Water Resources (Burnett Basin) Plan 2000
صدر في 2000-12-14 · النص بتاريخ 2026-10-01
القانون العام والإرشادات الرسمية منشورة بوصفها أبحاثاً. ليست مشورة قانونية أو ضريبية أو مالية.
البحث نفسه مكتوب بالإنجليزية. العناوين والوسوم مترجمة؛ أما النتائج والاقتباسات فغير مترجمة.
عن هذا القانون
- اللغة
- English
- النوع
- لائحة
- المنظمة
- European Union
- الدولة
- أستراليا · Queensland
- الموضوعات
- Water
- الكلمات المفتاحية
- water resources management, policy/planning, allocation/quota, monitoring, basin/catchment/watershed, Indigenous Peoples, inland waters
أين تقرؤه
لا يوجد رابط مصدر مسجل لهذا القانون.
النص
نص القانون نفسه، مادةً مادة، كما هو محفوظ. لكل مادة رابطها.
Queensland Water Act 2000 Water Resource (Burnett Basin) Plan 2000 Reprinted as in force on 18 December 2009 Reprint No. 2A This reprint is prepared by the Office of the Queensland Parliamentary Counsel Warning—This reprint is not an authorised copy Information about this reprint This plan is reprinted as at 18 December 2009. The reprint shows the law as amended by all amendments that commenced on or before that day (Reprints Act 1992 s 5(c)). The reprint includes a reference to the law by which each amendment was made—see list of legislation and list of annotations in endnotes. Also see list of legislation for any uncommenced amendments. This page is specific to this reprint. See previous reprints for information about earlier changes made under the Reprints Act 1992. A table of reprints is included in the endnotes. Also see endnotes for information about— • when provisions commenced • editorial changes made in earlier reprints. Spelling The spelling of certain words or phrases may be inconsistent in this reprint or with other reprints because of changes made in various editions of the Macquarie Dictionary (for example, in the dictionary, ‘lodgement’ has replaced ‘lodgment’). Variations of spelling will be updated in the next authorised reprint. Dates shown on reprints Reprints dated at last amendment All reprints produced on or after 1 July 2002, authorised (that is, hard copy) and unauthorised (that is, electronic), are dated as at the last date of amendment. Previously reprints were dated as at the date of publication. If an authorised reprint is dated earlier than an unauthorised version published before 1 July 2002, it means the legislation was not further amended and the reprint date is the commencement of the last amendment. If the date of an authorised reprint is the same as the date shown for an unauthorised version previously published, it merely means that the unauthorised version was published before the authorised version. Also, any revised edition of the previously published unauthorised version will have the same date as that version. Replacement reprint date If the date of an authorised reprint is the same as the date shown on another authorised reprint it means that one is the replacement of the other. Queensland Water Resource (Burnett Basin) Plan 2000 Contents Page Part 1 Preliminary 1 Short title . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 2 Purposes of plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 3 Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Part 2 Plan area and water to which plan applies 4 Plan area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 5 Water to which plan applies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Part 3 Outcomes for sustainable management of water Division 1 General outcomes 6 General outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Division 2 Ecological outcomes 7 Ecological outcomes for plan area . . . . . . . . . . . . . . . . . . . . . . . . 8 8 Auburn River catchment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 9 Barambah Creek and Stuart River catchments . . . . . . . . . . . . . . 9 10 Boyne River catchment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 11 Burnett River basin and Burnett River . . . . . . . . . . . . . . . . . . . . . 9 12 Elliott, Gregory and Isis river basins. . . . . . . . . . . . . . . . . . . . . . . 9 13 Kolan River basin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 13A Coastal Burnett groundwater management area . . . . . . . . . . . . . 10 Part 4 Environmental flow and compensation flow objectives, water allocation security objectives and performance indicators Division 1 Preliminary Subdivision 1 Assessing consistency with objectives 14 Assessing consistency with objectives for surface water . . . . . . . 11 15 Assessing consistency with objectives for groundwater . . . . . . . . 11 Subdivision 2 Water project areas, subcatchment areas and nodes 16 Water project areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 2 Water Resource (Burnett Basin) Plan 2000 17 Subcatchment areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 18 Nodes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Subdivision 3 Groundwater units and groundwater sub-areas for Coastal Burnett groundwater management area 18A Coastal Burnett groundwater management area . . . . . . . . . . . . . 13 18B Groundwater units and groundwater sub-areas . . . . . . . . . . . . . . 13 18C Information about areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Division 2 Environmental flow objectives and performance indicators Subdivision 1 Surface water 19 Objectives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 20 Performance indicators. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Subdivision 2 Groundwater 20A Groundwater-dependent ecosystem objectives . . . . . . . . . . . . . . 15 20B Performance indicators for groundwater-dependent ecosystem objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 20C Seawater intrusion objective. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 20D Performance indicator for seawater intrusion objective . . . . . . . . 16 Division 3 Compensation flow objectives and performance indicators 21 Objectives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 22 Performance indicators. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Division 4 Water allocation security objectives and performance indicators 23 Objectives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 24 Performance indicators. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Part 5 Strategies for achieving outcomes and implementing the plan Division 1 General strategies for achieving outcomes 25 Decisions about managing or allocating water . . . . . . . . . . . . . . . 18 26 Matters chief executive must consider . . . . . . . . . . . . . . . . . . . . . 18 Division 2 Strategies for achieving outcomes (surface water) 27 Restriction on taking water from waterholes or lakes . . . . . . . . . . 20 28 Restriction on taking water from the Elliott, Gregory and Isis river basins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 29 Restriction on taking water from the Auburn River catchment . . . 21 30 Restriction on taking water from the Boyne River catchment. . . . 21 Division 3 Strategies for achieving outcomes (groundwater) 30A Decision not to increase amount of groundwater taken in Coastal Burnett groundwater management area . . . . . . . . . . . . . 22 30B Restriction on taking or interfering with groundwater . . . . . . . . . . 22 3 Water Resource (Burnett Basin) Plan 2000 30C Taking or interfering with groundwater, other than for stock or domestic purposes, using existing works in extension area. . . . . 23 30D Taking groundwater for stock or domestic purposes using existing works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 30E Restriction on taking groundwater for stock or domestic purposes using new works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 30F Relationship with Sustainable Planning Act 2009 . . . . . . . . . . . . 24 Division 4 Authorisations and water allocations Subdivision 1 Surface water 31 Maximum daily rates for taking surface water . . . . . . . . . . . . . . . 25 32 Annual volumes of surface water that may be taken . . . . . . . . . . 26 33 Authorisations to state maximum daily rate and annual volume . 27 34 Authorisation to take surface water converted to water allocation 27 Subdivision 2 Groundwater 34A Maximum rates for taking groundwater . . . . . . . . . . . . . . . . . . . . 28 34B Authorisation to take groundwater converted to water allocation . 28 34C Granting water allocation to take groundwater in the extension area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 Division 5 Miscellaneous 35 Releasing water through fish ways. . . . . . . . . . . . . . . . . . . . . . . . 29 36 Changing rules for water project areas. . . . . . . . . . . . . . . . . . . . . 30 37 Unallocated water in plan area. . . . . . . . . . . . . . . . . . . . . . . . . . . 30 37A Continued effect of moratorium notice—Act, s 46(3) . . . . . . . . . . 30 Division 6 Implementing this plan 38 Implementation schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 39 Preparing resource operations plan for Boyne River water project area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 39A Amending resource operations plan. . . . . . . . . . . . . . . . . . . . . . . 33 Part 6 Monitoring and reporting requirements Division 1 Surface water 40 Monitoring for surface water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 41 Monitoring programs undertaken by water infrastructure operators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 42 Water infrastructure operators to give reports . . . . . . . . . . . . . . . 35 Division 2 Groundwater 42A Monitoring for groundwater in Coastal Burnett groundwater management area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 Part 7 Minister’s report and amending plan 43 Minister’s report on plan—Act, s 53 . . . . . . . . . . . . . . . . . . . . . . . 37 4 Water Resource (Burnett Basin) Plan 2000 44 Minor amendment of plan—Act, s 57 . . . . . . . . . . . . . . . . . . . . . . 38 Schedule 1 Plan area map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Schedule 2 Water project areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 1 Barker–Barambah water project area. . . . . . . . . . . . . . . . . . . . . . 40 2 Boyne River water project area . . . . . . . . . . . . . . . . . . . . . . . . . . 40 3 Bundaberg water project area . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 4 Three Moon Creek water project area . . . . . . . . . . . . . . . . . . . . . 41 5 Upper Burnett water project area . . . . . . . . . . . . . . . . . . . . . . . . . 41 Schedule 3 Subcatchment areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 Schedule 4 Nodes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 Schedule 4A Coastal Burnett groundwater management area . . . . . . . . . . 46 Schedule 4B Groundwater sub-areas for upper groundwater unit . . . . . . . 47 Schedule 4C Groundwater sub-area for lower groundwater unit . . . . . . . . 48 Schedule 5 Environmental flow objectives . . . . . . . . . . . . . . . . . . . . . . . . . 49 Schedule 6 Water allocation security objectives . . . . . . . . . . . . . . . . . . . . 59 Schedule 7 Rates and pump sizes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 Schedule 8 Volumes for simulated mean annual diversions . . . . . . . . . . 66 Schedule 9 Dictionary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 Endnotes 1 Index to endnotes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 2 Date to which amendments incorporated. . . . . . . . . . . . . . . . . . . . . . 74 3 Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74 4 Table of reprints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 5 Tables in earlier reprints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 6 List of legislation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 7 List of annotations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76 s 1 5 s 3 Water Resource (Burnett Basin) Plan 2000 Water Resource (Burnett Basin) Plan 2000 [as amended by all amendments that commenced on or before 18 December 2009] Part 1 Preliminary 1 Short title This water resource plan may be cited as the Water Resource (Burnett Basin) Plan 2000. 2 Purposes of plan The following are the purposes of this plan— (a) to define the availability of water in the plan area; (b) to provide a framework for sustainably managing water and the taking of water; (c) to identify priorities and mechanisms for dealing with future water requirements; (d) to provide a framework for establishing water allocations; (e) to provide a framework for reversing, where practicable, degradation that has occurred in natural ecosystems, including, for example, stressed rivers. 3 Definitions The dictionary in schedule 9 defines particular words used in this plan. s 4 6 s 5 Water Resource (Burnett Basin) Plan 2000 Part 2 Plan area and water to which plan applies 4 Plan area (1) This plan applies to the area within the plan area boundary shown on the plan area map. (2) The exact location of the plan area boundary is held in digital electronic form by the department. (3) The information held in digital electronic form can be reduced or enlarged to show the details of the plan area boundary.1 5 Water to which plan applies (1) This plan applies to the following water (surface water) in the plan area— (a) water in a watercourse or lake; (b) water in springs not connected to— (i) artesian water; or (ii) subartesian water connected to artesian water. (2) This plan also applies to groundwater in the Coastal Burnett groundwater management area. 1 The plan area boundary in digital electronic form may be inspected at the department’s office at 16–32 Enterprise Street, Bundaberg. s 6 7 s 6 Water Resource (Burnett Basin) Plan 2000 Part 3 Outcomes for sustainable management of water Division 1 General outcomes 6 General outcomes Water is to be managed and allocated— (a) to ensure a reliable and secure supply of water from the plan area during the time this plan is in force; and (b) to allow water to be taken for the following purposes— (i) urban and industrial needs; (ii) agriculture and aquaculture; (iii) stock and domestic use; (iv) small scale uses; (v) dewatering purposes; and (c) to protect the probability of being able to obtain water under a water allocation; and (d) to maintain access to unsupplemented water by holders of authorisations to take unsupplemented water; and (e) to provide for community aspirations about— (i) providing for future water requirements in the plan area; and (ii) maintaining areas of significant conservation value, including, for example, the Auburn National Park and fish habitat areas; and (iii) protecting species of significant conservation value, including, for example, lungfish and turtles; and (f) to reduce reliance on groundwater in areas affected, or potentially affected, by seawater intrusion; and (g) to reduce reliance on groundwater in areas where irrigation with groundwater is detrimental to soil; and s 7 8 s 8 Water Resource (Burnett Basin) Plan 2000 (h) to provide for the continued use of all water entitlements and other authorisations to take or interfere with groundwater; and (i) to provide water sharing rules under the resource operations plan that recognise the importance of access to groundwater for urban purposes; and (j) to make water available for the environment. Division 2 Ecological outcomes 7 Ecological outcomes for plan area Water is to be managed and allocated— (a) to maintain pool habitats, and native plants and animals associated with the habitats, in watercourses; and (b) to maintain long term water quality suitable for riverine and estuarine ecosystems; and (c) to provide flow regimes that favour native plants and animals associated with watercourses and riparian zones; and (d) to provide wet season flow to benefit native plants and animals, including, for example, fish and prawns, in estuaries; and (e) to improve stream flow conditions to assist the movement of fish along watercourses. 8 Auburn River catchment Water in the Auburn River catchment is to be managed and allocated— (a) to maintain existing riverine habitats upstream of AMTD 6.0km that sustain native plants and animals; and (b) to maintain near natural river forming processes upstream of AMTD 6.0km. s 9 9 s 12 Water Resource (Burnett Basin) Plan 2000 9 Barambah Creek and Stuart River catchments Water in the Barambah Creek and Stuart River catchments is to be managed and allocated to maintain and improve existing riverine habitats, that sustain native plants and animals, in the catchments. 10 Boyne River catchment Water in the Boyne River catchment is to be managed and allocated— (a) to maintain existing riverine habitats upstream of AMTD 5.0km that sustain native plants and animals; and (b) to maintain and improve existing river forming processes upstream of AMTD 5.0km. 11 Burnett River basin and Burnett River (1) Water in the Burnett River basin is to be managed and allocated to, if practicable, minimise the frequency and duration of marine conditions in the estuary of the Burnett River. (2) Water in the Burnett River is to be managed and allocated to provide for lungfish habitat in the river particularly lungfish habitat downstream of Gayndah at AMTD 200km. 12 Elliott, Gregory and Isis river basins Water in the Elliott, Gregory and Isis river basins is to be managed and allocated— (a) to maintain existing riverine habitats, that sustain native plants and animals, in the basins; and (b) to maintain existing estuarine habitats, particularly in fish habitat areas, that— (i) sustain native plants and animals; and (ii) are dependant on estuarine processes; and (c) to maintain near natural river forming processes in the basins. s 13 10 s 13A Water Resource (Burnett Basin) Plan 2000 13 Kolan River basin Water in the Kolan River basin is to be managed and allocated— (a) to maintain and improve existing riverine habitats, that sustain native plants and animals, in the basin; and (b) to maintain and improve existing estuarine habitats, particularly in fish habitat areas, that— (i) sustain native plants and animals; and (ii) are dependant on estuarine processes; and (c) to maintain and improve river forming processes in the basin. 13A Coastal Burnett groundwater management area Water in the Coastal Burnett groundwater management area is to be managed and allocated— (a) to maintain or improve the availability of groundwater to sustain native plants and animals that are dependent on groundwater; and (b) to maintain or improve the flow, level, pressure and quality of groundwater to sustain riverine, estuarine and marine processes; and (c) to prevent further seawater intrusion. s 14 11 s 15 Water Resource (Burnett Basin) Plan 2000 Part 4 Environmental flow and compensation flow objectives, water allocation security objectives and performance indicators Division 1 Preliminary Subdivision 1 Assessing consistency with objectives 14 Assessing consistency with objectives for surface water (1) The IQQM computer program’s simulation for the simulation period for surface water is used to assess consistency with the environmental flow objectives, compensation flow objectives and water allocation security objectives for surface water. (2) If it is not practicable to use the IQQM computer program, another assessment method approved by the chief executive may be used. (3) The chief executive may approve an assessment method for subsection (2) only if the chief executive is satisfied the method will assess consistency with the objectives at least as accurately as the IQQM computer program. 15 Assessing consistency with objectives for groundwater (1) Each of the following is used to assess consistency with the environmental flow objectives and water allocation security objectives for groundwater in the Coastal Burnett groundwater management area— (a) the instructional seawater intrusion model’s simulation for the simulation period for groundwater; (b) the Coastal Burnett groundwater project numerical groundwater flow model’s simulation for the simulation period for groundwater. s 16 12 s 17 Water Resource (Burnett Basin) Plan 2000 (2) If it is not practicable to use the instructional seawater intrusion model or the Coastal Burnett groundwater project numerical groundwater flow model, another assessment method approved by the chief executive may be used. (3) The chief executive may approve an assessment method for subsection (2) only if the chief executive is satisfied the method will assess consistency with the objectives at least as accurately as the instructional seawater intrusion model or the Coastal Burnett groundwater project numerical groundwater flow model. Subdivision 2 Water project areas, subcatchment areas and nodes 16 Water project areas (1) Each area described in schedule 2 is a water project area for this plan. (2) A water project area is a priority area for the conversion to or granting of water allocations to take water in the plan area. 17 Subcatchment areas (1) Each part of the plan area that is within a subcatchment area boundary shown on the map in schedule 3 is a subcatchment area for this plan. (2) Each subcatchment area is identified on the map by a letter of the alphabet. (3) The exact location of the boundaries of the subcatchment areas is held in digital electronic form by the department. (4) The information held in digital electronic form can be reduced or enlarged to show the details of a particular subcatchment area.2 2 The boundary locations in digital electronic form may be inspected at the department’s office at 16–32 Enterprise Street, Bundaberg. s 18 13 s 18B Water Resource (Burnett Basin) Plan 2000 18 Nodes (1) A node mentioned in this plan is a place on a watercourse in the plan area or a place in the Coastal Burnett groundwater management area. (2) The number and location of each node are shown on the plan area map or the map in schedule 4A and described in schedule 4. Subdivision 3 Groundwater units and groundwater sub-areas for Coastal Burnett groundwater management area 18A Coastal Burnett groundwater management area The Coastal Burnett groundwater management area is the part of the plan area shown on the map in schedule 4A. 18B Groundwater units and groundwater sub-areas (1) The Coastal Burnett groundwater management area consists of the following (each a groundwater unit)— (a) the upper groundwater unit, containing the aquifers of the Elliott Formation; (b) the lower groundwater unit, containing the aquifers of the Fairymead Beds. (2) Each of the following areas within the upper groundwater unit and shown on the map in schedule 4B is a groundwater sub-area for this plan— (a) Kolan-Burnett groundwater sub-area; (b) Burnett-Elliott groundwater sub-area; (c) Elliott-Gregory groundwater sub-area; (d) Farnsfield groundwater sub-area. (3) The area of the lower groundwater unit, shown on the map in schedule 4C as the Fairymead groundwater sub-area, is a groundwater sub-area for this plan. s 18C 14 s 20 Water Resource (Burnett Basin) Plan 2000 18C Information about areas (1) The exact location of the Coastal Burnett groundwater management area and groundwater sub-area boundaries is held in digital electronic form by the department. (2) The information held in digital electronic form can be reduced or enlarged to show the details of the boundaries. Editor’s note— The boundary locations in digital electronic form may be inspected at the department’s office at 16–32 Enterprise Street, Bundaberg. Division 2 Environmental flow objectives and performance indicators Subdivision 1 Surface water 19 Objectives The environmental flow objectives for surface water are stated in schedule 5, parts 1 and 2. 20 Performance indicators The performance indicators— (a) for low flow environmental flow objectives for surface water are as follows— (i) daily flow less than 2ML; (ii) 50% daily flow exceedence; (iii) 90% daily flow exceedence; (iv) low flow exceedence duration (10cm above cease-to-flow) (v) low flow exceedence duration (30cm above cease-to-flow); (vi) number of periods of no flow of at least 1 month; (vii) number of periods of no flow of at least 3 months; s 20A 15 s 20B Water Resource (Burnett Basin) Plan 2000 (viii)number of periods of no flow of at least 6 months; (ix) number of periods of no flow of at least 9 months; and (b) for medium to high flow environmental flow objectives for surface water are as follows— (i) annual proportional flow deviation; (ii) flow regime class; (iii) mean annual flow; (iv) mean wet season flow; (v) 1.5 year average recurrence interval daily flow volume; (vi) 5 year average recurrence interval daily flow volume; (vii) 20 year average recurrence interval daily flow volume. Subdivision 2 Groundwater 20A Groundwater-dependent ecosystem objectives The environmental flow objectives for groundwater-dependent ecosystems in the Coastal Burnett groundwater management area (groundwater-dependent ecosystem objectives) are stated in schedule 5, part 3. 20B Performance indicators for groundwater-dependent ecosystem objectives The performance indicators for the groundwater-dependent ecosystem objectives are— (a) for groundwater-dependent ecosystems at each node mentioned in schedule 5, part 3, table 8, column 1— (i) the simulated average depth to the watertable; and s 20C 16 s 21 Water Resource (Burnett Basin) Plan 2000 (ii) the simulated period that the depth to the watertable is more than the distance stated in column 3 of the table for the node; and (b) for submarine groundwater discharge systems—the simulated average coastal submarine groundwater discharge. 20C Seawater intrusion objective The environmental flow objective for seawater intrusion for the Coastal Burnett groundwater management area (seawater intrusion objective) is that there is no increase in the average simulated area affected by seawater intrusion in each groundwater sub-area as at the commencement of this section. 20D Performance indicator for seawater intrusion objective The performance indicator for the seawater intrusion objective is the average area affected by seawater intrusion simulated by the instructional seawater intrusion model and the Coastal Burnett groundwater project numerical groundwater flow model. Division 3 Compensation flow objectives and performance indicators 21 Objectives At Ban Ban gauging station on Barambah Creek— (a) the number of periods of at least 3 months (a dry period) in the simulation period in which flow for each day in the dry period is less than 2ML a day must be no more than 5; and (b) there must be no periods of 6 months or more (also a dry period) in which flow for each day in the dry period is less than 2ML a day. s 22 17 s 24 Water Resource (Burnett Basin) Plan 2000 22 Performance indicators The performance indicators for the compensation flow objectives are— (a) the number of periods of at least 3 months in which flow for each day in the period is less than 2ML a day; and (b) the number of periods of at least 6 months in which flow for each day in the period is less than 2ML a day. Division 4 Water allocation security objectives and performance indicators 23 Objectives The water allocation security objectives for this plan are stated in— (a) for water allocations to take supplemented water in a water project area—schedule 6, part 1; and (b) for water allocations to take unsupplemented water in a subcatchment area—schedule 6, part 2; and (c) for water allocations to take groundwater from the Coastal Burnett groundwater management area—schedule 6, part 3. 24 Performance indicators (1) The performance indicator for water allocation security objectives for water allocations to take supplemented water in a water project area is the supplemented water sharing index. (2) The performance indicators for water allocation security objectives for water allocations to take unsupplemented water in a subcatchment area are as follows— (a) 30% unsupplemented water sharing index; (b) 50% unsupplemented water sharing index; (c) 70% unsupplemented water sharing index. s 25 18 s 26 Water Resource (Burnett Basin) Plan 2000 (3) The performance indicators for water allocation security objectives for water allocations to take groundwater in a groundwater sub-area are— (a) simulated nominal volume; and (b) simulated nominal volume probability. Part 5 Strategies for achieving outcomes and implementing the plan Division 1 General strategies for achieving outcomes 25 Decisions about managing or allocating water Decisions about the management or allocation of water in the plan area, other than a decision in relation to a permit, must be consistent with— (a) the environmental flow objectives stated in section 20C and schedule 5; and (b) the compensation flow objectives stated in section 21; and (c) the water allocation security objectives stated in schedule 6. 26 Matters chief executive must consider (1) In making a decision about the allocation of water in the plan area, the chief executive must consider the following— (a) the availability of water for the purpose for which it is intended to be taken; (b) the availability of an alternative water supply for the purpose including the more efficient use of water already available; s 26 19 s 26 Water Resource (Burnett Basin) Plan 2000 (c) whether the volume of water intended to be taken should be restricted or a meter approved by the chief executive should be used to measure the volume of water taken; (d) whether the taking should be restricted during particular periods, including, for example, when— (i) there is no water flow in a watercourse; or (ii) the water flow is insufficient for downstream water users or to sustain the health of ecosystems; or (iii) water is released for the benefit of the environment; or (iv) groundwater levels in the Coastal Burnett groundwater management area are insufficient to maintain base flows to rivers or prevent further degradation of the quality of groundwater by seawater intrusion; (e) the impact of the proposed taking or proposed water infrastructure on the following— (i) achieving the outcomes under part 3; (ii) water quality; (iii) inundation of streambed habitat; (iv) the movement of fish and other aquatic species; (v) the natural variability and duration of seasonal streamflow patterns; (vi) the extent to which rapid artificial variations in instream water levels may adversely affect the environment; (vii) cultural values, including, for example, cultural values of local Aboriginal communities; (viii)groundwater-dependent ecosystems in the Coastal Burnett groundwater management area; (f) if the taking involves the transfer of water between watercourses in different river basins—whether the taking is likely to adversely affect the water quality and the ecology of the watercourse into which the water is transferred. s 27 20 s 27 Water Resource (Burnett Basin) Plan 2000 (2) Subsection (1)— (a) does not apply to a decision about granting a licence under the Water (Transitional) Regulation 2000, section 5(1)(c), to take unsupplemented water in the Burnett River; and (b) does not limit the matters the chief executive may consider in making a decision about the allocation of water in the plan area. Division 2 Strategies for achieving outcomes (surface water) 27 Restriction on taking water from waterholes or lakes (1) The chief executive may grant a licence, permit or water allocation to take water from a waterhole or lake in the plan area only if— (a) the chief executive imposes a condition on the licence, permit or water allocation that the water may be taken only if the water level in the waterhole or lake is above the level that is 0.5m below the level at which the waterhole or lake naturally overflows; or (b) the chief executive is satisfied the taking of the water will not adversely affect the cultural and environmental values of the waterhole or lake. (2) Subsection (1) does not apply to the following— (a) a permit for stock or domestic purposes; (b) a licence to irrigate crops for feeding stock if the area under irrigation is not more than 10ha; (c) any other authorisation in force immediately before the commencement; (d) a water allocation converted from an authorisation mentioned in paragraph (c). (3) Subsections (1) and (2) do not limit the restrictions that may be imposed on the taking of water from a waterhole or lake. s 28 21 s 30 Water Resource (Burnett Basin) Plan 2000 28 Restriction on taking water from the Elliott, Gregory and Isis river basins The chief executive may grant a licence or water allocation to take water from the Elliott, Gregory or Isis river basins (the relevant area) only if— (a) the licence or water allocation is for urban water supply; and (b) the volume of water allowed to be taken under the licence or water allocation does not result in the total volume of water allowed to be taken from the relevant area under licences and water allocations for urban water supply being more than 1000ML a year. 29 Restriction on taking water from the Auburn River catchment The chief executive may grant a licence or water allocation to take water from the Auburn River catchment only if the volume of water allowed to be taken under the licence or water allocation does not increase the total volume of water allowed to be taken from the catchment under licences and water allocations. 30 Restriction on taking water from the Boyne River catchment The chief executive may grant a licence or water allocation to take water from the Boyne River catchment only if the volume of water allowed to be taken under the licence or water allocation does not increase the total volume of water allowed to be taken from the catchment under licences and water allocations. s 30A 22 s 30B Water Resource (Burnett Basin) Plan 2000 Division 3 Strategies for achieving outcomes (groundwater) 30A Decision not to increase amount of groundwater taken in Coastal Burnett groundwater management area (1) The chief executive must not make a decision about the allocation or management of groundwater in the Coastal Burnett groundwater management area that would increase the total volume of groundwater that may be taken in the area. (2) A decision mentioned in subsection (1) includes a decision about an application, in relation to taking groundwater under an authorisation, made but not decided before the commencement of this section. (3) Subsections (1) and (2) do not apply to a decision— (a) about a water permit; or (b) about reinstating or replacing an expired water entitlement; or (c) to authorise taking groundwater for stock or domestic purposes under section 30E; or (d) about a water licence for dewatering purposes; or (e) required to be made under the resource operations plan. 30B Restriction on taking or interfering with groundwater A person must not take or interfere with groundwater in the Coastal Burnett groundwater management area other than— (a) under a water entitlement; or (b) under a water permit; or (c) under an authority under section 30E; or (d) by using works mentioned in section 30C or 30D for taking groundwater only for stock or domestic purposes; or (e) under a seasonal water assignment approved under section 233 of the Act. s 30C 23 s 30E Water Resource (Burnett Basin) Plan 2000 30C Taking or interfering with groundwater, other than for stock or domestic purposes, using existing works in extension area (1) This section applies to the owner of land in the extension area on which existing works for taking or interfering with groundwater are situated. (2) The owner may take groundwater, other than for stock or domestic purposes, using the existing works if the owner has, before 22 January 2007, given the chief executive a notice under the Water Regulation 2002, section 3CA, for the works. (3) In this section— existing works means— (a) works that were in existence immediately before the commencement of this section; or (b) works replacing works mentioned in paragraph (a). 30D Taking groundwater for stock or domestic purposes using existing works (1) An owner of land in the Coastal Burnett groundwater management area may use existing works for taking groundwater for stock or domestic purposes. (2) In this section— existing works means— (a) works— (i) in existence immediately before the commencement of this section; or (ii) for which an agreement with the chief executive in relation to the works was entered into before the commencement of this section; or (b) works replacing works mentioned in paragraph (a). 30E Restriction on taking groundwater for stock or domestic purposes using new works (1) This section applies to an owner of land in the Coastal Burnett groundwater management area if— s 30F 24 s 30F Water Resource (Burnett Basin) Plan 2000 (a) the owner is not, under section 30D, using existing works for taking groundwater for stock or domestic purposes; and (b) the land is not in a service area for a retail water service. (2) The owner may use new works for the taking of groundwater for stock or domestic purposes if reconfiguring a lot on the land has not happened after 22 January 2007. (3) However, if the new works were not physically completed before 22 January 2007, the owner must, before taking groundwater, give the chief executive notice in the approved form of the works. (4) In this section— new works means— (a) works not in existence immediately before the commencement of this section; or (b) works for which an agreement with the chief executive has not been entered into before the commencement of this section in relation to the works. reconfiguring a lot means— (a) creating lots by subdividing another lot; or (b) dividing land into parts by agreement (other than a lease for a term, including renewal options, not exceeding 10 years, or an agreement for the exclusive use of part of the common property for a community titles scheme under the Body Corporate and Community Management Act 1997) rendering different parts of a lot immediately available for separate disposition or separate occupation. 30F Relationship with Sustainable Planning Act 2009 In the Coastal Burnett groundwater management area— (a) works for taking or interfering with groundwater are assessable development for the Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 3(c)(ii); and s 31 25 s 31 Water Resource (Burnett Basin) Plan 2000 (b) works replacing works, mentioned in paragraph (a), for which a development permit is held or, under section 1048A of the Act, taken to be held, are self-assessable development for the Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 1(b)(iii). Division 4 Authorisations and water allocations Subdivision 1 Surface water 31 Maximum daily rates for taking surface water The maximum daily rate at which surface water may be taken under an authorisation to take surface water is— (a) for an authorisation that states a maximum daily rate—the stated rate; and (b) for an authorisation that does not state a maximum daily rate but states a pump size— (i) for a pump size mentioned in schedule 7, column 1—the rate stated in schedule 7, column 2, for the pump size; and (ii) for other pump sizes—the rate decided by the chief executive using the information about pump sizes and rates contained in schedule 7; and (c) for another authorisation—the rate decided by the chief executive having regard to— (i) the nature of the authorisation; and (ii) the outcomes under part 3; and (iii) the environmental flow and compensation flow objectives and the water allocation security objectives under part 4. s 32 26 s 32 Water Resource (Burnett Basin) Plan 2000 32 Annual volumes of surface water that may be taken (1) The annual volume of surface water that may be taken under an authorisation to take surface water is— (a) for an authorisation to take supplemented water that states an annual volume of water that may be taken—the stated volume; and (b) for another authorisation in force immediately before the commencement—a volume decided by the chief executive having regard to the following criteria— (i) the environmental flow and compensation flow objectives and the water allocation security objectives; (ii) the water taking capacity of any authorised works associated with taking water under the authorisation if the works were in existence, or started, immediately before the commencement; (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of no more than 10 years, before the commencement; (iv) the efficiency of the use of the water mentioned in subparagraph (iii); (v) the flow conditions under which water may be taken under the authorisation; (vi) for an authorisation that states the area that may be irrigated—the volume of water required to efficiently irrigate the area, including limiting the volume to an amount calculated by multiplying the area, in hectares, by 6ML for each hectare; and (c) for another authorisation—a volume decided by the chief executive having regard to— (i) the outcomes under part 3; and (ii) the environmental flow and compensation flow objectives and the water allocation security objectives under part 4. s 33 27 s 34 Water Resource (Burnett Basin) Plan 2000 (2) Subsection (3) applies to an authorisation mentioned in subsection (1)(b) for taking water in a subcatchment area mentioned in schedule 8, column 1. (3) In deciding the annual volume that may be taken under the authorisation, the chief executive must ensure— (a) for authorisations that, immediately before the commencement, stated the area that may be irrigated—the simulated mean annual diversion calculated for all of those authorisations in the subcatchment area is not more than the total volume stated in schedule 8, column 2, for the subcatchment area; and (b) for other authorisations—the simulated mean annual diversion calculated for all of those authorisations in the subcatchment area is not more than the total volume stated in schedule 8, column 3, for the subcatchment area. 33 Authorisations to state maximum daily rate and annual volume (1) The maximum daily rate at which water may be taken, and the annual volume of water that may be taken, under an authorisation must be stated on the authorisation. (2) However, the maximum daily rate at which water may be taken under a water allocation managed under a resource operations licence does not need to be stated on the allocation. 34 Authorisation to take surface water converted to water allocation (1) This section applies to a water allocation converted from an authorisation to take surface water. (2) If the water allocation is for supplemented water, the allocation belongs to— (a) if an interim resource operations licence identifies the authorisation as high priority or high-A priority—the high priority group; and (b) for other authorisations—the medium priority group. s 34A 28 s 34B Water Resource (Burnett Basin) Plan 2000 (3) The location from which water may be taken that is stated on the water allocation must be the same as the location stated on the authorisation. (4) The flow conditions under which water may be taken under a water allocation not managed under a resource operations licence are decided by the chief executive having regard to— (a) the environmental flow and compensation flow objectives and the water allocation security objectives under part 4; and (b) the flow conditions under which water may be taken under the authorisation. Subdivision 2 Groundwater 34A Maximum rates for taking groundwater An authorisation to take groundwater from the Coastal Burnett groundwater management area may state a maximum rate at which groundwater may be taken under the authorisation. 34B Authorisation to take groundwater converted to water allocation (1) This section applies to a water allocation converted, under the resource operations plan, from an authorisation to take groundwater in the Coastal Burnett groundwater management area. (2) The maximum annual volume of groundwater that may be taken under the water allocation is the maximum volume of water that may be taken under the authorisation in a water year. (3) The conditions under which water may be taken under a water allocation to take groundwater are decided by the chief executive having regard to the environmental flow objectives and the water allocation security objectives under part 4. (4) An authorisation to take groundwater in the Coastal Burnett groundwater management area will not be converted to a s 34C 29 s 35 Water Resource (Burnett Basin) Plan 2000 water allocation to take groundwater if the groundwater is to be taken for— (a) stock or domestic purposes; or (b) dewatering purposes. 34C Granting water allocation to take groundwater in the extension area (1) If an owner of land in the extension area is authorised under section 30C to take groundwater using existing works, the chief executive must, under a process in the resource operations plan, grant a water allocation to replace the authority. (2) The conditions under which water may be taken under the water allocation are decided by the chief executive having regard to— (a) the outcomes under part 3; and (b) the groundwater-dependent ecosystem objectives, seawater intrusion objectives, and water allocation security objectives under part 4; and (c) the information given in the notice mentioned in section 30C(2); and (d) the efficiency of the use of the water given in the information mentioned in paragraph (c). (3) Subsection (2) does not limit the matters to which the chief executive may have regard. Division 5 Miscellaneous 35 Releasing water through fish ways The environmental management rules under a resource operations plan must provide for releases of water through fish ways if water to which the plan relates can be released from a dam through fish ways. s 36 30 s 37A Water Resource (Burnett Basin) Plan 2000 36 Changing rules for water project areas (1) This section applies to an existing resource operations plan that includes environmental management rules, water sharing rules, water allocation transfer rules or seasonal water assignment rules for water in a water project area. (2) Before changing the rules in the plan, the chief executive must consider whether the change would maintain or improve the annual reliability of supply for water allocations in the area. 37 Unallocated water in plan area (1) Unallocated surface water in the plan area is available for future water requirements only under a resource operations plan. (2) Subsection (1) does not apply to water taken under a licence granted under the Water (Transitional) Regulation 2000, section 5(1)(c). (3) There is no unallocated groundwater in the Coastal Burnett groundwater management area. 37A Continued effect of moratorium notice—Act, s 46(3) (1) This section continues, in part, the effect of the moratorium notice, published on 3 October 2003 and amended on 22 December 2003 and 5 December 2006. (2) Subsection (3) applies to an application under the Act or the repealed Act if granting the application would have either or both of the following effects on water in the Coastal Burnett groundwater management area— (a) increase the amount of water taken or interfered with; (b) change the location from which the water may be taken or interfered with. (3) The application will not be accepted or, for applications accepted before the moratorium notice was published, will not be decided until the resource operations plan is amended to apply to groundwater in the Coastal Burnett groundwater management area. (4) However, subsection (3) does not apply to an application— s 38 31 s 38 Water Resource (Burnett Basin) Plan 2000 (a) for a water permit; or (b) for approval to dewater under a water licence to take water for dewatering purposes that was in existence at the commencement of this section; or (c) to reinstate an expired water licence under section 221 of the Act; or (d) to grant a water licence if the licence is to replace an expired water licence that was in existence on 3 October 2003; or (e) for a seasonal water assignment; or (f) to amalgamate 2 or more water licences under section 224 of the Act; or (g) to subdivide a water licence under section 225 of the Act. Division 6 Implementing this plan 38 Implementation schedule (1) It is proposed to prepare a resource operations plan— (a) to make unallocated water available for future water requirements in the plan area within 1 year after the commencement; and (b) to implement the monitoring requirements in part 6 within 1 year after the commencement; and (c) to convert water licences and interim water allocations for water in a water project area to water allocations; and (d) to require metering of the volume of water taken under an authorisation; and (e) to include environmental management rules, water sharing rules, water allocation transfer rules and seasonal water assignment rules for water in a water project area. s 39 32 s 39 Water Resource (Burnett Basin) Plan 2000 (2) For the matters mentioned in subsection (1)(c) to (e) it is proposed to prepare the plan for the following water project areas within the period after the commencement stated for the area— (a) Boyne River water project area—1 year; (b) Bundaberg water project area—1 year; (c) Barker–Barambah water project area—2 years; (d) Upper Burnett water project area—2 years; (e) Three Moon Creek water project area—3 years. (3) For the matters mentioned in subsection (1)(d) and (e) it is proposed to prepare the plan for the plan area, other than water project areas mentioned in subsection (2), within 5 years after the commencement. (4) As soon as practicable after the resource operations plan is prepared for a part of the plan in relation to a matter mentioned in subsection (1)(c), (d) or (e), it is proposed to amend water licences to take water in the part that are inconsistent with this plan. 39 Preparing resource operations plan for Boyne River water project area In preparing a resource operations plan for the Boyne River water project area, the chief executive must consider the following in relation to improving performance against the water allocation security objectives in the area— (a) using capacity sharing as the basis for the water sharing rules for the area; (b) upgrading the efficiency or capacity of water infrastructure in the area; (c) restricting the volume of water that may be taken under a water allocation by having regard to the criteria mentioned in section 32(1)(b)(ii) to (v) in relation to the authority from which the water allocation is converted; (d) progressively reducing the number of water allocations in the area. s 39A 33 s 40 Water Resource (Burnett Basin) Plan 2000 39A Amending resource operations plan (1) Within 1 year after the commencement of this section, it is proposed to amend the resource operations plan to implement provisions in this plan relating to groundwater in the Coastal Burnett groundwater management area. (2) The amendment of the resource operations plan will include additional strategies for the following— (a) protecting groundwater-dependent ecosystems; (b) preventing further seawater intrusion; (c) preventing negative impacts on baseflow to watercourses; (d) protecting the probability of being able to obtain groundwater under a water entitlement. Part 6 Monitoring and reporting requirements Division 1 Surface water 40 Monitoring for surface water (1) The monitoring requirements for surface water for this plan are— (a) water monitoring, in relation to— (i) river flow; and (ii) diversions of water; and (iii) water quality; and (b) natural ecosystems monitoring, in relation to— (i) volume, frequency, duration and season of streamflows; and (ii) the health and distribution of animal, plant and micro-organism species and communities; and s 41 34 s 41 Water Resource (Burnett Basin) Plan 2000 (iii) the condition of riverine and estuarine habitats including the following— (A) waterholes and lake ecosystems; (B) stream-bed habitats; (C) upper and in-channel riparian zones; (D) floodplains; (E) wetlands; and (iv) river forming flows. (2) The monitoring requirements are to be achieved by— (a) monitoring programs undertaken by water infrastructure operators under a resource operations plan; and (b) monitoring programs undertaken by community groups with relevant State agencies; and (c) monitoring programs administered by relevant State agencies. 41 Monitoring programs undertaken by water infrastructure operators (1) Each water infrastructure operator must develop and undertake monitoring programs, satisfactory to the chief executive, that include monitoring the following in the water project area in which the operator manages water— (a) water, in relation to the matters stated in section 40(1)(a); (b) natural ecosystems, in relation to the matters stated in section 40(1)(b). (2) For subsection (1)(a), the programs must include monitoring the following— (a) water quantity including— (i) the flow of water at gauging stations; and (ii) deliveries and diversions of water; and (iii) inflows of water to dams; and s 42 35 s 42 Water Resource (Burnett Basin) Plan 2000 (iv) the quantity of water released from a dam for each of the following— (A) consumption; (B) the environment; (C) the operation of fish ways; (D) any other purpose decided by the chief executive; and (v) the level of water in a dam; (b) water quality including— (i) temperature; and (ii) biological, chemical and physical measurements; (c) the operation of outlet works relating to a dam including, for example, multi-level offtakes. (3) The monitoring programs must assist in enabling the chief executive to assess the effectiveness of the strategies under part 5. 42 Water infrastructure operators to give reports (1) Each water infrastructure operator must give the chief executive a written report containing the following information— (a) details of the information obtained by monitoring the matters mentioned in section 41; (b) details of decisions made by the operator in managing water and water infrastructure, including, for example, decisions about the following— (i) making water available to water users under the operator’s usual procedures for managing water in a water project area; (ii) managing the flow of water; (iii) restrictions on the taking or supply of water; (iv) infrastructure modifications or installations; s 42A 36 s 42A Water Resource (Burnett Basin) Plan 2000 (c) information about any non-compliance by the operator with a resource operations plan for the area; (d) details about remedial action taken by the operator— (i) in relation to a requirement under a resource operations plan; or (ii) in response to an event or thing affecting water quality; (e) details of any emergency action taken by the operator that may affect the achievement of the outcomes under part 3. (2) A report about a matter mentioned in subsection (1)(a) and (b)(i) and (ii) must be given— (a) for each financial year in which the operator manages water under this plan; and (b) within 3 months after the end of the financial year to which the report relates. (3) A report about a matter mentioned in subsection (1)(b)(iii) and (iv), (c) and (d) must be given within 1 month after the matter happens. (4) A report about a matter mentioned in subsection (1)(e) must be given the next business day after the action is taken. Division 2 Groundwater 42A Monitoring for groundwater in Coastal Burnett groundwater management area (1) The monitoring requirements for groundwater for the Coastal Burnett groundwater management area are— (a) groundwater monitoring for— (i) groundwater levels; and (ii) electrical conductivity; and (iii) water quality; and (iv) interaction with surface water; and s 43 37 s 43 Water Resource (Burnett Basin) Plan 2000 (b) groundwater-dependent ecosystems monitoring for— (i) baseflow to watercourses; and (ii) the health and distribution of riparian vegetation, terrestrial vegetation and wetland species and communities dependent on groundwater; and (iii) the health and distribution of ecosystems dependent on submarine groundwater discharge, including, for example, seagrass communities; and (c) monitoring use of groundwater by metering water allocations. (2) The monitoring requirements are to be achieved by— (a) monitoring programs stated in the resource operations plan; and (b) monitoring programs administered by the chief executive and relevant State agencies; and (c) other monitoring programs considered by the chief executive to be relevant to the matters mentioned in subsection (1). Part 7 Minister’s report and amending plan 43 Minister’s report on plan—Act, s 53 The Minister’s report3 on this plan must be prepared— (a) for each financial year the plan is in force; and (b) within 6 months after the end of the financial year to which the report relates. 3 See section 54 (Matters the reports must include) of the Act. s 44 38 s 44 Water Resource (Burnett Basin) Plan 2000 44 Minor amendment of plan—Act, s 57 The following types of amendment may be made to this plan under section 57(b) of the Act— (a) an amendment to extend an environmental flow or compensation flow objective or water allocation security objective to other parts of the plan area if the amendment achieves an equivalent or improved ecological outcome without adversely affecting the water allocation security objectives or the outcomes under part 3; (b) an amendment or addition of an environmental flow or compensation flow objective if the amendment or addition achieves an equivalent or improved ecological outcome without adversely affecting the water allocation security objectives or the outcomes under part 3; (c) an amendment or addition of a water allocation security objective if the amendment or addition does not adversely affect existing water allocations, environmental flow or compensation flow objectives or the outcomes under part 3; (d) an amendment or addition of a water project area; (e) an amendment of the boundaries of a groundwater sub-area in the Coastal Burnett groundwater management area; (f) an amendment or addition of a monitoring or reporting requirement under part 6. 39 Water Resource (Burnett Basin) Plan 2000 Schedule 1 Plan area map section 4 40 Water Resource (Burnett Basin) Plan 2000 Schedule 2 Water project areas section 16(1) 1 Barker–Barambah water project area The Barker–Barambah water project area consists of— (a) the part of Barambah Creek from downstream of Stonelands gauging station (AMTD 85.0km) to AMTD 189.5km, including the impounded areas of all storages in the part of the creek; and (b) the part of Barker Creek between the confluence of Barker and Barambah Creeks and Bjelke-Petersen Dam, including the impounded area of the dam (AMTD 0.0km to AMTD 38.2km). 2 Boyne River water project area The Boyne River water project area consists of the part of the Boyne River between the confluence of the Boyne and Burnett rivers and Boondooma Dam, including the impounded area of the dam (AMTD 0.0km to AMTD 110.5km). 3 Bundaberg water project area The Bundaberg water project area consists of— (a) the part of the Kolan River between Kolan Barrage and Fred Haigh Dam, including the impounded area of the dam and Bucca Weir (AMTD 14.7km to AMTD 116.0km); and (b) the part of the Burnett River between Ben Anderson Barrage and the impounded area of the Burnett River Dam, including the impounded areas of the barrage and Ned Churchward Weir (AMTD 25.9km to AMTD 162.8km); and (c) Sheepstation Creek between AMTD 0.0km and AMTD 8.6km; and Schedule 2 (continued) 41 Water Resource (Burnett Basin) Plan 2000 (d) St Agnes Creek between AMTD 0.0km and AMTD 1.3km. 4 Three Moon Creek water project area The Three Moon Creek water project area consists of— (a) the part of Three Moon Creek between Abercorn and Cania Dam, including the impounded area of the dam (AMTD 13.2km to AMTD 130.8km); and (b) the part of Monal Creek between AMTD 0.0km and AMTD 2.8km. 5 Upper Burnett water project area The Upper Burnett water project area consists of— (a) the part of the Burnett River between the impounded area of the Burnett River Dam and John Goleby Weir, including the impounded areas of Claude Wharton Weir, Jones Weir, Kirar Weir and John Goleby Weir (AMTD 162.8km to AMTD 333.9km); and (b) the part of the Nogo River between the confluence of the Nogo and Burnett rivers and Wuruma Dam, including the impounded area of the dam (AMTD 0.0km to AMTD 44.5km). 42 Water Resource (Burnett Basin) Plan 2000 Schedule 3 Subcatchment areas section 17(1) 43 Water Resource (Burnett Basin) Plan 2000 Schedule 4 Nodes section 18 Part 1 Nodes for surface water Node Location 1 Burnett River at river mouth (AMTD 0.0km) 2 Burnett River at Figtree gauging station (AMTD 119km) 3 Burnett River at Gayndah flume (AMTD 201.3km) 4 Barambah Creek at Ban Ban (AMTD 35.1km) 5 Barambah Creek at Stonelands (AMTD 90.3km) 6 Boyne River at Derra (AMTD 6.4km) 7 Stuart River at Proston Rifle Range (AMTD 24.1km) 8 Auburn River at Glenwood (AMTD 37.9km) 9 Burnett River at Eidsvold (AMTD 291.1km) 10 Three Moon Creek at Abercorn (AMTD 13.1km) 11 Kolan River at river mouth (AMTD 0.0km) 12 Kolan River at Bucca Weir Tailwater (AMTD 37.9km) 13 Elliott River at river mouth (AMTD 0.0km) 14 Elliott River at Elliott gauging station (AMTD 17.0km) 15 Gregory River at river mouth (AMTD 0.0km) 16 Gregory River at Burrum Highway (AMTD 47.9km) 17 Isis River at river mouth (AMTD 0.0km) 18 Isis River at Bruce Highway (AMTD 22.7km) 19 Splinter Creek at Dakiel (AMTD 74.8km) 44 Water Resource (Burnett Basin) Plan 2000 Schedule 4 (continued) Part 2 Nodes for groundwater Terrestrial vegetation Node Location 20 Tantitha-Whymere (site 1) 21 Tantitha-Whymere (site 2) 22 Pasturage Reserve (site 1) 23 Pasturage Reserve (site 2) 24 Moore Park (site 1) 25 Moore Park (site 2) 26 North Gregory-Isis Highway (site 1) 27 North Gregory-Isis Highway (site 2) 28 Meadowvale (site 1) 29 Meadowvale (site 2) 30 Foley (site 1) 31 Foley (site 2) Riparian vegetation Node Location 32 Gregory River (site 1) 33 Gregory River (site 2) 34 Elliott River (site 1) 35 Elliott River (site 2) 45 Water Resource (Burnett Basin) Plan 2000 Schedule 4 (continued) Wetlands Node Location 36 Tantitha-Whymere (site 1) 37 Tantitha-Whymere (site 2) 38 Moore Park (site 1) 39 Moore Park (site 2) 40 Pasturage Reserve (site 2) 41 Elliott Heads (site 1) 42 Elliott Heads (site 2) 46 Water Resource (Burnett Basin) Plan 2000 Schedule 4A Coastal Burnett groundwater management area section 18A ! ! ! ! ! ! ! ! ! ! !!! ! ! ! ! ! ! ! ! ! ! LEGEND ! Node Coastal Burnett Groundwater Management Area 0 10 205 Kilometres ´ BUNDABERG BURNETT RIVER K O L A N G R E G O R Y R IV E R E L L IO T T R IV E R RI VE R PACIFIC OCEAN N O R T H C O A S T R A IL W A Y N O R T H C O A S T R A IL W A Y IS IS H IG H W A Y BU ND AB ER G R O A D G IN G IN WOODGATE BEACH ELLIOTT HEADS BURNETT HEADS MOORE PARK BARGARA G O O D W O O D R D . ! ! BRISBANE BUNDABERG PLAN AREA ( BURNETT BASIN ) QUEENSLAND ! ! ! ! ! ! BUNDABERG KINGAROY GAYNDAH CHILDERS MUNDUBBERA MONTO COASTAL BURNETT GROUNDWATER MANAGEMENT AREA PLAN AREA ( BURNETT BASIN ) 38 24 39 25 36 29 28 20 37 21 41 23 40 22 34 35 27 303132 33 26 42 47 Water Resource (Burnett Basin) Plan 2000 Schedule 4B Groundwater sub-areas for upper groundwater unit section 18B(2) E l l i o t t - G r e g o r yE l l i o t t - G r e g o r y K o l a n - B u r n e t tK o l a n - B u r n e t t B u r n e t t - E l l i o t tB u r n e t t - E l l i o t t F a r n s f i e l dF a r n s f i e l d LEGEND Coastal Burnett Groundwater Management Area Groundwater Sub-area Boundaries 0 10 205 Kilometres ´ BUNDABERG BURNETT RIVER K O L A N G R E G O R Y R IV E R E L L IO T T R IV E R RI VE R PACIFIC OCEAN N O R T H C O A S T R A IL W A Y N O R T H C O A S T R A IL W A Y IS IS H IG H W A Y BU ND AB ER G R O A D G IN G IN WOODGATE BEACH ELLIOTT HEADS BURNETT HEADS MOORE PARK BARGARA G O O D W O O D R D . ! ! BRISBANE BUNDABERG PLAN AREA ( BURNETT BASIN ) QUEENSLAND ! ! ! ! ! ! BUNDABERG KINGAROY GAYNDAH CHILDERS MUNDUBBERA MONTO COASTAL BURNETT GROUNDWATER MANAGEMENT AREA PLAN AREA ( BURNETT BASIN ) 48 Water Resource (Burnett Basin) Plan 2000 Schedule 4C Groundwater sub-area for lower groundwater unit section 18B(3) F a i r y m e a dF a i r y m e a d LEGEND Coastal Burnett Groundwater Management Area Groundwater Sub-area 0 10 205 Kilometres ´ BUNDABERG BURNETT RIVER K O L A N G R E G O R Y R IV E R E L L IO T T R IV E R RI VE R PACIFIC OCEAN N O R T H C O A S T R A IL W A Y N O R T H C O A S T R A IL W A Y IS IS H IG H W A Y BU ND AB ER G R O A D G IN G IN WOODGATE BEACH ELLIOTT HEADS BURNETT HEADS MOORE PARK BARGARA G O O D W O O D R D . ! ! BRISBANE BUNDABERG PLAN AREA ( BURNETT BASIN ) QUEENSLAND ! ! ! ! ! ! BUNDABERG KINGAROY GAYNDAH CHILDERS MUNDUBBERA MONTO COASTAL BURNETT GROUNDWATER MANAGEMENT AREA PLAN AREA ( BURNETT BASIN ) 49 Water Resource (Burnett Basin) Plan 2000 Schedule 5 Environmental flow objectives section 19 Part 1 Low flow objectives 1 At each node mentioned in table 1, column 1, the percentage of the total number of days in the simulation period when the daily flow is less than 2ML should be between the minimum and maximum percentages stated for the node. Table 1 Column 1 Column 2 Node Min–Max% 1 2–18 2 2–20 3 2–26 4 2–20 5 2–20 6 2–34 7 2–32 8 46–82 9 10–46 10 44–80 11 2–26 12 2–26 13 2–20 14 2–26 15 24–60 16 32–68 50 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) 2 At each node mentioned in table 2, column 1, the 50% daily flow exceedence stated for each month for the node should be equalled or exceeded between 32% and 68% of the total number of days in the month in the simulation period. Table 2 17 2–38 18 6–42 19 40–76 Column 1 Column 2 Node 50% daily flow exceedence (ML/day) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec 1 1313 1519 1154 583 315 280 255 154 137 212 370 789 2 976 1108 828 403 208 208 195 109 101 140 244 621 3 520 539 408 157 72 75 60 25 22 50 109 305 4 185 214 211 130 77 84 74 49 51 64 69 143 5 126 144 126 84 59 63 59 45 45 54 59 102 6 124 133 92 33 13 14 12 6 6 15 28 65 7 23 24 16 9 6 6 6 4 4 6 7 18 8 4 12 4 0 0 0 0 0 0 0 0 0 9 78 117 102 44 26 23 17 4 3 5 16 46 10 1 3 2 1 0 0 0 0 0 0 0 1 11 518 780 585 326 201 167 135 87 58 73 117 218 12 359 550 423 242 158 135 125 82 57 68 100 167 13 44 60 62 53 41 38 34 25 21 20 19 23 14 21 33 36 31 22 20 18 14 12 11 10 12 15 24 49 49 23 12 7 4 1 0 0 0 2 16 9 20 20 7 4 2 1 0 0 0 0 1 Column 1 Column 2 51 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) 3 At each node mentioned in table 3, column 1, the 90% daily flow exceedence stated for each month for the node should be equalled or exceeded between 72% and 100% of the total number of days in the month in the simulation period. Table 3 17 22 35 30 16 9 7 7 4 3 3 5 12 18 18 28 24 13 7 6 6 3 2 2 4 10 19 0 3 4 3 1 2 2 0 0 0 0 0 Column 1 Column 2 Node 90% daily flow exceedence (ML/day) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec 1 173 191 163 73 49 38 28 23 13 15 28 132 2 92 110 76 28 19 17 16 12 9 11 15 71 3 18 35 16 4 1 3 2 1 0 0 1 16 4 23 19 17 11 10 9 10 7 6 8 9 11 5 12 12 15 12 10 9 9 7 7 8 9 10 6 4 8 4 2 1 1 1 0 0 0 1 2 7 2 2 3 1 1 1 1 0 0 0 1 1 8 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 11 14 57 58 18 6 5 2 0 0 0 0 2 12 11 40 41 12 5 5 3 1 0 0 1 3 13 3 4 9 10 13 12 11 9 7 4 3 2 14 0 0 3 4 4 5 4 4 3 2 1 0 15 0 0 0 0 0 0 0 0 0 0 0 0 Column 1 Column 2 Node 50% daily flow exceedence (ML/day) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec 52 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) 4 At each node mentioned in table 4, column 1— (a) low flow exceedence duration (10cm above cease-to-flow) should be between the minimum and maximum percentages stated for the node in column 2; and (b) low flow exceedence duration (30cm above cease-to-flow) should be between the minimum and maximum percentages stated for the node in column 3. Table 4 16 0 0 0 0 0 0 0 0 0 0 0 0 17 2 4 4 2 0 0 0 0 0 0 0 0 18 1 3 3 1 0 0 0 0 0 0 0 0 19 0 0 0 0 0 0 0 0 0 0 0 0 Column 1 Column 2 Column 3 Node Min–Max% Min–Max% 2 76–98 52–88 3 64–98 35–71 4 76–98 36–72 5 76–98 32–68 6 54–90 24–60 7 66–98 7–43 8 15–51 3–39 9 48–84 22–58 10 18–54 2–31 14 70–98 2–37 16 28–64 2–31 Column 1 Column 2 Node 90% daily flow exceedence (ML/day) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec 53 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) 5 At each node mentioned in table 5, column 1— (a) the number of periods of no flow of at least 1 month in the simulation period should be between the minimum and maximum number stated for the node in column 2; and (b) the number of periods of no flow of at least 3 months in the simulation period should be between the minimum and maximum number stated for the node in column 3; and (c) the number of periods of no flow of at least 6 months in the simulation period should be between the minimum and maximum number stated for the node in column 4; and (d) the number of periods of no flow of at least 9 months in the simulation period should be between the minimum and maximum number stated for the node in column 5. Table 5 18 50–86 2–30 19 16–52 2–25 Column 1 Column 2 Column 3 Column 4 Column 5 Node Min–Max Min–Max Min–Max Min–Max 1 0–2 0–0 0–0 0–0 2 0–5 0–2 0–0 0–0 3 11–33 0–3 0–0 0–0 4 2–6 0–2 0–0 0–0 5 0–0 0–0 0–0 0–0 6 25–72 2–6 0–0 0–0 7 18–53 2–6 0–0 0–0 Column 1 Column 2 Column 3 54 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) Part 2 Medium to high flow objectives 1.(1) At each node mentioned in table 6, column 1— (a) the annual proportional flow deviation (APFD) must be less than the APFD stated for the node in column 2; and (b) the mean annual flow, expressed as a percentage of the mean annual flow for the pre-development flow sequence, must be at least the percentage stated for the node in column 3; and (c) the 1.5 year average recurrence interval daily flow volume (1.5 year ARI), expressed as a percentage of the 1.5 year ARI for the pre-development flow sequence, must be at least the percentage stated for the node in column 4; and (d) the 5 year average recurrence interval daily flow volume (5 year ARI), expressed as a percentage of the 5 year ARI for the pre-development flow sequence, must be at least the percentage stated for the node in column 5; and (e) the 20 year average recurrence interval daily flow volume (20 year ARI), expressed as a percentage of the 20 year ARI for the pre-development flow sequence, must be at least the percentage stated for the node in column 6. 8 109–315 26–75 8–24 4–12 9 50–145 3–9 0–2 0–0 10 104–300 7–20 0–2 0–0 11 9–25 0–0 0–0 0–0 12 8–23 0–3 0–3 0–0 19 100–289 38–109 15–45 6–18 Column 1 Column 2 Column 3 Column 4 Column 5 55 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) (2) Also, at each node mentioned in table 6, column 1— (a) the extent to which the APFD is more than 2 should be minimised; and (b) the extent to which the mean annual flow expressed as a percentage of the mean annual flow for the pre-development flow sequence is less than 81% should be minimised; and (c) the extent to which the 1.5 year ARI expressed as a percentage of the 1.5 year ARI for the pre-development flow sequence is less than 74% should be minimised; and (d) the extent to which the 5 year ARI expressed as a percentage of the 5 year ARI for the pre-development flow sequence is less than 71% should be minimised; and (e) the extent to which the 20 year ARI expressed as a percentage of the 20 year ARI for the pre-development flow sequence is less than 82% should be minimised. Table 6 Column 1 Node Column 2 APFD Column 3 Mean annual flow % Column 4 1.5 year ARI % Column 5 5 year ARI % Column 6 20 year ARI % 1 2.2 72 52 71 82 2 2.1 81 74 71 82 3 2.0 81 71 71 82 4 2.0 79 74 71 82 5 2.7 62 51 62 71 6 2.9 69 37 52 63 7 2.0 81 69 71 82 8 0.1 99 99 100 100 9 2.3 81 66 71 82 56 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) 2 The flow regime class at each node must be maintained as ‘late summer’ flow regime class. 3 At each of the following nodes the mean wet season flow, expressed as a percentage of the mean wet season flow for the pre-development flow sequence, must be at least the percentage stated for the node— (a) node 1—79%; (b) node 11—77%; (c) node 13—90%; (d) node 15—97%; (e) node 17—99%. 10 2.3 75 66 56 80 11 2.0 76 72 70 58 12 2.1 78 67 69 66 13 1.1 85 74 100 100 14 1.0 87 85 100 100 15 0.4 96 95 100 100 16 0.1 99 99 100 100 17 0.2 98 99 100 100 18 0.1 99 99 100 100 19 2.0 81 74 71 82 Column 1 Node Column 2 APFD Column 3 Mean annual flow % Column 4 1.5 year ARI % Column 5 5 year ARI % Column 6 20 year ARI % 57 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) Part 3 Groundwater-dependent ecosystem objectives 1 The simulated average coastal submarine groundwater discharge for a groundwater sub-area mentioned in table 7, column 2, is at least the volume stated in column 3 of the table for the groundwater sub-area. Table 7 2 At each node mentioned in table 8, column 1— (a) minimise the extent to which the simulated average depth to the watertable is more than the distance stated for the node in column 2 of the table; and (b) the simulated average depth to the watertable is not more than the distance stated for the node in column 3 of the table; and (c) minimise the extent to which the simulated depth to the watertable is more than the distance stated for the node in column 3 of the table in the simulation period; and (d) any period, expressed as a percentage of the simulation period for groundwater, for which the simulated depth to the watertable is more than the distance stated for the node in column 3 of the table is not more than the percentage stated in column 4 of the table for the node. Column 1 Column 2 Column 3 Groundwater unit Groundwater sub-area Volume (ML) Upper Kolan-Burnett 8600 Upper Burnett-Elliott 1800 Upper Elliott-Gregory 4200 Lower Fairymead 3800 58 Water Resource (Burnett Basin) Plan 2000 Schedule 5 (continued) Table 8 Column 1 Column 2 Column 3 Column 4 Groundwater node distance (m) Maximum distance (m) Percentage of simulation period 20 2.94 3.69 1.00 21 9.10 10.85 0 22 8.19 9.94 0 23 3.69 4.44 0 24 2.49 3.24 0 25 4.50 5.75 0 26 13.60 15.35 0 27 2.89 3.64 0.33 28 2.39 4.14 0.50 29 1.89 3.64 2.50 30 15.89 17.64 0 31 10.24 11.99 0 32 5.01 6.26 7.08 33 3.39 4.14 8.33 34 0.96 1.71 8.42 35 2.13 2.88 0 36 2.00 2.50 8.58 37 6.37 6.87 0 38 2.00 2.50 0 39 2.00 2.50 0 40 2.00 2.50 0 41 6.49 6.99 2.83 42 2.00 2.50 0 59 Water Resource (Burnett Basin) Plan 2000 Schedule 6 Water allocation security objectives section 23 Part 1 Supplemented water 1 For water allocations in a high priority group in a water project area— (a) the supplemented water sharing index must be at least 95%; and (b) the extent to which the supplemented water sharing index is less than 100% should be minimised. 2(1) For water allocations in a medium priority group in the following water project areas, the supplemented water sharing index for the allocations must be at least the percentage stated for the area— (a) Barker–Barambah water project area—85%; (b) Boyne River water project area—73%; (c) Bundaberg water project area—90%; (d) Upper Burnett water project area—90%. (2) Also, for water allocations in a medium priority group in the following water project areas, the extent to which the supplemented water sharing index for the allocations is less than the percentage stated for the area should be minimised— (a) Barker–Barambah water project area—90%; (b) Boyne River water project area—90%; (c) Bundaberg water project area—95%; (d) Three Moon Creek water project area—90%; (e) Upper Burnett water project area—95%. 60 Water Resource (Burnett Basin) Plan 2000 Schedule 6 (continued) Part 2 Unsupplemented water 1 For all water allocations for taking unsupplemented water in a subcatchment area mentioned in table 1, column 1, the 30% unsupplemented water sharing index must be more than— (a) for the group of allocations converted from authorisations that stated the areas that may be irrigated—the percentage stated in table 1, column 2, for the subcatchment area; and (b) for the group of other allocations—the percentage stated in table 1, column 3, for the subcatchment area. Table 1 Column 1 Column 2 Column 3 Subcatchment area % % A 111 113 B 107 108 C 113 106 D 113 127 E 116 114 F 113 110 G 104 105 H 105 131 I 111 118 J 106 114 K 107 114 L 110 111 M 107 107 N 108 111 O 106 112 61 Water Resource (Burnett Basin) Plan 2000 Schedule 6 (continued) 2 For all water allocations for taking unsupplemented water in a subcatchment area mentioned in table 2, column 1, the 50% unsupplemented water sharing index must be more than— (a) for the group of allocations converted from authorisations that stated the areas that may be irrigated—the percentage stated in table 2, column 2, for the subcatchment area; and (b) for the group of other allocations—the percentage stated in table 2, column 3, for the subcatchment area. Table 2 P 106 136 Q 117 118 R 109 113 S 106 112 Column 1 Column 2 Column 3 Subcatchment area % % A 94 96 B 95 92 C 96 95 D 96 92 E 97 91 F 96 91 G 97 97 H 95 107 I 96 106 Column 1 Column 2 Column 3 Subcatchment area % % 62 Water Resource (Burnett Basin) Plan 2000 Schedule 6 (continued) 3 For all water allocations for taking unsupplemented water in a subcatchment area mentioned in table 3, column 1, the 70% unsupplemented water sharing index must be more than— (a) for the group of allocations converted from authorisations that stated the areas that may be irrigated—the percentage stated in table 3, column 2, for the subcatchment area; and (b) for the group of other allocations—the percentage stated in table 3, column 3, for the subcatchment area. Table 3 J 97 103 K 98 96 L 98 101 M 99 97 N 98 102 O 97 101 P 98 110 Q 101 94 R 100 97 S 97 101 Column 1 Column 2 Column 3 Subcatchment area % % A 77 82 B 81 74 C 82 87 Column 1 Column 2 Column 3 Subcatchment area % % 63 Water Resource (Burnett Basin) Plan 2000 Schedule 6 (continued) Part 3 Groundwater in the Coastal Burnett groundwater management area For water allocations for taking groundwater in a groundwater sub-area mentioned in table 4, column 1— D 74 62 E 76 80 F 80 81 G 87 86 H 89 62 I 82 80 J 86 83 K 88 83 L 78 91 M 84 85 N 89 88 O 84 89 P 86 46 Q 82 84 R 87 85 S 84 89 Column 1 Column 2 Column 3 Subcatchment area % % 64 Water Resource (Burnett Basin) Plan 2000 Schedule 6 (continued) (a) the simulated nominal volume is not more than the volume stated in column 2 of the table for the groundwater sub-area; and (b) the simulated nominal volume probability is at least the percentage stated in column 3 of the table for the groundwater sub-area. Table 4 Column 1 Column 2 Column 3 Groundwater sub-area Simulated nominal volume Simulated nominal volume probability—% Kolan-Burnett 20125 55 Burnett-Elliott 25139 52 Elliott-Gregory 4555 56 Farnsfield 1644 54 Fairymead 13362 61 65 Water Resource (Burnett Basin) Plan 2000 Schedule 7 Rates and pump sizes section 31(b) Pump size (mm) Rate (ML/day) 32 0.69 40 1.05 50 2.2 65 4.0 80 5.6 100 8.2 125 10.0 150 12.9 200 19.0 250 25.9 300 30.0 350 35.0 375 to 400 43.2 450 55.0 500 65.8 600 to 610 86.4 660 132 800 184 66 Water Resource (Burnett Basin) Plan 2000 Schedule 8 Volumes for simulated mean annual diversions section 32(2) and (3) Column 1 Column 2 Column 3 Subcatchment ML ML A 3560 990 B 1130 200 C 11200 2480 D 7240 2290 E 3730 1530 F 1230 90 G 2980 1180 H 3500 9410 I 3490 730 J 6560 1580 K 5290 5260 L 400 2150 M 1530 140 N 905 2680 O 440 2130 P 192 1790 Q 1090 900 R 600 1200 S 10 10 67 Water Resource (Burnett Basin) Plan 2000 Schedule 9 Dictionary section 3 1.5 year average recurrence interval daily flow volume means the daily flow volume that has a 67% probability of being reached at least once a year. 5 year average recurrence interval daily flow volume means the daily flow volume that has a 20% probability of being reached at least once a year. 20 year average recurrence interval daily flow volume means the daily flow volume that has a 5% probability of being reached at least once a year. 30% unsupplemented water sharing index, for a group of water allocations for taking unsupplemented water in a subcatchment area, means— (a) for the group of allocations in the subcatchment area converted from authorisations that stated the areas that may be irrigated—the percentage of the simulated mean annual diversion, for all those allocations, calculated to occur in at least 30% of years in the simulation period; and (b) for the group of other allocations in the subcatchment area—the percentage of the simulated mean annual diversion, for all those allocations, calculated to occur in at least 30% of years in the simulation period. 50% daily flow exceedence, for a month, means the flow, in megalitres, that is equalled or exceeded on 50% of days in the month in the simulation period. 50% unsupplemented water sharing index, for a group of water allocations for taking unsupplemented water in a subcatchment area, means— (a) for the group of allocations in the subcatchment area converted from authorisations that stated the areas that may be irrigated—the percentage of the simulated mean annual diversion, for all those allocations, calculated to 68 Water Resource (Burnett Basin) Plan 2000 Schedule 9 (continued) occur in at least 50% of years in the simulation period; and (b) for the group of other allocations in the subcatchment area—the percentage of the simulated mean annual diversion, for all those allocations, calculated to occur in at least 50% of years in the simulation period. 70% unsupplemented water sharing index, for a group of water allocations for taking unsupplemented water in a subcatchment area, means— (a) for the group of allocations in the subcatchment area converted from authorisations that stated the areas that may be irrigated—the percentage of the simulated mean annual diversion, for all those allocations, calculated to occur in at least 70% of years in the simulation period; and (b) for the group of other allocations in the subcatchment area—the percentage of the simulated mean annual diversion, for all those allocations, calculated to occur in at least 70% of years in the simulation period. 90% daily flow exceedence, for a month, means the flow, in megalitres, that is equalled or exceeded on 90% of days in the month in the simulation period. affected by seawater intrusion means the arithmetic mean of electrical conductivity at particular depths in an aquifer is more than 2500µS/cm. AMTD means the adopted middle thread distance which is the distance in kilometres, measured along the middle of a watercourse, that a specific point in the watercourse is from the watercourse’s mouth or junction with the main watercourse. annual proportional flow deviation means the statistical measure of changes to flow season and volume in the simulation period calculated using the formula for annual proportional flow deviation described in Technical Report 5 of ‘Fitzroy Basin Water Allocation and Management Planning Technical Reports’ published by the department. 69 Water Resource (Burnett Basin) Plan 2000 Schedule 9 (continued) authorisation means a licence, permit or other authority to take water given under the Act or the repealed Act, other than a permit for stock or domestic purposes. Coastal Burnett groundwater management area see section 18A. Coastal Burnett groundwater project numerical groundwater flow model means the department’s computer model developed using the code MODFLOW that simulates movement of water below the surface of the land. commencement means the commencement of this plan. compensation flow objective means an objective that may be expressed as a performance indicator for the provision of water releases from a dam for stock or domestic purposes downstream of the dam. dewatering purposes means— (a) draining, either permanently or temporarily, overland flow water from land; or (b) removing groundwater from soils or sediments that are waterlogged. extension area— 1 The extension area is the part of the Coastal Burnett groundwater management area that, at the commencement of this definition, is not in the Bundaberg subartesian area. 2 For item 1, the Bundaberg subartesian area is the Bundaberg subartesian area on plan AP10062, declared to be a subartesian area under the Water Regulation 2002, section 102. fish habitat area means an area that is declared to be a fish habitat area under the Fisheries Act 1994. flow regime class means the measure of flow regime seasonality worked out using the method stated in Haines, A.T., Finlayson, B.L. and McMahon, T.A., ‘A global classification of river regimes. Applied Geography, 1988’. 70 Water Resource (Burnett Basin) Plan 2000 Schedule 9 (continued) groundwater means underground water. groundwater-dependent ecosystem objectives see section 20A. groundwater-dependent ecosystems means ecosystems affected by the permanent or temporary presence of groundwater. groundwater sub-area means a groundwater sub-area under section 18B(2) or (3). groundwater unit see section 18B(1). instructional seawater intrusion model means the department’s computer model developed using the code MODHMS that simulates movement of water and transfer of dissolved salts below the surface of the land. IQQM computer program means the department’s Integrated Quantity and Quality Modelling computer program, and associated statistical analysis and reporting programs, that simulate daily streamflows, flow management, storages, releases, instream infrastructure, water diversions, water demands and other hydrologic events in the plan area. licence means— (a) a water licence; or (b) a licence under the Water Resources Act 1989. lower groundwater unit means the lower groundwater unit under section 18B(1)(b). low flow exceedence duration (10cm above cease-to-flow) for a watercourse, means the percentage of the total number of days in the simulation period that the watercourse’s daily flow is at least 10cm above the cease-to-flow level in the watercourse. low flow exceedence duration (30cm above cease-to-flow) for a watercourse, means the percentage of the total number of days in the simulation period that the watercourse’s daily flow is at least 30cm above the cease-to-flow level in the watercourse. 71 Water Resource (Burnett Basin) Plan 2000 Schedule 9 (continued) mean annual flow means the total volume of flow in the simulation period divided by the number of years in the simulation period. mean wet season flow means the total volume of flow during the months of January to March in the simulation period divided by the number of years in the simulation period. megalitre means 1 million litres. ML means megalitre. node see section 18. permit means— (a) a water permit; or (b) a permit under section 56 or 57 of the Water Resources Act 1989. plan area means the area shown as the plan area on the map in schedule 1. plan area map means the map in schedule 1. pre-development flow sequence means the stream flows calculated using the IQQM computer program for the simulation period as if— (a) there were no dams or other water infrastructure in the plan area; and (b) no water was taken under licences or permits in the plan area. resource operations plan means the resource operations plan to implement this plan. seawater intrusion means movement of sea water inland into aquifers that contain freshwater. seawater intrusion objective see section 20C. simulated average area affected by seawater intrusion means the area affected by seawater intrusion simulated by the instructional seawater intrusion model for the simulation period for groundwater divided by the number of months in the simulation period. 72 Water Resource (Burnett Basin) Plan 2000 Schedule 9 (continued) simulated average coastal submarine groundwater discharge means the total simulated groundwater discharge to the coast in the simulation period for groundwater divided by the number of months in the simulation period. simulated average depth to the watertable means the sum of the simulated vertical distances from the surface of the land to the watertable in the simulation period for groundwater divided by the number of months in the simulation period. simulated depth to the watertable means the simulated vertical distance from the surface of the land to the watertable. simulated mean annual diversion, for authorisations to take water in a subcatchment area, means the total volume of water taken in the subcatchment area under the authorisations in the simulation period divided by the number of years in the simulation period. simulated nominal volume, for water allocations to take groundwater in a groundwater sub-area, means the total volume of water taken under the water allocations in the groundwater sub-area in the simulation period for groundwater, calculated monthly, divided by the number of years in the simulation period. simulated nominal volume probability, for water allocations to take groundwater in a groundwater sub-area, means the percentage of the number of years in the simulation period for groundwater, calculated for the water allocations in the groundwater sub-area, in which the nominal volumes for the water allocations are simulated to be fully supplied. simulation period means the period— (a) for surface water—from 1 July 1890 to 30 June 1997; or (b) for groundwater—from 1 January 1905 to 31 December 2004. subcatchment area see section 17(1). submarine groundwater discharge means the flow of water on continental margins from the sea bed to the ocean at the coast. 73 Water Resource (Burnett Basin) Plan 2000 Schedule 9 (continued) submarine groundwater discharge system means a coastal ocean ecosystem, including, for example, estuarine systems and seagrass communities, that depends on submarine groundwater discharge from terrestrial freshwater. supplemented water means surface water supplied under an interim resource operations licence, resource operations licence or other authority to operate infrastructure. supplemented water sharing index, for water allocations in a particular priority group in a water project area, means the median of the percentages of the number of months in the simulation period, calculated for each water allocation in the priority group in the area, in which the allocations are simulated to be fully supplied. surface water see section 5(1). unsupplemented water means surface water that is not supplemented water. upper groundwater unit means the upper groundwater unit under section 18B(1)(a). waterhole means a part of a watercourse that contains water after the watercourse ceases to flow, other than a part of a watercourse that is within the storage area of a dam on the watercourse. water infrastructure operator means the holder of— (a) an interim resource operations licence; or (b) a resource operations licence; or (c) another authority to operate water infrastructure for the management of water in a water project area. water project area see section 16(1). works replacing works means works that, in relation to the works being replaced, are a replacement bore within the meaning of the Code for Self-assessable Development of Replacement Bores. Editor’s note— A copy of the code is available on the department’s website. 74 Water Resource (Burnett Basin) Plan 2000 Endnotes 1 Index to endnotes Page 2 Date to which amendments incorporated . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74 3 Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74 4 Table of reprints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75 5 Tables in earlier reprints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75 6 List of legislation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75 7 List of annotations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .76 2 Date to which amendments incorporated This is the reprint date mentioned in the Reprints Act 1992, section 5(c). Accordingly, this reprint includes all amendments that commenced operation on or before 18 December 2009. Future amendments of the Water Resource (Burnett Basin) Plan 2000 may be made in accordance with this reprint under the Reprints Act 1992, section 49. 3 Key Key to abbreviations in list of legislation and annotations Key Explanation Key Explanation AIA = Acts Interpretation Act 1954 (prev) = previously amd = amended proc = proclamation amdt = amendment prov = provision ch = chapter pt = part def = definition pubd = published div = division R[X] = Reprint No. [X] exp = expires/expired RA = Reprints Act 1992 gaz = gazette reloc = relocated hdg = heading renum = renumbered ins = inserted rep = repealed lap = lapsed (retro) = retrospectively notfd = notified rv = revised edition num = numbered s = section o in c = order in council sch = schedule om = omitted sdiv = subdivision orig = original SIA = Statutory Instruments Act 1992 p = page SIR = Statutory Instruments Regulation 2002 para = paragraph SL = subordinate legislation prec = preceding sub = substituted pres = present unnum = unnumbered prev = previous 75 Water Resource (Burnett Basin) Plan 2000 4 Table of reprints Reprints are issued for both future and past effective dates. For the most up-to-date table of reprints, see the reprint with the latest effective date. If a reprint number includes a letter of the alphabet, the reprint was released in unauthorised, electronic form only. 5 Tables in earlier reprints 6 List of legislation Water Resource (Burnett Basin) Plan 2000 SL No. 359 approved by the Governor in Council on 14 December 2000 notfd gaz 15 December 2000 pp 1478–83 commenced on date of notification exp 1 September 2011 (see SIA s 54) Note—The expiry date may have changed since this reprint was published. See the latest reprint of the SIR for any change. amending legislation— Water Infrastructure Development (Burnett Basin) Act 2001 No. 32 (this Act is amended, see amending legislation below) date of assent 19 December 2001 commenced on date of assent amending legislation— Reprint No. Amendments to Effective Reprint date 1 none 15 December 2000 15 January 2001 1A 2001 Act No. 32 (amd 2001 Act No. 101) 7 June 2001 11 January 2002 Reprint No. Amendments included Effective Notes 1B rv 2005 SL No. 264 4 November 2005 1C rv 2006 SL No. 49 31 March 2006 1D 2007 SL No. 298 30 November 2007 R1D withdrawn, see R2 2 — 30 November 2007 2A 2009 SL No. 280 18 December 2009 Name of table Reprint No. Corrected minor errors 1 76 Water Resource (Burnett Basin) Plan 2000 Water Infrastructure Development (Burnett Basin) Amendment Act 2001 No. 101 (amends 2001 No. 32 above) date of assent 19 December 2001 commenced on date of assent Water Resource (Burnett Basin) Amendment Plan (No. 1) 2005 SL No. 264 notfd gaz 4 November 2005 pp 869–70 commenced on date of notification Note—An explanatory note was prepared Water Resource (Great Artesian Basin) Plan 2006 SL No. 49 s 1, pt 7 div 2 notfd gaz 31 March 2006 pp 1282–5 commenced on date of notification Note—An explanatory note was prepared Water Resource (Burnett Basin) Amendment Plan (No. 1) 2007 SL No. 298 notfd gaz 30 November 2007 pp 1824–6 commenced on date of notification Note—An explanatory note was prepared Sustainable Planning Regulation 2009 SL No. 280 ss 1–2, pt 9 div 34 notfd gaz 27 November 2009 pp 1001–6 ss 1–2 commenced on date of notification remaining provisions commenced 18 December 2009 (see s 2) 7 List of annotations Water to which plan applies s 5 sub 2006 SL No. 49 s 46 amd 2007 SL No. 298 s 3 General outcomes s 6 amd 2005 SL No. 264 s 4; 2007 SL No. 298 s 4 Ecological outcomes for plan area s 7 amd 2007 SL No. 298 s 5 Burnett River basin and Burnett River s 11 amd 2001 No. 32 s 10B (as ins 2001 No. 101 s 4) Coastal Burnett groundwater management area s 13A ins 2007 SL No. 298 s 6 Subdivision 1—Assessing consistency with objectives sdiv 1 (ss 14–15) sub 2007 SL No. 298 s 7 Nodes s 18 amd 2007 SL No. 298 s 8 Subdivision 3—Groundwater units and groundwater sub-areas for Coastal Burnett groundwater management area sdiv 3 (ss 18A–18C) ins 2007 SL No. 298 s 9 77 Water Resource (Burnett Basin) Plan 2000 Subdivision 1—Surface water sdiv hdg ins 2007 SL No. 298 s 10 Objectives s 19 amd 2007 SL No. 298 s 11 Performance indicators s 20 amd 2007 SL No. 298 s 12 Subdivision 2—Groundwater sdiv 2 (ss 20A–20D) ins 2007 SL No. 298 s 13 Objectives s 23 amd 2005 SL No. 264 ss 3, 4; 2007 SL No. 298 s 14 Performance indicators s 24 amd 2005 SL No. 264 ss 3, 4; 2007 SL No. 298 s 15 Division 1—General strategies for achieving outcomes div hdg ins 2007 SL No. 298 s 16 Decisions about managing or allocating water s 25 amd 2007 SL No. 298 s 17 Matters chief executive must consider s 26 amd 2005 SL No. 264 s 4; 2007 SL No. 298 s 18 Division 2—Strategies for achieving outcomes (surface water) div hdg ins 2007 SL No. 298 s 19 Division 3—Strategies for achieving outcomes (groundwater) div hdg ins 2007 SL No. 298 s 20 Decision not to increase amount of groundwater taken in Coastal Burnett groundwater management area s 30A ins 2007 SL No. 298 s 20 Restriction on taking or interfering with groundwater s 30B ins 2007 SL No. 298 s 20 Taking or interfering with groundwater, other than for stock or domestic purposes, using existing works in extension area s 30C ins 2007 SL No. 298 s 20 Taking groundwater for stock or domestic purposes using existing works s 30D ins 2007 SL No. 298 s 20 Restriction on taking groundwater for stock or domestic purposes using new works s 30E ins 2007 SL No. 298 s 20 Relationship with Sustainable Planning Act 2009 prov hdg amd 2009 SL No. 280 s 160(1) s 30F ins 2007 SL No. 298 s 20 amd 2009 SL No. 280 s 160(2)–(3) Division 4—Authorisations and water allocations div hdg ins 2007 SL No. 298 s 21 78 Water Resource (Burnett Basin) Plan 2000 Subdivision 1—Surface water sdiv hdg ins 2007 SL No. 298 s 21 Maximum daily rates for taking surface water prov hdg amd 2007 SL No. 298 s 22(1) s 31 amd 2007 SL No. 298 s 22(2) Annual volumes of surface water that may be taken prov hdg amd 2007 SL No. 298 s 23(1) s 32 amd 2005 SL No. 264 s 3; 2007 SL No. 298 s 23(2) Authorisation to take surface water converted to water allocation prov hdg sub 2007 SL No. 298 s 24(1) s 34 amd 2005 SL No. 264 s 3; 2007 SL No. 298 s 24(2) Subdivision 2—Groundwater sdiv 2 (ss 34A–34C) ins 2007 SL No. 298 s 25 Division 5—Miscellaneous div hdg ins 2007 SL No. 298 s 26 Unallocated water in plan area s 37 amd 2007 SL No. 298 s 27 Continued effect of moratorium notice—Act, s 46(3) s 37A ins 2007 SL No. 298 s 28 Division 6—Implementing this plan div hdg ins 2007 SL No. 298 s 29 Amending resource operations plan s 39A ins 2007 SL No. 298 s 30 Division 1—Surface water div hdg ins 2007 SL No. 298 s 31 Monitoring for surface water prov hdg sub 2007 SL No. 298 s 32(1) s 40 amd 2007 SL No. 298 s 32(2) Division 2—Groundwater div 2 (s 42A) ins 2007 SL No. 298 s 33 Minor amendment of plan—Act, s 57 s 44 amd 2007 SL No. 298 s 34 SCHEDULE 2—WATER PROJECT AREAS Barker–Barambah water project area s 1 amd 2005 SL No. 264 s 5(1) Boyne River water project area s 2 amd 2005 SL No. 264 s 5(2) Bundaberg water project area s 3 amd 2005 SL No. 264 s 5(3)–(4) Three Moon Creek water project area s 4 amd 2005 SL No. 264 s 5(5) 79 Water Resource (Burnett Basin) Plan 2000 Upper Burnett water project area s 5 amd 2005 SL No. 264 s 5(6)–(7) SCHEDULE 4—NODES sch hdg sub 2007 SL No. 298 s 35(1) sch 4 amd 2007 SL No. 298 s 35(2) SCHEDULE 4A—COASTAL BURNETT GROUNDWATER MANAGEMENT AREA ins 2007 SL No. 298 s 36 SCHEDULE 4B—GROUNDWATER SUB-AREAS FOR UPPER GROUNDWATER UNIT ins 2007 SL No. 298 s 36 SCHEDULE 4C—GROUNDWATER SUB-AREA FOR LOWER GROUNDWATER UNIT ins 2007 SL No. 298 s 36 SCHEDULE 5—ENVIRONMENTAL FLOW OBJECTIVES amd 2001 No. 32 s 10C (as ins 2001 No. 101 s 4); 2007 SL No. 298 s 37 SCHEDULE 6—WATER ALLOCATION SECURITY OBJECTIVES amd 2005 SL No. 264 ss 3, 4; 2007 SL No. 298 s 38 SCHEDULE 7—RATES AND PUMP SIZES amd 2005 SL No. 264 s 6 SCHEDULE 8—VOLUMES FOR SIMULATED MEAN ANNUAL DIVERSIONS amd 2007 SL No. 298 s 39 SCHEDULE 9—DICTIONARY def “30% unsupplemented water sharing index” amd 2005 SL No. 264 s 4 def “50% unsupplemented water sharing index” amd 2005 SL No. 264 s 4 def “70% unsupplemented water sharing index” amd 2005 SL No. 264 s 4 def “affected by seawater intrusion” ins 2007 SL No. 298 s 40(2) def “Coastal Burnett groundwater management area” ins 2007 SL No. 298 s 40(2) def “Coastal Burnett groundwater project numerical groundwater flow model” ins 2007 SL No. 298 s 40(2) def “dewatering purposes” ins 2007 SL No. 298 s 40(2) def “extension area” ins 2007 SL No. 298 s 40(2) def “groundwater” ins 2007 SL No. 298 s 40(2) def “groundwater-dependent ecosystem objectives” ins 2007 SL No. 298 s 40(2) def “groundwater-dependent ecosystems” ins 2007 SL No. 298 s 40(2) def “groundwater sub-area” ins 2007 SL No. 298 s 40(2) def “groundwater unit” ins 2007 SL No. 298 s 40(2) def “instructional seawater intrusion model” ins 2007 SL No. 298 s 40(2) def “lower groundwater unit” ins 2007 SL No. 298 s 40(2) def “plan area” ins 2007 SL No. 298 s 40(2) def “regulated water” om 2005 SL No. 264 s 7(1) def “resource operations plan” ins 2007 SL No. 298 s 40(2) def “seawater instrusion” ins 2007 SL No. 298 s 40(2) 80 Water Resource (Burnett Basin) Plan 2000 def “seawater instrusion objective” ins 2007 SL No. 298 s 40(2) def “simulated average area affected by seawater instrusion” ins 2007 SL No. 298 s 40(2) def “simulated average coastal submarine groundwater discharge” ins 2007 SL No. 298 s 40(2) def “simulated average depth to the watertable” ins 2007 SL No. 298 s 40(2) def “simulated depth to the watertable” ins 2007 SL No. 298 s 40(2) def “simulated nominal volume” ins 2007 SL No. 298 s 40(2) def “simulated nominal volume probability” ins 2007 SL No. 298 s 40(2) def “simulation period” amd 2005 SL No. 264 s 7(3) sub 2007 SL No. 298 s 40(1)–(2) def “submarine groundwater discharge” ins 2007 SL No. 298 s 40(2) def “submarine groundwater discharge system” ins 2007 SL No. 298 s 40(2) def “supplemented water” ins 2005 SL No. 264 s 7(2) amd 2007 SL No. 298 s 40(3) def “supplemented water sharing index” amd 2005 SL No. 264 s 3 def “surface water” ins 2007 SL No. 298 s 40(2) def “unregulated water” om 2005 SL No. 264 s 7(1) def “unsupplemented water” ins 2005 SL No. 264 s 7(2) amd 2007 SL No. 298 s 40(4) def “upper groundwater unit” ins 2007 SL No. 298 s 40(2) def “works replacing works” ins 2007 SL No. 298 s 40(2) © State of Queensland 2010