Skip to content
Nelum
Laws of Canada

Newfoundland Offshore Petroleum Drilling and Production Regulations (SOR/2009-316)

Made 2009-11-26 · Text as of 2026-10-01

Public law and official guidance, published as research. Not legal, tax or financial advice.

About this law

Language
English
Kind
Regulation
Organisation
European Union
Country
Canada
Subjects
Energy
Keywords
sub-national agreement, energy conservation/energy production, oil, policy/planning, enforcement/compliance
Categories
energy

Where to read it

    No source link is recorded for this law.

Text

The law's own text, section by section, as held. Each section has its own link.

  1. 1 INTERPRETATION 1 1 DÉFINITIONS ET INTERPRÉTATION 1

  2. 2 PART 1 2 PARTIE 1 BOARD’S POWERS 7 POUVOIRS DE L’OFFICE 7

  3. 2 SPACING 7 2 ESPACEMENT 7

  4. 3 NAMES AND DESIGNATIONS 7 3 NOMS ET DÉSIGNATIONS 7

  5. 5 PART 2 5 PARTIE 2 MANAGEMENT SYSTEM, SYSTÈME DE GESTION, APPLICATION FOR DEMANDE D’AUTORISATION ET AUTHORIZATION AND WELL APPROBATIONS RELATIVES À APPROVALS 8 UN PUITS 8

  6. 5 MANAGEMENT SYSTEM 8 5 SYSTÈME DE GESTION 8

  7. 6 APPLICATION FOR AUTHORIZATION 9 6 DEMANDE D’AUTORISATION 9

  8. 10 WELL APPROVAL 13 10 APPROBATION RELATIVE AU PUITS 13

  9. 14 SUSPENSION AND REVOCATION OF A 14 SUSPENSION ET ANNULATION DE WELL APPROVAL 14 L’APPROBATION RELATIVE À UN PUITS 14

  10. 15 DEVELOPMENT PLANS 15 15 PLAN DE MISE EN VALEUR 15

  11. 17 PART 3 17 PARTIE 3 OPERATOR’S DUTIES 15 OBLIGATIONS DE L’EXPLOITANT 15

  12. 17 AVAILABILITY OF DOCUMENTS 15 17 DISPONIBILITÉ DES DOCUMENTS 15

  13. 18 MANAGEMENT SYSTEM 16 18 SYSTÈME DE GESTION 16

  14. 19 SAFETY AND ENVIRONMENTAL 19 SÉCURITÉ ET PROTECTION DE PROTECTION 16 L’ENVIRONNEMENT 16

  15. 22 STORING AND HANDLING OF 22 ENTREPOSAGE ET MANUTENTION DES CONSUMABLES 18 PRODUITS CONSOMPTIBLES 18

  16. 23 HANDLING OF CHEMICAL SUBSTANCES, 23 MANUTENTION DES SUBSTANCES WASTE MATERIAL AND OIL 18 CHIMIQUES, DES DÉCHETS ET DU PÉTROLE 18

  17. 24 CESSATION OF A WORK OR ACTIVITY 18 24 CESSATION DES ACTIVITÉS 18

  18. 25 PART 4 25 PARTIE 4 EQUIPMENT AND OPERATIONS 19 ÉQUIPEMENT ET ACTIVITÉS 19

  19. 25 WELLS, INSTALLATIONS, EQUIPMENT, 25 PUITS, INSTALLATIONS, ÉQUIPEMENT, FACILITIES AND SUPPORT CRAFT 19 MATÉRIEL ET VÉHICULES DE SERVICE 19

  20. 28 DRILLING FLUID SYSTEM 20 28 CIRCUIT DU FLUIDE DE FORAGE 20 3 SOR/2009-316 — June 12, 2014 Section Page Article Page

  21. 29 MARINE RISER 20 29 TUBE PROLONGATEUR 20

  22. 30 DRILLING PRACTICES 20 30 PRATIQUES DE FORAGE 20

  23. 31 REFERENCE FOR WELL DEPTHS 21 31 RÉFÉRENCE POUR LA PROFONDEUR DU PUITS 21

  24. 32 DIRECTIONAL AND DEVIATION SURVEYS 21 32 MESURES DE DÉVIATION ET DE DIRECTION 21

  25. 33 FORMATION LEAK-OFF TEST 21 33 TEST DE PRESSION DE FRACTURATION 21

  26. 34 FORMATION FLOW AND WELL TESTING 34 ÉQUIPEMENT POUR LES ESSAIS EQUIPMENT 21 D’ÉCOULEMENT DE FORMATION ET LES ESSAIS D’UN PUITS 21

  27. 35 WELL CONTROL 22 35 CONTRÔLE DES PUITS 22

  28. 39 CASING AND CEMENTING 23 39 TUBAGE ET CIMENTATION 23

  29. 42 WAITING ON CEMENT TIME 24 42 PRISE DU CIMENT 24

  30. 43 CASING PRESSURE TESTING 24 43 ÉPREUVE SOUS PRESSION DU TUBAGE 24

  31. 44 PRODUCTION TUBING 24 44 TUBE DE PRODUCTION 24

  32. 45 MONITORING AND CONTROL OF PROCESS 45 SURVEILLANCE ET CONTRÔLE DES OPERATIONS 24 OPÉRATIONS DE TRAITEMENT 24

  33. 46 WELL COMPLETION 25 46 COMPLÉTION D’UN PUITS 25

  34. 47 SUBSURFACE SAFETY VALVE 26 47 VANNES DE SÉCURITÉ DE SUBSURFACE 26

  35. 48 WELLHEAD AND CHRISTMAS TREE 48 TÊTES DE PUITS ET TÊTES D’ÉRUPTION 26 EQUIPMENT 26

  36. 49 PART 5 49 PARTIE 5 EVALUATION OF WELLS, ÉVALUATION DES PUITS, POOLS AND FIELDS 26 GISEMENTS ET CHAMPS 26

  37. 49 GENERAL 26 49 DISPOSITIONS GÉNÉRALES 26

  38. 51 TESTING AND SAMPLING OF FORMATIONS 27 51 MISE À L’ESSAI ET ÉCHANTILLONNAGE DES FORMATIONS 27

  39. 52 FORMATION FLOW TESTING 27 52 ESSAIS D’ÉCOULEMENT DE FORMATION 27

  40. 53 SUBMISSION OF SAMPLES AND DATA 28 53 EXPÉDITION DES ÉCHANTILLONS ET DES DONNÉES 28

  41. 56 PART 6 56 PARTIE 6 WELL TERMINATION 29 CESSATION DE L’EXPLOITATION D’UN PUITS 29

  42. 56 SUSPENSION OR ABANDONMENT 29 56 SUSPENSION ET ABANDON 29

  43. 59 INSTALLATION REMOVAL 29 59 DÉPLACEMENT D’UNE INSTALLATION 29

  44. 60 PART 7 60 PARTIE 7 MEASUREMENTS 29 MESURAGE 29

  45. 60 FLOW AND VOLUME 29 60 DÉBIT ET VOLUME 29 4 DORS/2009-316 — 12 juin 2014 Section Page Article Page

  46. 62 TESTING, MAINTENANCE AND 62 ESSAIS, ENTRETIEN ET NOTIFICATION 30 NOTIFICATION 30

  47. 63 TRANSFER METERS 31 63 COMPTEURS DE TRANSFERT 31

  48. 64 PRORATION TESTING FREQUENCY 31 64 FRÉQUENCE D’ESSAIS AU PRORATA 31

  49. 65 PART 8 65 PARTIE 8 PRODUCTION CONSERVATION 31 RATIONALISATION DE LA PRODUCTION 31

  50. 65 RESOURCE MANAGEMENT 31 65 GESTION DES RESSOURCES 31

  51. 66 COMMINGLED PRODUCTION 32 66 PRODUCTION MÉLANGÉE 32

  52. 67 GAS FLARING AND VENTING 32 67 BRÛLAGE DE GAZ À LA TORCHE ET REJET DE GAZ DANS L’ATMOSPHÈRE 32

  53. 68 OIL BURNING 32 68 BRÛLAGE DE PÉTROLE 32

  54. 69 PART 9 69 PARTIE 9 SUPPORT OPERATIONS 33 OPÉRATIONS DE SOUTIEN 33

  55. 69 SUPPORT CRAFT 33 69 VÉHICULES DE SERVICE 33

  56. 71 SAFETY ZONE 33 71 ZONE DE SÉCURITÉ 33

  57. 72 PART 10 72 PARTIE 10 TRAINING AND COMPETENCY 34 FORMATION ET COMPÉTENCE 34

  58. 73 IMPAIRMENT AND FATIGUE 34 73 INCAPACITÉ ET FATIGUE 34

  59. 74 PART 11 74 PARTIE 11 SUBMISSIONS, NOTIFICATIONS, PRÉSENTATIONS, AVIS, RECORDS AND REPORTS 35 REGISTRES ET RAPPORTS 35

  60. 74 REFERENCE TO NAMES AND 74 MENTION DES NOMS ET DÉSIGNATIONS 35 DESIGNATIONS 35

  61. 75 SURVEYS 35 75 ARPENTAGE 35

  62. 76 INCIDENTS AND NEAR-MISSES 35 76 INCIDENTS ET QUASI-INCIDENTS 35

  63. 77 SUBMISSION OF DATA AND ANALYSIS 36 77 PRÉSENTATION DE DONNÉES ET ANALYSES 36

  64. 78 RECORDS 37 78 REGISTRES 37

  65. 79 METEOROLOGICAL OBSERVATIONS 38 79 OBSERVATIONS MÉTÉOROLOGIQUES 38

  66. 80 DAILY PRODUCTION RECORD 38 80 REGISTRES QUOTIDIENS RELATIFS À LA PRODUCTION 38

  67. 81 MANAGEMENT OF RECORDS 38 81 GESTION DES REGISTRES 38

  68. 82 FORMATION FLOW TEST REPORTS 39 82 RAPPORTS RELATIFS AUX ESSAIS D’ÉCOULEMENT DE FORMATION 39

  69. 83 PILOT SCHEME 39 83 PROJET PILOTE 39

  70. 84 DAILY REPORTS 39 84 RAPPORTS QUOTIDIENS 39 5 SOR/2009-316 — June 12, 2014 Section Page Article Page

  71. 85 MONTHLY PRODUCTION REPORT 40 85 RAPPORT MENSUEL CONCERNANT LA PRODUCTION 40

  72. 86 ANNUAL PRODUCTION REPORT 40 86 RAPPORT ANNUEL DE PRODUCTION 40

  73. 87 ENVIRONMENTAL REPORTS 40 87 RAPPORT SUR LES CONDITIONS ENVIRONNEMENTALES 40

  74. 88 ANNUAL SAFETY REPORT 41 88 RAPPORT ANNUEL SUR LA SÉCURITÉ 41

  75. 89 WELL HISTORY REPORT 42 89 RAPPORT FINAL DU PUITS 42

  76. 90 WELL OPERATIONS REPORT 42 90 RAPPORT D’EXPLOITATION DU PUITS 42

  77. 91 OTHER REPORTS 43 91 AUTRES RAPPORTS 43

  78. 92 PART 12 92 PARTIE 12 CONSEQUENTIAL MODIFICATIONS AMENDMENTS, TRANSITIONAL CORRÉLATIVES, ABROGATIONS PROVISION, REPEALS AND ET ENTRÉE EN VIGUEUR 43 COMING INTO FORCE 43

  79. 92 CONSEQUENTIAL AMENDMENTS 43 92 MODIFICATIONS CORRÉLATIVES 43

  80. 92 Newfoundland Offshore Certificate of 92 Règlement sur les certificats de Fitness Regulations 43 conformité liés à l’exploitation des hydrocarbures dans la zone extracôtière de Terre-Neuve 43

  81. 99 Newfoundland Offshore Petroleum 99 Règlement sur les installations pour Installations Regulations 43 hydrocarbures de la zone extracôtière de Terre-Neuve 43

  82. 103 TRANSITIONAL PROVISION 43 103 DISPOSITION TRANSITOIRE 43

  83. 104 REPEALS 44 104 ABROGATIONS 44

  84. 106 COMING INTO FORCE 44 106 ENTRÉE EN VIGUEUR 44

  85. SCHEDULE 45 ANNEXE 45 6 Registration Enregistrement SOR/2009-316 November 26, 2009 DORS/2009-316 Le 26 novembre 2009 CANADA-NEWFOUNDLAND ATLANTIC ACCORD LOI DE MISE EN ŒUVRE DE L’ACCORD ATLANTIQUE IMPLEMENTATION ACT CANADA — TERRE-NEUVE Newfoundland Offshore Petroleum Drilling and Règlement sur le forage et la production relatifs aux Production Regulations hydrocarbures dans la zone extracôtière de Terre- Neuve P.C. 2009-1891 November 26, 2009 C.P. 2009-1891 Le 26 novembre 2009 Whereas, pursuant to subsection 150(1) of the Attendu que, conformément au paragraphe 150(1) de Canada-Newfoundland Atlantic Accord Implementation la Loi de mise en œuvre de l’Accord atlantique Canada Acta, a copy of the proposed Newfoundland Offshore — Terre-Neuvea, le projet de règlement intitulé Règle- Petroleum Drilling and Production Regulations, sub- ment sur le forage et la production pour hydrocarbures stantially in the annexed form, was published in the dans la zone extracôtière de Terre-Neuve, conforme en Canada Gazette, Part I on April 18, 2009 and interested substance au texte ci-après, a été publié dans la Gazette persons were given an opportunity to make representa- du Canada Partie I, le 18 avril 2009 et que les intéressés tions to the Minister of Natural Resources with respect ont ainsi eu la possibilité de présenter leurs observations to the proposed Regulations; à cet égard à la ministre des Ressources naturelles; And whereas, pursuant to section 7 of that Act, the Attendu que, conformément à l’article 7 de cette loi, la Minister of Natural Resources has consulted the Provin- ministre des Ressources naturelles a consulté son homo- cial Minister with respect to the proposed Regulations logue provincial sur ce projet de règlement et que ce der- and the latter has given his approval for the making of nier a donné son approbation à la prise du règlement, those Regulations. Therefore, Her Excellency the Governor General in À ces causes, sur recommandation de la ministre des Council, on the recommendation of the Minister of Nat- Ressources naturelles et en vertu du paragraphe 149(1)b ural Resources, pursuant to subsection 149(1)b of the de la Loi de mise en œuvre de l’Accord atlantique Canada-Newfoundland Atlantic Accord Implementation Canada — Terre-Neuvea, Son Excellence la Gouver- Acta, hereby makes the annexed Newfoundland Offshore neure générale en conseil prend le Règlement sur le fo- Petroleum Drilling and Production Regulations. rage et la production relatifs aux hydrocarbures dans la zone extracôtière de Terre-Neuve, ci-après. a a S.C. 1987, c. 3. L.C. 1987, ch. 3 b b S.C. 1992, c. 35, s. 63 L.C. 1992, ch. 35, art. 63 NEWFOUNDLAND OFFSHORE PETROLEUM RÈGLEMENT SUR LE FORAGE ET LA DRILLING AND PRODUCTION PRODUCTION RELATIFS AUX REGULATIONS HYDROCARBURES DANS LA ZONE EXTRACÔTIÈRE DE TERRE-NEUVE INTERPRETATION DÉFINITIONS ET INTERPRÉTATION 1. (1) The following definitions apply in these Regu- 1. (1) Les définitions qui suivent s’appliquent au pré- lations. sent règlement. “abandoned”, in relation to a well, means a well or part « abandonné » Se dit d’un puits ou d’une partie d’un of a well that has been permanently plugged. (abandon- puits qui a été obturé de façon permanente. (abandoned) né) « approbation relative à un puits » Approbation accordée “Act” means the Canada-Newfoundland Atlantic Accord par l’Office en vertu de l’article 13. (well approval) Implementation Act. (Loi) « autorisation » Autorisation délivrée par l’Office en ver- “artificial island” means a humanly constructed island to tu de l’alinéa 138(1)b) de la Loi. (authorization) provide a site for the exploration and drilling, or the pro- « barrière » Tout fluide, bouchon ou autre dispositif duction, storage, transportation, distribution, measure- d’étanchéité qui empêche des hydrocarbures ou tout ment, processing or handling, of petroleum. (île artifi- autre fluide de s’écouler accidentellement soit d’une for- cielle) mation à une autre soit d’un puits. (barrier) “authorization” means an authorization issued by the « blessure entraînant une perte de temps de travail » Bles- Board under paragraph 138(1)(b) of the Act. (autorisa- sure qui empêche un employé de se présenter au travail tion) ou de s’acquitter efficacement de toutes les fonctions “barrier” means any fluid, plug or seal that prevents liées à son travail habituel les jours suivant le jour de petroleum or any other fluid from flowing unintentional- l’accident, qu’il s’agisse ou non de jours ouvrables pour ly from a well or from a formation into another forma- lui. (lost or restricted workday injury) tion. (barrière) « blessure sans gravité » Lésion professionnelle, autre “casing liner” means a casing that is suspended from a qu’une blessure entraînant une perte de temps de travail, string of casing previously installed in a well and does qui fait l’objet d’un traitement médical ou de premiers not extend to the wellhead. (tubage partiel) soins. (minor injury) “commingled production” means production of « câble » Câble renfermant un fil conducteur et servant à petroleum from more than one pool or zone through a la manœuvre d’instruments de sondage ou d’autres outils common well-bore or flow line without separate mea- dans un puits. (wire line) surement of the production from each pool or zone. (pro- « câble lisse » Câble en acier monobrin servant à la ma- duction mélangée) nœuvre d’outils dans un puits. (slick line) “completed”, in relation to a well, means a well that is « cessation » S’entend de l’abandon, de la complétion, ou prepared for production or injection operations. (complé- de la suspension de l’exploitation d’un puits. (termina- té) tion) “completion interval” means a section within a well that « complété » Se dit d’un puits qui a été préparé en vue de is prepared to permit the travaux de production ou d’injection. (completed) (a) production of fluids from the well; « conditions environnementales » Conditions météorolo- (b) observation of the performance of a reservoir; or giques, océanographiques et conditions connexes, no- 1 SOR/2009-316 — June 12, 2014 (c) injection of fluids into the well. (intervalle de tamment l’état des glaces, qui peuvent influer sur les ac- complétion) tivités visées par l’autorisation. (physical environmental “conductor casing” means the casing that is installed in a conditions) well to facilitate drilling of the hole for the surface cas- « contrôle d’un puits » Contrôle de la circulation des ing. (tubage initial) fluides qui pénètrent dans un puits ou en sortent. (well “drilling program” means the program for the drilling of control) one or more wells within a specified area and time using « couche » Couche ou séquence de couches, y compris, one or more drilling installations and includes any work pour l’application de la définition de « production mélan- or activity related to the program. (programme de fo- gée », de l’article 7, du paragraphe 61(2), des articles 64 rage) à 66 et 74, du paragraphe 83(2) et de l’article 86, toute “environmental protection plan” means the environmen- couche désignée comme telle par l’Office en vertu de tal protection plan submitted to the Board under section l’article 4. (zone) 6. (plan de protection de l’environnement) « date de libération de l’appareil de forage » Date à la- “flow allocation procedure” means the procedure to quelle un appareil de forage a exécuté des travaux pour la dernière fois dans un puits. (rig release date) (a) allocate total measured quantities of petroleum and water produced from or injected into a pool or « déchets » Détritus, rebuts, eaux usées, fluides résiduels zone back to individual wells in a pool or zone where ou autres matériaux inutilisables produits au cours des individual well production or injection is not mea- activités de forage, des travaux relatifs à un puits ou des sured separately; and travaux de production, y compris les fluides et les dé- blais de forage usés ou excédentaires, ainsi que l’eau (b) allocate production to fields that are using a com- produite. (waste material) mon storage or processing facility. (méthode de répar- tition du débit) « essai au prorata » Essai effectué dans un puits d’exploi- tation visé par un plan de mise en valeur pour en mesurer “flow calculation procedure” means the procedure to be le débit des fluides produits à des fins de répartition. used to convert raw meter output to a measured quantity (proration test) of petroleum or water. (méthode de calcul du débit) « essai d’écoulement de formation » Opération visant, se- “flow system” means the flow meters, auxiliary equip- lon le cas : ment attached to the flow meters, fluid sampling devices, production test equipment, the master meter and meter a) à provoquer l’écoulement des fluides de formation prover used to measure and record the rate and volumes vers la surface d’un puits afin d’obtenir des échan- at which fluids are tillons des fluides du réservoir et de déterminer les ca- ractéristiques de l’écoulement de celui-ci; (a) produced from or injected into a pool; b) à injecter des fluides dans une formation afin (b) used as a fuel; d’évaluer l’injectivité. (formation flow test) (c) used for artificial lift; or « exploitant » Personne qui est titulaire à la fois d’un per- (d) flared or transferred from a production installa- mis de travaux délivré en vertu de l’alinéa 138(1)a) de la tion. (système d’écoulement) Loi et d’une autorisation. (operator) “fluid” means gas, liquid or a combination of the two. « fluide » Gaz, liquide ou combinaison des deux. (fluid) (fluide) 2 DORS/2009-316 — 12 juin 2014 “formation flow test” means an operation « fond marin » Partie de la croûte terrestre formant le (a) to induce the flow of formation fluids to the sur- fond des océans. (seafloor) face of a well to procure reservoir fluid samples and « île artificielle » Île construite de toutes pièces afin de determine reservoir flow characteristics; or servir d’emplacement pour la prospection et le forage, ou (b) to inject fluids into a formation to evaluate injec- pour la production, le stockage, le transport, la distribu- tivity. (essai d’écoulement de formation) tion, la mesure, le traitement ou la manutention des hy- drocarbures. (artificial island) “incident” means « incident » (a) any event that causes a) Événement qui entraîne l’une ou l’autre des situa- (i) a lost or restricted workday injury, tions suivantes : (ii) death, (i) une blessure entraînant une perte de temps de (iii) fire or explosion, travail, (iv) a loss of containment of any fluid from a well, (ii) une perte de vie, (v) an imminent threat to the safety of a person, in- (iii) un incendie ou une explosion, stallation or support craft, or (iv) une défaillance du confinement d’un fluide (vi) pollution; provenant d’un puits, (b) any event that results in a missing person; or (v) une menace imminente à la sécurité d’une per- sonne, d’une installation ou d’un véhicule de ser- (c) any event that causes vice, (i) the impairment of any structure, facility, equip- (vi) de la pollution; ment or system critical to the safety of persons, an installation or support craft, or b) événement à la suite duquel une personne est por- tée disparue; (ii) the impairment of any structure, facility, equip- ment or system critical to environmental protection. c) événement qui nuit : (incident) (i) soit au fonctionnement d’une structure, de maté- “lost or restricted workday injury” means an injury that riel, d’un équipement ou d’un système essentiel au prevents an employee from reporting for work or from maintien de la sécurité des personnes ou de l’inté- effectively performing all the duties connected with the grité d’une installation ou d’un véhicule de service, employee’s regular work on any day subsequent to the (ii) soit au fonctionnement d’une structure, de ma- day on which the injury occurred whether or not that tériel, d’un équipement ou d’un système essentiel à subsequent day is a working day for that employee. la protection de l’environnement. (incident) (blessure entraînant une perte de temps de travail) « intervalle de complétion » Section aménagée dans un “minor injury” means an employment injury for which puits en vue de l’une des activités suivantes : medical treatment or first aid is provided and excludes a lost or restricted workday injury. (blessure sans gravité) a) la production de fluides à partir du puits; “multi-pool well” means a well that is completed in b) l’observation du rendement d’un réservoir; more than one pool. (puits à gisements multiples) c) l’injection de fluides dans le puits. (completion in- terval) 3 SOR/2009-316 — June 12, 2014 “natural environment” means the physical and biological « Loi » La Loi de mise en œuvre de l’Accord atlantique environment. (milieu naturel) Canada — Terre-Neuve. (Act) “near-miss” means an event that would likely cause an « méthode de calcul du débit » Méthode utilisée pour event set out in paragraph (a) of the definition of “inci- convertir le débit brut d’un compteur en une quantité dent”, but does not due to particular circumstances. mesurée d’hydrocarbures ou d’eau. (flow calculation (quasi-incident) procedure) “operator” means a person that holds an operating li- « méthode de répartition du débit » Méthode servant à : cence under paragraph 138(1)(a) of the Act and an au- a) répartir les quantités mesurées totales d’hydrocar- thorization. (exploitant) bures et d’eau qui sont produits par un gisement ou “physical environmental conditions” means the meteoro- une couche ou y sont injectés, entre les différents puits logical, oceanographic and related physical conditions, faisant partie d’un gisement ou d’une couche où la including ice conditions, that might affect a work or ac- production ou l’injection n’est pas mesurée séparé- tivity that is subject to an authorization. (conditions envi- ment pour chaque puits; ronnementales) b) répartir la production entre les champs où le sto- “pollution” means the introduction into the natural envi- ckage ou le traitement se fait dans une installation ronment of any substance or form of energy outside the commune. (flow allocation procedure) limits applicable to the activity that is subject to an au- « milieu naturel » Milieu physique et biologique. (natural thorization, including spills. (pollution) environment) “production control system” means the system provided « plan de protection de l’environnement » Plan de protec- to control the operation of, and monitor the status of, tion de l’environnement remis à l’Office conformément equipment for the production of petroleum, and includes à l’article 6. (environmental protection plan) the installation and workover control system. (système de contrôle de la production) « plan de sécurité » Plan en matière de sécurité remis à l’Office conformément à l’article 6. (safety plan) “production project” means an undertaking for the pur- pose of developing a production site on, or producing « pollution » Introduction dans le milieu naturel de toute petroleum from, a pool or field, and includes any work substance ou forme d’énergie au-delà des limites appli- or activity related to the undertaking. (projet de produc- cables à l’activité visée par l’autorisation. La présente tion) définition vise également les rejets. (pollution) “proration test” means, in respect of a development well « production mélangée » Production d’hydrocarbures to which a development plan applies, a test conducted to provenant de plusieurs gisements ou couches et circulant measure the rates at which fluids are produced from the dans la même conduite ou dans le même trou de sonde, well for allocation purposes. (essai au prorata) sans mesurage distinct de la production de chaque gise- ment ou couche. (commingled production) “recovery” means the recovery of petroleum under rea- sonably foreseeable economic and operational condi- « programme de forage » Programme relatif au forage tions. (récupération) d’un ou de plusieurs puits, dans une région donnée et au cours d’une période déterminée, au moyen d’une ou de “relief well” means a well drilled to assist in controlling plusieurs installations de forage. Y sont assimilées les a blow-out in an existing well. (puits de secours) activités connexes au programme. (drilling program) 4 DORS/2009-316 — 12 juin 2014 “rig release date” means the date on which a rig last con- « projet de production » Projet visant la mise en valeur ducted well operations. (date de libération de l’appareil d’un emplacement de production ou la production d’hy- de forage) drocarbures à partir d’un champ ou d’un gisement, y “safety plan” means the safety plan submitted to the compris les activités connexes au projet. (production Board under section 6. (plan de sécurité) project) “seafloor” means the surface of all that portion of land « puits à gisements multiples » Puits complété dans plus under the sea. (fond marin) d’un gisement. (multi-pool well) “slick line” means a single steel cable used to run tools « puits de secours » Puits foré pour aider à contrôler in a well. (câble lisse) l’éruption d’un puits existant. (relief well) “support craft” means a vessel, vehicle, aircraft, standby « quasi-incident » Événement qui serait susceptible d’en- vessel or other craft used to provide transportation for or traîner une des situations visées à l’alinéa a) de la défini- assistance to persons on the site where a work or activity tion de « incident » mais qui, en raison de circonstances is conducted. (véhicule de service) particulières, n’en entraîne pas. (near-miss) “surface casing” means the casing that is installed in a « reconditionnement » Opération pratiquée sur un puits well to a sufficient depth, in a competent formation, to complété et exigeant le retrait de la tête d’éruption ou du establish well control for the continuation of the drilling tube. (workover) operations. (tubage de surface) « récupération » Récupération d’hydrocarbures dans des “suspended”, in relation to a well or part of a well, conditions économiques et opérationnelles normalement means a well or part of a well in which drilling or pro- prévisibles. (recovery) duction operations have temporarily ceased. (suspension « suspension de l’exploitation » S’agissant d’un puits ou de l’exploitation) d’une partie d’un puits, interruption temporaire des acti- “termination” means the abandonment, completion or vités de forage ou des travaux de production. (suspend- suspension of a well’s operations. (cessation) ed) “waste material” means any garbage, refuse, sewage or « système de contrôle de la production » Système servant waste well fluids or any other useless material that is au contrôle du fonctionnement de l’équipement de pro- generated during drilling, well or production operations, duction d’hydrocarbures et à la surveillance de son état, including used or surplus drilling fluid and drill cuttings y compris le système de régulation de l’installation et du and produced water. (déchets) reconditionnement. (production control system) “well approval” means the approval granted by the « système d’écoulement » Les débitmètres et l’équipe- Board under section 13. (approbation relative à un ment auxiliaire qui y est fixé, les dispositifs d’échan- puits) tillonnage de fluides, l’équipement pour les essais de production, le compteur principal et le compteur étalon “well-bore” means the hole drilled by a bit in order to servant à mesurer et à enregistrer le débit et le volume make a well. (trou de sonde) des fluides qui, selon le cas : “well control” means the control of the movement of flu- a) sont produits par un gisement ou y sont injectés; ids into or from a well. (contrôle d’un puits) b) sont utilisés comme combustibles; “well operation” means the operation of drilling, com- pletion, recompletion, intervention, re-entry, workover, c) sont utilisés pour l’ascension artificielle; 5 SOR/2009-316 — June 12, 2014 suspension or abandonment of a well. (travaux relatifs à d) sont brûlés à la torche ou transférés d’une installa- un puits) tion de production. (flow system) “wire line” means a line that contains a conductor wire « travaux relatifs à un puits » Travaux liés au forage, à la and that is used to run survey instruments or other tools complétion, à la remise en production, au reconditionne- in a well. (câble) ment, à la suspension de l’exploitation, à l’abandon ou à “workover” means an operation on a completed well that la rentrée d’un puits ou à l’intervention dans un puits. requires removal of the Christmas tree or the tubing. (re- (well operation) conditionnement) « trou de sonde » Trou foré au moyen d’un trépan pour le “zone” means any stratum or any sequence of strata and creusage d’un puits. (well-bore) includes, for the purposes of the definition “commingled « tubage de surface » Tubage installé assez profondément production”, section 7, subsection 61(2), sections 64 to dans un puits, dans une formation compétente, pour as- 66 and 74, subsection 83(2) and section 86, a zone that surer le contrôle du puits en vue de la poursuite des tra- has been designated as such by the Board under section vaux de forage. (surface casing) 4. (couche) « tubage initial » Tubage installé dans un puits pour faci- liter le forage du trou dans lequel sera introduit le tubage de surface. (conductor casing) « tubage partiel » Tubage suspendu à un train de tubage installé antérieurement dans un puits et qui n’atteint pas la tête du puits. (casing liner) « véhicule de service » Navire, véhicule, aéronef, navire de secours ou autre moyen de transport ou d’aide destiné aux personnes se trouvant à un emplacement où sont me- nées des activités. (support craft) (2) In these Regulations, “delineation well”, “devel- (2) Dans le présent règlement, « puits de opment well” and “exploratory well” have the same délimitation », « puits d’exploitation » et « puits d’explo- meaning as in subsection 119(1) of the Act. ration » s’entendent au sens du paragraphe 119(1) de la Loi. (3) In these Regulations, “drilling installation”, (3) Dans le présent règlement, « appareil de forage », “drilling rig”, “drilling unit”, “drill site”, “installation”, « emplacement de forage », « emplacement de “production installation”, “production operation”, “pro- production », « installation », « installation de forage », duction site” and “subsea production system” have the « installation de production », « système de production same meaning as in subsection 2(1) of the Newfoundland sous-marin », « travaux de production » et « unité de fo- Offshore Petroleum Installations Regulations. rage » s’entendent au sens du paragraphe 2(1) du Règle- ment sur les installations pour hydrocarbures de la zone extracôtière de Terre-Neuve. (4) The following definitions apply for the purposes (4) Les définitions qui suivent s’appliquent of paragraph 138(4)(c) of the Act: à l’alinéa 138(4)c) de la Loi. “production facility” means equipment for the produc- « matériel de production » Équipement de production tion of petroleum located at a production site, including d’hydrocarbures se trouvant à l’emplacement de produc- 6 DORS/2009-316 — 12 juin 2014 separation, treating and processing facilities, equipment tion, y compris le matériel de séparation, de traitement et and facilities used in support of production operations, de transformation, les équipements et le matériel utilisés landing areas, heliports, storage areas or tanks and de- à l’appui des travaux de production, les aires d’atterris- pendent personnel accommodations, but not including sage, les héliports, les aires ou les réservoirs de stockage any associated platform, artificial island, subsea produc- et les logements du personnel connexes. La présente dé- tion system, drilling equipment or diving system. (maté- finition exclut toute plate-forme, toute île artificielle, riel de production) tout système de production sous-marin, tout équipement “production platform” means a production facility and de forage et tout système de plongée connexes. (produc- any associated platform, artificial island, subsea produc- tion facility) tion system, offshore loading system, drilling equipment, « plate-forme de production » S’entend de tout matériel facilities related to marine activities and dependent div- de production, ainsi que de tout système de production ing system. (plate-forme de production) sous-marin, plate-forme, île artificielle, système de char- gement extracôtier, équipement de forage, matériel lié aux activités maritimes et système de plongée non auto- nome connexes. (production platform) (5) For the purpose of section 193.2 of the Act, any (5) Pour l’application de l’article 193.2 de la Loi, installation is prescribed as an installation. toute installation est une installation désignée. PART 1 PARTIE 1 BOARD’S POWERS POUVOIRS DE L’OFFICE SPACING ESPACEMENT 2. The Board is authorized to make orders respecting 2. L’Office est autorisé à rendre des ordonnances the allocation of areas, including the determination of the concernant l’attribution de secteurs, notamment en ce size of spacing units and the well production rates for the qui a trait à la dimension des unités d’espacement et au purpose of drilling for or producing petroleum and to ex- taux de production des puits aux fins de forage ou de ercise any powers and perform any duties that may be production d’hydrocarbures, et à exercer les attributions necessary for the management and control of petroleum nécessaires à la gestion et au contrôle de la production production. d’hydrocarbures. NAMES AND DESIGNATIONS NOMS ET DÉSIGNATIONS 3. The Board may give a name, classification or sta- 3. L’Office peut attribuer un nom, une classe ou un tus to any well and may change that name, classification statut à un puits et les modifier. or status. 4. The Board may also 4. L’Office peut en outre : (a) designate a zone for the purposes of these Regula- a) désigner comme telle une couche pour l’applica- tions; tion du présent règlement; (b) give a name to a pool or field; and b) attribuer un nom à un gisement ou à un champ; (c) define the boundaries of a pool, zone or field for c) définir les limites d’un gisement, d’une couche ou the purpose of identifying it. d’un champ à des fins d’identification. 7 SOR/2009-316 — June 12, 2014 PART 2 PARTIE 2 MANAGEMENT SYSTEM, APPLICATION FOR SYSTÈME DE GESTION, DEMANDE AUTHORIZATION AND WELL APPROVALS D’AUTORISATION ET APPROBATIONS RELATIVES À UN PUITS MANAGEMENT SYSTEM SYSTÈME DE GESTION 5. (1) The applicant for an authorization shall devel- 5. (1) La personne qui demande une autorisation est op an effective management system that integrates oper- tenue d’élaborer un système de gestion efficace qui in- ations and technical systems with the management of fi- tègre les systèmes opérationnels et techniques et la ges- nancial and human resources to ensure compliance with tion des ressources humaines et financières pour assurer the Act and these Regulations. l’observation de la Loi et du présent règlement. (2) The management system shall include (2) Le système de gestion doit comprendre : (a) the policies on which the system is based; a) un énoncé des politiques qui en constituent le fon- (b) the processes for setting goals for the improve- dement; ment of safety, environmental protection and waste b) des processus permettant de fixer des objectifs en prevention; vue d’améliorer la sécurité, la protection de l’environ- (c) the processes for identifying hazards and for eval- nement et la prévention du gaspillage; uating and managing the associated risks; c) des processus permettant de repérer les dangers et (d) the processes for ensuring that personnel are d’évaluer et maîtriser les risques connexes; trained and competent to perform their duties; d) des processus permettant de veiller à ce que les (e) the processes for ensuring and maintaining the in- membres du personnel soient formés et disposent des tegrity of all facilities, structures, installations, support compétences nécessaires pour remplir leurs fonctions; craft and equipment necessary to ensure safety, envi- e) des processus permettant de garantir et de préser- ronmental protection and waste prevention; ver l’intégrité du matériel, des structures, des installa- (f) the processes for the internal reporting and analy- tions, des véhicules de service et des équipements né- sis of hazards, minor injuries, incidents and near-miss- cessaires à la sécurité, à la protection de es and for taking corrective actions to prevent their re- l’environnement et à la prévention du gaspillage; currence; f) des processus permettant de signaler à l’interne et (g) the documents describing all management system d’analyser les dangers, les blessures sans gravité, les processes and the processes for making personnel incidents et les quasi-incidents, et de prendre des me- aware of their roles and responsibilities with respect to sures correctives pour empêcher que ceux-ci ne se re- them; produisent; (h) the processes for ensuring that all documents as- g) des documents exposant tous les processus du sys- sociated with the system are current, valid and have tème de gestion et les processus visant à faire been approved by the appropriate level of authority; connaître aux membres du personnel leurs rôles et leurs responsabilités à cet égard; (i) the processes for conducting periodic reviews or audits of the system and for taking corrective actions h) des processus permettant de veiller à ce que tous les documents relatifs au système soient à jour, va- 8 DORS/2009-316 — 12 juin 2014 if reviews or audits identify areas of non-conformance lides et approuvés par le niveau décisionnel compé- with the system and opportunities for improvement; tent; (j) the arrangements for coordinating the management i) des processus permettant d’effectuer des examens and operations of the proposed work or activity ou des vérifications périodiques du système et d’appli- among the owner of the installation, the contractors, quer des mesures correctives lorsque les examens ou the operator and others, as applicable; and vérifications révèlent des manquements au système de (k) the name and position of the person accountable gestion et des domaines susceptibles d’amélioration; for the establishment and maintenance of the system j) des dispositions concernant la coordination des and of the person responsible for implementing it. fonctions de gestion et d’exploitation de l’activité pro- jetée, entre le propriétaire de l’installation, les entre- preneurs, l’exploitant et les autres parties, selon le cas; k) le nom et le titre du poste de la personne qui doit répondre de l’élaboration et de la tenue du système de gestion et de la personne chargée de sa mise en œuvre. (3) The management system documentation shall be (3) La documentation relative au système de gestion controlled and set out in a logical and systematic fashion doit être contrôlée et présentée d’une manière logique et to allow for ease of understanding and efficient imple- systématique pour en faciliter la compréhension et pour mentation. assurer l’application efficace du système. (4) The management system shall correspond to the (4) Le système de gestion doit être adapté à l’impor- size, nature and complexity of the operations and activi- tance, à la nature et à la complexité des travaux et des ties, hazards and risks associated with the operations. activités, ainsi que des dangers et risques connexes. APPLICATION FOR AUTHORIZATION DEMANDE D’AUTORISATION 6. The application for authorization shall be accompa- 6. La demande d’autorisation est accompagnée des nied by documents et renseignements suivants : (a) a description of the scope of the proposed activi- a) la description de l’étendue des activités projetées; ties; b) un plan de mise en œuvre et un calendrier des acti- (b) an execution plan and schedule for undertaking vités projetées; those activities; c) un plan de sécurité qui répond aux exigences de (c) a safety plan that meets the requirements of sec- l’article 8; tion 8; d) un plan de protection de l’environnement qui ré- (d) an environmental protection plan that meets the pond aux exigences de l’article 9; requirements of section 9; e) des renseignements sur le brûlage de gaz à la (e) information on any proposed flaring or venting of torche ou le rejet de gaz dans l’atmosphère qui sont gas, including the rationale and the estimated rate, prévus, y compris la raison du brûlage ou du rejet et quantity and period of the flaring or venting; une estimation du taux de rejet, des quantités de gaz qu’il est prévu de brûler ou de rejeter et de la période de temps au cours de laquelle le brûlage ou le rejet au- ra lieu; 9 SOR/2009-316 — June 12, 2014 (f) information on any proposed burning of oil, in- f) des renseignements sur le brûlage de pétrole prévu, cluding the rationale and the estimated quantity of oil y compris la raison du brûlage et une estimation des proposed to be burned; quantités qu’il est prévu de brûler; (g) in the case of a drilling installation, a description g) dans le cas d’une installation de forage, la descrip- of the drilling and well control equipment; tion de l’équipement de forage et de contrôle des (h) in the case of a production installation, a descrip- puits; tion of the processing facilities and control system; h) dans le cas d’une installation de production, la des- (i) in the case of a production project, a field data ac- cription du matériel de transformation et du système quisition program that allows sufficient pool pressure de contrôle; measurements, fluid samples, cased hole logs and for- i) dans le cas d’un projet de production, un pro- mation flow tests for a comprehensive assessment of gramme d’acquisition des données relatives au champ, the performance of development wells, pool depletion élaboré de manière à permettre l’obtention des me- schemes and the field; sures de la pression du gisement, des échantillons de (j) contingency plans, including emergency response fluide, des diagraphies en puits tubé et des essais procedures, to mitigate the effects of any reasonably d’écoulement de formation du puits nécessaires à une foreseeable event that might compromise safety or en- évaluation complète de la performance des puits d’ex- vironmental protection, which shall ploitation, des scénarios d’épuisement du gisement et du champ; (i) provide for coordination measures with any rel- evant municipal, provincial, territorial or federal j) des plans d’urgence, y compris des procédures emergency response plan, and d’intervention d’urgence, en vue de réduire les consé- quences de tout événement normalement prévisible (ii) in an area where oil is reasonably expected to qui pourrait compromettre la sécurité ou la protection be encountered, identify the scope and frequency of de l’environnement, lesquels doivent : the field practice exercise of oil spill countermea- sures; and (i) prévoir des mesures permettant leur coordina- tion avec tout plan d’intervention d’urgence muni- (k) a description of the decommissioning and aban- cipal, provincial, territorial ou fédéral pertinent, donment of the site, including methods for restoration of the site after its abandonment. (ii) dans une région où du pétrole peut vraisembla- blement être découvert, préciser l’étendue et la fré- quence des exercices d’intervention en cas de rejet de pétrole; k) une description des procédures de désaffectation et d’abandon du site, y compris les méthodes de rétablis- sement du site après l’abandon. 7. (1) If the application for authorization covers a 7. (1) Si la demande d’autorisation vise une installa- production installation, the applicant shall also submit to tion de production, le demandeur soumet aussi à l’appro- the Board for its approval the flow system, the flow cal- bation de l’Office le système d’écoulement et les mé- culation procedure and the flow allocation procedure that thodes de calcul et de répartition du débit qui seront will be used to conduct the measurements referred to in utilisés pour effectuer le mesurage prévu à la partie 7. Part 7. 10 DORS/2009-316 — 12 juin 2014 (2) The Board shall approve the flow system, the (2) L’Office approuve le système d’écoulement et les flow calculation procedure and the flow allocation pro- méthodes de calcul et de répartition du débit si le deman- cedure if the applicant demonstrates that the system and deur établit qu’ils permettent de déterminer de façon suf- procedures facilitate reasonably accurate measurements fisamment précise les mesures et répartit, par gisement and allocate, on a pool or zone basis, the production ou couche, la production et l’injection pour chaque puits. from and injection into individual wells. 8. The safety plan shall set out the procedures, prac- 8. Le plan de sécurité doit prévoir les procédures, les tices, resources, sequence of key safety-related activities pratiques, les ressources, la séquence des principales ac- and monitoring measures necessary to ensure the safety tivités en matière de sécurité et les mesures de sur- of the proposed work or activity and shall include veillance nécessaires pour assurer la sécurité des activi- (a) a summary of and references to the management tés projetées et doit en outre comporter : system that demonstrate how it will be applied to the a) un résumé du système de gestion et les renvois à proposed work or activity and how the duties set out celui-ci qui démontrent sa mise en œuvre pendant le in these Regulations with regard to safety will be ful- déroulement des activités projetées et comment le sys- filled; tème de gestion permettra de se conformer aux obliga- (b) a summary of the studies undertaken to identify tions prévues par le présent règlement en matière de hazards and to evaluate safety risks related to the pro- sécurité; posed work or activity; b) un résumé des études réalisées pour cerner les dan- (c) a description of the hazards that were identified gers et évaluer les risques pour la sécurité liés aux ac- and the results of the risk evaluation; tivités projetées; (d) a summary of the measures to avoid, prevent, re- c) la description des dangers cernés et les résultats de duce and manage safety risks; l’évaluation des risques; (e) a list of all structures, facilities, equipment and d) un résumé des mesures pour éviter, prévenir, ré- systems critical to safety and a summary of the system duire et contrôler les risques pour la sécurité; in place for their inspection, testing and maintenance; e) une liste des structures, du matériel, de l’équipe- (f) a description of the organizational structure for the ment et des systèmes qui sont essentiels à la sécurité, proposed work or activity and the command structure ainsi qu’un résumé du système en place pour veiller à on the installation, which clearly explains leur inspection, essai et entretien; (i) their relationship to each other, and f) une description de la structure organisationnelle re- lative à l’exécution des activités projetées et de la (ii) the contact information and position of the per- structure de commandement de l’installation, qui in- son accountable for the safety plan and of the per- dique clairement : son responsible for implementing it; (i) le lien entre les deux structures, (g) if the possibility of pack sea ice or drifting ice- bergs exists at the drill or production site, the mea- (ii) le titre du poste et les coordonnées de la per- sures to address the protection of the installation, in- sonne qui répond du plan de sécurité et de la per- cluding systems for ice detection, surveillance, data sonne chargée de sa mise en œuvre; collection, reporting, forecasting and, if appropriate, g) s’il risque d’y avoir des banquises marines ou des ice avoidance or deflection; and icebergs flottants sur les lieux de forage ou de produc- tion, les mesures prévues pour assurer la protection de 11 SOR/2009-316 — June 12, 2014 (h) a description of the arrangements for monitoring l’installation, y compris les systèmes de détection et compliance with the plan and for measuring perfor- de surveillance des glaces, de collecte des données, de mance in relation to its objectives. signalement et de prévision et, s’il y a lieu, d’évite- ment ou de déviation des glaces; h) une description des mécanismes de surveillance nécessaires pour veiller à ce que le plan soit mis en œuvre et pour évaluer le rendement au regard de ses objectifs. 9. The environmental protection plan shall set out the 9. Le plan de protection de l’environnement doit pré- procedures, practices, resources and monitoring neces- voir les procédures, les pratiques, les ressources et les sary to manage hazards to and protect the environment mesures de surveillance nécessaires pour gérer les dan- from the proposed work or activity and shall include gers pour l’environnement et protéger celui-ci des activi- (a) a summary of and references to the management tés projetées et doit en outre comporter : system that demonstrate how it will be applied to the a) un résumé du système de gestion et les renvois à proposed work or activity and how the duties set out celui-ci qui démontrent sa mise en œuvre pendant le in these Regulations with regard to environmental déroulement des activités projetées et comment le sys- protection will be fulfilled; tème de gestion permettra de se conformer aux obliga- (b) a summary of the studies undertaken to identify tions prévues par le présent règlement en matière de environmental hazards and to evaluate environmental protection de l’environnement; risks relating to the proposed work or activity; b) un résumé des études réalisées pour cerner les dan- (c) a description of the hazards that were identified gers pour l’environnement et évaluer les risques pour and the results of the risk evaluation; l’environnement liés aux activités projetées; (d) a summary of the measures to avoid, prevent, re- c) une description des dangers cernés et les résultats duce and manage environmental risks; de l’évaluation des risques; (e) a list of all structures, facilities, equipment and d) un résumé des mesures prévues pour éviter, préve- systems critical to environmental protection and a nir, réduire et contrôler les risques pour l’environne- summary of the system in place for their inspection, ment; testing and maintenance; e) une liste des structures, du matériel, de l’équipe- (f) a description of the organizational structure for the ment et des systèmes essentiels à la protection de l’en- proposed work or activity and the command structure vironnement, ainsi qu’un résumé du système en place on the installation, which clearly explains pour leur inspection, essai et entretien; (i) their relationship to each other, and f) une description de la structure organisationnelle re- lative à l’exécution des activités projetées et de la (ii) the contact information and position of the per- structure de commandement de l’installation, qui in- son accountable for the environmental protection dique clairement : plan and the person responsible for implementing it; (i) le lien entre les deux structures, (ii) le titre du poste et les coordonnées de la per- sonne qui répond du plan de protection de l’envi- 12 DORS/2009-316 — 12 juin 2014 (g) the procedures for the selection, evaluation and ronnement et de la personne chargée de sa mise en use of chemical substances including process chemi- œuvre; cals and drilling fluid ingredients; g) les procédures de sélection, d’évaluation et d’utili- (h) a description of equipment and procedures for the sation des substances chimiques, y compris les pro- treatment, handling and disposal of waste material; duits chimiques utilisés pour les procédés et les (i) a description of all discharge streams and limits fluides de forage; for any discharge into the natural environment includ- h) une description de l’équipement et des procédés de ing any waste material; traitement, de manutention et d’élimination des dé- (j) a description of the system for monitoring compli- chets; ance with the discharge limits identified in paragraph i) une description de toutes les voies d’évacuation et (i), including the sampling and analytical program to des limites relatives à toute évacuation dans le milieu determine if those discharges are within the specified naturel, y compris l’évacuation des déchets; limits; and j) une description du système de contrôle des limites (k) a description of the arrangements for monitoring d’évacuation visées à l’alinéa h), y compris le pro- compliance with the plan and for measuring perfor- gramme d’échantillonnage et d’analyse servant à véri- mance in relation to its objectives. fier si les limites sont respectées; k) une description des mesures prises pour contrôler la conformité au plan et en évaluer le rendement au re- gard de ses objectifs. WELL APPROVAL APPROBATION RELATIVE AU PUITS 10. (1) Subject to subsection (2), an operator who in- 10. (1) Sous réserve du paragraphe (2), l’exploitant tends to drill, re-enter, work over, complete or recom- qui a l’intention de procéder, à l’égard d’un puits ou plete a well or suspend or abandon a well or part of a d’une partie de puits, à des travaux de forage, de rentrée, well shall obtain a well approval. de reconditionnement, de complétion, de remise en pro- duction, de suspension de l’exploitation ou d’abandon doit avoir reçu l’approbation afférente. (2) A well approval is not necessary to conduct a wire (2) Aucune approbation n’est nécessaire pour exécu- line, slick line or coiled tubing operation through a ter des travaux par câble, par câble lisse ou par tube de Christmas tree located above sea level if production concentrique au moyen d’une tête d’éruption (a) the work does not alter the completion interval or installée au-dessus du niveau de la mer, si les conditions is not expected to adversely affect recovery; and suivantes sont réunies : (b) the equipment, operating procedures and qualified a) les travaux exécutés ne modifient pas l’état d’un persons exist to conduct the wire line, slick line or intervalle de complétion ou ne devraient pas nuire à la coiled tubing operations as set out in the authoriza- récupération; tion. b) l’équipement, les marches à suivre et les qualifica- tions du personnel effectuant le travail sont conformes à l’autorisation. 13 SOR/2009-316 — June 12, 2014 11. If the well approval sought is to drill a well, the 11. La demande d’approbation relative à un puits qui application shall contain vise le forage contient : (a) a comprehensive description of the drilling pro- a) une description complète du programme de forage; gram; and b) un programme d’acquisition de données relatives (b) a well data acquisition program that allows for the au puits élaboré de manière à permettre l’obtention collection of sufficient cutting and fluid samples, logs, des échantillons de déblais et de fluide, des diagra- conventional cores, sidewall cores, pressure measure- phies, des carottes classiques, des carottes latérales, ments and formation flow tests, analyses and surveys des mesures de pression, des essais d’écoulement de to enable a comprehensive geological and reservoir formation, des analyses et des levés nécessaires à une evaluation to be made. évaluation complète de la géologie et du réservoir. 12. The application shall contain 12. La demande d’approbation relative à un puits qui (a) if the well approval sought is to re-enter, work vise les travaux ci-après contient : over, complete or recomplete a well or suspend or a) s’agissant d’une rentrée ou de travaux de recondi- abandon a well or part of it, a detailed description of tionnement, de complétion, de remise en production, that well, the proposed work or activity and the ratio- de suspension de l’exploitation ou d’abandon visant nale for conducting it; un puits ou une partie d’un puits, une description dé- (b) if the well approval sought is to complete a well, taillée du puits ou de la partie, de l’activité projetée et in addition to the information required under para- de son but; graph (a), information that demonstrates that section b) s’agissant de la complétion d’un puits, outre les 46 will be complied with; and renseignements mentionnés à l’alinéa a), des rensei- (c) if the well approval sought is to suspend a well or gnements démontrant que les exigences de l’article 46 part of it, in addition to the information required under seront respectées; paragraph (a), an indication of the period within c) s’agissant de la suspension de l’exploitation d’un which the suspended well or part of it will be aban- puits ou d’une partie d’un puits, outre les renseigne- doned or completed. ments mentionnés à l’alinéa a), la mention du délai dans lequel le puits ou la partie de puits sera abandon- né ou complété. 13. The Board shall grant the well approval if the op- 13. L’Office accorde l’approbation relative au puits si erator demonstrates that the work or activity will be con- l’exploitant démontre que les activités seront menées en ducted safely, without waste and without pollution, in toute sécurité, sans gaspillage ni pollution, conformé- compliance with these Regulations. ment au présent règlement. SUSPENSION AND REVOCATION OF A WELL APPROVAL SUSPENSION ET ANNULATION DE L’APPROBATION RELATIVE À UN PUITS 14. (1) The Board may suspend the well approval if 14. (1) L’Office peut suspendre l’approbation rela- (a) the operator fails to comply with the approval and tive au puits dans les cas suivants : the work or activity cannot be conducted safely, with- a) l’exploitant omet de se conformer à toute condition out waste or without pollution; de l’approbation et les activités ne peuvent plus être 14 DORS/2009-316 — 12 juin 2014 (b) the safety of the work or activity becomes uncer- menées en toute sécurité ou sans gaspillage ou pollu- tain because tion; (i) the level of performance of the installation or b) la sécurité des activités ne peut plus être assurée service equipment, any ancillary equipment or any pour l’une ou l’autre des raisons suivantes : support craft is demonstrably less than the level of (i) le niveau de rendement de l’installation, de performance indicated in the application, or l’équipement de service ou auxiliaire ou d’un véhi- (ii) the physical environmental conditions encoun- cule de service est nettement inférieur au niveau tered in the area of the activity for which the well précisé dans la demande d’approbation, approval was granted are more severe than the (ii) les conditions environnementales existant dans equipment’s operating limits as specified by the la zone où se déroule l’activité pour laquelle l’ap- manufacturer; or probation a été accordée sont plus difficiles que (c) the operator fails to comply with the approvals is- celles prévues par le fabricant de l’équipement; sued under subsection 7(2), 52(4) or 66(2). c) l’exploitant omet de se conformer à l’approbation délivrée par l’Office aux termes des paragraphes 7(2), 52(4) ou 66(2). (2) The Board may revoke the well approval if the (2) L’Office peut annuler l’approbation si l’exploitant operator fails to remedy the situation causing the suspen- omet de corriger la situation dans les cent vingt jours sion within 120 days after the date of that suspension. suivant la suspension. DEVELOPMENT PLANS PLAN DE MISE EN VALEUR 15. For the purpose of subsection 139(1) of the Act, 15. L’approbation relative au puits qui vise un projet the well approval relating to a production project is pre- de production vaut pour l’application du paragraphe scribed. 139(1) de la Loi. 16. For the purpose of paragraph 139(3)(b) of the 16. Pour l’application du paragraphe 139(3) de la Loi, Act, Part II of the development plan relating to a pro- la seconde partie du projet de plan de mise en valeur re- posed development of a pool or field shall contain a re- latif à des activités projetées sur un gisement ou un source management plan. champ doit contenir un plan de gestion des ressources. PART 3 PARTIE 3 OPERATOR’S DUTIES OBLIGATIONS DE L’EXPLOITANT AVAILABILITY OF DOCUMENTS DISPONIBILITÉ DES DOCUMENTS 17. (1) The operator shall keep a copy of the autho- 17. (1) L’exploitant conserve à chaque installation rization, the well approval and all other approvals and une copie de l’autorisation, de l’approbation relative au plans required under these Regulations, the Act and the puits et de toute autre approbation ainsi que de tout plan regulations made under the Act at each installation and exigés par le présent règlement et par la Loi et ses règle- shall make them available for examination at the request ments, et les met, sur place, à la disposition de qui- of any person at each installation. conque en fait la demande. 15 SOR/2009-316 — June 12, 2014 (2) The operator shall ensure that a copy of all operat- (2) L’exploitant veille à ce qu’une copie des manuels ing manuals and other procedures and documents neces- d’exploitation et de tout autre procédé ou document né- sary to execute the work or activity and to operate the in- cessaire à la conduite des activités et au fonctionnement stallation safely without pollution are readily accessible sûr et sans pollution de l’installation soit facilement ac- at each installation. cessible à chaque installation. MANAGEMENT SYSTEM SYSTÈME DE GESTION 18. The operator shall ensure compliance with the 18. L’exploitant veille au respect du système de ges- management system referred to in section 5. tion prévu à l’article 5. SAFETY AND ENVIRONMENTAL PROTECTION SÉCURITÉ ET PROTECTION DE L’ENVIRONNEMENT 19. The operator shall take all reasonable precautions 19. L’exploitant doit prendre toutes les mesures vou- to ensure safety and environmental protection, including lues pour assurer la sécurité et la protection de l’environ- ensuring that nement, notamment : (a) any operation necessary for the safety of persons a) prendre les dispositions nécessaires pour assurer at an installation or on a support craft has priority, at prioritairement et en tout temps la sécurité des per- all times, over any work or activity at that installation sonnes se trouvant dans une installation ou un véhi- or on that support craft; cule de service; (b) safe work methods are followed during all b) adopter des méthodes de travail sûres pendant drilling, well or production operations; l’exécution des activités de forage, des travaux relatifs (c) there is a shift handover system to effectively à un puits et des travaux de production; communicate any conditions, mechanical or procedu- c) mettre en place un système pour assurer, à chaque ral deficiencies or other problems that might have an changement d’équipe de travail, la communication ef- impact on safety or environmental protection; ficace de tout renseignement relatif aux conditions, (d) differences in language or other barriers to effec- aux problèmes mécaniques ou opérationnels ou à tive communication do not jeopardize safety or envi- d’autres problèmes susceptibles d’influer sur la sécuri- ronmental protection; té des personnes ou sur la protection de l’environne- ment; (e) all persons at an installation, or in transit to or from an installation, receive instruction in and are fa- d) veiller à ce que la sécurité ou la protection de l’en- miliar with safety and evacuation procedures and with vironnement ne soit pas compromise du fait d’une their roles and responsibilities in the contingency mauvaise communication due à des obstacles linguis- plans, including emergency response procedures; tiques ou à d’autres facteurs; (f) any drilling or well operation is conducted in a e) s’assurer que toutes les personnes se trouvant dans manner that maintains full control of the well at all une installation ou qui y transitent sont informées des times; consignes de sécurité et des procédures d’évacuation, ainsi que des rôles et des responsabilités qui leur in- (g) if there is loss of control of a well at an installa- combent aux termes des plans d’urgence, y compris tion, all other wells at that installation are shut in until des procédures d’intervention d’urgence; the well that is out of control is secured; f) faire en sorte que toutes les activités de forage ou (h) plans are in place to deal with potential hazards; tous les travaux relatifs à un puits soient effectués de 16 DORS/2009-316 — 12 juin 2014 (i) all equipment required for safety and environmen- manière à ce que le puits soit entièrement contrôlé en tal protection is available and in an operable condi- tout temps; tion; g) s’assurer que, en cas de perte de contrôle d’un (j) the inventory of all equipment identified in the puits à une installation, les obturateurs de tous les safety plan and the environmental protection plan is autres puits de l’installation sont fermés, jusqu’à ce updated after the completion of any significant modi- que le puits ne présente plus de danger; fication or repair to any major component of the h) prévoir des dispositions pour corriger toute situa- equipment; tion comportant des risques potentiels; (k) the administrative and logistical support that is i) vérifier que tout l’équipement nécessaire à la sécu- provided for drilling, well or production operations in- rité et à la protection de l’environnement est en bon cludes accommodation, transportation, first aid and état et utilisable au besoin; storage, repair facilities and communication systems suitable for the area of operations; j) s’assurer que la liste de tout l’équipement mention- né dans le plan de sécurité et de protection de l’envi- (l) a sufficient number of trained and competent indi- ronnement est mise à jour après toute modification ou viduals are available to complete the authorized work réparation majeure à une pièce d’équipement impor- or activities and to carry out any work or activity safe- tante; ly and without pollution; and k) faire en sorte que le soutien administratif et logis- (m) any operational procedure that is a hazard to safe- tique prévu pour les activités de forage, les travaux re- ty or the environment is corrected and all affected per- latifs à un puits et les travaux de production com- sons are informed of the alteration. prenne la fourniture de logement, de services de transport, d’aménagements de premiers soins, d’amé- nagements d’entreposage, d’ateliers de réparation et de systèmes de communication adaptés à la région; l) veiller à ce que des personnes formées et compé- tentes sont en nombre suffisant pour mener à terme les activités visées par l’autorisation en toute sécurité et sans causer de pollution; m) corriger toute méthode de travail présentant un risque potentiel pour la sécurité ou l’environnement et en aviser les personnes concernées. 20. (1) No person shall tamper with, activate without 20. (1) Il est interdit d’altérer l’équipement de sécuri- cause, or misuse any safety or environmental protection té ou de protection de l’environnement, de le faire fonc- equipment. tionner sans motif ni d’en faire un mauvais usage. (2) A passenger on a helicopter, supply vessel or any (2) Tout passager d’un hélicoptère, d’un navire de ra- other support craft engaged in a drilling program or pro- vitaillement ou de tout autre véhicule de service partici- duction project shall comply with all applicable safety pant à un programme de forage ou à un projet de produc- instructions. tion doit respecter les consignes de sécurité applicables. 21. (1) No person shall smoke on an installation ex- 21. (1) Il est interdit de fumer dans une installation, cept in those areas set aside by the operator for that use. sauf aux endroits désignés à cette fin par l’exploitant. 17 SOR/2009-316 — June 12, 2014 (2) The operator shall ensure compliance with sub- (2) L’exploitant veille au respect du paragraphe (1). section (1). STORING AND HANDLING OF CONSUMABLES ENTREPOSAGE ET MANUTENTION DES PRODUITS CONSOMPTIBLES 22. The operator shall ensure that fuel, potable water, 22. L’exploitant veille à ce que le carburant, l’eau po- spill containment products, safety-related chemicals, table, les produits de confinement des rejets, les sub- drilling fluids, cement and other consumables are stances chimiques liées à la sécurité, les fluides de fo- (a) readily available and stored on an installation in rage, le ciment et les autres produits consomptibles quantities sufficient for any normal and reasonably soient : foreseeable emergency condition; and a) facilement accessibles et entreposés à l’installation (b) stored and handled in a manner that minimizes en quantité suffisante pour répondre aux besoins dans their deterioration, ensures safety and prevents pollu- des conditions normales et dans toute autre situation tion. d’urgence normalement prévisible; b) entreposés et manutentionnés de manière à limiter leur détérioration, à garantir la sécurité et à prévenir toute pollution. HANDLING OF CHEMICAL SUBSTANCES, WASTE MATERIAL MANUTENTION DES SUBSTANCES CHIMIQUES, DES DÉCHETS ET AND OIL DU PÉTROLE 23. The operator shall ensure that all chemical sub- 23. L’exploitant veille à ce que les substances chi- stances, including process fluids and diesel fuel, waste miques, y compris les fluides de traitement et le diesel, material, drilling fluid and drill cuttings generated at an les déchets, le fluide et les déblais de forage produits à installation, are handled in a way that does not create a l’installation soient manipulés de manière à ne pas poser hazard to safety or the environment. de risque pour la sécurité ou l’environnement. CESSATION OF A WORK OR ACTIVITY CESSATION DES ACTIVITÉS 24. (1) The operator shall ensure that any work or ac- 24. (1) L’exploitant veille à ce que les activités tivity ceases without delay if that work or activity cessent sans délai si elles : (a) endangers or is likely to endanger the safety of a) menacent ou sont susceptibles de menacer la sécu- persons; rité des personnes; (b) endangers or is likely to endanger the safety or in- b) menacent ou sont susceptibles de menacer la sécu- tegrity of the well or the installation; or rité ou l’intégrité du puits ou de l’installation; (c) causes or is likely to cause pollution. c) causent ou sont susceptibles de causer de la pollu- tion. (2) If the work or activity ceases, the operator shall (2) En cas d’interruption des activités, l’exploitant ensure that it does not resume until it can do so safely veille à ce qu’elles ne soient reprises que si la situation and without pollution. ayant mené à la cessation est rétablie. 18 DORS/2009-316 — 12 juin 2014 PART 4 PARTIE 4 EQUIPMENT AND OPERATIONS ÉQUIPEMENT ET ACTIVITÉS WELLS, INSTALLATIONS, EQUIPMENT, FACILITIES AND PUITS, INSTALLATIONS, ÉQUIPEMENT, MATÉRIEL ET VÉHICULES SUPPORT CRAFT DE SERVICE 25. The operator shall ensure that 25. L’exploitant veille au respect des exigences (a) all wells, installations, equipment and facilities suivantes : are designed, constructed, tested, maintained and op- a) tout puits, toute installation, tout équipement et erated to prevent incidents and waste under the maxi- tout matériel sont conçus, construits, mis à l’essai, en- mum load conditions that may be reasonably antici- tretenus et exploités de manière à prévenir les inci- pated during any operation; dents et le gaspillage dans des conditions de charge (b) a comprehensive inspection that includes a non- maximale normalement prévisibles pendant les activi- destructive examination of critical joints and structural tés; members of an installation and any critical drilling or b) une inspection complète, comportant notamment production equipment is made at an interval to ensure des examens non destructifs des raccords critiques et continued safe operation of the installation or equip- des éléments structuraux de toute l’installation et de ment and in any case, at least once in every five-year tout équipement critique de forage ou de production, period; and est effectuée à un intervalle permettant de garantir la (c) records of maintenance, tests and inspections are sécurité de fonctionnement de l’installation ou de kept. l’équipement, et, dans tous les cas, au moins une fois tous les cinq ans; c) des registres de l’entretien, des essais et des inspec- tions sont conservés. 26. The operator shall ensure that 26. L’exploitant veille au respect des exigences (a) the components of an installation and well tubu- suivantes : lars, Christmas trees and wellheads are operated in ac- a) les éléments de l’installation, le matériel tubulaire cordance with good engineering practices; and des puits, les têtes d’éruption et têtes de puits sont uti- (b) any part of an installation that may be exposed to lisés conformément aux règles de l’art en matière a sour environment is designed, constructed and main- d’ingénierie; tained to operate safely in that environment. b) toute partie de l’installation susceptible d’être ex- posée à un environnement acide est conçue, construite et entretenue pour fonctionner en toute sécurité dans un tel environnement. 27. (1) The operator shall ensure that any defect in 27. (1) L’exploitant veille à ce que toute défaillance the installation, equipment, facilities and support craft de l’installation, de l’équipement, du matériel ou d’un that may be a hazard to safety or the environment is rec- véhicule de service pouvant présenter un risque pour la tified without delay. sécurité ou l’environnement soit corrigée sans délai. (2) If it is not possible to rectify the defect without (2) En cas de retard inévitable, l’exploitant veille à ce delay, the operator shall ensure that it is rectified as soon que toute défaillance soit corrigée aussitôt que les cir- 19 SOR/2009-316 — June 12, 2014 as the circumstances permit and that mitigation measures constances le permettent et que des mesures d’atténua- are put in place to minimize the hazards while the defect tion soient prises entre-temps pour réduire les risques au is being rectified. minimum. DRILLING FLUID SYSTEM CIRCUIT DU FLUIDE DE FORAGE 28. The operator shall ensure that 28. L’exploitant veille au respect des exigences (a) the drilling fluid system and associated monitor- suivantes : ing equipment is designed, installed, operated and a) le circuit du fluide de forage et l’équipement de maintained to provide an effective barrier against for- contrôle connexe sont conçus, installés, exploités et mation pressure, to allow for proper well evaluation, entretenus de manière à constituer une barrière effi- to ensure safe drilling operations and to prevent pollu- cace contre la pression de formation, à permettre une tion; and évaluation adéquate du puits, à assurer le déroulement (b) the indicators and alarms associated with the sûr des activités de forage et à prévenir la pollution; monitoring equipment are strategically located on the b) les indicateurs et les dispositifs d’alarme liés à drilling rig to alert onsite personnel. l’équipement de contrôle sont installés à des endroits stratégiques sur l’appareil de forage, de manière à alerter le personnel qui s’y trouve. MARINE RISER TUBE PROLONGATEUR 29. (1) The operator shall ensure that every marine 29. (1) L’exploitant veille à ce que le tube prolonga- riser is capable of teur puisse : (a) furnishing access to the well; a) fournir un accès au puits; (b) isolating the well-bore from the sea; b) isoler le trou de sonde de la mer; (c) withstanding the differential pressure of the c) résister à la différence de pression entre le fluide de drilling fluid relative to the sea; forage et la mer; (d) withstanding the physical forces anticipated in the d) résister aux forces physiques prévues pendant le drilling program; and programme de forage; (e) permitting the drilling fluid to be returned to the e) permettre au fluide de forage de retourner à l’ins- installation. tallation. (2) The operator shall ensure that every marine riser (2) L’exploitant veille à ce que le tube prolongateur is supported in a manner that effectively compensates for soit supporté de manière à compenser efficacement les the forces caused by the motion of the installation. forces résultant du mouvement de l’installation. DRILLING PRACTICES PRATIQUES DE FORAGE 30. The operator shall ensure that adequate equip- 30. L’exploitant veille à ce que du personnel, des pro- ment, procedures and personnel are in place to recognize cédures et de l’équipement adéquats soient en place pour and control normal and abnormal pressures, to allow for constater et contrôler les pressions normales et anor- safe, controlled drilling operations and to prevent pollu- males, pour assurer le déroulement sûr et contrôlé des tion. activités de forage et pour prévenir la pollution. 20 DORS/2009-316 — 12 juin 2014 REFERENCE FOR WELL DEPTHS RÉFÉRENCE POUR LA PROFONDEUR DU PUITS 31. The operator shall ensure that any depth in a well 31. L’exploitant veille à ce que toute mesure de la is measured from a single reference point, which is ei- profondeur d’un puits soit prise à partir d’un point de ré- ther the kelly bushing or the rotary table of the drilling férence unique, qui est soit la table de rotation, soit la rig. fourrure d’entraînement de l’appareil de forage. DIRECTIONAL AND DEVIATION SURVEYS MESURES DE DÉVIATION ET DE DIRECTION 32. The operator shall ensure that 32. L’exploitant veille au respect des exigences (a) directional and deviation surveys are taken at in- suivantes : tervals that allow the position of the well-bore to be a) les mesures de déviation et de direction sont effec- determined accurately; and tuées à des intervalles qui permettent de situer correc- (b) except in the case of a relief well, a well is drilled tement le trou de sonde; in a manner that does not intersect an existing well. b) le puits est foré de manière à ne jamais couper un puits existant, sauf s’il s’agit d’un puits de secours. FORMATION LEAK-OFF TEST TEST DE PRESSION DE FRACTURATION 33. The operator shall ensure that 33. L’exploitant veille au respect des exigences (a) a formation leak-off test or a formation integrity suivantes : test is conducted before drilling more than 10 m be- a) un test de pression de fracturation ou un essai d’in- low the shoe of any casing other than the conductor tégrité de la formation est effectué avant de forer à casing; une profondeur de plus de 10 m au-dessous du sabot (b) the formation leak-off test or the formation in- de tout tubage autre que le tubage initial; tegrity test is conducted to a pressure that allows for b) le test ou l’essai est effectué à une pression qui safe drilling to the next planned casing depth; and permet d’assurer la sécurité du forage jusqu’à la pro- (c) a record is retained of each formation leak-off test chaine profondeur de colonne prévue; and the results included in the daily drilling report re- c) un registre de chaque test de pression de fractura- ferred to in paragraph 84(a) and in the well history re- tion est conservé et les résultats sont consignés dans le port referred to in section 89. rapport journalier de forage visé à l’alinéa 84a) et dans le rapport final du puits visé à l’article 89. FORMATION FLOW AND WELL TESTING EQUIPMENT ÉQUIPEMENT POUR LES ESSAIS D’ÉCOULEMENT DE FORMATION ET LES ESSAIS D’UN PUITS 34. (1) The operator shall ensure that 34. (1) L’exploitant veille au respect des exigences (a) the equipment used in a formation flow test is de- suivantes : signed to safely control well pressure, properly evalu- a) l’équipement utilisé pour les essais d’écoulement ate the formation and prevent pollution; de formation est conçu de façon à contrôler en toute (b) the rated working pressure of formation flow test sécurité la pression du puits, à évaluer correctement la equipment upstream of and including the well testing formation et à prévenir la pollution; 21 SOR/2009-316 — June 12, 2014 manifold exceeds the maximum anticipated shut-in b) la pression nominale de marche de tout équipe- pressure; and ment utilisé pour les essais d’écoulement de forma- (c) the equipment downstream of the well testing tion, au niveau du collecteur d’essai du puits et en manifold is sufficiently protected against overpres- amont de celui-ci est supérieure à la pression statique sure. maximale prévue; c) l’équipement en aval du collecteur d’essai du puits est suffisamment protégé contre la surpression. (2) The operator of a well shall ensure that the forma- (2) L’exploitant d’un puits veille à ce que l’équipe- tion flow test equipment includes a down-hole safety ment utilisé pour les essais d’écoulement comprenne une valve that permits closure of the test string above the vanne de sécurité de fond qui permet la fermeture du packer. train de tiges d’essai au-dessus de la garniture d’étan- chéité. (3) The operator shall ensure that any formation flow (3) L’exploitant veille à ce que l’équipement utilisé test equipment used in testing a well that is drilled with a pour les essais d’écoulement de formation dans un puits floating drilling unit has a subsea test tree that includes foré à l’aide d’une unité de forage flottante comporte une (a) a valve that may be operated from the surface and tête de puits d’essai sous-marine munie : automatically closes when required to prevent uncon- a) d’une soupape qui peut être manœuvrée de la sur- trolled well flow; and face et se ferme automatiquement au besoin pour em- (b) a release system that permits the test string to be pêcher un écoulement incontrôlé du puits; hydraulically or mechanically disconnected within or b) d’un système de libération qui permet au train de below the blow-out preventers. tiges d’essai d’être débranché de façon mécanique ou hydraulique à l’intérieur ou au-dessous des blocs d’obturation. WELL CONTROL CONTRÔLE DES PUITS 35. The operator shall ensure that adequate proce- 35. L’exploitant veille à ce que des procédures, des dures, materials and equipment are in place and utilized matériaux et de l’équipement adéquats soient en place et to minimize the risk of loss of well control in the event utilisés pour réduire le risque de perte de contrôle du of lost circulation. puits en cas de perte de circulation. 36. (1) The operator shall ensure that, during all well 36. (1) L’exploitant veille à ce que, au cours des tra- operations, reliably operating well control equipment is vaux relatifs à un puits, de l’équipement fiable de installed to control kicks, prevent blow-outs and safely contrôle du puits soit en place pour contrôler les venues, carry out all well activities and operations, including prévenir les éruptions et exécuter en toute sécurité les ac- drilling, completion and workover operations. tivités et les travaux relatifs au puits, y compris le fo- rage, la complétion et le reconditionnement. (2) After setting the surface casing, the operator shall (2) L’exploitant veille à ce que, après l’installation du ensure that at least two independent and tested well bar- tubage de surface, au moins deux barrières indépen- riers are in place during all well operations. dantes et éprouvées soient en place, et ce, pendant tous les travaux relatifs au puits. 22 DORS/2009-316 — 12 juin 2014 (3) If a barrier fails, the operator shall ensure that no (3) L’exploitant veille à ce que, en cas de défaillance other activities, other than those intended to restore or d’une barrière, seules les activités destinées à sa répara- replace the barrier, take place in the well. tion ou à son remplacement soient menées dans le puits. (4) The operator shall ensure that, during drilling, ex- (4) L’exploitant veille à ce que, durant le forage, cept when drilling under-balanced, one of the two barri- l’une des deux barrières soit la colonne de fluide de fo- ers to be maintained is the drilling fluid column. rage, sauf si le forage est effectué en sous-équilibre. 37. The operator shall ensure that pressure control 37. L’exploitant veille à ce que l’équipement de equipment associated with drilling, coil tubing, slick line contrôle de pression utilisé pour les activités de forage et and wire line operations is pressure-tested on installation les opérations par tube de production concentrique et par and as often as necessary to ensure its continued safe op- câble lisse ou autre soit soumis à une épreuve sous pres- eration. sion au moment de son installation, et par la suite, aussi souvent que cela est nécessaire pour en garantir la sécu- rité de fonctionnement. 38. If the well control is lost or if safety, environmen- 38. En cas de perte de contrôle du puits ou si la sécu- tal protection or resource conservation is at risk, the op- rité, la protection de l’environnement ou la conservation erator shall ensure that any action necessary to rectify des ressources est menacée, l’exploitant veille à ce que the situation is taken without delay, despite any condi- les mesures correctives nécessaires soient prises sans dé- tion to the contrary in the well approval. lai, malgré toute disposition contraire prévue par l’ap- probation relative au puits. CASING AND CEMENTING TUBAGE ET CIMENTATION 39. The operator shall ensure that the well and casing 39. L’exploitant veille à ce que le puits et le tubage are designed so that soient conçus de façon à : (a) the well can be drilled safely, the targeted forma- a) garantir la sécurité des activités de forage, per- tions evaluated and waste prevented; mettre l’évaluation des formations visées et prévenir (b) the anticipated conditions, forces and stresses that le gaspillage; may be placed upon them are withstood; and b) pouvoir résister aux conditions, forces et (c) the integrity of gas hydrate zones is protected. contraintes éventuelles; c) protéger l’intégrité des couches d’hydrates de gaz. 40. The operator shall ensure that the well and casing 40. L’exploitant veille à ce que le puits et le tubage se are installed at a depth that provides for adequate kick situent à une profondeur qui assure une résistance suffi- tolerances and well control operations that provide for sante aux venues et permet de mener les activités de safe, constant bottom hole pressure. contrôle de la pression du fond du puits de manière constante et sûre. 41. The operator shall ensure that cement slurry is de- 41. L’exploitant veille à ce que le laitier de ciment signed and installed so that soit conçu et installé de façon à : (a) the movement of formation fluids in the casing a) prévenir le déplacement des fluides de formation annuli is prevented and, where required for safety, re- dans le tubage annulaire et, lorsque la sécurité, l’éva- luation des ressources ou la prévention du gaspillage 23 SOR/2009-316 — June 12, 2014 source evaluation or prevention of waste, the isolation l’exigent, s’assurer que les couches d’hydrocarbures et of the petroleum and water zones is ensured; d’eau sont isolées les unes des autres; (b) support for the casing is provided; b) fournir un support au tubage; (c) corrosion of the casing over the cemented interval c) retarder la corrosion du tubage se trouvant au-des- is retarded; and sus de l’intervalle cimenté; (d) the integrity of gas hydrate zones is protected. d) protéger l’intégrité des couches d’hydrates de gaz. WAITING ON CEMENT TIME PRISE DU CIMENT 42. After the cementing of any casing or casing liner 42. L’exploitant veille à ce que, après la cimentation and before drilling out the casing shoe, the operator shall d’un tubage — notamment d’un tubage partiel — et ensure that the cement has reached the minimum com- avant le reforage du sabot de tubage, le ciment ait atteint pressive strength sufficient to support the casing and une résistance en compression minimale suffisante pour provide zonal isolation. supporter le tubage et garantir l’isolement des couches. CASING PRESSURE TESTING ÉPREUVE SOUS PRESSION DU TUBAGE 43. After installing and cementing the casing and be- 43. Après l’installation et la cimentation d’un tubage fore drilling out the casing shoe, the operator shall en- et avant le reforage du sabot de tubage, l’exploitant sure that the casing is pressure-tested to the value re- veille à ce que le tubage soit soumis à une épreuve sous quired to confirm its integrity for maximum anticipated pression à une valeur qui permet de confirmer son inté- operating pressure. grité à la pression d’utilisation maximale prévue. PRODUCTION TUBING TUBE DE PRODUCTION 44. The operator shall ensure that the production tub- 44. L’exploitant veille à ce que le tube de production ing used in a well is designed to withstand the maximum utilisé dans un puits soit conçu de manière à résister aux conditions, forces and stresses that may be placed on it conditions, forces et contraintes maximales qui pour- and to maximize recovery from the pool. raient s’y appliquer et à maximiser la récupération du gi- sement. MONITORING AND CONTROL OF PROCESS OPERATIONS SURVEILLANCE ET CONTRÔLE DES OPÉRATIONS DE TRAITEMENT 45. The operator shall ensure that 45. L’exploitant veille au respect des exigences (a) operations such as processing, transportation, suivantes : storage, re-injection and handling of petroleum on the a) les opérations telles que le traitement, le transport, installation are effectively monitored to prevent inci- le stockage, la réinjection et la manutention d’hydro- dents and waste; carbures à l’installation sont surveillés efficacement (b) all alarm, safety, monitoring, warning and control de manière à prévenir tout incident et tout gaspillage; systems associated with those operations are managed b) tous les systèmes d’alarme, de sécurité, de sur- to prevent incidents and waste; and veillance, d’avertissement et de contrôle liés à ces (c) all appropriate persons are informed of the appli- opérations sont gérés de manière à prévenir tout inci- cable alarm, safety, monitoring, warning or control dent et tout gaspillage; systems associated with those operations that are tak- 24 DORS/2009-316 — 12 juin 2014 en out of service, and when those systems are returned c) les personnes compétentes sont informées de la to service. mise hors service ou de la remise en service de ces systèmes. WELL COMPLETION COMPLÉTION D’UN PUITS 46. (1) An operator that completes a well shall en- 46. (1) L’exploitant qui complète un puits veille en sure that outre au respect des exigences suivantes : (a) it is completed in a safe manner and allows for a) le puits est complété d’une manière sûre et qui per- maximum recovery; met une récupération maximale; (b) except in the case of commingled production, b) chaque intervalle de complétion est isolé de tout each completion interval is isolated from any other autre intervalle perméable ou poreux traversé par le porous or permeable interval penetrated by the well; puits, sauf dans le cas de production mélangée; (c) the testing and production of any completion in- c) l’essai et l’exploitation de tout intervalle de com- terval are conducted safely and do not cause waste or plétion sont effectués en toute sécurité, sans gaspillage pollution; ni pollution; (d) if applicable, sand production is controlled and d) le cas échéant, la production de sable est contrôlée, does not create a safety hazard or cause waste; ne pose aucun risque pour la sécurité et ne produit pas (e) each packer is set as close as practical to the top of de gaspillage; the completion interval and that the pressure testing of e) toute garniture d’étanchéité est installée le plus the packer to a differential pressure is greater than the près possible du niveau supérieur de l’intervalle de maximum differential pressure anticipated under the complétion et mis à l’essai à une pression différen- production or injection conditions; tielle supérieure à la pression différentielle maximale (f) if practical, any mechanical well condition that prévisible dans des conditions de production ou d’in- may have an adverse effect on production of jection; petroleum from, or the injection of fluids into, the f) dans la mesure du possible, tout problème d’ordre well is corrected; mécanique du puits pouvant nuire à l’injection de (g) the injection or production profile of the well is fluides ou à la production d’hydrocarbures est corrigé; improved, or the completion interval of the well is g) le profil d’injection ou de production du puits est changed, if it is necessary to do so to prevent waste; amélioré ou l’intervalle de complétion est modifié, si (h) if different pressure and inflow characteristics of cela est nécessaire pour prévenir le gaspillage; two or more pools might adversely affect the recovery h) le puits est exploité soit comme un puits à gise- from any of those pools, the well is operated as a sin- ment simple soit comme un puits à gisements mul- gle pool well or as a segregated multi-pool well; tiples séparés, si la différence entre les caractéristiques (i) after initial completion, all barriers are tested to de pression et d’écoulement de plusieurs gisements the maximum pressure to which they are likely to be peut nuire à la récupération à partir d’un des gise- subjected; and ments; (j) following any workover, any affected barriers are i) après la complétion initiale, toutes les barrières sont pressure-tested. soumises à la pression maximale à laquelle elles sont susceptibles d’être exposées; 25 SOR/2009-316 — June 12, 2014 j) après tout reconditionnement, toutes les barrières exposées sont soumises à une épreuve de pression. (2) The operator of a segregated multi-pool well shall (2) L’exploitant d’un puits à gisements multiples sé- ensure that parés veille au respect des exigences suivantes : (a) after the well is completed, segregation has been a) à la fin des travaux de complétion, l’étanchéité à established within and outside the well casing and is l’intérieur comme à l’extérieur du tubage est confir- confirmed; and mée; (b) if there is reason to doubt that segregation is being b) s’il y a des motifs de douter de l’étanchéité, un es- maintained, a segregation test is conducted within a sai de séparation est effectué dans un délai raison- reasonable time frame. nable. SUBSURFACE SAFETY VALVE VANNES DE SÉCURITÉ DE SUBSURFACE 47. The operator of a development well capable of 47. L’exploitant d’un puits d’exploitation qui est flow shall ensure that the well is equipped with a fail- éruptif veille à ce que le puits soit muni d’une vanne de safe subsurface safety valve that is designed, installed, sécurité de subsurface à sûreté intégrée conçue, installée, operated and tested to prevent uncontrolled well flow mise en service et mise à l’épreuve de manière à empê- when it is activated. cher tout écoulement incontrôlé du puits lorsqu’elle est activée. WELLHEAD AND CHRISTMAS TREE EQUIPMENT TÊTES DE PUITS ET TÊTES D’ÉRUPTION 48. The operator shall ensure that the wellhead and 48. L’exploitant veille à ce que la tête de puits et la Christmas tree equipment, including valves, are designed tête d’éruption, y compris les vannes, soient conçues de to operate safely and efficiently under the maximum manière à fonctionner efficacement et en toute sécurité load conditions anticipated during the life of the well. dans des conditions de charge maximale prévisibles pen- dant la durée de vie du puits. PART 5 PARTIE 5 EVALUATION OF WELLS, POOLS AND FIELDS ÉVALUATION DES PUITS, GISEMENTS ET CHAMPS GENERAL DISPOSITIONS GÉNÉRALES 49. The operator shall ensure that the well data acqui- 49. L’exploitant veille à ce que les programmes d’ac- sition program and the field data acquisition program are quisition des données relatives aux puits et aux champs implemented in accordance with good oilfield practices. soient appliqués selon les règles de l’art en matière d’ex- ploitation pétrolière. 50. (1) If part of the well or field data acquisition 50. (1) Si un tel programme ne peut être appliqué en program cannot be implemented, the operator shall en- totalité, l’exploitant veille au respect des exigences sure that suivantes : (a) a conservation officer is notified as soon as the a) un agent du contrôle de l’exploitation en est avisé circumstances permit; and aussitôt que les circonstances le permettent; 26 DORS/2009-316 — 12 juin 2014 (b) the procedures to otherwise achieve the goals of b) les mesures prévues pour atteindre autrement les the program are submitted to the Board for approval. objectifs du programme sont soumises à l’approbation de l’Office. (2) If the operator can demonstrate that those proce- (2) L’Office approuve les mesures prévues à l’alinéa dures can achieve the goals of the well or field data ac- (1)b) si l’exploitant démontre qu’elles permettent d’at- quisition program or are all that can be reasonably ex- teindre les objectifs du programme d’acquisition des pected in the circumstances, the Board shall approve données relatives au puits ou au champ ou qu’elles sont them. les seules qui peuvent raisonnablement être prises dans les circonstances. TESTING AND SAMPLING OF FORMATIONS MISE À L’ESSAI ET ÉCHANTILLONNAGE DES FORMATIONS 51. The operator shall ensure that every formation in 51. S’il y a lieu de croire que des données sur la pres- a well is tested and sampled to obtain reservoir pressure sion des réservoirs ou des échantillons de fluide contri- data and fluid samples from the formation, if there is an bueraient sensiblement à l’évaluation du réservoir et de indication that the data or samples would contribute sub- la géologie des lieux, l’exploitant veille à ce que toute stantially to the geological and reservoir evaluation. formation dans un puits soit mise à l’essai et échantillon- née de manière à obtenir ces données ou échantillons. FORMATION FLOW TESTING ESSAIS D’ÉCOULEMENT DE FORMATION 52. (1) The operator shall ensure that 52. (1) L’exploitant veille au respect des exigences (a) no development well is put into production unless suivantes : the Board has approved a formation flow test in re- a) aucun puits d’exploitation n’est mis en production spect of the development well; and sans que l’Office n’en n’ait approuvé l’essai d’écoule- (b) if a development well is subjected to a well opera- ment de formation; tion that might change its deliverability, productivity b) lorsqu’un puits d’exploitation fait l’objet de tra- or injectivity, a formation flow test is conducted with- vaux qui pourraient en modifier la capacité de débit, la in a reasonable time frame after the well operation is productivité ou l’injectivité, il est soumis, dans un dé- ended to determine the effects of that operation on the lai raisonnable après la fin des travaux, à un essai well’s deliverability, productivity or injectivity. d’écoulement de formation visant à déterminer les ef- fets des travaux sur sa capacité de débit, sa productivi- té ou son injectivité. (2) The operator may conduct a formation flow test (2) L’exploitant peut effectuer un essai d’écoulement on a well drilled on a geological feature if, before con- de formation dans un puits foré dans une structure géolo- ducting that test, the operator gique si, au préalable : (a) submits to the Board a detailed testing program; a) il remet à l’Office un programme d’essai détaillé; and b) il obtient l’approbation de l’Office pour effectuer (b) obtains the Board’s approval to conduct the test. cet essai. (3) The Board may require that the operator conduct a (3) L’Office peut exiger de l’exploitant qu’il effectue formation flow test on a well drilled on a geological fea- un essai d’écoulement de formation dans un puits foré ture, other than the first well, if there is an indication that dans une structure géologique, autre que le premier 27 SOR/2009-316 — June 12, 2014 the test would contribute substantially to the geological puits, s’il y a lieu de croire que cet essai contribuerait and reservoir evaluation. sensiblement à l’évaluation du réservoir et de la géologie des lieux. (4) The Board shall approve a formation flow test if (4) L’Office approuve l’essai d’écoulement de forma- the operator demonstrates that the test will be conducted tion si l’exploitant démontre que celui-ci sera effectué en safely, without pollution and in accordance with good toute sécurité, sans causer de pollution et conformément oilfield practices and that the test will enable the opera- aux règles de l’art en matière d’exploitation pétrolière et tor to lui permettra à la fois : (a) obtain data on the deliverability or productivity of a) d’obtenir des données sur la capacité de débit ou la the well; productivité du puits; (b) establish the characteristics of the reservoir; and b) d’établir les caractéristiques du réservoir; (c) obtain representative samples of the formation flu- c) d’obtenir des échantillons représentatifs des li- ids. quides de formation. SUBMISSION OF SAMPLES AND DATA EXPÉDITION DES ÉCHANTILLONS ET DES DONNÉES 53. The operator shall ensure that all cutting samples, 53. L’exploitant veille à ce que les échantillons de dé- fluid samples and cores collected as part of the well and blais de forage ou de fluides et les carottes recueillis field data acquisition programs are dans le cadre des programmes d’acquisition des données (a) transported and stored in a manner that prevents relatives aux puits et aux champs soient : any loss or deterioration; a) transportés et entreposés de manière à prévenir les (b) delivered to the Board within 60 days after the rig pertes ou détériorations; release date unless analyses are ongoing, in which b) expédiés à l’Office dans les soixante jours suivant case those samples and cores, or the remaining parts, la date de libération de l’appareil de forage, sauf s’ils are to be delivered on completion of the analyses; and sont en cours d’analyse, auquel cas ils sont expédiés, (c) stored in durable containers properly labelled for ou ce qu’il en reste est expédié, après l’analyse; identification. c) emballés dans des contenants durables et correcte- ment étiquetés. 54. The operator shall ensure that after any samples 54. Lorsque les échantillons nécessaires à des ana- necessary for analysis or for research or academic stud- lyses, à des recherches ou à des études universitaires ont ies have been removed from a conventional core, the re- été prélevés d’une carotte classique, l’exploitant veille à maining core, or a longitudinal slab that is not less than ce que le reste de la carotte ou une tranche prise dans le one half of the cross-sectional area of that core, is sub- sens longitudinal et correspondant à au moins la moitié mitted to the Board. de la section transversale de la carotte soit remis à l’Of- fice. 55. Before disposing of cutting samples, fluid sam- 55. L’exploitant veille à ce que, avant l’élimination ples, cores or evaluation data under these Regulations, de tout échantillon de déblais de forage ou de fluides, de the operator shall ensure that the Board is notified in carottes ou de données d’évaluation aux termes du pré- writing and is given an opportunity to request delivery of sent règlement, l’Office en soit avisé par écrit et à ce the samples, cores or data. qu’on lui offre la possibilité d’en demander livraison. 28 DORS/2009-316 — 12 juin 2014 PART 6 PARTIE 6 WELL TERMINATION CESSATION DE L’EXPLOITATION D’UN PUITS SUSPENSION OR ABANDONMENT SUSPENSION ET ABANDON 56. The operator shall ensure that every well that is 56. L’exploitant veille à ce que tout puits abandonné suspended or abandoned can be readily located and left ou dont l’exploitation est suspendue soit facilement loca- in a condition that lisable et laissé dans un état tel : (a) provides for isolation of all hydrocarbon bearing a) qu’il assure l’isolement de toute couche renfermant zones and discrete pressure zones; and des hydrocarbures et de toute couche de pression dis- (b) prevents any formation fluid from flowing tincte; through or escaping from the well-bore. b) qu’il empêche l’écoulement ou le rejet de fluides de formation du trou de sonde. 57. The operator of a suspended well shall ensure that 57. L’exploitant d’un puits dont l’exploitation est sus- the well is monitored and inspected to maintain its con- pendue veille à ce que le puits soit surveillé et inspecté tinued integrity and to prevent pollution. pour en préserver l’intégrité et prévenir la pollution. 58. The operator shall ensure that, on the abandon- 58. Lorsqu’un puits est abandonné, l’exploitant veille ment of a well, the seafloor is cleared of any material or à ce que le fond marin soit débarrassé de tout matériel ou equipment that might interfere with other commercial équipement qui pourrait nuire aux autres utilisations uses of the sea. commerciales de la mer. INSTALLATION REMOVAL DÉPLACEMENT D’UNE INSTALLATION 59. No operator shall remove or cause to have re- 59. Il est interdit à l’exploitant de retirer ou de faire moved a drilling installation from a well drilled under retirer une installation de forage d’un puits, en vertu du these Regulations unless the well has been terminated in présent règlement, à moins que l’exploitation du puits accordance with these Regulations. n’ait cessé conformément au présent règlement. PART 7 PARTIE 7 MEASUREMENTS MESURAGE FLOW AND VOLUME DÉBIT ET VOLUME 60. (1) Unless otherwise included in the approval is- 60. (1) Sauf disposition contraire précisée dans l’ap- sued under subsection 7(2), the operator shall ensure that probation délivrée aux termes du paragraphe 7(2), l’ex- the rate of flow and the volume of the following are ploitant veille à ce que soient mesurés et enregistrés le measured and recorded: débit et le volume des fluides et matériaux suivants : (a) the fluid that is produced from each well; a) le fluide produit par chaque puits; (b) the fluid that is injected into each well; b) le fluide injecté dans chaque puits; (c) any produced fluid that enters, leaves, is used or is c) le fluide produit qui entre dans une installation, y flared, vented, burned or otherwise disposed of on an compris dans une salle des accumulateurs, une instal- lation de traitement ou une usine de transformation, 29 SOR/2009-316 — June 12, 2014 installation, including any battery room, treatment fa- ou qui en sort, y est utilisé ou est brûlé à la torche, est cility or processing plant; and rejeté, est brûlé ou autrement éliminé; (d) any air or materials injected for the purposes of d) l’air ou les matériaux injectés à des fins d’élimina- disposal, storage or cycling, including drill cuttings tion, de stockage ou de recyclage, y compris les dé- and other useless material that is generated during blais de forage et autres matériaux inutilisables pro- drilling, well or production operations. duits au cours des activités de forage, des travaux relatifs à un puits ou à des travaux de production. (2) The operator shall ensure that any measurements (2) L’exploitant veille à ce que le mesurage soit ef- are conducted in accordance with the flow system, flow fectué conformément au système d’écoulement et aux calculation procedure and flow allocation procedure, ap- méthodes de calcul et de répartition du débit approuvés proved under subsection 7(2). au titre du paragraphe 7(2). 61. (1) The operator shall ensure that group produc- 61. (1) L’exploitant veille à ce que soient réparties au tion of petroleum from wells and injection of a fluid into prorata la production regroupée d’hydrocarbures des wells is allocated on a pro rata basis, in accordance with puits et l’injection de fluides dans les puits, conformé- the flow system, flow calculation procedure and flow al- ment au système d’écoulement et aux méthodes de cal- location procedure approved under subsection 7(2). cul et de répartition du débit approuvés au titre du para- graphe 7(2). (2) If a well is completed over multiple pools or (2) Dans le cas d’un puits dont la complétion est réa- zones, the operator shall ensure that production or injec- lisée sur plusieurs gisements ou couches, l’exploitant tion volumes for the well are allocated on a pro rata ba- veille à ce que la production ou l’injection pour chaque sis to the pools or zones in accordance with the flow al- gisement ou couche soit répartie au prorata selon la mé- location procedure approved under subsection 7(2). thode de répartition du débit approuvée au titre du para- graphe 7(2). TESTING, MAINTENANCE AND NOTIFICATION ESSAIS, ENTRETIEN ET NOTIFICATION 62. The operator shall ensure 62. L’exploitant veille au respect des exigences (a) that meters and associated equipment are calibrat- suivantes : ed and maintained to ensure their continued accuracy; a) les compteurs et le matériel connexe sont entrete- (b) that equipment used to calibrate the flow system nus et étalonnés de manière à assurer la précision des is calibrated in accordance with good measurement mesures; practices; b) l’équipement utilisé pour étalonner le système (c) that any component of the flow system that may d’écoulement est étalonné conformément aux règles have an impact on the accuracy or integrity of the de l’art en matière de mesurage; flow system and that is not functioning in accordance c) tout composant du système d’écoulement pouvant with the manufacturer’s specifications is repaired or avoir des effets sur la précision ou sur l’intégrité du replaced without delay, or, if it is not possible to do so système d’écoulement et dont le fonctionnement n’est without delay, corrective measures are taken to mini- pas conforme aux spécifications du fabricant est répa- mize the impact on the accuracy and integrity of the ré ou remplacé sans délai; en cas de retard inévitable, flow system while the repair or replacement is pro- des mesures correctives sont prises entre-temps pour ceeding; and réduire au minimum ces effets; 30 DORS/2009-316 — 12 juin 2014 (d) that a conservation officer is notified, as soon as d) un agent du contrôle de l’exploitation est avisé, the circumstances permit, of any malfunction or fail- aussitôt que les circonstances le permettent, de toute ure of any flow system component that may have an défectuosité ou défaillance d’un composant du sys- impact on the accuracy of the flow system and of the tème d’écoulement qui pourrait avoir des effets sur corrective measures taken. l’exactitude du système d’écoulement et des mesures correctives prises. TRANSFER METERS COMPTEURS DE TRANSFERT 63. The operator shall ensure that 63. L’exploitant veille au respect des exigences (a) a conservation officer is notified at least 14 days suivantes : before the day on which any transfer meter prover or a) un agent du contrôle de l’exploitation est avisé au master meter used in conjunction with a transfer meter moins quatorze jours avant l’étalonnage d’un comp- is calibrated; and teur étalon de transfert ou d’un compteur général lié à (b) a copy of the calibration certificate is submitted to celui-ci; the Chief Conservation Officer as soon as the circum- b) une copie du certificat d’étalonnage est remise au stances permit, following completion of the calibra- délégué à l’exploitation aussitôt que les circonstances tion. le permettent après l’étalonnage. PRORATION TESTING FREQUENCY FRÉQUENCE D’ESSAIS AU PRORATA 64. The operator of a development well that is pro- 64. L’exploitant d’un puits d’exploitation produisant ducing petroleum shall ensure that sufficient proration des hydrocarbures veille à ce que le puits soit soumis à tests are performed to permit reasonably accurate deter- un nombre suffisant d’essais au prorata pour permettre mination of the allocation of oil, gas and water produc- de déterminer avec une précision suffisante la répartition tion on a pool and zone basis. de la production de pétrole, de gaz et d’eau par gisement et par couche. PART 8 PARTIE 8 PRODUCTION CONSERVATION RATIONALISATION DE LA PRODUCTION RESOURCE MANAGEMENT GESTION DES RESSOURCES 65. The operator shall ensure that 65. L’exploitant veille au respect des exigences (a) maximum recovery from a pool or zone is suivantes : achieved in accordance with good oilfield practices; a) la récupération maximale d’un gisement ou d’une (b) wells are located and operated to provide for max- couche est réalisée selon les règles de l’art en matière imum recovery from a pool; and d’exploitation pétrolière; (c) if there is reason to believe that infill drilling or b) les puits sont disposés et exploités de manière à implementation of an enhanced recovery scheme permettre la récupération maximale d’un gisement; might result in increased recovery from a pool or c) s’il y a lieu de croire que le forage intercalaire ou field, studies on these methods are carried out and la mise en œuvre d’un plan de récupération assistée submitted to the Board. permettrait d’accroître la récupération d’un gisement 31 SOR/2009-316 — June 12, 2014 ou d’un champ, ces méthodes font l’objet d’une étude qui est remise à l’Office. COMMINGLED PRODUCTION PRODUCTION MÉLANGÉE 66. (1) No operator shall engage in commingled pro- 66. (1) Il est interdit à l’exploitant de se livrer à une duction except in accordance with the approval granted production mélangée, sauf en conformité avec l’approba- under subsection (2). tion accordée au paragraphe (2). (2) The Board shall approve the commingled produc- (2) L’Office approuve la production mélangée si l’ex- tion if the operator demonstrates that it would not reduce ploitant démontre que celle-ci ne réduirait pas la récupé- the recovery from the pools or zones. ration des gisements ou des couches. (3) The operator engaging in commingled production (3) L’exploitant qui se livre à une production mélan- shall ensure that the total volume and the rate of produc- gée veille à ce que le volume total et le taux de produc- tion of each fluid produced is measured and the volume tion de chaque fluide produit soient mesurés et que le from each pool or zone is allocated in accordance with volume pour chaque gisement ou chaque couche soit ré- the requirements of Part 7. parti conformément aux exigences de la partie 7. GAS FLARING AND VENTING BRÛLAGE DE GAZ À LA TORCHE ET REJET DE GAZ DANS L’ATMOSPHÈRE 67. No operator shall flare or vent gas unless 67. Il est interdit à l’exploitant de brûler du gaz à la (a) it is otherwise permitted in the approval issued torche ou de rejeter du gaz dans l’atmosphère, sauf dans under subsection 52(4) or in the authorization; or les cas suivants : (b) it is necessary to do so because of an emergency a) le brûlage ou le rejet est par ailleurs permis aux situation and the Board is notified in the daily drilling termes de l’approbation accordée au titre du para- report, daily production report or in any other written graphe 52(4) ou dans l’autorisation; or electronic form, as soon as the circumstances per- b) le brûlage ou le rejet est nécessaire pour remédier à mit, of the flaring or venting and of the amount flared une situation d’urgence, auquel cas l’Office en est avi- or vented. sé, aussitôt que les circonstances le permettent, dans le rapport journalier de forage ou le registre quotidien re- latif à la production ou encore sous toute autre forme écrite ou électronique, avec indication des quantités brûlées ou rejetées. OIL BURNING BRÛLAGE DE PÉTROLE 68. No operator shall burn oil unless 68. Il est interdit à l’exploitant de brûler du pétrole, (a) it is otherwise permitted in the approval issued sauf dans les cas suivants : under subsection 52(4) or in the authorization; or a) le brûlage est par ailleurs permis aux termes de (b) it is necessary to do so because of an emergency l’approbation accordée au titre du paragraphe 52(4) ou situation and the Board is notified in the daily drilling dans l’autorisation; report, daily production report or in any other written b) il est nécessaire pour remédier à une situation d’ur- gence, auquel cas l’Office en est avisé, aussitôt que les 32 DORS/2009-316 — 12 juin 2014 or electronic form, as soon as the circumstances per- circonstances le permettent, dans le rapport journalier mit, of the burning and the amount burned. de forage ou le registre quotidien relatif à la produc- tion ou encore sous toute autre forme écrite ou électro- nique, avec indication des quantités brûlées. PART 9 PARTIE 9 SUPPORT OPERATIONS OPÉRATIONS DE SOUTIEN SUPPORT CRAFT VÉHICULES DE SERVICE 69. The operator shall ensure that all support craft are 69. L’exploitant veille à ce que tout véhicule de ser- designed, constructed and maintained to supply the nec- vice soit conçu, construit et entretenu de manière à pou- essary support functions and operate safely in the fore- voir remplir son rôle de soutien et fonctionner en toute seeable physical environmental conditions prevailing in sécurité dans les conditions environnementales qui the area in which they operate. règnent normalement dans la région desservie. 70. (1) The operator of a manned installation shall 70. (1) L’exploitant d’une installation habitée veille à ensure that at least one support craft is ce qu’au moins un véhicule de service soit : (a) available at a distance that is not greater than that a) disponible à une distance permettant une interven- required for a return time of twenty minutes; and tion d’au plus vingt minutes aller-retour; (b) suitably equipped to supply the necessary emer- b) équipé de manière à pouvoir fournir les services gency services including rescue and first aid treatment d’urgence nécessaires, y compris le secours et les pre- for all personnel on the installation in the event of an miers soins pour tout le personnel à l’installation au emergency. besoin. (2) If the support craft exceeds the distance referred (2) Le cas échéant, si le véhicule de service se trouve to in paragraph (1)(a), both the installation manager and à une distance plus grande que celle prévue à l’alinéa the person in charge of the support craft shall log this (1)a), le chargé de projet et la personne responsable du fact and the reason why the distance or time was exceed- véhicule de service doivent consigner ce fait et indiquer ed. la raison pour laquelle la distance ou le délai n’a pas été respecté. (3) Under the direction of the installation manager, (3) Sous la direction du chargé de projet, le personnel the support craft crew shall keep the craft in close prox- attaché au véhicule de service doit tenir le véhicule à imity to the installation, maintain open communication proximité de l’installation, maintenir ouvertes les voies channels with the installation and be prepared to conduct de communication avec celle-ci et être prêt à mener des rescue operations during any activity or condition that opérations de sauvetage durant toute activité ou dans presents an increased level of risk to the safety of per- toute situation qui présente un risque accru pour la sécu- sonnel or the installation. rité du personnel ou de l’installation. SAFETY ZONE ZONE DE SÉCURITÉ 71. (1) For the purposes of this section, the safety 71. (1) Pour l’application du présent article, la zone zone around an installation consists of the area within a de sécurité autour d’une installation est formée de la su- 33 SOR/2009-316 — June 12, 2014 line enclosing and drawn at a distance of 500 m from the perficie se trouvant dans les 500 m à l’extérieur du péri- outer edge of the installation. mètre de l’installation. (2) A support craft shall not enter the safety zone (2) Un véhicule de service ne peut entrer dans la zone without the consent of the installation manager. de sécurité sans le consentement du chargé de projet. (3) The operator shall take all reasonable measures to (3) L’exploitant doit prendre toutes les mesures vou- warn persons who are in charge of vessels and aircraft of lues pour aviser les responsables de navires ou d’aéro- the safety zone boundaries, of the facilities within the nefs des limites de la zone de sécurité, du matériel qui safety zone and of any related potential hazards. s’y trouve et des risques éventuels y afférents. PART 10 PARTIE 10 TRAINING AND COMPETENCY FORMATION ET COMPÉTENCE 72. The operator shall ensure that 72. L’exploitant veille au respect des exigences (a) all personnel have, before assuming their duties, suivantes : the necessary experience, training and qualifications a) avant d’assumer ses fonctions, tout le personnel and are able to conduct their duties safely, competent- doit avoir l’expérience, la formation et les qualifica- ly and in compliance with these Regulations; and tions voulues ainsi que la capacité d’exécuter ses (b) records of the experience, training and qualifica- fonctions en toute sécurité et de façon compétente, et tions of all personnel are kept and made available to ce, conformément au présent règlement; the Board upon request. b) les dossiers relatifs à l’expérience, la formation et les qualifications du personnel sont conservés et, sur demande, ils sont mis à la disposition de l’Office. IMPAIRMENT AND FATIGUE INCAPACITÉ ET FATIGUE 73. (1) Subject to subsection (2), the operator shall 73. (1) Sous réserve du paragraphe (2), l’exploitant ensure that no person works when their ability to func- veille à ce qu’aucune personne ne travaille si sa capacité tion is impaired and that no person is required to work de fonctionner est réduite et à ce qu’aucune personne (a) any shift in excess of 12.5 continuous hours; or n’effectue : (b) two successive shifts of any duration unless that a) un quart de travail continu de plus de 12,5 heures; person has had at least eight hours’ rest between the b) deux quarts de travail successifs, quelle qu’en soit shifts. la durée, si elle ne prend pas au moins huit heures de repos entre les deux. (2) The operator may allow a person to work in ex- (2) L’exploitant peut autoriser toute personne à effec- cess of the hours or without the rest period referred to in tuer un nombre d’heures de travail supérieur à celui indi- subsection (1) if the operator has assessed the risk asso- qué au paragraphe (1) ou à travailler sans prendre le re- ciated with the person working the extra hours and deter- pos qui y est prescrit si, après en avoir évalué le risque mined that such work can be carried out without in- pour la sécurité ou l’environnement, il établit que celui- creased risk to safety or to the environment. ci ne serait pas accru de ce fait. (3) If an operator allows a person to work in excess of (3) L’exploitant qui autorise une personne à effectuer the hours or without the rest period referred to in subsec- plus d’heures de travail que le nombre indiqué au para- 34 DORS/2009-316 — 12 juin 2014 tion (1), the operator shall ensure that a description of graphe (1) ou à travailler sans la période de repos prévue the work, the names of the persons performing the work, à ce paragraphe doit veiller à ce que soient consignés the hours worked and the risk assessment referred to in une description du travail effectué, les noms des per- subsection (2) are recorded. sonnes qui exécutent le travail, les heures de travail ef- fectuées et l’évaluation des risques visée au paragraphe (2). PART 11 PARTIE 11 SUBMISSIONS, NOTIFICATIONS, RECORDS AND PRÉSENTATIONS, AVIS, REGISTRES ET REPORTS RAPPORTS REFERENCE TO NAMES AND DESIGNATIONS MENTION DES NOMS ET DÉSIGNATIONS 74. When submitting any information for the purpos- 74. Au moment de la présentation de renseignements es of these Regulations, the operator shall refer to each en application du présent règlement, l’exploitant y in- well, pool and field by the name given to it under sec- dique chaque puits, gisement ou champ par le nom qui tions 3 and 4, or if a zone, by its designation by the lui est attribué en vertu des articles 3 et 4 ou, s’agissant Board under section 4. d’une couche, par la désignation de l’Office en vertu de l’article 4. SURVEYS ARPENTAGE 75. (1) The operator shall ensure that a survey is 75. (1) L’exploitant veille à ce qu’un arpentage soit used to confirm the location of the well on the seafloor. effectué pour confirmer l’emplacement d’un puits sur le fond marin. (2) The survey shall be certified by a person licensed (2) L’arpentage est certifié par une personne titulaire under the Canada Lands Surveyors Act. d’un permis en vertu de la Loi sur les arpenteurs des terres du Canada. (3) The operator shall ensure that a copy of the survey (3) L’exploitant veille à ce qu’une copie du plan d’ar- plan filed with the Canada Lands Surveys Records is pentage déposé aux Archives d’arpentage des terres du submitted to the Board. Canada soit remise à l’Office. INCIDENTS AND NEAR-MISSES INCIDENTS ET QUASI-INCIDENTS 76. (1) The operator shall ensure that 76. (1) L’exploitant veille au respect des exigences (a) the Board is notified of any incident or near-miss suivantes : as soon as the circumstances permit; and a) l’Office est avisé, aussitôt que les circonstances le (b) the Board is notified at least 24 hours in advance permettent, de tout incident ou quasi-incident; of any press release or press conference held by the b) l’Office est avisé, au moins vingt-quatre heures operator concerning any incident or near-miss during avant la diffusion de tout communiqué ou la tenue de any activity to which these Regulations apply, except toute conférence de presse par l’exploitant, de tout in- in an emergency situation, in which case it shall be cident ou quasi-incident survenu lors d’une activité vi- sée par le présent règlement, sauf en situation d’ur- 35 SOR/2009-316 — June 12, 2014 notified without delay before the press release or press gence, auquel cas avis lui est donné sans délai avant le conference. communiqué ou la conférence de presse. (2) The operator shall ensure that (2) L’exploitant veille au respect des exigences (a) any incident or near-miss is investigated, its root suivantes : cause and causal factors identified and corrective ac- a) une enquête est menée à l’égard de chaque incident tion taken; and ou quasi-incident, sa cause première et les facteurs (b) for any of the following incidents or near-misses, contributifs sont précisés et des mesures correctives a copy of an investigation report identifying the root sont prises; cause, causal factors and corrective action taken is b) un rapport d’enquête précisant la cause première submitted to the Board no later than 21 days after the de l’incident ou quasi-incident, les facteurs contribu- day on which the incident or near-miss occurred: tifs et les mesures correctives est remis à l’Office au (i) a lost or restricted workday injury, plus tard vingt et un jours après l’incident ou quasi-in- cident, s’il s’agit : (ii) death, (i) d’une blessure entraînant une perte de temps de (iii) fire or explosion, travail, (iv) a loss of containment of any fluid from a well, (ii) d’une perte de vie, (v) an imminent threat to the safety of a person, in- (iii) d’un incendie ou d’une explosion, stallation or support craft, or (iv) d’une défaillance du confinement d’un fluide (vi) a significant pollution event. provenant d’un puits, (v) d’une menace imminente à la sécurité d’une personne, d’une installation ou d’un véhicule de service, (vi) d’un événement de pollution important. SUBMISSION OF DATA AND ANALYSIS PRÉSENTATION DE DONNÉES ET ANALYSES 77. (1) The operator shall ensure that a final copy of 77. (1) L’exploitant veille à ce que soient remis à the results, data, analyses and schematics obtained from l’Office les résultats, données, analyses et schémas défi- the following sources is submitted to the Board: nitifs fondés sur : (a) testing, sampling and pressure surveys carried out a) la mise à l’essai, l’échantillonnage et les relevés de as part of the well and field data acquisition programs pression effectués dans le cadre des programmes d’ac- referred to in section 49 and testing and sampling of quisition des données relatives aux puits et aux formations referred to in section 51; and champs visés à l’article 49, et la mise à l’essai et (b) any segregation test or well operation. l’échantillonnage prévus à l’article 51; b) les essais de séparation ou les travaux relatifs à un puits. (2) Unless otherwise indicated in these Regulations, (2) Sauf disposition contraire du présent règlement, the operator shall ensure that the results, data, analyses l’exploitant veille à ce que les résultats, données, ana- and schematics are submitted within 60 days after the lyses et schémas soient présentés dans les soixante jours 36 DORS/2009-316 — 12 juin 2014 day on which any activity referred to in paragraphs suivant la fin de toute activité mentionnée aux alinéas (1)(a) and (b) is completed. (1)a) et b). RECORDS REGISTRES 78. The operator shall ensure that records are kept of 78. L’exploitant veille à ce que soient tenus des (a) all persons arriving, leaving or present on the in- registres concernant : stallation; a) les personnes qui arrivent à l’installation, qui s’y (b) the location and movement of support craft, the trouvent ou qui la quittent; emergency drills and exercises, incidents, near-misses, b) l’emplacement et les déplacements des véhicules the quantities of consumable substances that are re- de service, les exercices d’urgence, les incidents, les quired to ensure the safety of operations and other ob- quasi-incidents, les quantités de substances consomp- servations and information critical to the safety of per- tibles nécessaires à la sécurité des opérations et tout sons on the installation or the protection of the autre observation ou renseignement essentiel pour la environment; sécurité des personnes se trouvant à l’installation ou la (c) daily maintenance and operating activities, includ- protection de l’environnement; ing any activity that may be critical to the safety of c) les activités quotidiennes d’entretien et d’exploita- persons on the installation, the protection of the envi- tion, y compris toute activité essentielle pour la sécu- ronment or the prevention of waste; rité des personnes se trouvant à l’installation, la pro- (d) in the case of a production installation, tection de l’environnement ou la prévention du gaspillage; (i) the inspection of the installation and related equipment for corrosion and erosion and any result- d) dans le cas d’une installation de production : ing maintenance carried out, (i) les inspections de l’installation et du matériel (ii) the pressure, temperature and flow rate data for connexe en vue de vérifier la présence de corrosion compressors and treating and processing facilities, et d’érosion et les travaux d’entretien effectués par suite de ces inspections, (iii) the calibration of meters and instruments, (ii) les données relatives à la pression, à la tempé- (iv) the testing of surface and subsurface safety rature et au débit des compresseurs, du matériel de valves, traitement et de transformation, (v) the status of each well and the status of well op- (iii) l’étalonnage des compteurs et autres instru- erations, and ments, (vi) the status of the equipment and systems critical (iv) les essais des vannes de sécurité de surface et to safety and protection of the environment includ- de subsurface, ing any unsuccessful test result or equipment failure leading to an impairment of the systems; and (v) l’état de chacun des puits et l’état d’avancement des travaux relatifs aux puits, (e) in the case of a floating installation, all installation movements, data, observations, measurements and (vi) l’état de l’équipement et des systèmes essen- calculations related to the stability and station-keeping tiels à la sécurité et à la protection de l’environne- capability of the installation. ment, y compris tout résultat négatif des essais et toute défaillance de l’équipement qui ont mené à un affaiblissement des systèmes; 37 SOR/2009-316 — June 12, 2014 e) dans le cas d’une installation flottante, les mouve- ments de l’installation et les données, observations, mesures et calculs relatifs à la stabilité de l’installation et à sa capacité de conserver sa position. METEOROLOGICAL OBSERVATIONS OBSERVATIONS MÉTÉOROLOGIQUES 79. The operator of an installation shall ensure 79. L’exploitant d’une installation veille au respect (a) that the installation is equipped with facilities and des exigences suivantes : equipment for observing, measuring and recording a) l’installation est dotée des moyens et de l’équipe- physical environmental conditions and that a compre- ment nécessaires pour observer, mesurer et consigner hensive record of observations of physical environ- les conditions environnementales et un rapport détaillé mental conditions is maintained onboard the installa- des observations de ces conditions est conservé à bord tion; and de l’installation; (b) that forecasts of meteorological conditions, sea b) les prévisions des conditions météorologiques, de states and ice movements are obtained and recorded l’état de la mer et du mouvement des glaces sont obte- each day and each time during the day that they nues et consignées chaque jour, ainsi qu’à chaque fois change substantially from those forecasted. qu’il y a des variations sensibles de ceux-ci. DAILY PRODUCTION RECORD REGISTRES QUOTIDIENS RELATIFS À LA PRODUCTION 80. The operator shall ensure that a daily production 80. L’exploitant veille à ce qu’un registre quotidien record, which includes the metering records and other in- relatif à la production, contenant les dossiers relatifs aux formation relating to the production of petroleum and compteurs et tout autre renseignement concernant la pro- other fluids in respect of a pool or well, is retained and duction d’hydrocarbures et d’autres fluides dans un gise- readily accessible to the Board until the field or well in ment ou un puits, soit conservé et soit facilement acces- which the pool is located is abandoned and at that time sible à l’Office jusqu’à l’abandon du champ ou du puits shall offer the record to the Board before destroying it. dans lequel le gisement est situé, et il l’offre à l’Office avant de le détruire. MANAGEMENT OF RECORDS GESTION DES REGISTRES 81. The operator shall ensure that 81. L’exploitant veille au respect des exigences (a) all processes are in place and implemented to suivantes : identify, generate, control and retain records necessary a) des processus sont en place et mis en œuvre pour to support operational and regulatory requirements; identifier, produire, contrôler et conserver les registres and requis pour répondre aux exigences opérationnelles et (b) the records are readily accessible for inspection by réglementaires; the Board. b) les registres sont facilement accessibles à l’Office pour examen. 38 DORS/2009-316 — 12 juin 2014 FORMATION FLOW TEST REPORTS RAPPORTS RELATIFS AUX ESSAIS D’ÉCOULEMENT DE FORMATION 82. The operator shall ensure that 82. L’exploitant veille au respect des exigences (a) in respect of exploration and delineation wells, a suivantes : daily record of formation flow test results is submitted a) pour les puits d’exploitation et de délimitation, un to the Board; and registre quotidien des résultats des essais d’écoule- (b) in respect of all wells, a formation flow test report ment de formation est remis à l’Office; is submitted to the Board as soon as the circumstances b) pour tous les puits, un rapport des essais d’écoule- permit, following completion of the test. ment de formation est remis à l’Office aussitôt que les circonstances le permettent après l’essai. PILOT SCHEME PROJET PILOTE 83. (1) For the purposes of this section, “pilot 83. (1) Pour l’application du présent article, « projet scheme” means a scheme that applies existing or experi- pilote » s’entend de tout projet pour lequel on utilise une mental technology over a limited portion of a pool to ob- technique conventionnelle ou expérimentale dans une tain information on reservoir or production performance section limitée d’un gisement afin d’obtenir des rensei- for the purpose of optimizing field development or im- gnements sur le rendement du réservoir ou sur la produc- proving reservoir or production performance. tion à des fins d’optimisation de la mise en valeur du champ ou d’amélioration du rendement du réservoir ou de la production. (2) The operator shall ensure that interim evaluations (2) L’exploitant veille à ce que des évaluations provi- of any pilot scheme respecting a pool, field or zone are soires de tout projet pilote relatif à un gisement, un submitted to the Board. champ ou une couche soient remises à l’Office. (3) When the operator completes a pilot scheme, the (3) Au terme d’un projet pilote, l’exploitant veille à operator shall ensure that a report is submitted to the ce que soit remis à l’Office un rapport faisant état : Board that sets out a) des résultats du projet, avec les données et ana- (a) the results of the scheme and supporting data and lyses à l’appui; analyses; and b) des conclusions de l’exploitant quant à la possibili- (b) the operator’s conclusions as to the potential of té de passer à la mise en production à plein rendement. the scheme for application to full-scale production. DAILY REPORTS RAPPORTS QUOTIDIENS 84. The operator shall ensure that a copy of the fol- 84. L’exploitant veille à ce que soit remis à l’Office lowing is submitted to the Board daily: quotidiennement : (a) the daily drilling report; a) le rapport journalier de forage; (b) the daily geological report, including any forma- b) le rapport géologique quotidien, y compris les dia- tion evaluation logs and data; and graphies et les données relatives à l’évaluation de la (c) in the case of a production installation, a summa- formation; ry, in the form of a daily production report, of the 39 SOR/2009-316 — June 12, 2014 records referred to in paragraph 78(d) and the daily c) dans le cas d’une installation de production, un ré- production record. sumé des registres visés à l’alinéa 78d) et du registre quotidien relatif à la production, sous forme d’un rap- port de la production quotidienne. MONTHLY PRODUCTION REPORT RAPPORT MENSUEL CONCERNANT LA PRODUCTION 85. (1) The operator shall ensure that a report sum- 85. (1) L’exploitant veille à ce que soit présenté à marizing the production data collected during the pre- l’Office, au plus tard le quinzième jour du mois, un rap- ceding month is submitted to the Board not later than the port résumant les données de production du mois précé- 15th day of each month. dent. (2) The report shall use established production ac- (2) Le rapport de la production mensuelle est établi counting procedures. selon des méthodes reconnues de comptabilité de la pro- duction. ANNUAL PRODUCTION REPORT RAPPORT ANNUEL DE PRODUCTION 86. The operator shall ensure that, not later than 86. L’exploitant veille à ce que soit présenté à l’Of- March 31 of each year, an annual production report for a fice, au plus tard le 31 mars de chaque année, un rapport pool, field or zone is submitted to the Board providing annuel de la production ayant trait à un gisement, à un information that demonstrates how the operator manages champ ou à une couche et comprenant des renseigne- and intends to manage the resource without causing ments qui démontrent que l’exploitant gère les res- waste, including: sources sans gaspillage et entend les gérer ainsi à l’ave- (a) for the preceding year, details on the performance, nir, notamment : production forecast, reserve revision, reasons for sig- a) pour l’année précédente, des données sur le rende- nificant deviations in well performance from predic- ment, des prévisions concernant la production, une ré- tions in previous annual production reports, gas con- vision des réserves, une explication de tout écart mar- servation resources, efforts to maximize recovery and qué entre le rendement d’un puits et les prévisions reduce costs and the operating and capital expendi- contenues dans les rapports annuels de production an- tures, including the cost of each well operation; and térieurs, les ressources affectées à la conservation du (b) for the current year and the next two years, esti- gaz, les efforts déployés pour optimiser la récupéra- mates of the operating and capital expenditures, in- tion et réduire les coûts, les dépenses d’exploitation et cluding the cost of each well operation. d’immobilisation, y compris le coût de chacun des tra- vaux relatifs à un puits; b) pour l’année courante et pour les deux prochaines années, une estimation des dépenses d’exploitation et d’immobilisation, y compris le coût de chacun des tra- vaux relatifs à un puits. ENVIRONMENTAL REPORTS RAPPORT SUR LES CONDITIONS ENVIRONNEMENTALES 87. (1) For each production project, the operator 87. (1) Pour chaque projet de production, l’exploitant shall ensure that, not later than March 31 of each year, veille à ce que soit présenté à l’Office, au plus tard le 31 mars de chaque année, un rapport annuel sur les condi- 40 DORS/2009-316 — 12 juin 2014 an annual environmental report relating to the preceding tions environnementales pour l’année précédente et year is submitted to the Board and includes contenant : (a) for each installation, a summary of the general en- a) pour chaque installation, un résumé des conditions vironmental conditions during the year and a descrip- environnementales générales de l’année ainsi qu’une tion of ice management activities; and description des activités de gestion des glaces; (b) a summary of environmental protection matters b) un résumé des situations afférentes à la protection during the year, including a summary of any incidents de l’environnement survenues au cours de l’année, y that may have an environmental impact, discharges compris des données sommaires sur les incidents pou- that occurred and waste material that was produced, a vant avoir des effets environnementaux, les rejets sur- discussion of efforts undertaken to reduce pollution venus et les déchets produits, un exposé des efforts ac- and waste material and a description of environmental complis pour réduire la pollution et les déchets et une contingency plan exercises. description des exercices de simulation du plan d’ur- gence environnementale. (2) For each drilling installation for an exploration or (2) Pour chaque installation de forage d’un puits delineation well, the operator shall ensure that an envi- d’exploration ou de délimitation, l’exploitant veille à ce ronmental report relating to each well is submitted to the que soit présenté à l’Office pour chaque puits, dans les Board within 90 days after the rig release date and in- quatre-vingt-dix jours suivant la date de libération de cludes l’appareil de forage, un rapport sur les conditions envi- (a) a description of the general environmental condi- ronnementales qui contient ce qui suit : tions during the drilling program and a description of a) une description des conditions environnementales ice management activities and downtime caused by générales dans lesquelles le programme de forage a weather or ice; and été exécuté, ainsi qu’une description des activités de (b) a summary of environmental protection matters gestion des glaces et un relevé des périodes d’arrêt im- during the drilling program, including a summary of putables aux conditions atmosphériques ou aux spills, discharges occurred and waste material pro- glaces; duced, a discussion of efforts undertaken to reduce b) un résumé des situations afférentes à la protection them, and a description of environmental contingency de l’environnement survenues durant l’exécution du plan exercises. programme de forage, y compris des données som- maires sur les déversements et les rejets survenus et sur les déchets produits, un exposé des efforts accom- plis pour réduire ceux-ci, et une description des exer- cices de simulation du plan d’urgence environnemen- tale. ANNUAL SAFETY REPORT RAPPORT ANNUEL SUR LA SÉCURITÉ 88. The operator shall ensure that, not later than 88. L’exploitant veille à ce que soit présenté à l’Of- March 31 of each year, an annual safety report relating fice, au plus tard le 31 mars de chaque année, un rapport to the preceding year is submitted to the Board and in- annuel sur la sécurité portant sur l’année précédente et cludes contenant ce qui suit : 41 SOR/2009-316 — June 12, 2014 (a) a summary of lost or restricted workday injuries, a) un résumé des blessures entraînant une perte de minor injuries and safety-related incidents and near- temps de travail, des blessures sans gravité et des inci- misses that have occurred during the preceding year; dents et quasi-incidents en matière de sécurité surve- and nus au cours de l’année; (b) a discussion of efforts undertaken to improve b) un exposé des mesures prises pour renforcer la sé- safety. curité. WELL HISTORY REPORT RAPPORT FINAL DU PUITS 89. (1) The operator shall ensure that a well history 89. (1) L’exploitant veille à ce qu’un rapport final report is prepared for every well drilled by the operator soit établi pour chacun des puits qu’il a forés aux termes under the well approval and that the report is submitted de l’approbation relative au puits et à ce que le rapport to the Board. soit remis à l’Office. (2) The well history report shall contain a record of (2) Le rapport final doit contenir tous les renseigne- all operational, engineering, petrophysical and geologi- ments opérationnels, techniques, pétrophysiques et géo- cal information that is relevant to the drilling and evalua- logiques concernant le forage et l’évaluation du puits. tion of the well. WELL OPERATIONS REPORT RAPPORT D’EXPLOITATION DU PUITS 90. (1) The operator shall ensure that a report includ- 90. (1) L’exploitant veille à ce que soit remis à l’Of- ing the following information is submitted to the Board fice, dans les trente jours suivant la fin des travaux rela- within 30 days after the end of a well operation: tifs à un puits, un rapport qui contient : (a) a summary of the well operation, including any a) un résumé des travaux, y compris les problèmes problems encountered during the well operation; survenus au cours de ceux-ci; (b) a description of the completion fluid properties; b) une description des propriétés des fluides de com- (c) a schematic of, and relevant engineering data on, plétion; the down-hole equipment, tubulars, Christmas tree c) un schéma et les détails techniques des équipe- and production control system; ments de fond, des tubulaires, de la tête d’éruption et (d) details of any impact of the well operation on the du système de contrôle de la production; performance of the well, including any effect on re- d) les détails de toute incidence que l’exploitation du covery; and puits pourrait avoir sur son rendement, y compris sur (e) for any well completion, suspension or abandon- la récupération; ment, the rig release date. e) la date de libération de l’appareil de forage en ce qui concerne la complétion, la suspension de l’exploi- tation ou l’abandon d’un puits. (2) The report shall be signed and dated by the opera- (2) Le rapport est daté et signé par l’exploitant ou son tor or the operator’s representative. représentant. 42 DORS/2009-316 — 12 juin 2014 OTHER REPORTS AUTRES RAPPORTS 91. The operator shall ensure that the Board is made 91. L’exploitant veille à ce que l’Office soit prévenu, aware, at least once a year, of any report containing rele- au moins une fois l’an, de tout rapport renfermant de vant information regarding applied research work or l’information utile sur des études ou des travaux de re- studies obtained or compiled by the operator relating to cherche appliquée qu’il a obtenus ou compilés concer- the operator’s work or activities and that a copy of it is nant ses activités et veille à ce qu’il lui en soit remis co- submitted to the Board on request. pie, sur demande. PART 12 PARTIE 12 CONSEQUENTIAL AMENDMENTS, MODIFICATIONS CORRÉLATIVES, TRANSITIONAL PROVISION, REPEALS AND ABROGATIONS ET ENTRÉE EN VIGUEUR COMING INTO FORCE CONSEQUENTIAL AMENDMENTS MODIFICATIONS CORRÉLATIVES Newfoundland Offshore Certificate of Fitness Règlement sur les certificats de conformité liés à Regulations l’exploitation des hydrocarbures dans la zone extracôtière de Terre-Neuve 92. [Amendments] 92. [Modifications] 93. [Amendment] 93. [Modification] 94. [Amendments] 94. [Modifications] 95. [Amendment] 95. [Modification] 96. [Amendment] 96. [Modification] 97. [Amendments] 97. [Modifications] 98. [Amendment] 98. [Modification] Newfoundland Offshore Petroleum Installations Règlement sur les installations pour hydrocarbures de Regulations la zone extracôtière de Terre-Neuve 99. [Amendments] 99. [Modifications] 100. [Amendment] 100. [Modification] 101. [Amendment] 101. [Modification] 102. [Amendments] 102. [Modifications] TRANSITIONAL PROVISION DISPOSITION TRANSITOIRE 103. An operator at the time of the coming into 103. L’exploitant est tenu de se conformer aux exi- force of these Regulations shall comply with the re- gences de l’article 5 à la date d’entrée en vigueur du quirements of section 5. présent règlement. 43 SOR/2009-316 — June 12, 2014 REPEALS ABROGATIONS 104. [Repeal] 104. [Abrogation] 105. [Repeal] 105. [Abrogation] COMING INTO FORCE ENTRÉE EN VIGUEUR 106. These Regulations come into force on Decem- 106. Le présent règlement entre en vigueur le 31 ber 31, 2009. décembre 2009. 44 DORS/2009-316 — 12 juin 2014 SCHEDULE ANNEXE [Amendment] [Modification] 45

Newfoundland Offshore Petroleum Drilling and Production Regulations (SOR/2009-316) · Nelum