Zimbabwe Long-term Low Greenhouse Gas Emission Development Strategy (2020-2050)

صدر في 2020 · النص بتاريخ 2026-10-01

القانون العام والإرشادات الرسمية منشورة بوصفها أبحاثاً. ليست مشورة قانونية أو ضريبية أو مالية.

البحث نفسه مكتوب بالإنجليزية. العناوين والوسوم مترجمة؛ أما النتائج والاقتباسات فغير مترجمة.

عن هذا القانون

اللغة
English
النوع
policy
الدولة
زيمبابوي
الموضوعات
Agricultural and rural development, Livestock, Air and atmosphere, Energy, Forestry, Cultivated plants, Waste and hazardous substances
الكلمات المفتاحية
fertilizers/nutrients, cereals/grains/rice, equipment, agricultural commodities, crops, animal feed/feedstuffs, cattle, afforestation/reforestation, fire management, forest management/forest conservation, fuelwood, biotechnology, hazards, tobacco, climate change, bioenergy, biofuel, coal, emissions, energy conservation/energy production, natural gas, public procurement, renewable energy, hydropower generation, organic waste, recycling/reuse, solid waste, waste management
الفئات
agriculture, energy

أين تقرؤه

النص

نص القانون نفسه، مادةً مادة، كما هو محفوظ. لكل مادة رابطها.

  1. 1 Introduction .................................................................................................................................. 1

  2. 2 Methodology.................................................................................................................................. 3 2.1 Stakeholder Engagement ............................................................................................................3 2.2 BAU Modelling ..........................................................................................................................3 2.3 Key Assumptions .......................................................................................................................4 2.4 Mitigation Modelling and Economic Analysis ...........................................................................4 2.5 Sustainable Development Impacts and Co-benefits ...................................................................5

  3. 3 Energy 3.1 Business-as-usual Emissions ......................................................................................................1 3.1.1 Mitigation Measures ...................................................................................................................4 3.1.2 Economic Analysis .....................................................................................................................8 3.2 Roadmap of Actions .................................................................................................................10

  4. 4 Industrial Process and Product Use ............................................................................................. 12 4.1 Business-as-usual Emissions ....................................................................................................12 4.2 Mitigation Measures .................................................................................................................15 4.3 Economic Analysis ...................................................................................................................18 4.4 Roadmap of Actions .................................................................................................................19

  5. 5 Agriculture, Forestry and Other Land Use .................................................................................. 21 5.1 Business-as-usual Emissions ....................................................................................................21 5.2 Mitigation Measures .................................................................................................................24 5.3 Economic Analysis ...................................................................................................................27 5.4 Roadmap of Actions .................................................................................................................27

  6. 6 Waste 6.1 Business-as-usual Emissions ....................................................................................................29 6.2 Mitigation Measures .................................................................................................................30 6.3 Economic Analysis ...................................................................................................................31 6.4 Roadmap of Actions .................................................................................................................32

  7. 7 Bringing it all together................................................................................................................. 33 7.1 Summary of BAU and MIT Scenarios .....................................................................................33 7.2 Financing Strategy ....................................................................................................................35

  8. 8 References ................................................................................................................................... 41

  9. 9 Appendices .................................................................................................................................. 46 Annex I: Reduction of Technical Losses in the Transmission- and Distribution System .......................46 - iii - Annex II: Minimum Energy Performance Standard .................................................................................55 E c o n o m i c A n a l y s i s ................................................................................................................56 I m p l e m e n t a t i o n .........................................................................................................................60 Annex III: Low Carbon Waste initiative ..................................................................................................63 E s t i m a t e o f B A U E m i s s i o n s .........................................................................................63 P o l i c y F r a m e w o r k f o r W a s t e M i t i g a t i o n M e a s u r e s ..............................67 L a n d f i l l G a s F l a r i n g ...........................................................................................................69 C o m p o s t i n g ...................................................................................................................................72 R e c y c l i n g ........................................................................................................................................75 Annex IV: Low Carbon Transport Initiative ............................................................................................76 GHG mitigation potential .........................................................................................................................76 Mitigation Scenario ..................................................................................................................................81 Economic Analysis ...................................................................................................................................85 Policy and Implementation .......................................................................................................................87 Annex V: Low Carbon Cement Initiative .................................................................................................92 Overview 92 GHG mitigation potential .........................................................................................................................93 Economic Analysis ...................................................................................................................................97 Policy and Implementation .......................................................................................................................99 Annex VI: Commercial Tree Planting Initiative.....................................................................................104 Mitigation Potential ................................................................................................................................104 Economic Analysis .................................................................................................................................106 Annex VII: Conservation Agriculture Initiative .....................................................................................108 O v e r v i e w .......................................................................................................................................108 M i t i g a t i o n P o t e n t i a l .........................................................................................................108 E c o n o m i c A n a l y s i s ..............................................................................................................111 Annex VIII: Estimation of Carbon and Tobacco Tax Revenues ............................................................118 - iv - List of Figures Figure 3.1: GHG emissions from energy use, 2015 ................................................................................................ 1 Figure 3.2: GHG Emissions from energy use, historic and projected to 2050 under BAU ..................................... 2 Figure 3.3: GHG emissions mitigation in energy use, 2030 (MtCO 2e) ................................................................... 7 Figure 3.4: GHG emissions projections from energy use under BAU and with mitigation .................................... 8 Figure 3.5: Marginal abatement cost curve for energy use, 2030 ............................................................................ 9 Figure 3.6: Timeline of mitigation actions to support LEDS implementation in the energy sector ...................... 11 Figure 4.1: GHG emissions from IPPU, 2015 ....................................................................................................... 12 Figure 4.2: Historical and projected GHG emissions from IPPU .......................................................................... 15 Figure 4.3: GHG emissions mitigation within IPPU, 2030 (MtCO2e) .................................................................. 17 Figure 4.4: GHG emissions projections from IPPU under BAU and with mitigation ........................................... 18 Figure 4.5: Marginal abatement cost curve for IPPU, 2030 .................................................................................. 19 Figure4.6: Timeline of mitigation actions to support NDC implementation within IPPU .................................... 20 Figure 5.1: GHG Emissions from AFOLU............................................................................................................ 21 Figure 5.2: Annual Emissions from Deforestation ................................................................................................ 22 Figure 5.3: GHG emissions from AFOLU, historic and projected under BAU .................................................... 24 Figure 5.4: Estimated mitigation potential from forestry ...................................................................................... 24 Figure 5.5: AFOLU GHG Abatement by Mitigation Measure .............................................................................. 27 Figure 5.6: Marginal abatement cost curve for AFOLU, 2030.............................................................................. 27 Figure 5.7: Timeline of mitigation actions to support LEDS implementation within AFOLU ............................. 28 Figure 6.1: GHG emissions from Waste, historic and BAU projection to 2050 by source ................................... 30 Figure 6.2: GHG emissions projections from waste under BAU and with mitigation .......................................... 31 Figure 6.3: Marginal abatement cost curve for Waste, 2030 ................................................................................. 32 Figure 6.4: Roadmap for the Waste Sector ............................................................................................................ 32 Figure 7.1: Economy wide BAU Scenario ............................................................................................................ 33 Figure 7.2: Economy wide MIT Scenario ............................................................................................................. 34 Figure 7.3: Contribution of top ten mitigation options ......................................................................................... 34 Figure 7.4: Decoupling Economic Development from GHG Emissions under the MIT Scenario ........................ 35 Figure 7.5: Financial Intervention Logic ............................................................................................................... 40 Figure 9.1: Concept of Reactive Power Compensation ......................................................................................... 47 Figure 9.2: BAU and MIT Scenario, technical TD Losses .................................................................................... 54 Figure 9.3: AC Stock Development Forecast for Zimbabwe ............................................................................... 56 Figure 9.4 LC by Equipment Class considering Tariff Increase and SDR ............................................................ 58 Figure 9.5 LC by Equipment Class considering Tariff Increase, SDR & Subsidies.............................................. 59 Figure 9.6 LC by Equipment Class considering Tariff Increase and PLR (Scenario C) ....................................... 59 Figure 9.7: Minimum Energy Performance Standard Setting ............................................................................... 60 Figure 9.8: Electricity Demand under Business as Usual and under MEPS .......................................................... 61 Figure 9.9: Historical and projected waste generated per person .......................................................................... 64 Figure 9.10: Methane emission from solid waste disposal .................................................................................... 67 Figure 9.11: Integrated Solid Waste Management System .................................................................................... 69 Figure 9.12: Projected Recycle Potentials ............................................................................................................. 75 Figure 9.13: Road vehicles by type, historic and projected to 2050 (BAU) .......................................................... 78 Figure 9.14: Road vehicles, existing versus new stock to 2050 ............................................................................ 79 Figure 9.15: Projected fuel use in road transport to 2050 (BAU) .......................................................................... 80 Figure 9.16: Projected GHG emissions from road transport to 2050 (BAU) ........................................................ 80 Figure 9.17: Market penetration rates for electric vehicles (maximum share of new registrations) ...................... 82 Figure 9.18: Cumulative vehicle sales 2015-2050 (conventional ICE versus EV)................................................ 82 -v- Figure 9.19: GHG mitigation potential in road transport through 2050 ................................................................ 85 Figure 9.20: Lifetime vehicle cost comparison, Gasoline ICE versus EV (fleet operator).................................... 87 Figure 9.21: Diesel and biodiesel blend pump prices with and without support incentives .................................. 89 Figure 9.22: : Targets for improving sustainability in the global cement industry to 2050 ................................... 94 Figure 9.23: Indicative targets for improving sustainability in the Zimbabwe cement industry to 2050 ....................................................................................................................................................................... 96 Figure 9.24: Estimated mitigation potential versus BAU in the cement industry through 2050 ........................... 97 Figure 9.25: Improved GHG intensity of cement and clinker production with mitigation measures .................... 97 Figure 9.26: Carbon Stock Development under different Management Schemes ............................................... 105 Figure 9.27: Commercial Forestry Carbon Stock Development ......................................................................... 105 Figure 9.28: Commercial Forestry Cost and Benefits ......................................................................................... 106 Figure 9.29: Stylized SOC Stock Development .................................................................................................. 110 List of Tables Table 3-1: Summary of approach to BAU energy emissions projections according to IPCC category .................................................................................................................................3 Table 3-2: List of mitigation measures for Zimbabwe LEDS in the energy sector .........................................5 Table 4-1: Summary of assumptions to BAU IPPU emissions projections according to IPCC category ...............................................................................................................................14 Table 4-2: List of mitigation measures for Zimbabwe LEDS in IPPU ..........................................................17 Table 5-1: Summary of the approach to BAU AFOLU projections per IPCC Category ...............................23 Table 5-2: List of mitigation measures for Zimbabwe LEDS in the AFOLU Sector ....................................25 Table 7-1: Summary of Investment Needs ....................................................................................................38 Table 9-1: Overview on Data Set...................................................................................................................49 Table 9-2: Technical transmission- and distribution Losses ..........................................................................49 Table 9-3: Overview Power Factors in selected Countries ............................................................................50 Table 9-4: Savings from TD loss reduction measures ...................................................................................51 Table 9-5 Input parameter for lifecycle cost analysis ....................................................................................57 Table 9-6 Life cycle cost analysis for different scenarios..............................................................................58 Table 9-7: High level Roadmap for Minimum Energy Performance Standards ............................................62 Table 9-8: Solid waste composition ...............................................................................................................63 Table 9-9: Waste generated and collected .....................................................................................................64 Table 9-10: Parameters used in Waste Sector modelling...............................................................................66 Table 9-11: Legislation, policies and strategies on waste management in Zimbabwe ..................................68 Table 9-12: CH4 reduction from SWDS from 2020 to 2050 .........................................................................71 Table 9-13: LFG Cost Parameter ...................................................................................................................71 Table 9-14: Total cost for LFG flaring ..........................................................................................................71 Table 9-15: LFG Abatement Cost Analysis ...................................................................................................72 Table 9-16: CH4 mitigated through composting ............................................................................................74 Table 9-17: Investment and operational costs for composting ......................................................................74 Table 9-18: Cash flow, reinvestment in equipment every 10 years ...............................................................74 Table 9-19: Abatement cost analysis .............................................................................................................74 Table 9-20: Estimated vehicle fleet in Zimbabwe, 2000-2016 ......................................................................77 Table 9-21: Fuel economy improvement targets for new road vehicles ........................................................81 - vi - Table 9-22: Average electricity demand from new electric vehicles 2020-2050 (kWh/100 km) ..................83 Table 9-23: Abatement costs for low carbon road transport measures in 2030 .............................................86 Table 9-24: High level Roadmap for Low Carbon Road Transport ..............................................................91 Table 9-25: GHG emissions KPIs for Zimbabwe cement sector by 2030 .....................................................95 Table 9-26: Abatement costs for clinker substitution in 2030 .......................................................................99 Table 9-27: High level Roadmap for Sustainability in Cement Production.................................................103 Table 9-28: Planting Schedule Input Parameter...........................................................................................104 Table 9-29: Planting Schedule .....................................................................................................................104 Table 9-30: Stumpage prices .......................................................................................................................106 Table 9-31: Abatement Cost Analysis .........................................................................................................107 Table 9-32: CA Impact on Net Revenues ....................................................................................................111 Table 9-33: Input Parameter - Tractor lifecycle cost analysis .....................................................................112 Table 9-34: Lifecycle Cost Analysis of Utility Tractors and 2 Wheel Tractors ..........................................112 Table 9-35: Calculation of ERs per ha CA ..................................................................................................113 Table 9-36: Calculation of Added Value per Slaughter per ha CA .............................................................115 Table 9-37: Estimation of the areas eligible for CA ....................................................................................115 Table 9-38: Potential Impacts of Conservation Agriculture ........................................................................116 Table 9-39: CA Abatement Cost Analysis ...................................................................................................117 Table 9-40: Carbon Tax Revenue Projections .............................................................................................118 Table 9-41: Tobacco Tax Revenue Projection .............................................................................................119 Table 9-42: GHG Emissions from Conversion of Forest Land to Non-Forest ............................................120 Table 9-43: GDP by expenditure in constant prices ....................................................................................121 List of equations Equation 9.1: Determination equipment size and costs per customer 50 Equation 9.2: Equation for CH4 estimation ...........................................................................................65 - vii - List of Abbreviations AC Air Conditioning AfDB African Development Bank AFOLU Agriculture Forestry and Other Land-use AFR Alternative Fuels and Raw Materials BAT Best Available Technology BAU Business as Usual BFS Blast furnace slag BF-BOF Blast furnace to basic oxygen furnace BMU German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety BRT Bus Rapid Transport BTI Building Technology Institute CA Conservation Agriculture CAPEX Capital Expenditure CCMD Climate Change Management Department CCS Carbon capture and storage CDM Clean Development Mechanism CER Certified Emission Reductions CSA Climate Smart Agriculture CSI Cement Sustainability Initiative CIZ Commerce, Chamber of Mines, Construction Industry federation of Zim- babwe CIFOZ Construction Industry Federation of Zimbabwe CSP Concentrated solar power CIMMYT International Maize and Wheat Improvement Centre CZI Confederation of Zimbabwe Industries ECA Export Credit Agency EMA Environmental Management Agency EMS Environmental Management System EV Electric vehicles FCPF Forest Carbon Partnership Fund FeCr Ferrochromium GCF Green Climate Fund GCI Green Cooling Initiative GFEI Global Fuel Economy Initiative GHG Greenhouse Gas GHGI Greenhouse Gas Inventory GoZ Government of Zimbabwe GWh Giga Watt Hour GWP Global Warming Potential ICE Internal combustion engine ICRISAT International Crops Research Institute for the Semi-arid tropics IDBZ Infrastructure Development Bank of Zimbabwe IEA International Energy Agency - viii - IES Institute of Environmental Studies IPPU Industrial Processes and Product Use IPCC Intergovernmental Panel on Climate Change IRR Internal Rate of Return KPI Key Performance Indicators kVAr Kilo Volt Ampere Reactive kWh Kilo Watt Hour kW Kilo Watt LC Lifecycle Cost LFG Landfill gas flaring LEDS Low Emission Development Strategy LPG Liquefied Petroleum Gas LULUCF Land Use, land Use Change and Forestry NACAG Nitric Acid Climate Action Group NDC Nationally Determined Contribution NMT Non-motorised transport MAC Marginal Abatement Cost MACC Marginal abatement cost curve MD Maximum Demand ( MEPS Minimum Energy Performance Standard MICED Ministry of Industry, Commerce and Enterprise Development MLAWCRR Ministry of Lands, Agriculture, Water, Climate and Rural Resettlement MLGPWNH Ministry of Local Government, Public Works and National Housing MIT Mitigation scenario MoEPD Ministry of Energy and Power Development MRV Monitoring, Reporting and Verification MTID; Ministry of Transport and Infrastructure Development NCCRS National Climate Change Response Strategy NEP National Environment Policy and Strategies OPEX Operational Expenditure PF Power factor PA Paris Agreement PBP Payback-Period PLR Prime Lending Rate PPC Pretoria Portland Cement PV Photovoltaic RERA Regional Electricity Regulators Association of Southern Africa RPC Reactive Power Compensation SAZ Standards Association of Zimbabwe SDR Social Discount Rate SDP System Development Plan SE Standard Error SIRDC Scientific Industrial Research and Development Centre SME Small to Medium Enterprise SOC Soil Organic Carbon SWDS Solid Waste Disposal Sites TD Transmission and distribution - ix - TNC Third National Communication UNDP United Nation Development Programme TSP Transition Stabilisation Programme UNFCCC United Nations Framework Convention of Climate Change WB World Bank WBCSD World Business Council for Sustainable Development WHR Waste heat recovery ZBCA Zimbabwe Building Contractors Association ZERA Zimbabwe Electricity Regulatory Authority ZEDTC Zimbabwe Electricity Transmission and Distribution Company ZimAsset Zimbabwe Agenda for Sustainable Socio-Economic Transformation ZIMSTAT Zimbabwe National Statistics -x- Executive Summary Climate change is a defining challenge for humanity. The Government of Zimbabwe (GoZ) is committed to taking urgent action to mitigate and adapt to the effects of Cli- mate Change. As a Party to the United Nations Framework Convention on Climate Change (UNFCCC), the country seeks to contribute to the ambitious global mitigation goals as agreed under the Paris Agreement (PA). Zimbabwe’s long-term Low Green- house Gas Emission Development Strategy (LEDS) sets the course for reducing emis- sions, while at the same time ensuring sustainable economic development for the coun- try. It is based on the government's economic planning up to 2050 and covers mitigation measures across the four key sectors of Energy, Industrial Processes and Product Use (IPPU), Agriculture, Forestry and other Land use (AFOLU) and Waste. Zimbabwe, as a developing country, is projected to experience decades of economic growth with its GDP increasing from 19.6 billion USD in 2020 to 119.1 billion USD by 2050, based on constant prices(a seven-fold increase). Economic development will drive Zimbabwe’s business as usual (BAU) emissions of greenhouse gases (GHG), which are projected to increase from 36.6 MtCO2e in 2020 to 65.3 MtCO2e in 2050 (a doubling over this period). Energy. Currently, energy use is the country’s largest source of GHG emissions; the sector’s emissions are expected to increase to 26.5 MtCO2e in 2030 and 37.5 MtCO2e in 2050 with increasing demand for power generation, transport and other uses of fossil fuels. GoZ, private sector and civil society identified 21 mitigation measures including large hydropower projects (Batoka and Devils George) accompanied by other renewable energy measures such as the introduction of solar PV at the commercial and residential scale. Clean generation measures will be complemented by a series of energy efficiency measures reducing electricity demand and the reduction of technical losses in the power system. An important efficiency measure identified is the introduction of fuel economy standards for vehicles, reducing lifecycle costs to consumers as well as emissions and reducing Zimbabwe’s dependence on fuel imports. The aggregated set of mitigation measures identified has the potential to reduce the projected BAU emissions from the energy sector from 37.5 to 16.2 MtCO2e in 2030 (57% reduction). IPPU. Emissions from these sources represent a relatively small share of Zimbabwe’s total national emissions, estimated to total around 0.70 MtCO2e in 2020. The BAU emissions are based on assuming growth in clinker and cement, fertilizer and ferroalloys production, as well as a return to iron and steel production within the coming decade. BAU emissions are expected to rise to around 1.7 MtCO2e in 2030 and 2.5 MtCO2e in 2050. GoZ and stakeholders identified five key mitigation measures, most importantly the reduction of N2O emissions from fertilizer production and use of alternative fuels in the ferrochromium and iron and steel sectors. Implementing these measures could re- duce projected emissions to around 1.4 MtCO2e by 2050 (44% reduction compared to BAU). - xi - AFOLU. The AFOLU sector is the largest source of GHG emissions after energy use and is estimated to emit 18.8 MtCO2e by 2020. BAU emissions are projected to peak in around 2034 (at 32.4 MtCO2e) and fall thereafter to 22.7 MtCO2e by 2050. Stakeholders identified five mitigation measures to reduce deforestation and emissions from agricul- ture. Besides stopping net-deforestation by 2030, the most important intervention is increasing the use of conservation agriculture, which increases soil organic carbon as well as revenues from farming and livestock management. Implementation of these measures are estimated to l reduce projected GHG emissions to 14.5 MtCO2e by 2050 (reduction of 36.2%). Waste. BAU emission trends in the waste sector are driven by economic development (GDP per capita) and population growth, with GHG emissions expected to increase from 1.18 MtCO2e in 2020 to 2.62 MtCO2e by 2050. GoZ and stakeholders have identi- fied two key mitigation measures: capture of landfill gas and increased use of compost- ing, which together have the potential to significantly reduce emissions to just 0.08 MtCO2e by 2050 (a reduction of over 95% of sector emissions). Finance& policy amendments. The implementation of all 38 identified mitigation measures is expected to have a significant positive economic impact with a net present value of 7,130 M USD. Their implementation will reduce the costs of power, agricultur- al and industrial products improving the overall livelihood of Zimbabweans and increas- ing the country’s economic competitiveness. Similarly, the LEDS mitigation actions support SDG achievements beyond the SDG 13 on climate action. However, at the same time, the successful implementation will depend on the availabil- ity of a suitable financing mechanism – total investment needs are estimated at 7,880 M USD, corresponding to 25.4% of the current national GDP. This financing needs to be provided at a low cost of capital for mitigation projects to be viable and bankable. The successful implementation of the mitigation measures will depend on the availabil- ity of a large scale financing facility, providing concessional lending at rates, making the economically viable abatement potential also financially viable. This financing in- strument will need to be supported by an enabling framework of new policies and regu- lations (e.g. fuel economy standards) to incentivise companies and consumers in making purchase decisions minimizing lifecycle costs and GHG emissions. - xii -

  10. 1 Introduction The Government of Zimbabwe (GoZ) is committed to taking urgent action to mitigate the causes and adapt to the effects of climate change. As a Party to the United Nations Framework Convention on Climate Change (UNFCCC), the country seeks to contribute to the ambitious goal of limiting temperature rise to 1.5°C above pre-industrial levels as agreed under the Paris Agreement (PA). (UNFCCC, 2015).The GoZ submitted its In- tended Nationally Determined Contribution (INDC) to the UNFCCC in 2015 (GoZ, 2015a), and this was approved and advanced to Nationally Determined Contribution (NDC) following the ratification of the PA in 2017. Zimbabwe’s National Climate Policy (GoZ, 2017a) guides the mainstreaming of climate change within national development plans. Action on climate change is supported by several other instruments such as the National Climate Change Response Strategy (NCCRS) (GoZ, 2015b), the National Renewable Energy Policy (GoZ, 2019a) National Bio-fuels Policy (GoZ, 2019b), National Transport Master Plan (2018-2038) (GoZ, 2018a), Forestry Policy (draft), Climate Smart Agriculture (CSA) manual (GoZ-CTCN, 2017) and Climate Smart Agriculture Framework (GoZ, 2018b), as well as the National Environmental Policy and Strategies (GoZ, 2009). The GoZ acknowledges that more work is needed so that all key economic players, including private sector, can partici- pate in climate change mitigation. Zimbabwe’s first Nationally Determined Contribu- tion (NDC) is limited to climate change mitigation in the energy sector covering promi- nently the power and transport sectors, as well as adaptation in agriculture. The NDC targets to reduce energy-related GHG emissions per capita by 33% below the 2030 business as usual (BAU) scenario. In 2019 GoZ launched the NDC Implementation Framework to guide implementation of the current energy sector focused NDC. Building on these achievements, Zimbabwe Long term Low Greenhouse Gas Emission Development Strategy (LEDS) follows an economy-wide approach. The LEDS covers mitigation in all Intergovernmental Panel on Climate Change (IPCC) sectors (Energy, IPPU, Agriculture, Forestry and Other Land Use (AFOLU), and Waste). The LEDS also provides a framework for developing an economy wide NDC. Zimbabwe’s LEDS does not only address mitigation measures, it places equal emphasis on the country’s economic development. Zimbabwe’s 2019 Gross Domestic Product (GDP) per capita amounted to USD 2,788 compared, to e.g. USD 6,339 /capita in South Africa or the EU average (USD43,150/capita, all in purchasing power parity). Hence, strengthening the national economy and improving the livelihoods of Zimbabweans is an important priority, as outlined in Vision 2030 (GoZ, 2018c) and Zimbabwe’s Transi- tion Stabilisation Programme (TSP) (GoZ, 2018d). The TSP builds on the Zimbabwe Agenda for Sustainable Socio-Economic Transformation (ZimAsset) (2013-2018) (GoZ, 2013). Against this background, the LEDS explores measures that aim to reduce GHG emis- sions (or increase carbon sequestration in forests and soils) while contributing to socio- economic development. The LEDS is based on the assessment of 38 sectoral mitigation -1- measures, identified following a comprehensive stakeholder consultation process. These 38 sectoral mitigation measures are, to a large extent, economically viable at a Social Discount Rate (SDR) of 6%. High level modelling of the mitigation measures indicates an aggregated Net Present Value (NPV) of USD7.13 billion. The implementation of these measures will reduce the cost of electricity, reduce costs of agricultural produc- tion, reduce fuel consumption and overall provide a significant impulse for economic growth. While being economically viable, mitigation measures will require an investment vol- ume of USD7.88 billion up to 2030 (corresponding to a third of Zimbabwe’s GDP). Both, public and private investments, will be needed to deliver on the climate change mitigation targets. In 2019 the cost of capital was around 15% and hence significantly exceeded the SDR of 6%. The success of Zimbabwe’s LEDS will depend, to a large extent, on the availability of a large-scale climate financing facility. This facility should bridge the gap between prevailing lending rates and the SDR enabling private sector investment in economically viable mitigation measures. -2-

  11. 2 Methodology Zimbabwe’s LEDS was developed according to the methodology described in the next section. 2.1 Stakeholder Engagement The Climate Change Management Department (CCMD) in the Ministry of Lands, Agri- culture, Water, Climate and Rural Resettlement (MLAWCRR) led the LEDS develop- ment with support from the United Nations Development Programme (UNDP). The development of the LEDS employed a participatory approach. The CCMD organised stakeholder consultations during the inception, development and validation phases of the strategy formulation. Stakeholder groups included the responsible ministries (in ad- dition to the Ministry of Energy and Power Development (MoEPD); Ministry of Wom- en Affairs, Community, Small and Medium Enterprise Development (MWACSMED); Ministry of Transport and Infrastructure Development (MTID); Ministry of Local Gov- ernment, Public Works and National Housing; Ministry of Environment, Tourism and Hospitality Industry; Ministry of Finance and Economic Development (MoFED) and; Ministry of Industry and Commerce. Government departments and agencies that were involved include the Forestry Commission, Environmental Management Agency (EMA), Zimbabwe Energy Regulatory Authority, Rural Electrification Agency, the In- frastructure Development Bank of Zimbabwe (IDBZ) and the Scientific Industrial Re- search and Development Centre (SIRDC). Local authorities (cities of Harare, Bulawayo and Masvingo), private sector representations and individual companies, as well as var- ious organisations representing civil society (including youth- and women organisa- tions) also participated in the process. The Legal and Transparency, as well as the Miti- gation Technical Sub-committees for the implementation of Zimbabwe’s NDC provided oversight and guidance of the LEDS development process. 2.2 BAU Modelling The BAU scenarios developed using GHG data from Zimbabwe’s Third National Communication (TNC) to the UNFCCC (GoZ, 2016), and the NDC Implementation Framework (GoZ, 2017b). For each sub-sector, assumptions around future activity growth rates and factors determining change in GHG emissions were applied. In gen- eral, population, economic and industrial growth rates were based on the Zimbabwe National Statistics Agency(ZimStat) forecasting model, which represents an outlook for economic growth based on strong recovery: ▪ The GDP forecast bases on a forecasting approach, which assumes that the coun- try overcomes its current financial crisis and recovers through a series of years with strong economic development. The GDP forecast model bases on population growth, consumer price index and employment data. Annex X provides the GDP forecasts. ▪ For some sectors, where GoZ conducts detailed planning processes (i.e. develop- ment of the electricity demand), the LEDS considers such sector specific plan- ning. -3- ▪ Population forecasts were based on the medium case growth scenario from Zim- Stat; ▪ Detailed approaches to BAU modelling are described within each of the sector- specific chapters and in relevant Annexes of this document. 2.3 Key Assumptions For modelling the costs and benefits of diesel and gasoline related activities, the obtain- ing fuel price as provided by ZimStat and a global price forecast model were used. The global price forecast model assumes a modest fuel price increment (i.e. accumulated 16%) up to 2030 and constant prices thereafter. Since 2016, Zimbabwe has implemented a tobacco tax to support sustainable afforesta- tion and a carbon tax on fossil fuel use. As of 2019, the collected carbon tax amounted to fuel diesel and gasoline1 use is equivalent to around USD12.24/tCO2eq. Moreover, a constant electricity cost of 16 USDc/kWh was assumed. The cost is related to the current price for electricity (10 USDc/kWh, ZERA, 2014) and indirect subsidies related tariffs which are not fully cost reflective (i.e. CAPEX is not fully recovered; see Trimble et al., 2016). 2.4 Mitigation Modelling and Economic Analysis Climate change mitigation modelling was done using sector specific tools. Over past years, a high cost of capital has led the private sector to invest in emission intensive technologies featuring low capital expenditure (CAPEX), but high operational expendi- ture (OPEX), for example. the purchase of inefficient passenger cars, with a low asset costs, but high fuel costs. The alternative GHG mitigation pathway presented in this document is based on a strong climate-financing framework. The underlying assumption is that the LEDS im- plementation is supported by a national Climate Finance Facility (Figure 7-5, which offers debt capital and concessional lending rates based on sustainable and measurable GHG emissions reductions. This would eliminate the gap between the economically viable abatement potential and those measures that may be financially viable/attractive. The Marginal Abatement Cost (MAC) functions were used to prioritize the mitigation options. The modelling of a mitigation scenario (MIT) is based on brief sectoral studies for i) Reduction of load dependent technical losses in the electricity transmission and distribu- tion system, ii) introduction of Minimum Energy Performance Standards (MEPS), iii) abatement potential in the Solid waste subsector, iv) transport, v) cement and vi) AFOLU. These are presented in Annex I-VII.

  12. 1 Gasoline is generally referred to as petrol in Zimbabwe -4- 2.5 Sustainable Development Impacts and Co- benefits While the LEDS mitigation actions support Sustainable Development Goals (SDGs) achievements beyond the SDG 13, the SDG impacts of each mitigation action have not been analysed and quantified. There are however clear linkages, exemplified for in- stance in the energy sector, where fossil fuel based energy production and transport has severe air pollution effects. A shift to cleaner forms of energy has clear health benefits. Similarly, increased uptake of renewable energy also has a positive impact on employ- ment creation, in that the industry offers significant direct and indirect job creation po- tential across the full value chain. There is need for an analysis of how to make the transition to a low carbon economy a just and inclusive transition for all. When carbon-intensive industries are phased out, there is need to make sure that cleaner industries are ready to sustain growth and em- ployment and that both positive and negative effects on jobs and livelihoods are consid- ered. While the crafting of the LEDS has been centred on identification of cost- effective, low carbon solutions for reaching the country’s ambitious climate targets, the GoZ intends to include a deeper analysis of the social and employment dimensions. , These dimensions will include gender issues, SDG impact and elements of decent work and just transition as an integral part of the development of a LEDS implementation framework. -5-

  13. 3 Energy 3.1 Business-as-usual Emissions Energy use in power generation, transport, manufacturing industry, agriculture buildings accounts for the largest share of national GHG emissions. Emissions totalled around 11.9 MtCO2e in 2015, of which CO2 accounted for over 99%. Electricity generation accounted for the largest share of the total, mainly associated with coal and oil combus- tion - followed by the transport sector emissions, mainly from gasoline and diesel use in road vehicles (Figure 1). Diesel, coal and liquefied petroleum gas (LPG) fuel use in oth- er sectors such as industry, commercial, institutional, residential and agriculture ac- counted for the remaining share of emissions. Figure 3-1: GHG emissions from energy use, 2015 Figure 3-2 shows GHG emissions from energy use projected through 2050 under a BAU scenario. Bottom-up detailed energy use and emissions projections were devel- oped separately for each energy-using sector, reflecting a number of assumptions (Goz, 2016). around key drivers and the outlook for growth through 2050 determining chang- es in economic output, energy supply, technology, economics and policy choices. The approach taken to developing a BAU projection for each contributing sector is summa- rised in Table 3.1. Following this methodology, the total emissions are expected to increase significantly over the coming decades, rising to around 26.5 and 37.5 MtCO2e in 2030 and 2050, respectively. The fastest growth and overall contribution is expected to come from pow- er generation, in particular with the official planned expansion of thermal power genera- tion over the coming decade. Emissions from transport are also forecast to rise signifi- cantly as demand for vehicles and transport services increases with economic growth, -1- particularly for passenger cars. Most other sectors are expected to see a steady increase in activity and associated emissions, assuming robust economic growth, industrial out- put and rising standards of living over the medium and long term. Figure 3-2: GHG Emissions from energy use, historic and projected to 2050 under BAU -2- Table 3-1: Summary of approach to BAU energy emissions projections ac- cording to IPCC category IPCC sub- IPCC cate- Assumptions Sub-category Approach sector gory Based on analysis of Increased forecast electricity de- demand and mand and planned gen- generation to eration through 2038 by 2050 based on 1. A.1.a. Elec- power plant (ZETDC, growth trend tricity and 2017). A counterfactual and final grid Heat Produc- BAU was developed mix in 2038. tion excluding NDC projects being included, using ZPC plant-level infor- mation and data assump- 1. A.1. tions. Energy Use of coking Industries coal and other energy use assumed to 1. A.1.c. grow as a Manufacture function of of Solid Fuels Surrogate approach. projected and Other GDP growth Energy Indus- and decreas- tries ing energy per unit GDP intensity (MJ 1.A. Fuel per USD). Combustion Energy de- Activities mand to grow in most manu- facturing sectors as a 1. A.2. Manufacturing In- function of Surrogate approach dustries and Construction projected GDP growth and decreas- ing energy per unit GDP intensity. Fuel consumption fore- Increased cast for different vehicle vehicle fleet classes based on based on transport demand, fuel historical use and fuel economy trend assumptions, and de- 1. A.3. tailed vehicle fleet mod- Road Transport elling through 2030. Vehicle demand by type linked to GDP per capita growth forecasts using regression analysis from historic data (see Annex IV for details and data -3- IPCC sub- IPCC cate- Assumptions Sub-category Approach sector gory sources used). Forecast coal, diesel and Increased electricity consumption energy de- based on data provided mand with by National Railways of increasing Railways Zimbabwe (NRZ) and GDP MTID. Extrapolated to 2050 based on GDP growth trends. Energy demand assumed Increased to grow in line with energy de- GDP growth outlook. mand with Aviation Assumes resumption of increasing flight activity over me- GDP dium term to previous levels of year 2000. Energy de- mand as- sumed to grow in line 1. A.4. Other Sectors with GDP Surrogate approach. growth out- look Energy use per unit GDP 1. A.5. Non-specified to increase over time Modelled according to Increased coal IPCC Tier 1 guidance mining with assumed (90% surface increasing 1.B. Fugi- 1. B.1.a. mining and 10% under- domestic tive Coal ground mining); activity demand 1. B.1. Solid Emissions Mining data linked directly to Fuels from and projected national coal Fuels Handling demand within the same BAU scenarios (i.e. assumes domestic coal meets demand growth). 3.1.1 Mitigation Measures Error! Reference source not found. summarises the mitigation measures identified to contribute to the LEDS, according to each of the key energy sub-sectors. The table provides only a high-level summary, indicating the nature of the mitigation effect; furthermore, some of the options shown comprise several different actions or specific projects (e.g. municipal biogas power projects) grouped together. The list of options builds upon those identified in Zimbabwe’s first NDC. Several of those measures have been extended or scaled-up through to -4- 2050.The table also includes other additional measures considered feasible over the long-term with sufficient technical and financial support. Some of these measures were included as part of the low carbon road transport (see Annex IV), the use of Reactive Power Compensation (RPC, see Annex I), and Minimum Energy Performance Standards for appliances used in build- ings (see Annex II). An important contribution to the LEDS is the assumed expansion of new and as-yet unplanned renewable power generation projects to meet increas- ing demand through the last 15-20 years of the forecast period. These power generation projects assume the need to balance base load and peaking power whilst moving towards low carbon generation as renewable generation costs fall over time. An equal split between solar Photovoltaic (PV, utility), con- centrated solar power (CSP) and hydropower is assumed. Table 3-2: List of mitigation measures for Zimbabwe LEDS in the energy sector Sub Cat - ego- Mitigation measure Principal mitigation sec- ry tor Planned large hydropow- Replacement of existing and/or planned fossil-fuel er (including Batoka and generation from grid. Devil’s Gorge). Elec Planned solar PV micro- tricit grids. Replacement of generation and GHG emissions from En- y Planned solar PV utility Harare coal plant, and other fossil generation. ergy and projects. In- heat Planned municipal bio- dust Displacement of existing coal-fired power on grid. gen- gas power projects. ries era- Unplanned renewables Increase in power demand met from renewables from tion 2032-2050 (solar PV, 2032 onwards to reduce grid GHG intensity. CSP, hydro). Reactive power compen- Reduced transmission system losses, increasing effi- sation. ciency of power generation supply. Energy efficiency(EE) Manufac- Reduced on-site fuel use and grid power. programme. turing In- Energy efficient electric dustries Reduced power consumption. motors in mining. Reducing fossil fuel component in the energy mix Local biofuel production through blending. Roa Fuel economy policy. Reduction in gasoline and diesel consumption d Reduction of gasoline and diesel demand by Internal Electric- and hydrogen tran Combustion Engines (ICE) vehicles through the uptake Tra vehicles. spor of electric and hydrogen vehicles. nsp t Reduced carbon intensity of travel system by shifting ort Public transport (modal away from passenger car use to modern buses and non- shift). motorised transport (NMT). Rail Rail refurbishment and Displaced diesel consumption (rail + road) by less CO2- way electrification. intensive electricity provided from the grid. s Oth Ag- CSA: Solar pumping for Replacing diesel, gasoline and grid electricity in water er ri- irrigation. pumping. -5- Sub Cat - ego- Mitigation measure Principal mitigation sec- ry tor sec- cul- CSA: On-farm bio- Avoided emissions from manure management. tors ture digesters. Solar water heating pro- Replacing grid electricity consumption. gramme. Co Rooftop solar PV for Replacing diesel and gasoline in back-up generators. mm SMEs. er- Off-grid solar electrifica- Replacing kerosene (lighting) and diesel/gasoline (gen- cial tion. sets). & Solar LED street and Reduced grid electricity for street lighting. res- traffic lighting. iden Replacement of ineffi- tial cient lighting devices. Increased energy performance of appliances leading to Minimum Energy Per- reduced grid power consumption. formance Standards. Figure 3-3 summarises the estimated emissions reduction potential in 2030 for all the mitigation options identified in Table 3.2. In terms of overall mitigation con- tribution, electricity supply from the large hydropower projects of Batoka and Devil’s Gorge dominate the estimated mitigation potential, accounting for 8.1 MtCO2e of the total 10.8 MtCO2 potential estimated in 2030 – equivalent to al- most 75% of the total effort. After renewable electricity generation, low carbon transport contributes the largest share of mitigation potential, mainly through a combination of fuel savings and the use of alternative and low carbon fuels and vehicles (see Annex IV). -6- Figure 3-3: GHG emissions mitigation in energy use, 2030 (MtCO2e) The contribution from the key mitigation options over the long-term to 2050 is shown in Figure 3-4. The projections show that with the implementation of all mit- igation measures, total emissions could be limited to around 16MtCO2e in 2050, compared to 37.5 MtCO2e under BAU. This represents a more than halving of en- ergy sector emissions. The figure shows that achieving this level of mitigation will be highly determined by the ability of large-scale hydropower to meet future elec- tricity demand, followed by a mix of other renewables meeting incremental demand over the longer-term. Additional mitigation could be achieved through use of clean coal technologies for thermal power generation and other policy instruments to remove inefficient vehicles, equipment and appliances. -7- Figure 3-4: GHG emissions projections from energy use under BAU and with mitigation 3.1.2 Economic Analysis shows the marginal abatement cost curve (MACC) for the energy sector in which each of the identified mitigation options is sorted in ascending order of abatement cost. As described earlier, the costs shown represent the socio-economic costs of abatement, reflecting both costs and benefits to the wider economy. Some key assumptions for modelling the costs and benefits of mitigation measures were applied specific to the energy sector, including; ▪ A cost reflective price for electricity generation and supply (cp. ZERA, 2014 and Trimble et al., 2016) of 16 USDc/kWh; ▪ While the general modelling approach assumes constant prices, international projections for the generation of additional, currently unplanned, renewa- ble energy projects were considered. These unplanned projects will be re- quired to close the gap from 2032 onwards between i) the currently planned generation assets and ii) the increment of the energy demand pro- jected from 2030 onwards. For these projects, international projections for investment costs for utility PV, CSP and hydropower (NREL, 2018)2 were considered. Moreover, it was assumed that this ‘unplanned’ generation is provided by small-scale hydropower, PV and CSP in equal shares3. 2 2018 ATB Cost and Performance Summary, NREL. See: https://atb.nrel.gov/electricity/2018/summary.html 3Given limitedinformationand lack of a robust and comparable RE assessment and because detailed energy system modelling fell outside the scope of the LEDS development, making an equal split was deemed the -8- The MACC highlights the large potential for achieving mitigation principally through the introduction of increased renewable supply most noticeably from large hydropower projects such as Batoka and Devil’s Gorge to meet Zimbabwe’s rising demand for grid electricity. Abatement is also achieved indirectly through the impact that reduced electricity demand has in the electricity generation sector, arising from energy efficiency measures. Importantly, most of the projects are seen to have significant net benefits, shown here as ‘negative’ abatement costs. This is most noticeable for energy efficiency projects and those involving the re- placement of imported diesel fuel use (Table 3.2).The focus is instead on those options, which can deliver significant cost-effective GHG reductions whilst also offering important co-benefits such as reduced energy imports, green growth and local job creation. Figure 3-5: Marginal abatement cost curve for energy use, 2030 most transparent approach. Wind was excluded based on the low resource potential in Zimbabwe, whilst the assumption was that solar will have a larger potential than hydro, given falling unit costs (hence the 2/3 solar compared to 1/3 hydro). Hydro in turn comes with environmental challenges, mainly for large scale hydro. It should be noted that because all Renewable Energy options assume zero emission grid power, the actual split chosen doesn’t actually impact the GHG reductions and the LEDS mitigation outlook. The costs would be slightly different depending on the mix, although these become broadly similar going out to 2050. -9- 3.2 Roadmap of Actions shows a summary timeline for the development and implementation of each of the mitigation measures and actions proposed to implement the LEDS in the En- ergy sector. The roadmap shows that much of the mitigation effort to be achieved over the long-term through to 2050 will require the formulation and implementa- tion of policies, programmes and investments over the short and medium term. These will be essential in providing the basis and clear direction for subsequent scaling up of low carbon energy use and investment needed to decouple energy consumption from emissions. - 10 - Figure 3-6: Timeline of mitigation actions to support LEDS implementation in the energy sector - 11 -

  14. 4 Industrial Process and Product Use 4.1 Business-as-usual Emissions Industrial Processes and Product Use emissions include GHG emissions released by a wide range of industrial processes that chemically or physically transform materials and emissions from product use. According to the TNC GHG inventory data, emissions from these sources represent a relatively small share of Zimba- bwe’s total national emissions, totalling approximately 0.54 MtCO2e in 2015.4 The cement sector accounted for the largest share of total IPPU emissions in 2015, in the form of CO2 produced during calcination of limestone in cement kilns (Fig- ure 4.1). This sub-sector was followed by release of process CO2 from ferrochro- mium smelting and N2O emissions produced during the production of nitric acid within the country’s only nitrogen fertilizer manufacturing plant. A large number of much smaller sources and activities accounted for the remaining share of emis- sions, including glass production, soda ash use, secondary lead production, and lubricant, paraffin wax and solvent use (other IPPU). Figure 4-1: GHG emissions from IPPU, 2015 Figure 3-1shows historical GHG emissions from the IPPU sectors well as emis- sions projected through 2050 under a BAU scenario. The historical data shows how emissions have fallen significantly since 2000. Iron and steel production was a key emitter until around 2008 when the country's only integrated iron and steel works ceased production. Nitric acid production from the nitrogen fertilizer indus- try has significantly decreased due to operational challenges.

  15. 4 Note that the GHG inventory does not estimate GHG emissions arising from product uses as substitutes for Ozone Depleting Substances (ODS) due to a lack of data - 12 - Figure 4.2: GHG emissions from IPPU, historical and BAU projection to 2050 by source Emissions projections were developed separately for each emitting sub-sector, reflecting assumptions around the forecast outlook for industrial recovery and increased output growth through 2050. The approach taken to developing a BAU projection for each contributing sector is summarised in Table 4-2. According to this approach, total BAU emissions are expected to increase significantly over the coming decades, from an estimated 1.7 MtCO2e in 2030 to 2.5 MtCO2e in 2050. However, this increase is highly dependent upon the assumption that renewed industrial output and investment can be achieved in the medium-term, in particu- lar within iron and steel and fertilizer production, resulting in activity and emis- sions returning to early 2000 levels. Over the longer term, most IPPU sectors are expected to have an increase in activity and associated emissions, assuming robust economic growth and industrial output. In the absence of national mandatory GHG reporting requirements for companies, GHG emissions were calculated based on IPCC Tier 1 methodology. Figure 4.2 presents historical and projected BAU GHG emissions from IPPU. - 13 - Table 4-1: Summary of assumptions to BAU IPPU emissions projections accord- ing to IPCC category IPCC Sec- IPCC sub- tor IPCC category Assumptions sector Clinker production assumed to return to historical levels of around 550kt(early 2.A.1. Cement Pro- 2000s) by 2025; subsequent annual duction growth to occur in line with trends at around 2-3% p.a. Glass production assumed to return to 2.A. Mineral historical levels of around 20kt(mid 2.A.3. Glass Produc- Industry 2000s) by 2025; subsequent annual tion growth occurs in line with trends at around 5% p.a. Sodium carbonate use assumed to return 2.A.4b. Other Uses of to early 2000s levels of around 10kt by Soda Ash 2025; subsequent annual growth occurs in line with trends at around 5% p.a. Assumes target nitric acid production of 2. IPPU 2.B. Chemi- 2.B.2. Nitric Acid around 150kt reached by 2024, with sub- cals Industry Production sequent expansion to achieve ammonium nitrate production capacity of 240kt p.a. Assumes return to early 2000sproduction 2.C.1 Iron & Steel levels by 2025, subsequently increasing to Production 2.C. Metal 700kt by 2040. Industry 2.C.2. Ferrochromi- FeCr production assumed to return to um early2000 levels of around 250kt by 2025. 2.D.1 Lubricant Use Increased non-energy product use linked to manufacturing industry activity within 2.D. Non Category 1.A (Energy); assumed to in- Energy 2.D.5 Paraffin crease as a function of projected GDP Products Wax Use growth and decreasing energy per unit GDP intensity. Note: Growth rate and industrial output assumptions are based on Zimbabwe National Industrial Development Policy (2019-2023) and expert judgement - 14 - Figure 4-2: Historical and projected GHG emissions from IPPU 4.2 Mitigation Measures Table 4-2 summarises the mitigation measures identified to contribute to the LEDS, according to each of the key sources of IPPU emissions. Within the ce- ment sector, process CO2 emissions from the calcination process account for around 60% of total plant emissions. The primary option for reducing these is to substitute the clinker content within cement production with other materials such as fly ash from power generation and blast furnace slag (BFS) from steel produc- tion. These materials are currently used in cement production, but experiences globally show that these rates could be increased over time subject to the availa- bility of low cost substitutes and the acceptance of lower clinker products within the market and regulatory framework. These measures are therefore proposed as an important element within a broader package of measures to increase the sus- tainability of the cement sector in Zimbabwe (see Annex V). The main GHG emission from fertilizer production in Zimbabwe is nitrous oxide (N2O).The gas is produced from nitric acid generated during the production of ammonium nitrate fertilizer. Use of nitrous oxide abatement technology is ex- pected to reduce nitrous oxide emissions from ammonium nitrate production by up to 80%. Technical feasibility analysis supported by the German Federal Minis- try for the Environment, Nature Conservation and Nuclear Safety (BMU) Nitric Acid Climate Action Group (NACAG) has identified the potential to install sec- ondary catalyst technology at the facility, which could result in N2O emissions abatement of around 80%. Globally, the iron and steel industry is the largest industrial source of CO2 emis- sions due to the energy intensity of steel production and its reliance on carbon- - 15 - based fuels and reductants (primarily coking coal).5 Although currently there is low output from the steel industry in Zimbabwe a return to large scale production within the next decade, as assumed in the BAU scenario, based on the integrated blast furnace to basic oxygen furnace(BF-BOF) steelmaking route would result in a large increase in process emissions. Currently, the main route to reducing non-energy emissions from BF-BOF steelmaking is to substitute coke input with biomass (IPCC, 2006)6. Studies esti- mate that CO2 emission reductions of up to 1.3 kg/kg steel may be possible with 100% coke substitution (Norgate and Langberg, 2009)7, equivalent to abatement of around 80-90% of total process emissions. However, technical factors currently limit the use of biomass in large blast furnaces to 20%. The use of a processed type of biomass with better mechanical properties, known as bio-coke, is currently under development and could enable larger substitution rates over the longer-term. Only biomass feedstock from crop residue8 or sustainably managemed forests will be considered for bio-coke production. Production of ferrochromium (FeCr) is an energy-intensive industry involving a high consumption of coking coal. The GHG intensity of FeCr production from modern closed furnaces deploying best available technology (BAT) can be up to half as that from older facilities using open furnaces. It is expected that a phased replacement of existing open furnaces in Zimbabwe’s ferroalloy sector with mod- ern closed furnace technology employing BAT could deliver significant energy savings and GHG reductions. Similar to iron and steel, there is also the potential to replace the carbon content provided by coking coal with sustainable biomass alternatives such as io-coke, resulting in significant reductions in IPPU emissions. This has been estimated, based on similar assumptions for substitution in steel making.

  16. 5 Carbon is supplied to the blast furnace mainly in the form of coke produced from metallurgical grade coking coal, but can also be in the form charcoal made from wood or other forms of carbon. Carbon serves a dual purpose in the iron making process, primarily as a reducing agent to convert iron oxides to iron, but also as an energy source to provide heat when carbon and oxygen react exothermically. 6Reporting Guidelines for National GHG Inventories: IPPU Chapter (IPCC, 2006).

  17. 7 Environmental and Economic Aspects of Charcoal Use in Steelmaking. In ISIJ International 49(4):587-595. T.Norgate and D.Langberg, 2009.

  18. 8 Biomass from coffee, cotton or tobacco crop residues, straw or cleared invasive allien species like Lantana camara, Water hyacinth will be used - 16 - Table 4-2: List of mitigation measures for Zimbabwe LEDS in IPPU Sector Category Mitigation measure Principal mitigation effect Increased clinker substitution with fly ash (up to 16% by Increasing the content of clinker substi- Cement pro- 2030, 20% by 2050). tutes within cement products reduces CO2 duction Increased clinker substitution emissions associated with clinker produc- with BFS (up to 16% by 2030, tion. 20% by 2050). Fertiliser Selective De-N2O catalyst results in Decomposition of N2O emis- abatement of approximately 80% of all (nitric acid sions through use of a second- N2O emissions produced during nitric acid production) ary catalyst. production. IPPU Replacement of up to 50% fossil carbon Substitution of coke input to input by sustainable biomass supply (start- Iron and steel BF/BOF steel making with ing at 20% in 2025, rising to 50% by bio-coke . 2040) results in large reduction in IPPU emissions. Replacement of up to 50% fossil carbon Substitution of coke input to input by sustainable biomass supply (start- Ferrochromi- FeCr-production with bio- ing at 20% in 2025, rising to 50% by um production coke. 2040) results in large reduction in IPPU emissions. Figure 4-3 summarises the estimated emissions reduction potential in 2030 for the IPPU mitigation options identified in the Table 4. In terms of overall mitigation contri- bution, N2O decomposition from nitric acid production accounts for half of the estimat- ed mitigation potential of approximately 320ktCO2e in 2030. Coke substitution within the metals industry (iron and steel and ferrochromium production) account for the ma- jority of the remaining mitigation potential. Figure 4-3: GHG emissions mitigation within IPPU, 2030 (MtCO2e) - 17 - The estimated contribution from these key mitigation options over the long-term to 2050 is shown in Figure 4-4 The projections show that with the implementation of all mitigation measures, total emissions could be limited to around 1.3 MtCO2e in 2050, compared to 2.5 MtCO2e under BAU representing around half of total IPPU emissions. The future recovery of industrial activity in Zimbabwe over the coming decade will clearly determine the pathway of BAU emissions as well as the feasibility of imple- menting different mitigation options. Investment in new equipment, plant and practices offers an opportunity to build in low carbon options and cost-effective energy saving technologies. Subject to accessing finance and (in the case of cement) overcoming non-economic bar- riers, cost-effective mitigation could be achieved within fertiliser production and cement production based on already well-established abatement technology. The GHG emis- sions abatement within the metals industry is uncertain. This uncertainty arises from the outlook for these sectors in Zimbabwe, the types of technology used and the inability of the measures such as coke substitution to be economically viable over the coming dec- ades. Figure 4-4: GHG emissions projections from IPPU under BAU and with mitiga- tion 4.3 Economic Analysis Figure 4-5shows the marginal abatement cost curve for the IPPU sector. The figure shows that around half of the mitigation potential could be achieved at low or negative cost. Subject to materials being available and non-economic barriers overcome, clinker substitution can result in a reduction in both industrial process emissions and production costs (see Annex V). Application of secondary catalytic technology to N2O emissions - 18 - from nitric acid production is a proven technology delivering large emissions reductions for a relatively low capital cost. The economics of reducing emissions through the use of coke substitution will be largely determined by the relative costs of biomass fuels for example, bio-coke – and metallurgical coking coal. Figure 4-5: Marginal abatement cost curve for IPPU, 2030

  19. 4 Roadmap of Actions Figure4-6 shows a summary timeline for the development and implementation of each of the actions proposed to implement the LEDS in the IPPU sector. - 19 - Figure4-6: Timeline of mitigation actions to support NDC implementation within IPPU Note: MRV = Monitoring, Reporting and Verification; EMS = Energy Management System - 20 -

  20. 5 Agriculture, Forestry and Other Land Use 5.1 Business-as-usual Emissions The total annual GHG emissions for the country sum up to 22.0 MtCO2e,which consti- tutes 0.045% of the global emissions (GoZ, 2015). The TNC reported the total carbon stock, not the stock change. In the TNC enteric fermentation contributed the second highest GHG emissions (19.5%) after the energy industries (24.8%). In the LEDS de- velopment, forest loss data obtained from the Global Forest Change (GFW, 2019), as proxy data to estimate emissions from deforestation which employs an efficient algo- rithm for tiling cloud free Landsat images to produce up to date estimates of conversion from forest to non-forest. It is important to note, that GFW does distinguish between anthropogenic and natural conversion from forest to non-forest. In 2018, GHG emissions from AFOLU amounted to 15.8 MtCO2e.The emissions from conversion of forest to non-forest land amounted to 3.20 MtCO2e, while the agricultural sector contributed 12.59 MtCO2e (80%) (Figure 5.1). Figure 5-1: GHG Emissions from AFOLU Emissions from Deforestation Zimbabwe has not yet taken a final decision on its forest definition, inter alia consider- ing crown cover. The preliminary agreement is to use a crown cover of 10%, which was used for the further analysis. The emissions from forest degradation are not quantified. While the emissions may be significant, it has proven to be difficult to appropriately quantify the related activity data. For the determination of historic emissions (e.g. reference period of 10 years), very high-resolution imagery is not available. Attempts to quantify the emissions from degradation using Landsat imagery have proven to be inaccurate. Therefore, the emis- sions from forest degradation are not quantified. GoZ may develop capacities for the monitoring of forest degradation, once higher resolution imagery is available also for the historic reference period. - 21 - For the BAU scenario, following the Forest Carbon Partnership Fund (FCPF) meth- odological Framework, a historic reference period of ten years (i.e. 01/2009 to 12/2018) was applied. The changes shown in Figure 5.2 were attributed to emissions from deforestation, as well as the effects of the improvement in accuracy of the GFW algorithm. As a result, the shifting average approach was used to calculate the ten year average.as the GFW algorithm underwent updates resulting in significant in- crements in the accuracy. The updates are only applied for new images. This leads to reporting of deforestation, which was not detected before, which may partly explain the jumps in Figure 5.2. Hence, the LEDS development process considers the 10- year average as BAU scenario was considered. Note :this data does not distinguish between anthropogenic and natural deforesta- tion (cp. Harris et al. 2018) and hence is used as proxy in the absence of a Forest Reference Emission Level. Figure 5-2: Annual Emissions from Deforestation The approach taken to developing a BAU projection for each contributing sub-sector is summarized in Table 5. - 22 - Table 5-1: Summary of the approach to BAU AFOLU projections per IPCC Cate- gory Sub- Assumptions Sector Category sector Methodology. Increase in agricultural 3A1 Enteric fermentation Provided a forecast of the GDP GDP expected for the for the agricultural sector. period 2020-2050 The relation GDP agriculture Significant correlation (based on constant prices) and exists between agricultural GHG emissions of livestock GDP and livestock popula- 3.A based on historic data for the tion up to 2050. Live- stock period 1990 – 2018 was as- 3A2 Manure sessed No significant change is Management Considering the correlation co- expected in CH4 to live- efficient and the GDP forecast stock population relation- up to 2050, livestock popula- ships between the 1990- tions and GHG emissions from 2018 and the 2020-2050 2020 to 2050 were projected. period. Considering a forest definition Future emissions corre- with a minimum threshold of spond to the historic ten- Forest Land crown cover of 10%, historic year average. 3.B converted to data for the period 2009 to Land other land use 2018 was used to derive an 3. Agriculture, average GHG emission esti- Forestry and mate per annum. Other Land It is assumed that the emis- Use sions of agricultural soils depend to a large extent on the intensification of agri- cultural productivity linked 3C1 biomass to fertilizer application. burning Consequently, the devel- opment of the emissions of aggregate sources are 3C modelled using ZIMRA’s Aggre- GDP forecast for the agri- gate cultural sector. sources 3C2 Liming 3C3 Urea ap- plication 3C4-5 direct and indirect emissions from Based on historic data for the managed soils period 1990 – 2018. 3C7 Rice culti- vation Figure 5-3 shows the GHG emissions for deforestation and agriculture from 2000 pro- jected to 2050 under the BAU scenario. Based on forecasts provided by ZimStat, GDP growth projections indicate period of strong growth of agricultural productivity up to 2034. From 2034, the agricultural GDP is projected to slightly decrease to 2050, as the economy’s other sectors become more developed. - 23 - Figure 5-3: GHG emissions from AFOLU, historic and projected under BAU 5.2 Mitigation Measures Deforestation is one of the most severe environmental problems in Zimbabwe (GoZ, 2017) Annual forest area loss was estimated at 32,000 ha per annum for the period

  21. 2009-2018 (based on crown cover of 10%). Furthermore, forest degradation that is largely driven by the same factors causes many environmental problems such as in- creased soil erosion, depletion of water resources, and changes in microclimates. Table 5.2 summarizes the mitigation measures identified by stakeholders for the forestry and agriculture sector. The detailed analysis is provided in Annex VI and Annex VII. Figure 5-4: Estimated mitigation potential from forestry - 24 - Table 5-2: List of mitigation measures for Zimbabwe LEDS in the AFOLU Sector Cat- Sector Mitigation measure egory Principal mitigation Improved feedstock reduces CH4 emissions from enteric Feedstock improvement fermentation. Increases SOC stock (provided by International Maize and Wheat Improvement Centre (CIMMYT)). 3.A Reduced GHG emissions from machinery provided Live- Conservation Agriculture CIMMYT stock Economic impact of maize mucunaintercropping, provided by International Crops Research Institute for the Semi-arid tropics (ICRISAT). A set of policies and initiatives to reduce net deforestation to 0.5%by 2035: National tree planting programme. Tobacco regulations requiring the use of dedicated energy plantations for tobacco drying. 3. Agri- Reduction of deforestation Sustainable tobacco initiatives, implemented by tobacco cul- companies. ture, Tobacco Wood Energy Programme, proposed by the Forest- For- ry Commission. estry 3.B Reduction of prescribed burning assisting natural and Land Improved enforcement of national forest legislation. Other Improvement of AGB+BGB carbon stocks in fruit tree plan- Land Fruit Tree planting tation and provision of alternative income streams to reduce Use pressure on existing forests. Increase planting of commercial forests increases the ABG and BGB carbon stocks; Commercial Forestry The storage in long term harvested wood products may re- sult in additional GHG emission reductions not quantified. 3C Ag- gre- Reduction of prescribed gate burning sourc Reduces CH4 and N2O emissions from burning biomass in es savannah, shrub land and grassland. Figure 5-4 summarizes the estimated GHG abatement potential by 2030 for all identi- fied mitigation options. The results indicate that conservation agriculture may provide an important contribution to reducing the Zimbabwe’s overall emissions. CA is a prac- tice, which has implications on different GHG sources /carbon sinks. It increases SOC stocks, reduces fuel consumption by machinery, through the improvement of animal feed, reduces the emissions from enteric fermentation and may also reduce direct and indirect emissions from fertilizer application. - 25 - Figure 5.4: GHG emissions projections from AFOLU under BAU and with mitiga- tion While conservation agriculture is a well proven solution in Zimbabwe, there could be further benefits in the future in transitioning from Conservation Agriculture practices into increasingly regenerative agriculture practices. It is expected that farmers that have already taken up some or the full package of Conservation Agriculture measures will be ready to convert to more effective practices for restoring degraded land. Where relevant, this may include agro-forestry, tree-intercropping, silvo-pasture and improved grazing management strategies for land regeneration and associated increase in SOC stocks along with agro-forestry based carbon sequestration. - 26 - Figure 5-5: AFOLU GHG Abatement by Mitigation Measure It is important to note that, commercial forestry may easily accommodate biomass ener- gy demand of cement and ferrochromium mitigation measures specified under Chapter 4 and Annex V. The cement sector specifies an average annual energy demand from alternative fuels in the amount of 227.8 TJ, which could be met by 1,142 ha of short- term rotation plantations.

  22. 3 Economic Analysis Figure 5.6 illustrates the marginal abatement cost curve of the AFOLU Sector in which all abatement options are sorted in ascending order of marginal abatement cost. As dis- cussed in Chapter 2, MACCs are based on an economic analysis. Specifically for forest- ry operations, applying an economic discount rate is a decisive factor. Figure 5-6: Marginal abatement cost curve for AFOLU, 2030 Interestingly, 80.22% of the mapped abatement potential allows reducing GHG emis- sions while increasing economic wellbeing at a discount rate of 6% per annum. Howev- er, it is important to note, that not even the most attractive activity (commercial forestry, with MAC of -239.35 USD) is financially viable with the current lending rate. 5.4 Roadmap of Actions Figure 5-7shows a summary timeline for the development and implementation of each of the actions proposed to implement the LEDS in the AFOLU sector. - 27 - Figure 5-7: Timeline of mitigation actions to support LEDS implementation within AFOLU - 28 -

  23. 6 Waste 6.1 Business-as-usual Emissions In 2006 the Waste sector contributed 0.75MtCO2e (3.42%) to the national GHG 22.0MtCO2e. In Zimbabwe GHG emissions from the Waste sector mainly arise from solid waste disposal sites (SWDS) and wastewater treatment in urban areas. Biological treatment of solid waste, waste incineration and open burning of waste do not contribute much to the GHGs in Zimbabwe, and data on these waste management practices is scanty. The main gases produced from waste handling are CH4, CO2 (fossil origin), N2O, NOxs and non-methane volatile organic compounds (NMVOCs) (IPCC, 2006). The TNC only covered CH4 from the Waste sector. Solid waste management was a key category (excluding LULUCF) in 2006 and contributed 2.91%, while emissions from wastewater were 0.53% of the national total (GoZ, 2016). Greenhouse gas emissions from waste incineration and open burning of waste were not estimated in the TNC due to lack of activity data. The main climate change mitigation action cited in the TNC was integrated waste management, and to a lesser extent, waste to energy(GoZ, 2016). The main policies and strategies that relate to waste management in Zimbabwe include; the National Climate Policy (see Section 3.4), National Climate Change Response Strat- egy (see Section 3.3.4), National Environmental Policy and Strategies, Integrated Solid Waste Management Plan. The main activity drivers for waste in Zimbabwe are population growth, urbanization, GDP, unsustainable consumption and poor waste management practices. Waste projec- tions were based on population growth. The mitigation options proposed in this strategy focus on Landfill gas (LFG) flaring and composting. A waste collection rate of 80% was assumed to be achieved in 2020 and later increasing progressively to 100% by 2050. The involvement of corporates and small and medium enterprises remains critical in all aspects of solid waste management. Under BAU, GHG emissions from solid waste and wastewater are projected to grow from around 1Mt/yr in 2020 to around 2.5Mt/yr in 2050 (Figure 6.1). The emissions from wastewater are minimal and contribute approximately. 0.56% to the total BAU emissions by 2050. - 29 - Figure 6-1: GHG emissions from Waste, historic and BAU projection to 2050 by source

  24. 2 Mitigation Measures Mitigation measures identified include LFG flaring and composting of solid waste. Cen- tralized composting facilities employing accelerated composting technologies were rec- ommended taking into account the associated public health benefits. Although solid waste recycling was recommended in the Zimbabwe’s Integrated Solid Waste Manage- ment Plan of 2014, the option was not considered in the LEDS as a climate change mit- igation option in view of its limited effect in reducing GHG emissions from the Waste sector. Methane flaring from wastewater was not considered due to its limited applica- tion and unavailability of related data in Zimbabwe. Waste to energy was recommended for the cement industry as off taker. The related mitigation measures are included in the Energy section, Chapter 3. The Waste sector CDM tool, Version 02.0.0, was used for climate change mitigation modelling for the Waste sector. The tool provides procedures for calculating CH4 emis- sions from SWDS or prevented from SWDS9. The tool was developed for methane emissions mitigation from existing SWDS. The tool can be applied for mitigation of emissions from LFG flaring or avoided emissions from composting (UNFCCC, 2013). The existing SWDS from Harare, Bulawayo, Mutare and Gweru were considered. . Methane gas flaring LFG gas flaring is achieved through the combustion of gases produced from waste de- composition. Over 98% destruction of organic compounds from LFG can be achieved through the use of open or closed flares. Open flame flaring is cheaper and easier to operate, although it presents challenges in the control of the process. Enclosed flares, though expensive, provide better combustion efficiencies and control of LFG flaring. The Waste sector LEDS mitigation action assumes that LFG flaring will be conduct- ed in the SWDS. It was assumed that 72.6% of the methane generated would be col- lected and flared. The methane flaring projects will be implemented in one city after 9https://cdm.unfccc.int/methodologies/DB/SU1HDJCPVB9QB8D54SGUARSQVLTJUG - 30 - the other, starting with Harare in 2020, followed by Bulawayo in 2021, Mutare in 2022 and Gweru in 2023. A positive marginal abatement cost of $0.74/tCO2e was obtained from the economic analysis conducted. The positive marginal abatement cost showed that LFG flaring could be justified based on climate change mitigation and not on return on investment. Composting The residual emissions from the 72.6% abated through LFG flaring were targeted to be removed through composting, hence, composting targets avoiding generation of CH4 at SWDS from new waste generated. Figure 6.2 presents the BAU emissions and mitigation option from flaring and com- posting. The marginal abatement cost analysis on an internal rate of return (IRR) of 12.75% revealed that composting is financially viable (Figure 6.3). Figure 6-2: GHG emissions projections from waste under BAU and with miti- gation Solid waste recycling The ISWMP (2014) for Zimbabwe includes the option of recycling. Since recycling addresses waste management activities upstream, the option was not considered in the mitigation analysis in the LEDS. Recycling assists in removing any contaminants from waste so as to render such waste reusable, or returned to the economic mainstream in the form of raw materials. The en- vironmental concerns on recycling include the need to reduce waste at dumpsites. Fi- nancial, economic and social motivation factors for recycling border on reduction in waste handling cost and revenue generation.

  25. 3 Economic Analysis The Waste sector MACC (Figure 6.3) indicates that significant CH4 emissions can be abated through composting, giving financial gains. Further mitigation can be achieved - 31 - with flaring, which gives better mitigation option, but with no financial benefits. Flaring can therefore, be justified entirely on climate change mitigation reasons. Figure 6-3: Marginal abatement cost curve for Waste, 2030

  26. 4 Roadmap of Actions Figure 6-46.4 shows a summary timeline for the development and implementation of each of the actions proposed to implement the LEDS in the waste sector. Figure 6-4: Roadmap for the Waste Sector - 32 -

  27. 7 Bringing it all together 7.1 Summary of BAU and MIT Scenarios Zimbabwe, as a developing country, is projected to experience decades of economic growth with its GDP increasing from 19.6 billion USD in 2020 to 119.1 billion USD by 2050, based on constant prices (ZIMRA, 2019). This corresponds to an increase of 733% over three decades. Economic development is driving Zimbabwe’s BAU emis- sion increment. Since the beginning of its GHG emission inventory reporting in 1998 (Initial National Communication), the GHG intensity of Zimbabwe’s economy has been decreasing. This is also reflected in Zimbabwe’s BAU emission scenario. Figure 7-1 illustrates the ag- gregated BAU scenario up to 2050. The GHG emissions are projected to increase from 36.58 MtCO2e in 2020 to 65.28 MtCO2e in 2050. This corresponds to an increase of 207% over three decades. Figure 7-1: Economy wide BAU Scenario Chapters 3 to 6 describe the mitigation potential from the 38 different mitigation measures identified in the strategy. These mitigation measures have the potential to sig- nificantly reduce Zimbabwe’s GHG emissions below the BAU scenario despite strong forecast economic growth. Figure 7-2illustrates Zimbabwe’s mitigation potential, aggregated according to the IPCC sector classification. The abatement potential is estimated to be up to 33.2 MtCO2e by 2050, which corresponds to around 50% of BAU GHG emis- - 33 - sions in that year. The largest abatement potential is expected from the AFOLU sector (46.9% of the total abatement potential), followed by the energy sector (44.4%), waste (6.1%), and the IPPU (2.7%). Figure 7-2: Economy wide MIT Scenario It is equally important to consider the trends of the mitigation contributions by sector over time. The AFOLU abatement potential is driven by Conservation Agriculture, which leads to a substantial soil organic carbon (SOC) increment in the years following the change of management regime. However, as SOC reaches a new dynamic equilibri- um state, the annual sequestration rates diminish. Figure 7-3: Contribution of top ten mitigation options The energy sector, on the other hand, is dominated by slow turnover rates related to long equipment lifetimes. Mitigation measures such as introducing fuel economy stand- - 34 - ards for the transport fleet or promoting renewable energy projects face comparably small penetration rates, although their abatement potential increases over time. These policies and mitigation technologies play a central role and may contribute substantially towards decarbonisation in the long-term. Figure 7-3 shows the mitigation potentials of the top ten mitigation measures. Conser- vation agriculture is expected to contribute the largest share with 28%, followed by the Batoka hydro power plant (20%). Other renewable energy projects (Devil’s gorge, fur- ther RE measures) may contribute another 8% and 6% respectively. The aggregated mitigation scenario shows the potential to decouple Zimbabwe’s GHG emissions from economic development. Zimbabwe has very low GHG emission levels. Per capita emissions are around 1.82 tCO2e/person compared to the world average of 6.27 tCO2e/person. Figure 7-4 illustrates how Zimbabwe’s mitigation scenario manages to cater for needed economic development while maintaining the country’s total GHG emissions at current levels. Note: Economic development reflects forecast growth in real GDP Figure 7-4: Decoupling Economic Development from GHG Emissions under the MIT Scenario 7.2 Financing Strategy Zimbabwe aims to establish a national low emission development financing strategy in order to achieve low carbon development. This section describes the climate financing strategy framework that supports the ambitious mitigation measures outlined in this strategy. Climate Financing Strategy Zimbabwe’s financial crisis (2015-2019) led to a very high cost of capital (e.g. the prime lending rate amounted to 18% p.a. for 2018). The high - 35 - costs of capital result in investments being made in GHG intensive technologies. These include the purchase of cheap and inefficient vehicles, investments in diesel and coal power plants and use of energy intensive and inefficient equipment. Such decisions are guided by high discount rates, which lead to investment decisions with low capital ex- penditure (Capex) while the high operating expenses (Opex) over the equipment life- time is discounted by high compound interest. In such an environment, a climate financing framework offering concessional lending for low carbon investments can have significant impacts, including: ▪ Improving national economic development; ▪ Improving economic competitiveness in the mid to long-term; ▪ Reducing energy use and import dependency; and ▪ Reducing GHG emissions. Against this background, Zimbabwe’s LEDS reflected by the mitigation scenarios de- scribed in chapters 3 to 6 is closely linked to the development of a Low Emission De- velopment Financing Facility, which offers concessional lending reflecting the SDR. The SDR of 6%, suggested by the World Bank for infrastructure and energy projects in Southern Africa (WB, 2016b), was applied consistently in the analysis. Zimbabwe’s financing strategy is based on the following key elements: also se Figure 7.5): ▪ GHG Mitigation Potential. Abatement options which are predominantly eco- nomically viable, in which benefits (e.g. fuel savings, employment benefits) outweigh costs (e.g. costs of equipment, clean technology and infrastructure) were identified. The sectoral MACCs do not therefore represent all technically possible options, but focus more on economically viable abatement options. The sectoral analyses were undertaken from a socio-economic perspective consider- ing a SDR of 6% and the economic cost of fuel and electricity, among other fac- tors. ▪ Amendment of Policies.. It is envisaged that appropriate policies will guide the private sector to invest in mitigation measures. For example, MEPS will pre- scribe minimum standards for Air Conditioners (ACs) and lighting devices, among others. The private sector would be required to purchase only equipment, which is compliant with these standards (cp. Annex II). ▪ Financing Instruments. To facilitate the implementation of the LEDS, it is es- sential that a suite of suitable financing instruments is available. These must be designed to reduce the gap between the SDR and the commercial lending rate to a level where it becomes financially attractive for the private sector to invest in mitigation measures instead of continuing with BAU practices. According to the analysis if the lending rate is reduced to below 10%, most projects will become financially attractive (Annex IV). ▪ Private Sector Investment. Combining policy amendments with suitable financ- ing instruments will enable the private sector to invest in economically and fi- nancially viable abatement measures. It is therefore envisaged that the bulk of the investment required under the LEDS will be covered by the private sector avoiding further burden on Zimbabwe’s national budget. - 36 - The implementation of this strategy will create a win/win scenario where investments in mitigation measures will result in reduction of GHG emissions by around 50% against the BAU scenario. In the long term the expected increased competitiveness will result in the overall improvement in economic performance, and environmental and social well- being - 37 - Low Emission Development Financing Facility The vision for funding the implementation of Zimbabwe’s LEDS is based on the use of a national, economy wide Low Emission Development financing facility, hosted by the Infrastructure Development Bank of Zimbabwe (IDBZ) and funded by the Green Cli- mate Fund (GCF), with substantial contributions from the GoZ. As of 2019, the IDBZ was in the process of becoming accredited under the GCF. IDBZ started the accreditation process in 2017, submitted its application to the Green Climate Fund early 2019, and was working on the amendment of its application by the end of 2019. The process is estimated to be completed by July 2020. At the same time, IDBZ is working with a team of consultants on the design of a national financing facility. As shown in Table 7-1.1, the mitigation analysis indicates an accumulated investment need of 6.3 billion USD by 2030 to support the implementation of economically viable abatement activities. Table 7-1: Summary of Investment Needs MACC Accumulated In- NPV (in M No Mitigation Measure (in USD/ vestment Need up USD) tCO2e) to 2030 (in M USD)

  28. 1 On-farm biogas 175.01 -28.98 82.95

  29. 2 Solar pumping for irrigation 517.32 -94.44 378.98

  30. 3 Off-grid solar electrification 88.81 - 138.46 250.89

  31. 4 Energy Efficient lighting 106.68 -224.34 4.00

  32. 5 Rooftop solar (commercial) 128.43 -216.02 40.00 Minimum Energy Performance Stand- 39.31 -98.54 18.64 6 ard

  33. 7 Solar LED street lighting 25.12 -86.69 20.76

  34. 8 Solar water heaters 489.69 -144.45 90.08

  35. 9 Reactive Power Correction 123.96 -28.76 36.06

  36. 10 City of Harare-Mbarebiogas plant 0.15 -26.55 0.26

  37. 11 City of Bulawayo biogas plant 2.91 -24.83 3.30

  38. 12 City of Harare-Firle biogas plant 11.62 -24.79 13.20

  39. 13 Devil's Gorge 238.36 -3.95 2,250.00

  40. 14 Batoka hydro 1,123.65 -6.20 2,600.00

  41. 15 Solar IPPs - 1.91 4.74 13.28

  42. 16 Rural Electrification Fund micro-grids -0.14 10.85 2.66 Zimbabwe Power Company solar -96.61 11.02 354.00 17 plants Unspecified Renewable Energy pro- N.A. -1.91 - 18 jects

  43. 19 Energy efficiency programme 1,779.48 18.24 341.17

  44. 20 Electric motors (mining) 0.83 -8.01 0.32 National Railways of Zimbabwe Rail Energy -349.47 102.20 801.00 21 electrification

  45. 22 Electric Vehicles -193.81 17.71 367.37

  46. 23 Public transport N.A. 12.00 N.A. Energy

  47. 24 Fuel economy 2,051.67 -100.83 510.87

  48. 25 Biodiesel programme 2.94 -0.92 299.70 - 38 - MACC Accumulated In- NPV (in M No Mitigation Measure (in USD/ vestment Need up USD) tCO2e) to 2030 (in M USD) 12.42 -16.98 0.64

  49. 26 Clinker substitution: fly ash Clinker substitution: Blast Furnace 2.86 - 3.91 9.22

  50. 27 Slag

  51. 28 N2O decomposition - 2.23 0.70 2.84

  52. 29 Coke substitution: Steel - 226.21 25.86 - Waste IPPU

  53. 30 Coke substitution: FeCr -81.96 27.86 -

  54. 31 Landfill Gas Flaring - 31.79 0.74 14.36

  55. 32 Composting Emissions Reductions 25.91 - 2.20 104.51

  56. 33 SWMP - 2.85 1.37 7.33

  57. 34 Reduction of Deforestation N.A. 0.78 42.48

  58. 35 Fruit Tree planting 437.17 -119.77 - 661.34

  59. 36 Commercial Forestry 183.21 - 239.35 - 123.77 AFOLU

  60. 37 Conservation Agriculture 549.83 - 2.13 3.14

  61. 38 Reduction of Prescribed Burning N.A. 3.50 1.31 Total - All Projects 7,130 7,880 Total – Projects with positive NPV 8,116 6,273 The following institutional setup is envisaged: ▪ The financing facility is hosted under the IDBZ, which manages the available funds transparently and according to GCF approved standards. ▪ The facility will comprise loans provided by GCF, Africa Renewable Energy Initiative, the Africa 50 Infrastructure Fund as well as national pension funds ▪ The financing facility also covers grants which provide funding for i) developing bankable feasibility studies (revolving fund); and ii) high priority mitigation measures, which are not financially viable (e.g. a programme to reduce deforestation, implementation of LFG measures, etc.). ▪ If mitigation measures fall under IDBZ’s core mandate (agricultural investment, energy projects), stakeholders may borrow directly from IDBZ. If mitigation measures do not fall under IDBZ core mandate, borrowing will be arranged through the operations of commercial banks (loans for energy efficient equipment, electric vehicles, etc.). Both pathways will result in long-term tenure. ▪ The financing facility will be co-funded by the GoZ, which provides the proceeds of the carbon tax and the tobacco tax. Currently the government is collecting a carbon tax of 3USDc/l on gasoline and diesel. This is equivalent to a weighted average carbon tax of 12.24 USD/tCO2e. The GoZ may increase the carbon tax in the mid and long term. The accumulated tax revenue by 2030 is estimated to 1,282 M USD. This will be complemented by the proceeds of Zimbabwe’s tobacco tax, which is expected to con- tribute 42.48 M USD by 2030 (see Annex X for details on these estimates). The pro- posed Climate Fund will also be used for co-funding by GoZ. ▪ Figure 7.5 shows Zimbabwe’s Low Emission Development Financing Facility setup - 39 - Carbon Tax EMA National Climate Multi- Fund Tobacco Levy GoZ Fund Lateral and Bi-Lateral Climate Funds e.g Grant conces- Change Facility sional Management loans. Waste Department Measures Climate Finance Facility (Loans), Forestry IDBZ Measures Private Sector Commercial Banks Green Energy Economically Provide on-lending Fund viable abatement of concessional measures loan Key Recipients Domestic sources External sources Funds host Facility management Figure 7-5: Financial Intervention Logic It is envisaged that the incorporation of a suitable financing facility will trigger economic de- velopment and related improvements to the livelihoods of Zimbabweans. List of References - 40 -

  62. 8 References African Development Bank (AfDB), 2011. Infrastructure and Growth in Zimbabwe: An Action Plan for Sustained Strong Economic Growth. Tunis, Tunisia. SAPP(nd). ASB0001, Grid emission factor for the Southern African Power Pool, UNFCCC, Bonn, Germany. BLOOMBERG-PLATTS-CITIBANK, 2018. Coking coal price out- look.https://www.businessinsider.com.au/coal-price-outlook-supply-demand- balance-2018-2 CDM EB94, Annex 8, AMS-II.T.: Emission reduction through reactive power compen- sation in power distribution network, Version 1, UNFCCC, Bonn, Germany; CDM EB87, Annex 9, Tool 07 - Tool to calculate the emission factor for an electricity system, Version 5, UNFCCC, Bonn, Germany. RBZ. 2018.Interest Rates. https://rbz.co.zw/index.php/research/markets/interest-rates EBRD, 2016. Low-Carbon Roadmap for the Egyptian Cement Industry. European Bank for Reconstruction and Development, October 2016. Eijck, J. van, Smeets, E., and Faaij, A., 2012. The economic performance of jatropha, cassava and Eucalyptus production systems for energy in an East African smallholder setting. GCB Bioenergy 4, 828-845. Energy Saving Trust, 2017. Guide to charge-point infrastructure for business users. En- ergy Saving Trust, August 2017. FAO, 2003. On-farm Composting Methods. Land and Water Discussion Paper 2. Food and Agriculture Organization of the United Nations, Rome, Italy. FCPF 2016, Methodological Framework, FCPF Carbon Fund, Revised Version, World Bank, Washington, USA; Finealt Engineering , 2016. CDM Project Idea Note: Jatropha Cultivation and Biodiesel Production Project. Submitted by Finealt Engineering 24 February 2016. GFEI, 2019. Prospects for Fuel Efficiency, Electrification and Fleet Decarbonisation. Working Paper 20. Global Fuel Economy Initiative (GFEI) May 2019. Global Forest Watch (GFW), 2019. “High-Resolution Global Maps of 21st-Century Forest Cover Change.” Science 342 (15 November): Hansen, M. C., P. V. Potapov, R. Moore, M. Hancher, S. A. Turubanova, A. Tyukavina, D. Thau, S. V. Stehman, S. J. Goetz, T. R. Loveland, A. Kommareddy, A. Egorov, L. Chini, C. O. Justice, and J. R. G. Townshend.850–53. Data available on-line from: http://earthenginepartners.appspot.com/science-2013-global-forest. Government of Zimbabwe (GoZ), 2009. National Environmental Policy and Strategies. Ministry of Environment and Natural Resources, Harare Government of Zimbabwe (GoZ), 2013. Zimbabwe Agenda for Sustainable Socio- Economic Transformation. Harare: Ministry of Finance and Economic De- velopment, Harare - 41 - Government of Zimbabwe (GoZ), 2015a. Zimbabwe Intended Nationally Determined Contributions (INDCs) Submitted to the United Nations Framework Conven- tion on Climate Change (UNFCCC), Ministry of Environment Water and Climate, Harare Government of Zimbabwe (GoZ), 2015b. Zimbabwe’s National Climate Change Re- sponse Strategy. Ministry of Environment Water and Climate, Harare Government of Zimbabwe (GoZ), 2016. GoZ. Zimbabwe Third National Communica- tion to the United Nations Framework Convention on Climate Change (UNFCCC), Ministry of Environment Water and Climate, Harare Government of Zimbabwe (GoZ), 2017b. Zimbabwe Climate Policy. Minister of Envi- ronment, Water and Climate, Harare Government of Zimbabwe (GoZ), 2017b. Zimbabwe’s NDC Implementation and MRV Framework. Presented at IETA Pavilion, Bonn Zone, 13 November 2017. In- ternational Emissions Trading Association, Geneva Government of Zimbabwe (GoZ), 2002, Environmental Management Act Chapter 20:27, Harare, Zimbabwe GoZ, 2014, Solid Waste Management Plan, Harare, Zimbabwe Government of Zimbabwe (GoZ), 2018a. Zimbabwe National Transport Master Plan, 2018. Government of Zimbabwe (GoZ), 2018b. Climate Smart Agriculture Framework 2018 – 2028. Ministry of Lands, Agriculture, Water, Climate, and Rural Resettle- ment, Harare Government of Zimbabwe (GoZ), 2018c. Towards an Upper - Middle Income Economy by 2030: New Dispensation Core Values. Government of Zimbabwe, Wash- ington DC Government of Zimbabwe (GoZ), 2018d. Transitional Stabilisation Programme Re- forms Agenda. October 2018 – December 2020: Towards a Prosperous and Empowered Upper Middle Income Society by 2030. Government of Zimba- bwe, Harare Government of Zimbabwe (GoZ), 2019a. National Renewable Energy Policy. Ministry of Energy and Power Development, Republic of Zimbabwe, Harare Government of Zimbabwe (GoZ), 2019b. National Biofuels Policy. Ministry of Energy and Power Development, Republic of Zimbabwe, Harare Government of Zimbabwe (GoZ), 2017, Grid Code of Zimbabwe, Harare, Zimbabwe; GoZ-CTCN, 2017. Climate-Smart Agriculture Manual for Zimbabwe, Joint Govern- ment of Zimbabwe and Climate Technology Centre and Network, Denmark Harris, N., Davis., C.,Goldman.,E.D., Petersen., R and Gibbes., S 2018. “Comparing Global and National Approaches to Estimating Deforestation Rates in REDD+ Countries” Working Paper. Washington, DC: World Resources Insti- tute. Available online at wri.org/publication Hof, Andries, Michel den Elzen, AnnemiekAdmiraal, Mark Roelfsema, David Gernaat and Detlef van Vuuren. 2017. Global and regional abatement costs of Nation- - 42 - ally Determined Contributions (NDCs) and of enhanced action to levels well below 2 °C and 1.5 °C, Environmental Science & Policy, no. 71, 30-40. Wolfgang., H, Jürgen, S. and Wolfgang J. 2012. Reactive Power Compensation: A prac- tical guide, Wiley, ISBN: 978-1-119-96778-1. Homann-Kee, T. S, Valbuena, D., Masikati, P., Descheemaeker, K., Nyamangara, J., Claessens,L., Erenstein, O., Van Rooyen, A., Nkomboni, D., 2014, Economic trade-offs of biomass use in crop-livestock systems: Exploring more sustaina- ble options in semi-arid Zimbabwe, Agricultural Systems, 134, 48-60. ICCT, 2014. Costs and Benefits of China 5/V and 6/VI Standards in Guangdong Prov- ince. The International Council on Clean Transportation. Working paper 2014-6, June 2014. IEA/CSI, 2009. Cement Technology Roadmap. International Energy Agency/WBCSD Cement Sustainability Initiative (CSI). Paris. IPCC 2006., 2006 IPCC Guidelines for National Greenhouse Gas Inventories, Prepared by the National Greenhouse Gas Inventories Programme, Eggleston H.S., Buendia L., Miwa K., Ngara T. and Tanabe K. (eds). Published: IGES, Japan. IPCC/TEAP. 2005. Bert Metz, Lambert Kuijpers, Susan Solomon, Stephen O. Ander- sen, Ogunlade Davidson, José Pons, David de Jager, Tahl Kestin, Martin Manning, and Leo Meyer (Eds). Cambridge University Press, UK. pp 478. Cambridge, England. Masami,K.and Trimble, C. 2016. Political economy of power sector subsidies: A re- view with reference to Sub-Saharan Africa, African Renewable Energy Ac- cess Programme, World Bank, Washington, USA. Masami, K., Bacon,R. and Trimble, C. 2014. Making Power Affordable for Africa and viable for its utilities, African Renewable Energy Access Programme. World Bank. Washington, USA. McKinsey & Company. 2009. Pathways to a Low-Carbon Economy: Version 2 of the Global Greenhouse Gas Abatement Cost Curve. http://www.mckinsey.com/clientservice/ccsi/pathways_low_carbon_economy .asp. Meltzer, J. 2018. Blending Climate Funds to Finance low carbon, climate resilient infra- structure, Working Paper 120, Global Economy and Development, Brook- lings. Michaelowa, A. 2012. Strengths and weaknesses of the CDM in comparison with new and emerging markets. CDM Policy Dialogue. University of Zurich, Switzer- land. Asami, M., and Merven, B. 2013. Southern African Power Pool: Planning and Prospects for Renewable Energy, IRENA Innovation and Technology Centre. National Renewable Energy Laboratory (NREL), 2018. 2018 ATB Cost and Perfor- mance Summary. Accessed online July 2019.: https://atb.nrel.gov/electricity/2018/summary.html Ndong,R., Montrejaud-Vignoles, M. Girons, O. S., Gabrielle, B. Pirot, R. Domergue, M. and Sablayrolles, C. 2009. Life cycle assessment of biofuels from Jatropha - 43 - Curcas in West Africa: a field study. Plant Environment Interaction, 1,197- 210. Powlson, D.S., Stirling, C.M., Thierfelder, C, Whited, R. P and Jate, M.L., 2016, Does conservation agriculture deliver climate change mitigation through soil car- bon sequestration in tropical agro-ecosystems? In Agriculture, Ecosystems & Environment, 220, 164-174. Rahman, S., Larson, D.F., and Dinar, A. 2015. Cost of Greenhouse Gas Emissions Abatement under the Clean Development Mechanism. Climate Change Eco- nomics, 6-1, World Scientific Publishing Company. SAPP. 2017. Southern African Power Pool Plan 2017. Southern African Power Pool. Harare, Zimbabwe. SITRA, 2019. Information on Bogota Bus Rapid Transit (BRT) project. The Finnish Innovation Fund (SITRA).: https://www.sitra.fi/en/cases/bus-rapid-transit/ . Randall, S.F., ,Sentala, M.,Yamba, F., SLukewsa, B.,Himunzowa,G.,Heaps, C.,Chapman, A.,Mahumane, G.,Tembog, B.,Nyambe, I. 2016. Electricity supply and demand scenarios for the Southern African Power Pool. Southern African Power Pool, Harare. Martin; S., Castro, P.,Michaelowa, A. 2011. Mobilizing private finance for low carbon development, Climate Strategies, Cambridge. Prasad, T.,Shkaratan, M., Izaguirre, A.K.,Helleranta, J.,Rahman, S., Bergman, S. 2009. Monitoring Performance of Electric Utilities - Indicators and Benchmarking in Sub-Saharan Africa, Report Nr 69562, World Bank, Washington, USA. Trimble, C., Masami K., Ines P.K., Farah M. 2016. Financial Viability of Electricity Sectors in Sub-Saharan Africa: Quasi-Fiscal Deficits and Hidden Costs. Poli- cy Research Working Paper; No. 7788, World Bank, Washington, USA. United Nations Environment Programme (UNEP), 2016. Motor Vehicle Inventory for LDVs in Zimbabwe: data provided under the Global Fuel Economy Initiative (GFEI). UNFCC, 2013 ….. UNFCCC, 2015. The Paris Agreement. United Nations Framework Convention on Cli- mate Change. https://unfccc.int/resource/docs/2015/cop21/eng/l09.pdf, Ac- cessed date: 31 December 2019. Van Dorp, M., 2013. Economic feasibility of Jatropha production and processing: A calculation model for business case development by small producer organiza- tions (SPO). Supported by the Global Sustainable Biomass Fund, Nether- lands. Van Eijck, J., Smeets, E., and Faaij, A., 2012. The economic performance of jatropha, cassava and Eucalyptus production systems for energy in an East African smallholder setting. GCB Bioenergy 4, 828-845. VDZ, 2019. Analysis of clinker production costs. Accessed July 2019.https://www.vdz- online.de/uploads/media/EU_ETS_Charts_EN.pdf WBCSD CSI (2016) ‘Getting the Numbers Right’ (GNR) database. :https://www.wbcsdcement.org/index.html - 44 - World Bank, (WB) 2018, World Development Indicators - Electric power transmission and distribution losses, https://data.worldbank.org/products/wdi; World Bank (WB). 2016. State and Trends of Carbon Pricing 2016 (October), by World Bank, Washington, DC. World Bank (WB). 2016b. Discounting Costs and Benefits in Economic Analysis of World Bank Projects, World Bank, Washington, USA; Zimbabwe Energy Regulatory Authority (ZERA), 2015, Notification on the Introduc- tion of a Reactive Energy Charge (Draft), Harare, Zimbabwe; Zimbabwe Revenue Authority,(ZIMRA) 2017, Value Added Tax Act, Harare, Zimba- bwe. Zimbabwe Electricity Transmission and Distribution Company (ZETDC), 2017. System Development Plan. June 2017. ZETDC, Harare, Zimbabwe. Zimbabwe Electricity Transmission and Distribution Company (ZETDC), 2014, Elec- tricity Tariff, effective since September 2014; Electricity Act, Section 53 (Chapter 13:19), Harare, Zimbabwe. - 45 -

  63. 9 Appendices

  64. Annex I: Reduction of Technical Losses in the Transmission- and Distribution System This sectoral analysis investigates the emission reduction potential due to Reactive Power Compensation as means to reduce the load dependent technical losses of the transmission and distribution (TD) system. The implementation shall be supported through a regional Article 6 Pilot Programme, which is currently being negotiated be- tween the German Federal Ministry for the Environment and the Government of Zim- babwe and three other Sub-Saharan African countries. Discussion of Key Parameters Real power, apparent power and reactive power Electric power comprises two components, real power (measured in kilo Watts (kW)), which produces work, and reactive power (measured in Kilo Volt Ampere Reactive (kVAr)) necessary to generate magnetic fields specially required for rotating electrical equipment. The two components together constitute the apparent power measured in Kilo Volt Ampere (kVA). The ratio of useful power (in kW) to total power (in kVA) is known as Power Factor (PF) which range from 0 to 1, while typical industrial power factors range from 0.4 to 0.9 (Hofmann et al, 2012). Apparent power losses due lack of reactive compensation at the demand side A utility must generate apparent power (kVA), which includes reactive power that in- creases if customers are operating equipment with a low power factor. Therefore, if the transmission and distribution (TD) system is hampered by high technical losses part of the apparent power is lost. Information on technical losses in TD systems in Africa is scarce. Tallapragada et al. (2009) conducted a benchmarking exercise of Sub-Saharan Africa (SSA) power utili- ties. Eleven companies reported their technical losses (i.e. transmission and distribu- tion), and the average amounted to 11.54% of total apparent power. The World Bank (2018) reports total losses averaging 25.48% (including losses due to theft) for 31 out of the 50 SSA countries. In general, low power factors lead to high-energy losses and therefore unnecessary GHG emissions. A common reason for poor power factor is oper- ation of inductive loads such as motors at less than their rated capacity. Power factor correction occurs when customers generate their own reactive power for inductive loads from capacitor banks as depicted in Figure 9-1. Reactive Power Compensation equipment The objective of installing Reactive Power Compensation (RPC) equipment at the premises of a Maximum Demand (MD) electricity customer is to reduce the reactive power to be supplied by the TD system thereby reducing the technical losses. Typically, - 46 - equipment is installed after the utility meter, i.e. downstream. RPC equipment consists of: ▪ A capacitor bank which stores reactive power, instead of sending back onto the TD system; ▪ A high-speed switch, e.g. a thyristor control, which allows the dispatch of reactive power downstream as needed. The capacitor bank and the switch are built into one unit with appropriate cooling (ac- tive/passive depending on size of the RPC equipment needed). Incentives for reactive power compensation The electricity tariffs of large electricity customers typically include a financial incen- tive to reduce reactive power demand or for improving power factor through reactive power compensation. Large electricity customers (customers with a peak demand, for example those above 300 kVA) operate under a MD tariff. The tariff foresees payments for i) power consumed (i.e. kWh/month) and ii) a maximum demand charge, which is typically related to the highest power offtake (in kVA) over a defined period, for exam- ple a 30-minute period for one month. Figure 9-1: Concept of Reactive Power Compensation - 47 - Political economy / weak financial standing of utilities leads to lack of investment in TD system Under optimal conditions power utilities would install RPC equipment at their substa- tions, thus reducing the load and hence the technical losses of the TD system. Invest- ment in , cost-efficient maintenance systems and upgrading of the TD systems is low in SSA. This may be attributed to technical and financial constraints and to some extent due to non-cost reflective tariffs. A World Bank study (Trimble et al., 2016) investigated cost reflectiveness, comparing the operational and capital expenditures of generation and distribution with the average price of kWh billed for 39 Sub-Saharan African countries from 2010 to 2015. The re- sults indicate that only two countries (i.e. Seychelles and Uganda) operate on cost re- flective terms recovering both, operational- and capital expenditures. The cash collected in 19 countries barely covers operational expenditures, but is insufficient to cover any significant new capital layout. Hence, many SSA countries suffer from poor TD infra- structure and resultant technical losses. GHG accounting elements of an RPC programme The proposed RPC programme makes use of GHG accounting elements from methods designed and internationally recognized and approved for the UNFCCC Clean Devel- opment Mechanism: • An approved Clean Development Mechanism methodology, AMS-II.T.: Emission reduction through reactive power compensation in power distribution network, Version 1 (CDM EB94, Annex 8) to quantify the baseline emissions and emis- sion reductions due to power factor improvements; • Based on the grid expansion pathway of the mitigation scenario, the specific grid GHG intensity over time was determined (i.e. tCO2/MWh, per year). • A consideration of the forecast of electricity demand as harnessed for Zimbabwe’s power system planning was made, assuming that technical losses and the sys- tem’s weighted average power factor remains constant, while the system ex- pands. • . The GHG reduction potential from RPC intervention was determined by; i) selecting those interventions which have a Payback-Period (PBP) below the lifetime of the equipment, and ii) disregarding the cost of finance in the economic analysis. Applying UNFCCC approved methodologies ensures a consistent, transparent and re- producible estimation of GHG emissions. Sectoral Abatement Potentials Data sets and data treatment For analysing the sectoral abatement potentials, the Zimbabwe Electricity Transmission and Distribution Company (ZEDTC) provided the data for use in analysing sectoral abatement potentials. Table 9-1: Overview on Data Set provides an overview on the - 48 - country data set. In total, RPC interventions at 14,260 customers using 19,923 data points was assessed. Table 9-1: Overview on Data Set No of Data Points 10,932 Distribution Customer No of Customers 841 No of Data Points 107 Transmission Customer No of Customers 14 Where data sets exhibited gaps and/or inconsistencies, the data was treated as follows: ▪ For all customers, where kWh was available, but kVArh was missing, kVArh was estimated using the average PF; ▪ For all customers, where kVArh was available, but kWh was missing, kWh was estimated using the average PF; ▪ For all Medium Voltage (MV) customers, where the data set indicated a load fac- tor above 1, the peak demand was recalculated using a default load factor of 0.6; ▪ Literature indicates that lowest power factors are around of 0.4 for certain indus- tries (Hofmann et al, 2012). For all customers where the data showed a PF<0.3, this was assumed to be a metering error. Hence, for those customers, thekVArh was calculated based on minimum PF of 0.3, which is conservative; ▪ Customers which had only peak data were removed from the database. Technical losses The determination of technical losses is essential for the overall estimation of abatement potentials, as it allows the determination of losses (reactive power) at a given power factor. The TD loss figures for Zimbabwe were made available by Zimbabwe Electricity Regulatory Authority (ZERA). Table 9-2: Technical transmission- and distribution Losses Transmission Losses Total Technical Losses Technical Distribution Losses (in %) (in %) (in %) 3.27% 15.58% 19.36% Technical transmission losses of the transmission network amount to 3.3% while the losses of the distribution system amount to 15.58% as shown in Table 9.2. Consequent- ly, 19.36% of reactive power supplied to the final customer is lost(year). Average power factors - 49 - The weighted average PF for distribution customers10 was 0.85, whereas the weighted average PF for transmission customers11 was 0.90. The weighted average PF is always higher than the average PF. Table 9-3: Overview Power Factors in selected Countries Average PF 0.79 Distribution Customer Weighted average PF 0.85 Average PF 0.85 Transmission Customer Weighted average PF 0.90 Determining equipment size and costs per customer Complementing the CDM methodology, the appropriate RPC equipment size (in kVAr) based on a customer’s power demand and its power factor was determined as follows: Where: Reactive power, in kVAr; Average power, in kW; Power factor prior to reactive power compensation; i.e. original PF Power factor after reactive power compensation i.e. target PF. Equation 9.1: Determination equipment size and costs per customer Economically available abatement potentials Technical losses in the transmission and distribution system amount to 19.36% (i.e. without theft). The results indicate that the economically viable RPC potential would lead to reduction of technical, load dependent losses in the amount of 175 GWh/yr. The reduction of energy losses enables the utilities to sell more power using the same gener- ation capacity and the same amount of fuel. In the short term, this could improve power utilities / power distribution company cash flow. Zimbabwe has a tariff methodology in place which considers system losses to determine cost of electricity.The reduction of technical losses could aid in lowering the cost of electricity or avoid the need to increase electricity tariffs. Table 9.4 provides a summary of some of the benefits of RPC introduction. 10 Distribution customers are those, which are directly connected to typical distribution voltage levels of the grid system. 11 Transmission customers are those, which are directly connected to typical transmission voltage levels of the grid system. - 50 - Table 9-4: Savings from TD loss reduction measures Energy Saving Energy Cost Reduction of Total Savings Emission (MWh/yr.)174,776 Saving MD Charges ( Investment Reduction (USD/yr) SD/yr.) Potential Potential (USD) 4,879, ( tCO2/yr.) 17,477,600 106,511 22,357,472 15,302,485 According the results in Table 9.4, the project is economically viable with a simple pay- back period of approximately 0.7 years. Zimbabwe has a comparatively high prime lending rate, which also may render inter- ventions with short PBP financially unattractive. The prime lending rate indicates the interest rate, at which the premium customer segment may access debt capital from lo- cal commercial banks, some of which re-finance elsewhere. Zimbabwe’s prime lending rates amounts to 18.0% (RBZ, 2018) per annum. Small and Medium Enterprises (SME) are typically not part of the prime customer lending segment in in Zimbabwe and most SSA countries. The high lending rates make RPC interventions financially unviable. A suitable financing instrument is required to unlock the economically viable RPC poten- tial and realize its full benefits for Zimbabwe. Financing Strategy Combining ‘push’ and ‘pull’ components to maximize widespread uptake by private sector The ‘push’ component’ comprises potential amendments of the regulatory framework in Zimbabwe aiming at stimulating subsector-specific investments of the private sector at no cost for the government: ▪ Adjustment of national Grid Codes about higher mandatory power factor provi- sions; ▪ Improvement of the kVA payment structure; ▪ Introduction of a kVArh related scheme of penalty and reward payments. Such amendments could lead to cost efficiency, i.e. parity of generation and energy sav- ing costs (Figure 9-2). In-country stakeholder consultations showed, that regulatory measures are only acceptable for the private sector and implementable along with finan- cial and technical support (the ‘pull’). The fundamental programme funding structure therefore addresses main non-policy barriers to implementation: ▪ High capital cost that prevents investing in RPC energy efficiency by industries, ▪ Insufficient competitiveness compared to companies’ performance targets and ▪ Potential lack of awareness- and technical capacity in the country. - 51 - The ‘pull’ component is low cost finance from domestic commercial lenders. Local cur- rency loans are preferred as exposure to Foreign Currency further increases the cost of capital, the burden of which is almost always placed in the borrower. The low-cost fi- nance is made up of a blend of 3 sources i. carbon (results-based) finance, ii. export trade cover or risk insurance and iii. commercial bank debt, which can be augmented with Development Finance Insti- tutions debt as needed. The blend is essential to achieve the lending rates needed and Export Credit Agency (ECA) support is key as it can significantly reduce the overall cost of funding. ECAs can typically extend up to 85 % of the export contract value for eligible exporters i. as an exporter (supplier’s credit); ii. through a commercial bank in the form of trade related credit provided either to the supplier or to the importer (buyer’s credit); or iii. directly by another export credit agency of the exporting countries. This allows commercial banks to significantly adjust their risk assessment on the finance and thereby lower the cost of lending well below domestic rates. Financing instrument structure Some basic parameters determine the design of the financing instrument. The RPC equipment to be installed must adhere to defined quality standards12.and shall have a rated lifetime of 15 years. The financing instrument applied shall enable economically viable investments in RPC installations, while at the same time ensuring rapid uptake of the technology at maximum scale. For this, a financially attractive offer must be made to the MD customers, which allows for loan pay back within a maximum of 6 years from savings accruing from reduced kVA-related maximum demand payments, thus allowing the customer to profit from the installation for the remaining lifetime. The financing structure required for reducing capital cost applies a blended finance ap- proach: i. A local development bank sets up and administers a financing vehicle for onl- ending to stakeholders. ii. The bank enters into an agreement with a national ECA to reduce the cost of sen- ior funding. ECA conditions depend on the origin of the equipment and services determining the cost of the ECA premium; the amount that is covered (maxi- mum 80% of the export contract value) and on the rating of the recipient coun- try. For all four countries ECA insurance comprising commercial (payment), po- litical (change in government policy) and FX (transfer, convertibility) risks can be secured for a 6-year period. 12International standards: IEC 61642, IEC 61000-2-2, IEC 61000-2-4, IEC 61000-2-12, EN 50160 (in Europe), IEEE 519 (USA) and national standard such as NRS 048 in South Africa - 52 - iii. A DFI provides first loss funding for the uncovered portion (e.g. 20%). Respec- tive cost of finance is substantially higher than the ECA covered portion of the funding, usually approximately 8% above the cost of ECA backed funding. iv. In case up-front calculations reveal payback periods of more than 6 years, a car- bon finance-based co-financing instrument will be employed, which considers the business case of each individual intervention in order to account for addi- tionally issues and optimize carbon payments. The proposed carbon finance approach aims to improve on the CDM, where prices for Certified Emission Reductions (CER) were set by supply and demand of CERs under uncertainty about the underlying marginal abatement costs of projects generating the credits. A carbon price of e.g. 10 USD/CER was paid irrespective whether e.g., a HFC- 23 abatement project required 0.2 USD/CER (cp. IPCC/TEAP, 2005) or a hydropower project required 10 USD/CER (cp. Rahman et al., 2015) to become financially viable. This resulted in high producer rents for some project types, insufficient carbon incen- tives for other project types and an overall in a sub-optimal application of carbon fi- nance. Considering the substantial financing volumes required to achieve the objectives of the Paris Agreement and to implement the SDGs, it is generally understood that private sector involvement is needed with optimal use of public funding. Against this back- ground, the carbon-financing concept is conceived around a sectoral analysis, which estimates the benefits and the costs of each single intervention and determines the mar- ginal abatement costs of individual investments and the amount of carbon finance re- quired to make the mitigation action financially viable, i.e. contribute to reaching a con- ditional emission mitigation target. Carbon finance algorithm The carbon finance algorithm has the following guiding principles: • The analysis considers solely interventions which are economically reasonable, i.e. the RPC investment leads to net savings for the customer over the equipment lifetime of 15 years. • Based on the combination of the six-year ECA coverage and DFI first loss fund- ing, the financing vehicle offers average lending rates of around 9%. • If payback periods including cost of finance, import, transport, installation and service are within the 6-years range, no carbon finance is required. • In case the PBP for an individual intervention is above the range, the exact amount of carbon payment is determined that reduces the PBP to 6 years. • This results into a carbon payment scheme, which tailors’ individual results-based payments to meet the needs of economic viable interventions and reduce emis- sions of a whole sector. The carbon finance needs required for capturing Zimbabwe’s economically viable abatement potential is estimated at 3.26 M USD and will cover 333 customers. - 53 - Implementation Energy Savings and GHG Emission Reductions The RPC programme has the potential to reduce the load dependent technical losses by an accumulated 4,650 GWh by 2030 and 14, 898 GWh by 2050. Figure 9-2: BAU and MIT Scenario, technical TD Losses To estimate the abatement potential, the decreasing GHG intensity of power generation under the MIT scenario was considered. The energy savings will result in additional, accumulated emission reductions of 4.31 M tCO2 by 2030 and 11.97 MtCO2 by 2050. Co-benefits By applying the blended finance approach, a minimum amount of carbon payments is required for leveraging large-scale private investments with a substantial abatement potential. This is estimated to trigger private sector investments in the amount of 36.06 M USD by 2030 and 53.94 M USD by 2050. Based on the current tariff, these invest- ments will result in reduction of private electricity consumers maximum demand pay- ments by 110.55 M USD by 2030 and 399.20 M USD by 2050. In addition (as technical losses are a parameter to determine the electricity tariff), the reduction of technical loss- es will reduce the electricity costs / the cost increases. Based on the current price of 10 USDc/kWh, the programme will reduce electricity costs by accumulated 195.95 M USD by 2030 and 1,429.75 M USD by 2050. - 54 -

  65. Annex II: Minimum Energy Performance Standard Discussion of Key Parameter Technology Scope The model developed by the Green Cooling Initiative (GCI) ( refer to Section 2.5) co- vers 12 equipment types ranging from residential split air conditioners (AC) and other technology options for room cooling (self-contained air conditioners, commercial duct- ed splits, multi splits) air conditioning in transport and domestic refrigeration. The GCI13 was established through a project funded by the BMU’s International Climate Initiative. The GCI website provides information on inter alia AC stocks, their energy efficiency, as well as the related electricity consumption. GCI uses a sophisticated model to esti- mate AC stock and its electricity consumption considering population, GDP, urbaniza- tion, electrification and temperature (GCI, 2018). The proposed model targets energy savings, GHG emission reductions and costs/benefits for ACs and assumes that the scope of MEPS will be extended to other household devices covering all major electricity consuming devices, such as, i) refriger- ators and freezers, ii) audio and video equipment, iii) washing machines, iv) tumble dryers, v) washer-dryer combinations, vi) dishwashers and vii) electric ovens. Time Scope The GCI model covers a time-period starting with the year 2000 up to 2050. Having a long-term perspective is not only compliant with the requirements of the LEDS process, but equally facilitates an understanding of the expected exponential growth of AC sector in Zimbabwe in the next three decades, which underlines the importance of appropriate policies and financing instruments to guide this development. Scope of GHG Emissions The extreme winter and summer temperatures resulting from climate change will in- crease the demand for heating and cooling. The use of air conditioning systems results in direct and indirect GHG emissions. Direct GHG emissions relate to the production, use and disposal of refrigerants. Typically, AC systems with an installed capacity of 12,000 British Thermal Units (BTU) have small refrigerant loads (less than 1 kg). How- ever, as these refrigerants may feature a high GWP, small loads may also result in a substantial warming impact. Indirect GHG emissions refer to the emissions related to electricity consumption. In order to provide cooling, AC systems consume electricity. For middle-income countries, it is estimated, that the introduction of cooling will increase the electricity consumption 13 Can be accessed on the GCI website: www.green-cooling-initiative.org - 55 - by as much as 81% (Davis, Gertler, 2015). For each unit of electricity consumed, utili- ties have to generate power using a combination of renewable and fossil fuel-based power plants. Consequently, operating an AC results in indirect GHG emissions. Although direct GHG emissions are emitted from ACs, the quantitative analysis in this strate- gy is constrained to the indirect GHG emissions due to large uncertainties related to; i) management and disposal of current refrigerants; ii) replacement of current refrigerants by new refrigerants, which rely on more potent GHGs Against this background, direct GHG emissions are not considered in modelling. However, the roadmap suggests combining the MEPS with the prescription of using natural refrigerants (no Ozone Depleting Substances, low GWP, such as R290) from 2025 onwards. Current AC Stock, EC and future development In order to estimate the current AC stock, its future development and the resulting electricity consumption, the existing model. Figure 9.3 presents the development of the AC stocks (in million) from 2000 to 2050. The model estimates, that by the end of 2019, the start date of the Paris Agreement, there will be 7,995 devices installed in Zimbabwe. Due to economic development and popula- tion growth, it is estimated that the stock increases to 34,129 devices by 2030. Figure 9-3:AC Stock Development Forecast for Zimbabwe Economic Analysis Zimbabwe should guide the investment of the private sector through well-informed regulation regarding economically cost-efficient equipment. Specifically, the energy efficiency of new ACs may be effectively regulated through establishing and maintaining MEPS. Economic viability determines the best course of action based on governmental discount rate. The private sector, however, may be confronted with much higher financial barri- ers, for example higher interest rates. Economically viable investments from a macroe- conomic perspective may not be necessarily financially viable for a private investment. Carbon finance might be needed to bridge the gap: - 56 - Table 9-5 Input parameter for lifecycle cost analysis Parameter Value Electricity price increase (in %, p.a.) 3 Discount rate (in % p.a.) 20 Electricity cost (in USDc/kWh) 10 Electricity cost + Subsidy (in USDc/kWh) 16 Lifetime (in Years) 15 ▪ For the life cycle cost assessment, a SDR of 6% p.a. was used This discount rate was pro- posed by WB (2016) for economic cost/benefit analyses for the SADC region. ▪ The annual increase of electricity costs was assumed to amount to 3% p.a. ▪ The average lifetime of split AC systems is assumed to be 15 years. Lifetime of AC sys- tems is estimated from 15 to above 25 years, depending on maintenance and run-time hours. Therefore, the proposed lifetime is considered conservative. ▪ For analysis, the electricity price of 10 USDc/kWh (ZEDTC, 2014), and the electricity price including all CAPEX (Trimble et al., 2016) were considered. ▪ Finally, the average equipment costs for energy efficiency classes 1-10 as determined by a market review for the SADC region, was applied. Based on the input parameters in Table 12, the Lifecycle Costs (LC) for AC systems were estimated: ▪ Following the equipment review, the average electricity consumption per equipment class was determined (i.e. normalized, in kWh/kW, per year), ranging from 1 (least efficiency) to 10 (highest efficiency); ▪ For each class, the average electricity consumption(EC) (i.e. kWh/kW) and the aver- age price (i.e. USD/kW) amongst all products falling in this equipment class was determined. The majority of products range in the lower classes (1-4), while for the ultra-efficient equipment (7-10) only few devices are on the market. If no equip- ment was available for a class (e.g. class 8 and 9), then linear interpolation was done for the equipment cost and energy consumption. However, it is important to note, that also the least efficient equipment has a significantly lower electricity con- sumption compared to the existing equipment stock. ▪ Electricity costs over the lifetime of the equipment (15 years) were estimated considering an annual electricity price increase of 3% and discount the future electricity costs with a discount rate of 6% p.a. The findings are reported under Scenario A; ▪ The lifecycle costs were determined considering an electricity tariff increase, discount rate and indirect subsidies. - 57 - Table 9-6 Life cycle cost analysis for different scenarios Equip- Equipment Scenario A Scenario B Scenario C EC (in ment Price Lifecycle Electricity Lifecycle Electricity Lifecycle kWh/kW) Electricity Cost Class (USD/kW) Costs Cost Costs Cost Costs 1 462 143.19 385.24 528.44 329.38 472.57 174.63 318 2 426 142.76 355.71 498.47 304.16 446.92 161.26 304 3 403 193.78 336.07 529.85 287.35 481.13 152.35 346 4 379 174.07 316.43 490.50 270.54 444.61 143.44 318 5 356 185.26 296.72 481.98 253.73 438.99 134.52 320 6 332 196.45 277.08 473.53 236.92 433.37 125.61 322 7 308 207.64 257.44 465.08 220.11 427.75 116.70 324 8 285 237.75 237.80 475.55 203.30 441.05 107.79 337 9 261 267.86 218.09 485.95 186.49 454.34 98.87 349 10 226 297.96 188.63 486.59 161.27 459.23 85.50 356 Minimum Cost 465.08 427.75 304 Optimal Equipment 7 10 2 Class Figures 9.4,9.5 and 9.6 illustrate the findings of the analysis. Figure 9-4shows the lifecy- cle costs per equipment class. LC decreases from 528 USD/kW for the least efficient equipment, to reach a minimum with equipment class 7 (465 USD/kW). Figure 9-4: LC by Equipment Class considering Tariff Increase and SDR - 58 - Figure 9-5 LC by Equipment Class considering Tariff Increase, SDR & Subsidies Thereafter, LC increases with increasing energy efficiency, as the steep price increase moving from energy efficient to ultra-energy efficient equipment overcompensates the reduction of electricity costs. Expanding the analysis to comprise the consideration of subsidies (i.e. Scenario B) produces a similar result with class 10 equipment having least cost over its lifetime. It is concluded, that from an economic perspective (i.e. SDR of 6% p.a., consideration of electricity subsidies), the optimum is the purchase of class 10 equipment, which may be specified in a Minimum Ener- gy Efficiency Standard. This would result in the reduction of household’s electricity cost, re- duction of governmental subsidies for electricity and a reduction of GHG emissions. Figure 9-6 LC by Equipment Class considering Tariff Increase and PLR (Scenario C) However, private consumers or households may access debt capital only at substantially high- er interest rates. The Prime Lending Rate (PLR)(i.e. the rates at which the best customer seg- ment of commercial bank may access loans) currently (2019) is around 18% p.a. Considering a high discount rate and neglecting the indirect subsidies of electricity generation (Scenario C) provides a minimum LC of USD$300/KW for equipment with efficient rating of 2. Under such circumstances, the household chooses the equipment class 2 (being second least - 59 - efficient technology), leading to minimum lifecycle costs for the household, but high electrici- ty subsidies and large GHG emissions. Implementation A successful implementation of energy efficient cooling shall be ensured by a set of policy measures combined with the development of suitable financing instruments. Policy Measures For the introduction of MEPS, a stepwise approach is suggested: • In the first step, MEPS may be introduced in year 2020 forbidding the installation of new equipment with energy efficiency classes 1 to 3. This prohibits the purchase of new equipment with an annual electricity consumption of more than 2,049 kWh/year (i.e. for 12,000 BTU AC system). • In the second step, in 2023, the standard may be tightened to 1,660 kWh/year (prohibit- ing energy efficiency classes 4 and 5). • In the next step, by 2026 all equipment with more than 1,210 kWh/year may be prohib- ited. This stepwise approach limits the financial burden for the consumers, allows the market to adjust and steadily approaches the economic cost efficient MEPS. Figure 9-7: Minimum Energy Performance Standard Setting Energy Saving Potentials Based on the stock development, and the definition of the economically optimal energy effi- ciency level (Class 10), the AC electricity demand under a Business as Usual (BAU) and un- der a mitigation (MIT) scenario with MEPS implementation were estimated. As discussed under section 8.1, the findings were extrapolated from AC systems (which consume approx. 60% of total household electricity demand in developed countries) to a broad MEPS covering all major electricity consuming devices (i.e., i) refrigerators and freezers, ii) audio and video equipment, iii) washing machines, iv) tumble dryers, v) washer-dryer combinations, vi) dish- washers and vii) electric ovens). - 60 - Figure 9-8: Electricity Demand under Business as Usual and under MEPS The accumulated energy savings potential of a broad MEPS is estimated to 108 GWh by 2030 and 1,167 GWh by 2050. GHG Abatement Potentials To estimate the abatement potential, the decreasing GHG intensity of power generation under the MIT scenario were considered. The abatement potential refers to the GHG intensity reduc- tion potential, which is on top of the planned decarbonisation of the power system. Based on this decreasing intensity, the abatement potentials are estimated at 0.045 M tCO2 by 2030 and 0.399 M tCO2 by 2050. Economic Considerations The estimate to the implementation of the MEPS leads to: ▪ Additional investments (incremental price from an inefficient to an efficient electric de- vice) of 18. 64 M USD by 2030 and 49.89 M USD by 2050; ▪ Reduction of household electricity costs by 13.63 M USD by 2030 and 95.53 M USD by 2050; ▪ Additionally, MEPS may lead to a reduction of indirect subsidies (i.e. lack of full recap- italization of power generation, transmission and distribution infrastructure) of 8.18 M USD by 2030 and 56.12 M USD by 2050. Overall, considering a SDR of 6%, the NPV of 39.31 M USD was estimated with an IRR of 35%. It is important to note, that this represents the outcome of an economic analysis, not a financial. To implement this potential, Zimbabwe’s climate financing facility has to offer cap- ital at concessional interest rates. Institutional Aspects MEPS will be implemented in coordination by a range of institutions. These include the Re- gional Energy Regulatory Authority (RERA), ZERA and IDBZ. ZERA will establish and maintain national minimum energy performance standards for ACs equipment. ZERA or an- other appropriate entity will establish a testing centre; the testing centre will test any new AC product, which is produced and imported into the country. Testing will determine the elec- - 61 - tricity consumption for cooling and heating under standard conditions. The MEPS will be determined using current electricity prices and a national estimate of cooling degree-days to determine lifecycle costs. MEPS will aim to implement economically optimal energy effi- ciency standard. The IDBZ in cooperation with commercial banks will establish a climate-financing instrument for funding energy efficient AC systems. This will reduce the lending rate for energy efficient equipment to approx. 7.5% p.a. The reduction of cost of capital will allow realizing the eco- nomically viable abatement potential. Roadmap The roadmap for implementing the MEPS is presented in Table 9.7. Table 9-7: High level Roadmap for Minimum Energy Performance Standards Cooper- Potential Estimated Time- Lead or- ating No. Action funding total costs frame ganisation organi- sources t0 2050 sations GEF; UNEP; Establishment of a national Short- UNIDO; USD 0.2 M1 energy performance stand- term; on- ZERA World Bank; million ards for AC systems going DFID; EU National regulator GEF; DFID; Development of a regional Medium- USD 2 M2 RERA (SADC), EU; Climate testing laboratory term million SACREE finance E Ministry of Ener- Establish a climate financ- IDBZ, Medium- gy and Climate fi- USD 5 M3 ing instrument for energy commer- long term Power nance million efficient AC systems cial banks Devel- opment Ministry Update standards and in- of Ener- clude regulation of refriger- Medium to gy and Government USD 0.2 M4 ants, ban refrigerants with a ZERA long term Power Treasury million high global warming poten- Devel- tial. opment Establish MEPS for audio Min of and video equipment, dish- Energy washers, electric oven, re- Power Government USD 0.5 M5 frigerators and freezers, Long-term ZERA Devel- Treasury million tumble dryers, washer-dryer opment combinations, washing machines - 62 -

  66. Annex III: Low Carbon Waste initiative Estimate of BAU Emissions Definitions and Policy Framework In Zimbabwe the waste definition includes domestic, commercial or industrial material, whether in a liquid, solid, gaseous or radioactive form, which is discharged, emitted or deposited into the environment in such volume, composition or manner as to cause pollu- tion (GoZ, 2002). The definitions used in this study were adopted from the Environmen- tal Management Act Chapter 20:27 and Zimbabwe Integrated Solid Waste Management Plan of 2014 (GoZ, 2014). The following definitions apply: • Composting: The aerobic degradation of organic materials under controlled condi- tions, yielding a usable soil fertilizer or mulch • Landfilling: The disposal of solid waste at engineered facilities in a series of com- pacted layers on land. • Prevention: All activities which aim to optimise product design and manufacturing processes so that wastes are not generated in the first place • Recycling: The act of recovering materials from the waste stream and reprocessing them so they become raw materials for new applications. • Reduction: The reduction of waste at source, by understanding and changing pro- duction processes to reduce waste. • Reuse: Using an item more than once. A product may be reused either for its origi- nal purpose, or for some other purpose. • SWDS: Solid Waste Disposal Sites • LFG: Landfill gas The solid waste composition figures used in this study were obtained from the Integrated Solid Waste Management Plan as shown in Table 9-8. Table 9-8: Solid waste composition Composition by mass (in 1000 tonnes per year) Waste Bio- Electron- Medical Total Plastic Textile Rubble Stream Paper Metal Other degrada- ble Glass ic Residential 346 62 81 32 39 24 3 27 0 1 615 Commer- cial 76 181 128 24 30 9 13 16 0 8 486 Academic 13 28 20 0 10 0 0 0 0 0 72 Medical 4 7 3 0 0 0 0 19 0 1 34 Industrial 92 129 71 44 29 0 8 0 40 30 443 Grand Total 531 407 303 101 109 33 24 61 40 41 1,650 Share (in 32 25 18 6 7 2 1 4 2 2 100 %) Source: GoZ, 2014 - 63 - Forecasting BAU emissions from Solid Waste in Zimbabwe Historical urban waste quantities for the years 1990, 1994 and 2000-2012 were used for BAU modelling. These figures were obtained from the TNC (GoZ, 2015). The GHG con- sidered was CH4. The historical and projected waste figures are shown in Figure 9-9. Figure 9-9: Historical and projected waste generated per person The drop in waste generated per capita experienced from 1997 to 2000 resulted from the economic challenges experienced in the country during that period. The urban population figures and projections up to 2050 were obtained from ZimStat. Only the urban population was considered since landfilling is done mainly in urban areas in Zimbabwe (GoZ, 2014). Waste collection rates largely respond to the performance of the economy. Table 9.9 presents the forecasted waste collection rates from 2021 to 2050. Table 9-9: Waste generated and collected Year 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2035 2040 2045 2050 Waste Generated(Gg) 1892 1911 1930 1949 1967 1984 2001 2017 2032 2048 2114 2173 2225 2271 Waste Collected(Gg) 1551 1606 1660 1715 1770 1825 1880 1936 1992 2048 2114 2173 2225 2271 Collection Rate (in %) 82 84 86 88 90 92 94 96 98 100 100 100 100 100 Urban Waste (t/person) 438 442 446 449 453 457 460 463 466 469 483 495 506 516 Urban Population 4 4 4 4 4 4 4 4 4 4 4 4 4 4 (million) The BAU scenario was developed based on the projected waste figures provided in Table 9-9. Urban population was considered to be the main driver for waste generated in the cities. BAU GHG Emissions The CDM tool Version 02.0.0 for waste was used for climate change mitigation model- ling for the waste sector (Equation 1). The tool provides procedures for calculating CH4 emissions from SWDS or prevented from SWDS14. The tool was developed for methane 14https://cdm.unfccc.int/methodologies/DB/SU1HDJCPVB9QB8D54SGUARSQVLTJUG - 64 - emissions mitigation from existing SWDS. The existing SWDS from Harare, Bulawayo, Mutare and Gweru were considered. The cities are the main ones in Zimbabwe. The tool can be applied for mitigation of emissions from LFG flaring or avoided emissions from composting (UNFCCC, 2013). The CDM tool can also be used to estimate the emissions from a specific disposal site, based on waste disposed in earlier decades and specific decay rates (kj). The year 2030 was selected for marginal abatement cost analysis. The different types of biodegradable waste generated in urban areas in Zimbabwe are (GoZ, 2014): ▪ Wood and wood-products ▪ Pulp, paper and cardboard ▪ Food waste, beverages and tobacco ▪ Textiles ▪ Garden yard- and park waste The CDM tool can be used for estimating emissions produced on a monthly or yearly basis. Since the data was available on an annual basis, the yearly version of the equation was used. The equation assumes that the contribution of historic waste decreases expo- nentially over time. Equation 9.2: Equation for CH4 estimation Where, BECH4,SWDS,y is baseline, project or leakage methane emissions occurring in year, y , generated from waste disposal at a SWDS during a time period ending in year y (t CO2e / yr.). Other parameters used in Equation 1 are presented in Table 9-10. - 65 - Table 9-10: Parameters used in Waste Sector modelling Parameter Definition Selected parameters used in the LEDS model x Years in the time period in which waste 2020 to 2050 Time horizon for LEDS. is disposed at the SWDS, extending from the first year in the time period (x = 1) to year y (x = y). y Year of the crediting period for which Not Applicable. No registered Mitigation option in methane emissions are calculated (y is a Zimbabwe’s LEDS under CDM. consecutive period of 12 months) DOCf,y Fraction of degradable organic carbon 1.000 (DOC) that decomposes under the spe- cific conditions occurring in the SWDS for year y (weight fraction) Wj,x Amount of solid waste type j disposed W1 Wood and wood products: 0 or prevented from disposal in the W2 Pulp, paper and cardboard: 365 SWDS in the year x (t) in Gg W3 Food, food waste, beverages and tobacco: 468 W4 Textiles: 88 W5 Garden, yard and park waste: 0 φy Model correction factor to account for 0.900 model uncertainties for year y fy Fraction of methane captured at the Not Applicable SWDS and flared, combusted or used in another manner that prevents the emis- sions of methane to the atmosphere in year y GWP(CH4) Global Warming Potential of methane 24 (IPCC Second Assessment Report) OX Oxidation factor (reflecting the 0 (2006 IPCC default) amount of methane from SWDS that is oxidised in the soil or other material covering the waste) F Fraction of methane in the SWDS gas 0.500 (2006 IPCC default) (volume fraction) MCFy Methane correction factor for year y 0.400 (2006 IPCC default) DOCj Fraction of degradable organic car- W1 Wood and wood products=50.00% (dry) bon in the waste type j (weight fraction) W2 Pulp, paper and cardboard=44.00% W3 Food, food waste, beverages and tobacco=38.00% W4 Textiles=30.00% W5 Garden, yard and park waste=49.00% kj (dry) Decay rate for the waste type j (1 / yr.) W1 Wood and wood products=0.04 W2 Pulp, paper and cardboard-0.04 W3 Food, foodwaste, beverages and tobacco=0.06 W4 Textiles=0.05 W5 Garden, yard and park waste=0.045 j Type of residual waste or types of waste W1 Wood and wood products in the SWDS W2 Pulp, paper and cardboard W3 Food, food waste, beverages and tobacco W4 Textiles - 66 - Parameter Definition Selected parameters used in the LEDS model W5 Garden, yard and park waste e Constant-Euler's number 2.718 Figure 9-10: Methane emission from solid waste disposal Discussion results, GHG emissions 2020, 2030 and 2050 Methane emissions from SWDS in Zimbabwe are projected to grow more than 100% from around 1,1000Gg/yr. in 2020 to around 2,500 Gg/yr. in 2050. This significant increase in GHG emissions was considered a factor of increase in urban population. Policy Framework for Waste Mitigation Measures Waste policy framework Zimbabwe developed a number of pieces of legislation governing environmental management in general, and waste management in particular. These include the National Environment Pol- icy and Strategies (NEP) (GoZ, 2009), Environmental Management Act Chapter 20:27 (GoZ, 2002), Statutory Instruments (SI) No. 6 of 2007 (Effluent & Solid Waste Disposal), SI 10 of 2007 (Hazardous Waste Management), and SI 98 of 2010 (Plastic Packaging & Plastic Bot- tles) (Table 9-11). - 67 - Table 9-11: Legislation, policies and strategies on waste management in Zimbabwe Instrument Purpose/Focus area on environment and Climate Responsible authority change (ies) Renewable Energy Poli- Promote biogas Ministry of Energy and cy (2019) Power Development National Climate Policy Promote waste reduction, reuse and recycling; Local authorities (2017) waste to energy. NCCRS (2014) Create a Climate Change resilient nation by MAWCLRR promoting sustainable development and a cli- mate proofed economy through mainstreaming climate change adaptation and mitigation strate- gies in socio-economic development at national and sectoral levels through multi-stakeholder engagement. National Environmental Provide economic instruments to improve re- Ministry of Environment Policy and Strategies source and energy efficiency and Tourism (2009) Promote use of clean energy sources Industrial Development Promote environmentally sustainable industrial- Ministry of Industry and Policy (2012) isation. Commerce Science, Technology Provide scientific solutions to global environ- Ministry of Higher Educa- and Innovation Policy mental challenges. tion, Science and Tech- (2012) nology Constitution of Zimba- Environmental rights, prevention of pollution to GoZ bwe Chapter 4 Section be guaranteed by the state. 73 Environmental Man- To provide for the sustainable management of Ministry of Environment agement Act (Chapter natural resources and protection of the Envi- and Tourism 20:27, 2002) ronment; prevention of pollution and environ- mental degradation; Urban Councils Act Establishment and regulation of local authorities Ministry of Local Gov- (Chapter 29:15 ) and their function. ernment, Public Works and National Housing (MLGPWNH) Public Health Act To provide for public health MHCC (Chapter 15:17) The mitigation actions for solid waste were based on the Integrated Waste management Plan that was developed by the Institute of Environmental Studies (IES) commissioned by EMA in 2014 (GoZ, 2014) The Integrated Solid Waste Management Plan goals are (GoZ, 2014): i. Solid waste generation by maximizing resource use at source through sustainable consumption and cleaner production. ii. Separate solid waste at source. iii. Reduce biodegradable solid waste through reuse, use of solid waste as feed and composting. iv. Maximize resource recovery by creating an enabling environment for recovery; expanding markets for recyclables and forging partnerships in the value addition chain for recyclables v. Restructure and introduce efficient collection of source separated waste streams in all cities, towns and growth points to improve cleanliness and restore the glamour of Zimbabwe. - 68 - vi. Invest in and build environmentally sound infrastructure and systems for safe dis- posal of soil waste as required by legislation. vii. Educate and raise awareness in all citizens of Zimbabwe to better understand and participate in source separation; resource recovery and conversion; and integrated and sustainable solid waste management. viii. Promote cleanliness in Zimbabwe where the public, industry and government strive to reduce, reuse and recycle all solid waste materials in order to manage and mitigate the impacts of solid waste on public health and safety, the environment and climate. ix. Develop a Waste Management Information System to enable long-term measure- ment of system performance and for use in the design, implementation and moni- toring of an effective and efficient system for collection, transportation, recycling, treatment, recovery and disposal of various wastes and for informing policy and planning. x. Develop a Waste Management Policy and review and assess current legislation to improve implementation. Figure 9-11 presents Zimbabwe’s Integrated Solid Waste Management Plan Figure 9-11: Integrated Solid Waste Management System Source: GoZ, 2014 Based on this policy framework, the following section discusses the abatement poten- tials and costs / benefits of LFG flaring and composting. Recycling was included since it is covered in the Integrated Solid Waste Management Plan, although it has limited potential to mitigate CH4 emissions from the Waste sector. Landfill Gas Flaring The first abatement option considered was LFG flaring. LFG flaring mitigates climate change through the combustion of CH4 generated from waste already disposed. Consid- eration needs to be given to the efficiency of destruction achieved during flaring and, - 69 - hence, to the environmental impact and possible health risks associated with the com- bustion products resulting from flaring with systems of differing designs. LFG is an end product of the decomposition of biodegradable wastes in a landfill site (EA, 2002). Typ- ically, LFG comprises a mixture of up to 65% CH4 and 35% CO2 by volume, although it includes minor amounts of a range of organic gases and vapours. Combustion is the most common technique for controlling and treating LFG in order to mitigate climate change. Over 98% destruction of organic compounds from LFG can be achieved through the use of combustion technologies such as flares, incinerators, boilers, gas tur- bines, and internal combustion engines. Methane has a Global Warming Potential (GWP) of 24 and is converted to CO2 (GWP of 1), resulting in a large greenhouse gas impact reduction. Although combustion reduces the GWP of LFG by oxidising the CH4 and producing CO2, there is need to monitor and control the production of secondary emissions, for example, mercaptans, oxides of nitrogen (NOxs) and CO. The two broad technologies on CH4 flaring are open and closed flaring. Open flares Open flame flaring (e.g., candle or pipe flares), is the simplest flaring technology, and it consists of a pipe through which the gas is pumped, a pilot light to spark the gas, and a means to regulate the gas flow. The simplicity of the design and operation of an open flame flare is an advantage of this technology. Good mixing of air and fuel at the burner shortens the flame and reduces its luminosity. Mixing is improved by good burner design and pre-aeration, which also allow some degree of combustion control through adjustment of the flow of air. Open flares have the advantages of being inexpensive and relatively simple, which are very important factors when there are no emission standards. However, open flares are inefficient, re- sulting in very poor emissions control compared with those from enclosed flares. The disadvantages include inefficient combustion, aesthetic complaints, and monitoring dif- ficulties. Sometimes, open flame flares are partially covered to hide the flame from view and improve monitoring accuracy. In the general case of diffusion and pre-aerated open flares, there is often a shield around the burner to protect the flame from the wind. Enclosed flares Enclosed flares burn CH4 gas in a vertical, cylindrical or rectilinear enclosure with mul- tiple burners. Some means of combustion control is normally provided, and the enclo- sure is often insulated to reduce heat losses and allow operation at higher temperatures. In an enclosed flare, the burner or burners are located at the base of a shroud, which is usually, but not always, circular in cross-section. Enclosed flame flares are more com- plex and expensive than open flame flares. Unlike open flame flares, the amount of gas and air entering an enclosed flame flare can be controlled, making combustion more reliable and more complete. Other enclosed combustion technologies, for instance, boil- ers, process heaters, gas turbines, and internal combustion engines can also be used. Use of open flaring technologies was considered for LFG flaring. - 70 - Zimbabwe LEDS CH4 flaring mitigation action implementation The Waste sector LEDS mitigation action assumes that LFG flaring will be conducted in the SWDS in the four cities. It was assumed that 72.6% of the methane generated would be collected and flared. The methane flaring projects will be implemented in one city after the other; starting with Harare in 2020, followed by Bulawayo in 2021, Mutare in 2022 and Gweru in 2023 (see Table 9.12). The funding is expected to come from the Environmental Management Fund managed by EMA. Table 9-12: CH4 reduction from SWDS from 2020 to 2050 Year 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2035 2040 2045 2050 LFG Reduc- M tCO2eq 0.44 0.63 0.74 0.87 1.00 1.04 1.08 1.12 1.17 1.21 1.26 1.46 1.63 1.77 1.89 tions Costs for LFG flaring The Investment Costs and Operational Expenditure covering 38 cost categories were taken from several CDM LFG projects and have been normalized by area. The size of SWDS were measured for Harare (Pomona Dumpsite) and Bulawayo (Richmond Land- fill), while the areas for Gweru and Mutare were estimated. The total area amounts to 141.2 ha. The total cost for mitigation, based on the costs presented in and SWDS areas are shown in Table 9-13 while Table 9-14provides the cost parameters. Table 9-13: LFG Cost Parameter Parameter Value Investment Cost (in USD/ha) 92,046 OPEX (in USD/yr./ha) 10,179 Table 9-14: Total cost for LFG flaring 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2035 2040 2045 2050 M CAPEX 7.4 2.8 1.4 1.4 1.4 USD M OPEX 0.8 1.1 1.3 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 USD Total M 8.2 4.0 2.7 2.8 2.8 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 Cost USD A 6% SDR was considered for the economic analysis for the LFG flaring mitigation option. The economic analysis is presented in Table 9.15. - 71 - Table 9-15: LFG Abatement Cost Analysis Parameter Unit Value Net Present Value M USD 31.79 Total GHG Reduction M tCO2e 43.06 Abatement Potential 2030 M tCO2 e 1.26 Marginal Abatement Cost USD/tCO2e 0.74 A positive marginal abatement cost of $0.74/tCO2e was obtained. The result of the eco- nomic analysis showed that LFG flaring can be justified on the basis of climate change mitigation, and not on return on investment. Composting The aerobic decomposing of waste through composting reduces, significantly, the amount of biodegradable waste disposed at the SWDS. Modern, methodical composting is a multi-step, closely monitored process with measured inputs of water, air and car- bon- and nitrogen-rich materials, aided by shredding the plant matter, turning the mix- ture and adding water (Zaļoksnis, 2018). The introduction of worms also assists in speeding up the process. The resultant organic fertiliser can be used in gardens, land- scaping, and agriculture. The organic fertiliser improves soil conditioning, in addition to it providing some nutrients and vital humus or humic acids to the soil. Composting re- duces the amount of biodegradable waste to less than half of the original quantity. Composting can be achieved through aerobic or anaerobic digestion. In aerobic diges- tion, the breaking down of biodegradable material is done in the presence of oxygen under controlled conditions. The carbon content of the material breaks down to CH4, CO2 and other gases. Anaerobic composting is the decomposition of organic material in the absence of oxygen. Anaerobic organisms aid the process. Anaerobic decomposi- tion is generally slower than aerobic. During the composting process, the organic substrate is progressively broken down by a succession of populations of living organisms. Mesophilic and thermophilic bacteria and fungi are the predominant organisms during the initial and the active stages of the compost process. Larger organism like earthworms can be introduced in later stages. Types of composting technologies The two broad types of composting are windrow and in-vessel (Hussein et. al., 2018). Windrow systems can be static or turned. In the static version, aeration is accomplished without disturbing the windrow whereas with the “turned” version, aeration involves tearing down and rebuilding the windrow. The many variations between approaches to windrow composting render it difficult to formulate generalisations regarding the eco- nomics of the process. However, it can be generalised that turned or static windrow composting should be less costly than in-vessel composting. Current versions of wind- row composting differ among themselves with respect to size, degree of mechanisation, and process. The cost of the mechanical turner is a major item in the economics of me- dium- to large-scale operations. A shed may be required. Sheds would be particularly important if the facility is built relatively close to residential or commercial areas. - 72 - Goals underlying the design of an in-vessel reactor are to accelerate the composting process through the maintenance of conditions that are optimum for the microbe’s ac- tive in composting, and minimise or eliminate adverse impacts upon the ambient envi- ronment. The types of in-vessel systems that have been used over the years include Da- no drum, or other horizontal drum systems. The Dano reactor is typically less preferred due the high cost. The Eweson system differs from that of the Dano system in that its drum is divided into compartments such that the residence time can be varied through- out the drum. Factors affecting composting The main factors affecting composting include nutritional, environmental and opera- tional. Nutritional factors include levels of macronutrients (carbon (C), nitrogen (N), phosphorus (P), calcium (Ca), and potassium (K)) and micronutrients (magnesium (Mg), manganese (Mn), cobalt (Co), iron (Fe), and sulphur (S)) in the material. Envi- ronmental factors that affect the compost process are temperature, pH, moisture, and aeration. Limitations of composting Composting has been widely accepted as an eco-friendly productive way to manage the waste materials. However, it is a slow process taking several weeks and requiring fre- quent mixing with possible losses of nutrients (NH3). Though composting passing through thermophilic stage effectively reduces pathogens, however, absolute removal is very difficult. Marketing and distribution of compost Organic fertiliser can find use in agriculture, landscaping, nurseries and residences. The quality of the compost dictates its final use, for example, nurseries require a high- quality product; whereas, a lesser quality material would be suitable for land reclama- tion or landfill cover. Organic farming is the largest potential market for compost in Zimbabwe. Development of a market for compost involves instilling in potential users an awareness of the utility of the product. To be both effective and efficient, the distri- bution system must be such that the greatest number of consumers has ready access to the product at the lowest cost. Additional emission reduction potential from composting The residual emissions from the 72.6% abated through LFG flaring were targeted to be removed through composting. Considering that LFG flaring applies to both historical waste and projected at the SWDS, the mitigation of CH4 from composting targets new waste, hence, avoiding generation of CH4 at SWDS. Table 9-16 presents CH4 mitigated through composting from 2020 through 2050. - 73 - Table 9-16: CH4 mitigated through composting Year 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2035 2040 2045 2050 Compos-ting ERs M tCO2e 0.01 0.03 0.05 0.06 0.06 0.08 0.09 0.11 0.12 0.14 0.15 0.16 0.18 0.19 0.20 Economic Analysis The economic analysis was performed based on composting plant with the capacity to handle 20,000 mt of biodegradable waste per year. The revenue from the sale of organic fertiliser were estimated at US$ 35 /mt. The revenues were based on the empirical data provided by Zimbabwe Sunshine Group, an organisation involved in waste composting in Harare. The figure was validated by comparing with regional and international fig- ures. The capital and operational costs for composting are presented in Table 9.17. Table 9-17: Investment and operational costs for composting Capacity (t/yr.) Cost USD Investment Cost by Plant Capacity 20,000 3,534,737 OPEX (in USD/t) 11 Table 9.18 presents the cash flow for composting, based on the project lifetime of 10 years. The financial analysis indicates that the payback period for composting is 1 year, hence the mitigation would be financially sustainable for the life of the project. Table 9-18: Cash flow, reinvestment in equipment every 10 years Parameter Unit 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2035 2040 2045 2050 Revenues from M 10.35 10.72 11.10 11.48 11.86 12.24 12.62 13.00 13.38 13.77 14.16 14.62 15.02 15.38 15.70 Compost USD Sale Invest- M 52.25 - - - - - - - - - 52.25 - 52.25 - 52.25 ment Cost USD Compost- M 3.25 3.37 3.49 3.61 3.73 3.85 3.97 4.09 4.21 4.33 4.45 4.59 4.72 4.83 4.93 ing OPEX USD Net M - - - 7.35 7.61 7.87 8.13 8.39 8.65 8.91 9.18 9.44 10.02 10.55 - 41.49 Revenue USD 45.16 42.55 41.95 The abatement cost analysis presented in Table 9.18 based on an Internal Rate of Return (IRR) of 12.75% intimate that the marginal abatement cost for composting is – US4.22/mtCO2e. The negative marginal abatement cost reveals that composting is fi- nancially viable. Table 9-19: Abatement cost analysis Parameter Unit Value Net Present Value M USD 25.91 IRR % 12.75% Abatement Potential 2030 M tCO2 e 0.15 Total Abatement Potential M tCO2 e 6.14 Marginal Abatement Cost USD/tCO2e -4.22 - 74 - Recycling The ISWMP for Zimbabwe includes the option of recycling (GoZ, 2014). Since recy- cling addresses waste management upstream, the option was not considered in the miti- gation analysis. Recycling aims to remove any contaminants from waste so as to render such waste reusable, or returned to the economic mainstream in the form of raw materi- als. It does not reduce, significantly, biodegradable material disposed at SWDS. The environmental concerns on recycling include the need to reduce waste at dumpsites and promote climate change mitigation. The two main factors for recycling waste can be divided into environmental and economic. Financial, economic and social motivation for recycling borders on reduction in waste handling cost and revenue generation. For- mal sector recycling can generate modest profits, but it may not be the case for munici- palities. The involvement of the formal private and informal sectors in all aspects of solid waste management has proved to be effective (UN-Habitat, 2012). Mechanisation of the sorting process adds to investment and operational costs, requires good mainte- nance and a motivated workforce. Recycling happens spontaneously when it is econom- ically viable. Strategies to promote recycling include deposit system or regulations for promoting packaging recycling. Where it is not economically viable, however, it must be subsidised or the cost of alternatives (usually disposal) must be artificially increased. The projected recyclable solid waste is presented in Figure 9-12. Figure 9-12: Projected Recycle Potentials The main infrastructure and equipment required for a basic recycling facility include; waste transfer facility, waste sorting and recycling facility, waste compactor, bailing machine, forklift, vehicles, shredders, among others. The prices paid for recycled mate- rials often fluctuate wildly. It is, therefore, common for traders to have the space and working capital that allow them to stockpile material when prices are low. Prices fluctu- ate with supply and demand. The importation of cheap recyclable material can also af- fect prices. The recyclables can be sold locally or exported as is or after some semi- processing. - 75 -

  67. Annex IV: Low Carbon Transport Initiative Overview Zimbabwe’s National Climate Change Response Strategy of 2015 sets a goal to ‘develop cli- mate proofed and environmentally sustainable transport systems that are less carbon intense’ (GoZ, 2015). This goal was subsequently reflected in the Zimbabwe National Transport Mas- ter Plan of 2018, which has as one of its key themes or pillars Environmental Sustainability (Theme 2). Noting that road transport is a major contributor to national GHG emissions, the Plan identifies a number of specific measures for the sector, including; ▪ Enforcement of emission standards for vehicles and using them to assess the emissions of imported vehicles before they are allowed into the country; ▪ Introduction of an integrated transport system to reduce the carbon footprint caused by the road transport sector; ▪ Development of an efficient public and mass transport system by introducing larger buses and trains on urban commuter routes to reduce the use of private cars; ▪ Promotion of the use of non-motorised transport (NMT) such as bicycles and walking to reduce carbon emissions, whilst improving health; ▪ Incorporating climate change in road designs and transport related infrastructure; ▪ Moving towards the use of blended fuels for vehicles to reduce GHG emissions; and ▪ Introducing a transport policy framework that encourages use of transport with low car- bon emissions e.g. electric vehicles. This Annex draws upon this list to describe a package of measures aimed at supporting a low carbon road transport sector as part of the LEDS through 2050. A modelling exercise under- taken to estimate the mitigation potential from these interventions is described, followed by a high-level economic analysis of the package and summary of the types of policies, institution- al arrangements and key actions needed for implementation. GHG mitigation potential Modelling approach Transport sector modelling was undertaken to calculate the potential for GHG reductions against a business-as-usual scenario for road transport through 2050. A package of four key mitigation measures was analysed: ▪ Improved fuel economy of imported internal combustion engine (ICE) vehicles; ▪ Introduction of electric vehicles (EV); ▪ Commercial scale domestic biodiesel production and blending; and ▪ Increased public transport use, with modal shift from passenger car use to modern buses and NMT (e.g. walking and bicycles). The use of hydrogen fuel and hybrid vehicles was not modelled. Although these options are expected to play an increasing role in low carbon transport over the coming years, they are considered to effectively be variations on the use of EVs (this approach is also taken in the - 76 - GFEI’s analysis of low carbon vehicle potential through 2050 (GFEI, 2019). The modelling approach and results are described in the next section. Business as usual scenario The development of a BAU GHG projection is summarised in the following steps: Step 1: Characterization of existing vehicle fleet. Zimbabwe’s vehicle fleet was first charac- terised according to vehicle type, class, fuel type, and fuel economy. Vehicle registration data for recent years according to type and class were estimated based on data compiled by the African Development bank (AfDB, 2011)15 and under the UNEP-supported Global Fuel Economy Initiative (GFEI) in 2017 (Zanamwe Pers.com.)16 (Table 9-20. Average fuel econ- omy values (litres per 100 km) for each vehicle class and fuel type were developed, based on a variety of sources and estimates including recent analysis undertaken by the GFEI of fuel economy for road vehicles registered in Zimbabwe, as well as assumptions around future fuel economy improvements as part of expected technology improvements (GFEI, 2019)17. Based on national data for diesel and gasoline consumption in transport, average annual distances for each vehicle category were then developed (km per year). Total fuel consumption for the base year of 2016 was then calculated for each vehicle category and fuel type within each category (diesel; gasoline), according to: Fuel consumption = total number of vehicles x fuel economy (l/km) x distance travelled per vehicle (km) Table 9-20: Estimated vehicle fleet in Zimbabwe, 2000-2016 Category 2000 2005 2010 2015 2016 Motor cycles 191,117 195,711 218,318 278,635 292,567 Passenger vehicles 355,557 509,764 659,442 972,266 1,037,643 Commercial vehicles 86,457 106,272 131,780 168,188 176,597 Buses 1,678 2,531 3,542 4,521 4,747 Combis 8,364 12,150 16,341 20,856 21,899 Trailers 23,048 25,142 29,375 37,491 39,365 HGV (2.3-4.6 Mt) 17,780 23,370 30,234 38,587 40,516 HGV (4.6-9.0 Mt) 31,313 37,564 44,355 56,609 59,440 HGV (> 9.0 Mt) 4,274 5,515 7,932 10,124 10,630 Total number 633,131 811,747 1,009,540 1,419,089 1,506,807 Source: derived from AfDB, 2011 (Annex 5: Road Transport) and UoZ (2017) Step 2: Vehicle fleet projected through 2050. A forecast was then made of numbers for each vehicle category through 2016-2050. Numbers of new vehicle registrations were estimated 15 African Development Bank Infrastructure Report for Zimbabwe; Annex 5 Road Transport (AfDB, 2011) 16 Motor Vehicle Inventory. Presentation given at GFEI Zimbabwe meeting by N.Zanamwe, University of Zimbabwe, December 2017. 17 ‘Prospects for Fuel Efficiency, Electrification and Fleet Decarbonisation‘. Working Paper 20. Global Fuel Economy Initiative (GFEI), May 2019. - 77 - based on an increased demand for road transport vehicles. These were projected on the basis of GDP per capita growth (from national medium case GDP and population projections, with regression analysis undertaken to link vehicle ownership rates to GDP per capita from the available historic data). An average annual scrappage rate of 5% was assumed, in common with estimated historic scrappage rates in Zimbabwe, which are also in alignment with typical reported OECD values. Figure 9-13 shows the resulting estimated projections for road vehicles in Zimbabwe through 2050. It can be seen that from an estimated national fleet of 1.5 million road vehicles in 2016, numbers are projected to increase significantly to around 3.5 million by 2050, of which pas- senger vehicles (or light duty vehicles, LDVs) account for the large majority. Figure 9-13: Road vehicles by type, historic and projected to 2050 (BAU) - 78 - Figure 9-14: Road vehicles, existing versus new stock to 2050 Step 3: Estimation of fuel use and GHG emissions through 2050. Based on Steps 1 and 2, fuel use estimates were next calculated for diesel, gasoline and ethanol in each forecast year. Applying IPCC default emission factors for mobile emission sources (IPCC, 2006), a GHG forecast was made. In the absence of robust alternative assumptions, the existing split between diesel and gasoline usage was assumed to remain the same through the forecast period. Cur- rent ethanol blending rates from official data sources (which has reached up to 20%, E20, in some cases) were also assumed to remain at existing levels through 2050. Figures 9.15 and 9.16 show projected total fuel use and GHG emissions by transport mode through 2050. The projection estimates total emissions to increase from around 2.3 million tCO2e in 2015 to al- most 5.3 million tCO2e by 2050. Whilst this represents a major increase in GHG emissions, it should be noted that the rate of increase is lower than the projections for transport demand and vehicle numbers, largely reflecting the assumptions around gradual BAU fuel economy improvements over time. - 79 - Figure 9-15: Projected fuel use in road transport to 2050 (BAU) Figure 9-16: Projected GHG emissions from road transport to 2050 (BAU) - 80 - Mitigation Scenario The four identified GHG mitigation levers were modelled together as a combined package within one mitigation scenario. The key assumptions concerning each of the mitigation levers, and the estimated GHG reductions versus BAU, is summarised in the next section. Fuel economy measures. The potential for improved fuel economy measures for new internal ICE vehicles through 2050 is shown in Table 9-21. The values are proposed by the GFEI for four broad vehicles types, based on existing technical analysis undertaken by the International Energy Agency (IEA) and others, and reflect an estimated potential which could be delivered through use of policies and incentivise to drive increasing fuel economy standards for new vehicles within national fleets(GFEI, 2019). The assumed improvement rates are significantly ‘front-loaded’, reflecting the assumption that improved fuel economy becomes increasingly difficult within ICE technology development through 2050. The values were applied to all new vehicles entering the fleet from 2025 onwards, and the GHG mitigation was calculated through 2050 based on the resulting reduction in fuel consumption. Fuel economy improve- ments were applied equally to diesel and gasoline vehicle types. Table 9-21: Fuel economy improvement targets for new road vehicles Vehicle type 2025-2030 2030-2035 2035-2040 2040-2045 2045-2050 Motorcycles 2.2% pa 1.9% pa 1.6% pa 1.3% pa 0.9% pa LDVs 2.9% pa 2.2% pa 1.9% pa 1.4% pa 1.2% pa Buses 2.6% pa 2.5% pa 2.1% pa 1.8% pa 1.4% pa HGVs 2.5% pa 2.2% pa 1.9% pa 1.5% pa 1.1% pa Source: GFEI, 2019 Electric vehicles. The penetration of EVs within the national vehicle fleet was modelled through 2050 according to target potential uptake rates developed by the GFEI reflecting EV policy support (GFEI, 2019). Market penetration curves for new EVs as a share of total new vehicle registrations were developed through 2050 based on these GFEI values assuming EV penetration into Zimbabwe from around 2023 (beyond the existing very small EV numbers) supported by adequate policy incentives. These were applied to all new vehicle classes as di- rect replacements for ICE equivalents; the resulting growing share of EVs within the cumula- tive new vehicle fleet from 2016-2050 is shown in Figure 9-17. Emissions mitigation was calculated based on avoided fuel combustion from displaced ICE sales net of power genera- tion emissions associated with annual power demand for the EV fleet. Power generation emis- sions were calculated by multiplying the total power demand according to vehicle type by the grid emissions factors in each forecast year according to the power generation mitigation sce- nario (which foresees an increasing reduction in GHG intensity).18 Average vehicle power demand values from 2020-2050 were taken from GFEI (GFEI, 2019) and are shown in Table 9-22.19 18According to IPCC reporting guidelines, these emissions should be allocated to the electricity and heat generation category; however they are here allocated to transport for the purpose of transparently demonstrating sectoral policy contribution 19 Note that electricity demand projections for EVs are not linked to national power development system planning - 81 - Source: Derived from GFEI, 2019 Figure 9-17: Market penetration rates for electric vehicles (maximum share of new reg- istrations) Figure 9-18: Cumulative vehicle sales 2015-2050 (conventional ICE versus EV) - 82 - Table 9-22: Average electricity demand from new electric vehicles 2020-2050 (kWh/100 km) Vehicle type 2020 2025 2030 2040 2050 LDV Passenger car 18.0 18.6 18.6 19.3 19.3 HGV small 26.5 27.4 27.4 28.3 28.3 HGV medium 43.7 45.2 45.2 46.7 46.7 HGV large 88.6 91.6 91.6 94.7 94.7 Motorcycle 4.9 5.1 5.1 5.3 5.3 Bus 48.2 49.9 49.9 51.6 51.6 Source: GFEI, 2019 Biodiesel. Recognising the national dependence on oil product imports, indigenous biofuel production is an objective of ZimAsset and TSP; blending of biofuels in transport fuel use is also a key recommendation within the Zimbabwe National Transport Master Plan. A part of a national biofuels development programme, a biodiesel plant was commissioned in Mount Hampden, near Harare in November 2007 based on production from jatropha curcas harvest- ing and oil production using transesterification. However, the plant remains small-scale due to lack of funding,, despite having an estimated production potential of up to 100 Million litres. Zimbabwe’s NDC concluded that reviving the project to achieve commercial scale production would allow national biodiesel blending rates of up to 10% with fossil diesel to be achieved by 2030. Based on the existing technical analysis in the NDC, increased production and blending of biodiesel with fossil diesel in ICE vehicles was modelled through 2050. As with the NDC analysis, harvesting of jatropha is considered possible after three years, with full commercial- scale production reached after nine years. Output was extrapolated from the NDC analysis whereby jatropha production reaches 15,000 Ha and biodiesel fuel product around 100 mil- lion litres by 2030. For the LEDS, it was assumed that growth in production is achieved from 2030-2050 sufficient to achieve and maintain an average 15% blending rate within the steadi- ly increasing diesel fuel market20. Unlike GHG emissions arising from the production of imported fossil diesel, emission arising from domestic biodiesel production will occur in Zimbabwe. The mitigation potential from biodiesel blending is therefore determined by the displaced fossil diesel net of the emissions associated with the biodiesel production process. Energy emissions associated with jatropha 20 Note that this is an average national target assumption, and higher blending rates are possible for certain vehicles - 83 - production, covering transesterification, refining, transportation etc. are estimated at 11.3 gCO2e per MJ fuel based on analysis by Ndong et al, 200921. Public transport/modal shift. Policies and investments aimed at supporting a modal shift away from private vehicle use (mainly passenger cars) to public transport and NMT can be effective in reducing GHG emissions as well as easing congestion leading to greater economic productivity and health benefits. The Zimbabwe National Transport Master Plan proposes a range of measures aimed at increasing the use of transport from modern clean buses, rail, bi- cycling and walking. Quantifying the impacts of such policies is complex, typically involving the use of advanced transport system models, which are not currently available in Zimbabwe. Detailed modelling of modal shift potential has not been possible within the scope of the cur- rent project. However, a first order estimate of the potential is possible based on some high- level assumptions. It was assumed that a mix of policies and infrastructure projects starting in 2020 can be introduced to drive a modal shift from passenger car usage (defined as passenger km) to modern bus usage (equivalent passenger km) and also non-motorised passenger km (walking and cycling). An equal split between the two modes assumes e.g. covering bus rapid transport (BRT) activities and promotion of cycle lanes, green walkway and pedestrianisation projects. Modal shift programs are typically introduced over medium-long periods. Based on previous experiences in other countries, it was assumed that a total modal shift from passen- ger car usage to public and NMT alternatives could reach 10% by 2030, 20% by 2040 and 30% by 2050. GHG mitigation impacts arise from the increased energy efficiency of modern public transport compared to conventional private vehicle travel (in passenger km), and the zero- carbon characteristic of non-motorised transport use. Data was not available to estimate occu- pancy rates and typical travel distances for different modes in Zimbabwe with any accuracy, hence unit GHG intensity values presented in GFEI (2019) for different transport modes were applied to calculate the decreasing emissions intensity from modal shift relative to BAU through 2050. The following values were assumed ▪ Passenger car: 204 gCO2e/km; ▪ Modern public bus: 82 gCO2e/km; ▪ Rail: 60 gCO2e/km; ▪ NMT: 0 gCO2e/km. Rail rehabilitation and electrification was considered within the Zimbabwe NDC analysis: however, given the lack of available data, the potential for additional rail infrastructure devel- opment, including potential for HGV freight km to rail freight km has not been considered here. Increased rail rehabilitation and electrification rates (assuming the GHG intensity of grid supply falls significantly from present levels, as per the mitigation scenario presented in this LEDS) could achieve additional mitigation as diesel consumption from HGVs is displaced by more efficient rail freight energy use. 21 Life cycle assessment of biofuels from Jatropha curcas in West Africa: a field study (Ndong et al, 2009) - 84 - Combined results. The GHG mitigation potential estimated from the combined package of interventions is shown inFigure 9.19. The graph shows that by 2050, the carbon intensity of the road transport system is more than halved under the LEDS low carbon scenario. Under the BAU scenario, emissions are projected to increase to around 5.3 MtCO2e by 2050. Putting in place the package of low carbon road transport measures is estimated to reduce this level to around 2.4 MtCO2e. The largest contribution to the mitigation effort is expected to come from fuel economy improvements in the vehicle fleet, delivering around 50% of the GHG emis- sions reductions in 2050, followed by EVs which contribute around 30% of the effort; the use of biodiesel and modal shift account for the remaining 20% of the total mitigation. Note that total decarbonisation of the sector would require additional measures such as inter alia man- datory scrappage of all ICE vehicles before 2050 and the development of a zero carbon power supply. Figure 9-19: GHG mitigation potential in road transport through 2050 Economic Analysis Abatement costs were calculated for each of the four mitigation measures, based on a simple discounted cash-flow analysis of project costs and benefits (net present value) divided by the total mitigation achieved. The analysis was undertaken on a socio- economic basis applying a discounted factor of 6% over a long-term assessment period of 25 years. The resulting abatement costs are shown in Table 9-23, along with the key economic assumptions made. - 85 - Table 9-23: Abatement costs for low carbon road transport measures in 2030 USD/ Measure Key economic assumptions tCO2e Additional technology (vehicle) costs associated with an improvement of fuel econ- omy in all new vehicle imports (based on GFEI targets) are estimated based on an economic study of mandatory Euro V standard for ICE vehicle classes (ICCT, 2014). Incremental costs above uncontrolled vehicle types were estimated as $US 54 Fuel economy -100.83 (motorcycles), $US 361 (passenger cars), $US 2,958 (buses) and $US 2632-5394 (HGV, according to class). Set-up and policy study costs were estimated at $US 5 million, and annual administration and inspection/enforcement costs were estimated at $US 3 million. Capital costs for commercial scale biodiesel production plan estimated at $US 300 million (for target production of 100 million litres p.a.), based on Finealt Engineer- ing, 2016 Clean Development Project (CDM) project design document (PDD).Total Biodiesel -0.92 operating costs for scale-up estimated at 0.78 $US per litre biodiesel (Finealt Engi- blending neering, 2016). Local job creation from production and processing estimated at 3,000 with employment benefits equivalent to to USD 0.05/litre, based on study of jatropha production socio-economic benefits (Eijck et al., 2012). Insufficient data and transport system information was available to undertake robust Public cost-benefit analysis. Abatement cost therefore taken from an existing study of transport/ 12.00 modal shift implementation in developing country urban area (Bogota), applying bus modal shift rapid transit (BRT) system. Midpoint of US$ 10-14/tCO2e assumed. Additional capital costs include the incremental cost between an EV and equivalent ICE vehicle purchase, and the charging infrastructure needed to provide for reliable charging. Current costs for equivalent passenger cars e.g. VW Golf (gasoline) and VW eGolf (electric) indicate an incremental cost of around 25-30%. A wide range of market studies (e.g. Deloitte; McKinsey) estimate cost parity may be reached by 2025 principally as a result of rapidly declining battery costs; the year 2028 is as- sumed as a conservative assumption. It is assumed that wide-spread rapid charging (as opposed to overnight/slow; or fast) will be required for commercial scale EV Electric vehi- 17.71 uptake; a per vehicle capital cost of $US 2,500 is applied, based on a unit cost of cles GBP 30,000 (USD 37,500) for a 50kW rapid charger supplying 15 vehicles (Energy Saving Trust). Changes in operating costs between an EV and equivalent ICE vehi- cle are equivalent to vehicle electricity demand per km of travel minus the displaced diesel and gasoline costs per km of travel. Due to a lack of comparative datasets, these assumptions are applied on a unitised basis to all EV vehicles: this is consid- ered reasonable as (a) passenger cars will represent the large majority of new EV vehicles and (b) some vehicle types are expected to face higher relative costs and others lower relative costs compared to passenger cars. The abatement costs show that undertaking a programme aimed at improving vehicle fuel economy result is highly cost effective: the additional costs arising from the pur- chase of highly fuel efficient models within each vehicle class are offset by overall fuel savings, as are the set-up and ongoing costs of policy implementation and administra- tion. The inclusion of environmental and health impacts would deliver considerable additional benefits. Despite their ability to deliver cost-effective mitigation, the other measures as described will require larger levels of investment and costs to vehicle users, requiring financial support to enable their uptake. - 86 - Policy and Implementation Policy Measures Future uptake of electric vehicles to replace ICE vehicles will be largely determined by the rate of technology cost reductions in new models, principally reflecting battery costs. Even with vehicle cost parity, users need access to reliable charging (at home, work, or through public charging points). These represent an additional cost – whether paid for directly by the consumer (home charging), fleet manager (fast or rapid charging for multiple vehicles) or through charging stations. To help bridge the cost difference, a loan facility to incentivise EV and charging purchases is proposed as a climate finance instrument managed by the IDBZ. Figure 9-20 compares the lifecycle cost on a per km basis for a conventional gasoline ICE passenger car and an equivalent EV model.22 It is assumed that a fleet operator is assessing the relative financial case between a small fleet of gasoline versus EV vehi- cles. The first two bars show the costs compared based on a prime commercial lending (CL) basis applying a rate of 15%. It can be seen that although the lower operating costs per km (electricity for EV) are lower than those of the gasoline vehicle, these are insuf- ficient to overcome the total cost of capital. However, if a reduced rate of 6% was ap- plied through a loan facility (LF), the EV fleet now demonstrate lower lifecycle costs. Figure 9-20: Lifetime vehicle cost comparison, Gasoline ICE versus EV (fleet op- erator) 22Assumes finance provided over a five-year period with 15,000 km travel per year. Resale value in year six estimated to be 30% of new sale value (based on 75,000 km mileage). - 87 - On this basis, a loan facility to incentivise EV and charging purchases should be made available through a climate finance instrument managed by the IDBZ. Biodiesel production in Zimbabwe has so far suffered from a lack of funding and policy support. It can however play an important role in reducing fossil energy emissions whilst also helping to create domestic employment and reducing the country’s reliance on diesel imports. Importantly, blended biodiesel offers a way to help mitigation emis- sions from existing and future ICE vehicles, noting that electrification of the transport system will take several decades. However, the large investment costs (for harvesting, processing, refining and distribution) and long lead times in harvesting biomass pose a challenge to investment. Unlike EVs, biodiesel also face additional ongoing costs versus conventional diesel, as the estimated price required to generate a return to investors is higher than the current pump price for diesel. Figure 9-21 compares the final pump price for blended biodiesel and conventional die- sel (assumed in year 2022). Assuming a 30% margin for production and retail over pro- duction costs and biofuels tax exemption, new biodiesel production financed at a com- mercial lending rate of 15% would retail considerable higher than diesel. Lending at a rate of 6% under a climate finance facility would reduce the price, although the lower level would likely remain insufficient to compete with conventional diesel. Biodiesel would therefore need additional support to incentivise plan investment and commercial- ise its use. The graph shows the relative impact of increasing the existing carbon tax on transport fuels - here to around $US 0.13/litre, resulting in a final price preference for biodiesel. Carbon pricing could therefore play an important role in supporting biodiesel production – but unless raised to very high levels, would need to be accompanied by the support needed to help finance production plant. - 88 - Figure 9-21: Diesel and biodiesel blend pump prices with and without support in- centives A policy package to encourage improvements in vehicle fuel economy should be devel- oped, include the following potential components: ▪ Development of fuel economy and/or emissions standards for all new vehicle reg- istrations through 2025. Consideration should be given to application of latest Euro engine standards across all vehicle types and classes. A timeline of actions is proposed as: o Definition of new emission standards by 2022 o Phased introduction of the standards from 2022 to 2025 o Full implementation and enforcement of the standards from 2025 ▪ Strengthen capacity to measure, monitor vehicle emissions, and enforce emissions standards (e.g. setting up a national motor vehicle technical inspection centre). ▪ Promoting appropriate car maintenance by enforcing vehicle compliance and in- spection rules. ▪ Gradual phase out of kombis and minibuses on trunk routes by replacing them with conventional buses (2022-2025). ▪ Policy review to assist the private sector to investment in modern fleets, potential- ly supported through IDBZ loan facility. ▪ Policy review to assess potential for scrappage of the least fuel-efficient vehicles. ▪ Fiscal reform to incentivise fuel efficient vehicle, to include the following poten- tial elements: o Tax exemptions for imported large fuel efficient buses for public transport o Tax levy on imported used cars of 10 years or over. o Phased introduction of revenue neutral fee-bate scheme to incentivise purchase of the most fuel-efficient models within each vehicle class/category. The introduction of an integrated transport system in Zimbabwe would reduce the car- bon footprint caused by the road transport sector. This will reduce the number of people using private cars and reduce GHG emissions. A combination of policy development, infrastructure investment, and public awareness campaigns will be required to achieve modal shift from the current carbon intensive transport system to a more sustainable and efficient system over the medium and long term. Key actions will include; ▪ Introduction of an effective mass public transport system that includes use of big buses and rail transport, replacing kombis on trunk routes in all cities and most towns. ▪ Establishment of bus priority such as dedicated bus lanes, including construction of dedicated rush hour high speed bus lanes, and scheduled timetables (from 2025 onwards), - 89 - ▪ Introduction of regulations promoting use of non-motorized transport (NMT) to reduce carbon emissions and make provisions for non-motorized transport on existing and new road networks, for example, through use of new pedestrian and bicycle lanes. Roadmap of actions Table 9-24 presents a roadmap framework of actions proposed to develop a policy framework that promoting a transition to a low carbon transport sector in Zimbabwe. Note that modal shift actions (T6 and T7) area indicated to have economic costs out- weighing benefits. However, detailed economic analysis has not been possible and this conclusion is based on an existing study estimating abatement costs from a BRT scheme: inclusion of wider benefits such as reduced air pollution, health benefits and efficiency gains may indicate larger benefits to offset against significant infrastructure investment costs. Similarly, the promotion of EVs may be achievable at overall net eco- nomic benefit if assumptions around future capital costs of EVs and charging infrastruc- ture are more favourable and/or the relative costs of electricity versus imported fossil fuels are further reduced over time. - 90 - Table 9-24: High level Roadmap for Low Carbon Road Transport Economic Estimated Lead organ- benefits No. Action Time-frame Cooperating organisations Potential funding sources total costs t0 isation outweigh 2050 costs? Government Treasury; Develop national biofuels policy with MF; SAZ; MFED; BCSDZ; Short-term; MEPD and GEF; UNEP; UNIDO; T1 financial support for production invest- CZI; EMA; Research Institu- USD 2 billion Yes ongoing MTID World Bank; DFID; EU; ment. tions; NGO; IDBZ carbon tax on fuels Promote out-grower schemes and mini Medium- Government Treasury; MEPD and Private Sector; Farmer’s USD 50 mil- T2 processing plants for biofuels production term; ongo- GEF; DFID; EU; private Yes MOA Organisations; NGOs lion on smallholder farms. ing sector; climate finance Strengthen capacity to measure and mon- MOHA; Government Treas- MTID; USD 5 mil- T3 itor vehicle emissions and enforce fuel Short-term ury; motor Industry (traders, Carbon tax; import taxes Yes MLAWRCC lion economy standards for new vehicles. retailers); SAZ; MHTESTD; and sales taxes/fees; fines NGOs; fuel Companies; and penalties; motor indus- Implementation of fuel economy stand- Medium- MTID; transport operator associa- try. USD 1-2 T4 Yes ards and support/fiscal incentives. long term MLAWRCC tions billion Develop strategy to promote introduction MTID; Carbon tax; import taxes of EVs to replace imported ICE vehicles, Medium- Motor Industry (traders, re- USD 4-5 T5 MLAWRCC; and sales taxes/fees; climate No supported by loan facility to support long term tailers); Fuel Companies billion IDBZ finance additional costs. MF; MHA; MLGPWNH; Introduce regulations and provisions that MJLPA; CSOs; Media; Local Government Treasury; USD 50 mil- T6 promote use of non-motorized on exist- Short-term MTID No Authorities; Zimbabwe Safe- banks; private sector lion ing and new road networks. ty Council Government Treasury; Introduce an effective mass public MF; MLAWRCC; MHA; GEF; UNEP; EU; DFID; Medium- USD 500 T7 transport system that includes use of MTID MLGPWNH; MJLPA; CSOs; UNIDO; AfDB; World No term million large buses and rail transport. Media Bank; banks; private sector; IBDZ - 91 -

  68. Annex V: Low Carbon Cement Initiative Overview The cement sector is a major emitter of industrial GHG emissions, both globally and within Zimbabwe. Emissions include industrial process emissions from calci- nation during clinker production, as well as energy emissions arising from fossil fuel and electricity consumption. Three main levers exist to reduce direct GHG emissions from the cement industry: ▪ Lowering the clinker content in cement; ▪ Increasing the use of alternative fuels and raw materials (AFR) substituting fossil fuel use; and ▪ Implementing thermal energy and electrical efficiency improvements. There are currently three major clinker and cement producers operating in Zimbabwe. These include Lafarge, SinoZim and Pretoria Portland Cement (PPC) Zimbabwe. Two other plants, Live Touch and Pacstar also produce cement from sourced clinker. Total clinker production volume was estimated at 376,000 tonnes in 2013. Although aggre- gated data is not available, production levels in 2018 were estimated to be around 450,000 tonnes per year. The demand for cement rose by 30% through 2018 due to increased construction activi- ty . The sector is unable to meet demand due to insufficient foreign currency to finance plant repairs and imports of equipment/spare parts. As a result, plants are unable to run at full utilisation due to plant breakdowns. The shortfall is being met through imports from South Africa and other neighbouring countries. This Annex describes the key elements of a potential low carbon programme for the cement sector. Such a programme would aim to deliver GHG reductions from both GHG emission sources (process emissions and energy emission) whilst also reducing fossil energy use. The programme is described at a very high level only: a key recom- mendation is that a more detailed programme including specific targets, actions and funding sources be developed. This could can define step-wise goals, KPIs and associ- ated emissions reductions from a BAU baseline case through 2050. This would need to be underpinned by developing an MRV system according to a harmonised sectoral standard to assess progress in CO2 and energy performance, for example, as developed under the World Business Council for Sustainable Development (WBCSD) Cement Sustainability Initiative (CSI) and through capacity building, awareness raising and im- proving dialogue among relevant stakeholders. Although demand for cement is rising, production from existing facilities is hampered by a lack of investment in technology and access to spare parts. Any mitigation pro- - 92 - gramme for the sector should therefore be focused on reducing emissions whilst deliver- ing measurable and cost-effective co-benefits to the industry. For this reason, a realistic low carbon development scenario developed for the cement sector should recognise the need for industrial growth and focus on economic efficiency. Higher-cost or unproven technical options such as carbon capture and storage are not considered within the pro- gramme, although could be feasible subject to ongoing developments and support from international climate finance. The scope of the current analysis, only considers mitiga- tion from reducing calcination process emissions. Mitigation from reduced energy use and alternative fuels would deliver additional reductions and should be further assessed as part of a low carbon programme for the sector. GHG mitigation potential The cement production process can be divided into two basic steps; first clinker is pro- duced from heating limestone in a kiln to temperatures up to 1,400°C. Then the clinker is milled with other materials to produce powdered cement product. The production of cement gives rise to three principal sources of CO2: 1. Process emissions associated with de-carbonation of limestone in the kiln (around 525 kg CO2 per tonne of clinker); 2. Combustion of fuel in the kiln (typically 300-350 kg CO2 per tonne of cement); 3. Indirect emissions from electricity use for raw materials and clinker grinding, and cement finishing (typically 50 kg CO2 per tonne of cement). Process CO2 emissions associated with limestone calcination thus account for the larg- est source of sector emissions – equal to around 60% of direct sector emissions. The principal option available to reduce process emissions is through the increased blending of cement with clinker substitutes. Blending reduces the clinker production needed per tonne of cement product. The use of clinker substitutes such as fly ash, blast furnace slag and volcanic ash varies considerably by world region according to the local availa- bility of such materials and varying requirements for product specifications. In addition, significant emissions reductions could be achieved with CCS using post combustion or oxy-firing technology and via the development of alternative low-carbon cement prod- ucts. These options, however, face considerable uncertainties around their technical and economic viability. The WBCSD Cement Sustainability Initiative and IEA have developed long-term tar- gets for global cement industry based on the key abatement levers (Figure 9-22). These describe how increasing the use of clinker substitutes, alternative fuel use and energy efficiency measures could deliver 44% of sector mitigation potential cost-effectively. - 93 - Figure 9-22: Targets for improving sustainability in the global cement indus- try to 2050 Source: Cement Technology Roadmap (IEA/CSI, 2009) Various factors, including the local availability of affordable alternative fuels and substitutes, regulatory requirements and standards for the clinker content of ce- ment products, and technology availability will determine what can be achieved in practise. Table 9-25 presents a series of targets for the Zimbabwe cement sector, based on a series of key performance indicators. The table is based on a framework devel- - 94 - oped by the EBRD23 and shows the current performance levels for the sector and targets for what could be feasibly achieved over the medium term, subject to overcoming various barriers. The values shown are aggregated at the sector level based on information provided by each of the key producers. Table 9-25: GHG emissions KPIs for Zimbabwe cement sector by 2030 Key performance indicators Technical aspect Unit Current best practice worldwide Current Target % clink- Clinker substitu- er/t ce- <50% 78% 72% tion ment Thermal energy GJ/t clink- 2.8 4.2 3.8 consumption er Electrical energy kWh/t <80 130 120 consumption cement Alternative fuels % (ther- 100% 0% 19% (AF) mal) Alternative raw % (kg/kg 100% (small scale industrial) 14% 17% materials (AR) raw meal) Specific CO2 kgCO2/t 766 (EU ETS) 893 804 emissions clinker Specific CO2 kgCO2/t Depends on clinker factor (543, 704 611 emissions cement global 10% best) Source: based on EBRD, 2016 Figure 9-23 shows sustainability targets for Zimbabwe’s cement sector over the longer term to 2050. The specific KPI targets shown in the table are assumed achievable in the medium term (2030) subject to appropriate support. The long-term global targets for energy related emissions as proposed by the WBCSD-CSI and IEA are then applied in year 2050. For clinker content, a steady improvement is assumed based on reaching global BAT-type levels by 2050. The resulting trajectories indicate the potential in- crease in performance levels that could be achieved by the sector over the next 30 years as part of the national LEDS. It is important to stress that these values are highly indica- tive only based on initial analysis; as part of a low carbon initiative for the sector. A more detailed assessment and consultation with the industry is required to develop final- ised KPI targets. 23 Low-Carbon Roadmap for the Egyptian Cement Industry, EBRD October 2016. - 95 - Figure 9-23: Indicative targets for improving sustainability in the Zimbabwe ce- ment industry to 2050 Based on these targets, the sectoral mitigation potential through 2050 compared to BAU can be estimated. This is shown in Figure 9-24. The BAU projection shows total ce- ment production emissions comprising of both IPPU process emissions (around 56% of the total) and energy emissions (around 44% of the total). Under the BAU scenario, these rise from just under 0.4 million tCO2e in 2015 to almost 1 million tCO2e by 2050. With implementation of the sustainability targets, process and energy emissions are re- duced by around 40% compared to the BAU level in 2050. The graph (Figure 9-24) shows that clinker substitution delivers the largest reduction, which reduces both pro- cess and energy emissions. The associated expected improvements in the GHG intensity of clinker and cement production are shown in Figure 9-25. - 96 - Figure 9-24: Estimated mitigation potential versus BAU in the cement industry through 2050 Figure 9-25: Improved GHG intensity of cement and clinker production with miti- gation measures Economic Analysis Most economic analysis of abatement options in the cement sector indicate that mitiga- tion can be achieved on a cost-effective basis for the three key options in Figure 54 - 97 - (McKinsey and Company, 2009).24 This is because capital and material costs are offset by reduced clinker production costs and energy (fuel and electricity) consumption, as follows: • Clinker substitution by alternatives (e.g. fly ash, blast furnace, slag) typically in- volves capital costs for material handling and material and freight costs; substi- tution reduces clinker production costs. • Increasing use of alternative fuels and waste (e.g. municipal and fossil-based industrial waste) typically involves capital costs for waste handling and waste fuel costs; use of waste as a fuel reduces fossil fuel costs/imports and potentially also costs to public sector of disposing of domestic and industrial waste. • Energy efficiency and waste heat recovery options give rise to capital costs, which are typically offset in the medium-term by fuel and electricity savings. Estimating abatement costs for the sector is highly dependent on the technical and logis- tical circumstances of each production facility and its potential to implement abatement measures. A detailed economic assessment has not been possible due to limited data. However, an economic analysis of the potential to reduce cement process emissions by increasing clinker substitution rates was undertaken. Abatement costs were calculated for two clinker substitution options: increased use of fly ash (from coal-fired power stations) and increased use of blast furnace slag, BFS (from iron and steel production). Both sources are currently used in the sector and there is potential to increase their use over the medium and long-term, subject to key factors including their future availability and consumer acceptance of lower clinker content products.The GHG emissions reductions are achieved by displacing clinker production emissions. The costs associated with clinker substitution include capital costs for mate- rial handling, processing and material purchase costs. Benefits that arise from reduced clinker production costs include energy costs and other fixed and variable cost elements. For the sake of the analysis, and given the high degree of uncertainty around future ma- terials availability, an equal split between fly ash and BFS was assumed. Abatement costs were calculated for the two clinker substitution measures, based on a simple discounted cash-flow analysis of project costs and benefits (net present value) divided by the total mitigation achieved. The analysis was undertaken on a socio- economic basis applying a discounted factor of 6% over a long-term assessment period of 25 years. The resulting abatement costs are shown in Table 9-26, along with the key economic assumptions made. The resulting negative cost values are in line with other published studies, including McKinsey and Company, demonstrating the cost- 24Pathways to a Low-Carbon Economy, Version 2.0 of the Global Greenhouse Gas Abatement Cost Curve (McKinsey and Company, 2009). - 98 - effectiveness of increasing clinker substitution to reduce emissions within the cement sector(McKinsey and Company, 2009). Table 9-26: Abatement costs for clinker substitution in 2030 Measure USD/tCO2e Key assumptions Assumes increased use of fly ash to reach 20% by 2050. Capital costs for fly ash handling capacity estimated at USD 6 per tonne based on existing Increased use -16.98 engineering cost estimates.25 Material costs of USD 4 per tonne as- of fly ash sumed, based on ongoing domestic supply from thermal power genera- tion (sufficient coal-fired generation assumed available through 2050, despite increasing supply from renewables). Assumes increase in use of BFS to reach 20% by 2050. Capital costs for BFS granulation and grinding capacity estimated at USD 80 per tonne Increased use -3.91 based on existing engineering cost estimates.26 Material costs of USD 9 of BFS per tonne assumed, based on ongoing domestic supply from iron and steel production (sufficient supply assumed to be available through 2050, de- spite current cessation from ZISCO works). Clinker production cost assumptions Item USD per t Notes Labour 1.10 Based on average unit clinker production costs forecast in 2020 for Africa Raw materials 2.20 Maintenance 2.20 emerging economy producers (VDZ, accessed July 2019)27 Original Depreciation 4.40 values given in EUR and converted to USD assuming 1:1.11 exchange rate as of end of July, 2019 Other 1.10 Calculated based on assumed Zimbabwe fuel and electricity consumption Energy 23.00 values shown in Figure 9-23 Total 34.00 - Policy and Implementation Key challenges and barriers The cement sector faces a complex combination of economic and non-economic chal- lenges to implementing the types of abatement options in Table 9.26. Key challenges include: • Lack of funding and access to equipment: Each of the major cement companies have undertaken project feasibility studies to implement a range of energy effi- ciency measures and plant upgrades. Many of these are economically viable giv- en their potential to reduce energy and materials costs. However, a lack of fund- 25McKinsey and Company, 2009. 26McKinsey and Company, 2009. Analysis estimates a total of €145 per tonne. It is assumed that this would be reduced to half based on existing BFS handing and processing capacity within the cement sector. 27 See: https://www.vdz-online.de/uploads/media/EU_ETS_Charts_EN.pdf - 99 - ing remains an overriding constraint to investing in clean technology within Zimbabwean industries. The current investment climate does not support mean- ingful foreign direct investment and companies lack the finance to access im- ported equipment. Major retrofits also lead to plant downtime, which can impact short-term cash flow. • Policy and regulatory framework: In common with many other countries, exist- ing cement product and building codes focus on composition rather than product performance, presenting a barrier to enable the use of higher clinker substitution products. There is also a lack of awareness from consumers regarding the appli- cation and performance of lower clinker products • Availability of clinker substitute materials: BFS is currently still available from the ZISCO iron and steel works. However, unless investment is forthcoming to resume production over the coming decade, continued BFS supply will only be available as higher cost imports, thereby limiting and potentially reducing na- tional substitution rates. High quality fly ash is currently available from domes- tic coal-fired power generation, and is likely to replace BFS for some operators in the coming years. • Supply and quality of alternative fuels and waste. For waste to be used as kiln fuel, waste collection and pre-treatment arrangements and facilities must be de- veloped, potentially based on a supported programme of waste tyre collection. The availability of biomass at a reasonable cost and on a reliable basis will also be needed to achieve an increase in alternative fuel use, which is currently not in practice. The suitability of different available fuel and waste materials also needs to be determined (e.g. relating to calorific value, moisture content, volatiles). Policy Measures A series of policy actions and measures will be needed to overcome these barriers and implement a roadmap for increased cement sustainability in the national ce- ment sector contributing to the LEDS. These will need to be developed in consul- tation with stakeholders. An initial proposal of some key elements is however provided in the next section. Cement product qualities and construction practice and codes. It is recommend- ed that the Ministry of Local Government, Public Works and National Housing (MLGPWNH) arrange consultations between the cement producers, the Building Technology Institute (BTI), the Standards Association of Zimbabwe (SAZ), the Construction Industry Federation of Zimbabwe (CIFOZ) and the Zimbabwe Building Contractors Association (ZBCA) – and other relevant stakeholders – to explore options to improve the sustainability and carbon footprint of construction and support increased use of clinker substitutes in cement, concrete and construc- tion. There is also a need to raise awareness of low carbon cement production with actions aimed at education, and training of construction workers and managers. - 100 - Development of an enabling regulatory framework for waste. A broad framework of waste policy with targeted approaches to different waste products, reflecting the ‘waste hierarchy’ of reuse and reduction provides a sound basis for waste use in the cement sector. There is therefore a need to review the current legal and regulatory framework to ensure that a sound waste management market is developed with proper infrastructure and a price for waste treatment and disposal, encouraging the cement industry to use waste as a fuel. Incentives to improve thermal energy efficiency at facilities. It is recommended that the Ministry of Industry and Commerce and the MLAWCRR work to develop reference performance benchmarks for the existing clinker and cement production facilities and for new installation permits. Companies exceeding this level would be required to un- dertake energy auditing and demonstrate that energy efficiency improvements have been fully assessed. This could be transitioned over time to a mandatory energy auditing and Environmental Management System (EMS) scheme, including for example opera- tion of energy management systems in line with ISO 50001, including staff energy management training, and ISO14000 EMS part of Strategy for Sustainable Develop- ment. A financing facility should support proposals from cement companies which demonstrate a clear case for reduced emissions. Use of voluntary KPIs and sustainability agreement. As part of a wider policy to im- plement mitigation actions, track improvements and identify abatement opportunities within Zimbabwean industry, it is recommended that the cement sector enter into a vol- untary agreement with MLAWCRR to reduce its GHG emissions intensity over time. This could form a wider initiative within industry involving the BCSDZ, the Confedera- tion of Zimbabwe Industries (CZI), Chamber of Commerce, Chamber of Mines, Con- struction Industry Federation of Zimbabwe (CIFOZ), and others. Development and im- plementation of voluntary agreements between the government and these industry bod- ies should be effective as a first step in promoting climate change mitigation and has the benefit of reducing the burden of information and administrative costs from government authorities. Subject to economic growth and industrial recovery over the medium term, such agreements may provide basis for other types of policy e.g. including carbon pric- ing. MRV system and public GHG reporting. There is currently no requirement for cement companies - or other industrial operators - to undertake MRV of their energy and CO2 emissions according to a required standard. However, such a system would be needed to track facility and sector level KPIs. It would also help to monitor policy implementation and governmental reporting to the UNFCCC. It is, therefore, recommended to establish a Zimbabwean cement sector energy and GHG MRV approach at the facility and sector level to able to track progress against agreed KPIs. This could be based on the existing WBCSD/CSI global MRV standard and ‘Getting the Numbers Right’ (GNR) database. - 101 - This could be developed through a consultative process between the MIC, MLAWCRR, BCSDZ and SAZ. Based on this MRV system, an annual assessment of KPI progress at the sector level could be undertaken with public disclosure, but ensuring confidential information from each operator. The WBCSD/CSI could potentially facilitate capacity building in designing and developing such a system, and in providing training and knowledge transfer. Roadmap of actions Table 9-27 presents a roadmap framework of actions proposed to reduce GHG emis- sions from the cement sector in Zimbabwe. - 102 - Table 9-27: High level Roadmap for Sustainability in Cement Production Time- Lead organ- No. Action Cooperating organisations Potential funding sources Estimated costs frame isation Review and revise cement product codes MLGPWNH Cement companies; BTI; SAZ; C1 and standards to enable greater use of Short term MoFED; donor support < 1 million USD SAZ CIFOZ; ZBCA lower clinker content products Blended cement awareness, training and MLAWRCC; Cement companies; BTI; SAZ; 1-2 million C2 Short term MoFED donor support; GEF capacity building programmes MLGPWNH CIFOZ; ZBCA; consumer groups USD Technical assistance programme to sup- MLAWRCC; MLAWCRR; private sector (bio- MoFEDGEF; UNEP; UNIDO; World C3 port biomass suppliers and identify suit- Short term < 1 million USD ZERA mass suppliers); banks; MoEPD Bank; DFID; EU able business models Cement companies; BCSDZ; MoFEDGEF; UNEP; EU; DFID; Develop incentives for enhancing energy C4 Short term MLAWRCC MEPD; private sector; banks; UNIDO; AfDB; World Bank; banks; Unknown efficiency investments and practices MIC private sector; IBDZ Develop voluntary agreements with ; Cement companies; MoFEDdonor sup- C5 Short term Cement companies; BCSDZ; MIC < 1 million USD facility and sector KPIs MLAWRCC port; WBCSD/CSI Establish MRV system with reporting of MIC; Cement companies; MoFEDdonor sup- 1-2 million C6 Short term Cement companies; BCSDZ; energy and GHG emissions MLAWRCC port; WBCSD/CSI USD Waste companies; cement compa- Studies to determine feasibility of effi- MLGPWNH; C7 Short term nies; municipalities; Financial MoFEDdonor support; GEF 100-200 k USD cient tyre waste collection models. MLAWRCC institutions Review and revision of waste framework Medium MLGPWNH; Waste companies; cement compa- C8 MoFED < 1 million USD (e.g. ban landfilling of tyres). term MLAWRCC nies; municipalities - 103 -

  69. Annex VI: Commercial Tree Planting Initiative This mitigation activity provides an update of the commercial tree planting activity, developed under the WB’s NDC Support Project. Mitigation Potential Linked to the current economic situation and related difficulties to structure debt capital, the tree plantation establishment has fallen behind the harvesting rate and left areas unplanted in the Eastern Highlands. The total area allocated for planta- tions is estimated at 140,000 hectares with only 70,000 hectares currently forested. The remaining area is proposed to be reforested by commercial plantations. The trees to be planted include pine and eucalyptus species, namely Pinuspatula, P. taeda, P elliottii, P. maximinoi, P. tecunuminii, Eucalyptus grandis, E cloeziana, E. camaldulensis, E. pellita, and E. urophylla. The plantations will produce round wood for sawn wood from pines and eucalyptus and utility poles from eucalyptus. Table 9-28: Planting Schedule Input Parameter Parameter Unit Value Total Concession Area ha 200,000 Plantable Areas ha 140,000 Currently planted ha 70,000 Factor for actual planting % 80% The total forest concession area amounts to approx. 200,000 ha, whereof approx. 140,000 ha are plantable areas. While the historical maximum of planted areas amounts to 110,000 ha, the mitigation action considers the full commercial potential provided that acceptable financing conditions are provided. The net planting area (excluding roads, firebreaks etc.) that the companies will use is expected to total some 70,000 hectares. Table 9-29: Planting Schedule 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Pine Sawlogs 3,200 3200 3,200 3200 3,200 3200 3,200 3200 3,200 3200 3,200 2,133 37,333 Eucalyptus Sawlogs 400 400 400 400 400 400 400 400 400 400 400 267 4,667 Eucalyptus Poles 2,400 2400 2,400 2400 2,400 2400 2,400 2400 2,400 2400 2,400 1,600 28,000 Total 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 4,000 70,000 A planting programme of 6,000 hectares per year for five years is planned. Most of the plantations will be for pine sawlogs (3,200 hectares per year) followed by euca- lyptus poles (2,400 hectares per year), and eucalyptus sawlogs (400 hectares per year). It was assumed that the project implementation will start in 2020. The thin- ning intensity for pine saw wood is assumed to be 40% for the first thinning (year 8 ), 40% for the second thinning (year 15) and 100% for the final felling (year 25). - 104 - For eucalyptus sawwood, the first thinning is planned with an intensity of 40% (year 8) and a final felling after year 20. For eucalyptus poles the trees will be felled after year 10. The project’s GHG impact is related through to establishing and replanting trees after harvests leading to an increment of carbon sequestered in the project area. Even with pe- riodic harvesting and thinning, the average carbon dioxide stock considering both above- ground and belowground biomass in the area under reforestation is significantly higher than what it is currently as degraded unused previous plantation forests covered with grasses. Figure 9-26: Carbon Stock Development under different Management Schemes The baseline land use is assumed of being grassland with an aboveground biomass of 2.3 tonnes per hectare corresponding to 3.96 tCO2e/ha. The assessment does not consider carbon stored in wood product pools, though specifically saw wood will enter the long term harvesting product pool storing carbon in boards, furniture and houses well beyond 2050. Furthermore, the accumulation of soil carbon over plantation rotation periods are not considered in the assessment. Figure 9-27: Commercial Forestry Carbon Stock Development - 105 - In addition to climate change mitigation, the plantations produce valuable round wood that generates a decent cashflow to the project. In addition, plantation projects generally generate employment and additional income in the area of investment for both men and women. Economic Analysis The costs of the plantation project provided by Allied Timber include all overhead costs allocated to each hectare planted. The costs of establishing a hectare of plantation is set to USD 1,000 with lower maintenance costs throughout the forest rotation period (see Table E-10 for specific data points used). The costs of harvesting are not included separately in the calculations as the assessment uses net revenues (stumpage prices) from timber har- vesting. The benefits to the project are realised through round wood sales revenues. The regimes of the project will produce pine thinnings starting from year 8 after planting (50 m3/ha) and at year 15 after planting (80 m3/ha). Eucalyptus will generate thinnings start- ing at year 10 after planting (126 m3/ha), and poles from clear-cut at year 10 after plant- ing (315 m3/ha) and at year 20 after planting (350 m3/ha from pole regime and 539 m3/ha from saw log regime). The stumpage prices used for the sales of round wood are present- ed in Table 9.30 Table 9-30: Stumpage prices Standing pine prices as clear cut USD/m3 55 Standing pine prices at thinning USD/m3 27 Standing eucalyptus prices at clear cut USD/m3 30 Standing eucalyptus prices at thinning USD/m3 27 The project’s cost-benefit outlay is presented in Figure 9-28. For the first seven years, the mitigation measure is generating solely costs. However, considering future long-term revenues, the commercial forestry activities may be financially attractive in the long run. Figure 9-28: Commercial Forestry Cost and Benefits - 106 - Considering the costs and benefits in Figure 9.28 and applying a period up to 2050 to assess the costs and benefits of the project, the net present value using a 6 percent dis- count rate is USD 0.183 billion. The positive NPV for the project indicates that the pro- ject is financially viable at a discount rate of 6%. Table 9-31: Abatement Cost Analysis Parameter Unit Value SDR % 6% Accumulated Climate Financing Need up to 2030 M USD 123.77 Net Present Value M USD 183.21 IRR % 13% Abatement Potential 2030 M tCO2 0.77 Marginal Abatement Cost USD/tCO2 - 239 Due to the long-term nature of commercial forestry, based on current lending rates, com- mercial forestry would result in a negative NPV. This underlines the importance of a suit- able climate-financing instrument for implementing Zimbabwe’s LEDS. - 107 -

  70. Annex VII: Conservation Agriculture Initiative This section provides an amendment of the Annex F, Mitigation Potential in Agricul- ture, as produced under the WB’s NDC Support Project. Overview Zimbabwe has been pursuing a variety of Climate Smart Agriculture (CSA) adaptations including Conservation Agriculture, which includes minimum tillage, crop rotation, and mulching practices (CIAT World Bank, 2017). According to the Zimbabwe Agriculture Investment Plan, a budget was allocated toward improving livestock management and irrigation systems as well as promoting agroforestry and Conservation Agriculture (ZAIP, 2013). Many CSA practices also help mitigate GHG emissions, as it is one of the three pillars of CSA. Agriculture is the third largest emitter of GHGs in the country (16 %of national emis- sions), preceded by the Energy (23 %) and Land-Use, Land Use Change andForestry (57 %) sectors. Most of the emissions from agriculture are attributed to the livestock subsector (39 %from enteric fermentation and 28 %from manure depositedon pastures). Savannah burning for agricultural purposes is also a large emitter, about 28 %of the total attributed to agriculture (GoZ, 2016a). ▪ he subsequent section discusses the mitigation potentials by Conservation Agri- culture (CA), including crop rotation, minimum tillage, and improved livestock feed for communal non-dairy cattle. Mitigation Potential Conservation Tillage Conservation tillage involves disturbing the soil as little as possible during the planting process in order to reduce soil erosion and nutrient loss (CIAT World Bank, 2017). Conservation tillage ranges from zero tillage, which leaves the soil undisturbed from planting to harvest, to mulch ripping, which involves some tillage but ensures that crop residues remain on the surface of the ground. In Zimbabwe’s clayey and sandy soils, conservation tillage can help reduce the disturbance of soil organic matter and release of soil carbon into the atmosphere. Conservation tillage has widespread effectiveness across Zimbabwe, but different conservation tillage practices are more effective depend- ing on the soil and climate conditions of the region (CSA manual, 2017). Conservation Agriculture, including zero and minimum tillage, is a key part of the vi- sion of the agriculture sector in Zimbabwe according to the Zimbabwe Agriculture In- vestment Plan (ZAIP) 2013-2017. The ZAIP allocates $1.5 million (USD 2013) in 2013 to promoting Conservation Agriculture through extension services and advertising about the techniques (ZAIP, 2013). Zero and minimum tillage practices have largely been taken up in Agro-ecological Regions III, IV, and V by farmers growing, sorghum, - 108 - groundnut and cotton, largely due to provision of training and free or subsidized inputs (CIAT World Bank, 2017). Improved Feedstock for communal non-dairy cattle Although livestock management can encompass a wide variety of practices, Zimba- bwe’s own livestock management priorities include improving livestock husbandry, increasing livestock production, and diversifying livestock. For livestock, improving the quality of livestock feed and avoiding overstocking of livestock in one area can reduce methane emissions and improve livestock health and efficiency overall (CIAT World Bank, 2017). Furthermore, diversifying livestock to include goats and sheep can allow farmers and ranchers security in case of livestock disease or adverse weather conditions (CIAT World Bank, 2017). The main costs of improving livestock management are pay- ing for improved livestock feed, investing in smaller livestock, and accessing infor- mation on livestock management (CSA Manual, 2018). Livestock management is par- ticularly applicable in Agro-ecological Regions IV and V of Zimbabwe, where condi- tions are better for livestock ranching than crop production and drought and extreme heat are more common (CIAT World Bank, 2017). While the ZAIP focuses largely on improving livestock production, it does provide some support for CSA livestock management practices. Since livestock productivity is important in poverty reduction and livelihoods among smallholders in Regions IV and V in particular, the ZAIP focuses on ensuring and augmenting livestock yield. The ZAIP specifies increasing livestock production and strengthening rural livestock mar- kets as key objectives. However, the budget includes funding for livestock marketing, subsidies or social assistance for livestock rearing inputs, and extension programs to improve livestock husbandry, with the goal of 50 %farmers in Regions IV and V being trained by 2017 (ZAIP, 2013). However, improved feeding management and reduction in stock size has had a low adoption rate in Zimbabwe to date (CIAT World Bank, 2017). Currently, feed either from home-grown fodder or purchased feed accounts for roughly 10% of the required diet for all communal cattle, with the majority of this feed provided to dairy producing cattle in the dry season (ZimStat, 2015). Improved feed for cattle has been shown to reduce methane emissions significantly and improve cattle health for better milk pro- duction, slaughter yield, and birth success rates (GoZ, 2016a;Andeweg and Reisinger 2015). Crop Rotation Crop rotation is focused on switching the type of crops planted on a given area from year to year. Crop rotation often includes a nitrogen-fixing crop (i.e. legumes) to im- prove soil quality. When paired with zero tillage and mulching as part of Conservation Agriculture practices, crop rotation can increase the productivity of water applied to crops (CSA Manual, 2017). In the long run, crop rotation can lead to increased yield and - 109 - less reliance on fertilizers, as well as contribute to mitigation of greenhouse gases with higher soil carbon retention. Like conservation tillage, crop rotation is considered a part of Conservation Agri- culture, and is a central part of the vision of the agriculture sector in Zimbabwe according to the ZAIP. Crop rotation has a less than 30 %adoption rate among groundnut farmers, but a 30 to 60 % adoption rate among soybean and wheat farmers. Overall, crop rotation practices have largely been taken up in Agro- ecological Regions III, IV, and V, largely due to provision of training and free or subsidized inputs (CIAT World Bank, 2017). Aggregated CAImpact on SOC There is a wide range of measurements and estimates on CA impact on Soil Or- ganic Carbon (SOC). Powlson et al (2016) report conduct a metastudy for the In- do-Gangetic Plains and for the semi-arid Sub-Sahran Africa. For the aggregated CA activities (minimum tillage (including residue retention) and crop rotation, the metastudy indicates an annual SOC increment of 1.01 Mg C/ha with a Standard Error (SE) of 0.391. Assuming a normal distribution at 90% confidence interval of the annual SOC will be 0.69 Mg C/ ha. Though not supported by time series data sets, a strong SOC increment at the start of CA practices is assumed, which decreases over time. Based on IPCC 2006 guidelines, SOC stock change is completed during a time period of 20 years. The stylized SOC increment is illustrated in Figure 9-29. Figure 9-29: Stylized SOC Stock Development - 110 - Economic Analysis Aggregated impact on agricultural net revenues Many studies evaluate CA’s impacts on yields. However, specifically regarding the retention of crop residues, it seems important to consider trade-offs with ani- mal feed. Homann-Kee, et al. (2014) assessed the economic trade-offs on biomass use in crop-livestock systems in semi-arid Zimbabwe. The findings indicate sub- stituting a third of maize production with mucuna show up to 3.3 t mucuna bio- mass with an increase in maize production (Table 9-32). It is assumed that 30 % of the mucuna biomass is left as crop residue, while 70% is used as animal feed. Due to the limitations of smallholder households, it is assumed that they achieve only 50% of the researcher managed yield increase resulting in 1,155 kg mucuna /ha available as animal feed. Table 9-32: CA Impact on Net Revenues Conventional Farmer Practice Maize-Mucana rotation Value SE Value SE Grain 127 104 100 81 Revenue Residue 38 31 31 4 Mucana BM 0 0 142 20 Sub-total 166 135 273 105 Ext Input 27 30 27 30 Draft Power 22 12 22 12 Var Cost Manure 11 24 11 24 Mulch 0 0 46 0 Total 62 52 106 54 Net Revenue 104 134 167 111 The conversion from conventional agriculture to CA results in significant changes to tractor use and hence, related emissions and costs. Switching to minimal tillage, utility tractors are no longer required and minimum tillage can be achieved with a two-wheel tractor. To assess related costs changes, input parameters were consid- ered in Table 9-33. - 111 - Table 9-33: Input Parameter - Tractor lifecycle cost analysis Utility Tractor Two Wheel tractor Parameter Unit Value Value Lifetime Tractor hrs 10,000 10,000 Average power rating kw 82 20 Fuel consumption l/kW 0.30 0.30 Load Factor dimensionless 40% 40% Fuel consumption l/hr 10 2 Diesel Price USD/l 0.96 0.96 Tractor Cost USD 25,000 5,000 Tractor Cost USD 25,000 5,000 Discount Rate % 6% 6% Based on the input parameter in Table 9-34, the annual costs of a utility tractor and a two wheel-tractor were determined. Based on a lifetime of 10,000 working hours, the utility tractor operates for 14 years, whereas the two-wheel tractor lasts ten years. The discounted cost per working hour are 7.75 USDc and 1.74 USDc respectively. Table 9-34: Lifecycle Cost Analysis of Utility Tractors and 2 Wheel Tractors Utility Tractor Lifecycle Cost Analysis Year 1 2 3 4 5 … 10 … 13 14 Work time Hours 750 750 750 750 750 … 750 … 4,950 1,650 Fuel consumption Litre 4,950 4,950 4,950 4,950 4,950 … 4,950 … 4,752 1,584 Fuel cost USD 4,752 4,752 4,752 4,752 4,752 … 4,752 … 750 250 Maintenance cost USD 750 750 750 750 750 … 750 … Tractor cost USD 25,000 … … 5,502 1,834 Annual cost USD 30,502 5,502 5,502 5,502 5,502 … 5,502 … 2,734 860 Discounted annual cost USD 5,191 4,897 4,620 4,358 … 4,358 … 4,950 1,650 Total discounted cost USD 77,490 Discounted cost USD / hour 7.75 2-weehled Tractor Lifecycle Cost Analysis Work time Hours 1,125 1,125 1,125 1,125 1,125 … 125 Fuel consumption Litre 1,523 1,523 1,523 1,523 1,523 … 169 Fuel cost USD 1,462 1,462 1,462 1,462 1,462 … 162 Maintenance cost USD 563 563 563 563 563 … 63 Tractor cost USD 2,700 - - - - … - Annual cost USD 4,724 2,024 2,024 2,024 2,024 … 225 Discounted annual cost USD - 1,910 1,801 1,700 1,603 … 133 Total discounted cost USD 17,427 … Discounted cost USD / hour 1.74 … - 112 - Considering the discounted costs, the average discounted costs in Table 9-34, the cost savings from changing one hectare (prepared by a tractor) from conventional agriculture to Conservation Agriculture results in cost reductions of 6.01 USD per tractor hour and 5.25 L fuel savings. Zimbabwe’s agriculture is dependent on animal draught power. To produce a real- istic estimate on the cost savings and the GHG emission reductions, the actual tractor hour input per hectare in Zimbabwe were determined. The fuel consump- tion over all farm types amounts to 38.50 M litre diesel fuel corresponding to ap- prox. tractor input of 1.93 hrs per hectare. Consequently, the actual cost saving was 11.60 USD per hectare while the fuel savings correspond to 10.13 L/ha. Improved Feedstock Potential Legume production may improve the animal feed, which offers a double benefit: ▪ The improved diet, especially during the dry season may improve the live weight of animals at time of slaughter; ▪ The legume feed will replace dry grass, with high fibre content reducing methane emissions from enteric fermentation. As indicated earlier, the CA may produce approx. 1.65 t of legume feed, whereas 1.16t/ha (70%) is used as animal feed, while 30% remain on site as biomass residue. Cattle, with an average weight over its lifetime of 250kg requires approx. 1.37 t fodder per annum (Table 9-35). During the wet season, animals graze in open rangeland. However, during the dry sea- son of approximately. 6 months, the cows may feed from legume, requiring a legume intake of 0.68t. Consequently, considering the dry season period, one hectare of Con- servation Agriculture may feed 1.69 cows. The average emissions from enteric emis- sions correspond to 0.74 tCO2e/cow. It is assumed based on a legume feed, these emis- sions may be reduced by 30%. Considering the dry period, this results in 0.11 tCO2e per head and (considering that 1 ha of CA may feed 1.69 cows) 0.19 tCO2 per hectare of CA: Table 9-35: Calculation of ERs per ha CA Parameter Unit Value Legume feed t/ha 1.16 Cattle fodder Percentage of live-weight, per day 0.02 Average weight over cattle lifetime Kg 250.00 Cattle fodder t/yr. 1.37 Legume fodder t/yr. 0.68 Emission reduction potential % 0.30 Enteric fermentation emissions tCO2e/head 0.73 Emission Reduction Potential tCO2e/ha 0.18 - 113 - The improved animal feed will not only reduce GHG emissions, but also increase the animal live weight and hence the return per slaughter. The average live weight of com- munal cattle amounts to 302 kg. With appropriate feed during the dry season, it is esti- mated that this may be increased to 396 kg/cattle. Considering a percentage of beef to live weight of 53% and a price of 1,114 USD / t beef (producer price), results in an in- crement of 105.11 USD/slaughter. Considering that one ha may support 1.69 cows during dry season, and that cow is raised for 4 years results in an average increment of revenues from cattle slaughter of 44.35 USD/ha Conservation Agriculture. - 114 - Table 9-36: Calculation of Added Value per Slaughter per ha CA Parameter Unit Value Life Years 4.00 Added Value per Slaughter USD/slaughter 105.11 Added Value per Slaughter USD/ha 44.35 Conservation Agriculture Potential Conservation agriculture may be applied to maize, seed cotton, groundnuts and sorghum cultivation areas. .While CA may contribute to GHG emissions in Agro-ecological Re- gions I-V, increment in yields are mainly reported in the dryer Regions III to V. The cultivation areas of maize, cotton, groundnuts and sorghum in Regions III to V are esti- mated to 518,000 ha (Table 9-38Table 9-37). Table 9-37: Estimation of the areas eligible for CA III IV V Maize 133,123 70,387 6,305 Seed Cotton 187,808 - - Groundnuts 36,282 14,017 473 Sorghum 63,640 14,027 1,0391,039 Total Land Area Eligible for CA 518,100 It is estimated that at the beginning of 2020, approx. 210,000ha in the Agro-ecological Regions III-V will be under CA. For the expansion, .annual adoption rate was assumed to be 5% p.a. allowing to reach full coverage by 2031. Table 9-38provides an aggregated summary of potential impacts of CA, considering the regional built-out plan. While estimating the impacts of Conservation Agriculture is complex and associated with high uncertainties, the analysis underlines CA’s potential to reduce GHG emissions while improving the net returns from agriculture. - 115 - Table 9-38: Potential Impacts of Conservation Agriculture Parameter Value 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2035 2040 2045 2050 Area under CA 235,90 261,81 287,71 313,62 339,52 365,43 391,33 417,24 443,14 469,05 494,95 518,10 518,10 518,10 518,10 ha Mgmt 5 0 5 0 5 0 5 0 5 0 5 0 0 0 0 SOC Sequestration M tCO2 - 27.62 19.19 16.27 14.96 14.31 13.98 13.84 13.79 13.81 13.87 8.25 3.44 1.53 0.20 Impact Net Revenues Emission Reductions Emission Reduc- tion from Fuel tCO2 6,395 7,097 7,800 8,502 9,204 9,906 10,609 11,311 12,013 12,715 13,418 14,045 14,045 14,045 14,045 Consumption Emission Reduc- tion from Enteric tCO2e 10,997 12,205 13,412 14,620 15,828 17,035 18,243 19,450 20,658 21,866 23,073 24,152 24,152 24,152 24,152 Fermentation Total CA Ers M 0.02 27.64 19.21 16.29 14.98 14.33 14.01 13.87 13.82 13.85 13.91 8.29 3.48 1.57 0.24 tCO2e Increment in Net M USD 14.86 16.49 18.13 19.76 21.39 23.02 24.65 26.29 27.92 29.55 31.18 32.64 32.64 32.64 32.64 revenues from CA Tractor Cost Re- M USD 2.74 3.04 3.34 3.64 3.94 4.24 4.54 4.84 5.14 5.44 5.74 6.01 6.01 6.01 6.01 duction Improved Animal M USD 10.46 11.61 12.76 13.91 15.06 16.21 17.36 18.50 19.65 20.80 21.95 22.98 22.98 22.98 22.98 Feed Total CA Incre- ment in Net Reve- M USD 28.06 31.14 34.22 37.31 40.39 43.47 46.55 49.63 52.71 55.79 58.88 61.63 61.63 61.63 61.63 nues - 116 - Table 9-39: CA Abatement Cost Analysis Parameter Unit Value Net Present Value M USD 701.14 Abetment Potential 2030 M tCO2 13.91 Total Abatement Potential M tCO2 263.22 Marginal Abatement Cost USD/tCO2 -2.66 Based on a discount rate of 6%, the NPV is estimated to 701.14 M USD for the period 2020 to 2050. The related GHG abatement potential is estimated at 263 M tCO2. How- ever, it is important to note, that bulk of the mitigation potential is related to a tC stock change compared to conventional agriculture. If the CA practice would be abandoned, the SOC content would be released and emission reductions annihilated. - 117 -

  71. Annex VIII: Estimation of Carbon and Tobacco Tax Revenues This Annex provides a brief summary of the carbon and tobacco tax revenues, considered as GoZ contribution to a national financing facility. Carbon Tax Currently the government is collecting a carbon tax of 3USDc/l on Gasoline and Diesel. Con- sidering the different EFs (2.29 tCO2e/kL and 2.68 tCO2e/kL) and considering the share of gasoline and diesel in Zimbabwe’s total fuel consumption results into a weighted average car- bon tax of 12.24 USD/tCO2e.The assumption is that carbon tax is increased to 50 USD/tCO2 by 2030 and 125 USD/tCO2 by 2050, which is the lower bound estimate of the carbon tax required to achieve the Paris Agreement Objectives. Equally, the forecast of the fuel con- sumption under the MIT transport (Annex IV) was considered. Combining fuel consumption forecasts and projected carbon tax increases allows estimation of carbon tax income over time. Table 9-40: Carbon Tax Revenue Projections Parameter Unit 2020 2021 2022 2023 2024 2025 2030 2035 2040 2045 2050 Gasoline M litre 570 588 607 623 640 657 735 809 877 941 999 Diesel M litre 492 515 545 566 589 613 720 799 877 948 1,013 USD / 18.5 21.7 24.8 28.0 31.1 34.3 50.0 67.0 84.1 101 125.0 Carbon Tax tCO2 Carbon Tax 0.04 0.05 0.06 0.06 0.07 0.08 0.11 0.15 0.19 0.23 0.29 Gasoline USD/l Carbon Tax 0.05 0.06 0.07 0.07 0.08 0.09 0.13 0.18 0.22 0.27 0.33 Diesel USD/l Carbon Tax 49 59 71 82 95 108 180 267 366 474 625 Income M USD Carbon Tax 1,282 Income by 2030 M USD Carbon Tax 8,970 Income by 2050 M USD If the tax basis would be widened from fuel to other sectors of the economy, the tax income would increase correspondingly. Tobacco Tax The forestry activities of the LEDS will be co-funded by the tobacco tax. The tobacco tax revenue corresponded to 4.6 M Zimbabwe Dollars / 1.84 M USD by 2018. Combining the tax with ZimStat’s projections for annual growth of the agricultural sector, GDP will result into a tax revenue of 42.48 M USD by 2030 and 233.94 M USD by 2050. - 118 - Table 9-41: Tobacco Tax Revenue Projection Parameter Unit 2020 2021 2022 2023 2024 2025 2030 2035 2040 2045 2050 Growth of Agricultural 26.0 11.8 16.6 10.1 % 9.3% 8.9% 5.9% 5.9% 5.9% 5.9% 5.9% GDP % % % % Tobacco Tax M USD 2.09 2.33 2.72 3.00 3.28 3.57 4.96 6.61 8.81 11.4 15.7 Tobacco Tax Income by M USD 42.48 2030 Tobacco Tax Income by M USD 233.94 2050 - 119 -

  72. Annex IX: Emissions from Conversion from Forest Land to Non-Forest. Table 9-42: GHG Emissions from Conversion of Forest Land to Non-Forest Forest Cover Loss (in ha) Treecover 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 (in %) 10 19,158 1.1.1 21,887 30,169 37,175 33,645 43,938 23,552 67,156 27,014 18,957 35,209 22,126 22,769 25,118 23,391 60,114 19,605 15 16,224 19,578 17,948 23,832 30,901 27,727 31,931 17,517 52,278 20,876 16,620 29,897 17,891 18,590 21,433 20,312 50,222 15,873 20 11,384 11,931 10,484 12,830 18,126 18,892 15,329 8,911 29,496 10,812 11,781 19,047 12,269 12,818 15,549 14,502 34,235 9,637 25 10,716 11,013 9,676 11,761 16,539 17,949 13,676 8,029 26,800 9,634 11,125 17,716 11,487 11,923 14,610 13,514 31,770 8,724 30 8,213 8,028 7,321 8,432 11,771 14,905 9,316 5,448 19,427 6,649 9,053 13,821 9,645 9,662 12,280 10,972 26,019 6,568 50 4,223 3,642 4,208 4,398 5,000 9,876 4,251 1,995 8,690 2,356 5,421 7,040 5,976 5,276 7,877 6,105 15,868 3,157 75 990 857 1,110 1,486 1,655 3,800 1,789 859 4,154 953 2,438 3,611 2,754 2,380 3,847 2,483 5,610 1,221 Biomass Loss (in Mt.d.m) Treeco-ver 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 (in %) 10 1.82 1.91 1.95 2.37 3.07 3.54 2.83 1.66 5.10 1.75 2.03 3.32 2.35 2.28 2.88 2.46 6.31 1.75 15 1.71 1.76 1.79 2.12 2.78 3.32 2.43 1.40 4.53 1.56 1.94 3.09 2.16 2.09 2.71 2.31 5.83 1.56 20 1.46 1.37 1.39 1.57 2.07 2.88 1.66 0.93 3.38 1.09 1.68 2.49 1.84 1.76 2.37 1.98 4.88 1.19 25 1.42 1.32 1.34 1.51 1.97 2.83 1.57 0.88 3.22 1.02 1.64 2.41 1.80 1.70 2.31 1.92 4.71 1.14 30 1.26 1.13 1.19 1.30 1.66 2.64 1.32 0.71 2.76 0.84 1.51 2.15 1.67 1.54 2.15 1.74 4.30 0.99 50 0.88 0.75 0.89 0.97 1.07 2.17 0.91 0.42 1.87 0.48 1.17 1.56 1.32 1.14 1.72 1.28 3.31 0.67 75 0.25 0.21 0.27 0.38 0.42 0.96 0.45 0.22 1.05 0.24 0.62 0.93 0.72 0.61 0.97 0.62 1.39 0.31 CO2 Emissions Treeco-ver 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 (in %) 10 3.34 3.50 3.58 4.34 5.62 6.49 5.18 3.04 9.34 3.20 3.73 6.09 4.31 4.18 5.29 4.51 11.56 3.20 15 3.14 3.22 3.28 3.89 5.10 6.08 4.45 2.57 8.31 2.85 3.55 5.66 3.95 3.83 4.97 4.24 10.69 2.87 20 2.67 2.52 2.55 2.87 3.79 5.29 3.04 1.71 6.19 1.99 3.09 4.56 3.38 3.22 4.34 3.63 8.94 2.19 25 2.60 2.42 2.46 2.76 3.61 5.19 2.88 1.61 5.91 1.87 3.02 4.41 3.29 3.12 4.23 3.51 8.64 2.08 30 2.30 2.08 2.17 2.39 3.04 4.84 2.42 1.30 5.07 1.54 2.77 3.94 3.06 2.83 3.93 3.19 7.89 1.81 50 1.61 1.37 1.64 1.78 1.96 3.97 1.67 0.76 3.43 0.89 2.15 2.86 2.42 2.08 3.16 2.35 6.06 1.22 75 0.45 0.39 0.50 0.69 0.78 1.76 0.83 0.40 1.92 0.44 1.14 1.71 1.31 1.12 1.78 1.14 2.55 0.57 Source GFW, 2019 - 120 -

  73. Annex X: Gross Domestic Product Forecast by Sector Table 9-43: GDP by expenditure in constant prices 2010 2015 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 GDP inc Tax on Production & Products 12,847 18,188 21,712 23,616 26,628 28,632 31,113 33,974 36,485 39,637 42,466 46,082 49,684 GDP inc Tax on Production 11,560 16,250 19,662 21,384 24,110 25,922 28,167 30,756 33,028 35,880 38,441 41,713 44,973 Core activities 7,503 9,296 12,180 13,530 15,854 17,192 19,072 21,139 23,039 25,221 27,246 29,614 31,981 Agriculture and Forestry 1,259 1,564 2,216 2,478 2,890 3,183 3,480 3,789 4,079 4,373 4,674 4,969 5,263 Mining and Quarrying 792 1,153 1,653 1,814 2,655 2,848 3,164 3,376 3,608 3,835 4,076 4,288 4,489 Manufacturing 2,004 2,272 2,562 2,782 3,061 3,324 3,669 4,039 4,460 4,944 5,387 5,998 6,642 Electricity and Water 465 508 561 698 715 731 856 1,123 1,241 1,458 1,609 1,804 1,970 Construction 184 435 590 630 799 882 1,022 1,124 1,251 1,362 1,484 1,598 1,717 Distribution, Hotels and Restaurants 2,798 3,366 4,598 5,128 5,734 6,224 6,881 7,689 8,399 9,249 10,015 10,956 11,900 Supportive services 1,930 2,505 2,802 3,075 3,443 3,751 4,064 4,420 4,730 5,230 5,704 6,428 7,260 Transportation and Communication 1,264 1,530 1,759 1,943 2,225 2,394 2,622 2,860 3,171 3,552 4,025 4,626 5,445 Financial, Banking and Insurance activities 666 974 1,043 1,132 1,218 1,357 1,442 1,560 1,559 1,678 1,680 1,803 1,814 Government Public Administration, Education and Health 1,223 3,083 3,163 3,186 3,198 3,218 3,232 3,251 3,267 3,284 3,301 3,318 3,334 Private Education and Health 91 209 207 210 212 214 216 218 220 222 224 227 229 Administrative and support service activities 498 1,414 1,505 1,505 1,505 1,505 1,505 1,505 1,505 1,505 1,505 1,505 1,505 Education and Training 684 1,499 1,375 1,387 1,396 1,408 1,418 1,430 1,440 1,451 1,462 1,473 1,484 Human Health and Social work activities 132 379 490 503 508 518 525 534 541 550 557 566 573 Households-related services 738 1,077 1,203 1,267 1,267 1,406 1,426 1,555 1,575 1,707 1,724 1,861 1,872 Real estate activities 128 354 440 505 509 646 665 794 816 947 964 1,101 1,112 Other service activities 568 677 716 714 710 712 713 712 712 712 712 712 712 Private households with employed persons 42 45 48 48 48 48 48 48 48 48 48 48 48 Less Fin. Int. Services Indirectly Measured -49 -87 -97 -105 -113 -126 -134 -145 -145 -156 -156 -167 -168 Taxes on products (subsidies = 0) 1,286 1,938 2,051 2,232 2,519 2,710 2,946 3,218 3,456 3,757 4,025 4,369 4,711 Taxes on production (subsidies = 0) 126 168 203 221 249 268 291 318 342 371 398 432 466 Source: ZIMRA, 2019 - 121 -