those permits. pection visé par ce certificat. Limit on reallocation Limite de réattribution (6) The cost of work allocated under subsection (5) must (6) Le coût des travaux attribué au titre du paragraphe not be reallocated to any prospecting permit referred to (5) ne peut être réattribué à un permis de prospection vi- in another grouping certificate. sé par un autre certificat de groupement. Allocation not permitted Attribution non permise (7) The cost of work set out in a confirmation under sub- (7) Le coût des travaux indiqué dans la confirmation vi- section 15(11) with respect to a prospecting permit that sée au paragraphe 15(11) fournie à l’égard d’un permis was not, when the confirmation was provided, referred to de prospection qui n’était pas visé par un certificat de in a grouping certificate must not be allocated to any oth- groupement au moment où elle a été fournie ne peut être er prospecting permit. attribué à un autre permis de prospection. Current to September 3, 2026 15 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection Sections 18-21 Articles 18-21 Application to record claim in prospecting permit Demande d’enregistrement d’un claim dans une zone zone de permis de prospection 18 (1) A permittee may apply to record a claim wholly 18 (1) Le titulaire d’un permis de prospection ne peut or partially within the permittee’s prospecting permit présenter une demande d’enregistrement d’un claim si- zone only if a confirmation under subsection 15(11) re- tué — en tout ou en partie — dans la zone visée par son specting that zone has been provided setting out a cost of permis que si la confirmation visée au paragraphe 15(11) work equal to or greater than the number of hectares in lui a été fournie établissant que le coût des travaux qui y the permit zone multiplied by $0.25. ont été exécutés est égal ou supérieur au produit du nombre d’hectares compris dans cette zone par 0,25 $. Exclusion of claim from permit zone Superficie exclue de la zone de permis (2) When a claim referred to in subsection (1) has been (2) La superficie du claim visé au paragraphe (1) qui a recorded, the area covered by the claim no longer forms été enregistré ne fait plus partie de la zone visée par ce part of the permit zone. permis. Excess cost of work transferrable to claim Coût excédentaire des travaux transférable (3) If the cost of work that has been justified in a report (3) Lorsque le coût des travaux justifié dans un rapport with respect to a prospecting permit exceeds the charges à l’égard d’un permis de prospection est supérieur au prix remitted under subsection 19(2), the permittee may re- qui fait l’objet d’une remise en application du paragraphe quest the Mining Recorder to allocate the excess cost of 19(2), le titulaire du permis de prospection peut deman- work to work required under subsection 39(1) on a claim der au registraire minier que l’excédent soit attribué au referred to in subsection (1). The request must be in the coût des travaux à exécuter en application du paragraphe prescribed form and be accompanied by the fee for a cer- 39(1) à l’égard du claim visé au paragraphe (1). La de- tificate of work set out in Schedule 1. mande est présentée sur la formule prescrite et est ac- compagnée des droits prévus à l’annexe 1 pour la déli- vrance d’un certificat de travaux. Remission of charge Remise 19 (1) If a confirmation in respect of a prospecting per- 19 (1) Lorsque la confirmation visée au paragraphe mit is provided under subsection 15(11), the portion of 15(11) est fournie à l’égard d’un permis de prospection, the charges paid or payable under section 14 that does remise est accordée — en tout ou en partie — d’une not exceed the cost of work set out in the confirmation is somme égale au prix payé ou à payer en application de remitted. l’article 14. Le montant de la remise ne peut excéder le coût des travaux indiqué dans la confirmation. To whom remission is payable Remboursement (2) Any charge referred to under section 14 that has (2) Le prix visé à l’article 14 qui a été payé au registraire been paid to the Mining Recorder and that is remitted minier et qui fait l’objet d’une remise en application du under this section must be repaid by the Minister to the présent article est remboursé par le ministre à qui de person entitled to it. droit. Cancellation of permit on request Demande d’annulation du permis de prospection 20 A permittee may submit to the Mining Recorder a 20 Le titulaire d’un permis de prospection peut deman- written request for cancellation of their prospecting per- der par écrit au registraire minier l’annulation de son mit. The cancellation takes effect at the end of January permis. L’annulation prend effet à la fin du mois de jan- after it is requested. vier qui suit la demande. Cancellation of permit for non-payment Annulation pour défaut de paiement 21 If any charge payable under section 14 is not paid 21 Le permis de prospection est annulé si le prix visé à when due, the prospecting permit is cancelled. l’article 14 n’est pas payé à la date d’échéance. Current to September 3, 2026 16 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Prospecting Permits Permis de prospection Sections 22-24 Articles 22-24 Effect of expiration or cancellation of permit Effets de l’annulation ou de l’expiration 22 (1) The lands that were covered by a prospecting 22 (1) Les terres visées par un permis de prospection permit that has expired or has been cancelled are open expiré ou annulé sont rouvertes à la prospection et au ja- for prospecting and staking at noon on the day following lonnement à midi le lendemain du premier jour ouvrable the first business day after the day on which the permit suivant la date d’expiration ou d’annulation. expired or was cancelled. Temporary prohibition relating to former permittee Interdictions temporaires visant le titulaire du permis annulé ou expiré (2) For one year after a prospecting permit expires or is (2) Pendant l’année suivant la date d’expiration ou d’an- cancelled, the former permittee and any person related to nulation d’un permis de prospection, la personne qui en the former permittee are not permitted to était titulaire et toute personne qui lui est liée ne peuvent : (a) apply for a prospecting permit for a zone, or apply to record a claim, that covers any part of the area that a) présenter une demande de permis de prospection was covered by the expired or cancelled permit; or à l’égard d’une zone ou une demande d’enregistrement d’un claim si la zone ou le claim sont situés, en tout ou (b) acquire a legal or beneficial interest in a prospect- en partie, dans la zone visée par le permis expiré ou ing permit or claim referred to in paragraph (a). annulé; b) acquérir un intérêt en common law ou un intérêt bénéficiaire à l’égard du permis de prospection ou du claim visés à l’alinéa a). Claims Claims Size, Boundaries and Marking of a Superficie, limites et marquage des Claim claims Area of claim — excluded lands Superficie d’un claim — terres exclues 23 (1) The area of a claim must not exceed 1250 23 (1) La superficie d’un claim ne peut dépasser 1 250 hectares and must not include any lands referred to in hectares, et aucune des terres visées à l’article 5 ne peut section 5. en faire partie. Shape and boundaries of claim Forme et limites d’un claim (2) Every claim must, as nearly as possible, meet all of (2) Le claim est le plus conforme possible aux exigences the following specifications: suivantes : (a) it is rectangular in shape; a) il est de forme rectangulaire; (b) its boundaries run north, south, east and west as- b) les limites sont orientées selon les directions astro- tronomically; nomiques nord, sud, est et ouest; (c) the length of each boundary is 500 metres or a c) les limites sont chacune d’une longueur égale à multiple of 500 metres; 500 m ou à un de ses multiples; (d) the length of the longest boundary is not more d) aucune limite ne peut dépasser cinq fois la lon- than five times the length of the shortest. gueur d’une autre limite. Identification tags Plaques d’identification 24 (1) On payment of the applicable fee set out in 24 (1) Sur paiement des droits applicables prévus à Schedule 1, the Mining Recorder must issue a set of four l’annexe 1, le registraire minier remet un ensemble de identification tags, with the following inscriptions, for quatre plaques d’identification servant à identifier les Current to September 3, 2026 17 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Size, Boundaries and Marking of a Claim Superficie, limites et marquage des claims Sections 24-26 Articles 24-26 use in identifying the corners of a claim — “NE 1” for the angles d’un claim et portant les inscriptions suivantes : northeast corner, “SE 2” for the southeast corner, “SW 3” « NE 1 » pour l’angle nord-est, « SE 2 » pour l’angle sud- for the southwest corner and “NW 4” for the northwest est, « SW 3 » pour l’angle sud-ouest et « NW 4 » pour corner. l’angle nord-ouest. Reduced-area tags Plaques d’identification — claim de superficie réduite (2) On payment of the applicable fee set out in Schedule (2) Sur paiement des droits applicables prévus à l’an- 1, the Mining Recorder must issue a set of four reduced- nexe 1, le registraire minier remet un ensemble de quatre area tags for use in marking the corners of a reduced- plaques servant à identifier les angles d’un claim visé à area claim referred to in section 52. l’article 52 dont la superficie est réduite. Identification number Numéro d’identification (3) Each identification tag in a set must contain a unique (3) Tout ensemble de quatre plaques d’identification identification number for the set. porte un numéro d’identification unique. Marking of boundaries Marquage des limites d’un claim 25 (1) The boundaries and corners of a claim must be 25 (1) Les limites et les angles d’un claim sont marqués marked by legal posts in accordance with sections 26 to de bornes légales conformément aux articles 26 à 30. 30. Marking in treed area Marquage en région boisée (2) In a treed area, the boundaries of a claim must be (2) Dans les régions boisées, les limites du claim sont, marked along as much of the length as it is possible to sur la plus grande longueur possible, débroussaillées et mark by cutting underbrush and flagging or blazing trees. marquées d’une encoche sur les arbres ou d’un ruban at- taché aux arbres. Legal Posts Bornes légales Requirements for legal post Exigences 26 (1) A legal post must be one of the following: 26 (1) Les bornes légales sont constituées : (a) in a treed area, a) dans les régions boisées : (i) a post of sound wood planted firmly in an up- (i) d’un poteau de bois sain qui est solidement right position and standing not less than one metre planté dans le sol en position verticale, dont la par- above the ground, with at least the upper 30 cen- tie visible mesure au moins 1 m de haut et dont la timetres squared off so that each face of the partie supérieure — mesurant au moins 30 cm — squared portion is not less than four centimetres in est équarrie de façon que chaque face mesure au width, or moins 4 cm de large, (ii) a tree found in position and cut off not less (ii) d’un arbre qui se trouve à l’endroit voulu, cou- than one metre above the ground, with at least the pé à au moins 1 m au-dessus du sol et dont la partie upper 30 centimetres squared off so that each face supérieure — mesurant au moins 30 cm — est of the squared portion is not less than four centime- équarrie de façon que chaque face mesure au moins tres in width; 4 cm de large; (b) in a treeless area, a post described in subpara- b) dans les régions non boisées, du poteau visé au graph (a)(i) or a mound of stones that is not less than sous-alinéa a)(i) ou d’un monticule de pierres dont le one metre in diameter at the base and not less than 50 diamètre au sol est d’au moins 1 m et dont la hauteur centimetres in height. est d’au moins 50 cm. Current to September 3, 2026 18 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Legal Posts Bornes légales Sections 26-27 Articles 26-27 Requirements when mounds of stones are used Exigences — monticules de pierres (2) If a legal post is a mound of stones, then (2) Lorsque la borne légale est constituée d’un monti- cule de pierres : (a) a reference to a tag being secured to that post is to be read as a reference to a tag being inserted in a shat- a) la mention selon laquelle la plaque d’identification terproof and waterproof container secured in the apex est fixée solidement à cette borne vaut mention de « la of the mound; and plaque d’identification est insérée dans un récipient incassable et étanche fixé solidement au sommet du (b) a reference to information being inscribed on that monticule »; post is to be read as a reference to information being clearly and indelibly written on paper or inscribed on b) la mention selon laquelle les renseignements sont durable material and inserted in a shatterproof and inscrits sur cette borne vaut mention de « les rensei- waterproof container secured in the apex of the gnements ci-après sont inscrits de manière claire et mound. indélébile sur du papier ou sur une matière durable et sont insérés dans un récipient incassable et étanche fixé solidement au sommet du monticule ». Boundary post Bornes de délimitation 27 (1) Subject to subsection (2), boundary posts must 27 (1) Sous réserve du paragraphe (2), les bornes de be erected at intervals of not more than 500 metres along délimitation sont dressées à intervalles d’au plus 500 m the boundaries of a claim. le long des limites d’un claim. Obstructions in boundary line Obstacle (2) If, because of the presence of a body of water or oth- (2) Lorsqu’une borne de délimitation ne peut être dres- er natural obstruction or lands on which entry for staking sée sur la ligne de délimitation d’un claim en raison de la has not been authorized by the holder of the surface présence de terres dont l’accès pour y jalonner un claim rights, it is not practicable to erect a boundary post on n’a pas été autorisé par le titulaire des droits de surface, the boundary line of the claim, a boundary post must be d’une étendue d’eau ou d’un autre obstacle naturel, elle erected on the boundary line on each side of the body of est dressée sur la ligne de délimitation du claim de water or natural obstruction or lands. chaque côté de ces terres, de l’étendue d’eau ou de l’obs- tacle naturel. Common boundary post Borne de délimitation commune (3) When two or more claims are staked at the same (3) Lorsque deux claims ou plus sont jalonnés en même time by or on behalf of the same licensee and have a com- temps par un même titulaire de licence ou en son nom et mon boundary, a single boundary post may be erected to qu’ils ont une limite commune, une seule borne de déli- mark any common interval along the boundary. mitation peut être dressée pour marquer tout intervalle commun le long de cette limite. Numbering of boundary posts Numérotation en continu (4) Boundary posts must be numbered consecutively in (4) Les bornes de délimitation sont numérotées en a clockwise direction, commencing at “1” after the north- continu dans le sens des aiguilles d’une montre en com- east corner post, and recommencing at “1” after each mençant à un après la borne d’angle nord-est et en re- subsequent corner post. commençant à un après chaque borne d’angle. Information on boundary posts Renseignements inscrits (5) The name of the claim, the number referred to in (5) Le nom du claim, le numéro visé au paragraphe (4) subsection (4) and the following information must be in- et les renseignements ci-après sont inscrits sur toute scribed on each boundary post: borne de délimitation : (a) on the northern boundary, the letters “NBP” or a) sur la limite nord, les lettres « BLN » ou « NBP »; “BLN”; b) sur la limite est, les lettres « BLE » ou « EBP »; Current to September 3, 2026 19 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Legal Posts Bornes légales Sections 27-29 Articles 27-29 (b) on the eastern boundary, the letters “EBP” or c) sur la limite sud, les lettres « BLS » ou « SBP »; “BLE”; d) sur la limite ouest, les lettres « BLO » ou « WBP ». (c) on the southern boundary, the letters “SBP” or “BLS”; and (d) on the western boundary, the letters “WBP” or “BLO”. Corner post Borne d’angle 28 (1) Subject to section 29, corner posts must be 28 (1) Sous réserve de l’article 29, une borne d’angle erected at the four corners of a claim, and an identifica- est dressée à chacun des quatre angles du claim et la tion tag marked with the required inscription must be se- plaque d’identification portant l’inscription requise y est cured to each corner post. fixée solidement. Common corner post Borne d’angle commun (2) When two or more claims are staked at the same (2) Lorsque deux claims ou plus sont jalonnés en même time by or on behalf of the same licensee and have a com- temps par un même titulaire de licence ou en son nom et mon corner, a single corner post may be used to mark the qu’ils ont des angles communs, une seule borne d’angle common corner. The identification tag for each claim, peut être dressée pour marquer l’angle commun, mais les marked with the required inscription, must be secured to plaques d’identification portant l’inscription requise à the common corner post. l’égard de chacun des claims doivent y être fixées solide- ment. Information on corner posts Renseignements inscrits (3) The following information is to be clearly and indeli- (3) Les renseignements ci-après sont inscrits de manière bly inscribed on the identification tag of each corner post claire et indélébile sur la plaque d’identification de or, if there is insufficient room on the tag, on the post it- chaque borne d’angle ou, si l’espace y est insuffisant, sur self: la borne d’angle : (a) the name of the licensee for whom the claim is a) le nom du titulaire de la licence pour lequel le staked; claim est jalonné; (b) the name of the person who erected that post, if b) le nom de la personne qui a dressé la borne, si elle that person is not the licensee; n’est pas le titulaire de la licence; (c) the name of the claim; and c) le nom du claim; (d) the date and time that the post was erected. d) la date et l’heure auxquelles a été dressée la borne. Witness post Borne témoin 29 (1) If, because of the presence of a body of water or 29 (1) Lorsqu’une borne d’angle ne peut être dressée other natural obstruction or lands on which entry for en raison de la présence de terres dont l’accès pour y ja- staking has not been authorized by the holder of the sur- lonner un claim n’a pas été autorisé par le titulaire des face rights, it is not practicable to erect a corner post, a droits de surface, d’une étendue d’eau ou d’un autre obs- witness post must be erected at one of the following loca- tacle naturel, une borne témoin est dressée à l’un des en- tions: droits suivants : (a) on a boundary or an extension of a boundary of a) sur la limite du claim — ou sur son prolongement the claim and as near as practicable to the corner; — à l’endroit le plus près possible de l’angle de ce claim; (b) if it is not practicable to erect it at a location spec- ified in paragraph (a), at a location as near as practica- b) s’il est impossible en pratique de la dresser à l’en- ble to the corner. droit visé à l’alinéa a), à l’endroit le plus près possible de l’angle du claim. Current to September 3, 2026 20 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Legal Posts Bornes légales Sections 29-32 Articles 29-32 Corner post tag on witness post Plaque d’identification fixée à la borne témoin (2) The identification tag for the corner post must be at- (2) La plaque d’identification qui devrait être fixée à la tached to the witness post. borne d’angle en cause est fixée à la borne témoin. Additional information on witness post Renseignements complémentaires inscrits (3) In addition to the information referred to in subsec- (3) En plus des renseignements visés au paragraphe tion 28(3), the following information must be inscribed 28(3), le relèvement au compas, la distance en mètres, on the identification tag after the letters “WP”: the com- mesurée en ligne droite entre la borne témoin et l’endroit pass bearing and distance in metres, measured in a où la borne d’angle aurait été dressée n’eût été l’obstacle straight line, from the witness post to the location where au jalonnement, est inscrite à la suite des lettres « WP » the corner post would have been erected had it been sur la plaque d’identification. practicable to do so. Staked Claim Jalonnement du claim Requirements to complete staking Exigences pour achever le jalonnement 30 When the boundaries and corners of a claim have 30 Lorsque les limites et les angles du claim sont mar- been marked in accordance with sections 23 to 29, the qués conformément aux articles 23 à 29, la date et date and time of completion of the requirements of those l’heure où ces exigences ont été remplies ainsi que le nu- sections and the licence number of the licensee referred méro de licence du titulaire visé à l’alinéa 28(3)a) sont to in paragraph 28(3)(a) must be inscribed on the identi- inscrits sur la plaque d’identification de la borne d’angle fication tag of the northeast corner post or of the witness nord-est ou de la borne témoin marquant le même angle. post designating the northeast corner, as the case may Le claim est alors jalonné. be. The claim is then staked. Verification of staking Vérification 31 Compliance with the requirements set out in sections 31 Toute personne autorisée par le ministre à accomplir 23 to 30 may be verified by a person authorized by the des fonctions liées à l’exécution et au contrôle d’applica- Minister to perform any function related to the adminis- tion du présent règlement peut veiller au respect des exi- tration and enforcement of these Regulations. gences prévues aux articles 23 à 30. Moving Legal Posts and Modifying Déplacement de bornes légales et Information modification des renseignements Prohibition Interdictions 32 (1) Except as provided in subsections (2) and (3), it 32 (1) Sous réserve des paragraphes (2) et (3), il est in- is prohibited terdit : (a) to remove, displace or destroy a legal post; and a) de déplacer, d’enlever ou de détruire une borne lé- gale; (b) to remove, deface or alter an identification tag se- cured to a legal post or an inscription on a legal post. b) d’enlever, de détériorer ou de modifier une plaque d’identification qui y est fixée ou toute inscription qui y figure. Exception Exception (2) The claim holder, the holder of the surface rights or (2) Le détenteur du claim, le titulaire des droits de sur- a public authority may remove a legal post if the post is face ou une autorité publique peut enlever une borne lé- interfering with their use of the lands. gale si son emplacement gêne leur utilisation des terres sur lesquelles elle se trouve. Current to September 3, 2026 21 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Moving Legal Posts and Modifying Information Déplacement de bornes légales et modification des renseignements Sections 32-33 Articles 32-33 Notification Avis (3) If the holder of the surface rights or a public authori- (3) Le titulaire des droits de surface ou l’autorité pu- ty removes a legal post, they must, within 30 days after blique qui enlève une borne légale en avise le détenteur the removal, notify the claim holder and the Mining du claim et le registraire minier dans les trente jours sui- Recorder of the removal. vant l’enlèvement de la borne légale. Recording of a Claim Enregistrement du claim Application Demande 33 (1) Only the licensee for whom a claim has been 33 (1) Seul le titulaire de licence pour qui le claim a été staked may submit an application to the Mining jalonné peut présenter une demande d’enregistrement de Recorder to record the claim. ce claim au registraire minier. Prescribed form and time limit Formule et délai (2) The application must be made in the prescribed form (2) La demande est présentée au plus tard le soixan- within 60 days after the date on which the staking of the tième jour suivant la date à laquelle le jalonnement du claim is completed. claim est terminé, sur la formule prescrite. Fee and map Droits et cartes (3) The application must be accompanied by the appli- (3) La demande est accompagnée des droits applicables cable fee set out in Schedule 1 and a map or sketch at the prévus à l’annexe 1 et d’une carte ou d’un croquis, exécu- scale of 1:50 000 showing all of the following: té à une échelle de 1:50 000, qui indique ce qui suit : (a) the location of the claim in relation to permanent a) l’emplacement du claim selon les caractéristiques topographical features in the vicinity of the claim; topographiques permanentes de la région avoisinante; (b) any nearby prospecting permit zones, recorded b) toute zone visée par un permis de prospection, claims and leased claims; tout claim enregistré et tout claim enregistré visé par un bail qui sont situés près du claim; (c) the positions of the corner posts; c) l’emplacement des bornes d’angle; (d) the positions and numbers of the boundary posts; d) l’emplacement et le numéro des bornes de délimi- (e) the positions of any witness posts. tation; e) l’emplacement des bornes témoins, le cas échéant. Recording of claim Enregistrement (4) If the requirements of subsections (1) to (3) are met, (4) Si les exigences prévues aux paragraphes (1) à (3) the Mining Recorder must record the claim as soon as sont remplies, le registraire minier enregistre le claim practicable after the 60th day following the day on which dans les plus brefs délais après le soixantième jour sui- the staking is completed. The recording date is consid- vant la date à laquelle le jalonnement du claim est termi- ered to be the date that the application is received at the né. La date de la réception de la demande au bureau du Mining Recorder’s office. registraire minier tient lieu de date d’enregistrement du claim. Duration of claim Période de validité (5) Unless a recorded claim is leased under subsection (5) Sauf si un bail est délivré à son égard en application 60(5) or its recording is cancelled under subsection 50(2) du paragraphe 60(5) ou qu’il y ait annulation en applica- or 53(3) or section 54 or 55, the duration of a recorded tion des paragraphes 50(2) ou 53(3), ou des articles 54 claim is 10 years, beginning on its recording date, plus ou 55, le claim enregistré est valide à compter de la date any suspensions recorded under section 51 and any ex- de son enregistrement pour une période de dix ans, à la- tension under subsection 60(4). quelle s’ajoute toute période de prolongation inscrite Current to September 3, 2026 22 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Recording of a Claim Enregistrement du claim Sections 33-36 Articles 33-36 dans le registre en application de l’article 51 ou toute pé- riode de prolongation autorisée en application du para- graphe 60(4). Conflicting applications Demandes multiples 34 If applications have been submitted to record two or 34 Si plusieurs demandes d’enregistrement à l’égard more claims that overlap, the claim that is staked first in d’au moins deux claims qui se chevauchent sont présen- compliance with the staking requirements is the one that tées, seul le claim qui a été jalonné en premier conformé- must be recorded. ment aux exigences liées au jalonnement est enregistré. Claim recorded under the law of another province Claim enregistré sous le régime d’une loi provinciale 35 (1) If it is determined that lands covered by a min- 35 (1) Lorsqu’il est établi que des terres visées par un ing claim that is recorded or otherwise recognized under claim minier enregistré — ou dont l’existence est recon- the law regulating the disposition of mining interests in nue — en vertu d’une loi régissant la disposition d’inté- another province are wholly or partly in the Northwest rêts miniers en vigueur dans une autre province sont si- Territories Mining District, and if the portion in the tuées, en tout ou en partie, dans le district minier des Northwest Territories does not contain lands referred to Territoires du Nord-Ouest et qu’elles ne sont pas visées à in section 5, the claim holder may, within 90 days after l’article 5, le détenteur de ce claim peut, dans les quatre- the determination, apply to the Mining Recorder to have vingt-dix jours suivant cette constatation, présenter au the portion of the claim within the Northwest Territories registraire minier une demande d’enregistrement du recorded as a separate claim. claim ou de la partie de celui-ci située dans les Territoires du Nord-Ouest à titre de claim distinct. Limitation Hors délai (2) If an application to record the claim is not made (2) Si aucune demande d’enregistrement n’est présentée within the period set out in subsection (1), the lands that dans le délai prévu au paragraphe (1), les terres visées were covered by the claim and that are within the North- par le claim ou la partie de celui-ci et qui sont situées west Territories are considered to never have been cov- dans les Territoires du Nord-Ouest sont considérées ered by a claim. n’avoir jamais fait l’objet d’un claim. Recording date and time Enregistrement du claim et date (3) On receipt of an application made under subsection (3) Sur réception de la demande présentée au titre du (1) and the applicable fee set out in Schedule 1, the Min- paragraphe (1) et des droits applicables prévus à l’annexe ing Recorder must record the claim as soon as practica- 1, le registraire minier enregistre le claim dans les plus ble, using the date and time when the claim was recorded brefs délais et indique la date et l’heure auxquelles il a été or otherwise recognized under the law regulating the dis- enregistré — ou auxquelles son existence a été reconnue position of mining interests in the other province. — en vertu de la loi régissant la disposition d’intérêts mi- niers en vigueur dans l’autre province. Claim lying partly in another province Partie de claim située dans une autre province 36 If a plan of survey recorded under section 59 and 36 Lorsqu’un plan d’arpentage enregistré en application prepared with respect to a recorded claim shows that de l’article 59 et établi à l’égard d’un claim enregistré in- part of the claim is in another province, the Mining dique qu’une partie du claim est située dans une autre Recorder must reduce the boundaries of the claim in ac- province, le registraire minier réduit les limites de ce cordance with the plan, and must, as soon as practicable, claim en conséquence. Il en avise le détenteur du claim notify the claim holder of the reduction. dans les plus brefs délais. Current to September 3, 2026 23 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Dispute Respecting Recording of a Claim Contestation de l’enregistrement d’un claim Sections 37-38 Articles 37-38 Dispute Respecting Recording of a Contestation de l’enregistrement Claim d’un claim Notice of protest Avis de contestation 37 (1) If a person wants to dispute the recording of a 37 (1) La personne qui conteste l’enregistrement d’un claim, they must claim : (a) within one year after the day the disputed claim a) dépose auprès du registraire minier en chef, dans was recorded, file with the Supervising Mining l’année qui suit l’enregistrement du claim qu’elle Recorder a notice of protest in the prescribed form; conteste, un avis de contestation établi sur la formule and prescrite; (b) attest that they believe that they have, before the b) atteste qu’elle estime avoir jalonné en premier, en staking of the disputed claim, staked a claim on all or tout ou en partie, un claim sur les terres visées par le part of the area covered by the disputed claim. claim dont l’enregistrement est contesté. Priority based on time of staking Claim jalonné en premier (2) When the recording of a claim is disputed, the (2) En cas de contestation de l’enregistrement d’un recording of the area of the claim in dispute must be ac- claim, l’enregistrement de la superficie du claim en cause corded to the person who first staked the claim in accor- est accordé à la personne dont le claim a été jalonné en dance with these Regulations. premier conformément au présent règlement. Inquiry by Supervising Mining Recorder Enquête du registraire minier en chef 38 (1) When a notice of protest is filed, the Supervising 38 (1) Lorsqu’un avis de contestation lui est transmis, Mining Recorder must le registraire minier en chef : (a) send a copy of the notice by registered mail to the a) en envoie copie, par courrier recommandé, au dé- holder of the disputed claim; and tenteur du claim dont l’enregistrement est contesté; (b) inquire into the allegations contained in the no- b) enquête sur les allégations contenues dans l’avis tice of protest. de contestation. Powers related to the inquiry Pouvoirs (2) For the purposes of the inquiry, the Supervising (2) Dans le cadre de cette enquête, le registraire minier Mining Recorder may en chef peut : (a) summon and examine under oath any person a) convoquer des témoins et les interroger sous ser- whose attendance is considered necessary to the in- ment; quiry; b) obliger ces derniers à produire des documents; (b) compel the production of documents by witness- es; and c) prendre toutes les mesures utiles à l’enquête. (c) do all things necessary to provide a full and prop- er inquiry. Determination and reasons Décision motivée (3) After making the inquiry, the Supervising Mining (3) À l’issue de l’enquête, le registraire minier en chef Recorder must determine which claim was staked first décide quel claim a été jalonné en premier et fournit aux and must provide the parties and the Mining Recorder parties et au registraire minier, par écrit, les motifs de sa with written reasons for the determination. décision. Current to September 3, 2026 24 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Work Requirements Exigences relatives aux travaux Sections 39-41 Articles 39-41 Work Requirements Exigences relatives aux travaux Work required Exécution de travaux 39 (1) The holder of a recorded claim must do work 39 (1) Le détenteur d’un claim enregistré est tenu, au that incurs a cost of work that is equal to or greater than cours de la période applicable ci-après, d’exécuter des travaux et d’engager pour ce faire un coût des travaux (a) $10 per full or partial hectare in the claim during égal ou supérieur à ce qui suit : the two-year period following the day on which the claim is recorded; and a) 10 $ l’hectare ou partie d’hectare du claim au cours de la période de deux ans suivant la date d’enre- (b) $5 per full or partial hectare in the claim during gistrement du claim; each subsequent one-year period. b) 5 $ l’hectare ou partie d’hectare du claim au cours de toute période subséquente d’un an. Work before recording of claim Travaux déjà exécutés (2) Work that was done during the two years before the (2) Les travaux qui ont été exécutés au cours des deux claim was recorded is considered to be work done on the ans précédant l’enregistrement d’un claim comptent pour claim during the period referred to in paragraph (1)(a). la période visée à l’alinéa (1)a). Report of work or request for extension Rapport ou demande de prolongation 40 The claim holder must, no later than 90 days after 40 Le détenteur du claim présente au registraire minier, the end of the period during which the work referred to au plus tard le quatre-vingt-dixième jour suivant la fin de in subsection 39(1) must be done, submit to the Mining la période au cours de laquelle les travaux visés au para- Recorder graphe 39(1) doivent être exécutés, selon le cas : (a) a report of the work that has been done in respect a) un rapport sur les travaux exécutés à l’égard du of the claim; or claim; (b) an application for a one-year extension to do the b) une demande visant à prolonger la période d’exé- work. cution des travaux d’un an. Work Reports and Applications for Rapport sur les travaux exécutés et Extension demande de prolongation Report on work Rapport sur les travaux exécutés 41 (1) A report of the work that has been done in re- 41 (1) Le rapport sur les travaux qui ont été exécutés à spect of a claim must be prepared in accordance with l’égard d’un claim est préparé conformément à la partie 1 Part 1 of Schedule 2, but if the report deals only with ex- de l’annexe 2 et, dans le cas où il porte uniquement sur cavation, sampling or the examination of outcrops and des travaux d’examen d’affleurements rocheux et de dé- surficial deposits — or any combination of them — and pôts de surface, d’excavation ou d’échantillonnage, ou the cost of work is less than $10,000, the report may be a toute combinaison de ceux-ci, dont le coût des travaux simplified report prepared in accordance with Part 2 of est inférieur à 10 000 $, il peut être préparé sous forme Schedule 2. de rapport simplifié conformément à la partie 2 de l’an- nexe 2. Signature of report Signature (2) The report must be prepared and signed (2) Il est préparé et signé : (a) in the case of a simplified report, by the individual a) dans le cas du rapport simplifié, par la personne who performed or supervised the work; or qui a exécuté les travaux ou les a supervisés; Current to September 3, 2026 25 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Work Reports and Applications for Extension Rapport sur les travaux exécutés et demande de prolongation Sections 41-42 Articles 41-42 (b) in all other cases, by a professional geoscientist or b) dans les autres cas, par un géoscientifique ou un a professional engineer as those terms are defined in ingénieur au sens du paragraphe 1(1) de la Loi sur les subsection 1(1) of the Engineering and Geoscience professions d’ingénieur et de géoscientifique, L.N.T.- Professions Act, S.N.W.T. 2006, c. 16. O. 2006, ch. 16. Associated documents Documents complémentaires (3) The report must be accompanied by the fee for a cer- (3) Il est accompagné des droits prévus à l’annexe 1 tificate of work set out in Schedule 1 and the following pour la délivrance d’un certificat de travaux et des docu- documents: ments suivants : (a) a statement of work in the prescribed form; a) un énoncé des travaux présenté sur la formule prescrite; (b) a table setting out the cost of work by type of work, together with, for each type of work, details of b) un tableau indiquant le coût des travaux selon le the costs sufficient to enable evaluation of the report type de travaux exécutés et, pour chaque type, suffi- in accordance with subsection 44(1); and samment de détails pour permettre l’examen visé au paragraphe 44(1); (c) a table setting out the cost of work that is at- tributable to each claim. c) un tableau indiquant le coût des travaux attribué à chacun des claims. Claim holder’s equipment or work Équipement du détenteur du claim et travaux exécutés par ce dernier (4) If a holder of a recorded claim uses their own equip- (4) Si le détenteur du claim enregistré utilise son propre ment to perform work or personally performs work, équipement pour exécuter les travaux ou les exécute lui- même, le coût indiqué dans les détails fournis ne peut ex- (a) the cost claimed in relation to that equipment céder : must not be more than the cost of leasing similar equipment for the period that the equipment is used a) s’agissant de l’équipement, les frais de location in performing the work; and d’un équipement semblable pour la période pendant laquelle l’équipement a été utilisé pour les exécuter; (b) the cost claimed in relation to that work must not be more than an amount equal to the cost of engaging b) s’agissant des travaux, une somme égale à celle another person to do that work. qu’il aurait dû payer à une autre personne pour exécu- ter les mêmes travaux. Record keeping Conservation des documents justificatifs (5) The holder of a recorded claim must keep all sup- (5) Le détenteur du claim enregistré conserve tous les porting documents used to justify the cost of work and documents justificatifs du coût des travaux et donne, sur make them available on request by the Mining Recorder demande du registraire minier, accès à ces documents until the holder has received a certificate of work under jusqu’à ce qu’il reçoive le certificat de travaux visé à l’ali- paragraph 47(1)(a). néa 47(1)a). Work reported once Rapport unique (6) Work reported in one report must not be reported in (6) Les travaux dont fait état le rapport ne peuvent faire any other report. l’objet d’un autre rapport. Application for extension of time Demande de prolongation 42 (1) The application for a one-year extension referred 42 (1) La demande visée à l’alinéa 40b) est présentée to in paragraph 40(b) must be in the prescribed form and sur la formule prescrite et est accompagnée des droits ap- be accompanied by the applicable fee set out in Schedule plicables prévus à l’annexe 1 et du prix à payer pour cette 1 and the charge payable for that period under subsec- période visé au paragraphe 43(1). tion 43(1). Current to September 3, 2026 26 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Work Reports and Applications for Extension Rapport sur les travaux exécutés et demande de prolongation Sections 42-44 Articles 42-44 Certificate of extension Certificat de prolongation (2) If the requirements of subsection (1) are met, the (2) Si les exigences prévues au paragraphe (1) sont rem- Mining Recorder must issue to the claim holder a certifi- plies, le registraire minier délivre au détenteur du claim cate of extension for a one-year period to do the work, ex- u n certificat de prolongation de la période d’exécution cept that not more than three certificates of extension are des travaux d’un an; il ne peut toutefois en délivrer plus to be issued with respect to a claim. de trois à l’égard du même claim. Charges to Hold Recorded Claim and Prix à payer — claim enregistré et Assess Mineral Potential évaluation du potentiel minéral Charge Prix à payer 43 (1) The following charges apply to the right to hold a 43 (1) Le prix à payer pour l’octroi du droit de détenir recorded claim and assess its mineral potential: un claim enregistré et d’en évaluer le potentiel minéral est : (a) $10 per full or partial hectare in the claim during the two-year period following the day on which the a) 10 $ l’hectare ou partie d’hectare du claim, pour la claim is recorded; and période de deux ans suivant la date d’enregistrement du claim; (b) $5 per full or partial hectare in the claim for each subsequent one-year period. b) 5 $ l’hectare ou partie d’hectare du claim pour toute période subséquente d’un an. Payment Paiement (2) The claim holder must pay the charges in accordance (2) Le détenteur du claim est tenu de payer le prix with subsection 42(1) or 49(1), as the case may be. conformément aux paragraphes 42(1) ou 49(1), selon le cas. Evaluation of Report and Cost of Examen du rapport et coût des Work travaux Evaluation of report Examen du rapport 44 (1) The Mining Recorder must evaluate the report of 44 (1) Le registraire minier examine le rapport visé à work that is referred to in paragraph 40(a) to determine l’alinéa 40a) vérifie qu’il est conforme à l’annexe 2 et éta- its compliance with Schedule 2 and the cost of work to be blit le coût des travaux à indiquer dans le certificat de entered in a certificate of work under subsection 47(2). travaux visé au paragraphe 47(2). Supporting documents Documents justificatifs (2) If the Mining Recorder requests supporting docu- (2) Le registraire minier qui demande des documents ments that justify the cost of work reported, the Mining justificatifs du coût des travaux en avise par écrit le dé- Recorder must notify the holder of the recorded claim in tenteur du claim enregistré et indique le coût des travaux writing and must specify the cost of work for which the pour lequel ils sont demandés. documents are requested. Lack of justification Coûts des travaux non justifié (3) If the holder of the recorded claim does not, within (3) Si le détenteur du claim enregistré ne fournit pas les four months after the day the notification is sent, provide documents justificatifs demandés dans les quatre mois the supporting documents requested, the cost of work to suivant la date de l’envoi de l’avis, le coût des travaux which they relate must be considered to be unjustified. pour lequel ces documents sont demandés est considéré ne pas être justifié. Current to September 3, 2026 27 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Evaluation of Report and Cost of Work Examen du rapport et coût des travaux Sections 45-46 Articles 45-46 Allocation of excess cost of work Coûts des travaux excédentaires — demande d’attribution 45 (1) Subject to subsection (2), if a recorded claim is 45 (1) Sous réserve du paragraphe (2), lorsque, au mo- not grouped under section 46 and the cost of work that ment où le certificat de travaux est prêt à être délivré, le has been justified in a report in respect of that claim ex- coût des travaux exécutés à l’égard d’un claim enregistré ceeds the cost of work required to be done on it under — qui ne fait pas l’objet d’un groupement en vertu de l’ar- subsection 39(1) at the time the certificate of work re- ticle 46 — justifié dans un rapport excède le coût des tra- specting the report is ready to be issued, the Mining vaux qui doivent être exécutés en application du para- Recorder must allocate the excess cost of work to the graphe 39(1), le registraire minier attribue l’excédent à next period or periods for which work is still required to toute autre période suivant immédiatement cette période be done on the claim under subsection 39(1). à l’égard de laquelle des travaux doivent être exécutés en application de ce même paragraphe. Unallocated excess cost of work Excédent non attribué (2) At any time before the evaluation of the report has (2) Le détenteur du claim enregistré peut demander par been completed, the claim holder may submit a written écrit au registraire minier, en tout temps avant la fin de request to the Mining Recorder to not allocate the excess l’examen du rapport, soit de ne pas attribuer l’excédent, cost of work or to allocate it to fewer periods than would soit de l’attribuer à un nombre moindre de périodes que be required under subsection (1) and the Mining celui à l’égard duquel des travaux doivent être exécutés. Recorder must comply with the request. Le registraire minier procède selon ce qui est précisé dans la demande. Previous payment of charges Paiement précédent (3) A claim holder who has paid a charge in respect of a (3) Le détenteur du claim enregistré qui a acquitté le period under subsection 43(1) or 49(1) may submit a prix à payer prévu au paragraphe 43(1) ou 49(1) peut de- written request to the Mining Recorder that remission be mander par écrit au registraire minier que remise soit ac- granted of the charge in an amount equal to the excess cordée d’une somme égale à l’excédent. cost of work. Request re unallocated excess cost of work Demande d’attribution d’excédent non attribué (4) If an unallocated excess cost of work is recorded with (4) Lorsqu’un excédent non attribué à l’égard d’un claim respect to a recorded claim, the claim holder may submit enregistré est indiqué dans le registre, le détenteur du a request to the Mining Recorder to allocate that cost as claim peut demander au registraire minier d’attribuer cet specified in the request. The request must be in the pre- excédent selon ce qui est précisé dans la demande. Celle- scribed form and be accompanied by the fee for a certifi- ci est présentée sur la formule prescrite et est accompa- cate of work set out in Schedule 1. gnée des droits prévus à l’annexe 1 pour la délivrance d’un certificat de travaux. Allocation of unallocated excess cost of work Attribution d’excédent non attribué (5) If the unallocated excess cost of work is sufficient to (5) Si l’excédent non attribué à l’égard du claim enregis- comply with the request, the Mining Recorder must allo- tré faisant l’objet de la demande est suffisant, le regis- cate it in accordance with the request. traire minier attribue cet excédent conformément à la de- mande. Grouping of recorded claims Groupement de claims enregistrés 46 (1) Recorded claims may be grouped for the pur- 46 (1) Des claims enregistrés peuvent être groupés pose of allocating the cost of work done with respect to pour l’attribution du coût des travaux qui y sont exécutés, them if si les exigences ci-après sont remplies : (a) the claims are contiguous; a) les claims sont contigus; (b) the total area of the group does not exceed 5000 b) l a superficie totale du groupement n’excède pas hectares; and 5 000 hectares; Current to September 3, 2026 28 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Evaluation of Report and Cost of Work Examen du rapport et coût des travaux Sections 46-47 Articles 46-47 (c) none of the claims is leased. c) aucun des claims n’est visé par un bail. Request for grouping Présentation de la demande de groupement (2) A request to group recorded claims must be submit- (2) La demande de groupement de claims enregistrés est ted in the prescribed form to the Mining Recorder. It présentée au registraire minier sur la formule prescrite. must be signed by each of the claim holders and be ac- Elle est signée par tous les détenteurs de claim et est ac- companied by the applicable fee set out in Schedule 1. compagnée des droits applicables prévus à l’annexe 1. Grouping certificate Certificat de groupement de claims enregistrés (3) If the requirements of subsections (1) and (2) are (3) Si les exigences prévues aux paragraphes (1) et (2) met, the Mining Recorder must issue a grouping certifi- sont remplies, le registraire minier délivre un certificat de cate respecting the claims to each of the claim holders. groupement de claims enregistrés à chacun des déten- teurs de claim. Duration of certificate Période de validité (4) A grouping certificate takes effect on the day on (4) Le certificat de groupement prend effet à la date de which the fee under subsection (2) is received and ceases réception des droits visés au paragraphe (2) et cesse to have effect on the earliest of d’avoir effet à celle des dates ci-après qui est antérieure aux autres : (a) the day on which the recording of any claim in the group is cancelled, a) la date d’annulation de l’enregistrement de l’un des claims visés par le certificat; (b) the day on which a lease of any claim in the group takes effect, and b) la date d’entrée en vigueur d’un bail pris à l’égard d’un de ces claims; (c) the day on which a new grouping certificate in re- spect of any claim in the group takes effect. c) la date à laquelle prend effet un nouveau certificat de groupement à l’égard d’un de ces claims. Request for allocation re grouped claims Demande d’attribution des coûts (5) On request by a holder of a recorded claim listed in a (5) Sur demande de l’un des détenteurs de claim enre- grouping certificate, the Mining Recorder must allocate, gistré visés par un certificat de groupement, le registraire in accordance with the request, the cost of work that has minier attribue, conformément à la demande, le coût des been justified in a report in respect of any of the claims travaux qui a été justifié dans un rapport à l’égard de tout listed in the grouping certificate to any of the other claim visé par le certificat à tout autre claim visé par ce claims listed in the certificate, for any of the periods re- certificat pour toute période visée au paragraphe 39(1). ferred to in subsection 39(1). Presentation of request Présentation de la demande (6) A request must be in the prescribed form and, if it is (6) La demande est présentée sur la formule prescrite. Si not submitted with the report referred to in section 41, it elle n’est pas présentée en même temps que le rapport vi- must be accompanied by the fee for a certificate of work sé à l’article 41, elle est accompagnée des droits prévus à set out in Schedule 1. l’annexe 1 pour la délivrance d’un certificat de travaux. Limit on reallocation Limite de réattribution (7) The cost of work allocated to a recorded claim re- (7) Le coût des travaux attribué à un claim enregistré vi- ferred to in a grouping certificate must not be reallocated sé par un certificat de groupement ne peut être réattribué to any recorded claim referred to in another grouping à un autre claim enregistré visé par un autre certificat de certificate. groupement. Issuance of certificate of work Délivrance du certificat de travaux 47 (1) The Mining Recorder must issue a certificate of 47 (1) Le registraire minier délivre un certificat de tra- work in the following circumstances: vaux dans les cas suivants : Current to September 3, 2026 29 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Evaluation of Report and Cost of Work Examen du rapport et coût des travaux Sections 47-49 Articles 47-49 (a) when evaluation of a report respecting a recorded a) l’examen du rapport reçu à l’égard d’un claim en- claim has been completed; and registré est terminé; (b) when allocation of the cost of work under subsec- b) l’attribution d’une somme pour le coût des travaux tion 18(3), 45(1), (2) or (4) or 46(5) has been done. au titre des paragraphes 18(3), 45(1), (2) ou (4) ou 46(5) a été effectuée. Certificate of work respecting claim Certificat de travaux (2) A certificate of work respecting a claim must set out (2) Le certificat de travaux établit ce qui suit : (a) the cost of work; and a) le coût des travaux; (b) the allocation of the cost of work. b) la somme attribuée pour le coût des travaux. Remission of charge Remise du prix à payer 48 (1) Remission is granted of the charges paid or 48 (1) Remise est accordée d’une somme égale au prix payable in respect of a period referred to in section 43 in payé ou à payer en application de l’article 43 à l’égard de an amount equal to the cost of work allocated to the toute période qui y est visée et qui équivaut au coût des recorded claim during that period in the certificate of travaux attribué à un claim enregistré pour cette période work. dans le certificat de travaux. Remission in subsequent periods Remise pour toute période subséquente (2) If a holder of a recorded claim pays a charge in re- (2) Si le détenteur du claim enregistré paye le prix prévu spect of a period under subsection 43(1) or 49(1), remis- aux paragraphes 43(1) ou 49(1) et si le coût des travaux sion is granted of the portion of the charge that is equal attribué à l’égard d’un claim enregistré pour toute autre to the cost of work allocated to the claim during any sub- période subséquente excède le coût des travaux à engager sequent period that exceeds the cost of work required to pour cette période au titre du paragraphe 39(1), remise be done under subsection 39(1). est accordée de l’excédent. Repayment Remboursement (3) Any charge referred to in section 43 that has been (3) Le prix visé à l’article 43 qui a été payé au registraire paid to the Mining Recorder and that is remitted under minier et qui fait l’objet d’une remise en application du this section must be repaid by the Minister to the person présent article est remboursé par le ministre à qui de entitled to it. droit. Insufficient work Travaux exécutés insuffisants 49 (1) Subject to subsection (3), if a certificate of work 49 (1) Sous réserve du paragraphe (3), si le certificat de indicates that the cost of work is less than the amount re- travaux indique que le coût des travaux est moins élevé quired by subsection 39(1), the holder of the recorded que la somme exigée en application du paragraphe 39(1), claim must pay a charge that is equal to the difference be- le détenteur du claim enregistré est tenu de payer le prix tween the charge referred to in subsection 43(1) and the équivalent à la différence entre le coût des travaux indi- cost of work indicated in the certificate. qué dans le certificat des travaux et le prix à payer en ap- plication du paragraphe 43(1). Payment of charge Paiement (2) The claim holder must pay the charge within 60 days (2) Le détenteur du claim est tenu de payer le prix dans after the day on which the certificate is issued. les soixante jours suivant la date de délivrance du certifi- cat. Cancellation of recording of claim Annulation de l’enregistrement du claim (3) If three certificates of work are issued in respect of a (3) Si trois certificats de travaux délivrés à l’égard du claim that indicate that the cost of work is less than the claim indiquent que le coût des travaux est moins élevé amount required by subsection 39(1), the recording of que la somme exigée en application du paragraphe 39(1), Current to September 3, 2026 30 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Evaluation of Report and Cost of Work Examen du rapport et coût des travaux Sections 49-51 Articles 49-51 the claim is cancelled on the day that the third certificate l’enregistrement du claim est annulé à la date de of work is issued. délivrance du troisième certificat. Period of application of requirements Période d’application des exigences 50 (1) The requirements set out in section 39 and sub- 50 (1) Les exigences prévues à l’article 39 et au para- section 43(1) apply for the duration of a recorded claim. graphe 43(1) s’appliquent durant la période de validité du claim enregistré. Cancellation of recording Annulation de l’enregistrement (2) The recording of a claim is cancelled on one of the (2) L’enregistrement d’un claim est annulé à l’une des following days, as the case may be: dates suivantes : (a) the day after the last day on which a report must a) le jour suivant la date limite prévue à l’article 40, si be submitted under section 40, if a report with respect un rapport à l’égard de ce claim n’est pas présenté to that claim has not been submitted in accordance conformément à l’article 41, sauf si, selon le cas : with section 41 and (i) un certificat de prolongation a été délivré au dé- (i) the claim holder has not been issued a certifi- tenteur du claim conformément à l’article 42, cate of extension with respect to that claim under section 42, and (ii) une suspension de paiement a été autorisée en vertu de l’article 51; (ii) a suspension with respect to that claim has not been granted under section 51; b) sous réserve de l’article 84, le soixante et unième jour suivant la date de délivrance du certificat de tra- (b) subject to section 84, the day that is 61 days after vaux visé à l’article 47, si le certificat délivré à l’égard the day on which a certificate of work with respect to de ce claim indique que la somme attribuée au coût that claim is issued under section 47, if the cost of des travaux est moins élevée que la somme exigée en work allocated to that claim in the certificate of work application du paragraphe 39(1) et le détenteur du is less than the cost of work required to be done under claim n’a pas payé le prix équivalent à la différence subsection 39(1) and the claim holder has not paid the entre le coût des travaux indiqué dans le certificat et le difference between the charge referred to in subsec- prix qu’il est tenu de payer en application du para- tion 43(1) and the cost of work indicated in the certifi- graphe 43(1). cate. Suspension Suspension Suspension of payment and work requirements Demande de suspension de paiement et de prolongation de période d’exécution des travaux 51 (1) If a holder of a recorded claim is unable to do 51 (1) Le détenteur d’un claim enregistré qui, en raison work as required under subsection 39(1) because the de circonstances indépendantes de sa volonté, est dans claim holder is, for reasons beyond the claim holder’s l’attente d’une autorisation ou d’une décision préalable control, waiting for a public authority to give an autho- d’une autorité publique et qui, de ce fait, se trouve dans rization or decision without which the work cannot pro- l’impossibilité d’exécuter les travaux visés au paragraphe ceed, the claim holder may request a suspension of one 39(1), peut demander la suspension, à son égard, de l’ap- year — beginning on the anniversary date of the record- plication de l’article 39 et du paragraphe 43(1) pour une ing of the claim — of the work requirements under sec- période d’un an à compter de la date anniversaire de l’en- tion 39 and the charges under subsection 43(1). registrement du claim. Time limit for request Date limite — demande (2) The request must be made in writing to the Super- (2) La demande est présentée par écrit au registraire mi- vising Mining Recorder no later than 90 days after the nier en chef au plus tard le quatre-vingt-dixième jour sui- end of the applicable period under section 39 and subsec- vant la fin de la période applicable visée à l’article 39 ou tion 43(1) for which the suspension is requested, and au paragraphe 43(1) et pour laquelle la suspension est demandée. Elle est accompagnée de documents Current to September 3, 2026 31 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Suspension Suspension Sections 51-52 Articles 51-52 must be accompanied by documents showing that the démontrant que le détenteur du claim est dans l’attente claim holder is waiting for the authorization or decision. de l’autorisation. Companies’ Creditors Arrangement Act Loi sur les arrangements avec les créanciers des compagnies (3) If an order under section 11.02 of the Companies’ (3) Le détenteur d’un claim enregistré à l’égard de qui Creditors Arrangement Act has been made with respect une ordonnance a été rendue en vertu de l’article 11.02 to a claim holder, the holder of a recorded claim may re- de la Loi sur les arrangements avec les créanciers des quest a suspension of the payment and work require- compagnies peut demander la suspension, à son égard, ments under section 39 and subsection 43(1) until the de l’application de l’article 39 et du paragraphe 43(1) jus- anniversary date of the recording of the claim that is at qu’à la date anniversaire de l’enregistrement du claim least 12 months after the day on which the order has suivant d’au moins douze mois la date à laquelle l’ordon- ceased to have effect with respect to the claim holder. nance cesse d’avoir effet. Time limit for request Date limite — demande (4) The request must be made in writing to the Super- (4) La demande est présentée par écrit au registraire mi- vising Mining Recorder no later than 90 days after the nier en chef au plus tard le quatre-vingt-dixième jour sui- day on which the order was made, and must be accompa- vant la date à laquelle l’ordonnance a été rendue et est nied by a certified copy of the order. accompagnée d’une copie certifiée conforme de celle-ci. Recording of suspension Inscription au registre (5) If the requirements of subsections (1) and (2) or (3) (5) Si les exigences prévues aux paragraphes (1) et (2) and (4) are met, the Supervising Mining Recorder must ou (3) et (4) sont remplies, le registraire minier en chef record the suspension with respect to the claim. inscrit la suspension à l’égard du claim dans le registre. Effect of suspension Effet de la suspension (6) A suspension extends the duration of the claim by (6) La période de validité du claim est prolongée d’une the duration of the suspension. période équivalente à celle de la suspension. Reduced Area Réduction de superficie Application for reduced-area claim Demande de réduction de superficie 52 (1) The holder of a recorded claim (the original 52 (1) Le détenteur d’un claim enregistré, appelé au claim) may make an application to the Mining Recorder présent article « claim initial », peut présenter au regis- to record, within the area of the original claim, a re- traire minier une demande d’enregistrement d’un claim duced-area claim if de superficie réduite compris dans les limites du claim initial, si les conditions ci-après sont remplies : (a) the cost of work set out in a certificate of work with respect to the original claim is at least $10 per a) le coût des travaux établi dans un certificat de tra- full or partial hectare; and vaux à l’égard du claim initial s’élève à au moins 10 $ l’hectare ou partie d’hectare; (b) the reduced-area claim has been staked in accor- dance with sections 23 to 30, using reduced-area tags b) la superficie réduite a été jalonnée conformément issued under subsection 24(2). aux articles 23 à 30 au moyen de plaques remises en application du paragraphe 24(2). Presentation of application Présentation de la demande (2) The application must be made in the prescribed form (2) La demande est présentée sur la formule prescrite au no later than 60 days after the staking of the reduced- plus tard le soixantième jour suivant le jalonnement du area claim, and must be accompanied by the applicable claim de superficie réduite. Elle est accompagnée des fee set out in Schedule 1 and the map or sketch referred droits applicables prévus à l’annexe 1 et de la carte ou du to in subsection 33(3). croquis visés au paragraphe 33(3). Current to September 3, 2026 32 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Reduced Area Réduction de superficie Sections 52-53 Articles 52-53 Recording of reduced-area claim Enregistrement du claim de superficie réduite (3) If the requirements set out in this section are met, (3) Si les conditions prévues au présent article sont rem- the Mining Recorder must record the reduced-area plies, le registraire minier enregistre le claim de superfi- claim, effective on the next anniversary date of the cie réduite; l’enregistrement prend effet à la prochaine recording of the original claim. date anniversaire de l’enregistrement du claim initial. Effect of recording Effets de l’enregistrement (4) When the recording of a reduced-area claim takes ef- (4) Lorsque l’enregistrement d’un claim de superficie ré- fect, duite prend effet : (a) the recording date for it is considered to be the a) la date d’enregistrement est considérée être celle recording date of the original claim; du claim initial; (b) the information recorded by the Mining Recorder, b) les renseignements inscrits dans le registre, y com- including the requests and the documents filed with pris les demandes et les documents présentés à l’égard respect to the original claim, are considered to have du claim initial, sont considérés comme ayant été ins- been recorded or presented with respect to the re- crits ou présentés à l’égard du claim de superficie ré- duced-area claim; and duite comme s’il s’agissait du claim initial; (c) the recording of the original claim is cancelled. c) l’enregistrement du claim initial est annulé. Reopening of lands for prospecting and staking Réouverture des terres à la prospection et au jalonnement (5) Subject to subsection 56(3), the lands in the original (5) Sous réserve du paragraphe 56(3), les terres visées claim that are not within the reduced-area claim are open par le claim initial qui ne font plus partie du claim de su- for prospecting and staking at noon on the day following perficie réduite sont rouvertes à la prospection et au ja- the first business day after the day on which the record- lonnement à midi le lendemain du premier jour ouvrable ing of the original claim was cancelled. suivant la date d’annulation de l’enregistrement du claim initial. Notice Affichage (6) On the day the recording of the reduced-area claim (6) Le jour où l’enregistrement du claim de superficie ré- takes effect — or if that day is not a business day, on the duite prend effet ou, si ce jour n’est pas un jour ouvrable, first business day that follows — the Mining Recorder le premier jour ouvrable suivant, le registraire minier af- must post a notice in the Mining Recorder’s office speci- fiche dans son bureau un avis qui précise le moment de fying when the lands in the original claim that are not réouverture des terres visées par le claim initial qui ne within the reduced-area claim are open for prospecting font pas partie du claim de superficie réduite ainsi que les and staking, and setting out the boundaries of the re- nouvelles limites de celui-ci. duced-area claim. Cancellation of Recording of Claims Annulation de l’enregistrement du claim Notice of cancellation Avis d’annulation 53 (1) If the Mining Recorder has information that ei- 53 (1) Si le registraire minier détient des renseigne- ther of the following circumstances apply in respect of a ments selon lesquels une des situations ci-après s’ap- recorded claim, the Mining Recorder must immediately plique à l’égard d’un claim enregistré, il avise immédiate- send the claim holder a notice that the recording of the ment le détenteur du claim que l’enregistrement sera claim will be cancelled unless, within 60 days, the holder annulé, à moins que le détenteur ne démontre, au plus can show that the information is not correct: tard le soixantième jour suivant la date de l’avis, que ces renseignements sont inexacts : Current to September 3, 2026 33 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Cancellation of Recording of Claims Annulation de l’enregistrement du claim Sections 53-55 Articles 53-55 (a) the claim holder knowingly made a false or mis- a) le détenteur du claim a fait sciemment une décla- leading statement on the application to record the ration fausse ou trompeuse dans la demande d’enre- claim; gistrement de celui-ci; (b) the claim holder has contravened subsection 7(2). b) il a contrevenu au paragraphe 7(2). Notice to claim holder Motifs (2) The notice must set out the reason for the impending (2) L’avis comporte les motifs de l’annulation et un résu- cancellation and a summary of the evidence to support mé des preuves à l’appui. the cancellation. Default Soixante jours pour corriger la situation (3) If the claim holder has not shown the Mining (3) Si, au plus tard le soixantième jour suivant la date Recorder that the information is not correct within 60 d’envoi de l’avis, le détenteur du claim ne démontre pas days after the day on which the notice was sent, the l’inexactitude des renseignements visés au paragraphe recording of the claim is cancelled. (1), l’enregistrement du claim est annulé. Cancellation of recording or exclusion of lands Annulation ou modification de l’enregistrement d’un claim (4) If it is determined that a recorded claim includes any (4) S’il est établi qu’un claim enregistré vise l’une des of the following lands, the Mining Recorder must cancel terres ci-après, le registraire minier en annule l’enregis- the recording of the claim or, if it is possible to exclude trement ou, s’il est possible de l’exclure du claim, il modi- those lands from the claim, must amend the boundaries fie les limites de celui-ci et en avise le détenteur : of the recorded claim to do so and must notify the claim holder accordingly: a) les terres visées à l’article 5; (a) lands referred to in section 5; b) celles qui ont été jalonnées en contravention de l’article 6; (b) lands that were staked in contravention of section 6; c) celles auxquelles le présent règlement ne s’ap- plique pas. (c) lands to which these Regulations do not apply. Request for cancellation of recording Demande d’annulation 54 The holder of a recorded claim may request the can- 54 Le détenteur d’un claim enregistré peut demander cellation of the recording of the claim by submitting to par écrit au registraire minier l’annulation de l’enregis- the Mining Recorder a written request for cancellation trement de son claim. La demande est accompagnée des accompanied by the applicable fee set out in Schedule 1. droits applicables prévus à l’annexe 1. Date of cancellation Dates d’annulation 55 (1) The recording of a claim is cancelled on the day 55 (1) L’enregistrement d’un claim est annulé à l’une that des dates suivantes : (a) the Mining Recorder receives the request for its a) la date à laquelle le registraire minier reçoit la de- cancellation and payment of the fee under section 54; mande d’annulation et les droits visés à l’article 54; (b) the time specified in paragraph 60(2)(b) has end- b) celle qui correspond à la fin de la période visée à ed and no application for a lease on the claim has been l’alinéa 60(2)b) si aucune demande de prise à bail received; or n’est reçue; (c) a lease on the claim has terminated without being c) celle à laquelle le bail dont il fait l’objet a expiré renewed or was cancelled under subsection 63(2) or sans être renouvelé ou est annulé en application du section 64. paragraphe 63(2) ou de l’article 64. Current to September 3, 2026 34 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Claims Claims Cancellation of Recording of Claims Annulation de l’enregistrement du claim Sections 55-57 Articles 55-57 Prohibition Interdiction (2) For one year after the recording of a claim is can- (2) Pendant l’année suivant la date d’annulation de l’en- celled, the former claim holder and any person related to registrement d’un claim, l’ancien détenteur de celui-ci et the former claim holder are not permitted to toute personne qui lui est liée ne peuvent : (a) apply for a prospecting permit for a zone, or apply a) présenter une demande de permis de prospection to record a claim, that covers any part of the area that à l’égard d’une zone ou une demande d’enregistrement was covered by the claim the recording of which has d’un claim, si la zone ou le claim sont situés, en tout been cancelled; or ou en partie, dans les limites du claim dont l’enregis- trement a été annulé; (b) acquire a legal or beneficial interest in a prospect- ing permit or claim referred to in paragraph (a). b) acquérir un intérêt en common law ou un intérêt bénéficiaire à l’égard du permis de prospection ou du claim visés à l’alinéa a). Reopening of lands Réouverture à la prospection et au jalonnement 56 (1) The lands that were covered by a claim the 56 (1) Les terres visées par un claim dont l’enregistre- recording of which has been cancelled under subsection ment a été annulé en vertu du paragraphe 50(2), de l’ar- 50(2), section 55 or subsection 62(3) are open for ticle 55, des paragraphes 62(3) sont rouvertes à la pros- prospecting and staking at noon on the day following the pection et au jalonnement à midi le lendemain du first business day after the day on which the recording of premier jour ouvrable suivant la date d’annulation de the claim was cancelled. l’enregistrement. Reopening of lands — 30-day delay Réouverture à la prospection et au jalonnement — trentième jour (2) Subject to section 84, the lands that were covered by (2) Sous réserve de l’article 84, les terres visées par un a claim the recording of which has been cancelled under claim dont l’enregistrement a été annulé en vertu des pa- subsection 49(3) or 53(3) or paragraph 53(4)(b) are open ragraphes 49(3) ou 53(3) ou de l’alinéa 53(4)b) sont rou- for prospecting and staking at noon on the day that is 30 vertes à la prospection et au jalonnement à midi le lende- days after the day on which the recording of the claim main du trentième jour suivant la date d’annulation de was cancelled. l’enregistrement. Delay in reopening lands Réouverture différée (3) If the Minister has reasonable grounds to believe (3) Si le ministre a des motifs raisonnables de croire que that there is unremedied environmental damage to the des dommages non réparés ont été causés à l’environne- lands that were covered by a claim the recording of which ment et touchent aux terres visées par un claim dont l’en- has been cancelled under a provision set out in subsec- registrement a été annulé en vertu de l’une des disposi- tion (1) or (2), or the lands referred to in subsection tions mentionnées aux paragraphes (1) ou (2) ou à celles 52(5), the Minister may delay the opening of the lands visées au paragraphe 52(5), le ministre peut différer la for prospecting and staking. réouverture des terres à la prospection et au jalonne- ment. Lease of a Recorded Claim Bail visant un claim enregistré Plan of Survey Plan d’arpentage Survey required for lease Condition préalable — arpentage 57 (1) A holder of a recorded claim who wants to ob- 57 (1) Le détenteur d’un claim enregistré qui veut le tain a lease of a recorded claim must prendre à bail : (a) obtain a plan of survey of the claim prepared in a) obtient un plan d’arpentage du claim établi confor- accordance with the Canada Lands Surveys Act; mément à la Loi sur l’arpentage des terres du Canada; Current to September 3, 2026 35 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Lease of a Recorded Claim Bail visant un claim enregistré Plan of Survey Plan d’arpentage Sections 57-58 Articles 57-58 (b) provide a report of any overlap with a boundary of b) fournit un rapport concernant tout chevauche- any other claim; ment des limites du claim et de celles de tout autre claim; (c) send a copy of the plan of survey, the report and a notice in the prescribed form, by registered mail or c) transmet, par courrier recommandé ou par service courier, to the holders of adjacent recorded claims and de messagerie, une copie du plan d’arpentage, du rap- leased claims at their addresses on record with the port et d’un avis établi sur la formule prescrite aux dé- Mining Recorder; and tenteurs de claims enregistrés adjacents et preneurs à bail dont les claims visés par les baux sont adjacents, à (d) send to the Mining Recorder a copy of the plan of leur adresse figurant dans le registre du registraire mi- survey, the report, the notice and evidence that the nier; holders of the adjacent claims have received copies of those documents. d) transmet au registraire minier une copie du plan d’arpentage, du rapport et de l’avis en plus d’une preuve attestant que les destinataires de cet avis ont bien reçu copie de ces documents. Perimeter survey Plan d’arpentage du périmètre (2) If two or more contiguous recorded claims are to be (2) Lorsque deux claims enregistrés contigus ou plus included in one lease and their aggregate area, as stated doivent faire l’objet d’un seul bail et où la superficie to- in the applications to record them, does not exceed 1250 tale n’est pas supérieure à 1 250 hectares selon les de- hectares, one plan of survey may be prepared that shows mandes d’enregistrement, un seul plan d’arpentage du only the perimeter of the collection of contiguous claims. périmètre de l’ensemble des claims peut être établi. Posting of notice Affichage de l’avis (3) On receipt of the documents referred to in paragraph (3) Sur réception des documents visés à l’alinéa (1)d), le (1)(d), the Mining Recorder must post a copy of the no- registraire minier affiche une copie de l’avis dans son bu- tice in the office of the Mining Recorder for a period of 21 reau pendant vingt et un jours. days. Extra charge for additional area — one claim Prix à payer additionnel — superficie arpentée supérieure à celle déclarée 58 (1) If the surveyed area of one claim exceeds the 58 (1) Lorsque la superficie arpentée d’un claim enre- area stated in the application to record that claim, the gistré est supérieure à celle déclarée dans la demande claim holder must pay to the Mining Recorder the charge d’enregistrement du claim, le détenteur de celui-ci paie determined by the formula au registraire minier le prix calculé selon la formule sui- vante : A×C×D where A×C×D où : A is the excess area in hectares of the claim; A représente l’excédent, en hectares, de la superficie C is $5; and arpentée sur celle déclarée; D is the number of years from the date of recording of C 5 $; the claim. D le nombre d’années qui se sont écoulées depuis la date d’enregistrement du claim. Extra charge for additional area — collection of Prix à payer additionnel — superficie arpentée d’un claims ensemble de claims supérieure aux superficies déclarées (2) If the surveyed area of contiguous recorded claims (2) Lorsque la superficie arpentée d’un ensemble de that are shown in a plan of survey of their perimeter pre- claims enregistrés contigus présentée dans un plan d’ar- pared in accordance with subsection 57(2) exceeds their pentage établi conformément au paragraphe 57(2) est aggregate area as stated in the applications to record supérieure au total des superficies déclarées dans les Current to September 3, 2026 36 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Lease of a Recorded Claim Bail visant un claim enregistré Plan of Survey Plan d’arpentage Sections 58-60 Articles 58-60 those claims, the claim holder must pay to the Mining demandes d’enregistrement de ces claims, le détenteur Recorder for each claim the charge determined by the des claims paie au registraire minier, pour chacun des formula claims, le prix calculé selon la formule suivante : (A / B) × C × D (A / B) × C × D where où : A is the total excess area in hectares of all of the claims; A représente l’excédent, en hectares, de la superficie arpentée sur le total des superficies déclarées; B is the number of claims in the survey; B le nombre de claims visés par l’arpentage; C is $5; and C 5 $; D is the number of years from the recording date of the claim. D le nombre d’années qui se sont écoulées depuis la date d’enregistrement du claim. Remission Remise (3) Remission is granted of the portion of the charge (3) Une remise est accordée — en tout ou en partie — paid or payable under subsection (1) or (2), as the case d’une somme égale au prix payé ou à payer au titre des may be, that does not exceed the cost of work set out in paragraphes (1) ou (2), selon le cas. Le montant de la re- certificates of work issued with respect to the claim or mise ne peut excéder le coût des travaux qui sont indi- contiguous claims and that has not been remitted under qués dans tout certificat de travaux délivré à l’égard du these Regulations. claim ou de tout claim qui lui est contigu et qui n’ont pas fait l’objet d’une remise au titre du présent règlement. Recording of plan of survey Enregistrement du plan d’arpentage 59 The Mining Recorder must record the plan of survey 59 Le registraire minier enregistre le plan d’arpentage si if les conditions suivantes sont remplies : (a) 30 days have elapsed after the end of the period a) il n’a reçu aucune contestation à l’égard du plan for posting of a notice under subsection 57(3) and the d’arpentage dans les trente jours suivant la fin de la Mining Recorder has not received any protest with re- période d’affichage de l’avis prévue au paragraphe spect to the survey; 57(3); (b) the plan of survey has been made by the Surveyor b) le plan d’arpentage a été établi par l’arpenteur gé- General under section 31 of the Canada Lands Sur- néral conformément à l’article 31 de la Loi sur l’ar- veys Act; pentage des terres du Canada; (c) the applicable fee set out in Schedule 1 has been c) les droits applicables prévus à l’annexe 1 ont été paid; payés; (d) the requirements of section 57 have been met; d) les exigences prévues à l’article 57 ont été rem- and plies; (e) any charge payable under subsection 58(1) or (2) e) le prix à payer au titre des paragraphes 58(1) ou has been paid. (2) l’a été. Requirements Respecting Leases Exigences relatives au bail Application for lease Demande de prise à bail 60 (1) A holder of a recorded claim who wants to ob- 60 (1) Le détenteur d’un claim enregistré qui veut tain a lease of a recorded claim or a collection of contigu- prendre à bail un claim enregistré ou un ensemble de ous recorded claims must apply for the lease in the pre- claims enregistrés contigus en fait la demande sur la for- scribed form. mule prescrite. Current to September 3, 2026 37 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Lease of a Recorded Claim Bail visant un claim enregistré Requirements Respecting Leases Exigences relatives au bail
Section 60 Article 60 Application fee and limitation period Conditions de la demande (2) The application must (2) La demande remplit les exigences suivantes : (a) be accompanied by the applicable fee set out in a) elle est accompagnée des droits applicables prévus Schedule 1; and à l’annexe 1; (b) be received by the Mining Recorder at least one b) elle parvient au registraire minier au plus tard un year before the end of the duration of the claim or of an avant la fin de la période de validité du claim enre- the claim that has the earliest recording date of any of gistré ou, dans le cas d’un ensemble de claims enregis- the claims in the collection of contiguous claims. trés contigus, de celle du claim qui a été enregistré le premier. Other requirements for lease Exigences additionnelles (3) Before a lease is issued, (3) Un bail ne peut être délivré que si : (a) an official plan of survey of the claim, or the col- a) un plan officiel d’arpentage du claim ou de l’en- lection of contiguous claims, must have been recorded semble de claims enregistrés contigus a été enregistré under section 59; en vertu de l’article 59; (b) certificates of work must have been recorded with b) un certificat de travaux, inscrit au registre, indique respect to the claim, or with respect to each claim in une somme attribuée au coût des travaux exécutés à the collection of contiguous recorded claims, that allo- l’égard du claim — ou de chacun des claims de l’en- cate to the claim, or to each claim, a cost of work of at semble de claims enregistrés contigus — d’au moins least $25 per hectare, of which the total of the costs of 25 $ l’hectare dont au plus 5 $ l’hectare est attribué au the official plan of survey and of the construction of coût du plan officiel d’arpentage et à celui de la any roads, airstrips or docks does not exceed $5 per construction de routes, de quais ou de pistes d’atter- hectare; and rissage; (c) the rent for the first year of the lease must have c) le loyer de la première année a été payé au regis- been paid to the Mining Recorder. traire minier. Extension of duration of claim Avis au registraire (4) If a claim holder who has applied for a lease advises (4) Si le demandeur informe le registraire minier par the Mining Recorder in writing that they cannot, for rea- écrit qu’en raison de circonstances indépendantes de sa sons beyond their control, obtain an official plan of sur- volonté il est dans l’impossibilité d’obtenir le plan officiel vey and record it before the end of the duration of the d’arpentage et de le faire enregistrer avant la fin de la pé- claim to be leased, riode de validité du claim enregistré visé par le bail, les conséquences suivantes s’appliquent : (a) the duration of the recorded claim is extended for one year; a) la période de validité du claim enregistré est pro- longée d’un an; (b) the requirements under section 39 and subsection 43(1) do not apply for that year; and b) les exigences prévues à l’article 39 et au para- graphe 43(1) ne s’appliquent pas pendant cette pé- (c) the application for a lease on the claim remains riode; valid for that year. c) la demande de bail demeure valide jusqu’à l’expi- ration de cette période. Issuance of lease Délivrance du bail (5) If, before the end of the duration of the recorded (5) Le ministre délivre au détenteur du claim enregistré claim or of the claim that has the earliest recording date un bail de vingt et un ans si, avant la fin de la période de of any of the claims in the collection of contiguous validité du claim enregistré ou, dans le cas d’un ensemble recorded claims, the requirements of subsections (1) to de claims enregistrés contigus, de celle du claim qui a été Current to September 3, 2026 38 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Lease of a Recorded Claim Bail visant un claim enregistré Requirements Respecting Leases Exigences relatives au bail Sections 60-63 Articles 60-63 (3) are met, the Minister must issue the lease to the claim enregistré le premier, les exigences visées aux holder for a term of 21 years. paragraphes (1) à (3) sont remplies. Annual rent for lease Loyer annuel 61 (1) The annual rent for a lease is $2.50 per hectare 61 (1) Le loyer annuel est de 2,50 $ l’hectare pour un during the first term and $5.00 per hectare during each premier bail et de 5 $ l’hectare pour tout bail renouvelé. renewed term. When rent is due Échéance du paiement (2) The rent must be paid to the Mining Recorder before (2) Le loyer annuel est payable au registraire minier the anniversary date of the lease. avant la date anniversaire du bail. Request for renewal of lease Demande de renouvellement de bail 62 (1) To obtain renewal of a lease, the lessee must, at 62 (1) Le preneur à bail qui désire renouveler son bail least six months before the end of the existing lease, sub- présente par écrit, au moins six mois avant l’expiration mit to the Mining Recorder a written request for renewal du bail en cours, une demande au registraire minier ac- accompanied by the applicable fee set out in Schedule 1. compagnée des droits applicables prévus à l’annexe 1. Reduction in area of leased claim Réduction de la superficie du claim (2) At the time of renewal, the Mining Recorder must re- (2) Au moment du renouvellement, le registraire minier duce the area specified in the lease if, at least 90 days be- réduit la superficie indiquée au bail si, au moins quatre- fore the end of the existing lease, vingt-dix jours avant la date d’expiration du bail en cours : (a) the lessee requests it and a) le preneur à bail le demande et si : (i) if the lease covers only one recorded claim, that claim has been reduced in area in accordance with (i) dans le cas d’un bail visant un seul claim enre- section 52, or gistré, la superficie de celui-ci a été réduite confor- mément à l’article 52, (ii) otherwise, one or more recorded claims have been removed from the lease; and (ii) dans le cas d’un bail visant plus d’un claim en- registré, au moins un des claims enregistrés n’est (b) an official plan of survey of the reduced area has plus visé par le bail; been prepared in accordance with Canada Lands Sur- veys Act and has been submitted to the Mining b) un plan d’arpentage officiel de la superficie réduite Recorder for recording. a été établi conformément à la Loi sur l’arpentage des terres du Canada et transmis au registraire minier pour enregistrement. Cancellation of recording of claim Annulation de l’enregistrement d’un claim (3) The recording of a claim that has been removed from (3) L’enregistrement d’un claim qui n’est plus visé par a lease under subparagraph (2)(a)(ii) is cancelled at the un bail à la suite de la réduction de superficie visée au time that the renewal of the lease takes effect. sous-alinéa (2)a)(ii) est annulé au moment de la prise d’effet du renouvellement du bail. Issuance of renewal Condition de renouvellement (4) If, before the existing lease ends, the lessee pays the (4) Le ministre renouvelle le bail pour une période de rent for the first year of the renewal, the Minister must vingt et un ans si, avant l’expiration du bail en cours, le issue the renewal for a term of 21 years. preneur à bail paye le loyer pour la première année du bail renouvelé. Notice of overdue rent Avis d’exigibilité du loyer 63 (1) If rent is not paid within 30 days after the day it 63 (1) Si le loyer annuel n’est pas payé dans les trente is due, the Mining Recorder must send the lessee a notice jours suivant la date à laquelle il devient exigible, le Current to September 3, 2026 39 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Lease of a Recorded Claim Bail visant un claim enregistré Requirements Respecting Leases Exigences relatives au bail Sections 63-65 Articles 63-65 stating the amount of rent due and the rate of interest registraire minier envoie au preneur à bail un avis indi- payable on that amount. quant la somme due à ce titre et le taux d’intérêt appli- cable. Cancellation of lease for non-payment of rent Bail annulé (2) If the rent due, together with interest from the date (2) Si cette somme et les intérêts courus depuis la date à on which the rent was due, is not paid within 60 days af- laquelle le loyer est devenu exigible ne sont pas payés ter the day the notice was sent, the lease is cancelled on dans les soixante jours suivant la date d’envoi de l’avis, le the 61st day after the notice was sent. bail est annulé le soixante et unième jour. Cancellation of lease by lessee Avis d’annulation de bail 64 (1) A lease is cancelled if the lessee submits to the 64 (1) Le bail est annulé sur présentation par le pre- Mining Recorder a written notice of cancellation. The neur à bail d’un avis écrit au registraire minier. L’annula- cancellation takes effect on the day the notice is received tion prend effet à la date à laquelle le registraire minier by the Mining Recorder or, if a later day for cancellation reçoit l’avis ou, si elle est postérieure, à la date demandée is set out in the notice, on that day. par le preneur à bail. Temporary prohibition relating to former lessee Interdictions temporaires en cas d’annulation de bail (2) For one year after a lease is cancelled, the former (2) Pendant l’année suivant la date d’annulation du bail, lessee and any person related to the former lessee are not l’ancien preneur à bail et toute personne qui lui est liée permitted to ne peuvent : (a) apply for a prospecting permit for a zone, or apply a) présenter une demande de permis de prospection to record a claim, that covers any part of the area that à l’égard d’une zone ou une demande d’enregistrement was covered by the cancelled lease; or d’un claim si la zone ou le claim sont situés, en tout ou en partie, dans les limites de la superficie faisant l’ob- (b) acquire a legal or beneficial interest in a prospect- jet du bail qui a été annulé; ing permit or claim referred to in paragraph (a). b) acquérir un intérêt en common law ou un intérêt bénéficiaire à l’égard du permis de prospection ou du claim visés à l’alinéa a). Transfer of a Prospecting Transfert d’un permis de Permit, Claim or Lease prospection, d’un claim ou d’un bail Transfer of permit Conditions de transfert — permis de prospection 65 The transfer of a prospecting permit or an interest in 65 Le transfert d’un permis de prospection — ou d’un it may be recorded only if intérêt à l’égard du permis — ne peut être enregistré que si les conditions suivantes sont réunies : (a) the transfer is made to a licensee; a) la personne à qui le permis en cause est transféré (b) a request for recording of the transfer is made by est titulaire d’une licence; the permittee in writing to the Mining Recorder and is signed by the permittee and by the transferee; and b) le titulaire du permis de prospection présente une demande par écrit au registraire minier, signée par lui (c) the applicable fee set out in Schedule 1 is paid to et la personne à qui le permis est transféré; the Mining Recorder. c) les droits applicables prévus à l’annexe 1 sont payés au registraire minier. Current to September 3, 2026 40 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Transfer of a Prospecting Permit, Claim or Lease Transfert d’un permis de prospection, d’un claim ou d’un bail Sections 66-67 Articles 66-67 Requirements for transfer of recorded claim or Conditions de transfert — claim enregistré ou bail lease 66 (1) The transfer of a recorded claim or a lease of a 66 (1) Le transfert d’un claim enregistré ou d’un bail vi- recorded claim or an interest in either of them may be sant un claim enregistré — ou d’un intérêt à l’égard de recorded only if l’un d’eux — ne peut être enregistré que si les conditions suivantes sont réunies : (a) the transfer is made to a licensee; a) la personne à qui le claim ou le bail en cause est (b) if the transfer is of a recorded claim, a request for transféré est titulaire d’une licence; recording of the transfer is made by the claim holder in the prescribed form to the Mining Recorder and is b) dans le cas du transfert d’un claim enregistré, le signed by the claim holder and the transferee; détenteur du claim présente la demande de transfert au registraire minier sur la formule prescrite, signée (c) if the transfer is of a lease, par lui et la personne à qui le claim est transféré; (i) a request for recording of the transfer is made c) dans le cas du transfert d’un bail : by the lessee in writing to the Mining Recorder and is signed by the lessee and the transferee, and (i) le preneur à bail présente la demande de trans- fert par écrit au registraire minier, signée par lui et (ii) the rent and any interest on it is paid; la personne à qui le bail est transféré, (d) the applicable fee set out in Schedule 1 is paid to (ii) le loyer et les intérêts sur celui-ci ont été payés; the Mining Recorder. d) les droits applicables prévus à l’annexe 1 sont payés au registraire minier. Transfer of lease includes claims Transfert de bail et des claims visés par le bail (2) The transfer of a lease includes the transfer of the (2) Le transfert d’un bail emporte celui de tout claim en- recorded claims to which the lease applies. registré visé par ce bail. Condition on transfer within mining property Enregistrement sous condition de garantie (3) The transfer of a lease or a recorded claim either of (3) Le transfert d’un claim enregistré ou d’un bail qui which is part of a mining property may be recorded only fait partie d’une propriété minière ne peut être enregistré if security in the amount of any unpaid royalties in rela- que si une garantie équivalant à la somme des redevances tion to the mining property has been deposited with the minières impayées à l’égard de cette propriété a été dépo- Minister. sée auprès du ministre. Cancellation of recorded claim or lease Annulation d’un claim ou d’un bail 67 (1) The recording of a claim is cancelled, or a lease 67 (1) L’enregistrement d’un claim ou d’un bail et des and the recording of the claims covered by the lease are claims enregistrés qu’il vise est annulé à la date où sur- cancelled, on the day that any of the following events oc- vient l’un des événements suivants : cur: a) le ministre a réalisé une sûreté de premier rang sur (a) the Minister has realized on a charge or security un bien réel du détenteur du claim ou du preneur à over the real property of the claim holder or the lessee bail pour couvrir les frais de réparation d’un fait ou for the costs of remedying any environmental condi- dommage causé à l’environnement en vertu du para- tion or environmental damage under subsection graphe 11.8(8) de la Loi sur les arrangements avec les 11.8(8) of the Companies’ Creditors Arrangement Act créanciers des compagnies ou du paragraphe 14.06(7) or subsection 14.06(7) of the Bankruptcy and Insol- de la Loi sur la faillite et l’insolvabilité; vency Act; b) les intérêts dans les terres territoriales représentés par le claim ou le bail ont été retournés à la Couronne en raison de l’ordonnance d’un tribunal rendue sous le Current to September 3, 2026 41 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Transfer of a Prospecting Permit, Claim or Lease Transfert d’un permis de prospection, d’un claim ou d’un bail
Section 67 Article 67 (b) the interests in territorial lands represented by régime de la Loi sur les arrangements avec les créan- the claim or lease have reverted to the Crown as a re- ciers des compagnies ou de la Loi sur la faillite et sult of a court order made under the Companies’ Cred- l’insolvabilité; itors Arrangement Act or the Bankruptcy and Insol- vency Act; c) le ministre a accepté le claim ou le bail à titre de garantie à l’égard d’une créance de la Couronne et il a (c) the Minister has accepted the claim or lease as a réalisé cette garantie en vertu de l’article 156 de la Loi security in respect of a debt or other obligation owed sur la gestion des finances publiques. to the Crown and the Minister has realized on the se- curity under section 156 of the Financial Administra- tion Act. Delay in opening lands Réouverture différée (2) The lands that were covered by a claim or a lease the (2) Les terres visées par un claim ou un bail dont l’enre- recording of which has been cancelled under subsection gistrement est annulé aux termes du paragraphe (1) ne (1), are not open for prospecting and staking until the sont rouvertes à la prospection et au jalonnement que Minister opens them. lorsque le ministre les rouvre. Disposition of interests in lands Disposition des intérêts dans les terres (3) Subject to subsection (7), at any time after the (3) Sous réserve du paragraphe (7), à tout moment recording of a claim (the original claim) was cancelled après l’annulation de l’enregistrement d’un claim (ci- under subsection (1), the Minister may, with respect to après « claim initial ») aux termes du paragraphe (1), le the lands that were covered by the original claim, instruct ministre peut, à l’égard des terres visées par ce claim, or- the Mining Recorder to record, in the name of a specified donner au registraire minier d’enregistrer un nouveau person, a new claim that covers those lands. claim à l’égard de ces terres au nom de la personne qu’il désigne. New claim considered as transfer Conditions (4) When a new claim is recorded under subsection (3), (4) Lorsqu’un nouveau claim est enregistré en applica- tion du paragraphe (3) : (a) the new claim need not be staked; a) il n’a pas à être jalonné; (b) the recording date for the new claim is considered to be the recording date of the original claim; b) la date d’enregistrement est considérée comme étant celle du claim initial; (c) the information recorded by the Mining Recorder, including the requests and the documents filed with c) les renseignements inscrits dans le registre, les de- respect to the original claim, are considered to have mandes et les documents présentés à l’égard du claim been recorded or presented with respect to the new initial sont considérés comme ayant été inscrits ou claim; présentés à l’égard du nouveau claim comme s’il s’agissait du claim initial; (d) despite subsection 33(5), the duration of the new claim extends for a period beginning on the day on d) malgré le paragraphe 33(5), la période de validité which the Minister instructs that the new claim be du nouveau claim commence à la date à laquelle le mi- recorded (the start day) to the next anniversary date of nistre a ordonné l’enregistrement de celui-ci (ci-après the recording of the original claim that is at least “x” « date de commencement ») et se termine à la pro- days after the start day, where “x” is equal to the num- chaine date anniversaire de l’enregistrement du claim ber of days that were left in the duration of the origi- initial qui suit de « x » jours la date de commence- nal claim immediately before it was cancelled; and ment, « x » représentant le nombre de jours qui restait à la période de validité du claim initial immédiatement (e) the requirements of paragraphs 39(1)(b) and avant l’annulation; 43(1)(b) apply with respect to the new claim. e) les exigences prévues aux alinéas 39(1)b) et 43(1)b) s’appliquent à l’égard du nouveau claim. Current to September 3, 2026 42 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Transfer of a Prospecting Permit, Claim or Lease Transfert d’un permis de prospection, d’un claim ou d’un bail Sections 67-68 Articles 67-68 Minister may issue new lease Délivrance d’un nouveau bail dans certaines circonstances (5) Subject to subsection (7), at any time after a lease is (5) Sous réserve du paragraphe (7), à tout moment cancelled under subsection (1), the Minister may issue a après qu’un bail est annulé en application du paragraphe new lease that covers the same lands as were covered by (1), le ministre peut délivrer un nouveau bail à l’égard the cancelled lease. des terres visées par le bail. New lease considered as transfer Présomption (6) A new lease issued under subsection (5) is consid- (6) La délivrance du nouveau bail est considérée comme ered to be a transfer of the previous lease on the same le transfert du bail annulé; le premier expire à la date à lands, with the same duration as was left on the previous laquelle aurait expiré le second. lease at the time it was cancelled. Conditions Conditions (7) The Minister may only act under subsection (3) or (7) Le ministre peut procéder en vertu du paragraphe (5) if (3) ou du paragraphe (5) seulement si : (a) the lands covered by the new claim or lease have a) les terres visées par le nouveau claim ou visées par not been opened for prospecting and staking; and le nouveau bail n’ont pas été rouvertes à la prospec- tion et au jalonnement; (b) it is in the financial interest of the Crown or will aid in remedying environmental damage on territorial b) il est dans l’intérêt financier de la Couronne de le lands. faire ou cela contribuera à la réparation des dom- mages causés à l’environnement sur des terres territo- riales. Royalties Redevances Commencement of production of mine Mise en production de la mine 68 (1) For the purposes of these Regulations, the date 68 (1) Pour l’application du présent règlement, la date on which a mine commences production is de mise en production de la mine s’entend : (a) if the mine includes a mill or concentrator, the a) si la mine comprend une usine de broyage ou un first day of the first 90-day period during which the concentrateur, du premier jour de la première période mill or concentrator operates at an average of at least de quatre-vingt-dix jours pendant laquelle l’usine de 60% of its rated capacity; or broyage ou le concentrateur fonctionne en moyenne à au moins 60 % de sa capacité; (b) otherwise, the day the mine begins to produce minerals in reasonable commercial quantities. b) si la mine ne comprend pas d’usine de broyage ni de concentrateur, de la date à laquelle des minéraux commencent à y être produits en quantité commer- ciale raisonnable. Presumptions respecting mineral or processed Minéral ou minéral traité — présomption mineral (2) For the purposes of these Regulations, a mineral or (2) Pour l’application du présent règlement, tout miné- processed mineral is considered to ral ou minéral traité est considéré : (a) be produced and be part of the output of a mine if a) être produit par une mine et faire partie de sa pro- the mineral or processed mineral is in a saleable form duction s’il est sous une forme vendable ou s’il a été or has been removed from the mine; and retiré de la mine; (b) form part of the output of the mine if it is pro- b) faire partie de sa production s’il provient du recy- duced from the reprocessing of tailings from a mine. clage des résidus d’une mine. Current to September 3, 2026 43 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances Sections 68-69 Articles 68-69 Presumptions respecting related persons Présomption — personne liée (3) For the purposes of these Regulations, (3) Pour l’application du présent règlement : (a) if minerals or processed minerals that have been a) si des minéraux ou minéraux traités ayant été ven- sold by an operator to a person not related to the oper- dus par l’exploitant à une personne qui ne lui est pas ator are later sold to a person related to the operator, liée sont par la suite revendus à une personne qui lui those minerals or processed minerals are considered est liée, ils sont considérés avoir été vendus par l’ex- to have been sold by the operator to a related person; ploitant à la personne qui lui est liée; and b) si des minéraux ou minéraux traités ayant été ven- (b) if minerals or processed minerals that have been dus par l’exploitant à une personne qui lui est liée sont sold by an operator to a person related to the operator par la suite revendus à une personne qui ne lui est pas are later sold to a person not related to the operator liée et qu’une preuve à cet égard est fournie, ils sont and proof of that sale is provided, those minerals or considérés avoir été vendus par l’exploitant à la per- processed minerals are considered to have been sold sonne qui ne lui est pas liée. by the operator to a person not related to the operator. Royalties on value of output of mine Redevances sur la valeur de la production de la mine 69 (1) Each fiscal year, the owner or operator of a mine 69 (1) Le propriétaire ou l’exploitant d’une mine verse must pay to the Crown royalties on the value of the à la Couronne, pour chaque exercice, des redevances sur mine’s output during that fiscal year in an amount equal la valeur de la production de la mine durant l’exercice en to the lesser of cause d’une somme égale à la moins élevée des sommes suivantes : (a) 13% of the value of the output of the mine, and a) 13 % de la valeur de la production de la mine; (b) the sum of the royalties payable set out in Column 2 of the table to this paragraph for the dollar value of b) la somme calculée selon le pourcentage de rede- the output set out in Column 1. vance visé à la colonne 2 du tableau ci-après appli- cable selon la valeur en dollars de la production visée à la colonne 1. TABLE TABLEAU Column 1 Column 2 Colonne 1 Colonne 2 Royalty Pourcentage de payable on redevance à payer that portion selon la valeur de la of the value Article Valeur en dollars de la production production Item Dollar value of the output of the mine (%) 1 10 000 ou moins 0 1 10,000 or less 0 2 plus de 10 000 jusqu’à 5 millions 5% 2 greater than 10,000 but not greater than 5 million 5% 3 plus de 5 millions jusqu’à 10 millions 6% 3 greater than 5 million but not greater than 10 6% million 4 plus de 10 millions jusqu’à 15 millions 7% 4 greater than 10 million but not greater than 15 7% 5 plus de 15 millions jusqu’à 20 millions 8% million 6 plus de 20 millions jusqu’à 25 millions 9% 5 greater than 15 million but not greater than 20 8% million 7 plus de 25 millions jusqu’à 30 millions 10 % 6 greater than 20 million but not greater than 25 9% 8 plus de 30 millions jusqu’à 35 millions 11 % million 9 plus de 35 millions jusqu’à 40 millions 12 % 7 greater than 25 million but not greater than 30 10% million 10 plus de 40 millions jusqu’à 45 millions 13 % 8 greater than 30 million but not greater than 35 11% million 11 plus de 45 millions 14 % Current to September 3, 2026 44 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 69 Article 69 Column 1 Column 2 Royalty payable on that portion of the value Item Dollar value of the output of the mine (%) 9 greater than 35 million but not greater than 40 12% million 10 greater than 40 million but not greater than 45 13% million 11 greater than 45 million 14% Royalties payable to Receiver General Redevances payables au receveur général du Canada (2) The royalties payable to the Receiver General of (2) Les redevances s’accumulent pendant l’exercice à Canada under subsection (1) in respect of a mine accrue mesure que la production avance. Elles sont payées à during a fiscal year as the output of a mine is produced l’ordre du receveur général du Canada et remises au chef and must be remitted to the Chief not later than the last au plus tard le dernier jour du quatrième mois suivant la day of the fourth month after the end of that fiscal year. fin de l’exercice en cause. Joint and several liability Responsabilité solidaire (3) Subject to paragraph 74(1)(b), any person who was (3) Sous réserve de l’alinéa 74(1)b), toute personne qui an owner or operator of a mine during the fiscal year in était le propriétaire ou l’exploitant d’une mine pendant respect of which the royalties were payable is jointly and un exercice au cours duquel des redevances étaient dues severally liable for the entire amount of the royalties est solidairement responsable du montant total des rede- payable in respect of the period during which that person vances à payer pour la période pendant laquelle elle était was an owner or operator. le propriétaire ou l’exploitant. Calculation of value of output Formule de calcul (4) For the purposes of this section, the value of the out- (4) Pour l’application du présent article, la valeur de la put of a mine for a fiscal year must be calculated in accor- production d’une mine au cours d’un exercice est calculée dance with the formula selon la formule suivante : A+B–C+D+E+F+G+H–I+J A+B–C+D+E+F+G+H–I+J where où : A is the total of A représente le total des sommes suivantes : (a) the proceeds from sales, during the fiscal a) le produit de la vente, pendant l’exercice, des year, of minerals or processed minerals produced minéraux ou minéraux traités produits par la from the mine to persons not related to the opera- mine à des personnes non liées à l’exploitant, si la tor, if proof of those sales is provided, preuve de la vente est fournie, (b) the market value of any minerals or processed b) la valeur marchande des minéraux ou miné- minerals produced from the mine that were sold raux traités produits par la mine qui ont été ven- or transferred to a person related to the operator, dus ou transférés à une personne liée à l’exploi- or to any other person if the proof of that disposi- tant ou, si la preuve de la disposition n’est pas tion is not provided, and fournie, à toute autre personne, (c) if the minerals or processed minerals pro- c) si les minéraux ou minéraux traités produits duced from the mine are precious stones that have par la mine sont des pierres précieuses qui ont été been cut or polished before their sale or transfer, taillées ou polies avant leur vente ou leur trans- the market value of those precious stones before fert, la valeur marchande de ces pierres précieuses they were cut or polished; avant leur taille ou leur polissage; Current to September 3, 2026 45 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 69 Article 69 B is the market value of any inventories of minerals B la valeur marchande, déterminée conformément au and processed minerals produced from the mine, as paragraphe (9), des minéraux et minéraux traités at the end of the fiscal year, determined under sub- produits par la mine en stock à la fin de l’exercice; section (9); C la valeur marchande, déterminée conformément au C is the market value of any inventories of minerals paragraphe (9), des minéraux et minéraux traités and processed minerals produced from the mine, as produits par la mine en stock au début de l’exercice; at the beginning of the fiscal year, determined under D le moindre des montants suivants : subsection (9); a) tout paiement reçu au cours de l’exercice rela- D is the lesser of tivement à des frais pour lesquels une déduction a (a) the amount of any payment received during été réclamée en vertu du présent article, the fiscal year that is related to a cost that has b) ces frais; been claimed as a deduction or allowance under this section, and E tout montant excédentaire visé à l’alinéa 70(5)b); (b) that cost; F toute somme retirée, pendant l’exercice, d’une fidu- cie de restauration minière établie à l’égard de terres E is any excess amount referred to in paragraph visées par le présent règlement jusqu’à concurrence 70(5)(b); du total des sommes versées à la fiducie; F is any amount withdrawn, during the fiscal year, G toute prestation d’assurance reçue, pendant l’exer- from a mining reclamation trust established in re- cice, à l’égard de minéraux et minéraux traités pro- spect of lands to which these Regulations apply, up duits par la mine; to the maximum of the total of the amounts con- tributed to the trust; H toute subvention ou tout prêt — pour lequel l’exploi- tant a été dispensé de remboursement — accordé à G is the amount of any proceeds received, during the l’exploitant par le gouvernement fédéral relativement fiscal year, from insurance on minerals or processed à la mine pendant l’exercice; minerals produced from the mine; I le total des déductions réclamées aux termes du pa- H is the amount of any grants in respect of the mine ragraphe 70(1); that were made to the operator, or of any loans to the operator in respect of the mine that were forgiven, by J le total des sommes suivantes : the federal government during the fiscal year; a) l’excédent du total des sommes visées aux ali- I is the total of the deductions and allowances claimed néas 70(8)d) et (9)e) sur la fraction non amortie under subsection 70(1); and des actifs amortissables admissibles à la déduc- tion pour amortissement à la fin de l’exercice, J is the total of b) l’excédent du total des sommes visées aux ali- (a) the amount by which the sum of the amounts néas 70(9)c) et d) sur la fraction non amortie de la referred to in paragraphs 70(8)(d) and (9)(e) ex- déduction relative à l’aménagement à l a fin de ceeds the undeducted balance of the depreciable l’exercice. assets eligible for a depreciation allowance at the end of the fiscal year, and (b) the amount by which the sum of the amounts referred to in paragraphs 70(9)(c) and (d) exceeds the undeducted balance of the development al- lowance at the end of the fiscal year. Joint venture — determination of value of A Mine exploitée en coentreprise — calcul de l’élément A (5) For the purpose of determining the value of A in sub- (5) Dans le calcul de la valeur de l’élément A de la for- section (4), if a mine is operated as a joint venture whose mule figurant au paragraphe (4), si la mine est exploitée members deliver separate mining royalty returns under en coentreprise dont les membres remettent des déclara- subsection 74(1), tions de redevances minières distinctes conformément au paragraphe 74(1) : Current to September 3, 2026 46 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 69 Article 69 (a) a diversion of any or all of the production of the a) la réaffectation de la totalité ou d’une partie de la mine from one member of the joint venture to another production de la mine par un membre de la coentre- does not constitute a sale or transfer for the purposes prise en faveur d’un autre membre ne constitue pas of subsection 77(2), even if consideration is paid for une vente ni un transfert au titre du paragraphe 77(2), the diversion; and même si une contrepartie est versée pour cette réaffec- tation; (b) any consideration paid to the member from whom the production was diverted must be included b) toute contrepartie versée au membre dont la pro- by that member as proceeds of sale of minerals or pro- duction a été réaffectée est incluse par ce membre cessed minerals produced from the mine. comme produit de la vente des minéraux ou minéraux traités produits par la mine. Certain costs and values excluded Valeur des minéraux exclue du calcul (6) Costs related to the production of or value for miner- (6) Il n’est pas tenu compte, dans le calcul de la valeur als or processed minerals from lands other than lands to des éléments A à D, G et I de la formule figurant au para- which these Regulations apply must not be taken into ac- graphe (4), de la valeur des minéraux et minéraux traités count for the purposes of determining the values of A to provenant de terres auxquelles le présent règlement ne D, G and I in subsection (4). s’applique pas et de leur coût de production. Last year of production — option for calculation Option de calcul de l’élément B — dernier exercice de production (7) In the case of a mining royalty return for the last fis- (7) Dans le cas de la déclaration de redevances minières cal year of production of a mine, the operator may, for établie pour le dernier exercice de production de la mine, the purpose of determining the value of B in subsection l’exploitant peut, dans le calcul de la valeur de l’élément (4), elect to use the actual proceeds from the sale to a B de la formule figurant au paragraphe (4), choisir d’uti- party not related to the operator of minerals or processed liser le produit réel de la vente des minéraux ou miné- minerals in inventory at the end of the fiscal year, if proof raux traités en stock à la fin de l’exercice à une personne of that sale is provided, rather than the market value of qui ne lui est pas liée, si la preuve de la vente est fournie, the inventory of minerals or processed minerals at the au lieu de la valeur marchande des minéraux ou miné- end of that fiscal year as required under subsection (4). raux traités en stock à la fin de l’exercice comme le pré- voit le paragraphe (4). Election is irrevocable Choix irrévocable (8) An election made under subsection (7) is irrevoca- (8) Le choix fait en vertu du paragraphe (7) est irrévo- ble. cable. Market value of precious stones Valeur marchande des pierres précieuses (9) If the minerals or processed minerals referred to in (9) Si les minéraux ou minéraux traités visés aux alinéas paragraphs (b) and (c) of the description of A, and in the b) et c) de l’élément A et aux éléments B et C de la for- descriptions of B and C, in subsection (4) are precious mule figurant au paragraphe (4) sont des pierres pré- stones, the market value of the precious stones is as fol- cieuses, leur valeur marchande est la suivante : lows: a) dans le cas où l’évaluateur des redevances mi- (a) if the mining royalty valuer and the operator nières et l’exploitant s’entendent sur la valeur des agree on a value for the stones, that value; or pierres, cette valeur; (b) if the mining royalty valuer and the operator can- b) dans le cas où ils ne s’entendent pas, la valeur not agree on a value for the stones, the maximum maximale qui pourrait être obtenue de la vente des amount that could be realized from the sale of the pierres sur le marché libre une fois celles-ci triées se- stones on the open market after they are sorted into lon leur classement commercial. market assortments. Current to September 3, 2026 47 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 69 Article 69 Timing of market value of precious stones Moment du calcul de la valeur marchande des pierres précieuses (10) For the purpose of subsection (9), the market value (10) Pour l’application du paragraphe (9), la valeur mar- must be determined chande est calculée : (a) when the value is calculated for inventory purpos- a) dans le cas où il s’agit de déterminer la valeur des es, at the beginning or end of the fiscal year; and stocks, au début ou à la fin de l’exercice; (b) when the value is calculated for any other pur- b) dans les autres cas, au moment de la dernière éva- pose, as of the last time the precious stones were val- luation de l’évaluateur des redevances minières. ued by the mining royalty valuer. Market value of other minerals Valeur marchande des autres minéraux (11) If the minerals or processed minerals referred to in (11) Si les minéraux ou minéraux traités visés aux ali- paragraphs (b) and (c) of the description of A, and in the néas b) et c) de l’élément A et aux éléments B et C de la descriptions of B and C, in subsection (4) are not pre- formule figurant au paragraphe (4) ne sont pas des cious stones, their market value is the price that could be pierres précieuses, leur valeur marchande est égale au obtained from their sale to a person who is not related to prix qui pourrait être obtenu de leur vente à une per- the operator. sonne non liée à l’exploitant. Timing of market value of other minerals Moment du calcul de la valeur marchande des autres minéraux (12) For the purpose of subsection (11), the market val- (12) Pour l’application du paragraphe (11), la valeur ue must be determined marchande est calculée : (a) when the value is calculated for inventory purpos- a) dans le cas où il s’agit de déterminer la valeur des es, at the beginning or end of the fiscal year; and stocks, au début ou à la fin de l’exercice; (b) when the value is calculated for any other pur- b) dans les autres cas, au moment où les minéraux ou pose, at the time the minerals or processed minerals minéraux traités sont expédiés de la mine. are shipped from the mine. Exclusion respecting hedging transactions Exclusion — opérations de couverture (13) Gains and losses from hedging transactions must (13) Les gains et les pertes provenant d’opérations de not be included in calculating the value of the mine’s out- couverture n’entrent pas dans le calcul de la valeur de la put. production de la mine. Exchange rate Taux de change (14) For the purpose of these Regulations, the Bank of (14) Pour l’application du présent règlement, le taux de Canada’s noon exchange rate must be used to convert change utilisé pour convertir en dollars canadiens les de- foreign currencies into Canadian dollars vises étrangères est celui annoncé par la Banque du Canada à midi : (a) as of the date of that transaction if a transaction is carried out in a foreign currency; and a) le jour où la transaction en devises étrangères est effectuée; (b) as of the last day of the fiscal year if inventories have been valued in a foreign currency. b) si les stocks sont évalués en devises étrangères, le jour où prend fin l’exercice. Operating costs for operations outside Canada Frais d’exploitation — opérations à l’extérieur du Canada (15) When operating costs are incurred for operations (15) Lorsque des frais d’exploitation sont engagés pour outside of Canada, the operator may convert foreign cur- des opérations ayant lieu à l’extérieur du Canada, l’ex- rency transactions for those costs into Canadian dollars ploitant peut convertir en dollars canadiens les Current to September 3, 2026 48 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances Sections 69-70 Articles 69-70 using the Bank of Canada’s average noon exchange rate transactions en devises étrangères relatives à ces frais, for the month in which those costs were incurred. selon le taux de change moyen de la Banque du Canada, à midi, du mois au cours duquel les frais ont été engagés. Deductions Déductions 70 (1) In calculating the value of the output of a mine 70 (1) Dans le calcul de la valeur de la production d’une for a fiscal year, only the following deductions and al- mine pour un exercice, seuls les montants suivants lowances may be claimed: peuvent être déduits : (a) the costs, incurred during the fiscal year, of sort- a) les frais engagés au cours de l’exercice au titre du ing, valuing, marketing and selling the minerals or triage, de l’évaluation, de la commercialisation et de la processed minerals produced from the mine; vente des minéraux ou minéraux traités produits par la mine; (b) the costs, incurred during the fiscal year, of insur- ance, storage, handling and transportation to the pro- b) les frais engagés au cours de l’exercice au titre de cessing plant or market, in respect of the minerals or l’assurance, de l’entreposage et de la manutention des processed minerals produced from the mine; minéraux ou minéraux traités produits par la mine ainsi qu’au titre de leur transport vers une usine de (c) the costs, incurred during the fiscal year, of min- traitement ou vers les marchés; ing and processing minerals or processed minerals from the mine; c) les frais engagés au cours de l’exercice au titre de la production et du traitement des minéraux ou miné- (d) the costs, incurred during the fiscal year, of re- raux traités de la mine; pair, maintenance or reclamation at the mine; d) les frais engagés à la mine au cours de l’exercice au (e) the consideration paid by a member of a joint titre des réparations, de l’entretien et des restaura- venture for minerals or processed minerals diverted tions; from another member of the joint venture, when each member is delivering a separate mining royalty return e) la contrepartie versée par un membre d’une coen- in accordance with section 74; treprise pour les minéraux ou minéraux traités trans- férés d’un autre membre de la coentreprise, si chaque (f) general and administrative costs incurred during membre remet une déclaration de redevances mi- the fiscal year for property, employees or operations at nières distincte conformément à l’article 74; the mine that are not otherwise allocated to operating costs; f) les frais généraux et administratifs engagés au cours de l’exercice et qui ne sont pas autrement com- (g) exploration costs incurred during the fiscal year pris dans les frais d’exploitation, lorsqu’ils ont trait by an owner of the mine, other than on the mining aux biens, aux employés ou aux opérations de la mine; property, if those costs have not been otherwise claimed as an allowance or deduction under these g) les frais d’exploration engagés au cours de l’exer- Regulations, in an amount not greater than 10% of the cice par un propriétaire de la mine, ailleurs que sur la value of the output of the mine multiplied by the own- propriété minière, si une déduction n’a pas déjà été ré- er’s share of that output, calculated clamée à leur égard aux termes du présent règlement, jusqu’à concurrence de 10 % de la valeur de la produc- (i) after deduction of the costs referred to in para- tion de la mine multipliée par la part du propriétaire graphs (a) to (f), and de cette production, calculée : (ii)before the deduction of any depreciation al- (i) après soustraction des montants visés aux ali- lowance, mining reclamation trust contribution al- néas a) à f), lowance, development allowance or processing al- lowance; (ii) avant soustraction de toute déduction pour amortissement ou de toute déduction relative à (h) subject to subsection (5), paragraphs (8)(d) and l’aménagement, au traitement ou à la contribution (9)(e) and subsection (10), a depreciation allowance effectuée au profit d’une fiducie de restauration mi- for the depreciable assets of the mine, and for the de- nière; preciable assets of any facilities located outside the Current to September 3, 2026 49 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 70 Article 70 Northwest Territories that are used for the processing h) sous réserve du paragraphe (5), des alinéas (8)d) of minerals or processed minerals produced from the et (9)e) et du paragraphe (10), une déduction pour mine in an amount not exceeding the undeducted bal- amortissement des actifs amortissables de la mine et ance of the cost of those depreciable assets at the end des actifs amortissables des installations, situées à of the fiscal year of the mine; l’extérieur des Territoires du Nord-Ouest et utilisées pour le traitement des minéraux ou minéraux traités (i) a development allowance, not exceeding the unde- produits par la mine, dont le montant ne dépasse pas ducted balance at the end of the fiscal year of the mine la fraction non amortie du coût de ces actifs amortis- of sables à la fin de l’exercice; (i) exploration costs incurred, before the date of i) une déduction relative à l’aménagement ne dépas- commencement of production, on the mining prop- sant pas la fraction non amortie à la fin de l’exercice erty as constituted on the date of commencement of du total des sommes suivantes : production and not deducted under paragraph (g) in respect of any other mine, (i) les frais d’exploration engagés, avant la date de mise en production, sur la propriété minière telle (ii) all costs incurred before the date of the com- qu’elle était à cette date, et non déduits aux termes mencement of production for the purposes of de l’alinéa g) à l’égard de toute autre mine, bringing the mine into production less the total of (ii)l’excédent des frais engagés avant la date de (A) the value of any minerals or processed min- mise en production de la mine en vue d’en lancer la erals produced from the mining property that production sur le total des sommes suivantes : were sold or transferred before the date of com- mencement of production, calculated in accor- (A) la valeur des minéraux ou minéraux traités dance with section 69, and provenant de la propriété minière qui ont été vendus ou transférés avant la date de mise en (B) the market value of any minerals or pro- production, calculée conformément à l’article 69, cessed minerals produced from the mining prop- erty that are in inventory on the date of com- (B) la valeur marchande des minéraux ou miné- mencement of production, calculated in raux traités provenant de la propriété minière accordance with section 69, qui sont en stock à la date de mise en produc- tion, calculée conformément à l’article 69, (iii) exploration costs incurred on the mining property after the date of commencement of pro- (iii) les frais d’exploration engagés sur la propriété duction, minière après la date de mise en production, (iv) costs incurred after the date of commence- (iv) les frais engagés après la date de mise en pro- ment of production for workings designed for con- duction pour des ouvrages conçus pour un usage tinuing use, including the clearing, removing or prolongé, y compris le dégagement ou l’enlèvement stripping of overburden from a new deposit at the des terrains de recouvrement d’un nouveau gise- mine, the sinking, excavation or extension of a ment à la mine, la perforation, le creusage ou l’ex- mine shaft, main haulage way or similar under- tension d’un puits de mine, d’une galerie de roulage ground workings, the construction of an adit or principale ou d’autres aménagements souterrains other underground entry and the construction of a similaires, la construction d’une galerie horizontale road or of tailings disposal structures at the mine, ou d’une autre voie d’accès souterraine, et la and construction d’une route ou de structures d’évacua- tion des résidus à la mine, (v) if minerals or processed minerals are being produced in commercial quantities from a recorded (v) si des minéraux ou minéraux traités sont pro- claim or leased claim that was incorporated into the duits en quantité commerciale soit à partir d’un mining property after the date of the commence- claim enregistré ou d’un claim enregistré faisant ment of production of the mine, or from another l’objet d’un bail qui a été incorporé à la propriété mining property that was incorporated into the minière après la date de mise en production, soit à mining property on which the mine is located after partir d’une autre propriété minière qui a été incor- the date of the commencement of production, porée à la propriété minière sur laquelle la mine est située après la date de mise en production : Current to September 3, 2026 50 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 70 Article 70 (A) if the claim or lease was purchased, the pur- (A) dans le cas où le claim ou le bail a été ache- chase price of the claim or lease or the amount té, le prix d’achat ou, s’ils sont moins élevés, les referred to in clause (B), whichever is the lesser, frais visés à la division (B), or (B) dans les autres cas, les frais visés aux sous- (B) in any other case, the costs referred to in alinéas (i) et (ii) engagés à l’égard du claim ou du subparagraphs (i) and (ii) that were incurred on bail ainsi incorporé et pour lesquels une déduc- the incorporated claim or lease and that have not tion n’a pas déjà été réclamée en vertu du pré- been previously claimed as a deduction or al- sent règlement; lowance under these Regulations; j) une déduction relative à la contribution effectuée (j) a mining reclamation trust contribution al- au profit d’une fiducie de restauration minière, déter- lowance, determined by the operator, not exceeding minée par l’exploitant, ne dépassant pas la fraction the undeducted balance at the end of the fiscal year of non amortie, à la fin de l’exercice, des contributions amounts contributed to the mining reclamation trust effectuées au profit de la fiducie de restauration mi- with respect to any environmental impact resulting nière en raison des répercussions environnementales from the mining of minerals from lands to which these découlant de l’exploitation minière des terres visées Regulations apply; par le présent règlement; (k) if minerals or processed minerals are processed k) si des minéraux ou minéraux traités ont été traités by the operator of the mine before their sale or trans- par l’exploitant de la mine avant leur vente ou leur fer, an annual processing allowance equal to the lesser transfert, une déduction annuelle relative au traite- of ment égale à la moins élevée des sommes suivantes : (i) subject to subsection (2), 8% of the original cost (i) sous réserve du paragraphe (2), 8 % du coût of the processing assets used by the operator in the d’origine des biens utilisés pour le traitement dont processing of the output of the mine during the fis- l’exploitant fait usage dans le traitement de la pro- cal year, and duction de la mine pendant l’exercice, (ii) 65% of the value of the output of the mine, af- (ii) 65 % de la valeur de la production de la mine, ter deduction of the amounts referred to in para- déduction faite des sommes visées aux alinéas a) à graphs (a) to (j); and j); (l) if minerals or processed minerals from the mine l) si des minéraux ou minéraux traités de la mine are processed at another mine, or at any facilities lo- sont traités dans une autre mine ou dans des installa- cated outside the Northwest Territories that are used tions situées à l’extérieur des Territoires du Nord- for the processing of minerals or processed minerals Ouest et utilisées pour le traitement des minéraux ou produced from another mine that is owned by the op- minéraux traités produits par une autre mine apparte- erator or by a person related to the operator, the total nant à l’exploitant ou à une personne liée à celui-ci, le of total des sommes suivantes : (i) the amount of the costs of the other mine that (i) les frais engagés à l’égard de l’autre mine qui ne are not deductible under paragraph (8)(b), sont pas déductibles aux termes de l’alinéa (8)b), (ii) the amount by which the processing allowance (ii) la réduction aux termes de l’alinéa (8)c) de la for the other mine is reduced under paragraph déduction relative au traitement de l’autre mine, (8)(c), and (iii) le rajustement de la fraction non amortie du (iii) the amount by which the undeducted balance coût d’origine des actifs amortissables de l’autre of the original cost of the other mine’s depreciable mine aux termes de l’alinéa (8)d). assets is adjusted under paragraph (8)(d). Production or fiscal year less than 12 months Production ou exercice de moins de douze mois (2) When a mine is in production for less than 12 (2) Lorsqu’une mine est en production durant moins de months in a fiscal year or a fiscal year of a mine is less douze mois au cours d’un exercice ou que son exercice est than 12 months, de moins de douze mois : Current to September 3, 2026 51 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 70 Article 70 (a) the deduction for processing allowance calculated a) la déduction relative au traitement calculée under subparagraph (1)(k)(i) must be multiplied by conformément au sous-alinéa (1)k)(i) est multipliée one-twelfth times the number of months in the fiscal par un douzième du nombre de mois de production de year that the mine was in production or the number of la mine pendant l’exercice ou du nombre de mois que months in the shortened fiscal year, as the case may comprend l’exercice de moins de douze mois; be; and b) les valeurs indiquées à la colonne 1 du tableau du (b) each dollar amount in column 1 of the table to paragraphe 69(1) sont multipliées par un douzième du subsection 69(1) must be multiplied by one-twelfth nombre de mois de production de la mine pendant times the number of months in the fiscal year that the l’exercice ou du nombre de mois que comprend l’exer- mine was in production or the number of months in cice de moins de douze mois. the shortened fiscal year, as the case may be. Deduction respecting related person Déduction — opération avec une personne liée (3) When the operator of a mine claims a deduction for (3) Lorsque l’exploitant d’une mine réclame une déduc- costs incurred in a transaction with a related person, the tion pour les frais engagés relativement à une opération costs allowed as a deduction under this section must be avec une personne liée, le montant de la déduction per- the amount of the actual costs incurred by the related mise par le présent article est le montant des frais réels person, exclusive of any profit, gain or commission to the engagés par la personne liée, à l’exclusion de tout béné- related person or to any other related person. fice, gain ou commission versé à cette personne ou à toute autre personne liée à l’exploitant. Depreciation allowance Déduction pour amortissement (4) A depreciation allowance may be claimed in respect (4) Une déduction pour amortissement peut être récla- of a depreciable asset in the fiscal year in which it is first mée à l’égard d’un actif amortissable durant le premier used in the operations of the mine. exercice au cours duquel il est utilisé dans l’exploitation de la mine. Reduction in depreciation allowance Réduction de déduction pour amortissement (5) When an operator disposes of, or receives insurance (5) Lorsqu’un exploitant dispose des actifs à l’égard des- proceeds in respect of, assets for which a depreciation al- quels une déduction pour amortissement a été réclamée lowance has been claimed, ou reçoit le produit de l’assurance pour ceux-ci : (a) the undeducted balance of depreciable assets a) la fraction non amortie des actifs amortissables est must be reduced by the lesser of réduite du moindre des montants suivants : (i) the proceeds of disposition or insurance pro- (i) le produit de la disposition ou de l’assurance, ceeds, as the case may be, and (ii) le coût d’origine des actifs; (ii) the original cost of the asset; and b) lorsque le moindre des montants visés à l’alinéa a) (b) when the lesser of the amounts referred to in sub- dépasse la fraction non amortie des actifs amortis- paragraphs (a)(i) and (ii) exceeds the undeducted bal- sables durant l’exercice au cours duquel il en a été dis- ance of depreciable assets in the fiscal year in which posé, l’excédent est inclus dans la valeur de la produc- the assets were disposed of, the excess must be includ- tion de la mine pour cet exercice. ed in the value of the output of the mine for that fiscal year. Depreciation allowance — proceeds of disposition Déduction de dépréciation — produit de la disposition (6) For the purposes of subsection (5), when the opera- (6) Pour l’application du paragraphe (5), lorsque l’ex- tor of a mine sells to a related person an asset for which a ploitant d’une mine vend à une personne liée un actif à depreciation allowance has been claimed or removes the l’égard duquel une déduction pour amortissement a été asset from the mine, the proceeds of disposition of the réclamée ou lorsqu’il retire l’actif de la mine, le produit asset are the amount that could be expected to be de la disposition correspond au produit probable de la Current to September 3, 2026 52 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 70 Article 70 realized from the sale of the asset to a person not related vente de cet actif à une personne qui n’est pas liée à l’ex- to the operator. ploitant. Depreciation allowance — purchase cost Déduction de dépréciation — coût de l’actif (7) When the operator of a mine purchases from a relat- (7) Lorsque l’exploitant d’une mine achète d’une per- ed person an asset that is eligible for a depreciation al- sonne liée un actif admissible à une déduction pour lowance or transfers to the mine an asset from another amortissement ou transfère à la mine un actif provenant mine owned by the operator, the cost of the asset for the d’une autre mine lui appartenant, le coût de l’actif ser- purposes of calculating a depreciation allowance is the vant au calcul de cette déduction correspond au montant amount that the operator could be expected to pay to qu’il pourrait devoir payer pour acheter cet actif d’une purchase that asset from a person not related to the oper- personne qui ne lui est pas liée. ator. Rules respecting processing minerals not produced Traitement de minéraux ne provenant pas de la at the mine mine (8) When, in a particular fiscal year, a mine’s operator (8) Si, au cours d’un exercice, l’exploitant d’une mine se uses the mine’s depreciable assets, or any facilities locat- sert des actifs amortissables de la mine ou d’installations, ed outside the Northwest Territories that are used for the situées à l’extérieur des Territoires du Nord-Ouest et uti- processing of minerals or processed minerals produced lisées pour le traitement des minéraux ou minéraux trai- from the mine, to process minerals or processed minerals tés produits par la mine, pour traiter des minéraux ou other than those produced from the mine, minéraux traités qui ne proviennent pas de la mine : (a) the revenue earned from the sale or processing of a) les revenus tirés de la vente ou du traitement de those minerals or processed minerals must not be in- ces minéraux ou minéraux traités sont exclus de la va- cluded in the value of the output of the mine; leur de la production de la mine; (b) the deduction for the costs incurred during the b) la déduction pour les frais engagés pendant l’exer- fiscal year under paragraphs (1)(a) to (f) must be re- cice aux termes des alinéas (1)a) à f) est réduite des duced by any costs incurred for the processing of min- frais engagés pour le traitement des minéraux ou mi- erals or processed minerals not produced from the néraux traités qui ne proviennent pas de la mine; mine; c) le coût d’origine des biens utilisés pour le traite- (c) the original cost of the processing assets used to ment ayant servi au calcul de la déduction relative au calculate the processing allowance amount under sub- traitement aux termes du sous-alinéa (1)k)(i) est ré- paragraph (1)(k)(i) must be reduced by an amount duit d’une somme égale au coût d’origine des biens equal to the original cost of the processing assets mul- utilisés pour le traitement multiplié par le rapport tiplied by the ratio of the costs incurred during the fis- entre, d’une part, les frais engagés pendant l’exercice cal year under paragraphs (1)(a) to (f) for the process- aux termes des alinéas (1)a) à f) pour le traitement des ing of minerals or processed minerals not produced minéraux ou minéraux traités qui ne proviennent pas from the mine to the total costs incurred during the de la mine et, d’autre part, le total des frais engagés fiscal year, under those paragraphs, for the processing pendant l’exercice aux termes de ces alinéas pour le of all minerals or processed minerals at the mine; and traitement, à la mine, de tous les minéraux ou miné- raux traités; (d) the undeducted balance of the original cost of the mine’s depreciable assets at the end of the fiscal year d) la fraction non amortie du coût d’origine des actifs must be adjusted to exclude an amount equal to the amortissables de la mine à la fin de l’exercice est rajus- original cost of the depreciable assets used to process tée par soustraction d’une somme égale au coût d’ori- minerals or processed minerals not produced from the gine des actifs amortissables ayant servi au traitement mine multiplied by the ratio of the costs incurred un- des minéraux ou minéraux traités qui ne proviennent der paragraphs (1)(a) to (f) during that fiscal year and pas de la mine multiplié par le rapport entre, d’une all prior fiscal years for the processing through those part, les frais engagés pendant l’exercice et tous les assets of minerals or processed minerals not produced exercices précédents aux termes des alinéas (1)a) à f) from the mine to the total costs incurred under those pour le traitement au moyen de ces actifs des miné- paragraphs during that fiscal year and all prior fiscal raux ou minéraux traités qui ne proviennent pas de la mine et, d’autre part, le total des frais engagés Current to September 3, 2026 53 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 70 Article 70 years for the processing through those assets of all pendant l’exercice et tous les exercices précédents aux minerals and processed minerals at the mine. termes des mêmes alinéas pour le traitement, à la mine, au moyen de ces actifs de tous les minéraux ou minéraux traités. Rules respecting adjustment of calculations Règles de rajustement des calculs (9) When a mine produces minerals or processed miner- (9) Si des minéraux ou minéraux traités sont produits als from lands to which these Regulations apply and any par une mine et proviennent de terres visées par le pré- other lands, sent règlement et d’autres terres : (a) the deduction for the costs incurred during the a) la déduction pour les frais engagés pendant l’exer- fiscal year under paragraphs (1)(a) to (f) must be re- cice aux termes des alinéas (1)a) à f) est réduite des duced by any costs incurred for the production of min- frais engagés pour la production de minéraux ou mi- erals or processed minerals from lands other than néraux traités qui ne proviennent pas des terres visées lands to which these Regulations apply; par le présent règlement; (b) the original cost of the processing assets used to b) le coût d’origine des biens utilisés pour le traite- calculate the processing allowance under subpara- ment ayant servi au calcul de la déduction relative au graph (1)(k)(i) must be reduced by an amount equal to traitement aux termes du sous-alinéa (1)k)(i) est ré- the original cost of the processing assets multiplied by duit d’une somme égale au coût d’origine des biens the ratio of the costs incurred during the fiscal year utilisés pour le traitement multiplié par le rapport under paragraphs (1)(a) to (f) for the processing of entre, d’une part, les frais engagés pendant l’exercice minerals or processed minerals produced from lands aux termes des alinéas (1)a) à f) pour le traitement des other than lands to which these Regulations apply to minéraux ou minéraux traités qui ne proviennent pas the total costs incurred during the fiscal year, under des terres visées par le présent règlement et, d’autre those paragraphs, for the processing of all minerals or part, le total des frais engagés pendant l’exercice aux processed minerals at the mine; termes des mêmes alinéas pour le traitement, à la mine, de tous les minéraux ou minéraux traités; (c) the undeducted balance of costs eligible for the mine’s development allowance at the end of the fiscal c) la fraction non amortie des frais admissibles à la year must be adjusted to exclude an amount equal to déduction relative à l’aménagement de la mine à la fin the costs referred to in subparagraph (1)(i)(ii) multi- de l’exercice est rajustée par soustraction d’une plied by the ratio of the costs incurred under para- somme égale aux frais engagés aux termes du sous-ali- graphs (1)(a) to (f) during that fiscal year and all prior néa (1)i)(ii) multipliés par le rapport entre, d’une part, fiscal years for the production of minerals or pro- les frais engagés pendant l’exercice et tous les exer- cessed minerals from lands other than lands to which cices précédents aux termes des alinéas (1)a) à f) pour these Regulations apply to the total costs incurred un- la production de minéraux ou minéraux traités qui ne der those paragraphs during that fiscal year and all proviennent pas des terres visées par le présent règle- prior fiscal years for the production of all minerals or ment et, d’autre part, le total des frais engagés pen- processed minerals at the mine; dant l’exercice et tous les exercices précédents aux termes des mêmes alinéas pour la production, à la (d) the undeducted balance of costs eligible for the mine, de tous les minéraux ou minéraux traités; mine’s development allowance at the end of the fiscal year must be adjusted to exclude an amount equal to d) la fraction non amortie des frais admissibles à la the costs of the workings referred to in subparagraph déduction relative à l’aménagement de la mine à la fin (1)(i)(iv) used in the production of minerals or pro- de l’exercice est rajustée par soustraction d’une cessed minerals from lands other than lands to which somme égale aux frais engagés pour les ouvrages visés these Regulations apply multiplied by the ratio of the au sous-alinéa (1)i)(iv) servant à la production de mi- costs incurred under paragraphs (1)(c) to (f) during néraux ou minéraux traités qui ne proviennent pas des that fiscal year and all prior fiscal years for the use of terres visées par le présent règlement multipliés par le those workings in the production of minerals or pro- rapport entre, d’une part, les frais engagés pendant cessed minerals from lands other than lands to which l’exercice et tous les exercices précédents aux termes these Regulations apply to the total costs incurred un- des alinéas (1)c) à f) pour l’usage de ces ouvrages dans der those paragraphs during that fiscal year and all la production de minéraux ou minéraux traités qui ne prior fiscal years for the use of those workings in the proviennent pas des terres visées par le présent règle- ment et, d’autre part, le total des frais engagés Current to September 3, 2026 54 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 70 Article 70 production of all minerals or processed minerals at the pendant l’exercice et tous les exercices précédents aux mine; and termes des mêmes alinéas pour l’usage de ces ou- vrages dans la production, à la mine, de tous les miné- (e) the undeducted balance of the original cost of the raux ou minéraux traités; mine’s depreciable assets at the end of the fiscal year must be adjusted to exclude an amount equal to the e) la fraction non amortie du coût d’origine des actifs original cost of the depreciable assets used in the pro- amortissables de la mine à la fin de l’exercice est rajus- duction or processing of minerals or processed miner- tée par soustraction d’une somme égale au coût d’ori- als produced from lands other than lands to which gine des actifs amortissables utilisés dans la produc- these Regulations apply multiplied by the ratio of the tion ou le traitement des minéraux ou minéraux costs incurred under paragraphs (1)(a) to (f) during traités qui ne proviennent pas des terres visées par le that fiscal year and all prior fiscal years for the use of présent règlement multiplié par le rapport entre, d’une those assets for the production or processing of miner- part, les frais engagés pendant l’exercice et tous les als or processed minerals produced from lands other exercices précédents aux termes des alinéas (1)a) à f) than lands to which these Regulations apply to the to- pour l’utilisation de ces actifs dans la production ou le tal costs incurred under those paragraphs during that traitement des minéraux ou minéraux traités qui ne fiscal year and all prior fiscal years for the use of those proviennent pas des terres visées par le présent règle- assets for the production or processing of all minerals ment et, d’autre part, le total des frais engagés pen- or processed minerals produced at the mine. dant l’exercice et tous les exercices précédents aux termes des mêmes alinéas pour l’utilisation de ces ac- tifs dans la production ou le traitement, à la mine, de tous les minéraux ou minéraux traités. Timing and other requirements respecting Rajustements adjustments (10) The adjustments referred to in paragraphs (8)(d) (10) Les rajustements prévus aux alinéas (8)d) et (9)c) à and (9)(c) to (e) must each be calculated at the end of e) sont calculés à la fin de chaque exercice de la mine et la each fiscal year of the mine with the difference between différence entre la somme calculée pour l’exercice et la the amount calculated for that fiscal year and the amount somme calculée pour les exercices précédents est addi- calculated for the previous fiscal year being added to or tionnée à la fraction non amortie des actifs amortissables subtracted from the undeducted balance of the deprecia- ou des frais admissibles à la déduction relative à l’aména- ble assets or the undeducted balance of the costs eligible gement, ou en est soustraite, s’il y a lieu. for the development allowance, as the case may be. Limitations on deductions and allowances Coûts et frais ne donnant pas droit à déduction (11) Despite any other subsection of this section, no de- (11) Malgré les autres dispositions du présent article, duction or allowance can be made in respect of a mine in aucune déduction n’est accordée relativement à une mine relation to pour : (a) the capital cost of the depreciable assets, other a) le coût en capital des actifs amortissables autres than those subject to the depreciation allowance under que ceux visés par la déduction pour amortissement paragraph (1)(h); prévue à l’alinéa (1)h); (b) depletion in the value of the mine or mining prop- b) la baisse de la valeur de la mine ou de la propriété erty by reason of exhaustion of the minerals; minière en raison de l’épuisement des réserves de mi- néraux; (c) if an owner or the operator of the mine is a corpo- ration, c) lorsque le propriétaire ou l’exploitant de la mine est une société : (i) remuneration and travel costs of directors, (i) la rémunération et les frais de déplacement des (ii) stock transfer agents’ fees, administrateurs, (iii) shareholders’ meetings or the preparation of (ii) les honoraires versés aux agents des transferts, shareholders’ reports, and Current to September 3, 2026 55 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 70 Article 70 (iv) legal, accounting and other costs incurred in (iii) les réunions des actionnaires et l’établisse- connection with incorporations, reorganizations, fi- ment des rapports des actionnaires, nancing or security or stock issues; (iv) les frais juridiques, de comptabilité et ceux liés (d) interest on any debt, including an overdraft, loan, à la constitution en personne morale, aux réorgani- mortgage, advance, debenture or bond, that is capital- sations, au financement et à l’émission de valeurs ized or expensed for accounting purposes; mobilières ou d’actions; (e) remuneration of executive officers, administrative d) l’intérêt sur toute dette, y compris les découverts, and consulting costs and costs in respect of offices not les emprunts, les avances, les hypothèques, les dében- located at the mine site, unless that remuneration or tures et les obligations, capitalisé ou passé en charges those costs are directly related to operations of the pour les besoins de la comptabilité; mine or to the marketing and selling of minerals or processed minerals produced from the mine; e) la rémunération des dirigeants, les frais d’adminis- tration et de consultation ainsi que les frais relatifs (f) the taxes on profits, property or capital, or pay- aux bureaux qui ne sont pas situés sur le site de la ments in lieu of those taxes, paid to any level of gov- mine, sauf s’ils sont directement liés à l’exploitation de ernment and the cost of preparing returns in respect la mine ou à la commercialisation et à la vente des mi- of those taxes, except for customs duties, sales and ex- néraux ou minéraux traités produits par la mine; cise taxes not otherwise refundable to the operator, for any taxes related to the employment of employees, f) les impôts et taxes sur les bénéfices, les biens ou le and for the cost of preparing a return in respect of capital, et les paiements en tenant lieu, versés à tous those taxes; les ordres de gouvernement et les frais de préparation des déclarations de revenus relatives à ces impôts et (g) the royalties paid for the use of mining property, taxes, à l’exception des droits de douane, des taxes de the royalties calculated on revenue, production or vente et d’accise qui ne sont pas à rembourser à l’ex- profits of the mine, and the cost of calculating any roy- ploitant, des impôts concernant l’emploi de personnel alties other than the royalties paid or payable under et des frais de préparation des déclarations de revenus these Regulations; relatives à ces impôts ou taxes; (h) payments made to an organization, community or g) les redevances payées pour l’utilisation d’une pro- corporation, including an Aboriginal organization, priété minière, les redevances calculées sur les reve- community or corporation, that are not attributable to nus, la production ou les bénéfices de la mine et les the provision of goods and services directly related to frais relatifs au calcul de toute redevance autre que les the development and operation of the mine or to redevances payées ou à payer au titre du présent règle- prospecting and exploration on lands to which these ment; Regulations apply; h) les paiements faits à un organisme, à une collecti- (i) payments made for the use or lease of, or access vité ou à une société autochtone ou non autochtone to, the surface of the land on which the mine is locat- qui ne sont pas attribuables à la fourniture de biens et ed; à la prestation de services directement liés à l’aména- gement et à l’exploitation de la mine ou à la prospec- (j) discounts on bonds, debentures, shares or sales of tion et à l’exploration sur des terres visées par le pré- receivables; sent règlement; (k) increases in reserves or provisions for contingen- i) les paiements effectués pour utiliser ou louer la cies, other than in respect of a mining reclamation surface du terrain sur lequel se trouve la mine, ou trust; pour y avoir accès; (l) dues and memberships for persons, other than j) les escomptes accordés sur les obligations, les dé- employees, involved in the operation of the mine; bentures, les actions et les créances vendues; (m) insurance premiums other than those paid for k) les augmentations du fonds de réserve ou de la ré- minerals or processed minerals produced from the serve pour les imprévus, à l’exception de celles se rap- mine; portant à une fiducie de restauration minière; Current to September 3, 2026 56 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 70 Article 70 (n) costs incurred during the fiscal year to produce l) les droits d’adhésion versés pour des personnes, revenue that does not form part of the value of the autres que les employés, prenant part à l’exploitation output of the mine; de la mine; (o) subject to subparagraph (1)(i)(v), the purchase m) les primes d’assurance, sauf celles payées pour les price of a recorded claim, a lease of a recorded claim minéraux ou minéraux traités produits par la mine; or a mine; n) les frais engagés pendant l’exercice pour générer (p) the purchase price of any financial instrument; des revenus qui n’entrent pas dans le calcul de la va- leur de la production de la mine; (q) charitable donations; o) sous réserve du sous-alinéa (1)i)(v), le prix d’achat (r) advertising costs not directly identified with the d’un claim enregistré, d’un claim enregistré visé par output of a particular mine; un bail ou d’une mine; (s) any cost not evidenced in accordance with gener- p) le prix d’achat de tout instrument financier; ally accepted auditing standards; q) les dons de charité; (t) the cost of inventories of fuel, other consumables and spare parts that have not been consumed in the r) les frais engagés pour la publicité ne visant pas la operation of the mine; production d’une mine en particulier; (u) the costs of staking or recording a claim, or the s) les frais qui ne sont pas attestés conformément aux cost of surveying the claim for the purpose of taking it normes de vérification généralement reconnues; to lease; t) le coût des stocks de combustible, des biens de (v) rent paid for the lease of a recorded claim under consommation et des pièces de rechange qui n’ont pas these Regulations; été utilisés dans le cadre de l’exploitation de la mine; (w) the cost of preparing any financial information u) le coût du jalonnement et de l’enregistrement d’un not required for the calculation of mining royalties; claim et le coût de l’arpentage d’un claim effectué en vue d’obtenir un bail; (x) any cost incurred after any precious stones have been last valued by the mining royalty valuer, if those v) le loyer payé pour le bail d’un claim enregistré en stones were sold or transferred to a related party, or to vertu du présent règlement; any other person if proof of the disposition is not pro- vided, or if the stones were cut and polished before w) le coût relatif à l’établissement de données finan- their sale or transfer; cières qui ne sont pas nécessaires au calcul des rede- vances minières; (y) any costs related to public, community or govern- ment relations unless those costs were incurred for en- x) les frais engagés après la dernière évaluation des vironmental assessments or other regulatory process- pierres précieuses faite par l’évaluateur des rede- es; and vances minières si celles-ci ont été vendues ou transfé- rées à une personne liée ou à toute autre personne, si (z) any fines, penalties or bribes. la preuve de leur disposition n’est pas fournie, ou si elles ont été taillées ou polies avant leur vente ou leur transfert; y) les frais engagés pour les relations publiques et ad- ministratives et pour les relations avec les collectivités, sauf s’ils ont été engagés pour une évaluation environ- nementale ou pour tout autre processus réglemen- taire; z) toute amende, peine et sanction de même que tout pot-de-vin. Current to September 3, 2026 57 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 71 Article 71 Change of owner or operator has no effect Changement de propriétaire ou d’exploitant — sans effet 71 (1) A change in the ownership or of the operator of a 71 (1) Le changement de propriétaire ou d’exploitant mine does not affect de la mine n’a pas pour effet de modifier : (a) the undeducted balance of the depreciable assets a) la fraction non amortie des actifs amortissables eligible for a depreciation allowance; admissibles à une déduction pour amortissement; (b) the undeducted balance of the costs eligible for a b) la fraction non amortie des frais admissibles à la development allowance; déduction relative à l’aménagement; (c) the undeducted balance of contributions to a min- c) la fraction non amortie des contributions effec- ing reclamation trust; or tuées au profit d’une fiducie de restauration minière; (d) the original cost of the assets used for calculating d) le coût d’origine des actifs ayant servi au calcul de a processing allowance. la déduction relative au traitement. Costs not eligible for development allowance Frais non admissibles à une déduction (2) Subject to paragraph 70(1)(i), when a recorded claim (2) Sous réserve de l’alinéa 70(1)i), si un claim enregis- expires or its recording is cancelled, or a lease expires or tré ou un bail expire ou si l’enregistrement d’un claim ou is cancelled, any costs incurred in respect of that claim or un bail est annulé, tous les frais engagés relativement au lease that would otherwise be eligible for a development claim ou au bail qui seraient autrement admissibles à une allowance are no longer eligible for a development al- déduction relative à l’aménagement cessent d’être admis- lowance in respect of any mine. sibles à une telle déduction à l’égard de toute mine. Combining operations on two mining properties Regroupement des activités minières (3) If a mining property is acquired by the operator of (3) Si une propriété minière est acquise par l’exploitant another mine and the operations on the two mining d’une autre mine et que les activités des propriétés mi- properties are combined to become a single operation, nières sont regroupées dans une seule, la fraction non the undeducted balance of the costs eligible for the devel- amortie des actifs amortissables admissibles à une dé- opment allowance, the undeducted balance of the cost of duction pour amortissement, la fraction non amortie des the depreciable assets eligible for the depreciation al- frais admissibles à la déduction relative à l’aménage- lowance, the undeducted balance of the contributions to ment, la fraction non amortie des contributions effec- a mining reclamation trust and the original cost of the tuées au profit d’une fiducie de restauration minière et le processing assets eligible for the processing allowance for coût d’origine des actifs ayant servi au calcul de la déduc- each mine must be combined. tion relative au traitement pour chaque mine sont re- groupés. Valuations when mining property purchased from Achat d’une propriété minière de la Couronne Crown (4) For the purpose of subsection (3), if an operator pur- (4) Pour l’application du paragraphe (3), si l’exploitant chases a mining property from the Crown, the value of achète une propriété minière de la Couronne, la valeur de the undeducted balance of the costs eligible for the devel- la fraction non amortie des coûts admissibles à une dé- opment allowance, of the undeducted balance of the cost duction relative à l’aménagement, de la fraction non of the depreciable assets eligible for the depreciation al- amortie du coût des actifs amortissables admissible à une lowance and of the original cost of the processing assets déduction pour amortissement et du coût d’origine des eligible for the processing allowance of the purchased biens utilisés pour le traitement admissible à la déduc- mine is the lesser of the value established at the time the tion relative au traitement de la mine achetée correspond Crown acquired the mining property and the value estab- à celle établie au moment où la Couronne a acquis la pro- lished in the agreement of purchase and sale for that priété minière ou à celle établie dans la convention property. d’achat-vente de la propriété, si celle-ci est inférieure. Current to September 3, 2026 58 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances Sections 72-73 Articles 72-73 Statement respecting minerals whose gross value Déclaration — valeur brute de minéraux de plus de exceeds $100,000 100 000 $ 72 (1) If, in a particular year, minerals or processed 72 (1) Si, au cours d’une année donnée, des minéraux minerals that are from a leased claim and whose gross ou minéraux traités qui proviennent d’un claim enregis- value exceeds $100,000 are processed at a mine, re- tré visé par un bail et dont la valeur brute dépasse moved from a mine, sold or otherwise disposed of, the 100 000 $ sont traités à la mine, en sont retirés ou sont lessee must, within one month after the end of that year, vendus ou qu’il en est autrement disposé, le preneur à deliver to the Chief a statement setting out bail, dans le mois suivant la fin de cette année donnée, remet au chef une déclaration qui comporte les rensei- (a) the name and a description of the mine; gnements suivants : (b) the names and addresses of all owners, operators a) le nom et la description de la mine; and other lessees of the mine; b) les nom et adresse de tous les propriétaires, ex- (c) the name and address of a person to whom no- ploitants et preneurs à bail de la mine; tices may be sent; c) les nom et adresse d’une personne à qui les avis (d) the weight and value of minerals or processed peuvent être envoyés; minerals processed at the mine, removed from the mine, sold or otherwise disposed of during the year d) le poids et la valeur des minéraux ou minéraux and during each month of that year; and traités qui ont été traités à la mine, retirés de celle-ci, vendus ou dont il a été autrement disposé pendant (e) the design capacity of any mill, concentrator or l’année et au cours de chaque mois de l’année; other processing plant at the mine. e) la capacité de production nominale de toute usine de traitement à la mine, notamment toute usine de broyage ou tout concentrateur. Notice of changes Avis de changement (2) A lessee who has delivered a statement under sub- (2) Le preneur à bail qui a produit la déclaration avise section (1) must promptly notify the Chief of sans délai le chef : (a) any change in the name and address of the person a) de tout changement apporté aux nom et adresse de to whom notices may be sent; and la personne à qui les avis peuvent être envoyés; (b) any change in the ownership or of the operator of b) de tout changement de propriétaire ou d’exploi- the mine. tant de la mine. Contents of royalty return Déclaration de redevances minières 73 (1) On or before the last day of the fourth month af- 73 (1) Au plus tard le dernier jour du quatrième mois ter the end of each fiscal year of a mine, including the fis- suivant la fin de l’exercice d’une mine, y compris l’exer- cal year during which the mine commences production cice au cours duquel la mine est mise en production et and all subsequent years for which there are any amounts tous les exercices suivants au cours desquels des sommes that qualify for determining the values of A to H and J in sont indiquées pour calculer la valeur des éléments A à H subsection 69(4), the operator of the mine must deliver et J de la formule figurant au paragraphe 69(4), l’exploi- to the Chief a mining royalty return, in the prescribed tant de la mine remet au chef une déclaration de rede- form, setting out vances minières, selon la formule prescrite, qui comporte les renseignements suivants : (a) the name and a description of the mine; a) le nom et la description de la mine; (b) the name and address of the operator; b) les nom et adresse de l’exploitant; (c) the names of processing plants to which minerals or processed minerals have been shipped from the c) le nom des usines de traitement où les minéraux mine for processing; ou minéraux traités ont été expédiés de la mine pour traitement; Current to September 3, 2026 59 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 73 Article 73 (d) the weight of the minerals or processed minerals d) le poids des minéraux ou minéraux traités pro- produced from the mine during the fiscal year; duits par la mine pendant l’exercice; (e) the weight and value of the minerals or processed e) le poids et la valeur des minéraux ou minéraux minerals produced from the mine that were traités produits par la mine : (i) sold or transferred during the fiscal year of the (i) vendus ou transférés au cours de l’exercice à mine to persons not related to the operator, des personnes non liées à l’exploitant, (ii) sold or transferred during the fiscal year of the (ii) vendus ou transférés au cours de l’exercice à mine to persons related to the operator, des personnes liées à l’exploitant, (iii) in inventory at the beginning of the fiscal year (iii) en stock au début de l’exercice, of the mine, and (iv) en stock à la fin de l’exercice; (iv) in inventory at the end of the fiscal year of the mine; f) tous les frais et déductions réclamés aux termes du paragraphe 70(1); (f) any costs, deductions and allowances claimed un- der subsection 70(1); g) dans le cas d’une déduction réclamée à titre de frais d’exploration en vertu de l’alinéa 70(1)g), ou (g) if exploration costs are claimed as a deduction un- lorsque des frais sont inclus dans les frais admissibles der paragraph 70(1)(g), or if costs are included in the à titre de déduction relative à l’aménagement en vertu costs eligible for a development allowance under para- de l’alinéa 70(1)i), les claims enregistrés ou les baux graph 70(1)(i), the recorded claims or leases on which pour lesquels ces frais ont été engagés; those costs were incurred; h) en ce qui a trait aux actifs amortissables : (h) in respect of depreciable assets, (i) leur fraction non amortie au début de l’exercice, (i) the undeducted balance of depreciable assets at the beginning of the fiscal year, (ii) le coût de l’acquisition de tels actifs au cours de l’exercice, (ii) the cost of additions during the fiscal year to depreciable assets, (iii) le produit de la disposition de tels actifs au cours de l’exercice, (iii) the proceeds from the disposition during the fiscal year of depreciable assets, (iv) leur fraction non amortie à la fin de l’exercice, avant soustraction de toute déduction pour amor- (iv) the undeducted balance of depreciable assets tissement, at the end of the fiscal year before deduction of a depreciation allowance, (v) leur fraction non amortie à la fin de l’exercice, après soustraction de toute déduction pour amor- (v) the undeducted balance of depreciable assets at tissement, the end of the fiscal year after deduction of a depre- ciation allowance, and (vi) le coût d’origine des actifs amortissables dont il a été disposé au cours de l’exercice; (vi) the original cost of depreciable assets disposed of during the fiscal year; i) en ce qui a trait aux déductions relatives à l’aména- gement : (i) in respect of development allowances, (i) la fraction non amortie au début de l’exercice (i) the undeducted balance at the beginning of the des frais admissibles à une telle déduction, fiscal year of costs eligible for a development al- lowance, (ii) si la déclaration de redevances minières est présentée pour le premier exercice de la mine, le (ii) if the mining royalty return is delivered for the montant des frais déterminés conformément aux first fiscal year of the mine, the amount of the costs sous-alinéas 70(1)i)(i) et (ii), Current to September 3, 2026 60 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 73 Article 73 determined under subparagraphs 70(1)(i)(i) and (iii) le montant des frais visés à chacun des sous- (ii), alinéas 70(1)i)(iii) à (v) et engagés au cours de l’exercice, (iii) the amounts of each of the costs identified in subparagraphs 70(1)(i)(iii) to (v) incurred during (iv) la fraction non amortie des frais admissibles à the fiscal year, une telle déduction à la fin de l’exercice, avant la soustraction d’une telle déduction, (iv) the undeducted balance of costs eligible for a development allowance at the end of the fiscal year (v) la fraction non amortie des frais admissibles à before deduction of a development allowance, and une telle déduction à la fin de l’exercice, après sous- traction d’une telle déduction; (v) the undeducted balance of costs eligible for a development allowance at the end of the fiscal year j) en ce qui a trait à une fiducie de restauration mi- after deduction of a development allowance; nière établie à l’égard de terres visées par le présent règlement : (j) in respect of any mining reclamation trust estab- lished for lands to which these Regulations apply, (i) le total des contributions effectuées à son profit, (i) the total of all amounts contributed to the min- (ii) la fraction non amortie des contributions effec- ing reclamation trust, tuées à son profit au début de l’exercice, (ii) the undeducted balance of contributions to the (iii) les contributions effectuées à son profit au mining reclamation trust at the beginning of the fis- cours de l’exercice, cal year, (iv) la fraction non amortie des contributions ef- (iii) the amounts contributed to the mining recla- fectuées à son profit à la fin de l’exercice, avant mation trust during the fiscal year, soustraction de toute déduction relative à une contribution à une telle fiducie, (iv) the undeducted balance of contributions to the mining reclamation trust at the end of the fiscal (v) la fraction non amortie des contributions effec- year before any deduction of a mining reclamation tuées à son profit à la fin de l’exercice, après sous- trust contribution allowance, traction de toute déduction relative à une contribu- tion à une telle fiducie, (v) the undeducted balance of contributions to the mining reclamation trust at the end of the fiscal (vi) le total des sommes retirées de la fiducie au year after deduction of a mining reclamation trust cours de l’exercice et des exercices antérieurs; contribution allowance, and k) en ce qui a trait aux biens utilisés pour le traite- (vi) the total of all amounts withdrawn from the ment : mining reclamation trust during the fiscal year and in previous fiscal years; (i) leur coût d’origine au début de l’exercice, (k) in respect of processing assets, (ii) le coût d’origine des nouveaux biens utilisés pour le traitement ajoutés à la mine au cours de (i) the original cost of the processing assets at the l’exercice, beginning of the fiscal year, (iii) le coût d’origine de ceux acquis en remplace- (ii) the original cost of any new processing assets ment à la mine au cours de l’exercice, added to the mine during the fiscal year, (iv) le coût d’origine de ceux qui ont été remplacés (iii) the original cost of any processing assets that au cours de l’exercice, were substituted for other processing assets of the mine during the fiscal year, (v) le coût d’origine de ceux qui n’ont pas été utili- sés ou qui ont été vendus, jetés ou dont il a été au- (iv) the original cost of any processing assets for trement disposé au cours de l’exercice, which other processing assets were substituted dur- ing the fiscal year, (vi) leur coût d’origine à la fin de l’exercice; Current to September 3, 2026 61 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances Sections 73-74 Articles 73-74 (v) the original cost of any processing assets not l) tout paiement reçu au cours de l’exercice relative- used, sold, discarded or otherwise disposed of dur- ment à des frais pour lesquels une déduction a été ré- ing the fiscal year, and clamée; (vi) the original cost of the processing assets at the m) l’excédent éventuel du produit de la disposition end of the fiscal year; d’actifs pour lesquels une déduction pour amortisse- ment a été réclamée sur la fraction non amortie des (l) any payment received during the fiscal year that is actifs amortissables à la fin de l’exercice au cours du- related to a cost that has been claimed as a deduction quel les actifs dont il a été disposé. or allowance; and (m) any amount by which the proceeds of disposition of assets for which a depreciation allowance has been claimed exceed the undeducted balance of depreciable assets at the end of the fiscal year in which the assets were disposed of. Documents to accompany royalty return Documents accompagnant la déclaration (2) Every mining royalty return must be (2) Toute déclaration de redevances minières est : (a) accompanied by the financial statements for the a) accompagnée des états financiers de la mine ou, à mine or, if the mine has no financial statements, the défaut, de ceux de l’exploitant, et d’un état de rappro- financial statements of the operator of the mine, and a chement de ces états financiers et de la déclaration; reconciliation of those financial statements to the min- ing royalty return; and b) signée par l’exploitant de la mine et accompagnée d’une déclaration sous serment ou d’une affirmation (b) signed by the operator of the mine and include a solennelle de sa part ou, si l’exploitant est une société, statement under oath or solemn affirmation by the op- d’un dirigeant de celle-ci, attestant qu’à sa connais- erator or, if the operator is a corporation, by an officer sance les états financiers sont complets et exacts. of the corporation, that the financial statements are to that person’s knowledge and belief complete and cor- rect. Royalty return — election under subsection 69(7) Déclaration de redevances — choix visé au paragraphe 69(7) exercé (3) If a mine’s operator makes an election under subsec- (3) Si l’exploitant fait le choix prévu au paragraphe tion 69(7), 69(7) : (a) the operator must deliver the initial mining royal- a) il est tenu de remettre une première déclaration de ty return for the fiscal year using the market value of redevances minières pour l’exercice dans laquelle il the inventories of minerals or processed minerals and utilise la valeur marchande des stocks de minéraux ou then deliver an amended mining royalty return once minéraux traités, puis de remettre une déclaration those inventories have been sold; and modifiée une fois les stocks vendus; (b) the operator must deliver a mining royalty return b) il est tenu de remettre une déclaration de rede- for the mine’s subsequent fiscal years if there are any vances minières pour tout exercice ultérieur de la amounts that qualify for determining the values of D mine si des sommes indiquées servent à calculer la va- to H in subsection 69(4), or if the mine recommences leur des éléments D à H de la formule figurant au pa- production. ragraphe 69(4) ou si la mine reprend la production. Royalty returns for certain joint ventures Déclaration de redevances des membres d’une coentreprise 74 (1) If a mine is operated as a joint venture and each 74 (1) Si une mine est exploitée en coentreprise et que member of the joint venture takes its share of the output chaque membre de la coentreprise prend sa part de la of the mine in kind and sells that share separately and production en nature et la vend séparément et Current to September 3, 2026 62 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 74 Article 74 independently from other members of the joint venture indépendamment des autres membres à des acheteurs to purchasers who are not related to any of the members qui ne sont pas liés aux membres de la coentreprise : of the joint venture, a) chaque membre peut remettre au chef une décla- (a) each member may deliver to the Chief a separate ration de redevances minières distincte, pour les rede- mining royalty return for the royalty payable under vances à payer aux termes du paragraphe 69(1) sur la subsection 69(1) on the value of its share of the output valeur de sa part, plutôt que d’inclure ces renseigne- of the mine, in lieu of including that information in a ments dans la déclaration de redevances minières vi- mining royalty return delivered under subsection sée au paragraphe 73(1); 73(1); and b) chaque membre, ou toute personne qui lui est liée, (b) each member, and any person related to that n’est redevable que des redevances relatives à sa part. member, is liable to pay only those royalties at- tributable to that member’s share of the output of the mine. Joint venture respecting single mine Une mine, plusieurs déclarations de redevances — coentreprise (2) When, under subsection (1), more than one member (2) Lorsque, pour une seule mine, plus d’un membre de of a joint venture delivers a mining royalty return to the la coentreprise remet au chef une déclaration de rede- Chief for a single mine, vances minières aux termes du paragraphe (1) : (a) each member of the joint venture is considered to a) chaque membre est considéré être un exploitant be a separate operator for the purposes of these Regu- distinct pour l’application du présent règlement; lations; b) chaque membre indique sur sa déclaration le (b) each member must indicate on the mining royalty pourcentage de la production de la mine sur lequel return the percentage of the output of the mine repre- porte la déclaration; sented by that mining royalty return; c) la valeur de la production figurant sur sa déclara- (c) the value of the output on the mining royalty re- tion est calculée conformément à l’article 69 au moyen turn for each member must be calculated in accor- des éléments suivants : dance with section 69 using (i) à l’égard des frais admissibles aux déductions (i) in respect of costs eligible for deductions under visées aux alinéas 70(1)a) à f) : paragraphs 70(1)(a) to (f), (A) le pourcentage de ces frais engagés conjoin- (A) a percentage of costs that have been jointly tement par tous les membres qui est égal au incurred, equal to the percentage of the output of pourcentage de la production de la mine qu’il a the mine received by that member, and reçu, (B) the costs that have been incurred by that (B) les frais qu’il a engagés seul, member alone, (ii) pour le calcul de la déduction à titre de frais (ii) in determining a deduction for exploration d’exploration visée à l’alinéa 70(1)g), les frais d’ex- costs under paragraph 70(1)(g), the exploration ploration qu’il a engagés seul, costs incurred by that member alone, (iii) la déduction pour amortissement fondée sur : (iii) a depreciation allowance based on (A) le pourcentage des actifs amortissables de la (A) a percentage of the depreciable assets of the mine détenus conjointement qui est égal au mine that are jointly held, equal to the percent- pourcentage de la production de la mine qu’il a age of the output of the mine received by that reçu, member, and (B) les actifs amortissables de la mine qu’il dé- (B) the depreciable assets of the mine that are tient seul, held by the member alone, Current to September 3, 2026 63 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances Sections 74-75 Articles 74-75 (iv) a development allowance based on (iv) la déduction relative à l’aménagement fondée sur : (A) a percentage of the costs referred to in sub- paragraphs 70(1)(i)(i) to (v) that have been (A) le pourcentage des frais mentionnés aux jointly incurred, equal to the percentage of the sous-alinéas 70(1)i)(i) à (v) engagés conjointe- output of the mine received by that member, and ment qui est égal au pourcentage de la produc- tion de la mine qu’il a reçu, (B) the costs referred to in subparagraphs 70(1)(i)(i) to (v) that have been incurred by that (B) les frais mentionnés aux sous-alinéas member alone, 70(1)i)(i) à (v) qu’il a engagés seul, (v) a mining reclamation trust contribution al- (v) la déduction relative à la contribution effectuée lowance equal to the amount contributed to a min- au profit d’une fiducie de restauration minière égale ing reclamation trust in respect of lands to which aux contributions qu’il a effectuées au profit d’une these Regulations apply by that member, and telle fiducie relativement à des terres visées par le présent règlement, (vi) a processing allowance based on (vi) la déduction relative au traitement fondée (A) a percentage of the processing assets of the sur : mine that are jointly held equal to the percentage of the output of the mine received by that mem- (A) le pourcentage des biens utilisés pour le ber, and traitement à la mine détenus conjointement qui est égal au pourcentage de la production de la (B) the processing assets of the mine that are mine qu’il a reçu, held by that member alone; (B) les biens utilisés pour le traitement à la (d) the amounts in column 1 of the table to subsec- mine qu’il détient seul; tion 69(1) must be adjusted by multiplying each amount by a percentage equal to the percentage of the d) chaque valeur indiquée à la colonne 1 du tableau output of the mine received by that member; and du paragraphe 69(1) est rajustée en la multipliant par un pourcentage égal au pourcentage de la production (e) each mining royalty return must be based on the de la mine qu’il a reçu; same fiscal year. e) chaque déclaration vise le même exercice. Notice of assessment of royalties Avis de cotisation 75 (1) Within six years after the end of a particular fis- 75 (1) Dans les six ans suivant la fin d’un exercice don- cal year of a mine, the Chief must send to the operator of né d’une mine, le chef fait parvenir à l’exploitant un avis the mine a notice of assessment for the amount of the de cotisation relatif aux redevances à payer pour cet exer- royalty payable for that fiscal year. cice. Notice of reassessment Avis de nouvelle cotisation (2) If, during or after the period referred to in subsec- (2) Le chef peut émettre un avis de nouvelle cotisation tion (1), there are reasonable grounds to believe that the relatif aux redevances à payer pour un exercice donné à operator of a mine or any other person who delivers a l’égard d’une mine au cours de la période visée au para- mining royalty return has made a fraudulent or negligent graphe (1), ou après celle-ci, s’il a des motifs raison- misrepresentation in completing the mining royalty re- nables de croire que l’exploitant ou une autre personne turn or in supplying any other information under section qui a remis une déclaration de redevances minières a 73 or 74, the Chief may send a notice of reassessment for présenté des faits erronés, frauduleusement ou par négli- the amount of the royalty payable for a fiscal year in re- gence, dans la déclaration ou dans d’autres renseigne- spect of the mine. ments donnés aux termes des articles 73 ou 74. When royalties are considered payable Redevances à payer (3) If the Chief sends an operator a notice of assessment (3) Lorsque le chef fait parvenir à l’exploitant un avis de or reassessment for the amount of royalty payable for a cotisation ou de nouvelle cotisation relatif aux Current to September 3, 2026 64 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances Sections 75-76 Articles 75-76 fiscal year, the amount of royalty assessed or reassessed redevances à payer pour un exercice donné, les rede- for the fiscal year is considered to be payable on the last vances visées par l’avis sont considérées payables le der- day of the fourth month after the end of that fiscal year. nier jour du quatrième mois suivant la fin de l’exercice. Royalty returns when ownership of mine changes Déclaration de redevances — changement de propriétaire d’une mine (4) If the ownership of a mine changes, the operator (4) Lorsque le propriétaire d’une mine change au cours may file a separate mining royalty return for the portion d’un exercice donné, l’exploitant peut produire une dé- of the fiscal year before the change of ownership and the claration de redevances minières distincte pour la partie portion of the fiscal year after the change of ownership, de l’exercice précédant le changement de propriété et and each such portion is considered to be a fiscal year of pour celle suivant ce changement. Chaque partie est, less than 12 months for the purposes of subsection 70(2). pour l’application du paragraphe 70(2), considérée être un exercice de moins de douze mois. Record keeping Conservation des documents 76 (1) Every operator of a mine must keep at an office 76 (1) Afin de corroborer les renseignements devant fi- in Canada and make available to the Chief, to substanti- gurer dans les déclarations de redevances minières, l’ex- ate information required on mining royalty returns, ploitant d’une mine conserve dans un bureau situé au Canada les documents ci-après et les met à la disposition (a) records, books of account and other documents du chef : evidencing a) les dossiers, les livres comptables et les autres do- (i) the weight of all minerals extracted from the cuments qui établissent : mine and of all minerals or processed minerals pro- cessed at the mine, whether or not they are pro- (i) le poids de tous les minéraux extraits de la mine duced from the mine, et de tous les minéraux ou minéraux traités qui ont été traités à la mine, qu’ils soient produits ou non (ii) the weight and value of all minerals or pro- par celle-ci, cessed minerals produced from the mine, sold, transferred or removed from the mine by the (ii) le poids et la valeur des minéraux ou minéraux mine’s operator, traités produits par la mine, vendus, transférés ou retirés de la mine par l’exploitant, (iii) any amounts received from a processing plant and any other amounts received from the sale of (iii) les sommes provenant des usines de traite- minerals or processed minerals, and ment et toute autre somme résultant de la vente des minéraux ou minéraux traités, (iv) the costs, payments, allowances and other de- ductions referred to in section 70; (iv) les frais, paiements et déductions visés à l’ar- ticle 70; (b) the financial statements of the mine and the oper- ator; b) les états financiers de la mine et de l’exploitant; (c) a reconciliation between the documents referred c) un état de rapprochement des documents visés aux to in paragraphs (a) and (b) and the mining royalty re- alinéas a) et b) et de la déclaration de redevances mi- turn; nières; (d) if the financial statements of an owner or the op- d) si les états financiers de l’exploitant ou du proprié- erator of the mine are audited by an external auditor, taire de la mine sont vérifiés par un vérificateur ex- terne : (i) the audited financial statements and the accom- panying signed audit opinion of the external audi- (i) les états financiers vérifiés par le vérificateur ex- tor, and terne ainsi que son opinion signée, (ii) any working papers and documentation pre- (ii) les documents de travail et la documentation pared by the external auditor that are in the posses- préparés par le vérificateur externe que le proprié- sion of an owner or the operator; taire ou l’exploitant a en sa possession; Current to September 3, 2026 65 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances Sections 76-77 Articles 76-77 (e) any documents filed by an owner or the operator e) les documents déposés par l’exploitant ou le pro- with a stock exchange or securities commission; priétaire auprès d’une bourse des valeurs mobilières ou d’une commission des valeurs mobilières; (f) any documents related to any internal audits of a company that is an owner or the operator; and f) les documents relatifs aux vérifications internes de la société qui est propriétaire ou exploitant; (g) any other documents that contain information necessary for ascertaining the amount of royalty g) tout autre document contenant des renseigne- payable under section 69. ments nécessaires au calcul des redevances à payer aux termes de l’article 69. Non-disclosure of confidential information Divulgation de renseignements confidentiels (2) It is prohibited to disclose information of a confiden- (2) Il est interdit de divulguer des renseignements de tial nature acquired for the purposes of sections 69 to 77, nature confidentielle obtenus pour l’application des ar- except ticles 69 à 77, sauf : (a) to the extent necessary to determine the amount a) dans la mesure nécessaire au calcul des redevances of royalties payable under section 69; à payer aux termes de l’article 69; (b) when required under a land claims agreement re- b) lorsque l’exigent les accords sur les revendications ferred to in section 35 of the Constitution Act, 1982; territoriales des peuples autochtones mentionnés à or l’article 35 de la Loi constitutionnelle de 1982; (c) under an agreement entered into by the Minister c) en vertu d’une entente signée par le ministre pour for the purpose of the administration of section 69 l’application de l’article 69 avec le gouvernement d’un with the government of a country, province or state, or pays, d’une province ou d’un État, ou avec une organi- with an Aboriginal organization owning mineral sation autochtone possédant des droits miniers, en rights, under which the officers of that government or vertu de laquelle les dirigeants de ce gouvernement ou Aboriginal organization are provided with the infor- de cette organisation reçoivent ces renseignements et mation and the Chief is provided with information le chef reçoit des renseignements du gouvernement ou from the government or Aboriginal organization. de l’organisation. Condition on removal of minerals Condition préalable au déplacement de minéraux 77 (1) Subject to subsection (2), it is prohibited to re- 77 (1) Sous réserve du paragraphe (2), les minéraux ou move minerals or processed minerals produced from a minéraux traités produits par une mine ne peuvent pas mine, other than for the purposes of assay and testing to en être retirés, sauf pour des essais ou des épreuves afin determine the existence, location, extent, quality or eco- d’établir l’existence, l’emplacement, l’étendue, la qualité nomic potential of a mineral deposit in the lands consti- et le potentiel économique d’un gisement minier sur les tuting the mining property, until the weight and any oth- terres faisant partie de la propriété minière, tant que le er information necessary to establish the value of those poids et les autres renseignements nécessaires pour en minerals or processed minerals has been ascertained and déterminer la valeur n’ont pas été constatés et consignés entered in the books of account referred to in subsection dans les livres comptables visés au paragraphe 76(1). 76(1). Condition on removal of precious stones Condition préalable au déplacement de pierres précieuses (2) Precious stones must not be removed from a mine — (2) Les pierres précieuses ne peuvent pas être retirées other than in a bulk sample or in a concentrate for the d’une mine, sauf dans un échantillon en vrac ou dans un purposes of establishing the grade and the value of the concentré dans le but de déterminer la teneur et la valeur stones in a mineral deposit — or cut, polished, sold or des pierres dans un gisement minier, ni être taillées, po- transferred, until they have been valued by a mining roy- lies, vendues ou transférées, tant que leur valeur n’a pas alty valuer. été établie par un évaluateur des redevances minières. Current to September 3, 2026 66 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances
Section 77 Article 77 Facilities required for valuation Fourniture des installations et du matériel à l’évaluateur des redevances (3) The operator of a mine must provide, in the North- (3) L’exploitant d’une mine fournit, dans les Territoires west Territories, any facilities and equipment, other than du Nord-Ouest, les installations et le matériel, autre que computer equipment, necessary for a mining royalty val- le matériel informatique, permettant à l’évaluateur des uer to value any precious stones produced from the mine. redevances minières de procéder à l’évaluation des pierres précieuses produites par la mine. Facilities considered part of mine Installations considérées faire partie de la mine (4) For the purposes of these Regulations, facilities re- (4) Pour l’application du présent règlement, les installa- ferred to in subsection (3) are considered to be part of tions visées au paragraphe (3) sont considérées faire par- the mine and any transfer of the precious stones from tie de la mine et les pierres précieuses déplacées d’un en- one part of the mine to another is not considered to be a droit de la mine à un autre ne sont pas considérées en removal of the stones from the mine. avoir été retirées. Cleaning of precious stones Nettoyage des pierres précieuses (5) Precious stones must not be presented to the mining (5) L’exploitant est tenu de nettoyer les pierres pré- royalty valuer until the operator of the mine has cleaned cieuses afin de les débarrasser de toute substance étran- the stones so as to remove all substances from the stones gère avant de les présenter à l’évaluateur des redevances that are not part of them. minières. Presentation of precious stones to royalty valuer Présentation des pierres précieuses à l’évaluateur des redevances (6) As soon as any precious stones have been processed (6) Dès qu’elles ont été traitées de façon à être ven- into a saleable form, they must be presented to a mining dables, les pierres précieuses sont présentées à un éva- royalty valuer for valuation. luateur des redevances minières pour évaluation. Separate valuation of precious stones Évaluation séparée — pierres précieuses (7) An operator who produces precious stones and sells (7) L’exploitant qui produit des pierres précieuses et qui or transfers them to persons who are related to the oper- les vend ou les transfère à des personnes qui lui sont liées ator must present to a mining royalty valuer présente à l’évaluateur des redevances minières : (a) all stones that are to be sold or transferred to a a) les pierres qui doivent être vendues ou transférées person related to the operator, for separate valuation à une personne qui lui est liée afin qu’elles soient éva- before their sale or transfer; and luées séparément avant leur vente ou leur transfert; (b) all stones that are to be cut or polished by the op- b) celles qui doivent être taillées ou polies par l’ex- erator or any related party, for separate valuation be- ploitant ou une personne qui lui est liée afin qu’elles fore their being cut or polished. soient évaluées séparément avant leur taille ou leur polissage. Presentation of diamonds to royalty valuer Présentation des diamants (8) For the purposes of subsections (6) and (7), unless (8) Pour l’application des paragraphes (6) et (7), l’ex- otherwise agreed on by the operator and the mining roy- ploitant, à moins qu’il n’en ait convenu autrement avec alty valuer, an operator must present to the mining royal- l’évaluateur des redevances minières, présente à celui-ci : ty valuer a) les diamants dont le poids unitaire est d’au moins (a) diamonds with a weight of 10.8 carats or more, 10,8 carats en lui indiquant le poids de chacun; separately, together with the weight of each diamond; b) les diamants dont le poids varie de 2,8 carats à (b) diamonds with a weight from 2.8 carats to 10.79 10,79 carats, en des lots séparés selon leur poids en carats, in lots separated according to weight in carats, carats, en lui indiquant le nombre de diamants par lot; together with the number of diamonds per lot; Current to September 3, 2026 67 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Royalties Redevances Sections 77-80 Articles 77-80 (c) diamonds with a weight from 0.66 carats to 2.79 c) les diamants dont le poids varie de 0,66 carat à carats, in lots separated according to weight in grain- 2,79 carats, en des lots séparés selon leur poids en ers, from which randomly selected samples, accurately grains, desquels ont été prélevés des échantillons, representing the composition of each lot, have been choisis au hasard, représentatifs de chaque lot; separated; and d) les diamants dont le poids est inférieur à 0,66 ca- (d) diamonds with a weight of less than 0.66 carats, rat, en des lots séparés selon la grandeur déterminée in lots separated according to industry standard DTC au moyen d’un tamis DTC qui représente la norme de sieve sizes, from which randomly selected samples, ac- l’industrie, desquels ont été prélevés des échantillons, curately representing the composition of each lot, have choisis au hasard, représentatifs de chaque lot. been separated. Estimate of market value of diamonds Évaluation de la valeur marchande des diamants (9) Before diamonds are presented to the mining royalty (9) Avant que des diamants ne soient présentés à l’éva- valuer under subsection (8), the operator must provide luateur des redevances minières conformément au para- an estimate of the market value of each diamond or lot, graphe (8), l’exploitant fournit au chef une évaluation de as the case may be, to the Chief. la valeur marchande de chaque diamant ou de chaque lot, selon le cas. General Provisions Dispositions générales Recorded claim and lease subject to public works Bail assujetti à des travaux publics 78 Every recorded claim, whether leased or not, is sub- 78 Tous les claims enregistrés et les claims enregistrés ject to the right of the Crown and of the Commissioner of visés par un bail sont assujettis au droit de la Couronne the Northwest Territories to construct and maintain et du commissaire des Territoires du Nord-Ouest de roads or other public works on or over the lands covered construire et d’entretenir des routes ou de mener tout by the claim. autre genre de travaux publics sur des terres visées par un claim enregistré — visé ou non par un bail — ou au- dessus de celles-ci. Suspension — death or incompetency of claim Avis de décès ou de déclaration d’incapacité du holder détenteur de claim enregistré 79 If the holder of a recorded claim for which no lease 79 Lorsque le détenteur d’un claim enregistré qui n’a has been issued dies or is declared by a court of compe- pas été pris à bail meurt ou est déclaré incapable d’admi- tent jurisdiction to be incapable of managing their affairs nistrer ses affaires par un tribunal compétent, qu’un avis and notice of the death or declaration is filed with the à cet égard est fourni au registraire minier dans les cent Mining Recorder within 180 days after the date of the quatre-vingts jours suivant la date du décès ou de la dé- death or declaration, and if the recording of the claim claration et que l’enregistrement du claim n’a pas été an- was not cancelled before the filing of the notice, the run- nulé avant le dépôt de cet avis, tout délai imparti au dé- ning of a time period within which anything is required tenteur de ce claim pour remplir une exigence prévue par to be done by a claim holder with respect to that claim le présent règlement reprend à la date anniversaire de under these Regulations is suspended until the anniver- l’enregistrement du claim suivant d’au moins douze mois sary date of the recording of the claim that is at least 12 la date à laquelle l’avis est déposé. months after the day on which the notice was filed. Extension on account of strike Grève déclarée 80 If, as a result of a strike within the meaning of sub- 80 Si, en raison d’une grève au sens du paragraphe 2(1) section 2(1) of the Federal Public Sector Labour Rela- de la Loi sur les relations de travail dans le secteur pu- tions Act, a holder of a prospecting permit, recorded blic fédéral, le détenteur d’un claim enregistré, le titu- claim or lease is unable, through no fault on their part, to laire d’un permis de prospection ou le preneur à bail est do a thing within the time required by these Regulations, dans l’impossibilité de prendre toute mesure exigée en the deadline for doing that thing is extended for a period vertu du présent règlement et que cette incapacité ne lui ending 15 days after the last day of the strike. est en aucune façon imputable, l’échéance pour prendre 2017, c. 9, s. 58. Current to September 3, 2026 68 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest General Provisions Dispositions générales Sections 80-82 Articles 80-82 cette mesure est prolongée d’une période se terminant quinze jours après le dernier jour de la grève. 2017, ch. 9, art. 58. When written notice is considered to be received Avis considéré reçu 81 For the purposes of these Regulations, written notice 81 Pour l’application du présent règlement, un avis écrit is considered to be given to the holder of a prospecting est considéré avoir été donné au détenteur du claim enre- permit, recorded claim or lease when the notice is sent by gistré, au titulaire du permis de prospection ou au pre- registered mail to the holder at the holder’s address, or neur à bail, s’il lui est envoyé par courrier recommandé à transmitted by fax or email to the holder at the holder’s son adresse ou transmis par télécopieur ou par courriel; fax number or email address, as shown in the records of l’adresse, le numéro de télécopieur et l’adresse de cour- the Mining Recorder. riel étant ceux figurant dans les dossiers du registraire minier. Recording of documents Documents versés au registre 82 (1) The Mining Recorder must record 82 (1) Le registraire minier enregistre les documents suivants : (a) every judgment or order relating to the ownership of a recorded claim or a lease made by a court of com- a) tout jugement ou ordonnance portant sur les petent jurisdiction, the Minister, the Supervising Min- droits de propriété à l’égard d’un claim enregistré — ing Recorder or the Mining Recorder; visé ou non par un bail — rendu par un tribunal com- pétent, le ministre, le registraire minier en chef ou le (b) in respect of the recorded claims and leases that registraire minier; constitute a mining property or an interest in that property, a notice of any mining royalties payable that b) tout avis à l’égard des claims enregistrés — visés have not been paid within 30 days after ou non par un bail — qui constituent une propriété mi- nière ou des intérêts y afférents, portant sur des rede- (i) the delivery to the Chief of a mining royalty re- vances minières exigibles et impayées dans les trente turn in respect of that property or interest, or jours suivant : (ii) when a notice of assessment or reassessment (i) l’envoi au chef d’une déclaration de redevances has been sent under subsection 75(1) or (2), the minières les concernant, date of the notice of assessment or reassessment, unless a request for review of the assessment or re- (ii) la date de l’avis de cotisation ou de nouvelle co- assessment has been made under section 84; and tisation, lorsqu’un tel avis a été envoyé aux termes des paragraphes 75(1) ou (2), à moins qu’une de- (c) on the payment of the applicable fee set out in mande de révision de l’avis n’ait été présentée en Schedule 1, every other document filed in relation to a vertu de l’article 84; recorded claim or a lease. c) tout autre document déposé relativement à un claim enregistré — visé ou non par un bail —, sur paie- ment des droits applicables prévus à l’annexe 1. Recording considered to give notice Avis considéré avoir été reçu (2) All persons are considered to have received notice of (2) Toute personne est considérée avoir été avisée, à la every document recorded under subsection (1) as of the date d’enregistrement, de l’enregistrement de chaque do- date of the recording of the document. cument en application du paragraphe (1). Transfer subject to encumbrances Assujettissement du transfert de claim enregistré ou de bail (3) A transfer of a recorded claim or a lease, or any in- (3) Le transfert d’un claim enregistré ou d’un bail visant terest in either, is subject to all judgments, orders, liens un claim enregistré, ou de tout intérêt y afférent, est as- and other encumbrances that were recorded against the sujetti à tout jugement, ordonnance, privilège ou grève- claim or lease, or any interest in them, at the time of the ment enregistré à l’égard du claim, du bail, ou de tout in- recording of the transfer. térêt y afférent, à la date d’enregistrement du transfert. Current to September 3, 2026 69 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest General Provisions Dispositions générales Sections 83-84 Articles 83-84 Consultation of records Consultation des registres 83 (1) Subject to subsection (2), a person may 83 (1) Sous réserve du paragraphe (2), toute personne peut : (a) consult the record of a prospecting permit, recorded claim or leased claim, and any related docu- a) consulter gratuitement les registres concernant ments filed with the Mining Recorder, free of charge; tout permis de prospection, claim enregistré ou claim and enregistré visé par un bail et tout document connexe déposé auprès du registraire minier; (b) obtain a copy of a record on payment of the appli- cable fee set out in Schedule 1. b) obtenir une copie de ces registres sur paiement des droits applicables prévus à l’annexe 1. Limit on consultation Consultation — limites (2) A person is not permitted to consult or obtain a copy (2) Nul ne peut consulter les rapports présentés au titre of a report submitted under subsection 15(1) or 41(1) des paragraphes 15(1) ou 41(1), ni en obtenir de copie, until the earlier of jusqu’à la première des dates suivantes : (a) the day of the expiration or cancellation of the a) la date d’expiration ou d’annulation du permis de prospecting permit or recording of the claim, and prospection ou de l’enregistrement du claim; (b) three years after the day on which the report was b) la date qui suit le troisième anniversaire de la ré- received by the Mining Recorder. ception du rapport par le registraire minier. Review by the Minister Révision par le ministre Request for ministerial review Demande de révision 84 (1) Any person with a legal or beneficial interest in 84 (1) Quiconque a un intérêt en common law ou un the subject matter of a decision made or an action taken intérêt bénéficiaire lié à l’objet d’une décision prise ou or omitted to be taken under these Regulations may re- d’un fait — acte ou omission — accompli sous le régime quest that the Minister review any issue the person has du présent règlement peut demander au ministre de révi- with respect to the decision, action or omission. ser la question en cause. Requirements for request Présentation de la demande (2) A request for review must be made in writing within (2) La demande de révision est présentée par écrit dans 30 days after the day on which the decision is made or les trente jours suivant la date où la décision a été prise the action is taken or, in the case of an omission to take ou suivant celle où le fait est accompli ou aurait dû l’être action, within 30 days after the day on which action et comporte les renseignements suivants : should have been taken and must specify a) le nom et les coordonnées du demandeur; (a) the name of the requester and their contact infor- mation; b) la question en cause; (b) the issue the requester wishes the Minister to re- c) la date à laquelle la décision, le fait — acte ou omis- view; sion — est accompli; (c) the date on which the decision, act or omission d) la mesure corrective demandée. took place; and (d) the corrective relief requested. Absence of or error in information Demande recevable (3) A review may be undertaken despite a failure to (3) Une demande de révision est recevable même si les specify, or an error in specifying, any information re- renseignements visés au paragraphe (2) n’ont pas été quired under subsection (2). fournis ou comportent des erreurs. Current to September 3, 2026 70 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Review by the Minister Révision par le ministre Sections 84-87 Articles 84-87 Procedure for review Processus de révision (4) After receipt of a request for review, the Minister (4) Sur réception de la demande, le ministre : must a) donne au demandeur et à toute personne qui a un (a) provide the requester and all persons with an in- intérêt lié à la question en cause la possibilité de se terest in the issue a reasonable opportunity to be faire entendre; heard; b) révise la question en cause ainsi que les renseigne- (b) review all information received respecting the is- ments qui y sont liés; sue; and c) décide de la mesure corrective appropriée. (c) decide the corrective relief, if any, to be taken re- specting the issue. Additional information Renseignements complémentaires (5) The Minister may request the requester or any other (5) Le ministre peut demander au demandeur ou à toute person to provide any document or other information personne de fournir tout renseignement ou tout docu- that may be relevant to the review. ment utiles à la révision. Decision and reasons Décision motivée (6) A written statement of the Minister’s decision and (6) La décision du ministre est motivée et transmise par the reasons for it must be sent to the requester and all écrit au demandeur et à toute personne qui a un intérêt persons with an interest in the issue. lié à la question en cause. Final decision Décision finale (7) The Minister’s decision under this section is not to (7) La décision prise au titre du présent article ne peut be the subject of a request for review. faire l’objet d’une nouvelle demande de révision. Prohibition respecting staking Interdiction de jalonner 85 If a request for review is with respect to the cancella- 85 Durant la période au cours de laquelle le ministre tion of the recording of a claim under subsection 53(3) or procède à la révision et jusqu’à midi le lendemain du pre- paragraph 53(4)(b) or the amendment of the boundaries mier jour ouvrable suivant la date où la décision du mi- of a claim under paragraph 53(4)(b), it is prohibited to nistre a été transmise conformément au paragraphe stake a claim on the lands covered by the claim the 84(6), il est interdit de jalonner un claim sur les terres vi- recording of which was cancelled or the boundaries of sées par le claim qui fait l’objet de la demande de révision which were amended. The prohibition is in effect from et dont l’enregistrement a été annulé en vertu du para- the start of the review until noon on the day following the graphe 53(3), de l’alinéa 53(4)b) ou dont les limites ont first business day after the day on which the Minister’s été modifiées en application de cet alinéa. decision was sent in accordance with subsection 84(6). Transitional Provisions Dispositions transitoires Definition of former Regulations Définition de règlement antérieur 86 In sections 87 to 93, former Regulations means 86 Pour l’application des articles 87 à 93, règle- the Northwest Territories and Nunavut Mining ment antérieur s’entend du Règlement sur l’ex- Regulations. ploitation minière dans les Territoires du Nord- Ouest et au Nunavut. Recording of located claim Enregistrement d’un claim localisé 87 (1) If, within 59 days before these Regula- 87 (1) Si un claim a été localisé conformément tions come into force, a claim is located in accor- au paragraphe 14(14) du règlement antérieur dance with subsection 14(14) of the former Reg- dans les cinquante-neuf jours précédant la date ulations, an application to record the claim that d’entrée en vigueur du présent règlement et Current to September 3, 2026 71 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Transitional Provisions Dispositions transitoires Sections 87-93 Articles 87-93 is made after these Regulations come into force qu’une demande d’enregistrement du claim loca- may be made under section 24 of the former Reg- lisé est présentée après l’entrée en vigueur du ulations or under section 33 of these Regula- présent règlement, la demande est présentée soit tions. conformément à l’article 24 du règlement anté- rieur, soit conformément à l’article 33 du pré- sent règlement. Located claim considered as staked claim Claim localisé et claim jalonné (2) For greater certainty, a claim that is located (2) Il est entendu que le claim localisé conformé- under the former Regulations is considered to be ment au règlement antérieur s’entend d’un claim a claim that was staked under these Regulations. jalonné au sens du présent règlement. Certificates of extension Certificat de prolongation 88 A certificate of extension given under section 88 Le certificat de prolongation délivré en vertu 44 of the former Regulations is not counted as a de l’article 44 du règlement antérieur n’est pas certificate of extension under subsection 42(2) of pris en compte pour l’application du paragraphe these Regulations. 42(2) du présent règlement. Report on work — former Regulations Rapport de travaux exécutés à l’égard d’un claim 89 A report prepared in accordance with the for- 89 Le rapport faisant état de travaux obliga- mer Regulations respecting representation work toires exécutés avant l’entrée en vigueur du pré- that was done before the coming into force of sent règlement et qui a été préparé conformé- these Regulations is considered to be in accor- ment au règlement antérieur est considéré dance with these Regulations if it is submitted conforme au présent règlement s’il est remis within two years after the coming into force of dans les deux ans suivant l’entrée en vigueur du these Regulations. présent règlement. Deduction from lease payment Déduction du loyer à payer 90 Subsection 60(2) of the former Regulations 90 Le paragraphe 60(2) du règlement antérieur applies for one year after these Regulations come continue de s’appliquer au cours de l’année qui into force. suit l’entrée en vigueur du présent règlement. Application for common anniversary date Date commune d’anniversaire d’enregistrement d’un claim 91 If an application for a certificate under sub- 91 La demande de certificat de date d’anniver- section 39(1) of the former Regulations — giving saire commune visée au paragraphe 39(1) du rè- a common anniversary date of recording for glement antérieur qui a été reçue par le regis- claims — was received by the Mining Recorder traire minier sans être traitée avant l’entrée en before the coming into force of these Regulations vigueur du présent règlement continue d’être but was not dealt with before that time, it must traitée sous le régime du règlement antérieur. be dealt with in accordance with the former Reg- ulations. Honorary licence Renouvellement de permis honoraire 92 A person who, when these Regulations come 92 Le titulaire d’un permis honoraire délivré en into force, holds an honorary licence under sec- vertu de l’article 77 du règlement antérieur avant tion 77 of the former Regulations is entitled to l’entrée en vigueur du présent règlement peut le renew the honorary licence each year in accor- renouveler chaque année conformément à cet ar- dance with that section. ticle. Applications for leases and renewals Prise à bail et renouvellement de bail 93 (1) If an application for a lease or a request 93 (1) La demande de prise à bail d’un claim en- for a renewal of a lease is received before, or registré ou de renouvellement d’un tel bail qui a Current to September 3, 2026 72 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest Transitional Provisions Dispositions transitoires Sections 93-95 Articles 93-95 within six months after, the day on which these été reçue avant la date d’entrée en vigueur du Regulations come into force, the application or présent règlement ou dans les six mois qui request must be dealt with in accordance with suivent cette date est traitée sous le régime du rè- the former Regulations. glement antérieur. Continuation of lease Bail considéré en vigueur (2) In the case of a request for renewal under (2) Si une demande de renouvellement visé au subsection (1), if the request has not been dealt paragraphe (1) n’a pas été traitée avant la date with before the lease is due to expire, the lease is d’échéance du bail, le bail est considéré en vi- considered to continue in effect until the request gueur tant que la demande de renouvellement has been dealt with. n’a pas été traitée. Timing of application for lease Demande de prise à bail — période (3) If the duration of a recorded claim ends with- (3) Si la période de validité d’un claim enregistré in one year after the day on which these Regula- vient à échéance dans la période d’au plus une tions come into force, paragraph 60(2)(b) is to be année qui suit la date d’entrée en vigueur du pré- read without reference to the words “at least one sent règlement, l’alinéa 60(2)b) s’applique year”. compte non tenu des termes « au plus tard un an ». Repeal Abrogation 94 [Repeal] 94 [Abrogation] Coming into Force Entrée en vigueur March 31, 2014 31 mars 2014 95 These Regulations come into force on March 95 Le présent règlement entre en vigueur le 31 31, 2014. mars 2014. Current to September 3, 2026 73 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 1 ANNEXE 1
SCHEDULE 1 ANNEXE 1 (Subsections 3(1) and (4), paragraph 9(2)(c), subsections 17(2), (paragraphes 3(1) et (4), alinéa 9(2)c), paragraphes 17(2), 18(3), 18(3), 24(1) and (2), 33(3), 35(3), 41(3), 42(1), 45(4), 46(2) and (6) 24(1) et (2), 33(3), 35(3), 41(3), 42(1), 45(4), 46(2) et (6) et 52(2), and 52(2), section 54, paragraphs 59(c) and 60(2)(a), subsection article 54, alinéas 59c) et 60(2)a), paragraphe 62(1), alinéas 65c), 62(1) and paragraphs 65(c), 66(1)(d), 82(1)(c) and 83(1)(b)) 66(1)d), 82(1)c) et 83(1)b)) Fees Droits Column 1 Column 2 Colonne 1 Colonne 2 Item Description Fee ($) Article Description Droits ($) 1 Copy of a record, per page 1.00 1 Copie de toute page de document déposé 1,00 au registre 2 Licence issued to an individual 5.00 2 Licence délivrée à une personne physique 5,00 3 Licence issued to a corporation 50.00 3 Licence délivrée à une personne morale 50,00 4 Duplicate licence 2.00 4 Double de toute licence 2,00 5 Identification tags or reduced-area tags, per set 2.00 5 Ensemble de quatre plaques 2,00 d’identification ou de quatre plaques de 6 Application to record a claim or a reduced- superficie réduite (par ensemble) area claim, per hectare in the claim 0.25 6 Demande d’enregistrement d’un claim ou 0,25 7 Application for a prospecting permit 25.00 d’un claim de superficie réduite (par hectare) 8 Request to group prospecting permits 10.00 7 Demande de permis de prospection 25,00 9 Request to transfer a prospecting permit 25.00 8 Demande de groupement de permis de 10,00 10 Certificate of work, per hectare in the claim 0.25 prospection 11 Request to group recorded claims 10.00 9 Demande d’enregistrement de transfert 25,00 d’un permis de prospection 12 Application for extension to do work on a claim, per hectare in the claim 0.25 10 Certificat de travaux (par hectare du 0,25 claim) 13 Recording an official plan of survey of a claim, per claim in the survey 2.00 11 Demande de groupement de claims 10,00 enregistrés 14 Application for lease of a recorded claim or renewal of a lease, per claim in the lease 25.00 12 Demande de prolongation du délai 0,25 d’exécution de travaux (par hectare du 15 Recording a transfer of a lease and any claim) other document pertaining to a lease 25.00 13 Enregistrement d’un plan d’arpentage 2,00 16 Recording any document pertaining to a (par claim faisant l’objet du plan) claim, per entry 2.00 14 Demande visant la prise à bail d’un claim 25,00 17 Request to cancel the recording of a claim 10.00 enregistré ou le renouvellement d’un tel bail (par claim visé par le bail) 15 Enregistrement du transfert d’un bail ou 25,00 de tout document visant ce bail 16 Enregistrement de tout document visant 2,00 un claim (par inscription) 17 Demande d’annulation de 10,00 l’enregistrement d’un claim Current to September 3, 2026 74 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports SCHEDULE 2 ANNEXE 2 (Subsections 15(2) and (8), 41(1) and 44(1)) (paragraphes 15(2) et (8), 41(1) et 44(1)) Reports Rapports Interpretation Définitions Definitions Définitions 1 The following definitions apply in this Schedule. 1 Les définitions qui suivent s’appliquent à la présente annexe. identifier means a set of alphabetic, numeric or al- phanumeric characters used to uniquely identify a sam- carte Vise notamment un plan, un modèle en trois di- ple, a prospecting permit zone or an electronic storage mensions ou une image graphique présentés sur support medium. (identificateur) papier ou électronique. (map) map includes a plan, graphical image or three-dimen- coupe Vise notamment les coupes transversales, les sional model in electronic or paper form. (carte) coupes inclinées et les coupes longitudinales présentées sur support papier ou électronique. (section) preparation includes drying, fractioning, sieving and panning. (préparation) échantillon Vise notamment des fractions d’échan- tillons, des échantillons traités et analysés, des doubles sample includes a sample fraction, processed sample, d’échantillons, des échantillons témoins, des échantillons analyzed sample, duplicate sample, blank sample, quality de contrôle de qualité et de chacun des échantillons mul- control sample and each of multiple samples from one lo- tiples prélevés sur tout emplacement. (sample) cation. (échantillon) identificateur Série unique de lettres ou de chiffres, ou section, except when used to refer to a legislative provi- toute combinaison de ceux-ci, qui permet d’identifier un sion, includes a cross-section, inclined section and longi- échantillon, une zone de permis de prospection ou un tudinal section in electronic or paper form. (coupe) support de stockage électronique. (identifier) préparation Vise notamment le fractionnement, le ta- misage, le lavage à la battée et le séchage. (preparation) PART 1 PARTIE 1 General Requirements Exigences générales Paper or electronic format Support papier ou électronique 2 (1) A report must be submitted in paper format, in 2 (1) Tout rapport est présenté sur support papier ou electronic format or in a combination of paper and elec- électronique ou une combinaison des deux. tronic formats. Report submitted in electronic format Rapport présenté sur support électronique (2) The electronic format in which any part of a report — (2) Le rapport ou la partie de rapport présenté sur sup- other than the raw data specified in paragraph 4(s) — is port électronique — autre que celui contenant les don- submitted must be such that the report can be read using nées brutes visées à l’alinéa 4s) — est lisible pour le sys- the Mining Recorder’s computer systems. tème électronique de traitement de l’information utilisé par le registraire minier. Identifying information Renseignements identificatoires 3 (1) The following identifying information must be 3 (1) Le rapport comporte les renseignements identifi- provided: catoires suivants : Current to September 3, 2026 75 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports (a) a statement of the types of work being reported a) la mention des types de travaux exécutés qui font on; l’objet du rapport; (b) the name of the permittee or of the holder of the b) le nom du titulaire du permis de prospection ou du recorded claim, as the case may be; détenteur du claim enregistré, selon le cas; (c) a list of the prospecting permits or recorded c) la liste des claims enregistrés et des permis de claims in respect of which the work was done, and set- prospection à l’égard desquels des travaux ont été exé- ting out for each one cutés qui indique pour chacun d’entre eux : (i) if a prospecting permit, its identification num- (i) s’il s’agit d’un permis, son numéro d’identifica- ber, and tion, (ii) if a claim, its identification tag number and the (ii) s’il s’agit d’un claim, le numéro des plaques name associated with it, if any; d’identification de celui-ci et le nom qui lui est asso- cié, s’il existe; (d) the number of the National Topographic System of Canada 1:50 000 map sheet that shows the area d) le numéro du feuillet cartographique du Système covered by the permit or claim; national de référence cartographique du Canada réali- sé à une échelle de 1/50 000 où figurent les terrains (e) the four values representing either visés par le permis de prospection ou le claim enregis- tré; (i) the maximum and minimum latitude and longi- tude of the area covered by the permit or claim, or e) l’un ou l’autre des ensembles de coordonnées sui- vants : (ii) the maximum and minimum Northings and Eastings UTM coordinates of the area covered by (i) les coordonnées maximales et minimales de la- the permit or claim; titude et de longitude des terrains visés par le per- mis de prospection ou le claim enregistré, (f) the name of the individual who prepared and signed the report; (ii) les coordonnées UTM maximales et minimales de direction S-N et de direction O-E des terrains vi- (g) for each period that work was done in the field, sés par le permis de prospection ou le claim; the first date and last date that work in the field was done; f) le nom de la personne qui a établi et signé le rap- port; (h) the date of the report; g) pour toute période pendant laquelle des travaux (i) for a report submitted in paper format in more ont été exécutés sur le terrain, les dates de commence- than one volume, the volume number and total num- ment et de fin de ceux-ci; ber of volumes in the report; and h) la date du rapport; (j) for a report submitted on more than one electronic medium, the number of media submitted and the i) dans le cas du rapport présenté sur support papier, identifiers for each. le numéro du volume et le nombre total de volumes; j) dans le cas du rapport présenté sur plus d’un type de support électronique, leur nombre et l’identifica- teur de chaque support. Where information is provided Présentation des renseignements identificatoires (2) The information referred to in subsection (1) must (2) Les renseignements visés au paragraphe (1) fi- appear gurent : (a) for the parts of a report submitted in paper for- a) dans le cas des parties du rapport présentées sur mat, on the front cover of each volume of the report; support papier, sur la page titre de chaque volume; and Current to September 3, 2026 76 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports (b) for the parts of a report submitted in electronic b) dans le cas des parties du rapport présentées sur format, support électronique : (i) on a label affixed to, or on a sheet of paper in- (i) sur une étiquette apposée sur chaque boîtier de serted into, each container submitted, or ce support, ou sur une feuille de papier insérée dans chacun de ces boîtiers, (ii) in a file named “Readme - Lisez-moi” stored on each electronic medium submitted. (ii) dans un fichier « Readme - Lisez-moi » enre- gistré sur le support électronique. Details of contents Contenu 4 A report must include the following: 4 Le rapport comporte les éléments suivants : (a) a table of contents; a) la table des matières; (b) a list of the electronic media submitted and their b) la liste des supports électroniques et leur identifi- identifiers; cateur; (c) a list of the tables, charts, diagrams, maps, sec- c) la liste des tableaux, graphiques, diagrammes, tions and images presented in the report and the loca- cartes, coupes et images figurant dans le rapport, avec tion of each in the report; les renvois à leur emplacement; (d) a list of the permits or claims in respect of which d) la liste des claims enregistrés et des permis de the work was done, setting out for each one prospection à l’égard desquels des travaux ont été exé- cutés qui indique pour chacun d’entre eux : (i) if a prospecting permit, its identification num- ber and date of issue, (i) s’il s’agit d’un permis, son numéro d’identifica- tion et la date de sa délivrance, (ii) if a claim, its identification tag number, record- ing date and the name, if any, associated with it, (ii) s’il s’agit d’un claim, le numéro des plaques d’identification de celui-ci, la date de son enregis- (iii) the area in hectares of the lands covered, trement et le nom qui lui est associé, s’il existe, (iv) the number of the National Topographic Sys- (iii) la superficie en hectares des terrains visés, tem of Canada 1:50 000 map sheet in which it is lo- cated, and (iv) le numéro du feuillet cartographique du Sys- tème national de référence cartographique du (v) the name of the permittee or holder of the Canada réalisé à une échelle de 1/50 000 où fi- recorded claim; gurent les terrains visés par le permis de prospec- tion ou le claim, (e) a bibliography setting out the sources and refer- ences used in the report; (v) le nom du détenteur du claim enregistré ou du titulaire de permis de prospection, selon le cas; (f) an alphabetized list of definitions for all abbrevia- tions used in the report; e) une bibliographie indiquant les sources et les réfé- rences aux documents dont il est fait mention dans le (g) a brief description of the regional geology of the rapport; area in which the work was done; f) la liste alphabétique des abréviations utilisées dans (h) a statement of the purpose of the work being re- le rapport et leur signification; ported on; g) la brève description du contexte géologique régio- (i) a summary of the previous work that was done in nal où les travaux ont été exécutés; the lands covered by the prospecting permit or claim, and in the lands adjacent to those lands, that is rele- h) l’énoncé de l’objet des travaux; vant to the purpose of the work being reported on; Current to September 3, 2026 77 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports (j) a summary and a detailed description of the work i) le résumé des travaux exécutés antérieurement sur being reported on; les terrains visés par le claim ou par le permis de pros- pection, et sur les terrains avoisinants, qui sont liés à (k) if sampling was performed, a description of the l’objet des travaux visés par le rapport; sampling methodology and a statement of the number of samples analyzed; j) le résumé et le détail des travaux; (l) identification of quality control samples submitted k) le cas échéant, la description des méthodes to laboratories, along with the elemental concentra- d’échantillonnage utilisées et le nombre d’échantillons tion of each sample; analysés; (m) a description of the methods of preparation, pro- l) l’identificateur de chaque échantillon de contrôle cessing and analysis applied to samples and the calcu- de qualité qui a été soumis à un laboratoire et la lations used to arrive at the results of geochemical concentration des éléments chimiques présents dans analyses; celui-ci; (n) specification of the cutoff grades used for the re- m) la description des méthodes de préparation, de sults of geochemical analyses shown on maps and sec- traitement et d’analyse des échantillons et des mé- tions; thodes de calcul utilisées pour arriver aux résultats des analyses géochimiques; (o) a description of any geophysical or remote sens- ing anomalies and any anomalous results of geochem- n) la mention des teneurs de coupure utilisées pour ical analysis, with an explanation of the criteria used indiquer les résultats des analyses géochimiques sur to define them; les cartes ou les coupes; (p) interpretation of the data collected and of obser- o) la description de toute anomalie géophysique ou vations made during the work; de télédétection et de tout résultat anomal d’analyse géochimique, ainsi qu’une explication des critères uti- (q) conclusions and recommendations resulting from lisés pour définir ces anomalies; the interpretation of the data and of observations made during the work; p) l’interprétation des données recueillies et des ob- servations faites pendant l’exécution des travaux; (r) if geochemical analyses were performed, copies of all resulting analytical certificates and laboratory re- q) les conclusions et les recommandations résultant ports; de l’interprétation de ces données et de ces observa- tions; (s) an electronic copy of the raw data that was ac- quired in electronic format during the work; and r) si des analyses géochimiques ont été réalisées, une copie de tout certificat d’analyse et de tout rapport de (t) if environmental baseline studies were conducted, laboratoire établis à cet égard; an appendix that sets out the results of the studies. s) une copie électronique des données brutes obte- nues sur support électronique pendant l’exécution des travaux; t) si des études environnementales de base ont été réalisées, leurs résultats présentés en annexe. Maps or sections Cartes ou coupes 5 A report must include the following maps or sections: 5 Le rapport comporte les cartes ou coupes suivantes : (a) a regional geological map that is marked to indi- a) une carte géologique régionale indiquant l’empla- cate the area in which the work was done and that is cement des travaux exécutés et qui est publiée par la published by the Geological Survey of Canada, the Commission géologique du Canada, le Bureau géos- cientifique des Territoires du Nord-Ouest, le Bureau Current to September 3, 2026 78 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports Northwest Territories Geoscience Office, the Canada- géoscientifique Canada-Nunavut ou par un autre Nunavut Geoscience Office or other source of geosci- éditeur de publications géoscientifiques; entific publications; b) une carte indiquant l’emplacement des travaux (b) a map that shows the area in which the work was exécutés, des infrastructures régionales avoisinantes done, the regional infrastructure (including roads, air- — notamment les routes, aérodromes, ports et sites fields, ports and mine sites) and, if the scale of the miniers — et, si l’échelle de la carte le permet, des map permits, the communities and boundaries of communautés et les limites des Territoires du Nord- Northwest Territories; Ouest; (c) one or more maps on which the following ele- c) au moins une carte où figurent les éléments sui- ments are indicated: vants : (i) the boundaries of the recorded claim or (i) les limites de la zone visée par le permis ou prospecting permit zone where the work was done celles du claim enregistré où les travaux ont été and, exécutés et : (A) the type of work being reported on, (A) les types de travaux visés par le rapport, (B) the location of the work with respect to the (B) leur emplacement relativement à ces li- boundaries of the recorded claim or prospecting mites, permit zone where the work was done, (C) le numéro d’identification de chaque permis (C) the identification number of each prospect- de prospection, ing permit, and (D) le numéro des plaques d’identification de (D) the identification tag number of each claim chaque claim et, s’il existe, le nom de chaque and, if available, the name of each claim or group claim ou groupe de claims, of claims, (ii) l’emplacement et le type des travaux exécutés (ii) the location and type of the previous work that antérieurement sur les terrains visés par le claim ou was done in the lands covered by the prospecting par le permis de prospection, et sur les terrains permit or claim, and the lands adjacent to those avoisinants, qui sont liés aux travaux visés par le lands, that is relevant to the purpose of the work rapport, being reported on, (iii) les ouvrages souterrains ou à ciel ouvert qui (iii) all surface and underground workings that are ne font pas partie des travaux décrits dans le rap- not part of the work being reported on, port, (iv) the boundaries of each prospecting permit (iv) les limites de la zone visée par tout permis de zone or recorded claim, whether leased or not, that prospection ou celles de tout claim enregistré ou is adjacent to the boundaries of the prospecting claim enregistré visé par un bail qui est adjacent permit zone or recorded claim on which the work aux limites de la zone visée par le permis ou à celles was done, and du claim où des travaux ont été exécutés, (v) the infrastructure, hydrography and natural (v) les infrastructures, les caractéristiques hydro- landmarks within the boundaries referred to in graphiques et les repères terrestres naturels se subparagraphs (i) and (iv); trouvant dans les limites visées aux sous-alinéas i) et iv); (d) one or more maps or sections with a symbol indi- cating every site at which samples or data were collect- d) au moins une carte ou une coupe qui indique au ed, and a sample identifier for each sample; and moyen de symboles les emplacements où des échan- tillons ont été prélevés ou des données recueillies et (e) one or more maps or sections indicating any geo- l’identificateur attribué à chacun des échantillons; chemical or geophysical anomalies. e) au moins une carte ou une coupe qui indique les anomalies géochimiques ou géophysiques. Current to September 3, 2026 79 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports Geographic Location and Emplacement et coordonnées Coordinates géographiques Sample sites — coordinate systems Sites de collecte des données — coordonnées exigées 6 (1) All coordinates used in a report to locate the sites 6 (1) Seules les coordonnées géographiques et les coor- where samples or data were collected — including those données UTM peuvent être utilisées dans le rapport, les in sections, maps, tables and lists — must be geographic cartes, les coupes, les tableaux ou les listes pour localiser coordinates or UTM coordinates. l’emplacement des sites d’échantillonnage ou de collecte de données. Coordinate system specified on map Système de référence géodésique ou coordonnées UTM (2) The geodetic reference system — and, for UTM coor- (2) Le système de référence géodésique et, dans le cas dinates, the zone number — must be indicated for each des coordonnées UTM, le numéro de la zone, sont indi- map, section and table in which that coordinate system is qués sur chaque carte, coupe et tableau pour lesquels un used. tel système est utilisé. Geodetic coordinates Systèmes de référence géodésique (3) The geodetic reference system must be one of the (3) L’un des systèmes de référence géodésique ci-après following: est indiqué : (a) North American Datum 1927 (NAD 27); a) le système de référence géodésique de l’Amérique du Nord 1927 (NAD 27); (b) North American Datum 1983 (NAD 83); b) le système de référence géodésique de l’Amérique (c) Canadian Spatial Reference System (NAD 83 du Nord 1983 (NAD 83); (CSRS)); c) le système canadien de référence spatiale (NAD 83 (d) World Geodetic System 1984 (WGS 84). (SCRS)); d) le système géodésique mondial 1984 (WGS 84). Method for determination of location Méthodes de détermination des emplacements 7 For each location where work was done, a report must 7 Le rapport indique la manière dont a été établi l’em- specify how the location was determined for each type of placement de chaque type de travaux au moyen de l’une work, using one or more of the following methods: ou de plusieurs des méthodes suivantes : (a) a satellite positioning system, indicating the a) un système de positionnement par satellite indi- geodetic reference system used and, if UTM coordi- quant le système de référence géodésique utilisé et, si nates are used, the zone number; des coordonnées UTM sont utilisées, le numéro de la zone; (b) a map, indicating the scale, the geodetic reference system used and, if UTM coordinates are used, the b) une carte indiquant l’échelle et le système de réfé- zone number; rence géodésique utilisé et, si des coordonnées UTM sont utilisées, le numéro de la zone; (c) surveying, together with a description of the sur- veying equipment and method used. c) une méthode d’arpentage, y compris l’équipement et la méthode utilisés. Elevation coordinates Coordonnées d’élévation 8 If elevation coordinates are used with respect to the 8 Lorsque des coordonnées d’élévation sont utilisées à work, those coordinates and their zero reference level l’égard des travaux, ces coordonnées ainsi que leur ni- must be specified in the report. veau de référence zéro sont précisés. Current to September 3, 2026 80 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports Maps, Sections and Samples Cartes, coupes et échantillons Coordinates for geographic locations Coordonnées des emplacements géographiques 9 (1) Each map and section submitted with a report 9 (1) Tout emplacement géographique figurant sur une must have the location it represents indicated on it in ge- carte ou une coupe fournie avec le rapport est indiqué se- ographical or UTM coordinates that are shown by means lon ses coordonnées géographiques ou ses coordonnées of a grid or by a specification of those coordinates that is UTM, lesquelles sont représentées sur une grille ou indi- sufficient to allow the location of any point on the map. quées de façon à permettre la localisation de tout autre point. Requirements respecting grid lines Exigences — lignes de référence (2) If grid lines were used to perform the work, at least (2) Dans le cas où des lignes de référence sont utilisées one map of each grid must be submitted showing the dans l’exécution des travaux, au moins une carte de name of the grid, its geographic location and the coordi- chaque grille représentant ces lignes de références est nates established to identify each of the grid lines. fournie où figure le nom de cette grille représentant ces lignes de référence, son emplacement géographique et les coordonnées établies pour désigner chaque ligne de réfé- rence. Requirements for maps and sections Exigences — cartes et coupes (3) Each map and section must (3) Toute carte ou coupe : (a) be legible; a) est lisible; (b) have its scale set out on it using a bar scale in b) comporte une échelle linéaire utilisant les mesures metric units; métriques; (c) have a geographic north indicator; c) indique le nord géographique; (d) have a legend; and d) comporte une légende; (e) indicate the units of measure used on it. e) indique les unités de mesures qui y figurent. Elevation coordinates Coordonnées d’élévation (4) Each map and section must show the relevant eleva- (4) Toute carte ou coupe indique les coordonnées d’élé- tion coordinates. vation pertinentes. Location of data collection sites Coordonnées des sites de collecte de données 10 Every table or list that contains data with respect to a 10 Les tableaux ou les listes comportant des données à site (including sample data) must set out the location of l’égard d’un site, notamment celles relatives à des échan- the data collection site specified in geographic or UTM tillons, indiquent les coordonnées géographiques ou les coordinates. coordonnées UTM de l’emplacement des sites de collecte des données. Cross-referencing of sample identifiers Concordance des identificateurs d’échantillon 11 (1) If an identifier used in a report to identify a sam- 11 (1) Si les identificateurs d’échantillon figurant dans ple, such as in an analytical certificate, is not the same as le rapport, notamment sur le certificat d’analyse, sont the corresponding sample identifier shown on the sample différents des identificateurs d’échantillon correspon- location maps or sections required under paragraph dants figurant sur la carte ou la coupe visées à l’alinéa 5(1)(d), a table that makes a cross-reference between the 5(1)d), une table de concordance de ces identificateurs two identifiers must be provided. est fournie. Current to September 3, 2026 81 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports Sample identifiers Identificateurs d’échantillon (2) Data about samples must set out one of the following (2) Les données relatives à un échantillon précisent l’un identifiers for each sample: des identificateurs suivants : (a) the sample identifier shown on a map or section a) celui indiqué sur une carte ou une coupe en appli- as required under paragraph 5(1)(d); cation de l’alinéa 5(1)d); (b) the identifier cross-referenced, in accordance with b) celui indiqué dans la table de concordance visée au subsection (1), to the sample identifier mentioned in paragraphe (1) qui réfère à l’identificateur d’échan- paragraph (a). tillon visé à l’alinéa a). Information About Types of Work Renseignements sur les types de travaux Excavation Travaux d’excavation 12 Reporting on excavation work must include the fol- 12 La partie du rapport concernant les travaux d’excava- lowing: tion comporte les éléments suivants : (a) maps and sections showing the location, dimen- a) des cartes ou des coupes qui indiquent l’emplace- sions and orientation of each of the workings, includ- ment, les dimensions et l’orientation des ouvrages, no- ing stripped areas, trenches, open pits, shafts, adits, tamment les zones décapées, les tranchées, les mines à drifts and ramps; ciel ouvert, les puits, les galeries, y compris les galeries à flanc de coteau, et les rampes; (b) maps or sections showing any anomalous results of geochemical analyses; b) des cartes ou des coupes qui indiquent tout résul- tat anomal des analyses géochimiques; (c) a description of c) la description des éléments suivants : (i) the excavation methods and the equipment used, (i) les méthodes d’excavation et l’équipement utili- sés, (ii) the samples or groups of samples collected from each of the workings, (ii) les échantillons ou groupes d’échantillons pré- levés dans chaque ouvrage, (iii) the geological observations and any geotechni- cal observations, (iii) les observations géologiques et toute observa- tion géotechnique, (iv) the results of any geophysical surveys, and (iv) les résultats de tout levé géophysique, (v) the results of geoscientific investigations; and (v) les résultats des recherches géoscientifiques; (d) a copy of any log made respecting excavation of overburden or extraction of bedrock. d) une copie de chaque journal faisant état de travaux d’excavation de mort-terrains ou d’extraction de roche du substrat rocheux. Drilling Travaux de forage 13 Reporting on drilling work must include the follow- 13 La partie du rapport concernant les travaux de forage ing: comporte les éléments suivants : (a) maps showing the locations of drill hole collars a) des cartes indiquant l’emplacement de l’orifice des and traces; trous de forage et de leurs traces, (b) sections showing b) des coupes indiquant : Current to September 3, 2026 82 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports (i) the overburden thickness, (i) l’épaisseur des morts-terrains, (ii) the geological units intersected, (ii) les unités géologiques intersectées, (iii) the locations where samples were taken, and (iii) les emplacements où ont été prélevés les échantillons, (iv) all anomalous results of geochemical analyses; (iv) les résultats anomaux des analyses géochi- (c) a description of miques; (i) the drilling methods and the equipment used, c) la description des éléments suivants : (ii) the samples and their down-hole intervals, (i) les méthodes de forage et l’équipement utilisés, (iii) the geological observations and any geotechni- (ii) les échantillons prélevés et les intervalles de cal observations, prélèvement le long du trou, (iv) the results of any geophysical surveys, and (iii) les observations géologiques et toute observa- tion géotechnique, (v) the results of geoscientific investigations; and (iv) les résultats de tout levé géophysique, (d) drill logs setting out for each drill hole (v) les résultats des recherches géoscientifiques; (i) the hole number, d) les journaux de forage qui comportent les rensei- (ii) the hole or core diameter, gnements suivants : (iii) the date of drilling, the date logged, the geo- (i) le numéro de chaque trou de forage, graphic or UTM coordinates of the collar, initial az- imuth and inclination, final hole length and the re- (ii) le diamètre du trou ou de la carotte de forage, sults of any down-hole tests, and (iii) la date du forage, la date consignée, les coor- (iv) the overburden thickness. données géographiques ou UTM de l’orifice du trou de forage, l’azimut et l’inclinaison initiaux ainsi que la longueur du trou de forage et les résultats des es- sais réalisés le long du trou, (iv) l’épaisseur des morts-terrains. Geological mapping Cartographie géologique 14 Reporting on geological mapping work must include 14 La partie du rapport concernant les travaux de carto- the following: graphie géologique comporte les éléments suivants : (a) a table setting out the geological formations of the a) le tableau des formations géologiques de la région area mapped, if the information on those formations is cartographiée, si les renseignements relatifs à ces for- published by the Geological Survey of Canada, the mations sont publiés par la Commission géologique du Northwest Territories Geoscience Office, the Canada- Canada, le Bureau géoscientifique Canada-Nunavut, le Nunavut Geoscience Office or other source of geosci- Bureau géoscientifique des Territoires du Nord-Ouest entific publications; ou un autre éditeur de publications géoscientifiques; (b) maps or sections showing geological units, struc- b) des cartes ou des coupes indiquant les unités géo- tural data, areas of mineralization, locations of rock logiques, les données structurales, les aires de minéra- outcrops and mineralized erratic blocks, anomalous lisation, l’emplacement des affleurements rocheux et results of geochemical analyses, locations of any des blocs erratiques minéralisés, les résultats ano- trenches, stripped areas, drill holes and other work- maux des analyses géochimiques, l’emplacement de ings referred to in the report, and, if applicable, indi- toute tranchée, de toute zone décapée, de tout trou de cators of the direction of ice movement; forage et de tout autre ouvrage mentionné dans le Current to September 3, 2026 83 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports (c) a description of the features of geological interest, rapport et, le cas échéant, les éléments indicateurs de such as overburden, rock types, structures, veins, ar- la direction du mouvement des glaces; eas of mineralization, mineralized erratic blocks, al- tered zones, anomalous results of geochemical analy- c) la description des caractéristiques géologiques ses, and, if applicable, indicators of the direction of ice d’importance, notamment les morts-terrains, les types movement; and de roche, les structures, les filons, les aires de minéra- lisation, les blocs erratiques minéralisés, les zones (d) the results of geoscientific investigations, includ- d’altération, les résultats anomaux des analyses géo- ing the results of any petrographic studies, and any in- chimiques et, le cas échéant, les éléments indicateurs terpretation that has been made of the glacial history de la direction du mouvement des glaces; based on the geological mapping work. d) les résultats des recherches géoscientifiques, y compris les résultats de toute étude pétrographique et toute interprétation de l’histoire glaciaire fondée sur les travaux de cartographie géologique. Sampling and geochemistry Travaux d’échantillonnage et de géochimie 15 Reporting on sampling and geochemical analysis 15 La partie du rapport concernant les travaux d’échan- must include the following: tillonnage et de géochimie comporte les éléments sui- vants : (a) complete results of geochemical analyses; a) l’ensemble des résultats des analyses géochi- (b) a geological description of the samples or group of miques; samples; b) la description géologique des échantillons ou des (c) a description of the sampling methodologies, in- groupes d’échantillons; cluding any pattern of sample collection; c) la description des méthodes d’échantillonnage, y (d) the dates the samples or group of samples were compris toute maille d’échantillonnage; collected and the dates that any preparation or pro- cessing of the samples was done in the field or in a lab- d) la date de prélèvement des échantillons ou du oratory; groupe d’échantillons et la date de leur préparation ou de leur traitement sur le terrain ou en laboratoire; (e) a description of any preparation or processing of samples or group of samples that was done in the field e) la description de la préparation ou du traitement or in a laboratory; des échantillons ou du groupe d’échantillons sur le terrain ou en laboratoire; (f) a description of the methods of geochemical anal- ysis used on each sample or group of samples, includ- f) la description des méthodes d’analyses géochi- ing a list of the elements and compounds for which the miques utilisées pour chaque échantillon ou groupe analysis was done and the limits for their detection; d’échantillons, y compris la liste des éléments chi- miques et des composés que ces analyses visaient à ré- (g) a description of any statistical methods used and véler et les limites de détection; the results obtained; g) la description des méthodes statistiques utilisées (h) the results of the geochemistry survey, represent- et des résultats obtenus; ed on maps or sections; and h) les résultats des travaux de géochimie, indiqués (i) if any geoscientific investigation of surficial de- sur des cartes ou des coupes; posits was performed, an interpretation of the sources from which the indicator minerals came, a description i) si des recherches géoscientifiques sont réalisées sur of the methods used to determine the direction of les dépôts de surface, l’interprétation des sources d’où movement of ice, water or other transport medium for proviennent les minéraux indicateurs, la description those minerals and any interpretation of the glacial des méthodes utilisées pour établir la direction du history revealed by the investigation. mouvement des glaces, des eaux ou de tout autre moyen par lequel ces minéraux ont pu être déplacés et Current to September 3, 2026 84 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports toute interprétation de l’histoire glaciaire fondée sur les recherches. Geophysics or remote sensing work Travaux de géophysique ou de télédétection 16 (1) Reporting on geophysical analysis or remote 16 (1) La partie du rapport concernant les travaux de sensing work must be accompanied by the following in- géophysique ou de télédétection comporte les éléments formation and documents: suivants : (a) the type of survey performed; a) le type de levé réalisé; (b) the dates that the survey started and ended; b) les dates de début et de fin du levé; (c) if the work was done using a grid, the distance be- c) si des lignes de référence ont été utilisées, la dis- tween the lines, the azimuth and the length of the lines tance entre les lignes, l’azimut, la longueur des lignes surveyed and the total distance surveyed; qui ont été levées et la longueur totale du levé; (d) a copy of each report respecting geophysics or re- d) une copie de chaque rapport de géophysique ou de mote sensing made by a contractor, together with all télédétection exécuté par l’entrepreneur, accompagnée maps and sections produced and data collected in con- des cartes ou coupes produites et des données re- nection with the report; cueillies et qui sont liées à ce rapport; (e) a description of the survey methods, including e) la description des méthodes de levé, qui comprend notamment : (i) the characteristics of the equipment used, (i) les caractéristiques de l’équipement utilisé, (ii) the characteristics of the instruments and sen- sors used, including their precision, (ii) les caractéristiques et la précision des instru- ments et capteurs utilisés, (iii) the positioning system used to record the loca- tion of data collection points, and (iii) le système de positionnement utilisé pour en- registrer l’emplacement des sites de collecte de (iv) a description of any methods used to make données, corrections to the data; (iv) la description des méthodes utilisées pour cor- (f) a description of the methods of analysis applied to riger les données; the data; f) la description des méthodes d’analyse appliquées (g) a database or spreadsheet containing the geo- aux données; graphic coordinates of each ground data collection site, the raw measurements, the measurements used g) une base de données ou une feuille de calcul élec- to correct the raw measurements, the corrected mea- tronique qui fait état des coordonnées géographiques surements and calculated results used for interpreta- de chaque emplacement au sol où a eu lieu la collecte tions; and des données, des mesures brutes, des mesures utili- sées pour corriger les mesures brutes, des mesures (h) the results of the geophysical or remote sensing corrigées et des résultats des calculs utilisés pour l’in- survey, represented on maps, sections, pseudo-sec- terprétation des données; tions or profiles. h) les résultats des levés géophysiques ou des levés obtenus par télédétection indiqués sur des cartes, des coupes, des pseudo-coupes ou profils. Down-hole geophysical survey Trou de forage — levé géophysique (2) If a down-hole geophysical survey was performed, (2) Si des levés géophysiques sont exécutés le long d’un the section required under paragraph (1)(h) must show trou de forage, la coupe visée à l’alinéa (1)h) indique aus- si : (a) the hole number; Current to September 3, 2026 85 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest SCHEDULE 2 Reports ANNEXE 2 Rapports (b) the date the hole was drilled; a) le numéro du trou; (c) the location of the drill hole collar and trace; b) la date du forage; (d) the geographic or UTM collar coordinates; c) l’emplacement de l’orifice du trou et de la trace du forage; (e) the initial azimuth and inclination of the hole; and d) les coordonnées géographiques ou UTM de l’ori- fice du trou; (f) the length of the hole. e) l’azimut et l’inclinaison initiaux du trou; f) la longueur du trou. Electromagnetic survey Levé électromagnétique (3) If an electromagnetic survey was performed, the (3) Si un levé électromagnétique est réalisé, la carte vi- map required under paragraph (1)(h) must show the pro- sée à l’alinéa (1)h) indique la projection en surface du jection of the surveyed drill hole to the surface and the trou de forage et l’emplacement du transmetteur et du location and configuration of the transmitter and receiv- récepteur et leur configuration. er. Geophysical survey grids Lignes de référence du levé géophysique (4) If a ground-based, waterborne or airborne geophysi- (4) Tout levé géophysique terrestre, aérien ou hydrique cal survey was performed, it must be presented in the re- comporte une carte qui indique les lignes de référence port accompanied by a map showing the surveyed lines. faisant l’objet du levé. Underground geophysical survey Levé géophysique souterrain (5) If an underground geophysical survey was per- (5) Tout levé géophysique souterrain comporte une formed, it must be presented in the report accompanied carte qui indique l’emplacement de ce levé, les lignes de by a map showing the location of the geophysical survey, référence et l’emplacement, les dimensions et l’orienta- the surveyed lines and the location, dimensions and ori- tion des ouvrages souterrains. entation of the underground workings. PART 2 PARTIE 2 Simplified Report Rapport simplifié Simplified report Rapport simplifié 17 A simplified report provided for under subsection 17 Le rapport simplifié visé aux paragraphes 15(2) et 15(2) or 41(1) of these Regulations must be prepared in 41(1) du présent règlement est présenté conformément accordance with sections 2 to 11 of this Schedule, but aux articles 2 à 11 de la présente annexe, à l’exception without the requirements set out in paragraphs 4(g), (m), des alinéas 4g), m), o), p) et q) et 5(1)a) et e). Il comporte (o), (p) and (q) and 5(1)(a) and (e), and must contain the les renseignements et documents suivants : following information and documents: a) la description des éléments suivants : (a) a description of (i) tout échantillon ou groupe d’échantillons préle- (i) each sample or group of samples collected, vé, (ii) methods of preparation, processing and analy- (ii) les méthodes de préparation, de traitement et sis applied to samples, d’analyse des échantillons, (iii) the excavation methods and the equipment (iii) les méthodes d’excavation et l’équipement uti- used for the excavation, lisés, Current to September 3, 2026 86 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break --> Northwest Territories Mining Regulations Règlement sur l’exploitation minière dans les Territoires du Nord-Ouest
SCHEDULE 2 Reports ANNEXE 2 Rapports (iv) the field observations, and (iv) les observations de terrain, (v) the results of the work performed and of geo- (v) les résultats des travaux et des analyses géochi- chemical analyses; miques; (b) maps or sections showing b) des cartes ou des coupes qui indiquent : (i) the area investigated and the traverses per- (i) la région examinée et les traverses exécutées, formed, (ii) l’emplacement des affleurements rocheux exa- (ii) the locations of rock outcrops investigated, minés, (iii) the locations of the sampling sites, including (iii)l’emplacement des sites d’échantillonnage, y the locations of any erratic blocks that were sam- compris l’emplacement de tout bloc erratique pled, échantillonné, (iv) the locations of any stripped areas and trench- (iv) l’emplacement des tranchées et des zones dé- es, and capées, le cas échéant, (v) features of interest such as significant results of (v) les caractéristiques d’importance, notamment geochemical analyses; and tout résultat important des analyses géochimiques; (c) comments respecting follow-up work for the pur- c) les commentaires sur les travaux de suivi à effec- pose of assessing the mineral potential of the area in- tuer en vue de l’évaluation du potentiel minier de la vestigated. région examinée. Current to September 3, 2026 87 À jour au 3 septembre 2026 Last amended on June 19, 2017 Dernière modification le 19 juin 2017 <!-- page break -->