تخطَّ إلى المحتوى
Nelum
قوانين الولايات المتحدة

50 CFR § 29.1 - 29.220 - The National Wildlife Refuge System - Land Use Management

صدر في 1966-12-15 · النص بتاريخ 2026-10-01

القانون العام والإرشادات الرسمية منشورة بوصفها أبحاثاً. ليست مشورة قانونية أو ضريبية أو مالية.

البحث نفسه مكتوب بالإنجليزية. العناوين والوسوم مترجمة؛ أما النتائج والاقتباسات فغير مترجمة.

عن هذا القانون

اللغة
English
النوع
لائحة
المنظمة
European Union
الدولة
الولايات المتحدة
الموضوعات
Livestock, Land and soil, Wild species and ecosystems
الكلمات المفتاحية
animal feed/feedstuffs, grazing, environmental standards, land-use planning, mining, ownership, authorization/permit, protected area, right of use, standards, protection of environment, property rights, aquatic animals, ecosystem conservation, marine fishes, precautionary principle, protection of habitats, protection of species, wild fauna, wild flora, access right, access-to-information, legal proceedings/administrative proceedings, collecting/harvesting, court/tribunal, offences/penalties, fees/royalties, soil conservation/soil improvement, timber, biodiversity
الفئات
energy, metals-base, metals-precious, minerals-critical

أين تقرؤه

    لا يوجد رابط مصدر مسجل لهذا القانون.

النص

نص القانون نفسه، مادةً مادة، كما هو محفوظ. لكل مادة رابطها.

  1. 278 50 CFR Ch. I (10–1–23 Edition) § 28.43 the United States for, capturing, im pounding, advertising, care, forage, and damage claims. (f) If an animal impounded under this section is offered at public sale and no bid is received or if the highest bid re ceived is an amount less than the claim of the United States, the animal may be sold at private sale for the highest amount obtainable, or be condemned and destroyed or converted to the use of the United States. Upon the sale of any animal in accordance with this section, the buyer shall be issued a cer tificate of sale. (g) In determining the claim of the Federal Government in all livestock trespass cases on national wildlife ref uges, the value of forage consumed shall be computed at the commercial unit rate prevailing in the locality for that class of livestock. In addition, the claim shall include damages to na tional wildlife refuge property injured or destroyed, and all the related ex penses incurred in the impounding, car ing for and disposing of the animal. The salary of Service employees for the time spent in and about the investiga tions, reports, and settlement or pros ecution of the case shall be prorated in computing the expense. Payment of claims due the United States shall be made by certified check or postal money order payable to the U.S. Fish and Wildlife Service. § 28.43 Destruction of dogs and cats. Dogs and cats running at large on a national wildlife refuge and observed by an authorized official in the act of killing, injuring, harassing or molest ing humans or wildlife may be disposed of in the interest of public safety and protection of the wildlife. PART 29—LAND USE MANAGEMENT Subpart A—General Rules Sec. 29.1 May we allow economic uses on na tional wildlife refuges? 29.2 Cooperative land management. 29.3–29.4 [Reserved] 29.5 Fees. Subpart B—Rights-of-Way General Regulations 29.21 What do these terms mean? 29.21–1 Purpose and scope. 29.21–2 Application procedures. 29.21–3 Nature of interest granted. 29.21–4 Terms and conditions. 29.21–5 Construction. 29.21–6 Disposal, transfer or termination of interest. 29.21–7 What payment do we require for use and occupancy of national wildlife refuge lands? 29.21–8 Electric power transmission line rights-of-way. 29.21–9 Rights-of-way for pipelines for the transportation of oil, natural gas, syn thetic liquid or gaseous fuels, or any re fined product produced therefrom. 29.22 Hearing and appeals procedures. Subpart C—Mineral Operations 29.31 Mineral ownerships in the United States. 29.32 Non-Federal mineral rights. Subpart D—Management of Non-Federal Oil and Gas Rights PURPOSE AND SCOPE 29.40 What are the purpose and scope of the regulations in this subpart? 29.41 When does this subpart apply to me? 29.42 What authorization do I need to con duct operations? 29.43 If I am already operating under Serv ice authorization, what do I need to do? 29.44 If I am operating without prior Serv ice authorization, what do I need to do? DEFINITIONS 29.50 What do the terms used in this subpart mean? PRE-EXISTING OPERATIONS 29.60 Do I need an operations permit for my pre-existing operation? 29.61 What information must I provide to the Service? 29.62 What if I intend to conduct new oper ations or modify my pre-existing oper ations? 29.63 What plugging and reclamation re quirements apply to my pre-existing op erations? 29.64 What other provisions apply to my op erations? TEMPORARY ACCESS PERMITS 29.70 When do I need a temporary access permit? 29.71 How do I apply for a temporary access permit? 29.72 When will the Service grant a tem porary access permit? 29.73 How much time will I have to conduct my reconnaissance surveys? VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00288 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 279 U.S. Fish and Wildlife Serv., Interior Pt. 29 ACCESSING OIL AND GAS RIGHTS FROM A NON FEDERAL SURFACE LOCATION 29.80 Do I need a permit for accessing oil and gas rights from a non-Federal loca tion? OPERATIONS PERMIT: APPLICATION 29.90 Who must apply for an operations per mit? 29.91 What should I do before filing an appli cation? 29.92 May I use previously submitted infor mation? 29.93 Do I need to submit information for all possible future operations? 29.94 What information must be included in all applications? 29.95 What additional information must be included if I am proposing geophysical exploration? 29.96 What additional information must be included if I am proposing drilling oper ations? 29.97 What additional information must be included if I am proposing production op erations? OPERATIONS PERMIT: APPLICATION REVIEW AND APPROVAL 29.100 How will the Service process my ap plication? 29.101 How will the Service conduct an ini tial review? 29.102 How will the Service conduct a for mal review? 29.103 What standards must be met to ap prove my application? 29.104 What actions may the Service take on my operations permit application? OPERATING STANDARDS 29.110 What are the purposes of the Serv ice’s operating standards? 29.111 What general facility design and management standards must I meet? 29.112 What fish and wildlife protection standards must I meet? 29.113 What hydrologic standards must I meet? 29.114 What safety standards must I meet? 29.115 What lighting and visual standards must I meet? 29.116 What noise reduction standards must I meet? 29.117 What reclamation and protection standards must I meet? 29.118 What additional operating standards apply to geophysical operations? 29.119 What additional operating standards apply to drilling and production oper ations? GENERAL TERMS AND CONDITIONS 29.120 What terms and conditions apply to all operators? 29.121 What monitoring and reporting is re quired for all operators? 29.122 For how long is my operations permit valid? ACCESS FEES 29.140 May I cross Federal property to reach the boundary of my oil and gas right? 29.141 Will the Service charge me a fee for access? 29.142 Will I be charged a fee for emergency access to my operations? FINANCIAL ASSURANCE 29.150 When do I have to provide financial assurance to the Service? 29.151 How does the Service establish the amount of financial assurance? 29.152 Will the Service adjust the amount required for my financial assurance? 29.153 When will the Service release my fi nancial assurance? 29.154 Under what circumstances will I for feit my financial assurance? MODIFICATION TO AN OPERATION 29.160 Can I modify operations under an ap proved permit? CHANGE OF OPERATOR 29.170 What are my responsibilities if I transfer my right to operate? 29.171 What must I do if operations are transferred to me? WELL PLUGGING 29.180 When must I plug my well? 29.181 Can I get an extension to the well plugging requirement? PROHIBITED ACTS AND PENALTIES 29.190 What acts are prohibited under this subpart? 29.191 What enforcement actions can the Service take? 29.192 How do violations affect my ability to obtain a permit? APPEALS 29.200 Can I, as operator, appeal Service de cisions? PUBLIC INFORMATION 29.210 How can the public learn about oil and gas activities on refuge lands? INFORMATION COLLECTION 29.220 Has the Office of Management and Budget approved the collection of infor mation? AUTHORITY: 5 U.S.C. 301; 16 U.S.C. 460k, 664, 668dd, 685, 690d, 715i, 725, 3161; 30 U.S.C. 185; 31 U.S.C. 3711, 9701; 40 U.S.C. 319; 43 U.S.C. 315a; 113 Stat. 1501A–140. VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00289 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 280 50 CFR Ch. I (10–1–23 Edition) § 29.1 SOURCE: 31 FR 16026, Dec. 15, 1966, unless otherwise noted. Subpart A—General Rules § 29.1 May we allow economic uses on national wildlife refuges? We may only authorize public or pri vate economic use of the natural re sources of any national wildlife refuge, in accordance with 16 U.S.C. 715s, where we determine that the use con tributes to the achievement of the na tional wildlife refuge purposes or the National Wildlife Refuge System mis sion. We may authorize economic use by appropriate permit only when we have determined the use on a national wildlife refuge to be compatible. Per sons exercising economic privileges on national wildlife refuges will be subject to the applicable provisions of this sub chapter and of other applicable laws and regulations governing national wildlife refuges. Permits for economic use will contain such terms and condi tions that we determine to be nec essary for the proper administration of the resources. Economic use in this section includes but is not limited to grazing livestock, harvesting hay and stock feed, removing timber, firewood or other natural products of the soil, removing shell, sand or gravel, culti vating areas, or engaging in operations that facilitate approved programs on national wildlife refuges. [65 FR 62483, Oct. 18, 2000] § 29.2 Cooperative land management. Cooperative agreements with persons for crop cultivation, haying, grazing, or the harvest of vegetative products, including plantlife, growing with or without cultivation on wildlife refuge areas may be executed on a share-in kind basis when such agreements are in aid of or benefit to the wildlife man agement of the area. §§ 29.3–29.4 [Reserved] § 29.5 Fees. Fees and charges for the grant of privileges on wildlife refuge areas and for the sale of products taken there from, where not otherwise prescribed by law or regulation, shall be set at a rate commensurate with fees and charges for similar privileges and prod ucts made by private land owners in the vicinity or in accordance with their local value. Fees or rates of charge for products and privileges may be based either on a monetary exchange or on a share in kind of the resource or prod uct. Subpart B—Rights-of-Way General Regulations § 29.21 What do these terms mean? Compatible use means a proposed or existing wildlife-dependent rec reational use or any other use of a na tional wildlife refuge that, based on sound professional judgment, will not materially interfere with or detract from the fulfillment of the National Wildlife Refuge System mission or the purposes of the national wildlife ref uge. The term ‘‘inconsistent’’ in sec tion 28(b)(1) of the Mineral Leasing Act of 1920 (30 U.S.C. 185) means a use that is not compatible. Department means U.S. Department of the Interior unless otherwise speci fied. National Wildlife Refuge System land means lands and waters, or interests therein, administered by the Secretary as wildlife refuges, areas for the pro tection and conservation of fish and wildlife that are threatened with ex tinction, wildlife ranges, game ranges, wildlife management areas, or water fowl production areas. Other lands means all other lands, or interests therein, and waters adminis tered by the Secretary through the U.S. Fish and Wildlife Service which are not included in National Wildlife Refuge System lands, e.g., administra tive sites, research stations, fish hatch eries, and fishery research stations. Project Manager means the officer in charge of the land under administra tion by the U.S. Fish and Wildlife Serv ice. [34 FR 19907, Dec. 19, 1969, as amended at 39 FR 5490, Feb. 13, 1974; 42 FR 43917, Aug. 31, 1977; 44 FR 42976, July 23, 1979; 48 FR 31655, July 11, 1983; 51 FR 7575, Mar. 5, 1986; 65 FR 62483, Oct. 18, 2000] VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00290 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 281 U.S. Fish and Wildlife Serv., Interior § 29.21–2 § 29.21–1 Purpose and scope. The regulations in this subpart pre scribe the procedures for filing applica tions and the terms and conditions under which rights-of-way over and across the lands administered by the U.S. Fish and Wildlife Service may be granted. (a) National Wildlife Refuge System lands. Applications for all forms of rights-of-way on or over such lands shall be submitted under authority of Pub. L. 89–669, (80 Stat. 926; 16 U.S.C. 668dd) as amended, or for oil and gas pipelines under section 28 of the Min eral Leasing Act of 1920 (41 Stat. 449; 30 U.S.C. 185) as amended by Pub. L. 93– 153, following application procedures set out in § 29.21–2. No right-of-way will be approved unless it is determined by the Regional Director to be compat ible. See § 29.21–8 for additional require ments applicable to rights-of-way for electric power transmission lines and § 29.21–9 for additional requirements ap plicable to rights-of-way for pipelines for the transportation of oil, natural gas, synthetic liquid or gaseous fuels, or any refined product produced there from. (b) National Wildlife Refuge System lands—easement interest. Applications for all forms of rights-of-way across lands in which the United States owns only an easement interest may be sub mitted to the Regional Director in let ter form. No map exhibit is required, however, the affected land should be described in the letter or shown on a map sketch. If the requested right-of way will not adversely affect the United States’ interest, the Regional Director may issue a letter stating that the interest of the United States to the right-of-way easement would not be affected provided there would be no objection to a right-of-way by the fee owner. If the interest of the United States will be affected, application for the right-of-way must be submitted in accordance with procedures set out in § 29.21–2. (c) Other lands outside the National Wildlife Refuge System. Rights-of-way on or over other lands will be granted in accordance with controlling authori ties cited in 43 CFR part 2800, or for oil and gas pipelines under section 28 of the Mineral Leasing Act of 1920 (41 Stat. 449; 30 U.S.C. 185) as amended by Pub. L. 93–153. See § 29.21–8 for addi tional requirements applicable to rights-of-way for electric power trans mission lines and § 29.21–9 for addi tional requirements applicable to rights-of-way for pipelines for the transportation of oil, natural gas, syn thetic liquid or gaseous fuels, or any other refined product produced there from. Applications will be submitted in accordance with procedures set out in § 29.21–2. [34 FR 19907, Dec. 19, 1969, as amended at 36 FR 2402, Feb. 4, 1971; 39 FR 5490, Feb. 13, 1974; 42 FR 43917, Aug. 31, 1977; 44 FR 42976, July 23, 1979; 48 FR 31655, July 11, 1983] § 29.21–2 Application procedures. (a) Application. (1) No special form of application is required. The application should state the purpose for which the right-of-way is being requested to gether with the length, width on each side of the centerline, and the esti mated acreage. Applications, including exhibits, must be filed in triplicate with the Regional Director for the re gion in which the State is located. A list of States in each region and the ad dresses of the regional offices are pro vided at 50 CFR 2.2. (2)(i) All applications filed pursuant to this subpart in the name of individ uals, corporations, or associations must be accompanied by a nonreturn able application fee. No application fee will be required of (A) State of local governments or agencies or instrumen talities thereof except as to rights-of way, easements or permits under sec tion 28 of the Mineral Leasing Act of 1920, as amended by Pub. L. 93–153, or (B) Federal Government agencies. (ii) Application fees will be in accord ance with the following schedule: (A) For linear facilities (e.g., powerlines, pipelines, roads, etc.). Length Payment Less than 5 miles ........... $50 per mile or fraction thereof. 5 to 20 miles ................... $500. 20 miles and over ........... $500 for each 20 miles or fraction thereof. (B) For nonlinear facilities, $250 for each 40 acres or fraction thereof. (C) Where an application includes both linear and nonlinear facilities, payment will be the aggregate of VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00291 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 282 50 CFR Ch. I (10–1–23 Edition) § 29.21–2 amounts under paragraphs (a)(2)(ii)(A) and (B) of this section. (D) When an application is received, the Regional Director will estimate the costs expected to be incurred in proc essing the application. If the estimated costs exceed the payments under para graph (a)(2)(ii) (A), (B), or (C) of this section by an amount greater than the cost of maintaining actual cost records, the Regional Director shall re quire the applicant to make periodic payments in advance of the incurrence of such costs by the United States ex cept for the last payment which will reflect final reimbursement for actual costs of the United States in processing the application. Overpayments may be refunded or adjusted by the Regional Director as appropriate. (E) The Regional Director shall, on request by an applicant or prospective applicant, give an estimate based on the best available cost information, of the costs which would be incurred by the United States in processing an ap plication. However, reimbursement will not be limited to the estimate of the Regional Director if the actual costs exceed the estimate. Prospective applicants are encouraged to consult with the Regional Director in advance of filing an application in regard to probable costs and other requirements. (3)(i) By accepting an easement or permit under this subpart, the holder agrees to reimburse the United States for reasonable costs incurred by the Fish and Wildlife Service in moni toring the construction, operation, maintenance, and termination of facillities within or adjacent to the easement or permit area. No reim bursement of monitoring costs will be required of (A) State or local govern ments or agencies or instrumentalities thereof except as to right-of-way, ease ments, or permits granted under sec tion 28 of the Mineral Leasing Act of 1920 as amended by Pub. L. 93–153, or (B) Federal Government agencies. (ii) Within 60 days of the issuance of an easement or permit the holder must submit a nonreturnable payment in ac cordance with the following: (A) For linear facilities e.g., powerlines, pipelines, roads, etc.). Length Payment Less than 5 miles ........... $20 per mile or fraction thereof. 5 to 20 miles ................... $200. 20 miles and over ........... $200 for each 20 miles or fraction thereof. (B) For nonlinear facilities, $100 for each 40 acres or fraction thereof. (C) Where an easement or permit in cludes both linear and nonlinear facili ties, payment will be the aggregate amounts under paragraph (a)(3)(2)(ii) (A) and (B) of this section. (D) When an easement or permit is granted the Regional Director shall es timate the costs, based on the best available cost information, expected to be incurred by the United States in monitoring holder activity. If the esti mated costs exceed the payments under paragraph (a)(3)(2) (ii), (A), (B), or (C) of this section by an amount which is greater than the cost of maintaining actual cost records for the monitoring process, the Regional Director shall re quire the holder to make periodic pay ments of the estimated reimbursable costs prior to the incurrence of such costs by the United States. Overpay ments may be refunded or adjusted by the Regional Director as appropriate. (E) Following the termination of an easement or permit, the former holder will be required to pay additional amounts to the extent the actual costs to the United States have exceeded the payments required by paragraphs (a)(3)(ii)(A), (B), and (C) of this section. (4) All applications filed pursuant to this subpart must include a detailed environmental analysis which shall in clude information concerning the im pact of the proposed use of the environ ment including the impact on air and water quality; scenic and esthetic fea tures; historic, architectural, archeo logical, and cultural features; wildlife, fish and marine life, etc. The analysis shall include sufficient data so as to enable the Service to prepare an envi ronmental assessment and/or impact statement in accordance with section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and comply with the requirements of the National Historic Preservation Act of 1966 (16 U.S.C. 470 et seq.), the Ar cheological and Historic Preservation VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00292 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 283 U.S. Fish and Wildlife Serv., Interior § 29.21–4 Act of 1974 (16 U.S.C. 469 et seq.), Execu tive Order 11593 ‘‘Protection and En hancement of the Cultural Environ ment’’ of May 13, 1971 (36 FR 8921), and ‘‘Procedures for the Protection of His toric and Cultural Properties’’ (36 CFR, part 800). Concerning the National En vironmental Policy Act, the Regional Director may, at his discretion, rely on an environmental assessment or im pact statement prepared by a ‘‘lead agency.’’ (b) Maps. A map or plat must accom pany each copy of the application and must show the right-of-way in such de tail that the right-of-way can be accu rately located on the ground. Ties to Service land boundary corner monu ments or some prominent cultural fea tures which can be readily recognized and recovered should be shown where the right-of-way enters and leaves Service project land together with courses and distances of the centerline. The width of the right-of-way on each side of the centerline together with the acreage included within the right-of way or site must also be shown. If the right-of-way or site is located wholly within Service project land, a tie to a Government corner or prominent cul tural feature which can be readily rec ognized and recovered should be shown. [31 FR 16026, Dec. 15, 1966, as amended at 42 FR 43917, Aug. 31, 1977; 44 FR 42976, July 23, 1979; 48 FR 31655, July 11, 1983; 77 FR 5715, Feb. 6, 2012; 78 FR 35152, June 12, 2013] § 29.21–3 Nature of interest granted. (a) Where the land administered by the Secretary is owned in fee by the United States and the right-of-way is compatible with the objectives of the area, permit or easement may be ap proved and granted by the Regional Di rector. Generally an easement or per mit will be issued for a term of 50 years or so long as it is used for the purpose granted, or for a lesser term when con sidered appropriate. For rights-of-way granted under authority of section 28 of the Mineral Leasing Act of 1920, as amended, for pipelines for the transpor tation of oil, natural gas, synthetic liq uid or gaseous fuels, or any refined product produced therefrom, the grant may be for a term not to exceed 30 years and the right-of-way may not ex ceed 50 feet, plus the area occupied by the pipeline and its related facilities unless the Regional Director finds, and records the reasons for his finding, that, in his judgment, a wider right-of way is necessary for operation and maintenance after construction, or to protect the environment or public safe ty. Related facilities include but are not limited to valves, pump stations, supporting structures, bridges, moni toring and communication devices, surge and storage tanks, terminals, etc. However, a temporary permit supplementing a right-of-way may be granted for additional land needed dur ing construction, operation, mainte nance, or termination of the pipeline, or to protect the natural environment or public safety. (b) Unless otherwise provided, no in terest granted shall give the grantee any right whatever to remove any ma terial, earth, or stone for construction or other purpose, except that stone or earth necessarily removed from the right-of-way in the construction of a project may be used elsewhere along the same right-of-way in the construc tion of the same project. [31 FR 16026, Dec. 15, 1966, as amended at 42 FR 43918, Aug. 31, 1977] § 29.21–4 Terms and conditions. (a) Any right-of-way easement or per mit granted will be subject to out standing rights, if any, in third parties. (b) An applicant, by accepting an easement or permit agrees to such terms and conditions as may be pre scribed by the Regional Director in the granting document. Such terms and conditions shall include the following, unless waived in part by the Regional Director, and may include additional special stipulations at his discretion. See § 29.21–8 for special requirements for electric powerlines and § 29.21–9 for special requirements for oil and gas pipelines. (1) To comply with State and Federal laws applicable to the project within which the easement or permit is grant ed, and to the lands which are included in the right-of-way, and lawful existing regulations thereunder. (2) To clear and keep clear the lands within the easement or permit area to the extent and in the manner directed by the project manager in charge; and VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00293 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 284 50 CFR Ch. I (10–1–23 Edition) § 29.21–4 to dispose of all vegetative and other material cut, uprooted, or otherwise accumulated during the construction and maintenance of the project in such a manner as to decrease the fire hazard and also in accordance with such in structions as the project manager may specify. (3) To prevent the disturbance or re moval of any public land survey monu ment or project boundary monument unless and until the applicant has re quested and received from the Regional Director approval of measures the ap plicant will take to perpetuate the lo cation of aforesaid monument. (4) To take such soil and resource conservation and protection measures, including weed control on the land cov ered by the easement or permit as the project manager in charge may re quest. (5) To do everything reasonably with in his power, both independently and on request of any duly authorized rep resentative of the United States, to prevent and suppress fires on or near, lands to be occupied under the ease ment or permit area, including making available such construction and main tenance forces as may be reasonably obtainable for the suppression of such fires. (6) To rebuild and repair such roads, fences, structures, and trails as may be destroyed or injured by construction work and upon request by the Regional Director, to build and maintain nec essary and suitable crossings for all roads and trails that intersect the works constructed, maintained, or op erated under the right-of-way. (7) To pay the United States the full value for all damages to the lands or other property of the United States caused by him or by his employees, contractors, or employees of the con tractors, and to indemnify the United States against any liability for dam ages to life, person or property arising from the occupancy or use of the lands under the easement or permit, except where the easement or permit is grant ed hereunder to a State or other gov ernmental agency which has no legal power to assume such a liability with respect to damages caused by it to lands or property, such agency in lieu thereof agrees to repair all such dam ages. Where the easement of permit in volves lands which are under the exclu sive jurisdiction of the United States, the holder or his employees, contrac tors, or agents of the contractors, shall be liable to third parties for injuries in curred in connection with the ease ment or permit area. Grants of ease ments or permits involving special haz ards will impose liability without fault for injury and damage to the land and property of the United States up to a specified maximum limit commensu rate with the foreseeable risks or haz ards presented. The amount of no-fault liability for each occurrence is hereby limited to no more than $1,000,000. (8) To notify promptly the project manager in charge of the amount of merchantable timber, if any, which will be cut, removed, or destroyed in the construction and maintenance of the project, and to pay the United States in advance of construction such sum of money as the project manager may determine to be the full stumpage value of the timber to be so cut, re moved, or destroyed. (9) That all or any part of the ease ment or permit granted may be termi nated by the Regional Director, for failure to comply with any or all of the terms or conditions of the grant, or for abandonment. A rebuttable presump tion of abandonment is raised by delib erate failure of the holder to use for any continuous 2-year period the ease ment or permit for the purpose for which it was granted or renewed. In the event of noncompliance of abandon ment, the Regional Director will notify in writing the holder of the easement or permit of his intention to suspend or terminate such grant 60 days from the date of the notice, stating the reasons therefor, unless prior to that time the holder completes such corrective ac tions as are specified in the notice. The Regional Director may grant an exten sion of time within which to complete corrective actions when, in his judg ment, extenuating circumstances not within the holder’s control such as ad verse weather conditions, disturbance to wildlife during breeding periods or periods of peak concentration, or other compelling reasons warrant. Should the holder of a right-of-way issued under authority of the Mineral Leasing VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00294 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 285 U.S. Fish and Wildlife Serv., Interior § 29.21–6 Act, as amended, fail to take correc tive action within the 60-day period, the Regional Director will provide for an administrative proceeding pursuant to 5 U.S.C. 554, prior to a final Depart mental decision to suspend or termi nate the easement or permit. In the case of all other right-of-way holders, failure to take corrective action within the 60-day period will result in a deter mination by the Regional Director to suspend or terminate the easement or permit. No administrative proceeding shall be required where the easement or permit terminates under its terms. (10) To restore the land to its original condition to the satisfaction of the Re gional Director so far as it is reason ably possible to do so upon revocation and/or termination of the easement or permit, unless this requirement is waived in writing by the Regional Di rector. Termination also includes per mits or easements that terminate under the terms of the grant. (11) To keep the project manager in formed at all times of his address, and, in case of corporations, of the address of its principal place of business and the names and addresses of its prin cipal officers. (12) That in the construction, oper ation, and maintenance of the project, he shall not discriminate against any employee or applicant for employment because of race, creed, color, or na tional origin and shall require an iden tical provision to be included in all subcontracts. (13) That the grant of the easement or permit shall be subject to the ex press condition that the exercise there of will not unduly interfere with the management, administration, or dis posal by the United States of the land affected thereby. The applicant agrees and consents to the occupancy and use by the United States, its grantees, per mittees, or lessees of any part of the easement of permit area not actually occupied for the purpose of the granted rights to the extent that it does not interfere with the full and safe utiliza tion thereof by the holder. The holder of an easement or permit also agrees that authorized representatives of the United States shall have the right of access to the easement or permit area for the purpose of making inspections and monitoring the construction, oper ation and maintenance of facilities. (14) That the easement or permit herein granted shall be subject to the express covenant that any facility con structed thereon will be modified or adapted, if such is found by the Re gional Director to be necessary, with out liability or expense to the United States, so that such facility will not conflict with the use and occupancy of the land for any authorized works which may hereafter be constructed thereon under the authority of the United States. Any such modification will be planned and scheduled so as not to interfere unduly with or to have minimal effect upon continuity of en ergy and delivery requirements. (15) That the easement or permit herein granted shall be for the specific use described and may not be construed to include the further right to author ize any other use within the easement or permit area unless approved in writ ing by the Regional Director. [31 FR 16026, Dec. 15, 1966, as amended at 42 FR 43918, Aug. 31, 1977] § 29.21–5 Construction. (a) If construction is not commenced within two (2) years after date of right of-way grant, the right-of-way may be canceled by the Director of the U.S. Fish and Wildlife Service at his discre tion. (b) Proof of construction: Upon com pletion of construction, the applicant shall file a certification of completion with the Regional Director. [42 FR 43919, Aug. 31, 1977] § 29.21–6 Disposal, transfer or termi nation of interest. (a) Change in jurisdiction over and dis posal of lands. The final disposal by the United States of any tract of land tra versed by a right-of-way shall not be construed to be a revocation of the right-of-way in whole or in part, but such final disposition shall be deemed and taken to be subject to such right of-way unless it has been specifically canceled. (b) Transfer of easement or permit. Any proposed transfer, by assignment, lease, operating agreement or other wise, of an easement or permit must be VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00295 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 286 50 CFR Ch. I (10–1–23 Edition) § 29.21–7 filed in triplicate with the Regional Di rector and must be supported by a stip ulation that the transferee agrees to comply with and be bound by the terms and conditions of the original grant. A $25 nonreturnable service fee must ac company the proposal. No transfer will be recognized unless and until approved in writing by the Regional Director. (c) Disposal of property on termination of right-of-way. In the absence of any agreement to the contrary, the holder of the right-of-way will be allowed 6 months after termination to remove all property or improvements other than a road and useable improvements to a road, placed thereon by him; otherwise, all such property and improvements shall become the property of the United States. Extensions of time may be granted at the discretion of the Re gional Director. [31 FR 16026, Dec. 15, 1966, as amended at 42 FR 43919, Aug. 31, 1977] § 29.21–7 What payment do we require for use and occupancy of national wildlife refuge lands? (a) Payment for use and occupancy of lands under the regulations of this sub part will be required and will be for fair market value as determined by ap praisal by the Regional Director. At the discretion of the Regional Director, the payment may be a lump sum pay ment or an annual fair market rental payment, to be made in advance. If any Federal, State or local agency is ex empted from such payment by and any other provision of Federal law, such agency shall otherwise compensate the Service by any other means agreeable to the Regional Director, including, but not limited to, making other land available or the loan of equipment or personnel, except that any such com pensation shall relate to, and be con sistent with the objectives of the Na tional Wildlife Refuge System. The Re gional Director may waive such re quirement for compensation if he finds such requirement impracticable or un necessary. (b) When annual rental payments are used, such rates shall be reviewed by the Regional Director at any time not less than 5 years after the grant of the permit, right-of-way, or easement or the last revision of charges thereunder, The Regional Director will furnish a notice in writing to the holder of an easement or permit of intent to impose new charges to reflect fair market value commencing with the ensuing charge year. The revised charges will be effective unless the holder files an appeal in accordance with § 29.22. [42 FR 43919, Aug. 31, 1977, as amended at 65 FR 62483, Oct. 18, 2000] § 29.21–8 Electric power transmission line rights-of-way. By accepting a right-of-way for a power transmission line, the applicant thereby agrees and consents to comply with and be bound by the following terms and conditions, except those which the Secretary may waive in a particular case, in addition to those specified in § 29.21–4(b). (a) To protect in a workmanlike manner, at crossings and at places in proximity to his transmission lines on the right-of-way authorized, in accord ance with the rules prescribed in the National Electric Safety Code, all Gov ernment and other telephone, tele graph and power transmission lines from contact and all highways and rail roads from obstruction and to main tain his transmission lines in such manner as not to menace life or prop erty. (b) Neither the privilege nor the right to occupy or use the lands for the pur pose authorized shall relieve him of any legal liability for causing induc tive or conductive interference be tween any project transmission line or other project works constructed, oper ated, or maintained by him on the ser vient lands, and any radio installation, telephone line, or other communica tion facilities now or hereafter con structed and operated by the United States or any agency thereof. [42 FR 43919, Aug. 31, 1977, as amended at 48 FR 31655, July 11, 1983] § 29.21–9 Rights-of-way for pipelines for the transportation of oil, nat ural gas, synthetic liquid or gaseous fuels, or any refined product pro duced therefrom. (a) Application procedure. Applica tions for pipelines and related facilities VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00296 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 287 U.S. Fish and Wildlife Serv., Interior § 29.21–9 under this section are to be filed in ac cordance with § 29.21–2 of these regula tions with the following exception: When the right-of-way or proposed facility will occupy Federal land under the control of more than one Federal Agency and/or more than one bureau or office of the Department of the Interior, a single application shall be filed with the appropriate State Director of the Bureau of Land Management in accord ance with regulations in 43 CFR part 2800. Any portion of the facility occupying land of the National Wildlife Refuge System will be subject to the provi sions of these regulations. (b) Right-of-way grants under this sec tion will be subject to the special re quirements of section 28 of the Mineral Leasing Act of 1920 (30 U.S.C. 185), as amended, as set forth below. Gathering lines and associated structures used solely in the production of oil and gas under valid leases on the lands admin istered by the Fish and Wildlife Service are excepted from the provisions of this section. (1) Pipeline safety. Rights-of-way or permits granted under this section will include requirements that will protect the safety of workers and protect the public from sudden ruptures and slow degradation of the pipeline. An appli cant must agree to design, construct, and operate all proposed facilities in accordance with the provisions of parts 192 and/or 195 of title 49 of the CFR and in accordance with the Occupational Safety and Health Act of 1970, Pub. L. 91–596, including any amendments thereto. (2) Environmental protection. An appli cation for a right-of-way must contain environmental information required by § 29.21–2(a)(4) of this subpart. If the Re gional Director determines that a pro posed project will have a significant af fect on the environment, there must also be furnished a plan of construc tion, operations, and rehabilitation of the proposed facilities. In addition to terms and conditions imposed under § 29.21–4, the Regional director will im pose such stipulations as may be re quired to assure: (i) Restoration, re vegetation and curtailment of erosion of the surface; (ii) that activities in connection with the right-of-way or permit will not violate applicable air and water quality standards in related facilities siting standards established by law; (iii) control or prevention of damage to the environment including damage to fish and wildlife habitat, public or private property, and public health and safety; and (iv) protection of the interests of individuals living in the general area of the right-of-way or permit who rely on the fish, wildlife, and biotic resources of the area for sub sistence purposes. (c) Disclosure. If the applicant is a partnership, corporation, association, or other business entity it must dis close the identity of the participants in the entity. Such disclosure shall in clude where applicable (1) the name and address of each partner, (2) the name and address of each shareholder owning 3 percentum or more of the shares, together with the number and percentage of any class of voting shares of the entity which such share holder is authorized to vote, and (3) the name and address of each affiliate of the entity together with, in the case of an affiliate controlled by the entity, the number of shares and the percent age of any class of voting stock of that affiliate owned, directly or indirectly, by that entity, and in the case of an af filiate which controls that entity, the number of shares and the percentage of any class of voting stock of that entity owned, directly or indirectly, by the af filiate. (d) Technical and financial capability. The Regional Director may grant or renew a right-of-way or permit under this section only when he is satisfied that the applicant has the technical and financial capability to construct, operate, maintain and terminate the facility. At the discretion of the Re gional Director, a financial statement may be required. (e) Reimbursement of costs. In accord ance with § 29.21–2(a)(3) of this subpart, the holder of a right-of-way or permit must reimburse the Service for the cost incurred in monitoring the con struction, operation, maintenance, and termination of any pipeline or related facilities as determined by the Re gional Director. (f) Public hearing. The Regional Di rector shall give notice to Federal, State, and local government agencies, VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00297 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 288 50 CFR Ch. I (10–1–23 Edition) § 29.21–9 and the public, and afford them the op portunity to comment on right-of-way applications under this section. A no tice will be published in the FEDERAL REGISTER and a public hearing may be held where appropriate. (g) Bonding. Where appropriate the Regional Director may require the holder of a right-of-way or permit to furnish a bond, or other security satis factory to him, to secure all or any of the obligations imposed by the terms and conditions of the right-of-way or permit or by any rule or regulation, not to exceed the period of construc tion plus one year or a longer period if necessary for the pipeline to stabilize. (h) Suspension of right-of-way. If the Project Manager determines that an immediate temporary suspension of ac tivities within a right-of-way or permit area is necessary to protect public health and safety or the environment, he may issue an emergency suspension order to abate such activities prior to an administrative proceeding. The Re gional Director must make a deter mination and notify the holder in writ ing within 15 days from the date of sus pension as to whether the suspension should continue and list actions needed to terminate the suspension. Such sus pension shall remain in effect for only so long as an emergency condition con tinues. (i) Joint use of rights-of-way. Each right-of-way or permit shall reserve to the Regional Director the right to grant additional rights-of-way or per mits for compatible uses on or adjacent to rights-of-way or permit areas grant ed under this section after giving no tice to the holder and an opportunity to comment. (j) Common carriers. (1) Pipelines and related facilities used for the transpor tation of oil, natural gas, synthetic liq uid or gaseous fuels, or any refined product produced therefrom shall be constructed, operated, and maintained as common carriers. (2)(i) The owners or operators of pipe lines subject to this subpart shall ac cept, convey, transport, or purchase without discrimination all oil or gas delivered to the pipeline without re gard to whether such oil or gas was produced on Federal or non-Federal lands. (ii) In the case of oil or gas produced from Federal lands or from the re sources on the Federal lands in the vi cinity of the pipelines, the Secretary may, after a full hearing with due no tice thereof to the interested parties and a proper finding of facts, determine the proportionate amounts to be ac cepted, conveyed, transported or pur chased. (3)(i) The common carrier provisions of this section shall not apply to any natural gas pipeline operated by any person subject to regulation under the Natural Gas Act or by any public util ity subject to regulation by a State or municipal regulatory agency having jurisdiction to regulate the rates and charges for the sale of natural gas to consumers within the State or munici pality. (ii) Where natural gas not subject to state regulatory or conservation laws governing its purchase by pipelines is offered for sale, each such pipeline shall purchase, without discrimination, any such natural gas produced in the vicinity of the pipeline. (4) The Regional Director shall re quire, prior to granting or renewing a right-of-way, that the applicant submit and disclose all plans, contracts, agree ments, or other information or mate rial which he deems necessary to deter mine whether a right-of-way shall be granted or renewed and the terms and conditions which should be included in the right-of-way. Such information may include, but is not limited to: (i) Conditions for, and agreements among owners or operators, regarding the ad dition of pumping facilities, looping, or otherwise increasing the pipeline or terminal’s throughput capacity in re sponse to actual or anticipated in creases in demand; (ii) conditions for adding or abandoning intake, offtake, or storage points or facilities; and (iii) minimum shipment or purchase tenders. (k) Limitations on export. Any domes tically produced crude oil transported by pipeline over rights-of-way granted pursuant to section 28 of the Mineral Leasing Act of 1920, except such crude oil which is either exchanged in similar quantity for convenience or increased efficiency of transportation with per sons or the government of an adjacent VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00298 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 289 U.S. Fish and Wildlife Serv., Interior § 29.32 foreign state, or which is temporarily exported for convenience or increased efficiency of transportation across parts of an adjacent foreign state and reenters the United States, shall be subject to all of the limitation and li censing requirements of the Export Ad ministration Act of 1969. (l) State standards. The Regional Di rector shall take into consideration, and to the extent practical comply with, applicable State standards for right-of-way construction, operation, and maintenance. (m) Congressional notification. The Secretary shall promptly notify the Committee on Natural Resources of the United States House of Representatives and the Committee on Energy and Nat ural Resources of the United States Senate upon receipt of an application for a right-of-way for pipeline 24 inches or more in diameter, and no right-of way for such a pipeline shall be granted until 60 days (not including days on which the House or Senate has ad journed for more than three days) after a notice of intention to grant the right-of-way, together with the Sec retary’s detailed findings as to the terms and conditions he proposes to impose, has been submitted to such committees. [42 FR 43921, Aug. 31, 1977, as amended at 77 FR 5716, Feb. 6, 2012] § 29.22 Hearing and appeals proce dures. An appeal may be taken from any final disposition of the Regional Direc tor to the Director, U.S. Fish and Wild life Service, and, except in the case of a denial of a right-of-way application, from the latter’s decision to the Sec retary of the Interior. Appeals to the Secretary shall be taken pursuant to 43 CFR part 4, subpart G. [44 FR 42976, July 23, 1979] Subpart C—Mineral Operations § 29.31 Mineral ownerships in the United States. Where mineral rights to lands in wildlife refuge areas are vested in the United States, the provisions of 43 CFR 3101.3–3, 3109.4, 3201.1–6 and 3501.2–2 gov ern. [31 FR 16026, Dec. 15, 1966, as amended at 44 FR 42976, July 23, 1979] § 29.32 Non-Federal mineral rights. (a) Non-Federal mineral rights own ers within the National Wildlife Refuge System, not including coordination areas, must, to the greatest extent practicable, conduct all exploration, development, and production oper ations in such a manner as to prevent damage, erosion, pollution, or contami nation to Service-administered lands, waters, facilities, and to wildlife there on. So far as is practicable, such oper ations must also be conducted without interference to the operation of the ref uge and disturbance to the wildlife thereon. (1) Physical occupancy must be kept to the minimum space necessary to conduct efficient mineral operations. (2) Persons conducting mineral oper ations on Service-administered lands and waters must comply with all appli cable Federal and State laws and regu lations for the protection of wildlife and the administration of the area. (3) All waste and contaminating sub stances must be kept in the smallest practicable area, confined so as to pre vent escape as a result of rains and high water or otherwise, and removed from Service-administered lands and waters as quickly as practicable in such a manner as to prevent contami nation, pollution, damage, or injury to Service-administered lands, waters, or facilities, or to wildlife thereon. (4) Structures and equipment must be removed when the need for them has ended, and, upon the cessation of oper ations, the habitat in the area of oper ations must be restored to the extent possible to pre-operation conditions. (b) Nothing in this section will be ap plied so as to contravene or nullify rights vested in holders of mineral in terests on refuge lands. [81 FR 79971, Nov. 14, 2016] Subpart D—Management of Non Federal Oil and Gas Rights SOURCE: 81 FR 79971, Nov. 14, 2016, unless otherwise noted. VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00299 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 290 50 CFR Ch. I (10–1–23 Edition) § 29.40 PURPOSE AND SCOPE § 29.40 What are the purpose and scope of the regulations in this sub part? (a) The purpose of this subpart is to ensure that operators exercising non Federal oil and gas rights within the National Wildlife Refuge System (NWRS) outside of Alaska use techno logically feasible, least damaging methods to: (1) Protect Service-administered lands and waters, and resources of ref uges; (2) Protect refuge wildlife-dependent recreational uses and experiences and visitor or employee health and safety; and (3) Conserve refuges for the benefit of present and future generations of Americans. (b) This subpart applies to all opera tors conducting non-Federal oil and gas operations outside of Alaska on Service-administered lands held in fee or less-than fee (excluding coordina tion areas) or Service-administered waters to the extent necessary to pro tect those property interests. These regulations do not apply to non-Fed eral surface locations within the boundaries of a refuge (i.e., inholdings), except to the extent that activities as sociated with those operations, includ ing access to an inholding, occur on Service-administered lands or waters. (c) This subpart is not intended to re sult in a taking of any property inter est. The purpose of this subpart is to reasonably regulate operations to pro tect Service-administered lands and waters, resources of refuges, visitor uses and experiences, and visitor or employee health and safety. § 29.41 When does this subpart apply to me? This subpart applies to you if you are an operator who conducts or proposes to conduct non-Federal oil or gas oper ations on Service-administered lands or waters outside of Alaska. § 29.42 What authorization do I need to conduct operations? (a) You must demonstrate to the Service that you have the right to op erate in order to conduct operations on Service-administered lands or waters. (b) Except as provided in §§ 29.43 or 29.44, before starting operations, you must obtain a temporary access permit under §§ 29.70 through 29.73 for recon naissance surveys and/or an operations permit under §§ 29.90 through 29.97. § 29.43 If I am already operating under Service authorization, what do I need to do? If you already have a Service-issued permit, you may continue to operate according to the terms and conditions of that approval, subject to the provi sions of this subpart. If you propose to conduct new operations, modify your existing operations, conduct well plug ging or reclamation operations, or ob tain an extension of the well plugging requirement to maintain your well in shut-in status, you must either amend your current authorization or obtain an operations permit in accordance with §§ 29.90 through 29.97, Operations Permit: Application, and such new op erations or modifications will be sub ject to the applicable provisions of this subpart. Additionally, your existing operations are subject to the following regulations: (a) § 29.120(b) and (d)–(g) and § 29.121(a) and (c)–(f); (b) § 29.170(a); (c) §§ 29.180 and 29.181; (d) § 29.190; and (e) § 29.200. § 29.44 If I am operating without prior Service authorization, what do I need to do? Any operator that has commenced operations prior to December 14, 2016 in accordance with applicable local, State, and Federal laws and regula tions may continue without an oper ations permit. However, your operation is subject to the requirements of §§ 29.60 through 29.64, Pre-Existing Operations, and the requirements that when you propose to conduct new operations, modify your pre-existing operations, conduct well plugging and reclamation operations, or obtain an extension of the well plugging requirement to main tain your well in shut-in status, you must obtain an operations permit in accordance with §§ 29.90 through 29.97, VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00300 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 291 U.S. Fish and Wildlife Serv., Interior § 29.50 Operations Permit: Application, and all applicable requirements of this sub part. DEFINITIONS § 29.50 What do the terms used in this subpart mean? In addition to the definitions in §§ 25.12, 29.21, and 36.2 of this sub chapter, the following definitions apply to this subpart: Access means any method of entering or traversing on or across Service-ad ministered lands or waters, including but not limited to: Vehicle, watercraft, fixed-wing aircraft, helicopter, un manned aerial vehicle, off-road vehicle, mobile heavy equipment, snowmobile, pack animal, and foot. Access does not include the use of aircraft, including, but not limited to, airplanes, heli copters, and unmanned aircraft vehi cles, that do not land on, or are not launched from, Service-administered lands or waters. Area of operations means the area of Service-administered lands or waters on which operations are carried out, in cluding roads or other areas that you are authorized to use related to the ex ercise of your oil and gas rights. Contaminating substance means any toxic or hazardous substance that is used in or results from the conduct of operations and is listed under the Clean Air Act (42 U.S.C. 7401 et seq.), Clean Water Act regulations at 40 CFR parts 112 and 116, the Resource Con servation and Recovery Act regula tions at 40 CFR part 261, or the Haz ardous Materials Transportation Act regulations at 49 CFR part 172. This in cludes, but is not limited to, explo sives, radioactive materials, brine waters, formation waters, petroleum products, petroleum byproducts, and chemical compounds used for drilling, production, processing, well testing, well completion, and well servicing. Gas means any fluid, either combus tible or noncombustible, that is pro duced in a natural state from the earth and that maintains a gaseous or rar efied state at ordinary temperature and pressure conditions. Oil means any viscous combustible liquid hydrocarbon or solid hydro carbon substance that occurs naturally in the earth and is easily liquefiable on warming. Modifying means changing operations in a manner that will result in addi tional impacts on refuge resources, vis itor uses, refuge administration, or human health and safety beyond the scope, intensity, and/or duration of ex isting impacts. In order to determine if activities would have additional im pacts, you must consult with the Serv ice. Operations means all existing and proposed functions, work, and activi ties in connection with the exercise of oil or gas rights not owned by the United States and located on Service administered lands or waters. (1) Operations include, but are not limited to: Access by any means to or from an area of operations; construc tion; geological and geophysical explo ration; drilling, well servicing, workover, or recompletion; production; hydraulic fracturing, well simulation, and injection wells; gathering (includ ing installation and maintenance of flowlines and gathering lines); storage, transport, or processing of petroleum products; earth moving; excavation; hauling; disposal; surveillance, inspec tion, monitoring, or maintenance of wells, facilities, and equipment; rec lamation; road and pad building or im provement; shot hole and well plugging and abandonment, and reclamation; and all other activities incident to any of the foregoing. (2) Operations do not include recon naissance surveys as defined in this subpart or oil and gas pipelines that are located within a refuge under au thority of a deeded or other right-of way. Operations permit means a permit issued by the Service under this sub part authorizing an operator to con duct operations on Service-adminis tered lands or waters. Operator means any person or entity, agent, assignee, designee, lessee, or representative thereof exercising or proposing to exercise non-Federal oil and gas rights on Service-administered lands or waters. VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00301 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 292 50 CFR Ch. I (10–1–23 Edition) § 29.60 Reconnaissance survey means an in spection or survey conducted by quali fied specialists for the purpose of pre paring a permit application. A recon naissance survey: (1) Includes identification of the area of operations and collection of natural and cultural resource information within and adjacent to the proposed area of operations. (2) Does not include surface disturb ance activities except for minimal dis turbance necessary to perform cultural resource surveys, natural resource sur veys, and location surveys required under this subpart. Right to operate means a deed, lease, memorandum of lease, designation of operator, assignment of right, or other documentation demonstrating that you hold a legal right to conduct the oper ations you are proposing on Service-ad ministered lands or waters. Service, we, us and our means the U.S. Fish and Wildlife Service. Technologically feasible, least damaging methods are those that we determine, on a case-by-case basis, to be most pro tective of refuge resources and uses while ensuring human health and safe ty, taking into consideration all rel evant factors, including environ mental, economic, and technological factors and the requirements of appli cable law. Temporary access permit means a per mit issued by the Service authorizing an operator to access that operator’s proposed area of operations to conduct reconnaissance surveys to collect basic information necessary to prepare an operations permit application. Third-party monitor means a qualified specialist, who is not an employee, agent, or representative of the oper ator, nor has any conflicts of interest that could preclude objectivity in mon itoring an operator’s compliance, and who has the relevant expertise to mon itor operations for compliance with ap plicable laws, regulations, and permit requirements. Usable water means an aquifer or its portion that: (1)(i) Supplies any public water sys tem; or (ii) Contains a sufficient quantity of ground water to supply a public water system and either: (A) Currently supplies drinking water for human consumption; or (B) Contains fewer than 10,000 mg/l total dissolved solids; and (2) Is not an exempted aquifer. Waste means any material that is dis carded. It includes, but is not limited to: Drilling fluids and cuttings; pro duced fluids not under regulation as a toxic or hazardous substance; human waste; garbage; fuel drums; pipes; oil; refined oil and other hydrocarbons; contaminated soil; synthetic mate rials; manmade structures or equip ment; or native and nonnative mate rials. You means the operator, unless oth erwise specified or indicated by the context. PRE-EXISTING OPERATIONS § 29.60 Do I need an operations permit for my pre-existing operation? No. Pre-existing operations are those conducted as of December 14, 2016 with out an approved permit from the Serv ice or prior to a boundary change or es tablishment of a new refuge. Your pre existing operations may be continued without an operations permit, but you are required to operate in accordance with applicable local, State, and Fed eral laws and regulations, and are sub ject to applicable provisions of this subpart, including requirements for a permit when you propose to conduct new operations or to modify pre-exist ing operations. § 29.61 What information must I pro vide to the Service? You must submit the following infor mation to the Service where your pre existing operation is occurring by Feb ruary 13, 2017 or 90 days after a bound ary change or establishment of a new refuge: (a) Documentation demonstrating that you hold the right to operate on Service-administered lands or waters. (b) The names, phone numbers, and addresses of your: (1) Primary company representative; (2) Representative responsible for field supervision; and (3) Representative responsible for emergency response. (c) A brief description of your current operations, and any anticipated VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00302 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 293 U.S. Fish and Wildlife Serv., Interior § 29.72 changes to current operations, includ ing: (1) A scaled map clearly delineating your existing area of operations; (2) Documentation of the current op erating methods, surface equipment, materials produced or used, and moni toring methods; and (3) Copies of all plans and permits re quired by local, State, and Federal agencies, including a Spill Prevention Control and Countermeasure Plan if re quired by Environmental Protection Agency regulations at 40 CFR part 112. § 29.62 What if I intend to conduct new operations or modify my pre-exist ing operations? (a) You must obtain an operations permit before conducting operations that are begun after December 14, 2016 for those new operations in accordance with §§ 29.90 through 29.97, Operations Permit: Application, and all applicable requirements of this subpart. (b) You must obtain an operations permit prior to modifying your pre-ex isting operations for that modification in accordance with §§ 29.90 through 29.97, Operations Permit: Application, and all applicable requirements of this subpart. § 29.63 What plugging and reclamation requirements apply to my pre-exist ing operations? Upon completion of your production operation, you are subject to the rec lamation standards in § 29.117(d). You must obtain an operations permit in accordance with §§ 29.90 through 29.97, Operations Permit: Application, and all applicable requirements of this sub part, prior to plugging your well and conducting site reclamation. § 29.64 What other provisions apply to my operations? Your pre-existing operations are also subject to the following regulations in this part 29: (a) § 29.120(b), (d), (f), and (g) and § 29.121(a) and (c)–(f); (b) § 29.170(a); (c) §§ 29.180 and 29.181; (d) § 29.190; and (e) § 29.200. TEMPORARY ACCESS PERMITS § 29.70 When do I need a temporary ac cess permit? You must apply to the Service and obtain a temporary access permit to access your proposed area of operations in order to conduct reconnaissance sur veys within a refuge. This permit will describe the means, routes, timing, and other terms and conditions of your ac cess determined by the Service to re sult in only the minimum disturbance necessary to perform surveys. § 29.71 How do I apply for a temporary access permit? You must submit the information re quested in FWS Form 3–2469 (Oil and Gas Operations Special Use Permit Ap plication) to the refuge in which you propose to conduct operations. Infor mation includes, but is not limited to: (a) The name, legal address, and tele phone number of the operator, em ployee, agent, or contractor respon sible for overall management of the proposed operations; (b) Documentation demonstrating that you hold the right to operate on Service-administered lands or waters; (c) The name, legal address, tele phone number, and qualifications of all specialists responsible for conducting the reconnaissance surveys (only re quired if the assistants/subcontractors/ subpermittees will be operating on Service-administered lands or waters without the permittee being present); (d) A brief description of the intended operation so that we can determine re connaissance survey needs; (e) A description of the survey meth ods you intend to use to identify the natural and cultural resources; (f) A map (to-scale and determined by us to be acceptable) delineating the proposed reconnaissance survey area in relation to the refuge boundary and the proposed area of operations; and (g) A description of proposed means of access and routes for conducting the reconnaissance surveys. § 29.72 When will the Service grant a temporary access permit? Within 30 calendar days of receipt of the application for a reconnaissance survey, we will advise you whether the VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00303 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 294 50 CFR Ch. I (10–1–23 Edition) § 29.73 application fulfills the requirements of §§ 29.70 through 29.71 and issue you a temporary access permit or provide you with a statement of additional in formation that is needed for us to con duct review of your application. § 29.73 How much time will I have to conduct my reconnaissance sur veys? Your temporary access permit will be in effect for a maximum of 60 calendar days from the date of issuance, unless a longer term is approved in the per mit. We may extend the term of the permit for a reasonable period of time, based upon your written request that explains why an extension is necessary. ACCESSING OIL AND GAS RIGHTS FROM A NON-FEDERAL SURFACE LOCATION § 29.80 Do I need a permit for access ing oil and gas rights from a non Federal location? No. Using directional drilling from a non-Federal surface location to reach your oil and gas rights within a refuge is exempt from these regulations. How ever, you are encouraged to provide the Service the names, phone numbers, and addresses of your primary company representative, representative respon sible for field supervision, and rep resentative responsible for emergency response at least 60 calendar days prior to conducting your operation. If you require access across Service-adminis tered lands or waters, that access is subject to applicable provisions of this subpart, including obtaining an oper ations permit for any new access or modification of existing access. OPERATIONS PERMIT: APPLICATION § 29.90 Who must apply for an oper ations permit? Except as otherwise provided in §§ 29.43, 29.44, 29.70, and 29.80, if you are proposing to conduct operations on Service-administered lands or waters outside of Alaska, you must submit an application (FWS Form 3–2469) for an operations permit to the Service. § 29.91 What should I do before filing an application? You should participate in a pre-appli cation meeting with the Service to allow for an early exchange of informa tion between you and the Service with the intent of avoiding delays in your application process. (a) For the meeting, you should pro vide: (1) Documentation demonstrating that you hold the legal right to operate on Service-administered lands or waters; and (2) An overview of your proposed op eration and timing. (b) The Service will provide guidance on the permitting process and informa tion on available resource data, and identify additional data needs. § 29.92 May I use previously submitted information? Yes. (a) You do not need to resubmit in formation that is already on file with the Service, provided that such infor mation is still current and accurate. You should reference this information in your oil and gas operations permit application. (b) You may submit documents and materials submitted to other Federal and State agencies noting how the in formation meets the specific require ments of §§ 29.93 through 29.97. § 29.93 Do I need to submit informa tion for all possible future oper ations? No. You need only provide informa tion for those operations for which you are seeking immediate approval. Ap proval of activities beyond the scope of your application may be subject to a new application and approval process. § 29.94 What information must be in cluded in all applications? All applications must include the in formation requested on FWS Form 3– 2469, including, but not limited to: (a) The name, legal address, and tele phone number of the operator, em ployee, agent, or contractor respon sible for overall management of the proposed operations. (b) Documentation demonstrating that you hold the legal right to operate within the refuge. (c) A description of the natural fea tures of your proposed area of oper ations, such as: Streams, lakes, ponds, VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00304 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 295 U.S. Fish and Wildlife Serv., Interior § 29.94 wetlands, estimated depths to the top and bottom of zones of usable water and topographic relief. (d) The location of existing roads, trails, railroad tracks, pipeline rights of-way, pads, and other disturbed areas. (e) The location of existing struc tures that your operations could affect, including buildings, pipelines, oil and gas wells including both producing and plugged and abandoned wells, injection wells, freshwater wells, underground and overhead electrical lines, and other utility lines. (f) Descriptions of the natural and cultural resource conditions from your reconnaissance survey reports or other sources collected for your proposed area of operations, including any base line testing of soils and surface and near-surface ground waters within your area of operations that reasonably may be impacted by your surface oper ations. (g) Locations map(s) (to-scale and de termined by us to be acceptable) that clearly identifies: (1) Proposed area of operations, exist ing conditions, and proposed new sur face uses, including the boundaries of each of your oil and gas tracts in rela tion to your proposed operations and the relevant refuge boundary. (2) Proposed access routes of new sur face disturbances as determined by a location survey. (3) Proposed location of all support facilities, including those for transpor tation (e.g., vehicle parking areas, heli copter pads, etc.), sanitation, occupa tion, staging areas, fuel storage areas, refueling areas, loading docks, water supplies, and disposal facilities. (h) The method and diagrams, includ ing cross-sections, of any proposed pad construction, road construction, cut and-fill areas, and surface mainte nance, including erosion control. (i) The number and types of equip ment and vehicles, including an esti mate of vehicular round trips associ ated with your operation. (j) An estimated timetable for the proposed operations, including any operational timing constraints. (k) The type and extent of security measures proposed at your area of op erations. (l) The power sources and their trans mission systems for the proposed oper ations. (m) The types and quantities of all solid and liquid waste generated and the proposed methods of storage, han dling, and disposal. (n) The source, quantity, access route, and transportation/conveyance method for all water to be used in oper ations, including hydraulic fracturing, and estimations of any anticipated wastewater volumes generated, includ ing flowback fluids from hydraulic fracturing, and the proposed methods of storage, handling, and recycling or disposal. (o) The following information regard ing mitigation actions and alternatives considered: (1) A description of the steps you pro pose to take to mitigate anticipated adverse environmental impacts on ref uge resources and uses, including, but not limited to, the refuge’s land fea tures, land uses, fish and wildlife, vege tation, soils, surface and subsurface water resources, air quality, noise, lightscapes, viewsheds, cultural re sources, and economic environment. (2) A description of any anticipated impacts that you cannot mitigate. (3) A description of alternatives con sidered that meet the criteria of tech nologically feasible, least damaging methods of operations, as well as the costs and environmental effects of such alternatives. (p) You must submit the following in formation about your spill control and emergency preparedness plan. You may use a spill prevention control and coun termeasure plan prepared under 40 CFR part 112 if the plan includes all of the information required by this section. You must submit: (1) The names, addresses, and tele phone numbers of the people whom the Service can contact in the event of a spill, fire, or accident, including the order in which the individuals should be contacted. (2) The notification procedures and steps taken to minimize damage in the event of a spill, fire, or accident. (3) Identification of contaminating substances used within your area of op erations or expected to be encountered during operations. VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00305 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 296 50 CFR Ch. I (10–1–23 Edition) § 29.95 (4) Trajectory analysis for potential spills that are not contained on loca tion. (5) Identification of abnormal pres sure, temperature, toxic gases or sub stances, or other hazardous conditions at your area of operations or expected to be encountered during operations. (6) Measures (e.g., procedures, facility design, equipment) to minimize risks to human health and safety, and the environment. (7) Steps to prevent accumulations of oil or other materials deemed to be fire hazards from occurring in the vicinity of well locations and lease tanks. (8) The equipment and methods for containment and cleanup of contami nating substances, including a descrip tion of the equipment available at your area of operations and equipment available from local contractors. (9) A stormwater drainage plan and actions intended to mitigate stormwater runoff. (10) Material safety data sheets for each material you will use or encoun ter during operations, including ex pected quantities maintained at your area of operations. (11) A description of the emergency actions you will take in the event of injury or death to fish and wildlife or vegetation. (12) A description of the emergency actions you will take in the event of accidents causing human injury. (13) Contingency plans for conditions and emergencies other than spills, such as if your area of operations is located in areas prone to hurricanes, flooding, tornadoes, fires, or earthquakes. (q) A description of the specific equipment, materials, methods, and schedule that will be used to meet the operating standards for reclamation at § 29.117. (r) An itemized list of the estimated costs that a third party would charge to complete reclamation. § 29.95 What additional information must be included if I am proposing geophysical exploration? If you propose to conduct geophysical exploration, you must submit the in formation requested on FWS Form 3– 2469, including, but not limited to: (a) A map showing the positions of each survey line including all source and receiver locations as determined by a locational survey, and including shot point offset distances from wells, buildings, other infrastructure, cul tural resources, and environmentally sensitive areas; (b) The number of crews and numbers of workers in each crew; (c) A description of the acquisition methods, including the procedures and specific equipment you will use, and energy sources (e.g., explosives, vibroseis trucks); (d) A description of the methods of access along each survey line for per sonnel, materials, and equipment; and (e) A list of all explosives, blasting equipment, chemicals, and fuels you will use in the proposed operations, in cluding a description of proposed dis posal methods, transportation meth ods, safety measures, and storage fa cilities. § 29.96 What additional information must be included if I am proposing drilling operations? If you are proposing to drill a well, you must submit the information re quested on FWS Form 3–2469, includ ing, but not limited to: (a) A description of the well pad con struction, including dimensions and cross sections of cut-and-fill areas and excavations for ditches, sumps, and spill control equipment or structures, including lined areas; (b) A description of the drill rig and equipment layout, including rig com ponents, fuel tanks, testing equipment, support facilities, storage areas, and all other well-site equipment and fa cilities; (c) A description of the type and characteristics of the proposed drilling mud systems; and (d) A description of the equipment, materials, and methods of surface oper ations associated with your drilling, well casing and cementing, well con trol, well evaluation and testing, well completion, hydraulic fracturing or other well stimulation, and well plug ging programs. VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00306 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 297 U.S. Fish and Wildlife Serv., Interior § 29.102 § 29.97 What additional information must be included if I am proposing production operations? If you are proposing to produce a well, you must submit the information requested on FWS Form 3–2469, includ ing, but not limited to: (a) The dimensions and the to-scale layout of the well pad, clearly identi fying well locations, noting partial rec lamation areas; gathering, separation, metering, and storage equipment; elec trical lines; fences; spill control equip ment or structures, including lined areas, artificial lift equipment, tank batteries, treating and separating ves sels, secondary or enhanced recovery facilities, water disposal facilities, gas compression and/or injection facilities; metering points; sales point (if on lease); tanker pickup points; gas com pressor, including size and type (if ap plicable); and any other well site equip ment. (b) A general description of antici pated stimulations, servicing, and workovers. (c) A description of the procedures and equipment used to maintain well control. (d) A description of the method and means used to transport produced oil and gas, including vehicular transport; flowline and gathering line construc tion and operation, pipe size, and oper ating pressure; cathodic protection methods; surface equipment use; sur face equipment location; maintenance procedures; maintenance schedules; pressure detection methods; and shut down procedures. (e) A road and well pad maintenance plan, including equipment and mate rials to maintain the road surface and control erosion. (f) A vegetation management plan on well sites, roads, pipeline corridors, and other disturbed surface areas, in cluding control of noxious and invasive species. (g) A stormwater management plan on the well site. (h) A produced water storage and dis posal plan. (i) A description of the equipment, materials, and procedures proposed for well plugging. OPERATIONS PERMIT: APPLICATION REVIEW AND APPROVAL § 29.100 How will the Service process my application? We will conduct initial review of your application to determine if all in formation is complete. Once your in formation is complete, we will begin formal review. § 29.101 How will the Service conduct an initial review? (a) Within 30 calendar days of receipt of your application, the Service will notify you in writing that one of the following situations exists: (1) Your application is complete, and the Service will begin formal review; (2) Your application does not meet the information requirements, in which case we will identify the additional in formation required to be submitted be fore the Service will be able to conduct formal review of your application; or (3) More time is necessary to com plete the review, in which case the Service will provide the amount of ad ditional time reasonably needed along with a justification. (b) If you submit additional informa tion as requested under paragraph (a)(2) of this section, and the Service determines that you have met all ap plicable information requirements, the Service will notify you within 30 cal endar days from receipt of the addi tional information that either: (1) Your application is complete, and the Service will begin formal review; or (2) More time is necessary to com plete the initial review, in which case the Service will provide the amount of additional time reasonably needed along with a justification. § 29.102 How will the Service conduct a formal review? For those applications for which the Service determines that the applicant holds a valid property right, the Serv ice will conduct a formal review of your application by: (a) Evaluating the potential impacts of your proposal on Service-adminis tered lands and waters, or resources of refuges; visitor uses or experiences; or visitor or employee health and safety VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00307 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 298 50 CFR Ch. I (10–1–23 Edition) § 29.103 in compliance with applicable Federal laws; and (b) Identifying any additional oper ating conditions that would apply to your approved application. § 29.103 What standards must be met to approve my application? (a) In order to approve your oper ations permit application, the Service must determine that your operations will: (1) Use technologically feasible, least damaging methods; and (2) Meet all applicable operating standards. (b) Before operations begin, you must submit to the Service: (1) Financial assurance in the amount specified by the Service and in accordance with the requirements of §§ 29.150 through 29.154, Financial As surance; (2) Proof of liability insurance with limits sufficient to cover injuries to persons or property caused by your op erations; and (3) A statement under penalty of per jury, signed by an official who is au thorized to legally bind the company, stating that proposed operations are in compliance with any applicable Fed eral law or regulation or any applicable State law or regulation related to non Federal oil and gas operations and that all information submitted to the Serv ice is true and correct. § 29.104 What actions may the Service take on my operations permit appli cation? (a) We will make a decision on your application within 180 days from the date we deem your application com plete unless: (1) We and you agree that such deci sion will occur within a shorter or longer period of time; or (2) We determine that an additional period of time is required to ensure that we have, in reviewing the permit application, complied with all applica ble legal requirements. (b) We will notify you in writing that your permit application is: (1) Approved, with or without oper ating conditions; or (2) Denied, and provide justification for the denial. Any such denial must be consistent with § 29.40(c). OPERATING STANDARDS § 29.110 What are the purposes of the Service’s operating standards? The purposes are to: (a) Protect Service-administered lands and waters, and refuge resources; wildlife-dependent visitor uses and ex periences; and visitor and employee health and safety; and (b) Ensure use of technologically fea sible, least damaging methods. The op erating standards give us and the oper ator flexibility to consider using alter native methods, equipment, materials design, and conduct of operations. § 29.111 What general facility design and management standards must I meet? As a permittee, you must: (a) Design, construct, operate, and maintain access to your operational site to cause the minimum amount of surface disturbance needed to safely conduct operations and to avoid areas we have identified as containing sen sitive resources. (b) Install and maintain secondary containment materials and structures for all equipment and facilities using or storing contaminating substances. The containment system must be suffi ciently impervious to prevent dis charge and must have sufficient stor age capacity to contain, at a minimum, the largest potential spill incident. (c) Keep temporarily stored waste in the smallest area feasible, and confine the waste to prevent escape as a result of percolation, rain, high water, or other causes. You must regularly re move waste from the refuge and law fully dispose of the waste in a direct and workable timeframe. You may not establish a solid waste disposal site on a refuge. (d) Use engines that adhere to appli cable Federal and State emission standards. (e) Construct, maintain, and use roads in a manner to minimize fugitive dust emissions. (f) Design, operate, and maintain your operations and equipment in a VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00308 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 299 U.S. Fish and Wildlife Serv., Interior § 29.117 manner consistent with good air pollu tion control practices so as to mini mize emissions and leaks of air pollut ants and hydrocarbons, including in tentional releases or flaring of gases. (g) Control the invasion of noxious and invasive plant and animal species in your area of operations from the be ginning through final reclamation. (h) Avoid conducting ground-dis turbing operations within 500 feet of any surface water, including an inter mittent or ephemeral watercourse, or wetland, or any refuge structure or fa cility used by refuges for interpreta tion, public recreation, or administra tion. We may increase or decrease this distance consistent with the need to protect Service-administered struc tures or facilities, visitor uses or expe riences, or visitor or employee health and safety; or to ensure that you have reasonable access to your non-Federal oil and gas. Measurements for purposes of this paragraph are by map distance. § 29.112 What fish and wildlife protec tion standards must I meet? To protect fish and wildlife resources on the refuge, you must: (a) Along with your employees and contractors, adhere to all refuge regu lations for the protection of fish, wild life, and plants; (b) Ensure that you, your employees, and contractors have been informed and educated by the refuge staff on the appropriate protection practices for wildlife conservation; (c) Conduct operations in a manner that does not create an unsafe environ ment for fish and wildlife by avoiding or minimizing exposure to physical and chemical hazards; and (d) Conduct operations in a manner that avoids or minimizes impacts to sensitive wildlife, including timing and location of operations. § 29.113 What hydrologic standards must I meet? You must: (a) Construct facilities in a manner that maintains hydrologic movement and function. (b) Not cause measurable degradation of surface water or groundwater be yond that of existing conditions. (c) Conduct operations in a manner that maintains natural processes of erosion and sedimentation. § 29.114 What safety standards must I meet? To ensure the safety of your oper ations, you must: (a) Maintain your area of operations in a manner that avoids or minimizes the cause or spread of fire and does not intensify fire originating outside your operations area; (b) Maintain structures, facilities, improvements, and equipment in a safe and professional manner in order not to create an unsafe environment for refuge resources, visitors, and employ ees, by avoiding or minimizing expo sure to physical and chemical hazards; and (c) Provide site-security measures to protect visitors from hazardous condi tions resulting from your operations. § 29.115 What lighting and visual standards must I meet? (a) You must design, shield, and focus lighting to minimize the effects of spill light on the night sky or adjacent areas; and (b) You must reduce visual contrast in the landscape in selecting the area of operations, avoiding unnecessary disturbance, choosing appropriate col ors and materials for roads and perma nent structures, and other means. § 29.116 What noise reduction stand ards must I meet? You must prevent or minimize all noise that: (a) Adversely affects refuge resources or uses, taking into account frequency, magnitude, or duration; or (b) Exceeds levels that have been identified through monitoring as being acceptable to or appropriate for uses at the sites being monitored. § 29.117 What reclamation and protec tion standards must I meet? (a) You must promptly clean up and remove from the refuge any released contaminating substances in accord ance with all applicable Federal, State, and local laws. (b) You must perform partial rec lamation of areas that are no longer VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00309 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 300 50 CFR Ch. I (10–1–23 Edition) § 29.118 necessary to conduct operations. You must begin final reclamation within 6 months after you complete your au thorized operations unless we authorize a different reclamation period in writ ing. (c) You must protect all survey markers (e.g., monuments, witness cor ners, reference monuments, and bear ing trees) against destruction, oblitera tion, or damage from operations. You are responsible for reestablishment, restoration, and referencing of any monuments, corners, and bearing trees that are destroyed, obliterated, or damaged by your operations. (d) You must complete reclamation by: (1) Plugging all wells; (2) Removing all above-ground struc tures, equipment, roads, and all other manmade material and debris resulting from operations; (3) Removing or neutralizing any contaminating substances; (4) Reestablishing native vegetative communities, or providing for condi tions where ecological processes typ ical of the ecological zone (e.g., plant or wildlife succession) will reestablish themselves; (5) Grading to conform the contours to pre-existing elevations as necessary to maximize ecological function; (6) Restoring conditions to pre-dis turbance hydrologic movement and functionality; (7) Restoring natural systems using native soil material that is similar in character to the adjacent undisturbed soil profiles; (8) Ensuring that reclamation does not interfere with visitor use or with administration of the refuge; (9) Attaining conditions that are con sistent with the management objec tives of the refuge, designed to meet the purposes for which the refuge was established; and (10) Coordinating with us or with other operators who may be using a portion of your area of operations to ensure proper and equitable apportion ment of reclamation responsibilities. § 29.118 What additional operating standards apply to geophysical op erations? If you conduct geophysical oper ations, you must do all of the fol lowing: (a) Use surveying methods that mini mize the need for vegetative trimming and removal. (b) Locate source points using indus try-accepted minimum safe-offset dis tances from pipelines, telephone lines, railroad tracks, roads, power lines, water wells, oil and gas wells, oil- and gas-production facilities, and build ings. (c) Use equipment and methods that, based upon the specific environment, will minimize impacts to Service-ad ministered lands and waters, and re sources of refuges; visitor uses and ex periences; and visitor and employee health and safety. (d) If you use shot holes, you must: (1) Use biodegradable charges; (2) Plug all shot holes to prevent a pathway for migration for fluids along any portion of the bore; and (3) Leave the site in a clean and safe condition that will not impede surface reclamation or pose a hazard to wild life or human health and safety. § 29.119 What additional operating standards apply to drilling and pro duction operations? If you conduct drilling and produc tion operations, you must meet all of the following standards: (a) To conduct drilling operations, you must: (1) Use containerized mud circulation systems for operations; (2) Not create or use earthen pits; (3) Take all necessary precautions to keep your wells under control at all times, using only employees, contrac tors, or subcontractors trained and competent in well control procedures and equipment operation, and using in dustry-accepted well control equip ment and practices; and (4) Design, implement, and maintain integrated casing, cementing, drilling fluid, completion, stimulation, and blowout prevention programs to pre vent escape of fluids to the surface and to isolate and protect usable water zones throughout the life of the well, VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00310 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 301 U.S. Fish and Wildlife Serv., Interior § 29.121 taking into account all relevant geo logic and engineering factors. (b) To conduct production operations, in addition to meeting the standards of paragraphs (a)(1) through (a)(4) of this section, you must do all of the fol lowing: (1) Monitor producing conditions for early indications that could lead to loss of mechanical integrity of pro ducing equipment. (2) Maintain all surface equipment and the wellhead to prevent leaks or releases of any fluids or air pollutants. (3) Identify wells and related facili ties with appropriate signage. Signs must remain in place until the well is plugged and abandoned and the related facilities are removed. Signs must be of durable construction, and the lettering must be legible and large enough to be read under normal conditions at a dis tance of at least 50 feet. Each sign must show the name of the well, name of the operator, and the emergency contact phone number. (4) Remove all equipment and mate rials when not needed for the current phase of your operation. (5) Plug all wells, leaving the surface in a clean and safe condition that will not impede surface reclamation or pose a hazard to wildlife or human health and safety, in accordance with § 29.117. GENERAL TERMS AND CONDITIONS § 29.120 What terms and conditions apply to all operators? The following terms and conditions apply to all operators, regardless of whether these terms and conditions are expressly included in the permit: (a) You must comply with all appli cable operating standards in §§ 29.111 through 29.119; these operating stand ards will be incorporated in the terms and conditions of your operations per mit. Violation of these operating standards, unless otherwise provided in your operations permit, will subject you to the Prohibited Acts and Pen alties provisions of §§ 29.190 through 29.192. (b) You are responsible for ensuring that all of your employees, agents, con tractors, and subcontractors comply fully with the requirements of this sub part. (c) You may be required to reimburse the Service for the costs of processing and administering temporary access permits and operations permits. (d) You may not use any surface water or groundwater from a source lo cated on a refuge unless you have dem onstrated a right to use that water or the use has been approved by the Serv ice as the technologically feasible, least damaging method. (e) You agree to indemnify and hold harmless the United States and its offi cers and employees from and against any and all liability of any kind what soever arising out of or resulting from the acts or omissions of you and your employees, agents, representatives, contractors, and subcontractors in the conduct of activities under a Service issued permit. (f) You will be required to take all reasonable precautions to avoid, mini mize, rectify, or reduce the overall im pacts of your proposed oil and gas ac tivities to the refuge. You may be re quired to mitigate for impacts to ref uge resources and lost uses. Mutually agreed to mitigation tools for this pur pose may include providing alternative habitat creation or restoration, land purchase, or other resource compensa tion. (g) You are responsible for unantici pated and unauthorized damages as a direct or indirect result of your oper ations. You will be responsible for the actions and consequences of your em ployees and subcontractors. You will also be responsible for any reclamation of damages to refuge resources directly or indirectly caused by your operations through the occurrence of severe weather, fire, earthquakes, or the like thereof. § 29.121 What monitoring and report ing is required for all operators? (a) The Service may access your area of operations at any time to monitor the effects of your operations to ensure compliance with the regulations in this subpart. (b) The Service may determine that third-party monitors are necessary to ensure compliance with your oper ations permit and to protect Service administered lands and waters, or the resources of refuges, visitor uses and VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00311 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 302 50 CFR Ch. I (10–1–23 Edition) § 29.122 experiences, and visitor or employee health and safety. (1) The Service’s determination will be based on the scope and complexity of the proposed operation, reports that you are required to submit under para graph (e) of this section, and whether the refuge has the staff and technical ability to ensure compliance with the operations permit and any provision of this subpart. (2) A third-party monitor will report directly to the Service at intervals de termined by the Service. We will make the information reported available to you upon your request. (3) You will be responsible for the cost of the third-party monitor. (c) You must notify the Service with in 24 hours of any injuries to or mor tality of fish, wildlife, or endangered or threatened plants resulting from your operations. (d) You must notify the Service of any accidents involving serious per sonal injury or death and of any fires or spills on the site immediately after the accident occurs. You must submit a full written report on the accident to the Service within 90 days after the ac cident occurs. (e) Upon our request, you must sub mit reports or other information nec essary to verify compliance with your permit or with any provision of this subpart. To fulfill this request, you may submit to us reports that you have submitted to the State under State regulations, or that you have submitted to any other Federal agency to the extent they are sufficient to verify compliance with permits or this subpart. (f) If your operations include hydrau lic fracturing, you must provide the Service with a report including the true vertical depth of the well, total water volume used, and a description of the base fluid and each additive in the hydraulic fracturing fluid, including the trade name, supplier, purpose, in gredients, Chemical Abstract Service Number (CAS), maximum ingredient concentration in additive (percent by mass), and maximum ingredient con centration in hydraulic fracturing fluid (percent by mass). The report must be either submitted through FracFocus or another Service-designated database. § 29.122 For how long is my operations permit valid? Operations permits remain valid for the duration of the operation. Provi sions of § 29.160 apply. ACCESS FEES § 29.140 May I cross Federal property to reach the boundary of my oil and gas right? The Service may grant you the privi lege of access on, across, or through Service-administered lands or waters to reach the boundary of your oil and gas right. You should contact the Serv ice to determine if additional permits are necessary for access. § 29.141 Will the Service charge me a fee for access? (a) The Service will charge you a fee if you require use of Service-adminis tered lands or waters outside the boundary or scope of your oil and gas right: (1) If you require new use of Service administered lands or waters, we will charge you a fee based on the fair mar ket value of that use. (2) Fees under this section will not be charged for access within the scope of your oil and gas right or access to your right that is otherwise provided for by law. (b) If access to your oil and gas right is across an existing refuge road, we may charge a fee according to a posted fee schedule. § 29.142 Will I be charged a fee for emergency access to my operations? No. (a) The Service will not charge a fee for access across Service-administered lands or waters beyond the scope of your oil and gas right as necessary to respond to an emergency situation at your area of operations if we determine after the fact that the circumstances required an immediate response to ei ther: (1) Prevent or minimize injury to ref uge resources; or (2) Ensure public health and safety. (b) You will remain liable for any damage caused to refuge resources as a result of such emergency access. VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00312 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 303 U.S. Fish and Wildlife Serv., Interior § 29.160 FINANCIAL ASSURANCE § 29.150 When do I have to provide fi nancial assurance to the Service? You will need to provide financial as surance as a condition of approval for your operations permit when you sub mit your application. You must file fi nancial assurance with us in a form ac ceptable to the Service and payable upon demand. This financial assurance is in addition to any financial assur ance required by any other Federal or State regulatory authority. § 29.151 How does the Service estab lish the amount of financial assur ance? (a) You are responsible for com pleting reclamation of your disturb ances, whether within or outside your permit area, in accordance with this subpart and the terms of your permit. If you fail to properly complete rec lamation, you will be liable for the full costs of completing the reclamation. We will base the financial assurance amount upon the estimated cost that a third-party contractor would charge to complete reclamation in accordance with this subpart. If the cost of rec lamation exceeds the amount of your financial assurance, you will remain liable for all costs of reclamation in ex cess of the financial assurance. (b) The Service will reduce the re quired amount of your financial assur ance during the pendency of operations by the amount we determine is rep resented by in-kind reclamation you complete during your operations. § 29.152 Will the Service adjust the amount required for my financial assurance? The Service may require, or you may request, an adjustment to the financial assurance amount because of any cir cumstances that increase or decrease the estimated costs established under § 29.151. § 29.153 When will the Service release my financial assurance? (a) Your responsibility under the fi nancial assurance will continue until either: (1) The Service determines that you have met all applicable reclamation operating standards and any additional reclamation requirements that may be included in your operations permit; or (2) A new operator assumes your op erations, as provided in § 29.170(b). (b) You will be notified by the Serv ice within 30 calendar days of our de termination that your financial assur ance has been released. § 29.154 Under what circumstances will I forfeit my financial assur ance? (a) You may forfeit all or part of your financial assurance if we cannot secure your compliance with the provi sions of your operations permit or a provision of this subpart. The part of your financial assurance forfeited is based on costs to the Service to remedy your noncompliance. (b) In addition to forfeited financial assurance, we may temporarily: (1) Prohibit you from removing all structures, equipment, or other mate rials from your area of operations; (2) Require you to secure the oper ations site and take any necessary ac tions to protect Service-administered lands and waters, and resources of the refuge; visitor uses; and visitor or em ployee health and safety; and (3) Suspend review of any permit ap plications you have submitted until we determine that all violations of permit provisions or of any provision of this subpart are resolved. (4) Seek recovery as provided in § 29.151 for all costs of reclamation in excess of the posted financial assur ance. MODIFICATION TO AN OPERATION § 29.160 Can I modify operations under an approved permit? The Service may amend an approved temporary access permit or an oper ations permit to adjust to changed con ditions or to address unanticipated conditions, either upon our own action or at your request. (a) To request a modification to your operation, you must provide, in writ ing, to the Service, your assigned per mit number, a description of the pro posed modification, and an explanation of why the modification is needed. We will review your request for modifica tion under the approval standards at VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00313 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 304 50 CFR Ch. I (10–1–23 Edition) § 29.170 §§ 29.72 or 29.103. You may not imple ment any modification until you have received the Service’s written ap proval. (b) If the Service needs to amend your temporary access permit or oper ations permit, you will receive a writ ten notice that: (1) Describes the modification re quired and justification; (2) Specifies the time within which you must notify the Service that you either accept the modifications to your permit or explain any concerns you may have; and (3) Absent any concerns, specifies the time within which you must incor porate the modification into your oper ations. CHANGE OF OPERATOR § 29.170 What are my responsibilities if I transfer my right to operate? (a) If your operations are being con ducted under § 29.44, you must notify the Service in writing within 30 cal endar days from the date the new oper ator acquires the rights to conduct op erations. Your written notification must include: (1) The names and addresses of the person or entity conveying the right and of the person or entity acquiring the right; (2) The effective date of transfer; (3) The description of the rights, as sets, and liabilities being transferred and which ones, if any, are being re served by the previous operator; and (4) A written acknowledgement from the new operator that the contents of the notification are true and correct. (b) If your operations are being con ducted under § 29.43 or an operations permit: (1) You must provide notice under paragraph (a) of this section. (2) You remain responsible for com pliance with your operations permit, and we will retain your financial assur ance until the new operator: (i) Adopts and agrees in writing to conduct operations in accordance with all terms and conditions of your oper ations permit; (ii) Provides financial assurance with us that is acceptable to the Service and made payable to the Service; and (iii) Receives written notification from the Service that transfer of the operations permit has been approved. § 29.171 What must I do if operations are transferred to me? (a) If another operator transfers oper ations conducted under § 29.44, as the transferee you may continue operating under the requirements of that section, but: (1) Within 30 calendar days from the date of the transfer, you must provide to the Service: (i) Documentation demonstrating that you hold the right to operate; and (ii) The names, phone numbers, and addresses of your: (A) Primary company representative; (B) Representative responsible for field supervision; and (C) Representative responsible for emergency response. (2) Within 90 days, or as otherwise agreed to by the Service, submit an op erations permit application in compli ance with §§ 29.90–29.97, Operations Per mit: Application, that must be ap proved in compliance with applicable provisions of this subpart and under the timelines outlined in §§ 29.100– 29.103, Operations Permit: Application Review and Approval. (b) If another operator transfers oper ations conducted under § 29.43 or an op erations permit, you must within 30 days of commencing transferred oper ations: (1) Provide documentation dem onstrating that you hold the right to operate. (2) Provide the names, phone num bers, and addresses of your: (i) Primary company representative; (ii) Representative responsible for field supervision; and (iii) Representative responsible for emergency response. (3) Agree in writing to conduct oper ations in accordance with all terms and conditions of the previous operator’s permit. (4) File financial assurance with us that is acceptable to the Service and made payable to the Service. (5) Receive written approval from the Service for the transfer of the oper ation’s permit. VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00314 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 305 U.S. Fish and Wildlife Serv., Interior § 29.200 (c) You may modify operations trans ferred to you in accordance with § 29.160. WELL PLUGGING § 29.180 When must I plug my well? Except as provided in § 29.181, you must plug your well, in accordance with the standards and procedures out lined in this subpart, when any of the following occurs: (a) Your drilling operations have ended and you have taken no further action on your well within 60 calendar days; (b) Your well, which has been com pleted for production operations, has no measurable production quantities for 12 consecutive months; or (c) The period approved in your per mit to maintain your well in shut-in status has expired. § 29.181 Can I get an extension to the well plugging requirement? (a) You may apply for either an oper ations permit or a modification to your approved operations permit to main tain your well in a shut-in status for up to 5 years. Provide the information re quested on FWS Form 3–2469, includ ing, but not limited to: (1) An explanation of why the well is shut-in or temporarily abandoned and your future plans for utilization; (2) A demonstration of the mechan ical integrity of the well; and (3) A description of the manner in which your well, equipment, and area of operations will be maintained in ac cordance with the standards in the sub part. (b) Based on the information pro vided under this section, we may ap prove your application to maintain your well in shut-in status for a period up to 5 years. We may condition an ex tension on an adjustment of your fi nancial assurance. (c) You may apply for additional ex tensions by submitting a new applica tion under paragraph (a) of this sec tion. PROHIBITED ACTS AND PENALTIES § 29.190 What acts are prohibited under this subpart? The following acts are prohibited: (a) Operating in violation of the terms or conditions of a temporary ac cess permit, an operations permit, a permit under § 29.43, or any applicable provision of this subpart, including §§ 29.60–29.64 for pre-existing operations. (b) Damaging Service-administered lands or waters, or resources of a ref uge, as a result of failure to comply with the terms or conditions of a tem porary access permit, an operations permit, operations being conducted under §§ 29.43 or 29.44, or any provision of this subpart. (c) Conducting operations without a temporary access permit or an oper ations permit, unless conducting oper ations under §§ 29.43 or 29.44. (d) Failure to comply with any sus pension or revocation order issued under this subpart. (e) Failure to comply with the appli cable provisions of Federal law or regu lation including this subchapter. (f) Failure to comply with the appli cable provisions of the laws and regula tions of the State wherein any oper ation is located unless further re stricted by Federal law or regulation including this subchapter. § 29.191 What enforcement actions can the Service take? If you engage in a prohibited act: (a) The Service may suspend and/or revoke your approved operations per mit and your authorization for oper ations as set forth at § 29.43 and § 29.44; and/or (b) All prohibited acts are subject to the penalty provisions set forth at § 28.31 of this subchapter. § 29.192 How do violations affect my ability to obtain a permit? Until you comply with the regula tions in this subpart, we will not con sider a request to conduct any new op erations, except plugging and reclama tion operations, on Service-adminis tered lands or waters. APPEALS § 29.200 Can I, as operator, appeal Service decisions? Yes. If you disagree with a decision made by the Service under this sub part, you may use the appeals process VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00315 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 306 50 CFR Ch. I (10–1–23 Edition) § 29.210 in § 25.45 of this subchapter. The proc ess set forth in § 25.45 will be used for appeal of any written decision con cerning approval, denial, or modifica tion of an operation made by the Serv ice under this subpart. No Service deci sion under this subpart that is subject to appeal to the Regional Director or the Director shall be considered final agency action subject to judicial re view under 5 U.S.C. 704 until the Re gional Director has rendered his or her decision on the matter. The decision of the Regional Director will constitute the Service’s final agency action, and no further appeal will lie in the Depart ment from that decision. PUBLIC INFORMATION § 29.210 How can the public learn about oil and gas activities on ref uge lands? (a) Interested parties may view pub licly available documents at the ref uge’s office during normal business hours or by other means prescribed by the refuge. The availability for public inspection of information about the na ture, location, character, or ownership of refuge resources will conform to all applicable laws and implementing reg ulations, standards, and guidelines. (b) The refuge will make available for public inspection any documents that an operator submits to the Service under this subpart except those that the operator has identified as propri etary or confidential. (c) For the information required in § 29.121(f), the operator and the owner of the information will be deemed to have waived any right to protect from public disclosure information sub mitted through FracFocus or another Service-designated database. (d) For information required under this subpart that the owner of the in formation claims to be exempt from public disclosure and is withheld from the Service, a corporate officer, man aging partner, or sole proprietor of the operator must sign and the operator must submit to the authorized officer an affidavit that: (1) Identifies the owner of the with held information and provides the name, address, and contact informa tion for a corporate officer, managing partner, or sole proprietor of the owner of the information; (2) Identifies the Federal statute or regulation that would prohibit the Service from publicly disclosing the in formation if it were in the Service’s possession; (3) Affirms that the operator has been provided the withheld information from the owner of the information and is maintaining records of the withheld information, or that the operator has access and will maintain access to the withheld information held by the owner of the information; (4) Affirms that the information is not publicly available; (5) Affirms that the information is not required to be publicly disclosed under any applicable local, State, trib al, or Federal law; (6) Affirms that the owner of the in formation is in actual competition and identifies competitors or others that could use the withheld information to cause the owner of the information substantial competitive harm; (7) Affirms that the release of the in formation would likely cause substan tial competitive harm to the owner of the information and provides the fac tual basis for that affirmation; and (8) Affirms that the information is not readily apparent through reverse engineering with publicly available in formation. (e) If the operator relies upon infor mation from third parties, such as the owner of the withheld information, to make the affirmations in paragraphs (d)(6) through (d)(8) of this section, the operator must provide a written affi davit from the third party that sets forth the relied-upon information. (f) The Service may require any oper ator to submit to the Service any with held information, and any information relevant to a claim that withheld infor mation is exempt from public disclo sure. (g) If the Service determines that the information submitted under para graphs (d) or (e) of this section is not exempt from disclosure, the Service will make the information available to the public after providing the operator and owner of the information with no fewer than 10 business days’ notice of the Service’s determination. VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00316 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R 307 U.S. Fish and Wildlife Serv., Interior § 30.12 (h) The operator must maintain records of the withheld information until the later of the Service’s release of the operator’s financial assurance or 7 years after completion of operations on refuge lands. Any subsequent oper ator will be responsible for maintain ing access to records required by this paragraph during its operation of the well. The operator will be deemed to be maintaining the records if it can promptly provide the complete and ac curate information to the Service, even if the information is in the custody of its owner. (i) If any of the chemical identity in formation required in this subpart is withheld, the operator must provide the generic chemical name in the sub mission required. The generic chemical name must be only as nonspecific as is necessary to protect the confidential chemical identity, and should be the same as or no less descriptive than the generic chemical name provided to the Environmental Protection Agency. INFORMATION COLLECTION § 29.220 Has the Office of Management and Budget approved the collection of information? The Office of Management and Budg et reviewed and approved the informa tion collection requirements contained in this subpart and assigned OMB Con trol No. 1018–0162. We use the informa tion collected under this subpart to manage non-Federal oil and gas oper ations on Service-administered lands or waters for the purpose of protecting wildlife and habitat, water quality and quantity, wildlife-dependent rec reational opportunities, and the health and safety of employees and visitors on the NWRS. We may not conduct or sponsor and you are not required to re spond to a collection of information unless it displays a currently valid OMB control number. PART 30—RANGE AND FERAL ANIMAL MANAGEMENT Subpart A—Range Animals Sec. 30.1 Surplus range animals. 30.2 Disposition of surplus range animals. Subpart B—Feral Animals 30.11 Control of feral animals. 30.12 Disposition of feral animals. AUTHORITY: 5 U.S.C. 301; 16 U.S.C. 668dd, as amended; 16 U.S.C. 715i, as amended; 41 CFR 101–44. Subpart A—Range Animals § 30.1 Surplus range animals. Range animals on fenced wildlife ref uge areas, including buffalo and long horn cattle, determined to be surplus to the needs of the conservation pro gram may be planned and scheduled for disposal. [38 FR 16356, June 22, 1973] § 30.2 Disposition of surplus range ani mals. Disposition shall be made only dur ing regularly scheduled disposal pro gram periods, except in the event of ex igent circumstances affecting the ani mals, their range, or the recipient. The Refuge Manager is responsible for de termining the existence of ‘‘exigent circumstances.’’ Surplus range animals may be disposed of, subject to State and Federal health laws and regula tions, by donation for specific purposes to public agencies, public institutions, other governments or charitable insti tutions, or sold on the open market. [62 FR 19937, Apr. 24, 1997] Subpart B—Feral Animals § 30.11 Control of feral animals. (a) Feral animals, including horses, burros, cattle, swine, sheep, goats, reindeer, dogs, and cats, without own ership that have reverted to the wild from a domestic state may be taken by authorized Federal or State personnel or by private persons operating under permit in accordance with applicable provisions of Federal or State law or regulation. (b) [Reserved] [31 FR 16027, Dec. 15, 1966] § 30.12 Disposition of feral animals. Feral animals taken on wildlife ref uge areas may be disposed of by sale on the open market, gift or loan to public VerDate Sep<11>2014 08:53 Feb 09, 2024 Jkt 259244 PO 00000 Frm 00317 Fmt 8010 Sfmt 8010 Y:\SGML\259244.XXX 259244js pe ar s on D S K 12 1T N 23 P R O D w ith C F R

50 CFR § 29.1 - 29.220 - The National Wildlife Refuge System - Land Use Management · Nelum