National Guidelines for Environmental Audit in Nigeria

صدر في 2011 · النص بتاريخ 2026-10-01

القانون العام والإرشادات الرسمية منشورة بوصفها أبحاثاً. ليست مشورة قانونية أو ضريبية أو مالية.

البحث نفسه مكتوب بالإنجليزية. العناوين والوسوم مترجمة؛ أما النتائج والاقتباسات فغير مترجمة.

عن هذا القانون

اللغة
English
النوع
أخرى
الدولة
نيجيريا
الموضوعات
Air and atmosphere, Energy, Environment, Land and soil, Cultivated plants, Water, Wild species and ecosystems, Waste and hazardous substances
الكلمات المفتاحية
environmental planning, environmental audit, policy/planning, environmental standards, standards, monitoring, enforcement/compliance, data collection/reporting, protection of environment, ecosystem conservation, pollution control, public health, cultural heritage, good practices, risk assessment/management, emissions, noise pollution, soil conservation/soil improvement, plant protection, freshwater pollution, biodiversity, air quality/air pollution, energy conservation/energy production, waste management, hazardous waste, solid waste, waste disposal
الفئات
agriculture

أين تقرؤه

النص

نص القانون نفسه، مادةً مادة، كما هو محفوظ. لكل مادة رابطها.

  1. 1.0 INTRODUCTION 10

  2. 1.1 Purpose of Environmental Audit Guidelines 11

  3. 1.2 Environmental Audit Aim 11

  4. 1.3 Objectives of Environmental Audit (EA) 12

  5. 1.4 Environmental Audit Focus 12

  6. 1.5 Defining the Scope of Environmental Audit 13

  7. 1.6 Environmental Audit Criteria 15

  8. 1.7 Types of Audit and Their Scope 15

  9. 1.8 The Compliance Audit Regulated Sectorial Coverage 19

  10. 1.9 Environmental Audit Impact on Company Profitability 20

  11. 2.0 CERTIFICATION OF ENVIRONMENTAL AUDIT 21

  12. 2.1 Environmental Auditor 21

  13. 2.2 Areas of specialization requiring NESREA Accreditation 21

  14. 2.3 Criteria for Accreditation as Environmental Consultants 21

  15. 2.4 Requirement for Certification 23

  16. 2.5 Responsibilities of the Environmental Consultant 23

  17. 2.6 Ethical Responsibility of the Environmental Consultant 24

  18. 3.0 ENVIRONMENTAL AUDIT PROCESS 26

  19. 3.1 Pre-Audit Phase 27

  20. 3.2 On Site Audit Phase 29

  21. 3.3 Post Audit Activities 32

  22. 4.0 AUDIT PROTOCOLS FOR ENVIRONMENTAL MANAGEMENT AND PERFORMANCE 34

  23. 4.1 Significant environmental issues 34

  24. 4.2 Audit Protocol for Manufacturing Industries 35

  25. 4.3 Audit Protocol for Housing Estate (complex)/ Real Estates/Infrastructure buildings 38

  26. 4.4 Audit protocol for Mining 41

  27. 4.5 Audit protocol for Rail roads 44

  28. 4.6 Audit protocol for Port and Harbour 45

  29. 4.7 Audit protocol for Healthcare facilities 47 5 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA

  30. 4.8 Audit Protocols for Landfill site 49

  31. 4.9 Audit protocol for Wildlife Facilities and Sanctuaries 53

  32. 4.10 Audit protocol for wood and wood products including charcoal production and processing 54

  33. 4.11 Audit Protocols for Health and Safety 55

  34. 4.12 Audit Protocol for Water Resources 56

  35. 4.13 Audit protocol for Quarrying and Blasting Operations 57

  36. 4.14 Audit protocol for Construction 61

  37. 4.15. Audit protocol for Open Burning activities for Regulatory Agencies and others 63

  38. 5.0 REPORTING PROCEDURES 65

  39. 5.1 Contents of Environmental Audit Report 65

  40. 5.2 Environmental Audit Report Writing Format 67

  41. 6.0 REVIEW OF ENVIRONMENTAL AUDIT REPORT 69

  42. 6.1 Review Committee 69

  43. 6.2 Review Parameters 69 ANNEXES 71 Annexure 1: Environmental Action Plan Framework 71 Annexure 2: Audit Protocol and Checklist 72 Annexure 3: Major Industrial Sectors and their Related Environmental Issues 113 Annexure 4: Format for Environmental Audit Statement-Manufacturing Industries 116 Annexure 5: Format for Environmental Audit Statement-Real Estate/Housing Complex 121 Annexure 6: Format for Environmental Audit Statement-Mining 124 Annexure 7: Format for Environmental Audit Statement-Rail Roads 129 Annexure 8: Format for Environmental Audit Statement-Port And Harbour 133 Annexure 9: Format for Environmental Audit Statement-Health Care Facility 136 Annexure 10: Format for Environmental Audit Statement-Landfill 140 Annexure 11: Checklist for Review Of Environmental Reports 144 Annexure 12: Classification of Facilities 149 Annexure 13: Classification of Facilities in the Housing Sector 149 Annexure 14: Classification of Facilities in the Construction Sector 149 6 Foreword The National Environmental Standards and Regulations Enforcement Agency (NESREA), was established by Act 25 of 2007. One of the responsibilities of NESREA is to ensure that the regulated community complies with all environmental laws and regulations in Nigeria. It will be recalled that the National Guidelines for Environmental Audit in Nigeria was first published in 1999 by the then Federal Environmental Protection Agency (FEPA). The review of the Guidelines was done in 2011 by NESREA. However, another review has become necessary due to various emerging trends and issues bearing on the environment. The review also places NESREA in a better stead to ensure proper environmental auditing of the regulated community, as well as assist the regulated community to carryout mandatory and voluntary self-audit of their facilities. The document is self-explanatory and easy to use. It has been expanded in scope to cover such issues/areas as infrastructure, agro-allied, land degradation and the service sector. It is intended to serve as a reference material for all stakeholders who have need for environmental audit of their establishment/organizations. I wish to recommend this document to all stakeholders and urge them to effectively apply the Guidelines as clearly stipulated therein. I want to also urge all environmental practitioners from both the public and private sectors to use this revised National Guidelines for Environmental Audit in Nigeria in their professional practices towards ensuring a cleaner and healthier environment for all Nigerians. Mallam Balarabe Abbas Lawal Honourable Minister of Environment 7 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Acknowledgement I wish to express my profound gratitude to the Honourable Minister of Environment, Mallam Balarabe Abbas Lawal, for his support, as well as his passion to make the environment safer for all Nigerians. My gratitude also goes to the Permanent Secretary of the Federal Ministry of Environment, the Senate Committee on Environment, and the House Committee on Environment, for their support towards ensuring a cleaner and healthier environment. I want to specially thank the Center for Science and Environment, India, for their financial and technical support for the review of the National Guidelines for Environmental Audit in Nigeria. It is important to acknowledge the inputs of some NESREA Accredited Environmental Consultants in this document, including Sustainabiliti Limited, Sorbita Nigeria Limited and Spatial Ecosystems Limited amongst others. Finally, I wish to thank the entire staff of NESREA for their immense contribution in various ways in seeing to the successful review of this document. I thank you all for a job well done. Dr. Innocent B. Director General/Chief Executive Officer NESREA 8 List of acronyms EA - ENVIRONMENTAL AUDIT EIA - ENVIRONMENTAL IMPACT ASSESSMENT EMP - ENVIRONMENTAL MANAGEMENT PLAN EMS - ENVIRONMENTAL MANAGEMENT SYSTEM FGN - FEDERAL GOVERNMENT OF NIGERIA GHS - GLOBAL HARMONISED SYSTEM HSE - HEALTH SAFETY AND ENVIRONMENT LFN - LAWS OF THE FEDERATION OF NIGERIA NESREA- NATIONAL ENVIRONMENTAL STANDARDS AND REGULATIONS ENFORCEMENT AGENCY PPE - PERSONAL PROTECTIVE EQUIPMENT RD - RESEARCH AND DEVELOPMENT UNDP - UNITED NATIONS DEVELOPMENT PROGRAMME UNEP - UNITED NATIONS ENVIRONMENT PROGRAMME 9 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA CHAPTER ONE: INTRODUCTION Environmental Protection remains a central topic of global discourse and imperative for sustainable development. Environmental Policies based upon comprehensive analysis of air, water and land pollution are becoming an important supplement to traditional single media approaches to environmental protection. In this regard globally, environmental regulatory agencies continue to embrace comprehensive, multi-statute solutions to facility permitting, compliance assurance, education/ outreach and regulatory development issues. In relation to organisation’s activities, sustainable development involves meeting the current need of the organisation while protecting resources so that future generations are able to meet their needs. To achieve sustainable development, the organization must consider 1) whether the natural resources they are currently consuming can be replenished for future generations, 2) the impact the production/service process has on the environment, and 3) the impact that their service or product’s use and disposal will have on the environment. For these reasons governmental and corporate decision makers need an information system that provides feedback on environmental impact both for control purposes and to support environmental claims useful in promoting the firm as socially responsible. This calls for Environmental Audit (EA) of existing industries and Environmental Impact Assessment (EIA) for new industries and major developmental projects as provided in sections 21 of the S.I.9 regulations of 1991 on National Environmental Protection (Pollution Abatement in Industries and Facilities Generating Wastes), EIA Act No. 86 of 1992 and 7 (a) and 7 (k) of the NESREA Act No. 25 of 2007 with amendments 2018. The National Environmental Standards and Regulations Enforcement Agency (NESREA) is responsible for ensuring that all businesses and organizations comply with environmental laws that protect the environment and public health in Nigeria. Thus other than the statutory requirement of enforcing the conduct of environmental audit by all relevant facilities, NESREA ensures that environmental auditing complements regulatory requirements and prohibits the use of any equipment that undermines environmental integrity. Organizations that conduct environmental audit as at when due, signal to their employees that the management is committed to improving its environmental 10 performance. In addition, it portends that the professionals within the organization are interested in environmentally conscious and wishes to maintain environmental governance. Environmental Audit address regulators’ problem of obtaining effective day-to- day monitoring of regulatory compliance with limited resources. In addition, it aids in targeting enforcement actions because it is more reliable in differentiating between compliers and non-compliers. Environmental auditing has the long-term potential for improving relations between the regulator and the regulated that demonstrate innovative approaches to environmental management provides basis for the issuance of the NESREA GREEN MARK to deserving organizations.

  44. 1.1 Purpose of the Environmental Audit Guidelines These guidelines are primarily to assist Environmental Consultants/Auditors to conduct environmental audits in organizational facilities. They can also be useful for Government Inspectors, Clients and the Regulated Community. These guidelines may be replaced, amended or updated periodically. It is the responsibility of the Environmental Consultants/Auditors, Government Inspectors, Clients and the Regulated Communities to keep abreast of updates of these guidelines.

  45. 1.2. Environmental Audit Aim Environmental Audit is designed to protect the environment with the aim of: a. Assessing performance against a set of requirements or targets, related to specific issues; b. Evaluating compliance with environmental legislation and corporate policies; c. Measuring performance against the requirements of an environmental management system standard; d. Generating Data for Policy formulations; e. Improving Environmental Management and Sustainability; f. Undertaking self-regulation practices towards resource conservation; and g. Exploring the potential economic, social and environmental benefits that an improved performance can achieve, such as: • Environmental benefits in terms of conservation of natural resources and pollution reduction • Economic benefits in terms of savings in use of water, materials, energy towards sustainable goals 11 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA • Social benefits in terms of protection of health, vegetation, property and monuments, improvement in aesthetics and longevity

  46. 1.3 Objectives of Environmental Audit (EA) The objectives of the EA include: a. Generation of adequate environmental information of facilities for the potential environmental risks that are likely to be caused by their operations to the immediate environment; b. Determine how well the environmental management systems and equipment are performing; c. Achieving resource optimization and improved process performance; d. Encouraging organizations to self-regulate their environmental practices and to increase their responsibilities to stakeholders and society; e. Ensuring compliance, not only with laws, regulations and standards, but also with company policies, the requirements of the approved NESREA-endorsed Environmental Management Plan of the organization as standard; f. Enabling environmental problems and risks to be anticipated and responses to be planned; and g. Minimizing human exposure to risks from environment, health and safety issues.

  47. 1.4. Environmental Audit Focus Environmental Audit (EA) focuses on achieving environmental results rather than adhering to procedures. The aim is to encourage innovations by giving organizations some flexibility in meeting environmental regulations. At the same time, organizations are expected to accept responsibility for environmental stewardship. Consequently, NESREA approach to compliance and enforcement include: a. A broader mission for enforcement with a focus on environmental results rather than the number of enforcement actions taken; b. Changing the relationship between the regulator and the regulated from an adversarial one to a more involving one to create partnerships and build relationships in which both groups cooperate in solving problems; c. Changing the approach from one of enforcing all laws equally to one of setting priorities and recognizing limited resources; d. Realizing that one method of correcting a problem may not necessarily be useful in all situations; e. Moving towards multi-media, multi-pollutant deterrence programs; 12 f. Empowering the public with information by increasing public awareness. This will enable NESREA form partnerships and improve data quality and data access. Environmental Audit as a management tool comprises a systematic, documented, periodic and objective evaluation of how well organizations, management and equipment are performing with the aim of safeguarding the environment and human health. This would facilitate management control of practices and assess compliance of organizations’ policies which would include applicable regulatory requirements and standards. In addition to environmental and public health considerations, environmental audit also takes cognizance of socio-economic impacts of an industry, projects or operations in the host community and at large, with regards to meeting sustainable development goals.

  48. 1.5. Defining the Scope of an Environmental Audit As the prime objective of audits is to assess the adequacy of existing management systems, they fulfill a fundamentally different role from the monitoring of environmental performance. The greater the scope of the audit, the greater will be the size of the audit team, the time spent onsite and the depth of investigation and eventual holistic outlook of the organization. In addition, the scope of an audit can vary from simple compliance testing to a more rigorous examination, depending on the perceived needs of the management. The technique is applied not only to operational environment, health and safety management, but increasingly to product safety and product quality management and to areas such as loss prevention. The scope and focus of an audit can be defined on the basis of organizational; geographical; functional; and compliance contexts.

  49. 1.5.1. Organizational Boundaries address the company’s operations (manufacturing, R&D, distribution, servicing, construction and so on) that should be included in the audit program. They generally depend on the organizational structure, business unit reporting relationships, and corporate culture.

  50. 1.5.2. Geographical boundaries address how far or wide the program applies (Local Government, State, National, Regional, or International). Selection of 13 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA geographical boundaries generally depends upon the location of facilities and offices, and the nature of products and services.

  51. 1.5.3. Locational boundaries address what “territory” is included in a specific audit. In many cases, the audit focus is mostly on the activities within the facility boundary although some companies audit beyond this boundary. For example, an audit could also include off site manufacturing or packaging activities, off site waste disposal activities, local residences, or a nearby river or lake if there is potential for environmental damage.

  52. 1.5.4. A number of specific functional areas can be included in an audit program. While most audit programs cover air and water pollution control, solid and hazardous waste management, employee safety, and industrial hygiene, many also include occupational health, fire and loss prevention, process safety, and product safety.

  53. 1.5.5. Compliance boundaries define the standards against which the facility is measured. These standards can include: a. Federal, State, Local laws, edicts and regulations; b. Corporate or division policies, procedures, standards and guidelines; c. Strategic objectives as defined in the organizational Environment Management Plan; d. Local facility operating procedures; and e. Standards established by an outside group such as an industry or trade association Table 1.1 Scope of Coverage in an Environment Audit Environment Occupational Safety Occupational Health • Site history • Safety policy/procedures • Employee exposure to air • Process/materials • Accident Reporting contaminants • Storage of Materials • Accident recording • Exposure to physical agents, • Air Emissions • Accident Investigation e.g. noise, radiation, heat • Water Discharges • Permit to work systems • Measurements of employee • Liquid/Hazardous Wastes • Special procedures for exposure • Asbestos confined space • Exposure records • Waste Disposal Onsite/ • Emergency response • Ventilation/Engineering Offsite • Fire fighting controls • Oil/Chemical Spill Prevention • Job Safety analysis • Personnel Protective • Permits/license • Safety training Equipment • Storm Water Management • Safety communication/ • Information and training on promotion health hazards • Housekeeping • Medical surveillance • Regulatory compliance programme • Hearing conservation 14 The intention of auditing is to help ensure that these broad areas are managed properly, and all relevant topics must be reviewed, including social, environmental and public health, occupational safety, as outlined in Table 1.1

  54. 1.6 Environmental Audit Criteria An essential step in performing an environmental audit is the development of a set of criteria from which to gauge its success or failure. Documenting the criteria for auditing eliminates miscommunication and errors in interpretation Regulatory compliance audit, the environmental management system audit or any audit type requires assessment on the basis of criteria. These criteria should be specific, measurable, reliable, acceptable, timely and coherent. The different criteria that can be considered for use in a Regulatory Compliance Audit are outlined below: a. National Laws — Acts of legislation and any regulations, guidelines, standards, rules, orders, etc made under an Act and having the force of law. b. International agreements — such as, Convention, Protocol, and treaties which have been ratified by the Government c. Binding Standards (including techniques, procedures and qualitative criteria) issued by environmental monitoring/regulatory agencies d. Conditions Contained in Facility Permit e. Contracts f. Company Policies and Procedures on Environmental Matters g. Company Environmental Management Plan Objectives h. Codes of Professional Practice/International Code of Conduct i. Good Environmental Management Practices

  55. 1.7 Types of Environmental Audit and their Scope An environmental audit differs from EIA which aims to predict environmental impacts. Audit is a multidisciplinary process of objectively reviewing the environmental performance of an operating company including its processes, material storage, operating procedures and environmental management to identify potential environmental impacts and liabilities. Depending on the purpose of an audit, its aim and scope will vary. The main types of audit include the following: a. Regulatory Compliance Audit; b. Environmental Management Systems Audit; c. Process Safety Audit; 15 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA d. Product Life Cycle Audit; e. Occupational Health & Safety Audit; f. Liability Audit; g. Risk Assessment Audit; h. Waste Audit; i. Energy Audit; and j. Social Safeguard Audit

  56. 1.7.1 Regulatory Compliance Audit a. This is mandatory for all companies in Nigeria and shall be conducted every three (3) years; b. Companies/facilities operating without Environmental Impact Assessment (EIA) certificate must immediately conduct an environmental audit and submit a report to NESREA. c. The focus of this guideline is on the mandatory regulatory compliance audit. The other audit types described below can be components of the regulatory compliance audit or stand-alone depending on the circumstances under which an environmental audit is required. When the other audits are conducted as stand-alone, then the frequency is determined on a need basis for internal improvement or at best annually.

  57. 1.7.2 Process Safety Audit: a. Identifies hazards and quantifies the risks arising from the process. b. Assesses past and current practices to identify and correct safety impediments which, if left unsolved may result in personal injuries, property damages or business interruptions. c. Examines procedures for emergencies, accident response preparedness and awareness in health and safety d. May be undertaken routinely or after industrial accident, to determine the causes and liabilities, consequences for the company future management, and the environmental impact resulting from the accident.

  58. 1.7.3 Occupational Health and Safety Audit a. Examines exposure of the workforce to hazards that could result in physical disabilities (e.g. noise, temperature). b. Ensures the availability of appropriate and good quality Personal Protective Equipment (PPE) and its usage. c. Assesses workforce knowledge, attitude and perceptions of industrial/ production process and environmental outcomes. 16 d. May be undertaken annually as good management practice at industrial facilities, to assess current compliance, potential areas for improvement and to monitor implementation of recommendation remedial actions.

  59. 1.7.4 Liability Audit a. Is a comprehensive assessment to identify potential environmental, health, and safety liabilities associated with the facility’s operations, past activities, or future plans. b. Examines environmental conditions of the site(s) and determines the need for clean up and remediation measures. It involves spot checks of site(s) known to have actual or potential environmental problems. c. It should be conducted before a transaction takes place to reduce the likelihood of inheriting liabilities (e.g. contaminated land requiring remediation) and assess current practices at the facility/site. d. Liability audits may focus on Environmental liabilities (e.g., contaminated soil, groundwater, or air), Health and safety liabilities (e.g., worker exposure, hazardous materials), Regulatory compliance liabilities (e.g., permit violations, reporting requirements), Financial liabilities (e.g., cleanup costs, fines, penalties) and Reputation and social liabilities (e.g., community concerns, public perception)

  60. 1.7.5 Management Audit a. Checks the management system to ascertain whether it is an asset or a liability for the company’s environmental performance b. It may be undertaken if a company aims to implement environmental management system as part of an initial or routine certification process for EMS certification by an external accreditation body.

  61. 1.7.6 Waste Audit a. Checks the waste management components of an operation or site/facility from the generation of waste through its management and disposal practices b. It may be undertaken routinely/annually to identify potential opportunities for improvement in specific areas of the facility or process with a view to minimizing waste (including wastewater and energy), improving a product or for various other reasons. c. Waste audits may focus on waste reduction and minimization, recycling and composting optimization, waste-to-energy opportunities, landfill diversion, special waste streams (e.g., hazardous waste, electronics), supply chain waste management and waste-related cost savings. 17 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA

  62. 1.7.7 Energy Audit An Energy Audit entails a comprehensive assessment of a building’s or facility’s energy usage and efficiency. It involves a. Gathering energy consumption data, building plans, and equipment information, b. Visually inspecting the building’s envelope, lighting, HVAC systems, and other energy-using equipment, analyzing energy consumption patterns, c. Identifying areas of inefficiency, and calculating energy savings opportunities, d. Evaluating the condition and efficiency of energy-using equipment, such as boilers, chillers, and lighting systems, e. Pinpointing areas for improvement, including energy-efficient upgrades, retrofits, and operational changes and f. Evaluating the financial feasibility of recommended energy-saving measures. g. In general, energy audits focus on Energy efficiency, Energy conservation, Renewable energy integration, Energy cost reduction, Greenhouse gas emissions reduction and Compliance with energy regulations and standards.

  63. 1.7.8. Risk assessment Audit a. These audits identify, evaluate and mitigate potential risks and hazards associated with the facility’s operations such as the likelihood and potential consequences of environmental incidents such as spills, leaks or contamination and recommends measures to mitigate risks and prevent incidents. b. It entails a systematic evaluation of an organization’s risk management processes to identify, assess, and prioritize potential risks that could impact its objectives. c. The audit focuses on identifying potential risks that could impact the organization, assessing the likelihood and impact of identified risks, prioritizing risks based on their likelihood and impact, evaluating the effectiveness of existing risk mitigation measures, and reviewing the organization’s risk monitoring processes. d. The various risk categories that can be covered include Operational risks, Financial risks, Compliance risks, Environmental risks, Social risks, Reputation risks and Cybersecurity risks among others.

  64. 1.7.9. Social Safeguard Audit a. A Social Safeguard Audit entails an assessment of an organization’s social policies, and practices to ensure they are aligned with international standards and best practices. b. Audit focuses on the organization’s impact on people, including among others, Labor practices, Human rights, Community engagement, Indigenous peoples’ 18 rights, Displacement and resettlement, Gender and diversity, Health and safety and Supply chain management. The audit evaluates the organization’s Compliance with social safeguard policies and procedures, Identification and management of social risks, Stakeholder engagement and consultation, Grievance mechanisms, Monitoring and reporting of social performance. c. The audit’s objectives are to identify areas for improvement, Enhance social performance, Reduce social risks, improve stakeholder relationships, Ensure compliance with international standards. d. Social Safeguard Audits are commonly conducted in industries with high social risks, such as- Extractive industries (mining, oil, and gas), Infrastructure development, Manufacturing, Agriculture, Construction. In addition, the audits are usually conducted by independent auditors, using frameworks like those of the International Finance Corporation (IFC) Performance Standards, World Bank Environmental and Social Framework, United Nations Guiding Principles on Business and Human Rights, ISO 26000 (Social Responsibility).

  65. 1.8 The Compliance Audit Regulated Sectoral Coverage In recognition of sectoral based approach for comprehensive environmental protection, the following sector areas/activities outlined in Table 1.2, the Small Businesses under the Nigeria Association of Chamber of Commerce, Industry, Mines and Agriculture (NACCIMA) and the eleven sectoral groups of the Manufacturer’s Association of Nigeria (MAN) are the regulated sectors to be covered in the conduct of environmental audits. Table 1.2: The Regulated Sectors Requiring Compliance Audit Manufacturing Infrastructural Servicing Food Beverages and Tobacco Coastal and marine Development Hospitality & Tourism Industry Chemical and Pharmaceuticals Port, Harbours and Terminals Saw Mills Domestic and Industrial Plastic, Ground Transportation, Trucking, Financial Service Rubber and Foam Railroad, Pipeline Base Metals, Iron and Steel and Quarry and Blasting Operations Auto Workshops/ Service Centers Fabricated metal products Pulp, Paper and Paper products Real Estates, Housing Estate, Stadiums and Parks printing, publishing and Packaging Government Building Electrical and Electronics Air Transportation, Shipping and Small Businesses Ferry Textile Wearing Apparels’ Carpet, Water Transportation, Shipping leather/leather footwear and Ferry Wood and Wood products including Healthcare Industry furniture, charcoal production and processing 19 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Manufacturing Infrastructural Servicing Non-Metallic Mineral Products Urban Development Motor Vehicle and Miscellaneous Electric Power Generation, Assembly Transmission & Distribution Systems MAN Export Group Telecommunication (Base Transceiver Stations) Construction, Asphalt Industry Domestic Water and Sanitation Waste Management Facilities, Landfills Mining Dams and reservoir

  66. 1.9 Environmental Audit Impact on Company Profitability Environmental Audit in manufacturing, servicing, construction, infrastructural and agro allied industries have a direct impact on market share and company profitability because it promotes ‘green’ marketing thus there is now a range of practices which come under the label of environmental auditing. 20 CHAPTER TWO: CERTIFICATION OF ENVIRONMENTAL CONSULTANTS

  67. 2.1 Environmental Consultants Environmental Consultants conducts audits to assess the performance of commercial and industrial operations. Following established procedures, they collect and document evidence, to assess a facility’s compliance with environmental laws and regulations. Typical work activities include making site visits, monitoring, measuring, documenting and reporting audit findings, advising clients, formulating action plans, checking compliance. Their assessment helps organizations identify risks, ensure regulatory compliance, and implement effective environmental management practices.

  68. 2.2 Areas of specialization requiring NESREA Accreditation i. Environmental Audit ii. Environmental Studies iii. Waste Management iv. Environmental Technology v. Environmental Management System vi. Laboratory Service

  69. 2.3 Criteria for Accreditation as Environmental Consultants Environmental Audit - Requisite Environmental background and knowledge acquired through i. Work experience (at least 3 years) ii. Educational qualification (minimum of a Degree or equivalent in Environmental related studies) iii. Professional certification, (additional advantage) - Demonstration of competence in Audit process and techniques. 21 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Environmental Studies - Requisite Environmental background and knowledge acquired through i. Work experience (at least 3 years) ii. Educational qualification (minimum of a Degree or equivalent in Environmental related studies) iii. Professional certification, (additional advantage) - Evidence of previous environmental research/studies done, eg. Environmental Impact Assessment (EIA) Waste Management - Requisite Environmental background and knowledge acquired through i. Work experience (at least 3 years) ii. Educational qualification (minimum of a Degree or equivalent in Environmental related studies) iii. Professional certification - Evidence of Waste Management Facility with requisite equipment - Membership of professional Waste Management Association(s) (additional advantage) Environmental Technology - Requisite Environmental background and knowledge acquired through i. Work experience (at least 3 years) ii. Educational qualification (minimum of a Degree or equivalent in Environmental related studies) iii. Professional certification, (optional) - Evidence of technological innovation/proficiency in use of technology to mitigate environmental challenges. Environmental Management Systems - Requisite Environmental background and knowledge acquired through i. Work experience (at least 3 years) ii. Educational qualification (minimum of a Degree or equivalent in Environmental related studies) iii. Professional certification - Certification in EMS from a recognized certification body — International Organization for Standardization / Nigerian National Accreditation System (ISO / NINAS) 22 Laboratory Service - Requisite Environmental background and knowledge acquired through i. Work experience (at least 3 years) ii. Educational qualification (minimum of a Degree or equivalent in Environmental related studies) iii. Professional certification of laboratory staff - Certification of laboratory by at least one relevant body (mandatory) Eg. IPAN - Laboratory must be available for inspection (location) - Proposed laboratory must be owned by the prospective consultant (not affiliate)

  70. 2.4 Requirement for Certification The following shall constitute the minimum requirements for NESREA Certification of Environmental Consultants: i. Certificate of Incorporation with Corporate Affairs Commission ii. Memorandum and Article of Association iii. Particulars of Directors of the Company (CAC Form 7/Status Report) iv. Recent Tax Clearance Certificates of the Company v. Evidence of competence in environmental consultancy (Relevant academic and professional certificates) vi. Evidence of previous environmental jobs successfully completed vii. Evidence of registration with other relevant regulatory bodies and in particular the Institute of Environmental Practitioner of Nigeria (IEPN) Issuance of certificate is however not solely dependent on the above, but subject to a successful interview with NESREA.

  71. 2.5 Responsibilities of the Environmental Consultant Environmental consultants are appointed pursuant to the NESREA Act. In exercising their functions and duties, environmental consultants owe a primary duty of care to the environment and to Nigerians above all others. Environmental consulting is often a form of compliance consulting in which the consultant ensures that the client maintains an appropriate measure of compliance with environmental laws. The responsibilities of an environmental consultant includes amongst others; a. Investigate business operations to assess compliance with environmental standards; b. Collect data using questionnaires, interviews, on-site inspections, and investigate site history (i.e. land titles, aerial photos, where applicable); c. Assess the level of environmental performance of various operations within the business or industry/facility; 23 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA d. Identify regulations, procedures, and practices that are relevant to the business and assist them in developing an Environmental Management Plan (EMP) and potential cost saving opportunities; e. Examine an organization’s records for appropriate government permits, safety standards, maintenance documentation, and inventory control measures; f. Review emergency handling procedures, employee training programs, environmental monitoring programs, and waste management efforts; g. Select and manage an audit team which shall include the environmental regulator and/or hazardous waste and pollution control technicians; and h. Write quality and accurate environmental audit reports, including findings, data and recommendations to management and clients.

  72. 2.6 Ethical Responsibility of the Environmental Consultant Professional Ethics are moral principles or rules of conduct recognized and expected to be adhered to by a particular profession a. NESREA Accredited Consultants are environmental professionals that assist the regulated facilities not only to comply with environmental laws but to stay in business. b. Because of the type of services that the consultants are expected to perform, high ethical responsibilities are expected of them c. Thus, an accredited consultant shall: d. Ensure that no action/omission on his part or within the scope of his responsibilities is detrimental to the interest, conditions or safety of the public and the environment; e. Not act in any way that may prejudice that reputation of the Agency or her functions f. Shall not give inadequate, false or misleading information g. Ensure that all works undertaken by him are carried out in accordance with applicable standards and best practices, taking into account advancement in science and technology; h. Conduct business for his client with due diligence; i. Not unreasonably delay carrying out instruction received from client j. Not breach the terms of contract with the client; k. Not give his opinion on environmental study or report in which he has substantial interest unless he discloses the nature of his interest; l. Not misrepresent or allow misrepresentation of his professional qualifications nor exaggerate his degree of responsibility of any work of a professional nature; 24 m. Not accept any commission, gift, or other inducement from the employee or agent of the operator or any other interested party when carrying out an audit, or knowingly allow any person to do so; and n. Not disclose classified information acquired in the course of his professional engagement to any person other than the client without the consent of the client or the Agency. 25 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA CHAPTER THREE: ENVIRONMENTAL AUDIT PROCESS An Environmental Audit is undertaken in three phases: - Pre-Audit Phase - On-site Audit Phase - Post-Audit Phase 26

  73. 3.1 Pre-Audit Phase This is the audit preparation phase prior to site visit by an audit team. It entails: a. Obtaining full management commitment; b. Setting overall goals, objectives, scope and priorities; c. Selecting a team to ensure objectivity and professional competence; d. Sending out prepared pre-audit questionnaire to facility management (Annexure 2.6); e. Reviewing background and operational information with facility management or factory/plant manager; f. Conducting initial site visit at the facility to be audited; and g. Reviewing audit plan and arrange logistics. I. Management Commitment The first step in preparing for audit is an invitation letter from the facility to the auditor or a written management decision to conduct the audit. It should be obtained before commencement of the audit. II. Defining the Objectives and Scope The objectives and scope of the audit have to be clearly defined and communicated to the facility at this stage specifying the type of audit. It should provide the baseline data to allow the preparation of an audit. III. Team Selection The audit team should be carefully selected and should include the environmental regulator, employees of the facility or/and external consultants. The team leader should be a NESREA accredited consultant, while the other team members must have skills and knowledge relevant to the audit process as they relate to research, interview, data analysis and report writing. The selection of the team should be done as described in Chapter 2 of these guidelines. Each member of the team must understand his/her roles and responsibilities and undergo pre-audit training to ensure that all the team members are adequately prepared for the task. Audit Team Members should, at a minimum: a. Be selected from appropriate management backgrounds to ensure peer review; b. Be multidisciplinary, representing a mix of expertise ranging from across management systems to control technology, with direct experience with the relevant type of operation; c. Have direct experience with the type of operations at hand; d. Collectively have appropriate expertise, knowledge and proficiency in auditing techniques, e.g. verification, observation and information analysis; and e. Be non-biased and display due diligence. 27 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA IV. Identify Facility Background Information a. Maps b. Drawings c. Description of Geology/Hydrology d. Flood Plains, Wetlands, Historical Sites e. Land Use f. Names, Phone Numbers and e-mail addresses g. Records of Changes V. Identify Reports and Other Relevant Records a. Compliance Records b. Correspondents Citizen Complaints c. Audit/Inspection Records and Reports d. Inventory Records e. Monitoring Data f. Studies g. Manifests h. Contingency Plans, Spills Plans i. Permits VI. Identify Pollutants and Waste Generation, Control, Storage, Transportations, Treatment and Disposal a. Description and Design Data for Pollution Control Systems b. Storage, Treatment and Disposal Facilities c. Sources of Waste d. Bypass Conditions or Potentials VII. Identify Requirements, Regulations and Limitations as applicable a. Permits b. Licenses VIII. Indicate Federal and State Database Relevant to Facility, such as, any nearby: a. Abandoned, inactive or uncontrolled/hazardous waste sites; b. Industrial Landfill c. Municipal Landfill d. Solid Waste Sites e. Drinking Water Sources 28

  74. 3.2 On-site Audit Phase The purpose of the on-site audit phase is to collect veritable evidence to determine whether audit criteria are being complied with. This entails well defined and systematic use of protocols or checklists which should start with: I. Conducting opening meeting with office manager and site personnel a. Identify Areas to be Inspected b. Outline Procedures c. Outline Schedules d. Identify Records and Documents to be Reviewed during Audit e. Review Health and Safety Requirements f. Review how Confidential Data will be handled. II. Collection of Information in line with relevant audit protocols, personal observations, collection of relevant samples and taking measurements, etc. III. Undertaking a review of relevant documents such as the following: a. Corporate and/or management policy; NESREA endorsed facility Environmental Management Plan (EMP); b. Management System Documentation; c. Operational Procedures and Records; d. Evidence of registration with relevant Producer Responsibility Organization (PRO) as applicable; e. Records (Inventory, Utility, Monitoring, Transportation, Training); f. Environmental Monitoring/Quality Records; g. Correspondence on Environmental Issues; h. Environmental Committee/Team Meeting minutes; and i. Previous Environmental Audit Report (s) (if any). IV. Conducting detailed on-site inspection with the relevant Environmental Audit Protocol checklist a. Facility Use — Past and Present; b. Adjoining Properties type and use — Past and Present; c. Above Ground Storage Tanks; d. Sources of air pollution– mobile and stationary; e. Air pollution control devices; f. Asbestos; 29 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA g. Boilers; h. Contaminated Sites; i. Drinking Water Quality — Cross Connections; j. Drinking Water Supplies; k. Discharges to Groundwater; l. Neighboring Federal Wetlands and Waterways Protection; m. Hazardous Waste Storage, Handling and Disposal; n. Medical Waste Handling and Disposal (where applicable); o. Radioactive waste handling and disposal (where applicable); p. PCB Containing Transformers and/or other PCB Regulated Equipment; q. Sewage and Septic System Discharge; r. Solid Waste Disposal at Un-permitted Facilities; s. Effluent treatment and disposal (where applicable); t. State Water Management Program; u. Underground Storage Tanks; v. Wetland Impacts; w. Water Pollution and Storm-Water Runoff; x. Depth of Blasting Pit/Hole; y. Storm Water Management; and z. Quantity of Explosives Used Per Hole and Per Blast. V. Conducting staff interview to obtain information on actual practices, awareness level of requirement, expectations and possible suggestions for better performance. a. Identify Key Facility Personnel b. Schedule ahead of time, meetings in work areas c. Confirm Interview Time VI. Conducting Material Balance a. To be effective, the audit must be conducted methodically and thoroughly under the direction of experienced individuals who understand the firm’s processes and operations. It is necessary to record all data and information to ensure no operation is missed. The mass of inputs to the process/industry (water, raw material, fuel) should balance the mass of outputs (products, emissions and wastes, as well as any change in stocks). b. The checklists and questionnaires in the annex of this guideline are provided to guide in the compilation of accurate, comprehensive data essential to a successful audit of a facility. Significant imbalances may occur due to measurement and estimation. Additionally, various inputs and losses, i.e. evaporation, may have been understated or missed altogether. Therefore, a 30 preliminary material balance must be made to determine if the information has gaps or inaccuracies. This simply entails the following steps. i. Assembling unit process input and output information; ii. Deriving a preliminary material balance for unit processes; iii. Evaluating the material balance; iv. Refining the material balance; and v. Keep accurate records. VII. Ascertaining facts through a review of Environmental Audit evidence (information and findings). VIII. Evaluate Impacts of Facility Process on the Environment within 2km radius of the facility being audited with respect to soil, water and air. IX. Debriefing of the management of audit activities, findings, recommended corrective actions as appropriate and chain of communication in the following areas: a. Identify Actual and/or Imminent Threats to Health and the Environment; b. Identify Actual Non-Compliance; c. Identify Potential Non-Compliance; d. Identify and Discuss Information Gaps; e. Identify and Discuss Unclear Audit Findings; and f. Establish Clear Corrective Action Plan X. Evaluating Environmental Monitoring Data In evaluating environmental monitoring data, the Environmental Auditor should consider the following amongst others: a. Appropriateness of sampling, analysis procedures and results, to ensure compliance with relevant national guidelines; b. The Auditor must outline the approach and steps taken to review, evaluate or verify data relied upon/referenced in the environmental audit report; c. Ensure management of data obtained in the course of audit process such as: Index, Facility Records, Correspondence, Protocols and Checklists, Photographs (including date, time, what, when and other specific information), sampling records, and follow up data collection; d. Evaluate the environmental management system; and a. Identify data gaps, uncertainties and recommend appropriate actions to be taken. 31 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA

  75. 3.3 Post Audit Activities The objectives are to produce an Environmental Audit Report with audit findings and recommendations, and to contribute toward formulation of an Action Plan for continuous improvement of operations of the facility. Actions required in post audit phase include: I. Collation of information and follow up on outstanding issues; this may include but not limited to i. Quantity of resources used monthly such as water, raw material, energy, fuel ii. Type and quantity of product produced monthly iii. Sources of air pollution and measured air pollutant iv. Performance evaluation of pollution control device with respect to air quality, status of air quality around the plant; v. Quantity and quality of wastewater generated monthly, details and adequacy of effluent treatment facility, ambient water quality of the receiving stream/land; vi. Type and quantity of hazardous and non-hazardous waste generated monthly, its storage and disposal facility. vii. Status of Recycling chain verification through tracing the recycling process to ensure materials are properly recycled and not sent to landfills. viii. Verify compliance with relevant EPR regulations, permits, and licenses. ix. Status of any facility of recovery of valuable resources such as solvents, chemicals etc; x. Status of compliance with respect to license conditions laid down by regulatory authority xi. Status of occupational health of the employees II. Evaluation of findings on the relevant outcome of material balance and impact evaluation of facility process on the environment; III. Preparation of the draft audit report in the approved presentation format; IV. Circulate draft audit report for comments to management and audit team; V. Incorporate or resolve all comments; VI. Preparation of an action plan as provided in the format in Annexure 1 in consultation with the facility management to incorporate: i. A list of recommended actions, in terms of increasing cost effectiveness in addressing the facility’s critical environmental issues; ii. Interim and long term targets/objectives and a timetable for achieving them for environmental improvement in the facility; and iii. An indication of investments and other resources (human and information) 32 that would be required at the facility without compromising their commercial confidential information. a. Produce report for client and Regulatory Agency; and b. Facilitate the Implementation of Action Plan at facility level.

  76. 3.3.1 Evaluation of Findings After information gathering and data collection, the findings could be reviewed in line with the protocol and extant regulations with the facility management. The key rules in discussing the findings are: a. The exact nature of the problems should be clearly stated; b. Communicate the extent of the problem fully, stating whether the facility is in compliance or non-compliance; c. Generalization should be avoided; d. Contradictory messages should be avoided; e. Using extreme languages should be avoided; f. Use appropriate and familiar terminologies; g. Drawing unsubstantiated conclusions should be avoided; h. Provide good management practices suitable to the site/facility; i. Provide context and rationale for findings; j. Offer practical and site-specific recommendations; k. Encourage open dialogue and feedback; l. Maintain professionalism and objectivity; and m. Emphasize opportunities for continuous improvement.

  77. 3.3.2 Steps after Analysis of Result After analyzing the result of findings, the following steps should be taken: a. Prioritize the problems/impacts; b. Allocate responsibilities/roles; c. Develop a plan of action; d. Implement the plan; e. Assess the effectiveness of the plan; f. Make all necessary agreed changes with facility management if the plan is not effective; g. Document and communicate the changes to the facility management; h. Incorporate feedback and continuous improvement’ and i. Establish a monitoring and review process

  78. 3.3.3 Implementation of the Action Plan Responsible parties need to undertake action according to allotted budget and timeline for completion within the environmental action framework (see annex 1). 33 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA CHAPTER FOUR: AUDIT PROTOCOLS FOR ENVIRONMENTAL MANAGEMENT AND PERFORMANCE This chapter is intended to illustrate the organization of a protocol and the key features required. The protocols are organized around generic environmental issues and are applicable to all the regulated sectors in the manufacturing, infrastructural, agro allied and service areas covered in Section 1.8 and Table 1.2. For the purpose of the mandatory Regulatory Compliance Audit due every three (3) years; the audit must assess compliance of the facility with criteria derived from: a. National Policy on Environment; b. b. Laws (National Environmental Standards and Regulations Enforcement Agency (Establishment) (Amendment) Act 2018, Environmental Impact Assessment Act Cap. E 12 LFN 2004, Harmful Waste (Special Criminal Provisions) Act Cap. H 1 LFN 2004); c. Corporate or Management Policy; d. Approved Facility Environmental Management Plan; e. National Environmental Regulations (S.1.8, S.1.9, S.1.15 of 1991), S.1.28, 29, 30, 31, 33, 34, 35 and 36 of 2009), (S.1.11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22 and 23 of 2011), (S.I. 34 and 35 of 2013), (S.I. 62, 63, 65 and 66 of 2014), (S.I. 2 of 2020), (S.I. 44 and 88 of 2021), (S.I. 52 of 2024) and those that will be gazette and come into force from time to time; and f. Applicable Guidelines and Standards.

  79. 4.1 Significant environmental issues The audit procedure for all kind of projects are mostly same, however, the depth of the audit and the significant parameters which needs to be considered varies depending on the type of project. For example, for line projects (roads, railways, transmission lines), impact on biodiversity and loss of flora/fauna is a significant parameter to be audited while for a large manufacturing industry, parameters 34 like water pollution, air pollution and safety are of prime concern. Project-wise significant parameters are provided at Annexure 3. The parameters considered are as follows a. Air pollution b. Water pollution c. Generation of solid waste d. Generation of hazardous waste e. Biodiversity and loss of Ecology f. Storm Water Management g. Greenhouse Gas Emission Inventory h. Abandoned Burrow, Mining and Quarrying Pits i. Noise pollution j. Soil pollution k. Chemicals Management l. Risk Assessment m. Requirement for company policy n. Energy requirement o. Safety Issues p. Occupational health of workers These parameters are marked from low significance to high significance for different kind of projects depending on the nature of the project. While the other parameters are self-explanatory, the parameter of “Requirement for company policy” implies that the project proponent should have a detailed policy on measures to be taken to control environmental hazards and the strategies to reduce the use of natural resources. The auditor should consider these parameters while auditing different project as it will provide a clear understanding on the aspects to be focused on.

  80. 4.2 Audit Protocol for Manufacturing Industries The manufacturing industries are usually termed as point source projects since the area of the industry is well defined with boundaries and the discharges of liquid waste, solid waste and air emissions are through well-defined outlets. The major component of an environmental audit for point source projects is the input and output matrix which gives the “pollution footprint” of an activity. In order to develop this matrix, both qualitative and quantitative information is required as shown in table 4.1 below 35 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Table 4.1: Input and output matrix Resource Input Output Material i. Quantity of raw material consumed per i) Quantity of product produces per unit of process month/year ii. Quantity of fuel consumed ii) Quantity of material loss due to iii. Type of fuel consumed and its calorific efficiency per unit of production value iii) Quantity of pollutant generated in terms of liquid, solid waste and air emission Water (i) Source of water and its quality (i) Quantity of waste water generated per (ii) Quantity of water consumptions per unit of product unit of product (ii) Quality of waste water (iii) Quantity of water consumed for utilities, domestic washing and other purposes

  81. 4.2.1 Major Environmental issues o Air pollution due to toxic gases and fumes o Water pollution due to discharge of untreated chemically loaded effluent o Hazardous/non-hazardous waste generation and its improper disposal o Occupational Health and safety o Noise pollution and Vibration o Soil pollution o Chemicals Management o Risk Assessment o Energy requirement What to look for Where to look • Type, number and quantity of products • Records from storage department, Sales tax documents • Type and quantity of raw material used • Logbook of storage department • Quality of raw materials • Quality control document (the impurity in raw material which leads to pollution) • Total water requirement and source o Log book of meters/pump at source (Utility o Surface water department) o Ground water o Log book of meters/pump at source (Utility o Private tanker supply department) o Treated water o Payment receipts • Any other o Log book of meters/pump at source (Utility department) • Different water uses and quantity Log book of meters at sources (Utility department) o Process o Utility o Domestic o Other purposes • Quantity and Quality of effluent generated Log book of meter at inlet of ETP (EHS department) 36 What to look for Where to look • Treatment of effluent Purchase order and prefeasibility report and design of o Capacity and technology of Effluent ETP treatment plant (ETP) • Quantity and Quality of treated Logbook of meter at outlet of ETP/storage of treated wastewater used and where it is used water (utility department) o Gardening o Utility o Flushing o Other • Water conservation practices, if any • Disposal outlet of treated effluent and its Logbook of effluent discharged at designated outlet quantity (EHS department) o Surface water o Sewer lines o Other, specify • Effluent monitoring Monitoring records from EHS department. Auditor o Parameters measured should also collect effluent sample and compare with o Frequency of monitoring records • Quantity and type of hazardous waste Logbook from EHS department generated • Disposal of hazardous waste Manifest/payment receipt of facilitator • Quantity and type of industrial non- Logbook from EHS department hazardous waste generated • Disposal of non-hazardous waste Payment receipt from the buyer • Provision of separate storm water drain Drainage system with proper coverage • Provision of separate bund walls at area farm tank, Generator House, Diesel Tank and storage of farm tank and storage of raw material and hazardous waste • Number of process stacks and vents EHS department • Type and quantity of air pollutant Measurement records from EHS department released from combustion • What air pollution control measures are in Design document from EHS department place • Adequacy and efficiency of air pollution Performance documents of the APCD control measures • Type and quantity of fuel used in Records from storage department combustion • Type and quantity of air pollutant Process and technical service department released from process • What Alternative or renewable energy Provide details from EHS department sources are in place • Ambient air quality monitoring within and Monitoring location map and monitoring reports. outside the industry premises Auditor should perform ambient air quality monitoring o Number of stations on-site and compare with the records o Parameters measured o Frequency of monitoring 37 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA What to look for Where to look • Stack monitoring Monitoring reports and check the frequency of o Number of stacks parameters exceeding the standards. Auditor should o Parameters measured perform stack monitoring on-site and compare with the o Frequency of monitoring records • Identification of hazard areas in industry Safety audit report from EHS and check the and measures to control implementation of the proposed measures o Frequency of safety audit o Number of accidents • Frequency of health outreach for Health records employees and nearby habitants

  82. 4.2.2 Important points to be considered by the auditor o Auditor should identify any odour problem within and outside the industry o Auditor should conduct noise monitoring within and outside the premises, if necessary Draw a diagram of the plant layout and show: Check company records for the following: • Storage of raw material • Purchasing orders for raw materials/machinery • Production area plant or processes; • Location of ETP; • Evidence of registration with the relevant • Storage of hazardous waste Producer Responsibility Organization (PRO) for • Emergency evacuation area the various sectors; • Storm water drains; • Water and sewer records; • Final discharge points for effluent; • Solid and hazardous waste management records; • Flow diagram of production process; • ETP maintenance records • Bunding for protection of stored materials; • Production records; • Flow diagram of ETP • Environmental monitoring records; • Location of stacks • Material safety data sheets; • Manifests annual reports; and • Environmental permits • Previous Environmental Audit Reports

  83. 4.3 Audit Protocol for Housing Estate (complex)/ Real Estates/Infrastructure buildings Like manufacturing industries, the housing estate projects are also considered as point source projects. These include all residential and commercial projects whether standalone buildings or housing complex. The residential colonies which are part of railway, port harbor and other similar projects are to be audited following this protocol. The audit for hospitality sector will also follow more or less the same protocol.

  84. 4.3.1 Major Environmental issues o Fresh water requirement and its distribution o Treatment and disposal of waste water 38 o Management of solid waste (dry waste, kitchen, garden waste etc) o Energy consumption and fuel consumption from generator sets o Noise pollution o Emergency preparedness and response o Drainage system What to look out for Where to look • Number of apartments occupied • Records from maintenance office • Number of occupants/apartment • Ask the maintenance office, otherwise take an average number as 4 • Non-residential population • Staff register • Total water requirement and source o Surface water o Log book of meters/pump at source o Ground water o Log book of meters/pump at source o Private tanker supply o Payment receipts o Rain water o Log book of meters/pump at source o Treated water o Log book of meters/pump at source o Any other • Different water uses and quantity Log book of meters (if available) or estimate o Domestic through bucket and stopwatch method o Gardening o Cleaning of common areas o Other purposes • Disposal mechanism of generated waste water o Municipal sewer o Soak pit/septic tank o In-house sewage treatment plant • Quantity of waste water generated • Log book of meter at inlet of STP (if available) otherwise estimate through rationale • Treatment of waste waster o Capacity and technology of waste water Purchase order and prefeasibility report of treatment plant (WWTP) WWTP • Quantity of treated wastewater used and where it Logbook of meter at outlet of STP/storage of is used treated water o Gardening Estimation through bucket and stop watch flow o Washing measurement o Flushing o Other • Water conservation practices, if any • Quantity of total solid waste generated • Logbook or calculate using the rationale • Waste Disposal Bill receipt o Quantity sent to recyclers/third party/ disposal site o Quantity composted in-house, if applicable • Energy received from grid Electricity bill/bill payment receipts • Supplementary support by generator sets, if any Logbook/bill receipts of purchased fuel o Number of operation hours/month o Type and quantity of fuel used 39 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA

  85. 4.3.2 Rationales for Estimation/Calculation In case, the information is not available with the auditee, estimation/calculation can be done by using the following rationales. Water: Total population = No of apartments * average number of dwellers/apartment Domestic water usage for residential population (drinking and other household purpose)=135 litre per capita per day (lpcd)-as per Indian norms Water usage for non-residential population =45 lpcd Total water consumption = Total residential population*135 lpcd + total non- residential population *45 lpcd Total wastewater generation= 80 per cent of total water consumption Solid waste: Per capita waste generation= 0.3-0.5 kg Total waste generation = Total population* per capita waste

  86. 4.3.3 Important points to be considered by the auditor o Auditor should derive the quantity of water requirement by measuring flow through flowmeters and multiply with number of hours of operation. This will also cross check the values given by the management. o If both groundwater and surface water are combined and used, the auditor should check the Total dissolved solids (TDS) concentration in the combined water and advice the management whether pre-treatment of water is required or not o Auditor should explore the options to reduce the water consumption and solid waste generation and advise the same to the management and provide the same in the audit report. This may include options of using rain water and treated waste water and other practical applications; o Auditor should assess the feasibility of using renewable energy at common areas such as corridors, street lightening etc o Auditor should also check the emergency planning and arrangement with respect to fire and other hazardous events. Draw a diagram of audited complex and show: Check records for the following: • Water distribution network • Purchasing orders for fuel/water; • Location of flow meters • Water and sewer records; • Sewers layout; • Solid and hazardous waste management records; • Location of all drains and rubbish bins; • Waste water treatment units; and • Storm water drains; • Environmental permits • Final discharge points for treated waste • Previous Environmental Audit Reports water; • Waste collection area; 40

  87. 4.4 Audit protocol for Mining Mining projects are considered under area projects as it covers a large area not only longitudinally but also laterally and vertically. Mining process is of two types: surface mining and sub-surface mining. This protocol details out the issues and auditing protocol of surface mining. Mining process

  88. 4.4.1 Major Environmental issues o Air pollution o Water Pollution due to discharge of untreated heavy metals from processing of ore o Water requirement o Noise pollution and vibration o Ground water breaching 41 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA o Solid waste/over burden management/topsoil management o Abandoned Mining Pits o Chemicals Management o Risk Assessment o Energy requirement o Occupational health and Safety What to look for Where to look • Source of water and quantity o Log book of meters/pump at source o Ground water (borehole) o Log book of meters/pump at source o Surface water (river/lake) o Payment receipt o Private tankers • Residential and non-residential population • Maintenance department and staff register • Water consumption o Utility department (capacity of different o Domestic (if residential colony included) tanks) o Mine operation o Land reclamation o Drinking o Dust suppression o Green Belt/cover o Fire service o Others (specify) • Quantity and disposal mechanism of o Logbook of STP inlet and check with flow generated waste water meter o Residential colony o Utility department or measure through o Mining activity rationale o Breached water o Logbook of pump/meter for pumping breached o Acidic water, if applicable water o Logbook of inlet of ETP or measure with flow meter • Water conservation practices, if any • Check for recycling and reuse of treated domestic waste water, breached water and treated acidic water • Noise pollution management • Monitoring results conducted by the project proponent, conduct monitoring • Number of trucks per day • Register at entry gate o Carrying overburden o Carrying extracted ore • Energy source and consumption • Electricity bill/fuel consumption of generator sets • Air pollution • Monitoring results by the project proponent, conduct self-monitoring, or calculate air emissions using USEPA’s AP-42 • Air pollution management measures • Check the adequacy and efficiency of the measures 42 What to look for Where to look • Quantity of waste generation o Utility department or calculate using rationale o Overburden o Receipt from recycler o Domestic o Hazardous waste (waste oil) • Biodiversity Forest department or perform reconnaissance o Type and number of species of flora survey o Type and number of species of fauna • Safety aspects Safety audit report and the implementation of recommendation mentioned in safety report • Quantity of explosives used for blasting Permit for use of explosives • Status of Land and Mining Pit Reclamation Document stating the current Status and Rehabilitation

  89. 4.4.2 Rationales for Estimation/calculation Domestic waste generation: Total Number of residential population * 0.3-0.5 kg per person Overburden: 1. Number of trucks carrying overburden each day* capacity of each truck; or 2. Ore production (in tonnes) * stripping ratio (obtain this information from mining manager)

  90. 4.4.3 Important points to be considered by the auditor o Auditor should derive the quantity of water requirement by measuring flow through flowmeters and multiply with number of hours of operation. This will also cross check the values given by the management. o Auditor must conduct noise monitoring near core area, buffer area of mining and outside mining area especially near habitat. o Auditor should identify the number and type of flora and fauna near the mining area or obtain from forest department, prepare biodiversity index and compare it with the information provided in EIA report to identify if there is decline in the species count. o In terms of safety, the auditor should examine and identify vulnerable areas in the mine area particularly the steep slopes within the mine and overburden storage apart from other aspects. o For checking the efficiency of overburden management, the auditor should look for provision of concrete walls and geotextile layer around the overburden dump, guard drain to capture surface run off from the overburden dump and collection pond to store surface runoff. 43 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Draw a diagram of the plant layout and show: Check company records for the following: • Core area of mining/ open pit • Production records • Hauling roads • Water and sewage treatment cost • Location of STP and hazardous waste storage • Solid and hazardous waste management cost • Overburden dumpsite • Material safety data sheets • Domestic waste dumpsite, if applicable • Manifests annual reports; and • Borehole locations • Environmental permits • Residential colony, if applicable • Safety audit report • Breached water storage location • Employee health records

  91. 4.5 Audit protocol for Rail roads Railways, highways, pipelines, transmission lines are considered as linear projects and may include even cross boundary with other regions or nations. Such projects have major impacts in terms of habitat fragmentation and loss of biodiversity. Railway includes rail coaches, stations, maintenance yards and railway housing colony. The audit procedure for railway housing colonies are similar to that of housing complex discussed earlier; the other three components are discussed here.

  92. 4.5.1 Major Environmental issues o Water consumption and waste water generation at maintenance yards, coaches and stations o Management and disposal of waste water, excreta and solid waste from rail coaches o Accidents including animal corridors o Noise pollution impact at congested habitats What to look for Where to look • Water consumption o Capacity of water tank and number of times it is o In railway coaches while on run filled during the journey o At major stations o Logbook of borehole/pump of surface water/ o In maintenance yard receipt of purchase from water board o At railway colony o Logbook of borehole/pump of surface water • Disposal mechanism for generated waste water o Municipal sewer o In-house sewage treatment plant • Quantity of solid waste generation • Logbook and receipt from recycler o Railway colony o From coaches o At stations o Used oil from maintenance yard • Solid waste disposal mechanism o Payment receipts o Landfill/dumpsite o Sent to third party • Excreta generation and disposal mechanism • Capacity and number of excreta tank from rail coaches, if bio toilets are not used 44 What to look for Where to look • Type and quantity of fuel consumption • Records from maintenance department • Logbook at maintenance office • Cases of accidents (major/minor) including • Safety records animal fatality • Air emissions • Calculate as per the rationale • Energy utilization/efficiency • Records from maintenance • Sources of Energy (National Grid/Generator/ renewable energy etc)

  93. 4.5.2 Rationales for Estimation/calculation Air emissions generated from the fuel during rail movement can be calculated as follows Pollutant (PM/Sox/NOx) (kg) =quantity of fuel used (tonnes) * Emission factor for pollutant of the fuel (kg/tonnes)

  94. 4.5.3 Important points to be considered by the auditor o Auditor should check the number of forest corridors on the route of the rail track and calculate the biodiversity index in those corridors to check if the number of species have declined or not. It is mandatory aspect of the audit for these projects o Identify the congested habitats on the rail route and ensure the noise barriers are provided Draw amap with GPS location showing: Check company records for the following: • Location of railway housing colony • Fuel purchase records • Location of major stations • Solid and hazardous waste management cost • Location of congested habitats • Water and sewage treatment cost • Location of forest sections indicating animal • Electricity purchase cost corridors • Environmental permits for maintenance yards, • Location of railway yards stations, housing colony • Previous Environmental Audit Reports • Environmental Monitoring Data • Environmental Impact Assessment (EIA) Certificate • Emergency Response Plan • Energy Utilization Records

  95. 4.6 Audit protocol for Port and Harbour The operation of ports is complex and diverse in nature and includes both land and water ecosystem. The activities included in the operation of port are listed as below o Loading/unloading of goods and material 45 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA o Operation of huge ware houses for storage of raw material/ goods including chemicals o Regular dredging operation to extend and deepen access channels to achieve desired water depth. o Blasting and repairs at maintenance workshops

  96. 4.6.1 Major Environmental issues o Increased suspended solids in water, disrupted aquatic ecosystem and overburden disposal due to dredging o Hazardous waste generation (used oil/paint residues) o Waste water generation o Solid waste generation o Heavy traffic volume in port area o Air pollution o Noise pollution What to look for Where to look • Number of cargos loading/unloading per day • Logbook at warehouses/office • Number of dredging operation per year • Management records of port • Quantity of overburden generated during • Management records of port dredging • Overburden disposal/reuse mechanism • Management records of disposal • Quantity and type of hazardous waste • Logbook at yard or calculate from rationale generated at maintenance yard • Payment receipt from recycler • Frequency of oil skimming due to spillage • Records from maintenance department in marine ecosystem and quantity of oil recovered • Quantity of explosives used for blasting • Permit for use of explosives • Quantity of solid waste generated Payment receipt to third party/municipality/recyclers o From port housing complex o From maintenance yard o Office/commercial complex • Source and quantity of water consumption Payment receipt of municipal supplied water o From port housing complex Logbook of meters at different inlets o From maintenance yard o Office/commercial complex • Quantity of waste water generation Logbook of meter/pump at STP inlet for residential o From port housing complex and office complex o Office complex Logbook of meter/pump at ETP inlet for maintenance o Maintenance yard yard Logbook of meter at marine disposal point • Ship breaking activities, if any (mention the • Permit for ship breaking activity number of ship breaking/year) • Air pollution due to traffic • Ambient air monitoring records and traffic volume records or calculate through rationale 46 What to look for Where to look • Safety aspects • Safety audit report and the implementation of recommendation mentioned in safety report • Energy consumption • Electricity bill and fuel for generator sets

  97. 4.6.2 Rationales for Estimation/calculation Air pollution due to traffic: Traffic volume of different segment of vehicles * emission factor for that sector (USEPA) Waste/used oil generation (KL) from maintenance yard: Number of ships repaired per year* waste oil generated per ship

  98. 4.6.3 Important points to be considered by the auditor o The auditor should perform assessment of aquatic ecosystem through professional taxonomist or obtain information from marine department, if available. o Auditor should also perform marine water monitoring before and after dredging operation. Draw a diagram of the plant layout and show: Check company records for the following: • Location of warehouse • Water and sewer costs; • Location of loading unloading area • Solid and hazardous waste management costs; • Location of Ship maintenance yard • Sewage and effluent treatment units; • Location of housing and office complex • Cargo handling records • Traffic terminal/parking area • Material safety data sheets; • Ship breaking area, if applicable • Environmental permits • Location of Lock gate • Ship breaking permit and use of explosive permit • EIA certificate • Previous Environmental Audit Reports • Environmental Monitoring Data • Emergency Response Plan • Dredging and Sediment Management Records

  99. 4.7 Audit protocol for Healthcare facilities Health care facilities deals with biomedical waste/human waste (solid and liquid) and thus its handling, classification, storage and disposal are major concerns. Biomedical waste generated from this industry is of various nature, such as anatomical waste, infected/soiled cloths, date expired drugs, Injection syringe etc, thus their disposal system are also different. Hence, if such waste is disposed to land fill without segregation, the people in the habitat around disposal site will face extreme health hazard. Thus the strategy biomedical waste management • Segregation • Storage separately in color coded bags 47 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA • Disposed environmentally sound way as per their characteristic and approximate technology.

  100. 4.7.1 Color coding of waste It is an extremely important system required to be in place within healthcare facilities. This system reduces the risk of injury, maintain compliance with biomedical waste, and keep medical waste disposal costs low. The storage of different kind of biomedical waste should be strictly performed as per the color coding system as stated in the National Environmental (Healthcare Waste) Regulations 2021 S.I. No. 44.

  101. 4.7.2 Major Environmental issues o Management of biomedical waste on basis of potential hazard and its disposal o Waste water generation, treatment and disposal o Hazardous Waste Management (Chemicals radioactive waste) What to look for Where to look • Number of beds • Quantity of Solid waste generation o Records from OT o Anatomical waste (human) o Records from laboratory o Anatomical waste (animal) o Records from OT and wards o Soiled waste (items contaminated o Store room with blood and fluid) o Records from laboratory o Expired and discarded medicines o Records from laboratory o Chemical waste o Records from OT, OPD and wards o Microbiology, biotechnology and o Records from lab and wards other clinical waste o Records from labs and wards o Waste sharps including metals o Records from wards and OT (needle, syringes) o Records from kitchen, store room and wards o Contaminated waste such as plastics, tubing bottles, urine bags, intravenous tubes o Glass wares (broken and discarded) o Discarded bedding and linen o Domestic waste • Disposal mechanism for generated waste o Payment receipt of biomedical waste o Quantity incinerated with management facility autoclaving/microwaving o Payment receipt from recyclers o Quantity directly incinerated (without o Payment receipt from municipality autoclaving) o Quantity sent to recyclers o Quantity sent to municipality • Source and quantity of water consumption Logbook of meter at borehole/payment receipt from supplier • Quantity of waste water generated o Meter readings at inlet to sewer lines o Domestic o Logbook of meter at inlet of ETP o Liquid chemical waste 48 What to look for Where to look • Quantity of Energy consumption Electricity bill o Electricity o Generator sets • Quantity and type of fuel consumption Logbook at maintenance office o Generator sets o Boiler • Safety aspects Safety audit report and implementation of recommendations Draw a diagram of the healthcare facility and show: Check company records for the following: • Waste storage area • Biomedical waste management cost • Location of ETP • Water and sewer costs; • Sewer network; • ETP/STP operation and maintenance cost; • Storm water drains; • Monthly records for No of occupied beds; • Final discharge points for effluent; • Material safety data sheets for all • Storage Areas for Hazardous chemicals and hazardous substances; Pharmaceuticals • Environmental permits • Areas where radioactive materials are used • Training records of employees on biomedical waste handling • Environmental Management Plans • Air Quality Records • Incident and accident reports • Radiation safety records • Previous Environmental Audit Reports • Emergency Preparedness and Response Plan • Mitigation Measures

  102. 4.8 Audit Protocols for Landfill site Waste Management shall mean the collection, transport, recovery and disposal of waste, including the supervision of such operations and after-care of disposal sites’. The general principle of the waste hierarchy is prevention, minimization, reuse, recycling, energy recovery and disposal. Prevention is the most favoured and disposal is the least favoured option. Thus, strategies should focus on waste prevention and minimization through the ‘5 Rs’ — Reduce, Repair, Reuse, Recover and Recycle, and disposal in an environmentally sound manner.

  103. 4.8.1 Waste According to the Basel Convention, wastes are substances or objects that are disposed or are intended to be disposed or are required to be disposed by the provisions of national laws. Waste includes all items that people no longer have any use for, which they either intend to get rid of, or have already discarded. Additionally, wastes are such items which people are required to discard, for example by law because of their hazardous properties. Many items can be considered 49 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA as waste e.g. household rubbish, sewage sludge, wastes from manufacturing activities, packaging items, discarded cars, old televisions, garden waste, empty paint containers, etc.

  104. 4.8.2 Types of Waste Modern urban living brings on the problem of waste, which is increasing in quantity and changing in composition with each passing day. The different kinds of waste are: a. Municipal Waste: Waste generated by households consisting of paper, plastic, packaging, organic waste, metals, etc. b. Industrial and Hazardous Waste: Consists of waste generated during the manufacturing process which turns raw materials into consumer products. Some of this waste can also be hazardous. c. Biomedical Waste: Waste generated by hospitals, disease diagnostic centres/ Laboratories, and other health providers consisting of discarded drugs, medical sharps, microbiology and biotechnology waste, human anatomical waste, animal waste, etc. d. Construction and Demolition Waste: Waste arising from activities such as the construction and demolition of buildings, creation of infrastructure such as road planning and maintenance, etc e. Mining Waste: Waste arising from prospecting, extraction, treatment and storage of minerals. f. E-Waste: This consists of end of life electrical and electronic equipment and comprises of such items as information technology and telecommunication equipment like computers and printers, electrical and electronic tools, washing machines, medical equipment, refrigerators, televisions, etc g. Radioactive Waste: Waste that contain a concentration of radio nuclides greater than those deemed safe by national authorities and for which no use is foreseen. Because of the wide variety of nuclear applications, the amounts, types and even physical forms of radioactive waste vary considerably. Some of these wastes remain radioactive for hundreds or thousands of years, while others may require storage for only a short period, while they decay, prior to conventional disposal. 50 h. Other Waste: These include end-of vehicles, unserviceable aircraft and ships, packaging waste, tyres, batteries, agricultural waste, waste from forestry and other hazardous waste classified under the Basel Convention.

  105. 4.8.3 Audit issues in Management of Waste Some of the major issues in the management of waste are: a. Existence of database regarding waste; b. Recognition of threats to health and environmentl posed by waste; c. Existence of waste policy/laws/rules governing waste management; d. Strategies to reduce, reuse and recycle waste; e. Collection and segregation of waste; f. Processing of waste/recovery of energy from waste; g. Proper final waste disposal; h. Proper accountability mechanism; i. Compliance with waste policies/laws/guidelines/rules/plans; j. Monitoring of compliance with waste policies/laws/guidelines/rules/plans; and k. Adequacy of infrastructure for waste management This protocol deals with the auditing of municipal landfill sites. Similar criteria with some additional markers can be used for hazardous waste management sites.

  106. 4.8.4 Major Environmental Issues o Leachate contamination o Groundwater contamination due to leakage o Surface runoff from landfill catchment area o Generation of toxic and fire prone gases o Fire Hazard o Air pollution (green House Gas emission and Odour) o Soil pollution o Public Health Risk What to look for Where to look • Compliance with site selection criteria laid • NESREA guidelines down by NESREA • Availability of proper fencing to prevent entry • Check fencing area of stray animals • Total waste entered in the premises • Computer record at overbridge • Total number of trucks entered • Computer record at over bridge/entry book at gate 51 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA What to look for Where to look • Whether the incoming waste is segregated or • Logbook of dry and wet waste section not? • Quantity of waste going for compositing • Logbook at wet waste section • Quantity of waste going for recycling and • Receipt from recycler landfill • Logbook at landfill section • Auditor should do the mass balance as given in the rationale • Quantity of water consumption • Quantity of leachate from landfill • Logbook of leachate collection/ auditor should also perform the flow measurement • Treatment facility • Check the adequacy of treatment with respect to design parameters and existing performance • Disposal mechanism • Log book at laboratory to check the discharge parameters and check the compliance with standards • Availability of guard drain around landfill area • Check drainage area constructed and maintained or not • Maintenance of HDPE liner • Logbook of HDPE maintenance area • Number and location of air quality monitoring • Monitoring reports stations • Assess the air quality at site and nearby areas • Monitoring reports done by proponent and conduct self-monitoring • Piezo metric network for ground water • Check the analytical report for results and sampling frequency of sampling and do self- monitoring • Safety audit report • Check whether recommendation are implemented or not • Health status of workers • Heath records of checkups done by proponent

  107. 4.8.5 Rationales for Estimation/calculation Mass balance of waste: Total waste = Total dry waste+ total wet waste Total dry waste= total recyclable waste + waste sent to landfill If quantity of total waste is equal to waste sent to landfill, there is no segregation of waste If landfill waste is equal to total dry waste, no waste is sent for recycling

  108. 4.8.6 Important points to be considered by the auditor o The auditor should calculate the total waste entering and waste per truck to crosscheck the waste details o Auditor should collect the leachate sample and groundwater sample for analysis 52 Draw a diagram of the plant layout and show: Check company records for the following: • Unloading area • Manifests annual reports; • Location of weighing bridge • Environmental monitoring data; • Location of compositing • Emergency response plan; • Leachate treatment area • Leachate management plan; and • Location of fire extinguishers • Environmental permits • Storm water drains; • Final discharge points for leachate; • Storage areas for bulk materials incoming; • Location of ground water monitoring stations

  109. 4.9 Audit protocol for Wildlife Facilities and Sanctuaries Wildlife facilities are establishments that provide care, shelter, and support for various animal species. These facilities often focus on rehabilitation, conservation, education, and research to ensure the welfare and wellbeing of the Wildlife in their care. The facilities include: Zoo, Parks, Game Reserves, Sanctuaries, Rescue centers and Recreational centers.

  110. 4.9.1 Major Environmental Issues o Animal welfare and well-being o Enclosure design and maintenance o Animal handling and training practices o Nutrition and dietary management o Veterinary care and health protocols o Record keeping and data management o Staff training and qualifications o Safety protocols for visitors and staff o Conservation and education programs o Compliance with laws and regulations What to look for Where to look Animal welfare (Nutrition, Dietary Management and Wildlife Parks, Zoos, Sanctuaries, etc (Cages, Pen, Well- being general) etc.), Facility’s Management records of feeds for Wildlife species Enclosure design and maintenance Wildlife Parks, Zoos, Sanctuaries, etc Animal handling and training practices Facility Records and Management personnel records Veterinary care and health protocols Facility’s Veterinary Clinic, Drugs and Medicine, Log books, etc. Record keeping and data management Facility’s Manager Office Staff training and qualifications Management’s Personnel Records Safety protocols for visitors and staff Records from health and safety Unit 53 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA What to look for Where to look Conservation and education programs Facility’s Manager Office (Logbook) Compliance with laws and regulations Logbook for Facility maintenance, Animal well- being, Records of Certification and Permit

  111. 4.10. Audit protocol for wood and wood products including charcoal production and processing The audit protocol for wood and wood products, including charcoal production and processing, is designed to ensure compliance with environmental regulations, sustainability standards, and best practices in resource management. This protocol aims to assess the legality, sustainability, and traceability of wood and wood products throughout the supply chain.

  112. 4.10.1 Major Environmental Issues o Legal Compliance (Permits, Licenses and Regulatory Compliance e.g. CITES) o Sourcing and Traceability (Origin of Raw Materials and Chain of Custody) o Sustainability Practices (Forest Management Practice, Biodiversity Assessment, Carbon Footprint and Certification Standards) o Corporate Social Responsibility (Community Engagement and Labor Practices) o Production Processes (Processing Standards and Quality Control) o Health and Safety (Worker Safety Protocols and Health Risks) o Waste Management (Waste Reduction and Recycling and Reuse) o Chemical Use and Pollution What to look for Where to look Environmental Compliance status (Permits, • Certification records Licenses and Regulatory Compliance) • Safety book record Sourcing and Traceability (Origin of Raw Procurement Manager / Supply Chain Manager Materials and Chain of Custody) - Certificates of legality and sustainability - Chain of custody documents Sustainability Practices (Forest Management Sustainability/ Manager Practice, Biodiversity Assessment, Carbon - Environmental impact assessments (EIAs) Footprint and Certification Standards) - Sustainability reports - Compliance audits and assessments Corporate Social Responsibility (Community Public relation officer’s desk Engagement and Labor Practices) - CRS Records Production Processes (Processing Standards and Quality Control Manager Quality Control) - Production logbooks - Process flow diagrams - Quality control records 54 What to look for Where to look Health and Safety (Worker Safety Protocols and Health and Safety Officer Risk Management) - Safety training records - Incident reports - Safety audits and inspections Waste Management (Waste Reduction, Recycling Operation Manager’s desk and Reuse) - Logbook - Stock movement records - Waste management records Chemical Use and Pollution Operation Manager - Chemical Inventory records - Safety Data sheet - Waste Management Records

  113. 4.10.2 Important points to be considered by the auditor o Auditors should ensure compliance with environmental regulations and sustainable sourcing practices. o Verify the traceability of raw materials to prevent illegal logging and assess the adequacy of inventory management and quality control processes to ensure product integrity and safety. o The auditor should perform assessment of aquatic ecosystem through professional taxonomist or obtain information from marine department, if available.

  114. 4.11 Audit Protocols for Health and Safety Health and Safety is an important concern of most businesses, particularly those in the manufacturing, infrastructural and service industries. Most industries/ businesses need to conduct regular (annually) health and safety audits to make sure that the working environment is as safe as possible for all employees. Health and safety audit is a methodical approach to evaluate potential hazards enabling suggestions for improvement. It is an important tool for identifying deterioration of standards, areas of risks or vulnerability, hazards and potential incidents in the machines or production lines for determining necessary action to minimize hazards thus ensuring effective and meaningful safety efforts. Issues typically addressed other Occupational Health and Safety Audit includes the following (as appropriate and regulated) as shown in Table 4.2 55 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Table 4.2: Occupational Health and Safety Management Occupational Health Safety Management • Medical Surveillance • Duty of Care/General Prevention including general • First Aid including first aid provisions and training duty of care, general prevention requirements, • Accident/Illness Investigation occupational health and safety expert persons • Record-Keeping and reporting and services, works councils, health and safety • Workplace Requirements including general committees, etc workplace requirements, ventilation, temperature, • Risk Assessment and Risk Management Program lighting, sanitary provisions, cloak room, drinking including risk assessment, action plan and risk water, rest areas, workplace violence, pestering, management, reporting, etc. sexual harassment, etc • Information, Communication and Training • Ergonomics including general ergonomic including training and health and safety signs/ requirements, visual screen equipment, manual posters. handling of loads and back injury prevention. • Protection Classes of Employees including young • Exposure Limits Protection including chemical workers, pregnant and breastfeeding workers, agents, vibrations, UV-reactive materials, asbestos, temporary workers, night workers, home workers, lead, radon, etc etc. • Ionizing and Non-Ionizing Radiation. • On-site Contractors and Construction Activities • Materials Safety Data Sheet on Chemical Usage • PPE • Details of Internal Classification including use of • Strategic Placement of safety signs within facility. the Global Harmonised System of Classification and • Strategic placement of precautions to be taken labeling of chemicals (GHS) for each machine

  115. 4.12 Audit Protocol for Water Resources I. The requirements in this subsection pertain to the need for authorizations, permissions or environmental licenses for specific types of water-related activities such as, if: a. The facility extracts materials such as stones, sand or gravel from streams, channels or beds of waterways; b. The facility plans to construct works that will occupy a channel or stream; c. The facility establishes tourist, recreation or sporting activities in streams, lakes or other waters of public domain; d. The facility has to alter channels or marginal slopes to avoid floods or damage in shoreline areas; e. The facility wishes to establish a concession for water for power use; f. The facility collects and channels drainage or irrigation waters; g. The facility wishes to explore or prospects for groundwater resources; and h. The facility has constructed dikes or dams to capture water for its use. II. Each environmental license will indicate all the requirements, obligations and conditions with which licensee must comply. Key environmental legislation and regulations covered in this protocol are noted as follows: a. National Environmental (Wetlands, River Banks and Lake Shores) Regulations S.I. 26 of 2009; and b. National Environmental (Wetlands, Mountainous, Hilly and Catchment Areas) Regulations S.I. 27 of 2009. 56 III. Issues typically addressed under Water Resources Audit include the following (as appropriate and regulated): a. Environmental Licenses/Authorization for Construction and/or Operations of certain water related activities b. Drainage and Runoff c. Development of Groundwater Resources d. General Requirements for Private Water Supplies e. Private Drinking Water Supplies f. Water Quality Criteria for Human and Domestic Consumption g. General Discharge Limitation h. Discharges to Surface Waters i. Discharges to Groundwater j. Discharges to Sewers k. Permissions/Authorizations for Liquid Discharges l. Prevention of Water Resources Contamination

  116. 4.13 Audit protocol for Quarrying and Blasting Operations Quarrying is the process of removing rock, sand, gravel or other minerals from the ground in order to use them to produce materials for construction or other uses. So, a quarry is any such working on the surface of the earth where minerals are extracted Quarrying, Blasting and Crushing Process 57 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA

  117. 4.13.1 Major Environmental issues o Air pollution due to drilling and blasting activities o Water pollution o Noise and vibration o Solid waste/over burden management/topsoil management o Quantity of explosive used per hole and per blast operation o Depth of the Quarrying Pits o Abandoned Quarrying Pits o Risk Assessment o Requirement for company policy o Energy requirement o Safety Issues o Occupational health of workers o Rehabilitation and Decommissioning Plan What to look for Where to look • Operational procedures across all stages of • Operational Manual the process • Distance of the Quarry to the nearest • Check the adequacy and efficiency of the residential buildings measures • Source of water and quantity o Log book of meters/pump at source o Ground water (borehole) o Log book of meters/pump at source o Surface water (river/lake) o Payment receipt o Private tankers • Water consumption o Utility department (capacity of different tanks) o Domestic (if residential colony included) o Drinking o Dust suppression o Green Belt/cover o Others (specify) • Noise pollution management • Monitoring results conducted by the project proponent, conduct monitoring • Surface and Ground Water Pollution • Monitoring results conducted by the project Management proponent, conduct monitoring • Conducting In-situ and Ex-situ analysis • Number of trucks per day • Register at entry gate o Carrying materials • Energy source and consumption • Electricity bill/fuel consumption of generator sets • Air pollution • Monitoring results by the project proponent, conduct self-monitoring or calculate air emissions using USEPA’s AP-42 • Air pollution management measures • Check the adequacy and efficiency of the measures 58 What to look for Where to look • Quantity of waste generation o Utility department or calculate using rationale o Solid waste o Receipt from recycler o Domestic o Hazardous waste (waste oil) • Biodiversity Forest department or perform reconnaissance survey o Type and number of species of flora o Type and number of species of fauna • Safety aspects Safety audit report and the implementation of recommendation mentioned in safety report • Worker training and competency Interview or interactions with workers assessments • Quantity of explosives used Per Hole and Per Permit for use of explosives blast • Depth and Volume of the Quarrying Pits Check the adequacy and efficiency of the measures

  118. 4.13.2 Rationales for Estimation/calculation Domestic waste generation: Total Number of staff * 0.3-0.5 kg per person Overburden: 1. Number of trucks carrying material each day* capacity of each truck; or 2. Material production (in tonnes) * stripping ratio (obtain this information from quarrying manager)

  119. 4.13.3 Important points to be considered by the auditor o Verify the presence and validity of all required permits, licenses, and regulatory approvals. o Ensure compliance with occupational health and safety regulations, such as those related to worker training, personal protective equipment (PPE), and emergency response. o Review adherence to environmental protection laws and guidelines, including those addressing air quality, water management, noise, and waste disposal. o Assess the overall site layout, including access controls, traffic management, and segregation of different operational areas. o Evaluate the maintenance and inspection procedures for quarrying equipment, such as excavators, loaders, and haul trucks. o Examine the material extraction, handling, and storage processes to identify potential inefficiencies or safety risks. o Review the blasting plan development and approval process, ensuring that it considers factors such as vibration, fly-rock, and air overpressure. 59 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA o Verify the depth and volume of the quarrying pit o Evaluate the blasting execution, monitoring, and post-blast evaluation procedures to ensure safety and effectiveness. o Assess the selection, maintenance, and performance of the crushing equipment, including its suitability for the material being processed o Examine the material handling and stockpiling procedures, with a focus on dust control and suppression measures. o Evaluate the efficiency and optimization of the crushing and processing operations. o Verify the adequacy of worker training and competency assessments, particularly for high-risk tasks. o Ensure the proper use, storage, and maintenance of personal protective equipment (PPE). o Review the emergency response planning and the effectiveness of emergency drills and preparedness measures. o Assess the effectiveness of noise and vibration mitigation strategies, such as the use of noise barriers and monitoring programs. - Evaluate the water management and wastewater treatment practices, including the compliance with discharge requirements. o Review the waste management and disposal procedures, ensuring responsible and sustainable practices. o Examine the communication and engagement processes with nearby communities, addressing their concerns and feedback. o Assess the effectiveness of the grievance management and resolution procedures. - Evaluate the collaboration with regulatory bodies and local authorities to address community-related issues. o Auditor must conduct noise monitoring near core area, buffer area of quarrying and outside quarrying area especially near habitat. o Auditor should identify the number and type of flora and fauna near the quarrying area or obtain from forest department, prepare biodiversity index and compare it with the information provided in EIA report to identify if there is decline in the species count. Draw a diagram of the plant layout and show: Check company records for the following: • Quarrying/Blasting pit • Production records • Crushing Plants • Water and sewage treatment cost • Hauling roads • Solid and hazardous waste management cost • Location of STP and hazardous waste • Material safety data sheets storage • Manifests annual reports; and • Domestic waste dumpsite, if applicable • Environmental permits • Borehole locations • Safety audit report • Residential colony, if applicable • Employee health records • Decommissioning Plan 60

  120. 4.14 Audit protocol for Construction Construction refers to the act of building or assembling infrastructure, structures, or other physical components. It involves the planning, design, and execution of projects that create or modify buildings, roads, bridges, dams, and other facilities. The construction process typically includes activities such as: - Site preparation and excavation - Laying foundations and structural framing - Installing electrical, plumbing, and HVAC systems

  121. 4.14.1 Major Environmental issues o Air pollution o Water pollution o Noise pollution and vibration o Site Waste o Liquid waste o Deforestation o Storm water o Abandoned Burrow Pits o Occupational health and safety What to look for Where to look • Operational procedures across all stages of the • Operational Manual process • Site Waste Management • Utility department • Storm water Management • Storm water Management Plan • Set back to the nearest river, lake or waterways • Construction design • Source of water and quantity o Log book of meters/pump at source o Ground water (borehole) o Log book of meters/pump at source o Surface water (river/lake) o Payment receipt o Private tankers • Water consumption o Utility department (capacity of different o Domestic activities tanks) o Drinking o Dust suppression o Others (specify) • Noise pollution management • Monitoring results conducted by the project proponent, conduct monitoring • Surface and Ground Water Pollution Management • Monitoring results conducted by the project proponent, conduct monitoring • Conducting In-situ and Ex-situ analysis • Number of trucks per day if applicable • Register at entry gate (Construction o Carrying materials yards) • Energy source and consumption • Electricity bill/fuel consumption of generator sets 61 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA What to look for Where to look • Air pollution • Monitoring results by the project proponent, conduct self-monitoring, or calculate air emissions using USEPA’s AP- 42 • Air pollution management measures • Check the adequacy and efficiency of the measures • Quantity of waste generation o Utility department or calculate using o Solid waste rationale o Domestic o Receipt from recycler o Hazardous waste (waste oil) • Biodiversity Forest department or perform reconnaissance o Type and number of species of flora survey o Type and number of species of fauna • Safety aspects Safety audit report and the implementation of recommendation mentioned in safety report • Worker training and competency assessments Interview or interactions with workers • Quantity of explosives used for blasting Permit for use of explosives

  122. 4.14.2 Rationales for Estimation/calculation Domestic waste generation: Total Number of staff * 0.3-0.5 kg per person Overburden: 1. Number of trucks carrying material each day* capacity of each truck; or Material production (in tonnes) * stripping ratio (obtain this information from project manager)

  123. 4.14.3 Important points to be considered by the auditor o Verify the presence and validity of all required permits, licenses, and regulatory approvals. o Ensure compliance with occupational health and safety regulations, such as those related to worker training, personal protective equipment (PPE), and emergency response. o Review adherence to environmental protection laws and guidelines, including those addressing air quality, water management, noise, and waste disposal. o Note the set back of the projects to the water way, rivers/lake o Site Waste Management Plan: The operator/facility shall submit a Site Waste Management Site Waste Plan (SWMP) to the Agency for all new construction projects that will require Management mandatory Environmental Impact Assessment (EIA) or such projects that Plans may generate significant waste. 62 o Storm Water Discharge Permit: Storm Water Discharge Permit shall be obtained from the Agency with some requirements. o Storm Water Management Plan of the project o Lighting Activities that can or have the potential to cause disturbance to the surrounding community. o Control of Dust and Fugitive Emission o Noise generated within the work site shall be within permissible limit o Hazardous Substances: There shall be proper management of Hazardous Substances by the operator/facility owners. o Use of Asbestos: Note that use of asbestos for construction is prohibited. o Spent Oil: The Spent Oil shall be disposed off in an environmentally friendly manner as approved by the Agency Draw a diagram of the plant layout and show Check company records for the following • Set back to the nearest water channel • Solid and hazardous waste management cost • Hauling roads • Material safety data sheets • Location of STP and hazardous waste storage • Manifests annual reports; and • Domestic waste dumpsite, if applicable • Environmental permits • Borehole locations if applicable • Safety audit report • Employee health records • Rehabilitation and Decommissioning Plan if applicable

  124. 4.15. Audit protocol for Open Burning activities for Regulatory Agencies and others Open burning of seized and confiscated contraband, substandard manufactured products, mutilated notes, health care wastes, etc by regulatory agencies of government, medical institutions / centers, and others in Nigeria, is one of the major contributors to climate change in the country. The need to ensure compliance with extant national protocols, laws and regulations is of utmost important to mitigate this menace.

  125. 4.15.1 Major Environmental issues o Types of contraband o Method of burning in practice o Clearance evidence for open burning o How frequent is burning exercise (annually or biannually) 63 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA What to look for Where to look • Types of contraband • Logbook at warehouses/office • Method of burning in practice • Management / Operational records of disposal • Clearance evidence for disposal • Management records of clearance by relevant issuing Authority on environmental matters • How frequent is the disposal (annually or • Management / Operational records of disposal biannually) • Quality of disposable items • Operation Manager/Director of Operation, Health Safety Environment Officer (HSE)

  126. 4.15.2 Important points to be considered by the auditor • The auditor should perform assessment of aquatic ecosystem through professional taxonomist or obtain information from marine department, if available. • Auditor should also perform marine water monitoring before and after dredging operation. 64 CHAPTER FIVE: REPORTING PROCEDURES The Environmental Audit (EA) Report is a written record of the Environmental Audit process. It describes project or process being audited, lists the environmental effects associated with that project or process, quantifies the industrial data regarding input and output of the process and identifies the relevant environmental legislation and standards that applies in order to provide an objective analysis of the environmental impacts arising from a project or process and ultimately provide the information required to draw up a Comprehensive Mitigation Plan in the event of there being any significant negative impacts on the environment. The EA Report needs to communicate the relevant information clearly and concisely and should therefore: a. Be presented to make information accessible to the non-specialist, avoiding technical terminology where possible. b. Have information presented in summary tables and use good quality maps, charts, diagrams and other visual aids wherever possible. c. Be clearly laid out with a clear table of contents, to allow the reader to find and assimilate information easily and quickly. d. Present information without bias and discuss issues with the emphasis appropriate to their importance as in the overall context of the Environmental Audit.

  127. 5.1 Contents of Environmental Audit Report I. Introduction The objectives and scope of the Environmental Audit II. Conduct of the Audit Those interviewed during the audit, the timing and audit methodologies used should be presented III. Description of the Development or Activity Under Audit The size and nature of the development or activity, a description of the relevant management structures and workforce, a summary of all inputs and outputs, 65 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ancillary operations such as transport and services, storage and processing operations. IV. Description of Industrial data Quantification of raw material, water, energy/fuel used in the process along with the products and waste generated (air, water, solid waste) from the process or activity. The measures taken for controlling air pollution, water pollution and management of solid/hazardous waste to be detailed including the technical information and capacity wherever applicable. V. Description of the Environment A brief description of the surrounding environment including the natural and built environment, local ecology (Noting any sites or special interest or conservation value) and socio-economic or cultural factors that may have a bearing on the audit. VI. Description of Environmental Effects Environmental effects related to the transport, handling, processing, storage and eventual disposal route to the environment of all relevant inputs and outputs should be presented systematically in a clear and appropriate manner. They should include: a. The environmental effects observed during the course of the audit b. The good and bad management practices that were observed during the course of the audit, including the effectiveness of existing environmental mitigation measures. VII. Evaluation of Environmental Effects The relevant environmental legislation and standards that apply must be defined. These should be cross referenced to the environmental effects identified in the Description of Environmental Effects in paragraph 5 above. The environmental effects must be systematically evaluated and ranked in terms of their significance and the assessment of significance justified. VIII. Recommendations a. The EA Report must make recommendations to address any significant negative environmental effects and, importantly, allocate and justify priorities for action b. Recommendations should include the control and reduction of emissions by improved efficiency, management and technical control measures. c. The emphasis should be on incentive and removing the source of a problem rather than the use of command and control or “end of pipe” technology. 66

  128. 5.2 Environmental Audit Report Format a. Title Page (including the name of complying facility); b. List of Preparers; c. Disclaimer by the auditors involved d. Certificate of accreditation e. Table of Contents; f. Acknowledgement; g. Executive Summary (background, audit findings, conclusion and recommendations); h. Introduction; i. Overview of Background Information; ii. Objectives; iii. Terms of Reference (ToR)/Scope of Audit iv. Approach and Methodology i. Overview of the Facility/Development or Activity under Audit i. Description of facility; ii. Organizational Structure; iii. Process Description; iv. Summary of ancillary operations (such as transport and services, storage and processing operations) v. Quantification of all inputs (raw material, water, energy etc) and outputs (product, waste etc) to the process as provided in Annexure 4 j. Baseline Environmental Assessment and Management Study i. Description of Surrounding Environment; ii. Existing Environmental Management Systems; iii. Survey of Compliance with Environmental Laws, Regulations and Company Policies k. Audit Findings i. Observations and Evaluation of General Housekeeping Practices ii. Identification, Quantification and Characterization of Waste iii. Material Balance iv. Description of Environmental Effects related to Operational Activities v. Impact Evaluation l. Conclusion i. Summary of Audit findings; and 67 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ii. Assessment of Facility’s environmental performance and compliance status. m. Recommendation i. General Recommendations; ii. Specific Recommendations; and iii. Follow-up Action Plan with timelines, responsibilities and performance indicators to track implementation of the action plan. n. Bibliography o. Appendix i. Project layout; ii. Company’s policies (avoid including unnecessary photocopies of regulations). iii. Photo logs (optional) iv. Supporting documentation (optional) 68 CHAPTER SIX: REVIEW OF ENVIRONMENTAL AUDIT REPORT The submitted environmental audit reports will be reviewed for its quality and appropriateness of data by the committee formed by NESREA. If the review of the audit report is satisfactory, the report will be accepted, otherwise the auditor will be advised to either resubmit the report with modifications as suggested or the report may be rejected due to its poor quality. The auditors will be called for a discussion during the review exercise.

  129. 6.1 Review Committee NESREA may decide to have a single technical committee that reviews reports of type of projects in the country, but this may overburden the committee. The other alternative is to have a technical committee at the headquarters which reviews audit reports of large-scale and complex projects and then other technical committees at the zonal/regional level which reviews audit reports of small-and medium-scale projects.

  130. 6.2 Review Parameters The parameters to be covered under the environmental audit review will include but not limited to • Status of auditor certification • Layout and housekeeping of the plant/project • Raw material consumption and production figures • Water conservation and waste water generation • Waste generation and management • Quantity of Waste Generated • Quantity of Waste Recycled • Quantity of Waste Used • Air pollution and mitigation measures • Any project specific requirements • Applicable rules, permit conditions and its compliance status • Environmental management system evaluation • Hazardous materials management • Energy management 69 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA • Material safety data sheet • Emergency preparedness and response • Biodiversity and Ecosystem Protection • Noise Pollution Monitoring and Control • Soil Contamination and Remediation Measures • Occupational Health and Safety (OHS) Compliance • Community Engagement/Corporate Social Responsibility • Resource Recovery and Circular Economy Initiatives • Effluent Quality Monitoring • Lifecycle Assessment (LCA) of Products or Services • Environmental Risk Assessment • Training and Capacity Building on Environmental Issues • Compliance with Extended Producers Responsibility (EPR) Program. The checklist for the review of audit report is provided at Annexure 11 70 ANNEXURE ANNEXURE 1: Environmental Action Plan Framework Environmental Issue Objective Target Action Responsible Personnel Budget Timeline for Department Responsible Implementation/ Completion Material Management Energy Management Waste Management Water & Wastewater Management Air Quality Noise Emission Transportation & Travelling Emergency Response Procedures Staff Awareness and Training Response to public Enquiries and Complaints Publicity of Environmental Information Environmental Management Plan 71 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ANNEXURE 2: Audit Protocol and Checklist Audit Site ………………………………………………………………………………...………… Audit Date ………………………………………………………………………………...………… Auditor (s) ………………………………………………………………………………...………… Site Personnel ………………………………………………………………………………...………… ANNEX 2.1: AUDIT PROTOCOL FOR WASTE CONTROL Legislation: Waste Control & Sanitation Regulations S.1.28 Reference Requirement Activity Comments/ Compliance Remarks Yes No N/A Unknown S.1. 28 Section Registration Business activity: (4), (19), (28) Type of Waste Examine Waste Registration & produced attach a coopy Section (13) Waste Disposal Reception point(s) (1) (a) Arrangement to deliver waste to reception point(s) (1) (b) If disposal internally, examine license and site reference no. (2) If no suitable reception point for the waste, examine & attach the approval for the present disposal arrangement Section (13) Containment Waste Containers of suitable design Suitable material (corrosion resistant) well maintained Proper Packaging (1) (a) Waste stored to ensure handling safety and container effectiveness (1) (b) Containers properly and securely closed and surface free to waste (1) (c) Incompatible wastes not missed, packed or stored in same container (1) (d) Sufficient air space allowed in containers of liquid chemical waste 72 Reference Requirement Activity Comments/ Compliance Remarks Yes No N/A Unknown Storage in Working Area Wastes stored in working area Quantity stored in single are below 50 litres Containers properly stored and labeled Containers kept in cabinet or receptacle of suitable material and construction Containers of incompatible wastes separated by an impermeable partition inside cabinet Storage Area (2) (a) Dedicated storage area (2) (b) Enclosed on 3 sides with no less than 2m in height or height of tallest container or stack of containers (2) (c) Adequacy of area ventilation (2) (d) Isolation from surface water drains or foul sewers (2) (e) Adequacy of handling space (2) (f) Indoors storage area and building escape/exit not obstructed (2) (g) Outdoors storage area covered (2) (h) Storage area kept clean and dry Liquid Waste Storage (1) (a) Storage area floor/surface permeation proofed (1) (b) Capacity of retention structure sufficient to accommodate contents of the largest container or 20% volume of waste in storage (1) (c) Walls or partitions of stacked container storage area constructed of impermeable material 73 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Reference Requirement Activity Comments/ Compliance Remarks Yes No N/A Unknown Warning Signs on Storage Area (1) Warning notice at/near the entrance or opening of every stored waste storage area, cabinet and receptacle (2) Kept clean and free from obstruction Engagement of Waste Collector Examine contract with a licensed waste collected and attach a copy Particulars of Waste Collector (1) Examine and attach a copy of trip ticket (2) Confirm retention of trip ticket copies for 12 months Provision of Sanitary Facilities (1) Examine adequate toilet facilities including adequate water supply for use of their customers/ staff (2) Examine adequate hand washing facilities Emergency Procedures Assess employee (1) (a) Availability of written competence and emergency procedures ticket awareness (1) (b) Adequacy of employee instruction and training on emergency procedures. This audit does not cover the import, export or manufacture of the ozone depleting scheduled substances. * * Audit Site ………………………………………………………………………………...………… Audit Date ………………………………………………………………………………...………… Auditor (s) ………………………………………………………………………………...………… Site Personnel ………………………………………………………………………………...………… 74 ANNEX 2.2: AUDIT PROTOCOL FOR THE OZONE LAYER Legislation: National Environmental (Ozone Layer Protection) Regulation S.1. No. 32 of 2009 Reference Requirement Activity Comments/ Compliance Remarks Yes No N/A Unknown S.1 Approval Particulars of (1) Any use of controlled Furnace Oven or refrigerant Examine approval Chimney from Authority and site Ref. No. Types, grade and quantity of fuel consumed. Operation time in each period of 24 hours Details of automatic or semi- automatic control connected Rating of the boiler: Dimension and material of chimney: Mechanical stoking device (for solid fuel) Burner appliance (for liquid or gaseous fuel) Record of Refrigeration Particulars of Equipment Service the Refrigeration (1) Examine the record of Equipment Service refrigeration equipment service by authorized person Date of refrigerant and attach a copy removal; Date of refrigerant (2) Confirm retention of the replacement; record for at least 1 year Registration No. of the authorized person; 75 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Reference Requirement Activity Comments/ Compliance Remarks Yes No N/A Unknown For destruction facility Permit to operate ODS/HFC destruction facility List of ODS/HFCs destroyed Amount of emission of ODS/ HFC into the atmosphere during destruction Details of technical qualification of operators ODS/HFC Storage information For any facility Special permit for Refrigeration and Air- conditioning List of Refrigerants used Details of what the refrigerants are used for Details of reuse, recovery, recycling or reclamation of refrigerants Method of disposal of refrigerant Method of storage of refrigerants This protocol covers only noise arising from Factory, Workshops, Infrastructure, Construction or Mining and related activities, Storage facilities, Public places and Domestic premises only. Audit Site ………………………………………………………………………………...………… Audit Date ………………………………………………………………………………...………… Auditor (s) ………………………………………………………………………………...………… Site Personnel ………………………………………………………………………………...………… 76 ANNEX 2.3: AUDIT PROTOCOL FOR NOISE POLLUTION CONTROL Legislation: National Environmental (Noise Pollution Control) Regulation S.1. No. 35 of 2009 Reference Requirement Activity Comments/Remarks Compliance (Measurements to be specified) Yes No N/A Unknown S.1. 35 Noise at Night or on a General Holiday Any noisy activity produced (1) Prohibited time in residential area (2) designated noise control zone S.1.35 section Noise at Any Time (5) Any noise produced from: (1) (a) Musical or other instrument operation (1) (b) Loud-speaker, megaphone, or other device for magnifying sound (1)(c) Trade or business activity (2) Air-conditioning or ventilating system (3) Animal or bird examine any record of previous prosecution/complaints 77 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ANNEX 2.4: AUDIT PROTOCOL FOR HAZARDOUS SUBSTANCE AND WASTE CONTROL The protocols for Hazardous Substance Management cover those substances in Schedule X111 of the Regulations S.1.28 of 2009 Confirm manufacture, storage or use the following hazardous substance or waste at this premise Hazardous Hazardous Substances Special Activity Involved Description Substances of Hazardous Category Type Manufacturing Store Use substance or waste 1 Explosives 2 Compressed Gases 3 Flammable Liquids 4 Flammable Solids 5 Oxidizing substances and organic peroxide 6 Poisonous toxic substance 7 Corrosive 8 Eco toxic • For definition of different types of hazardous substances, please refer to

  131. Schedule XIII of Regulations S.1.28 Audit Site ………………………………………………………………………………...………… Audit Date ………………………………………………………………………………...………… Auditor (s) ………………………………………………………………………………...………… Site Personnel ………………………………………………………………………………...………… 78 ANNEX 2.5: AUDIT PROTOCOL FOR HAZARDOUS SUBSTANCE AND WASTE CONTROL Legislation: National Environmental (Waste Control and Sanitation) Regulation S.1. No. 28 of 2009 Reference Requirement Compliance Activity Comments/Remarks Yes No N/A Unknown S.1. 28 (1) Examine license to manufacture/store Registration No. compressed gases and attach a copy Business activity: (2) Exempt if the quantity is within exemption criteria Type of compressed Gases: Quantity License Conditions Storage Site: (a) Conformation of storage construction Materials of with the approved plan Construction: (b) Equipped with appropriate fire Means Ventilation extinguisher Method of fixing gas distribution pipeline: Fire extinguisher type Use of Approved Cylinder Specification to be Use of appropriate cylinders for specific Stated gas Use of listing and classification Marking of Cylinder Cylinders appropriately colour coded (i.e. red inflammable, yellow — poisonous, half red and half yellow — both) Labeling of Cylinders The protocols for Water Pollution Control cover all operations that discharge or release waste water or effluent in the course of its operations Audit Site ………………………………………………………………………………...………… Audit Date ………………………………………………………………………………...………… Auditor (s) ………………………………………………………………………………...………… Site Personnel ………………………………………………………………………………...………… 79 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ANNEX 2.6: AUDIT PROTOCOL FOR WATER POLLUTION CONTROL Legislation: Water Pollution Control Limitations Reference Requirement Compliance Activity Comments/Remarks Yes No N/A Unknown (Measurements to be specified) S.1. 28 section (35) Discharge, other than Sources of discharge: domestic sewage and S.1.29 section (4) unpolluted water into: Type of drainage connected: S.1.31. (section) 10 (i) Water system (ii) inland water S. 1.33 section (15) (iii) public drains and underground injection S.1.34, section (11) Examine license to discharge S.1.36 section (16), or from non-domestic (17). premise and attach a copy Examine expedient connection and site plan License Conditions (as per license) Particulars on the discharge — (4) Compliance with license terms and condition Place: License terms and conditions: Time/Period: I __________________________________________ Rate/Total Amount: II _________________________________________ Characteristics: III ________________________________________ Effluent treatment and IV _________________________________________ equipment used: V __________________________________________ Assess the competence of treatment equipment and operators Examine and attach effluent sampling/ measurement records * N/A - Not Applicable: Un — Unknown ** For definition of domestic sewage and unpolluted water, please see below Definition of Domestic Sewage and Unpolluted Water Domestic Sewage: Means waste of a kind and quantity that is generated by the domestic use of toilet, water closet, bath, shower, sink, basin or other sanitary 80 fitment by person residing in a household or while at a place of work but does not include: (a) The solid residue from a wastewater treatment facility; (b) The effluent from a wastewater treatment facility that uses electrical or mechanical equipment in its operation; or (c) Waste that is generated by a good business. Unpolluted Water means: (a) Rain water from any part of a building, including any area appurtenant of a building; (b) Water used: a. For firefighting purpose; b. In connection with an occurrence in which life or property is endangered c. For the cleansing of streets, thoroughfares, and other areas.

  132. Annex 2.7 PRE-AUDIT QUESTIONNAIRE AND CHECKLIST INTRODUCTION The purpose of this questionnaire is gathering the necessary information on your Facility prior to undertaking an on-site Environmental Audit. The questionnaire covers each area of environmental concern, and is supplemented by information checklists for each of these areas. This questionnaire is designed to familiarize the Audit Team with your Facility operations prior to the Environmental Audit visit, while information checklists highlights a list of the documents required prior to the audit. Please complete the forms as thoroughly and accurately as possible. Where a question does not apply or cannot be answered, please respond with not applicable or unknown. Respondents are encouraged to provide responses which reflect and actual conditions as opposed to the ‘ideal’ situation. Provision of pertinent information prior to the audit visit will allow the audit team to be adequately prepared for a more effective audit. Note: Unless otherwise specified, references made to ‘premises’ or ‘area’ in this questionnaire generally refer to the Facility which the respondent represents. 81 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 1. General Company Information Name of Facility: -------------------------------------------------- -------------------------------------------------- Location: -------------------------------------------------- -------------------------------------------------- -------------------------------------------------- Telephone No. -------------------------------------------------- E-mail address: -------------------------------------------------- Company Registration No. -------------------------------------------------- Commencement Date of Operations: -------------------------------------------------- Estimated Age of Facility: -------------------------------------------------- Number of Employees: Full-Time: ----------------- Part Time:------------- Contract Staff -------------- TOTAL: -------------------- Normal Operation Schedule: Hours per day:------------- Days per Week: ------ Weekly Total: -------- No. of Shifts per day: ---------------------------------- Hours per shift:--------------- Weekly Days of Operations: -------------------------------------------------------------- Facility Location Percent Industrial ---------------------------------------------------------------------------------- Mixed Industrial/Commercial ----------------------------------------------------------- Mixed Industrial or Commercial/Residential ----------------------------------------- Predominantly Residential --------------------------------------------------------------- Agricultural, Underdeveloped or Rural ------------------------------------------------ Others (describe) ------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------- Are there any off-site locations (warehouses, processing units, farms, etc) that fall under the direct control of plant Management Yes/No If yes, list the site location -------------------------------------------------- -------------------------------------------------- 82 If applicable, state distance to nearest: Residence: ----------------------------------------Business ------------------------------ Industrial Facility ------------------------------- Public Building ---------------------- River/Stream/Lake -------------------------------- Ancient Monuments ------- Provide an Aerial Photograph of the Facility (where applicable) and a Site Plan/ View of the Facility Showing: Wastewater Discharge Point(s) Air Pollution Vent Stacks Chemical Storage Tanks Chemical Drum Storage Areas Solid Waste Disposal Areas Itemize a list of operations applicable to the Facility in a sequential manner • • Mention the Jobs, Tasks, and/or Areas where Respiratory Protective Equipment (Dust Mask, Charcoal Respirators, Air-supplied Respirators, etc) are required within this facility • • Mention Areas within the Facility where Noise Protection Equipment (Ear Muffs, Ear Plugs) are required: • • Describe any Routine Programme for Periodic Measurement of levels of employee exposure to Airborne Chemicals, Noise, Heat or Radiation. • • Identify any products manufactured/stored/used at this Facility that reasonably might endanger the environment if the products fails or is misused. • • 83 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 1.1 Building Premises Information a. i. Are the premises owned or leased? ii. When were the properties first acquired by this Facility iii. What are the areas of the premises (break down by floor/functional area)? d. Are there any known cases of asbestos material used in the building construction? If so, are these uses indicated on the floor plans? b. Indicate the dates, ownership, and use(s) of the properties prior to the date of acquisition or lease by this Facility. c. Have there been any remedial investigations of corrective actions taken at these premises (e.g. indoor air quality (IAQ) monitoring, wastewater monitoring etc)? Describe briefly: d. Have there been any known discharges, investigations, or mitigation actions at neigbouring offices/adjacent buildings? If so, Describe briefly: e. List the names of environmental or building services consultants retained (for Indoor Air Quality (IAQ) monitoring, energy audit as applicable etc.) and briefly describe the projects involved. 1.2 Overall Environmental Management and Responsibilities Company Level (Questions A to L to be completed by any Environmental Committee Member/ Health Safety and Environmental (HSE)/Plant Management) a. Who at this Facility is responsible for: Name/Job Title Time Spent (%) Reports To: Air Pollution Control ------------------- --------------- -------------- Water Pollution Control -------------------- ----------------- -------------- Effluent Pollution Control --------------------- ------------------ -------------- Solid and Hazardous Waste Mgt -------------- ------------------ -------------- Emergency Responses: -------------------- ------------------ -------------- Occupational Health: --------------------- ----------------- -------------- On-Site Contractors: -------------------- ----------------- -------------- Liaison with Govt. Agencies ----------------- -- ----------------- -------------- Coordinating Environment Health ------------- ----------------- -------------- b. How to you characterize the facility position to the following aspects of Environmental Management at this Facility? (Tick applicable the descriptor). 84 N— S— F— NE —New Never Some-s Fre- Emp- time quency loyee Written Policies and Procedures N S F NE Written Job Description N S F NE Environmental Training N S F NE Other Training N S F NE Review of new Capital Projects/Operations N S F NE Written Reports to Head of Facility N S F NE Written Reports to the Board N S F NE Written Reports to Government Areas N S F NE c. Is there a Corporate Environmental Policy? If so, please provide a copy. d. Is there an Environmental Management Plan? If so, is it endorsed by NESREA, please provide a copy. e. Describe the scope of existing Company Environmental Policy (i.e. application to resources used, pollution prevention, energy use and conservation, training, public relations, etc). f. Is the Environmental Policy by the CEO or his designated nominees; g. Has the Company Environmental Coordinator/HSE Manager been formally appointed and given the responsibility of implementing the policy within the Facility? h. Has the Company Environmental Coordinator HSE Manager been given the responsibility for monitoring the effectiveness of policy implementation? i. Is the Environmental Policy on prominent display at all Company premises? j. Has every staff member been issued with a copy (or summary) of the Environmental Policy? k. Is there a written procedure and schedule for reviewing the Environmental Policy? 85 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA l. Area all revisions of the Environmental Policy communicated to all parties concerned? (i.e., office managers, staff members, concerned public members)? m. Have staff, financial and other necessary resources been allocated to cover specific environmental issues (i.e. emergencies, waste management, monitoring, audit, etc) at Facility level? Please specify. n. List number of staff at the premises GF IF 2F Professional --------------- --------------- ----------------- Technical/Field --------------- --------------- ----------------- Others (please specify) --------------- --------------- ----------------- o. Does the Facility have a documented Emergency Procedure? Yes/No p. If Yes, does it cover Tick Applicable descriptor) Chemical Spills --------------- Accidental releases to the atmosphere ---------------- Fire Protection ----------------Coordinated Responses with Local Authorities-------- q. Have staff, financial and other necessary resources been allocated to cover specific environmental issues (emergencies, waste management, monitoring of discharges/emission, environmental performance audit) at office level? Please specify. Provide name of staff responsible for Emergency Procedure issues at this Facility Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.3 Materials Procurement Policy Facility Level (Questions A to F to be completed by any Environmental Committee Members/ Health Safety and Environmental (HSE)/Plant Manager) a. Is there an inventory of all incoming supplies and materials for: i. Office supplies (i.e. paper, stationery, etc) 86 ii. Computer related supplies (i.e. printer toner cartridges, paper, etc) iii. Refreshment supplies (i.e. Biscuits, Soft Drinks, Styrofoam cups, packaged beverages etc) iv. Others, (specify) b. Are there defined procedures for inventory keeping, updating and checking? c. Is there a mechanism for verify new supplies/materials for: i. Nature, quality, quantity, and specification ii. Compliance with environmental regulations and/or Departmental guidelines iii. Potential environmental impacts iv. Compliance with health and safety regulations and/or Departmental guidelines v. Packaging materials (i.e. quantity, biodegradability, recyclability, etc d. Provide details on any policy/guidance for reviewing existing supplies and materials in relation to possible environmentally friendly’ alternatives; e. Is there a similar system of controls on the materials introduced to the premises (i.e. contractors, laboratory samples, etc) f. Where are laboratory analysis done? Provide the name of staff responsible for Facility procurement issues. Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.4 Energy Management (To be completed by any Environmental Committee Member/HSE/Plant Manager) a. Are there records of energy use for the Facility’s premises (e.g. break down by Section or floor levels)? b. Have there been audits undertaken to identify energy use and minimization opportunities? If so, where are the reports kept? c. Are there defined maintenance programmes to ensure all equipment is operating at optimum efficiency? d. Are there formal arrangements to replace energy inefficient equipment/ fixtures 87 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA e. Are there formal procedures to consider energy efficiency when purchasing new equipment? f. Is there a written commitment to reduce energy use? If so, attach a copy. g. Has the responsibility to reduce energy use been formally allocated in writing? h. Programmes to monitor energy use and to quantify reduction? Where are the records kept? Provide name of staff responsible for Energy Management issues at this premises. Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.5 Material Management (To be completed by the Environmental Committee Member/HSE/Plant Manager or other appropriate persons) Office Operation a. Is there an inventory for all supplies and materials? b. Is there a mechanism for managing existing supplies and materials for: i. Nature, quality, quantity and specification ii. Compliance with environmental regulations and/or Facility guidelines iii. Possible environmental impacts iv. Compliance with health and safety regulations and/or Facility guidelines v. Packaging materials (i.e. quantity, biodegradability, recyclability, etc) c. Describe any guidance or procedures to review current supplies and materials in relation to: i. Eliminate/minimize use of environmentally unfriendly materials ii. Eliminate/Minimize storage of environmentally unfriendly materials iii. Eliminate/minimize waste generation iv. Recycling and reuse (i.e. printer toner cartridges, used paper, etc) d. Describe any guidance or practice on material management leading to overall environmental performance improvement (i.e. double sided printed, single line spacing, use of non glossy report covers, use of recycled paper stock, etc). PA Laboratory Operation e. Indicate activities where hazardous materials are used. Describe the nature and quantity of hazardous materials involved, including the following materials 88 — acid, irritants, bases, sensitizers, asphyxiants, heavy metals, cryogens, flammables, carcinogens, poisons, biological/infectious materials, radioactive, explosive materials. f. Is there an inventory of all incoming supplies and materials for: i. Standard laboratory supplies ii. Dangerous materials iii. Chemicals iv. Biological/infectious materials v. Radioactive materials g. Does the facility maintain a current file of Material Safety Data Sheets (MSDS) for all hazardous materials stored at the facility? h. Provide details of any licenses, permits or applications on file pertinent to hazardous material storage and handling (i.e. title, number, materials, covered, etc) i. If applicable, describe investigations or corrective actions taken in the past (i.e. regarding fugitive emissions to atmosphere, major chemical spillages, etc) j. Provide details on any policy or practices relating to the prevention or reduction in overall environmental impact concerning: i. Elimination of use of environmental or health and safety adverse substances (i.e. ozone depleting substances, asbestos ii. Proper storage and leakage containment of dangerous materials and chemicals (i.e corrosive substances, explosives, poisons, etc) iii. Appropriate storage and labeling of materials iv. Scheduled inspection of storage and handling facilities k. What chemicals are stored in bulk on Site? (State generic name, brand name or trade name of chemical as appropriate) Chemicals No. of Tanks Tank Vol. U/G A/G Bunded l. What Chemicals are stored in Drums on Site? Chemical Appropriate Number of Is Storage area Protected/Curbed 100 — 200 Drums (Yes/No) m. Are drums of chemicals routinely segregated so that incompatible materials (e.g. Solvents and Oxidising Agents) are not stored together? Yes No 89 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA n. List Chemicals stored in bags on site ----------------------------------------------- ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ o. List of the Chemicals used in this Facility with Regulated Workplace Exposure Name of Chemical Usage of Facility Regulatory Limit p. Does the Facility have polychlorinated biphenyls (PCBs) on Site? Ye s / No If yes, indicate the Quantity--------------------------------------- Proper Labelling Yes No Don’t Know Operator Training Yes No Don’t Know Appropriate Spill Containment Yes No Don’t Know q. Does the Facility have a Secondary buyer for its Chemicals or waste materials/ scraps? Provide name of staff responsible for Hazardous Materials Handling this premises. Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ----------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- Pesticides r. Are pesticides used in the premises? If yes, indicate general types and indicate if the use of these pesticides are restricted by any sort of control. Algicides ----------------------------------------- Herbicides ---------------------- Insecticides -------------------------------------- Rodenticides ------------------- Fungicides --------------------------------------- Others --------------------------- s. Are pesticides applied by Facility personnel? If so, indicate whether any certification was obtained by pesticide handlers. Provide details of this certification (i.e. certification title and number, type of pesticides covered, etc.) 90 t. If pesticides are stored at these facilities, briefly describe the following: i. Locations and storage practices ii. Measures in pesticide storage, application and disposal iii. Segregation practices u. If outside contractors are utilized for pesticide application, indicate below: Contractor Service Provided Initial Date of Application and Certification Number Frequency Indicate the name of staff responsible for Pesticides issues at the premises. Staff Name and Title: --------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- Asbestos v. Describe any formal Asbestos management programme in place w. Describe any formal procedures to audit compliance in the Asbestos Management Programme x. Have formal Surveys and inspections been conducted at the site to identify areas if and where Asbestos — containing materials are located y. If known, list the premises that have been identified as having Asbestos — containing materials and indicate whether the buildings are leased or owned, whether abatement is occurring or is planned, and the type of Asbestos — containing material(s) present. Premises Leased/ Abatement Asbestos — Containing Owned Action Material type * Use following codes: A = sprayed on insulation; B = Pipe insulation C = Vessel/Tank Insulation D = Equipment (describe, i.e. Ovens etc); E = Others (describe, i.e. floor tiles, bench tops, etc) 91 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Provide name of staff responsible for Asbestos Management issues: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.6 Water Supply Management (To be completed by Environmental Committee Member/HSE/Plant Manager) a. Indicate the source of water supply at the premises b. What are the uses of water supplied? c. Are water quality checks done? If so, please provide a copy of laboratory analysis d. Describe any on-site potable/process water treatment systems e. Indicate frequency of system maintenance/resin generation. Provide name of staff responsible for Asbestos Management issues: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.7 Wastewater Management (To be completed by Environmental Committee/HSE/Plant Manager) a. List the sources of wastewater, type of discharge and daily volumes for the following types of Wastewater: Sources Discharge Volume Frequency (Indicate units) i. Facility Process Water ii. Laboratory Wastewater iii. Sanitary Wastewater (Domestic/Kitchen) iv. Cooling Water Contact Noncontact v. Others (describe) 92 b. Provide details of any permits or applications on file pertaining to water pollution control regulations (i.e. Permit title and number, sources of wastewater covered, locations of discharge points, specific discharge standards, etc) c. Describe any analysis and type(s) of wastewater pre-treatment prior to discharge (i.e. oil separation, neutralization, filtration, ion exchange, carbon treatment, etc) d. Indicate locations of all discharge points. e. Describe operational specifications and maintenance schedules of the pre- treatment system. Have records been kept? f. Is any wastewater recycled? If so, describe briefly (i.e. treatment and use). g. Describe any formal criteria for reviewing the premises discharge strategies (i.e. reduce or eliminate discharges). h. Describe any written procedures to be followed in the event of accidental discharge standards. i. Are all relevant staff fully trained in the above procedures? j. Describe any wastewater compliance monitoring programmes in place. Where are records of all monitoring results kept? What is the frequency of monitoring? k. Were there ever any internal investigation and/or mitigation action taken for wastewater related issues? If so, specify l. Where do process wastewaters, including cooling waters go? Tick applicable descriptor. Municipal Waste Facility (via Sewers): --------------------------- On-Site waste Facility, via discharge to surface water --------------------------- Discharge to surface water without pre-treatment --------------------------- To a deep well --------------------------- To an irrigation system --------------------------- Others (describe) --------------------------- 93 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Provide name of staff responsible for Asbestos Management issues: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.8 Waste Management (To be completed by Environmental Committee/HSE/Plant Manager) a. Provide details of internal classification, source, nature, quantity and frequency of waste generated for: i. Dangerous Waste ii. Chemical Waste iii. Biological/Infectious Waste iv. Solid Waste (including obsolete equipment & scraps) v. Radioactive Waste vi. Other Wastes e.g. Used Oil (Specify) b. Provide details of any licenses, permits or applications on file (i.e. License/ permit and title, number, issuing agency, sources covered, special conditions, etc) in related to generation, storage, handling, disposal or transportation of these wastes. c. Provide details of any on-site waste or disposal systems (i.e. types of waste disposal system and capacity, type and quantity of waste disposed of, etc) for these wastes. d. Describe operational specifications and maintenance schedules of the pre- treatment system. If records have been kept, indicate location. e. Briefly describe any waste recycled (i.e. type, source, characteristics, treatment and use) f. Briefly describe any current waste minimization programmes (i.e reductions, re-use and recycling) and indicate responsible staff. g. Provide the following information for any off-site facilities used for waste treatment, storage or disposal in the past three (3) 94 Company Premises Type of Volume Treatment Disposal Method Name Name Waste (Per Month) h. Existing programme to audit regulatory compliance in place at the premises? Describe briefly. i. Has there been any internal investigation in relation to waste generation, storage, handling or disposal? If so, describe briefly. j. Where does Sanitary Waste go? Tick applicable description(s) i. Municipal Waste facility (via Sewers) ------------------------------------------ ii. On-Site waste facility, via discharge to surface water ------------------------ iii. Discharge to surface waste without pre-treatment ------------------------ iv. To a specific system ---------------------------------- v. Other (describe) ----------------------------------- k. How is non-hazardous Solid Waste disposed of at this Facility? Incineration: --------------------------------------------- Burial on Site ---------------------------------------------Burial in a Public or Commercial Landfill --------------------------------------------- Give address of location of Public or Commercial Landfill ----------------------- l. How does this Facility normally dispose of waste/used oils and solvents? Tick applicable descriptor(s) Incineration: ------------------------------------------ Supplemental Boiler Fuel : ------------------------------------------------- Sold or given to Contract recycler: ------------------------------------------------- Poured on the ground: ------------------------------------------ Others (describe) ------------------------------------------------- m. Does this Facility generate any waste that are considered toxic or hazardous or whose disposal is generally regulated? If yes, name the waste and approximate annual volume generated Describe how the hazardous waste are accumulated and stored before disposal Describe how these wastes are normally disposed of Indicate which functions are regulated: 95 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Regulated (Y/N) Regulatory Body Storing Transporting Treating Disposing n. Have personnel from your Facility ever inspected the Facilities to which Solid Hazardous wastes are sent for Treatment and/or Disposal? Yes No Don’t Know If yes, describe any problems that were observed: --------------------------------- ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ----------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.9 Air Quality Monitoring and Control (To be completed by Environmental Committee/HSE/Plant Manager) General a. Describe any formal policy or written guidance in relation to air quality (e.g. smoking policy, use of non-formaldehyde containing carpet underlay/ furniture, substitute ozone depleting substances in solvents, refrigerants and fire extinguishers, etc.) Office Operation b. Indicate the number of each type of the following equipment at this premises: Laser Printer ----------------------------------------------------------------------------- Photocopier ----------------------------------------------------------------------------- Facsimile Machine -------------------------------------------------------------------- Computer ----------------------------------------------------------------------------- Others (e.g. ozone Generator, specify) ------------------------------------------ c. Indicate all other significant sources of indoor air emissions/pollutants not covered above. 96 d. Has indoor air pollution at this premises been monitored in the past year? If so, are records of findings kept and where? e. Is there a programme to monitor the indoor air quality at this premises? If so, describe briefly. f. Describe any mitigation actions taken in the area with respect to indoor air quality improvement. g. Indicate any known respiratory symptoms or irritations experience by staff in this premises (i.e. frequent flu systems, sore throat, eye irritation, etc) h. Describe known time pattern of symptoms occurrence and relief (i.e. morning, afternoon, weekends, etc) i. How many process fume stacks are present at this Facility? Description/Function Height above Ground/Roof j. Is Arrestment Plant fitted on any Vents/Stacks? Yes/No If yes, give details/description k. How many and what size of Boiler(s) does the Facility have? Is it fired with: Gas: ----------------------------- Oil (If yes %) ------------------- Coal (if yes %) ----------------- Other ------------------------------ Approximate height of the Stack(s) in meters l. Does the emission stack (s) discharge at a height at least 3 meters above the highest point of the building roof? Yes No Don’t Know m. Is the exhaust ventilation greater than the air intake such that the Facility is under negative air pressure? Yes No Don’t Know n. List all relevant cooling towers, wet scrubbers, etc., and tick applicable descriptor Name (E.g. Foundry Cooling Tower) ----------------------------------------- Regularly Tested for Legionella species: ------------------------------------------ Frequency of Testing --------------------------------------------------- 97 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Treated with biocide ----------------------- Name of Biocide ------------- Is the equipment Registered with FMEnv./NESREA: ------------------------ o. How many Fork-Lift Trucks used in the Facility powered by: Are the Fork-Lift Trucks used in the Facility powered by: Battery: ------------------- Propane:------------------- Diesel: ---------------- p. Describe the type of Boiler water treatment chemical used: Is Boiler blow down discharged to the sewer? Yes/No To the Ground” Yes/No Elsewhere? (describe): ----------------------------------------------------------- ------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------ q. How many Cooling Towers are at this Facility? Describe the type of biocide and corrosion inhibitor added to the cooling water How is the Cooling Tower sludge dislodged of: Is Cooling Tower blow down discharged to the Sewer? To the ground? ------------------------------------------------------------------------ Elsewhere (describe): ---------------------------------------------------------------- r. Is Monitoring undertaken on any Emission, Discharge, etc If Yes, Specify: Source: Species Monitored Frequency of Monitoring Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ----------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 98 General Process Operation s. Identify operations conducted at the premises that involve air emission (i.e. handling of chemicals and solvents, biological sample preservations, etc). t. Is there an inventory of all emissions (including fugitive emissions) released from the area? u. Explain how the facility deals with fugitive emissions v. Describe any programme of updating emissions inventory w. Describe the air pollution control equipment installed and operating at the premises (i.e. particulate filters, scrubbers, etc) x. Indicate the number and location of stacks, vents or other outside emission points originating from the area. y. Provide details of any licenses or applications on file pertinent to ambient air quality regulations (i.e. license title and number, issuing agency, sources of air emissions, etc) z. Describe any formal criteria for reviewing the premises emission strategy (i.e. eliminate or reduce emissions). i. Has this area ever been under any internal investigation and/or taken mitigation action related to ambient air emissions? If so, specify ii. Describe any ambient air compliance monitoring programmes in place at the premises and the frequency. Are records kept of all monitoring results? iii. Describe any written procedures to be followed in the event that the set standard is exceeded iv. Are all relevant staff fully training in the above procedures? Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.10 Noise Monitoring and Control (To be completed by Environmental Committee Member/HSE/Plant Manager) a. Identify all operations or activities that may be substantially elevate noise beyond normal premises background levels. b. If applicable, describe any current practices to reduce noise levels at the premises c. Have there been any noise monitoring programmes undertaken at the premises? If so, describe briefly 99 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA d. Have there been any formal complaints received on noise generated within the area, If so, provide details Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.11 Transportation and Travel (To be completed by Environmental Committee Member/HSE/Plant Manager) a. Describe any formal car fleet procurement policies or selection criteria related to overall environmental performance (i.e. fuel type and economy, refrigerant use, emissions standards, noise level, recyclability of materials, paint use, etc) b. Is there an inventory of transportation devices operated by the Facility? Describe scope of the inventory (i.e fuel type and economy, emission level, maintenance requirement, etc). c. Describe scope of maintenance programme in place for all transportation devices. d. Is there any formal policy or guidance on spillage prevention and disposal of fleet maintenance wastes (i.e. engine oil, refrigerant, tyres, etc) e. Is there a programme in place to monitor air and noise emissions and to effect appropriate arrangement for corrective maintenance as required? f. Describe training/instruction provided to drivers/operators on increasing the fleet’s environmental performance (i.e. turn off idle engines, minimize number of trips, etc)? g. Is there any written policy or guidance on use of Facility Vs private vehicles? h. Existing guidance on staff transport arrangements to encourage use of public transportation? 100 i. Provide name of staff responsible for Transportation and Travel related issues at this premises. Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.12 Emergency Response Procedures (To be completed by Environmental Committee Member/HSE/Plant Manager) a. Attach copy of any formal emergency response procedures and/or contingency plans on: i. Disruption of water supply ii. Supplied water treatment system failure iii. Wastewater treatment system failure iv. Chemical/chemical waste spillage v. Dangerous materials/waste spillage vi. Biological/infectious materials/waste release vii. Radioactive materials/waste release b. Provide details of any equipment located in areas where emergencies have the potential to occur. c. Are the staff in these areas appropriately trained in emergency response procedures? Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 101 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 1.13 Staff Awareness and Training (To be completed by Environmental Committee Member/HSE/Plant Manager) Staff Awareness a. Are there regular general meetings on the improvement of the working environment? b. Has there been wide participation in specific environmental management issues in the office (e.g. campaigns on reduction of paper and energy usage)? If so, are staff members adequately informed of the specifics (i.e. objectives, approach etc.) Training c. Describe briefly the nature and topics of premises environmental training (workshops, seminars, campaigns/activities), offered in the past year d. Is the training programme offered to all relevant personnel? e. Have there been regular reviews to ensure the effectiveness of the training programme? f. Have the participants been involved in the training review process? Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.14 Publicity of Environmental Information (To be completed by Environmental Committee Member/HSE/Plant Manager) a. Describe any formal programme to ensure staff members responsible for publicity of environmental information have the relevant experience and adequate training. b. Are there any formal procedures to review adequacy of publicity materials? c. Describe any programme to ensure that information contained in the publicity materials are correct and up to date. 102 Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.15 Response Public Enquiries and Complaints (To be completed by Environmental Committee Member/HSE/Plant Manager) a. Describe any formal procedures or guidelines in enquiry referral (i.e. both internal and external). b. Does the Facility have any procedures in place to handle enquiries on Environmental information that is publicly available? If so, describe the procedures. c. Are there any procedures or guidelines available to handle complaints received from the public? If so, describe briefly. d. Describe any complaints from neighbours regarding Noise, Odour, Dust, or Nuisance, with indications of frequency of complaints. e. List all the Environmental Permits, Consents, and Registrations you have obtained and the operations or equipment they cover (include Import Permits, Discharge Consents, Waste Management Licenses, etc) f. Name and Designation of Person responsible for coordinating Environmental Management activities at this Facility. List and give details (Dates, etc) of all plant activities covered under Sections 5 and 8 of S.1.9 Regulation, 1991. Has a Plant Environmental Committee/Task Force been established to handle all Environmental Management Activities in this Facility? If yes, give details including the names and designation of the members. List and give details (Dates, etc) o all plants activities covered under Section 5 and 8 of S.1.9 Regulation, 1991 103 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA g. What are the principal agencies that regulate environmental matters at this Facility? i. Give applicable names ii. Do you have copies of all Environmental Laws and Regulations at the Facility? h. Which Environmental Regulatory Agencies have inspected the Facility and when? i. Has the Facility ever been cited for fined or violations of Environmental Laws? If yes, describe citation and/or fine. j. Has the Facility ever been cited or fined for violations of Occupational Health Laws? If yes, describe citation and/or fine k. Has the Facility ever been cited or fined for violations of Safety Laws? If yes, describe citation and/or fine l. Describe any complaints from employees regarding potential chemical exposures, Noise, Heat or symptoms suspected of being connected to workplace exposures? Describe frequency of complaints Provide name of staff responsible for Waste Management issues at this premises: Name and Title: --------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- 1.16 Environmental Concerns (To be completed by Environmental Committee Member/HSE/Plant Manager) a. What are the principal Environmental Concerns at this Facility? b. What are the principal Occupational Health Concerns at this Facility? c. Other comments 104 PRE-AUDIT QUESTIONAIRE COMPLETED BY: Name and Title: --------------------------------------------------------------------------- Premises: ---------------------------------------------------------------------------------- Location: ----------------------------------------------------------------------------------- Telephone No: ---------------------------------------------------------------------------- E-mail address: --------------------------------------------------------------------------- Date: --------------------------------------------------------------------------------------- 1. GENERAL INFORMATION PREMISE INFORMATION Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments Diagrams of premises layout 2. Drainage layout plans 3. Environmental reports (prepared-in-house or by external consultants) 4. Diagrams of ventilation ducting layout 5. Diagrams of lighting wiring layout 2. OVERALL ENVIRONMENTAL POLICY Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Department Environmental Policy Statement 2. Procedures and Schedules for reviewing Environmental Policy 3. Record of overall Environmental Performance Review Meetings 4. Departmental Environmental Structure 105 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 3. MATERIALS PROCUREMENT POLICY Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Procurement Policy 2. Procedures for Inventory keeping, updating and checking 3. Procedures for the review and selection of materials that are not environmentally detrimental 4. Guidelines on ‘green products’ for suppliers 4. ENERGY MANAGEMENT Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Energy use records for the past three (3) years - Gas - Electricity - Liquid Fuel - Solid Fuel Evaluation Frequency 2. Audit Reports or monitoring data on energy conservation 3. Procedures or guidelines for energy conservations 4. Documentation on energy conservation grades over the past three (3) years. 5. HAZARDOUS MATERIAL MANAGEMENT Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Procedures or guidelines for material management (i.e. specific storage and handling procedures etc). 2. List of any hazardous materials and chemical stored within the office areas 3. Diagrams showing the routes for hazardous materials and chemicals transport 4. Diagrams showing the storage areas, for hazardous materials and chemicals 106 Laboratory Operations/Public Service Information to be Reviewed Available Not Available Not Applicable Location of Documents/ Comments 1. Certification for the analyses being conducted 2. Document on contracted out laboratory analyses and copies of the laboratories’ certificate for the analyses 3. Evidence of analytical methods used in compliance with standards methods. 4. Dangerous goods/chemicals inventory. 5. List of permits for storage of dangerous goods and chemicals. 6. Procedures or guidelines for dangerous goods/chemical handling 7. Diagrams showing hazardous materials storage areas 8. Hazardous materials inspection logs 9. Material Safety Data Sheet (MSDS) file 10. Guidelines provided for training of staff in handling hazardous materials/ chemicals 11. Documentation/training for Personnel 12. Violation notices received 13. Alarm systems and evacuation procedures in case of an emergency Pesticides Information to be Reviewed Available Not Available Not Applicable Location of Documents/ Comments 1. Pesticides inventory 2. Pesticides storage area diagrams 3. Guidelines for pesticide handling 4. Records of the use of pesticides in office and laboratory areas for the past three years 5. Violation notices received in the past three years 107 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Asbestos Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Formal asbestos management plan or policy statement Asbestos — Containing Materials (ACM) inspection or survey reports ACM management or monitoring plans and copies of any ACM abatement or removal plans or certificate 4. Regulatory agency inspection 5. Notices of violation received pertaining to asbestos 6. List of any operations which generate asbestos waste 6. WATER SUPPLY MANAGEMENT Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. List of sources of water supply (including that for flushing) 2. Records of water consumption (office and laboratory) 3. Water Quality Monitoring Data 4. Details of water pre-treatment system 7. WASTEWATER MANAGEMENT Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Wastewater discharge license(s) 2. Expedient connection and site drainage plan 3. Effluent discharge monitoring data 4. Regulatory inspection reports 5. Violation notices received in the past 6. Floor plans the wastewater storage and discharge points 7. Accessibility of discharge point(s) for sampling 8. Details of existing wastewater treatment facilities 108 Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 9. Operation and maintenance manual(s) for wastewater treatment facility(ies) 10. Procedures or guidelines for collection, preparation and analysis of wastewater samples 8. WASTE MANAGEMENT Information to be Reviewed Available Not Not Applicable Location of Available Documents/ Comments 1. Permit(s) or license(s) for waste storage, transportation and disposal with specification of terms and conditions 2. Procedures or guidelines for waste handling 3. Guidelines for classification of waste 4. Diagrams showing waste storage areas and routes for waste handling 5. List of sources generating these wastes 6. Waste analysis data and profiles for all current waste streams 7. Waste analysis data and profiles for all current waste streams 8. Copies of any regulatory inspection reports 9. Any violation notices received 10. Waste transportation and disposal documentation (including waste contractor licenses and any associated documents) 11. Waste recycling and minimization plan and associated documents 12. Documents related to the disposal facilities used 13. Operating records of any disposal facilities 14. Any incident reports for the past three years 15. Waste control or management licenses issued from the appropriate authorities 16. Safety procedures or programmes 17. Details of waste segregation programme(s) 109 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Information to be Reviewed Available Not Not Applicable Location of Available Documents/ Comments 18. Dangerous Goods License(s) 19. Training records for personnel • Waste denotes dangerous waste, chemical waste, biological/infectious waste, radioactive waste and other wastes 9. AIR QUALITY MONITORING AND CONTROL Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Air Quality Policy 2. Air Quality Survey records or reports 3. Air quality monitoring data 4. Any Complaints related to emissions to the atmosphere or indoor environment Indoor Air Quality Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Guidelines for the use of office machines or operations to minimize gaseous emissions 2. Reports of any in-house investigation of emission sources 3. Details of mitigation measures taken and evaluation of its effectiveness 4. Details of indoor air quality improvement programme (s) External Air Emission Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. All permits related to air emission 2. Any violation notices regarding air emissions issued within the past three years 3. Investigation reports identifying any sources of air pollutant emissions 4. Diagrams of premise emission Location 5. Compliance, assessments, and/or sampling reports 110 Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 6. List of control apparatus for air emissions 7. Air Quality Monitoring Logs 8. Plan(s) for air emissions elimination or reduction 10. NOISE MONITORING AND CONTROL Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Noise Control Policy 2. Noise monitoring data or monitoring programme being exercised 3. Reports of any in-house investigation to identify the sources of noise emissions 4. Details of mitigation measures and their effectiveness 5. Details of programme for improvement of noise emission 6. Complaints related to noise emissions 11. TRANSPORTATION AND TRAVEL Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Departmental policy relating to transportation and travel 2. Records of reports for the use of Departmental Vehicles 3. Maintenance and overhaul procedures or guidelines for Departmental vehicles 4. Procedures for handling of chlorofluorocarbons (CFC) 5. Procedures for handling of use oil and antifreeze 6. Records of fuel consumption of Departmental vehicles 7. Data on the environmental performance of the Departmental vehicles 111 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 12. EMERGENCY RESPONSE PROCEDURES Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Emergency response procedures and contingency plans 2. Staff training record in emergency response procedures 13. STAFF AWARENESS AND TRAINING Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. List of any regular meetings on the improvement of the working environment 2. Copy of any Departmental environmental policy on staff training 3. List of staff training programmes relating to environmental matters 4. Details of criteria for selection of staff to attend the relevant training programme 5. Report on the effectiveness of training programme 6. Staff training record 14. COMMUNITY RELATIONS Information to be Reviewed Available Not Not Location of Available Applicable Documents/ Comments 1. Procedures or guidelines for the dissemination and/or publicity of environmental information 2. List of regular publications 3. Details of training programme for staff responsible for publicity of environmental information 4. Procedures or guidelines on responding to public enquiries and complaints 5. Records or reports of public enquiries and complaints 6. Staff training programme on public enquiry and complaint response. 112 ANNEXURE 3: MAJOR INDUSTRIAL SECTORS AND THEIR RELATED ENVIRONMENTAL ISSUES A. Manufacturing Sectors Sl Type of Sector Environmental Pollution Regulation and Require- Energy Safety Occu- Bio- No. compliance ment of pational diversity Air Water Solid Hazardous Company Health and (including Waste waste Policy loss of Noise) and self- Ecology regulation 1 Food Beverage ++ +++ ++ + ++ ++ + + - and Tobacco (Boiler/ dust) 2 Chemical and ++ +++ ++ ++ +++ ++ ++ ++ - Pharmaceutical (if it is for- (Storage mulation of unit) chemi- cal) 3 Domestic and ++ ++ +++ +++ ++ ++ ++ ++ - Industrial rubber and foam 4 Base Metals, +++ + + +++ +++ ++ ++ - Iron and Steel and Fabricated metal products 5 Pulp, paper and ++ +++ ++ + +++ ++ ++ ++ + paper products printing, publishing and packaging 6 Electrical & + (without ++ - Electronics solvent) +++ +++ +++ +++ +++ ++ (with +++ - solvent) 7 Textile wearing, ++(Boiler) +++ (if ++ + +++ + + + - carpet, leather/ dying is included) 8 Wood & wood + (Noise) ++ ++ +(chemical ++ + + + + products contains) including furniture 9. Non-metallic +++ + +++ +++ + ++ +++ Mineral Products 10. Motor Vehicles ++ ++ ++ + ++ ++ ++ ++ - and Misc (if manufacturing) 11. Battery Control ++ +++ +++ +++ ++ ++ ++ ++ +++ B. Infrastructural 113 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA A. Manufacturing Sectors Sl Type of Sector Environmental Pollution Regulation and Require- Energy Safety Occu- Bio- No. compliance ment of pational diversity Air Water Solid Hazardous Company Health and (including Waste waste Policy loss of Noise) and self- Ecology regulation 1 Port, Harbours +++ +++ +++ +++ +++ +++ +++ +++ +++ and Terminals (waste/ (Aquatic) used oil) 2. Electric power +++ +++ +++ + +++ +++ +++ +++ ++ (for generation (waste oil) Trans- Transmission mission and distribution system 3 Real estate, ++ +++ ++ + + ++ + + - Housing estate Government building 4 Urban +++ +++ +++ + +++ +++ ++ ++ ++(if development (Mobility) (Accident near due to forest sewer line area) cleaning 5 Mining +++ +++ +++ ++ +++ ++ +++ +++ +++ 6 Domestic - +++ ++ - + + + + - water and sanitation 7 Waste ++ ++ +++ + ++ - +++ ++ - management facilities, landfill 8 Quarries, +++ - ++ + ++ + + ++ ++ construction asphalt industry 9 Healthcare ++ (if inci- ++ + ++ +++ +++ + ++ ++ - industry nerator (sewage) (Bio- ope- medical rated by waste) hospital) 114 A. Manufacturing Sectors Sl Type of Sector Environmental Pollution Regulation and Require- Energy Safety Occu- Bio- No. compliance ment of pational diversity Air Water Solid Hazardous Company Health and (including Waste waste Policy loss of Noise) and self- Ecology regulation 10 Roads + (Due + ++ (ter- ++ (waste ++ - +++ - +++ (if to traffic minals/ oil from passing NIOSE eateries) work- through near shops) forest habitat area) 11 Railways ++ +++ ++ ++ +++ +++ + +++ (if (NIOSE) (waste oil passing from main- through tenance forest yards) area) 12 Water + ++ + + + + + + Transportation, (aquatic) shipping and ferry 13 Air ++ + ++ + +++ +++ +++ + + transportation, (NOISE) shipping and ferry 14 Watershed - +++ + - ++ - - ++ and wetland (aquatic) management 15 Hospitality ++ ++ ++ - ++ + + - - Industry 16 Quarry and +++ + ++ + ++ ++ +++ +++ + Blasting Operation 17 Construction +++ + +++ + ++ + + +++ + and Asphalt Operation 18 Logging + + ++ + ++ + + + + 19 Wildlife + + + + + + + + + LEGEND + Low significance ++ Medium significance +++ High significance NOTE: The ratings (in Annex 4) for the Food & Beverages sector, is a generalized arbitrary rating of the likelihood of severity of impact which may not be the same or apply for some of the facilities or classes of industries in the sector. The environmental pollution index of facilities and the sensitivities of different ecosystems on which they operate result in different effects and thus ratings of the parameters of Quality/Quantity of Water-use, Wastewater Quality, Safety, Hazardousness of waste and Energy requirements as well as other effects and their contributions to climate change differs with levels of significance. 115 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ANNEXURE 4: FORMAT FOR ENVIRONMENTAL AUDIT STATEMENT-MANUFACTURING INDUSTRIES PART A 1. Name and address of the owner/occupier of the industry 2. Production capacity(with units) 3. Year of establishment 4. Date of last environmental audit submitted 5. GIS coordinate of the unit 6. Brief background on type of industry, process, raw material, fuel, water and wastewater 7. Type of air and water polluting activities nearby to the industry, what they produce, raw material [Consultant can get the name of the industry and details can be provided by the regulatory agency] PART B 8. Product type and generation S. no. Type of product Quantity (tonne or in kilo litre) Current audit report (Year) Previous audit report (Year) 9. Water sourcing Types of sources Water consumption in KL Current audit report Previous audit report (year) (year) Groundwater (bore well) Surface water (river, lake) Seawater Third-party water (tankers, others) 116 10. Water consumption Different water-consuming areas Water consumption per unit of product/output Current audit report (year) Previous audit report (year) Domestic Utility(cooling towers, boilers) Process Others 11. Details of boreholes Details of boreholes Current audit report (year) Previous audit report(year) Number of boreholes Depth and head of boreholes Average running hours of boreholes Number of piezometers installed For ground water monitoring 12. Details of flowmeters Description Current audit report Previous audit report (year) (year) Type of flow meter installed i) Electromagnetic ii) Mechanical type iii) Others, if any Number of flow meters installed at different locations, When were they last calibrated, mention the date Share the calibration certificates for each meter. 13. Waste water generation Current audit report (year) Previous audit report (year) Total waste water generated in KL Quantity of waste water recycled or Reused in KL Waste water discharge point •Surface water i) With treatment ii) Without treatment •Seawater i) With treatment ii) Without treatment Other , specify Notes: Provide the diagram for the waste water treatment scheme; 117 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 14. Raw material consumption Name of raw material Consumption of raw material (in tonne or per tonne of product) including chemical Current audit report (year)specify Previous audit report (year)specify unit unit 1 2 3 15. Fuel consumption Name of fuel Consumption of fuel(in tonne/litre/kg or per tonne of product) Current audit report (year)specify unit Previous audit report (year)specify unit 1 2 3 16. Energy consumption Energy consumption Consumption of energy in kwH or per tonne of product) Current audit report (year)specify unit Previous audit report (year)specify unit 1 2 3 118 PART C 17. Pollution discharge to environment/unit of output(parameters as specified in license condition issued) Pollution Parameter Quantity of pollutants Concentration of Prescribed standard discharged(mass/day) pollutants Water 1. pH 2. SS 3. BOD 4. COD Note:Add more parameters Air 1. PM 2. SOx 3. NOx Note: Add more parameters PART D 18. Details of hazardous waste(as specified under license condition) Hazardous waste Current financial report Previous financial report Quantity Quantity Quantity Quantity Quantity Quantity recycled sold disposed recycled sold disposed From process i. ii. From Pollution Control Device i. ii. PART E 19. Details of non-hazardous waste Non-hazardous waste Current financial report Previous financial report Quantity Quantity Quantity Quantity Quantity Quantity recycled sold disposed recycled sold disposed From process i. ii. From Pollution Control Device i. ii. PART F 20. Describe qualitatively disposal practices adopted for these categories of waste. 119 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA PART G 21. Impact of pollution abatement measures taken on conservation of natural resources and benefit thereof. PART H 22. Additional measures/investment proposal for environment protection abatement of pollution, prevention of pollution. PART I 23. Indicate both qualitatively and quantitatively how the industry plans to reduce its pollution, reduce its natural resource consumption, and maximize its waste consumption as raw material/fuel. Specify the target and deadline. Part J a) Number of people interviewed from local community and their overall feedback on environmental and other issues b) Number of people interviewed from district government offices and their overall feedback on environmental and other issues Stakeholder Feedback Recommendations for improvement Locals Details of environmental and others What do they think company should do issues highlighted to improve their environmental or other issues Government office 1 Government office 1 120 ANNEXURE 5: FORMAT FOR ENVIRONMENTAL AUDIT STATEMENT-REAL ESTATE/HOUSING COMPLEX PART A 1. Name and address of the owner/occupier of the housing complex 2. Number of apartments 3. Occupancy status 4. Year of establishment 5. Date of last environmental audit submitted 6. GIS coordinate of the unit 7. Brief background on type of complex, other facilities in the complex, fuel, water and wastewater 8. Type of any air and water polluting activities nearby to the complex, what they produce, raw material [Consultant can get the name of the industry and details can be provided by the regulatory agency] PART B 9. Facilities provided S. no. Type of Current audit report (Year) Previous audit report (Year) facilities 1 Swimming pool 2 Gym 3 Commercial area etc 10. Water sourcing Types of sources Water consumption in KL Current audit report (year) Previous audit report (year) Groundwater(bore well) Surface water(river, lake) Seawater Third-party water (tankers, others) 121 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 11. Water consumption Different water-consuming areas Water consumption per unit of product/output Current audit report (year) Previous audit report (year) Domestic Gardening Cleaning of common areas Others 12. Details of boreholes Details of boreholes Current audit report (year) Previous audit report(year) Number of boreholes Depth and head of boreholes Average running hours of boreholes Number of piezometers installed for groundwater monitoring 13. Details of flow meters Description Currentaudit report Previousaudit report (year) (year) Type of flow meter installed i) Electromagnetic ii) Mechanical type iii) Others, if any Number of flow meters installed at different locations, When were they last calibrated, mention the date Share the calibration certificates for each meter. 14. Wastewater generation Current audit report (year) Previous audit report (year) Total wastewater generated in KL Quantity of wastewater recycled or Reused in KL Wastewater disposal mechanism o Municipal sewer o Soak pit/septic tank o In-house sewage treatment plant o Other , specify Notes: Provide the diagram for the wastewater treatment scheme; 122 15. Energy consumption Energy consumption Consumption of energy in kwH) Current audit report (year) Previous audit report (year) From Grid From generator sets 16. Details of solid waste generated Current audit report (year) Previous audit report (year)specify unit Type of waste specify unit Domestic Other, specify PART C 17. Describe qualitatively disposal practices adopted for these categories of waste. PART D 18. Impact of pollution abatement measures taken on conservation of natural resources and benefit thereof. PART E 19. Additional measures/investment proposal for environment protection abatement of pollution, prevention of pollution. PART F 20. Indicate both qualitatively and quantitatively how the industry plans to reduce its pollution, reduce its natural resource consumption, and maximize its waste consumption. Specify the target and deadline. 123 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ANNEXURE 6: FORMAT FOR ENVIRONMENTAL AUDIT STATEMENT-MINING PART A 1. Name and address of the owner/occupier of the mine 2. Area licensed for mining activity (Acre/hectare) 3. Area covered presently under mining (Acre/hectare) 4. Production capacity (with units) 5. Type of mining (coal mineral) 6. Year of establishment 7. Date of last environmental audit submitted 8. GIS coordinate of the unit 9. Brief background on process, raw material, fuel, water and wastewater 10. Type of air and water polluting activities nearby to the industry, what they produce, raw material [Consultant can get the name of the industry and details can be provided by the regulatory agency] PART B 11. Product type and generation S. no. Type of product Quantity (tonne) Current audit report (Year) Previous audit report (Year) 12. Water sourcing Types of sources Water consumption in KL Current audit report (year) Previous audit report (year) Groundwater(borehole) Surface water(river, lake) Seawater Third-party water (tankers, others) 124 13. Water consumption in m3/day Different water-consuming areas Water consumption per unit of product/output Current audit report (year) Previous audit report (year) Domestic Mining Activity Others, specify 14. Details of boreholes Details of boreholes Current audit report (year) Previous audit report(year) Number of boreholes Depth and head of boreholes Average running hours of boreholes Number of piezometers installed For groundwater monitoring 15. Details of flow meters Description Current audit report Previous audit report (year) (year) Type of flow meter installed i) Electromagnetic ii) Mechanical type iii) Others, if any Number of flow meters installed at different locations, When were they last calibrated, mention the date Share the calibration certificates for each meter. 125 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 16. Wastewater Generation Description Current audit report (year) Previous audit report (year) Total wastewater generated in KL Waste water generated from mining activity Quantity of acidic water generation, if any Water generated from breaching Domestic waste water Quantity of wastewater recycled or Reused in KL Wastewater discharge point •Surface water i) With treatment ii) Without treatment •Seawater i) With treatment ii) Without treatment Others, specify Notes: Please provide the diagram for the wastewater treatment scheme; 17. Fuel consumption Name of fuel Consumption of fuel(in tonne/litre/kg or per tonne of product) Current audit report (year)specify unit Previous audit report (year)specify unit 1 2 3 126 18. Energy consumption Energy consumption Consumption of energy in kwH or per tonne of product) Current audit report (year)specify unit Previous audit report (year)specify unit 1 Domestic 2 Mining 3 Others, specify PART C 19. Pollution discharge to environment/unit of output (parameters as specified in license condition issued) Pollution Parameter Quantity of pollutants Concentration of Prescribed standard discharged(mass/day) pollutants Water pH SS BOD COD Note: Add more parameters Air PM Sox Nox Note: Add more parameters PART D 20. Details of solid waste generated Type of waste Current audit report (year)specify unit Previous audit report (year) specify unit Domestic Overburden Hazardous waste (used/waste oil) PART E 21. Describe qualitatively disposal practices adopted for these categories of waste. 127 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA PART F 22. Assessment of Biodiversity S No Flora Fauna Biodiversity Index Name of species Population Name of Population of Current At time of of species species species EIA 1. 2 3 PART G 23. Impact of pollution abatement measures taken on conservation of natural resources and benefit thereof. PART H 24. Additional measures/investment proposal for environment protection abatement of pollution, prevention of pollution. PART I 25. Indicate both qualitatively and quantitatively how the industry plans to reduce its pollution, reduce its natural resource consumption, and maximize its waste consumption as raw material/fuel. Specify the target and deadline. Part J a) Number of people interviewed from local community and their overall feedback on environmental and other issues b) Number of people interviewed from district government offices and their overall feedback on environmental and other issues Stakeholder Feedback Recommendation for improvement Locals Details of environmental and others What do they think company issues highlighted should do to improve their environmental or other issues Government office 1 Government office 2 128 ANNEXURE 7: FORMAT FOR ENVIRONMENTAL AUDIT STATEMENT-RAIL ROADS PART A 1. Name and address of the owner/occupier of the industry 2. Year of establishment 3. Date of last environmental audit submitted 4. Brief background on type of industry, process, raw material, fuel, water and wastewater 5. Number of large stations 6. Number of railway colonies 7. Number of corridor passing through forest area and provide GIS coordinate of each corridor 8. Number of dense habitat on the railway track along with GIS coordinate of each habitat PART B 9. Water sourcing Types of sources Water consumption in KL Current audit report (year) Previous audit report (year) Groundwater(borehole) Surfacewater(river, lake) Third-party water (tankers, others) 10. Water consumption in m3/day Different water-consuming areas Water consumption per unit of product/output Current audit report (year) Previous audit report (year) Domestic o Supply to railway colonies o Supply to large stations o Supply to rail coaches Maintenance yard 129 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 11. Wastewater generation Current audit report (year) Previous audit report (year) Total wastewater generated in KL Quantity of wastewater recycled or Reused in KL Wastewater discharge point •Municipal Sewer i) With treatment ii) Without treatment •Surface water i) With treatment ii) Without treatment Notes:Please provide the diagram for the wastewater treatment scheme; 12. Fuel consumption Name of fuel Consumption of fuel(in tonne/litre/kg or per tonne of product) Current audit report (year)specify unit Previous audit report (year)specify unit 1 2 3 13. Energy consumption Energy consumption Consumption of energy in kwH or per tonne of product) Current audit report (year)specify unit Previous audit report (year)specify unit 1 2 3 130 14. Noise o Status of noise generation near congested habitats (db) o Status of noise generation at forest area particularly near animal corridor (db) 15. Details of solid waste generated Type of waste Current audit report (year) Previous audit report (year) specify unit specify unit Domestic o from railway colonies o From large railway stations o From Rail coaches Excreta generation from rail coaches Hazardous waste (used/waste oil) PART C 16. Describe qualitatively disposal practices adopted for these categories of waste. PART D 17. Assessment of Biodiversity S No Flora Fauna Biodiversity Index Name of species Population Name of Population of Current Previous of species species species year 1. 2 3 PART E 18. Impact of pollution abatement measures taken on conservation of natural resources and benefit thereof. PART F 19. Additional measures/investment proposal for environment protection abatement of pollution, prevention of pollution. PART G 20. Indicate both qualitatively and quantitatively how the industry plans to reduce its pollution, reduce its natural resource consumption, and maximize its waste consumption as raw material/fuel. Specify the target and deadline. 131 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Part H a. Number of people interviewed from local community and their overall feedback on environmental and other issues b. Number of people interviewed from district government offices and their overall feedback on environmental and other issues Stakeholder Feedback Recommendation for improvement Locals Details of environmental and others What do they think company issues highlighted should do to improve their environmental or other issues Government office 132 ANNEXURE 8: FORMAT FOR ENVIRONMENTAL AUDIT STATEMENT-PORT AND HARBOUR PART A 1. Name and address of the port along with map of the port 2. Total area covered (acre/hectare) 3. Total capacity- Cargo handling (tonnes/ year) 4. Year of establishment 5. Date of last environmental audit submitted 6. Brief background on type of industry, process, raw material, fuel, water and wastewater PART B 7. Cargo handling S. no. Type of cargo Quantity(tonnes) Current audit report (Year) Previous audit report (Year) 8. Water sourcing Types of sources Water consumption inKL Current audit report (year) Previous audit report (year) Groundwater(borehole) Surface water(river, lake) Seawater Third-party water/ municipal supply 9. Water consumption Different water-consuming areas Water consumption per unit of product/output Current audit report (year) Previous audit report (year) Domestic o Housing complex o Office complex Ship maintenance yard Others 133 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA 10. Wastewater generation Current year Previous year Domestic water o Housing complex o Office complex Storm water Waste water from ship maintenance yard Wastewater discharge point •Seawater i) With treatment ii) Without treatment Notes: Please provide the diagram for the wastewater treatment scheme PART C 11. Details of waste generated Type of waste Current audit report (year) Previous audit report (year)specify specify unit unit Domestic o from housing complex o From port area Dredging overburden Hazardous waste (used/waste oil/ paint/chemcials) from maintenance yard PART D 12. Describe qualitatively disposal practices adopted for these categories of waste. 134 PART E 13. Impact of pollution abatement measures taken on conservation of natural resources and benefit thereof. PART F 14. Assessment of aquatic ecosystem and water quality around dredging area PART G 15. Additional measures/investment proposal for environment protection abatement of pollution, prevention of pollution. PART H 16. Indicate both qualitatively and quantitatively how the industry plans to reduce its pollution, reduce its natural resource consumption, and maximize its waste consumption as raw material/fuel. Specify the target and deadline. 135 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ANNEXURE 9: FORMAT FOR ENVIRONMENTAL AUDIT STATEMENT-HEALTH CARE FACILITY PART A 1. Name and address of the owner/occupier of the healthcare facility 2. Number of beds 3. Average occupancy (in percentage) 4. Facilities: OPD Emergency ICU Pathology Radiology 5. Year of establishment 6. Date of last environmental audit submitted 7. GIS coordinate of the unit 8. Brief background about the unit PART B 9. Water sourcing Types of sources Water consumption in KL Current audit report (year) Previous audit report (year) Groundwater(borehole) Surface water(river, lake) Third-party water (tankers, others) 10. Water consumption Different water-consuming areas Water consumption per unit of product/output Current audit report (year) Previous audit report (year) Domestic Utility(fire, cooling, steam) Health care service Laboratory water 11. Wastewater generation Current year Previous year Total wastewater generated in KL o Domestic o Liquid chemical waste Quantity of wastewater recycled or Reused in KL 136 Current year Previous year Wastewater discharge point •Surface water i) With treatment ii) Without treatment •Seawater i) With treatment ii) Without treatment Note: Please provide the diagram for the wastewater treatment scheme 12. Fuel consumption Name of fuel Consumption of fuel(in tonne/litre/kg or per tonne of product) Current audit report (year)specify unit Previous audit report (year)specify unit 1 2 13. Energy consumption Energy consumption Consumption of energy in kwH) Current audit report (year)specify unit Previous audit report (year)specify unit 1 2 3 PART D 14. Waste Generation Type of waste Quantity generated Current Quantity generated Previous audit report (year)specify unit audit report (year)specify unit o Anatomical waste (human) o Anatomical waste (animal) Soiled waste (items contaminated with blood and fluid) o Expired and discarded medicines o Chemical waste o Microbiology, biotechnology and other clinical waste o Waste sharps including metals (needle, syringes) o Contaminated waste such as tubing bottles, urine bags, intravenous tubes 137 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA Type of waste Quantity generated Current Quantity generated Previous audit report (year)specify unit audit report (year)specify unit o Glass wares (broken and discarded) o Discarded bedding and linen o Domestic waste 15. Waste Disposal Type of waste Current audit report (year) Previous audit report (year) specify unit specify unit o Quantity incinerated with autoclaving/microwaving o Quantity directly incinerated (without autoclaving) o Quantity sent to recyclers o Quantity sent to municipality PART E 16. Describe qualitatively disposal practices adopted for these categories of waste. PART F 17. Provide the details of manifest system for waste disposal PART G 18. Impact of pollution abatement measures taken on conservation of natural resources and benefit thereof. PART H 19. Additional measures/investment proposal for environment protection abatement of pollution, prevention of pollution. PART I 20. Indicate both qualitatively and quantitatively how the industry plans to reduce its pollution, reduce its natural resource consumption, and maximize its waste consumption as raw material/fuel. Specify the target and deadline. 138 PART J a) Number of people interviewed from local community and their overall feedback on environmental and other issues b) Number of people interviewed from district government offices and their overall feedback on environmental and other issues Stakeholder Feedback Recommendation for improvement? Locals Details of environmental and others What do they think company should issues highlighted do to improve their environmental or other issues Government office 1 139 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ANNEXURE 10: FORMAT FOR ENVIRONMENTAL AUDIT STATEMENT-LANDFILL PART A 1. Name and address of the owner/occupier of the industry 2. Ownership- Municipality (urban local body) or private (authorized by regulatory agency) 3. Design capacity (in tonnes) 4. Design period 5. Designed population (projected population as per designed period) 6. Area licensed for landdfill activity (Acre/hectare) 7. Area covered presently under landfill (Acre/hectare) 8. Year of establishment 9. Date of last environmental audit submitted 10. GIS coordinate of the unit 11. Brief background on process, raw material, fuel, water and wastewater 12. Type of air and water polluting activities nearby to the facility, what they produce, raw material [Consultant can get the name of the industry and details can be provided by the regulatory agency] PART B 13. Quantity of municipal waste accepted S. no. Type of waste Quantity(tonne/year) Current audit report (Year) Previous audit report (Year) Wet waste (Organic waste) Dry waste (recyclable) Dry waste (inert/land fillable) 14. Water sourcing Types of sources Water consumption in KL Current audit report (year) Previous audit report (year) Surface water(river, lake) Municipal supply Third-party supply (tankers, others) Note: No water should be extracted for groundwater 140 15. Water consumption Different water-consuming areas Water consumption in KL Current audit report (year) Previous audit report (year) Domestic Landfill activity Others, specify 16. Wastewater Generation Description Current audit report (year) Previous audit report (year) Domestic Leachate Wastewater discharge point Surface water i) With treatment ii) Without treatment Municipal Sewer iii) With treatment iv) Without treatment Notes:Please provide the diagram for the wastewater treatment scheme; 17. Energy consumption Energy consumption Consumption of energy in kwH) Current audit report (year)specify unit Previous audit report (year)specify unit 1 Domestic 2 Landfill 3 Others, specify 18. Fuel consumption Name of fuel Consumption of fuel(in tonne/litre/kg) Current audit report (year)specify unit Previous audit report (year)specify unit 1 2 3 141 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA PART C 19. Pollution discharge to environment(parameters as specified in license condition issued) Pollution Parameter Quantity of pollutants Concentration of Prescribed standard discharged(mass/day) pollutants leachate pH SS BOD COD Heavy metals Note: Add more parameters Air NH3 H2S Ch4 PM Note: Add more parameters Groundwater pH COD TDS Heavy metals PART D 20. Provide the percentage of population currently covered and strategies to cover entire population in collection network PART E 21. Provide the number of trucks/tractors engaged for collection of municipal waste along with the number owned by municipal authority and private owners. PART F 22. Impact of pollution abatement measures taken on conservation of natural resources and benefit thereof. PART G 23. Additional measures/investment proposal for environment protection abatement of pollution, prevention of pollution. 142 PART H 24. Indicate both qualitatively and quantitatively how the facility plans to reduce its pollution, reduce its natural resource consumption, and maximize its waste consumption as raw material/fuel. Specify the target and deadline. Part I a) Number of people interviewed from local community and their overall feedback on environmental and other issues b) Number of people interviewed from district government offices and their overall feedback on environmental and other issues Stakeholder Feedback Recommendation for improvement Locals Details of environmental and others What do they think company issues highlighted should do to improve their environmental or other issues Government office 1 Government office 2 143 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA ANNEXURE 11: CHECKLIST FOR REVIEW OF ENVIRONMENTAL REPORTS S/No Description Document needed for Yes No Remark proof Registration status 1. Is the auditor/audit firm certified NESREA certificate If not present, return the with NESREA report 2 Have all members of the audit Disclaimer form If not present, return the team agreed on the report report Layout plan and housekeeping 3 Has the report mentioned any Layout plan drawing If yes, what is the congestion in the project and recommendation given susceptible risk? by the auditor 4 Is the storage area properly Photos of storage areas If not, what is the ventilated, well-spaced and the recommendation given raw material/ products kept by the auditor properly stacked? 5 Is the storm water drain properly Photos of storm water If not, what is the laid down and well maintained? drain recommendation given by the auditor 6 Is there any spillage and leakage Photos of premises If yes, what is the in the project premises? recommendation given by the auditor 7 Are the internal roads and working Photos of the roads and If not, what is the places clean and well maintained? other spaces recommendation given by the auditor Raw material and Production details 8 Is the production figure as per Granted license If not, ask for license condition? clarification 9 Has the auditor checked the Production report/log book If not, ask to provide the production figures with the record technical team 10 Are the production figures given Sale tax document If not, ask to provide the by the plant matched with the record figures of other agencies like tax department? 11 Is the raw material as per the Granted license If not, ask for license condition? clarification 12 Has the auditor checked the raw Log book of storage If not, ask to provide the material consumption with the log record book of the storage 13 Did the auditor make the material If not, the auditor may balance (applicable only for be asked to provide manufacturing sector)? 144 S/No Description Document needed for Yes No Remark proof 14 If S.no 13 is yes, is the raw material consumption high compared to material balance? 15 If s.no 14 is yes, what is the reason What are the thereof? recommendations given i)Is it due to impurities so that effective raw material is less? ii)Is the production process condition not controlled properly? iii)Is material handling not proper and resulting in spillage? iv)Is the requirement as per the demand of the reaction? v)Is there any off- specific product? vi) any other reason Water conservation and waste water generation 16 Is the water consumption as per Granted license If not, ask for the license? clarification 17 Did auditor make any water Provide the water balance If not, ask the auditor balance for the project? to re-submit the report with water balance 18 If S. no is yes, is the water If not measured, has the quantities mentioned in the water auditor recommended balance measured or estimated? the plant to install flow meters? 19 If estimated, has the report If not, ask the auditor provided any rationale for to re-submit the report estimates? providing the rationale. 20 Did the auditor indicate the area If not, ask for of loss of water or water recycled? clarification 21 Is the quantity of wastewater as Check the granted license If not, are there any per the license condition? reasons listed for exceeded quantities 22 Is there any designated outlet for Photos of designated If not, has the auditor discharge of wastewater fitted outlet recommended to with flow measurement device? construct the outlet 23 If S. no 22 is yes, has the auditor Photos of flow If not, ask the audit measured the waste water measurement team to provide the quantity at outlet rationale for the quantity provided 145 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA S/No Description Document needed for Yes No Remark proof 24 Has the auditor tested quality of Laboratory report If not, ask to conduct the waste water discharged? waste water sampling and provide report 25 Are the values of parameters If not, ask for tested comply with the standards? clarification 26 Is the provided wastewater Provide performance If performance treatment adequate? evaluation report of waste evaluation not done, ask water treatment plant for reasoning 27 If s.no 26 is no, is there any recommendation provided? 28 Is the entire waste water Photos of the waste water If not, what areas has treatment plant well maintained? treatment plant the auditor identified for improvement and what recommendations are provided. Waste generation and management 29 Has the report provided the list of all hazardous and non-hazardous waste along with its quantity generated from the project? 30 Is the quantity of waste generated Provide industry log book If yes, what exceeds the license? for generated waste recommendations are provided 31 Does the industry dispose the Proof for disposal of all If not, what waste in an environmentally safe kind of waste recommendation are manner? provided 32 Has the audit report identified If yes, whether recyclable/reusable waste for auditor has provided effective recycle/reuse? recommendations on where it can be applied. 33 Are all the containers holding Photos of hazardous waste What is the observation hazardous waste well-maintained storage of the auditor? and stored properly? Air Pollution and measures 34 Has the audit report identified If not, ask for sources of air pollution explanation 35 If s.no 34 is yes, is the air Mention the sources like pollutant generated through boiler, heater, generator combustion? sets etc 36 Has the report provided the type Check logbook of the If not, ask the auditor to and quantity of fuel used? industry for quantity provide the details 37 Are there any air pollutant from If yes, are the sources the process? and type of pollutant identified? 146 S/No Description Document needed for Yes No Remark proof 38 Are the pollutants from process If not, ask for the quantified? clarification 39 If s.no 38 is yes, is the measured If measured, provide If estimated, provide or estimated laboratory reports rationale used for the estimation 40 Has the industry installed Air Photos of APCDS If not, what are reasons pollution control devices (APCDs)? listed in the report 41 Is the performance of APCD Check Performance If not, has the auditor adequate? evaluation report of APCD recommended any modification in the device or installation of an appropriate one. 42 Is there any stack monitoring If yes, provide monitoring If not, has the auditor programme in place by the datasheet of project recommended any project? monitoring programme 43 Has the auditor performed any If yes, provide the If not, provide stack monitoring during the audit laboratory report explanation period? 44 Does the monitoring results If not, has the auditor matches with the results of the identified any reasons industry? for the difference Biodiversity Assessment (applicable for line and mining projects) 45 Has the auditor performed If yes, provide photos If not, reject the report biodiversity monitoring (type of and ask to re-submit species and population) for flora after performing and fauna assessment 46 Is any biodiversity index prepared If not, ask the auditor to by the auditor? provide the same 47 If s.no 46 is yes, does the present If yes, has the index less than the index provided report identified the in EIA species lost. What recommendation has been provided by the auditor for restoration of lost species? Health and Safety 48 Did the project have safety report? If not, what are the comments of the auditor 49 Has the auditor visited the If not, ask for identified hazard areas justification 50 If s. no 49 is yes, are the measures If not, what are the mentioned in safety report recommendation of the properly implemented auditor 147 NATIONAL GUIDELINES FOR ENVIRONMENTAL AUDIT IN NIGERIA S/No Description Document needed for Yes No Remark proof 51 Has the auditor identified major If yes, what are the environmental and health concerns measures given by in case of major accident auditor 52 Has the report mentioned number If yes, what are the of accidents happened in the remedial measures taken projects and how many are fatal? 53 Has there any accident reported If yes, what are actions which has affected the people/ taken environment outside the premises of the project? 54 Does the project have regular If yes, provide the medical If not, what are the health check-up programme for reports recommendation of the employees as well as nearby auditor habitants 55 Is there any co-relation between If yes, what actions has health issues mentioned in the taken by the project medical report and pollutants from project 148 ANNEXURE 12: CLASSIFICATION OF FACILITIES For Large Facilities: i. Staff strength: Greater than 50 workers and mechanized; ii. Land mass: From 2,000 — 5,000 square meters and mechanized. For Medium Facilities: i. Staff strength: Greater than 10 workers and less than 50 workers and mechanized; ii. Land mass: From 1,000 — 2,000 square meters and mechanized. ANNEXURE 13: CLASSIFICATION OF FACILITIES IN THE HOUSING SECTOR Any building above sixty (60) rooms and two (2) hectares should conduct Environmental audit ANNEXURE 14: CLASSIFICATION OF FACILITIES IN THE CONSTRUCTION SECTOR Any 1 km road awarded and still under construction after the 5 years EIA certificate has elapsed should conduct Environmental audit. 149 56 Lome Crescent, Wuse Zone 7 NESREANigeria NESREANigeria NESREANigeria w w w. n e s re a . g ov. n g