تخطَّ إلى المحتوى
Nelum
قوانين الولايات المتحدة

Flood Control Contributions (Revised Code of Washington (RCW): Title 86 Flood Control; Chapter 86.18)

صدر في 0000 · النص بتاريخ 2026-10-01

القانون العام والإرشادات الرسمية منشورة بوصفها أبحاثاً. ليست مشورة قانونية أو ضريبية أو مالية.

البحث نفسه مكتوب بالإنجليزية. العناوين والوسوم مترجمة؛ أما النتائج والاقتباسات فغير مترجمة.

عن هذا القانون

اللغة
English
النوع
قانون
المنظمة
European Union
الدولة
الولايات المتحدة · State of Washington
الموضوعات
Water
الكلمات المفتاحية
flood, financing, public health, surface water, inland waters, drainage/land reclamation, local government, subsidy/incentive, hazards

أين تقرؤه

النص

نص القانون نفسه، مادةً مادة، كما هو محفوظ. لكل مادة رابطها.

  1. Chapter Chapter 86.1886.18 RCW RCW Chapter ListingChapter Listing | | RCW DispositionsRCW Dispositions FLOOD CONTROL CONTRIBUTIONSFLOOD CONTROL CONTRIBUTIONS SectionsSections 86.18.01086.18.010 Declaration of purpose.Declaration of purpose. 86.18.03086.18.030 Conditions and limitations on expenditures and contributions from appropriationsConditions and limitations on expenditures and contributions from appropriations—— Warrants.Warrants. 86.18.90086.18.900 ConstructionConstruction——1967 ex.s. c 136.1967 ex.s. c 136. 86.18.01086.18.010 Declaration of purpose.Declaration of purpose. Economic development and growth of the state is dependent on the control of flood waters. TheEconomic development and growth of the state is dependent on the control of flood waters. The legislature declares, in the exercise of its sovereign and police powers, that the purpose of this chapter islegislature declares, in the exercise of its sovereign and police powers, that the purpose of this chapter is to provide for contributions of funds for assisting political subdivisions of the state in the protection ofto provide for contributions of funds for assisting political subdivisions of the state in the protection of lands from inundation; the protection of public highways; the control of storm drainage; the maintenancelands from inundation; the protection of public highways; the control of storm drainage; the maintenance of stream channels and water courses; and the protection of life and property.of stream channels and water courses; and the protection of life and property. It is the intent of the legislature that funds be provided to political subdivisions of the state toIt is the intent of the legislature that funds be provided to political subdivisions of the state to assist in the development of those flood control improvements and projects, which cannot be reasonablyassist in the development of those flood control improvements and projects, which cannot be reasonably and practicably financed through the normal methods of financing available to such political subdivisions.and practicably financed through the normal methods of financing available to such political subdivisions. [ [ 1967 ex.s. c 136 § 1.1967 ex.s. c 136 § 1.]] 86.18.03086.18.030 Conditions and limitations on expenditures and contributions from appropriationsConditions and limitations on expenditures and contributions from appropriations —Warrants.—Warrants. Funds shall be expended and contributions made to a political subdivision of the state from floodFunds shall be expended and contributions made to a political subdivision of the state from flood control appropriations only after:control appropriations only after: (1) The project for which the funds are to be used has been approved by the department of(1) The project for which the funds are to be used has been approved by the department of ecology in accordance with the regulatory provisions of chapter ecology in accordance with the regulatory provisions of chapter 86.1686.16 RCW. RCW. (2) Engineering studies and plans have been made and filed with the county engineer of the(2) Engineering studies and plans have been made and filed with the county engineer of the county in which the project is located, or the county engineers of all counties in which the project iscounty in which the project is located, or the county engineers of all counties in which the project is located, if it is located in more than one county.located, if it is located in more than one county. (3) The estimate of cost of acquisition of necessary lands, rights­of­way and construction of the(3) The estimate of cost of acquisition of necessary lands, rights­of­way and construction of the project or improvements, together with adequate supporting data have been completed and filed with theproject or improvements, together with adequate supporting data have been completed and filed with the department of ecology.department of ecology. (4) A comprehensive plan for the area involved has been completed and filed with the(4) A comprehensive plan for the area involved has been completed and filed with the department.department. (5) The political subdivision desiring a contribution has made an application for a contribution to(5) The political subdivision desiring a contribution has made an application for a contribution to the department showing the estimated cost of the project and the requested contribution.the department showing the estimated cost of the project and the requested contribution. (6) Federal funds are available for contribution for payment of a portion of the cost of the project.(6) Federal funds are available for contribution for payment of a portion of the cost of the project. The director of ecology is authorized to determine when these conditions have been met and toThe director of ecology is authorized to determine when these conditions have been met and to request the proper warrant for the state's contribution. Contributions to a political subdivision for arequest the proper warrant for the state's contribution. Contributions to a political subdivision for a http://app.leg.wa.gov/RCW/default.aspx?cite=86.18 https://app.leg.wa.gov/RCW/default.aspx?cite=86.18 https://app.leg.wa.gov/RCW/dispo.aspx?cite=86.18 http://leg.wa.gov/CodeReviser/documents/sessionlaw/1967ex1c136.pdf?cite=1967%20ex.s.%20c%20136%20%C2%A7%201. http://app.leg.wa.gov/RCW/default.aspx?cite=86.16 specific project shall not exceed fifty percent of the cost of acquisition of necessary lands and rights­of­specific project shall not exceed fifty percent of the cost of acquisition of necessary lands and rights­of­ way, and construction of the project or works of improvement.way, and construction of the project or works of improvement. [ [ 1987 c 109 § 63;1987 c 109 § 63; 1980 c 32 § 12;1980 c 32 § 12; 1967 ex.s. c 136 § 3.1967 ex.s. c 136 § 3.]] NOTES:NOTES: PurposePurpose——Short titleShort title——ConstructionConstruction——RulesRules——SeverabilitySeverability——CaptionsCaptions——1987 c 109:1987 c 109: See See notes following RCW notes following RCW 43.21B.00143.21B.001.. 86.18.90086.18.900 Construction—1967 ex.s. c 136.Construction—1967 ex.s. c 136. This legislative proposal shall be complete authority for the accomplishment of purposes herebyThis legislative proposal shall be complete authority for the accomplishment of purposes hereby authorized, and shall be liberally construed to accomplish its purposes.authorized, and shall be liberally construed to accomplish its purposes. [ [ 1967 ex.s. c 136 § 4.1967 ex.s. c 136 § 4.]] http://leg.wa.gov/CodeReviser/documents/sessionlaw/1987c109.pdf?cite=1987%20c%20109%20%C2%A7%2063; http://leg.wa.gov/CodeReviser/documents/sessionlaw/1980c32.pdf?cite=1980%20c%2032%20%C2%A7%2012; http://leg.wa.gov/CodeReviser/documents/sessionlaw/1967ex1c136.pdf?cite=1967%20ex.s.%20c%20136%20%C2%A7%203. http://app.leg.wa.gov/RCW/default.aspx?cite=43.21B.001 http://leg.wa.gov/CodeReviser/documents/sessionlaw/1967ex1c136.pdf?cite=1967%20ex.s.%20c%20136%20%C2%A7%204.

Flood Control Contributions (Revised Code of Washington (RCW): Title 86 Flood Control; Chapter 86.18) · Nelum