Skip to content
Nelum
Laws of Bangladesh

Time Series Data Quality Control Guideline for Hydro-meteorological Data

Made 2015-07 · Text as of 2026-10-01

Public law and official guidance, published as research. Not legal, tax or financial advice.

About this law

Language
English
Kind
Other
Country
Bangladesh
Subjects
Environment, Water
Keywords
data collection/reporting, meteorology, integrated management, good practices, groundwater, surface water, standards, monitoring, governance

Where to read it

Text

The law's own text, section by section, as held. Each section has its own link.

  1. Government of the People’s Republic of Bangladesh Ministry of Water Resources Time Series Data Quality Control Guideline (For Hydro-meteorological data) July 2015 Water Resources Planning Organization i Preface Hydro-meteorological information is very essential for land and water resources planning, development and management in Bangladesh. National Water Resources Database (NWRD) of Water Resources Planning Organization contains valuable and huge amount of time series data that was collected from the Bangladesh Water Development Board, Bangladesh Meteorological Department, Bangladesh Inland Water Transport Authority and other relevant agencies. Surface water level, discharge and cross-section are the main hydrological data available in Bangladesh and similarly meteorological data available are rainfall, temperature, humidity, sunshine, wind speed, ground water level etc. Quality of data is very crucial which refers to the relative accuracy and precision of a particular application of those data in different study or projects. Over the years, quality assurance for the time series hydro-meteorological data has become increasingly important. In Bangladesh, there are not yet any standard guidelines for processing and quality checking of hydro-meteorological data. Quality guidelines for hydrological data are important particularly for the NWRD, where different type of data from different sources are accumulated and for providing water resources planning and management in Bangladesh. As WARPO is mandated organization, who prepared the Time Series Quality Control Guideline on Hydro-meteorological data to maintain and update National Water Resources Database. The main purpose of this guideline is to setup a national standard for quality assurance of NWRD and the important steps to be followed data quality checking, detecting inconsistencies and recommend necessary steps for data processing and for comparing with international standard. Although, the guideline focuses on data collection method, procedure, quality assurance & framework, processing factors, etc. responsible for overall data status in Bangladesh, however it also help to analyze the time series, basic statistical anaysis, data validation and exercise of data processing steps. WARPO has taken necessary steps to review this guideline by the national agencies, universities and research institutes who would be the user of the guideline to ensure their own data quality. Most of comments and suggestions received from the reviewers were incorporated into the document. Some comments that cannot be incorporated into the current version will be incorporated in future update. This Guideline is a state of procedures or practices that would be useful to the different users. WARPO will be grateful and happy if the guideline will be used to planner, researcher other stakeholder with feedback for further improvement of the document. ii iii List of abbreviations ADCP Acoustic Doppler Current Profiler ANN Artificial Neural Network ARFF Attribute-Relation File Format ASCII American Standard Code for Information Interchange AWLR Auto Water Level Recorder BADC Bangladesh Agricultural Development Corporation BIWTA Bangladesh Inland Water Transport Authority BMD Bangladesh Meteorological Department BMDA Barind Multipurpose Development Authority BTMA Bed load Transportmeter Arnhem BUET Bangladesh University of Engineering Technology BWDB Bangladesh Water Development Board CDF Cumulative Distribution Function DCA Data Collecting Agencies DGPS Digital Global Positioning System DoE Department of Environment DoF Department of Forest DPHE Department of Public Health Engineering DTW Deep Tubewell EGIS Environmental and Geographic Information System EMF Electromagnetic Fields EV Extreme Value GIS Geographic Information System GWC Ground Water Circle EPA Environment Protection Agency FAO Food and Agriculture Organization FAP Flood Action Plan FFWC Flood Forecasting and Warning Center GEV generalized extreme value GMT Greenwich Mean Time HMV Hymos Manual Version H-S Helley-Smith ISO International Standard Organisation IWM Institute of Water Modelling LGED Local Government Engineering Department NEMIP North East Minor Irrigation Project NWRD National Water Resources Database NWMP National Water Management Plan PC Personal Computer PDB Point Data Bank PDF Probability Density Function POT Peaks over threshold PWD Public Works Department PWM Probability Weighted Moments QC Quality Check RL Reduced Level RMSE Root Mean Square Error SPARRSO Space Research and Remote Sensing Organization WARPO Water Resources Planning Organization WMO World Meteorological Organization iv Table of Contents Preface .................................................................................................................................................................... i List of abbreviations ............................................................................................................................................ iii Table of Contents ................................................................................................................................................. iv List of Tables ....................................................................................................................................................... vii List of figures ..................................................................................................................................................... viii Chapter 1 Introduction ....................................................................................................................................... 1 1.1 Background ................................................................................................................................ 1 1.2 Regulatory background .............................................................................................................. 1 1.3 Rationale for the guideline ......................................................................................................... 1 1.4 Objectives .................................................................................................................................. 2 1.5 Scope of the guideline ................................................................................................................ 2 Chapter 2 Data and Quality................................................................................................................................. 3 2.1 Introduction ................................................................................................................................ 3 2.2 Data types .................................................................................................................................. 3 2.3 Data collection scenarios ........................................................................................................... 4 2.3.1 Data collecting agencies in Bangladesh ........................................................................... 4 2.3.2 International standard for observations ........................................................................... 5 2.3.3 International standards in accuracy ................................................................................. 5 2.4 Data collection procedures ......................................................................................................... 6 2.4.1 Water level data ................................................................................................................ 6 2.4.2 Discharge data .................................................................................................................. 7 2.4.3 Groundwater ..................................................................................................................... 8 2.4.4 Sediment data .................................................................................................................... 9 2.4.5 Rainfall ............................................................................................................................ 10 2.4.6 Evaporation ..................................................................................................................... 11 2.5 Quality assurance ..................................................................................................................... 12 2.5.1 Elements of data quality .................................................................................................. 13 2.5.2 Guidance on quality control procedures ......................................................................... 13 2.5.3 Definition of quality levels .............................................................................................. 13 2.6 Present data quality scenario of Bangladesh ............................................................................ 13 2.6.1 Findings of NWRD .......................................................................................................... 14 2.7 Quality framework ................................................................................................................... 17 2.8 Recommendations for data collection ...................................................................................... 19 2.8.1 Water level ...................................................................................................................... 19 2.8.2 Discharge data ................................................................................................................ 19 2.8.3 Groundwater ................................................................................................................... 20 2.8.4 Sediment .......................................................................................................................... 20 2.9 Data entry & editing................................................................................................................. 21 2.9.1 Station /Series definition ................................................................................................. 21 2.9.2 Initial quality check ......................................................................................................... 23 2.10 Quality at different levels ......................................................................................................... 23 Chapter 3 Data Processing ................................................................................................................................. 25 3.1 What is data processing ........................................................................................................... 25 3.2 Why processing ........................................................................................................................ 25 3.3 Basic needs of data processing ................................................................................................ 25 3.3.1 International standards for data processing ................................................................... 25 3.4 Present processing procedures ................................................................................................. 26 3.4.1 Processing of BWDB ....................................................................................................... 26 v 3.4.2 Bangladesh Meteorological Department (BMD) ............................................................ 27 3.5 Need for improved processing facilities .................................................................................. 27 3.6 Data processing at the NWRD ................................................................................................. 28 3.6.1 Data processing tools and applications .......................................................................... 28 3.7 Types of Error .......................................................................................................................... 29 3.8 Generalized data processing steps ........................................................................................... 31 3.9 Recommendations .................................................................................................................... 32 3.10 Quality gradation ..................................................................................................................... 32 3.11 Approach/ Techniques of hydrologic processes ...................................................................... 33 3.11.1 Hydrologic process ......................................................................................................... 33 3.11.2 Deterministic processes................................................................................................... 33 3.11.3 Stochastic processes ........................................................................................................ 33 Chapter 4 Time Series Analysis ......................................................................................................................... 35 4.1 Concept .................................................................................................................................... 35 4.2 Analysis of time series ............................................................................................................. 35 4.2.1 Correlation analysis ........................................................................................................ 35 4.2.2 Spectral analysis ............................................................................................................. 36 4.2.3 Range analysis ................................................................................................................ 36 4.2.4 Run analysis .................................................................................................................... 37 4.2.5 Storage analysis .............................................................................................................. 37 4.3 Interpolation ............................................................................................................................. 37 4.3.1 Linear interpolation ........................................................................................................ 38 4.3.2 Block-type filling-in ......................................................................................................... 38 4.3.3 Series relation ................................................................................................................. 38 4.3.4 Spatial Interpolation ....................................................................................................... 38 Chapter 5 Basic Statistics ................................................................................................................................... 39 5.1 General ..................................................................................................................................... 39 5.2 Objectives of statistics ............................................................................................................. 39 5.4 Some basic statistics ................................................................................................................ 40 5.4.1 Product Moment .................................................................................................................... 40 5.4.2 Probability Weighted Moment ............................................................................................... 41 5.4.3 L-Moment .............................................................................................................................. 41 5.4.4 Commonly used Distributions ............................................................................................... 42 5.5 Types of statistical test ............................................................................................................. 43 5.5.1 Parametric statistics ........................................................................................................ 43 5.5.2 Non-parametric test ........................................................................................................ 43 5.5.3 Recommends for choosing a statistical test ..................................................................... 43 5.5.4 Null hypothesis test ......................................................................................................... 44 5.6 Statistical features: ................................................................................................................... 44 Chapter 6 Data Validation ................................................................................................................................. 45 6.1 General ..................................................................................................................................... 45 6.2 Test of trend ............................................................................................................................. 45 6.2.1 Turning point test ............................................................................................................ 45 6.2.2 t-Test for detecting linear trend ...................................................................................... 46 6.2.3 Mann-Kendall Test .......................................................................................................... 46 6.3 Double mass analysis ............................................................................................................... 47 6.4 Mass curve ............................................................................................................................... 49 6.5 Residual mass curve ................................................................................................................. 49 6.6 Removing Trend ...................................................................................................................... 49 6.7 Moving averages ...................................................................................................................... 50 6.8 Least square method ................................................................................................................ 52 6.9 Normal distribution function .................................................................................................... 52 vi 6.9.1 Decision of normality test ............................................................................................... 53 6.10 Pearson’s Correlation test (Parametric) ................................................................................... 54 6.11 Spearman’s rank correlation test (non-parametric) .................................................................. 55 6.12 Median run test ........................................................................................................................ 56 6.13 Difference sign test .................................................................................................................. 56 6.14 Series homogeneity test ........................................................................................................... 57 6.15 Spatial homogeneity test .......................................................................................................... 58 Chapter 7 Data Compilation .............................................................................................................................. 59 7.1 General ..................................................................................................................................... 59 7.2 Minimum, mean and maximum series ..................................................................................... 59 7.3 Fitting distributions .................................................................................................................. 59 7.3.1 Log-normal distribution function .................................................................................... 60 7.3.2 Standard incomplete gamma function ............................................................................. 60 7.3.3 Pearson’s type III or gamma distribution function ......................................................... 61 7.3.4 Raleigh distribution function ........................................................................................... 61 7.3.5 Exponential distribution function .................................................................................... 61 7.3.6 General Pearson distribution function ............................................................................ 61 7.3.7 Log Pearson type III distribution function ...................................................................... 62 7.3.8 Extreme type I or Gumbel distribution ............................................................................ 62 7.3.9 Extreme type II or Frechet distribution ........................................................................... 62 7.3.10 Extreme type III distribution ........................................................................................... 63 7.3.11 Goodrich/Weibull distribution ........................................................................................ 63 7.3.12 Pareto distribution .......................................................................................................... 63 7.3.13 Peaks over threshold (POT ) method .............................................................................. 64 7.4 Selection of Probability Distribution for Frequency Analysis ................................................... 64 7.4.1 Methodology for selection of probability distribution ........................................................... 64 7.5 Test for stability of variance and mean .................................................................................... 67 7.5.1 T-test ................................................................................................................................ 67 7.5.2 Wilcoxon-Mann-Whitney U-test ...................................................................................... 68 7.5.3 F-test ............................................................................................................................... 69 7.6 Goodness to fit test................................................................................................................... 70 7.6.1 Chi-square test ................................................................................................................ 70 7.6.2 Kolmogorv - Smirnov test ................................................................................................ 71 7.7 Test for relative consistency and homogeneity ........................................................................ 72 Chapter 8 Data Infilling ..................................................................................................................................... 75 8.1 Necessity of data infilling ........................................................................................................ 75 8.2 Methods used in filling data ..................................................................................................... 75 8.2.1 Preliminary infilling ........................................................................................................ 75 8.2.2 Secondary infilling .......................................................................................................... 77 8.3 Filling of missing rainfall data ................................................................................................. 78 8.3.1 General method ............................................................................................................... 78 8.3.2 Proposed method ............................................................................................................. 78 8.4 Methods of handling in missing data ....................................................................................... 79 Chapter 9 Processing of Hydrological Data ..................................................................................................... 81 9.1 Concepts ................................................................................................................................... 81 9.2 Steps for data processing ......................................................................................................... 81 9.2.1 Validation ........................................................................................................................ 81 9.2.2 Data screening ................................................................................................................ 83 9.2.3 Data verification ............................................................................................................. 83 9.2.4 Filling missing value ....................................................................................................... 84 9.2.5 Data compilation ............................................................................................................. 84 9.3 Discharge data generation ........................................................................................................ 85 vii 9.4 Procedure of statistical analysis ............................................................................................... 87 Bibliography ........................................................................................................................................................ 89 Appendix A Examples of steps for data processing ......................................................................................... 91 Checklist for quality monitoring of time series data ........................................................................ 93 Exercise A1: Rainfall data ............................................................................................................... 93 Exercise A2: Discharge data .......................................................................................................... 116 Exercise A3: Water Level Data ..................................................................................................... 131 Appendix B Tables............................................................................................................................................ 146 Appendix C Data Quality Report .................................................................................................................... 152 C.1 Product Specification ............................................................................................................. 154 C.2 Data Quality Specification ..................................................................................................... 154 C.3 Quality management in production ....................................................................................... 154 List of Tables Table 2.1: Sources of hydrometric/hydro-meteorological information in Bangladesh ........................... 4 Table 2.2: Relevant international standards for plains ............................................................................ 5 Table 2.3: International standards in accuracy (WMO) .......................................................................... 6 Table 2.4: Types of gauges ..................................................................................................................... 6 Table 2.5: Available groundwater level data .......................................................................................... 9 Table 2.6: Methods of different samplings ........................................................................................... 10 Table 2.7: Quality framework ............................................................................................................... 17 Table 9.2: Data validation code ............................................................................................................ 84 Table A1.1: Average rainfall depth (mm) at 13 stations - Base Stations .............................................. 94 Table A1.2: Rainfall depth (mm) at Atghoria station – Test station ..................................................... 94 Table A1.3: Rainfall at Pabna (Station ID-25) ..................................................................................... 96 Table A1.4: Rainfall at Ishwardi (Station ID-15) ................................................................................. 97 Table A1.5: Rainfall at Chatmohar (Station ID-7) ............................................................................... 98 Table A1.6: Turning-point test of station Atghoria .............................................................................. 99 Table A1.7: Cumulative average of test and base station ................................................................... 100 Table A1.8: Spearman's rank correlation test ..................................................................................... 103 Table A1.9: Pearson's correlation test ................................................................................................. 104 Table A1.10: Correlation with Pabna Station ..................................................................................... 105 Table A1.11: Correlation with Ishwardi station.................................................................................. 106 Table A1.12: Correlation with Chatmohor station.............................................................................. 107 Table A1.13: Correlation between Tested station and Base stations .................................................. 107 Table A1.14: Estimation of missing value .......................................................................................... 108 Table A1.15: Determination of probability plot correlation coefficient ............................................. 109 Table A1.16: Determination of Mann-Kendall Statistics ................................................................... 112 Table A1.17: Goodness of fit test ....................................................................................................... 114 Table A2.1: Monthly average discharge data of Baruria Transit ........................................................ 116 Table A2.2: Monthly average data of Hardinge Bridge ...................................................................... 117 Table A2.3: Turning point determination at Baruria Transit within the data range years ................. 118 Table A2.4: Cumulative average of test and base station ................................................................... 119 Table A2.5: Determination of correlation ........................................................................................... 119 Table A2.6: Infilling of missing data with the help of neighboring station ........................................ 121 viii Table A2.7: Normality test ................................................................................................................. 122 Table A2.8: Calculation of Mann-Kendall Statistics .......................................................................... 125 Table A2.9: Smoothened value of Tested station ............................................................................... 127 Table A2.10: Average discharge data with and without trend ............................................................ 128 Table A2.11: Goodness of fit test ....................................................................................................... 129 Table A3.1: Monthly average water level data at Baruria Transit ...................................................... 131 Table A3.2: Average water level data of Goalunda Transit................................................................ 132 Table A3.3: Average water level data of Talbaria .............................................................................. 133 Table A3.4: Average water level data of Mohendrapur ...................................................................... 133 Table A3.5: Average water level data of Hardinge Bridge ................................................................. 134 Table A3.6: Average water level data of Sengram ............................................................................. 134 Table A3.7: Average water level data of Sardah ................................................................................ 135 Table A3.8: Average water level data of Rampur Boalia ................................................................... 135 Table A3.9: Determination of turning points ...................................................................................... 136 Table A3.10: Average and cumulative average of test station and neighboring station ..................... 137 Table A3.11: Correlation with Goalunda Transit ............................................................................... 138 Table A3.12: List of missing data ....................................................................................................... 139 Table A3.13: Estimating missing data (Baruria) ................................................................................ 140 Table A3.14: Estimating missing data (Neighboring) ........................................................................ 140 Table A3.15: Estimating probability plot correlation coefficient ....................................................... 141 Table A3.16: Average record before and after infilling ...................................................................... 142 Table A3.17: Mann-Kendall Statistics ................................................................................................ 143 Table B1.1: Critical r* values for the probability plot correlation coefficient test of normality (Helsel and Hirch, 2002) .......................................................................................................... 148 Table B1.2: Areas under the Standard Normal Density from 0 to z (Haan, 1979) ............................. 150 List of figures Figure 2.1: Water level data at Goalanda Transit, (a)Data with a lot of undershoots breaking the trend (b) A smooth hydrograph after removal of undershoots ................................................ 15 Figure 2.2: Water level data at Bijoypur showing change in trend ....................................................... 16 Figure 6.1 Removing trends in the series .............................................................................................. 50 Figure 9.1 Rating Curve: Arithmetic Plot ........................................................................................... 86 Figure A1.1: Neighbor stations of Atghoria ........................................................................................ 96 Figure A1.2: Double mass plot ........................................................................................................... 101 Figure A1.3: Comparison of mass curve of cumulative average rainfall depth at station– 1 and the 13 stations vs. time. ........................................................................................................... 101 Figure A1.4: Comparison of rainfall depth between rainfall station-1 and station-7 ......................... 102 Figure A2. 1: Double mass plot .......................................................................................................... 119 Figure A2.2 Linear trend in annual average discharge data ............................................................... 128 1 Chapter 1 Introduction 1.1 Background Hydrological data are an important component for the planning process as the country’s land and water resource systems need continuous planning and management. Hydrological data are not only prerequisite for planning, development and management of water resources and the environment, they are also necessary for the scientific study of hydrological processes. With availability of sophisticated methods for data analysis and multi-dimensional problems such as floods of long durations, droughts, drainage congestion, low flow in rivers, and siltation in river beds, emphasis is now being placed on comprehensive and quality data. Data quality refers to the relative accuracy and precision of a particular database. Assessment refers to standardisation and suitability for presentation. The quality of hydrological data depends a lot on field and office practices. These practices encompass the core activities of data collection namely the instrumentation system, data observation program, the central collection for annotation and pre-processing of raw data – inevitably a sound and robust database system for processing, retrieval and dissemination of data to users. Quality guidelines for hydrological data are important particularly for the NWRD, where different data sources are accumulated, and for supporting national water resources planning as well. 1.2 Regulatory background The hydro-meteorological data quality control guideline states procedures or practices that may be useful to the users to whom they are directed, but are not legal requirements. The guideline represents the organisation's position on a procedure or practice at the time of their issuance. A planner may follow the guideline or may choose to follow alternative procedures. If a planner chooses to use alternate procedures, that person may wish to discuss the matter further with the organization. The guideline does not bind any organization and nor does it create or confer any rights, privileges, immunities, or benefits for or on any person. Where the guideline states a requirement imposed by the National Water Resources Database (NWRD), its force and effect are not changed in any way by users. 1.3 Rationale for the guideline In Bangladesh, there were no standard guidelines for processing and quality checking of hydrometric and hydro-meteorological data. This data quality control guideline will fill up this gap have a pivotal role in this field. During the development of the NWRD, a huge amount of time series data was collected from the Bangladesh Water Development Board (BWDB), the Bangladesh Meteorological Department (BMD) and other organizations. The NWRD is a database to ensure the qualitative and quality line used for national water resources planning and management. It is a unique databank at the national level, which provides good quality data. The following features are within the scope of the guideline:  To document the present data quality and options for quality data collection in the future.  To describe data collection procedures followed in different organisations in Bangladesh.  To provide some quality checking options for different data and for comparing with international standards.  To define the data quality level and the best way of detecting inconsistencies. Chapter1: Introduction 2  To analyze and interpret hydrological data series with the goal of providing reliable bases for water management and environmental protection.  To recommend necessary steps for data processing in Bangladesh. While carrying out the above activities, the NWRD needs to establish guidelines for processing and quality assessment of time series data. 1.4 Objectives The guideline will help users as well as researchers in checking quality and assessing data. The short term objectives of the guideline are:  checking data quality and scope of different organisations in Bangladesh  providing necessary data and information for planners  developing a framework for the best way of data quality checking  defining the best statistics for quality checking  comparing existing data quality with the international standards  suggesting methods of filling and handling missing values The long term objectives of the guideline are:  to provide support to micro and macro level planning  to establish the best possible accuracy of hydrological data in Bangladesh  to disseminate the guidelines at different organisations for maintaining their activities at quality level  to introduce a methodology for accuracy maintenance 1.5 Scope of the guideline The guideline will help to control and assess quality more after data collection than at field level. This report discusses the different methods and instruments but does not give details on how to use the instruments. The user can get information about the method of data collection and data quality assessment from the guideline. The processing steps, which are supposed to be followed for checking the quality of data, have been incorporated in the guideline. The present data quality standards are shown through comparison with the international standards. Different types of data are included in the statistical part to enable users to find out the best possible alternatives for checking data quality. 3 Chapter 2 Data and Quality 2.1 Introduction The method used to collect data from the field influences the quality of the data. Different types of data are collected by different methods. The human factor is an important consideration for any field measurement. Properly collected data gives absolute measures of the quality of data. Different types of errors such as random, systematic or non-homogenous errors may be introduced in the observation/sensing, transmitting or recording during measurements. Although it is very difficult to maintain certain standards of reliability and accuracy of time series data, the collection and processing of data are crucial particularly for national databases. The following is a discussion of these difficulties. 2.2 Data types Hydrological data, which have been classified in hydrometric and hydrometeorological data, have been dealt with in this guideline. In Bangladesh, the main sources of hydrological data are the BWDB, the BMD and the Bangladesh Inland Water Transport Authority (BIWTA). Some project oriented hydrological time series data are also available. More specifically, these two categories of data are known as collection units:  Hydrometric data  Water level  Discharge  Groundwater, and  Sediment.  Hydrometeorological data  Rainfall and  Evaporation (temperature, humidity, wind speed and sunshine). Upon state, data can be classified as the following types:  Time–oriented data  Equidistant time series (same duration in collection) and  Non-equidistant time series. Non-equidistant time series can be transformed into equidistant time series. Generally, the non equidistant series may not fill all equidistant time steps.  Relation-oriented data  Stage-discharge  Rating curve parameters  Relation curve parameters, and  Relation between data series  Space-oriented data  Catchment characteristics  Local origin in geographical coordinates Chapter 2: Data and Quality 4  Sub-catchment characteristics–area, boundaries, river slope and length, etc.  Plot- graphical display of catchment boundaries  Station data: characteristics, log-book and histories  Series characteristics, and  Geo-hydrological profiles 2.3 Data collection scenarios 2.3.1 Data collecting agencies in Bangladesh At this level an overview can be given on the overall scenario of the data collection in Bangladesh. In hydrological data collection, any missing observation will be lost forever and can seriously effect development costs of a particular water resources project in the future. As hydrological data series are subject to variation in time and space, they should be observed and measured in accordance with the standard practices and guidelines. In Bangladesh, the key organizations collecting data on hydrology as time series are as follows: Table 2.1: Sources of hydrometric/hydro-meteorological information in Bangladesh Types of information Operating agency Purpose Data collection frequency Unit Surface Water level BWDB (Both Tidal and Non tidal) Planning, monitoring and designing As per available document, BWDB collects five data a day and disseminates daily data Meter (mPWD) BIWTA (Tidal) For navigational and other related infrastructure development BIWTA collects hourly data Meter (mPWD, Chart Datum) Discharge BWDB (Both Tidal and Non tidal) Planning and monitoring BWDB generally collects data at intervals of one week during the monsoon season (May-November) and fortnightly during the rest of the year. BWDB disseminates daily data from rating curves. Cubic meter per second (m3/sec) Groundwater BWDB (Level and Quality) Planning monitoring and designing forecasting purpose, research, academic, and monitoring & commercial application Weekly continuous Meter and mPWD DPHE (Level and Quality) Annually and weekly Meter and mPWD BADC (Level and Quality) Fortnightly to monthly 2*annually continuous Meter BMDA (Level) Fortnightly Chapter 2: Data and Quality 5 Types of information Operating agency Purpose Data collection frequency Unit Sediment BWDB Planning and monitoring Weekly ppm Rainfall BWDB Planning and monitoring Daily mm/day BMD Forecasting purpose, research, academic, monitoring & commercial application 3 hourly mm/3hr Evaporation BWDB Planning and monitoring Daily mm BMD Forecasting purpose, research, academic, monitoring & commercial application Daily mm Source: BWDB, BMD BIWTA and others 2.3.2 International standard for observations For certain types of data, standards have been established by international agencies. These provide point of reference against which the density and frequency of observations can be measured. A comparison is given in Table 2.2 between some of the standards used by the World Meteorological Organization (WMO, 1974) and the corresponding level of observations in Bangladesh, which is a generally low lying plain where aerographic effects are limited. Table 2.2: Relevant international standards for plains Data type Agency Standard of observation Minm Area/Station (km2)* Available observations Area/Station (km2) Water level BWDB - 294 Discharge BWDB 1,750 905 Groundwater level BWDB - 110 Sediment BWDB - 3,700 Rainfall BWDB/BMD 575 450 Evaporation BWDB/BMD 50,000 2,900 *Source: WMO, BWDB and BMD Most of the existing network fulfills the WMO criteria for a standard network. The BWDB, the BMD and the BIWTA all hold valuable long time-series data, but few sets exceed 40 years. 2.3.3 International standards in accuracy The measurement accuracy of some of the hydrological parameters is described in Table 2.3: Chapter 2: Data and Quality 6 Table 2.3: International standards in accuracy (WMO) Data type Specification River discharge and suspended sediment 5% Water level 10 mm Rainfall 0.5 mm Evaporation 0.1 mm Source: WMO 2.4 Data collection procedures 2.4.1 Water level data Different types of gauges Most of the water level gauging stations are equipped with a gauge and a recorder. In many cases the water level is measured in a stilling well, thereby eliminating strong oscillations. The following table gives an overview of the gauges, which are most commonly used in Bangladesh, indicating also the necessity of a stilling well along with the way of reading. Table 2.4: Types of gauges Type of gauge Stilling well recommended Way of reading Intermittently directly manual Continuously recorder-equipped Staff gauge -- Yes Float operated gauge Indispensable Possible Yes Wire-weight gauge Preferable Yes Possible Pneumatic gauge -- -- Yes Flood crest gauges -- Yes Source: BWDB Station installation requirements Installation of a water level measurement station consists of the following:  The installation of the water level measurement system (water level sensor(s), Data Collection Platform (DCP), satellite transmitter) and its supporting structure and staff.  The recovery and/or installation of a minimum number of benchmarks and a level connection between the benchmarks and water level sensor(s), or tide staff as appropriate.  The preparation of all documentation and forms. Chapter 2: Data and Quality 7 Additional field requirements (a) Generally upon completion of the data acquisition for each gauge installed, the data must be sent all together within a minimum of 30-day unless the data are transmitted via satellite or other quick means. (b) All water level data from an auto gauge should be downloaded and backed up at least weekly on diskettes/cds whether the gauge data are sent via satellite or not. (c) For new stations the head office shall be contacted once the location of the gauge has been finalized and the latitude and longitude of the gauge site shall be provided at least three working days prior to actual installation of the gauge in field. The head office will assign a new station number within three available days and inform the hydrographer. (d) The progress sketch shall show the field sheet, layout, area of hydrography, gauge location, and other information as appropriate. The location of the gauge as shown on the progress sketch, benchmark and station location sketch shall also be verified. Automatic recording systems According to the WMO, most of the water level gauges can be adapted for automatic recording except for the staff gauge and the flood crest gauges, which require direct observation. Apart from the pneumatic gauges, recording gauges are usually placed in stilling wells, which dampen fluctuations caused by waves and turbulence. Normally a non-recording gauge is installed next to a recording gauge to enable comparison of direct readings and the recorded stages. For recording purposes both analogue and digital systems can be used. The analogue system can be made to operate unattended for periods from 2 weeks to 3 months. The analogue system provides a graphical record proportional to the actual rise or fall of the water level with respect to time. The recording is made on recorder paper fixed to a rotation drum, which is moved by a clock. The rate of rotation determines the time base of the hydrograph. The digital stage-recorder punches code values of stage on paper tape at pre-selected time intervals, for instance every 15 minutes. The punching of a stage requires only a few millimetres of tape; this is wound up by a clock. The two methods of recording are about equal in accuracy, reliability and cost. The advantage of the digital system is that it is more compatible with the use of electronic computers. Data collection procedure adopted by the BWDB: Surface Water Hydrology (SWH-I) of the BWDB operates in about 100 water level stations in the main rivers and 389 water level stations in other rivers. Water levels are normally measured with wooden staff-gauges five times in a day at 6:00, 9:00, 12:00, 15:00 and 18:00 hours at these stations. Since the seasonal water-level variations exceed by far the reach of a staff gauge, its reach is regularly adjusted by fixing a new gauge close to the previous one. During high flow, the gauge may be shifted to another location. Sometimes it may be shifted up to one kilometer upstream or downstream and datum from a nearby benchmark is carried out. Water-level corrections are carried out at the field offices before the data are transferred to SWH-II for further processing. The water levels received from the field are adjusted for the vertical shifts according to the check leveling. 2.4.2 Discharge data Measurement procedure Discharge at a given stage is computed from measurements of velocity and depth at a cross section near the recorder. Velocity is measured at locations or verticals spaced across the cross section using a current meter. The spacing between velocity measurements should be such that not more than 10 percent of total flow is represented by any one vertical. The current meter is suspended on a cable controlled by Chapter 2: Data and Quality 8 a winch or in shallow water and mounted on a measuring rod carried by the gauge. The depth at each vertical is measured using the cable or measuring rod. A current meter contains a rotating element whose speed of rotation is proportional to the water velocity. The vertical-axis that meets with rotating cups (price type meter) is commonly used in the United States. Horizontal-axis rotating screw (or propeller) meters are less prone to pollution by weed. Other methods of measuring include use of floats, a boat equipped with current meter and sonar, a velocity head rod, and ultrasonic equipment. In water depth measurement a synthetic rope is marked in red at every half meter. Similarly, PVC pipes are used for measuring the water depth marked in red at every centimeter. A uniform section is then closed at the downstream for selecting each regulator. The rope is fastened tightly with wooden pegs and placed on the water surface perpendicular to the direction of the flow. In the wider sections of canals, water depth at every meter is measured with PVC pipes. On the other hand, in narrow sections of canals, depths are measured at every half meter. For wider and narrow canals, the current meter readings are taken at 0.8 and 0.2 depths at the center of each segment of the channel width. Where it is found difficult to place the current meter at 0.8D, measurements are only taken at 0.2D. Measurements are also taken at every half meter in narrow and shallow sections of canals. Data collection procedure by the BWDB Discharge is measured at five locations in the main rivers, generally at intervals of one week during the monsoon season (May-November) and fortnightly during the rest of the year. The BWDB uses the velocity-area method for determining discharge. The flow velocities are measured from a survey boat by a non-directional Ott current-meter (propeller type), exposed at 0.2 and 0.8 of depth in the verticals. The measuring time in each point in a vertical is 100 sec. The survey boat is dynamically positioned; i.e. the boat is not anchored. Its location in the transect is determined with a sextant. The suspension cable with the current-meter is used to measure the depth in a vertical. The number of verticals varies according to the actual flow conditions. The rule is that in one vertical no more than 10% of the total flow in a channel is measured. The required number of verticals often becomes very high (at Bahadurabad some 100 verticals) and it takes about two days to complete one measurement of the total discharge. The direction of the flow on the water surface is determined at each measurement point across the river by following the path of a floating bottle. The float positions are measured by sextants. 2.4.3 Groundwater The origin of groundwater is through infiltration, influent streams, and seepage from reservoirs, artificial recharge, condensation, seepage from oceans, water trapped in sedimentary rock, and juvenile water. Groundwater occurs in two zones: o Saturated zones, and o Unsaturated zones Groundwater level monitoring agencies in Bangladesh The water level in any well usually does not remain constant, but changes in response to several factors. Rainfall distribution and the amount may affect groundwater recharge and discharge, and subsequently may affect the water level in area wells. Also, wells that are hydraulically connected to a stream may show fluctuations in the water level as the stream level changes. In some cases, depending upon the hydraulic properties of the geologic formation, the intense pumping of a well, or number of wells, the water level in some nearby wells may be lowered. Groundwater levels are being monitored by the following agencies: o Bangladesh Water Development Board (BWDB) Chapter 2: Data and Quality 9 o Bangladesh Agricultural Development Corporation (BADC) o Department of Public Health Engineering (DPHE) o Barind Multipurpose Development Authority (BMDA) Table 2.5: Available groundwater level data Agency Station type Frequency BWDB Piezometric AWLRs weekly continuous BADC DTWs AWLRs fortnightly to monthly 2*annually continuous DPHE Rural and Urban Annually and weekly BMDA DTWs fortnightly Source: BWDB, DPHE, BADC and BMDA Groundwater level measurement BWDB The BWDB measures groundwater level data every Monday at 9:00 a.m in a week throughout the country. Wells are set to a suitable position and measurements are taken from the measuring point at the top of the parapet level. Tapes or ropes are scaled for carrying out measurements. The height of the measuring point is noted with respect of the Reduced Level (R.L.). Besides 20 automatic groundwater level recorders are used for measuring water level. Standard measurement procedure (U. S. EPA Environmental Response Team) Monitoring of water table depth is carried out using manual measurements, automatic water-level recorders, or pressure transducers. A survey mark should be placed on top of the riser pipe or casing as a reference point for groundwater level measurements. If the lip of the riser pipe is not flat, the reference point may be located on the grout apron or the top of the outer protective casing (if present). The measurement reference point should be documented in the site logbook and on the groundwater level data form, if used. All field personnel must be made aware of the measurement reference point being used in order to ensure the collection of comparable data. Before measurements are made, water levels in piezometers and monitor wells should be allowed to stabilize for a minimum of 24 hours after well construction and development. In low yield situations, recovery of water levels to equilibrium may take longer. All measurements should be made to an accuracy of 3.05 mm. Water level measuring equipment must be decontaminated and, in general, measurements should proceed from the least to the most contaminated wells. The well should be opened and the headspace monitored with appropriate air monitoring instruments to determine the presence of volatile organic compounds. For electrical sounders the device should be lowered into the well until the water surface is reached as indicated by a tone or meter deflection. The distance should be recorded from the water surface to the reference point. Measurement with a chalked tape will necessitate lowering of the tape below the water level and holding a convenient foot marker at the reference point. Both the water levels should be recorded as indicated on the chalked tape section and the depth mark held at the reference point. The depth to water is the difference between the two readings. The measuring device should then be removed, the riser pipe cap replaced, and the equipment decontaminated as necessary. Note that if a separate phase is present, an oil/water indicator probe is required for measuring product thickness and water level. 2.4.4 Sediment data Methods of sediment measurement Chapter 2: Data and Quality 10 In addition to the flow recordings, the routine gauging comprised determination of suspended sediment transport and bed load transport as well as sediment grain-size distributions, vertical distribution of sediment concentration and grain-size/settling velocity distribution. The methods and analyses included in the routine monitoring are listed below: Table 2.6: Methods of different samplings Method Instrument Suspended sediment sampling Pump bottle Integrated bottle Optical turbidity ADCP back-scatter Near-bed sediment sampling Dune tracking with echo-sounder and side-scan sonar Helly-Smith trap sampler Bed material sampling US BM-54, Scoop sampler Van Veen Grab sampler Source: Special Report 12, FAP24 Data collection by BWDB The BWDB measures suspended sediment in a few selected stations in the main rivers. In these rivers suspended sediment is considered to be more important than bed load transport. Bed load transport is not measured regularly due to difficulties in measuring it and its presumed relative low importance. Therefore, the attention is focused on suspended sediment transport measurements. The BWDB has selected the Binckley silt sampler made by Kelvin Hughes as the standard instrument for suspended sediment sampling. After entrapping a quantity of water and suspended sediment the Binckley sampler is raised to the surface, opened and emptied into the elutriator, thus separation of the sand and silt/clay fractions of the samples is achieved. Instantaneous suspended sediment point samples are collected at each alternate vertical assigned for flow velocity measurement. In this system samples are taken at one point at the relative depth of 0.6m if the local water depth is less than 1 meter. On the other hand, samples are taken at two points at the relative depths of 0.2 and 0.8 if the local depth is more. At relatively high flow velocities a special method is developed earlier in order to avoid a large drag angle of the sampler. The sample of river bed is collected with a Kolb Bed Sampler. All the samples are stored in a plastic bag and sent to the River Research Institute (RRI) for analysis. 2.4.5 Rainfall Measuring equipment Recording gauges are of three different types:  weighing type  tilting bucket type, and  float type The weighing type observes precipitation directly when it falls (including snow) by recording the weight of the reservoir e.g. by pen on a chart. With the float type rain is collected in a float chamber and the vertical movement of the float is recorded by pen on a chart. Both types have to be emptied manually Chapter 2: Data and Quality 11 or by automatic means. The tilting or tipping bucket type is a very simple recording rain gauge, but less accurate (only registration when bucket is full, losses during tipping and due to evaporation). Storage gauges for daily rainfall measurement are observed at a fixed time each morning. Recording gauges may be equipped with charts that have to be replaced daily, weekly or monthly, depending on the clockwork. The rainfall is usually recorded cumulatively (mass curve) from which the hyetograph (a plot of the rainfall with time) is easily derived. The tipping bucket uses an electronic counter or magnetic tape to register the counts (each count corresponds to 1 mm, for instance, per 15 minutes time interval). International standards  Manual measurements are taken at a fixed time – 8.00 am daily from 203 mm (8 inch) diameter rain gauge.  Self-recording Hattori type weekly or long-term recorders are used to collect rainfall data.  0.5 mm tipping bucket coupled with locally manufactured data loggers are used to collect rainfall data.  Real time rainfall data for flood forecasting purpose are available from telemetric stations. Methods of measurement in Bangladesh Two principal devices are used by the BWDB for measuring rainfall. These are: (i) Non-recording rain gauge in which total precipitation for the preceding period, usually 24 hours, is determined by direct measurement of water retained in the gauge. (ii) Recording rain gauge, which makes automatic record of rainfall and graphic chart, is readily analyzed for the time distribution of precipitation. On the other hand, the BMD uses recording gauges in all stations and uses microprocessor technology to telemeter electrical signals from tipping-bucket gauges. BMD keeps records at 00, 03, 06, 09, 12, 15, 18, 21 GMT. Wind turbulence affects the catch of rainfall. Tests have shown that rain gauges installed on the roof of a building may catch substantially less rainfall as a result of turbulence (10-20%). Wind is probably the most important factor in rain-gauge accuracy. Updrafts resulting from air moving up and round the instrument reduce the rainfall catchment. To reduce the effects of wind, rain gauges can be provided with windshields. Moreover, obstacles should be kept far from rain gauges (distance at least twice the height of such an object) and the gauge heights should be minimized (e.g. ground-level rain gauge with screen to prevent splashing). 2.4.6 Evaporation Measuring equipment The following instrument are used for evaporation measurement  Atmometers  Evaporation pans  Lysimeters International standards Manual measurements are taken at a fixed time – 8.00 a.m. daily from the Class-A Pan used by the U.S. Weather Bureau. Chapter 2: Data and Quality 12 Measurement procedures Direct measurement of evaporation or evapotranspiration from extensive water or land surfaces has not been achieved yet. There are several indirect methods, which are discussed below:  Evaporation estimated by calculation  Energy-budget method  Mass-transfer method  Water budget method  Empirical formulae  Evaporation measurement using pans  Actual evaporation  FAO Penman-Monteith method for estimating evaporation  Catchment water balance method  For evapotranspiration calculation  Methods based on temperature (Thornwaite’s heat index)  Radiation method  Penman method Data collection by BWDB & BMD The BWDB mostly uses the steel sheet Evaporation pan, which is almost similar to the Class-A Land pan used by the U.S. Weather Bureau. The pan used by the BWDB is of 48 inch diameter and 17 inches high. The water level is maintained 7 inches below the rim. The BWDB keeps records in millimetre per day while the BMD, which uses automatic recorders and telemetry to transmit data, keeps records at 00, 03, 06, 09, 12, 15, 18, 21 GMT. 2.5 Quality assurance Hydrological time series data are sequences of numeric values that collectively represent fluctuations in their states. As the means of sensing these fluctuations are often approximations or prone to interference by other forces of nature, there are risks of errors, which are small or large, random or systematic, obvious or subtle. As the sensing is usually remote in collecting the data, it can be difficult for data collectors to detect and quantify potential errors. Data collection and processing therefore need as many checks and fail-safe components as are reasonable to include. Data collectors, with knowledge of what and how they are measuring, can build in a good level of checking. Over the years this has improved as knowledge and techniques have progressed. Hydrometric quality assurance (QA) begins with concise, useable (documented) procedures and traceably calibrated measuring equipment, and goes through sophisticated checks and statistics on the end product – in this case the data. QA systems are often modeled on recognized systems with a series of integrated elements. QA involves provision of instruction manuals, training, internal auditing, calibration of equipment, monitoring non-conforming products and maintaining various records aimed at verifying and recording information on quality. The quality system encompasses many elements, including tracking the batches of data collected, range and sensibility checks, sensor calibration, tracking of data editing and archiving, and a structured data review and checking process. Chapter 2: Data and Quality 13 2.5.1 Elements of data quality For the processing of time series hydrological data the key elements that will be considered for grading the quality levels are as follows:  Conformance to expectations: fulfilling arbitrary thresholds  Following established procedures: as with geodetic standards  Fitness for use: Truth in labeling (distinct roles of producer and consumer) 2.5.2 Guidance on quality control procedures Quality control procedure should be based on the following criteria:  All data should be subject to quality control and validation procedures.  Procedures should aim at detecting errors as close to the source as possible.  Original data values should be recoverable after quality control has been performed. 2.5.3 Definition of quality levels As a guideline for data processing, NWRD data management will apply the following data levels. Level 0: Original, direct instrumental reading. Collected from the field using manual gauges and stored in hard copy. Level 1: Raw data in digital format. This may be available through automatic gauges or converting hard copies to digital form Level 2: Data are referred for cross-checking. Level 3: Level 2 data have been tested for significance. Level 4: Level 3 data having gaps filled with the missing values. Level 5: Homogeneous data fields derived by analysis or modeling techniques. 2.6 Present data quality scenario of Bangladesh Quality, which is practiced during data collection, analysis and other different stages, is meant as existing quality. In Bangladesh the major sources of qualitative hydrometric and hydro-meteorological data are the BWDB and the BMD respectively. In most cases, obvious errors are found in the data. Some of the findings from processing NWRD data can be mentioned here, as these would lead to finding the best processing methods for this guideline. Data quality is a very important consideration for any kind of analysis. Prior to undertaking the sophisticated analysis methods now available to water resource planners and managers, input data need to be thoroughly checked and institutional reforms made for ensuring that agencies responsible for data collection are also accountable for the quality of data they collect and disseminate. WARPO has started this process, and it is clear that much can be done to improve the data, but it takes time and considerable effort. The simple collection, generation and storing of data could not fulfill the requirements of water sector planners, as almost all data are in raw format and need at least a primary or obvious error check. This has brought forth the issue of quality data. In this context, the NWRD has started to check the obvious errors of time series and spatial data. Quality check of data is a long-term process, as it requires the involvement of data collecting agencies and field verification. So the process is on going. Initial quality checking of time series hydrological data layers has been done in the NWRD in consultation with NWMP expatriate and WARPO planners. Chapter 2: Data and Quality 14 2.6.1 Findings of NWRD To check the obvious errors of water level, discharge, groundwater, sediment, rainfall and evaporation data three main characteristics of time series data have been considered as criteria of variability check. These are: Punching error If this type of data is plotted against time it would follow a more or less systematic variability shape from where marked deviation within one time interval is quite impossible. These deviations are clear when plotted graphically. Therefore applying judgment, the sharp rise and fall that breaks the trend of the particular hydrograph remarkably have been considered as punching errors. It has been assumed that these errors have intruded while punching data or keeping records. As these records have been consequently deleted, they appear as missing data. For discharge data this punching error is more difficult than for water level as discharge is depended on both water level and velocity of flow. Therefore error can be from three parameters i.e., water level, measuring or recording of velocity and from punching data. In summary, ISO (1983) identifies the following error types in measuring average flow velocity:  Instrumental errors e.g., if the current meter behavior deviates from the calibration curve or application of incorrect flow angles relative to the normal to the transect.  Type I error: exposure time of the local point velocity.  Type II error: number of points in the vertical.  Type III error: number of verticals in the cross-section. Furthermore, in the compilation of discharge data from the flow velocity measurements additional errors are introduced due to random and systematic errors in the water level. To check the discharge data, sometimes water level data of the same time have been checked and, applying judgment, anomalous data have been marked. The example below shows the old data with punching errors and the data after being updated by the NWRD. Both old and updated time series data are available in the NWRD. The phenomenon of obvious error described above is not true for all types of meteorological data. For example, to some extent evaporation data can be checked in this way, but for rainfall data the obvious error check is difficult with visual inspection or plots. Therefore to make the data free from obvious error, the NWRD has set some criteria and have deleted those erroneous data. The criteria applied are summarized below:  All negative values have been deleted.  Very high/low values have been marked but not deleted. Chapter 2: Data and Quality 15 Figure 2.1: Water level data at Goalanda Transit, (a)Data with a lot of undershoots breaking the trend (b) A smooth hydrograph after removal of undershoots Change in Trend Water level is measured by data collecting agencies with automatic or manual gauges. Therefore, every time the gauge is shifted its position with the standard datum should also be read. However, if the reduced level is not read properly, gauge shift is reflected on the time series plot as ‘change of trend’. These trend changes in discharge and water level data have been marked by the NWRD as obvious Chapter 2: Data and Quality 16 errors for some selected stations and need to be corrected in consultation with the data collecting agencies. It can be mentioned here that changes in trend can occur for other reasons like construction of structures that can alter the flow or depth of rivers. Therefore, these types of errors should be treated carefully. During the FAP24 study, initiatives were taken to check zero values of gauges. About 50 of the BWDB gauges were checked for BM corrections and the results were published in a report (FAP 24). The variations were found in the range of –0.3m to +0.4m. The NWRD needs to find out whether the corrections of FAP24 have been incorporated in the BWDB data when transferred to the NWRD. Discussion should also be held with the BWDB for correcting the discharge and water level data. For rainfall and evaporation, any kind of obstacle causing precipitation to fall in the gauges or evaporation to occur may lead to changes in the trend (FAP-2). Figure 2.2: Water level data at Bijoypur showing change in trend Missing Data Time series data are collected at regular time intervals. When data is not collected or available for some period for some reason, the gap should be filled for analysis purposes. Therefore NWRD has noted the ranges of missing data that should be filled with proper methodology in the future. Most of the data layers are not complete and on an average 10-20% of the data are missing. These were three main considerations for obvious error check of rainfall, evaporation, water level and discharge data in the NWRD. The data are not still error free. For example, in some cases data of same stations are found to be different when collected from different sources. Chapter 2: Data and Quality 17 2.7 Quality framework Table 2.7: Quality framework Data Task Existing Checking Bangladesh Reference International Recommend by Water level Measurement procedures Analogue recorder Digital recorder BWDB Analogue recorder Digital recorder WMO Methods of measurement Staff gauge Float operated gauge Pneumatic gauge BWDB Staff gauge Float operated gauge Pneumatic gauge WMO Validation Double mass Least square method Moving average BWDB Double mass Frequency analysis Moving average WMO Filling missing value Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service BWDB Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service WMO Compilation Frequency distribution T-test/Wilcoxon test F-test BWDB Frequency distribution T-test/Wilcoxon test F-test WMO Goodness of fit test Chi-square test Kolmogorv-Smirnov test BWDB Chi-square test Kolmogorv-Smirnov test WMO Discharge Measurement procedure Direct measurement BWDB - Methods of measurement Velocity area method ADCP-EMF moving boat BWDB - Trend analysis Double mass Frequency analysis Least square method Moving average BWDB Double mass Gamma family Moving average WMO Filling missing value Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service BWDB Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service WMO Compilation Frequency distribution T-test/Wilcoxon test F-test BWDB Frequency distribution T-test/Wilcoxon test F-test WMO Goodness of fit test Chi-square test Kolmogorv-Smirnov test BWDB Chi-square test Kolmogorv-Smirnov test WMO Methods of measurement Tape or rope scaled Automatic groundwater level recorder BWDB Automatic groundwater level recorder WMO Chapter 2: Data and Quality 18 Data Task Existing Checking Bangladesh Reference International Recommend by Groundwater Trend analysis Double mass Frequency analysis Moving average BWDB Double mass Gamma family Moving average WMO Filling missing value Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service BWDB Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service WMO Compilation Frequency distribution T-test/Wilcoxon test F-test BWDB Frequency distribution T-test/Wilcoxon test F-test WMO Goodness of fit test Chi-square test Kolmogorv-Smirnov test BWDB Chi-square test Kolmogorv-Smirnov test WMO Rainfall Methods of measurement Weighing type Tilting bucket type Float type BWDB Weighing type Tilting bucket type Float type WMO Trend analysis Double mass Frequency analysis Moving average BWDB Double mass Gamma family Moving average WMO Filling missing value Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service BWDB Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service WMO Compilation Frequency distribution T-test/Wilcoxon test F-test BWDB Frequency distribution T-test/Wilcoxon test F-test WMO Goodness of fit test Chi-square test Kolmogorv-Smirnov test BWDB Chi-square test Kolmogorv-Smirnov test WMO Evaporation Methods of measurement Energy-budget method Mass-transfer method Water budget method Empirical formulae Evaporation using pans BWDB Energy-budget method Mass-transfer method Water budget method Empirical formulae Evaporation using pans WMO Trend analysis Double mass Least square method Moving average BWDB Double mass Gamma family Moving average WMO Chapter 2: Data and Quality 19 Data Task Existing Checking Bangladesh Reference International Recommend by Filling missing value Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service BWDB Double mass Moving average Correlation & regression Normal ratio Arithmetic average National Weather Service WMO Compilation Normality test T-test/Wilcoxon test F-test BWDB Normality test Significant test Goodness to fit WMO Goodness of fit test Chi-square test Kolmogorv-Smirnov test Chi-square test Kolmogorv-Sm. test WMO 2.8 Recommendations for data collection During data collection any missing value causes serious effect in development projects. Hydrological data series are subject to variations in time and space. Therefore, the missing values could be filled following standard guidelines and practice.  As much as possible, data should be collected in a consistent manner  Well-documented quality control should be applied to the collected data  Data should be archived under appropriate conditions to maintain integrity. 2.8.1 Water level Depending on the types of error to be expected in gauge readings due to the observation and operation practice, the following systematic checking procedure is recommended: For each discharge station to be checked at least two adjacent water-level stations have to be selected for comparison. Annual tables should be made for the data to carry out a first check on variations in the estimated maximum rates of rise or fall. Water-level time series for each discharge station should be plotted for every year together with the time series of two comparison stations. This gives a first visual impression of possible erroneous/shift in data. 2.8.2 Discharge data The following are recommendations on qualitative data collection (FAP-24):  Accurate gauging of hydraulic parameters is critical at primary gauging stations. If this is not possible, serious consideration should be given to relocating the stations.  Discharge measurements should be made bi-weekly, weekly, or fortnightly, depending on the different phases of the hydro-graph.  A DGPS positioning system should be pursued. This technique is developing quickly and provides a better accuracy and easier operation as compared with sextant or Decca positioning.  Although propeller-type current meters are found to be sustainable, other instruments are developing quickly and should be considered for future implementation  The traditional acoustic-type echo sounder should be maintained for depth measurements. Chapter 2: Data and Quality 20  Although manual staff gauges have been found to be sustainable, other devices that provide better accuracy should be considered.  The velocity-area discharge estimation method, although found generally suitable, needs improved instrumentation and a potential means for optimization of the procedure has been identified. Also, a cost-effective application of the ADCP-EMF moving boat method can be sustainable under similar circumstances. 2.8.3 Groundwater Execution of field level data measurements involves the following tasks:  Activating reference stations and checking positional quality.  Determining or checking accuracy e.g. transect perpendicularity at discharge transects.  Ensuring station function.  Preliminarily checking instruments.  Actually executing work and logging data.  On-line data processing, quality checking and recording on PC hard disks.  Storing data and making two back-up tapes.  Maintaining a record of executed observations in the log-book. 2.8.4 Sediment The recommendations (FAP24) for sediment transport measurements are summarized as follows: 1. The human factor is an important consideration for any field measurement. A sophisticated and high-tech survey can fail if the equipment and method are not operated properly. Therefore, human resources development through training should be a fundamental step towards executing an effective survey. 2. A survey vessel, with its facilities for handling survey operations, is a basic requirement, which determines the failure or success of sediment measurements. Therefore, careful consideration should be given when selecting the vessel. 3. Utmost care should be given to measuring sediment transport parameters accurately at the primary gauging stations. Relocation of certain stations may be considered. 4. Different phases of the hydrograph show that it is necessary for suspended sediment measurements to be taken either be-weekly, weekly or fortnightly. Near-bed sediment measurements should be taken similarly unless a suitable relation is established with total sediment transport for all hydraulic conditions. 5. For an accurate sampling of suspended sediment, a sufficient recording length is required to obtain appropriate time averaged values. This means that either a time integrated sampler should be used, applying sufficient exposure time, or an instantaneous sampler should be used for obtaining a series of repeated measurements. This implies that the Binckley instantaneous sampler currently in use with the BWDB should preferably be used for time series to improve the accuracy or be replaced. A depth-integrated sampler such as a collapsible-bag can be used for details. A pump method is the best alternative. Use of the Delft-bottle as a transport method, either as point-integrated or depth-integrated, is attractive but the loss of finer fractions should be quantified. 6. Some exercise carried out during the low-flow and high-flow seasons show that with an exposure time of 100s which was followed by FAP24, a relative error of 4 to 36% is made. As often suggested in literature, the error reduces to 2 to 30% with 300 s of Chapter 2: Data and Quality 21 exposure time. Based on this, a 100s exposure time (integration time) appears to be a reasonable choice for a time-integrated sampler. 7. As accurate sampling of near-bed sediment is difficult and expensive, such sampling should be made to establish a suitable relationship with the total or suspended sediment transport if possible. If such a relationship does not exist it should be investigated whether a shift in location improves the situation. For routine estimates, near-bed sampling is not recommended. 8. For special near bed sediment measurement the Delft Bottle or pump sampling is recommended. For the bed load sampling a trap sampler like the BTMA or H-S is useful, especially in the mid flow range. 9. When a multi-point suspended sediment sampling is made over a vertical, at least 6 points over the vertical should be sampled with at least 1-point near to the bed (0.5m above the bed). The Straub or Chinese methods appear to give unacceptably huge errors. 10. For selecting the numbers and locations have suspended sediment-sampling verticals. A u2/h or a suspended sediment distribution over the river width should be used. The verticals have to be placed in such a way that the schematised concentration profile over the verticals fits best with the concentration distribution over the channel width. To effectively follow this method a reconnaissance survey should be made beforehand. 11. When large bedforms are present, it is not clear as to where a near-bed sampling vertical should be located. In such cases, a mid-point location on the stoss-face may provide reasonable average results. Such methods have been applied (Zaire, Jamuna) but not on a routine basis as they are time consuming. 2.9 Data entry & editing As data entry is the primary concern of data collection it must be done carefully. Entry of data is followed by:  Reading data from file - with full description of data.  Electronic media- current meter data-record (date, no. of observation, gauge level, water level, discharge, width, wetted perimeter cross-sectional area and carefully gradient or fall) are given. Proper correction of data is crucial for data processing. To get qualitative data, it is necessary to go through each record. Editing of data allows the examination of each mistake that would significantly facilitate further preparation. Data entry should be checked to:  examine missing data;  find out errors in preparation; and  find out accessibility of input or record of data. While keeping records some important information should also be kept with real data. These are: 2.9.1 Station /Series definition The code name and location of the station where the data originated from are essential for specifying station/series database. Before the entry and editing of data the following terms must be kept in mind:  station code and station data Chapter 2: Data and Quality 22  station log-book  station history  series characteristics More specifically, these records can be elaborated as follows: Station code and station data Station code and station data comprises:  station code  station name  district  country  latitude  longitude  altitude  catchment area and  agency Station logbook To maintain control on the status of processed and executed series, the actions can be stored in a station logbook. The logbook can only be opened and updated for the station or series location with the following features: period : validity period of the remark in year, month and day. date : the date of the log-book opened or updated remark : remark on series or its processing status : status of action action : required action user : name of user making the remark Station history Station history with specified information about the station is kept properly for future references. There is no constraint on the contents of the history file. Any information of the station, state of processing, maintenance should be entered under station history. New information of a station is to be added to the previous record. Series characteristics Series characteristics, which are indispensable for data processing, are measured properly for data processing. The following are included in series characteristics:  station code  data type, and  time interval The following characteristics are additionally needed: Chapter 2: Data and Quality 23  data unit  time interval  basic time interval  time shift  missing value  minimum or maximum, and  rate of rise or fall However, non-equidistant series does not comprise time interval, basic time interval, or time shift. 2.9.2 Initial quality check Regular checks should be done to make sure that standards are being followed. This may include regular testing of data added to the data set or may involve spot checks. This would allow users to pinpoint difficulties at an early stage to assist the correction of errors. A sample of collection stations can be resurveyed to check their accuracy and precision. If too many errors crop up, or if the surveyed area has changed greatly, the work is updated and corrected. Preliminary data checking can be done by different ways such as:  cross checking  general observation  graphical presentation, and  simple statistical analysis 2.10 Quality at different levels Different levels are checked for the quality of data. The errors or mistakes can easily be detected during the use of data for different purposes. Data can be disseminated to different internal and external users to detect any accidental or gross error. Detected error can be returned to relevant organizations. The following directions are proposed to the different user levels:  Cross-examination should be done before use or any kind of operation on data by users;  Overall study on data is to be done regarding capturing and quality processing by professional users; and  If any kind of gross mistake is found by users the data sets should be sent back to the database administrator to make necessary corrections. A- 25 Chapter 3 Data Processing 3.1 What is data processing Data processing is aimed at ensuring logical and scientific integrity of databases. Processing contributes to data quality. The interface places many demands on the robustness and completeness of the descriptions of data structure. It requires standardization in terms of the data model and the storage formats. 3.2 Why processing Data collection at field level has many influences over quality control. Different types of data are collected by different methods. The human factor is an important consideration for any field measurement. Properly collected data gives an absolute measure of the quality of data, which is the proper root for analysis of hydrometric and hydro-meteorological data. Different types of errors such as random, systematic or non-homogenous errors may be introduced in the observation/sensing, transmitting or recording during measurements. Although it is very difficult to maintain certain standards of reliability and accuracy of time series data, the collection and processing of data are crucial for many areas, especially for national databases. 3.3 Basic needs of data processing The first step of data processing is to understand the following characteristics of the data set in order to develop a QC method, an analysis technique, and a presentation tool. The data character items are:  basic statistics (averages, max. min, range, percentiles),  data intervals / inconsistencies,  missing data / incomplete data,  frequency distribution,  identification of problem area,  setting up a strategy for QC and analysis, including guidelines on the use of blanks and flagging. 3.3.1 International standards for data processing The processing steps for the data set are: a) Reformatting of the acquired station-related data; b) Quality control of the metadata (station co-ordinates); c) Preliminary filling the missing Point Data Bank (PDB), i.e. merging the station-related data from different sources (national data sets, other collections) to one world-wide data set; d) First objective analysis using uncontrolled records; e) Automatic quality control of the data record; f) Visual expert quality control and interactive correction with graphical workstation assistance (comparison with climate maps, orographical data, extreme-event-catalogs, etc.); g) Second objective analysis using controlled data; h) Filling the results of the second analysis run (step 7) into recorded data Grid Data Bank (GDB); i) Correction of the results from step 8 with regard to systematic measuring errors; j) Calculation of grid-related stochastic errors of precipitation results (step 8) from station density, value variance fields, individual data uncertainties, and uncertainty of the systematic measuring error corrections. Chapter 3: Data Processing 26 3.4 Present processing procedures Data is collected and processed by agencies for their own purposes, such as for publishing annual reports or for specific research work and project development or monitoring. Agencies follow their own procedures to process data with whatever facilities they have available, some of which are described below: 3.4.1 Processing of BWDB The BWDB Hydrology Division is one of the earliest users of computers for data storage and processing. The Processing and Flood Forecasting Circle of the BWDB processes water level, discharge, sediment discharge, rainfall and evaporation data. Water level data received from the field are adjusted for vertical shifts following check leveling and then keyed into the computerized system to display a graphical presentation. In cases of apparently incompatible data, reference is made to the field office for validation. After this initial check, the data is transferred to the database, and a second check is made by drawing a superimposed water level hydrograph of the upstream and downstream stations. A spreadsheet developed for entering discharge data allows several trial curves such as WL vs. discharge, cross section area, etc, to be plotted to identify errors or incompatible data, and then transferred into the database. At the end of the year or when appropriate, data is retrieved for development of a rating curve. From the database, observed discharge data can be downloaded in a spreadsheet file and displayed as graphs of level vs. area, width, velocity and discharge. When calculating the mean daily discharge from observed water levels, the BWDB regularly corrects for shifts, applying corrections when the rating curve changes with time due to changes in the cross sectional characteristics along the cross-section. The BWDB maintains a network of stations collecting rainfall data over the country. Field sheets of daily rainfall and rainfall recorder charts from the Automatic Rainfall Recorder (ARFR) are received monthly, and hourly rainfall is entered from the charts. In examining the recorder chart and comparing the 24-hour rainfall total with daily rainfall from the manual gauge to check test the consistency of the data, the following points should be considered:  Consistency of daily records with daily data of the adjacent stations.  Consistency of monthly rainfall totals with monthly and annual rainfall totals in a sheet of 13 maps and with areal rainfall distribution by drawing isohytes.  Depth duration data on an annual basis for each station. Plotting of this map also provides an additional check in the areal distribution of rainfall.  Long-term trend in the average and standard deviation of rainfall by double mass analysis (and correction applied). On receipt of the monthly evaporation statement, daily evaporation is calculated by balancing the rainfall and amount of water added/removed. High values of vaporisation are caused by rain associated with strong winds when the splashing of raindrops against the water in the pan, or leakage in the pan or unrecorded removal of water from the pan (drinking by birds and animals) cause extra loss of water. If the evaporation on a rainy day exceeds the highest daily evaporation recorded on a non-rainy day of the month, the evaporation value is bracketed as doubtful and replaced by estimated value. When daily evaporation data of a station is missing for one to three consecutive days, the missing data is estimated, but if the gap is longer, it is left unfilled. The BWDB Groundwater Circle (GWC) collects data on observation wells, aquifer tests, lithology and water quality in a number of stations. Observation well data are collected every Monday and processed in hardcopy within 45 days and sent to the processing division. Consistency and error checking procedures are available, mainly using hydrographs superimposed on records from the same Chapter 3: Data Processing 27 station for different years (long term hydrograph correlation). Data digitization normally lags by three years due to a shortage of operators. Aquifer tests are generally performed to estimate the transmissivity and storage co-efficient. The BWDB conducted over 200 tests at production wells installed by the BADC. Deep tubewells are used to pump from the wells at a constant rate. Sometimes shallow tubewells are used for pumping tests, but they cannot be run continuously for 72 hrs, so there is replenishment of the water surface during pumping. Data is stored in hardcopy in the processing circle and processed data is available in both hardcopy graphical and tabular formats. Test holes, drilled throughout Bangladesh, are concentrated in areas on which sub-surface data are the least available. The program consists of drilling deep (300 460m) and shallow (90-100m) holes, sampled at 3m intervals. Analyses in the field are done to produce borelogs and sent to the RRI for laboratory test (sieve analysis) and further confirmation of materials. The GWC has the facilities to enter the data in a database file as developed under the UNDP project and a small part of it has been digitized. The GWC also collects samples of water quality data in 117 stations during March-April every year. These samples are sent to the RRI for chemical analysis of 19 parameters. Data are recorded, processed and filed in hardcopy and used to prepare water quality maps by district. The Flood Forecasting and Warning Center (FFWC) of the BWDB produces daily flood bulletins using data from 44 water level and 46 rainfall stations all over the country. The bulletins are sent in by wireless. The 3-hourly data are sent at 9am to 10am every morning including holidays and entered in computers within an hour for analysis. The telemetering transmission system cannot transfer the data acquired directly into the flood-forecasting model and the data has to be manually re-entered. Data validation software is used to check for errors and consistency of the data, which are then processed in a forecasting model to generate flood warning information for each of the stations within two to four hours. The daily bulletin lists water levels above danger level and makes 24-hour and 48-hour forecasts. 3.4.2 Bangladesh Meteorological Department (BMD) The BMD processes most of the meteorological parameters at the Processing Division both for surface and upper air all over Bangladesh round the clock. After receiving data from the Forecasting Section as teleprinter output, the data is entered into a digital format for further checking and processing. Hardcopy printouts are taken for correcting errors in punching. If errors are found, they send back the data to the field office using the same device. A technical committee consisting of SPARRSO, the DoE, and the Flood Monitoring Cell of the BWDB provides suggestions on the processing procedure and long term forecasting techniques. The Processing Cell produces tables of maximum, minimum and average weekly, fortnightly, monthly and annual values in report format. Digital data are sent to the World Meteorological Organization. 3.5 Need for improved processing facilities Gauge readers living in the remotest areas of the country and facing some of the most adverse physical situations are responsible for the collection of data. These data have to be correct, mutually compatible and consistent with the laws of hydraulics and river mechanics. To be useful, the collected data require supervision and quality control at the field level and validation and quality control at the data processing office. A number of persons have been trained for data processing in different agencies, but it was observed that during the implementation of the FAP 24 training program, trained people were not available at the BWDB to operate the computer system for hydrology. Most professional engineers are reluctant to work in the processing circle for financial reasons, as no planning allowances are provided. The most important outcome is that the officers trained under the project have either been transferred or retired. The officers trained in data processing should not be transferred frequently. Arrangements are needed for the transfer of technology from the trained personnel to those who come to replace them. Chapter 3: Data Processing 28 In the past the Design Directorate had arranged a presentation on the completion of designs which was compulsory for all officers to attend. The design was improved with discussion and queries and junior officers were able to learn about new technology. The BWDB should adopt this principle to keep their technical manpower up-to-date about modern technology. Computerized departments need equipment and accessories (paper, disks/CDs, ink, backup facilities, etc) and software for optimum use. Sufficient funds have to be assigned to departments for these needs and future system upgrades. However, funds are rarely available on a sustained basis. The following are required to improve processing facilities:  Data collection - methods and processes for the collection of new data.  Data analysis procedures - the methods for computing, assembling a data set for a specified product.  Data integration - Data integration procedures are the methods for combining various data sets into a unified, geographically harmonious data set  Quality control and quality assurance - Quality control and quality assurance processes are respectively the methods followed to achieve a specified quality and the methods to check the quality of an existing data set. 3.6 Data processing at the NWRD WARPO processes data for its own needs but it does not have sufficient manpower to handle the processing of different types of data for other users. It has modern equipment and processing facilities with a central database system. It acts as a data-collating agency, processing data and correcting it when errors are found and filling in gaps. Discrepancies are reported to agencies for comment and improvement of mutually approved data layers. WARPO shares information with other collecting agencies and aims to create a sustainable database with facilities for easy update in the future. However, none of this is sustainable without a legal framework, or, as a minimum interim measure, strong administrative support of the NWRD. 3.6.1 Data processing tools and applications NWRD data are usually processed by the Data Collecting Agencies (DCA) prior to being sent to WARPO. However, there is considerable scope for adding value to it within WARPO so that it can better serve user needs. A number of tools have been developed which can be applied to transform, combine and present data in different ways. ArcView, web-based and Oracle based tools and applications have been developed for front-end users for searching, downloading, exporting, viewing, analyzing and data sharing. A number of system management tools have also been developed for updating the database. A brief description of some of the tools developed under the NWRD is given in the following and are more fully described in a user manual. The first way of adding value is to standardize formats so that the tools can be applied to all data of a particular type, irrespective of the format used by the original DCA. An Import Tool may therefore be develop to allow easy transfer of data from the formats used by particular agencies into the NWRD format. It is not considered necessary or desirable to insist that all agencies use a common format. Since potential users use different formats, an Export Tool has been developed to allow users to take copies of the data formatted to their own requirements. These tools also allow DCAs to take back copies of their own databases if needed, either as the original set or with further processing added. To export data to different external formats from the NWRD, a Generic Export Tool has been created as a stand-alone application developed in Visual Basic, Chapter 3: Data Processing 29 which can export the data to Excel, Access, Comma and Tab Delimited Text format. The subset of tabular data maintained in the Oracle database can be selected and exported to any location. This tool can also export shape files with associated information to any desired location. A Time Series Viewer can be used to display, edit, export and import any time series data. Data from the SQL server can be retrieved for display as chart for a single station or more than one station for any specified time interval. This list will be extended in the future in response to user demand. Modern computing facilities make it relatively easy to develop tools and it is tempting for WARPO to develop further tools simply because it is possible. This is time-consuming and with scarce human resources, it is important to concentrate on tools for which there is an established demand from users. In addition, powerful tools make it easy to forget the limitations of the original data set. A smooth surface can be created and presented as a coloured contour map from very few point observations. The above tools were developed after discussion with NWMP consultants and WARPO planners in order to assist in different types of analysis. The potential users of these tools are still not well defined. Future users of these tools may be different projects and organizations dealing with spatial and time series data (such as CEGIS or the IWM). 3.7 Types of Error In the historical data series for a hydrological event (e.g. rainfall) if any abnormal value is found which cannot be obtained from the deterministic or stochastic processes of hydrology, it can be concluded that the data for a particular year, month or day used in analyses are faulty. Several types of errors may exist, including random, systematic or input data errors. Systematic errors a. Systematic error occurs when the sign of the error tends to persist over a number of time intervals. b. Inadequate representation or misrepresentation by a hydrological process model is one of the causes of systematic error. c. A further cause of systematic error is the use of a period of record in the calibration of parameters which is not representative of the long term and which, for example, does not contain enough events of critical magnitude to calibrate key parameters. Consequently, hydrological responses of critical magnitudes (e.g. floods or low flow sequences) may be simulated incorrectly. d. In the solution of storage problems for synthesizing flows, the existence of systematic errors may be very serious. Random errors a. Random errors can be defined as errors, which occur when a model shows no tendency to over estimate or underestimate for a number of successive time intervals. b. Random errors can be identified by checking for the conservation of means and variances. Attribute data errors a. The existence of data errors must also be recognized. These input errors include errors in rainfall, evaporation, temperature and stream flow. b. The following types of errors are associated with flow and rainfall data:  Method of measurement errors; Chapter 3: Data Processing 30  Flow data errors due to inaccurate rating curves;  Mechanical and digitizing errors associated with flow data;  Flow data errors due to poor or inaccurate manual observations, and  Flow data errors due to the influence of catchment development or rainfall data errors. It could thus be concluded that most errors can be detected by normal checking procedures and common sense and that basic checks should be carried out on all hydrological data, since some less obvious errors can influence model result significantly. Chapter 3: Data Processing 31 3.8 Generalized data processing steps Flow chart Note: ‘*’ means sometimes essential. The definition of the tests can be expressed by the following tests: Raw data: Data collected from different organizations. Randomness test: Turning point test is done for checking the randomness of data. Consistency test: Double mass analysis shows the trend or inconsistency of a series. Trend analysis: Moving average method is used for trend correction. yes no yes Validation test Compilation test Raw data *Range test Randomness test (Turning point test) Correlation test *Standard error estimate Consistency test (Double mass, mass curve) no Trend analysis Moving average, Least square method Normal distribution test T-test / Wilcoxon and F-test Filling no yes Chi-Square / Kolmogorv Smirnov test Goodness of fit test   Report/Comments Frequency test Chapter 3: Data Processing 32 Regression and Correlation test: To find the best association of data in a series. Filling: Suitable method is used for filling gaps. Normal distribution: Normal distribution is used for the selection of suitable significant test (T test/Wilcoxon test). Frequency test: Mass curve is used for the test to see any shifting on the tested and base series. Significance test: T-test or Wilcoxon test is used for finding the significance value. Goodness to fit test: Chi square test is used for checking the good fit of a series. 3.9 Recommendations Data storage and aggregation Data can be stored in paper base files, computer files or in databases. It is advantageous to store data in computer files or in databases. However, the original paper files must be well guarded and analyzed carefully for what information to be stored in a database and in which time step. Data with significant change in values are picked up by data aggregation to avoid unnecessary readings. Data acquisition and transfer Planning, designing and management of water resources or water usage systems require information on past and present behaviors in time and space of all process and boundary conditions affecting relevant water quantity and quality parameters. This information is provided by an Information System, which covers data operations of the following kinds: Data collection comprising  Sensing  Recording and  Transmission Data processing comprising  Preparation  Entry and transfer to the database  Validation  Correction  Filling in missing data  Compilation and analysis  Retrieval and  Dissemination or publication of annual report. 3.10 Quality gradation The following quality control levels are applied to NWRD data layers: QC 1: Identification of obvious errors, including human error and instrumental failure. QC 2: Identification of errors that becomes apparent when data from different sources are compared. QC 3: Adjustment by processing designed for the intended use of data, e.g. adjustment for biases, change of algorithms, etc. Chapter 3: Data Processing 33 3.11 Approach/ Techniques of hydrologic processes 3.11.1 Hydrologic process Any hydrologic environment consists of water inputs, environmental responses and the output. For example, with rainfall as the input, infiltration and run-off are the environmental response and output respectively. Usually the output from one environment becomes input for another. This union of three in-one input, response and output may be described as the basic parts of a hydrologic system, while each of these parts represents a hydrologic process. Natural hydrologic processes are never deterministic but are a combination of various deterministic and stochastic processes. 3.11.2 Deterministic processes These are the processes of hydrology that are the results of physical, chemical and biological deterministic laws. For example, a rating curve of the stage-discharge relationship of a river cross section with a fixed bed is a unique function and is thus a deterministic relation giving the same discharge for the same discharge. The case is opposite when the bed is changeable where many random factors influence the stage-discharge relationship. 3.11.3 Stochastic processes These are the processes of hydrology, which are governed by the laws of chance, e.g. phenomena such as precipitation, evaporation, runoff, etc. Strictly speaking, there are no pure deterministic hydrologic processes. It is , in fact, a combination of deterministic and stochastic processes or predominantly stochastic processes. Therefore, hydrology cannot be fully understood, described and applied to water resources developmental projects without the extensive use of methods of probability theory. It is important to stress that the terms chance, random, probabilistic and stochastic are considered synonyms in this text; they all refer to phenomena subject to the laws of chance. A- 35 Chapter 4 Time Series Analysis 4.1 Concept A sequence of values collected over time on a particular variable is a time series. Time series may be conveniently divided into two types: continuous and discontinuous. A time series which is given at a series of discrete time points, ti where, i = 1,2...n is defined as a discontinuous time series, even though the variable itself may be continuous. A continuous time series is one in which the time variable is continuous, even though the phenomenon being described may not necessarily be continuous for a given ‘t’. Continuous time series must be converted into a discrete form prior to analysis. A time series is a sequence of values arranged in order of their occurrence and characterized by statistical properties. The time interval for a discrete series might vary from a day or less to a month or a year. The selection of the time interval for representing a continuous series by a discrete series has two aspects:  the extraction of optimal information in observing a variable, or from hydrologic data.  the optimization between the accuracy of results and the computation cost in solving various problems. Four types of time series are common in hydrology. These are:  Full series  Annual series  Partial-duration series, and  Extreme value series 4.2 Analysis of time series There are two main goals of time series analysis: (a) identifying the nature of the phenomenon represented by the sequence of observations, and (b) forecasting (predicting future values of the time series variable). On the other hand, it may be referred to as the detection and quantitative description of the generating process that is characteristic of a given set of observations. Time series analysis includes the following types of analysis:  Correlation analysis  Spectral analysis  Range analysis  Run analysis  Storage analysis 4.2.1 Correlation analysis Correlations are done to identify the independence of time series. Correlation tests with a certain bend of confidence limit albeit double mass analysis are generally the most appropriate means of checking data consistency. Time constraints mean that it was impracticable to produce them for all stations. A prior quality check by cross-correlation can be carried out to identify stations where double mass analysis would be particularly beneficial. A correlation matrix can be produced for a group of ten neighboring stations, and any station, which showed poor correlation with more than three of the other nine stations, can be assumed to require further checking. The correlation can be carried out on monthly data for the wet season only, since differences in dry season rainfall is less significant than overall mean Chapter 4: Time Series Analysis 36 rainfall. In general, the correlation coefficients would be higher if dry season months are included in the analysis. The definition of a “poor” correlation is necessary. There is no particular high value for correlation between monthly records at nearby stations, but a higher threshold would indicate that many stations have doubtful data. If more time is available on this or a subsequent project is undertaken, it would allow further examination of stations with borderline correlation. Correlation analysis covers the computation of:  Auto-covariance function  Auto-correlation function  Cross-covariance function  Cross-correlation function. 4.2.2 Spectral analysis Spectral analysis provides an alternative approach to identifying the generating process that underlies an observed time series. On the other hand, auto correlation analysis operates in the time domain. The relation between spectra density (y-axis) and frequency in cycles per unit of time (x-axis) are plotted for spectral analysis. The smoothed auto-spectral estimate Cxx (f), for f=0, ½ is calculated from: (H.M.V.3.00): (4.1) } fk)(2 cos (k)w(k)c2(0)2{c(f)C 1M 1k xxxxxx      where : f = frequency in cycles per time interval, computed at spacing 1/(2Nf), where, Nf is 2 to 3 times M Nf = number of frequency points Cxx (k) = autocovariance function at lag k M = truncation point or maximum lag of the autocovariance function used to estimate the autospectrum; clearly M is conditioned by: M≤ Lmax w(k) = window function. Following window w(k) for k = 1, M-1 according to Tukey is used to smooth the spectral estimate: 4.2.3 Range analysis The quantities are computed from the accumulative departures from the mean Si for i = 0, N and with S0: where: mx = average of x(i), i = 1, N cf = conversion factor to transfer intensities into volumes. (4.2) )) M πk cos((1 2 1 w(k)  (4.3) )cm(XS i 0j fxji    Chapter 4: Time Series Analysis 37 4.2.4 Run analysis A run is and excursion above or below the crossing level i.e. bounded by an upcrossing and a downcrossing or a downcrossing and an upcrossing. The positive and negative runsums RS+ and RS respectively, are computed from: where: j = location of an upcrossing k = location of the next downcrossing cf = conversion factor to transfer intensities into volumes. xc = crossing level where: k = location of the next downcrossing m = location of the next upcrossing 4.2.5 Storage analysis The sequent peak algorithm water shortage or equivalently storage requirements without running dry are computed for various draft levels from the reservoir. The algorithm considers the following sequence of storage: Si = Si-1 + (xi-Dx)cf i =1, 2N ; S0 = 0 (4.6) where: xi = inflow Dx = DL. mx mx = average of xi, i = 1, N DL = draft level as a fraction of mx cf = multiplier to convert intensities into volumes (time units per time Interval) The local maximum of Si large tan the preceding maximum is sought. Let the locations be k2 and k1 respectively with k1. The largest non-negative difference between Sk1 and Si, i =k1.., k2.., is then determined, which is the local range. This procedure is executed twice the actual series xi; hence the series xi is used twice in sequence: xi = xN+i. In this way initial effects are eliminated. Besides the above mentioned range analysis, run analysis can be done for time series analysis. 4.3 Interpolation The following interpolation methods can be considered to fill missing data:  linear interpolation,  block-type filling: block type filling data is the replacement of missing data by the last non missing values before the gap.  use of series relation: relation equations are used for filling the missing data. (4.4) c)x(xRS f K ji ci    (4.5) c)x(xRS f m i ic    k Chapter 4: Time Series Analysis 38  spatial interpolation. 4.3.1 Linear interpolation In a number of cases gaps in a series can be filled by linear interpolation between the last value before the gap and the first one after, provided that the distance over which interpolation takes place is not too large. The use of linear interpolation requires the following options:  selection of types of linear interpolations  selection of series interval  period to be considered for filling.  maximum interpolation distance (expressed as a number of time intervals). This means that gaps larger than this maximum will not be filled-in. 4.3.2 Block-type filling-in Filling–in data according to block-type filling-in comprises the replacement of missing data by the last non-missing value before any gap. 4.3.3 Series relation Series relation is used to fill-in missing data, provided that the standard error in the fit is small. Different types of equation (polynomial, simple linear, exponential, power, logarithmic, hyperbolic, multiple linear etc.) are used for fill–in missing data. 4.3.4 Spatial Interpolation Complex data sets are simplified into a low dimension to filter errors. The spatial interpolation technique is applicable to quality and quantity parameters with spatial characters, such as rainfall, temperature, evaporation, etc., but sampled at a number of stations. Missing data at a test station are estimated by weighted averages of observations at neighbour stations. The weights are inversely proportional with some power of the distance between the test station and the neighbour stations. 39 Chapter 5 Basic Statistics 5.1 General Statistics is a set of methods that are used to collect, analyse, present, and interpret data. Statistical methods are used in a wide variety of occupations and help people identify, study, and solve many complex problems. The statistical methods enable decision-makers and users to make informed and better decisions about uncertain situations. To compete statistical analysis successfully users and decision-makers must be able to understand the information and use it effectively. Statistical data analysis provides hands on experience to promote the use of statistical thinking and techniques to apply in order to make educated decisions according to need. Studying a problem through the use of statistical data analysis usually involves four basic steps. 1. Defining the problem 2. Collecting the data 3. Analyzing the data 4. Reporting the results 5.2 Objectives of statistics The objectives of statistics in hydrology may be listed as follows:  Interpretation of observations;  Search for hydrology probabilistic regularities;  Extraction of maximum information from hydrologic data; and  Presentation of hydrologic information in condensed form as graphs, tables of numbers, and mathematical equations, basically for decision-making in water resources planning. 5.3 Scope of analysis The main subjects covered in statistical analysis is: Plausibility of hydrological data: All measured hydrological data or the value derived therefrom contains errors. Quality control test for the examination of possible errors in hydrological data is recommended. Theoretical probability distributions: It covers the concept of distribution functions, moment and quintiles, empirical distributions, plotting positions, partial series, and distribution functions, including the Gaussian or normal distribution, log normal, Pearson type III, log Pearson III and Gumbel. Correlation and regression analysis: Theoretical considerations are useful to indicate the existence of correlation between hydrological variables. The problem is then to determine the type and degree of correlation. Time series analysis: The main objective of time series analysis in hydrology is to disaggregate the trend, the periodic and the stochastic elements from a measured hydrograph. The methods of time Chapter 5: Basic Statistics 40 series analysis are also used to evaluate the accuracy estimates of statistical parameters and to determine whether a time series is sufficiently long. 5.4 Some basic statistics The following basic statistics are needed in statistical analysis: Minimum: xmin = min (x1, x2, x3,……………xn) (5.1) Maximum: xmax = max (x1, x2, x3,………… xn) (5.2) Median: Middle value of the ranked series Xi Mode: Value of X, which occurs with the greatest frequency; i.e. the middle value of the class with the greatest frequency. If classes have equal greatest frequency then the middle value of the class with the lowest class levels will be indicated as mode Skewness: The lack of symmetry of a distribution is called skewness or asymmetry. The population skewness is given by Skewness = 3(Mean - Median)/Standard deviation 5.4.1 Product Moment Several summary statistics can describe the character of the probability distribution of a random variable. Moments and quantiles are used to describe the location or central tendency of a random variable. Mean of a random sample is the first moment, the second moment about the mean is the variance. The standard deviation is the square root of the variance and describes the width or scale of a distribution. These are examples of product moments because they depend upon powers of X. Arithmetic mean: where, x = m1 = Arithmetic mean and n = No. of data xi = Individual sample. Standard deviation (SD): SD, m2=   1/2 n 1i 2 i xx n 1         (5.4) Coefficient of Variance (CV): CV = m2/ x (5.5) Coefficient of Skewness (CS): CS, m3 =   3 2 n 1i 3 i m xx n 1    (5.6) Kurtosis Kurtosis is a measure of whether the data are peaked or flat relative to a normal distribution. That is, data sets with high kurtosis tend to have a distinct peak near the mean, decline rather rapidly, and have (5.3) n 1i i x n 1 1 mx    Chapter 5: Basic Statistics 41 heavy tails. Data sets with low kurtosis tend to have a flat top near the mean rather than a sharp peak. A uniform distribution would be the extreme case. Kurtosis, m4 =   4 2 n 1i 4 i m xx n 1    (5.7) 5.4.2 Probability Weighted Moment A new class of moments, called Probability Weighted Moments (PWM) was introduced by Greenwood et al., (1979). The PWM is particularly suitable for distributions whose CDF can be inverted. The PWM estimator b0 is the sample mean. To estimate PWMs of a sample, the data are arranged in ascending order of magnitude so that x1  x2  ……. xi  ……. xn where n is the sample size. The first four unbiased PWM estimators are b0 = xmean (5.12) b1 = 1)(n 1)x(i n 1 n 1i i    (5.13) b2 = 2)1)(n(n 2)x1)(i(i n 1 n 1i i    (5.14) b3 = 3)2)(n1)(n(n 3)x2)(i1)(i(i n 1 n 1i i    (5.15) It is obtained from these equations that PWM estimators are linear functions of data. 5.4.3 L-Moment L-moments are certain linear combinations of probability weight moments that have simple linear interpretations as measures of the location, dispersion and shape of the data sample. The first few L moments are defined by l1= b0 5.16) l2 = 2b1-b0 (5.17) l3 = 6b2-6b1+6b0 (5.18) l4 = 20b3-30b2+12b1-b0 (5.19) The analogous of conventional product moment ratio estimators, such as CV, CS and kurtosis are L moment estimators L-cv, L-cs and L-kurtosis. By dividing the higher order L-moments by the dispersion measure, we obtain the L-moment ratios, tr = lr/l2 (5.20) These are dimensionless quantiles, independent of the units of measurement of the data. t3 is a measure of skewness and t4 is a measure of kurtosis – these are respectively the L-skewness and L-kurtosis. They Chapter 5: Basic Statistics 42 take values between –1 and +1 (exception some even order L-moment ratios computed from very small samples can be less than –1). The L-moment analogue of the co-efficient of variation (standard deviation divided by mean), is the L cv, defined by t2 = l2/l1 (5.21) It takes values between 0 and 1. L-moment ratio diagram can be used to compare the L-skewness and L-kurtosis relations of different distributions and data samples. This gives a visual indication of which distribution may be expected to give a good fit to a data sample or samples. The goodness of fit for candidate distributions are compared by using the probability plot correlation co-efficient and the root mean square deviation. Then the capability of a distribution to simulate the site to site variations in the statistical behavior of flood samples are assessed with the help of L-moment ratio scatter diagram. 5.4.4 Commonly used Distributions Binomial Gives probability of exactly successes in n independent trials, when probability of success p on single trial is a constant. Used frequently in quality control, reliability, survey sampling, and other industrial problems. Negative Binomial Gives probability similar to Poisson distribution when events do not occur at a constant rate and occurrence rate is a random variable that follows a gamma distribution. Poisson Gives probability of exactly x independent occurrences during a given period of time if events take place independently and at a constant rate. May also represent number of occurrences over constant areas or volumes. Used frequently in quality control, reliability, queuing theory, and so on. Normal The normal distribution is an extremely important probability distribution in many fields. It is also called the Gaussian distribution. It is actually a family of distributions of the same general form, differing only in their location and scale parameters: the mean and standard deviation. The standard normal distribution is the normal distribution with a mean of zero and a standard deviation of one. Because the graph of its probability density resembles a bell, it is often called the bell curve. Gamma A basic distribution of statistics for variables bounded at one side - for example x greater than or equal to zero. Gives distribution of time required for exactly k independent events to occur, assuming events take place at a constant rate. Used frequently in queuing theory, reliability, and other industrial applications. http://www.free-definition.com/Probability-distribution.html http://www.free-definition.com/Expected-value.html http://www.free-definition.com/Standard-deviation.html http://www.free-definition.com/Probability-density-function.html http://www.free-definition.com/Bell.html Chapter 5: Basic Statistics 43 Exponential Gives distribution of time between independent events occurring at a constant rate. Equivalently, probability distribution of life, presuming constant conditional failure (or hazard) rate. Consequently, applicable in many, but not all reliability situations. Log-normal Permits representation of random variable whose logarithm follows normal distribution. Model for a process arising from many small multiplicative errors. Appropriate when the value of an observed variable is a random proportion of the previously observed value. In the case where the data are lognormally distributed, the geometric mean acts as a better data descriptor than the mean. The more closely the data follow a lognormal distribution, the closer the geometric mean is to the median, since the log re-expression produces a symmetrical distribution. Weibull General time-to-failure distribution due to wide diversity of hazard-rate curves and extreme-value distribution for minimum of N values from distribution bounded at left. The Weibull distribution is often used to model "time until failure" In this manner, it is applied in actuarial science and in engineering work. It is also an appropriate distribution for describing data corresponding to resonance behavior, such as the variation with energy of the cross section of a nuclear reaction or the variation with velocity of the absorption of radiation in the Mossbauer effect. Extreme value Limiting model for the distribution of the maximum or minimum of N values selected from an "exponential-type" distribution, such as the normal, gamma, or exponential. 5.5 Types of statistical test 5.5.1 Parametric statistics  Appropriate for interval/ratio data  Follow normal distribution  For large data parametric tests are so robust  For small data parametric tests are not so robust. 5.5.2 Non-parametric test  Used with normal/ordinal data  Does not follow the normal distribution  For large data nonparametric tests are so powerful.  For small data nonparametric tests are not powerful. 5.5.3 Recommends for choosing a statistical test This guideline has discussed different statistical tests. To select the right test we need to know the followings:  Collected data type and  Goal that should be resolved. Chapter 5: Basic Statistics 44 5.5.4 Null hypothesis test A statistical procedure designed to assess the degree of plausibility of a given statement or null hypothesis, concerning for example the value of the population mean, on the basis of the evidence provided by a sample. Thus a test conducted at the 5% significance level means that the null hypothesis will be accepted if the given sample value is one of those which would be expected from 95% of all random samples. It is important to realize that a hypothesis test cannot lead to a definite conclusion. Generally, a statement theorizing that there is no difference between (the null) groups of subjects, or factors to be studied. 5.6 Statistical features: Descriptive statistics  Arithmetic mean  Standard deviation  Standard error  Skewness  Kurtosis  95% confidence limit for mean  Min value  Max value  Sample range  Number of samples  Median  Geometric mean  Variance  Average deviation Parametric tests  Frequency analysis  T-test  Regression  Correlation  F-test  Z-test of a correlation coefficient  Fisher cumulant test for normality of a distribution.  Chi-square test  Kolmogorov-Smirnoff  Sign test Nonparametric tests  F-test  Chi-squared  Wilcoxon's test  Wilcoxon-Mann-Whitney U-Test  Spearman rank correlation test  Kolmogorov-Smirnov test  Median test  Serial correlation test  Turning point test for randomness of fluctuations  The difference sign test for randomness in a sample  Rank correlation test for agreement in multiple judgments. A- 45 Chapter 6 Data Validation 6.1 General The following options are typically used for data validation purposes. Time series data are applied for equidistant time series. But some of them are applied for non-equidistant or combined equidistant and non-equidistant time series. Data validation should go through the following stages: Screening: Data screening is performed for proper listing of series for easy references and first check on the range of data. Time series plots: Time series plots show the sum or accumulated differences from the mean. Relation curves: A relation curve gives a functional relationship between two series which is used for detection or random errors, systematic errors, missing data and forecasting purposes. Double mass analysis: Double mass analysis is a technique to detect possible inhomogeneities in series, like jumps, trends etc. Series homogeneity tests: It is performed by different statistics, which have been discussed later. Spatial homogeneity test: The test is applicable to quality and quantity parameters with spatial characters like rainfall, temperature, evaporation, etc. to the neighbor stations. 6.2 Test of trend Purpose and objectives Trend analysis is used for finding the inhomogenity of a series. Before estimating trend the first thing to find is whether or not any trend is present at all. And to check this, tests for randomness following test are performed on the time series. If any trend is found then trend analysis is necessary for removing the trend before analysing the data. 6.2.1 Turning point test The turning points test is used check whether the time series verify the following hypothesis:  H0: The series is a random no trend series.  Ha: The series has trend and/or has autocorrelation errors. Description Trend of a series is estimated in this step. For an independent stationary series, N is number of data, T is approximately normally distributed with, mean = 2(N – 2)/3 and standard deviation = [(16N - 29)/90]0.50 Standard value of T, t = T-mean / Standard deviation If t value ranges within ±1.96 for 5% level of significance, it is decided that the series is of random sequence. If series is not random, the trend value should be estimated by Least Square Method or Moving Average Method. Chapter 6: Data validation 46 Input Range of data set is divided by a certain block and arranged in ascending/descending order to determine the number of turning. Output Each limit identifies one turning point. Cumulative number of turning is determined whether data is random. Operational requirement and restrictions Equal limit is used for finding turning point and record of data set should be long. 6.2.2 t-Test for detecting linear trend The t-test is used to check whether the time series data verify the following hypothesis:  H0: The series is a random no trend series.  Ha: The series has linear trend. Description Assume that yt, t = 1, . . . . . . . ., N is an annual time series and n = sample size. A simple linear trend can be written as yt = a + bt where a and b are the parameters of the regression model. Rejection of the hypothesis b = 0 can be considered as a detection of a linear trend. The hypothesis that b = 0 is rejected if 2 1 2 rr N T c    >   , 2 1 T in which r is the cross-correlation coefficient between the sequences y1,…….,yN and 1,………….,N, and   , 2 1 T is the 1-/2 quantile of the student t distribution . 6.2.3 Mann-Kendall Test The Mann-Kendall test is used to check whether a time series follows a trend or not. The hypotheses are as follows:  H0: The series is random no trend series  Ha: The series has trend either upward or downward Description This is a non-parametric test which tests for a trend in a time series without specifying whether the trend is linear or nonlinear. Consider the annual time series yt, t = 1, . . . . . . . ., N. Each value ,1,  tyt . . . . . . . . ,N – 1 is compared with all subsequent values ,2,1,  ttty t . . . . . . ., N, and a new series zk is generated by 1 k z if tt yy  0 k z if tt yy  Chapter 6: Data validation 47 1 k z if tt yy  in which k = ).(2/)2)(1( tttNt  The Mann-Kendall statistics is given by the sum of the zk series      1 1 1 N t N tt k zS This statistic represents the number of positive differences minus the number of negative differences for all the differences considered. The test statistic for N>40 may be written as )(SV mS u c   where, S = Mann-Kendall statistic, m = 1 when S < 0 and m = -1 when S > 0 and               n i iii eeeNNNSV 1 521521 18 1 )( in which ei is number of data in ith group (tied group). The statistic uc is assumed to be zero if S = 0. then the hypothesis of an upward or downward trend cannot be rejected at the  significance level if 2/1  uuc . For small sample size,       c u Where,  = 0,  =    19 522   NN N and   2/1   NN NN du in which Nu = the number of upward pairs, Nd = the number of downward pairs and N = sample size. 6.3 Double mass analysis Purpose Double mass analysis is a technique commonly employed to determine corrections to hydrological data to account for changes in data collection procedures or other local conditions. The changes may result from a variety of things including changes in instrumentation, changes in observation procedures, or changes in gauge location or surrounding conditions. Double mass analysis detect the possible inhomogeneities in series, like jumps, trends, etc. by investigating the ratio of accumulated values of two series:  the series to be tested, and  the base series. Computational procedure If Yi, (i =1,N) be the test series and Xi, (i =1,N) the base series. The double mass analysis then considers the following ratio of two series: Chapter 6: Data validation 48 Or expressed as a ratio of the percentages of the totals for N elements: In the tabular results 9 columns can be presented as follows: 1) Time 2) Value of series X (base series) 3) Accumulated value of series X 4) Accumulated value as a percentage of the total of X 5) Value of series Y (test series) 6) Accumulated value of series Y 7) Accumulated value as a percentage of the total of Y 8) Ratio (item 6)/(item 3), equation (1) 9) Ratio (item 7)/(item 4), equation (2) The last column is also presented in the double mass plot. Now from any set of data we can calculate and plot the percent of total series (base over X-axis-column no.4 and test over Y-axis -column no.7). Input Average cumulative value of stations in X direction and cumulative value of tested station in Y direction. Output Particular point from where trend starts. A ratio is determined for multiplying the deviated record(s) to get homogeneous series. Operational requirements and restriction Stations of cumulative average values must be similar topographical features and climates with the station of tested series. (6.1) X Y rc i 1j j i 1j j i      (6.2) X X . Y Y pc i 1j j N 1j j N 1j j i 1j j i          Chapter 6: Data validation 49 6.4 Mass curve Purpose To find the variation of a series with respect to time is shown graphically by a mass curve. Variation of tested series is compared with the average of a series of surrounding stations. Description A mass curve is a plot of cumulative value of hydrological data (rainfall, discharge etc.) against time. From the mass curve total depth of rainfall and intensity of rainfall at any instant of time can be found. The amount of rainfall for any increment of time is the difference between the ordinates at the beginning and end of the time increments, and the intensity of rainfall at any time is the slope of the mass curve (i.e. ∆P/∆t) at that time. A mass curve of rainfall is always a rising curve and may have some horizontal sections, which indicates periods of no rainfall. The mass curve for the design storm is generally obtained by maximizing the mass curves of the severe storms in the basin. Input Data of base series and tested series is plotted with respect to time. Output Dissimilar of the point of tested and base series is found. Operational requirement and restrictions Data must be collected in same time and similar topographical features. Short-term interval (day/week) for rainfall data is not used for mass curve analysis. 6.5 Residual mass curve A residual mass curve represents accumulative departures from the mean. It is an efficient tool e.g. to detect climatic variabilities or other inhomogenates. The departure of the mass curve from the normal may be plotted against time. In other word the mass curve is plotted about a horizontal axis obtained by rotating the average slope line of the mass curve, to the horizontal. Such a plot is called a “residual mass curve”. The difference between the maximum and minimum values of a residual mass curve for a given period n is known as the ‘range’ for the period n. If R is the range of a period n years of annual runoff record whose sample standard deviation is σ. 6.6 Removing Trend Hydrologic time series exhibit, in various degrees, trends, shifts or jumps, seasonality, autocorrelation, and nonnormality. The common ones are trends in the mean and in the variance. A linear trend in the mean is shown in Figure 6.1a. The trend t y can be removed by the difference yt - t y as shown in fig. 6.1b. The variance of such difference series, expressed by st2, may be either a function of time or may be a constant. The trend in variance can be removed by t tt s yy  . The residual series may still have other properties such as correlation structure which can be decomposed and removed. Chapter 6: Data validation 50 Figure 6.1 Removing trends in the series 6.7 Moving averages Purpose and objective To investigate the long term variability or trends in series moving average curves are useful. The procedure of smoothening the series consists in averaging preceding and succeeding values to a given values to a given value xi or a total of 2m or 2m + 1 successive members of series. The new smoothened value x3 is at the i th position of the series. The smoothened procedure may be repeated n times. Generally, a polynomial is fitted to 2m + 1 points. Description: Consider, for example, fitting a cubic equation to seven points. Let t = -3, -2, -1, 0, 1, 2, 3 denote the time indices of the seven points. Let a0 + a1t + a2t 2 + a3t 3 represents the cubic equation to be fitted to seven points by the least square method. Then To minimize S, we have Where j = 0, 1,2,3. It may be noted that when i is an odd power, e.g., when i =1, From equation (b), we get Therefore, Also,           3 3t (a) 2 3 t 3 a 2 t 2 at 1 a 0 atx S        3t 3t (b) 0 j t 3 t 3 a 2 t 2 at 1 a 0 a t x2 j a S   0 i t   .03210123t   28(3)(2)(1)0(-1)(-2)(-3) t 2222222      0jfor taax a S 2 20t 0 (c) 28a7a ta7a x 20 2 20t      2jfor 02 t2t 2 a 0 at x 2 a   S t y t t yt (a) (b) yt Chapter 6: Data validation 51 Therefore, by solving equation (c) and (d), we get Thus the smooth value at the middle position of seven points can be obtained by coefficients derived above by the least square method and given in equation above. Input Average of five or more (odd number) weights is moved successively. Output Weights or coefficients sum to unity and they are symmetric about the middle points. The middle value of the average is the treated value. Operational requirement and restrictions Series should be long. Short series does not show better filling. Initial and final values can not be filled in moving average method. Advantage of moving average  We get the same trend fit whether we fit forward or backward.  It is easy to up-date.  The moving average coefficients of a fit to (2m+1) points are the same for polynomial of degree 2p and 2p+1. Disadvantage of moving average  Data at the beginning and end of a series are lost.  This may generate cycles or other movements that were not present in the original data. (d) 2 196a 0 28a 4 t 2 a 2 t 0 atx 2 t        t 2 t0 xtx7 21 1 a        7 6, 3, 2, 21 1 2 3, 6, 7, 6, 3, 2, 21 1 2x3x6x7x6x3x2x 21 1 9x4xx0x 4x9x7x7x7x7x7x7x7x 21 1 3210123 3211 233210123         Chapter 6: Data validation 52 6.8 Least square method Purpose and Objective The method of finding the line that best fits the collected data is done by Least Square Method. This is used to find the equation of an appropriate trend line, which can later be used to compute the trend values T. Description The method of least squares assumes that the best-fit curve of a given type is the curve that has the minimal sum of the deviations squared (least square error) from a given set of data. Suppose that the data points are (x1, y1), (x2, y2)……………….(xn, yn) where x is the independent variable and y is the dependent variable. The fitting curve f(x) has the deviation (error) d from each point i.e. d1 = y1 f(x1), d2 = y2-f(x2)………. dn = yn-f(xn). According to the method of least square, the best fitting curve has the property that: MSE = Maximum square error Recommendation Statistical inference of trend existence is the best way to detect trends in hydrologic series. If a jump is in the mean, variance first serial correlation coefficient, or any other parameter, then with their known sampling distributions and the tolerance level fixed, it is possible to determine whether a jump is significantly different from zero or not. Similarly a straight line trend x = a + bi fitted as a regression line by the least squares through the x-time series which is tested for b being significantly different from zero, or as a polynomial of the second or higher order having coefficients that are or are not significantly different from zeros. This approach in trend detection and description is more reliable than the moving average. 6.9 Normal distribution function Purpose and Objective Normal distribution is used to find out the distribution shape of data set. It measures the bell shaped for qualitative data and skewed for irregular data. One reason the normal distribution is important is that many psychological and educational variables are distributed approximately normally. Measures of reading ability, introversion, job satisfaction, and memory are among the many psychological variables approximately normally distributed. Although the distributions are only approximately normal, they are usually quite close. A second reason the normal distribution is so important is that it is easy for mathematical statisticians to work with. This means that many kinds of statistical tests can be derived for normal distributions. Description The normal distribution can be fitted to data either analytically or graphically. The analytical test to check the goodness of set of a distribution function to an empirical distribution will be dealt with in the ensuing text. Goodness of fit, however, is generally checked graphically. In order to facilitate this fit, a    )3.6( xfy d d...ddMSE 2n 1 ii n 1 2 i 2 n 2 2 2 1   Chapter 6: Data validation 53 special scale for probabilities is transformed in such a way that the normal distribution function becomes a straight line. The probability density function (PDF) of a random continuous variable and is given as: The two parameters of the distribution are the mean,  and the standard deviation,  for which X and s, derived from sample data, are substituted in above equation. By a simple transformation the distribution can be written as a single parameter function only. Thus when t = (x-)/, dx =  dt, the PDF becomes And the continuous distribution function (CDF), The variable t is called the standard unit, it is normally distributed with zero mean and unit standard deviation. This transformation is called the standardization of normal distribution variable. Input Number of data in a certain range is a plotted in y-direction and the range is plotted in x-direction. Output Average line of plotted data shows whether data set is normally distributed or bell shaped in condition. It helps to make further statistical decision. Operational requirement and condition Large number of data set gives more accurate curve. 6.9.1 Decision of normality test The result of this test is expressed as ‘accept normality or ‘reject normality’ with P value. If P value is higher than 0.05, it may be assumed that the data have a Normal distribution and the conclusion accepts Normality is displayed. In normality test, if the P value is less than 0.05, then the hypothesis that the distribution of the observations in the sample is normal should be rejected. In the later case the sample cannot accurately be described by arithmetic mean and standard deviation, and such samples should not be submitted to any parametrical statistical test or procedure, such as t-test. To test the possible difference between not normally distributed samples, the Wilcoxon test should be used, and correlation can be estimated by means of rank correlation. When the sample size is small, it may not be possible to perform the selected test and an appropriate message will appear. In this case visually evaluate the symmetry and peakdness of the distribution using the histogram or cumulative frequency distribution. )/2σμ)(xexp( 2πσ 1 f(x) 22  /2)texp( 2π 1 f(t) 2  /2)duuexp( 2π 1 F(t) 2 t    Chapter 6: Data validation 54 6.10 Pearson’s Correlation test (Parametric) Purpose and objective Pearson’s “r” is a measure of the strength of the linear relationship between two variables: the extent to which increases in one variable are associated with increases (or decreases) in another variable. Pearson's "r" is a parametric test. Procedures for using Pearson’s correlation test (parametric) It is used when both of the variables satisfies certain requirements and assumptions. These assumptions are that both variables are (a) continuous; (b) measured on an interval or ratio scale; (c) normally distributed. Pearson’s “r” is measured on a scale which goes from +1 (perfect positive correlation, where increases in one variable are perfectly matched by increases in another variable) to -1 (perfect negative correlation, where increases in one variable are perfectly matched by decreases in another variable). Formula for Pearson’s “r” r =                                  N Y Y N X X N YX XY 2 2 2 2 * * To get a clear idea about the correlation one has to determine the square of the correlation coefficient “r”. r2 is called the “coefficient of determination” and it shows how much the variance in one of the variables can be accounted for by a knowledge of the other. Note that calculating the coefficient of determination emphasizes the fact that the scale on which Pearson’s r is ranged (i.e., -1 to +1) is not a linear scale: a correlation of 0.8 is not twice as good as one of 0.4, it is much better. A 0.8 correlation between two variables means that knowledge of one variable accounts for 64% of the variance in the other (0.8 squared = 0.64 = 64%). In contrast, a 0.4 correlation accounts for only 16% of the variance, and a 0.2 correlation accounts for only 4% of the variance. In short, the closer a correlation is to -1 to +1, then the stronger it is, and this process accelerates as one nears -1 or +1. Input Two sets of data to find the difference. Operational requirement and restriction The method is applicable for the data which are normally distributed and continuous. Chapter 6: Data validation 55 6.11 Spearman’s rank correlation test (non-parametric) Purpose and Objective Spearman’s rank correlation test is a technique used to test the direction and strength of the relationship between two variables. Square value of difference is determined and helps to determine Rs for taking null hypothesis decision. Procedure for using Spearman’s rank correlation This is used in much the same circumstances as Pearson's r. The chief difference is that it makes fewer assumptions about the nature of the data on which the correlation is to be performed: the data need only be measurements on an ordinal scale of measurement (i.e., as long as they can be meaningfully placed in rank order, this correlation can be used). Another important difference is that whereas Pearson’s “r” is a measure of the strength of the linear relationship between two variables, Spearman’s rho is a measure of the strength of the monotonic relationship between them. If a monotonic relationship exists, it simply means that one of the variables increases (or decreases) by some amount when the value of the other variable changes. A linear relationship is thus a special case of a monotonic relationship. Thus, if there is a monotonic but non linear relationship between two variables, it’s better to use Spearman’s rho because Pearson’s “r” will tend to underestimate the strength of the relationship. Spearman’s rho won’t be “fooled” by the fact that the relationship isn’t a linear one. Method to calculate Rank both sets of data from the highest to the lowest. Make sure to check for tied ranks. Subtract the two sets of ranks to get the difference d. Square the values of d. Add the squared values of d to get Sigma d2. Use the formula Rs = 1 - (6  d 2 /(n 3 n)) where n is the number of rank and d is difference of similar position. As with Pearson’s “r”, Spearman’s rho is on a scale which goes from -1 (perfect negative correlation) to +1 (perfect positive correlation). If the Rs value… …is –1, there is a perfect negative correlation. …falls between –1 and 0.5, there is a strong negative correlation. …falls between –0.5 and 0, there is a weak negative correlation. …is 0, there is no correlation …falls between 0 and 0.5, there is a weak positive correlation. …falls between 0.5 and 1, there is a strong positive correlation. …is 1, there is a perfect positive correlation between the 2 sets of data. If the Rs value is 0, state that null hypothesis is accepted. Otherwise, it is rejected. Input Two sets of data are ranked in similar order to find the difference of ranks. Chapter 6: Data validation 56 Output Correlation of two values. Square value of difference is determined and helps to determine Rs for taking null hypothesis decision. Operational requirement and restriction It is applicable if the data sets are normally distributed. 6.12 Median run test Purpose The runs test can be used to decide if a data set is from a random process. Description In the median run test the number of runs Nr of series Ai, (i=1, N) above and below the median is counted. Run is defined as an excursion above or below the median, denoted by Am:  A positive run is bounded by an up-crossing and down-crossing,  A negative run is bounded by a down crossing and an up-crossing. If the number values above and below the median are denoted by m and n respectively, the quantity Nr for a random series is asymptotically normally distributed with N (r,r): r = 2mn /(m+n) + 1 r 2 = 2mn{2mn-(m+n)/{(m+n) 2 (m+n-1)} where,  is mean and  is variance. Operational requirement The normal approximation holds for m and n >20. For smaller values of m and n may be used to obtain critical values of Nr at a 5% significance level. 6.13 Difference sign test The difference sign Nn between successive values of series Ai, (i =1,N): A(i+1) - A(i). Let the maximum of the two be given by Nds: Nds = max (Np, Nn) For an independent stationary series of length Neff (Neff +N – zero differences) the number of negative or positive differences is asymptotically normally distributed with N (ds,ds): ds = (Neff -1) 2 ds 2 = (Neff +1) 12 The absolute value of the following standardized test statistic is computed: u = |Nds - ds| ds Chapter 6: Data validation 57 6.14 Series homogeneity test Depending on the type of analysis series must fulfill one or more of the following requirements:  Stationary: i.e. the properties or characteristics of the series do not vary with time;  Homogeneity: i.e. all elements of a series belong to the same population;  Randomness: i.e. series elements are independent. Following statistical tests investigate stationary, homogeneity or randomness of a series:  Median run test: a test for randomness by calculating the number of runs above and below the median:  Turning point test: a test for randomness by calculating the number of turning points:  Difference sign test: a test for randomness by calculating the number of positive and negative differences;  Spearman rank correlation test: the Spearman rank correlation coefficient is computed to test:  the existence of correlation between two series,  the significance of serial rank correlation, and  the significance of a trend;  Arithmetic serial correlation coefficient test : a test for serial correlation:  Wilcoxon-Mann-Whitney U-test: a test to investigate whether two series are from the same population;  Student t-test: a test on difference in the mean between two series;  Wilcoxon W-test: a test on difference in the mean between two series;  F-test for variance of two series;  Linear trend test: a test on significance of linear trend by statistical inference on slope of trend lie;  Range test: a test for series homogeneity by the rescaled adjusted range.  Chi-Square test: It is used for ‘Goodness of Fit’ Notes:  The Spearman rank correlation test may be used as a single or two series test; in the single series mode it tests the significance of correlation with time.  Wilcoxon-Mann-Whitney U-test, Student t-test and Wilcoxon W-test are basically two-series tests; however, the test can also be used for a single series by means of the split-sample approach, where a series is divided into two parts, which are mutually compared. Chapter 6: Data validation 58 6.15 Spatial homogeneity test Like rainfall, temperature, evaporation, etc., but sampled at a number of stations (point measurements) to investigate the reliability of point observation at a station called the test station, the observations are compared with weighted averages of the rainfall at neighbor stations. The weights are inversely proportional to some power of the distance between the test station and neighboring stations. Now the test is considering the difference between the observed and estimated value at the test station. If the absolute difference between observation and estimation exceeds specific limits (absolute and relative), the observation will be flagged (but not deleted!) to stress the need for further investigation. The test generally performed for rainfall, like estimation of point rainfall. A- 59 Chapter 7 Data Compilation 7.1 General Aggregation and disaggregation of series are executed in data compilation. Aggregation of a series implies the evaporation of a series with a large time interval, by adding or averaging data of the series with the smaller interval: for example aggregation of series with an interval equal to one day to a series with an interval of one month, or from month to year, etc. Disaggregation is the opposite process: by disaggregation series with a smaller time interval is created. In aggregation series two cases are distinguished:  For instantaneous observations the aggregated data are averages of the originals, e.g. discharges in m3/s.  For accumulative observations the aggregated data are the sums of the originals e.g. rainfall or runoff in mm. In disaggregation series following options exist: For instantaneous observations  Basic and disaggregated series data are equal,  Disaggregated series data are interpolated linearly between the mid-point values of the basic series data (the original series, the series to be aggregated, is called the basic series.) For accumulative observations Disaggregated series data are fractions of the basic series data; if there are n disaggregated series elements in a basic series interval, then the fraction is 1 n : disaggregated series data = 1 n  basic series data. 7.2 Minimum, mean and maximum series For a given series the computation of minimum, maximum and mean values for specific time periods are needed. Minimum, maximum and mean values for following time periods can be obtained:  day  month  year  period within the year. 7.3 Fitting distributions For fitting distributions normally following theoretical frequency distributions are used:  Normal Distribution  Two-Parameter Log-Normal Distribution,  Three-Parameter Log-Normal Distribution, Exponential distribution,  Extreme Value Type I or Gumbel Distribution Chapter 7: Data compilation 60  Extreme Type II or Frechet Distribution,  Extreme Type III Distribution,  Generalized Extreme Value Distribution,  Pearson Type III or Gamma distribution  Log-Pearson Type III distribution  Box-Cox transformation to normality, For each distribution one can obtain:  Estimation of parameters,  Summary of observed and theoretical probabilities,  Goodness of fit-test: – Binomial, – Kolmogorov-Smirnov, – Chi-squares  Computation of extreme values for specific return periods, either related to probability of non-exceedance or exceedance, and  Plot of distribution function. 7.3.1 Log-normal distribution function Many hydrologic variables show a marked right skewness, partly due to the influence of natural phenomena having values greater than zero or some other lower limit, and being unconstrained, theoretically in ht upper range. In such cases frequencies will not follow the normal distribution, and instead, variables fortunately are often functionally normal and their logarithms follow a normal distribution.             2 y 2 y X S 2 μy exp 2πσx 1 p(x) for X > 0. (7.1) where, µy = location parameter Sy = Shape parameter 7.3.2 Standard incomplete gamma function This function forms the basis of a number of distribution functions. It has very wide applications in hydrology studies. But Pearson Type III, a special case of Gamma distribution is all the more useful. This distribution has been widely adopted as the standard method for flood frequency analysis in a form known as the log-Pearson type III in which the transform Y = log X is used to reduce skewness. Although all the three moments are required to fit the distribution, yet it is extremely flexible in the sense that a zero skew will reduce the Log-Pearson type III distribution to lognormal. One of the greatest advantages in practical application of gamma and normal varieties lies in the fact that the sum of two such variables retains the same distribution. This function forms the basis of a number of distribution functions. It has the following form: f(x) = x k - 1exp(-x) / Γ(k) for x > 0. (7.2) A random variable x with this density is said to have the gamma distribution with shape parameter k. The following exercise shows that the family of densities has a rich variety of shapes, and shows why k is called the shape parameter. Chapter 7: Data compilation 61 7.3.3 Pearson’s type III or gamma distribution function This is a skew distribution with limited range in the left direction, usually bell shaped. The Pearson curve, is truncated on one side of the axis of the variate, i.e. below a certain value of the variate the probability is zero, but it is infinite converging asymptotically to the axis of the variate. This means even values infinitely large (or small) have a certain probability of occurrence.      βΓ eεxλ p(x) εxλ1ββ    (7.3) where, βsxε, C 2 β, β s λ x 2 s x          The parameters can be estimated by:  method of moments, and  modified maximum likelihood method 7.3.4 Raleigh distribution function PR(X) = FG(Z) (7.4) where: Z = (X – X0)/ β) 2 and γ = 1 X0 = location parameter, (X0 < X) β = scale parameter The parameters X0 and β are estimated from the moments. 7.3.5 Exponential distribution function PE(X) = FG(Z) (7.5) where: Z = (X – X0)/β and γ =1 X0 = location parameter, (X0 < X) β = scale paramerer The parameter X0 and β are estimated from moments 7.3.6 General Pearson distribution function PGP(X) = 0.5 + (K/ K )(FG(Z) – 0.5) (7.6) Chapter 7: Data compilation 62 where: Z = ((X-X0)/β) k, β = scale parameter, k = type paramete (integer) 1: Pearson Type III (Exponential distribution for γ =1) 2: Raleigh (γ = 1) and Maxwell (γ = 1.5) distributions. 1: Pearson Type V distribution. The type parameter k is provided by the user. The parameters X0, (X0<X) or may be provided by the user (2-parameter distribution) or can be estimated (3-parameter distribution). The parameters X0, β and γ are estimated by a mixed moment maximum likelihood method. 7.3.7 Log Pearson type III distribution function      βxΓ eεyλ p(x) εyλ1ββ    (7.7) where, βsyε, (y)C 2 β, β s λ y 2 s y          Parameters are estimated by mixed moment-maximum likelihood method, and described in terms of sample moment. ε = location parameters,  = shape parameters,  = scale parameters. 7.3.8 Extreme type I or Gumbel distribution                 α μx exp α μx exp α 1 p(x) for  x (7.8) where:  = location parameter, α = scale parameter. The parameters  and α can be estimated by : 1) method of moments, 2) modified maximum lidelihood method, (with or without censoring). 7.3.9 Extreme type II or Frechet distribution where: X0 = location parameter, (X0<X) β = scale parameter, k = shape parameter, (k<0) (7.9) 1 β 0 X-X exp (X) IIEV P k           Chapter 7: Data compilation 63 The location parameter may be given (2-parameter distribution) or estimated (3-parameter distribution). The parameters can be estimated by the modified maximum likelihood method. 7.3.10 Extreme type III distribution The Extreme Value Type III (EV3) distribution arises when the extreme is from a parent distribution that is limited in the direction of interest. This distribution has found its greatest use in hydrology as the distribution of low stream flows. Naturally low flows are bounded by zero on the left. The EV3 distribution is also known as Weibull distribution, (Haan, 1979). Distribution function can be described as follows:       αα1α βxexpβαxp(x)   (7.10) where: β = scale parameter, α = shape parameter, The parameters of the Weibull distribution can be estimated by the method of moments 7.3.11 Goodrich/Weibull distribution where: X0 = location parameter, (X0 < X) β = scale paramerer k = shape parameter (k > 0) For the estimation of parameters the same applies as for the Extreme Type II distribution. 7.3.12 Pareto distribution PPA(X) = 1-e z ; 0< Z <∞ ;θ = 0 (GP – I) (7.12) where: Z = (X-X0)/σ X0 = threshold (to be specified by the user), σ = scale parameter θ = shape parameter: 0 : general Pareto type –I distribution, < 0 : general Pareto type-II distribution, and > 0 :general Pareto type-III distribution. The domain of X is, For θ ≤ 0: X > X0 (7.11) β )X(X exp1(X)P k 1 0 GO         III)-0(GPθ ; θ 1 Z0 ; θZ)-(1-1 II)-0(GP θ ; Z0 ; θZ)-(1 1 θ 1 θ 1   Chapter 7: Data compilation 64 For θ > 0: <X0 < X< X0 + σ/θ The parameters are estimated either by the maximum likelihood method (θ ≤ 0) or by the method of moments (θ > 0). 7.3.13 Peaks over threshold (POT ) method The POT-method uses the Pareto distribution, which is a skewed, heavy-tailed distribution that is sometimes used to model the distribution. An additional parameter λ is introduced, which is the average number of exceedance per year, A return period of T years corresponds in the POT method to one occurrence of the extreme in a series of λΤ exceedances above a fixed threshold X0. Hence the related probability of non-exceedance in a series of all exceedances above a threshold is 1-1/(λΤ). 7.4 Selection of Probability Distribution for Frequency Analysis Among all the above-described probability distributions all the methods are not applicable for all types of data. Distributions are dependent on statistical properties of the data set. Depending on statistical properties of the data set, different data sets follow different types of distribution. Selection of appropriate probability distribution can be done by probability plotting on a probability paper and goodness of fir test. In Flood Hydrology Study (1992) under the Flood Action Plan (FAP 25) has included the results of an investigation on suitability of six probability distribution functions for fitting annual maximum water level and annual maximum discharge data for 5 key stations (Bahadurabad, Serajganj, Baruria, Mawa, Bhairab Bazar). They have followed following methods:  Visual inspection of plotting on probability paper  Goodness-of-fit tests using Kolmogorov-Smirnov (KS) and Chi-Square (CQ) tests  Comparison of the extrapolation properties of the distribution. It is reported that all distributions fit fairly well on probability papers and visual inspection was not conclusive. The criteria for judging an extrapolated value have not been mentioned there. Chowdhury and Karim (1993) have followed different approaches for selecting appropriate probability distribution. These approaches are described in Article 7.4.1 of this chapter. They have compared five widely used method of frequency distribution for water level and discharge data for 48 and 31 gauging stations. The methods are Log-normal, Gumbel, generalized extreme value (GEV), Pearson Type-3 and Log-Pearson Type-3 (LP3). From their study report GEV distribution has been found to be the most appropriate followed by LN2, Gumbel and LN3 distributions for frequency analysis of annual maximum discharge data in Bangladesh. The GEV distribution has been found to be most appropriate followed by LN2 and P3 for annual maximum water level data. In FAP 4, (Southwest Area Water Resources Management Project) final report (1993), frequency analysis has been carried out for the annual peaks at non-tidal gauging stations. The Gumbel and Extreme Value Type-3 distributions were fitted to the data and distribution which gave the best for events at higher return periods was chosen for that station. Other distributions have not been used in that study. 7.4.1 Methodology for selection of probability distribution Normalization of the sample Normalization of a sample of data means dividing every data of sample by the sample mean ( x ). This can be expressed mathematically as: x/xh ii  , where hi is the normalized data. Chapter 7: Data compilation 65 Generation of random number A random number is defined as a number selected at random from a population of numbers in such a technique that every number in the population has an equal chance of being selected. Random sample can be generated from a probability distribution by making use of the fact that the CDF for the continuous variate is uniformly distributed over the interval 0 to 1. Thus for any random variable X with PDF p(x), the variate P(x) =   x p(x)(t)dt is uniformly distributed over (0,1), (Chowdhury and Karim, 1993). Therefore, random numbers from a distribution can be drawn by generating random numbers from the uniform distribution and using the inverse of the CDF of that distribution. One example of generating data for Gumbel Distribution have been using the following equation: xp =   plnαlnε  where  is a location parameter and Euler’s constant, which is equal to 0.57721, α is a scale parameter. Normal random numbers can be generated from the equation Zp =       131q192q562q 205q1004qq 2   Where q = ln [2p]; p is the probability for different return periods. The log-normal random numbers can be obtained by exponentiating the generated normal random numbers. Equations for obtaining the random numbers for GEV and P3 are xp = ε +(α/k)[1-{-ln(1-1/T)} k] xp = μx + Kpσx For P3 distribution Zp obtained from normal random number is inserted in place of Kp. The LP3 random numbers can be obtained by exponentiating the generated P3 random numbers. Moment ratio diagram Two approaches are available, one is to construct product moment ratio diagram and the other is to construct L-moment ratio diagram. For annual maximum data, the moment ratio diagram should be constructed by using unbiased estimators of moment ratio. Two moment ratio diagram can be constructed. One is a plot of L-CS versus L-CV and the other is L-kurtosis versus L-CS. Generally the first one is used for the two parameter distributions. Equation 5.16 to 5.21 is used to plot this diagram. L-moment ratio diagram would be plotted for the observed data and by using different probability distributions. Selection of distribution is made by examining which candidate distribution produces a L-kurtosis versus L-CS plot that is close to that obtained from observed data samples in the region. It is better to apply this method to the regionally homogeneous data sample. Regional distribution of L-CS The skewness is an important parameter since the shape of the tail end of a distribution is dependent on this. L-CS of the observed data and L-CS obtained for different distributions will be plotted against EV1 standardized variate. Plotting position can be determined by using the following formula: Fi = i/(n+1) Chapter 7: Data compilation 66 By comparing the plot of observed data sample with the plot obtained from different distributions selection will be made. Regional distribution of the largest data For this approach sample size and period should be same for the selected station. A new data set can be obtained by picking the largest value from each year for each station. Average of theses values for each station will be plotted against EV1 standardized variate. For every parent distribution, similarly a new data set can be obtained by picking the largest value from every generated sample. Similar plot will be made for different distributions. Selection of distribution will be made by comparing the plot of observed sample data with generated data. Probability plot correlation Probability plots are extremely useful for visual revealing the character of a data set. Plots are effective ways to determine if fitted distributions appear consistent with the data. The PPC coefficient can be used as a criterion for comparing the goodness-of-fit of alternative distributions. It gives a measure of the correlation between the ordered observations hi and the corresponding fitted quantiles wi = G 1(Fi), Determined by plotting positions Fi = i/(n+1) For each h. Values of correlation coefficient  near 1.0 suggest that the observations could have been drawn from the fitted distribution. Essentially,  measures linearity of the probability plot providing a quantitative assessment of fit.  can be obtained from following equation:  =     0.5 n 1i 2 n 1i i 2 i n 1i ii )w(whh wwh)(h               where:    n 1i i /nhh and    n 1i i /nww The quantiles wi can be obtained for distributions is obtained from Eqs. 7.2, 7.4, 7.6, 7.8, 7.9, 7.11, 7.13 with the help of plotting position formula. Root mean square error in fit When a distribution is fitted to a sample of observed data at a station, the deviation of the fitted distribution from observed data can be evaluated by root mean square error (RMSE). The average RMSE can be used as a criterion for comparing the goodness-of-fit of alternative distributions. In the case of regional analysis, it is advantageous to use the relative average RMSE. (Chowdhury, 1993) RMSE can be calculated by: RMSE = 0.5 n 1i 2 i ii h ĥh n 1                    where hi be the observed value and iĥ be the computed value from the fitted distribution. The values of i ĥ can be obtained from Eqs. 7.2, 7.4, 7.6, 7.8, 7.9, 7.11, 7.13. Chapter 7: Data compilation 67 Results A summary of ranking of the distributions can be made from the results of above described five approaches 7.5 Test for stability of variance and mean Test for stability, of variance and mean (F–test and t–test) (for stationary, consistency and homogeneity). To test the stability of variance and mean, which is an indication of the homogeneity, stationary and consistency of the time series, the F-test for stability of variance and t-test for stability of mean is used Dhamen and Hall. 7.5.1 T-test Purpose Testing for equality of the variances and means of two samples. Description Now we want to know whether could seeding significantly affects rainfall, i.e. whether one set of numbers is larger or smaller than the other. The t-test is used to test for the mean of two sets of numbers being equal. You compute the t-statistic, which is given by this formula: 12 21 SE xx t   (7.13) The denominator is computed with: 21 12 n 1 n 1 SSE  where: 2 - n n 1)s - (n 1)s (n S 21 2 22 2 112    where: 1 x and 2x are the means of the two sets of numbers, 1S and 2S are the square roots of the variances of the two sets, and n1 and n2 are the number of points in each data set. Operational requirements Normal or almost normal distribution is necessary. T-test Condition It would seem logical that, because the t-test assumes Normality, one should test for Normality first. The problem is that the test for Normality is dependent the sample size. With a small sample a non significant result does not mean that the data come from a Normal distribution. On the other hand, with a large sample, a significant result does not mean that we could not use the t-test, because the t-test is robust to moderate departures from Normality- that is, the P value obtained can be validly interpreted. There is something illogical about using one significance test conditional on the results of another significance test. In general it is a matter of knowing and looking at the data. One can ‘eyeball’ the data and if the distributions are not extremely skewed, and particularly if (for the two-sample t-test) the numbers of observations are similar in the two groups, then the t-test will be valid. The main problem Chapter 7: Data compilation 68 is often that outliers will inflate the standard deviations and render the test less sensitive. Also, it is not generally appreciated that if the data originate from a randomised-controlled trial, then the process of randomisation will ensure the validity of the t test, irrespective of the original distribution of the data. The t-test is used to determine whether sample (s) have different means. Essentially, the t-test is the ratio between the sample mean difference and the standard error of that difference. The t-test makes some important assumptions:  interval/ratio level data.  one or two levels of one or two variables  normal distribution  equal variances (relatively) Types of t-test There are three types of t-tests: The one sample t-test  This statistic tests a sample mean against a known population mean  The null hypothesis tests if the sample mean is equal to the population mean. The independent samples t-test  This statistic tests whether the mean of one sample is different from the mean of another sample.  The null hypothesis tests if the mean of sample 1 is equal to the mean of sample2. The paired group t-test  This statistic tests if two groups within the overall sample are different on the same dependent variable.  The null hypothesis tests if the mean of (var1- var2) is equal to 0. 7.5.2 Wilcoxon-Mann-Whitney U-test Purpose The two-tailed (Wilcoxon) Mann-Whitney U test can be used to test whether the medians of two independent distributions are different. So the test is used for comparing the medians of two samples. Description The Wilcoxon-Mann-Whitney test uses the ranks of data to test the hypothesis that two samples of sizes m and n might come from the same population. The procedure is as follows:  Combine the data from both samples  Rank each value  Take the ranks for the first sample and sum them  Compare this sum of ranks to all the possible rank sums that could result from random rearrangements of the data into two samples. If step 4 reveals that the rank sum for the observed first sample is larger (or smaller) than nearly all the random orderings, this indicates that the first sample is significantly different from the second sample. Chapter 7: Data compilation 69 The sum of the raw scores for the control group are computed from S = {N (N+1)/2} - Wgroup Where: S = sum of the control group N = total no. of rank Wgroup = sum of working group The formula for this z score computation is… Where the value of U is the sum of the ranks in the important group, n1 and n2 are the no. of ranks of two groups and N = (n1 + n2) = is the sum of total no of ranks. Input Two columns of measured or counted data. Output Mean value of the sample data sets. Operational requirements This test is non-parametric, which means that the distributions can be of any shape. This test is valid for only if both samples have N>7. 7.5.3 F-test Purpose The F test employs the statistic (F) to test various statistical hypotheses about the mean (or means) of the distributions from which a sample or a set of samples have been drawn. It is noteworthy that as demonstrated in this tutorial, the t test is a special form of the F test. Description     12 1Nnn /21Nn0.5U z 21 1            (7.15) )1/(3-Nr t :is r of cesignifican themeasure toused statistic The data of No. N effientcon Correlatio r A ofmean m :th wi (7.14) N mA 1N mAmA r 2 11 1 1 iA N 1i 2 Ai 1N 1i A1iAi 1 r              Chapter 7: Data compilation 70 The F or Fisher distribution is the distribution of the variance-ratio of samples from a normal distribution. Also, the F-test or Fisher-distribution gives an acceptable indication of stability of variance of the sub-sets of the time series even if the samples are not from a normal distribution. The test statistic is the ratio of the variance of two split, non-overlapping, sub-sets of the time series. F-test is the best choice as it always gives the exact P value. Whether the chi-square test is simpler to calculate but yields only an approximate P value. Chi-square test should be definitely avoided when the numbers are larger.        0 x, (m/n)x1 x n m 2)Γ(m/2)Γ(n/ /2nmΓ f(x) n)/2(m /22mm/2            where, m, n = degree of freedom m/(n +1) = mean n√((m+2)/(m(n-2)(n-4)) = standard deviation if n > 4, 4)m(n 2nm 2n n 2var(x) 2           Input Two columns of measured or counted data. Output Variance of medians Operational requirements Random data set is required for f-test. 7.6 Goodness to fit test 7.6.1 Chi-square test Purpose Testing for equal distribution of compartmentalized, counted data. Description The chi-square test is used to test if a sample of data comes from a specific distribution. An attractive feature of the chi-square goodness of fit test is that it can be applied to any univariate distribution for which one can calculate the cumulative distribution function. The chi-square goodness of fit test is applied to binned data. This is actually not a restriction since for non-binned data one can simply calculate a histogram or frequency table before generating the chi-square test. However, the value of chi-square test statistic is dependent on how the data is binned. Another disadvantage of the chi-square test is that it requires sufficient sample size in order for the chi-square test is that it requires sufficient sample size in order for the chi-square approximations to be valid. The chi-square test is an alternative to the Anderson-Darling and Kolmogorov-Smirnov goodness of fit tests. The chi-square goodness of fit test can be applied to discrete distributions such as the binomial and the Poision. The Kolmogorov-Smirnov and Anderson-Darling tests are restricted to continuous distributions. Chapter 7: Data compilation 71 Often, the interest in practice is to know whether or not the observed frequencies differ significantly from the expected frequencies. A measure of the discrepancy existing between observed and expected frequencies is supplied by the statistic chi-square, where: Oi = observed frequency ei = expected frequency = N*1/k, where, N = no. of observed data. k = no. of class (interval) frequency. If χ 2 = 0, it indicates that the observed and theoretical frequencies agree exactly, while if χ 2>0, they do not agree exactly. The sampling distribution of χ is approximated very closely to the chi-square distribution with (k-1) degrees of freedom provided the expected frequencies can be computed without having to estimate population parameters from the sample statistics. If we know (k-1) of the expected frequencies the remaining frequency can be determined. The degrees of freedom would be (k - h - 1) if the expected frequencies can be computed only by estimating h population parameters. From the percentile of chi-square distribution table the critical value of χ2 is measured with 95% confidence level. The expected frequencies are computed on the basis of a hypothesis H0. Input Two columns of counted data in different compartments (rows). Output Numerical value for goodness of fit. The larger Chi-square value is the more probable the null hypothesis is false. Operational requirements  all the individual items in the samples should be independent; and  the differences between small observed and expected frequencies at the ends of a distribution have a great effect upon Chi-square. Hence it is necessary to consider together two or more classes at each end. It has been suggested that no group should contain fewer than five expected frequencies.  Chi-square test should be avoided if the number of data less than six. 7.6.2 Kolmogorv - Smirnov test The ‘two-tailed’ Kolmogorov-Smirnov test determines whether two independent samples have been drawn from the same population. If the two samples have in fact been drawn from the same population, then the cumulative distributions of both samples may be expected to be fairly close to each other, i.e. they should show only random deviation from the population distributions. If the two sample cumulative distributions are too far apart at any point this suggests that they come from different populations. Thus a large enough deviation between the two sample cumulative distributions is evidence for rejecting the null hypothesis.   (7.16) k 1i i e 2 i e i O 2 χ               Chapter 7: Data compilation 72 The Kolmogorov-Smirnov two-tail test focuses on the maximum deviation, D. D = maximum | SNa (X) - SNb (X) | (7.17) SNa = K Na and SNb = K Nb where K = No. of required observation. Na and Nb = Total no. of observation. For large samples (N>40) Kolmogorov-Smirnov tables show that the value of D must equal or exceed the value of: ba ba NN NN 1.36  (7.18) To reject the null hypothesis at the 5 per cent level, that is, that they are not from the same population. The ‘one-tailed’ Kolmogorov-Smirnov test determines whether the two samples have been drawn from the same population or whether the values of one sample are stochastically larger than the values of the population from which the other sample was drawn. The maximum deviation is again calculated using equation (7.13) and the significance of the observed value of D can be computed by reference to the chi-squared distribution. It has been shown that for large samples: ba ba22 NN NN 4Dχ   (7.19) It has a sampling distribution which is approximated to the chi-square distribution with two degrees of freedom. A chi-squared table for reference is given below. If Kolmogorov-Smirnov value is less than D value then null hypothesis will be rejected. That is, in this case there is a significant difference between the two samples. Which is less than the maximum deviation, and thus we can reject the null hypothesis at the 5% level. That is, in this case there is a significant difference between the two speed samples. 7.7 Test for relative consistency and homogeneity Test for relative consistency and homogeneity with double–mass analysis will be carried out for all data. Double mass analysis can be carried out using the records for wet season months only. Inclusion of dry season months would make very little difference to the resulting plots. The cumulative rainfall at the station of interest could be compared to the cumulative average rainfall at a group of between the neighboring stations. It should be noted that missing data values have not been replaced by long-term mean as is often done in double mass analysis; instead, the months of missing data have been omitted from the period of analysis. The variations in slope of the rainfall pattern may also consider which can be attributed to natural variation in rainfall patterns. The checking of these records might identify particular errors in the data and thereby improve the overall reliability. The double mass analysis can clearly identify some periods of questionable data, and examination of the data led to some adjustments. Where a period or periods of data showed consistently high or low rainfall the records have been adjusted by a factor chosen to bring the slope of the double mass plot into line with the long-term situation represented by the average of the check station. It has not been possible to identify the reason for such consistent errors in the data, but it is considered that the adjustments result in inaccurate data being replaced by a more realistic record. Possible reasons for changes in slope of the double mass plot include the re-location of a rain gauge, construction of nearby buildings, removal of trees, the use of an incorrect measuring cylinder, and incorrect conversion from inches to millimeters. After the double mass analysis further examination of the records would identify additional corrections. http://www.roads.dft.gov.uk/roadsafety/goodpractice/39.htm#01 Chapter 7: Data compilation 73 7.8 Test for regional homogeneity Stations can be grouped subjectively by site characteristics (i.e., latitude, longitude, elevation and mean annual precipitation). Although that purpose of the homogeneity test is to identify the stations with frequency distributions that are identical apart from a station-specific scale factor. For testing the homogeneity between different stations discordancy measure test is used. Stations can also be grouped objectively using cluster analysis procedures. Cluster analysis is a multivariate statistical analysis procedure for partitioning a data set into groups. The procedure involves assigning a data vector to each site. Sites are then divided into groups based on the similarity of their data vectors. The data vectors can consist of site statistics, site characteristics, or some combination of both. For regional frequency analysis it is required that data series come from a homogeneous region. A homogeneous region is group of sites having data series which are assumed to have been drawn from the same frequency distribution. A nonparametric test based on a discordancy measure suggested by Hosking and Wallis (1993) was used to determine whether a given data series was discordant with a group of data series as a whole. The theme of the method is that if the L-moments (L-cv, L-skewness and L-kurtosis) of a site can be considered as a point in the three dimensional space, a group of sites will yield a cluster of such points. Any point which is far from the center of the cluster can be marked as discordant. Let ui = [t1 (i) t3 (i) t4 (i)]T be a vector containing at-site estimators of L-moment ratios for a data series of site i. Define the average over the N sites in an hypothesized region umean =   N 1i i u N 1 and the sample covariance matrix as S =       N 1i T meanimeani uuuu 1N 1 The discordancy measure for site I can be expressed as Di =       meani 1T meani uuSuu 1N3 N    Hosking and Wallis (1993) tabulated critical values of the discordancy statistic Di for various numbers of sites in a region at a significance level of 10%. Threshold Di ranges from 1.333 for 5 sites to 3.00 for 15 or more sites in a given region. 75 Chapter 8 Data Infilling 8.1 Necessity of data infilling The occurrence of missing data varies considerably depending upon the different factors, e.g. instrumental problem, human error, recording error, systems involved in delivering the data. Missing or incomplete data are a serious problem in many fields of research. An added complication is that the more data that are missing in a database, the more likely that it is needed to address the problem of incomplete cases, yet those are precisely the situations where imputing or filling in values for the missing data points is most questionable due to the small proportion of valid data points relative to the size of the data set. 8.2 Methods used in filling data 8.2.1 Preliminary infilling Different methods and techniques are used in filling missing values depending on the nature of data. Sometimes the following methods are only used for this purpose. No further approaches are followed. In this guideline we have considered the methods in filling as a preliminary filling and furthermore have considered for training the filling data series to get more nearest output to real data. The most widely used methods are If the large number of missing values  correlation weightage method,  linear interpolation method,  double mass analysis If the small number of missing values  moving average method,  normal ratio method,  arithmetical average method and  national weather services method Double mass analysis and moving average methods have been discussed at the statistical and exercise sections. Correlation weighted method Correlation is used in a series of data to denote some form of association. It is used between two quantitative variables. It is assumed that the association is linear, that one variable increases or decreases a fixed amount for a unit increase or decrease in the other. Pearson method is used if the nature of data series is parametric and Spearman’s method is in nonparametric series. Prior filling by correlation weightage, nearest stations are selected and correlation among the nearest stations is determined. On the preference of correlation values some sort of series are selected and normalized their correlation values. After getting the correlation factors other series are arranged according to the similar date. The normalized correlation factor is used for determining the missing value of a similar period. The calculated value may be shifted from the natural trend of its own series. Chapter 8: Data Infilling 76 The shifting is happened due to having the variation of tested data series from the other selected data series. After fitting the shifting data series is fed into the model for training. Linear interpolation method Linear interpolation method is one of the widely used methods in filling missing of hydrological data. Statistical tools, SPSS, gives the best technique to do so in modern data analysis. Based upon study it is recommended that it gives better output if the fewer number of missing values exist in the series. However, it could be used for preliminary filling, later on which will be fed into secondary infilling method, Artificial Neural Network intelligence. Normal ratio method If the normal annual precipitation at any of the index stations differ from that of the station in question by more than 10%, the arithmetical average method does not work. Under such circumstances, the normal ratio method is used in which the amounts at index stations are weighted by the ratios of the normal annual precipitation values. Thus, precipitation at station A, say PA, is given by Where, N stands for normal annual precipitation. NA = Average annual rainfall N = Average annual rainfall of surrounding station P = Precipitation record. Arithmetic average method Many precipitation stations have breaks in their records due to some reason or the other. To fill this missing data, three stations as close to and as evenly spaced as possible around the particular station with the missing record are selected such that the normal annual precipitation at each of the index stations is within 10% of that for the station. Then a simple arithmetic average of the precipitation of the index stations provides the estimated amount. Thus, if P is the amount of rainfall and suffix A is for a particular station, and 1,2,3 are for index stations, then National weather services method This is a more suitable method in practice and has been verified on both theoretical and empirical bases. The rainfall at point A is computed by establishing a set of axes running through A. The following equation is used for filling missing. where: W = 1/D2 D = distance between station A and the index station. (8.1) ..............P N N .P N N .P N N N 1 P 3 3 A 2 2 A 1 1 A A          (8.2) 3 PPP P 321 A      W PW PA Chapter 8: Data Infilling 77 8.2.2 Secondary infilling Artificial Neural Network (ANN) is one of the most up to date techniques in data infilling so far. The main advantage of it that generates the whole series regarding the input values as a training data set. It is widely used in developed countries. NWRD is studying on it for the application of the hydrological database. The preliminary fitted data has been set as an input data set in the model. Simulation shows better performance over preliminary treated data. If no preliminary filling, model assumes an average value for each missing values. Indeed, it checks out the variation of measured and targeted values and minimizes the error to get the nearest values of real data. However, it can train over without preliminary filling data for which more iteration is needed and Root Mean Square Error (RMSE) shows higher error or poor simulation. The output of ANN’s simulation could be improved by clustering the data in seasons or similar time period. ANN simulates better output with the large data series, as it is required. Some outputs of ANN’s have been annexed. ANN methodology Following flow-chart shows the ANN’s methodology. During training the expertness of the modeller plays an important role over good fitting of data. Observed data Correlation Model input Data in ARFF format Full version Simulation & Calibration Simulated output Old version Preliminary infilling Verification of output Chapter 8: Data infilling 78 8.3 Filling of missing rainfall data 8.3.1 General method Normal ratio method is widely used to carry out the infilling. This method is applicable for a unit missing of data. Other methods are also used depending on the users needs. The procedure is summarized as follows: Step 1 For each station a group of nearby stations are chosen from which the missing values will be estimated. Among large number of stations correlation method is preferred for the selection. The size of the group varies depending on the location of potential infilling stations. Stations of doubtful data quality are not included as filling stations. Step 2 When a whole month data is missing, the monthly rainfall is estimated first by the normal ratio method from those stations the specified group which had data for the whole month and then this monthly rainfall is distributed in proportion to the rainfall pattern at one of the stations (the closest one for which data is available). This method provides the best estimate of the monthly rainfall and gives it a daily distribution which is realistic for the time of year and the location; the alternative procedure of using all the stations (effectively a weighted average of daily rainfalls) will tend to produce a smoothed series with many modest daily rainfalls but few extreme values. If data is missing at all the check stations then the record remained as missing data. For an example group of three neighboring stations (a, b and c), all of which have data for the required month, the rainfall in month j at station i (the one being infilled) was found as follows: Rmi = (Mi,j/3)*{Rma/Ma,j + Rmb/Mb,j + Rmc/Mc,j} Rdi = Rda * Rmi/Rma where, Mx,j = Mean rainfall at station x for month j Rmx = Monthly rainfall at station x Rdx = Daily rainfall at station x Step 3 Where data for part of month is missing, the missing days are infilled from the closest of the neighboring gauges, factoring the daily value at that gauge by the ratio of mean rainfalls for the relevant month at the two stations: Rdi = Rda * Mi,j/Ma,j If data at the nearest gauge is also missing, the required value is filled from the next closest gauge, which has data available. In the event that data is missing at all the specified gauges the value at the station being infilled remained as missing. This infilling provided estimates for almost all the periods of missing data. 8.3.2 Proposed method Following methods are proposed for filling the missing rainfall: Step1 Correlations of surrounding rainfall stations are determined. Chapter 8: Data infilling 79 Step2 Data series are arranged according to the correlations. Missing values are filled by ordinary method, e.g. correlation method, linear interpolation method etc. Step3 Cluster the data series as Training and Verification sets. Verification set comprises one-fourth to one third of the data series and the rest is Training set. Step4 Data sets are fed into the model and different parameters are set for better simulations. Step5 From the simulated output results are picked out for verifications. 8.4 Methods of handling in missing data Some of the most popular methods for handling missing data described below. This list is not exhaustive, but it covers some of the more widely recognized approaches to handling databases with incomplete cases.  Listwise or casewise data deletion: If a record has missing data for any one variable used in a particular analysis, omit that entire record from the analysis. This approach is implemented as the default method of handling incomplete data by many statistical procedures. Pairwise data can be deleted also.  Mean substitution: Substitute a variable’s mean value computed from available cases to fill in missing data values on the remaining cases.  Regression methods: Develop a regression equation based on complete case data for a given variable, treating it as the outcome and using all other relevant variables as predictors. Then, for cases where Y is missing, plug the available data into the regression equation as predictors and substitute the equation’s predicted Y value into the database for use in other analyses. An improvement to this method involves adding uncertainty to the imputation of Y so that the mean response value is not always imputed.  Expectation Maximization (EM) approach: An iterative procedure that proceeds in two discrete steps. First, in the expectation (E) step the expected value of the complete data is computed. In the maximization (M) step the expected value is substituted for the missing data obtained from the E step and then maximize the likelihood fuction as if no data were missing to obtain new parameter estimates. The procedure iterates through these two steps until convergence is obtained. 81 Chapter 9 Processing of Hydrological Data 9.1 Concepts Processing of data is essential as prime factor for various applications in connection with water resources planning, drainage design, reservoir design and operation, irrigation as well as hydrological forecasting and flood control. After processing a period of data the nature of the data set and its quality is determined. The standard gauge is used to record daily readings. The size of the aperture and the height varies among various countries but it is usually standardized for each country. Therefore, the two points, types of collected data and goal are supposed to be decided before processing. Following concepts should go through data processing:  enter data in the database and retrieve data  plot and edit data  carry out hydrological observations and measurements  assist in the compiling and dissemination of hydrological data and information  take part in field work 9.2 Steps for data processing Handling of observational data until they are in a form ready to be used for a specific purpose. To make the proper use of data, data should be stored in such a way that all-possible errors can be avoided and that the data can be made easily accessible. Following steps are required to get a proper storage of data:  validation;  screening  verification  filling of missing value;  compilation. 9.2.1 Validation After the field data are collected and transferred to office computing environment, the next steps are to validate and process data, and generate reports. The flow chart presented below illustrates the sequence and roles of these steps: Chapter 9: Processing of Hydrological Data 82 Data Validation Flowchart Data validation is defined as the inspection of all the collected data for completeness and reasonableness, and the elimination of erroneous values. This step transforms raw data into validated data. The validated data are then processed to produce the summary reports you require for analysis. This step is also crucial to maintaining high rates of data completeness during the course of the monitoring program. Therefore data must be validated as soon as possible, within one-two days, after they are transferred. The sooner the site operator is notified of a potential measurement problem, the lower the risk of data loss. Data validation methods Data can be validated either manually or automatically (computer-based). The latter is preferred to take advantage of the power and speed of computers, although some manual review will always be required. Validation software may be purchased from some data logger vendors, created in-house using popular Raw Data Files Develop Data Validation Routines General system and measured parameter checks  Range tests  Relation tests  Trend tests Validate Data  Subject all data to validation  Print validation report of suspect values  Manually reconcile suspect values  Insert validation codes  Alert site operator to suspected measurement problems Create Valid Data Files Data Processing and Report Generation Chapter 9: Processing of Hydrological Data 83 spreadsheet programs (e.g., Microsoft Excel, Lotus 123), or adapted from other utility environmental monitoring projects. An advantage of using spreadsheet programs is that they can also be used to process data and generate reports. These programs require an ASCII file format for imported data; the data logger's data management software will make this conversion if binary data transfer is used. There are essentially two parts to data validation; data screening and data verification. 9.2.2 Data screening Erroneous data should be corrected before storing and should go through screening. As the first step of processing, screening of data is performed to obtain proper listing of series for easy reference and first checks on the range of data. Data screening procedure consists of five principal steps. These are:  rough screening of the data and compute or verify the totals for the hydrological year or season.  plot these totals according to the chosen time-step (e.g. month, year, season and note any trends or discontinuities).  test the time series for absence of trend by suitable statistical method (e.g. Spearman’s rank correlation method, moving average method etc).  apply the F-test for stability of variance and the t-test for satiability of mean to split, non overlapping, sub-sets of the time series.  apply Chi-square test for ‘Goodness to Fit’ The above procedures form what we call the basic procedure. If necessary, one can expand the basic procedure to include two additional steps. These are:  test the time series for absence of persistence by computing the first serial-correlation coefficient;  test the time series for relative consistency and homogeneity with double-mass analysis. 9.2.3 Data verification Validation routines are designed to screen each measured parameter for suspect values before they are incorporated into the archived database and used for site analysis. They can be grouped into two main categories, general system checks and measured parameter checks. 1. General system checks: Two simple tests evaluate the completeness of the collected data: Data records: The number of data fields must equal the expected number of measured parameters for each record. Time sequence: If there are any missing sequential data values this test should focus on the time and date stamp of each data record. 2. Measured parameter checks: These tests represent the heart of the data validation process and normally consist of range tests, relational tests, and trend tests. Range test: These are the simplest and most commonly used validation tests. The measured data are compared to allowable upper and lower limiting values. The limits of each range test must be set so they include nearly (but not absolutely) all of the expected values for the site. Technicians can fine-tune these limits as they gain experience. Relation test: This comparison is based upon expected physical relationships between various parameters. Relational checks should ensure that physically improbable situations are not reported in the data without verification. Chapter 9: Processing of Hydrological Data 84 Trend test: These checks are based on the rate of change in a value over time. Different statistics have been discussed in statistical section for removing trend of a time series data. Data validation code Data validation code is assigned for suspect values which provide particular information about data. Table 9.2: Data validation code Code Rejection Criteria 900 Rejection 990 Unknown event 991 Operating error 992 Equipment malfunction 993 Missing data (no value possible) 994 Missing data (value possible) 9.2.4 Filling missing value Filling missing value has been discussed in infilling chapter. Treatment of suspect and missing data After the raw data are subjected to all the validation checks, what should be done with suspect data? Some suspect values may be real, unusual occurrences while others may be truly bad. Here are some guidelines for handling suspect data: 1. Generate a validation report (printout or computer-based visual display) that lists all suspect data. For each data value, the report should give the reported value, the date and time of occurrence, and the validation criteria that it failed. 2. It should be examined to determine their acceptability. Invalid data should be assigned and replaced with a validation code. A common designation for data rejection is assigning a –900 series validation code, with numbers that represent various rejection explanations. 3. If redundant sensors are used, replace a rejected value from the primary sensor with a substitute one from the redundant sensor as long as the redundant sensor’s data passed all the validation criteria. 4. Maintain a complete record of all data validation actions for each monitoring site in a Site Data Validation Log. This document should contain the following information for each rejected and substituted value:  File name  Parameter type and monitoring height  Date and time of flagged data  Validation code assigned and explanation.  The source of the substituted values. 9.2.5 Data compilation Data compilation encompasses with some statistical techniques to analyze or summarize the characteristics of the data set, which is included with data aggregation, frequency analysis, fitting of Chapter 9: Processing of Hydrological Data 85 distribution functions, etc. After validation and filling of missing value data compilation ensure the data quality. Frequency analysis is measured to find the time impact over the data. Different graphical plots ensure the quality. Procedure involved in interpreting a past record of hydrological events in terms of future probabilities of occurrence, e.g. estimates of frequencies of floods, droughts, storages, rainfall, water quality, waves. Fitting distributions are also used to examine the fitness of data set such as chi-square test. 9.3 Discharge data generation Daily or continuous discharge data cannot practically be obtained directly. But it is possible to obtain daily or continuous stage data and from that a continuous discharge record can be estimated based on the relationship of water level and flow. The result is a correlation called the stage-discharge relationship. The Stage-Discharge relationship is known as rating curve. The rating curve is constructed by plotting successive measurements of discharge and gauge height on a graph. Uses of the rating curve are mainly:  To convert water level record into flow rates.  To estimate the design flood discharge by extrapolating rating curve. The rating curve must be checked periodically to ensure that the relationship between the discharge and the gauge height has remained constant; scouring of the stream bed or deposition of sediment in the stream bed or deposition of sediment in the stream can cause the rating curve to change so that the same recorded gage height produces a different discharge. Construction of rating curve To develop this relationship, discharge measurements are obtained at the gauging station over the maximum range of gauge heights possible. A history of the relationship evolves over time, as each discharge measurement and corresponding stage is plotted, and a smooth curve is drawn that best represents these points. This curve is converted to a table of discharge values for incremental gauge heights, which in turn is referred to as a stage-discharge table. Daily or continuous discharge can be derived from this table using a daily or continuous stage record. In other case equation for the plotted curve will be derived and daily or continuous discharge can be obtained from that equation. The constant values of the equation need not be the same for full range of stage. Methodology for developing a stage discharge curve:  The stage discharge relationship curve can be plotted in a arithmetic or logarithmic paper. One example is shown in Figure 9.1.  The relationship between the stage and discharge is a single- valued relation which is expressed as Q = Cr(G-a) β (1) Where, Q = stream discharge, G = Gauge height (stage), a = a constant which represents the gauge reading corresponding to zero discharge, Cr and β are rating curve constants. Values of Cr and β need not be the same for the full range of stages. For arithmetic plot stage versus discharge can be plotted and for logarithmic plot (G-a) versus Q can be plotted. Logarithmic plot is advantageous as in logarithmic paper equation plots as a straight line. Chapter 9: Processing of Hydrological Data 86 Figure 9.1 Rating Curve: Arithmetic Plot Determination of Rating Curve constants: Determination of Cr and β The best values of Cr and β in equation for a given range of stage are obtained by the least-square-error method. Thus by taking logarithms: log Q = β log (G-a) + log Cr (2) it can be compare with the equation Y = βX +b where, Y = log Q, X = log (G-a) and b = log Cr For the best-fit straight line of N observations of X and Y              22 XXN YXXYN β b =     N XβY   Determination of a There are four approaches to determine ‘a’ 1. Plot Q vs G on an arithmetic paper and draw a best fit curve. By extrapolating the curve by eye judgment find a as the value of G corresponding to Q = 0. Using this value of a, plot log Q vs log (G-a) and verify whether the data plots as a straight line. If not, select another value, which is nearest to the previous value and by trial and error get an acceptable value that gives a straight line in logarithmic plot. 2. A graphical method due to running as follows: The Q vs G data are plotted to an arithmetic scale and a smooth curve through the plotted points are drawn. Choose three points in the curve like A, B and C such as their discharges are in geometric progression, i.e. QA/QB = QB/QC At A and B vertical lines are drawn and then horizontal lines are drawn at B and C. The intersecting points of these vertical and horizontal lines are D and E. Two straight lines Ed and 0 2 4 6 8 10 0 20000 40000 60000 80000 100000 S ta g e i n m e te r Discharge in cumec Rating Curve: Arithmetic Plot Chapter 9: Processing of Hydrological Data 87 BA are drawn and extending to join at F. The Y ordinate of F point is the value of a. This method assumes the lower part of the stage discharge curve to be a parabola. 3. Plot Q vs G to an arithmetic scale and draw a smooth good-fitting curve by eye-judgment. Select three discharges Q1, Q2and Q3 such that Q1/Q2 = Q2/ Q3 and note from the curve the corresponding values of gauge readings G1, G2 and G3. From Equation (1) (G1-a)/(G2-a) =(G2-a)/(G3-a) a =   231 2 231 2GGG GGG   4. A number of optimization procedures that are based on the use of computers are available to estimate the value of a. A trial and error search that gives the best value of the correlation coefficient is one of them. 9.4 Procedure of statistical analysis Following steps have been considered for statistical analysis of hydrological data: Step1: Raw data Arranging raw data. Step 2: Validation test This step is typically used for data validation purposes. Range test is done before trend of a series is estimated in this step. Data range helps to arrange data series in some ranges for a particular series. Before estimating trend, the first thing to find is whether or not any trend is present at all. And to check this, tests for randomness, turning point test are performed on the time series. If t value ranges within ±1.96 for 5% level of significance, it is decided that the series is of random sequence. If series is not random, the trend value should be estimated by Least Square Method or Moving Average Method. On the other hand it goes through the consistency test. Step3: Consistency checking For checking the consistency of a set of data Double Mass analysis has been done to detect possible inhomogeneities in a series, like jumps, trends, etc. by investigating the ratio of accumulated values of two series. It should not be done with any missing value. Step4: Correlation test Correlation test is performed for determining the correlation of neighboring stations with the tested station. The missing value of the tested station should be filled with comparing the most correlated station. If the correlation value does not satisfied it should be gone through the trend analysis. Step 5: Filling missing value After getting the correlation value the best correlated series with tested series is taken as base series. Normal ratio method is done for filling missing value. Step 6: Normality test The primary reason to test whether data follow a normal distribution is to determine if parametric tests procedures can be applied or not. Use of a larger -level will increase the power to detect non-normality, especially for small sample size. Chapter 9: Processing of Hydrological Data 88 Step 7: Test for shift in the mean After filling missing value normal distribution is done before significant test. If data set is normally distributed T-test is performed for further analysis otherwise Wilcoxon test is performed. It can be also defined that if the sample cannot accurately be described by arithmetic mean and standard deviation, and such samples should not be submitted to any parametrical statistical test or procedure, such as T test. The Wilcoxon test should be used for alternative analysis. Step 8: Trend test Trend test is necessary to determine presence of trend in the data series. If there is any trend in the data series it should be removed before further analysis. Step 9: Trend analysis If data series contains trend then it can be removed by trend analysis (by using moving average method and/or slope) Step 10: Selection of frequency distribution Before starting with distribution function for a set of data it has to be ensured that the selected distribution is applicable for that data set that is the inherent assumption is the sample is drawn from the selected distribution. For selecting the true distribution five methods can be used which is described in the Article 7.4. Goodness of fit test is also used for this purpose. Step 11: Frequency analysis After selecting the type of distribution frequency analysis can be done. The objective of frequency analysis of hydrological data is to relate the magnitude of the extreme events to their frequency of occurrences through the use of probability distribution. Step 12 After analysis of data quality report or comments is prepared. 89 Bibliography BWDB, 1972. The Hydrometric Apparatus and Techniques used in the Hydrology Directorate (BWDB water supply paper-361) Chow V. T., Maidment David R., Mays Larry W., 1988. Applied Hydrology Chowdhury, J.U. & Karim, M.A. (1993), Selection of Probability Distribution for Flood Frequency Analysis in Bangladesh, Final Report. Chowdhury, J.U. (1995), Flood Frequency Analysis, Supporting Study on Selection of Probability Distribution for Flood Frequency Analysis in Bangladesh, Volume 7. Hosking, J.R.M. and Wallis, J. (1993) Some statistics useful in frequency analysis, Wat.Resour. Res. 24,588-600 Hossain, M.M, (1995), BUET, Lecture notes on Sediment Transportation. EGIS, 1999, Application of AEZ database in drought management and water availability assessment. FAP 2, 1992 North West Regional Study. Draft final report, summary. FAP 2, 1991, North West Regional Study. Interim report- volume 3, annex 2: hydraulic studies, annex 3: hydrology, annex 4: groundwater. FAP 2, 1991, North West Regional Study. Interim report- volume 2, annex 1: engineering. FAP 4, 1993, Southwest Area Water Resources Management Project, Final Report, Volume 5. FAP 6, 1993, North East Regional Water Management Project. Interim report. FAP 6, 1993, North East Regional Water Management Project. Specialist study on river sedimentation and morphology: draft final. FAP 23, 1992, Flood Proofing. Interim report. FAP 24, 1994, River Survey Project. Report on mission project adviser, annexure I: sediment gauging strategies, annexture III: remote sensing and bathymetry in morphological assessment, annexture IV: comments on FAP 24 - a flow and sediment gauging. FAP 24, 1993, River Survey Project. Interim report, volume I: main report. FAP 24, 1996, River Survey Project. Overland flow and floodplain sedimentation measurements. FAP 24, 1996, River Survey Project. Optimization of sediment measurements. FAP 24, 1996, River Survey Project. Bathymetric survey FAP 24, 1996, River Survey Project. Water level and gauging stations (Special report 2) FAP 24, 1996, River Survey Project. Final report: main volume FAP 24, 1996, River Survey Project. Optimization of hydraulic measurements. (Special report no. 11) FAP 24, 1996, River Survey Project. Final report- annex 3: hydrology. FAP 25, 1992, Flood Modelling and Management, Flood Hydrology Study, Annex 1. Haan Charles T., 1979. Statistical Methods in Hydrology Hymos Manual, 1992, Version 3.0, delft hydraulics Jaisawal R. K., Goal N.K., Singh P., Thomas T., (2003), L-moment based flood frequency modeling. Bibliography 90 Klinting A., 2000, National Water Sector Database, Database and Application Design. Kumar R., Chatterjee C., Panigrahy N., Patwary B. C., Singh R.D. (2003), Development of regional flood formulae using L-moments for gauged and ungauged catchments of North Brahmaputra River system. Mutreja K N, 1990. Applied Hydrology NWRD, WARPO, 2001 Technical Notes on Surface Water Data Group Ogink H.J.M., 1993, Lecture notes on hydrology 2 Raghunath H M, 1990. Hydrology (Principles, Analysis, Design) Scarborough James B., 1996, Numerical Mathematical Analysis, Shahin Mamdouh, Oorschot H.J.L Van, De Lange S.J., 1993. Statistical Analysis in Water Resources Engineering by Hydrosystems Engineering SSWRDSP, LGED, 1998, Standard Design Catalogue, volume 1: Hydrology. Approximations for use in constructing L-moment ratio diagrams, Research Report RC 16635, IBM Research Division, Yorktown Heights, N.Y., 1991]. The approximations are also given in Appendix A.12 of the book Regional frequency analysis: an approach based on L-moments, by J. R. M. Hosking and J. R. Wallis. SWMC Handbook, 1996 Surface Water Modelling Centre WEB Sites: http://www.crwr.utexas.edu/gis/gisenv98/class/risk/ex1/ex1soln.html#hist http://www.dianthus.co.uk/statistics/fisher.htm http://www.deming.eng.clemson.edu/pub/tutorials/qctools/flowm.htm http://www.epa.gov/region1/oeme/toc.html http://www.filebox.vt.edu/artsci/stats/waterman/7.1A.htm http://www.fao.org/docrep/X5560E/x5560e04.htm http://www.fmi.uni-sofia.bg/vesta/Virtual Labs/special0/special5.htm http://geography.uoregon.edu/mcdowell/geog427w02/Exercises/Ex%201/x1.html http://math.uc.edu/~brycw/classes/147/blue/tools.htm http://mathworld.wolfram.com/topics/StatisticalDistributions.html http://www.munro-group.co.uk/met.htm, http://www.web.utk.edu/~toddc/xsqtan.html, http://www.physics.csbsju.edu/stats/t-test.html, http://www.roads.dft.gov.uk/roadsafety/goodpractice/39.htm#01 http://www-stat.stanford.edu/~nars/jsm/FindProbability.html, http://www.stats.gla.ac.uk/steps/glossary/nonparametric.html#kst http://traffic.ce.gatech.edu/nchrp2045/glossary.html#217 http://www2.truman.edu/shaffer/266ch13 2001.htm http://www.up.ac.za/academic/geol/meteo/WKD162c03.doc http://www.warpo.org/NWRD/HydStn.html, http://www.wmo.ch/web/homs/homs/h76205.html, http://www.xhuoffice.psyc.memphis.edu/statistics/xhu/all/lecture18/node18.html, http://www.research.ibm.com/people/h/hosking/abs.mono.html http://www.crwr.utexas.edu/gis/gisenv98/class/risk/ex1/ex1soln.html#hist http://www.dianthus.co.uk/statistics/fisher.htm http://www.deming.eng.clemson.edu/pub/tutorials/qctools/flowm.htm http://www.epa.gov/region1/oeme/toc.html http://www.filebox.vt.edu/artsci/stats/waterman/7.1A.htm http://www.fao.org/docrep/X5560E/x5560e04.htm http://www.fmi.uni-sofia.bg/vesta/Virtual Labs/special0/special5.htm http://geography.uoregon.edu/mcdowell/geog427w02/Exercises/Ex%201/x1.html http://math.uc.edu/~brycw/classes/147/blue/tools.htm http://mathworld.wolfram.com/topics/StatisticalDistributions.html http://www.munro-group.co.uk/met.htm http://www.web.utk.edu/~toddc/xsqtan.html http://www.physics.csbsju.edu/stats/t-test.html http://www.roads.dft.gov.uk/roadsafety/goodpractice/39.htm#01 http://www-stat.stanford.edu/~nars/jsm/FindProbability.html http://www.stats.gla.ac.uk/steps/glossary/nonparametric.html#kst http://traffic.ce.gatech.edu/nchrp2045/glossary.html#217 http://www2.truman.edu/shaffer/266ch13 2001.htm http://www.up.ac.za/academic/geol/meteo/WKD162c03.doc http://www.warpo.org/NWRD/HydStn.html http://www.wmo.ch/web/homs/homs/h76205.html http://www.xhuoffice.psyc.memphis.edu/statistics/xhu/all/lecture18/node18.html Appendix A Examples of steps for data processing Appendix A: Examples of steps for data processing A- 93 Checklist for quality monitoring of time series data Raw Data Format: Data Processing Software: Timeline (Mention Missing Data Information) Period: Metadata Yes/No (If yes, informative or not) Bundle information (Field description and units) Yes/No (If yes, informative or not) Technical Report Validation Test Method and result Consistency Checking Method and result Correlation test Method and result Filling missing value Method and result Test for Normality Method and result Test for shift in the mean Method and result Trend test Method and result Trend Analysis Method and result Selection of distribution Method and result Frequency Analysis Method and result Comments Very good / Good/Moderate/Poor Some Exercises has been practised following the above checklist is presented below: Exercise A1: Rainfall data The following table shows the monthly average rainfall data (in mm) from 1962-1995 for the base station Atghoria (Station ID 1) and the 13 neighbouring stations. The stations are selected on the basis of distance from the base station and there correlation has been investigated. The correlation among the stations with base station is given in the Table below. From the observed correlation 3 stations are selected which shows better correlation with the base station. Further analysis of the base stations is done considering the 3 surrounding stations for statistical tests. Appendix A: Examples of steps for data processing A- 94 A. Step 1- Raw Data Table A1.1: Average rainfall depth (mm) at 13 stations - Base Stations Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1962 18.8 10.9 8.5 107.8 234.6 254.5 340.0 232.4 127.7 108.7 0.0 0.0 1963 0.0 0.0 6.6 71.3 144.7 360.5 276.5 188.1 155.7 115.9 24.0 0.0 1964 1.5 10.9 5.2 110.1 186.6 429.4 384.4 205.9 119.3 352.7 1.1 0.0 1965 0.8 5.9 23.4 43.0 75.0 281.5 285.7 296.0 230.1 40.9 16.9 0.5 1966 16.7 0.0 3.1 49.4 104.7 270.9 259.7 272.0 145.9 107.7 14.4 8.0 1967 15.4 3.6 83.6 87.9 87.9 242.6 256.9 347.5 316.9 89.1 0.1 1.6 1968 0.0 2.3 24.9 47.8 117.3 368.1 287.9 267.0 131.4 101.4 32.2 0.0 1969 0.5 1.3 65.4 77.2 122.4 228.4 194.4 574.1 329.9 93.5 32.6 0.0 1970 39.4 15.1 19.6 34.9 102.0 287.7 391.4 231.5 353.0 328.6 4.3 0.0 1971 7.5 5.2 3.2 162.1 122.5 267.7 313.1 452.7 239.0 102.1 31.0 0.0 1972 1.4 14.4 0.6 49.0 201.0 242.9 143.5 265.9 145.4 29.6 0.0 0.0 1973 10.5 29.3 24.7 90.1 377.8 435.3 180.0 238.2 351.1 122.5 30.9 48.6 1974 0.6 0.0 75.0 124.0 122.8 196.0 504.4 226.8 200.0 75.3 0.5 0.0 1975 1.0 9.6 10.4 61.5 187.0 130.0 619.6 211.1 200.2 141.8 25.0 0.0 1976 0.0 14.8 10.5 49.9 352.0 367.9 378.6 378.6 200.8 91.2 7.1 0.0 1977 7.2 42.6 10.2 176.0 191.5 605.1 357.1 181.7 137.4 147.5 11.9 43.8 1978 1.1 18.7 53.6 95.5 227.3 229.8 175.5 164.3 226.6 89.5 0.4 0.0 1979 10.8 24.2 10.0 50.8 15.9 224.4 310.4 427.8 189.3 34.2 25.1 19.5 1980 25.4 13.6 26.7 27.4 341.0 221.6 211.6 208.6 201.3 175.7 0.0 0.0 1981 14.1 68.0 47.5 276.9 224.1 146.6 391.8 175.3 161.8 4.7 0.0 49.8 1982 0.6 5.3 80.7 131.1 90.1 198.0 166.7 190.3 100.4 47.6 51.3 0.0 1983 6.4 30.4 58.7 135.8 217.5 147.4 256.1 367.3 212.6 272.9 0.0 15.5 1984 3.9 0.0 0.4 61.6 195.8 590.0 386.4 244.1 368.4 149.9 0.0 0.0 1985 0.2 1.3 36.4 33.7 211.0 248.5 272.5 181.0 209.7 157.1 1.0 0.1 1986 1.8 6.1 2.6 89.7 139.1 226.3 274.5 215.2 626.8 236.4 62.9 1.9 1987 0.6 2.5 23.4 90.9 107.0 199.9 478.2 572.6 218.3 42.3 15.7 22.2 1988 0.0 51.5 47.5 95.8 325.1 447.7 305.0 220.2 200.4 118.1 130.1 1.5 1989 0.1 23.6 0.1 14.4 317.9 203.5 431.0 83.2 195.8 142.0 0.0 12.0 1990 0.0 72.1 97.7 137.7 168.4 259.3 380.8 221.2 349.3 128.4 26.7 0.7 1991 11.0 23.3 27.7 52.1 323.9 403.0 376.4 202.8 533.0 179.0 0.6 102.8 1992 1.0 55.5 6.3 15.5 129.6 144.8 373.9 219.6 281.4 75.5 7.3 1.2 1993 1.2 27.7 62.5 125.1 224.4 372.8 290.1 271.3 326.0 121.0 6.5 0.0 1994 30.0 44.4 18.9 68.3 226.8 291.3 153.0 187.1 115.5 124.1 4.8 0.0 1995 7.6 27.1 4.8 8.7 133.4 377.9 316.5 337.2 326.0 53.0 75.8 0.9 Table A1.2: Rainfall depth (mm) at Atghoria station – Test station Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Avg 1962 81.3 197.8 383.0 293.8 140.8 62.2 92.5 0.0 0.0 104 1963 0.0 0.0 8.3 25.1 109.7 306.6 175.8 245.8 164.8 97.5 27.0 0.0 97 1964 0.3 21.1 5.8 105.0 215.8 474.5 367.5 257.1 116.9 387.4 0.0 0.0 163 1965 0.0 2.0 36.3 75.3 85.9 423.7 312.9 385.6 216.5 18.3 12.7 2.3 131 1966 12.1 0.0 1.5 44.3 139.9 395.1 204.1 286.2 143.7 134.0 18.0 12.5 116 Appendix A: Examples of steps for data processing A- 95 1967 20.3 2.0 94.7 155.0 117.6 375.3 370.8 499.4 486.7 226.1 0.0 1.8 196 1968 0.0 0.0 23.6 20.6 127.8 268.5 334.3 317.8 82.0 103.4 23.1 0.0 108 1969 1.3 0.0 83.0 129.4 113.9 222.0 183.5 782.6 535.3 141.4 36.4 0.0 186 1970 39.9 18.8 31.5 25.1 130.5 338.1 515.9 143.6 420.6 356.3 5.6 0.0 169 1971 10.1 7.4 0.0 197.9 181.2 462.8 507.0 559.1 319.6 76.6 42.9 0.0 197 1972 3.0 21.8 0.0 78.7 187.2 295.8 205.3 302.2 160.0 39.3 0.0 0.0 108 1973 19.0 6.4 15.0 116.5 348.0 437.4 162.8 298.0 376.8 108.1 30.4 63.5 165 1974 0.0 0.0 112.7 89.5 95.6 217.0 578.7 239.4 265.2 119.3 5.1 0.0 144 1975 3.3 1.3 18.7 76.7 184.8 77.0 599.2 164.8 125.8 158.3 42.7 0.0 121 1976 0.0 31.0 3.3 15.8 281.8 398.6 496.4 345.1 383.4 32.3 1.8 0.0 166 1977 12.7 39.1 0.0 176.5 204.3 751.4 383.7 142.5 151.4 154.2 10.4 44.5 173 1978 0.8 22.3 48.7 85.1 250.6 199.1 335.5 129.7 200.4 52.3 0.0 0.0 110 1979 6.9 21.8 15.5 61.8 10.4 248.7 255.7 509.9 316.8 30.1 41.6 32.8 129 1980 30.0 7.8 26.0 2.5 272.5 302.7 279.2 296.1 101.1 163.8 0.0 0.0 123 1981 45.5 120.6 89.4 426.1 211.8 208.3 450.0 227.2 162.4 6.3 0.0 69.5 168 1982 0.0 5.3 134.9 193.0 71.0 244.8 204.9 233.2 74.5 38.6 40.3 0.0 103 1983 13.0 38.1 52.0 215.6 220.7 132.2 264.0 427.6 387.9 467.1 0.0 20.6 187 1984 7.2 0.0 0.0 37.7 180.7 739.4 304.0 231.8 282.9 182.2 0.0 0.0 164 1985 0.0 0.0 85.1 16.8 148.1 284.7 369.7 130.8 186.8 118.0 0.0 0.0 112 1986 6.4 16.5 0.0 111.0 75.4 317.0 319.7 146.9 621.7 277.1 13.5 6.9 159 1987 0.0 0.0 43.6 104.6 85.8 260.5 500.9 658.7 231.6 32.0 17.8 16.0 163 1988 0.0 47.2 26.4 62.2 259.8 394.4 258.2 218.5 137.0 43.8 109.5 0.0 130 1989 0.0 62.0 0.0 25.6 261.5 240.4 549.9 110.6 170.2 209.0 0.0 30.4 138 1990 0.0 97.5 113.7 122.7 128.1 343.3 367.2 289.0 366.5 124.7 34.5 0.0 166 1991 23.2 17.8 9.8 51.7 351.7 320.0 281.1 180.2 552.6 115.0 1.8 76.3 165 1992 0.0 45.4 0.0 0.0 119.6 191.1 327.3 217.3 222.6 73.5 1.5 6.4 100 1993 1.2 29.2 80.0 111.2 161.5 324.9 268.9 344.5 221.7 74.3 19.2 0.0 136 1994 22.8 65.2 2.9 47.4 258.8 311.5 208.2 167.7 215.8 98.1 0.0 0.0 117 1995 10.5 18.1 12.9 12.2 90.7 201.9 343.5 282.6 437.4 83.9 99.4 0.0 133 Appendix A: Examples of steps for data processing A- 96 Figure A1.1: Neighbor stations of Atghoria Table A1.3: Rainfall at Pabna (Station ID-25) Year Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1962 17.8 16.8 26.2 128.2 237.6 305.2 271.8 221.4 140.2 0 0 1963 0 0 0 55.2 152 276.2 163.6 187.6 191.2 106.6 21.1 0 1964 1.5 14 0 82.3 123.8 371.4 268.1 207.6 173 489.2 0 0 1965 0 5.6 34.8 59.7 74.9 262.7 344.3 302.7 220 32.3 39.6 0 1966 0 0 6.8 24.4 87.7 201.7 226.9 224.3 126.6 97.5 20.6 20.2 1967 19.8 0 64.8 108.6 59.7 254.9 233.6 291.3 274.9 120.3 0 3.8 1968 0 3.3 26.2 86.6 131 356.5 219.2 213.3 97.6 54.6 25.9 0 1969 1 0.7 51.3 73.1 127.7 173 273.2 532.8 368 115.8 37.4 0 1970 49.5 8.1 33.6 64.3 60.6 318.2 387.9 184.2 541.7 385.5 0 0 1971 1.5 18.3 3.8 0 0 278.7 354.8 639 333.1 51.3 36.8 0 1972 0 22.9 0 37.4 312.4 199.4 183.3 262.1 135.8 24.9 0 0 1973 0 115 25.1 95.1 382.2 345.9 164.4 184.9 266 112.7 42.6 69.1 1974 0 0 105.3 108.4 98.5 241.6 448.7 271.9 184.2 118.8 0 0 1975 2 3.3 22.4 124.4 400 52.4 647.2 157 123.2 135.2 31 0 1976 0 15.5 11.4 12.5 286.7 335.2 268.1 365.7 244 90.1 0 0 1977 13.9 21 5.1 169.6 236.5 584.7 390.3 161.8 64.5 117.7 17 54.1 1978 2 18.8 37.9 120.1 222.2 212.1 177 136.5 253.3 51.5 2.5 0 Appendix A: Examples of steps for data processing A- 97 Year Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1979 13.7 32 1.3 29.9 5.8 209.7 369.4 481.9 157.8 31.2 22.9 33.5 1980 45.7 8.4 26.6 25.4 316.9 227.1 201.7 188.2 169.8 220.5 0 0 1981 16.5 81.2 31.4 250.7 247.9 194.1 482.8 144.1 152.1 5.8 0 69.1 1982 0 8.1 98.6 118.7 81.5 172.2 148.7 218 65.3 74.1 33 0.5 1983 1.5 77.9 43.2 47.9 250 140.5 339.6 391.8 341.3 336.8 0 16 1984 2.5 0 0 81.2 155.9 701.5 249.5 264 339.9 145.3 0 0 1985 0 0 37.3 51.5 107.8 301.3 301.6 172.1 127.2 79.5 0 0 1986 0 0 0 38.7 118.8 247.1 234.8 210.2 655.1 196.8 48.8 2.3 1987 2 0.3 36.8 29.4 74.5 237 332.4 534.4 168.9 5.6 29.2 17.8 1988 0 43.2 36.8 36 392 384.1 320 180.5 181 80.2 126 0 1989 0 29.5 0 11.5 345 165.9 308.6 67.5 196 121.8 0 11.5 1990 0 100.5 109 101.5 150.8 248.7 367.8 264.5 223 90 14.5 0.5 1991 10.5 26 10 10 302 385.7 418 305 463.4 215 1 115.5 1992 2.5 45.5 0 0 158.5 132.8 419.9 196.3 244.4 167.7 5 0 1993 0.4 14.3 32 116.2 142.9 367.6 271.5 314.3 322.9 98 1.6 0 1994 37.4 56.3 43.1 45 349 267.5 123 193.5 132 112.5 0 0 1995 10 27.5 0.5 3.5 81 270.5 196.1 404 331 79.5 70.5 0 Sum 251.7 814 961.3 2347 6273.8 9423.1 10107.8 9074.4 8008.4 4164.3 627 413.9 Avg 7.40 23.94 28.27 69.03 184.52 277.15 297.29 266.89 235.54 122.48 18.44 12.17 Table A1.4: Rainfall at Ishwardi (Station ID-15) Year Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1962 17.8 5.1 5.8 63.5 238.9 284.8 433.8 277.5 126 0 0 1963 0 0 82.3 177.9 616.6 216.3 275.1 252.1 172.8 33 0 1964 0 19.9 2.3 63.5 184 547.3 428.1 106 112.2 619.4 0 0 1965 0 6.3 36.9 48.5 85.6 210.5 425 236.5 215.4 90 11.7 0 1966 0.3 0 5.1 105.1 71.5 208.1 271.9 194.3 200.4 209.1 16.5 5.6 1967 14.5 0 94.5 83.3 70.3 172.6 289 533.6 213.2 96.5 0 0 1968 0 0 24.6 10.9 71.9 397.3 249.7 236 125.5 140.4 29.2 0 1969 0 0 65.7 70.6 62 189.5 127.6 590 396.2 107.2 45.9 0 1970 46.3 23.4 21.3 20 68 305.4 267.7 103.4 309.8 320.3 2.8 0 1971 16 4.1 0 71.1 452.5 472.8 104.2 1972 17.8 67.6 147.9 130.4 103.8 279.4 12.7 0 0 1973 20.3 6.3 2.5 43.2 426.3 525.7 72.4 171.4 203.5 101.6 8.7 25.4 1974 1.3 0 0 161.3 21.6 116.9 146.5 45.6 37.6 49.1 0 0 1975 0 0 23.3 130.8 60.4 127 436.2 172.1 105.2 43.5 14.5 0 1976 0 34.6 0 40.7 108.5 331.6 141.3 252.9 101.1 124.7 10.2 0 1977 11.5 35.5 2.5 181.6 172.8 823.1 298.3 219.6 82.1 106.7 0 50.6 1978 0 36.1 71.6 88.8 223.5 167.6 125.8 218.9 184.9 69.4 0 0 1979 16 18.3 0 70.6 13.9 323.4 377 438.4 163.8 27.9 33 10.2 1980 30 0 21.6 0 276.1 245.2 135.8 208.1 289 164.5 0 0 1981 18.9 59.6 39.3 216.6 203.2 128.1 393.7 189 279.2 2.5 0 82.5 1982 0 6.3 78.8 129.7 70.4 263.4 87.4 168.8 143.4 21.6 35.6 0 1983 11.4 10.1 31.5 75 218.6 139.8 315.1 342.9 177.3 332.7 0 0 Appendix A: Examples of steps for data processing A- 98 Year Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1984 2.5 0 0 64.8 62.8 571.4 334.4 243.4 390.9 130.8 0 0 1985 0 0 29.7 55.3 161.8 157.2 186.9 161.7 250.4 133.6 0 0 1986 0 5.3 5.1 65 119.1 163.6 338.4 218.5 480.3 173.5 42.5 4.8 1987 0 0 16.3 94.5 96.2 139.5 520.4 918 161.1 19 10.2 29.5 1988 0 28.2 98.8 28.8 354.6 341.2 241.1 238.6 218 79 97 0 1989 0 58 0 6 406.4 103.1 494.2 68.2 208.2 103.9 0 11.5 1990 0 62.7 132.7 116.1 252.4 435.6 510.4 143.2 376.6 113.2 38.5 0 1991 0 8 18 135.5 188.2 471.5 222.2 179.8 425.1 110.3 0 88.6 1992 0 28.1 0 21.5 180.3 105.3 305.6 319.3 345.4 51.5 3.5 1 1993 2 3.1 49.1 121.9 243.8 309.2 232.2 194 322 89.5 8 0 1994 24.5 41.5 0.2 35 209 326 151.1 154.5 142 68.5 0 0 1995 14 28 31 0 151 224 243 300 337 24 94 5 Sum 247.3 528.5 908.2 2448.2 5318.6 9619.4 9220 8675.6 8001.1 4139.6 534.8 314.7 Avg 7.274 15.54 26.71 72.006 156.43 282.92 271.2 255.16 235.33 121.75 15.73 9.256 Table A1.5: Rainfall at Chatmohar (Station ID-7) Year Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1964 55.3 231.1 808.2 576.9 134.2 56.8 185.7 0 0 1965 8.1 5.8 0 0 42.2 219.4 50 254.3 51.6 20.6 24.1 0 1966 31.8 0 3.3 11.7 60.6 223.6 133.4 229.2 97 10.4 1.3 0.3 1967 0.5 0.5 39 62.2 58.8 153.4 163.7 224.4 226.3 28.4 0 0 1968 0 0 1.8 6.4 12.3 224.6 143.3 360.3 158.1 49.7 13.5 0 1969 0 0 76.9 65.5 102.4 199.7 268.1 739.1 162.7 54.4 6.6 0 1970 11.7 7.1 0 26.2 99 314.7 424 167.7 276.9 398.9 9.4 0 1971 0.8 0 0 163.6 42.8 45.8 159.2 128.6 473.8 103.9 9.1 0 1972 0 0 0 0 130.8 452.6 67.8 238.4 150.6 9.6 0 0 1973 13.2 14.8 20.3 122.2 415.4 845.2 293.9 282.1 591.6 85.6 21.4 6.9 1974 0 0 95 196.6 166.2 142.5 619.8 178.1 102.4 46.8 0 0 1975 0 0 0 47.1 94.4 163.1 816.2 178.3 106.9 45.2 30.5 0 1976 0 3 4.8 26.4 711.8 467.8 343.6 474.2 48 42.9 3 0 1977 3.6 58.9 7.9 96.4 108 983.5 141.5 135.6 57.4 87.8 0 15.2 1978 0 4.3 53.9 105.1 127.6 144.9 38.3 69.9 70 16 0 0 1979 8.9 15.5 0 44.7 8.1 206.5 233.7 292.2 75.8 25 8.4 3.8 1980 5.1 5.9 20.8 14.3 239.4 214.6 115.5 271 29.3 58.7 0 0 1981 12.6 74 52.8 144.3 101 123.4 390.7 161.4 86.2 0 0 18.8 1982 0 0 33.2 71.4 22.4 142.8 73.6 140.1 44.9 24.9 34.5 0 1983 4.8 20.8 39.6 125.7 218.2 112.8 118.4 0 0 0 0 0 1984 0 0 0 1985 42.2 195 298 271.2 197.8 183.1 365.2 0 1.5 1986 2.3 5.8 8.9 102 82.5 238.5 250.7 204.7 760.3 152.9 62.7 0 1987 0 0 7.1 63.8 117.1 155.3 538.7 536.2 225 80 3.8 16.3 1988 0 79.3 55.2 87.4 216 369.1 269.4 197.5 290.2 132.1 133 0 1989 0 45 0 0.1 223.7 182.9 515.4 38.7 334.3 101.5 0 0 1990 0 63 67.5 112.8 145.4 211.5 289.7 173.4 157.8 81.3 11 0 Appendix A: Examples of steps for data processing A- 99 Year Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1991 3 0 33 15 386.6 209 421.4 139.7 458.1 154.7 0 88.4 1992 0 23 0 69.5 100.1 125 376.2 225.2 258.4 44.8 4 0 1993 2 5 74.5 140.5 306 401 222 301 284 261 0 0 1994 28 50 17 44 168 249 125 172 168 96 7 0 1995 0 35 0 11 114 295 366 290 272.8 18.5 72.6 3 Sum 136.4 516.7 712.5 2073.4 5046.9 8923.4 8817.3 7135.3 6258.3 2782.5 455.9 154.2 Avg 4.547 17.22 23.75 66.884 162.8 287.85 284.43 230.17 201.88 89.758 14.71 4.974 B. Step 2- Validation Test Test for Randomness of the data: Turning point test The Turning point test is used to check whether the time series verify the following hypothesis: H0: The series is a random no trend series Ha: The series has trend and/or auto correlated errors. With this test one can check yearly or monthly randomness of data set. The example describes yearly randomness checking of the data set: Mean = 2(N – 2)/3 and Standard deviation = [(16N - 29)/ 90] 0.50 Standard value of t, t = (T- Mean) Standard deviation Table A1.6: Turning-point test of station Atghoria Annual average rainfall Range Turning points Cumulative Turning points Annual average rainfall Range Turning points Cumulative Turning points 104 129 110<129>123 yes 14 97 104>97<163 yes 1 123 129>123<168 yes 15 163 97<163<131 no 1 168 123<168>103 yes 16 131 163<131>116 yes 2 103 168>103<187 yes 17 116 131>116<196 yes 3 187 103<187>164 yes 18 196 116<196>108 yes 4 164 187>164>112 no 18 108 196>108<186 yes 5 112 164>112<159 yes 19 186 108<186>169 yes 6 159 112<159<163 no 19 169 186>169<197 yes 7 163 159<163>130 yes 20 197 169<197>108 yes 8 130 163>130<138 yes 21 108 197>108<165 yes 9 138 130<138<166 no 21 165 108<165>144 yes 10 166 138<166>165 yes 22 144 165>144>121 no 10 165 166>165>100 no 22 121 144>121<166 yes 11 100 165>100<136 yes 23 166 121<166<173 no 11 136 100<136>117 yes 24 173 166<173>110 yes 12 117 136>117<133 no 24 110 173>110<129 yes 13 133 T = 24 Appendix A: Examples of steps for data processing A- 100 Therefore, T = 24 and N=34 T follows normal distribution with Mean = 2 3 (N-2) = 2 3 (34-2) = 21.33 mm Standard deviation = ((16N - 29)/90)1/2 = ((16*34-29)/90)1/2 = 2.392 Therefore, t =   392.2 333.2124  = 1.115 t1-/2 = 1.96 (at 5% significance level) [Area under the normal curve] Since t < t1-/2, Null hypothesis accepted that the data set is random and No trend in series. No trend analysis is necessary at this stage. C. Step 3- Consistency Checking i) Double mass analysis Table A1.7: Cumulative average of test and base station Year 1962 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 Base Station 120 232 383 491 596 723 838 982 1132 1274 1366 1527 Test Station 104 201 364 495 611 807 915 1101 1270 1467 1575 1740 Year 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 Base Station 1654 1787 1942 2101 2208 2320 2441 2571 2659 2803 2969 Test Station 1884 2005 2171 2344 2454 2583 2706 2874 2977 3164 3328 Year 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 Base Station 3082 3239 3387 3549 3667 3821 4007 4117 4269 4374 4513 Test Station 3440 3599 3762 3892 4030 4196 4361 4461 4597 4714 4847 Appendix A: Examples of steps for data processing A- 101 Figure A1.2: Double mass plot Since, there is no significant change in trend in the double mass plot, the data is considered as consistent. ii) Mass curve The variation of rainfall with respect to time may be shown graphically by a mass curve. A mass curve of rainfall is a plot of cumulative depth of rainfall against time. From the mass curve total depth of rainfall and intensity of rainfall at any instant of time can be found. Figure A1.3: Comparison of mass curve of cumulative average rainfall depth at station– 1 and the 13 stations vs. time. iii) Relation curve between tested station and base station: 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 0 1000 2000 3000 4000 5000 6000 C u m . r a in fa ll o f te st e d s ta ti o n Cum. rainfall of base station Double mass curve 0 500 1000 1500 2000 2500 3000 3500 4000 1 2 3 4 5 6 7 8 9 10 11 12 C u m . ra in fa ll d e p th Cum. time, t Comparision of mass curves stn-1 13 stns Appendix A: Examples of steps for data processing A- 102 Figure A1.4: Comparison of rainfall depth between rainfall station-1 and station-7 It seems that the rainfall depth of the station-1 and station-7 has relatively change. D. Step 4- Correlation test If the data set comes from normal distribution then parametric test is applicable for that data set otherwise nonparametric test is applicable. For correlation test Pearson’s correlation test is parametric test and Spearman’s rank correlation test is nonparametric test. Example of two types of correlation test is given here. 0 50 100 150 200 250 300 350 1 2 3 4 5 6 7 8 9 10 11 12 A v g . ra in fa ll d e p th Month Comparision of rainfall between Station 1 & 7 stn-7 stn-1 Appendix A: Examples of steps for data processing A- 103 i) Spearman’s rank correlation test Table A1.8: Spearman's rank correlation test Avg. rainfall of Test station Rank Avg. rainfall of Base station Rank d d2 120 22 104 31 -9 81 112 26.5 97 34 -8 56 151 10.5 163 13.5 -3 9 108 29 131 20 9 81 104 32 116 26 6 36 128 19 196 2 17 289 115 24 108 29.5 -6 30 143 13.5 186 4 10 90 151 10.5 169 6 5 20 142 15 197 1 14 196 91 33 108 29.5 4 12 162 3.5 165 10.5 -7 49 127 20 144 16 4 16 133 17 121 24 -7 49 154 7.5 166 8.5 -1 1 159 5 173 5 0 0 107 30 110 28 2 4 112 26.5 129 22 5 20 121 21 123 23 -2 4 130 18 168 7 11 121 89 34 103 32 2 4 143 13.5 187 3 11 110 167 2 164 12 -10 100 113 25 112 27 -2 4 157 6 159 15 -9 81 148 12 163 13.5 -2 2 162 3.5 130 21 -18 306 119 23 138 17 6 36 154 7.5 166 8.5 -1 1 186 1 165 10.5 -10 90 109 28 100 33 -5 25 152 9 136 18 -9 81 105 31 117 25 6 36 139 16 133 19 -3 9 6865.0R 3443 20526 1 R n d6 1 R s 3s 3 2 s        n It shows that the series are strongly correlated. [Rs fall between 0.5 to 1 - strong positive correlation] Appendix A: Examples of steps for data processing A- 104 ii) Pearson’s correlation test Table A1.9: Pearson's correlation test Avg. rainfall of Test station, Xi Avg. rainfall of Base station, Yi Xi - Xmean Yi - Ymean (Xi - Xmean) 2 (Yi - Ymean) 2 (Xi - Xmean)* (Yi - Ymean) 120 104 -12 -39 154.28 1486.78 478.94 112 97 -21 -46 432.82 2075.61 947.82 151 163 18 20 318.47 417.84 364.78 108 131 -24 -12 597.20 133.61 282.47 104 116 -28 -27 804.92 705.37 753.50 128 196 -5 53 24.88 2855.96 -266.55 115 108 -18 -35 314.04 1194.31 612.42 143 186 11 43 111.56 1887.14 458.84 151 169 18 26 319.66 699.14 472.74 142 197 9 54 88.90 2963.84 513.32 91 108 -42 -35 1730.93 1194.31 1437.80 162 165 29 22 831.59 503.61 647.14 127 144 -6 1 31.69 2.08 -8.11 133 121 0 -22 0.13 464.78 -7.63 154 166 22 23 463.85 549.49 504.86 159 173 27 30 706.88 926.67 809.35 107 110 -26 -33 670.18 1060.08 842.87 112 129 -21 -14 435.95 183.84 283.10 121 123 -12 -20 136.21 382.55 228.27 130 168 -3 25 7.27 647.25 -68.59 89 103 -44 -40 1956.98 1564.90 1749.99 143 187 11 44 113.15 1975.02 472.73 167 164 34 21 1153.43 459.72 728.19 113 112 -20 -31 401.51 933.84 612.33 157 159 24 16 585.43 270.31 397.80 148 163 15 20 226.62 417.84 307.72 162 130 29 -13 850.44 157.72 -366.24 119 138 -14 -5 199.17 20.78 64.34 154 166 21 23 431.76 549.49 487.08 186 165 54 22 2868.02 503.61 1201.81 109 100 -23 -43 549.72 1811.25 997.84 152 136 20 -7 385.62 43.02 -128.80 105 117 -27 -26 750.55 653.25 700.21 139 133 6 -10 40.06 91.37 -60.50 133 143 550 876 484         5.022      meanimeani meanimeani YYXX YYXX r r = 0.6972 It shows that the series are strongly correlated. Appendix A: Examples of steps for data processing A- 105 iii) Correlation among surrounding stations Table A1.10: Correlation with Pabna Station Average rainfall of Test station, Xi Average rainfall of Base station, Yi Xi - Xmean Yi - Ymean (Xi - Xmean) 2 (Yi - Ymean) 2 (Xi - Xmean)* (Yi - Ymean) 124 104 -5 -39 22.94 1486.78 184.69 96 97 -33 -46 1074.14 2075.61 1493.15 144 163 15 20 235.40 417.84 313.62 115 131 -14 -12 201.14 133.61 163.93 86 116 -43 -27 1806.88 705.37 1128.95 119 196 -10 53 91.98 2855.96 -512.54 101 108 -28 -35 768.16 1194.31 957.82 146 186 17 43 298.17 1887.14 750.13 169 169 41 26 1645.73 699.14 1072.66 143 197 14 54 201.90 2963.84 773.57 98 108 -31 -35 943.45 1194.31 1061.50 150 165 21 22 455.86 503.61 479.14 131 144 3 1 6.51 2.08 3.68 142 121 13 -22 158.99 464.78 -271.84 136 166 7 23 47.16 549.49 160.99 153 173 24 30 581.66 926.67 734.17 103 110 -26 -33 679.86 1060.08 848.94 116 129 -13 -14 172.68 183.84 178.17 119 123 -10 -20 94.23 382.55 189.86 140 168 11 25 115.40 647.25 273.31 85 103 -44 -40 1936.65 1564.90 1740.88 166 187 37 44 1342.68 1975.02 1628.44 162 164 33 21 1072.63 459.72 702.22 98 112 -31 -31 942.94 933.84 938.38 146 159 17 16 294.16 270.31 281.98 122 163 -7 20 42.78 417.84 -133.70 148 130 19 -13 377.04 157.72 -243.86 105 138 -24 -5 581.97 20.78 109.98 139 166 10 23 106.80 549.49 242.25 189 165 60 22 3553.27 503.61 1337.70 114 100 -15 -43 210.71 1811.25 617.77 140 136 11 -7 126.40 43.02 -73.74 113 117 -16 -26 244.11 653.25 399.33 123 133 -6 -10 36.69 91.37 57.90 129 143 602 876 517 Correlation coefficient between Base station with Pabna Station, r = 0.7123 It shows strong correlation between two stations. Correlation with Ishwardi station Appendix A: Examples of steps for data processing A- 106 Table A1.11: Correlation with Ishwardi station Average rainfall of base station, Xi Average rainfall of test station, Yi Xi - Xmean Yi - Ymean (Xi - Xmean) 2 (Yi - Ymean) 2 (Xi - Xmean)* (Yi - Ymean) 132 104 6 -39 40.38 1486.78 -245.03 166 97 40 -46 1620.44 2075.61 -1833.95 174 163 48 20 2285.21 417.84 977.17 114 131 -12 -12 141.32 133.61 137.41 107 116 -18 -27 339.64 705.37 489.46 131 196 5 53 23.72 2855.96 260.29 107 108 -19 -35 347.06 1194.31 643.81 138 186 12 43 147.31 1887.14 527.25 124 169 -2 26 2.96 699.14 -45.51 160 197 34 54 1179.62 2963.84 1869.81 84 108 -41 -35 1710.19 1194.31 1429.16 134 165 8 22 67.03 503.61 183.73 48 144 -77 1 5995.32 2.08 -111.59 93 121 -33 -22 1089.29 464.78 711.54 95 166 -30 23 917.35 549.49 -709.98 165 173 40 30 1568.47 926.67 1205.59 99 110 -27 -33 722.06 1060.08 874.89 124 129 -1 -14 1.90 183.84 18.70 114 123 -12 -20 133.70 382.55 226.15 134 168 9 25 74.46 647.25 219.53 84 103 -42 -40 1761.58 1564.90 1660.33 138 187 12 44 146.71 1975.02 538.28 150 164 24 21 591.89 459.72 521.64 95 112 -31 -31 963.34 933.84 948.48 135 159 9 16 79.58 270.31 146.66 167 163 41 20 1706.01 417.84 844.30 144 130 18 -13 324.74 157.72 -226.32 122 138 -4 -5 17.05 20.78 18.83 182 166 56 23 3139.24 549.49 1313.38 154 165 28 22 794.05 503.61 632.37 113 100 -12 -43 151.19 1811.25 523.31 131 136 5 -7 30.02 43.02 -35.93 96 117 -30 -26 883.84 653.25 759.85 121 133 -5 -10 23.40 91.37 46.24 126 143 854 876 427 Correlation between test station and Ishwardi, r = 0.494 The value shows weak correlation between two stations. Correlation between Test station and Chatmohor station Appendix A: Examples of steps for data processing A- 107 Table A1.12: Correlation with Chatmohor station Average rainfall of base station, Xi Average rainfall of test station, Yi Xi - Xmean Yi - Ymean (Xi - Xmean) 2 (Yi - Ymean) 2 (Xi - Xmean)* (Yi - Ymean) 228 163 112 18 12642.39 317.29 2002.81 56 131 -59 -14 3457.17 201.29 834.19 67 116 -48 -29 2328.65 851.91 1408.47 80 196 -35 51 1251.23 2581.91 -1797.38 81 108 -34 -37 1176.91 1382.91 1275.76 140 186 24 41 599.14 1665.66 998.98 145 169 29 24 869.89 567.04 702.32 94 197 -21 52 448.29 2684.54 -1097.01 87 108 -28 -37 764.86 1382.91 1028.46 226 165 111 20 12301.16 392.54 2197.42 129 144 14 -1 190.73 1.41 -16.40 123 121 8 -24 69.48 585.04 -201.62 177 166 62 21 3842.21 433.16 1290.08 141 173 26 28 685.25 773.54 728.05 53 110 -63 -35 3923.70 1238.16 2204.12 77 129 -38 -16 1463.53 262.04 619.27 81 123 -34 -22 1150.75 492.29 752.66 97 168 -18 23 325.42 520.41 -411.52 49 103 -66 -42 4376.63 1779.79 2790.96 53 187 -62 42 3816.90 1748.29 -2583.22 0 164 -115 19 13257.08 353.91 -2166.06 173 112 58 -33 3309.39 1101.41 -1909.19 156 159 41 14 1664.82 190.79 563.58 145 163 30 18 908.15 317.29 536.79 152 130 37 -15 1390.84 230.66 -566.40 120 138 5 -7 24.94 51.66 -35.89 109 166 -6 21 32.37 433.16 -118.41 159 165 44 20 1930.34 392.54 870.47 102 100 -13 -45 167.86 2041.91 585.45 166 136 51 -9 2629.36 84.41 -471.11 94 117 -21 -28 461.08 794.54 605.26 123 133 8 -12 64.30 148.54 -97.73 115 145 2548 813 329 Correlation coefficient, r = 0.2286, weak correlation. Table A1.13: Correlation between Tested station and Base stations Station ID Station name Atghoria Station 25 Pabna 0.7123 15 Ishurdi 0.494 7 Chatmohar 0.2285 Hence, it seems that the tested station is most closely related with the Pabna rainfall station. Appendix A: Examples of steps for data processing A- 108 Step 5: Filling missing value Data of January, February and March of 1962 at Atghoria station is missing. Atghoria station is highly correlated with Pabna station. So for estimating missing value Pabna station gets first priority. Table A1.14: Estimation of missing value Station name January February March Average rainfall at test station 8.77 23.20 35.62 Average rainfall at Pabna station 7.4 23.94 28.27 In 1962 rainfall at Pabna station 17.8 16.8 26.2 Filling missing value for Atghoria station 1962 21.1 16.3 33 Missing value of January at Atghoria, PA =                   station gneighborin ofJAnuary for average timeLong year particularfor that station gneighborin of discharge Average * station gneighborin of No. Atghoria ofJanuary for average timeLong = (8.77/1) * (17.4/7.4) = 20.62 mm Step 6: Test for Normality H0: The data are normal H1: The data are not normal If r < rcritical – reject null hypothesis Determination of XT: Observed data are arranged in descending order Calculate, p = (i – a)/(n+1-2a), a = plotting position for normal distribution a = 0.375, I = rank, n = sample size = 27 Then, return period, T = 1/p, p and T determined for each sample and then determine ZT for each sample by using following formula Standard Normal Variate, ZT = 0.1975 T 1 T 1 1 0.1350.135              = 0.1975 43.6 1 43.6 1 1 0.1350.135              = 2.0058 Appendix A: Examples of steps for data processing A- 109 xTmean ZX  T X Where, meanX = 143, x = 30.04 So, XT = 143+ 30.04* 2.102 XT = 206 Table A1.15: Determination of probability plot correlation coefficient Ranked data XT Xi-Xmean XTi - XTmean (Xi-Xmean)2 (XTi - XTmean)2 (Xi-Xmean)*(XTi XTmean) 197 206 54 63 2964 3986 3437 196 193 53 50 2856 2532 2689 187 186 44 43 1975 1844 1909 186 180 43 38 1887 1407 1629 173 176 30 33 927 1094 1007 169 172 26 29 699 857 774 168 168 25 26 647 671 659 166 165 23 23 549 522 535 166 163 23 20 549 400 469 165 160 22 17 504 300 389 165 157 22 15 504 219 332 164 155 21 12 460 153 265 163 153 20 10 418 100 205 163 150 20 8 418 60 158 159 148 16 5 270 30 90 144 146 1 3 2 11 5 138 144 -5 1 21 1 -5 136 141 -7 -1 43 1 7 133 139 -10 -3 91 11 31 131 137 -12 -5 134 30 63 130 135 -13 -8 158 60 97 129 133 -14 -10 184 100 136 123 130 -20 -12 383 153 242 121 128 -22 -15 465 219 319 117 125 -26 -17 653 300 443 116 123 -27 -20 705 400 531 112 120 -31 -23 934 522 698 110 117 -33 -26 1060 671 844 108 113 -35 -29 1194 857 1012 108 109 -35 -33 1194 1094 1143 104 105 -39 -38 1487 1407 1446 103 100 -40 -43 1565 1844 1699 100 92 -43 -50 1811 2532 2142 97 79 -46 -63 2076 3986 2877 143 143 29786 28377 28277 r =   5.022 )(*)( )(*)(      TiTi TiTi XXXX XXXX Appendix A: Examples of steps for data processing A- 110 r = 0.973 rcritical = 0.968 r > rcritical, null hypothesis accepted that data are from normal distribution. So, parametric tests can be applied for this data set. Step 7: Test for shift in the mean Parametric Test: t-Test H0: Equal mean, no change in the mean Ha: Shift in the mean After infilling the missing value one can check the data set if the mean of the new data set is deviated from the mean of the previous data set. Formula: 21 12 11 NN S yy T c    where,     2 11 2211    N sNsN S , where N = no. of sample, y = mean of the sample and s denotes standard deviation, subscript 1 and 2 describes sample data before and after infilling. Here, N1 = 33, 1y = 8.77 and s1 = 12.1 N2 = 34, 2y = 9.14 and s2 = 12.1     2 11 2211    N sNsN S =     267 1.12*1341.12*133   S = 3.5 21 12 11 NN S yy T c    = 33 1 33 1 5.3 14.977.8   = 0.4 T1-/2 = 1.96 c T < T1-/2, so hypothesis is accepted and acceptation of hypothesis is considered as no detection of shift. Non-parametric test: Mann-Whitney Test Step 8: Trend test T-test: test for linear trend with other station H0: no trend Ha: Linear trend Appendix A: Examples of steps for data processing A- 111 2 1 2 rr N T c    where, N = number of sample = 34 r = Cross correlation co-efficient = 0.7123 2 1 2 rr N T c    = 2 7123.017123.0 234   = 11.315  ,2/1T = 1.96 c T >  ,2/1T , So null hypothesis is rejected. Rejection of hypothesis considered as a detection of linear trend. This test also can check trend between two months of one station by determining correlation between those months. Test for trend: Mann-Kendall test H0: The series is random no trend series Ha: The series has trend either upward or downward )(SV mS u c   where, S = Mann-Kendall statistic, m = 1 when S < 0 and m = -1 when S > 0 Yearly average data has been taken for Mann-Kendall test. Calculation for Mann-Kendall statistic is shown in table (A1-16) Here, S < 0, m = 1               n i iii eeeNNNSV 1 521521 18 1 )( Where, ei is the number of data in tied group and n is the number of tied group. In this data set there is five tied group, n = 5 and ei = 10. N = 34 V(S) = 4545.333 uc = (34 +1)/ 4545.333 = 0.1335 u1-/2 = 1.96 uc < u1-/2, so the null hypothesis is accepted and acceptance of hypothesis indicates no trend random series. So, trend analysis is not necessary. Appendix A: Examples of steps for data processing A- 112 Table A1.16: Determination of Mann-Kendall Statistics 110 97 163 131 116 196 108 186 169 197 108 165 144 121 166 173 110 129 123 168 103 187 164 112 159 163 130 138 166 165 100 136 117 133 Sum 1 1 1 1 1 -1 1 1 1 -1 1 1 1 1 1 0 1 1 1 -1 1 1 1 1 1 1 1 1 1 -1 1 1 1 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 32 1 -1 1 -1 1 1 1 -1 1 -1 -1 1 1 -1 -1 -1 1 -1 1 1 -1 -1 0 -1 -1 1 1 -1 -1 -1 -1 -6 1 1 -1 1 1 1 -1 1 1 -1 1 1 -1 -1 -1 1 -1 1 1 -1 1 1 -1 1 1 1 -1 1 -1 1 6 1 -1 1 1 1 -1 1 1 1 1 1 -1 1 1 1 -1 1 1 -1 1 1 1 1 1 1 -1 1 1 1 17 1 -1 -1 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -26 1 1 1 0 1 1 1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 -1 1 1 1 22 1 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -22 1 -1 -1 -1 -1 -1 1 -1 -1 -1 -1 -1 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -19 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -24 1 1 1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 -1 1 1 1 19 1 -1 1 1 -1 -1 -1 1 -1 1 -1 -1 -1 -1 -1 -1 1 0 -1 -1 -1 -1 -11 1 1 1 -1 -1 -1 1 -1 1 1 -1 1 1 -1 -1 1 1 -1 -1 -1 -1 -3 1 1 -1 1 1 1 -1 1 1 -1 1 1 1 1 1 1 -1 1 -1 1 10 1 -1 -1 -1 1 -1 1 -1 -1 -1 -1 -1 -1 0 -1 -1 -1 -1 -1 -12 1 -1 -1 -1 -1 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -16 1 1 1 -1 1 1 1 1 1 1 1 1 1 -1 1 1 1 13 1 1 -1 1 1 -1 1 1 1 1 1 1 -1 1 -1 1 6 1 -1 1 1 -1 1 1 1 1 1 1 -1 1 -1 1 7 1 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -12 1 1 1 1 1 1 1 1 1 -1 1 1 1 11 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -12 1 -1 -1 -1 -1 1 1 -1 -1 -1 -1 -7 1 1 1 1 1 1 -1 1 1 1 8 1 -1 -1 1 1 -1 -1 -1 -1 -3 1 -1 1 1 -1 -1 -1 -1 -4 1 1 1 -1 1 -1 1 3 1 1 -1 -1 -1 -1 -2 1 -1 -1 -1 -1 -5 1 -1 -1 -1 -4 1 1 1 3 1 -1 -2 1 1 S -10 Appendix A: Examples of steps for data processing A- 114 Step 9: Trend Analysis Not needed. Step 10: Selection of distribution Goodness of fit (Chi-square) test Comparing the theoretical and sample values of the relative frequency or the cumulative frequency function can test the goodness of fit of a probability distribution. In the case of the relative frequency function, the Chi-square test is used. Table A1.17: Goodness of fit test Column 1 2 3 4 5 6 7 8 Interval, I Range(in) NI Fs(xi) (ni/n) Fs(xi) zi F(xi) P(xi) 2 1 0-55 5 0.417 0.417 -0.67 0.251 0.251 1.317 2 55-110 1 0.083 0.500 -0.25 0.440 0.189 0.713 3 110-165 1 0.083 0.583 0.17 0.567 0.127 0.183 4 165-220 1 0.083 0.666 0.59 0.722 0.155 0.401 5 220-275 1 0.083 0.749 1.01 0.844 0.122 0.150 6 275-330 2 0.167 0.916 1.43 0.922 0.078 1.219 7 330-385 1 0.083 0.999 1.85 0.968 0.046 0.357 Total=12 1.000 4.340 Mean ym = 142.5 Standard deviation  = 131.31 Column 1: equally ranges data Column 2: no. of data within range Column 3: ration of the no. of certain ranges of data and the total no. of data Column 4: Cumulative value of column 3. Column 5: z = (x- ym)/ = (41.5-143.5)/51 = -2 Column 6: From cumulative probability of standard normal distribution table Column 7: Intervals of the values of column 6. Column 8: n[fs(xi) - P(xi) ] 2/ P(xi) From the cumulative probability of the standard normal distribution table find the value corresponding to z values. To employ the table for z<0, use Fz (z) = 1 - Fz (|z|) Where Fz(|z|) is the tabulated value. To check the goodness of fit, the 189.0.251-440. )p(x 1.317 251.0 )251.0417.0(12 )( )]()([ 2 2 1 2 11      xp xpxfn s Appendix A: Examples of steps for data processing A- 115 2 test statistic is calculated by The total of the values in column 8 is 4.340. The value of 2v, 1- for a cumulative probability of 1 –  = 0.95 and degree of freedom v = m-p-1 = 7 – 2 – 1= 4 is 27, 0.95 = 9.49. Since this value is greater than 2c, the null hypothesis (the distribution fits the data) cannot be rejected at the 95 percent confidence level; the fit of the normal distribution to the Simulbari station rainfall data is accepted. If the distribution had fitted poorly, the values of fs(xi) and P(xi) would have been quite different from one another, resulting in a value of 2c larger than 9.49, in which case the null hypothesis would have been rejected. Hence the test of goodness to fit shows that the data are well fitted in the series. Other methods for selecting the fitted distribution are described in ‘Technical notes on statistical analysis’. Step 11: Frequency Analysis Described in ‘Technical notes on statistical analysis’ Step 12: Comments It is analyzed that the set of data at the station at Atghoria (station-ID-1) is good quality. Different analysis shows that the data set is within the accepted limit. The data set is suitable for planning purposes. Appendix A: Examples of steps for data processing A- 116 Exercise A2: Discharge data Following tables show the monthly average discharge data of Baruria Transit and Hardinge Bridge has been recorded from 1966 to 1994. Steps for quality checking of time series discharge data are described below. In this example Baruria transit is taken as test station. Step 1: Raw Data Table A2.1: Monthly average discharge data of Baruria Transit Year Apr May June July Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1966 – 67 7814 11860 31953 48419 65219 61050 24771 12157 8915 6805 5934 6041 290939 24245 1967 – 68 6930 11957 25463 51594 49581 53517 30742 12770 8744 6895 6160 5977 270330 22527 1968 – 69 8202 13404 31800 60361 58990 42010 37345 13653 8899 6628 5735 5628 292655 24388 1969 – 70 6957 11376 28800 51939 61142 58957 31897 14040 9503 7238 6481 6944 295273 24606 1970 – 71 9627 20661 34520 57832 71116 55380 39797 16597 9712 7503 6580 6328 335654 27971 1971 – 72 1972 – 73 9597 17826 30470 49390 57948 53780 29194 15393 10204 7450 6363 6675 294290 24524 1973 – 74 7914 14752 38187 47871 79181 66030 49571 22547 12500 8555 6655 6351 360113 30009 1974 – 75 9024 19829 34113 69690 96539 78923 41529 18677 10937 7583 6573 6205 399623 33302 1975 – 76 9911 15335 28133 65126 78819 75647 42968 18403 9971 6750 5530 5722 362315 30193 1976 – 77 7429 12318 28210 53561 66526 66213 28926 14693 10057 7315 6416 7054 308719 25727 1977 – 78 11186 19345 38490 53587 75003 65357 42423 18990 11067 7788 6261 6215 355712 29643 1978 – 79 8467 16039 37723 60755 74352 62793 39068 16757 10792 7073 5983 5817 345617 28801 1979 – 80 1980 – 81 9188 18287 32980 60845 93532 76313 37965 17377 9036 6028 5365 6056 372973 31081 1981 – 82 8922 12757 23147 66145 76465 60803 27416 12150 7420 5853 4571 5309 310957 25913 1982 – 83 9152 17371 28983 54410 64032 72373 29629 14380 11229 9951 9380 6260 327150 27263 1983 – 84 11736 20935 28167 50235 57803 82770 52716 19280 9347 6911 6016 5393 351310 29276 1984 – 85 9684 19184 39530 70071 68487 88217 36758 16367 9707 6930 5804 6981 377720 31477 1985 – 86 10992 15241 37233 67129 66081 69983 56674 20990 10415 7138 6255 6447 374580 31215 1986 – 87 9343 13687 19890 54155 63406 58103 40690 15870 9014 6559 4530 5229 300477 25040 1987 – 88 9260 11703 22987 55090 91319 81113 44223 19710 10309 6678 5606 7105 365104 30425 1988 – 89 10288 19619 37953 66800 92477 86250 40810 16813 10577 7314 6046 5928 400877 33406 1989 – 90 8119 17458 40373 66174 59303 62907 47816 19043 10531 7310 6321 6856 352212 29351 1990 – 91 10829 19745 40576 66603 77003 65447 56561 18300 10155 6812 4975 5551 382557 31880 1991 – 92 9970 20381 39270 69823 75926 81833 38442 16483 10027 7120 5462 5576 380313 31693 1992 – 93 10725 15048 19983 47810 55535 57497 32739 17500 9225 6492 5756 5403 283713 23643 1993 – 94 7299 19077 37433 63839 76087 77183 49955 18853 10446 6776 5603 5572 378124 31510 Sum 238563 425198 836370 1529255 1851874 1760450 1030623 437793 258742 185455 156363 158622 Average 9176 16354 32168 58817 71226 67710 39639 16838 9952 7133 6014 6101 Appendix A: Examples of steps for data processing A- 117 Table A2.2: Monthly average data of Hardinge Bridge Year April May June July Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1966 – 67 1656 1724 3208 13011 31874 25670 7630 4138 3128 2309 1951 1551 97850 8154 1967 – 68 1528 1615 2832 15247 30019 43390 11985 5339 3783 3064 2710 2212 123726 10310 1968 – 69 1776 1745 4259 22018 36984 20543 17667 5999 3736 2729 2204 1863 121521 10127 1969 – 70 1741 1904 4532 16547 43790 34940 18526 7234 4532 3065 2660 2507 141979 11832 1970 - 71 2207 2305 4763 19452 33310 34197 15202 6263 3843 2638 2294 2197 128669 10722 1971 - 72 1972 - 73 2337 2562 3969 11866 22129 28343 12196 6250 4292 3170 2838 2389 102341 8528 1973 - 74 2013 2746 7382 17506 41029 40767 26494 9545 5476 3886 2936 2393 162173 13514 1974 - 75 2394 2487 4281 18274 45432 34220 15368 6775 4004 2722 2345 1946 140249 11687 1975 - 76 1880 1713 3466 29313 44039 39563 20042 6978 3405 1882 1470 830 154581 12882 1976 - 77 728 1323 4413 14911 34558 45097 13067 4565 2435 1424 1100 912 124533 10378 1977 - 78 967 1167 2484 21282 43035 33693 17308 5828 3379 2281 1762 1550 134738 11228 1978 - 79 1729 2415 5921 26381 52355 44007 20526 6649 3467 1884 1731 1413 168476 14040 1979 - 80 1269 1501 1482 14259 29448 15119 7807 2754 1955 1335 1029 911 78869 6572 1980 - 81 943 1216 3294 25274 48013 44517 14487 5106 2727 1639 1334 991 149542 12462 1981 - 82 1107 1578 2401 22768 41406 29023 13429 4099 2494 1441 1383 1281 122409 10201 1982 - 83 1577 1840 4526 10155 33319 47750 9781 4482 2779 1382 1136 869 119597 9966 1983 - 84 820 1534 2235 12468 25668 44767 24939 7198 3323 2105 1551 1240 127846 10654 1984 - 85 981 1393 7831 22794 33803 46173 11273 4455 2381 1532 1147 873 134635 11220 1985 - 86 771 877 1675 16523 38803 35830 37129 12197 4441 2729 1822 1705 154503 12875 1986 - 87 1284 1652 2455 25574 40745 30090 17093 6050 3193 2266 1432 993 132827 11069 1987 - 88 1066 1299 2019 14810 44629 56450 14348 6200 2524 1375 1085 994 146800 12233 1988 - 89 1030 1475 2957 20689 51865 40703 10610 3592 2032 1280 856 512 137600 11467 1989 - 90 607 998 5139 17890 26339 26900 15992 4299 2153 1304 672 788 103080 8590 1990 - 91 870 1547 4497 30583 44119 32023 19024 5077 2255 1459 775 577 142806 11901 1991 - 92 730 1151 5299 11692 27855 40297 9910 3786 2228 1475 810 499 105732 8811 1992 - 93 430 555 902 5848 21939 27637 9524 4438 2228 1199 544 316 75558 6296 1993 - 94 402 1081 2052 10670 23861 36330 17958 5162 2679 1286 1111 636 103228 8602 Sum 34841 43403 100271 487805 990368 978039 429315 154458 84872 54862 42686 34947 Average 1290 1608 3714 18067 36680 36224 15901 5721 3143 2032 1581 1294 Step 2: Checking for validation of data Test for randomness of the data: Turning point test The Turning point test is used to check whether the time series verify the following hypothesis: H0: The series is a random no trend series Ha: The series has trend and/or autocorrelated errors. With this test one can check yearly or monthly randomness of data set. The example describes yearly randomness checking of the data set: Mean = 2(N-2)/3 and Standard Deviation = [(16N-29)/90]0.50 Standard Value of T, t = (T-mean)/standard Deviation Appendix A: Examples of steps for data processing A- 118 Table A2.3: Turning point determination at Baruria Transit within the data range years Yearly Avg. Discharge in cumec Range No of turning Cumulative no. of turning 24245 22527 24245>22527<24388 yes 1 24388 22527<24388<24606 no 1 24606 24388<24606<27971 no 1 27971 24606<27971>24524 yes 2 24524 27971>24524<30009 yes 3 30009 24524<30009<33302 no 3 33302 30009<33302>30193 yes 4 30193 33302>30193>25727 no 4 25727 30193>25727<29643 yes 5 29643 25727<29643>28801 yes 6 28801 29643>28801<31081 yes 7 31081 28801<31081>25913 yes 8 25913 31081>25913<27263 yes 9 27263 25913<27263<29276 no 9 29276 27263<29276<31477 no 9 31477 29276<31477>31215 yes 10 31215 31477>31215>25040 no 10 25040 31215>25040<30425 yes 11 30425 25040<30425<33406 no 11 33406 30425<33406>29351 yes 12 29351 33406>29351<31880 yes 13 31880 29351<31880>31693 yes 14 31693 31880>31693>23643 no 14 23643 31693>23643<31510 yes 15 31510 T = 15 Therefore, T = 15 and N = 26 T follows normal distribution with, Mean = 16 and Standard Deviation = [(16N-29)/90] 0.50 = 2.074 Therefore, t = 0.482 t1-/2 = 1.96 Since t < t1-/2, the null hypothesis says that the series is a random no trend series. Appendix A: Examples of steps for data processing A- 119 Step 3: Consistency Checking Double mass analysis Table A2.4: Cumulative average of test and base station Year 1966 - 67 1967 - 68 1968 - 69 1969 - 70 1970 - 71 1971 - 72 1972 - 73 1973 - 74 1974 - 75 Test Station 24245 46772 71160 95766 123738 148262 178271 211573 241766 Base Station 8154 18465 28591 40423 51145 59674 73188 84876 97757 Year 1975 - 76 1976 - 77 1977 - 78 1978 - 79 1979 - 80 1980 - 81 1981 - 82 1982 - 83 1983 - 84 Test Station 267493 297135 325937 357018 382931 410193 439469 470946 502161 Base Station 108135 119363 133403 139975 150176 160143 170796 182016 194891 Year 1984 - 85 1985 - 86 1986 - 87 1987 - 88 1988 - 89 1989 - 90 1990 - 91 1991 - 92 Test Station 527201 557626 591032 620383 652263 683956 707599 739109 Base Station 205960 218193 229660 238250 250151 258962 265258 273860 Figure A2. 1: Double mass plot Since there is no significant change in the trend in double mass plot, data can be considered as consistent data. Step 4: Correlation Test Correlation between Baruria Transit and Hardinge Bridge Table A2.5: Determination of correlation Xi Yi Xi-Xmean Yi-Ymean (Xi-Xmean)*(Yi-Ymean) 24245 8154 -347832 -136518 47485231719 46772 18465 -325305 -126207 41055785855 71160 28591 -300917 -116080 34930545329 95766 40423 -276311 -104249 28805060543 123738 51145 -248340 -93526 23226297311 0 100000 200000 300000 400000 500000 600000 700000 800000 0 50000 100000 150000 200000 250000 300000c u m u la ti v e a v e r a g e o f te st s ta ti o n Cumulative average of base station Double mass plot Double mass plot Appendix A: Examples of steps for data processing A- 120 Xi Yi Xi-Xmean Yi-Ymean (Xi-Xmean)*(Yi-Ymean) 148262 59674 -223815 -84998 19023855309 178271 73188 -193806 -71484 13853933760 211573 84876 -160504 -59796 9597524790 241766 97757 -130311 -46914 6113467902 267493 108135 -104585 -36537 3821168104 297135 119363 -74942 -25308 1896665966 325937 133403 -46140 -11269 519948053.1 357018 139975 -15059 -4696 70725441.07 382931 150176 10854 5504 59742675.91 410193 160143 38116 15471 589686411.5 439469 170796 67392 26125 1760587990 470946 182016 98869 37344 3692166106 502161 194891 130084 50219 6532721455 527201 205960 155124 61288 9507257884 557626 218193 185549 73522 13641847184 591032 229660 218955 84988 18608622703 620383 238250 248306 93578 23236063095 652263 250151 280186 105479 29553672712 683956 258962 311879 114290 35644550837 707599 265258 335522 120586 40459282940 739109 273860 367032 129189 47416339694 Mean Mean Sum 372077 144672 4.61103E+11 Stdev Stdev 221689 83263 Xmean = 28427 Ymean = 10605 Sx = 25017 Sy = 13336 Co-efficient of correlation, r = 0.0.961 In Ganges there is only two discharge station so correlation with other station cannot be judged for infilling the missing data. If there remains more than two station correlation between test station with other station should be checked for selecting the station which would be used for infilling the missing data. Step 5: Missing data Missing data years at Baruria Transit are as follows:  1971 – 72  1979 – 80 Since, data of 1971 – 72 at Hardinge Bridge is also missing, infilling of data 1979 – 80 is only possible with the help of Hardinge Bridge data Appendix A: Examples of steps for data processing A- 121 Infilling of Missing data Table A2.6: Infilling of missing data with the help of neighboring station Station name Apr May June July Aug Sep Oct Nov Dec Jan Feb Mar Annual Discharge Baruria Transit (test) 9176 16354 32168 58817 71226 67710 39639 16838 9952 7133 6014 6101 Annual Discharge Hardinge Bridge (base) 1290 1608 3714 18067 36680 36224 15901 5721 3143 2032 1581 1294 In 1979 - 80 data at Hardinge Bridge 1269 1501 1482 14259 29448 15119 7807 2754 1955 1335 1029 911 Filling missing value for B. Transit for 1979 - 80 9021 15270 12840 46420 57183 28260 19464 8105 6189 4688 3913 4292 Missing value of April at Baruria Transit, DA =                   station gneighborin of Aprilfor average timeLong year particularfor that station gneighborin of discharge Average * station gneighborin of No. Transit B. of Aprilfor average timeLong =( 9176/1 ) * ( 1269/1290 ) = 9021 m3/sec Step 6: Normality Test H0: The data are normal H1: The data are not normal If r < rcritical – reject null hypothesis Determination of XT: Observed data are arranged in descending order Calculate, p = (i – a)/(n+1-2a), a = plotting position for normal distribution a = 0.375, I = rank, n = sample size = 27 Then, return period, T = 1/p, p and T determined for each sample and then determine ZT for each sample by using following formula Standard Normal Variate, ZT = 0.1975 T 1 T 1 1 0.1350.135              = 0.1975 43.6 1 43.6 1 1 0.1350.135              = 2.0058 xTmean ZX  T X Appendix A: Examples of steps for data processing A- 122 Where, meanX = 28023, x = 2792 So, XT = 28023+ 2792* 2.0058 XT = 33623 Table A2.7: Normality test Ranked data XT Xi-Xmean XTi - XTmean (Xi-Xmean) 2 (XTi - XTmean) 2 (Xi-Xmean)*(XTi - XTmean) 32674 33623 4651 5600 21636076 31364577 26050074 31693 32382 3670 4359 13466970 18996730 15994637 31510 31660 3487 3637 12161713 13229113 12684190 30373 31123 2350 3100 5521126 9611720 7284746 30355 30683 2332 2660 5436305 7073216 6200980 30319 30301 2296 2278 5271296 5188026 5229496 30040 29958 2017 1935 4070158 3745160 3904279 29993 29643 1970 1620 3880783 2625738 3192165 29974 29349 1951 1326 3805769 1757142 2585977 29882 29068 1859 1045 3454142 1092693 1942760 29644 28799 1621 776 2626427 601567 1256970 29459 28536 1436 513 2062210 263403 737016 29358 28278 1335 255 1781076 65274 340968 29303 28023 1280 0 1639221 0 0 29108 27767 1085 -255 1177856 65274 -277279 27815 27510 -208 -513 43258 263403 106744 26316 27247 -1707 -776 2913833 601567 1323959 26209 26978 -1814 -1045 3290200 1092693 1896095 25989 26697 -2034 -1326 4135567 1757142 2695696 25976 26403 -2047 -1620 4189498 2625738 3316704 25815 26088 -2208 -1935 4875573 3745160 4273149 25296 25745 -2727 -2278 7434569 5188026 6210535 24716 25363 -3307 -2660 10933714 7073216 8794118 24388 24923 -3635 -3100 13213393 9611720 11269580 24245 24386 -3778 -3637 14273597 13229113 13741435 23643 23664 -4380 -4359 19186444 18996730 19091352 22527 22423 -5496 -5600 30200567 31364577 30777070 Mean Mean Sum Sum Sum 28023 28023 202681343 191228719 190623413 r =   5.022 )(*)( )(*)(      TiTi TiTi XXXX XXXX r = 0.9682 rcritical = 0.961 Appendix A: Examples of steps for data processing A- 123 r > rcritical, null hypothesis accepted that data are from normal distribution. So, parametric tests can be applied for this data set. Step 7: Check for shift in the mean Parametric Test: t-Test for shift in the mean H0: Equal mean, no change in the mean Ha: Shift in the mean After infilling the missing value one can check the data set if the mean of the new data set is deviated from the mean of the previous data set. Formula: 21 12 11 NN S yy T c    where,     2 11 2211    N sNsN S , where N = no. of sample, y = mean of the sample and s denotes standard deviation, subscript 1 and 2 describes sample data before and after infilling. Here, N1 = 26, 1y = 28427 and s1 = 24802 N2 = 27, 2y = 28040 and s2 = 24629     2 11 2211    N sNsN S =     253 24629*12724802*126   S = 24714 21 12 11 NN S yy T c    = 27 1 26 1 24714 2842728040   = 0.057 T1-/2 = 1.96 c T < T1-/2, so hypothesis is accepted and acceptation of hypothesis is considered as no detection of shift. Non Parametric test: Mann-Whitney test for shift in the mean Step 8: Trend test Test for linear trend with neighboring station H0: no trend Ha: Linear trend 2 1 2 rr N T c    Appendix A: Examples of steps for data processing A- 124 where, N = number of sample = 27 r = Cross correlation co-efficient = 0.9422 2 1 2 rr N T c    = 2 9422.019422.0 227   = 15.84  ,2/1 T = 1.96 c T >  ,2/1T , So null hypothesis is rejected. Rejection of hypothesis considered as a detection of linear trend. This test also can check trend between two months of one station by determining correlation between those months. Mann-Kendall Test for trend H0: The series is random no trend series Ha: The series has trend either upward or downward This can check trend of yearly average data. This is more useful to check the low flow or high flow trend of long time period. The trend is decreasing if Mann-Kendall statistics, S is a negative large number otherwise the trend is increasing. No trend hypothesis indicates a stable condition. Formula:     T z , where, 2/)1( 21    NN NN  , 0 , and    19 522    NN N  N1 (1st is smaller than the 2nd) and N2 are the upward downward pairs respectively Here in this example trend of yearly average data has been checked. Calculation of Mann-Kendall statistics is shown in table 2.8. Here in this example from Table 2.8 values for N1 and N2 can be obtained as follows: N1 = 243, N2 = 108 2/)1( 21    NN NN  = 2/)127(27 108243   = 0.3846    19 522    NN N  =    127*27*9 527*2*2   = 0.1111     T z = 1111.0 03846.0  = 3.462 2/1  z = 1.96, T z > 2/1 z , So null hypothesis rejected and it indicates presence of trend in the series. From Table 7 Mann-Kendall statistics S = 135, the no is positive and it considered as upward trend of the series. For removing trend in the data trend analysis is necessary. Appendix A: Examples of steps for data processing A- 125 Table A2.8: Calculation of Mann-Kendall Statistics 24245 22527 24388 24606 27971 24524 30009 33302 30193 25727 29643 28801 17970 31081 25913 27263 29276 31477 31215 25040 30425 33406 29351 31880 31693 23643 31510 Sum 1 1 1 1 1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1 1 1 -1 1 20 1 1 1 1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23 1 1 1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1 1 1 -1 1 20 1 -1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1 1 1 -1 1 17 1 1 1 1 -1 1 1 -1 1 -1 -1 1 1 1 -1 1 1 1 1 1 -1 1 8 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1 1 1 -1 1 17 1 1 -1 -1 -1 -1 1 -1 -1 -1 1 1 -1 1 1 -1 1 1 -1 1 0 1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 1 -1 -1 -1 -1 -1 -17 1 -1 -1 -1 1 -1 -1 -1 1 1 -1 1 1 -1 1 1 -1 1 -2 1 1 -1 1 1 1 1 1 1 -1 1 1 1 1 1 -1 1 11 1 -1 1 -1 -1 -1 1 1 -1 1 1 -1 1 1 -1 1 0 1 1 -1 -1 1 1 1 -1 1 1 1 1 1 -1 1 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 1 -1 -1 1 1 -1 -1 1 -1 1 1 -1 1 -1 1 1 1 1 -1 1 1 1 1 1 -1 1 8 1 1 1 -1 1 1 1 1 1 -1 1 7 1 1 -1 1 1 1 1 1 -1 1 6 1 -1 -1 1 -1 1 1 -1 1 -1 1 -1 1 -1 1 1 -1 1 0 1 1 1 1 1 -1 1 5 1 -1 1 1 -1 1 2 1 -1 -1 -1 -1 -5 1 1 -1 1 2 1 -1 -1 -3 1 -1 -2 1 1 S 135 Appendix A: Examples of steps for data processing A- 126 Step 9: Trend analysis Moving Average method Let t = -3, -2, -1, 0, 1, 2, 3 denote the time indices of the seven points. Let a0 + a1t + a2t2 + a3 t3 represents the cubic equation to be fitted to seven points by the least square method. Then To minimize S, we have, Where j = 0, 1,2,3. It may be noted that when i is an odd power, e.g., when i =1, From equation (a), we get Therefore, Also, Therefore, Therefore, by solving equation (c) and (d), we get      3 3t 23 3 2 2 1 10t (a) tatataax S        3t 3t j3 3 2 210t j (b) 0ttatataax2 a s   0 i t   .03210123t   28 2 t      0jfor taax a s 2 20t 0 (c) 287a 7a 20 2 20 a t at i      2jfor 0 a s 22 20 2    ttaax t (d) 196a28a tataxt 20 4 2 2 0t 2        t 2 t0 xtx7 21 1 a        7 6, 3, 2, 21 1 2 3, 6, 7, 6, 3, 2, 21 1 2x3x6x7x6x3x2x 21 1 9x4xx0x 4x9x7x7x7x7x7x7x7x 21 1 3210123 3211 233210123         Appendix A: Examples of steps for data processing A- 127 Thus the smooth value at the middle position of seven points can be obtained by coefficients derived above by the least square method and given in equation above. Now, Smoothened value = 1 21 (-2  24245 + 3  22527 + 24388  6 + 24606 7 + 27971  6 + 24524  3 + 30009  - 2) = 24716 m Table A2.9: Smoothened value of Tested station Year Average monthly discharge Smoothened Values (m) 1966 - 67 24245 24245 1967 - 68 22527 22527 1968 - 69 24388 24388 1969 - 70 24606 24716 1970 - 71 27971 25815 1972 - 73 24524 27815 1973 - 74 30009 30040 1974 - 75 33302 29993 1975 - 76 30193 30373 1976 - 77 25727 29974 1977 - 78 29643 26209 1978 - 79 28801 25976 1979 - 80 17970 25989 1980 - 81 31081 25296 1981 - 82 25913 26316 1982 - 83 27263 29108 1983 - 84 29276 29358 1984 - 85 31477 29882 1985 - 86 31215 29303 1986 - 87 25040 29644 1987 - 88 30425 29459 1988 - 89 33406 30355 1989 - 90 29351 32674 1990 - 91 31880 30319 1991 - 92 31693 31693 1992 - 93 23643 23643 1993-94 31510 31510 Removing trend by using slope A linear trend in the mean is shown in Figure A2.2. It can be removed by the difference tt yy  as shown in Table A2.10. Appendix A: Examples of steps for data processing A- 128 Figure A2.2 Linear trend in annual average discharge data Table A2.10: Average discharge data with and without trend Year Yearly Average Data without Trend 1966 - 67 24245 24037 1967 - 68 22527 22112 1968 - 69 24388 23764 1969 - 70 24606 23775 1970 - 71 27971 26932 1972 - 73 24524 23277 1973 - 74 30009 28555 1974 - 75 33302 31639 1975 - 76 30193 28322 1976 - 77 25727 23648 1977 - 78 29643 27356 1978 - 79 28801 26307 1980 - 81 31081 28379 1981 - 82 25913 23003 1982 - 83 27263 24145 1983 - 84 29276 25950 1984 - 85 31477 27943 1985 - 86 31215 27474 1986 - 87 25040 21091 1987 - 88 30425 26269 1988 - 89 33406 29042 1989 - 90 29351 24779 1990 - 91 31880 27099 1991 - 92 31693 26705 1992 - 93 23643 18447 1993 - 94 31510 26107 Step 10: Selection of distribution Goodness of fit (Chi-square) test Ho: The data are from specified distribution Ha: The data are not from specified distribution and comes from other distributions y = 207.84x + 25621 y = -0.0003x + 25621 16000 21000 26000 31000 36000 D Is c h a r g e i n c u m e c Year Plot of annual average discharge Appendix A: Examples of steps for data processing A- 129 Formula:    k i iiic EEO 1 22 /)( Null hypothesis is rejected if 2 1,1 2   pkc  This test is a method to compare the observed and expected number of frequency (expected according to the distribution under test) that fall in the class interval. Table A2.11: Goodness of fit test Range of data Observed Frequency, Oi Z Area under the normal curve Area between range Expected Frequency, Ei Oi-Ei (Oi-Ei) 2/ Ei 17500-20000 1 -2.79 0.4974 0.014 0.378 0.622 1.023 20000-22500 0 -2.13 0.4834 0.0542 1.4634 -1.4634 1.46 22500-25000 6 -1.47 0.4292 0.1411 3.8097 2.1903 1.26 25000-27500 4 -0.805 0.2881 0.2729 7.3683 -3.3683 1.54 27500-30000 5 -0.143 0.561 0.3625 9.7875 -4.7875 2.34 30000-32500 9 0.519 0.1985 0.1825 4.9275 4.0725 3.36 32500-35000 2 1.181 0.381 0.0861 2.3247 -0.3247 0.045 1.84 0.4671 Sum 27 30.0591 -3.0591 11.038 Mean = 28040 Standard deviation = 3776.7 Column1: Equal ranges of the data Column2: Number of data falls in the range described in column1 Column3: Z = (Xi – mean)/Standard Deviation = (17500-28040)/3776.7 = -2.79 Column4: Area under the normal curve corresponding to Z value Column5: Area under the range described in Column1= 0.4974-0.4834 = 0.014 Column6: Ei = Column5*Total observed frequency = 0.014*27 = 0.378 Column7: Oi-Ei = 1-0.378 = 0.622 Column8: (Oi-Ei) 2/ Ei = (0.622) 2/0.378 = 1.023    k i iiic EEO 1 22 /)( = 11.038 2 1,1  pk = 9.49 (for  = 0.05 and degrees of freedom, k-p-1 = 7-2-1 = 4) Since 2 1,1 2   pkc  , null hypothesis rejected. That means the data set does not come from normal distribution. This is one way of testing the goodness of fit or selection of probability distribution. Other methods are described in ‘Technical Notes on Statistical Methods’. Appendix A: Examples of steps for data processing A- 130 Step 11: Frequency Analysis After selection of type of probability distribution frequency analysis can be done according to the steps described in ‘Technical Notes on Statistical Methods’. Step 12: Reports and comments Appendix A: Examples of steps for data processing A- 131 Exercise A3: Water Level Data The following table shows the monthly average water level data (in m) are recorded from 1983-2003 at Baruria Transit in Ganges. Steps for data quality checking for these data has been described here. Step 1: Raw Data Table A3.1: Monthly average water level data at Baruria Transit Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1983-84 2.7 4.18 5.3 7 7.29 7.94 6.64 4.5 2.94 2.33 1.9 1.88 54.64 4.55 1984-85 2.81 4.28 6.4 7.6 7.4 7.88 5.88 4.01 2.78 2.13 1.84 2.16 55.1 4.59 1985-86 2.9 3.59 5.9 7.2 7.24 7.3 6.71 4.77 3.48 2.69 2.2 2.23 56.17 4.68 1986-87 2.85 3.79 4.5 6.9 7.26 7.25 6.43 4.71 3.3 2.59 2.16 2.11 53.84 4.49 1987-88 3.14 3.74 5.3 7.3 8.46 8.2 6.49 4.63 3.35 2.61 2.28 2.58 58.1 4.84 1988-89 3.2 4.49 6.2 7.4 8.18 8.06 6.46 4.4 3.35 2.6 2.3 2.28 58.91 4.91 1989-90 2.81 4.25 6.3 7.3 7.33 7.49 6.64 4.54 3.18 2.44 2.15 2.26 56.69 4.72 1990-91 3.12 4.58 6.6 7.7 7.91 7.39 6.86 4.49 3.18 2.46 2.03 2.08 58.32 4.86 1991-92 3.01 4.69 6.4 7.4 7.68 7.9 6.12 4.24 3.07 2.49 2.08 2.08 57.13 4.76 1992-93 3.2 3.8 4.5 6.5 7.01 7.16 5.93 4.24 2.88 2.29 2.03 2.06 51.67 4.31 1993-94 2.49 4.46 6.1 7.3 7.75 7.79 6.69 4.51 3.16 2.43 2.17 2.21 57.09 4.76 1994-95 3.3 4.02 6.2 6.9 7.74 7.25 5.88 3.82 2.73 1.96 1.75 1.86 53.39 4.45 1995-96 2.39 4.66 6.5 8 7.9 7.83 6.57 4.59 3.22 2.42 2.05 2.22 58.39 4.87 1996-97 2.9 5 5.5 7.8 7.78 7.5 6.29 4.75 3.29 2.54 2.17 2.3 57.88 4.82 1997-98 3.07 3.59 5.5 7.2 7.42 7.3 5.66 3.92 3.39 2.72 2.07 1.96 53.85 4.49 1998-99 2.82 4.83 6.3 8.1 8.73 8.41 7.02 5.06 3.46 2.56 2.06 1.81 61.15 5.10 1999-00 2.19 3.91 5.9 7.7 7.82 8.05 6.96 4.94 3.29 2.37 1.92 1.91 56.96 4.75 2000-01 2.83 4.24 6.6 7.5 8.08 8.14 5.99 3.95 2.81 2.06 1.77 1.69 55.67 4.64 2001-02 2.23 3.46 5.6 6.8 7.57 7.68 6.64 4.2 2.77 1.98 1.74 1.71 52.36 4.36 2002-03 2.55 3.78 5.5 7.5 7.89 6.99 6.03 3.83 2.67 1.95 1.68 1.75 52.05 4.34 Sum 56.5 83.3 117 147 154 154 128 88.1 62.3 47.62 40.4 41.14 Average 2.83 4.17 5.9 7.4 7.72 7.68 6.39 4.41 3.115 2.381 2.02 2.057 Neighboring water level stations of Baruria Transit are as listed below: 1. Hardinge Bridge 2. Talbaria 3. Mohendrapur 4. Sengram 5. Sardah 6. Rampur Boalia 7. Goalunda Transit Appendix A: Examples of steps for data processing A- 132 Figure A3.1: Location of upstream stations of Baruria Transit Table A3.2: Average water level data of Goalunda Transit Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1983-84 2.95 4.46 5.72 7.31 7.72 8.44 7.13 4.87 3.29 2.67 2.26 2.27 59.09 4.92 1984-85 3.14 4.59 6.68 7.96 7.84 8.32 6.2 4.32 3.12 2.5 2.2 2.52 59.39 4.95 1985-86 3.31 4 6.22 7.6 7.77 7.78 7.13 5.15 3.82 3.1 2.58 2.57 61.03 5.09 1986-87 3.21 4.13 4.87 7.26 7.76 7.76 6.93 5.14 3.71 2.97 2.53 2.51 58.78 4.90 1987-88 3.54 4.16 5.76 7.71 8.9 8.61 6.87 5.02 3.68 2.92 2.6 2.96 62.73 5.23 1988-89 3.61 4.92 6.65 7.99 8.72 8.53 6.86 4.77 3.76 2.95 2.61 2.56 63.93 5.33 1989-90 3.08 4.48 6.65 7.78 7.76 7.94 7.11 5.07 3.62 2.83 2.54 2.67 61.53 5.13 1990-91 3.55 5.02 7.03 8.12 8.39 7.79 7.3 4.87 3.51 2.82 2.43 2.48 63.31 5.28 1991-92 3.46 5.14 6.82 7.89 8.1 8.34 6.55 4.62 3.48 2.91 2.49 59.8 5.44 1992-93 3.69 4.23 4.99 6.88 7.23 7.56 6.44 4.56 3.24 2.67 2.42 2.55 56.46 4.71 1993-94 2.99 4.93 6.67 7.88 8.31 8.36 7.23 5.06 3.71 3.03 2.77 2.84 63.78 5.32 1994-95 3.95 4.67 6.85 7.41 8.33 7.85 6.39 4.28 3.19 2.44 2.22 2.33 59.91 4.99 1995-96 2.86 5.16 7.1 8.57 8.44 8.36 7.05 5.06 3.73 2.97 2.61 2.73 64.64 5.39 1996-97 3.41 5.5 6.09 8.48 8.43 8.09 6.75 5.31 3.81 3.1 2.76 2.87 64.6 5.38 1997-98 3.72 4.31 6.25 7.87 7.96 7.92 6.26 4.52 4.04 3.44 2.88 2.88 62.05 5.17 1998-99 3.95 4.83 6.99 8.71 9.31 8.85 7.01 5.64 4.01 3.04 2.57 2.31 67.22 5.60 1999-00 2.71 4.37 6.39 8.2 8.36 8.74 7.58 5.53 3.87 2.95 2.49 2.43 63.62 5.30 2000-01 3.4 4.83 7.21 8.07 8.67 8.76 6.61 4.51 3.37 55.43 6.16 2001-02 7.79 8.34 8.31 7.29 4.91 3.48 2.63 2.41 2.33 47.49 5.28 2002-03 3.11 4.33 6 7.99 8.47 7.56 6.68 4.4 3.24 2.48 2.22 2.3 58.78 4.90 Sum 63.6 88.1 120.9 157.5 164.8 163.9 137.4 97.6 71.7 54.4 47.6 46.1 Avg 3.35 4.63 6.37 7.87 8.24 8.19 6.869 4.88 3.58 2.86 2.50 2.56 Appendix A: Examples of steps for data processing A- 133 Table A3.3: Average water level data of Talbaria Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1983-84 4.48 5.71 6.53 9.8 11.8 13.13 11.66 8.79 7.14 6.43 5.92 5.54 96.93 8.08 1984-85 5.23 5.76 8.64 12.04 12.77 13.12 9.85 7.79 6.73 6.24 5.88 5.48 99.53 8.29 1985-86 5.23 5.39 6.71 10.3 12.49 12.51 12.25 9.61 7.7 6.75 6.08 5.9 100.9 8.41 1986-87 5.49 5.89 6.33 10.93 12.33 11.83 11.1 8.55 7.06 6.45 5.74 5.21 96.91 8.08 1987-88 5.3 5.55 6.59 10.12 12.91 13.11 10.39 8.57 6.86 6.02 5.74 5.56 96.72 8.06 1988-89 5.65 6.27 7.72 11.29 13.15 12.52 10.16 8.06 6.92 6.51 5.8 5.2 99.25 8.27 1989-90 5.13 5.66 8.29 10.91 11.97 12.04 10.6 8.01 6.64 5.67 4.7 4.81 94.43 7.87 1990-91 4.91 5.99 8.17 11.71 12.6 11.83 10.84 8.12 6.71 5.93 5.09 4.69 96.59 8.05 1991-92 1992-93 4.32 4.74 5.42 8.66 11.32 11.51 9.41 7.66 6.25 5.19 4.08 3.68 82.24 6.85 1993-94 3.77 5.4 7.01 9.68 11.57 12.28 10.5 8.24 6.93 5.74 5.42 4.48 91.02 7.59 1994-95 4.41 4.97 7.54 10.79 12.73 12.04 9.71 7.68 6.62 5.47 4.98 4.67 91.61 7.63 1995-96 4.07 5.52 8.06 10.92 11.75 12.13 10.35 8.33 6.84 5.96 5.51 4.87 94.31 7.86 1996-97 4.48 6.18 7.22 11.45 12.77 12.72 10.26 8.08 6.52 5.41 4.73 4.17 93.99 7.83 1997-98 4.3 4.7 6.05 10.37 11.73 11.78 9.42 7.82 7.77 6.96 5.45 4.44 90.79 7.57 1998-99 4.3 4.7 7.93 11.1 12.31 13.41 11.95 10.48 8.59 6.34 5.6 4.82 101.5 8.46 1999-00 4.6 5.17 7.29 11.33 12.29 12.84 11.42 8.99 7.23 6.13 5.42 4.91 97.62 8.14 2000-01 4.8 5.76 8.82 11.28 11.84 12.2 9.47 7.51 6.23 5.31 5.42 4.58 93.22 7.77 2001-02 4.44 5.16 7.73 11.13 12.04 11.93 10.85 8.73 7.26 6.13 5.79 5.28 96.47 8.04 2002-03 5.15 6.04 7.51 10.28 12.09 11.41 9.91 7.74 6.58 5.64 82.35 7.94 Sum 90.06 104.56 139.56 204.09 232.46 234.34 200.10 158.76 132.58 114.28 97.35 88.29 Average 4.74 5.50 7.35 10.74 12.23 12.33 10.53 8.36 6.98 6.01 5.41 4.91 Table A3.4: Average water level data of Mohendrapur Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1983-84 3.8 5.33 6.67 8.8 9.81 10.71 9.19 6.4 4.53 3.8 3.3 3.14 75.5 6.29 1984-85 - - - - - - - - - - - 1985-86 4.11 4.88 7.15 9.16 10.09 10.1 9.52 6.98 5.27 4.47 3.94 3.72 79.4 6.62 1986-87 3.72 4.85 5.61 8.75 9.49 9.28 8.13 5.94 4.59 3.95 3.34 3.1 70.8 5.90 1987-88 3.78 4.39 6.08 8.82 10.6 10.48 8.14 6.11 4.5 3.69 3.33 3.42 73.3 6.11 1988-89 3.9 5.24 7.05 9.3 10.56 10.12 8 5.86 4.39 3.68 3.15 2.94 74.2 6.18 1989-90 3.39 4.89 7.36 9.18 9.68 9.61 8.25 5.8 4.45 3.65 3.01 3.17 72.4 6.04 1990-91 3.8 5.26 7.47 9.53 10.05 9.32 8.52 5.75 4.27 3.49 2.86 2.78 73.1 6.09 1991-92 3.64 5.39 7.51 8.97 9.83 10.04 7.43 5.27 4.31 3.79 3.09 2.86 72.1 6.01 1992-93 3.95 4.65 5.42 7.81 8.89 9.02 7.45 5.48 4.31 3.42 2.78 2.59 65.8 5.48 1993-94 2.98 5.09 7.01 8.69 9.63 9.86 8.35 6.14 4.39 3.32 3.05 2.81 71.3 5.94 1994-95 3.79 4.54 6.89 8.37 9.76 9.07 7.13 4.91 3.83 2.98 2.61 2.51 66.4 5.53 1995-96 2.84 5.2 7.42 9.47 9.63 9.64 7.97 5.81 4.47 3.64 3.13 2.99 72.2 6.02 1996-97 3.35 5.46 6.19 9.21 9.51 9.16 7.28 5.56 3.95 2.99 2.5 2.4 67.6 5.63 1997-98 3.06 3.5 5.79 8.42 8.85 8.8 6.81 5.06 4.75 4.11 3.02 2.64 64.8 5.40 1998-99 3.5 4.73 7.28 9.88 10.83 10.48 - 6.25 4.5 3.51 2.92 2.35 66.2 6.02 1999-00 2.61 4.15 6.2 9.42 10.07 10.3 8.51 6.08 4.3 3.33 2.83 2.67 70.5 5.87 2000-01 3.4 4.78 7.56 9.33 9.92 10.23 7.71 5.54 4.15 - - - 62.6 Appendix A: Examples of steps for data processing A- 134 Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 2001-02 - - - 8.89 10.09 10.09 8.87 6.1 4.63 3.67 3.42 3.24 59 2002-03 3.91 5.12 6.84 9.41 10.23 8.93 7.72 5.37 4.15 3.18 2.91 2.9 70.7 5.89 Sum 63.53 87.5 122 171 187.5 185.2 145 110 83.7 64.7 55.2 52.2 Average 3.53 4.86 6.75 9.02 9.87 9.75 8.05 5.81 4.41 3.59 3.07 2.90 Table A3.5: Average water level data of Hardinge Bridge Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1983-84 5.54 6.6 7.41 11 13.12 14.18 12.73 9.72 8.04 7.31 6.8 6.41 108.9 9.07 1984-85 6.08 6.59 9.53 12.75 13.46 14.05 10.67 8.49 7.41 6.77 6.33 5.9 1985-86 5.73 5.88 7.2 11.24 13.54 13.52 13.29 10.6 8.42 7.37 6.71 6.52 110 9.17 1986-87 6.1 6.46 6.94 12.33 13.36 12.84 11.51 8.94 7.75 7.15 6.43 5.95 105.8 8.81 1987-88 5.97 6.23 7.2 10.98 13.94 14.21 11.36 9.43 7.74 6.91 6.53 6.33 106.8 8.90 1988-89 6.32 6.83 8.2 12.14 14.16 13.31 10.86 8.58 7.38 6.95 6.21 5.63 106.6 8.88 1989-90 5.57 6.15 9.12 11.88 12.86 12.89 11.35 8.51 7.11 6.22 5.22 5.39 102.3 8.52 1990-91 5.45 6.52 8.76 12.63 13.66 12.9 11.79 8.89 7.35 6.57 5.64 5.23 105.4 8.78 1991-92 5.39 6.3 8.88 11.22 13.17 13.71 10.35 8.35 7.33 6.75 5.8 5.1 102.4 8.53 1992-93 4.9 5.25 5.9 9.4 12.33 12.7 10.46 8.52 6.99 5.92 4.82 4.37 91.56 7.63 1993-94 4.46 6 7.6 10.69 12.73 13.45 11.51 9.13 7.59 6.39 6.09 5.26 100.9 8.41 1994-95 5.01 5.27 7.88 11.55 13.51 12.83 10.4 8.37 7.32 6.24 5.73 5.4 99.51 8.29 1995-96 4.74 5.94 8.92 12.08 13.06 13.36 11.11 8.92 7.42 6.58 6.07 5.41 103.6 8.63 1996-97 4.83 6.19 7.29 11.93 13.43 13.53 11.24 9.21 7.75 6.74 6.13 5.55 103.8 8.65 1997-98 5.49 5.78 6.92 11.79 12.98 12.86 10.32 8.69 8.66 7.94 6.39 5.41 103.2 8.60 1998-99 5.68 6.76 8.37 12.53 14.01 13.84 11.81 10.3 8.32 7 6.27 5.41 110.3 9.19 1999-00 5.11 5.7 8.12 12.39 13.62 13.96 12.5 9.75 7.91 6.82 6.09 5.56 107.5 8.96 2000-01 5.44 6.47 9.97 12.84 13.44 13.83 10.71 8.55 7.47 6.42 5.74 5.31 106.2 8.85 2001-02 5.13 5.69 8.24 12.02 13.14 13.08 11.71 9.09 7.59 6.43 6.09 5.62 103.8 8.65 2002-03 5.49 6.21 7.87 11.42 13 12.23 11.61 8.41 7.11 6.12 - - 89.47 Sum 108 123 160.3 234.8 266.5 267.3 227.3 180 153 134.6 115 105.8 Average 5.42 6.14 8.016 11.74 13.33 13.36 11.36 9.02 7.63 6.73 6.06 5.566 Table A3.6: Average water level data of Sengram Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1983-84 3.98 4.89 6.22 8.85 10.3 11.41 10.03 7.27 5.82 4.85 3.96 3.61 81.19 6.77 1984-85 3.73 4.95 7.88 10.32 10.99 11.75 8.47 6.09 4.79 4.16 3.72 3.42 80.27 6.69 1985-86 3.85 4.9 7.2 9.58 10.9 10.37 10.34 7.53 5.96 5.28 4.81 5.01 85.73 7.14 1986-87 4.83 5.16 5.76 9.94 10.86 10.34 9.23 7.06 5.77 5.14 4.4 3.97 82.46 6.87 1987-88 4.45 5.17 6.48 9.86 11.86 11.66 9.16 7.38 5.71 4.76 4.32 4.28 85.09 7.09 1988-89 4.7 5.83 7.57 10.31 11.74 11.04 8.76 6.54 5.29 4.58 3.99 3.62 83.97 7.00 1989-90 3.25 4.38 6.9 10.02 10.33 10.46 9.43 6.99 5.71 4.89 4.03 4.14 80.53 6.71 1990-91 4.49 5.62 7.85 10.57 11.1 10.3 9.61 6.94 5.47 4.73 4.38 4.13 85.19 7.10 1991-92 - - - - - - - - - - - 1992-93 4.27 5 5.81 8.2 10.22 10.63 8.6 6.66 5.33 4.45 3.61 3.36 76.14 6.35 1993-94 3.58 5.37 7.15 9.22 10.52 10.92 9.23 6.88 5.49 4.36 4.14 3.74 80.6 6.72 1994-95 4.4 5.1 7.51 9.59 11.34 10.73 8.81 6.87 5.86 4.95 4.57 4.33 84.06 7.01 Appendix A: Examples of steps for data processing A- 135 Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1995-96 4.04 6.07 8.31 10.96 11.5 11.52 10.19 7.91 6.51 5.27 4.62 4.21 91.11 7.59 1996-97 4.18 6.16 7.08 10.67 11.46 11.21 9.17 6.96 5.54 4.48 3.89 3.55 84.35 7.03 1997-98 3.9 4.33 6.23 9.39 10.07 10.22 7.96 6.3 6.07 5.49 4.19 3.53 77.68 6.47 1998-99 4.06 5.38 7.75 10.78 11.91 11.42 9.18 7.67 5.62 - - - 73.77 1999-00 - - - - - - - - - - - 2000-01 - - - - - - - - - - - 2001-02 - - - - 10.92 11.23 9.78 7 5.8 4.67 4.36 4.08 57.84 2002-03 4.58 5.15 6.2 9.55 10.97 10.25 8.77 6.28 4.94 4.02 - - 70.71 7.07 Sum 66.3 83.46 111.9 157.8 187 185.46 156.7 118.3 95.68 76.08 62.99 58.98 Average 4.14 5.22 6.99 9.86 11.00 10.91 9.22 6.96 5.63 4.76 4.20 3.93 Table A3.7: Average water level data of Sardah Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1983-84 7.48 8.5 9.11 13.49 16.09 17.52 15.72 11.95 9.91 8.4 8.14 7.6 133.91 11.16 1984-85 7.58 8.05 11.43 15.47 16.6 17.47 13.2 10.88 9.72 9.08 8.43 7.98 135.89 11.32 1985-86 7.93 8.04 8.95 13.89 16.84 16.59 16.45 13.3 11.14 9.03 8.54 8.13 138.83 11.57 1986-87 8.7 9.1 9.5 15.1 16.49 15.71 14.15 11.45 10.17 10.13 9.43 9.17 139.1 11.59 1987-88 8.18 8.42 9.2 13.28 16.81 17.56 13.97 12 10.21 9.49 8.66 8.09 135.87 11.32 1988-89 8.57 8.98 10.22 14.78 17.34 16.03 13.23 11.09 9.9 9.27 8.81 8.55 136.77 11.40 1989-90 8.05 8.55 11.55 14.4 15.68 15.82 14.12 10.87 9.59 9.42 8.6 8.06 134.71 11.23 1990-91 8.14 8.97 10.91 15.56 16.78 15.85 14.3 11.52 10.2 8.86 7.94 8.14 137.17 11.43 1991-92 8.36 8.82 11.45 13.83 15.99 17.03 13.06 11.19 10.34 9.57 8.66 8.27 1992-93 8.01 8.1 8.54 12.01 15.18 15.66 13.29 11.64 10.24 9.81 8.8 8.21 129.49 10.79 1993-94 8.16 9.2 9.8 13.01 15.38 16.49 14.38 11.81 10.39 9.32 8.47 8.14 134.55 11.21 1994-95 7.84 7.92 10.22 14.41 16.94 16.22 13.41 11.49 10.51 9.25 8.98 8.12 135.31 11.28 1995-96 8.19 8.9 11.95 14.8 16.04 16.52 13.78 11.71 10.32 9.59 9.18 8.89 139.87 11.66 1996-97 7.83 8.56 10.06 14.59 16.7 16.88 14.01 11.92 10.56 9.5 9.18 8.59 138.38 11.53 1997-98 8.25 8.57 9.3 14.46 15.96 15.83 13.03 11.75 11.76 9.43 8.83 8.21 135.38 11.28 1998-99 8.95 9.8 10.9 15.37 17.33 17.25 14.81 13.07 11.46 11.02 9.61 8.67 148.24 12.35 1999-00 9.1 9.5 11.11 15.04 16.77 17.47 15.54 12.67 10.97 10.48 9.89 9.3 2000-01 9 9.69 12.59 15.47 16.31 16.88 13.48 11.66 10.64 10.04 9.46 9.07 2001-02 8.98 9.45 11.45 14.95 16.12 16.07 14.73 12.47 11.21 9.84 9.34 9.01 143.62 11.97 2002-03 9.49 9.96 11.05 14.14 15.81 15.34 13.55 11.46 10.31 10.19 9.96 9.6 140.86 11.74 Sum 166.8 177.1 209.3 288.1 327.2 330.2 282.2 235.9 209.6 191.7 178.9 169.8 Average 8.34 8.854 10.46 14.4 16.36 16.51 14.11 11.8 10.48 9.586 8.946 8.49 Table A3.8: Average water level data of Rampur Boalia Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1983-84 7.94 8.96 9.49 13.92 16.62 18.3 16.35 12.47 10.44 9.6 8.94 8.46 141.44 11.79 1984-85 8.18 8.67 12.23 16.37 17.66 18.5 13.94 11.51 10.25 9.61 9.09 8.65 144.63 12.05 1985-86 8.46 8.72 9.59 14.73 17.76 17.6 17.48 14 11.64 10.58 9.88 9.64 150.05 12.50 1986-87 9.18 9.49 9.97 16.04 17.46 16.7 - - - - 9.28 9.11 97.24 1987-88 9.2 9.43 10.22 14.14 17.83 18.6 14.74 12.66 11.03 10.24 9.85 9.66 147.58 12.30 1988-89 9.68 9.99 11.05 15.75 18.22 16.9 14.01 11.85 10.62 10.17 9.31 8.73 146.24 12.19 Appendix A: Examples of steps for data processing A- 136 Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Sum Avg 1989-90 8.73 9.28 12.34 15.28 16.64 16.8 15.02 12.15 10.84 10.02 9.18 9.31 145.57 12.13 1990-91 9.3 10.09 11.86 16.36 17.55 16.7 15.15 12.32 10.82 10.06 9.34 9.12 148.69 12.39 1991-92 9.24 9.57 12.28 14.62 16.83 18 14.01 12.14 11.33 10.84 9.88 9.14 147.86 12.32 1992-93 8.85 9.11 9.57 12.91 16.15 16.6 13.93 12.4 11.02 10.14 9.25 8.97 138.88 11.57 1993-94 8.82 9.81 10.71 14.22 16.47 17.4 15.54 12.83 11.31 10.26 9.96 9.11 146.45 12.20 1994-95 8.83 8.86 11.09 15.22 17.81 17.1 14.19 12.2 11.25 10.27 9.8 9.51 146.08 12.17 1995-96 9.4 10.16 13.23 16.42 17.74 17.6 14.95 13.38 12.24 11.46 10.99 10.33 157.85 13.15 1996-97 9.58 10.24 11.47 15.61 17.51 17.9 15.41 13.46 12.27 11.31 10.73 10.16 155.61 12.97 1997-98 10.12 10.29 10.77 15.37 16.74 16.7 14.97 13.87 13.07 12.25 10.97 10.06 155.2 12.93 1998-99 10.32 11.19 12.21 16.56 18.37 18.4 16.04 14.36 12.39 11.42 10.79 10.16 162.16 13.51 1999-00 10.05 10.31 12.07 15.97 17.77 18.5 16.79 13.81 12.33 11.35 10.67 10.18 159.75 13.31 2000-01 10.04 10.82 13.78 16.27 17.38 18 14.84 12.89 11.77 10.91 10.35 9.92 157 13.08 2001-02 9.8 10.46 12.78 16.01 17.16 17.2 15.8 13.2 11.87 10.83 10.66 10.24 156.02 13.00 2002-03 10.14 10.7 11.93 15.15 16.87 16.3 14.31 11.92 10.69 9.72 9.5 9.36 146.63 12.22 Sum 185.9 196.2 228.6 306.9 346.5 349 287.5 243.4 217.2 201 198.4 189.8 Average 9.29 9.81 11.43 15.35 17.33 17.47 15.13 12.81 11.43 10.58 9.92 9.49 Step 2: Validation Test Checking for randomness of data: Turning point test Mean = 2(N-2)/3 and Standard Deviation = [(16N-29)/90]0.50 Standard Value of T, t = (T-mean)/standard Deviation Table A3.9: Determination of turning points Average WL Range Remarks of Turning Cumulative No. of Turning 4.55 4.59 4.55<4.59<4.68 no 0 4.68 4.59<4.68>4.49 yes 1 4.49 4.68>4.49<4.84 yes 2 4.84 4.49<4.84<4.91 no 2 4.91 4.84<4.91>4.71 yes 3 4.72 4.91>4.72<4.86 yes 4 4.86 4.72<4.86>4.76 yes 5 4.76 4.86>4.76>4.31 no 5 4.31 4.76>4.31<4.76 yes 6 4.76 4.31<4.76>4.45 yes 7 4.45 4.76>4.45<4.87 yes 8 4.87 4.45<4.87>4.82 yes 9 4.82 4.87>4.82>4.49 no 9 4.49 4.82>4.49<5.10 yes 10 5.10 4.49<5.10>4.75 yes 11 4.75 5.10>4.75>4.64 no 11 4.64 4.75>4.64>4.36 no 11 4.36 4.64>4.36>4.34 no 11 4.34 T = 11 Appendix A: Examples of steps for data processing A- 137 Therefore, T = 11 and N = 20 T follows normal distribution with, Mean = 12 and Standard Deviation = [(16N-29)/90] 0.50 = 1.798 Therefore, t = 0.5561 For 5% level of significance t1-/2 = 1.96 Therefore, t < t1-/2. So, null hypothesis is accepted and the series considered as a random/no trend series. Step 3: Consistency Checking Double mass analysis Table A3.10: Average and cumulative average of test station and neighboring station Test Station Base Station Average Cumulative WL of Tested Station Cumulative avg. Tested Station Average Cumulative WL of Surrounding Stations Cumulative avg. Base Station 4.34 4.34 8.29 8.29 4.36 8.70 8.94 17.23 4.64 13.34 9.24 26.47 4.75 18.09 8.98 35.45 5.1 23.19 9.05 44.50 4.49 27.68 8.20 52.70 4.82 32.50 8.43 61.13 4.87 37.37 8.61 69.74 4.45 41.82 8.13 77.87 4.76 46.58 8.20 86.07 4.31 50.89 7.63 93.70 4.76 55.65 8.75 102.45 4.86 60.51 8.45 110.90 4.72 65.23 8.23 119.13 4.91 70.14 8.46 127.59 4.84 74.98 8.43 136.02 4.49 79.47 8.11 144.13 4.68 84.15 8.64 152.77 4.59 88.74 8.72 161.49 4.55 93.29 8.30 169.79 Appendix A: Examples of steps for data processing A- 138 Figure 3.1 Double mass analysis of base station vs. tested station From the double mass plot no trend change is observed here. Data series shows consistent pattern. Step 4: Correlation test Correlation between test station with neighboring station Correlation between test station and Goalunda Transit Table A3.11: Correlation with Goalunda Transit Xi Yi Xi-Xmean Yi-Ymean (Xi-Xmean)*( Yi-Ymean) 4.55 4.92 -0.11 -0.30 0.0330 4.59 4.95 -0.07 -0.27 0.0197 4.68 5.09 0.02 -0.14 -0.0023 4.49 4.90 -0.18 -0.32 0.0574 4.84 5.23 0.18 0.01 0.0010 4.91 5.33 0.25 0.11 0.0258 4.72 5.13 0.06 -0.09 -0.0057 4.86 5.28 0.20 0.05 0.0105 4.76 5.44 0.10 0.21 0.0207 4.31 4.71 -0.36 -0.52 0.1852 4.76 5.32 0.09 0.09 0.0087 4.45 4.99 -0.21 -0.23 0.0493 4.87 5.39 0.20 0.16 0.0332 4.82 5.38 0.16 0.16 0.0257 4.49 5.17 -0.18 -0.05 0.0091 5.10 5.60 0.43 0.38 0.1639 4.75 5.30 0.08 0.08 0.0066 4.64 6.16 -0.02 0.94 -0.0233 4.36 5.28 -0.30 0.05 -0.0164 4.34 4.90 -0.33 -0.32 0.1057 Mean Mean 4.66 5.22 Sum = 0.7079 Stdev Stdev 0.2132 0.3142 0 10 20 30 40 50 60 70 80 90 100 0 20 40 60 80 100 120 140 160 180 C u m a v e r a g e o f te st e d S ta ti o n Cum average of Surrounding Station Double Mass Plot Appendix A: Examples of steps for data processing A- 139 Correlation between test station and Talbaria Correlation between test station and Mohendrapur Correlation between test station and Hardinge Bridge Correlation between test station and Sengram Correlation between test station and Sardah Correlation between test station and Rampur Boalia Correlation of Baruria Transit with surrounding Stations Station Name Correlation Co-efficient Goalunda Transit Mohendrapur Sengram Hardinge Bridge Talbaria Sardah Rampur Boalia Correlation between Baruria Transit and Goalunda Transit is best. So, infilling of missing data at Baruria Transit will be done with the help of Data of Goalunda Transit. But there is no missing data within the sample data used for this example. In all other stations some data is missing. List of missing data is given in Table A3.12: Step 5: Filling missing data Table A3.12: List of missing data Name of Station Period Year Month Goalunda Transit 1991-92 March 2000-01 Jan-Mar 2001-02 April-June Talbaria 1991-92 Whole Year 2002-03 Feb-Mar Mohendrapur 1984-85 Whole Year 1998-99 Oct 2000-01 Jan-Mar 2001-02 April-June Sengram 1991-92 Whole Year 1998-99 Jan-Mar 1999-00 Whole Year 2000-01 Whole Year 2001-01 Apr-June Hardinge Bridge 2002-03 Feb-Mar Rampur Boalia 1986-87 Oct-Jan For infilling the missing data first step is to find out the correlation of that station with all other station. The station which gives best correlation with that station will be used for infilling the missing data. In other ways all neighboring stations also can be used for infilling. Missing data of Goalunda Transit is Appendix A: Examples of steps for data processing A- 140 filled here with both of the methods. Correlation between Goalunda Transit with other stations is not checked here but in case of Baruria Transit it has given the best correlation. So Baruria transit can be used for this station. But for infilling the other stations data correlation between target station with other stations should be checked. In Table A3.13 shows the estimation of missing data by using the data of best correlated station Baruria Transit: Table A3.13: Estimating missing data (Baruria) Year Jan Feb Mar Apr May Jun 1991-92 2.59 2000-01 2.48 2.20 2.10 2001-02 2.64 3.85 6.03 For example in 1991-92: Long term average for March at Goalunda Transit = 2.56 m Long term average for March at Baruria Transit = 2.057 m Data of March, 1991-92 at Baruria Transit = 2.08 m Estimated missing data = 2.56*(2.08/2.057) = 2.59 m Other year’s data can also be estimated in this way. Data also estimated by using all the neighboring station data and shown in Table A3.14: Table A3.14: Estimating missing data (Neighboring) Year Jan Feb Mar Apr May Jun 1991-92 2000-01 2001-02 For example in January 2000-01: Step 6: Normality Test H0: The data are normal H1: The data are not normal If r < rcritical – reject null hypothesis Determination of XT: Observed data are arranged in descending order Calculate, p = (i – a)/(n+1-2a), a = plotting position for normal distribution and n = sample size Then, return period, T = 1/p, p and T determined for each sample and then determine ZT for each sample by using following formula Standard Normal Variate, ZT = 0.1975 T 1 T 1 1 0.1350.135              Appendix A: Examples of steps for data processing A- 141 = 0.1975 5 1 5 1 1 0.1350.135              = 0.8385 xTmean ZX  T X Where, meanX = 4.66, x = 0.2132 So, XT = 4.66 + 0.2132* 1.876 XT = 5.06 Table A3.15: Estimating probability plot correlation coefficient Ranked data XT Xi-Xmean XTi - XTmean (Xi-Xmean) 2 (XTi - XTmean) 2 (Xi-Xmean)*(XTi XTmean) 5.10 5.0639579 0.432 0.400 0.18648 0.15997 0.17272 4.91 4.9634574 0.245 0.299 0.06011 0.08967 0.07342 4.87 4.9041712 0.202 0.240 0.04074 0.05768 0.04847 4.86 4.8593593 0.196 0.195 0.03842 0.03817 0.03829 4.84 4.8219785 0.178 0.158 0.03157 0.02496 0.02807 4.82 4.7890299 0.159 0.125 0.02539 0.01563 0.01992 4.76 4.7589156 0.097 0.095 0.00938 0.00901 0.00919 4.76 4.7306516 0.094 0.067 0.00874 0.00444 0.00623 4.75 4.7035586 0.083 0.040 0.00683 0.00156 0.00327 4.72 4.6771165 0.060 0.013 0.00362 0.00017 0.00079 4.68 4.6508835 0.017 -0.013 0.00028 0.00017 -0.00022 4.64 4.6244414 -0.025 -0.040 0.00062 0.00156 0.00098 4.59 4.5973484 -0.072 -0.067 0.00523 0.00444 0.00482 4.55 4.5690844 -0.111 -0.095 0.01225 0.00901 0.01050 4.49 4.5389701 -0.177 -0.125 0.03115 0.01563 0.02207 4.49 4.5060215 -0.177 -0.158 0.03145 0.02496 0.02801 4.45 4.4686407 -0.215 -0.195 0.04615 0.03817 0.04197 4.36 4.4238288 -0.301 -0.240 0.09040 0.05768 0.07221 4.34 4.3645426 -0.326 -0.299 0.10660 0.08967 0.09777 4.31 4.2640421 -0.358 -0.400 0.12828 0.15997 0.143251594 Mean Mean Sum Sum Sum 4.66 4.66 0.86368 0.80253 0.82174 r =   5.022 )(*)( )(*)(      TiTi TiTi XXXX XXXX r = 0.9870 rcritical = 0.951 Appendix A: Examples of steps for data processing A- 142 r > rcritical, null hypothesis accepted that data are from normal distribution. So, parametric tests can be applied for this data set. Step 7: Test for shift in the mean and variance t-Test t-Test for mean and shift in the mean. Table A3.16 shows the value of average water level before infilling and after infilling with two method, their average and standard deviation. 21 12 11 NN S yy T c    where,     2 11 2211    N sNsN S Table A3.16: Average record before and after infilling Month Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Avg Stdev Avg before infilling 3.35 4.63 6.37 7.87 8.24 8.19 6.87 4.88 3.58 2.86 2.50 2.56 5.16 2.249 Avg after infilling with 1st method 3.31 4.60 6.35 7.87 8.24 8.19 6.87 4.88 3.58 2.84 2.49 2.54 5.1478 2.257 Avg after infilling with 2nd method 3.34 4.63 6.38 7.87 8.24 8.19 6.87 4.88 3.58 2.86 2.50 2.55 5.1587 2.252 t-Test between original sample data with data set infilled with first method:         253.2 224 257.2*112249.2*112 2 11 2211        N sNsN S 0134.0 12 1 12 1 253.2 16.51478.5 11 1 21 12        NN S yy T c T1-/2 = 1.96 c T < T1-/2, so hypothesis is accepted and acceptation of hypothesis is considered as no detection of shift t-Test between original sample data with data set infilled with second method:         25.2 224 252.2*112249.2*112 2 11 2211        N sNsN S 0013.0 12 1 12 1 253.2 16.51587.5 11 21 12        NN S yy T c Appendix A: Examples of steps for data processing A- 143 T1-/2 = 1.96 c T < T1-/2, so hypothesis is accepted and acceptation of hypothesis is considered as no detection of shift Value of Tc is found lower in case of second method. Mann-Whitney Test   2/1 2121 1 211 12/)1( 2/)1()( 1      NNNN NNNyR u N t t c Step 8: Determination and Testing of Trend Parametric Test: Estimation of linear trend: 2 1 2 rr N T c    where, N = number of sample r = Cross correlation co-efficient 2 1 2 rr N T c    = 2 99996.0199996.0 220   = 474  ,2/1 T = 1.96 c T >  ,2/1T , So hypothesis is rejected. Rejection of hypothesis considered as a detection of linear trend between tested station Baruria Transit with neighboring station Goalunda Transit. In this way presence or absence of trend with other stations can be determined. Nonparametric Test: Mann-Kendall test )(SV mS u c   where, S = Mann-Kendall statistic, m = 1 when S < 0 and m = -1 when S > 0 Yearly average data has been taken for Mann-Kendall test checking trend in the data series. Calculation for Mann-Kendall statistic is shown in table A3.17 Table A3.17: Mann-Kendall Statistics Early average Water Level data 4.92 4.95 5.09 4.90 5.23 5.33 5.13 5.28 5.19 4.71 5.32 4.99 5.39 5.38 5.17 5.60 5.30 5.26 5.15 4.90 Sum 1 1 -1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 -1 13 1 -1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 -1 12 1 1 1 1 1 1 -1 1 -1 1 1 1 1 1 1 1 -1 9 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 0 13 1 -1 1 -1 -1 1 -1 1 1 -1 1 1 1 -1 -1 1 Appendix A: Examples of steps for data processing A- 144 Early average Water Level data 4.92 4.95 5.09 4.90 5.23 5.33 5.13 5.28 5.19 4.71 5.32 4.99 5.39 5.38 5.17 5.60 5.30 5.26 5.15 4.90 Sum 1 -1 -1 -1 -1 -1 1 1 -1 1 -1 -1 -1 -1 -8 1 1 -1 1 -1 1 1 1 1 1 1 1 -1 7 1 -1 1 -1 1 1 -1 1 1 -1 -1 -1 -2 1 1 -1 1 1 -1 1 1 1 -1 -1 1 1 1 1 1 1 1 1 1 1 1 10 1 1 1 -1 1 -1 -1 -1 -1 -3 1 1 1 1 1 1 1 -1 6 1 -1 1 -1 -1 -1 -1 -5 1 1 -1 -1 -1 -1 -4 1 1 1 -1 -1 1 1 -1 -1 -1 -4 1 -1 -1 -3 1 -1 -2 1 -1 41 Here, S > 0, m = -1               n i iii eeeNNNSV 1 521521 18 1 )( Where, ei is the number of data in tied group and n is the number of tied group. In this data set there is one tied group and ei = 2. N = 20 V(S) = 950 uc = (41-1)/950 = 1.298 u1-/2 = 1.96 uc < u1-/2, so the hypothesis is rejected and rejection of hypothesis means no trend found. So, trend analysis is not necessary. Step 9: Trend Analysis Not necessary. Step 10: Selection of distribution Step 11: Frequency analysis Step 12: Reports and comments Appendix B Tables Appendix B: Tables B - 148 Table B1.1: Critical r* values for the probability plot correlation coefficient test of normality (Helsel and Hirch, 2002) [reject H0: data are normal when PPCC r < r* ] Sample Size -level n 0.005 0.01 0.025 0.05 0.1 0.25 3 0.867 0.869 0.872 0.879 0.891 0.924 4 0.813 0.824 0.846 0.868 0.894 0.931 5 0.807 0.826 0.856 0.88 0.903 0.934 6 0.82 0.838 0.866 0.888 0.91 0.939 7 0.828 0.85 0.877 0.898 0.918 0.944 8 0.84 0.861 0.887 0.906 0.924 0.948 9 0.854 0.871 0.894 0.912 0.93 0.952 10 0.862 0.879 0.901 0.918 0.934 0.954 11 0.87 0.886 0.907 0.923 0.938 0.957 12 0.876 0.892 0.912 0.928 0.942 0.96 13 0.885 0.899 0.918 0.932 0.945 0.962 14 0.89 0.905 0.923 0.935 0.948 0.964 15 0.896 0.91 0.927 0.939 0.951 0.965 16 0.899 0.913 0.929 0.941 0.953 0.967 17 0.905 0.917 0.932 0.944 0.954 0.968 18 0.908 0.92 0.935 0.946 0.957 0.97 19 0.914 0.924 0.938 0.949 0.958 0.971 20 0.916 0.926 0.94 0.951 0.96 0.972 21 0.918 0.93 0.943 0.952 0.961 0.973 22 0.932 0.933 0.945 0.954 0.963 0.974 23 0.925 0.935 0.947 0.956 0.964 0.975 24 0.927 0.937 0.949 0.957 0.965 0.976 25 0.929 0.939 0.951 0.959 0.966 0.976 26 0.932 0.941 0.952 0.96 0.967 0.977 27 0.934 0.943 0.953 0.961 0.968 0.978 28 0.936 0.944 0.955 0.962 0.969 0.978 29 0.939 0.946 0.956 0.963 0.97 0.979 30 0.939 0.947 0.957 0.964 0.971 0.979 31 0.942 0.95 0.958 0.965 0.972 0.98 32 0.943 0.95 0.959 0.966 0.972 0.98 33 0.944 0.951 0.961 0.967 0.973 0.981 34 0.946 0.953 0.962 0.968 0.974 0.981 35 0.947 0.954 0.962 0.969 0.974 0.982 36 0.948 0.955 0.963 0.969 0.975 0.982 37 0.95 0.956 0.964 0.97 0.976 0.983 38 0.951 0.957 0.965 0.971 0.976 0.983 39 0.951 0.958 0.966 0.971 0.977 0.983 40 0.953 0.959 0.966 0.972 0.977 0.984 41 0.953 0.96 0.967 0.973 0.977 0.984 42 0.954 0.961 0.968 0.973 0.978 0.984 43 0.956 0.961 0.968 0.974 0.978 0.984 Appendix B: Tables B - 149 Sample Size -level n 0.005 0.01 0.025 0.05 0.1 0.25 44 0.957 0.962 0.969 0.974 0.979 0.985 45 0.957 0.963 0.969 0.974 0.979 0.985 46 0.958 0.963 0.97 0.975 0.98 0.985 47 0.959 0.965 0.971 0.976 0.98 0.986 48 0.959 0.965 0.971 0.976 0.98 0.986 49 0.961 0.966 0.972 0.976 0.981 0.986 50 0.961 0.966 0.972 0.977 0.981 0.986 55 0.965 0.969 0.974 0.979 0.982 0.987 60 0.967 0.971 0.976 0.98 0.984 0.988 65 0.969 0.973 0.978 0.981 0.985 0.989 70 0.971 0.975 0.979 0.983 0.986 0.99 75 0.973 0.976 0.981 0.984 0.987 0.99 80 0.975 0.978 0.982 0.985 0.987 0.991 85 0.976 0.979 0.983 0.985 0.988 0.991 90 0.977 0.98 0.984 0.986 0.988 0.992 95 0.979 0.981 0.984 0.987 0.989 0.992 100 0.979 0.982 0.985 0.987 0.989 0.992 Appendix B: Tables B - 150 Table B1.2: Areas under the Standard Normal Density from 0 to z (Haan, 1979) z 0 1 2 3 4 5 6 7 8 9 0 0 0.004 0.008 0.012 0.016 0.0199 0.0239 0.0279 0.0319 0.0359 0.1 0.0398 0.0438 0.0478 0.0517 0.0557 0.0596 0.0636 0.0675 0.0714 0.0753 0.2 0.0793 0.0832 0.0871 0.091 0.0948 0.0987 0.1026 0.1064 0.1103 0.1141 0.3 0.1179 0.1217 0.1255 0.1293 0.1331 0.1368 0.1406 0.1443 0.148 0.1517 0.4 0.1554 0.1591 0.1628 0.1664 0.17 0.1736 0.1772 0.1808 0.1844 0.1879 0.5 0.1915 0.195 0.1985 0.2019 0.2054 0.2088 0.2123 0.2157 0.219 0.2224 0.6 0.2257 0.2291 0.2324 0.2357 0.2389 0.2422 0.2454 0.2486 0.2517 0.2549 0.7 0.258 0.2611 0.2642 0.2673 0.2703 0.2734 0.2764 0.2793 0.2823 0.2852 0.8 0.2881 0.291 0.2939 0.2967 0.2995 0.3023 0.3051 0.3078 0.3106 0.3133 0.9 0.3159 0.3186 0.3212 0.3238 0.3264 0.3289 0.3315 0.334 0.3365 0.3389 1 0.3413 0.3438 0.3461 0.3485 0.3508 0.3531 0.3554 0.3577 0.3599 0.3621 1.1 0.3643 0.3665 0.3686 0.3708 0.3729 0.3749 0.377 0.379 0.381 0.383 1.2 0.3849 0.3869 0.3888 0.3906 0.3925 0.3943 0.3962 0.398 0.3997 0.4015 1.3 0.4032 0.4049 0.4066 0.4082 0.4099 0.4115 0.4131 0.4147 0.4162 0.4177 1.4 0.4192 0.4207 0.4222 0.4236 0.4251 0.4263 0.4279 0.4292 0.4306 0.4319 1.5 0.4332 0.4345 0.4357 0.437 0.4382 0.4394 0.4406 0.4418 0.4429 0.4441 1.6 0.4452 0.4463 0.4474 0.4484 0.4495 0.4505 0.4515 0.4525 0.4535 0.4545 1.7 0.4554 0.4564 0.4573 0.4582 0.4591 0.4599 0.4608 0.4616 0.4625 0.4633 1.8 0.4641 0.4648 0.4656 0.4664 0.4671 0.4678 0.4686 0.4693 0.4699 0.4606 1.9 0.4713 0.4719 0.4736 0.4732 0.4738 0.4744 0.475 0.4756 0.4761 0.4767 2 0.4772 0.4778 0.4783 0.4788 0.4793 0.4798 0.4803 0.4808 0.4812 0.4817 2.1 0.4821 0.4826 0.483 0.4834 0.4838 0.4842 0.4846 0.485 0.4854 0.4857 2.2 0.4861 0.4864 0.4868 0.4871 0.4875 0.4878 0.4881 0.4884 0.4887 0.489 2.3 0.4893 0.4896 0.4898 0.4901 0.4904 0.4906 0.4909 0.4911 0.4913 0.4916 2.4 0.4915 0.492 0.4922 0.4924 0.4927 0.4929 0.4931 0.4932 0.4934 0.4936 2.5 0.4938 0.494 0.4941 0.4943 0.4945 0.4946 0.4948 0.4949 0.4951 0.4952 2.6 0.4953 0.4955 0.4956 0.4957 0.4959 0.496 0.4961 0.4962 0.4963 0.4964 2.7 0.4965 0.4966 0.4967 0.4968 0.4969 0.497 0.4971 0.4972 0.4973 0.4974 2.8 0.4974 0.4975 0.4976 0.4977 0.4977 0.4978 0.4979 0.4979 0.498 0.4981 2.9 0.4981 0.4982 0.4982 0.4983 0.4984 0.4984 0.4985 0.4985 0.4986 0.4986 3 0.4986 0.4987 0.4987 0.4988 0.4988 0.4989 0.4989 0.4989 0.499 0.499 3.1 0.499 0.4991 0.4991 0.4991 0.4992 0.4992 0.4992 0.4992 0.4993 0.4993 3.2 0.4993 0.4993 0.4994 0.4994 0.4994 0.4994 0.4994 0.4995 0.4995 0.4995 3.3 0.4995 0.4995 0.4995 0.4996 0.4996 0.4996 0.4996 0.4996 0.4996 0.4997 3.4 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4997 0.4998 3.5 0.4998 0.4998 0.4998 0.4998 0.4998 0.4998 0.4998 0.4998 0.4998 0.4998 3.6 0.4998 0.4998 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 3.7 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 3.8 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 0.4999 3.9 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Appendix C Data Quality Report Appendix C: Data Quality Report C- 154 Data quality implementation for Surface Water Level (Non Tidal) of BWDB C.1 Product Specification Dataset name Water Level (Non Tidal) of BWDB Product description This data layer contains daily non-tidal water level data collected at 281 non-tidal water level stations of Bangladesh Water Development Board (BWDB). Types of features (name, definition) Water Level (Non Tidal) of BWDB International boundary Definition: International boundary of Bangladesh Source: SoB topographic map Coastline Definition: Coast line of Bangladesh Source: LANDSAT image Other administrative boundary Definition: Administrative boundary of districts, thana, union, pourshava Source: DLRS thana map Data dictionary for features Name Data Water Level (Non Tidal) of BWDB Time series surface water level data of BWDB C.2 Data Quality Specification Data quality sub elements Product specification Completeness The data layer covers all non-tidal water level stations of BWDB. Logical consistency Requirement Unit: Units of measurement should be English measurement system Assurance: All attribute names and definition are verified Quality Data is available for all non-tidal water level stations (281) of BWDB (from 1-4-1910 to 31-3-2010). But extent of data availability varies from station to station. Some data are missing at some stations. The data those are to be obviously errors, have been excluded by NWRD. Positional accuracy (Absolute) The positional accuracy should be same of that source map. C.3 Quality management in production Assessment of source Documentation Data title Water Level (Non Tidal) of BWDB Organization BWDB (Bangladesh Water Development Board) Project under which the data was collected from source National Water Resources Database (NWRD) Appendix C: Data Quality Report C- 155 Name of individual who authorizes the data (if any) System Analyst, Surface water processing division, BWDB Unit of the data Meter PWD Year of publication Regular update Source of the content (in detail) Bangladesh Water Development Board collected and stored this daily water level data from different non-tidal water level stations throughout the country for a long period of time. Readability of features Good Readability of texts Good Final grading according to table 1 II Grading Grade Descriptions Grade Name Grade I Data information is quite good. Very Good Grade II Everything is ok, but need some check. Good Grade III Many errors but can be used giving little effort. Fair Grade IV Quality is very bad which can’t be usable as source data. Poor Data Capture Data digitisation Data preparation Collecting this data layer from BWDB, NWRD has checked the obvious errors and stored in an ordered format. Data editing NWRD has checked the obvious errors and stored in an ordered format